Loading...
HomeMy WebLinkAboutMiscellaneous - Exception (726)ONCHff'D CONSTRUCTION 'CORPORATION'' Fi Lt�. ° `March 20, 2003 Mr: D..RobertNicetta Town "of North Andover ,' . Building Commissioner. 27 -Charles St North Andover,. . Kittredge Crossing Building #2 &. 3,Plan Review Concerns _ D,e r. Nicetta: , We: are'in receipt of your list of questions afteryour'review of Buildings .2 and 3 and we offer.the'following in response: 1. Your concern with the adaptability of•each unit: a." Blocking:,will be installed within, the walls of each bathroom for future adaptability. We have' enclosed a detaile&ske,tch of the locations of this.blocking for your use: (Attachment #l)' b'.:Our engiineer,'.Bob Jennings"of Mechanical Innovations, Inc., has "spoken`with Thomas Hopkins . ' of the Mass. Architectural,Access"Board. As a result,"`we have revised Bathroom Details 3;.4; &: 6.on Drawing A8'to provide the proper clearance and adaptability in .those bathrooms. Sketches of the revised.bathroonis are enclosed for your record. (Attachment #2) 2.. We have enclosed -a copy,of the. Mass: EnergyCode,"for Buildings 2'& 3'.' (Attachment #3) 3. The demising wall between units (Type 3) is a 3 5/8" 25 GA metal studs'24" OC with resilient furring and l ,layer of 5/8" GWR on one side and 2.layers of 5/8" GWB on the other side. It also has sound, insulation and is a full height partition, providing a STC. rating. of 55. This Wallis designed under UL' > - AssemblyU419. , -4. The attachment of the false chimney has been submitted to our structural engineer (JSN Associates) and ' revised:. We have.included a sketch.of the revision for your,reference: (Attachment. #4) 5. `Kitchen wall cabinets -will be supported with in -wall blocking as shown on the sketch enclosed herein.' :(Attachment"#1) Base cabinets will ;be secured to the wall with.blockirig as "described ori Detail3 -on- drawing ndrawing A-20: 6..: We offer the following to address your structural concerns: . "a. John Turner Consulting has been engaged to, perform torque and weld te'sti4 We will. forward Y 'those reports upon receipt.' ,b. 7Welder Certifications are enclosed herein for your reference. (Attachment #5), c: Control Construction 'reports will continue to:be delivered for'your review on the .Tuesday following the inspection: ,d: W,e have enclosed a copy of the joist and bridging information. (Attachment #6) 7.I We' have enclosed the stamped roof truss design inforniation,as requested. Truss T3 shows the framed '67 opening for the elevator shaft. (Attachment #7) 8.All-Simpson hold-down clips will be attached per manufacturer's recommendations 11, CORPORATE\ DRIVE; " BEL'MONT,' NH 03220 " PHONE (603) 527-9090 FAX (603) ' 527-9,191 fib. - • ,. ` . '