HomeMy WebLinkAboutMiscellaneous - 902 ALDER WAY 4/30/2018a
« V
♦� rr
CERTIFICATE OF USE & OCCUPANCY
TOWN OF NORTH ANDOVER
Building Pennit Number 780 (6/23/2005) bate: April 26,_2006
THIS CERTIFIES THAT
THE BUILDING LOCATED ON 2357 Turnpike Street Bldg #9_- b Units
900 Adler Way
MAY BE OCCUPIED AS Town House - 4013 Condo IN ACCORDANCE
WITH THE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE AND
SUCH OTHER REGULATIONS AS MAY APPLY.
Units 901-902-903-904905-906
Certificate Issued to: vaga Roux Trust LLC
231 Sutton Street Ste 1B
North Andover MA 01845
Building- Inspector
PLUMBING DESIGN AFFADAVIT
TOWN OF NORTH ANDOVER
I certify that I or my authorized representative have observed the Plumbing work for
Building no. 9 at 900 Alder Way.
To the best of my knowledge, information and belief, the work has been done in
conformance with the approved plans and the provisions of the Massachusetts State
Building Code and all other pertinent laws, rules and regulations of the town of North
Andover.
George Dubin -
Dubin Engineers 29370
Engineer MA Reg. No.
40 Willard Street, Quincy, MA 02169
or
�q flusIr,
U
I No. 29370 1
Signature���c�c,
617-376-8877 March 10, 2006
Address Date .
Then personally appeared the above-named George Dubin and made oath
that the above statement by him/her is true.
Before. me,
My Commission Expires
KAMM
U$
Notary Public
" ComwmNealdr of 'Masud UMWb
W CwnWim bppes Nov 17, 2011
U$
f ,6oerH
1- m
A
�SSACH115Ej
Gerald A. Brown
Inspector of Buildings
TOWN OF NORTH ANDOVER
OFFICE OF -
BUILDING DEPARTMENT
400 Osgood Street
North Andover, Massachusetts 01845
Telephone (978) 688-9545
Fax (978) 688-9542
AFFIDAVIT FOR FINAL COST OF CONSTRUCTION
In accordance with the provisions o the Massachusetts State Building Code, Article 1, Section 110.4.
and 114.2, the total estimated cost of the construction including all related construction costs* of the
building located at /�.�t;L Gi/�� ���"� amounts to
$ 1400-3, a&k r
I, %��iym.r �.z�� ,being the .per son referred to as the owner
identified below, do solemnly swear that the statements made herein are strictly true and correct and
made.in good faith.
*Related construction costs included all work done with or concurrently with the work contemplated
by the Building Permit including demolition, plumbing, heating; electrical, air conditioning, painting,
carpentry, landscaping, site improvement; etc. Furnishings and portable equipment are not part of the
total construction costs.
Signature of Owner
COMMONWEALTH OF MASSACHUSETTS
S. S. ka} I L 20 Q b
Then personally appeared the able named Th d m a--% L a, w.d a, I and
Made an oath that the above statement is true.
Before, Me,
A +-A ,
Notary Public
OFFICIAL USE:
Final Cost: .......... .._._._...._ . _,..
Original Estimate cost of gene`I o work: _..,.. ._..__._w __.._._..:... ___n_. ,_...�,.....---.........,.... �,_.
Cost Difference: _.__,._.....�,..._........_..._........_,.........._"::.._.., ..ti ._..........
Additional Fee Required: ........... .,........
TO AMEND FEE UNDER PERMIT NO.: -__-- ..,......_ ._ ._a.. ... ..... .... _ ._ ......
Inspectional services Departmed 2005
FAfinalcostaffidavitfoan Strict code enforcement makes the town safer
Before buying, renting, leasing check zoning
:.> Town of
low NORTH ANDOVER
BUILDING PERMIT INSPECTION REPORT
e
PERMIT NO.: PROJECT: f'!P �!`rl_�V J INSPECTION DATE: 3;;.
UNIT NO.: —FLOOR: .3 ,FI0O,- 5 WING: AJ/% BUILDING NO.: d
REMARKS: h AL. El e-C.E'd
Excavation - depth and soil conditions
Date:
Inspector
Framing -
Date:
Other:
Date:
Inspector
Inspector
Footings and foundations and drains -
Date:
Insulation -
Date:
Inspector
Other:
Date:
Inspector
Inspector
Electrical - rough -
Date:
Plumbing and/or gas - rough -
Date:
Other:
Date:
Inspector
Inspector
Inspector
Electrical - final
Date: 9 - G C
Inspector �5
Plumbing and/or gas - final
Date:
Inspector
Other:
Date:
Inspector
Fire Dept -
oil burner, tank, stove, smoke detectors
Date:
Inspector
Final inspection
Date:
Inspector
Certificate of Use and Occupancy
Date: C of O #
Inspector
Town of
J
NORTH ANDOVER
BUILDING PERMIT INSPECTION REPORT
REMARKS:
't;
Excavation - depth and soil conditions
Date:
Inspector
Framing -
Date:
Inspector
J
�� 0kJ
PERMIT NO.: ./810 PROJECT:
� ��' ..�-r'�J7
INSPECTION DATE:
Date:
UNIT NO.: FLOOR:
j i t %' WING:
62/x'+ BUILDING NO.:
Electrical - rough -
Date:
REMARKS:
't;
Excavation - depth and soil conditions
Date:
Inspector
Framing -
Date:
Inspector
Other:
Date:
Inspector
Footings and foundations and drains -
Date:
Insulation -
Date:
Other:
Date:
Inspector
Inspector
Inspector
Electrical - rough -
Date:
Plumbing and/or gas - rough -
Date:
Inspector
Other:
Date:
Inspector
Inspector
Electrical - final
Date: " ' '
Inspector -'
Plumbing and /or gas - final
Date:
Other:
Date:
Inspector
Inspector
Fire Dept -
oil burner, tank, stove, smoke detectors
Date: 9
Inspector
Final inspection
Date:
Inspector
Certificate of Use and Occupancy
Date: C of 0#
Inspector
SAM ZAX ASSOCIATES
Phone: (617) 479-7415 CONSULTING ELECTRICAL ENGINEERS Fax: (617) 770-1423
E -Mail: mzax@zaxengineering.com
1400 Hancock Street - PO Box 690353
Quincy, MA 02169
ELECTRICAL FINAL AFFIDAVIT
I, or my authorized representative, have observed the work associated with Permit No.5810, as in accordance
with Section 116. of 780CMR dated 5/24/05, for 900 Alder way (building #9), located in
North Andover, Ma. And to the best of my knowledge, information, and belief, the work has been done in
conformance with the approved plans and with the provisions of the Massachusetts State Building Code and all
other pertinent laws and regulations of the Town of North Andover.
James P. Stroke 20068
ENGINEER - MASS. REG. NO.
1400 Hancock St., Quincy, MA 02169
ADDRESS
March 13,2006
Date
Then personally appeared the above-named James P. Stroke
And made oath that the above statement by him is true.
Before me,
My Commission expires
l6 "Z� 20
ROBERT F. KFAIM JR,
Notary Public
Commuawealth of Massachusetts
C�oOctober 24,200irea
8
CO)
m
X
m
y
m
CO)
S
CA
az
CD O
CZ
Q �■
o
o p
CL
Q
=�
CD 0
C CD
d 0
_
y
CD
SO
O
L71i
CO)
.0
d
cm
O
_
C7
C
CO)
0
C2
CD0
_
CD
3
CO)
0
O
CCD
O
.CCD
0
Otl•
9
cn
J
Ch
cn
H
V 1
O
z
cn
C101
a
Mm
�rf cn
O
=
®
Q
ao .a
fR
y
m �an
�.
m
Z
n
0 O. 2
y
4
I Ita
o
=r 06
O y
G
y
�O
b
ro
m
• N
o
O
ZG
-m
Oa
m
o s_?
o H
0
0
gaOm
0.
SO
N
mm h '
_• �cr
CL
~
C C
H
_?
H
•:
N V
O
;W
20
o
�3
:(Or
:
GO
o Z
1`
� p� :O
o`O
Sum
WO
d
n�--�
0
�s
om.
m
cn cn by
C
?y qd
O
�rf cn
O
O
O O
0 O
R.
o It
�.
Gd
b
ro
t
b00
w o
O
H
0
c
h
-v
� Z
CD O
O.�
CL
acc
.o
0 v
CL
"C
CD 0
CD
FL
Sao
CCD
y
d
O
y
O
C
CO)
d
C2
O
0
CD
CODa
CA
0
b
n
IL
04
U)
Cto
mr
c? 0 O
Z
o
_Iacr Nom
;z
a�ac 3
Mm
Z
O�
or��5
w 0
T
,o
aa,•a
;n
K
m
o
-40
aaxim
a
D
O :
e O
tin
w
U2
���
We
a
_
co
a
mc
c
�c�mE
CL
°O
aamacr
e
�,� a
to
:c y
A t
Noft
904
ilc
Qm� Gv:
o
o. q
a�
H AD
'O O
roA
m o
Irmo
CL
�C
O
CID:
cn
cn
as
hn
;z
p
•n
,o
Crzr
;n
K
n
�
91
►n
Itz
cn
tin
w
0
t/
x
o
a�
4
W
0
I
H
0
0
4A