Loading...
HomeMy WebLinkAboutMiscellaneous - Lucent EC-EO 11-19-08BRIAN T. PENDLETON, P.E. f SENIOR CIVIL EN13INEER TEN NEW ENGLAND BUSINESS CENTER DRIVE SUITE 107 ANDOVER, MA oiaio TEL 97B.794.1792 Xl 27 FAX 978.794.1 793 SPENDLETON@TECMASS.COM Town of North Andover Office of the Conservation Department Community Development and Services Division Alison E. McKay Conservation Admiiristrator November 22, 2004 Ozzy. Properties 1 Dundee Park, Suite 3 Andover, MA 01810 Att: Orit Goldstein 27 Charles Street North Andover, Massachusetts 01.845 RE: Enforcement Order for Emergency Road Repairs 1600 Osgood Street, Lucent Technology Dear Mrs. Goldstein: Telephone (978) 688-9530 Fax (978) 688-9542 The North Andover Conservation Department is in receipt of the letter prepared by Epsilon Associates, Inc., dated 11/22/04, requesting to perform emergency road repairs at the Lucent facility, located at 1600 Osgood Street. On Friday, November 19, 2004, I met with Julie Vondrak of Epsilon Associates, Christopher Huntress of Huntress Associates and Brian Pendleton of TEC to review the two collapsed sections of the roadway. Upon review of the site, I agreed that the damaged roadway poses a safety threat, in addition to an unstable condition, which is contributing to sedimentation into the adjacent wetland resource area. The attached Enforcement Order is being issued to allow immediate stabilization activities to prevent further damage to the roadway over the winter months. All work must be conducted in accordance with the submitted letter and proposed detail plans. It is anticipated the work will be conducted over a 2-3 day period. The following conditions must be adhered to as required under this Enforcement Order: 1. Prior to the commencement of work activities, erosion controls consisting of staked haybales and trenched silt fence must be properly installed at the limit of work.. Upon installation of said erosion controls, the Conservation Department shall be contacted for a site inspection. 2. Equipment must be staged from the existing roadway pavement only. No machinery or equipment shall be used beyond the existing paved limits. 3. All removed materials (pavement, concrete, sedimentation) must be removed from the site and properly disposed of off site. 4. All disturbed bank areas adjacent to the wetland resource areas must be protected with geotextile fabric to prevent erosion over the winter months. Erosion controls must be maintained and remain in place until all disturbed areas have been adequately stabilized. BOARD OF APPEALS 688-9541 BUILDING 688-9,45 CONSERVATION 688-9530 HEALT11 688-9540 PLANNING; 688-9535 P I 6. This Enforcement Order permits stabilization activities associated with the collapsed roadway only. No other activities are allowed at this time and it is anticipated a Notice of Intent will be filed in the future to address permanent upgrades to the stormwater management system. Upon completion of work activities, the Conservation Department shall be contacted for a final site inspection. Please feel free to contact me or my Associate, Pamela Merrill, if you have any further questions in this regard. Thank you for your anticipated cooperation. Sin ely, �r Alison McKay, Conserva ' Administrator North Andover Conserva ion Encl. CC: NACC Heidi Griffin, Community Development Director Julie Vondrak, Project Scientist, Epsilon Associates, Inc. Christopher Huntress, Huntress Associates Brian Pendleton, TEC Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. w �1 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Violation Information This Enforcement Order is issued by: To: North Andover Conservation Commission Conservation Commission (Issuing Authority) Ozzy Properties Inc., Aft: Orit Goldstein Name of Violator Dundee Park, Andover, MA 01810 Address 1. Location of Violation: SAME Property Owner (if different) 1600 Osgood Street Street Address North Andover City/Town Assessors Map/Plat Number 11/22/04 Date LU Zip Code Parcel/Lot Number DEP File Number: Provided by DEP 2. Extent and Type of Activity (if more space is required, please attach a separate sheet): This Enforcement Order is being issued to perform emergency road repairs to a collapsed portion of roadway that accesses the rear of the Lucent building at 1600 Osgood Street. The applicant wishes to immediately stabilize a portion of roadway that poses a safety threat and source of sedimentation to the adjacent resource area. This Enforcement Omer is a permitting mechanism to allow the work to immediately commence without the filing of a Notice of Intent, due to the emergency nature of the situation. Activities will include removal of collapsed pavement, the concrete spillway and accumulated sedimentation and will include stabilization of the roadway through the installation of gravel, geotextile fabric and rio-rao. B. Findings (This EO allows emergency repair work only) The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L. c. 131, § 40) and its Regulations (310 CMR 10.00), because: Ef the activity has been/is being conducted without a valid Order of Conditions. wpaform9a.doc • rev. 7111104 Pape 1 of 3 L7 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP ❑ the activity has been/is; being conducted in violation of the Order of Conditions issued to: Name File Number B. Findings (cont.) ❑ Other (specify): See attached Special Conditions C. Order Dated Condition number(s) The issuing authority hereby orders the following (check all that apply): ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ® Wetland alterations resulting from said activity should be corrected and the site returned to its original condition. ❑ Complete the attached Notice of Intent. The completed application and plans for all proposed work as required by the Act and Regulations shall be filed with the Issuing Authority on or before Date No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ® The property owner shall take the following action to prevent further violations of the Act: See Special Conditions Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a) wpaform9a.doc. rev. 7114/04 Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Appeals/Signatures DEP File Number: Provided by DEP An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: North Andover Conservation Department Name 978 6.88-9530 Phone Number -— — ------ -- ---------------- Monday-Friday, 8:30 AM — 4:30 PM Hours/Days Available Issued by: North Andover Conservation Commission In a situation regarding immediate action, an Enforcement Order may be signed by a single member or agent of the Commission and ratified by majority of the members at the next scheduled -meeting of the Commission_ Si Signature of delivery person or certified mail number wpaform9a.doc - rev. 7114104 Page 3 of 3 Town of North Andover Office of the Conservation Department Community Development and Services Division Alison E. McKay Conservation Administrator November 22, 2004 Ozzy Properties 1 Dundee Park, Suite 3 Andover, MA 0 18 10 Att: Orit Goldstein 27 Charles Street North Andover, Massachusetts 01.845 RE: Enforcement Order for Emergency Road Repairs 1600 Osgood Street, Lucent Technology Dear Mrs. Goldstein: Telephone (978) 688-9530 Fax (978) 688-9542 The North Andover Conservation Department is in receipt of the letter prepared by Epsilon Associates, Inc., dated 11/22/04, requesting to perform emergency road repairs at the Lucent facility, located at 1600 Osgood Street. On Friday, November 19, 2004, I met with Julie Vondrak of Epsilon Associates, Christopher Huntress of Huntress Associates and Brian Pendleton of TEC to review the two collapsed sections of the roadway. Upon review of the site, I agreed that the damaged roadway poses a safety threat, in addition to an unstable condition, which is contributing to sedimentation into the adjacent wetland resource area. The attached Enforcement Order is being issued to allow immediate stabilization activities to prevent further damage to the roadway over the winter months. All work must be conducted in accordance with the submitted letter and proposed detail plans. It is anticipated the work will be conducted over a 2-3 day period. The following conditions must be adhered to as required under this Enforcement Order: 1. Prior to the commencement of work activities, erosion controls consisting of staked haybales and trenched silt fence must be properly installed at the limit of work. Upon installation of said erosion controls, the Conservation Department shall be contacted for a site inspection. 2. Equipment must be staged from the existing roadway pavement only. No machinery or equipment shall be used beyond the existing paved limits. 3. All removed materials (pavement, concrete, sedimentation) must be removed from the site and properly disposed of off site. 4. All disturbed bank areas adjacent to the wetland resource areas must be protected with geotextile fabric to prevent erosion over the winter months. 5. Erosion controls must be maintained and remain in place until all disturbed areas have been adequately stabilized. BOARD OF APPEALS 688-9541 BUILDING 688-95=45 CONSERVATION 688!)530 11EAI T11 688-9540 PLANNING; 688-9535 6. This Enforcement Order permits stabilization activities associated with the collapsed roadway only. No other activities are allowed at this time and it is anticipated a Notice of Intent will be filed in the future to address permanent upgrades to the stormwater management system. 7. Upon completion of work activities, the Conservation Department shall be contacted for a final site inspection. Please feel free to contact me or my Associate, Pamela Merrill, if you have any further questions in this regard. Thank you for your anticipated cooperation. Since ely, 1 Alison McKay, Conserva ' Administrator North Andover Consery on Encl. CC: NACC Heidi Griffin, Community Development Director Julie Vondrak, Project Scientist, Epsilon Associates, Inc. Christopher Huntress, Huntress Associates Brian Pendleton, TEC PE? Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. VQ Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Violation Information This Enforcement Order is issued by: To: North Andover Conservation Commission Conservation Commission (Issuing Authority) Ozzy Properties Inc., Aft: Orit Goldstein Name of Violator Dundee Park, Andover, MA 01810 Address 1. Location of Violation: SAME Property Owner (if different) 1600 Osgood Street Street Address North Andover Cityrrown Assessors Map/Plat Number 11/22/04 Date MA Zip Code Parcel/Lot Number DEP File Number. Provided by DEP 2. Extent and Type of Activity (if more space is required, please attach a separate sheet): This Enforcement Order is being issued to perform emergency road repairs to a collapsed portion of roadway that accesses the rear of the Lucent building at 1600 Osgood Street. The applicant wishes to immediately stabilize a portion of roadway that poses a safety threat and source of sedimentation to the adjacent resource area. This Enforcement Order is a permitting mechanism to allow the work to immediately commence without the filing of a Notice of Intent, due to the emergency nature of the situation. Activities will include removal of collapsed pavement, the concrete spillway and accumulated sedimentation and will include stabilization of the roadway through the installation of gravel, geotextile fabric and rip -rap. B. Findings (This EO allows emergency repair work only) The Issuing Authority has determined that the activity described above is in violation of the Wetlands Protection Act (M.G.L. c. 131, § 40) and its Regulations (310 CMR 10.00), because: N the activity has been/is being conducted without a valid Omer of Conditions. wpaformftdoo • mv. 7114104 Page 1 of 3 i Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number. r WPA Form 9A - Enforcement Order ' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP ❑ the activity has been/is being conducted in violation of the Order of Conditions issued to: Name Dated File Number Condition number(s) B. Findings (cont. ❑ Other (specify): See attached Special Conditions C. Order The issuing authority hereby orders the following (check all that apply): ❑ The property owner, his agents, permittees, and all others shall immediately cease and desist from the further activity affecting the Buffer Zone and/or wetland resource areas on this property. ® Wetland alterations resulting from said activity should be corrected and the site retumed to its original condition. ❑ Complete the attached Notice of Intent. The completed application and plans for all proposed work as required by the Act and Regulations shall be filed with the Issuing Authority on or before uate No further work shall be performed until a public hearing has been held and an Order of Conditions has been issued to regulate said work. ® The property owner shall take the following action to prevent further violations of the Act: See Special Conditions Failure to comply with this Order may constitute grounds for additional legal action. Massachusetts General Laws Chapter 131, Section 40 provides: "Whoever violates any provision of this section (a) wpaformga.doc • rev. 7/14104 Page 2 of 3 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 9A - Enforcement Order Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Appeals/Signatures An Enforcement Order issued by a Conservation Commission cannot be appealed to the Department of Environmental Protection, but may be filed in Superior Court. Questions regarding this Enforcement Order should be directed to: North Andover Conservation Department Name 978 688-9530 Phone Number Monday -Friday, 8:30 AM — 4:30 PM Hours/Days Available Issued by: North Andover Conservation Commission In a situation regarding immediate action, an Enforcement Omer may be signed by a single member or agent of the Commission and ratified by majority of the members at the next scheduled meeting of the Commission - Sig S. Signature of delivery person or certified mail number wpaform9a.doc • rev. 7/14104 Page 3 of 3 Town of North Andover Office of the Conservation Department Community Development and Services Division Heidi Griffin, Division Director 27 Charles Street North Andover, "Aassachusetts 01845 To: -TLu- I I e- Uon d ircL From: off �i ,So h Fax: Pages: S' -t- cover Phone: Date: t Z Re: CC: Han —[�C" ksI n 3 Telephone (978) 688-9330 Fax (978) t)88-9542 110ARD OF .1PPEA S 698-9541 HI jILDINC 6RR-9545 C0\SER\-XrI0\ fiRR-9330 HEALTH 688-9540 PLANN'1\6689-9333 facsimile transmittal To: Julie Vondrak From: Pamela Merrill North Andover Conservation Department 400 Osgood Street North Andover, Ma 01845 Tel: 978.688.9530 Fax: 978.688.9542 Fax: 978.897.0099 Date: 11/23/04 Re: EO Letter: Lucent Tech. Pages: 6(includes cover) CC: ❑ Urgent ❑ For Review ❑ Please ❑ Please Comment Reply ❑ Please Recycle PRINCIPALS 7hadare A 8aM PE magard a ASE Gu* CCM Sarrd G. "AjuM LLR Lte T. Rw4T&d, PE It 1 1 : w\': M. Lester a &7ft Ir W"b H. A!ktw,, RLA EEPn9hSYL0NA"*MU'u November 22, 2004 Alison McKay, Conservation Administrator North Andover Conservation Commission 400 Osgood Street North Andover, MA 01845 Re: -EO for Lucent Technology 1600 Osgood Street Dear Alison: O�Ke corJ As you-are'aware, Epsilon Associates, Inc., on behalf of.Ozzy Properties, contacted you last week to review a collapsed portion of roadway behind the Lucent building at 1600 Osgood Street. At our scheduled inspection on Friday, November 19, 2004, we observed a collapsed concrete slab spillway and two eroded portions of roadway, which currently serves as a safety threat and contributor of sediment to the adjacent resource area (see attached photos). We requested- immediate stabilization activities be permitted under an Emergency Certification, in order to further prevent damage to the roadway over the winter season. A future filing with the Conservation Commission will address upgrades to the outdated stormwater drainage system. Upon discussions with Commission members, it is my understanding that you would Tike to proceed with our requested emergency stabilization activities under the issuance of an Enforcement Order. Ozzy Properties has no objection to proceeding in this manner, however we would like the record to reflect that Epsilon Associates notified the Commission of this issue because we felt there was an immediate public safety concern relative to the possible collapse of the roadway. Ozzy Properties has every intention to correct the pro -[em in an efficient and expedited manner, while at the same time proceeding in a manner which best minimized the impact to the adjacent wetland resource areas. Stabilization Activities Stabilization activities are anticipated to be conducted over a 2-3 day period. Prior to the c� omme cetnent..of_work,.erosion controls consisting of haybales and silt fence ill - be installed at the limit of work (see attached detail sheets). Th�jgishain'1j;fience will be temporarily remo urmgi 0–tion a c—tivities. Construction mach' consisting of either a backhoe o r will be staffed or ++►�,Px,,, + g en n o MMaRM pavement will be sawcut and removed. The broken concrete slab will also be removed by machinery. Sediments from the undermined road will be removed by machinery. All removed materials will be loaded onto a dump truck and will be 6,-d,'�,.o� dis se W -,site. Damaged areas will be fiW with gravel over ain y geotextr'le fabric to prevent erosion of the fines. Rip -rap will be installed over the geotextile fabric. Upon s 150 Main Street • Maynard, Massachusetts 01754-0700 0 978.897.7100 Fax 978.897.0099 www.epsilonassociates.com ft 2 stabilization of the site, erosion controls will be removed to allow the flow of stormwater. Brian T. Pendleton, P.E. of TEC, #978 7941792, ext. 127; will serve at the contact person for the project. Please feel free to call him with. any specific questions regarding the sequencing of the stabilization activities. Also; please feel free to contact me at 978 461-6227 with any questions. The Enforcement Order should be addressed to: Ozzy Properties Inc. Dundee Park Andover, MA 01810 Att: Orit Goldstein We thank you for your cooperation in addressing this matter. Sinc rt��42�..� u Vondrak, Project Scientist E silon Associates cc: Huntress associates Brian Pendleton, TEC Ozzy Properties Inc. EEP..I.SYLONASSOMM Of LLJ u- iY 0 0 < F- wz < cl� C3 LL, lz LLJI w < 1-r 0 10 w ILL- i(o Y1 1>� Z LJ _3 LL - Of o z z < w 2 < D 0- F- F- -j 1 0 (L < I <ow 0 3: 1 X w I I -H -H -H Lo O m 100 V) I I C*4 F - XU l z w C) 04 0 0 w > x Z < }' I I Ow lo - F - w -y 1 .14 %-oo 0-0 0-w II'=Q w I I < m I m Ld Of < 0- F- Ld < X w F-: m 1 M -FLI k M'A 1 -9 EXISTING CONDITIONS LUCENT PROPERTY NORTH ANDOVER, MA v Of 4,. -H O T- PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA a w Q w 4. j.. U LL w O w� >.� V Q wz a~ Q oLLJ o ww z > Q w >oQ o101. wa U W LL J Q w J LL. O� O z Z F- J Q- Ca F- QOC-) yw J w -H ' M �O Q J O c/) X U z Z N O Ix (� > (L a OF Wm OW Y Q fY Y ... zLu mOf N� Qm .. m w�� J C3 m to CU Of Q Q Q F- a QO WO ��: - ��� F- W w Ww = .=ter cQi� a oofir w v Of 4,. -H O T- PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA l / � { « P « . 2222 � v � EXIST. GUARDRAIL (TYP.) -EXIST. 6' CHAIN LINK FENCE (TYP.) -EXIST. BROKEN CONC. SLAB HAY BALES (DURING CONST.) ,. DAMAGED AREA EXISTING CONDITIONS GEOTEXTILE FABRIC TO PREVENT EROSION OF FINES SAWCUT 18" RIP RAP \tm (6"-12" STONE) PROPOSED IMPROVEMENTS 8" SONO TUBE WITH CONCRETE FILL BENEATH 18" OF RIP RAP WITH GRAVEL n i RIP RAP REPAIR DETAIL LUCENT PROPERTY NORTH ANDOVER, MA Lucent Road Repair Page 1 of 1 McKay, Alison . From: Vondrak, Julie ovondrak@epsilonassociates.com] Sent: Monday, November 22, 20041:10 PM To: amckay@townofnorthandover.com Cc: chuntress@comcast.net Subject: Lucent Road Repair Hello Alison, just think it is almost over and you will be off to Florida soon. Attached is our letter regarding the EO for Lucent. I also attached the three PDF's of the detail sheets and one sheet of pictures. I have one question. Do you want hard copies of everything in your hand today? If so I may have Chris Huntress deliver them. If not I will drop everything in the mail today. Let me know. Thanks so much. Happy Turkey Day! <<RoadSite Photos.pdf>> <<t 0091_ PLAN_EXIST.pdf>> << 0091_PLAN_PROP.pdf>> << 0091_SECTION.pdf» «Alison McKay.pdf>> Julie A. Vondrak, Project Scientist Epsilon Associates Inc. 150 Main Street Maynard, MA 01754 jvondrak@epsilonassociates.com #978 461-6227 (direct) #978 897-7100 (main) 11/22/04 Photo 1: Road collapse at concrete spillway. '; A •� � its .r�tr : 4s,�. v f yy 4 rt i .� Z r. N 4 - t. tM Photo 2: Road collapse north of concrete spillway. Site Photographs EPSILON.. 1600 Osgood Street fto-- m North Andover, Massachusetts North Andover Conservation Commission Site Inspection Sheet Dep File # 242- • es t have permit with Conservation Commission Date: f l q Address: Agent/Rep present:_ Findings: iS +Cv55_ TIA ie. �0 fiat,- trV,5 jN , — u9 i Lucent Meeting McKay, Alison From: Vondrak, Julie Ovondrak@epsilonassociates.com] Sent: Thursday, November 18, 2004 2:47 PM To: amckay@townofnorthandover.com Cc: Huntress Associates, Inc.; Howard, Mike Subject: Lucent Meeting Hi Alison: Page 1 of 1 Thanks for scheduling a last minute site inpsection at Lucent to review the collapsed section of roadway. As we planned, we will meet at Lucent at 10:15 tomorrow morning. I will be meeting Chris Huntress at the north gate (as your facing the building, the entrance to the right, near the Haverhill line). You can wait there for us. We can just drive into the site to the back without clearance. Attached is a picture just to give you an idea of the problem. I believe someone from TEC will also be on site to discuss the recommended short term stabilization that will prevent the road from collapsing. Lucent is hoping to possibly proceed with stabilization at this time under an Emergency Certification. Upon completion of our inspection, I will follow up with a letter describing the proposed stabilization activities and construction methodology. This is the access road the Fire Department would have to use and further collapse of the road is a serious issue to Lucent. See you in the morning! Thanks so much . <<DCP 3180Lucent.JPG>> Julie A. Vondrak, Project Scientist Epsilon Associates Inc. 150 Main Street Maynard, MA 01754 jvondrak@epsilonassociates.com #978 461-6227 (direct) #978 897-7100 (main) 11/18/04 A '4AL- Y� Page I of I file://C:\WINDOWS\TEMP\DCP-318OLucent.JPG 11/18/04 -14 m ry D C) X L -L ---i;J Wil � ILYA PATiIIIIIII EXISTING CONDITIONS LUCENT PROPERTY NORTH ANDOVER, MA x LL. 0 (n X 0 'o OZZ E 0 < a- F- a- < ic 0 -H m I co < 0 V) xCN . z 00 LZLI C14 :2 Ld X Z < OW a- ry y a-0 I a- of < m m m ry D C) X L -L ---i;J Wil � ILYA PATiIIIIIII EXISTING CONDITIONS LUCENT PROPERTY NORTH ANDOVER, MA 'fir En 9 m I I Ib � O V 04X U Z U�, Q O Z_ U N xz QQ a Z) r) LdY O oF- wm O � OJT a w::) " "Q� m� - CL Q m (NU 0WOf w )-Z �Z QO w0 2U �U L 1* 9 m I I Ib � V U Z Q 0 :2 U 0 I> QQ a Z) r) LdY F- 0>Of O � QOQ J m Im :2:20- 71a TEC O M m ry U H Fn- PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA Q � Q J >= 0 QQ a Z) r) F- 0>Of 2 0 Q QOQ J V) :2:20- 0WOf w m ry U H Fn- PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA EXIST. GUARDRAIL (TYP. ) EXISTING CONDITIONS GEOTEXTILE FABRIC TO PREVENT EROSION OF FINES SAWCUT 18" RIP RAP (6"-12" STONE) PROPOSED IMPROVEMENTS EXIST. 6' CHAIN LINK FENCE (TYP.) EXIST. BROKEN CON C. SLAB 8" SONO TUBE WITH CONCRETE FILL BENEATH 18" OF RIP RAP WITH GRAVEL n CROSS-SECTION PROPERTYRIP RAP REPAIR DETAIL LUCENT TEC NORTH D • . ''Jill ENGINEERING �' CON STRIJCTIGN PRINCIPALS Theodore A. Borten, P.E. Margaret B. Briggs Michael E Guski, CCM Samuel G. MygoM L.L.B. Dale T. Roczynski, P.E. Cindy Schlessinger Lester B. Smith, It Victoria H. Fletcher, RIA ;PSILONASSOCIATES INC. Engineers O Environmental Consultants November 22, 2004 Alison McKay, Conservation Administrator North Andover Conservation Commission 400 Osgood Street North Andover, MA 01845 Re: EO for Lucent Technology 1600 Osgood Street Dear Alison: RECEIVED NOV 2 9 2004 D NORTH ANDOVER CONSERVATION COMMISSION As you are aware, Epsilon Associates, Inc., on behalf of Ozzy Properties, contacted you last week to review a collapsed portion of roadway behind the Lucent building at 1600 Osgood Street. At our scheduled inspection on Friday, November 19, 2004, we observed a collapsed concrete slab spillway and two eroded portions of roadway, which currently serves as a safety threat and contributor of sediment to the adjacent resource area (see attached photos). We requested immediate stabilization activities be permitted under an Emergency Certification, in order to further prevent damage to the roadway over the winter season. A future filing with the Conservation Commission will address upgrades to the outdated stormwater drainage system. Upon discussions with Commission members, it is my understanding that you would like to proceed with our requested emergency stabilization activities under the issuance of an Enforcement Order. Ozzy Properties has no objection to proceeding in this manner, however we would like the record to reflect that Epsilon Associates notified the Commission of this issue because we felt there was an immediate public safety concern relative to the possible collapse of the roadway. Ozzy Properties has every intention to correct the problem in an efficient and expedited manner, while at the same time proceeding in a manner which best minimized the impact to the adjacent wetland resource areas. Stabilization Activities Stabilization activities are anticipated to be conducted over a 2-3 day period. Prior to the commencement of work, erosion controls consisting of haybales and silt fence will be installed at the limit of work (see attached detail sheets). The existing chain link fence will be temporarily removed during the stabilization activities. Construction machinery consisting of either a backhoe or excavator will be staged on the existing pavement. Damaged pavement will be sawcut and removed. The broken concrete slab will also be removed by machinery. Sediments from the undermined road will be removed by machinery. All removed materials will be loaded onto a dump truck and will be disposed off-site. Damaged areas will be filled with gravel overlain by geotextile fabric to prevent erosion of the fines. Rip -rap will be installed over the geotextile fabric. Upon 150 Main Street • Maynard, Massachusetts 01754-0700 M 978.897.7100 Fax 978.897.0099 www.epsiIonassociates. corn 2 stabilization of the site, erosion controls will be removed to allow the flow of stormwater. Contacts Brian T. Pendleton, P.E. of TEC, #978 794-1792, ext. 127, will serve at the contact person for the project. Please feel free to call him with any specific questions regarding the sequencing of the stabilization activities. Also, please feel free to contact me at 978 461-6227 with any questions. The Enforcement Order should be addressed to: Ozzy Properties Inc. Dundee Park Andover, MA 01810 Att: Orit Goldstein We thank you for your cooperation in addressing this matter. S i n cewq, ul Vondrak, Project Scientist E silon Associates cc: Huntress Associates Brian Pendleton, TEC Ozzy Properties Inc. EPSILONASSOCIATES INC. Engineers 0 Environmental Consultants -r li 00 0 TEC g m U H- Fn EXISTING CONDITIONS LUCENT PROPERTY NORTH ANDOVER, MA a z ww_ w� w >�0 OQw : W LL O� X 0 O z z �O f- J F- Q0� J m Q J 0 V) N U X Z�" � 0 OfZ U 0� W m O W wD OJT gkwt. mN m (n U >- Z Z QO w0 =U w L 1* 9 O K) L- 0� 0w 0:2 wW X Q w� J Q W W X 0Ofx W z Qw = U UZ) L - CO Y X Z W J -H O PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA 0 Q d � H � � Q W' J uJ UJ >= O O d paLd ~ > C7 Q Q 0Q -J (A :2 :2w J Q W W X 0Ofx W z Qw = U UZ) L - CO Y X Z W J -H O PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA EXIST. GUARDRAIL (TYP.) -EXIST. 6' CHAIN LINK FENCE (TYP.) -EXIST. BROKEN CONC. SLAB HAY BALES (DURING CONST.) DAMAGED AREA EXISTING CONDITIONS GEOTEXTILE FABRIC TO PREVENT EROSION OF FINES SAWCUT 18" RIP RAP (6"-12" STONE) PROPOSED IMPROVEMENTS 8" SONO TUBE WITH CONCRETE FILL BENEATH 18" OF RIP RAP WITH GRAVEL n RIP RAP REPAIR DETAIL LUCENT PROPERTY NORTH ANDOVER, MA -N7 ............... 9i .", K� PRINCIPALS Theodore A. Barten, P.E. Margaret B. Briggs Michael E. Guski, CCM Samuel G. MygaM LLB. Dale T. Raczynskr; RE Gndy Schlessinger Lester 8. Smith, Jr. Victoria H. Fletcher, RLA Engineers'sLONA'SOGATESINC. ■ Environmental Consultants November 22, 2004 Alison McKay, Conservation Administrator North Andover Conservation Commission 400 Osgood Street North Andover, MA 01845 Re: EO for Lucent Technology 1600 Osgood Street Dear Alison: RECEIVED NOV 2 9 2004 NORTH ANDOVER CONSERVATION COMMISSION As you are aware, Epsilon Associates, Inc., on behalf of Ozzy Properties, contacted you last week to review a collapsed portion of roadway behind the Lucent building at 1600 Osgood Street. At our scheduled inspection on Friday, November 19, 2004, we observed a collapsed concrete slab spillway and two eroded portions of roadway, which currently serves as a safety threat and contributor of sediment to the adjacent resource area (see attached photos). We requested immediate stabilization activities be permitted under an Emergency Certification, in order to further prevent damage to the roadway over the winter season. A future filing with the Conservation Commission will address upgrades to the outdated stormwater drainage system. Upon discussions with Commission members, it is my understanding that you would like to proceed with our requested emergency stabilization activities under the issuance of an Enforcement Order. Ozzy Properties has no objection to proceeding in this manner, however we would like the record to reflect that Epsilon Associates notified the Commission of this issue because we felt there was an immediate public safety concern relative to the possible collapse of the roadway. Ozzy Properties has every intention to correct the problem in an efficient and expedited manner, while at the same time proceeding in a manner which best minimized the impact to the adjacent wetland resource areas. Stabilization Activities Stabilization activities are anticipated to be conducted over a 2-3 day period. Prior to the commencement of work; erosion controls consisting of haybales and silt fence will be installed at the limit of work (see attached detail sheets). The existing chain link fence will be temporarily removed during the stabilization activities. Construction machinery consisting of either a backhoe or excavator will be staged on the existing pavement. Damaged pavement will be sawcut and removed. The broken concrete slab will also be removed by machinery. Sediments from the undermined road will be removed by machinery. All removed materials will be loaded onto a dump truck and will be disposed off-site. Damaged areas will be filled with gravel overlain by geotextile fabric to prevent erosion of the fines. Rip -rap will be installed over the geotextile fabric. Upon 150 Main Street •Maynard, Massachusetts 01754-0700 M 978.897.7100 Fax 978.897.0099 www.epsi lon associates. corn 2 stabilization of the site, erosion controls will be removed to allow the flow of stormwater. Contacts Brian T. Pendleton, P.E. of TEC, #978 794-1792, ext. 127, will serve at the contact person for the project. Please feel free to call him with any specific questions regarding the sequencing of the stabilization activities. Also, please feel free to contact me at 978 461-6227 with any questions. The Enforcement Order should be addressed to: Ozzy Properties Inc. Dundee Park Andover, MA 01810 Att: Orit Goldstein We thank you for your cooperation in addressing this matter. WEsilSinc; �on drak, Project Scientist ssociates cc: Huntress Associates Brian Pendleton, TEC Ozzy Properties Inc. EEPTLONASSOMM INC. 0 Environmental Consultants M M 'fir• LL - 0 v) L- Ov) X � Z aOJ Q0 J m Q O N +I I :� I� �__ o XU I Z O0 w I XZ II Q I� 0Y 0-O Q m ,I m w Q w Q Q 0 EXISTING CONDITIONS LUCENT PROPERTY NORTH ANDOVER, MA Q W CL of Q ol l- w� `{ 0 Q QLd Q i— — Q.�< W> QW >� 0 to wa =U OQ W Uu- WLd�r �Z J X _ W J LL No X 'oO (/� p 10Z O Z Q 0- � J O C7 QUW ?3 X W ii 10 -H Lr) Q J 0 X U Z Z� 0 0 NU j wz DO OF Wm OW �^ QQ. (/)0 Q JD Q(n �� F_- Q �F J Qm,.•' m �� O MU) U QQM d >-Z 2 CL QO WO"4.. O =U QU ° U Ld; I CE U ✓ Q O Q J ti.Ul Q W W X Oww W m W O U m PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA s A ri EXIST. GUARDRAIL ( TYP. ) -EXIST. 6' CHAIN LINK FENCE (TYP.) -EXIST. BROKEN CONC. SLAB HAY BALES (DURING CONST.) --------------- DAMAGED AREA EXISTING CONDITIONS GEOTEXTILE FABRIC TO PREVENT EROSION OF FINES 8" SONO TUBE SAWCUT 18" RIP RAP WITH CONCRETE (6"-12" STONE) FILL BENEATH 18" OF RIP RAP WITH GRAVEL • 7.'a�. �?�5�� i,,,,r_y��a'. �r:7�� Mi(! .fes \ I�I.ri3:�ly :tA�� •' .. .. PROPOSED IMPROVEMENTS RIP RAP REPAIR DETAIL LUCENT PROPERTY NORTH ANDOVER, MA PRINCIPALS Theodore A. Barten, P.E. Margaret B. Briggs Michael E. Guski, CCM Samuel G. Mygatt, LLB. Dale T. Raczynsk; RE Gndy Schlessinger Lester B. Smith, /r. Victoria H. Fletcher, RLA Engineers'sLONASSOGATE'INC. ■ Environmental Consultants November 22, 2004 Alison McKay, Conservation Administrator North Andover Conservation Commission 400 Osgood Street North Andover, MA 01845 Re: EO for Lucent Technology 1600 Osgood Street Dear Alison: RECEIVED NOV 29 4 200 NORTHANDOVER CONSERVATION COMMISSION As you are aware, Epsilon Associates, Inc., on behalf of Ozzy Properties, contacted you last week to review a collapsed portion of roadway behind the Lucent building at 1600 Osgood Street. At our scheduled inspection on Friday, November 19, 2004, we observed a collapsed concrete slab spillway and two eroded portions of roadway, which currently serves as a safety threat and contributor of sediment to the adjacent resource area (see attached photos). We requested immediate stabilization activities be permitted under an Emergency Certification, in order to further prevent damage to the roadway over the winter season. A future filing with the Conservation Commission will address upgrades to the outdated stormwater drainage system. Upon discussions with Commission members, it is my understanding that you would like to proceed with our requested emergency stabilization activities under the issuance of an Enforcement Order. Ozzy Properties has no objection to proceeding in this manner, however we would like the record to reflect that Epsilon Associates notified the Commission of this issue because we felt there was an immediate public safety concern relative to the possible collapse of the roadway. Ozzy Properties has every intention to correct the problem in an efficient and expedited manner, while at the same time proceeding in a manner which best minimized the impact to the adjacent wetland resource areas. Stabilization Activities Stabilization activities are anticipated to be conducted over a 2-3 day period. Prior to the commencement of work,.erosion controls consisting of haybales and silt fence will be installed at the limit of work (see attached detail sheets). The existing chain link fence will be temporarily removed during the stabilization activities. Construction machinery consisting of either a backhoe or excavator will be staged on the existing pavement. Damaged pavement will be sawcut and removed. The broken concrete slab will also be removed by machinery. Sediments from the undermined road will be removed by machinery. All removed materials will be loaded onto a dump truck and will be disposed off-site. Damaged areas will be filled with gravel overlain by geotextile fabric to prevent erosion of the fines. Rip -rap will be installed over the geotextile fabric. Upon 150 Main Street •Maynard, Massachusetts 01754-0700 M 978.897.7100 Fax 978.897.0099 www.epsilonassociates.com K stabilization of the site, erosion controls will be removed to allow the flow of stormwater. Contacts Brian T. Pendleton, P.E. of TEC, #978 794-1792, ext. 127, will serve at the contact person for the project. Please feel free to call him with any specific questions regarding the sequencing of the stabilization activities. Also, please feel free to contact me at 978 461-6227 with any questions. The Enforcement Order should be addressed to: Ozzy Properties Inc. Dundee Park Andover, MA 01810 Att: Orit Goldstein We thank you for your cooperation in addressing this matter. Si 1.cewV, drak, Project Scientist Essociates cc: Huntress Associates Brian Pendleton, TEC Ozzy Properties Inc. - - - SPS 1 LO N ASSOCIATES INC. Engineers 0 Environmental -Consultants I rq A rq .11,. a u- 0 Lf) - OLf) Z O Z O �a� a0W � ro a J O N N() X Z 00 04 U OW 0-O Qm X W 0 Lo H Z W W M pos EXISTING CONDITIONS LUCENT PROPERTY NORTH ANDOVER, MA m � F-� wa_ w� .-. Q" H >X W> 0 Da w W W'�'�r LL - 0 0 X 0 OZZ of O LLJ a0� J m Q J O V) N U X Z�' -0N 0 Ofz U of wm ow W� 0-j WO Q� m� am, m (n U ?-Z gZ a0 w0 2U Of L 1* _ H 00 -H O to u- 0uJ 0 w 0:2 W UJ X a wa a a a } Is H 00 -H O to u- 0uJ 0 w 0:2 W UJ X a wa m Of D U H m -H O V) if PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA a a a } w W J W CE >2 0 a Do ~ o>w 2 C� Q a0Q Qww x 0OfW w m Of D U H m -H O V) if PROPOSEDIMPROVEMENTS LUCENT PROPERTY NORTH ANDOVER, MA EXIST. 6' CHAIN EXIST. GUARDRAIL [LINK FENCE (TYP.) (TYP.) EXIST. BROKEN CONC. SLAB HAY ES [(DURINGLCONST.) GEOTEXTILE FABRIC TO PREVENT EROSION OF FINES SAWCUT 18" RIP RAP (6"-12" STONE) PROPOSED IMPROVEMENTS 8" SONO TUBE WITH CONCRETE FILL BENEATH 18" OF RIP RAP WITH GRAVEL n RIP RAP REPAIR DETAIL LUCENT PROPERTY NORTH ANDOVER, MA