Loading...
HomeMy WebLinkAboutMiscellaneous - Amberville RoadC ,jov%I, o A LT 'l,C1fWN OF Nf3RTH ANDC W -!,R N0� 2 6 2002 SYSTEM PUjAPING ", CORD SYSTEM OWNER & ADDRESS Coy orco 011�0i�C UZ� N'STEhi LOCATION asa�-le• Ieifi front of Louse) V Kai e ! 1U, n4T1: OF I'(i14IPING. //- fl-%� /�� L,ANTITY PU.NII'ED � G zLLONS nr _btu /yrs CESSPOOL; NO X E5 SEPTW 'T.A,,N .: NO NATURE OF S.r RVICE: ROUTINE y EMLIPIGE-N- :Y OBSERVATIONS: J GOOD CONIyf ZION FULL TO COVER HEAVY GREASE BAFFLES IN PLACE; ROOTS LEACHFIT.LU RUNBACK -�— EXCESSIV"E SOLIDS FLOODED SOLIDS CARRYOVER OTtIER (EXPLAIN) --•-";7'i-S'fcl;Vi ?tlPvil'Ei) id ti : yn �1('A 61X COMMENTS: CONTENTS TRANSFERRED 'r Ot 'rONNIN Of, NORT HAN,'D0NT-,R� �01 Z 6 SYSTEM PUMPING RE CORD DATE: Z — "swSTFAI LOCAYION— sysTEi M 011AINERS, ADDRESS , �ae: lelft frout of hou C(��%u v T'l-'< 0J & yu uuu�j 0t(vJ'c-'( A UANTITY PUMPF DAI'L OF PCIN-1PING. b--04G.kLL0NS, CESSPOOL; NO y r"s SEPTiCTANK, NO YFS NATURE OF S.ERVICE, ROUTINV� EVIERGENCY OBSERVATIONS! GOOD CONDITION FULL TO COVER HEAVY GREASE il,&k'JiLES IN PLACC ROOTS LEACHFIELD RUN -BACK XCESSIVE Sol -IDs FLOODED SOLIDS CARRYOVER OT -HER (.EXPLAIN) T/t A0 4 COMMENTS: CONTENTS TRANSFEItRED'10- Lit 4blT f .� .lum—'t R(In —Ir. Dirucior or.l ngineerirrg Mr. Patrick S. Cone Director of Construction Pulte Home Corporation 257 Turnpike Road Southborough, MA 01772 RE: Forest View Estates Dear Pat: 1-t,IW_ t.J.I+ NORTH ANDOVER DIVISION OF PU1.B.L,1C WORKS '384 C)S6001) 5"1'1{1::1;T NNIORT11 AN.13C:3ttER, MASSAC:R S1_! ITTS 01845-2909 J. W11_,1..IANI 11ML.I tC;IAK, 1.-)1REC:TOR, P.E of ao DT)l Ti!iephone (9.7) 085-0950 50 m I''Ld i%'iSJF�t3-9J.''.3 sSaCHUSE� October 23, 2000 Today I made an inspection of the Forest View Estates Subdivision and found on Palomino Drive, at station 0+50 left +/- that the hydrant gate appears in the wrong location. I met with your Superintendent Dave Stillson and reviewed the approved plans in the construction trailer. While Stillson and I were at the hydrant location Mr. Jack Masterson of J. Masterson Construction Corp. stopped at the site. Mr. Masterson informed us that his company did not install the hydrant as part of his work for you. Mr. Masterson also stated that he thought that the water main was within three or four feet of the hydrant and that it may have an anchor tee. This brings up a potential problem of the water main location being incorrect. After I spoke to you today, I checked the as -built plans for the Forest View Pump Station. My staff engineer has not yet completed reviewing them and the pump station details are the last page. The as -built plan show the water main completely relocated with additional bends and completely in the wrong location. While the location may be satisfactory for the pump station the location is not the approved location for the subdivision. The approved location for the water main is 10 feet off the centerline. I have not been able to find any submissions to this office to relocate the water main or have I been able to find any approval from this office as to the new location. This is a serious matter. You have now added drainage to perhaps both sides of this water main and I question the horizontal separation of the drainage structures and anyone's ability to service the water main in an emergency situation. Also, the hydrant gate is so close to the hydrant that I. question if our standard gate keys will function. The close proximity of the gate creates the additional problem of hydrant repairs. If there is damage to the hydrant and the water leaking from the hydrant makes it impossible to shut the gate we would be forced to shut a portion of Palomino Drive that would include several homes and the pump station. This is clearly not the design intent nor is it acceptable. Also, the as built plan shows the end of the water main approaching the centerline of the roadway. This is not acceptable. Patrick S. Cone Forest View Estates Page 2 October 23, 2000 The submission and receiving of an as -built plan is just that, the submission and receipt of said plan, it is not approval of all the utilities. While the pump station is functioning and is serviced by a water.main that does not indicate approval of all utilities for every purpose. Therefore, I would propose that you complete and as -built plan that shows all of the utilities within the first 300 feet of Palomino Drive, submit it to the DPW and after we have some time to review the as -built plan we can then meet. Include any approvals of the relocated line with the as -built plan. Please keep both the Planning Board and Heidi Griffin, Town Planner appraised of the situation. Planning Board action on this issue may be required. I will be meeting with the full staff of the DPW to assess the current situation and how it affects the turning on of water services to your buildings under - construction. JJR/hs CC: J. William Hmurciak, PE, Director of DPW Attorney Thomas Urbelis Tim Willett, Staff Engineer Heidi Griffin, Town Planner Michael McGuire, Local Building Inspector Fire Chief William Dolan, Fire Department Mesiti Development Corp. C:/SUBDIVISIONS/PULTEFORESTVIEW/CONE02 Sincerely, ' James Rand, Jr. Director of Engineering "I_ON "iI O.F i 0RT11 A'vD{_lVE' DIVISION OF PUBLIC WORI,.CS :siii=l ()S(a(.)Ol) SFREI,A" NOR I-1 ANDC VF.R NIASSA{.:1"1l,SE!["1 S 0194,_Noq Town of North Andover HORTh OFFICE OF COMMUNITY DEVELOPMENT AND MY&ALAW, 27 Charles Street TOWN CLERK North Andover, Massachusetts 018 45 NORTH ANDOVER WILLIAM J. SCOTT 9S S4c Hu5y{ Director 1000 FEB A '�- 3y (978) 688-9531 Fax (978) 683-9542 NOTICE OF DECISION This is to W* lhst twenty l�1 dant Any -appeal shall be filed have elapsW from da* wiew avofanNV °t'�/3 40 within (20) days after the --joyme A& - aradoan date of filing this Notice Tomcwk in the Office of the Town Clerk. Date 3)' 20 b Q Date of HearingICICI c Zan (0'2-000 7�co Petition of Lap-< j ne-.lelnn rti� Cnrr�nrrfidrti C.7 Premises affected Tnf P c'-+41 QI.1 �c r hrl i U i 541 — Referring to the above petition for a Subdivision from the requirements of the 5c,�dry'►�,Zm 12r 11P.s � �c��cict•h1�1 C so as to allow M nd 4Snca t Ln r-1.4 Z P in '-L _ n_ After a public hearing given on the above date, the Planning Board voted based upon the following conditions: CC: Director of Public Works Building Inspector Natural Resource / Land Use Planner Health Sanitarian Assessors Police Chief Fire Chief Applicant Engineer Towns Outside Consultant File Interested Parties Alison Lescarbeau, Chairman John Simons, Vice Chairman Alberto Angles, Clerk Richard Nardella Richard S.Rowen WiHiana Cunningham Planning Board BOARD OF APPEALS 688-9541 BUILDING 683-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 -K Town of North Andover OFFICE OF COMMUNITY DEVELOPMENT AND SERVICES WILLIAM J. SCOTT Director (978)688-9531 January 31, 2000 Mesiti Development Corporation 231 Sutton Street North Andover, MA 01845 Dear Mr. Mesiti: 27 Charles Street North Andover, Massachusetts 01 845 REVISED NOTICE OF DECISION h0 Fax(978)688-9542 Please be advised that at their regularly scheduled meeting of December 21, 1999 and January 18, 2000, the North Andover Planning Board voted to APPROVE your application for a modification to a definitive subdivision plan, plan entitled "Modification of Lot Layout Plan" drawn by Marchionda and Associates, dated 11/30/99, revised 12/19/99. The plan depicts a modification so as to revise the existing house plans previously approved which were titled "Forestview Subdivision, North Andover, MA, by A. Mesiti Development". This modification was approved with the following conditions: 1. One certified copy of the recorded decision and endorsed plans must be filed with the Essex North Registry of Deeds and delivered to the Planning Department prior to Form U verification for any of the house lots depicted on these plans Included as a part of this decision are the following plans and reports: A. 1) Plans Titled: Modification of Lot Layout Plan Prepared By: Marchionda and Associates 62 Montvale Avenue, Suite 1 Stoneham, MA 02180 Prepared For: Pulte Home Corporation of N.E. 257 Turnpike Road — Suite 200 Southborough, MA Plans Dated: 11/30/99, revised 12/19/99 Sheets: Sheets I of 4 BOARD OF APPEALS 688.9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 2) Report Titled: Prepared By: 3) Report Titled: Prepared By: B. 1) Plans Titled: Prepared By: Plans Dated: Sheets: Homes of New England — Pulte, Master Builder Pulte Home Corporation — 1999 Laurel — House Elevations — Laurel/D 1246EL2A Pulte Home Corporation - 1999 Forestview Estates Conceptual Landscape Plan Lot 7; Lot 85, Lot 90 Huntress Associates 17 Tewksbury Street Andover, MA 0 18 10 11/22/99 1-3 2. In no instance shall approval of this modification be construed to replace any of the conditions set forth in the originally approved Forestview Estates Subdivision Plan previously approved by the Planning Board than for what is expressly stated in this conditional approval. Sincerely, ll " Allison Lescarbeau Chairperson, North Andover Planning Board cc: Department of Public Works senT by: ui bu3 big 8232 OCt-24-00 12:54PM; Page 1/2 • ti a West EnvironmenW, Inc. 48 Stevens Hill Road, Natti h , N.H. 03290 (603) 679-8212 (603) 679-8232 Email: westenv e ire.net , t' FAX MEMO DATE: TO: Brian LaGmse, Conservation Heidi Gritgn, Planning FROM: Bobbie jean Weiler RE: Environmental Monitoring CC. David Stinson 978-79 f 978-688-9542 Brian, Attached is the monitoring report for the Forest View projeec. pkasc call 01e number above if you have questions. BJW beni. tsy: u; 603 big 8232; Uct-24-OU 12:54PM; Page 2!2 ENVIRONMENTAL MONITOR REPORT Project ID: Forest view InspectionDate: 1() JE3 0CI: Permit File# 242-885 WET 00-0.18NIA I Client: Marchionda & Associates Tel I Contractor Name: Pulte ltome Corporation, David Stilson, superintenjent 508-326-8047 or FAX 978-794-4862 Contractor Interaction: Z/10 Silt Fence Status: Ut Required: Locution: a&yj Out cj-zintn, Catch Basin: Repair/Clean Out Requirf Location: Dewatering: 11AA Water Clarity Last Rain Event Slope Stabilization Status, Photographs Taken: �Mffll Notice to APPLICANr/TOWN CLERK and Certification of Action of -Planning Board on Definitive Subdivision Plan entitled: jFor�iew-Estates--15 By: MHF Design Inc. dated September 22, ? 1'e 97 rev. 12/12/97 The North Andover Planning Board has voted to APPROVE said plan, subject to the following conditions: 1. That the record owners of the subject land forthwith execute and record a "covenant running with the land", or otherwise provide security for the con- struction of ways and the installation of municipal. services within said sub -- division, all as provided by G.L. c. 14.1., S. 81-U. 2. That all such construction and installations shall in all respects conform to the governing rules and, regulations of this Board. 3. That, as required by the North Andover Board of Health in its report to this Board, no building or other structure shall be built or placed upon Lots No. as shown on said Plan without the _prior consent of said Board of Health. 4. Other conditions: See Attached a o _ w mr W C) m -� �. m:c to � 1 c In the event that no appeal shall have been taken from said approval within twenty days from this date, the North Andover Planning Board will forthwith thereafter endorse its formal approval upon said plan. The Date: N plan, fo:p t , f NORTH ANDOVER PLANNIM BOARD April 13, 1998 By..v� I G Richard S. Rowen Forest View Estates Definitive Subdivision Conditional Approval The Planning Board herein APPROVES the Definitive Subdivision for a 92 (ninety -two) -lot, with 91 new homes, subdivision known as Forest View Estates. Richard Pelletier, Mesiti Development Corp., 11 Old Boston Road, Tewksbury, MA 01876, submitted this application on October 15, 1997. The area affected is located off ofRt. 114 in the VR Zoning District. The Planning Board has determined that all lots or structures will be serviced with public sewer approved and accepted by the Town as required by Footnote 12 of Table 2 of the North Andover Zoning Bylaw in effect at the time of submittal. The Planning Board makes the following findings as required by the Rules and Regulations Governing the Subdivision of Land: A. The Definitive Plan, dated September 21, 1997, last revised on 1/21/98, includes all of the information indicated in Section 3 of the Rules and Regulations concerning the procedure for the submission of plans. B. The Definitive Plan adheres to all of the design standards as indicated in Section 7 of the Rules and Regulations except as noted in Condition 18 Waivers. C. The Definitive Plan is in conformance with the purpose and intent of the Subdivision Control Law. D. The Definitive Plan complies with all of the review comments submitted by various town departments in order to comply with state law, town by-laws and insure the public health, safety, and welfare of the town. Finally, the Planning Board finds that the Definitive Subdivision complies with Town Bylaw requirements so long as the following conditions are complied with: 1) Sewer System Issues: a) The sewer extension in Rt. 114 will be subject to the terms and conditions of the Department of Environmental Protection draft Administrative Consent Order and Notice of Noncompliance, ACO -NE -98-1004 dated March 13, 1998 as well as any modifications to the conditions stipulated in the Final Consent Ofder. b) The sewer extension will be subject to the policies of the Division of public Works regarding mitigation of groundwater infiltration and inflow into the receiving system c) The applicant and the Town of North Andover mutually agree to establish an escrow account with the Town with sufficient funds provided by the applicant for the purpose of funding a 1 review engineer to provide services to the Planning Board. The engineer shall review the sewer design and pump station plans submitted to the Planning Board and DPW to determine their adequacy and over -sizing costs (if any), and to monitor construction. d) The Town Manager and applicant will agree to put in place a participation agreement to provide for the collection and payment of any over -sizing costs. 2)—Environmental Monitor: The applicant shall designate an independent environmental monitor who shall be chosen in consultant with the Planning Department. The Environmental Monitor must be available upon four- (4) hour's notice to inspect the site with the Planning Board designated official. The Environmental Monitor shall make weekly inspections of the project and file monthly reports to the Planning Board throughout the duration of the project. The monthly reports shall detail area of non-compliance, if any and actions taken to resolve these issues. 3) Erosion Control: The applicant shall implement and follow all requirements set forth in the "Proposed Construction/Erosion Control Schedule for Forest View Subdivision, Route 114 Salem Turnpike, North Andover, Massachusetts", prepared for Mesiti Development Corporation, 11 Old Boston Road, Tewksbury, Massachusetts, 01876, prepared by MI -IF Design Consultants, Inc., 12-B Manor Parkway, Salem, NH 03079, dated January 1998 and as shown on a plan entitled Phasing and Construction Plan as amended in Condition 4(c) below. 4) Prior to endorsement of the plans by the Planning Board the applicant shall adhere to the yfoll wing: a The cul-de-sac island planting plan prepared by Bruce Taylor, AIA for Forest View Estates, North Andover, MA on 1/26/98 must be added to the plans as a detail. b A Development Schedule must be submitted which conforms to both_ Sections 4.2 and Section 8.7 of the North Andover Zoning Bylaw. The schedule must show building permit eligibility by quarter for all 91 lots. Need Gk 1 110 CAAn amended "Proposed Construction/Erosion Control Schedule" must be submitted which conforms to the Development Schedule required above in Condition 4(b). d) The Applicant must submit documents conveying the designated Open Space Parcel C to the State or in the alternative to the Town through the Conservation Commission for review and approval. If the land is to be donated to the State, a perpetual restriction of the type described in M.G.L. Chapter 184, Section 31 running to or enforceable by the Town shall be recorded with respect to such land. Such restriction shall provide that the Open Space shall be retained in perpetuity for one or more of the following uses, conservation, agriculture, or recreation. The land will be conveyed to the appropriate entity prior to acceptance of the roadways as public ways - 2 e) Open Space Parcels A, B, D, E, and F are to be conveyed to a Homeowners' Association to be held intrust for conservation and or agricultural purposes only. The land will be conveyed to the Home Owner's Association prior to acceptance of the roadways as public ways. Due to the location of this subdivision on Rt. 114, the applicant shall post a Site Opening Bond in the amount of fifteen thousand dollars ($15,000) to be held by the Town of North Andover. The Site Opening Bond shall be in the form of a check made out to the Town of North Andover that will be placed into an interest bearing escrow account. This amount shall cover any contingencies that might affect the public welfare such as site -opening, clearing, erosion control and performance of any other condition contained herein, prior to the posting of the Roadway Bond as described in Condition 60). This Site Opening Bond may at the discretion of the Planning Board be rolled over to cover other bonding considerations, be released in full, or partially retained in accordance with the recommendation of the Planning Staff as directed by a vote of the NAPB. Q� The Site Opening Bond is not intended to cover the off-site sewer. The Division of Public Works Opening Permit will cover the off-site sewer work and Performance Bond Agreement referenced in Condition 5(c). a s c ` g) The final subdivision plans must bg reviewed and approved by the outside consultant, the Planning Department and D.P. All comments outlined the letter from James Rand, DPW —! dated January 7, 1998 must be adequately addressed. CYICSS�ct, b 1�e�.-l�� -�lo/-� h) The final Rt. 114 off-site sewer and pump station plans must be reviewed and approved by the outside consultant and D.P. W. /The plans must be in accordance with a letter from Richard Pelletier, Mesisti Development to the Division of Public Works dated April 1, 1998 which l agrees to DPW's required modifications outlined in a letter from Guertin Associates dated March 2, 1998. The plans shall be fiu ther revised to include a divided wet wall with sluice gate L, 't - = •� _ at both pumping stations, and modifications to the inlet piping at station No. 2 to accommodate the new wet well. Suction piping for the emergency by pass pumping system shall be installed in the last sewer manhole before each wet well. i) A covenant (FORM I)'securing all lots within the subdivision for the construction of ways and municipal services must be submitted to the Planning Board. Said lots may be released from the covenant upon posting of security as requested in Condition 60). j) The applicant must submit to the Town Planner a FORM M for all utilities and easements placed on the subdivision. a(All application fees must bepaid in full and verified by the Town Planner. C1)Xle applicant must meet with the Town Planner in order to ensure that the plans conform to 3 the Board's decision. A full set of final plans reflecting the changes outlined above, must be submitted to the Town Planner for review endorsement by the Planning Board, within ninety (90) days of filing the decision with the Town Clerk. ;All111The ubdivision Decision for this project must appear on the mylars. documents shall be prepared at the expense of the applicant, as required by the Planning -Board Rules and Regulations Governing the Subdivision of Land. S 5) Prior to ANY WORK on the site, S� a) The applicant must submit sufficient proof as determined by the North Andover Planning Board to the Board that the Massachusetts Department of Environmental Protection and the Town of North Andover has allowed the connection of the 91 house lots to the "system �0. must be submitted to the Planning Board. 0 '� 'L b) C) 4 The Rt. 114 sewer line and all necessary appurtenances must be constructed in accordance with; the approved plans, Department of Public Works requirements and the Planning Board consulting engineer review. Work on the off-site sewer in Rt. 114 will be allowed only upon the receipt of a conditional sewer extension permit from the Massachusetts Department of Environmental Protection, a Massachusetts Highway Department Permit, and a Division of Public Works Street Opening Permit and Performance Bond Agreement.(DICA-0 j,� 0--e-A d) Detailed phasing plans must be submitted for each phase as submitted for phase I referenced below: i) Plan titled: Forest View Estates — Phase 1 Prepared by: Bruce Stevenson Taylor, AIA 248 Main Street West Newbury, Massachusetts 01985 Dated: February 3, 1998 ` e) Yellow "Caution" tape must be placed along the limit of work as shown on the detailedV phasing plans referenced above. The Planning Staff must be contacted prior to any cuff �' 11 or clearing on site. �V1 fl All erosion control measures as shown on the plan and outlined in the erosion control plan must be in place and reviewed by the Town Planner. 6) Prior to any lots being released from the statutory covenants: 4 a) Three (3) complete copies of the ersed and recorded subdivision one (1) certified c py of the following documentsfrecorded subdivision appro corded Covenant (FORM ), recorded Growth Management Development Schedul�,�dnd recorded FORM M wasf e submitted to the Town Planner as proof of recording. b) Lots will be released incrementally as site work is completed per the amended Construction/Erosion Control Schedule for Forest View Submission. Subsequent phases of lots may be released when the first 8 lots of the previous phase are near completion with final stabilization completed. Stabilization is defined as the final grading ofthe proposed road or lot with either seeding, hay mulch spread on the slopes or in the case of winter conditions, the placement of erosion control mattingiblanketing in the slope. Prior to the release of Lots 38, 42,,P5 , 46, the trail on or adjacent to the lot must be constructed as shown on theplant-All other portions of the trails must be constructed and completed within the Constructione of the adjacent lots d) The entrance to the subdivision and pump house must be constructed during phase I as shown on the approved Entry — Pump House Plan prepared by Bruce Stevenson Taylor, AIA, 248 Main Street, West Newbury, Massachusetts 01985. The Home Owner's Association will maintain the pump house and entrance landscaping. e) The Play Field on Amberville Road must be constructed and completed within the Construction Phase of the adjacent lots. The Play Field must be constructed as shown on a plan showing the Play Field and Tot Lot prepared by Bruce Stevenson Taylor, AIA, 248 Main Street, West Newbury, Massachusetts 01985, dated January 27, 1998. A chain link fence must be constructed extending along the Detention Basin No. 6 to Amberville Road and along Amberville Road to Rt. 114. Low shrubs such as forsythia will be planted to camouflage the fence. The fence is necessary to protect children from the traffic on Rt. 114. The Homeowner's Association will maintain the Play Field. fl The Tot Lot on Lot 31 must be constructed and completed within the Construction Phase of the adjacent lots. The Tot Lot must be constructed as shown on a plan showing the Play Field and Tot Lot prepared by Bruce Stevenson Taylor, AIA, 248 Main Street, West Newbury, Massachusetts 01985, dated January 27, 1998. The Homeowner's Association will maintain the Tot Lot. g) The Parklet located on Parcel F and Lots 88 and 89 must be constructed and completed within the Construction Phase of the adjacent lots. The Parklet must be constructed as shown on a plan titled Forest View Estates — Phase 1 prepared by Bruce Stevenson Taylor, AIA, 248 Main Street, West Newbury, Massachusetts 01985, dated February 3, 1998. The Homeowner's Association will maintain the Parklet. h) All site erosion control measures required to protect offsite properties from the effects of work 6-1 on the lot proposed to be released must be in place. The Town Planning Staff shall determine whether the applicant has satisfied the requirements of this provision prior to each lot release and shall report to the Planning Board prior to a vote to release said lot. �) The applicant must submit a lot release FORM J to the Planning Board for signature. A Performance Security in an amount to be determined by the Planning Board, upon the recommendation of the Department of Public Works, shall be posted to ensure completion of the work in accordance with the Plans approved as part of this conditional approval. The bond must be in the form of a check made out to the Town of North Andover. This check will then be placed in an interest bearing escrow account held by the Town. Items covered by the Bond may include, but shall not be limited to: i) as -built drawings ii) sewers and utilities iii) roadway construction and maintenance iv) lot and site erosion control v) site screening and street trees vi) drainage facilities vii) site restoration viii)final site cleanup A Performance Security may be established for each phase individually. V�) The Performance Security must also include the cost of constructing the Parklet, Play Field, and Tot Lot referenced above in Condition 6(d), (e) (f) and (g). 7) Prior to a FORM U verification for an individual lot, the following information is required by the Planning Department: a) The Planning Board will review the status of the Subdivision and vote to verify FORM U applications as appropriate and in conformance with this decision.. b) An as -built plan must be submitted to the Division of Public Works for review and approval pnor to acceptance of the sewer appurtenances for use. c) The house designs must be consistent with those presented to the Planning Board as shown in a booklet titled Forest View Subdivision, North Andover, Massachusetts, " Another collection of finer homes by A. Mesiti Development" showing The Parker, The Joppa, The Merrimack, and The Woodbridge. d) Individual lighting on each lot at the end of the driveways must be provided as stated n the Environmental Impact Statement for Forest View Subdivision dated October 1997. 2 e) If a sidewalk is to be constructed in front of the lot, then such sidewalk must be graded and staked at a minimum. fl The applicant must submit a certified copy of the recorded FORM J referred to in Condition 6(i) above. g) A plot plan for the lot in question must be submitted, which includes all of the following: i) location of the structure, ii) location of the driveways, iii) location of the septic systems if applicable, iv) location of all water and sewer lines, v) location of wetlands and any site improvements required under a NACC order of condition, vi) any grading called for on the lot, vii) all required zoning setbacks, viii)Location of any drainage, utility and other easements. h) All appropriate erosion control measures for the lot shall be in place. The Planning Board or Staff shall make final determination of appropriate measures. i) Lot numbers, visible from the roadways must be posted on all lots. 8) Prior to a Certificate of Occupancy being requested for an individual lot, the following shall be required: a) The landscaping and final grading for each lot must be as shown on the detailed Phasing Plan, dated February 3, 1998 and Typical Landscape Plan, dated February 2, 1998 prepared by Bruce Stevenson Taylor, AIA, 248 Main Street, Massachusetts 01985. b) Sprinkler systems must be installed in all homes per NAFD requirements. c) The roadway must be constructed to at least binder coat of pavement to properly access the lot in question. Prior to construction of the binder coat, the applicant shall ensure that all required inspection and testing of water, sewer, and drainage facilities has been completed. The applicant must submit to the Town Planner an interim as -built, certified by a professional engineer, verifying that all utilities have been installed in accordance with the plans and profile sheet. d)_ All necessary permits and approvals for the lot in question shall be obtained from the North Andover Board of Health, and Conservation Commission. 7 e) Permanent house numbers must be posted on dwellings and be visible from the road. f) There shall be no driveways placed where stone bound monuments and/or catch basins are to be set. It shall be the developer's responsibility to assure the proper placement of the driveways regardless of whether individual lots are sold. The Planning Board requires any driveway to be moved at the owner's expense if such driveway is at a catch basin or stone bound position. 9) Prior to the final release of security retained for the site by the Town, the following shall be completed by the applicant: a) The applicant must convey the Open Space Parcel to the State or in the alternative to the Town through the Conservation Commission as outlined in Condition 4(d). b) An as -built plan and profile of the site shall be submitted to the DPW and Planning Department for review and approval. c) The applicant shall petition Town Meeting for public acceptance of the street. Prior to submitting a warrant for such petition the applicant shall review the subdivision and all remaining work with the Town Planner and Department of Public Works. The Planning Board shall hold a.portion of the subdivision bond for continued maintenance and operations until such time as Town Meeting has accepted (or rejected in favor of private ownership) the roadways. It shall be the developer's responsibility to insure that all proper easements have been recorded at the Registry of Deeds. 10) The Applicant shall ensure that all Planning, Conservation Commission, Board of Health and Division of Public Works requirements are satisfied and that construction was in strict compliance with all approved plans and conditions. 11) The Town Planner will review any signs utilized for this project. The applicant must obtain a sign permit as required by Section 6 of the Bylaw. The Planning Board shall approve any entrance structures. The applicant must remove any lighting used for the entrance signs prior to acceptance of the subdivision. 12) The applicant shall adhere to the following requirements of the Fire Department: a) Open burning is allowed by permit only after consultation with the Fire Department. b) Underground fuel storage will be allowed in conformance with the Town Bylaws and State Statute and only with the review and approval of the Fire Department and Conservation Commission. 13) There shall be no burying or dumping of construction material on site. 8 14) The location of any stump dumps on site must be pre -approved by the Planning Board. 15) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 16) Gas, Telephone, Cable, and Electric utilities shall be installed as specified by the respective utility companies. 17) Any action by a Town Board, Commission, or Department which requires changes in the roadway alignment, placement of any easements or utilities, drainage facilities, grading or no cut lines, may be subject to modification by the Planning Board. 18) The following waivers from the Rules and Regulations Governing the Subdivision of Land, North Andover, Massachusetts, revised February, 1989 have been granted by the Planning Board: a) Section 7(A)(2)(d) Cul-de-sac with Island: A waiver has been requested from the right of way diameter for the cul-de-sac with an island. This waiver has been granted with the understanding that the Homeowners Association created for this subdivision will maintain the cul-de-sac islands. b) Section 7 A)(3) a)Grade at intersections: The grade at intersections exceed the requirement at the intersections of Palomino Drive and Rt. 114; Palomino Drive and Amberville Road; Amberville Road and Rt. 114; Amberville Road and Anvil Circle. c) Section 7(C)(1) Shoulders: This section requires an eight -foot (8') shoulder be provided for the typical roadway cross-section. This waiver requests a reduction in the shoulder width on Garnet Drive from Station 2+00 to Station 3+75 from the required 8 feet to 5 feet in order to reduce the wetland impact of the crossing at this location. d) These waivers have been granted in an effort to minimize the amount of cutting and filling required on site thereby decreasing the amount of erosion and siltation on site. 19) The utilities must be installed and the streets or ways constructed to binder coat April 13, 2006 (eight years from the date permit granted). If the utilities are not installed, the streets or ways are not constructed to binder coat and the Planning Board has not granted an extension by the above referenced date, this definitive subdivision approval will be deemed to have lapsed. 20) This Definitive Subdivision Plan approval is based upon the following information which is incorporated into this decision by reference: a) Booklet: Forest View Subdivision North Andover, Massachusetts "Another collection of finer homes by A. Mesiti Development" E b) Booklet: Environmental Impact Statement for Forest View Subdivision Route 144 Salem Turnpike, North Andover, Massachusetts 01876 Prepared For: Mesiti Development Corp 11 Old Boston Road, Tewksbury, Massachusetts 01876 Prepared By: MHF Design Consultants, inc. 12-B Manor Parkway, Salem, NH 03079 Dated: October 1997 c) Booklet: Proposed Construction/Erosion Control Schedule for Forest View Subdivision Route 144 Salem Turnpike, North Andover, Massachusetts Prepared For: Mesiti Development Corporation 11 Old Boston Road, Tewksbury, Massachusetts 01876 Prepared By: MHF Design Consultants, inc. 12-B Manor Parkway, Salem, NH 03079 Dated: January 1998 d) Plan titled: Forest View Estates — Phase 1 Prepared by: Bruce Stevenson Taylor, AIA 248 Main Street West Newbury, Massachusetts 01985 Dated: February 3, 1998 e) Plan titled: Play Field and Tot Lot Prepared by: Bruce Stevenson Taylor, AIA 248 Main Street West Newbury, Massachusetts 01985 Dated: January 27, 1998 Plan titled: Cul-de-sac island planting plan Prepared by: Bruce Stevenson Taylor, AIA 248 Main Street West Newbury, Massachusetts 01985 Dated: 1/26/98 g) Plan titled: Entry -Pump House Prepared by: Bruce Stevenson Taylor, AIA 248 Main Street West Newbury, Massachusetts 01985 h) Report: Stormwater Management Report for Forest View Subdivision Route 144 Salem Turnpike, North Andover, Massachusetts 01845 Prepared For: Mesiti Development Corporation 11 Old Boston Road, Tewksbury, Massachusetts 01876 10 Prepared By: MIF Design Consultants, inc. 12-B Manor Parkway, Salem, NH 03079 Dated: October 14, 1997, rev. December '997, rev. January 1998 i) Plan titled: Typical Landscape Plan Prepared by: Bruce Stevenson Taylor, AIA 248 Main Street West Newbury, Massachusetts 01985 Dated: February 2, 1998 j) Traffic Study Conservation Administrator Director of Public Works Health Administrator Building Inspector Police Chief Fire Chief Assessor Applicant Engineer File Forest View - subdivision 11