Loading...
HomeMy WebLinkAboutMiscellaneous - Exception (50)KANAYO LALA, P.E........ - 03/03/2014 SPECIFIC CALCULATIONS FOR THE WOOD CONSTRUCTION IN 100MPH WIND ZONE 54 & 56 COMPASS POINT, NORTH ANDOVER, MA BUILDING "F" UNIT F2/F3 24'X34' BASIC LOADS: GROUND SNOW LOAD 50 PSF LIVE LOAD 40 PSF WIND LOAD 18 PSF Building Length 34 ft Building Width 24 ft Building Aspect Ratio= 1.42 Building Area 816 sf Shear End Wall= 11,016 230 PLF Building Mean Height 36 ft Shear Long Wall= 7,776 114 PLF Total Height 45 ft Dead Load of Building 57,120 lbs 1/2"A.BOLT SHEAR 801 LB DL Moment End Wall 971,040 LB -FT 4 FT SPACING FOR 1/2" A.BOLTS DL Moment Long Wall 685,440 LB -FT WITH TWO 2X SYP PLATES NET Wind Moment End Wall 198,288 End Wall M -772752 NO UPLIFT Wind Moment Long Wall 139,968 Long W M -545472 NO UPLIFT I.E. NO UPLIFT EXISTS AT THE BASE OF THE BUILDING. SHEAR ANCHORS ARE ADEQUTE. SHEAR WALL CAPACITY BY TABLE 2306.2.1(1) %" OSB / CDX PLY WITH 8D NAILS AT 6" ON EDGES AND 6" ON FIELD - 270PLF< 230 PLF REQUIRED FOR THREE STORY HEIGHT- OK SHEAR WALL REQUIREMENT BY TABLE R602.10.1.2(1) %" OSB WITH 6D NAILS AT 6" ON EDGES AND 12" ON FIELD PER TABLE R602.3(3) 13 FT CONTINUOUS SHEATHING AVAILABLE ALONG LONG WALL = 19 FT THE MOMENT SHEAR AT THE OPENINGS IS RESISTED BY THE METAL CONNECTION PLATES AS DETAILED ON THE PLANS. FOR A TYPICAL 6' WIDE OPENING IN END WALL AT 230 PLF SHEAR: AT THE OPENING CORNER 689 LBS. A SIMPSON PC66 POST CAP - LATERAL CAPACITY 1285LBS - OK. THE CALCULATIONS ABOVE MEET THE REQUIREMENTS OF THE IRC2009 R602.10 AND 780CMR51 AMENDMENTS TO IRC2009. ..awr.._