HomeMy WebLinkAboutMiscellaneous - Exception (581)0
e
0
o �
1-0
v
Cn
N
N
- Ul
NJ\E
r
D�
C��
Town of North Andover a� NORrN
Office of the Zoning Board of Appeals
0
Community Development and Services Division i ey
27 Charles Street
North Andover, Massachusetts 01845 c►+US�� y
D. Robert Nicetta
Building Commissioner
North Andover Zoning Board of Appeals
Telephone (978) 688-9541
Fax(978)688-9542
There will be Special Public Hearing meetings on
Tuesdays, the 15th, 22nd, and 29th of October, 2002 at
7:30 p.m. in the Senior Center, 120R Main Street, North
Andover regarding Valley Realty Development, LLC's
request for a Comprehensive Permit at 2357 Turnpike
Street (Meadows Condominiums).
Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535
C-. c.uujc 1 • Jttrh1f9 VHk;
NO.234 P. tz
1S. The location of snow disposal areas has not been identified on the site plan. The Applicant .
should show the location of proposed snow storage areas and refer to the Snow Disposal
Guidelines issued by DEP for snow disposal location requirements. Ideal snow storage
locations are away from wetland areas.
EJAMRONMENTAL REVIEW
This review is provided for the Comprehensive Permit Application submitted by Valley Realty
Development, LLC, for The Meadows Condominiums in North Andover. No field visit to verify
wetland boundaries is included in this review. VBB assumes that grading pians and larger scale
plans will be submitted at a later date, and note that our review map suggest items .that would be
included in later designs. We also note that the North Andover Conservation Conwdssion
requires 40 scale plans for its review during the, Wetlands protection Act permitting process_
The Applicant is proposing a 270 -unit development on a 47 -acre parcel located at
2537 Turapsice Street: The Applicant has flagged wetlands in the project area and appears to have
sited the project outside of wetland resource areas, and in most cases sited structures outside the
25-1oot No Mturb Zoon. However, the. pro*t Will require approval from the Wetlands
Protection Act for work wiffim the 100 -foot buffer zoite to wetland resource areas. Without
further information, we cannot comment on compliance with the WPA.
VHB assumes that the Applicant is also aware.titat the project will need to conform to the
Stormwater Management policy (SNIP) From the Site M2inago plata, dwre appears to be three
direst dil edwges to adjacent wetlands. Under the SMP for new development new discharges- can
be permitted only for nmoff that has been treated to remove 80 pence of tate Total Suspended
Solids. It appears that roof runoff has been tied into the site
systettt. int accoidatwe with
the SW,- MW ra not figs ccrosi d=",cl W- and-dwiddbe*dutrawt
diafi* system. ftft
TRAE1tIC REWIE
VHB Inas performed a professional and independent tied ical review of the Tic and
Access study — Proposed ReddenfW DPmkMient Project (The Meadows) prepared by Demnat J -ZeB}r
Associates. % (DM for a 270 -unit apartment emnmunity to be located along Route 114 in North
Andover. The praposed developpnertf is being.propoGed under tate Conwtoneyvealth of
ic�tassxcitvsett �c rtprehWMea?emits Lars ( pt r 40B), w►hicic g s the a of
affcmdable
g "m'tg16C91Y Wanted penut&7I1elaw MableS-{3ta.ofA�„r.,sa1.,.
CAA), incort5 t ticar.tNre$t odle lit�l dPd bOAZ& and p� t4 g .ap 1'
who"� Pig side or f� ` ' #o:a deeekspekp
er
F moored lose or sr►odetate te_Aau . lU developer
may appeal a denial decision by the ZBA to the Cont MweaWs Housing Appeals Cwwda.e.
1-Z�rrM vrtts NEi.234 P.
I
I
and/or the analysis does not support a specific recommendation, additional information
is requested;
Finally, VHB offers findings and suggestions to the ZBA as the process moves forward_
These specifically focus on other issues not noted in the technical submissions for the
project.
In general, the traffic report has been prepared in a professional manner generally consistent with
iranspertation industry standards. However, from a transportation perspective, the impact
analysis has five main areas of concern:
• The existing traffic volumes were not adjusted to reflect average conditions;
■ Trip distribution/assignment of site related traffic isnot specified in detail and assigns
site generated traffic to existing travel patterns, which may not take into consideration the
layout of the buildings and parking areas for the "Upper" and q ower Meadows" that
may impact each driveway differently than what was analyzed;
• Accident data was not obtained or reviewed in the traffic report;
■ Existing sight distance nwAsurenimb were not reported only measured distances with
recoi3rimzectdedlmprovements; and
• gynchro analysis for the study area intersections assume aperatiow conditions that are
not specified in report.
The fdHowing provides specific coa=mmts on the traffic study and provides traffic coaummt:s on
the site plan stibmtftd along with the study.
�� Traffic �ttpatt rad A,cceas
In term -4 ifte studyhWbeeri prepared t6 indusbrg standards us!rig uiformatiott and me�
suitable for atrdffrc *pact and access study, !!OwcvuktsevmdkLqgrd*r.,&&mmfionmd
condusiew preseued in the repoatt ase riot ve4fi&Ie given $te fi fot&uW let provided lit the
Appticibc section of the deport When specifically noted, additional i r&rmahm has been
requested' to verify statements made in t3ie report
Intro�ctioa
The descrip#im of *t, -study area and -methodol ftrwere presertted in a standard >ii.'Mer and are
amrrat : Rowever, k should be rioted tit die ttaffic report was prepared nssng.,V&m uis and not
the 270 -units speeded in i e plans prepared by CSD Assodates- it Sw nw d%ai tine dWicipmet<tt
size array have been vpdaW but 6w. traffic study was nck This WP g iiM dice will be
discussed—In— lite trip gmerai on secti+ort to this mum.
2002 1:157PM VHB
P40. 2_34 P _ ,
EyrstrrFg Tra frc Volumes — The study notes that traffic volumes were collected during the month of
February 2002, however, these volumes were not adjusted to reflect average month conditions
based on seasonal usaffic volume inforrnation. It appears that the average conditions for this area
could generate as much as 11 percent more traffic than the month of February. This information
was based on data published by MassMghway at permanent count station 502 located on Route
114 in North Andover. This increase in traffic could have an impact on the level of service analysis
prepared for the study area intersections.
Automatic traffic recorder data collected, yvhen compared to Mass4ghway data for Route 114,
does seem reasonable.
Vehicle Sig&- Speed measurements were collected by the "floating car method" and are an
acceptable method of determining vehicle speeds along a roadway However, thismethod does
have a small sample size and pression is difficult to obtain Vehicles speeds should have been
collected with the automated traffic recorder when daily traffic volumes were recorded.
Mofor_V_eh le Crashes —There is no indication that accident data for this area was collected or
discussed. While this appeals to be a low accident locatioal, according to Masdaghway data,
vehicle accident records should be reviewed. through the town to determine the amount of
accidents in this area and the cause of each. With the addition of the developnw tanOrrth
driveway, Sharpner's Pond Road will change from a T intersectian to a 4 -way intersection
increasing the amount of turning movements thus increasing the risk for vehicle accidents.
Public .Trm�stxrriaiion: Seraiees — There is nomention of public transportation along chis roadway
and it is assumed ti►at there will be no bras stops to this residential development. In addition„ this
study does not nnengm any, sidewalks present along Route 214 nor does it pro" sidewalk
along the front of *ds development. However, it appears that this arca of Route 214 is mostly
residential use and with the addition of this 270 -unit developmunt a sidewalk in front of tins
Suysx"y _The analysis- of -tI* adstirig conditions as pteseMed in the Traffic bapect and Access
Study appears tube reasonable and foDaws general industry gwdeiines for the preparation of a
traffic impact study Addiiiond information on the following wild be helpful in evaluating the
potential hopacts of the project on the surrounding street network
Adjustment of traffic volumes to reflect average conditions
• gash data statistics along the Rohe Ito corridor 500 feet to the north and south of flus
site
Futu= Condi tiros
In the study methodology section, it is noted that the proponent contacted the Planning Office for
the Tawn of Worth Andover, however, Route 114 is considered state highway and there is no
andieetimn _ci�.f t� ponant eczzte�g.tlre sacinssetts F�ght+va�rt � the - -
a
AGOL
_IWb
1:\0571658\doB\teporte\blCadeW9 temp petmilBeview 9�iOd2-wrlangd«
2.2002 1:58PM VHB
P40. 234 P.
Bacl:�zondzmtA — The analysis includes three specific potential projects in the
vidnity of the proposed development and characterizes them asprojects that will add new traffic
m the vicinity of the project site. The study notes that these three specific developments (totaling
79 residential condominiums, 95 single-family homes, and K700 square feet of retail) would be
occupied within the 5 -year project horizon. For this reason, the new vehicular traffic associated
with each of these projects was assigned to the local roadway system and considered as
'backgrouIInd'. traffic growth. The vehicular traffic estimate for each of these projects was obtained
from the Planning Office for the Town of North Andover. However, there is no mention of traffic
studies performed as part of the permitting process for each specific development or -if the
proponent determined this data using standard M trip generation estimates. Therefore a trip
generation table mid tuffic network should be prepared and included in this study huhcafi ng the
amount of trips generated by each development making note where the data was obtained to
quantify this background traffic.
In addition, a background growth rate of 1.0 percent was used to account for general
background' growth and to account for projects not currentlyproposed thatmnghtbe
constructed in the near future. This was dome to further lughhght the fact that the analysis
presextted in the report is 'conservative'.
Trip Generation — VM verified the traffic generation used iii the traffic study and fords that the
method used, regression analysis, is a reasonable method to develop traffic generation. However,
an argument could be made fltat.the average rate method could also be used, in whirl► case
increases traffic by 10 vehicles during the mowing and evening peak hours for 294-umts.
However, since this development has changed from 294 to TD-trrits the average ratemethod for
270 -units generato the exact same amount of trips, dwmg tate peak hours oantlr, as the reVrft9io e
method for 294-vauts. Therefore, this report generates a reasonable atkd accurate amount of traffic
for ZM-unlits'durf m thepea k hours and is riot considered tube a coots erMd" anatys The da t?y
traffic.volumes gernerated=by this bitez using the higher average rate method for VNmtts wauld
geoerate a #proxi>bat ly :1&2 -rain than the I"pzolec d in titin , the daily.
This site couldbe expected to ger maw appioxintately 1,582 new daffy t Vsi 12t1 rtnon=g
peak hour v9deubwUips and 150 evening peaik hour vehinilar tip&
a r�tutirl�€b'be developed $ thea i c can:
Sunk — The analysis of the future conditions as presmted in tha. Traffic Impact and Act
Additional intfomation on the fo%wmg would be helpful m evaluating the potential impacts of
the project on the surrounding street network
oT:\0671656\dacs\rexm\Modows comp peanitBevlew 9.30.D24+ridng.doc
2002 .1=SBPM vHs
NO. 234 P
Develop a traffic network and table illustrating the background traffic used for this study
Evaluate trip distribution of traffic to/from the site driveways using journey to work data
and assigning traffic to/from the "Upper Meadow" and 'Tower Meadow" to appropriate
drives.
Metes hod�adoguv - The traffic study used the appropriate analysis software and methods to analyze
the intersections and roadways within the study area. The analysis is based on the most recent
version of the Highway Capacity Manual and the software selected (Synchro) is an approved and
widely recognized analysis tool for traffic operations analysis.
Results - The following is a sununary of the results, VB B's observations, and discussion on the
mitigation planned by the Applicant for specific locations.
Route 114 at the Proposed North Site Drive and Sharers Pond Road - According to the analysis
presented in the traffic study, the westbound Sharpnees Road approach operates at Level of
Service (IAS) D during the morning and LOS C during the evening peak conum4w hours. Future
analysis conditions show that the level of service will worsen to a LOS 'E for`the 2007 No -Build
condition and LOS F for the 2007 Build condition. For the evening peak hoar this approach will
operate at a LOS D for the 2007 No -Build condition and LOS P for the 2007 Build condition.
Synchrp analysis was performed with the wesftund approach having enough room to store one
vehicle rnaldrtg a right turn and thus shnulm tga twoalane analysis Trois would willow tight
turners; enough room to pass to the right and separate from leftLtumers. Since these assumptions
were not mentioned in the report traffic conditions an ibis approach should be observed to ensure
these candifiens are occurring if this is not the rage the Level of ser rim attaiysed nt utas report
woxsld ;eotbe=aoctie a�td rct�ndm't be ziiitht w lhesa - nw�ei i cn
the ptoposed north she driveway. Bods sides of die stems appear. to► dalrr otte purpose
lane for all ftM ft VVMkMI$, however,. the throat of the road 9a3es out to a much widerwidth.
As long as vehicle queues are not extensive and blocking the shoot right turn lane this analysis is
considered acceptable.
The Applicant has committed -that Shm pad's Pond Road be widened to =wmmodate'tm 12-fwt wide
approach lanes fnt' a dismme of 100 feet from Route 114". With the addition of this lane traffic
operations kr this approach would improve, however, with the ad+diom of this lane more
conducts will exist at the intersection withnuin licue traffic :aond traffic odlingt1w naatth site
driveway; which_ maycause .n r+e acedit & 110wicM, itisse000 02% -gist w� theaddition
of thesetwo taw driveways a gap study be conducted. Afieldoaf the nw nlaes and
duration of gaps should be conducted`during the peak fours. This data would help de6erafne if
in fact there are enough gaps and of the appropriate duration for vehicles to each this
developnent.
Rome 114�at.t�.osPdSttuih>gfte Ike and fastrn�T 2�tt.� �e=mss aci�i�ta: tie sante _ _ _ -
movements for this drive were oat cued and were estinna#ed in the traffic report. Sho Wd these
nwr be* be-acc:ua ate the level -of service oTec"d for His eppraach will continue to operate at a
LOS C or better for all conditions analyzed.
r.\D671658\dnes\.epans\McW wscomppermItrWlew9_OQZ-WI$ V.dM
-11 JJI 1 i vnD
fIv. e:=;4 r: 10
rhe eastbound site driveway approach is expected to operate at a LOS D during the weekday
nortling conditions and at a LOS C during the weekday evening condition. The gap study
iiscussed above would help in determining if in fact there are enough gaps that are long enough
or traffic to exit the site safely_ The proponent has conunitted to having two lanes for egrets,
vhich will help elevate traffic congestion and maintain queues on site.
istance Analvsis
The traffic study used the appropriate guidelines for determine adequate sight distance for the
observed apd posted speed limits. However, it does not indicate the actual sight distance
rneasuremenis in the field but the measurements based on futdre clearing of roadside vegetation
and topographic ground elevations. Sight lines need to be maintained during constrniction as well
as when the development has been completed. The proposed sight lines seem to be attainable for
the proposed south site driveway, however, with the north driveway being so close to the
abutting property, to the north, sight distance looking north may be more difficult to attain. This
depends an how far back from the edge of pavement vegetation needs to be cleared and on the
locatiort of property lines.
Parking Analysis
The report does not provide a discussion of area pariang issues. In addition the total number of
parking illustrated on, did site plan is 784 with a parking ratio of 2.9 parking spaces per unit, on
site. This seems to be incorrect and the actual number of spaces is 662 with a ratio of 245.
VHS reviewed industry standards as well as other developments of this type and has found that,
in geri=4 a parkin$ ratio of between 1.80 and Z W is the current industry standard for
comparable sites. With this high of a ratio the Applicant is well above thisrange.
Cmnclusi ns and Reconmemdatimns
The Applicanthas made.a eoarumitment to providing on and off-site Wadway usfrao picture
iunprovements. IYn addition, the Applicant has also committed the of n of intersection
advanced waning signs.
VHB has requested addit orW informatwn (discussed in detail in the previous section) including:
9
�hT:\0671658\d=\rcports\W-zd scomp pmrtieReview,"MZ-wrkirgdee
Town of North Andover
Office of the Zoning Board of Appeals
Community Development and Services Division
27 Charles Street
North Andover, Massachusetts 01845
D. Robert Nicetta
Building Commissioner
Post -its Fax Note
7671
Date 10--q-0T—Wpages
To HN2 e
From
Co./Dept. D .,
Co.
Phone # q7 0 --,W-
7
Phone # 97% _ (O — i5
Fax # 9 _ q-70 ._
Fax #
9 �
TO: Town of North Andover
Zoning Board of Appeals
27 Charles Street
North Andover MA 01845
I Date
Telephone (978) 688-9541
Fax(978)688-9542
10 '13.02, -
Please
13 02, -
Please be advised that I have agreed to waive the time constraints for the Zoning Board of
appeals to make a decision regarding the granting of a Variance and /or Special Permit for
property located at:
STREET:
TOWN: �V) 2`t o!& .
MEETING DATE(S):() 66 6jp� ( Op
NAME OF PE'
Signed:
WAIVER
44ff X/ /-� �c
w
C-
T
re"
CD
CJ
CD
w r
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
Town of North Andover o� NaRTy
Office of the Zoning Board of Appeals <•�e° a
Community Development and Services Division 9 x > ~ ~ y
27 Charles Street
'11,9 °�eseo ♦�~.F'
North Andover, Massachusetts 01845 Ssac►+usE%
D. Robert Nicetta
Building Commissioner
FAX TRANSMISSION
TO: �1t7m-P-r/1lc., V i ( 2iYo( V1 D1lOX, Sal
FAX NUMBER: 117 g j 0 r
Telephone (978) 688-9541
Fax (978) 688-9542
FROM: Town of North Andover
Zoning Board of Appeals
27 Charles Street
North Andover, Massachusetts 01845
FAX: 978-688-9542
PHONE: 978-688-9541
r�
DATE: I 0 - Cl - 0 ) vt e-
t u�
SUBJ ECT: M . 1,e c, -a7
. ''II
oivxd tiVkirOdu(.� I'D In �e�1Q��-1-0�-
NUMBER OF PAGES:
REMARKS:
Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535
HP OfficeJet
Personal Printer/Fax/Copier
Last Fax
Identification
89784701759
1.2.0 Z.8
Result Pages Type
OK 04 Sent
Fax Log Report
Oct -09-02 11:24 AM
Date Time Duration Diagnostic
Oct -09 11:21A 00:02:39 002081430020
HP OfficeJet
Personal Printer/Fax/Copier
Fax Log Report
Oct -09-02 01:08 PM
Last Fax
Identification Result Pages Tyne Date Time Duration Diagnostic
89784702690 OK 01 Sent Oct -09 01:07P 00:00:25 002582030022
1.2.0 2.8
Town of North Andover
Office of the Zoning Board of Appeals F y - . p
Community Development and Services Division
27 Charles Street
�R4TE0 t�`�
North Andover, Massachusetts 01845 9SsacHuS��
D. Robert Nicetta Telephone (978) 688-9541
Building Commissioner
Fax (978) 688-9542
October 10, 2002
Domenic S. Terranova, Esq.
166 North Main Street
Andover, Massachusetts
01810-0013
Dear Attorney Terranova;
The Zoning Board of Appeals received your July 9, 2002 letter stating that Mr. Joseph DiGrazia
has a drainage problem due to a blocked culvert that crosses Turnpike Street. We feel that the
following organizations would be better equipped to address Mr. DiGrazia's problem. The
Division of Public Works is the North Andover town department that deals with Street openings
(driveway cuts), water lines, sewer lines, and resurfacing town roads. The Commonwealth of
Massachusetts Highway Department is responsible for Route 114.
Thank you for your interest.
Very truly yours,
William J. Sullivan, Chairman
North Andover Zoning Board of Appeals
WJS:mg
CC: ZBA files
Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535
.. I
Town of North Andover
Office of the Zoning Board of Appeals
Community Development and Services Division
27 Charles Street
North Andover, Massachusetts 01845
D. Robert Nicetta
Building Commissioner
October 10, 2002
Domenic S. Terranova, Esq.
166 North Main Street
Andover, Massachusetts
01810-0013
Dear Attorney Terranova;
Telephone (978) 688-9541
Fax (978) 688-9542
The Zoning Board of Appeals received your July 9, 2002 letter stating that Mr. Joseph DiGrazia
has a drainage problem due to a blocked culvert that crosses Turnpike Street. We feel that the
following organizations would be better equipped to address Mr. DiGrazia's problem. The
Division of Public Works is the North Andover town department that deals with Street openings
(driveway cuts), water lines, sewer lines, and resurfacing town roads. The Commonwealth of
Massachusetts Highway Department is responsible for Route 114.
Thank you for your interest.
Very truly yours, )
IN � (IM C
William J. Sullivan, qairman
North Andover Zoning Board of Appeals
WJS:mg
CC: ZBA files
Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535
October 10, 2002
Domenic S. Terranova, Esq.
166 North Main Street
Andover, Massachusetts
01810-0013
Dear Attorney Terranova;
The Zoning Board of Appeals received your July 9, 2002 letter stating that Mr. Joseph DiGrazia
has a drainage problem due to a blocked culvert that crosses Turnpike Street. We feel that the
following organizations would be better equipped to address Mr. DiGrazia's problem. The
Division of Public Works is the North Andover town department that deals with Street openings
(driveway cuts), water lines, sewer lines, and resurfacing town roads. The Commonwealth of
Massachusetts Highway Department is responsible for Route +2-5y.
Thank you for your interest.
Very truly yours,
William J. Sullivan, Chairman
North Andover Zoning Board of Appeals
WJS:mg
CC: ZBA files
DOMENIC S. TERRANOVA
ATTORNEY -AT- LAW
166 NORTH MAIN STREET
P.O. BOX 778
ANDOVER, MASSACHUSETTS 01810-0013
TEL (978) 470-1770
FAX (978) 470-1759
9 July 2002
By FAX and regular mail
Zoning Board of Appeals
Town of North Andover
27 Charles Street
North Andover, MA 01845
Re: The Meadows Project
Turnpike Street
Dear Board Members:
I represent Joseph DiGrazia, Trustee of NOMID TRUST, who
owns property at 2350 Turnpike Street, North Andover. Mr.
DiGrazia is an abutter to the above -captioned project.
Mr. DiGrazia's property is adversely affected by a drainage
problem caused by the blockage of a culvert that crosses
Turnpike Street near STA 261 + 85 on the baseline of that
highway layout. At some time in the past, someone filled
the land on the westerly end of the culvert and thereby
blocked the flow of rainwater from Mr. DiGrazia's property
to the site where the Meadows Project is shown on the
developer's plan - Sheet C-2.1.
My client respectfully requests that the culvert be cleared
and that the flow of water be restored to allow drainage
from his property.
Thank you for your attention to this request.
er truly yours,,,
'1
Domenic S. Terranova
DST: so
cc: Joseph DiGrazia
i
JUL 1 0 2001 U
BO%HD OFAPPEALS
Town of North Andover o� �aR7y
ss�eo .6
Office of the Zoning Board of Appeals or °° '°'
Community Development and Services Division+29 A.
27 Charles Street* ° A
North Andover, Massachusetts 01845 �9Ssgcmus%
D. Robert Nicetta
Building Commissioner
FAX TRANSMISSION
TO: LTe
FAX NUMBER: cl 7 V 10 - 9, 6 9 0
FROM: Town of North Andover
Zoning Board of Appeals
27 Charles Street
North Andover, Massachusetts 01845
FAX: 978-688-9542
PHONE: 978-688-9541
DATE: 10- ) I - 0
SUBJECT: +ke- Vlame , McGJDy)S
NUMBER OF PAGES: a -
REMARKS:
Telephone (978) 688-9541
Fax (978) 688-9542
Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535
HP OfficeJet
Personal Printer/Fax/Copier
Last Fax
Identification
89784702690
1.2.0 2.8
Fax Log Report
Oct -11-02 04:04 PM
Result Pages Tvne Date Time Duration Diagnostic
OK 02 Sent Oct -11 04: OOP 00:00:37 002582030022
Town of North Andover
Office of the Zoning Board of Appeals
Community Development and Services Division
27 Charles Street
North Andover, Massachusetts 01845
D. Robert Nicetta
Building Commissioner
October 11, 2002
To: Gerry -Lynn Darcy, Project Manager
From: William J. Sullivan, Chairman
North Andover Zoning Board of Appeals
Re: The Meadows
Telephone (978) 688-9541
Fax (978) 688-9542
I am forwarding the following memo in case the Fire Department did not contact Northpoint
Realty Development:
-----Original Message -----
From: Griffin, Heidi
Sent: Thursday, October 10, 2002 11:29 AM
To: Glennon, Michel
Cc: Dolan, Chief William; Nicetta, Robert
Subject: The Meadows
Hi Mitch:
Since Bob is at a seminar for a few days, I thought I'd send this email to you to
pass along to the Zoning Board.
Can you please make sure that the Zoning Board is aware that the Fire
Department has requested the applicant to change the name of the proposed
project to something else other than "The Meadows". The name makes it
difficult for public safety purposes due to the fact there are several other streets,
and one other development in town, with similar names.
Thanks
I -f eic�%Gr�f�,w
Community Development & Services Director
27 Charles Street
North Andover, MA 01845
(978) 688-9531
(978) 688-9542 fax
Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535
-----Original Message -----
From: Griffin, Heidi
Sent: Thursday, October 10, 2002 11:29 AM
To: Glennon, Michel
Cc: Dolan, Chief William; Nicetta, Robert
Subject: The Meadows
Hi Mitch:
Since Bob is at a seminar for a few days, I thought I'd send this email to you to
pass along to the Zoning Board.
Can you please make sure that the Zoning Board is aware that the Fire
Department has requested the applicant to change the name of the proposed
project to something else other than "The Meadows". The name makes it difficult
for public safety purposes due to the fact there are several other streets, and one
other development in town, with similar names. .
Thanks
He,6d&Gr
Community Development & Services Director
27 Charles Street
North Andover, MA 01845
(978) 688-9531
(978) 688-9542 fax
rec-1
Town of North Andover
Office of the Zoning Board of Appeals
Community Development and Services Division
27 Charles Street
North Andover, Massachusetts 01845
D. Robert Nicetta
Building Commissioner
FAX TRANSMISSION
TO: PSgt4 S-z�11Qn 5 jKI
FAX NUMBER:
FROM: Town of North Andover
Zoning Board of Appeals
27 Charles Street
North Andover, Massachusetts 01845
FAX: 978-688-9542
PHONE: 978-688-9541
DATE: 10— /1-0a
SUBJECT:y, do W u,
iV% 00YA Ao�oue r r c. oo �<
Telephone (978) 688-9541
Fax (978) 688-9542
NUMBER OF PAGES:
REMARKS:
1ro vi ) `l
5qv�� i h 'f�vv� ��l/ p✓► i�� T Dw nA h' vy►
!v
Oki P a 5e- go ,,) CrP 5i 64 e em l
01d (!�reey) g604f 4(1 oherS ov,
P -C' Oe5 -�- � 5 , Th,'5 ill �Orm vvP �k- CIL rfrl
Board of Appeals 688-9541 Building 688-9545 Conservation 688-9530 Health 688-9540 Planning 688-9535 1 f1� 0 �S
North Andover Public Schools (j
School Year 2000-2001
Royal Crest Village Green Heritage Green
Grade Students Students Students /-
K 8 1 7
1 7 1 4 _
2 8 1 9
3 4 4 13
4 3 1 6
5 8 2 10
6 4 3 10
7 4 4 12
8 5 3 8
9 5 5 12
10 6 4 5
11 6 4 5
12 14 5 8
TOTAL 82 38 109
TTn L
/,j comp F y, Reiffi LS comae �pN 6
OCT 1 1 Z002
BOARD OF APPEALS
6
APARTMENTS
NAME ROYAL CREST ESTATES
OWNER T.J. FLATLEY CO.
LOCATION TURNPIKE STREET
ACREAGE 76
BUILDINGS 49
UNITS 588
UNITS PER BUILDING 12
OVERALL DENSITY 7.7
................................... ■ ............................. ■ 1
4,4
CO-OP UNITS
NAME
WOODRIDGE HOMES OF N.A.
LOCATION
WAVERLEY ROAD
ACREAGE
31.7 AC
BUILDINGS
23
UNITS
230
UNITS PER BUILDING
OVERALL DENSITY
7.3
■.■a■aaa0aaaaaa.aaaaaa0aaa.aa0aaa0mas■aa-■a.aa..a
a■ a a. a a.. a a a. a a aai
NAME
ANDREW CIRCLE
LOCATION
OFF ANDOVER STREET
-ACREAGE
_ 6.4 AC
BUILDINGS
UNITS
31 ,
UNITS PER BUILDING
OVERALL DENSITY
4.8
LAND WITH EACH UNIT
................................................................. a 0 1
NAME
ALCOTT VILLAGE
LOCATION
ALCOTT WAY OFF TURNPIKE
ACREAGE
8.3 AC
BUILDINGS
7
~' y
UNITS
39
UNITS PER BUILDING
OVERALL DENSITY
4.6
-
NAME
SUTTON POND
LOCATION
ACREAGE
6.75
BUILDINGS
5
UNITS
dir
UMTS PER BUILDING
OVERALL DENSITY
APARTMENTS
NAME
NASSAR 90
— OWNER
BESTWAY REALTY TRUST
LOCATION
SUTTON STREET #90
ACREAGE
% AC
BUILDINGS
1
UNITS
30 (RES)
3 (COM OFF)
UNITS PER BUILDING
33
OVERALL DENSITY
60
.............................. a a m a 0. 0 0 2 0 2 0 a a 0 a a a. a. a.■ a a 0. a a m
NAME
GRAY ROCK
LOCATION
jCHESTNUT ST
ACREAGE
4.166 AC
BUILDINGS
2
UNITS
13
UNITS PER BUILDING
7 FRONT
6 REAR
OVERALL DENSITY
3.1
■aaa■aaa■■a■■a■■■aaaaa■■aa■■■■■■■■aaa■
a a a a■■ a a a a a a a a a a a a a 0 a a a a■ai
NAME
MILL POND _
LOCATION
PLEASANT ST
ACREAGE
15.5 AC
BUILDING
UNITS
120
UNITS PER BUILDING
OVERALL DENSITY 7.7
LAND WITH.EACH UNIT
.......■■.■■..■■■.■.■.■.■■..■..■■■■.jaa■■■■....■■■a■■■■■■■■■mass ■■■■■■■■l
NAME BROOKSIDE
LOCATION E WATER ST & CHICKERING RD
ACREAGE 7.14 AC (4.54 AC OPEN SPACE)
BUILDINGS
UNITS 29
UNITS PER BUILDING
OVERALL DENSITY 4.6
LAND WITH EACH UNIT
a■■■■■■■■■■a■■0aa■aa■■a■■a■■aa■a■a■■■■a■a■aaaa■■aaa■.■a■a aa■■aa■0aaI
NAME PRESCOTT VILLAGE
LOCATION PRESCOTT STREET
ACREAGE 3.04 AC
BUILDINGS
UNITS 25
UNITS PER BUILDING
OVERALL DENSITY 8.2
LAND WITH EACH UNIT
a0■■■a0a0aaa0■■0■a■a0a0a000a0aa020■a5a■a0■■0■a0■a■■2■a00 a a a a a a 0a001
NAME THE COLONADE
LOCATION BRADFORD STREET
ACREAGE 2AC
BUILDINGS 1
UNITS 18
UNITS PER BUILDING
OVERALL DENSITY 9
5
TOWN OF NORTH ANDOVER
APARTMENT AND CONDOMINIUM SURVEY
CONDOMINIUNS
NAME HERITAGE GREEN
LOCATION CHICKERING ROAD
ACREAGE' 36.22 AC
BUILDINGS 37
UNITS 438
UNITS PER BUILDING 36 BUILDINGS W/12 UNITS
1 11W/6 UNITS
■ ■ ■ ■ ■ ■ ■ ■ ... OVERALL DENSITY ........:..... 12.09,UNITS PER ACRE , ■ ■ , , , ■ , , , , ,
NAME STURBRIDGE ARMS
LOCATION MAIN ST
ACREAGE .08 AC
BUILDINGS 2
UNITS 19
UNITS PER BUILDING 1 BUILDING W/11 UNITS
1 W/8 UNITS
■■■■■■■■■■■■O VERALLDENSITY,,,,,,,■22.5,UNITSPERACRE„■,,,,,,,,,,
NAME MEADOWVIEW CONDOMWUMS.
LOCATION' OFF CHICKERING ROAD -WALKER RD
ACREAGE 16.06 AC
BUILDINGS 14
UNITS 168_
UNITS PER BUILDING 12
OVERALL DENSITY 10.46 .
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Y ■ ■ ■ ■ ■ ■ ■ ■ 1
NAME VILLAGE GREEN
LOCATION CHICKERING RD
ACREAGE 12.04 AC.
BUILDINGS 16
UNITS 127
UNIT PER BUILDING 14 BUILDINGS W/8 UNITS
1 BUILDING W/6 UNITS
1 BUILDING W/9 UNITS
OVERALL DENSITY 10.2
NAME
LOCATION
ACREAGE
BUILDINGS
_ UNITS
UNITS PER BUILDING
VILLAGE GREEN (WEST)
CHICKERING ROAD
7.9 AC
10
74
7 BUILDINGS W/8 UNITS
3 BUILDINGS W/6 UNITS
OVERALL DENSITY 9.03
...... ■ ■ ■ ■ ■ ■ ■ ■ ■ .. ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ 1
NC�C�C�OMC�
OCT 1 1 2002
BOARD OF APPEALS �
HP OfficeJet
Personal Printer/Fax/Copier
Last Fax
Identification Result Pages Tvne
89787940231 OK 06 Sent
1.2.0 2.8
Fax Log Report
Oct -11-02 02:43 PM
Date Time Duration Diagnostic
Oct -11 02:41P 00:02:09 002582030022
-----Original Message -----
From: Griffin, Heidi
Sent: Thursday, October 10, 2002 11:29 AM
To: Glennon, Michel
Cc: Dolan, Chief William; Nicetta, Robert
Subject: The Meadows
Hi Mitch:
Since Bob is at a seminar for a few days, I thought I'd send this email to you to
pass along to the Zoning Board.
Can you please make sure that the Zoning Board is aware that the Fire
Department has requested the applicant to change the name of the proposed
project to something else other than "The Meadows". The name makes it difficult
for public safety purposes due to the fact there are several other streets, and one
other development in town, with similar names.
Thanks
H�(�r4 fi.-v
Community Development & Services Director
27 Charles Street
North Andover, MA 01845
(978) 688-9531
(978) 688-9542 fax
NORTHPOINT
REALTY DEVELOPMEj M
SOUTHPOII iT
Northpoint Realty Development
P.O. Box 907
North Andover, MA 01845
(978) 327-6540
Date: October 14, 2003
To: North Andover Zoning Board of Appeals
Robert Nicetta, Code Enforcement Officer
From: Gerry -Lynn Darcy
Valley Realty Development, LLC
Re: Oakridge Village and Maplewood Reserve
Final Approval under Decision *2002-31
cc: Thomas Laudani, Robert Levy
Southpoint Realty Development
1020 Miramar Drive
Delray Beach, FL 33483
(561) 272-9958
In an effort to finalize the remaining open item as it relates to our Decision on Comprehensive Permit
dated January 14, 2003, and to expedite our ability to obtain a building permit, I have been requested
to attach the Performance Guarantee and Letter of Credit for the project as referenced above for final
sign off by the North Andover Zoning Board of Appeals.
This document must be approved for its' format and content. The actual amount to be secured by this
document will not be inserted until such date that VHB (or other Town Consultant) has assigned
specific values to the corresponding improvements as they relate to said Performance Guarantee and
Letter of Credit. Additionally, the content of this Performance Guarantee and Letter of Credit is subject
to future modifications, by the Developer, only upon approval by the majority of the Members of the
North Andover Zoning Board of Appeals.
Furthermore, it is the Board's intention to appoint the Building Commissioner/Code Enforcement
Officer as its' authorized agent to issue approval of the amount to be secured by said Performance
Guarantee and Letter of Credit based on the schedule of values as provided by the Town's Consultant
for the proposed improvements. In addition to the above, the Building Commissioner/ Code
Enforcement Officer is also responsible for approving the executed regulatory agreement form, and
affirmative action plan prior to the issuance of a foundation permit for any building to be erected within
the Project.
Approved on October 14, 2003:
Date
Date
Date Date
PERFORMANCE GUARANTY AND LETTER OF CREDIT AGREEMENT
THIS AGREEMENT (the "Agreement") effective as of Date, by and between the
Town of North Andover Zoning Board of Appeals (the "ZBA"), with an address at 27
Charles Street, North Andover, MA 01845, and Valley Realty Development, LLC
("Developer"), having an address of 231 Sutton Street, Suite 2F, North Andover, MA
01845.
WITNESSETH:
WHEREAS, Developer is the owner of certain property known as Oakridge
Village and Maplewood Reserve located at 2357 Turnpike Street, North Andover,
Massachusetts and being more particularly described in Exhibit A attached hereto (the
"Property");
WHEREAS, the ZBA granted the Developer a Comprehensive Permit, pursuant
to M.G.L. c. 40B, §20 et. seq., dated January 14, 2003 (the "Permit") for the construction
of a 270 unit residential condominium (the "Protect");
WHEREAS, the Developer did not appeal the Permit or the conditions therein and
therefore all rights for such appeal by the Developer are hereby waived by the Developer;
WHEREAS, the ZBA has required as a condition of the Permit that the Developer
provide security for the completion of certain improvements to the Property (the
"Improvements") set forth in the letter of Vanasse Hangen Brustlin, Inc. ("VHB") to Mr.
Robert Nicetta, dated , a copy of which is attached hereto as Exhibit B (the
"VHB Letter");
WHEREAS, at the Developer's request the ZBA has agreed to accept a Letter of
Credit in lieu of a surety bond as stated in specific condition 27 in the "Permit", to cover
the cost associated with the improvements as set forth in said condition, inclusive of
water and sewer improvements; and
WHEREAS, the Developer has agreed to guarantee the construction of the
Improvements and to provide the required security in the form of a Letter of Credit,
which Letter of Credit will be governed by the terms and conditions hereof.
NOW, THEREFORE, for good and valuable consideration, the receipt and
sufficiency of which is hereby acknowledged, the parties hereby covenant and agree as
follows:
1. Receipt of Letter of Credit. The ZBA acknowledges receipt of Letter of
Credit No in the amount of ( the "Stated Amount") in favor of the ZBA
issued by (the "Bank") and dated (the "Letter of Credit") with an
expiration date of , a copy of which is attached hereto as Exhibit C. The ZBA
(K0247031.5)
shall hold the Letter of Credit, subject to the terms and conditions of this Agreement.
2. Release of the Letter of Credit. The parties acknowledge that the
Improvements to be completed and the estimated costs associated therewith are contained
in the VHB Letter. The Letter of Credit shall be released or partially released, as the case
may be, upon completion or partial completion of the Improvements. Accordingly, upon
the certification to the ZBA, from time to time, by VHB or such other consultant approved
by the ZBA (the "ZBA Consultant") certifying the Improvements that have been completed
and the corresponding dollar value ascribed to such Improvements in the VHB Letter (the
"Consultant's Certificate"), the Letter of Credit shall be reduced by such amount. The
ZBA shall cooperate with the Developer and (Bank) in facilitating the reduction of
the Letter of Credit. Towards that end, upon receipt of the Consultant's Certificate the
Building Commissioner for the Town of North Andover, or his designee, shall promptly
execute and deliver to the Developer, for delivery to the Bank, a written direction that the
Stated Amount in the Letter of Credit be reduced by the amount contained in the
Consultant's Certificate. Such direction shall be in the form attached hereto as Exhibit D.
Upon certification by the ZBA Consultant that all the Improvements have been completed,
the Letter of Credit shall be returned to Developer and terminated and the Building
Commissioner shall so instruct the Bank. The Developer shall pay forthwith, upon written
demand, the reasonable cost and expenses incurred by the ZBA as a result of said periodic
certification, from time to time, by the ZBA Consultant. Notwithstanding the foregoing,
upon failure of the Developer to pay such costs and expenses, the ZBA may, ten (10) days
after written demand to the Developer therefore, draw upon the Letter of Credit for such
payment.
3. Presentment of the Letter of Credit. In the event the Improvements have
not been completed on or before , thereafter the ZBA may draw on the Letter of
Credit in the amount of such costs necessary to complete the Improvements not
previously completed, or not certified by VHB to have been completed, including, but not
limited to, engineering and attorneys' fees. In the event the Letter of Credit is drawn
upon, the amount drawn shall be used for the completion of the Improvements. Any
unused funds will be returned to Developer upon completion of the Improvements on
behalf of the ZBA.
4. Renewal of the Letter of Credit. In the event the Developer has not
completed the Improvements on or before , Developer shall replace or extend
the Letter of Credit in a manner and upon such terms satisfactory to the ZBA prior
. In the event Developer fails to replace or extend the Letter of Credit on or
before , the ZBA may draw on the Letter of Credit and the proceeds thereof
shall be held by the ZBA and dispersed, in accordance with the terms hereof, to either
fund the cost of the Improvements or be returned to Developer, as the case may be.
5. Performance Guaranty. Developer hereby agrees, warrants and guaranties
to the ZBA that it will complete the Improvements as required. The provisions hereof are
rendered solely for the benefit of, and can only be relied upon by, the ZBA in connection
with the Permit. The foregoing may not be relied upon for any other purpose or relied
upon by any other persons or entities for any reason nor shall it be deemed to create any
(K0247031.5) 2
rights in any party or entity other than the ZBA.
6. Amendments. This Agreement may not be waived, changed, or
discharged orally but only by an agreement in writing signed by the parties hereto.
7. Notices. Any notices required to be furnished by either party hereto shall
be personally delivered, sent by overnight courier or by certified mail, return receipt
requested to the parties at the above -noted addresses, and in case of notice to Developer,
a copy to Robert W. Levy, Esquire, Eckert Seamans Cherin & Mellott, LLC, One
International Place, 18`h Floor, Boston, MA 02110, or at such other address as the parties
may designate in writing to the other party hereto.
8. Miscellaneous. Time shall be of the essence of this Agreement. This
Agreement may be executed in one or more counterparts, each of which shall be deemed
an original and all such counterparts shall constitute one and the same instrument. This
Agreement shall be construed in accordance with and governed by the laws of the
Commonwealth of Massachusetts. This Agreement shall be binding upon the successors
and assignees of Developers development rights to the Project. The parties hereto waive
the right to trial by jury in any action to enforce the provisions of this Agreement. The
parties further agree that any action to enforce the provisions of this Agreement shall be
brought in the Essex Superior Court or, if such action is not subject to the jurisdiction of
the Superior Court, the Lawrence District Court.
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed
as a sealed instrument as of the date and year first above written.
Signatures on next page.
{
K0247031.5)
TOWN OF NORTH ANDOVER Valley Realty Development, LLC
ZONING BOARD OF APPEALS
By: By:
By: By:
I -
{K0247031.5} 4
EXHIBIT A
Legal Description of Property
(K0247031.5)
EXHIBIT B
VHB LETTER
(K0247031.5)
EXHIBIT C
LETTER OF CREDIT
(K0247031.5)
Bank
EXHIBIT D
LETTER OF TOWN
TOWN OF NORTH ANDOVER
OFFICE OF
COMMUNITY DEVELOPMENT AND SERVICES
27 CHARLES STREET
NORTH ANDOVER, MASSACHUSETTS 01845
[insert date]
Re: Irrevocable Letter of Credit No.
Beneficiary: Town of North Andover
Customer:
Dear Sir/Madam:
You are hereby authorized and directed to permanently reduce the Stated Amount
of the above referenced Letter of Credit by the amount of (insert amount of reduction]
($ ) US Dollars.
Thank you for your attention to this matter.
Very truly yours,
cc: Bank
Valley Realty Development, LLC
(K0247031.5) 8
14�ORTHPOINT
TY DEVELOPMENT
J.
§ i 9
Northpoint Realty Development
P.O. Box 907
North Andover, MA o1845
(978) 327-6540
Date: October 14, 2003
To: North Andover Zoning Board of Appeals
Robert Nicetta, Code Enforcement Officer
From: Gerry -Lynn Darcy
Valley Realty Development, LLC
Re: Oakridge Pillage and Maplewood Reserve
Final Approval under Decision #2002-31
cc: Thomas Laudani, Robert Levy
_ _ l
Southpoint Realty evelophent '
1020 Miramar Drive
Delray Beach, FL 33483
(561) 272-9958
In an effort to finalize the remaining open item as it relates to our Decision on Comprehensive Permit
dated January 14, 2003, and to expedite our ability to obtain a building permit, I have been requested
to attach the Performance Guarantee and Letter of Credit for the project as referenced above for final
sign off by the North Andover Zoning Board of Appeals.
This document must be approved for its' format and content. The actual amount to be secured by this
document will not be inserted until such date that VHB (or other Town Consultant) has assigned
specific values to the corresponding improvements as they relate to said Performance Guarantee and
Letter of Credit. Additionally, the content of this Performance Guarantee and Letter of Credit is subject
to future modifications, by the Developer, only upon approval by the majority of the Members of the
North Andover Zoning Board of Appeals.
Furthermore, it is the Board's intention to appoint the Building Commissioner/Code Enforcement
Officer as its' authorized agent to issue approval of the amount to be secured by said Performance
Guarantee and Letter of Credit based on the schedule of values as provided by the Town's Consultant
for the proposed improvements. In addition to the above, the Building Commissioner/ Code
Enforcement Officer is also responsible for approving the executed regulatory agreement form, and
affirmative action plan prior to the issuance of a foundation permit for any building to be erected within
the Project.
Approved on October 14,2003:
/U �l %1G3
Date
Date
aCCEl-i W N
UG 1 16 1003
/%
f P�a[e
Date
A-; -PTES7':
Tme Copy
01 VV ). CI .P«
' I
PERFORMANCE GUARANTY AND LETTER OF CREDIT �iG>1
1VIENT
SLI i
THIS AGREEMENT (the "Agreement") effective as of Date, by and between the
Town of North Andover Zoning Board of Appeals (the "ZBA"), with an address at 27
Charles Street, North Andover, MA 01845, and Valley Realty Development, LLC
("Developer"), having an address of 231 Sutton Street, Suite 2F, North Andover, MA
01845.
WITNESSETH:
WHEREAS, Developer is the owner of certain property known as Oakridge
Village and Maplewood Reserve located at 2357 Turnpike Street, North Andover,
Massachusetts and being more particularly described in Exhibit A attached hereto (the
"Property");
WHEREAS, the ZBA granted the Developer a Comprehensive Permit, pursuant
to M.G.L. c. 40B, §20 et. seq., dated January 14, 2003 (the "Permit") for the construction
of a 270 unit residential condominium (the "Project");
WHEREAS, the Developer did not appeal the Permit or the conditions therein and
therefore all rights for such appeal by the Developer are hereby waived by the Developer;
WHEREAS, the ZBA has required as a condition of the Permit that the Developer
provide security for the completion of certain improvements to the Property (the
"Improvements") set forth in the letter of Vanasse Hangen Brustlin, Inc. ("VHB") to Mr.
Robert Nicetta, dated ; a copy of which is attached hereto as Exhibit B (the
"VHB Letter");
WHEREAS, at the Developer's request the ZBA has agreed to accept a Letter of
Credit in lieu of a surety bond as stated in specific condition 27 in the "Permit", to cover
the cost associated with the improvements as set forth in said condition, inclusive of
water and sewer improvements; and
WHEREAS, the Developer has agreed to guarantee the construction of the
Improvements and to provide the required security in the form of a Letter of Credit,
which Letter of Credit will be governed by the terms and conditions hereof.
NOW, THEREFORE, for good and valuable consideration, the receipt and
sufficiency of which is hereby acknowledged, the parties hereby covenant and agree as
follows:
1. Receipt of Letter of Credit. The ZBA acknowledges receipt of Letter of
Credit No in the amount of ( the "Stated Amount") in favor of the ZBA
issued by (the "Bank") and dated (the "Letter of Credit") with an
expiration date of , a copy of which is attached hereto as Exhibit C. The ZBA
(K0247031.5)
shall hold the Letter of Credit, subject to the terms and conditions of this Agreement.
2. Release of the Letter of Credit. The parties acknowledge that the
Improvements to be completed and the estimated costs associated therewith are contained
in the VHB Letter. The Letter of Credit shall be released or partially released, as the case
may be, upon completion or partial completion of the Improvements. Accordingly, upon
the certification to the ZBA, from time to time, by VHB or such other consultant approved
by the ZBA (the "ZBA Consultant") certifying the Improvements that have been completed
and the corresponding dollar value ascribed to such Improvements in the VHB Letter (the
"Consultant's Certificate"), the Letter of Credit shall be reduced by such amount. The
ZBA shall cooperate with the Developer and (Bank) in facilitating the reduction of
the Letter of Credit. Towards that end, upon receipt of the Consultant's Certificate the
Building Commissioner for the Town of North Andover, or his designee, shall promptly
execute and deliver to the Developer, for delivery to the Bank, a written direction that the
Stated Amount in the Letter of Credit be reduced by the amount contained in the
Consultant's Certificate. Such direction shall be in the form attached hereto as Exhibit D.
Upon certification by the ZBA Consultant that all the Improvements have been completed,
the Letter of Credit shall be returned to Developer and terminated and the Building
Commissioner shall so instruct the Bank. The Developer shall pay forthwith, upon written
demand, the reasonable cost and expenses incurred by the ZBA as a result of said periodic
certification, from time to time, by the ZBA Consultant. Notwithstanding the foregoing,
upon failure of the Developer to pay such costs and expenses, the ZBA may, ten (10) days
after written demand to the Developer therefore, draw upon the Letter of Credit for such
payment.
3. Presentment of the Letter of Credit. In the event the Improvements have
not been completed on or before . , thereafter the ZBA may draw on the Letter of
Credit in the amount of such costs necessary to complete the Improvements not
previously completed, or not certified by VHB to have been completed, including, but not
limited to, engineering and attorneys' fees. In the event the Letter of Credit is drawn
upon, the amount drawn shall be used for the completion of the Improvements. Any
unused funds will be returned to Developer upon completion of the Improvements on
behalf of the ZBA.
4. Renewal of the Letter of Credit. In the event the Developer has not
completed the Improvements on or before , Developer shall replace or extend
the Letter of Credit in a manner and upon such terms satisfactory to the ZBA prior
. In the event Developer fails to replace or extend the Letter of Credit on or
before , the ZBA may draw on the Letter of Credit and the proceeds thereof
shall be held by the ZBA and dispersed, in accordance with the terms hereof, to either
fund the cost of the Improvements or be returned to Developer, as the case may be.
5. Performance Guaranty. Developer hereby agrees, warrants and guaranties
to the ZBA that it will complete the Improvements as required. The provisions hereof are
rendered solely for the benefit of, and can only be relied upon by, the ZBA in connection
with the Permit. The foregoing may not be relied upon for any other purpose or relied
upon by any other persons or entities for any reason nor shall it be deemed to create any
{ K0247031.5) 2
rights in any party or entity other than the ZBA.
6. Amendments. This Agreement may not be waived, changed, or
discharged orally but only by an agreement in writing signed by the parties hereto.
7. Notices. Any notices required to be furnished by either party hereto shall
be personally delivered, sent by overnight courier or by certified mail, return receipt
requested to the parties at the above -noted addresses, and in case of notice to Developer,
a copy to Robert W. Levy, Esquire, Eckert Seamans Cherin & Mellott, LLC, One
International Place, 18th Floor, Boston, MA 02110, or at such other address as the parties
may designate in writing to the other party hereto.
8. Miscellaneous. Time shall be of the essence of this Agreement. This
Agreement may be executed in one or more counterparts, each of which shall be deemed
an original and all such counterparts shall constitute one and the same instrument. This
Agreement shall be construed in accordance with and governed by the laws of the
Commonwealth of Massachusetts. This Agreement shall be binding upon the successors
and assignees of Developers development rights to the Project. The parties hereto waive
the right to trial by jury in any action to enforce the provisions of this Agreement. The
parties further agree that any action to enforce the provisions of this Agreement shall be
brought in the Essex Superior Court or, if such action is not subject to the jurisdiction of
the Superior Court, the Lawrence District Court.
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed
as a sealed instrument as of the date and year first above written.
Signatures on next page.
{K0247031.5)
TOWN OF NORTH ANDOVER Valley Realty Development, LLC
ZONING BOARD OF APPEALS
By: `�'
{ K0247031.5} 4
EXHIBIT A
Legal Description of Property
(K0247031.5)
EXHIBIT B
VHB LETTER
j K0247031.5)
EXHIBIT C
LETTER OF CREDIT
{ K0247031.5)
i
Bank
EXHIBIT D
LETTER OF TOWN
TOWN. OF NORTH ANDOVER
OFFICE OF
COMMUNITY DEVELOPMENT AND SERVICES
27 CHARLES STREET
NORTH ANDOVER, MASSACHUSETTS 01845
[insert date]
Re: Irrevocable Letter of Credit No.
Beneficiary: Town of North Andover
Customer:
Dear Sir/Madam:
You are hereby authorized and directed to permanently reduce the Stated Amount
of the above referenced Letter of Credit by the amount of [insert amount of reduction)
($ ) US Dollars.
Thank you for your attention to this matter.
cc: Bank
Valley Realty Development, LLC
(K0247031.5)
E
Very truly yours,
Town of North Andover
Office of the Zoning Board of Appeals
Community Development and Services Division
27 Charles Street
North Andover, Massachusetts 01845
D. Robert Nicetta
Building Commissioner
Date 0// S �%
TO: Town of North Andover
Zoning Board of Appeals
27 Charles Street
North Andover MA 01845
Telephone (978) 688-9541
Fax(978)688-9542
Please be advised that I have agreed to waive the time constraints for the Zoning Board of
appeals to make a decision regarding the granting of a Variance and /or Special Permit for
property located at:
STREET.
TOWN: No Y ' "`
MEETING DATE(S):
NAME OF PE
Signed:
V u �k
Petitioner (or petitioner's representative)
Q
CD C-: -;
M F-1
C)
WAIVER r
O Frl CD M
<_U Cr,
W 7 a`
0
cn
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9.535
Town of North Andover
Office of the Zoning Board of Appeals
Community Development and Services Division
27 Charles Street
North Andover, Massachusetts 01845
D. Robert Nicetta
Building Commissioner
Date
TO: Town of North Andover
Zoning Board of Appeals
27 Charles Street
North Andover MA 01845
Telephone (978) 688-9541
Fax(978)688-9542
Please be advised that I have agreed to waive the time constraints for the Zoning Board of
appeals to make a decision regarding the granting of a Variance and /or Special Permit for
property located at:
STREET:
TOWN:
MEETIlI
NAME (
Signed:
WAIVER
�H EC E
BOARD OF AP
S688-9541
U 2 2 2002
BOARD OF APPEALS
BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
C37
M
CDCD
CD
W
: A
--y-
Cn
BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
NORt'NPOiNT wl� Nd*'.44
PO 9" 3039
Aft", MA 01810
(9)8) 470 -RM
October 28, 2002
Mr. William Sullivan, Chairman
Zoning Board of Appeals
27 Charles Street
North Andover, MA o1845
Re: Condominium Students
Dear Mr. Sullivan:
5OUTHPO(N1 Wig, Dev4
19S NE 6` A+o-"
DAAV, Bim, Ft 33483
(561) M-1158
I am writing in response to a memo that was sent to Mr. Paul Szymanski requesting information on
the number of school children in grades k through 12 within the various condominium
developments throughout the Town.
At the suggestion of Mr. Nicetta, I contacted the School Department who in turn had Mr. Craig
Mitchell, President of School Geographics, Inc. call me directly. I had a terrific conversation with
Mr. Mitchell who agreed to begin compiling the information per your request within the next week.
My intention is to review the findings relative to the number of school children in local
condominium complexes with Mr. Mitchell as soon as possible. Additionally, it might be a good
idea for him to attend the November 12, 2002 Zoning Board hearing to discuss his data.
Please let me know if you would be in favor of Mr. Mitchell attending the November hearing at your
convenience. In the meantime I will forward the data to you for review as it becomes available to
you for review.
Thank you for your ongoing attention to this matter.
Sincerely,
Valley Realty Development, LLC
rry-L'yl.�in �alrcy
U
cc: Mr. Paul Szymanski, Mr. Craig Mitchell, Bob Nicetta, Karen Pollastrino, Thomas Laudani
OCT 3 0 2002
BOARD OF APPEALS
I + I -i- ) ✓
d;d oo+
k'�I �k, vv—
Vv 'I I f -(�x
X1150 cc-
-6 of
G-6oF Sei
T Al
`fi ,� cte k
1U11DU1�'nU- 'J/d4/UZbyb NURFH ATLANTIC PAGE 01
NORTHPOINT Realty Development
PO Box 3039
Andover, MA o-t8-io
(978) 470-8257
SOUTHPOINT Realty Development
185 NE 6`h Avenue
Delray Beach, FL 33483
(56.0 272-9958
Date: October 29, 1-001-
To:
002To: North Andover Fire Dept. (Chief William Dolan and Lt. Andrew Melnikas)
North Andover Poli
,-pt. (Richard Boettcher, Communications Supervisor)
From: Gerry -Lynn Darcy
Re: Name Change for "the Meadow"
cc: Chris Huntress, Dermott Kelly, Julie Parrino, Karen Pollastrino, Thomas Laudani, Robert
Nicetta, Gregg Smith, William Sullivan, Steve Trettel
We have been requested to change the name of our proposed 4oB development. It appears as
thought "the Meadows" has already been used for a few locations in Town. To avoid any potential
confusion with the public safety departments servicing our Town, we have chosen the names listed
below.
Upper Meadow "Parker Common"
Lower Meadow "Parker Reserve"
Please contact me immediately should there be a problem with the new names as provided. Thank
you in advance for your attention to this matter.
BOARD OF APPEALS
Torn of North Andover
Office of the Zoning Board of Appeals
Community Development and Services Division
27 Charles Street
North Andover, Massachusetts 01845
D. Robert Nicetta
Building Commissioner
TO: Town of North Andover
Zoning Board of Appeals
27 Charles Street
North Andover MA 01845
Telephone (978) 688-9541
Fax(978)688-9542
Please be advised that I have agreed to waive the time constraints for the Zoning Board of
appeals to make a decision regarding the granting of a Variance and /or Special Permit for
property located at:
STREET:
TOWN: * LOY41 at1L&
MEETING DATE(S): t Z. Zo n,
NAME OF PETITIONER: V aJ LL14 I ".moi h� !YA,i Y!0-0 �- L— t,C-
Signed:
(or petitioner's kpresentative)
WAIVER
C=
w
a
2
L+
w
BOARD OF APPEALS 688-9541 BUILDING 688-9.545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 6535
c_
Ca
CEJ C? 77 ,
M, , it
R
CX)
CD CD
`�acn�,
r- D