Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 86 COMPASS POINT ROAD 4/30/2018
Date.. .11.4!.� .. TOWN OF NORTH ANDOVER PERMIT FOR PLUMBING This certifies that 1..:...... ......... ................. I ................................................... has permission to perform ...... k\4�.. f:.? ...... plumbing in tpe buildings 'z' -V — ................................... J"*"*****"********* .............. at ......Y') .. y ...... ................ North Andover, Mass. Fee 47.6?........ Lic ............. ........................................................ . No. 1�.JJJ. PLUMBING INSPECTOR Check It f.N– up, TYPE OR PRINT CLEARLY MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK CITY NORTH ANDOVER, _ , MA. DATE 3-11-14 PERMIT # -tUll— JOBSITE ADDRESS 86 COMPASS POINT OWNER'S NAME TRUST CONSTRUCTION OWNER ADDRESS: 1,51 MT JOY DRIVE TEL: 15083209337 FAX: OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑■ NEW: ❑■ RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES -1 FLOORS- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB 2 CROSS CONN DEVICE DEDICATED SPECIAL WASTE SYS DEDICATED GAS/OIUSAND SYS DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYS DEDICATED WATER REUSE SYS DISHWASHER 1 DRINKING FOUNTAIN FOOD WASTE GRINDER UNIT FLOOR /AREA DRAIN INTERCEPTOR INTERIOR KITCHEN SINK LAVATORY 3 ROOF DRAIN SHOWER STALL 1 SERVICE / MOP SINK TOILET 1 2 URINAL WASHING MACHINE CONNECTION 1 WATER HEATER ALL TYPES 1 WATER PIPING 1 SPIGOTS 2 INSURANCE COVERAGE I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY N OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT I hereby certify that all of the details and information I have submitted (or entered) regarding this application ar and accuratK94he best of my Knowledge and that all plumbing work and installations performed under the permit issued for this applicati will a in7�r th all Pertinent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER NAME: MIKE BURKE _ LICENSE # 113127 SI RE COMPANY NAME: I POWERHOUSE PLUMBING AND HEATING CORP 1 ADDRESS: I PO BOX 196 CITY: I PLAISTOW STATE: NH ZIP: 1-03865---,-- FAX:6033780040 TEL: I 16033780020 _ _ __ CELL: 1,19744909385 EMAIL: J.LAURENCIO@POWERHOUSEPLUMBING.COM MASTER F0 JOURNEYMAN ❑ CORPORATION ❑■ # 2482 PARTNERSHIP ❑ # 0 LLC ❑ # W F O z z 0 p U W a z a Q z w , . . . . . . . . . . . . . . . . . . .. oEl Z Z O w r� W 0 z Au LU o a a W� Chi W w 3 co 0 o aa. a � w Q � U J a a vs Q L w x w I-- U - w O z z 0 U w a m z u z a� a a a x 0 x i Date.. �1.- L.�............................. TOWN OF NORTH ANDOVER PERMIT FOR GAS INSTALLATION r I jj This certifies that ...!.`.... L� )?�� � (� has permission for gas -installation . v..P...,1....!.��^=•-Q-................................. _tea ti. in the buildings of. ..................-....................... ........................................................ at ...... .. ........�l..f.' �!�.%''!........................................, North Andover, Mass. Fee... fUb........ Lic. No. 71 7......... ... t.............................................................. 77 {� GAS INSPECTOR Check # w tS � r -- to • GOWNER TYPE OR PRINT CLEARLY MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY LKRTHANDOVER , MA. DATE 3-11-14 PERMIT # JOBSITE ADDRESS 186 COMPASS POINT OWNER'S NAME J.TRIUSTPPNSTRUCTION ADDRESS: 51 MT JOY DRIVE TEWKSBURY MA 01876 TEL: 1,508320R37 FAX: _ OCCUPANCY TYPE: COMMERCIAL ❑ EDUCATIONAL ❑ RESIDENTIAL ❑■ NEW: RENOVATION: ❑ REPLACEMENT: ❑ PLANS SUBMITTED: YES ❑ NO ❑ FIXUTRES Z FLOOR- Bsmt 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BOILER BOOSTER CONVERSION BURNER COOK STOVE DIRECT VENT HEATER DRYER FIREPLACE FRYOLATOR FURNACE > > GENERATOR GRILLE LABORATORY COCKS MAKEUP AIR UNIT OVEN POOL HEATER ROOM 1 SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER WATER HEATER INSURANCE COVERAGE I have a current liabili insurance policy or its substantial equivalent which meets the requirements of MGL. Ch. 142 YES ❑Q NO ❑ If you have checked YES, please indicate the type of coverage by checking the appropriate box below. LIABILITY INSURANCE POLICY 0 OTHER TYPE INDEMNITY ❑ BOND ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER ❑ AGENT ❑ SIGNATURE OF OWNER OR AGENT 4-z 2A hereby certify that all of the details and information I have submitted (or entered) regarding this application 4KtD& and Knowledge and that all plumbing work and installations performed under the permit issued for this 7�7� provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBERIGASFITTER NAME: I MIKE BURKE LICENSE #1 SIG TURE COMPANY NAME: I POWERHOUSE PLUMBING AND HEATING CORP ADDRESS: PO BOX 89f CITY: I PLAISTOW _ STATE: NH ZIP: 103865. —� TEL: 16033780020 CELL: _9784909385 EMAIL: I J.LAURENCIO@POWERHOUSEPLL best of my all Pertinent FAX: 16033780040._ VGAND HEATING.COM MASTER 0 JOURNEYMAN ❑ LP INSTALLER ❑ CORPORATION 0 # .2482 PARTNERSHIP 0 # LLC V W F O z z F U W CL Q �i0 z w 113 Z z O o � w F W a � LU W ca O a a a co o L W 3 N a 0 0 0. a � W a � U J a N 111 Z W F L+- N 0 F0.0 z z 0 F U W a rA z d x m Q The Commonwealth of Massachusetts Department of IndustrialAccidents Office of Investigations ' d I Congress Street, Suite 100 .` Boston, DIA 02114-2017 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers ADDlicant Information Please Print Legibly Name (Business/Organization/Individual): POWERHOUSE PLUMBING CORP Address: PO BOX 896 /State/Zip: PLAISTOW, NH 03865 Phone #: 6033780020 Are you an employer? Check the appropriate box: 1. ❑■ I am a employer with 6 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub -contractors 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. ship and have no employees These sub -contractors have working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.t required.] 5. ❑ We are a corporation and its 3. ❑ I am a homeowner doing all work officers have exercised their myself. [No workers' comp. right of exemption per MGL insurance required.] t c. 152, §1(4), and we have no employees. [No workers' comp. insurance required.] Type of project (required): 6. ❑■ New construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10.❑ Electrical repairs or additions 11.0 Plumbing repairs or additions 12.❑ Roof repairs 13. ❑ Other *Any applicant that checks box # I must also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub -contractors and state whether or not those entities have employees. If the sub -contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: HARTFORD UNDERWRITERS INSURANCE COMP Policy # or Self -ins. Lic. #: 04WECIT2480 Expiration Date: 7-28-14 Job Site Address: 86 COMPASS POINT City/State/Zip: N ANDOVER MA Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year impriso ent, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violato . e advised that a copy of this statement may be forwarded to the Office of Investigations of the�or insuranc co a verification. I do hereby;ep6 and the pai an ent of perjury that the information provided above is true and correct. 3-11-14 Official u0only. Do notXrite in this area, to be completed by city or town official. City or Town: Issuing Authority (circle one): 1. Board of Health 2. Building Department 6. Other Permit/License # 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector Contact Person: Phone rj,y NAME: MICHAEL W BURKE LIC #: 3801 M ' EXPIRES: 05/31/2014 ��'MrEEM n m C a gt vvMMONWEALTH mi a MASS/4CHUSE17S N o n i N PLUI HERS AND GASFITTERS w M > M LICEN%'-.t.1 AS A MASTER PLUMBrn' �+ ISSUES THE ABOVE LICENSE TO' 1 N' `� Z MICHAEL It BURKE •�y a 61 CORLISS HILI RD i D •4A o - Z HAVERHILL w 1830 1613 o � � ...W � _ 13127 05/01 114 160677 I COMMONWEALTH OF MASSACHUSETTS tl; PLUMBERS AND GASFITTEFcS REGISTERED AS A PLUMBING :O ISSUES THE ABOVE LICENSE TO: MICHAEL W BURKE E POWERHOUSE PLB & HEATING C lR 61 CORLISS HILL RD ; HAVERHILL MA 01830-161%. 2482 05/01/14 160675M=Mwi t i,luffl I Commonwealth of Massachusetts Department of Public Safety (Jil Burncr Tcchnlc+an C'crlificatr License: BU -059572 MICHAEL W BURKE y r 61 CORLISS HII4j, Haverhill MA 0" / - Commissioner Expiration a f , S` 05/26/2014 10 ACORO� CERTIFICATE O F LIABILITY INSURANCEF3/11/2014 DATE (MM/DD/YYYI� THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELE*. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER INSURANCE SOLUTIONS CORPORATION Westville Rd Plaistow NH 03865 CONTAr r CT Kathleen Miller CISR CPIW AM PHONE(603) 382-4600 FAXC. (603)382-2034 E-MAIL .kmiller@isc-insurance.com ADDRESS60 INSURERS AFFORDING COVERAGE NAIC # INSURER Merchants 23329 INSURED Powerhouse Plumbing S Heating Corp. PO Box 896 Plaistow NH 03865 INSURER B .Hartford Underwriters Ins. Co. INSURERC: INSURER D: INSURER E: 1 INSURER F: COVERAGES CERTIFICATE Nl1MRFR-CL1372212161 RGVIRInN NI IMRFR- THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL BR POLICY NUMBER POLICY EFF MWDD POLICY EXP MMIDD LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE FXI OCCUR BOP1065497 /1/2013 /1/2014 DAMA E TO REND PR MI a occurrence) $ 500,000 MED EXP (Any one person) $ 15,000 PERSONAL & ADV INJURY $ Include GENERAL AGGREGATE $ 2,000,000 GENT AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 X POLICY PRO LOC $ AUTOMOBILE LIABILITY EOMaBIINdED SINGLE LIMIT 1,000,000 A X ANY AUTO ALL OWNEDSCHEDULED AUTOS AUTOS CAPI058154 /1/2013 /1/2014 BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ HIRED AUTOS NON -OWNED AUTOS PROPERTY DAMAGE $ Per accident Medical payments $ 5,000 UMBRELLA LIAB OCCUR EACH OCCURRENCE $ AGGREGATE $ EXCESS LIAB CLAIMS -MADE DED I I RETENTION $ B WORKERS COMPENSATIONX AND EMPLOYERS' LIABILITY Y / N ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory In NH) If yes, describe under DESCRIPTION OF OPERATIONS below N/A 4WECIT2480 /28/2013 /28/2014 WC STATU- OTH- E.L. EACH ACCIDENT $ 100,000 E.L. DISEASE - EA EMPLOYE $ 100,000 E.L. DISEASE - POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space Is required) CERTIFICATE HOLDER rAMrFI I ATlnKI (978)688-9542 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. 1600 Osgood Street AUTHORIZED REPRESENTATIVE North Andover, MA 01845 Keith Maglia/KRM(��--- AGURD 25 (2010/05) NS025 /?ninnsi m ©1988-2010 ACORD CORPORATION. All rights reserved. Tho Ar:nRr1 nnmo and Innn arc rcnicfcrcrl mnrirc of Arr)pn 431��Date................... TOWN OF NORTH ANDOVER PERMIT FOR WIRING Thiscertifies that.......................................................................................................................... has permission to perform .... ✓ A ............................................................,........................ wiring in the building of........./... ......... G ' rth Andover, at ........... ....................... ..........!................. I........................ Mass. {�5 Fee ............................ Lic. No. ��°. Y .. �a ...:....... ............................... .............. I ELECTRICAL INSPECTOR Check # C;Z 96{-/�� Official Use Only Commonwealth of Massachusetts Department of Fire Services Permit No. 12,z Occupancy and Fee Checked BOARD OF FIRE PREVENTION REGULATIONS [Rev. 1/071 (leave blank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code (NEC), 527 CMR 12.00 (PLEASE PRINT ININK OR TYPE ALL )NFORMATION) Date: City or Town of. NORTH ANDOVER To the Inspector of Wires: By this application the undersigned gives notice of his or her intention to perform the electrical work described below. Location (Street & Number) g6 C -a ryi-pC—SS� Coor U.6 i Owner or Tenant f c,t.�"j� Cp nsi-y'"t CCOA Core. Telephone No. Owner's Address Is this permit in conjunction with a building permit? Yes -V No ❑ (Check Appropriate Box) Purpose of Building Utility Authorization No. // 5S K9 246 Existing Service Amps / Volts Overhead ❑ Undgrd ❑ No. of Meters New Service _ Amps ;C Volts Overhead ❑ Undgrd No. of Meters _Z— Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: /U 6 --kJ C4011 �1/ ".0 Completion of the.following table may be waived by the Inspector of Wires. No. of Recessed LuminairesNo. t� of Ceil: Susp. (Paddle) Fans No. of Total Transformers KVA No. of Luminaire Outlets No. of Hot Tubs Generators KVA No. of Luminaires Swimming Pool Above ❑In- ❑No-7-oYEmergency rnd. grnd. Lighting Battery Units No. of Receptacle Outlets No. of Oil Burners FIRE ALARMS No. of Zones No. of SwitchesNo. of Gas Burners No. of Detection and Initiatin Devices No. of Ranges / No. of Air Cond. fr Total 2 Tons J No. of Alerting Devices No. of Waste Disposers HeatPump Totals: Number ' ' Tons "''""' """'""""""""""" KW No. of Self -Contained Detection/Alerting Devices No. of Dishwashers Space/Area Heating KW Local ❑ Municipal ❑ Other Connection No. of Dryers / ` Heating Appliances KW Security Systems:* No. of Devices or Equivalent No. of Water KW Heaters ` No. of No. of Signs - Ballasts Data Wiring: No. of Devices or Equivalent No. Hydromassage Bathtubs No. of Motors Total HP Telecommunications Wiring: No. of Devices or Equivalent OTHER: 00 Attach additional detail if desired, or as required by the Inspector of Wires. Estimated Value of Electrical Work: �1 (When required by municipal policy.) Work to Start:4-3 - - Inspections to be requested in accordance with MEC Rule 10, and upon completion. INSURANCE COVERAGE: Unless waived by the owner, no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including "completed operation" coverage or its substantial equivalent. The undersigned certifies that such C23pg` is in force, and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE tIJ BOND ❑ OTHER ❑ (Specify:) I certify, under thepains andpenalties ofperjury, that the information on this application is true and complete. FIRM NAME &S ( j/ I C, �� �'�' T LIC. NO.: Qr7 Licensee: «� Signature 1100 (If applicable, enter "exem t" 1in the cense number line.) r- Address: 1(vi ' *Per M.G.L c. 147, S. 57-61, security work requires Department of P i OWNER'S INSURANCE WAIVER: I am aware that the Licensee oes required by law. By my signature below, I hereby waive this requirement. Owner/Agent Signature Telephone No. ;:Jt� tom- 05 C- LIC. NO.: Bus. Tel. No.: 7$'� 21 Alt. Tel. No.: >afe "S" License: Lic.No. not have the liability insurance coverage normally I am the (check one) ❑ owner ❑ owner's agent. PERMIT FEE. &Z5 — ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00 § Rule 8: In accordance with the provisions of M.G.L. c. 143, § 3L, the permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth, and applications shall be filed on the prescribed form. After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G.L c. 166, § 32, an r - electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the notification of completion of the work as required in M.G.L. c. 143, § 3L. Permits shall be limited as to the time of ongoing construction activity, and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12 -month period. Upon written application, an extension of time for completion of work shall be permitted for reasonable cause. A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012. The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property. With limited exceptions, the Act automatically extends, for four years beyond its otherwise applicable expiration date, any permit or approval that was "in effect or existence" during the qualifying period beginning on August 15, 2008 and extending through August 15, 2012. 0. Rule 8—Permit/Date Closed: *** Note: Reapply for new permit ❑ ❑ Permit Extension Act — Permit/Date Closed: Trench Inspection Pass 0 Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: . Pass M Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass M Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INS . ECTION: Pass Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: V Date. FINAL INSPEC ON: Pass M Failed Re- Inspection Required ($.) ❑ Inspectors Comm nts: Inspector Signature: Date: DEB WEINHOLD ... TOWN OF MERRIMAC, MA. .......dweinhold@townofinerrimac.com The Commonwealth of Massachusetts Department of Industrigl Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www.mass gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): �j�� �'��(, (� co rp Address: City/State/Zip: Phone#: 279 3-02 ,e 3 , Are y an employer? Check the appropriate box: 1. I am a employer with �/ 4. ❑ I am a general contractor and I employees (fall and/or part-time).* have hired the sub -contractors 2. ❑ 1 am a sole proprietor or partner- listed on the attached sheet. # ship and'have no employees These sub -contractors have working for me in any capacity. workers' comp. insurance. [No workers' comp. insurance 5. ❑ We are a corporation and its required.] officers have exercised their ' 3. ❑ I am a homeowner doing all work right of exemption per MGL myself. [No workers' comp. c. 152, §1(4), and we have no insurance required.] t employees. [No workers' comp, insurance required.] Type of project (required): 6. few construction 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ Building addition 10.Q -L ectrical repairs or additions I L ❑ Plumbing repairs or additions 12.❑ Roofrepairs 13. ❑ Other *Any applicant that checks box#1 must also fill out the section below showing their workers' compensation policy information. i Homeowners who submit this affidavit indicating they are doing all work and then.hire outside contractors must submit a new affidavit indicating such. #Contractors that check this box must attached an additional sheet showing the name of the sub -contractors and their workers' comp. policy information. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. r^ Insurance Company Name:. AIM ( Qr M 14 _s� / L Policy # or Self -ins. Lie. #: Expiration Date: Job Site Address: �� U 2 (f jg? l7, /1 ��l �% City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL o. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cert a t1 aI d penalties ofperjury that the information provided above is true and correct. Signature: Date. %") / 7— 1 /7 Phone #: Official use only. Do not write in this area, to be completed by city or town official. City or Town: PermitUcense Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. EIectrical Inspector 5. Plumbing Inspector 6. Other - - - Contact Person: Phone #' }J l �. Date. , : 7„ �...j. ...( ........ TOWN OF NORTH ANDOVER PERMIT FOR MECHANICAL INSTALLATION P s -� �� \.J � � � � � }—iii. ✓"F � .-- This certifies that .... ....... .... . has permission for mechanical installation ... k in the buildings of .. s ..'.-.' .' ' + ....�.�.. .................... . at .. ...... ........... North Andover, Mass. Fee... ... Lic. INo. '?:! `...... ........ .................. / GAS INSPECTOR WHITE: Applicant CANARY: Building Dept. PINK: Treasurer t - Commonwealth of Massachusetts Sheet Metal Permit Date: Permit ## T Estimated Job Cost: $ C)dU�°u Permit Fee: $� Plans Submitted: YES NO Plans Reviewed: NO Business License # 196 EYES Applicant License ## 1.5& 9) Business Information: Property Owner / Job Location Name: J&J Heating. h Air Conditioning IIInfo,rmation: Name:, 17 Arlington St.: Street: 8 Street: C�1pJ� City/Town: Dracut, MA 01826 City/Town: North Andover, MA 01845 Telephone: 978-454-8197 Telephone: = 001--. Photo I.D. required / Copy of Photo I.D. attached: YES_ NO i8f��ll�llfl� J-1 / Mi -l -unrestricted license J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 10,000 sq. ft. / 2 -stories or less Res identiah-T-211 -111ly -Multi-family Condo / Townhouses Other Commercial: ' Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. ft. ✓' over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: ✓ Renovation: HVAC ✓ Metal Watershed Roofing Kitchen Exhaust System Metal Chimney / Vents Air Balancing Provide detailed description of work to be done: C4 0,0l!1 ,f inrisl.t e- 7a du�7`—work✓ v INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 112 Yes ❑ No ❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this boxEl, I hereby certify that all of the details and Information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Date Datc Duct inspection required prior to insulation installation: YES NO Yrot;lress Inspections Conunents Final Inspection Comments Signature of Licensee License Number: t5&,9 Check at www.mass.gov/dpi The Commonwealth of Massachusetts W.. Print Forl11 Depnrlment o Industrial Accidents O�fice q tweslfgalions l Can/;r•ess Sl -eel, Suite 100 Boston AIA 02114-20.17 <,�'r,l','��"'• tv►vw.nrnss.bov/Jlirr Workers' Compensation hisurance Affidavit: 13uil(lers/Contractors/Electricians/l)lurr'thers A_hl)licant: Information Please Print Le ►il, 1)ly Name(13usincss/Urganizalion/In(lividual): J&J Heating & Air Conditioning, Inc. Addrooss: 1.7 Arlington, St. City/State/Zip: Dracut, MA 01826 Phone #: 978-454-8197 Arcyou an employer? Clieck tllc appropri:►te box: 1.0 1 inl a employer with 4. ❑ 1 and a general contrlctor and _40 colployccs (Itlll Mild/o I' pert-t1111c).* haVC lured the S(Ib-colltractol's ((�� 2.0 1 alit a sole p,'Op,-ict01' of p:ll'tllel•_ listed oil the alaached slice(. , Ship 111(1 have no c1liployces 'These sub -contractors have working for the in any capacity. employees and have workers' INo workcrs' comp. irlstu:111cc comp. insurance.( 1'C(lllll'ed.1 5• ❑ We arc i coi'pol'atimi all(I Its 3.❑ 1 Mill 1 110111cOwllcr doing ill woi-k oflicei's have excl'cised (hell' myself. No workcrs' comp. right of exemption per MGL insnrancc rcduirc(I.l t c. 152, § ](4), -md we have no cmployccs. (No worms' C01111). insnrancc rcquircd.j Type of pro,jecl (requiral): 6. F1 New COI1S11'tlCti011 7. ❑ Remodeling 8. ❑ Demolition 9. ❑ 13uilding addition 10.0 Electrical repairs or additions I I.❑ Plumbing repairs or additions 12. El Roofrcpairs 13.❑ Other *Any applicant that chccla pox 111 must also fill out the section below showing their workcrs' compensation policy inlbrmalion. .l. I lomeowuccs who submit Ibis,al'Iidavil indicating Ihey arc doing all work and Then hire outside ConttaCtors must submit a new aliidavil indicating such. lConlracto,s that check this box must attached an ad(lilional shcel showing the name ol'the sub -contractors and stale whether or not those entities have (•mployces. If the suh-contractors have. employees, Ihcy musl provide their workers' comp. policy number. 1 rmr rill empinper that is prnvidhig workers' compeils(i ioit hisarance• m- nip empinlleec. Below is thepolicy (iml_jnb sile inJ)raurlinn. Insurance Company Naill c: A.T.M. Mutua.L Insurance Policy t! or Sell -ins. Lic. ll: WM`L-800-8006553-2013A Expiratim Date: 06/021201./± Job Site Address: All Sites in IVo�� 4-11 1 �Q City/state/Zip: � Attach a copy of the workcrs' compensation policy declaration page (showing; file policy number a1)(1 expiration (Iate). Fililurc to secure coverage is required tnlder section 25A of MCL c. 152 can lead to the imposition of criminal perlllltics of"I line up to $1,500.00 mid/or one-year iill prisonnlent, as well as civil penall:ies in the form of a STOP WORK ORDER and i fine of til) t(� fi)T a day ag:)jlist the aiokitm. 13c i(lvIsed that a copy of this statement play be forwarded to the Office of Invcsli a {(ms of the DIA JJor instil,,, Lio;e covcragc vcriticatioll. ! do perch vu (11, t yideVlj ! pones rar� penalties nl'perjmep that the in fnrw tion provided above is true mild c•orr•ec•1. I'honc ll: 011icirrl tete oil/p. Do tial lw•ile ie lhic area, to he completed bp c•ily or Jnwe qlfieial City ol- Towo: Permit/License # Issuing Authority (circle one): I. 111o.11A of Ilcallh 2. liuil(lilig Department 3. City/Town Cleric 4. Electric. l Inspector S. P4lmbi ig Inspector 6. Other _ Coolacl Pel -son: Phone ll: i �(AS'SA,CHUSETN OLICIENS'E 1L d 1 gusn M0. q ISS - Bb END 4d NUMBER 905;03�2011s ;:NONE 59965587') n rxa',I i ,.. a 50p51�r 01,6 Q it Q 4 kr LASS- 2 REST 15 SEX'M �4�! �glVf ` NON E Y ,KLINE"' 2 ERIC RJ ` e 83 LONG DR DRACUT, MA 01826-2048 P .S DD 05-0E-1011 Rev 07-161009 COMMONWEALTH OF MASSACHUSETTS SHEET METo ►. WORKERS AS A MASTER-';NRESTRICTED ISSUES T -HE ABOVE LICENSE TO: ERIC R KLINE J & J HEATING 17 ARLINGTON 8T, DRACUT MA 0186 393 ].568 05/28/14 ]' 46- ACORD CERTIFICATE OF LIABILITY INSURANCE I DATE(MM/DD/YYYY) PRODUCER 978.887.4900 FAX 978.887.2404 Edward F. Sennott Insurance Agency, Inc. 16 South Main Street P. 0. Box 457 Topsfield, MA 01983 IN—SUR ED&J (Heating &Air Conditioning, Inc. 17 Arlington Street Dracut, MA 01826 COVERAGES 06/03/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURERA. Great American Alliance Ins Co INSURER B: Safety Insurance Company 39454 INSURERC: A.I.M. Mutual Insurance Co. INSURER D: INSURER E: l HE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR DD' LTR INSRE.TYPF OF INSURANCE POLICY NUMBER DATEMMCF CTYYY EXPIRATION DATE MM DD LIMITS GENERAL LIABILITY PAC6418906-07 06/01/2013 06/01/2014 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMA - RENT_ PREMISES Eaoccurrence_ $ 300,00 CLAIMS MADE �� OCCUR A MED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 — --- —-------' -_.._ ..__.-- GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGAI"E LIMIT APPLIES PER PRODUCTS - COMP/OP AGG $ 2,000,000 PRO- Pot -ICY FI JECT LOC AUTOMOBILE LIABILITY 2434550 06/01/2013 06/01/2014 _ ANY AUTO COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 ALL OWNED AUTOS B X SCHEDULED AUTOS BODILY INJURY (Per person) $ X HIRED AUTOS X NON -OWNED ALTOS INJURY accident) $ALTOS(Per PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ $ AUTO ONLY: AGG EXCESS/ UMBRELLA LIABILITY X OCCUR CI CLAIMS MADE UMB6418958-05 06/01/2013 06/01/2014 EACH OCCURRENCE $ 2,000,000 AGGREGATE $ 2,000,000 I A DEDUCTIBLE $ RETENTION $ $ WOR KERSCOMPENSATIOIJ AND EMPI.OVFRS' LIABILITY WMZ-800-8006553-2013A 06/02/2013 06/02/2014 X " TORY LIMITS ER C ANY PROPRIETOR/PARTNER/EXECUfIVEJY OFRCFR/MFMRER EXCLUDED? U E.L. EACH ACCIDENT _ $ 1,000,000 (Mandatory In N If yes dnscriho under , E.L. DISEASE - EA EMPLOYEE _ $ 1,000, 00 SPECIAI. PROVISIONS belnw E.L. DISEASE _ POLICY LIMIT 1 $ 1,000,000 OTHER DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT/ SPECIAL PROVISIONS CFRTIFirATG un, nr_n Evidence of Insurance ACORD 25 (2009/01) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIO(' DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE J Peter Sennott/AAMT © 1988-2009 ACORD CORPORA The ACORD name and logo are registered marks of ACORD •All rinhtc rPservPd_ -- wrightsoft, Load Short Form Basemnt/1 st sys Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Job: 86 Compass Point Date: jan14, 2014 By: HEATING EQUIPMENT Area COOLING EQUIPMENT Clg load Make n/a Clg AVF Make n/a (Btuh) (Btuh) Trade n/a (cfm) 2nd floor d Trade n/a 47865 29857 Model n/a 1250 1st floor system d Cond n/a 43447 28883 AHRI ref. n/a 1314 Basemnt/1st sys d Coil n/a 91312 58857 2565 2817 Other equip loads AHRI ref. n/a 8476 0 Efficiency n/a Equip. @ 0.93 RSM Efficiency n/a 54502 Heating input Latent cooling Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 2927 47865 29857 1250 1250 1st floor system d 2358 43447 28883 1314 1314 Basemnt/1st sys d 5285 91312 58857 2565 2817 Other equip loads 8476 0 Equip. @ 0.93 RSM 54502 Latent cooling 7589 T(1TAI C COor nn -700 cnnn4 ncnr nna� Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft® 2014 -Mar -07 08:49:55 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 1 ACCA ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N WrIQhtSOftLoad Short Form Job: 86 Compass Point Date: jan14, 2014 1st floor system By: Croinin Construction Management P.0 Box 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 OF 1314 cfm 0.030 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER 0 Btuh 0 Btuh 0 Btuh 1314 cfm 0.046 cfm/Btuh 0 in H2O 0.93 1274 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) basement zone p 1274 24469 16831 740 766 1st floor p 1084 18978 13036 574 593 1 st floor system d 2358 43447 28883 1314 1314 Other equip loads 3626 0 Equip. @ 0.93 RSM 26745 Latent cooling 2044 TOTAI S n7rn-713 -1viv r_ur ucr IJI'+ IJ I1+ Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. - 2014 -Mar -07 08:49:55 I� F wrightsoft0 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 Z� ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wrighsoftLoad Short Form Job: 86 Compass Point Date: jan14, 2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 A-1 ll, WEojec lnfo„ matron For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 d 0 Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L 1107 Inside humidity (%) 50 50 29857 Moisture difference (gr/Ib) 47 28 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 Btuh 0 Btuh 0 OF 1250 cfm 0.026 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 1250 cfm 0.041 cfm/Btuh 0 in H2O 0.86 8549 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bouns zone p 885 13058 8549 341 350 2nd floor zone p 2042 34807 27010 909 1107 2nd floor d 2927 47865 29857 1250 1250 Other equip loads 4850 4096 Equip. @ 0.93 RSM 31440 Latent cooling 5545 TnTAl .q 0007 Colic or_non_ .n n v -I JLI IJ GUU IGUU Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �� +wrightsoft® Right -Suite® 2014 -Mar -07 08:49:55 Universal 2013 13.0.07 RSU05790 Page 3 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Load Short Form Job: 86 Compass Point WrIQI1tSOfta Date: jan14, 2014 1st floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 -moi tCu .R' �� ��■0 9 0 }z� � .�.., � �. �°% For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Actual air flow Htg Clg 0 cfm/Btuh Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L 1084 18978 Inside humidity (%) 50 50 Other equip loads Moisture difference (gr/Ib) 47 28 Equip. @ 0.93 RSM HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Heating input Sensible cooling Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency n/a Htg load Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 117 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1 st floor p 1084 18978 13036 574 593 Other equip loads 2805 0 Equip. @ 0.93 RSM 12071 Latent cooling 1581 TOTAIR 1 M 01701 nnrn G 1 / U1J a11+ Mas Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft Right-SuiteO 2014 -Mar -07 08:49:55 Universal 2013 13.0.07 RSU05790 Page 4 ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wri htsofto Load Short Form Job: 86 Compass Point g Date: jan14, 2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 o, ecty�ntormatlon,� ,fir .,�.j a m, 'aro .- _ _eaz�-um . -.Q For: Construction 51 Mount • drive,• . i • HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Httg load (Btuh) Heating input 0 Btuh Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a 107 COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency , n/a Httg load (Btuh) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 107 ROOM NAME Area ( 2) Httg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 000 1nC7n 444 AA n -n - Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. � +wrightsoft°' Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -Mar -07 08:49:55 Page 5 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 2nd floor zone p 2042 34807 27010 909 1107 Other equip loads 2817 0 Equip. @ 0.93 RSM 25012 Latent cooling 4033 TnTA I C 2 2 04 37624 29045 909 1107 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. a WCI i1tSOft" 2014 -Mar -07 08:49:55 1 g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 6 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N ` Load Short Form Job: 86 Compass Point Vllrightsofte Date: jan14, 2014 basement zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 9 0 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Htg load Heating input 0 Btuh Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a 766 COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref n/a Efficiency n/a Htg load Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 766 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Basement 1274 24469 16831 740 766 basement zone p 1274 24469 16831 740 766 Other equip loads 822 0 Equip. @ 0.93 RSM 15585 Latent cooling 463 TnTAIC 4nnen � VVTV � TV I VV Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft° 2014 -Mar -07 08:49:55 g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Wrightsoft, Load Short Form Job: 86 Compass Point Date: jan14, 2014 Bouns zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 dMOWY n/a Trade v i Model Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 70 75 Construction quality Tight Design TD (°F) 58 13 Fireplaces 1 (Average) Daily range - L cfm Inside humidity (%) 50 50 Static pressure Moisture difference (gr/Ib) 47 28 0 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref n/a Efficiency n/a Heating input Coil n/a Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Area Htg load Coil n/a Htg AVF Clg AVF AHRI ref n/a (ft2) (Btuh) Efficiency n/a (cfm) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 13058 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 1132 77 46 Bouns zone p 885 13058 8549 341 350 Other equip loads 2033 0 Equip. @ 0.93 RSM 7916 Latent cooling 1512 TnTAl C Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. t�� Wrl htSOft" Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -Mar -07 08:49:55 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Page 8 -- wrightsoft. Load Multizone Summary Report Croinin Construction Management Job: 86 Compass Point Date: jan14, 2014 By: P. • Box 7237, Lowell, Ma 01852 Infiltratio oad and �►`1%F $ mma ROOM NAME Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM Basement ft3 cfm Btuh/ft2 ft3 cfm Btuh/ft2 basement zone 3822 0.41 26 4.2 3822 0.39 25 0.9 1st floor 9756 0.55 89 4.2 9756 0.52 84 0.9 Bouns zone 8975 0.43 64 4.2 8975 0.41 61 0.9 2nd floor zone 13050 0.41 89 4.2 13050 0.39 84 0.9 Basemnt/1st sys 35603 0.16 268 1.5 35603 0.07 253 0.1 oad and �►`1%F $ mma ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm Clg AVF cfm Basement 1274 24469 16831 740 766 basement zone 1274 24469 16831 740 766 Living room 704 8928 5556 270 253 Kitchen 130 1672 2581 51 117 office 250 8378 4898 253 223 1st floor 1084 18978 13036 574 593 bouns room 625 8866 7083 232 290 bouns room closet 70 1248 334 33 14 dining room 190 2944 .1132 77 46 Bouns zone 885 13058 8549 341 350 Ldy 32 1097 294 29 12 Masterbath 65 2667 1501 70 62 Bedroom 2 208 4865 2622 127 107 bedroom 1 176 2952 3058 77 125 1/2 bath 91 1432 375 37 15 Masterbed room 325 8308 7137 217 293 full bath 77 675 171 18 7 2nd floor hall 180 2237 707 58 29 attic 888 10574 11144 276 457 2nd floor zone 2042 34807 27010 909 1107 Basemnt/1st Sys 5285 91312 58857 2565 2817 ACOA -�- wrightSOW Right-SuiteOO Universal 2013 13.0.07 RSU05790 ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces 2014 -Mar -07 08:49:55 Page 1 Wrl htsoft Building Analysis Job: 86 Compass Point 9 Basemnt/1st sys Byte: jan14, 2014 Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 Wits' For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Component 0 m e o o % of load Walls Location: 19328 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 5.7 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F 58 13 Latitude: 420N 4.2 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range6 °F) - 15 (L ) Method Simplified 8.5 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments Component Btuh/ft2 Btuh % of load Walls 3.7 19328 19.4 Glazing 17.3 5656 5.7 Doors 16.7 702 0.7 Ceilings 13.9 28587 28.6 Floors 4.2 10371 10.4 Infiltration 4.2 16975 17.0 Ducts 9692 9.7 Piping 0 0 Humidification 8476 8.5 Ventilation 0 0 Adjustments 0 Total 1 99788 100.0 �g Component Btuh/ft2 Btuh % of load Walls 0.7 3604 6.1 Glazing 22.5 7349 12.5 Doors 7.7 323 0.5 Ceilings 12.1 24815 42.2 Floors 0.8 2071 3.5 Infiltration 0.9 3509 6.0 Ducts 9447 16.1 Ventilation 0 0 Internal gains 7740 13.2 Blower 0 0 Adjustments 0 Total 1 588571 100.0 Latent Cooling Load = 7589 Btuh Overall U -value = 0.140 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 08:49:55 Right -Suite® Universal 2013 13.0.07 RSU05790 wrightsoft' Page 1 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Building Analysis Job: 86 Compass Point wrightsoft� g y Date: jan14, 2014 1st floor system By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 IME �-; 3� .�{ a -77 777q 'R as Component Btuh/ft2 o ® i23�V % of load Walls Location: 8015 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 2.6 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 1.4 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dailyran 72 ( L ) Method Simplified 7.7 (e60F) _ Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments IME �-; 3� .�{ a -77 777q 'R as Component Btuh/ft2 Btuh % of load Walls 3.3 8015 17.0 Glazing 17.3 1233 2.6 Doors 16.7 702 1.5 Ceilings 14.7 25507 54.2 Floors 1.4 729 1.5 Infiltration 4.2 7263 15.4 Ducts 0 0 Piping 0 0 Humidification 3626 7.7 Ventilation 0 0 Adjustments 0 Total 470731 100.0 Component Btuh/ft2 Btuh % of load Walls 0.6 1500 5.2 Glazing 31.1 2217 7.7 Doors 7.7 323 1.1 Ceilings 12.7 22142 76.7 Floors 0 0 0 Infiltration 0.9 1501 5.2 Ducts 0 0 Ventilation 0 0 Internal gains 1200 4.2 Blower 0 0 Adjustments 0 Total 288831 100.0 Latent Cooling Load = 2044 Btuh Overall U -value = 0.130 Btuh/ft2-°F WARNING: window to floor area ratio = 3.0% - less than 5%. 2014 -Mar -07 08:49:55 -- wrightsoft• Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 ACCK ..oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N BuildingAnalysis Job: 86 Compass Point WClglhiCSOft°y Date: jan14, 2014 2nd floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Dally range6 °F) - Wet bulb (° - Wind speed (mph) 15.0 Dest Co.R itions Component Indoor: Btuh Indoor temperature (°F) Walls Design TD (°F)) 11314 Relative humidity (%) Coo88 g Moisture difference (gr/Ib) 4424 InfMe 15 L ( ) hods 72 Construction quality 7.5 Fireplaces Component Btuh/ft2 Btuh % of load Walls 4.0 11314 21.5 Glazing 17.3 4424 8.4 Doors 0 0 0 Ceilings 9.9 3080 5.8 Floors 4.9 9642 18.3 Infiltration 4.2 9713 18.4 Ducts 9692 18.4 Piping 0 0 Humidification 4850 9.2 Ventilation 0 0 Adjustments 0 Total 1 527151 100.0 Heating Cooling 70 75 58 13 50 50 46.5 27.8 Simplified Tiht 1 Average) EI0 a,:a. Z. ;�' Component Btuh/ft2 Btuh % of load Walls 0.8 2104 6.2 Glazing 20.0 5132 15.1 Doors 0 0 0 Ceilings 8.6 2673 7.9 Floors 1.1 2071 6.1 Infiltration 0.9 2008 5.9 Ducts 9330 27.5 Ventilation 0 0 Internal gains 6540 19.3 Blower 4096 12.1 Adjustments 0 Total 1 339531 100.0 Latent Cooling Load = 5545 Btuh Overall U -value = 0.149 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 08:49:55 �4CC-N wrightsoft' Right-Suite(g)Universal 2013 13.0.07 RSU05790 Page 3 ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N MR I El Btuh % of load Location: 3.7 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 1233 Indoor temperature (°F) 70 75 Elevation: 30 ft 3.2 Design TD (°F) 58 13 Latitude: 42°N Floors Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Piping Dally range6 °F) - 15 (L ) Method Simplified 2805 Wet bulb (° -72 Ventilation Construction quality Ti ht 0 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Total ?�0� y" . a � , Component Btuh/ft2 Btuh % of load Walls 3.7 4596 21.1 Glazing 17.3 1233 5.7 Doors 16.7 702 3.2 Ceilings 14.7 6831 31.4 Floors 0 0 0 Infiltration 4.2 5617 25.8 Ducts 0 0 Piping 0 0 Humidification 2805 12.9 Ventilation 0 0 Adjustments 0 Total 1 217831 100.0 Component Btuh/ft2 Btuh % of load Walls 1.0 1221 9.4 Glazing 44.9 3201 24.6 Doors 7.7 323 2.5 Ceilings 12.7 5930 45.5 Floors 0 0 0 Infiltration 0.9 1161 8.9 Ducts 0 0 Ventilation 0 0 Internal gains 1200 9.2 Blower 0 0 Adjustments 0 Total 1 130361 100.0 Latent Cooling Load = 1581 Btuh Overall U -value = 0.128 Btuh/ft2-°F Data entries checked. 2014 -Mar -07 08:49:55 -- wrightsoft® Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N fin- Component h Com onent Btuh/ft2 Btuh % of load Walls Location: 7899 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 9.0 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F) 58 13 Latitude: 420N 6.4 Relative humidity (%)50 21.6 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 (L ) Method Simplified 7.5 Wet bulb (° - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments fin- Component h Com onent Btuh/ft2 Btuh % of load Walls 4.2 7899 21.0 Glazing 17.3 3387 9.0 Doors 0 0 0 Ceilings 8.8 2379 6.3 Floors 6.4 8132 21.6 Infiltration 4.2 5642 15.0 Ducts 7368 19.6 Piping 0 0 Humidification 2817 7.5 Ventilation 0 0 Adjustments 0 Total 1 376241 100.0 Component Btuh/ft2 Btuh % of load Walls 0.6 1197 4.4 Glazing 35.4 6931 25.7 Doors 0 0 0 Ceilings 7.6 2065 7.6 Floors 1.4 1741 6.4 Infiltration 0.9 1166 4.3 Ducts 8571 31.7 Ventilation 0 0 Internal gains 5340 19.8 Blower 0 0 Adjustments 0 Total 1 270101 100.0 Latent Cooling Load = 4033 Btuh Overall U -value = 0.182 Btuh/ft2-°F Data entries checked. 4 + wrilghtsoft, 2014 -Mar -07 08:49:55 .._.. Right-Suite(q)Universal 2013 13.0.07 RSU05790 Page 5 ACKA HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N g 7Buildin Analysis Job: 86 Compass Point wrightsoft� Date: jan14, 2014 basement zone By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 .a paro'ect informatioMMM r< For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 t Btuh/ft2 21 Location: 2.9 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0 Indoor temperature (°F) 70 75 Elevation: 30 ft 0 Design TD (°F) 58 13 Latitude: 420N Floors Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Piping Dally range °F) - 15 (L ) Method Simplified 822 Wet bulb (°F� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) 0 k +-. �. A xv �" a`IM , > _ p a:.. .„' ""`x's..:;: �;°,grk s ,iE Component Btuh/ft2 Btuh % of load Walls 2.9 3418 13.5 Glazing 0 0 0 Doors 0 0 0 Ceilings 14.7 18676 73.8 Floors 1.4 729 2.9 Infiltration 4.2 1646 6.5 Ducts 0 0 Piping 0 0 Humidification 822 3.2 Ventilation 0 0 Adjustments 0 Total 1 25291 100.0 Component Btuh/ft2 Btuh % of load Walls 0.2 279 1.7 Glazing 0 0 0 Doors 0 0 0 Ceilings 12.7 16212 96.3 Floors 0 0 0 Infiltration 0.9 340 2.0 Ducts 0 0 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 16831 100.0 Latent Cooling Load = 463 Btuh Overall U -value = 0.131 Btuh/ft2-°F WARNING: window to floor area ratio = 0.0% - less than 5%. 2014 -Mar -07 08:49:55 ACCP.+ wrightsoft' Right-Suitea Universal 2013 13.0.07 RSU05790 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Page 6 Building Analysis Job: 86 Compass Point wrightsoft® 9 Y Date: jan14, 2014 Bouns zone By: Croinin Construction Management P. • Box 7237, Lowell, Ma 01852 In, For: matron . For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Component Btuh/ft2 Btuh % of load Walls Location: 3415 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 6.9 Indoor temperature (°F) 70 75 Elevation: 30 ft Ceilings Design TD (°F� 58 13 Latitude: 42°N 2.2 Relative hums Ity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Daily range6 °F) - 15 (L ) Method Simplified 13.5 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments Component Btuh/ft2 Btuh % of load Walls 3.7 3415 22.6 Glazing 17.3 1037 6.9 Doors 0 0 0 Ceilings 17.5 701 4.6 Floors 2.2 1510 10.0 Infiltration 4.2 4071 27.0 Ducts 2324 15.4 Piping 0 0 Humidification 2033 13.5 Ventilation 0 0 Adjustments 0 Total 1 15091 100.0 Component Btuh/ft2 Btuh % of load Walls 1.0 907 10.6 Glazing 35.8 2148 25.1 Doors 0 0 0 Ceilings 15.2 609 7.1 Floors 0.5 330 3.9 Infiltration 0.9 841 9.8 Ducts 2514 29.4 Ventilation 0 0 Internal gains 1200 14.0 Blower 0 0 Adjustments 0 Total 1 85491 100.0 Latent Cooling Load = 1512 Btuh Overall U -value = 0.080 Btuh/ft2-°F Data entries checked. �� +wrightsoft" Right -Suite® 2014 -Mar -07 08:49:55 Universal 2013 13.0.07 RSU05790 Page 7 ..oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft Date: jan14, 2014 Basemnt/1 st sys By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh 15621-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft2-°FBtuh Btuh/ftz Btu Btuh/ft2 Btu n 945 0.065 21.0 3.74 3538 Location: 940 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 2145 Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 420N w 585 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 3020 Daily range (°F) - 15 ( L ) Method Simplified 744 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 8.0 Construction descriptions Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh 15621-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft2-°FBtuh Btuh/ftz Btu Btuh/ft2 Btu n 945 0.065 21.0 3.74 3538 0.99 940 e 573 0.065 21.0 3.74 2145 0.99 570 s 934 0.065 21.0 3.74 3496 0.99 929 w 585 0.065 21.0 3.74 2190 0.99 582 all 3037 0.065 21.0 3.74 11369 0.99 3020 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 n 36 0.300 0 17.3 622 8.04 290 n 24 0.300 0 17.3 415 13.0 313 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 e 24 0.300 0 17.3 415 52.7 1265 s 48 0.300 0 17.3 829 16.0 769 s 23 0.300 0 17.3 403 27.4 640 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 327 0.300 0 17.3 5656 22.5 7349 2014 -Mar -07 08:49:56 wrightsoft°' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 1 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" 120 0.026 38.0 1.50 180 1.30 156 gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd fir fnsh, firm fir, 10" thkns, 1/2" 1890 0.255 1.0 14.7 27706 12.7 24050 gypsum board int fnsh C part ceiling,: C part ceiling, frm fir, 10" thkns, 1/2" gypsum board 40 0.304 1.0 17.5 701 15.2 609 int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 1224 0.368 0 6.90 8442 1.51 1847 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns 625 0.034 30.0 1.64 1027 0.36 225 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 506 0.025 0 1.44 729 0 0 120 0.025 0 1.44 173 0 0 all 626 0.025 0 1.44 901 0 0 ,., 2014 -Mar -07 08:49:56Wil htsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 2 ACCk ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-"F ft'-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 151321-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fish Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 288 0.042 21.0 2.90 835 0.24 Location: e Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 835 Indoor temperature (°F) 70 75 Elevation: 30 ft 0.042 Design TD (°F) 58 13 Latitude: 420N 121 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 21.0 2.90 Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft2-"F ft'-°FBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 151321-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fish Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 2014 -Mar -07 08:49:56 � � wrightsoft' Right-Suite(R)Universal 2013 13.0.07 RSU05790 Page 3 )m ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJB Front Door faces: N wri htsoft Component Constructions Job: 86 Compass Point Q Date: jan14, 2014 1st floor By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area s o o ® Htg HTM Loss Clg HTM tw Location: e Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btu Indoor temperature (°F) 70 75 Elevation: 30 ft 23 Design TD (°F) 58 13 Latitude: 42°N 27.4 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: e 174 Daily range (°F) - 15 (L ) Method Simplified 0.99 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0.065 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 112 Btuh/ftl-°F ft2-°FBtuh Btuh/ft2 Btu Btu h/ft2 Btuh Walls s 23 0.300 0 17.3 403 27.4 640 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 468 0.065 21.0 3.74 1752 0.99 465 gypsum board int fnsh, 2"x6" wood frm e 174 0.065 21.0 3.74 651 0.99 173 11 P0: Door, mtl pur core type s 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; e 24 0.300 0 17.3 415 52.7 1265 50% outdoor insect screen; foreground = green grass (0.23) s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 466 0.255 1.0 14.7 6831 12.7 5930 gypsum board int fnsh Floors (none) 2014 -Mar -07 08:49:56 rF wrightsoft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 4 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N -- wrightsofto P.O Box 7237, Lowell, Ma 01852 Component Constructions Bouns zone Croinin Construction Management For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Job: 86 Compass Point Date: jan14, 2014 By: Construction descriptions g • o o •;•.°� KNOW U -value aH i Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Cig HTM Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/R2-°F Design TD (°F) 58 13 Latitude: 420N Btu Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 225 0.065 Daily range (°F) - 15 (L ) Method Simplified 224 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 21.0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/R2-°F ft2-F/Btuh Btu h/ft2 Btu Btu h/ftz Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"x6" wood frm a 90 0.065 21.0 3.74 337 0.99 90 S 390 0.065 21.0 3.74 1460 0.99 388 w 207 0.065 21.0 3.74 775 0.99 206 all 912 0.065 21.0 3.74 3415 0.99 907 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 24 0.300 0 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) w 36 0.300 0 all 60 0.300 0 Doors (none) Ceilings C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board 40 0.304 1.0 int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm flr, 10" thkns 70 0.368 0 625 0.034 30.0 17.3 415 16.0 385 17.3 622 28.2 1015 17.3 1037 23.3 1400 17.5 701 15.2 609 6.90 483 1.51 106 1.64 1027 0.36 225 wri htSOft' 2014 -Mar -07 08:49:56 .. g Right-SuiteCw Universal 2013 13.0.07 RSU05790 Page 5 ACC -N ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point Wr1�h�SO�t p Date: jan14, 2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 ""N'.,:Fry 0.065 g • ® • o a tt ,? Location: e 399 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 0.99 Indoor temperature (°F) 70 75 Elevation: 30 ft 3.74 Design TD (°F) 58 13 Latitude: 420N 0.065 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 1799 n 168 Daily range (°F) - 15 (L ) Method Simplified 0.17 Wet bulb (F) - 72 Construction quality Tiht 4.72 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 0.073 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh n 477 0.065 21.0 3.74 1786 0.99 474 e 399 0.065 21.0 3.74 1494 0.99 397 s 636 0.065 21.0 3.74 2381 0.99 633 w 297 0.065 21.0 3.74 1112 0.99 295 all 1809 0.065 21.0 3.74 6773 0.99 1799 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 s 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 n 36 0.300 0 17.3 622 8.04 290 n 48 0.300 0 17.3 829 13.0 625 e 24 0.300 0 17.3 415 28.2 677 s 48 0.300 0 17.3 829 16.0 769 s 64 0.300 0 17.3 1106 27.4 1756 w 36 0.300 0 17.3 622 28.2 1015 all 256 0.300 0 17.3 4424 20.0 5132 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 40 0.304 1.0 17.5 701 15.2 609 J-}.� " 2014 -Mar -07 08:49:56 .{ f wrightsoft' Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 6 ACCP....oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Floors 19A-Obstp: Part floor, frm fir, 10" thkns 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns 21A -24t: Bg floor, heavy dry or light damp Soil, 6' depth, the fIr fnsh 1224 0.368 0 6.90 8442 1.51 1847 625 0.034 30.0 1.64 1027 0.36 225 120 0.025 0 1.44 173 0 0 AL_2014-Mar-07 08:49:56 V wrightSOW Right -Suite® Universal 2013 13.0.07 RSU05790 Page 7 �� ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft� p Date: jan14, 2014 1st floor system By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 ce. For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 . 0.065 21.0 3.74 , Location: 465 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 651 Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 420N w 288 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 1221 Daily range (°F) - 15 ( L ) Method' Simplified 835 Wet bulb (°F) - 72 Construction quality Ti ht 21.0 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) s 513 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ft2- °F/Btuh Btuh/ft2 Btu Btu h/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fish, 2"x6" wood frm 151321-Owc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh n 468 0.065 21.0 3.74 1752 0.99 465 e 174 0.065 21.0 3.74 651 0.99 173 s 298 0.065 21.0 3.74 1114 0.99 296 w 288 0.065 21.0 3.74 1078 0.99 286 all 1228 0.065 21.0 3.74 4596 0.99 1221 n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 s 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 n 24 0.300 0 17.3 415 13.0 313 e 24 0.300 0 17.3 415 52.7 1265 s 23 0.300 0 17.3 403 27.4 640 all 71 0.300 0 17.3 1233 31.1 2217 n 21 0.290 10.5 16.7 351 7.68 161 s 21 0.290 10.5 16.7 351 7.68 161 all 42 0.290 10.5 16.7 702 7.68 323 1740 0.255 1.0 14.7 25507 12.7 22142 506 0.025 0 1.44 729 0 0 rF 2014 -Mar -07 08:49:56 wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 8 ACC% ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N WI'I J01tSOftComponent Constructions Job: 86 Compass Point Date: jan14, 2014 2nd floor zone By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Cooling 70 Indoor temperature (°F) 58 Design TD (°F) 50 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 ( L ) Method 72 Construction quality 7.5 Fireplaces Heating Cooling 70 75 58 13 50 50 46.5 27.8 Simplified ft2 Ti ht 1 Average) ft� °FBtuh Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain w ft2 Btuh/ft�'F ft� °FBtuh Btuh/ftp Btuh Btuh/ft2 Btu Walls 897 0.065 21.0 3.74 3358 0.99 892 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 252 0.065 21.0 3.74 943 0.99 251 gypsum board int fnsh, 2"x6" wood frm a 309 0.065 21.0 3.74 1157 0.99 307 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) S 246 0.065 21.0 3.74 921 0.99 245 w 90 0.065 21.0 3.74 337 0.99 90 all 897 0.065 21.0 3.74 3358 0.99 892 n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 S 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; n 50% outdoor insect screen; foreground = green grass (0.23) e s s all Doors (none) Ceilings 16B-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 36 0.300 0 17.3 622 8.04 290 48 0.300 0 17.3 829 13.0 625 24 0.300 0 17.3 415 28.2 677 24 0.300 0 17.3 415 16.0 385 64 0.300 0 17.3 1106 27.4 1756 196 0.300 0 17.3 3387 19.0 3732 120 0.026 38.0 1.50 180 1.30 156 150 0.255 1.0 14.7 2199 12.7 1909 1154 0.368 0 6.90 7959 1.51 1741 2014 -Mar -07 08:49:56 AZ__ rFwri htsofta Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 9 /TCCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile flr fnsh 120 0.025 0 1.44 173 2014 -Mar -07 08:49:56 .+ rF wrightSOW Right-Suite(k) Universal 2013 13.0.07 RSU05790 Page 10 JCC& ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 86 Compass Point Q Date: jan14, 2014 Basement By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 r 0 • • a �.' For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Walls 151321-0wc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, the fir fnsh Or ® • � • MS• • �`� „ f`.p ria e 1 ��� 3 � +.- Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/R2-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh Design TD (°F) 58 13 Latitude: 420N 2.90 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: S 513 Daily range (°F) - 15 ( L ) Method Simplified 0.24 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) 21.0 Construction descriptions Walls 151321-0wc-6: Bg wall, heavy dry or light damp soil, 2"x4" wood int frm, concrete wall, r-8 ins, r-21 cav ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, the fir fnsh Or Area U -value Insul R Htg HTM Loss Cig HTM Gain 0.025 ft2 Btuh/R2-°F ft2-°FBtuh Btuh/112 Btu Btuh/ftz Btuh n 288 0.042 21.0 2.90 835 0.24 68 e 288 0.042 21.0 2.90 835 0.24 68 S 513 0.042 21.0 2.90 1487 0.24 121 w 90 0.042 21.0 2.90 261 0.24 21 all 1179 0.042 21.0 2.90 3418 0.24 279 1274 0.255 1.0 14.7 18676 12.7 16212 506 0.025 0 1.44 729 0 0 2014 -Mar -07 08:49:56 F wrightsoft' Right -Suite@ Universal 2013 13.0.07 RSU05790 Page 11 ACClk ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 86 Compass Point Q Date: jan14, 2014 Living room By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R ';!',7'077u Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ft�-°F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 242 Daily range (°F) - 15 (L ) Method Simplified 21.0 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft�-°F ft2-°F/Btuh Btu h/ftz Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 243 0.065 21.0 3.74 910 0.99 242 gypsum board int fnsh, 2"x6" wood frm e 174 0.065 21.0 3.74 651 0.99 173 w 198 0.065 21.0 3.74 741 0.99 197 all 615 0.065 21.0 3.74 2303 0.99 612 Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 13.0 313 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) e 24 0.300 0 17.3 415 52.7 1265 all 48 0.300 0 17.3 829 32.9 1577 Doors 11 P0: Door, mtl pur core type n 21 0.290 10.5 16.7 351 7.68 161 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 176 0.255 1.0 14.7 2580 12.7 2240 gypsum board int fnsh Floors (none) 2014 -Mar -07 08:49:56 wrightsoft* Right -Suite® Universal 2013 13.0.07 RSU05790 Page 12 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wri htsoft Component Constructions Job: 86 Compass Point 9 Date: jan14, 2014 Kitchen By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 0 0 0 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft� °F/Btuh Btuh/ft2 Btuh Btu h/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 105 0.065 21.0 3.74 394 0.99 105 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 40 0.255 1.0 14.7 586 12.7 509 gypsum board int fnsh Floors (none) 2014 -Mar -07 08:49:56 ,� � wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 ,CCA' ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N �u Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftz-°F ft� °F/Btuh Btuh/ft2 Btuh Btu h/ft' Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 105 0.065 21.0 3.74 394 0.99 105 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" 40 0.255 1.0 14.7 586 12.7 509 gypsum board int fnsh Floors (none) 2014 -Mar -07 08:49:56 ,� � wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 13 ,CCA' ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft� p Date: jan14, 2014 office By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 oectn I �oo�rrna�tto,n For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions n; Area U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/k� °F Indoor temperature (°F) 70 75 Elevation: 30 ft Btu Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 224 Daily range (°F) - 15 ( L ) Method Simplified 21.0 Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 3.74 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/k� °F ftz-°F/Btuh Btuh/ftz Btu Btu h/ft2 Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 225 0.065 21.0 3.74 842 0.99 224 gypsum board int fnsh, 2"x6" wood frm s 192 0.065 21.0 3.74 720 0.99 191 w 90 0.065 21.0 3.74 337 0.99 90 all 507 0.065 21.0 3.74 1899 0.99 505 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s 12 0.300 0 17.3 202 27.4 320 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors 11 P0: Door, mtl pur core type s 21 0.290 10.5 16.7 351 7.68 161 Ceilings C part ceiling,: C part ceiling, hrd wd flr fnsh, frm flr, 10" thkns, 1/2" 250 0.255 1.0 14.7 3665 12.7 3181 gypsum board int fnsh Floors (none) 2014 -Mar -07 08:49:56 wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 14 ACO, ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Component Constructions Job: 86 Compass Point wrightsoft Date: jan14, 2014 Bedroom 2 By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 . ftfro 0-40 , ormatl6--i'' a , . ,For: Trust Construction51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Loss Indoor temperature (°F) 70 75 Elevation: 30 ft W Design TD (°F) 58 13 Latitude: 42°N Btuh/ft2 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: n 120 Daily range (°F) - 15 (L ) Method, Simplified 0.99 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0.065 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftl-°F ft2-°F/Btuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 120 0.065 21.0 3.74 449 0.99 119 gypsum board int fnsh, 2"x6" wood frm e 117 0.065 21.0 3.74 438 0.99 116 all 237 0.065 21.0 3.74 887 0.99 236 Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 24 0.300 0 17.3 415 8.04 193 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 208 0.368 0 6.90 1435 1.51 314 2014 -Mar -07 08:49:56 wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 15 �Cp....oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wrightsoft Component Constructions Job: 86 Compass Point Date: jan14, 2014 Ld y By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 11 'T �;g For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Clg HTM Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/(t2-°F Design TD (°F) 58 13 Latitude: 420N Btu Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 36 0.065 Daily range (°F) - 15 (L ) Method Simplified 36 Wet bulb (F) - 72 Construction quality Tiht 21.0 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/(t2-°F W-TBtuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 36 0.065 21.0 3.74 135 0.99 36 gypsum board int fnsh, 2"x6" wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 81 0.065 21.0 3.74 303 0.99 81 Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 32 0.368 0 6.90 221 1.51 48 2014 -Mar -07 08:49:56 wrightsOft" Right -Suite® Universal 2013 13.0.07 RSU05790 Page 16 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N wri htsoft- Component Constructions Job: 86 Compass Point 9 Date: jan14, 2014 bedroom 1 By: Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 `'`�,� ' , Pro'ectllri#ormatlon For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Location: Clg HTM Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Btuh/ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft� Btuh/ft2-'F ft2-°F/13tuh Btuh/ft2 Btu BtuhM Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" a 75 0.065 21.0 3.74 281 0.99 75 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 e 24 0.300 0 17.3 415 28.2 677 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 176 0.368 0 6.90 1214 1.51 266 2014 -Mar -07 08:49:56 wrightsoft" Right-Suite(g) Universal 2013 13.0.07 RSU05790 Page 17 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N wri htsoft Component Constructions Job: 86 Compass Point 9 1/2 bath Byte: jan14, 2014 Croinin Construction Management P.O Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftl-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 63 0.065 21.0 91 0.368 0 3.74 236 0.99 63 6.90 628 1.51 137 -A.}�_ 2014 -Mar -07 08:49:56 ' f wrightsofta Right -Suited Universal 2013 13.0.07 RSU05790 Page 18 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ftl-°F ft2-°F/Btuh Btuh/ft2 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns n 63 0.065 21.0 91 0.368 0 3.74 236 0.99 63 6.90 628 1.51 137 -A.}�_ 2014 -Mar -07 08:49:56 ' f wrightsofta Right -Suited Universal 2013 13.0.07 RSU05790 Page 18 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value r t r^r Location: Loss Indoor: Heating Cooling Boston Logan Int'I AP, MA, US ft2 Indoor temperature (°F) 70 75 Elevation: 30 ft Btuh/ft2 Design TD (°F) 58 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 753 0.99 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 45 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain 1.0 14.7 ft2 Btuh/ft2-°F W-°FBtuh Btuh/ft2 Btuh Btuh/ft2 Btuh Walls 1.51 490 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" s 201 0.065 21.0 3.74 753 0.99 200 gypsum board int fnsh, 2"x6" wood frm w 45 0.065 21.0 3.74 168 0.99 45 all 246 0.065 21.0 3.74 921 0.99 245 Partitions (none) Windows 2 glazing, cir outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 s glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm fir, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm fir, 10" thkns 24 0.300 0 17.3 415 16.0 385 125 0.255 1.0 14.7 1832 12.7 1591 325 0.368 0 6.90 2242 1.51 490 tid I WCI htsoftA 2014 -Mar -07 08:49:56 .,`. 9 Right -Suite® Universal 2013 13.0.07 RSU05790 Page 19 ACCP. ... oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Cooling 70 Indoor temperature (°F) 58 Design TD (°F) 50 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 (L ) Method 72 Construction quality 7.5 Fireplaces Heating Cooling 70 75 58 13 50 50 46.5 27.8 Simplified Ti ht 1 Average) ft2 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-0F ftt-°F/Btuh Btuh/ft2 Btuh Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" e 117 0.065 21.0 3.74 438 0.99 116 gypsum board int fnsh, 2"x6" wood frm s 45 0.065 21.0 3.74 168 0.99 45 all 162 0.065 21.0 3.74 607 0.99 161 Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, hrd wd fir fnsh, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors 19A-Obstp: Part floor, frm flr, 10" thkns 25 0.255 1.0 65 0.368 0 " F wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 ACCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 14.7 366 12.7 318 6.90 448 1.51 98 2014 -Mar -07 08:49:56 Page 20 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain W Btuh/ftp °F ft2- "F/Btuh Btuh/ft2 Btuh Btuh/W Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 77 0.368 0 6.90 531 1.51 116 C WI'1 htsoft d I 2014 -Mar -07 08:49:56 �. ' r' g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 21 ACiCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain W Btuh/ftp °F ft2- "F/Btuh Btuh/ft2 Btuh Btuh/W Btu Walls (none) Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns 77 0.368 0 6.90 531 1.51 116 C WI'1 htsoft d I 2014 -Mar -07 08:49:56 �. ' r' g Right -Suite® Universal 2013 13.0.07 RSU05790 Page 21 ACiCA ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain W Btuh/V-°F ftl-°F/Btuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns s 63 0.065 21.0 70 0.368 0 3.74 236 0.99 63 6.90 483 1.51 106 2014 -Mar -07 08:49:56 .t � wrightsoft' Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 22 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain W Btuh/V-°F ftl-°F/Btuh Btuh/112 Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm flr, 10" thkns s 63 0.065 21.0 70 0.368 0 3.74 236 0.99 63 6.90 483 1.51 106 2014 -Mar -07 08:49:56 .t � wrightsoft' Right-Suite(R) Universal 2013 13.0.07 RSU05790 Page 22 ACCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 0.065 21.0 S 156 0.065 21.0 w 207 0.065 21.0 all 588 0.065 21.0 s 24 0.300 0 w 36 0.300 0 all 60 0.300 0 11*& @@ *YL Zil(i; 3.74 842 0.99 224 3.74 584 0.99 155 3.74 775 0.99 206 3.74 2201 0.99 585 17.3 415 16.0 385 17.3 622 28.2 1015 17.3 1037 23.3 1400 1.64 1027 0.36 225 wri htsofta 2014 -Mar -07 08:49:56 1 9 Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 23 /CCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N h; Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 ( L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ft2-°F/Btuh Btuh/ftz Btu Btuh/ft2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-30bstp: Part floor, r-30 ins, frm fir, 10" thkns n 225 0.065 21.0 S 156 0.065 21.0 w 207 0.065 21.0 all 588 0.065 21.0 s 24 0.300 0 w 36 0.300 0 all 60 0.300 0 11*& @@ *YL Zil(i; 3.74 842 0.99 224 3.74 584 0.99 155 3.74 775 0.99 206 3.74 2201 0.99 585 17.3 415 16.0 385 17.3 622 28.2 1015 17.3 1037 23.3 1400 1.64 1027 0.36 225 wri htsofta 2014 -Mar -07 08:49:56 1 9 Right-SuiteO Universal 2013 13.0.07 RSU05790 Page 23 /CCA ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N - wri htsoftComponent Constructions Job: 86 Compass Point 9 2nd floor hall Byte: jan14, 2014 Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM g K ERA W Location: ft2-°F/Btuh Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft 21.0 Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Windows Daily range (°F) - 15 (L ) Method Simplified 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 Wet bulb (°F) - 72 Construction quality Ti ht glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) 50% outdoor insect screen; foreground = green grass (0.23) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain W Btuh/ftz-°F ft2-°F/Btuh Btuh/ft2 Btu Btu hA2 Btu Walls 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 33 0.065 21.0 3.74 124 0.99 33 gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n 12 0.300 0 17.3 207 8.04 97 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) Doors (none) Ceilings (none) Floors 19A-Obstp: Part floor, frm fir, 10" thkns 180 0.368 0 6.90 1241 1.51 272 ZZ AL_ 2014 -Mar -07 08:49:56 I. rFwrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 24 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MA Front Door faces: N wri htsoft- Component Constructions Job: 86 Compass Point Q Date: jan14, 2014 attic By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 'm.- For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ft2-0F/Btuh Btu h/112 Btu Btuh/ftz Btu Walls 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) n 168 0.073 8.0 4.43 Location: 0.17 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 4.72 Indoor temperature (°F) 70 75 Elevation: 30 ft 0.073 Design TD (°F) 58 13 Latitude: 42°N 10 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: 4541 0.31 Daily range (°F) - 15 (L ) Method Simplified Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Cig HTM Gain ft2 Btuh/ft2-°F ft2-0F/Btuh Btu h/112 Btu Btuh/ftz Btu Walls 15B-8s3c-6: Bg wall, heavy dry or light damp soil, concrete wall, r-8 ins, 8" thk, 1/2" gypsum board int fnsh Partitions (none) n 168 0.073 8.0 4.43 744 0.17 29 e 333 0.073 8.0 4.72 1573 0.40 133 S 152 0.073 8.0 4.29 652 0.06 10 w 333 0.073 8.0 4.72 1573 0.40 133 all 986 0.073 8.0 4.61 4541 0.31 305 Windows 2 glazing, clr outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/4" thk: 2 n glazing, clr outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/4" thk; 50% outdoor insect screen; foreground = green grass (0.23) s all Doors (none) Ceilings 1613-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 1/2" gypsum board int fnsh Floors 21A -24t: Bg floor, heavy dry or light damp soil, 6' depth, tile fir fnsh 48 0.300 0 17.3 829 13.0 625 64 0.300 0 17.3 1106 27.4 1756 112 0.300 0 17.3 1935 21.3 2381 120 0.026 38.0 1.50 180 1.30 156 120 0.025 0 1.44 173 0 0 2014 -Mar -07 08:49:56 i AL_ wrightsofta Right -Suite® Universal 2013 13.0.07 RSU05790 Page 25 ACCK ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces: N i Job: 86 Compass Point Component Constructions wrightsoft� Date: jan14, 2014 dining room By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft'-'F ftl-°F/Btuh Btu hM2 Btu Btuh/ft2 Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) e 90 0.065 21.0 s 171 0.065 21.0 all 261 0.065 21.0 40 0.304 1.0 3.74 337 0.99 90 3.74 640 0.99 170 3.74 977 0.99 260 17.5 701 15.2 609 2014 -Mar -07 08:49:56 1 13 wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 26 �CP....oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 70 75 Elevation: 30 ft Design TD (°F) 58 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 46.5 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range (°F) - 15 (L ) Method Simplified Wet bulb (°F) - 72 Construction quality Tiht Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft'-'F ftl-°F/Btuh Btu hM2 Btu Btuh/ft2 Btu Wal I s 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows (none) Doors (none) Ceilings C part ceiling,: C part ceiling, frm flr, 10" thkns, 1/2" gypsum board int fnsh Floors (none) e 90 0.065 21.0 s 171 0.065 21.0 all 261 0.065 21.0 40 0.304 1.0 3.74 337 0.99 90 3.74 640 0.99 170 3.74 977 0.99 260 17.5 701 15.2 609 2014 -Mar -07 08:49:56 1 13 wrightsoft' Right -Suite® Universal 2013 13.0.07 RSU05790 Page 26 �CP....oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N Job #: 86 Compass Point Performed for: Trust Construction 51 Mount joy drive Tewskbury, ma 01876 attic Croinin Construction Management P.O B ox 72 37 Lowell, Ma 01852 Scale: 1 : 101 Page 4 Right -Suite® Universal 2013 13.0.07 RSU05790 2014 -Mar -07 08:50:24 construction 21 gabriel way.rup wri htsoft Duct System Summary Job: 86 Compass Point 9 Cate: jan14,2014 1st floor system By: Croinin Construction Management P. 0 Box 7237, Lowell, Ma 01852 I ITO, N�k ,; ' Pro ectinfo mations For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0 in H2O 0 in H2O 0 in H2O 0.000 / 0.000 in H20 0 in/100ft 1314 cfm Cooling 0 in H2O 0 in H2O 0 in H2O 0.000 / 0.000 in H2O 0 in/100ft 1314 cfm 0 ft 153 apply Branc eta�lableIN Name Design (Btuh) Htg (cfm) Clg (cfm) Design FR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk Basement c 3366 148 153 0 0 Ox 0 ShMt 0 0 Basement -A c 3366 148 153 0 0 Ox 0 ShMt 0 0 Basement -B c 3366 148 153 0 0 Ox 0 ShMt 0 0 Basement -C c 3366 148 153 0 0 Ox 0 ShMt 0 0 Basement -D C 3366 148 153 0 0 Ox 0 ShMt 0 0 Kitchen C 2581 51 117 0 0 0x0 ShMt 0 0 Living room h 2778 135 126 0 0 Oz0 ShMt 0 0 Living room -A h 2778 135 126 0 0 OX 0 ShMt 0 0 office h 2449 127 111 0 0 0X0 ShMt 0 0 office -A h 2449 127 111 0 0 Ox 0 ShMt 0 0 22 R Name Grill Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Mat[ Trunk rb4 Ox 0 1166 1206 0 0 0 0 Ox 0 ShMt . wrightsoW Right -Suite® Universal 2013 13.0.07 RSU05790 )CCK ...oft HVAC\cronin construction 21 gabriel way.rup Calc = MJ8 Front Door faces: N 2014 -Mar -07 08:49:56 Page 1 wri htsoft Duct System Summary Job: 86 Compass Point 9 Date: jan14, 2014 2nd floor By: Croinin Construction Management P.0 Box 7237, Lowell, Ma 01852 -fit � .�� ! ,�w„F'�.�` �.. 3 ;� ro�ect�lnformat�on , a, 10 a For: Trust Construction 51 Mount joy drive, Tewskbury, ma 01876 External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0 in H2O 0 in H2O 0 in H2O 0.000 / 0.000 in H2O 0 in/100ft 1250 cfm Cooling 0 in H2O 0 in H2O 0 in H2O 0.000 / 0.000 in H20 0 in/100ft 1250 cfm ft 15 S1,p ly Brand Detail Table11 1111 111,1111 ��.� ,,,fOME Name Design (Btuh) Htg (cfm) Clg (cfm) Design FR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk 1/2 bath h 375 37 15 0 0 Ox 0 ShMt 0 0 2nd floor hall h 707 58 29 0 0 Ox 0 ShMt 0 0 Bedroom 2 h 2622 127 107 0 0 Ox 0 ShMt 0 0 Ldy h 294 29 12 0 0 Ox 0 ShMt 0 0 Masterbath h 1501 70 62 0 0 Ox 0 ShMt 0 0 Masterbed room c 3569 109 146 0 0 0x0 ShMt 0 0 Masterbed room -A c 3569 109 146 0 0 0x0 ShMt 0 0 attic c 3716 92 152 0 0 Ox 0 ShMt 0 0 attic -A c 3715 92 152 0 0 OX 0 ShMt 0 0 attic -B c 3715 92 152 0 0 Ox 0 ShMt 0 0 bedroom 1 c 3058 77 125 0 0 OX 0 ShMt 0 0 bouns room c 3541 116 145 0 0 OX 0 ShMt 0 0 boons room closet h 334 33 14 0 0 OX 0 ShMt 0 0 bouns room -A c 3541 116 145 0 0 OX 0 ShMt 0 0 dining room h 1132 77 46 0 0 OX 0 ShMt 0 0 full bath h 171 18 7 0 0 Ox 0 ShMt 0 0 M ERe. turn B anch Detait table Name Grill Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Matl Trunk rb3 OX 0 1250 1458 0 0 0 0 Ox 0 ShMt .Q � wrightsoftw Right -Suite@ Universal 2013 13.0.07 RSU05790 ACCP ...oft HVAC\cronin construction 21 gabriel way. rup Calc = MJ8 Front Door faces 2014 -Mar -07 08:49:56 Page 2