Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Miscellaneous - 92 COMPASS POINT ROAD 4/30/2018
N f'"014wo Co E? This certifies that .... ... ............................ has permission to perform. . .......... .................. plun bi ,j, ing in the buildl sof ..9Z.. ( -/................. at ... .................. . North Andover, Mass. Fee//O�Orj . Lic. No/—��)K.7.. ............ ......... ... PLUMBING INSPECTOR/ Check # ?— • 44.�LkU.���. I• TOWN OF NORTH ANDOVER a PERMIT FOR GAS INSTALLATION This certifies that ...... has permission forgas installation .. ...... ./� in the buildings of .. %�... G M�� at ., North.And' v , Mass. ........, Fee ��' fd.�! . Lic. No l�G,7.. �.v�.! ,( /� ... ... GAS INSPECT Q�' Check #�2 0) 9 } rv- MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM PLUMBING WORK _ CITY _ _ � MA ATE - / _-..._- PERMIT # (� S --- P r"J - - -�- JOBSITE ADDRESS 2. f OWNER'S NAME '�19._ff�`llGJ7 OWNER ADDRESS /_xFAX TYPE OR OCCUPANCY TYPE COMMERCIAL Ej EDUCATIONAL _.._.. RESIDENTIAL PRINT CLEARLY NEW;W RENOVATION: [_ REPLACEMENT: PLANS SUBMITTED: YES NO FIXTURES Z FLOOR- BSM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 BATHTUB J J _-_-- _. __. CROSS CONNECTION DEVICE DEDICATED SPECIAL WASTE SYSTEM DEDICATED GAS/OILISAND SYSTEM DEDICATED GREASE SYSTEM DEDICATED GRAY WATER SYSTEM __-.__.__.! ...._..- DEDICATED WATER RECYCLE SYSTEM-- DISHWASHER DRINKING FOUNTAIN FOOD DISPOSER _...._...! -.I FLOOR /AREA DRAW INTERCEPTOR INTERIOR ---__.? ... __._........____ - ` .,.._. . _— ..._. KITCHEN SINK LAVATORY _1 ROOF DRAIN SHOWER STALL SERVICE / MOP SINK f TOILET URINAL WASHING MACHINE CONNECTION WATER HEATER ALL TYPES .............1 WATER PIPING OTHER -...................._.._.._. INSURANCE COVERAGE: I have a currentIli insurance policy or its substantial equivalent which meets the requirements of MGL Ch. 142. YES 0 [] IF YOU CHECKED YES, PLEASE INDICATE �THTYPE OF COVERAGE BY CHECKING THE APPROPRIATE BOX BELOWLIABILITY INSURANCE POLICY OTHER TYPE OF INDEMNITY 0 BOND [ OWNER'S INSURANCE WAIVER: I m aware that the licensee does not have the insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement, CHECK ONE ONLY: OWNE I AGENT ...._i SIGNATURE OF OWNER OR AGENT i hereby certify that all of the details and Information I have submitted or entered regarding this application are true a a urat the best of my knowledge and that all plumbing work and Installations performed under the permit issued for this application will be In compl ce th eminent provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER'S NAM&j,' ,� �� .. , ........_._. _I LICENSE # � TURE MP JP CORPORATIOMW# PARTNERSHIP ___; #[_ .._. ...... .... LLC D# COMPANY NAME������-� � ADDRESS _ CITEL _ _ ..�1t L _... -- —' STATE ...... -) ZIP 5� TEL ; �� r FAX AZO - CELL EMAIL -A ..-.. -- J - 11 LB rv- MASSACHUSETTS UNIFORM APPLICATION FOR A PERMIT TO PERFORM GAS FITTING WORK CITY�Y"' _� MA DATE .- — PERMIT # JOBSI7EADDRESS._�OWNER!SNAME GOWNER ADDRESS TEFAX TYPE OCCUPANC TYPE COMMERCIAL(] EDUCATIONAL111 RESIDENT CLEARLY NEW: IVV RENOVATION: [J REPLACEMENT: [l PLANS SUBMITTED: YES 0 NOD APPLIANCES Y FLOORS- BSM 1 1 2 3 4 5 8 1 7 8 g 10 11 12 13 14 BOILER ! BOOSTER CONVERSION BURNER . _,--- --- .-- - - --_--- -- _-- _-__-- I _• _ ._ _..-.. _J _ ...J COOK STOVE ,� _.. Ell _-.I _ DIRECT VENT HEATER DRYER FIREPLACE -ZJ FRYOLATOR FURNACE GENERATOR GRILLE INFRARED HEATER __....1....-.- _--1 __ _� LABORATORY COCKS MAKEUP AIR UNIT OVEN -- I -- - - POOL HEATER ROOM SPACE HEATER ROOF TOP UNIT TEST--._-_,1 _ _.I _ .- _ ,I _. ..-...-J -.- - _I .. J ___. J _... 771 UNIT HEATER UNVENTED ROOM HEATER -- WATER HEATER_. OTHER_... ................... ---._. .. 1 �... _. - --J � . __ .....__. _.1 ...._. _ .._I ...... ___ _. � .._ I --J --- 1 --•- J J __ YI - - -- - -1 - -I - -1 INSURANCE COVERAGE I have a current liability Insurance policy or Its substantial equivalent which meets the requirements of MGL. Ch.142 YE __ NO 0 I IF YOU CHECKED YES, PLEASE INDICATE THE TYPE OF COVE BY CHECKING THE APPROPRIATE BOX BELOW LIABILITY INSURANCE POLIC OTHER TYPE INDEMNITY EJ BOND f_11 OWNER'S INSURANCE WAIVER: i am aware that th licensee does not have the Insurance coverage required by Chapter 142 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. CHECK ONE ONLY: OWNER _ AGENT SIGNATURE OF OWNER OR AGENT I hereby certify that all of the details and Information I have submitted or entered regarding this application are true and to t best of my knowledge and that all plumbing work and Installations performed under the permit Issued for this application will be In complian all nt provision of the Massachusetts State Plumbing Code and Chapter 142 of the General Laws. PLUMBER-GASFITTER NAME 4 LICENSE #*%-_� Si URE MP GF E]l JP [, � JGF [j LPGI D CORPORATIOI�o PARTNERSHIPD#= LLC C Il#= COMPANY NAME:ADDRESS „ CITY w STATE ZIP _ . TEL—�� - ----------- - - - FAX CELLI EMAIL Yv-2-s-- a3 Date. ).. ..1.. ....................... TOWN OF NORTH ANDOVER PERMIT FOR WIRING 1 This certifies that ....... ............ L% has permission to perform ...L'`..`.n 4Z— N P ...................................................... wiling in the buildi g of .... -+S� C— at .............. 2 ........... f I.C<! ?.' .....!... ......................, orth Andover, Mass. Fee. 1 c.....�Lic. No. .............. �-�.�.. EL C7RICAL INSPECTOR Check # Commonwealth of Massachusetts Official Use Only Department of Fire Services Permit No. i[16 Occupancy and Fee Checked ,M BOARD OF FIRE PREVENTION REGULATIONS [Rev. 1/07] (leave blank APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code (NEC), 527 CMR 12.00 (PLEASE PRINT INHK OR TYPE ALL INFORMATION) Date: City or Town of. NORTH ANDOVER To the Inspector of Wires: By this application the undersigned gives notice of his or her intention to perform the electrical work described below. Location (Street & Number) 2 wi r4.. SS A—J . 0 AlAoyet f . Owner or Tenant MM►A5TC_0 . LLC Telephone No. Owner's Address D%qm #— Is this permit in conjunction with a building permit? Yes , /� No ❑ (Check Appropriate Box) Purpose of Building Utility Authorization No. /g soy�3 - Existing Service Amps / Volts Overhead ❑ Undgrd ❑ No. of Meters New Service 210-0Amps 4C0/ N bVolts Overhead ❑ Undgrd.K No. of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: LA.4 `ed A&A.) Cor,40 Cmmnletinn nfthe fn)lnwina tnhlo "imi ho wnivod by ilio T»c»artnr of Wira.c No. of Recessed LuminairesNf �% Ce: Susp. (Paddle) Fans r V o. oil No. of Total Transformers KVA No. of Luminaire Outlets No. of Hot Tubs Generators KVA No. of Luminaires Swimming Pool Above ❑ In- Elo. rnd. rnd. o Emergency Lighting Batter Units No. of Receptacle Outlets d No. of Oil Burners FIRE ALARMS No. of Zones No. of Switches No. of Gas Burners Z No. of Detection and Initiating Devices No. of Ranges No. of Air Cond. Z Total Tons No. of Alerting Devices 3 No. of Waste Disposers / I Heat Pump Totals: " ' ' "' I Tons "� " *---I--*--- "Detection/Alerting I K....... No. of Self -Contained Devices No. of Dishwashers Space/Area Heating KW Local ❑ Municipal Other Connection No. of DryersHeating Appliances KW Security Systems:* No. of Devices or Equivalent No. of Water KW Heaters No. of No. of Signs Ballasts Data Wiring: No. of Devices or Equivalent No. Hydromassage Bathtubs No. of Motors Total HP Telecommunications Wiring: No. of Devices or E uivalent OTHER: ! Attach additional detail if desired, or as required by the Inspector of 97res. Estimated Value of Electrical Work: ! 0�' (When required by municipal policy.) Work to Start: Inspections to be requested in accordance with MEC Rule 10, and upon completion. INSURANCE COVERAGE: Unless waived by the owner, no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including "completed operation" coverage or its substantial equivalent. The undersigned certifies that such coy age is in force, and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE 16BOND ❑ OTHER ❑ (Specify:) I certify, under FIRM NAME: Licensee: 'A (If applicable, en Address: " *Per M.G.L c. I that the information on this application is true and complete. LIC. NO.: 7173 _ 16 Signature �% LIC. NO.: Bus. Tel. No.: Alt. Tel. No.: Lic. No. OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below, I hereby waive this requirement. I am the (check one) ❑ owner ❑ owner's agent. Owner/Agent PERMIT FEE: $ Signature Telephone No. ❑ 2012 Massachusetts Electrical Code Amendments 527 CMR 12.00 § Rule 8: In accordance with the provisions of M.G.L. c. 143, § 3L, the permit application form to provide notice of installation of wiring shall be uniform throughout the Commonwealth, and applications shall be filed on the prescribed form. After a permit application has been accepted by an Inspector of Wires appointed pursuant to M. G.L c. 166, § 32, an electrical permit shall be issued to the person, firm or corporation stated on the permit application. Such entity shall be responsible for the notification of completion of the work as required in M.G.L. c. 143, § 3L. Permits shall be limited as to the time of ongoing construction activity, and may be deemed by the Inspector of Wires abandoned and invalid if he or she has determined that the authorized work has not commenced or has not progressed during the preceding 12 -month period. Upon written application, an extension of time for completion of work shall be permitted for reasonable cause. A permit shall be terminated upon the written request of either the owner or the installing entity stated on the permit application. ❑ The Permit Extension Act was created by Section 173 of Chapter 240 of the Acts of 2010 and extended by Sections 74 and 75 of Chapter 238 of the Acts of 2012. The purpose of this act is to promote job growth and long-term economic recovery and the Permit Extension Act furthers this purpose by establishing an automatic four-year extension to certain permits and licenses concerning the use or development of real property. With limited exceptions, the Act automatically extends, for four years beyond its otherwise applicable expiration date, any permit or approval that was "in effect or existence" during the qualifying period beginning on August 15, 2008 and extending through August 15, 2012. ❑ Rule 8 — Permit/Date Closed: *** Note: Reapply for new permit ❑ ❑ Permit Extension Act — Permit/Date Closed: Trench Inspection Pass Failed Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: SERVICE INSPECTION: Pass 151 Failed Re- Inspection Required ($.) ❑ Inspectors Comments: . Inspectors Signature: Date: PARTIAL ROUGH INSPECTION: Pass N Failed (] Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: ROUGH INSPECTION: Pass M V Failed Re- Inspection Required ($.) ❑ jA Inspectors Commen : i Inspectors Signature: e: FINAL INSPECTION: Pass Failed 0 Re- Inspection Required ($.) ❑ Inspectors Comments: Inspectors Signature: Date: DEB WEINHOLD ... TOWN OF MERRIMAC, MA. .......dweinhold@townofinerrimac.com The Commonwealth oflYlassachusetts Department oflndustriglAccidents Office of Investigations 600 Washington Street Boston, MA 02111 www.massgov/ilia WnrlsPr.q1 C mm-nensation Insurance Affidavit: Builders/Contractors/Electricians/.Plumbers City/State/Zip:, ©� Phone #• 7C-Pel— Are ou an employer? Check the appropriate box: Type of project (required): 1. I am a employer with 4. ❑ I am a general contractor and I 6. ❑ New construction employees (full and/or part-time).* have hired the sub -contractors �• [J Remodeling 2. ❑ I am a sole proprietor or partner- listed on the attached sheet. These sub -contractors have 8. ❑ Demolition ship and'have no employees working for me in any capacity. workers' comp. insurance. g• ❑ Building addition [No workers' comp. insurance 5. ❑ We are a corporation and its 10.[! Electrical repairs or additions required.] 3. ❑ 1 am a homeowner, doing all work officers have exercised their right of exemption per MGL 11.❑Plumbing repairs or additions -myself. [No workers' comp. c. 152, §1(4), andwehaveno 12.❑ Roofrepairs insurance required.] q ] employees. [No workers' 1311 Other comp. insurance required.] *Any applicant that checks box41 must also fill out the section below showingtheir workers' compensation policy information. i Homeowners who submit this affidavit indicating they tie doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that checkthis box must attached an additional sheet showing the name of the sub -contractors and their workers' comp. policy information. I am an employer that is providing workers' compensation insurance for my employees Below is the palicy and job site information. n ..• Insurance Company Policy # or Self -ins. Lic. #: �-7 .7 Expiration Date: Y �S % -AW . �' <X) ICity/State/Zip: I V • Y I l�y V {% . Job Site Address: , Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as requiredunder Section 25A of MGL o.152 can lead to the imposition of criminal penalties of a fine up tef$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP -WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement maybe forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido Jzereby certa de ae pat penalties ofperjury that the information provided above is true and correct. 7 Official use only. Do not write in this area, to be completed by city or town official. City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other - Phone #: S.- 10-,4dOMMONWtALTH OF MASSACHUSETTS SACHUSETTS J . _Date r1.� t-7 .......... 40RTH TOWN OF NORTH ANDOVER pf tao ,tip PERMIT FOR MECHANICAL INSTALLATION 9 I f This certifies that .. .. ... _ ... .............. has permission for mechanical installation in the buildings of . +. �'. :�.. . d� h..: C4! . c .t .......... at ... 1.7...I..:)..j.. ..........., North Andover, Mass. Fee. ??;� ` J .. Lic. No 1' l X ..... .................... GAS INSPECTOR WHITE: Applicant CANARY: Building Dept. PINK: Treasurer ti Commonwealth of Massachusetts Sheet Metal Permit Date: IAPermit Estimated Job Cost: $ -5000.00 Permit Fee: $ Plans Submitted: YES NO Plans Reviewed: YES NO Business License # 119(.4 Business Information: Name: Street: City/Town: m�k rik 018M, Telephone: +��'$ _q5q_ 8 jQ,�• Photo I.D. required / Copy of Photo I.D. attached J-1 / M -1 -unrestricted licenses, Applicant License # 15U S /! f Property Owner / Job Location Information: I(( Name: 1 �5-f' (..�xmq Street: -A721, CO 1V* City/Town: IU, nytjfi no y5 Telephone: YES NO Staff Initial J-2 / M -2 -restricted to dwellings 3 -stories or less and commercial up to 10,000 sq. ft. / 2 -stories or less Residential: 1-2 family bt Multi -family Condo / Townhouses Other 1 Commercial: Office Retail Industrial Educational ` Institutional Other Square Footage: under 10,000 sq. ft. _Vl over 10,000 sq. ft. Number of Stories: t Sheet metal work to be completed: New Work: bI Renovation: HVAC #4 Metal Watershed Roofing Kitchen Exhaust System Metal Chimney / Vents Air Balancing Provide detailed description of work to be done: 7 INSURANCE COVERAGE: I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L. Ch. 112 Yes ❑ No ❑ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy ❑ Other type of indemnity ❑ Bond ❑ OWNER'S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by Chapter 112 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. Check One Only Owner ❑ Agent ❑ Signature of Owner or Owner's Agent By checking this box❑, 1 hereby certify that all of the details and information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit Issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws. Duct inspection required prior to insulation installation: YES NO Progress Inspections Date Comments Final Inspection )ate Comments Type of License: Master title ❑ Master -Restricted —,)wn ❑Joumeyperson Si nature of Licensee ❑Journeyperson-Restricted License Number: AS& & F1 Check at www.mass.gov/dpi Inspector, 1val .. . ..... ... A,ti�ISA C, J.: usl DMVERis CA-) IVI IVI 0 N VV I _ A I A I 101- M A' ; !:'i A C , 1-1 U :D L f 1':; SHEET mul*� wol . M F. RS A')' A JAGIA-1.110. 10, Ill KLINE ij 7 A 1? 1. 111 WTO N Wr 1.111'A r NA 1111:5_'6- V14ki'M LI LNSE 1s99G5587-,T:` If non.. Is -lDM NONE KLANL ERIC RJ m U.) LONG DR DRACUT, MA 01826.204R CA-) IVI IVI 0 N VV I _ A I A I 101- M A' ; !:'i A C , 1-1 U :D L f 1':; SHEET mul*� wol . M F. RS A')' A JAGIA-1.110. 10, Ill KLINE ij 7 A 1? 1. 111 WTO N Wr 1.111'A r NA 1111:5_'6- V14ki'M 6 :r/le u,1111llollwealtit ofAlassachuseltl' IFIN,1'�(ItlVtlfl%fi� 7P1�L��Yl`T� }�i1'r �rarcac' Department oflrltlustrialAccirlctlts tam R Office of In 1 Congress Street, Suite 100 t - Boston, MA 02114-2017 til 'Sf ' )VIVIV.111ass.goVIdla Workers, CompenNatioll h1sur» nce Afilditvit ,Builders/Colttritetors/Llectriciluis/Plumbers AI)pliclltlt 111 ol•1)t:ltio)i Plellsc X'1 tit Leelblv N:.tIl1C(1lusincss/Qrga111zntloli/llid lvldunl): J b .T lleat.-iny, & Air Couditioliliily, Int: At.1dress: 17• Ar]. :trt)>ton 13treet , City/State/Lip: ])rztcut: 'MA 01.826 I'lone #: Are }you 1111 employer? Clieck the approl)rlalo•Uoz: 1978 h54-81' 7 :. I . lJ I nttl it employer with L_�o 4•..[] I.aw a gwic' nl contractor and I lyl)�e,o/f plrojcct (required): clllployct:s ((1.111 incl/or part-tiule).* . llnvo hired the. sub -contractors 6: LJ Ncw construction 7.. ❑ .I an, a sole proprietor or pnrtner- .-' listed on the attached sheet. 7. E] Rcutodehilg ship and havo no employees These sub -contractors havo g (� Demolition working for nlc in any capacity. Culployccs nud havo workers' lNo Nvorkcrs' colup. insurnncc comp: ills uralIC0. . • 9. (] Building addition rcquil-ed.] 5. [] We aro a corpgraliou wid its lo.[j L;lcctl•Ical I-cpali-s or aticlltioi)s 3. [) I aur a I)ourcowllcr doing till work officers have lxcrelscd-their I Ln, Plumbing repairs or additions myself. [No woilccrs' cwlnp, right of exemption per MOL insurance required.] t c. 152, §1(,}), nud wo havo no 12.n Roofl'epai -s Cllll)ICyC6. [No workers' 13.❑ Other Comp. insuraltco ret ►tired.) 'Any npplienut lhnt clrccks'bux III must nlsri till out the sectfun Iobelow showing thole workers' compeusnllou policy Infurutnliou. i 1 ntcuwners who subtnll lhls,n(Itdnvlt bldlcnihlg Ihoy aro doing nil work and then ]tiro outsldo. ccontractors must subntlt n new Affidavit Indicating such• lCuulrnctors Ihnt aleck (Ills box.tuust ntlncllcd nn additional ahcoi showing Ilio name of tho sub- and stale wIlclhcr or not Ihoso cnlltics have mpluycc�. If Ilia sub -r untracturs havo cluployccs,ihcy 1, m3t'provide Ihcir workers' comp. policy auntbm Deft fur employer tint la provtding workers' co'lq)clisallon.htsnranceformy emplvyccs. 1lelvly is the pulliy runt fvG •sllc in furrrratiun. tnsurallce Company Nimic: A.I.M. 1ilitual Insurance Co. Policy It or Self -ills. Lic. ll: WM7.-8(10-8006553-2013A Expiration Date: 06/02/2014 .fol) Site Address: x-1.1. TocationUif .y/S late/Zip:____ Attach it Copy of the workers, Compensation policy dCelli rllllon pogo (silo Wing the pollcy,nunlber 1111d Cxplr.atloit date). Failure to sCCUI.O covcrugo as required under Section 25A ofly GL C. 152 call lead to the imposition of criminal penaltimof it tillc up to $1,500,00. and/or oi1C-yCpl' 1111prisolnllclit, as well as civil pCllaltics 111 t11C forth of a STOP WOIut ORDER and n tine of op to $250.00 It clay aguinst the violator. Be advised that a Copy of this statement May be forwarded to lk Office of luvcstil;ations of the DIA For Illslimllcc coverage verikatlon. I flu hereto r r r tr �� nrrcler the prrlrrc rind jrerlrrltler of ier111rV that the ler ormatloil provldeil aGnlrel� trite grtrl correct i' OJJicaal useonly. Do 'lot write In this area, to he completed by clly or town gjjklal. City ol- Towil: Perallt/Llcense Isslling Alithot•Ity (eh•cle. one); I. I3unrll of Helilth 2. 1luildln(;1)epartment 3. C1tyrrowlt Cl ti. Other eric 4. Llectrlcal Inspector 5.1'lumblu6 Iuspcctur Contr►et Person: ACORD CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH 06/03/2013 PRODUCER 978. 887, 4900 FAX 978. 887. 2404 'Edward F. Sennott Insurance Agency, Inc. 16 South Main Street P. 0. Box 457 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. TYPE OF INSURANCE Topsfield, MA 01983 INSURERS AFFORDING COVERAGE NAIC # INSURED J&J Heating & Air Conditioning, Inc- 17 Arlington Street Dracut, MA 01826 INSURERA: Great American Alliance Ins Co INSURERB: Safety Insurance Company 39454 INSURERC: A.I.M. Mutual Insurance Co. INSURER D: PAC6418906-07 INSURER E: 06/01/2014 COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IR LTR LT DD' NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE MM D POLICY EXPIRATION DATE MM DD LIMITS GENERAL LIABILITY PAC6418906-07 06/01/2013 06/01/2014 EACH OCCURRENCE $ 1,000,000 COMMERCIAL GENERAL LIABILITY _ PAMAGE TO RENTED REMISES Ea occurrr nce $ 300,000 CLAIMS MADE FRI OCCUR MED EXP (Any one person) $ 10,000 A X PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: —1JECT PRODUCTS - COMP/OP AGG $ 2,000,000 POLICY PR i LOC AUTOMOBILE LIABILITY 2434550 06/01/2013 06/01/2014 COMBINED SINGLE LIMIT $ ANY AUTO (Ea accident) 1,000,000 ALL OWNED AUTOS X BODILY INJURY $ B SCHEDULED AUTOS (Per person) X HIRED AUTOS X BODILY INJURY $ NON-OWNEDAUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESS/ UMBRELLA LIABILITY UMB6418958-05 06/01/2013 06/01/2014 EACH OCCURRENCE $ 2,000,000 OCCUR CLAIMS MADE AGGREGATE $ 2,000,00 A $ DEDUCTIBLE $ X RETENTION $ 10,00 $ WORKERS COMPENSATION WMZ-800-8006553-2013A 06/02/2013 06/02/2014 T O STATT- ER AND EMPLOYERS' LIABILITY E.L. EACH ACCIDENT $ 1,000,000 C OFFICER/MEMBERANY /EXCLUDED? PROPRIETOR/PARTNER/EXECUTIVE U E.L. DISEASE - EA EMPLOYE $ 1, 000 , 00 (Mandatory in NH) If yes, describe under E.L. DISEASE - POLICY LIMIT $ 1 , 000 , 00 SPECIAL PROVISIONS below OTHER DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS CERTIFICATE HOLDER rANrFI I ATInN SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR Evidence of Insurance I AUTHORIZED REPRESENTATIVE ACORD 25 (2009/01) Peter Sennott/AAM y% -T -<,-fes„: ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Load Short Form Job: y,2Compass Rd -- wrightsoft� Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@ijheatac.com Web: jjheatac.com Project Information For: Barlo Building 100 Compass point, N Andover, ma Design Information Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT Make n/a Trade n/a Model n/a AH R I ref. n/a Efficiency n/a Htg load Heating input Htg AVF Clg AVF Heating output 0 Btuh Temperature rise 0 °F Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Space thermostat n/a cfm COOLING EQUIPMENT Make n/a Trade n/a Cond n/a Area Htg load Coil n/a Htg AVF Clg AVF AHRI ref. n/a (ft2) (Btuh) Efficiency n/a (cfm) Sensible cooling 0 Btuh Latent cooling 0 Btuh Total cooling 0 Btuh Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Load sensible heat ratio 0 0 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor d 1014 17105 12149 519 519 (Rest of House) d 1560 25717 16668 833 833 Entire House d 2574 42821 28785 1352 1352 Other equip loads 0 0 Equip. @ 0.93 RSM 26655 Latent cooling 9138 T A1n nl-. Annn4 nL nn 4 n1 4nc1 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. i htsof#" 2013 -Apr -2313:44:35 wr 9 Right -suite@ Universal 2012 12.0.13 RSU05790 Page 1 /SCC% C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Load Short Form Job: V Compass Rd wrightsoft� Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project Information For: Barlo Building 100 Compass point, N Andover, ma Design Information Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFUE 0 MBtuh 0 Btuh 0 OF 833 cfm 0.032 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make Trade Cond Coil AHRI ref Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER Area 0 Btuh 0 Btuh 0 Btuh 833 cfm 0.050 cfm/Btuh 0 in H2O 0.74 4922 ROOM NAME Area Htg load Cig load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Play Room 546 8687 4922 281 246 Kitchen 266 4861 4855 157 243 1/2 bath 49 1628 422 53 21 dinning room 400 5393 4227 175 211 Living room 250 4375 2070 142 103 hall 49 771 172 25 9 (Rest of House) d 1560 25717 16668 833 833 Other equip loads 0 0 Equip. @ 0.93 RSM 15435 Latent cooling 5722 Tr1TA10 1560 2 5717 21157 833 833 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. „�- �wri htsoft" 9 Right-SuiteO Universal 2012 12.0.13 RSU05790 2013-Apr-2313:44:35 A(*'C% C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJS Front Door faces: N Page 2 Job: Short ort Form ya Compass Rd wrightsoftro LDate: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@iiheatac.com Web: iiheatac.com Project Information For: Barlo Building 100 Compass point, N Andover, ma Design Information Htg Clg Infiltration Outside db (°F) 12 88 Method Simplified Inside db (°F) 68 75 Construction quality Tight Design TD (°F) 56 13 Fireplaces 1 (Average) Daily range - L Inside humidity (%) 50 50 Moisture difference (gr/Ib) 43 28 HEATING EQUIPMENT Make Amana Trade Goodman Model AMH950453B AHRI ref 456321 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 95 AFUE 0 MBtuh 0 Btuh 0 OF 519 cfm 0.030 cfm/Btuh 0 in H2O COOLING EQUIPMENT Make AMANA Trade GOODMAN Cond CHPF2430b Coil ASX13024 AHRI ref 837621 Efficiency Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 0 SEER 0 Btuh 0 Btuh 0 Btuh 519 cfm 0.043 cfm/Btuh 0 in H2O 0.78 204 ROOM NAME 01 Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 2nd floor hall 204 1893 457 57 20 master Bedroom 238 4776 4413 145 188 Walk in Closet 112 1085 1477 33 63 Master bath 196 3312 2020 100 86 office 108 2867 1652 87 71 bedeoom 2 156 3171 2130 96 91 2nd floor d 1014 17105 12149 519 519 Other equip loads 0 0 Equip. @ 0.93 RSM 11250 Latent cooling 3416 TOTALS 1 4 17105 14666 519 519 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed wri htsoft" I -2013 -Apr -2313:44:35 g Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 3 o CCK C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N wri htsoft- Load Multizone Summary Report Job: U. Compass Rd 9 Date: Apr 23, 2013 By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Infiltration 3 Load and AVF Summary ROOM NAME Area ft2 Heating Clg load Btuh Htg AVF cfm Clg AVF cfm Cooling 204 1893 ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM Walk in Closet ft3 1085 cfm Btuh/ft2 ft3 Master bath cfm Btuh/ft2 2nd floor 9126 0.81 office 123 6.4 9126 0.79 71 120 1.4 (Rest of House) 14040 0.80 91 187 6.414040 17105 0.78 519 182 1.4 Entire House 23166 0.20 281 310 1.6 23166 0.08 4855 302 0.1 3 Load and AVF Summary ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm Clg AVF cfm 2nd floor hall 204 1893 457 57 20 master Bedroom 238 4776 4413 145 188 Walk in Closet 112 1085 1477 33 63 Master bath 196 3312 2020 100 86 office 108 2867 1652 87 71 bedeoom 2 156 3171 2130 96 91 2nd floor 1014 17105 12149 519 519 Play Room 546 8687 4922 281 246 Kitchen 266 4861 4855 157 243 1/2 bath 49 1628 422 53 21 dinning room 400 5393 4227 175 211 Living room 250 4375 2070 142 103 hall 49 771 172 25 9 (Rest of House) 1560 25717 16668 833 833 Entire House 2574 42821 28785 1352 1352 ti wrl ItSOf" Right-SuiteCN Universal 2012 12.0.13 RSU05790 2013 -Apr -2313:44:35 AM% C:\Users\JA Des ktop\M-J\Project1.rup Calc = MJ8 Front Door faces: N Page 1 Buildin Anal sis Job: 9a Compass Rd -- wrightsoft,9 9 y Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@ijheatac.com Web: jiheatac.com For: Barlo Building 100 Compass point, N Andover, ma Desinn Cnnditic Location: Btuh/ft2 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 10616 Indoor temperature (°F) 68 75 Elevation: 30 ft 7.5 Design TD (°F) 56 13 Latitude: 420N Ceilings Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Ducts Daily range °F) - 15 (L ) Method Simplified 0 We bulb (°F� - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0 Heating -Component Btuh/ft2 Btuh % of load Walls 4.0 10616 24.8 Glazing 16.7 3203 7.5 Doors 21.7 2732 6.4 Ceilings 1.8 971 2.3 Floors 1.6 1609 3.8 Infiltration 6.4 18936 44.2 Ducts 4754 11.1 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 42821 100.0 Cooling Latent Cooling Load = 9138 Btuh Overall U -value = 0.077 Btuh/ft2-°F Data entries checked. u 2013 -Apr -2313:44:35 Wrl htsof" Right -Site@ Universal 2012 12.0.13 RSU05790 Page 1 ACOA C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Btuh/ft2 Btuh % of load -Component Walls 1.3 3350 11.6 Glazing 22.1 4234 14.7 Doors 10.3 1302 4.5 Ceilings 1.6 874 3.0 Floors 0.4 365 1.3 Infiltration 1.4 4175 14.5 Ducts 2925 10.2 Ventilation 0 0 Internal gains 11560 40.2 Blower 0 0 Adjustments 0 Total 1 1 287851 100.0 Latent Cooling Load = 9138 Btuh Overall U -value = 0.077 Btuh/ft2-°F Data entries checked. u 2013 -Apr -2313:44:35 Wrl htsof" Right -Site@ Universal 2012 12.0.13 RSU05790 Page 1 ACOA C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Building Analysis Job: Cl°2 Compass Rd wrightsoft® 9 i Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project Information -- For: Barlo Building 100 Compass point, N Andover, ma 3lesinn Cenditir. Location: Btuh/ft2 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 6739 Indoor temperature (°F) 68 75 Elevation: 30 ft 7.8 Design TD (°F) 56 13 Latitude: 420N Ceilings Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Ducts Dally range6 °F) - 15 (L ) Method Simplified 0 Wet bulb (° -72 Wind speed (mph) 15.0 7.5 Construction quality Fireplaces Ti ht 1 Average) 0 Component Btuh/ft2 Btuh % of load Walls 4.2 6739 26.2 Glazing 16.7 2002 7.8 Doors 21.7 911 3.5 Ceilings 1.8 971 3.8 Floors 1.6 1609 6.3 Infiltration 6.4 11431, 44.4 Ducts 2054 8.0 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 25717 100.0 Cooling Component Btuh/ft2 Btuh % of load Walls 1.4 2200 13.2 Glazing 19.7 2364 14.2 Doors 10.3 434 2.6 Ceilings 1.6 874 5.2 Floors 0.4 365 2.2 Infiltration 1.4 2521 15.1 Ducts 571 3.4 Ventilation 0 0 Internal gains 7340 44.0 Blower 0 0 Adjustments 0 Total 1 16668 100.0 Latent Cooling Load = 5722 Btuh Overall U -value = 0.067 Btuh/ft2-°F Data entries checked. Wrl htSof - 2013 -Apr -2313:44:35 9 Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 2 ACCX C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Building Analysis Job: �,? Compass Rd -- wrightsoft� 7 Date: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Pro*ect Information For: Barlo Building 100 Compass point, N Andover, ma Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range °F) - Wet - Wind speed (mph) 15.0 Design Conditions Heating Indoor: 68 Indoor temperature (°F) 56 Design TD (°F) 50 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 (L ) Method 72 Construction quality 7.5 Fireplaces Heating Cooling 68 75 56 13 50 50 42.7 27.8 Simplified Tiht 1 Average) Heating;K. Latent Cooling Load = 3416 Btuh Overall U -value = 0.106 Btuh/ft2-°F Data entries checked. Wrl htsoft' 2013 -Apr -2313:44:35 g Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 3 ACCP. C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Btuh/ft2 Btuh % of load —Component Walls 3.8 3877 22.7 Glazing 16.7 1201 7.0 Doors 21.7 1821 10.6 Ceilings 0 0 0 Floors 0 0 0 Infiltration 6.4 7505 43.9 Ducts 2700 15.8 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 17105 100.0 Latent Cooling Load = 3416 Btuh Overall U -value = 0.106 Btuh/ft2-°F Data entries checked. Wrl htsoft' 2013 -Apr -2313:44:35 g Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 3 ACCP. C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N Btuh/ft2 Btuh % of load —Component Walls 1.1 1150 9.5 Glazing 26.4 1899 15.6 Doors 10.3 868 7.1 Ceilings 0 0 0 Floors 0 0 0 Infiltration 1.4 1655 13.6 Ducts 2357 19.4 Ventilation 0 0 Internal gains 4220 34.7 Blower 0 0 Adjustments 0 Total 12149 100.0 Latent Cooling Load = 3416 Btuh Overall U -value = 0.106 Btuh/ft2-°F Data entries checked. Wrl htsoft' 2013 -Apr -2313:44:35 g Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 3 ACCP. C:\Users\JJ\Desktop\M-J\Projectt.rup Calc = MJ8 Front Door faces: N • Wil htsoftw Component Constructions Job: L/0% Compass Rd 9 Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project For: Barlo Building 100 Compass point, N Andover, ma Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ftz-°F/Btuh Btuh/ft2 Btu Bluh/ftz Btu Walls 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, cir outr, air gas, wd frm mat, cir innr, 1/4" gap, 1/8" thk: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk Doors 11 DO: Door, wd sc type Ceilings 1613-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceil ins Floors 19A-30bswp: Part floor, hrd wd fir fish, r-30 ins, frm fir, 10" thkns n 300 Design Conditions 13.0 5.06 1518 Location: 587 Indoor: Heating Cooling Boston Logan Int'I AP, MA, US 1366 Indoor temperature (°F) 68 75 Elevation: 30 ft 13.0 Design TD (°F) 56 13 Latitude: 420N all 759 Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: 0.99 251 Daily range (°F) - 15 ( L ) Method Simplified 2201 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 21.0 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ftz-°F ftz-°F/Btuh Btuh/ft2 Btu Bluh/ftz Btu Walls 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" gypsum board int fnsh, 2"x6" wood frm Partitions (none) Windows 2 glazing, cir outr, air gas, wd frm mat, cir innr, 1/4" gap, 1/8" thk: 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk Doors 11 DO: Door, wd sc type Ceilings 1613-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceil ins Floors 19A-30bswp: Part floor, hrd wd fir fish, r-30 ins, frm fir, 10" thkns n 300 0.091 13.0 5.06 1518 1.96 587 e 270 0.091 13.0 5.06 1366 1.96 528 W 189 0.091 13.0 5.06 956 1.96 370 all 759 0.091 13.0 5.06 3840 1.96 1485 n 252 0.065 21.0 3.61 911 0.99 251 e 609 0.065 21.0 3.61 2201 0.99 606 S 384 0.065 21.0 3.61 1388 0.99 382 W 630 0.065 21.0 3.61 2277 0.99 627 all 1875 0.065 21.0 3.61 6776 0.99 1865 n 24 0.300 0 16.7 400 8.94 214 e 12 0.300 0 16.7 200 29.1 349 s 84 0.300 0 16.7 1401 15.6 1309 w 72 0.300 0 16.7 1201 29.1 2096 all 192 0.300 0 16.7 3203 20.7 3969 n 42 0.390 0 21.7 911 10.3 434 n 84 0.390 0 21.7 1821 10.3 868 all 126 0.390 0 21.7 2732 10.3 1302 546 0.032 30.0 1.78 971 1.60 874 1014 0.034 30.0 1.59 1609 0.36 365 2013 -Apr -23 13:44:35 wrightsoft" Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 1 ACCP. C:\Users\JJ\Desktop\M-J\Project 1.rup Calc = MJ8 Front Door faces: N Com onent Constructions Job: %Compass Rd wrightsoft" � Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com For: Barlo Building 100 Compass point, N Andover, ma Location: Boston Logan Int'I AP, MA, US Elevation: 30 ft Latitude: 420N Outdoor: Heating Dry bulb (°F) 12 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Heating Cooling 68 Indoor temperature (°F) 56 Design TD (°F) 50 Relative humidity (%) Cooling Moisture difference (gr/Ib) 88 Infiltration: 15 ( L ) Method 72 Construction quality 7.5 Fireplaces Heating Cooling 68 75 56 13 50 50 42.7 27.8 Simplified 0 Tiht ft? 1 Average) ftp °F/Btuh Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain 0 16.7 ft? Btuh/ftp-°F ftp °F/Btuh Btuh/ftz Btu Btu h/ft2 Bluh Walls 15.6 748 36 0.300 0 16.7 600 29.1 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm n 234 0.091 13.0 5.06 1184 1.96 458 e 189 0.091 13.0 5.06 956 1.96 370 W 189 0.091 13.0 5.06 956 1.96 370 all 612 0.091 13.0 5.06 3096 1.96 1197 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 168 0.065 21.0 3.61 607 0.99 167 gypsum board int fnsh, 2"x6" wood frm a 339 0.065 21.0 3.61 1225 0.99 337 S 186 0.065 21.0 3.61 672 0.99 185 W 315 0.065 21.0 3.61 1138 0.99 313 all 1008 0.065 21.0 3.61 3643 0.99 1002 Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk: 2 n glazing, clr outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk e s W all Doors 11 DO: Door, wd sc type Ceilings 16B-30ad: Attic ceiling, asphalt shingles roof mat, r-31 roof ins, r-30 ceil ins Floors 19A-30bswp: Part floor, hrd wd fir fnsh, r-30 ins, frm fir, 10" thkns 24 0.300 0 16.7 400 8.94 214 12 0.300 0 16.7 200 29.1 349 48 0.300 0 16.7 801 15.6 748 36 0.300 0 16.7 600 29.1 1048 120 0.300 0 16.7 2002 19.7 2360 n 42 0.390 0 546 0.032 30.0 1014 0.034 30.0 21.7 911 10.3 434 1.78 971 1.60 874 1.59 1609 0.36 365 Wrl htsoft" 2013 -Apr -2313:44:35 9 Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 2 ACCA C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJB Front Door faces: N • Wrl htsoft- Component Constructions Job: Ia Compass Rd 9 Date: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project For: Barlo Building 100 Compass point, N Andover, ma :11llesian Cenditir. Location: Or Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Loss Indoor temperature (°F) 68 75 Elevation: 30 ft ftz Design TD (°F) 56 13 Latitude: 42°N Btuh/ftz Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: n 66 Daily range (°F) - 15 ( L ) Method Simplified 1.96 Wet bulb (°F) - Wind speed (mph) 15.0 72 7.5 Construction quality Fireplaces Tiht 1 Average) 0.091 Construction descriptions Or Area U -value Insul R Htg HTM Loss Clg HTM Gain ftz Btuh/ft'-°F ftz-°F/Btuh Btuh/ft2 Btu Btuh/ftz Btuh Walls 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2"x4" wood frm n 66 0.091 13.0 5.06 334 1.96 129 e 81 0.091 13.0 5.06 410 1.96 158 all 147 0.091 13.0 5.06 744 1.96 288 12F-Osw: Frm wall, vnl ext, 1/2" wood shth, r-21 cav ins, 1/2" n 84 0.065 21.0 3.61 304 0.99 84 gypsum board int fnsh, 2"x6" wood frm a 270 0.065 21.0 3.61 976 0.99 269 s 198 0.065 21.0 3.61 716 0.99 197 w 315 0.065 21.0 3.61 1138 0.99 313 all 867 0.065 21.0 3.61 3133 0.99 862 Partitions (none) Windows 2 glazing, clr outr, air gas, wd frm mat, cir innr, 1/4" gap, 1/8" thk: 2 s 36 0.300 0 16.7 600 15.6 561 glazing, cir outr, air gas, wd frm mat, clr innr, 1/4" gap, 1/8" thk w 36 0.300 0 16.7 600 29.1 1048 all 72 0.300 0 16.7 1201 22.3 1609 Doors 11 DO: Door, wd sc type n 42 0.390 0 21.7 911 10.3 434 n 42 0.390 0 21.7 911 10.3 434 all 84 0.390 0 21.7 1821 10.3 868 Ceilings (none) Floors (none) Wrlhtsoft' 2013 -Apr -23 13:age 3 g Right-SuiteC� Universal 2012 12.0.13 RSU05790 Page 3 ktk C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Project Summar Job: '?A Compass Rd wrightsoft" i Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@ijheatac.com Web: jjheatac.com JICGI 1111UrlilduG For: Barlo Building 100 Compass point, N Andover, ma Notes: Design Information Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF Btuh Daily range Relative humidity L 50 % 0 Btuh Piping 0 Btuh Moisture difference 28 gr/Ib Heating Summary ' Sensible Cooling Equipment Load Sizing Structure 38068 Btuh Structure 25860 Btuh Ducts 4754 Btuh Ducts 2925 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 42821 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 26655 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 8085 Btuh Ducts 1052 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft22574 2574 Equipment latent load 9138 Btuh Volume ft3) 23166 23166 Air changes/hour 0.20 0.08 Equipment total load 35793 Btuh Equiv. AVF (cfm) 310 302 Req. total capacity at 0.70 SHR 3.2 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrl htsoft• 2013 -Apr -23 13:age 1 9 Right-SuiteC� Universal 2012 12.0.13 RSU05790 Page 1 ACCA C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N wrl ntso'i�t Project Summary Job: %Z Compass Rd g Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Proiect Information For: Barlo Building 100 Compass point, N Andover, ma Notes: Design information Weather: Winter Design Conditions Outside db 12 OF Inside db 68 OF Design TD 56 OF Heating Summary L 50 Structure 23663 Btuh Ducts 2054 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Pi in 1560 1560 Btuh Equipment load 257107 Btuh Infiltration Boston Logan Int'I AP, MA, US Summer Design Conditions Outside db 88 OF Inside db 75 OF Design TD 13 OF Daily range Relative humidity L 50 % Moisture difference 28 gr/Ib Sensible Cooling Equipment Load Sizing Structure 16097 Btuh Ducts 571 Btuh Central vent (0 cfm) 0 Btuh Blower 0 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Equipment sensible load 15435 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 5032 Btuh Ducts 690 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft2 1560 1560 Equipment latent load 5722 Btuh Volume (ft3) 14040 14040 Air changes/hour 0.80 0.78 Equipment total load 21157 Btuh Equiv. AVF (cfm) 187 182 Req. total capacity at 0.80 SHR 1.6 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80AFUE Efficiency 0 SEER Heating input 0 MBtuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 833 cfm Actual air flow 833 cfm Air flow factor 0.032 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.74 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed t ,..Wrl htsof4 Right-Suite� Universal 2012 12.0.13 RSU05790 2013 -Apr -2313:44:35 Page 2 �� C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N •Job: / � Compass Rd wrightsoft° Project Summary Date: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: ijheatac.com JIVUL mwrmauc For: Barlo Building 100 Compass point, N Andover, ma Notes: Des! - n Information Weather: Boston Logan Int'I AP, MA, US Winter Design Conditions Summer Design Conditions Outside db 12 OF Outside db 88 OF Inside db 68 OF Inside db 75 OF Design TD 56 OF Design TD 13 OF . Daily range Relative humidity L 50 % Moisture difference 28 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 14405 Btuh Structure 9792 Btuh Ducts 2700 Btuh Ducts 2357 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 17105 Btuh Use manufacturer's data n Rate/swing multiplier 0.93 Infiltration Equipment sensible load 11250 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Average) Structure 3053 Btuh Ducts 362 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (ft21014 1014 Equipment latent load 3416 Btuh Volume ()w) 9126 9126 Air changes/hour 0.81 0.79 Equipment total load 14666 Btuh Equiv. AVF (cfm) 123 120 Req. total capacity at 0.80 SHR 1.2 ton Heating Equipment Summary Cooling Equipment Summary Make Amana Make AMANA Trade Goodman Trade GOODMAN Model AMH950453B Cond CHPF2430b AHRI ref 456321 Coil ASX13024 AHRI ref 837621 Efficiency 95AFUE Efficiency 0 SEER Heating input 0 MBtuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 OF Total cooling 0 Btuh Actual air flow 519 cfm Actual air flow 519 cfm Air flow factor 0.030 cfm/Btuh Air flow factor 0.043 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.78 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. JJ 1..� ° 2013 -Apr -23 13:44:35WI1 htsoftRight-SuiteOUniversal 2012 12.0.13 RSU05790 Page 3 ACCO'. C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N wri htsofta AED Assessment Job: 47A. Compass Rd g Date: Apr 23, 2013 Entire House By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project information For: Barlo Building 100 Compass point, N Andover, ma Location: Heating Boston Logan Int'I AP, MA, US 68 Elevation: 30 ft 56 Latitude: 42°N 50 Outdoor: Heating Cooling Dry bulb (°F) 12 88 Daily range °F) - 15 ( L We bulb (°F� - Wind speed (mph) 15.0 72 7.5 Indoor: Heating Indoor temperature (°F) 68 Design TD (°F) 56 Relative humidity (%) 50 Moisture difference (gr/Ib) 42.7 Infiltration: Cooling 75 13 50 27.8 =fir Test for Adequate Exposure Diversity' Hourly Glazing Load /Hwy Hour of Day / n„e,nye / MOI - Maximum hourly glazing load exceeds average by 36.1%. House does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 265 Btuh (PFG-1.3*AFG) ,t wri htsoft• 2013 -Apr -2313:44:35 g Right -Suite@ Universal 2012 12.0.13 RSU05790 ACCk C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Page 1 AED Assessment Job -V Compass Rd -- wrightsoftQ Date: Apr 23, 2013 (Rest of House) By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MA 01826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jiheatac.com Web: jjheatac.com Project information For: Barlo Building 100 Compass point, N Andover, ma Desian Conditir Location: Boston Logan Int'I AP, MA, US Indoor: Indoor temperature (°F) Heating 68 Cooling 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 42°N Outdoor: Heating Cooling Relative humidity (%) Moisture difference (gr/Ib) 50 42.7 50 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 ( L ) We bulb (°F� - 72 Wind speed (mph) 15.0 7.5 ''r .f.=4`yx Test for Adequate Exposure Diversity Hourly Glazing Load Hour of Day / Hw�IY / Amapa / AEDN 1 Maximum hourly glazing load exceeds average by 30.2%. Zone does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 4 Btuh (PFG - 1.3*AFG) `- wrl ht:SOft:' 2013 -Apr -2313:44:35 ,� 9 Right -Suite® Universal 2012 12.0.13 RSU05790 ACCA C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N Page 2 v AED Assessment Job: ?„? compass Rd -- wrightsofta Date: Apr 23, 2013 2nd floor By: J&J Heating and Air Condtioning Inc. 17 Arlington st, Dracut, MAO 1826 Phone: 978 454 8197 Fax: 978 454 8615 Email: office@jjheatac.com Web: jjheatac.com Project For: Barlo Building 100 Compass point, N Andover, ma Insion Cnnditir Location: Indoor: Heating Cooling Boston Logan Int'I AP, MA, US Indoor temperature (°F) 68 75 Elevation: 30 ft Design TD (°F) 56 13 Latitude: 420N Relative humidity (%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/Ib) 42.7 27.8 Dry bulb (°F) 12 88 Infiltration: Daily range °F) - 15 ( L ) Wet bulb (°F) - 72 Wind speed (mph) 15.0 7.5 Test for Adequate Exposure Diversity Hourly Glazing Load Hour of Day / Hw111Y / A—,q. / Am YiMt Maximum hourly glazing load exceeds average by 46.7%. Zone does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 290 Btuh (PFG-1.3*AFG) 1 2013 -Apr -2313:44:35 Wrl htsoft• Right -Suite@ Universal 2012 12.0.13 RSU05790 Page 3 ACCK C:\Users\JJ\Desktop\M-J\Projectl.rup Calc = MJ8 Front Door faces: N