Loading...
HomeMy WebLinkAboutMiscellaneous - Exception (407)(+ O TOWN OF NORTH ANDOVER Office of COMMUNITY DEVELOPMENT AND SERVICES HEALTH DEPARTMENT 27 CHARLES STREET w� go�,no',.�• NORTH ANDOVER, MASSACHUSETTS 01845 "sS,C„„SE� Susan Y. Sawyer, REHS/RS 978.688.9540 — Phone Public Health Director 978.688.9542 — FAX D -BOX Comments: SOIL ABSORPTION SYSTEM S 5 Comments: PRESSURE DISTRIBUTION Comments: Installed on stable stone base Inlet tee (if pumped or >0.08'/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Bottom of SAS excavated down to C soil layer, as provided on plan 8 —8 ft of old sand removed to C Size of SAS excavated as per plan Title 5 sand installed, if specified 1 load on site ok 314-11/2" double washed stone installed 1/8-1/2" (peastone) double washed stone installed laterals installed and ends connected to header (and vented if impervious material above) Orifices @ 5 & 7 o'clock positions Gravelless disposal systems: type, number and location as per plan Elevations of laterals installed as on approved plan 40 Mil HDPE barrier installed Retaining wall (boulder / concrete / timber/ block) Final cover as per plan inch manifold laterals installed with end sweeps size: material: Squirt test ft in height Equal distribution to all laterals orifice size inch as per plan Page 3 of 4