Loading...
HomeMy WebLinkAboutMiscellaneous - Exception (247)ALPER AUDI, INC. STRUCTURAL ENGINEERS February 21, 2001 Bob Nicetca Town of North Andover 27 Charles Street North Andover, MA 01845 Re: Sweetheart Cup Company 351 HO d f q Mezzanine Acceptance :•R I hereby certify that I am the structural engineer of record for the above referenced project. We designed the framing, bearing walls and foundations and prepared the structural plans and specifications for the mezzanine addition now being constructed within the existing Sweetheart Cup facility. Based upon our review of submitted material's test reports, shop drawings and intermittent site visits by an independent testing lab, we can state that to the best of our knowledge and belief the mezzanine is being constructed to be in conformance with the plans, specifications and the applicable sections of the Massachusetts State Building Code, -6th edition, and meets the accepted standard of quality and care of the construction industry. Respectfully, Marc H. Alper, .E. MHA;esm A01002 MHA Sweetheart Cup Mezzanine Accept. 2-21-01 0 E BUILDING DEPT. 1804 Borman Circle Drive • St. Louis, Missouri 63146 • 314/432-8600 • Fax: 314/432-8630 E-mail: aai@alperaudi.com • Website: www.alperaudi.com FEB -12-01 4ON 5:08 PM PIERCE ARCHITECTS FAt, NO. 9787453376 P, 2 t ARCHITECT'S FIELD REPORT Date: 25 January 2001 Architect's Project No.: Project: SELECTIVE DEMOLITION Field Report No.: Sweetheart Cup Company 351 Holt Road North Andover, Massachusetts Contractor: Mr. Gregg Ernst; Pfoject Manager CLAYCO CONSTRUCTION COMPANY 2199 Innerb�lt Business Center Drive Saint Louis,'Missouri 63114 Weather: Sunny, 25° F Present at Site: Bob O'Dell, superintendent and workmen, Clayco Cotlstruction Company 0015,1 I visited the site on Thursday, January 25th at approximately 11:30 A.M. to review progress and quality of the selective demolition work and to determine if the work is being completed in accordance with the requirements of the Contract Documents dated 01 December 2000. The following observations were noted: Work in Progress I . Loading of demolition debris from staging areas into dumpsters. 2. Removal of abandoned mechanical ductwork, piping, electrical conduit and miscellaneous equipment. 3. Removal of CMU walls and framed partitions. ra Observations L Non=structural selective demolition work is progressing well and appears to be approximately 40 .to 50% complete at this time. 2. -The selective demolition work as observed has generally been completed in accordance with the Contract Documents. Items to Verify No items require verification at this time. FEB 1 32001 BUILDING DEPT. FEB -12-01 MON 5:09 PPS PIERCE ARCHITECTS FAX NO. 9787453376 P. 3 Architect's Field Report 25 January 2001 Page 2 of 2 Information of Action Required 1. Pierce Architects has yet to receive the Submittals and copies of the Insurance Certificates as required by _the -Contract Documents. Clayco shall provide copies of all sub -contractors' Insurance Certificates as well as Clayco's Insurance Certificates with the Submittals as indicated in Specifications Section 02071 -Selective Demolition, Report Prepared By: Daniel H. Pierce, AIA Sigq Copies: Gregg Ernst, Clayco Construction Company Fax (314) 429-3137 Bob O'Dell, Clayco Construction Company Fax (978) 738-9866 Ed Moll, Structures North Consulting Engineers Fax (978) 745-6067 FEB -12-01 BION 5:09 Pik PIERCE ARCHITECTS FAX NO. 9787453376 P. 4 ARCHITECT'S FIELD REPORT Date: 09 February 2001 Architect's Project No.: Project: SELECTIVE DEMOLITION Field Report No.: Sweetheart Cup Company 351 Holt Road North Andover, Massachusetts Contractor: Mr. Gregg Ernst, Project Manager CLAYCO CONSTRUCTION COMPANY 2199 Inner -belt Business Center Drive Saint Louis, Missouri 63114 Weather: Rain, 35° F Pre -sent at Site- Bob O'Dell, superintendent and workmen, Clayco Ed Moll, Structures North Consulting Engineers, Inc. 0015.1 3 I visited the site on Friday, February 9th. at approximately 8:30 A.M. to review progress and quality of the .selective demolition work and to determine if the work is being completed in accordance with the requirements of the Contract Documents dated 01 December 2000. The following observations were noted: Work in Progress 1. Removal of demolition debris. 2. Removal of abandoned MEP piping, ductwork; conduit and miscellaneous equipment. 3.. Removal of sections of concrete slabs on.grade. Observations 1. The majority of selective demolition work has been completed in all areas of the building including removal of the tilt -up concrete panels, CMU walls, framed partitions, and mezzanines as indicated. 2. The concrete floor slab has been removed inthe general area between column grid lines G - N and between 6A - 13. 3. The following. steel column locations were observed to have been damaged during.tbe demolition of tilt -up concrete panels: • Column grid line L-2 , L-4, and possibly L-5 as well. 4. The following steel column locations were observed to have been damaged by construction equipment during general demolition operations: • Column line G-13. a i� FEB -12-01 MOTs 5:10 PM PIERCE ARCHITECTS FAX NO. 9787453376 P. 5 Architect's Yield Report Page 2 of 3 9 February 2001 Clayco indicated that Sweetheart Cup authorized the removal of the following additional sections of tilt -up concrete panels: • Column grid-line T between -grid lines 5 - 6. • Column grid line 8A between grid lines T1 and U. 6. Some exterior wall panels have been damaged by demolition operations in the area along column grid line 1 between grid lines K and M. 7. Some concrete tilt -up panels located along column grid dine 8A have large holes broken out of the center of the panels: Clayco indicated that the --subcontractor started to remove these panels in error, when Clayco halted the demolition opgrations in this area. 8. In the former Boiler Room located between column grid lines K=L and 15-17, the flue piping (breaching) has collapsed through the roof, damaging a large section of the roof and roof decking. 9- The -bus duct located -on column line O between column grid lines 15 -and 17 has been temporarily supported with unistrut framing and, hanging rods. Where the bus duct penetrates the CMU wall along column grid line 15.5, the concrete block abovethe'opening have fallen down onto the bus duct. It appears no steel lintels were installed in this opening when the original construction was completed. 11. With the exception of the above noted items, the selective demolition work as observed has generally been completed in accordance with the Contract Documents. FEB -12-01 MON 5:11 PM PIERCE ARCHITECTS FAX NO. 9787453376 P. 6 w Architect's Field Report Page 3 of 3 9 February 2001 Items to Verify 1. Clayco to provide Pierce Architects with a copy of the report identifying the scope of roof replacement work required or recommended. Pierce and Structures North w,1ll review said report, review the existing construction details and conditions at locations -where tilt -up concrete panels have been removed, and advise the Clayco of the remedial repair YVork required to properly support the roof expansion joints. Refer to attached Field Report dated 9 February 2001 prepared by Structures North Consulting Engineers for additional information. Information of Action Required 1. Refer to attached -Field Report dated 9 February 2001 prepared by -Structures North Consulting Engineers for additional information and action required relative to the observations identified above. 2. Prior to determining the means and methods of repairing the damaged exterior wall panels as identified in Observation item -6 above, Clayco-shall confirm that the siding-lnaterial is free of any hazardous materials (asbestos), and advise the Owner if additional measures wit] be required to remove, repair and/or replace any damaged materials. 3. Repair the damaged sections of concrete tilt -up panels as identified in Observation item 7 above, with new Gunite concreting methods as directed by Structures North. 4. Provide protective barricades in the former Boiler Room in the area of collapsed breaching as indicated in Observation item 8 above. Report Prepared By: Daniel H. Pierce, AIA /- - -), ftA, V� ig- Copies: Gr g Ernst, Clayco Construction Company F�x (314) 429-3137 -Bob O'Dell, Clayco Construction Company Tax (978) 738-9866 Ed Moll, Structures North Consulting Engineers Fax (978) 745-6067 FEB -12-01 MOIL 5:12 PM PIERCE ARCHITECTS FAX NO. 9787453376 P. 7 FROM : STRUCTURES NORTH FAX NO. : 9707451x067 Feb. 09 2001 03:57PM P3 Structures (Porth Consult. Engrs. 60 Washington Street, P,O,_ Box 8560.. . SALEM, MASSACHUSETTS 01971 *78) 745-6817 TO Pierce Architects Attn: Mr. Dan Pierce 214 Derby Street Salem, MA 01970 I visited the site in order to measure open web bar joists supporting the foot. These joists were measured and sketches were generated in order to analyze joists in areas affected by the proposed installation ofprocess- piping. The areas turvoyed included column line6 F to JJ, from 3A to iy, curing this time selective demolition was underway DATE 22 January 2001 JOB N0, 60111 PROJECT Sweetheard Cup Company Selective Demolition LOCATI N N. Andover. Massachusetts CONTRACTOR 0 ER Clayco Constr. Co. Cappet;i Enterprises WEATHER TEMP. PRESENT A S!T£ O'Deti; Workmen I The completeq work and the work in progress that f observed was generally in compliance with the contract documents. End of Report COPIES TO: FIELD REPORT slcrlEo _.r Cap �e�te G • t.'{' . �— FEB -12-01 MON 5:13 PM PIERCE ARCHITECTS FAX NO. 9787453376 P. 8 FROM : STRUCTURES NORTH FAX NO. : 9707456067 Feb. 09 2001 03:56PM P2 Structures North Consult. Engrs. 60 Washington street, P.O. Box 8560. SALEM, MASSACHUSETTS 01971 (978) 745.6817 TO Pierce Architects. . Ann: Mr. Dan Pierce 214 Derby Street Salem, MA 019713 g February 2001 JOB NA 00111 iCT Sweetheard Cup Company Selective Demolition IOtJ N. Andover Massachusetts I visited the site in order to assess progress of selective demolition for demolition contract document drawings D-1 to D-3, S-1 and 672 dated 1 December 2000. At the time of the visit, the majority of walls to be removed, including tilt -up conaete panels and CMU and metal stud walls had been complete. Ongoing work includes removal of abandoned idlEP equipment, and concrete slab demolition. In the following discussion, we have italicized the information that requires follow-up. Where Clayco is referred to in the comments. we request written direction as to either the time frame for completing the corrective or supplementary work, or direction as to how Structures North should proceed in providing remedial structural detailing. We noted that there was damage to the steel columns on column grid line L where tilt up panels were removed Detween a L L V r a 0 d �;d NAPYAU ARCHITECT'S FIELD REPORT FEB 2 6Ul 8�--LDIN� DEPT 4"(0Date: �p Architect's Project No.: Project: SELECTIVE DEMOLITION Field Report No.: Sweetheart Cup Company 351 Holt Road North Andover, Massachusetts Contractor: CLAYCO CONSTRUCTION COMPANY 2199 Innerbelt Business Center Drive Saint Louis, Missouri 63114 Weather: �G�1/,o �✓ Present at Site: . AAA / .IL. 0015.1 I visited the site on Monday, February 26th at approximately 12:30 P.M. to review progress and quality of the selective demolition work and to determine if the work is being completed in accordance with the requirements of the Contract Documents dated 01 December 2000. The following observations were noted: Work in Progress /. Observations !, rr 1e01%;;�-r,5, //./- 0, s�zTld�- cd V 'le— C y l�wzr/45!:�7 _.._-�- - � � � � �- _ �� �_; ,, w, `�� f', �.,.. t �--� ■ Architect's Field Report Observations _ �� � '4 ;w' ol� Page2ef Items to Verify Information of Action Required �/4 -"/*" AM� Report Prepared By: Daniel H. Pierce, AIA Signed Copies: G gg Ernst, Clayco Construction Company Fax (314) 429-3137 Bob O'Dell, Clayco Construction Company Fax (978) 738-0789 Ed Moll, Structures North Consulting Engineers Fax (978) 745-6067 --The Commonwealth of Massachusetts Division of Professional Licensure 239 Causeway Street, Boston, MA 02114 Board of Registration of Professional Engineers e° & Land Surveyors www.state.ma.us/reaoards/en 617-727-9957 November 22,2000 Paul T. Merrill 9357 Sonora St.Louis, MO 63144 RE: APPL. NO: 51.050 TEMPORARYPERMIT2000-142 PE" Dear Mr.Merrill In accordance with Section 81R -c of Chapter 112, of the General Laws, you are hereby granted permission to practice PROFESSIONAL ENGINEERING in the Commonwealth of Massachusetts for a period of thirty days from November 15,2000 or until such time as Board need for final action on your application for registration in the Commonwealth of Massachusetts. The procedure for using your. MISSOURI SEAL on a plan or document in Massachusetts under this permit is to letter or write under the seal the following: TEMPORARY PERMIT MASSACHUSETTS 2000-142 PE" Very truly yours, H. William Flood, PE Chairman a ,�-54. Commonwealth of Massachusetts ARGEO PAUL CELLUCCI Division of Registration 239 Causeway Street s Boston, Massachusetts 02114 JANE GOVERNOR SWIFT LIEUTENANT GOVERNOR JENNIFER DAVIS CAREY OFFICE OF CONSUMER AFFAIRS WILLIAM G. WOOD DIRECTOR January 12, 2001 RE: Certification of Registration LIC: AR 10868 Michael J. Benz To Whom It May Concern: This is to certify that the above referenced person is licensed in the Commonwealth of Massachusetts by reciprocity as a Registered Architect. The license was issued on January 12, 2001 will expire on Aumt 31., 2002, unless renewed before then. The license is found to be in good standing at this time, having no past or present disciplinary actions against him/her. If you have any questions, please contact the Board at 617-727-3072. This document is certified by authorization of the COMMONWEALTH OF MASSACHUSETTS, BOARD OF REGISTRATION OF ARCHITECTS, certified by Tammy R. Tyndall, Administrative Assistant. Signature. Date: FORM - U - LOT RELEASE FORM INSTRUCTIONS: This form is used to verify that all -necessary approval/ permits from Boards and Departments having jurisdiction have been obtained. This does not relieve the applicant and or lando er from compliance with any applicable requirements. ✓♦/TT1T T/� A l7*T 4 � . _ "� / � / 'n'LT/IATf! ASSESSORS MAP NUMBER /0 LOT NUMBER -Z— Z -SUBDIVISION SUBDIVISION LOT NUMBER STREET f/4= l P�� STREET NUMBER .■.....■■......■■r.........................................................■ OFFICIAL USE ONLY RECONEVIENDATIONS OF TOWN AGENTS DATE APPROVED CONSERVATION ADMINISTRATOR DATE REJECTED CONOAENTS DATE APPROVED ~ TOWNPLANNER DATE REJECTED l CONO&NTS 1 . DATE APPROVED FOOD INSPECTOR -'HEALTH DATE REJECTED DATE APPROVED SEPTIC INSPECTOR - HEALTH DATE REJECTED CONOAENTS PUBLIC WORKS - SEWER / WATER CONNECTIONS DRIVEWAY PERMIT !/ D DATE APPROVED FIRE DEPAR DATE REJECTED CONOAENTS RECEIVED BY BUILDING INSPECTOR DATA Town of North Andover Office of the Building Department Community Development and Services Division William J. Scott, Division Director 27 Charles Street North Andover, Massachusetts 01845 D. Robert Nicetta Building Commissioner January 22, 2001 Mr. Larry Gumb Project Director Sweetheart Cup Company, Ine. 30 Innetbelt Road Somerville, Ma 02143 Dear Mr. GWW. Telephone (978) 688-9545 Fax (978) 688-9542 Thank you for meeting with me concetnbag your anticipated move to the old Bowden Plant located at 351 Holt Road, North Andover. Pursuant to our conversation it is Sweetheart Cup Company's intention, in the first phase, renovatee existing the buildin building understand and toSomerville, t that the nd operations into the existing buddingplans dW were shown renovations would not tequine additions to the building or site. In response to your inquiry I am of the opinion that this portion of the prc jest would not be subject to Section 8.3 — Site Plan Review of the Zoning By-law, as there will not be: 1. A change of use in the existing stnuxure. 2. Any addition to the existing structure. 3. Any additional parking required The second phase of your project will be building and paving additions at the site. This phase will be subject to a Site Plan Review by the Planning Board- Please call if you require fiurther assistance at the number listed above. The Town of North Andover welcomes Sweetheart Cup Company Yours truly, 1) D.Robert Nicetta Building Commissioner CC. William Scott, CD&S Heidi Grim, Town Planner BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 BEALTH 688-9540 PLANNING 688-9535 GENERAL _NOTES st'"e I. These drawings are for renovations to the existing building at 351 Holt Road, North Andover, which is to be in compliance with the following codes: Massachusetts State Building Code (MSBG) 780 GMR Massachusetts Architectural Access Board (MAAB) 521 CMR Massachusetts Electrical Code 527 GMR, 12.00 Massachusetts State Fire Prevention Regulations (5276MR) NFPA 70-Iggq National Electrical Code w/ state amendments Massachusetts State,. Fuel, Gas, and Plumbing Code 248 CMR NFPA 231-lgg5 - Standard for General Storage NFPA 2310 -Igg5 - Standard for Rack Storage of Materials Use Group: Main Use Group: F -I, Moderate Hazard Factory 780 CMR (306.1) 5-I, Moderate Hazard Storage 780 CMR (311.2) B, Business 780 CMR (304.0) Building Area: Proposed: Occupant Load: Warehouse Area (93,135 51. (/ 300) = 210 Factory/industrial Area I7q,000 s.f. (/ 100) = I,-7qO Off ice Area 6,3(95 5.f. (/ 100) = 64 Building Footprint: Allowed Building Area: Building Height: Construction Type: 248,500 s.f. 2,064 Total Occupants Unlimited per 780 CMR (507.0) Warehouse - I story / 85'-O" 2C Unprotected Noncombustible 750 GMR ((003.1) Building is fully sprinklered. 750 CMR (g06.0) Fireresistance Rating of Structural Elements 780 CMR (table 602) Hours Fire Walls and Party Walls 2 Fire Enclosures of Exits (interior stairway enclosures) 2 Shafts other than exits 2 Fire Separation Assemblies (fire partitions) I Exit Access Corridors 0 Non -Load Bearing Partitions 0 Interior Load Bearing Partitions, Columns, Girders, Framing $ Trusses (other than roof trusses) Supporting more than one floor 0 Supporting only one floor 0 Structural Members Supporting Wall 0 Floor Construction Including Beams 0 Roof Construction Including Beams, Trusses, Framing, Arches $ Roof Deck (20' or more in height to the lowest member) 0 Egress Width Per Occupant 750 CMR (Sect. 1011.3 a 1017.3) Min. Corridor Width: 44" Req.'d Calculation: Occupancy Load x 0.15 = inches of Egress Use Calculation Rea.'d Min. Width Provided Warehouse (210 x 0.15) = 31.5 32" Req.'d 252" 0 doors) Industrial (I3g0 x 0.15) = 265.5 270" Req.'d 288" (5 doors) Off ice (64 x 0.15) = gb 10" Req,.'d 108" (3 doors) Building Area Existing Area 248,500 sf Proposed Area No Change No Change Allowable Continuation of Same Use Group Unlimited Areas 780 GMR Sect. Length of Exit Access Travel 780 CMR (table 1006.5) Use Group F -I Moderate Hazard Factory and Industrial 5-1 Moderate Hazard Storage 3404.0 507.1 250 ft with Sprinkler System 250 ft with Sprinkler System 2. Work shall conform to all state and local applicable building codes, regulations and ordinances having jurisdiction. 3. Building ground floor slab elevation is existingt. The construction documents are based on 100'-0" Finished Floor Elevation. 4. See sheet AG -I for partition types and typical partition notes. 5. See sheet A4 -I for typical mounting locations and heights of devices. Mechanical and Electrical Sub-Gontroctors to schedule a pre -rough -in meeting with the Architect to coordinate aesthetic location of outlet, switch, data, thermostat, panel, etc. rough -ins. 6. Contractor shall verify all conditions and dimensions, and shall coordinate with trades in the layout of his work. The alignment in coordination of his work and other adjacent work is of primary importance and shall take precedence over dimensions. Contractor shall layout and verify his work to ensure proper alignment and fit. Contractor shall report immediately any discrepancies to his superintendent and the Architect before proceeding or proceed at Contractor's own risk. Contractor shall work from established points and lines, establish and maintain markers for lines and levels of work. Do not scale drawings, calculate dimensions and measure for layout of work. Contractor shall report immediately any discrepancies to his superintendent and the Architect before proceeding or proceed at Contractor's own risk. �. General Contractor is responsible for protecting all construction and the repair of any damages incurred during construction. 8. Contractor shall obtain all required permits and similar releases for required for construction and occupancy. Cl. Contractor shall obtain ail required inspections of the work and update the Architect and Owner on status and schedule of inspections. 10. Contractor shall coordinate work with applicable utility providers. 11. Contractor is solely responsible for the means, methods and sequences of construction. 12. Contractor shall maintain a set of Record Drawings on site at all times. 13. Contractor shall remove and dispose of properly all construction debris. 14. Sub -Contractors are responsible for examining all substrate conditions where their work is to be applied. Substrate shall be free from defects, smooth and shall conform to the requirements of the finished material manufacturer's recommendation. 15. Drawings (or portions of drawings) shall not be reproduced for submittals. Submittals produced in this manner will be rejected and returned to Contractor. 16. Typical dimensions are to column center line, or to new construction. I-7. The word 'align' as in these documents shall supersede any dimensional information shown. If a discrepancy occurs, notify the superintendent and Architect immediately. 18. All angles are 45 deg., q0 deg., or 135 deg. unless indicated otherwise. Iq. Refer to spot grade elevations) for exact grade elevation. Contours are approximate. 20. Refer to structural drawings and soils report for all Joints in f loor slab. 21. All footings and foundations -in excavated area to bear on and/or be be formed by clean undisturbed, virgin -subsoil or approved engineered fill which is certified by a CEOTEGH engineer. 22. Provide clean concrete fill per structural drawings for all building entrances to prevent frost heave. 23. Provide a non-metallic separator between all dissimilar metals. 24. Provide 1/2" pre -molded expansion material along foundation wall where sidewalks occur, unless otherwise noted. 25. All interior wood blocking is to be fire-resistant. 26. All control .joints in gypsum board and plaster ceilings if not specifically shown, at a minimum shall be located as required by U.S. Gypsum for all interior and exterior locations. 2-7. Wall shall extend to structure when separating a room with exposed structure from a room with a ceiling. 28. All penetrations thru rated partitions to be filled with safing insulation and fire rated sealant. 2q. General Contractor shall coordinate the installation of access panels in partitions and ceilings which are required by MEP and FP Contractors. Contractors shall provide C.G. required access panels. NORTq O P ACMUS� / This certifies that /-/ l ��. r. LA has permission to perform plumbing in the buildings of.........t ..l!.. . . at ...3 . l.. /..�. Z... J ......... I... ,,North Andover, Mass. Fee,lt,.�l..... Lie. No.//..7. ? �':. ..... ....) .1...... . Y PLUMBING INSPECTOR Check # Date .'T. �< 1: G. ? TOWN OF NORTH ANDOVER PERMIT FOR PLUMBING 5i69 100 MASSACHUUSETTS UNIFORM APPLICATION FOR PERMIT TO DO PLUMBING ��U 1 Mass. Type of occupancy-CQMMERCIAL RESIDENTIAL ❑ Owners Name owners Address Building Location �Yj % gni,+ p Date —3/ Y/0-21 New �Q Renovation ❑ Replacement ❑ Plans Submitta0— _ _ a a • T ' r . • - _ 1S a r i5 T � Installing Company Name one: Certificate Address Corp. �5-+qo Cit 0 w4m State Zip Code�"5j� Partner Business Telephone:- Firm/Co. Name of Licensed Plumber or Gasfitter INS COVERA r: check I have a curr�t liability insurance policy or its substantial equivalent. Yes If you have ch ease indicate the type coverage by dx=ki 9' the a� gate box. tY Other type of unity Bond 0it'S ID1St04N= FAIVFR: I am aware that the licensee does not have the insurmce coverage required by Cbapter 142 of the Mass_ Cemni Laws, and that my signiture on this permit appli-catian waives this Zf�tl1 TQi�lt Check 0m: Oraier. rl argent Signature of 0..enar's Agent I texecy certify that all of tho details and infamntim I have sain{tted tar entered) in abase app is ti&� are true and accurate to the best of M lanalad and that all pludbing work and installatians perfvrnmed order. the mr= t is*ux-�d for this awliotim will be in ampliance with all pertinent prwisians of the massac n. efts State Cos and r-laptns '142 of the Type of License: _ Title Si of �Li u+rber c'ty/'ibYm �] �� a.taumi:er I f M -CODE -012 z . . 0 H H U W C4 M z H a d z H w rn I 0 FA m o x ° z H m o z Q a H w a