Loading...
HomeMy WebLinkAboutMiscellaneous - 90 COMPASS POINT ROAD 4/30/2018l Location P �r'`QU j J PrI ; � t No. -y, � — l -5 Date Check # 110"00 TOWN OF NORTH ANDOVER Certificate of Occupancy $ Building/Frame Permit Fee $ Foundation Permit Fee $ Other Permit Fee $ TOTAL $- B ilding Building Inspector NUMBER TOWN OF NORTH ANDOVER SCHEDULE OF DEPARTMENTAL PAYMENTS DEPARTMENT: BUILDING DATE:4"')l 1 2014 GENERAL LEDGf-R A/C # 1001001.1.1.2.0241.0000.0 FROM WHOM SOURCE AMOUNT TOTAL 1001001.1.1.2.0241.0000.0.433300. BLDG 1001001.1.1.2.0241.0000.0.433500. ELEC 1001001.1.1.2.0241.0000.0.433400. PLB 1001001.1.1.2.02,41.0000.0.433800. GAS bD COMMONWEALTH OF MASSACHUSETTS TOWN OF NORTH ANDOVER NUMBER DATE: ' '2 To the Accounting Officer: The above is a ailedlIlist'' of moneys colt cted by me, a ounting in the aggregate ,� To sum of ✓2_.`—� �4-d �'—, �-� 1yx Dollars, For the Period nding e, which I have paid to the Town Treasurer, whose rec ipt I hold th refor. TITLE White: Departmental Copy Pink: Accounting Yellow: Treasurer 12IX MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK CITY �— _ ) MA DATE-,_5=.� : PERMIT # �Qb JOBSITE ADDRESS r C j�' iV7 1I OWNER'S NAME) P OWNER ADDRESS- - ELr_ 32p�3 , AX �— TYPE OR OCCUPANC TYPE COMMERCIAL �J EDUCATION RESIDENTIAL PRINT CLEARLY NEW: RENOVATION: REPLACEMENT: PLANS SUBMITTED: YES NO[I FIXTURES I FLOOR- BSM 1 2 3 4 5 1 6 7 1 8 9 10 11 12 13 14 anruri io _ CROSS CONNECTION DEVICE DEDICATED SPECIAL WASTE SYSTEM DEDICATED GAS/O]USAND SYSTEM DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYSTEM DEDICATED WATER RECYCLE SYSTEM DISHWASHER DRINKING FOUNTAIN FOOD DISPOSER FLOOR I AREA DRAIN INTERCEPTOR IINTERIORI LAVATORY ROOF DRAIN SHOWER STALL SERVICE I MOP SINK URINAL WASHING MACHINE CONNE WATER HEATER ALL TYPES WATER PIPING OTHER 1. ,"OUNMrvct UVVt;KAGE: I have a current liability insurance policy or its substantial equivalent which meets the requirements of MGL Ch. 142. YES . _ NO R.1 IF YOU CHECKED YES, PLEASE INDICATE TH TYPE OF COVERAGE BY CHECKING THE APPROPRIATE BOX BELOW LIABILITY INSURANCE POLIC OTHER TYPE OF INDEMNITY [] BOND 0 OWNER'S INSURANCE WAIVER: I aware that the licensee sloes not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and hat my signature on this permit application Valves this requirement. CHECK ONE ONLY: WNER .: AGENT SIGNATURE OF OWNER OR AGENT 1 hereby certify that all of the details and Information I have submitted or entered regarding this application are trua an a rata tot est of my knowledge and that all plumbing work and Installations performed under the permit issued for this application will be in compli e h all P on rovlslon of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER'S NAM ►I LICENSE # GNA MP JP ._ i CORPORATION �ARTNERSHIP __ #= LLC [_�,I# COMPANY NAME ADDRESS _ �x_ ---- -- . .......----- CI - — - STATE ZIP d _ .. �� II TEL f FAX .3 j_- CELL — _- EMAIL `p PERMIT FOR GAS INSTALLATION This certifies that ..... \-J;t? .%:', f -e-- has permission for gas installation .. P.-"«....... «`-.. ... in the buildings of ...o J...: %: , ori ...J. �';� `t . ........... . at ....r.�....��.u�' ... , . , , ,North Andover, Mass. Fee Lic. No. /_Sf1 �� t ..!0�` A,�� GASINSPEC OR Check #�; U I / U This certifies that .... ( . .CL-!. ........... . has permission to perform. :.... �� .lam? �!� , ............ plumbing inn the buildings of. G. ......... fe `: r'�.. �U ...... n North Andover, Mass. Fee ! !' . ? o.. Lic. No. 45W7.V� "i; rim/�:%' �/,�c� . _ PLUMBING INSPECTOR Check # .57�?- -2- INFRARED HEATER LABORATORY COCKS MAKEUP AiR UNIT bVEN POOL HEATER ROOM / SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER I have a current liability Insurance policy or Its substantial equivalent which meets the requirements of MGL. Ch, 142 YES12fm EI I IF YOU CHECKED YES, PLEASE INDICATE THE TYPE OF COVER BY CHECKING THE APPROPRIATE BOX BELOW LIABILITY INSURANCE POLICY OTHER TYPE INDEMNITY ED BOND rj OWNER'S INSURANCE WAIVER: l am aware that the Ilcensee does not have the Insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER �GENT 0- SIGNATURE OF OWNER I hereby certify that ail of the details and Information I have submitted or entered regarding this application are true and ac r e to best of my knowl and that all plumbing work and Installations performed under the permit issued for this application will be In comp llanc iI P rant provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. / PLUMBER GASFITTER NAM. LICENSE #rPARTN IGNATURE MP AGF [] JP D JGF `j LPG[ ® CORPORATION)a# Zy IP �W _ LLC C�#��� J) COMPANY NAME:13__G�cFt! ... - .I�ADDRESS CITYJ .i wSTATEK�]ZIP 0TELO33% -- FAX CELL�EMAILI. MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY MA DATE , - _ - PERMIT # 1� JOBSITEADDRESS _ _ 1j _ _ OWNER'S NAME _ .. G OWNERADDRESS /�l� O LAG✓ TE S&_'e326'_)3 FAX _ GSCO._� TYPE OR OCCUPANC TYPE COMMERCIAL (] EDUCATION L RESIDENTIAL DSJ CLEARLY NEW: RENOVATION: [ REPLACEMENT: [� PLANS SUBMITTED: YES Q NO(,�_I APPLIANCES I FLOORS-► BSM 1 2 3 4 5 6 1 7 8 9 10 11 12 13 14 BOILER 1 . BOOSTER _ _f • . , .-. �. CONVERSION BURNER COOK STOVE_ Ej DIRECT VENT HEATER ! .�,�7 i _ _ __.J I . i -_ J . _ I ....,J ._ DRYER j j - FIREPLACE FRYOLATOR FURNACE Zj GENERATOR GRILLE - 1 R-- . _ .- _ ,1 . _ . L.,-,1 INFRARED HEATER LABORATORY COCKS MAKEUP AiR UNIT bVEN POOL HEATER ROOM / SPACE HEATER ROOF TOP UNIT TEST UNIT HEATER UNVENTED ROOM HEATER I have a current liability Insurance policy or Its substantial equivalent which meets the requirements of MGL. Ch, 142 YES12fm EI I IF YOU CHECKED YES, PLEASE INDICATE THE TYPE OF COVER BY CHECKING THE APPROPRIATE BOX BELOW LIABILITY INSURANCE POLICY OTHER TYPE INDEMNITY ED BOND rj OWNER'S INSURANCE WAIVER: l am aware that the Ilcensee does not have the Insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER �GENT 0- SIGNATURE OF OWNER I hereby certify that ail of the details and Information I have submitted or entered regarding this application are true and ac r e to best of my knowl and that all plumbing work and Installations performed under the permit issued for this application will be In comp llanc iI P rant provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. / PLUMBER GASFITTER NAM. LICENSE #rPARTN IGNATURE MP AGF [] JP D JGF `j LPG[ ® CORPORATION)a# Zy IP �W _ LLC C�#��� J) COMPANY NAME:13__G�cFt! ... - .I�ADDRESS CITYJ .i wSTATEK�]ZIP 0TELO33% -- FAX CELL�EMAILI. 1 1 :3 ! L Date.... 11.+ {( ....... TOWN OF NORTH ANDOVER PERMIT FOR MECHANICAL INSTALLATION This certifies that :1 ..` :...� l ; ... . has permission for mechanical installation in the buildings of ..' :. L s :.:....... �_.......... ........... at ... . t.... A..... x. . _, ....r�. r ...... , North Andover, Mass. Fee. _ f r�. -:.. Lic. No..'t�i ..................... . GASINSPECTOR WHITE: Applicant CANARY: Building Dept. PINK: Treasurer 1 • Commonwealth of Massachusetts Sheet Metal Permit Date: Estimated Job Cost: $ t' p Plans Submitted: YES NO Business License # Lq(k Business Information: Name: �" -�pq + 416– V 14 Street: Ad 'lot . City/Town: Telephone: Photo I.D. required / Copy of Photo I.D. attached J-1 / M -1 -unrestricted license %(„ Permit # / 1q Permit Fee: $62 Plans Reviewed: YES NO Applicant License # %4.N1 Property Owner / Job Location Information: Name: l , s 6asyuW_o19 Street: 9. D �Qj',was " T City/Town: �), �11'1dQi/' /,f d%8yS Telephone: YES d- NO ALI staff Initial J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 10,000 sq. ft. / 2 -stories or less tA Residential: 1-2 family t4 Multi -family Condo / Townhouses Other Commercial: Office Retail Industrial Educational Institutional Other Square Footage: under 10,000 sq. ft. _tC over 10,000 sq. ft. Number of Stories: Sheet metal work to be completed: New Work: 4 Renovation: HVAC __�— Metal Watershed Roofing Kitchen Exhaust System Metal Chimney / Vents Air Balancing Provide detailed description of work to be done: 1 i INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 112 Yes ❑ No ❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy ❑ Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent I By checking this box[], I hereby certify that all of the details and information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Date Date Progress Inspections Comments Final Inspection Inspector Signature of Permit Approval Comments - Signature of Licensee License Number: ✓(5&4© Check at www.mass.gov/dpi Type of License: BY 'Master Title ❑ Master -Restricted City/Town ❑Journeyperson Permit # ❑Jou rneyperson-Restricted Fee $ ❑ Inspector Signature of Permit Approval Comments - Signature of Licensee License Number: ✓(5&4© Check at www.mass.gov/dpi il A J Tv Im E 4, Ist ... ...... n'" 605.03.20fl.,-, NONr '.3. non or 'I ASS 11 PUT 1 t7 DM NONr, KIAL ERIC 10 tt' 03 LONG Dit II DRAW, MA 01026.204A 1-1 OF MA,;SACHU,:,L-- i (,�i SMUT METO 1. worwcwl A.')' A X .1 ARLINGTON ST 1) P A �, IJ'l Il A 11 18 6 ;93 6 It i. 1 r; The Commompeu1111 ofMassachusetts. t Ic�1MIMIti� YET) i', 'J1,�. I VIIdfJIiy11L't Department of,(rulustrlulAccicicttls Ca.arr t Office of Its vesti tttiolls 1 Congress Street, Suite 100 U`� Boston, AL4 02114-2017 tM)v.mttss.ggv%illi tiV(')'lccl's' ColllpcllN:lliun Insurance Aflldigit.Builders/Colttl•Ketol•s/Llectricililis/Plitliibct•s �lplicn)ll. Zll1'urulaliul>i • 1'lctlsc, Pi►lit Legibly Name(13usitiess/Qrg"ulzntlori/Indlvldunl): J 6 J Ilea, Air Couditiotnny.. Inc. A(ldress:�:17' A-0.1tigtorl Street City/Sl11lC/7-i is Dracut: MA 01tI26 I'honc /l: Are yOul till enlpluyct•7 Cltecic the appropl'lalo box: ` 8-454-8197 7 i • I rtlll it culployer with r 4...[j I. am a yencral contractor and I • l'YI))CC,,o!f project (redulrcd): _, call loyct;s (full null/o► port -limo).* . hnvo Itired tho.sub-contractors 6: tr New construction 2. ❑ 1 hill Il sole propl'ictor or l)artiici-- . listed oil tho attached shlct. 7. E] Remodeling ship and hav0 110 c111pl0ycCS Theso sub -contractors hnvo 8 I�C111011t10n working for talc in any capacity, culployccs nod hnvo workers' [No workers: coup. m5111•tince con)ll: iustirauee.;. 9. M Dilildiag additiojl required.] 5. [� 3. I :ua it homeowner We nub a corppration mid its officers have ME] Electrical reimirs of additions cloing till work myscl1. [No workers' co)ilp. Weercised•thcir right of oxotuption per MCIL 11.[] 1'lunlbing repairs or "dcliliolls insurance rccluircd.] t c. 152, §1(']), and wo hnvo ll0 12 ❑ lZbof rcpail:5 employees. [No workers' 13.❑ Othci- coat ), Insurnnco ret aired.) 'Any npplienul thnt checks bu.e U1 must nlsri 1111 out 1110 sectio" below rhowbrg their wutkon' cowpmranlion pollcy Infunnnliorr. —1 1 I lomcuwucrs who subinit ilils,nffjdnvlt hrdicnung thoy aro doing nil work and tile" biro oulrrldo. cpntlactors moat suLrnit n new ntlidnvit indicating such• tCuulrnclurs thnt check this box.uurst nttncllcrl nn additional sbcot showing tiro nalno of Iho aub•cuntraclora and sink whcllrcr or not thoso entities hnvc cngiluycc5: If Ilia sub•anurnotors hnvo cr"ployees, they tiwst'provldo Ihclr mtkers' comp, pollcy number. i um rrll u,lploye, that Is proplding worketsI conlpcnsatlolt./nsltrancefornty employees. Beloit/ IT the pollcy andjob site in/orinttiun. Insurnucc Conlpnny Nnulc: A.I.M. Mutual Ilnoulrance Co. Policy 11 ur Sell=ins. Lie. 11 WM7-8(10-8006553-2013A t Expiration Date: 06/02/20)4 Jul) Site t ddi-ess: .A11. :locatlout; iu y V/ I (/// r Attach It Col)y of the wot•I(ers' collil nslitioll policy declaralloll I)ago (si101vilig tile I)OIICy.illllllbel' sled cxpiratioa (1olt). Failure to sccuro euvct'1g0 as required under Section 25A of MGL C. 152 call lead to the i111positioll of crimillal 1)C11111tics•of a Lille up to $1,500,00. and/or unc-yopr iulprisolunclil, as well as civil pelinitics 111 the form of a 5'TOl' WOIZIC O1ZDLlt and n fine of up to 25(J.UU Il cloy aguinst 1110 violator. Be advised that a copy of this stntelncllt may be forwarded to the OfFlce of Invcstilntlons of the DIA Fol• ilIS111'nI1CC Coverage vcriFlt;at►oll. A (lv lrer cGlr r r r fir l' rrm- -- tlr7 rrrlis -7 7 r url r.IrrlltlC , n )r_r ur r that the llt ormatlon provided above 1; trite and correct Ojf is ial ase only. Do not write lit flits area, to be cvntpleted by city or tome gjjclal. City ur'I'o)vll: 1'erallt/Llcense 0 Issulllg Authority (ell -CIO otle); 1. I3unrd of 11cu►tll 2. Building Pepartument 3. Cltyrl'own Cleric 4. Electrical Inspector 5.1'lualblul; Inspector (i. OUlcl• Cuntnet Persoll: - I'honc It: ACORD CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH 06/03/2013 PRODUCER 978.887, 4900 FAX 978.887.2404 Edward F. Sennott Insurance Agency, Inc. 16 South Main Street P. 0. Box 457 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. TYPE OF INSURANCE POLICY NUMBER Topsfield, MA 01983 INSURERS AFFORDING COVERAGE NAIC # INSURED )&] Heating & Air Conditioning, Inc. 17 Arlington Street Dracut, MA 01826 INSURERA: Great American Alliance Ins Co GENERAL LIABILITY INSURERS: Safety Insurance Company 39454 INSURERC: A.I.M. Mutual Insurance Co. EACH OCCURRENCE $ 1,000,000 INSURER D: COMMERCIAL GENERAL LIABILITY INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I LTR LTA DD' NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE MM DD POLICY EXPIRATION DATE MM D LIMITS GENERAL LIABILITY PAC6418906-07 06/01/2013 06/01/2014 EACH OCCURRENCE $ 1,000,000 COMMERCIAL GENERAL LIABILITY PREMISES TO REa occur TEante $ 300,000 CLAIMS MADE I OCCUR MED EXP (Any one person) $ 10,000 A X PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,00 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 POLICY PRO- JECT LOC AUTOMOBILE LIABILITY 2434550 06/01/2013 06/01/2014 COMBINED SINGLE LIMIT $ ANY AUTO (Ea accident) 1,000,000 ALL OWNED AUTOS X BODILY INJURY $ B SCHEDULED AUTOS (Per person) X HIRED AUTOS " X BODILY INJURY $ NON -OWNED AUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/UMBRELLA LIABILITY UMB6418958-05 06/01/2013 06/01/2014 EACH OCCURRENCE $ 2,000,00 OCCUR F-1CLAIMS MADE AGGREGATE $ 2,000,00 A $ DEDUCTIBLE $ X RETENTION $ 10,000 $ WORKERS COMPENSATION AND WMZ-800-8006553-2013A 06/02/2013 06/02/2014 1 TORY LIMITS ER EMPLOYERS' LIABILITY E.L. EACH ACCIDENT $ 1,000,000 CANY PROPRIETOR/PARTNER/EXECUTIVF{/N OFFICER/MEMBER EXCLUDED? u E.L. DISEASE - EA EMPLOYE $ 1,000,000 (Mandatory In NH) If yes, describe under E.L. DISEASE - POLICY LIMIT $ 1,000,00 SPECIAL PROVISIONS below I OTHER DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS l:tH i H-iL:A I t HOLDER rANrFI I ATinm SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIC DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. Evidence of Insurance AUTHORIZED REPRESENTATIVE I jPeter Sennott/AAM 1!9 ` ACORD 25 (2009/01) © 1988-2009 ACORD CORPORATION. All rights reserved The ACORD name and logo are registered marks of ACORD Load Short Form Job: 410 Compass Rd - wrightsoft Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project Information For: Barlo Building 100 Compass point, N Andover, ma Design Information Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AHRI ref. n/a Efficiency n/a Htg load Heating input 0 Btuh Heating output 0 Btuh Temperature rise 0 OF Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a 833 COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Coil n/a AHRI ref. n/a Efficiency n/a Htg load Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 833 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 1014 17105 12149 519 519 (Rest of House) d 1560 25717 16668 833 833 Entire House d 2574 42821 28785 1352 1352 Other equip loads 0 0 Equip. @ 0.93 RSM 26655 Latent cooling 9138 Tr)TAIC Oc7A nnoni nc�nn anrn -�• •--�-• vv. vv � VV[. 1 VJL Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft^ 2013 -Apr -2313:44:35 9 Right -Suite® Universal 2012 12.0.13 RSU05790 ACCA C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Page 1 wrightsoft. Load Short Form Job: Q6 Compass Rd Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@ijheatac.com Web: iiheatac.com Project Information For: Barlo Building 100 Compass point, N Andover, ma Design Information Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFU E 0 MBtuh 0 Btuh 0 OF 833 cfm 0.032 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 833 cfm 0.050 cfm/Btuh 0 in H2O 0.74 4922 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Play Room 546 8687 4922 281 246 Kitchen 266 4861 4855 157 243 1/2 bath 49 1628 422 53 21 dinning room 400 5393 4227 175 211 Living room 250 4375 2070 142 103 hall 49 771 172 25 9 (Rest of House) d 1560 25717 16668 833 833 Other equip loads 0 0 Equip. @ 0.93 RSM 15435 Latent cooling 5722 TnTAI C n4,— vVv G..1/ II LI IJ/ oils 833 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ftn ,,,,,.- + wrihtsog Right-SuiteO Universal 2012 12.0.13 RSU05790 2013-Apr-2313:44:35 ACCP. C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Page 2 wrightsoft, Load Short Form Job: etj Compass Rd Date: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project formation For: Barlo Building 100 Compass point, N Andover, ma Design Information Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT Make Amana Trade Goodman Model AMH950453B AHRI ref 456321 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 95 AFU E 0 MBtuh 0 Btuh 0 OF 519 cfm 0.030 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make AMANA Trade GOODMAN Cond CHPF2430b Coil ASX13024 AHRI ref 837621 Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 519 cfm 0.043 cfm/Btuh 0 in H2O 0.78 457 ROOM NAME Area Htg load Cig load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor hall 204 1893 457 57 20 master Bedroom 238 4776 4413 145 188 Walk in Closet 112 1085 1477 33 63 Master bath 196 3312 2020 100 86 office 108 2867 1652 87 71 bedeoom 2 156 3171 2130 96 91 2nd floor d 1014 17105 12149 519 519 Other equip loads 0 0 Equip. @ 0.93 RSM 11250 Latent cooling 3416 TOT41C 101n 171 me 4nnnn ivl- Ir ivv I 400 Dly 01y Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ri htsoft" 2013 -Apr -2313:44:35 ,,,�,,,, w � 9 Right-SuiteC� Universal 2012 12.0.13 RSU05790 ACCP. C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Page 3 wri htftm Load Multizone Summary Report Job: 9O. Compass Rd f" gsoDate: Apr 23, 2013 By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Infiltration 3 w Load and AVF Summary ROOM NAME Area ft2 Heating Clg load Btuh Htg AVF cfm C1gAVF cfm Cooling 204 1893 ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM Walk in Closet ft3 1085 cfm Btuh/ft2 ft3 Master bath cfm Btuh/ft2 2nd floor 9126 0.81 office 123 6.4 9126 0.79 71 120 1.4 (Rest of House) 14040 0.80 91 187 6.4 14040 0.78 519 182 1.4 Entire House 23166 0.20 281 310 1.6 23166 0.08 4855 302 0.1 3 w Load and AVF Summary ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm C1gAVF cfm 2nd floor hall 204 1893 457 57 20 master Bedroom 238 4776 4413 145 188 Walk in Closet 112 1085 1477 33 63 Master bath 196 3312 2020 100 86 office 108 2867 1652 87 71 bedeoom 2 156 3171 2130 96 91 2nd floor 1014 17105 12149 519 519 Play Room 546 8687 4922 281 246 Kitchen 266 4861 4855 157 243 1/2 bath 49 1628 422 53 21 dinning room 400 5393 4227 175 211 Living room 250 4375 2070 142 103 hall 49 771 172 25 9 (Rest of House) 1560 25717 16668 833 1 833 Entire House 2574 42821 28785 1352 -F 1352 �—^„ wrl ltsofRight-Suite� Universal 2012 12.0.13 RSU05790 2013 -Apr -2313:44:35 ACCA C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Page 1 Building Anal sis Job: ap Compass Rd wrightsoft' y Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: iiheatac.com For: Barlo Building 100 Compass point, N Andover, ma Desinn Cnnditir Location: Btuh/ft2 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 10616 Indoor temperature (°F) 68 75 Elevation: 30 ft 7.5 Design TD (°F) 56 13 Latitude: 42°N Ceilings Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Ducts Daily range6 °F) - 15 (L ) Method Simplified 0 Wet bulb (° -72 Humidification Construction quality Ti ht 0 Wind speed (mph) 15.0 7.5 Fireplaces 1 Average) Adjustments Heating Coolin -Component Btuh/ft2 Btuh % of load -Component Walls 4.0 10616 24.8 Glazing 16.7 3203 7.5 Doors 21.7 2732 6.4 Ceilings 1.8 971 2.3 Floors 1.6 1609 3.8 Infiltration 6.4 18936 44.2 Ducts 4754 11.1 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 42821 100.0 Coolin -Component Btuh/ft2 Btuh % of load Walls 1.3 3350 11.6 Glazing 22.1 4234 14.7 Doors 10.3 1302 4.5 Ceilings 1.6 874 3.0 Floors 0.4 365 1.3 Infiltration 1.4 4175 14.5 Ducts 2925 10.2 Ventilation 0 0 Internal gains 11560 40.2 Blower 0 0 Adjustments 0 Total 1 28785 100.0 Latent Cooling Load = 9138 Btuh Overall U -value = 0.077 Btuh/ft2-°F Data entries checked. wri htsoft• 2013 -Apr -2313:44:35 9 Right-Suit,,O Universal 2012 12.0.13 RSU05790 Page 1 ACCA C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Building Analysis Job: C(O Compass Rd wrightsoft 9 y Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax 978 454 8615 Email: office@jiheatac.com Web: jjheatac.com Prooect Informatio For: Barlo Building 100 Compass point, N Andover, ma Component Design Conditions % of load Walls Location: 6739 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 7.8 Indoor temperature (°F) 68 75 Elevation: 30 ft Ceilings Design TD (°F) 56 13 Latitude: 420N 1.6 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42:7 27.8 Dry bulb (°F) 12 88 Infiltration: 0 Dally range °F) - 15 ( L ) Method Simplified 0 Wet bulb (°F� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) Adjustments 0 Total 1257171 1166681 Heating Component Btuh/ft2 Btuh % of load Walls 4.2 6739 26.2 Glazing 16.7 2002 7.8 Doors 21.7 911 3.5 Ceilings 1.8 971 3.8 Floors 1.6 1609 6.3 Infiltration 6.4 11431 44.4 Ducts 2054 8.0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1257171 1166681 100.0 Cooling Component Btuh/ft2 Btuh % of load Walls 1.4 2200 13.2 Glazing 19.7 2364 14.2 Doors 10.3 434 2.6 Ceilings 1.6 874 5.2 Floors 0.4 365 2.2 Infiltration 1.4 2521 15.1 Ducts 571 3.4 Ventilation 0 0 Internal gains 7340 44.0 Blower 0 0 Adjustments 0. Total 1 1166681 100.0 Latent Cooling Load = 5722 Btuh Overall U -value = 0.067 Btuh/ft2-°F Data entries checked. so .t + Wrlhtft• 2013 -Apr -2313:44:35 g Right -Suite( Universal 2012 12.0.13 RSU05790 ,4(--Ck C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Page 2 Building Analysis Job: V Compass Rd -- wrightsoftm 7 Date: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com For: Barlo Building 100 Compass point, N Andover, ma Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range °F) - Wet - Wind speed (mph) 15.0 Heating Indoor: Heating Cooling —Component Walls Indoor temperature (°F) 68 75 Glazing Design TD (°F) 56 13 Doors Relative humidity (%) 50 50 Cooling Moisture difference (gr/Ib) 42.7 27.8 88 Infiltration: 0 0 15 ( L ) Method Simplified 43.9 72 Construction quality Tiht 15.8 7.5 Fireplaces 1 Average) 0 Heating Cooling Btuh/ft2 Btuh % of load —Component Walls 3.8 3877 22.7 Glazing 16.7 1201 7.0 Doors 21.7 1821 10.6 Ceilings 0 0 0 Floors 0 0 0 Infiltration 6.4 7505 43.9 Ducts 2700 15.8 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 1 171051 100.0 Cooling Latent Cooling Load = 3416 Btuh Overall U -value = 0.106 Btuh/ft2-°F Data entries checked. WI'1 htsoft" 2013 -Apr -2313:44:35 9 Right-Suil,,O Universal 2012 12.0.13 RSU05790 Page 3 ACCP. C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Btuh/ft2 Btuh % of load —Component Walls 1.1 1150 9.5 Glazing 26.4 1899 15.6 Doors 10.3 868 7.1 Ceilings 0 0 0 Floors 0 0 0 Infiltration 1.4 1655 13.6 Ducts 2357 19.4 Ventilation 0 0 Internal gains 4220 34.7 Blower 0 0 Adjustments 0 Total 12149 100.0 Latent Cooling Load = 3416 Btuh Overall U -value = 0.106 Btuh/ft2-°F Data entries checked. WI'1 htsoft" 2013 -Apr -2313:44:35 9 Right-Suil,,O Universal 2012 12.0.13 RSU05790 Page 3 ACCP. C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N •Job: 10 wri htsoft- Component Constructions Compass Rd 9 Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project For: Barlo Building 100 Compass point, N Andover, ma Construction descriptions or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ftz Bluh/ftz-°F ftz-°FBtuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk Doors 11 DO: Door, wd sc type Ceilings 166-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceil ins Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm fir, 10" thkns n 300 0.091 13.0 5.06 1518 1.96 Location: Boston Logan Int'I AP, MA, US e 270 Indoor: Indoor temperature (°F) Heating 68 Cooling 75 Elevation: 30 ft 1.96 Design TD (°F) 56 13 Latitude: 420N 5.06 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: 0.065 21.0 Daily range (°F) - Wet bulb (°F) - 15 (L 72 ) Method Simplified e 609 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Tiht 1 Average) 0.99 Construction descriptions or Area Ll -value Insul R Htg HTM Loss Clg HTM Gain ftz Bluh/ftz-°F ftz-°FBtuh Btuh/ft2 Btu Btuh/ftz Btu Walls 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk Doors 11 DO: Door, wd sc type Ceilings 166-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceil ins Floors 19A-30bswp: Part floor, hrd wd flr fnsh, r-30 ins, frm fir, 10" thkns n 300 0.091 13.0 5.06 1518 1.96 587 e 270 0.091 13.0 5.06 1366 1.96 528 w 189 0.091 13.0 5.06 956 1.96 370 all 759 0.091 13.0 5.06 3840 1.96 1485 n 252 0.065 21.0 3.61 911 0.99 251 e 609 0.065 21.0 3.61 2201 0.99 606 s 384 0.065 21.0 3.61 1388 0.99 382 w 630 0.065 21.0 3.61 2277 0.99 627 all 1875 0.065 21.0 3.61 6776 0.99 1865 n 24 0.300 0 16.7 400 8.94 214 e 12 0.300 0 16.7 200 29.1 349 s 84 0.300 0 16.7 1401 15.6 1309 w 72 0.300 0 16.7 1201 29.1 2096 all 192 0.300 0 16.7 3203 20.7 3969 n 42 0.390 0 21.7 911 10.3 434 n 84 0.390 0 21.7 1821 10.3 868 all 126 0.390 0 21.7 2732 10.3 1302 546 0.032 30.0 1.78 971 1.60 874 1014 0.034 30.0 1.59 1609 0.36 365 ,1 " F- wrightsoft°' Right -Suite@ Universal 2012 12.0.13 RSU05790 2013 -Apr -23 13:44 Page age 1 1 ACOA C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJB Front Door faces: N Job: Compass Rd - - wrightsoft- Component Constructions Job: gApr2ompas 3, 2013 (Rest of House) BY: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@iiheatac.com Web: jiheatac.com Project• • For: Barlo Building 100 Compass point, N Andover, ma Desian Cnnditir Location: 234 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 1.96 Indoor temperature (°F) 68 75 Elevation: 30 ft 13.0 Design TD (°F) 56 13 Latitude: 420N W Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: 5.06 3096 Daily range (°F) - 15 (L ) Method Simplified 0.065 Wet bulb (F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 167 Construction descriptions or Area U -value Insul R Htg HTM Loss Clg HTM Gain ft2 Btuh/ft2-°F ftz-°F/Btuh Btuh/ft2 Btu ROM Btu Walls 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk Doors 11 DO: Door, wd sc type Ceilings 1613-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceil ins Floors 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, frm flr, 10" thkns n 234 0.091 13.0 5.06 1184 1.96 458 e 189 0.091 13.0 5.06 956 1.96 370 W 189 0.091 13.0 5.06 956 1.96 370 all 612 0.091 13.0 5.06 3096 1.96 1197 n 168 0.065 21.0 3.61 607 0.99 167 e 339 0.065 21.0 3.61 1225 0.99 337 s 186 0.065 21.0 3.61 672 0.99 185 W 315 0.065 21.0 3.61 1138 0.99 313 all 1008 0.065 21.0 3.61 3643 0.99 1002 n 24 0.300 0 16.7 400 8.94 214 e 12 0.300 0 16.7 200 29.1 349 s 48 0.300 0 16.7 801 15.6 748 W 36 0.300 0 16.7 600 29.1 1048 all 120 0.300 0 16.7 2002 19.7 2360 n 42 0.390 0 21.7 911 10.3 434 546 0.032 30.0 1.78 971 1.60 874 1014 0.034 30.0 1.59 1609 0.36 365 2013-Apr-2313:44:35WCI 1tSQf" Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 2 ACCA C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N wri htsoft Component Constructions Job: q0 Compass Rd 9 Date: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com LLava intormation For: Barlo Building 100 Compass point, N Andover, ma esion Cnnditir Location: or Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 30 ft ft2 Design TD (°F) 56 13 Latitude: 420N BtuhRlz Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: n 66 Daily range (°F) - 15 (L ) Method Simplified 1.96 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Ti ht 1 Average) 0.091 Construction descriptions or Area U -value Insu1 R Htg HTM Loss Cig HTM Gain glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk w ft2 Btuh/ft2-'F ftz-'F/Btuh Btuh/(lz Btu BtuhRlz Btu Walls all 72 0.300 0 16.7 1201 22.3 1609 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm n 66 0.091 13.0 5.06 334 1.96 129 11 DO: Door, wd sc type e 81 0.091 13.0 5.06 410 1.96 158 all 147 0.091 13.0 5.06 744 1.96 288 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 84 0.065 21.0 3.61 304 0.99 84 gypsum board int fnsh, 2"x6" wood frm a 270 0.065 21.0 3.61 976 0.99 269 (none) s 198 0.065 21.0 3.61 716 0.99 197 w 315 0.065 21.0 3.61 1138 0.99 313 all 867 0.065 21.0 3.61 3133 0.99 862 Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 s 36 0.300 0 16.7 600 15.6 561 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk w 36 0.300 0 16.7 600 29.1 1048 all 72 0.300 0 16.7 1201 22.3 1609 Doors 11 DO: Door, wd sc type n 42 0.390 0 21.7 911 10.3 434 n 42 0.390 0 21.7 911 10.3 434 all 84 0.390 0 21.7 1821 10.3 868 Ceilings (none) Floors (none) t 2013-Apr-2313:44:35WI1 ItSOf" Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 3 ACC% C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Project Summar Job: Cid Compass Rd -- wrightsoft9 y Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: iiheatac.com Prooect Information For: Barlo Building 100 Compass point, N Andover, ma Notes: µ . Design Information Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Daily range L Relative humidity 50 % Moisture difference 28 gr/Ib Heating Summary . Sensible Cooling Equipment Load Sizing Structure 38068 Btuh Structure 25860 Btuh Ducts 4754 Btuh Ducts 2925 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 42821 Btuh Use manufacturer's data n Efficiency Rate/swing multiplier 0.93 n/a Infiltration Equipment sensible load 26655 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Latent cooling 0 Btuh Fireplaces 1 (Average) Structure 8085 Btuh Btuh Actual air flow Ducts 1052 Btuh 0 Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft22574 2574 Equipment latent load 9138 Btuh Volume ft3) 23166 23166 0 in H2O Space thermostat Air changes/hour 0.20 0.08 Equipment total load 35793 Btuh Equiv. AVF (cfm) 310 302 Req. total capacity at 0.70 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. soft" 2013 -Apr -2313:44:35 WCIht 9 Right -suite@ Universal 2012 12.0.13 RSU05790 Page 1 ACCA C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Project Summar Job: �% Compass Rd -- wrightsoft� y Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@iiheatac.com Web: jjheatac.com w ~ Proiect • • For: Barlo Building 100 Compass point, N Andover, ma Notes: Design Information Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 °F Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Daily range Relative humidity L 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 23663 Btuh Structure 16097 Btuh Ducts 2054 Btuh Ducts 571 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 . Btuh Equipment load 25717 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 15435 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 5032 Btuh Ducts 690 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2) 1560 1560 Equipment latent load 5722 Btuh Volume (ft3) 14040 14040 Air changes/hour 0.80 0.78 Equipment total load 21157 Btuh Equiv. AVF (cfm) 187 182 Req. total capacity at 0.80 SHR 1.6 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 MBtuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 833 cfm Actual air flow 833 cfm Air flow factor 0.032 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.74 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. t Wriihtsoft" 9 2013 -Apr -2313:44:35 ,....-. Right-SuiteCn� Universal 2012 12.0.13 RSU05790 /4CCk C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Page 2 + - wrightsoft' Project Summary 2nd floor J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@iiheatac.com Web: iiheatac.com For: Notes: Barlo Building 100 Compass point, N Andover, ma Design Information Weather: Boston Logan Int'I AP, MA, US Job: -qo Compass Rd Date: Apr 23, 2013 By: Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Btuh Daily range L Relative humidity 50 % 0 Btuh Use manufacturer's data Moisture difference 28 gr/Ib Heating Summary Structure 14405 Btuh Ducts 2700 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Piping 0 Btuh Equipment load 17105 Btuh Infiltration Method Simplified Construction quality Tight Fireplaces 1 (Average) Heating Cooling Area (ft2 1014 1014 Volume ft 3) 9126 9126 Air changes/hour 0.81 0.79 Equiv. AVF (cfm) 123 120 Heating Equipment Summary Make Amana Trade Goodman Model AMH950453B AHRI ref 456321 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 95 AFU E 0 MBtuh 0 Btuh 0 OF 519 cfm 0.030 cfm/Btuh 0 in H2O Sensible Cooling Equipment Load Sizing Structure 9792 Btuh Ducts 2357 Btuh Central vent (0 cfm) 0 Btuh Blower 0 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Equipment sensible load 11250 Btuh Latent Cooling Equipment Load Sizing Structure 3053 Btuh Ducts 362 Btuh Central vent (0 cfm) 0 Btuh Equipment latent load 3416 Btuh Equipment total load 14666 Btuh Req. total capacity at 0.80 SHR 1.2 ton Cooling Equipment Summary Make AMANA Trade GOODMAN Cond CHPF2430b Coil ASX13024 AHRI ref 837621 Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER 0 Btuh 0 Btuh 0 Btuh 519 cfm 0.043 cfm/Btuh 0 in H2O 0.78 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. .� Wrl I1t SOfC 2013 -Apr -23 13:44:35 .� 9 Right-Suite(g) Universal 2012 12.0.13 RSU05790 Page 3 ACCP. C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N AED Assessment Job: l0 Compass Rd wrightsoft� Date: i pr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project Information For: Barlo Building 100 Compass point, N Andover, ma 3esian Cenditi; Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 ( L ) Wet bulb (OF) - 72 Wind speed (mph) 15.0 7.5 k ' Test for Adequate Exposure Diversity"'! Hourly Glazing Load Hour of Day Maximum hourly glazing load exceeds average by 36.1%. House does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 265 Btuh (PFG-1.3*AFG) t wrsoft• „�, �iht9 Right-SuiteCi) Universal 2012 12.0.13 RSU05790 2013-Apr-2313:44:35 /CCK C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Page 1 AED Assessment Job: y0 Compass Rd -- wrightsoft� Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project Information For: Barlo Building 100 Compass point, N Andover, ma 3esien Cenditic Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 ( L ) Wet bulb (°F) - 72 Wind speed (mph) 15.0 7.5 Test for Adequate Exposure Diversity Hourly Glazing Load Hour of Day -.1y e A—,. / IiM.., Maximum hourly glazing load exceeds average by 30.2%. Zone does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 4 Btuh (PFG-1.3*AFG) .� WCI hfSOft° 2013 -Apr -2313:44:35 9 Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 2 ACCX C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N 0 - -WilI1tSO1 L 9 , AED Assessment Job: q0 Compass Rd Date: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project For: Barlo Building 100 Compass point, N Andover, ma Hourly Glazing Load Hour of Day / H—ly / A—N. /AED llnil Maximum hourly glazing load exceeds average by 46.7%. Zone does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 290 Btuh (PFG - 1.3*AFG) 1 WriihtSOft° 2013 -Apr -2313:44:35 ,.,"„ � g Right-SuiteO Universal 2012 12.0.13 RSU05790 ACCA C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Page 3 Design Conditions Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 (L ) Wet bulb (°F) - 72 Wind speed (mph) 15.0 7.5 Test for Adequate ExposureDiversity Hourly Glazing Load Hour of Day / H—ly / A—N. /AED llnil Maximum hourly glazing load exceeds average by 46.7%. Zone does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 290 Btuh (PFG - 1.3*AFG) 1 WriihtSOft° 2013 -Apr -2313:44:35 ,.,"„ � g Right-SuiteO Universal 2012 12.0.13 RSU05790 ACCA C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Page 3 This certifies that.....j! i 1 Date.............................. TOWN OF NORTH ANDOVER PERMIT FOR WIRING e(Ilf-, L 1 Q c, -a'' C- .. ..................................................................................................................... has permission to perform ......1 . \ i e— wiring in the building of.........,,I,.,,�– ^ „U I--� ...... ................................................................... o�G ?/ at ........... .. S t. '....... ,, North Andover, Mass. ..................................................................... Fee... ............. Lic. No. .. � v1 • LECTRICAL NSPECTOR Check #�I / Commonwealth of Massachusetts Official Use Only Permit No. I Og Department of Fire Services Occupancy and Fee Checked a BOARD OF FIRE PREVENTION REGULATIONS [Rev. 1/07] (leave blank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code (MEC), 527 CMR 12.00 (PLEASE PRINT 1N NK OR TYPE ALL INFORMATION) Date: City or Town of: NORTH ANDOVER To the Inspector of Wires: By this application the undersigned gives notice of his or her intentio to�perform the electrical work described below. QA Location (Street & Number) 7LZ Of h t Owner or Tenant _ Tr j" C,01 • LLC Telephone No. Owner's Address 1., i Is this permit in conjunction with a building permit? Yes g No ❑ (Check Appropriate Box) Purpose of Building Utility Authorization No. - Existing Service Amps / Volts Overhead ❑ Undgrd ❑ No. of Meters New Service G� Amps f ?A/ZA*�Volts Overhead ❑ Undgrd/ No. of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: Completion ofthe following table may be waived by the Inspector of Wires. No. of Recessed Luminaires 1^ No. of Ceil: Susp. (Paddle) Fans No. of Total Transformers KVA No. of Luminaire Outlets No. of Hot Tubs Generators KVA No. of Luminaires Above In- Swimming Pool rnd. ❑ rnd. El o. o mergency Lighting Batter Units No. of Receptacle Outlets No. of Oil Burners FIRE ALARMS No. of Zones No. of Switches 0 No. of Gas Burners2 No. of Detection and Initiating Devices No. of Ranges No. of Air Cond.Total 1, Tons No. of Alerting Devices 3 No. of Waste Disposers Heat Pump Totals: Number Tons KW....._.... No. of Self -Contained Detection/Alerting Devices No. of Dishwashers Space/Area Heating KW Local ❑ MunicipalOther Connection No. of Dryers Heating Appliances KW Security Systems:* No. of Devices or Equivalent No. of Water KW Heaters No. of No. of Ballasts Data Wiring: No. of Devices or Equivalent No. Hydromassage Bathtubs —Signs No. of Motors Total HP Telecommunications Wiring: No. of Devices or Equivalent OTHER: Attach additional detail if desired, or as required by the Inspector of Wires. Estimated Value of Electrica Work: //0W• (When required by municipal policy.) Work to Start: `4> — I ^ IP Ins'p�ec—tions to be requested in accordance with MEC Rule 10, and upon completion. INSURANCE COVERAGE: Unless waived by the owner, no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including "completed operation" coverage or its substantial equivalent. The undersigned certifies that such cove age is in force, and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE BOND ❑ OTHER ❑ (Specify:) I certify, under Ih FIRM NAME: 1 Licensee: ICAI (If applicable, enter Address: 2 lr and complete. LIC. NO.:2 ?173 G LTC. NO. Wto /4 Tel. No. -- 07 Tel. No.: *Per M.G.L c. 147, s. 57-61, security work requires Department is Safety "S" License: Lic. No. of OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below, I hereby waive this requirement. Owner/Agent Signature — Telephone No I am the (check one) ❑ owner ❑ owner's agent. PERMIT FEE. $ ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00 § Rule 8: In accordance with the provisions of M.G.L. c. 143, § 3L, the permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth, and applications shall be filed on the prescribed form. After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G.L c. 166, § 32, an •0 electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the notification of completion of the work as required in M.G.L. c. 143, § 3L. Permits shall be limited as to the time of ongoing construction activity, and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12 -month period. Upon written application, an extension of time for completion of work shall be permitted for reasonable cause. A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012. The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property. With limited exceptions, the Act automatically extends, for four years beyond its otherwise applicable expiration date, any permit or approval that was "in effect or existence" during the qualifying period beginning on August 15, 2008 and extending through August 15, 2012. ❑ Rule 8 — Permit/Date Closed: *** Note: Reapply for new permit ❑ ❑ Permit Extension Act — Permit/Date Closed: Trench Inspection Pass F?1 Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass 151 Failed IN Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass M Failed ❑' Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INSPECTION: Pass Failed Re- Inspection Required ($.) ❑ Inspectors Co nts: Inspectors Signature: Date: FINAL INSPECTION: Pass ❑? Failed Re- Inspection Required ($.) ❑ r Inspectors Comments: Inspectors Signature: Date: DEB WEINHOLD ... TOWN OF MERRIMAC, MA........dweinhold@townofinerrimac.com The Commonwealth ofMassachusetts Department oflndustrialAccidents Office of Investigations 600 Washington. Street Boston, MA 02111 www' -mass govIdia Workers' Comuensation Insurance Affidavit: Builders/Contractors/Electriciansfplumbers Otxm r Phone M Are ou an employer? Check the appropriate box: - Typp of project (required): 1.7 am a employer with 2 4. ❑ I am a general contractor and I 6. ❑ New construction employees (full and/or part-time).` have. hired the sub -contractors �• Remodeling 2. ❑ I am a sole proprietor or partner - listed on the attached sheet. These sub -contractors have 8. ❑ Demolition ship and'have no employees working for me in any capacity. workers' comp. insurance. 9. ❑ Building addition [No workers' comp. insurance 5. ❑ We are a corporation and its 10.8 Blectrical repairs or additions •required.] 3. E] I am a homeowner doing all work officers have exercised their right of exemption per MGL 11.0 Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(4), and we have no 12.❑ Roofrepairs insurance required.] q ] employees. [No workers' 13.0 other comp. insurance required.] 'Any applicant that checks box #1 must also fill out the section below showingtheir workers' compensation policy information. i Homeowners who submit this affidavit indicating they t' e doing all work and then hire outside contractors must submit a new affidavit indicating such. #Contractors that check this box must attached an additional sheet showing the name of the sub -contractors and their workers' comp. policy information. I am an employer that is providing workers' compensation insurance for my _employees. Below is the policy and job site information. n . _ n Insurance Company Name:, Policy# or Self -ins. Lic. #: I 1 .7 03' 2 0 p� 1:5 Expiration Date: Job Site Address:' �j i . t!'5 a�iV jCity/State/Zip: %'li • �i� �Ol�G1%� . '�' _------, Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A of MGL o.152 can lead to the imposition of criminal penalties of a fine up:to $1,500.00 and/or one=year imprisonment, as wellas civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido hereby cert de zepalipmpipenalties ofperjury that the information pro videdabove is true andcorrect. it Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing inspector 6. Other - - - r,,,,+,, +Anrann• Phone #: �IRATIONIW r,qj..:COMMONWEALTH OF MASSACHUSETTS