HomeMy WebLinkAboutMiscellaneous - 90 SUTTON STREET 4/30/2018 (4)TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WORKS
384 OSGOOD STREET
NORTH ANDOVER, MASSACHUSETTS 01845-2909
Timothy J. Willett
Water & Sewer
Distribution Superintendent
June 22, 2007
Ms. Alison McKay
Conservation Administrator
1600 Osgood Street
North Andover, MA 01845
RE: 90 Sutton Street
Dear Ms. McKay:
IAvg N0roxf:ILyjInw•T/_': &1 DT • C '
Telephone (978) 685-0950
Fax (978) 688-9573
As you are aware, the Division of Public Works would like to re -pave the parking lot at 90 Sutton
Street due to the replacement of our trunk sewer in that location. The bituminous curb would be
removed and replaced and the parking lot would receive an overlay 1.5 inches thick. In my opinion,
this change in grade is minimal and will have an insignificant effect on the flood plain. I am asking
your permission to proceed with the work.
Very truly yours,
j
Timothy J. Willett
Water & Sewer Superintendent
Town of North Andover
Office of the Conservation Department
Community Development and Services Division
400 Osgood Street
North Andover, Massachusetts 01.845
Alison McKay
Conservation Administrator
October 25, 2005
Mr. Anthonv Zimbone
90 Sutton Street
North Andover, MA 01845
140"" De'l";ery
Telephone (978) 688-9530
Fax (978).688-9542
RE: Enforcement Order- Installation of Block Wall - 90 Sutton Street, North Andover, NIA
Dear Mr. Zimbone:
As you know, the North Andover Conservation Commission issued an Enforcement Order, dated
October 12, 2005 to allow the construction of a 4 -foot high block wall at the above-mentioned
property. This department was immediately contacted by Richard Tomczk, MA Department of
Environmental Protection (DEP), who informed me that the DEP will not allow the project to move
forward under the issued Enforcement Order. The DEP finds that it needs to be determined whether
or not the proposed wall would displace portions of the 100 -year floodplain.. As such, this letter has
been prepared to inform you that the Enforcement Order previously issued to you dated October
12, 2005 is officially null and void.
In order to proceed with this project, you must file a Notice of Intent with the North Andover
Conservation Commission and the DEP pursuant to the Massachusetts Wetlands Protection Act
(M.G.L. Chapter 131, section 40,310 CMR 10.00) and the North Andover Wetlands Protection Bylaw
(Chapter 178 code of North Andover). Enclosed please find the Notice of Intent application and
instructions, accompanied by other pertinent local forms and information.
Please do not hesitate to contact me if you should have any further questions or concerns in this
regard. Thank you in advance for your anticipated cooperation with this matter.
Sincerely,
4"
Alison McKay
Conservation Ad . istrator
Encl. Notice of Intent application
Cc: Richard Tomczk, DEP, NERO, Wetlands Division
Curt Bellavance, Community Development Director
Jerry Brown, Inspector of Buildings
Bill Hmurciak, DPW Director
Tim Willett, Water & Sewer Superintendent
NACC
File
BOARD OF APPEALS 638-9541 BUILDING 689.-9545 CONSERVATION 688-95.30 HEALTH 688-9540 PLANNING 683-95;5