A. General Information
From: North Andover
1. Conservation Commission
2. This issuance is for (check one): ® Order of Conditions ❑ Amended Order of Conditions
3. To: Applicant:
a. First Name
60 Beechwood Drive
b. Last Name
Key -Lime, Inc.
c. Company
d. Mailing Address
North Andover
MA.
_ _ _
e. City/Town
f. State
c>r�sr
4. Property Owner (if different from applicant): —
}tc._.�11`�
Harold & Beverly Whipple
5. Project Location:
a. First Name b. Last Name
c. Company
123 Winchester Drive
01845
g. Zip Code
d. Mailing Address
Monroe
NH.
e. City/Town
f. State
_
g. Zip Code
5. Project Location:
Old Salem Village (Salem/Turnpike-Rte 114) North Andover
a. Street Address
b. City/Town
Map 107B
Lots 16 & 73
c. Assessors Map/Plat Number
d. Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator):
e. Latitude
f. Longitude
6. Property recorded at the Registry of Deeds for (attach additional information if more than one parcel):
Essex North
a. County
b. Certificate (if registered land)
c. Book
9/13/05
7. Dates:
d.Page
i ce, }' ; � ►l1)LOL'
a. Date Notice of Intent Filed
b. Date Pu lic He ring Closed c. Date
f Iss ance
8. Final Approved Plans and Other Documents (attach additional plan or document
references as
needed):
Index Plan sheets 1 thru 19
a. Plan Title
Hayes Engineering, Inc.
Peter J. Ogren, P. E.
h Prepared By
_
c. Signed and Stamped by
WM�i�n
1"=60'&1"=40'
d. Date
e. Scale
f. Additional Plan or Document Title
g. Date
9. Total WPA Fee Paid: $ 17,975.00
$5,237.50
$12,737.50
a. Total Fee Paid
b. State Fee Paid
c. City/Town Fee Paid
wpaform5.doc • rev. 3/1/05
Page 1 of 9
LOCUS
MAP Lot
107.6 16
107.6 13
LIST OF OWNERS
OLD SALEM VILLAGE
NORTH ANDOVER, MASSACHUSETTS
Location Owner
Rt. 114 L.A.M. Realty Trust
89 Main Street
North Andover, MA 01845
Rt. 114 Harold & Beverly Whipple
123 Winchester Drive
Monroe, NH
September 1, 2005
Reference
Doc. # 3390
7127/556
a
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1337
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
1. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above -referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
® the following conditions which are necessary in accordance with the performance standards set forth
in the wetlands regulations. This Commission orders that all work shall be performed in accordance
with the Notice of Intent referenced above, the following General Conditions, and any other special
conditions attached to this Order. To the extent that the following conditions modify or differ from the
plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall
control.
Denied because:
❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland
regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is
submitted which provides measures which are adequate to protect these interests, and a final Order of
Conditions is issued. A description of the performance standards which the proposed work cannot
meet is attached to this Order.
❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect
of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may
not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information
and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions
is issued. A description of the specific information which is lacking and why it is necessary is
attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary (if available)
linear feet
Resource Area Proposed
Permitted Proposed
Permitted
Alteration
Alteration Replacement
Replacement
3. ❑ Bank
a. linear feet
b. linear feet c. linear feet
d. linear feet
4. ❑ Bordering Vegetated
Wetland a. square feet
b. square feet c. square feet
d. square feet
5. ❑ Land Under a. square feet
b. square feet c. square feet
d. square feet
Waterbodies and
Waterways
e, cu.yd dredged
f. cu.yd dredged
wpaform5.doc • rev. 3/1/05 Page 2 of 9
t t
Massachusetts Department of Environmental Protection
Lll�
Bureauof Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
242-1337
B. Findings (cont.)
Coastal Banks
15. ❑
Rocky Intertidal
Shores
Proposed
Permitted
Proposed
Permitted
Resource Area
Alteration
Alteration
Replacement
Replacement
6. ❑ Bordering Land
_
__
Subject to Flooding
a. square feet
b square feet
c. square feet
d. square feet
Cubic Feet Flood
Storage
e. cubic feet
f. cubic feet
g. cubic feet
h. cubic feet
7. ❑ Isolated Land Subject
to Flooding
a. square feet
b. square feet
Cubic Feet Flood
Storage
c. cubic feet
d. cubic feet
e. cubic feet
f. cubic feet
a. ❑ Riverfront area
a. total sq. feet
b. total sq. feet
Sq ft within 100 ft
d. square feet
e. square feet
f. square feet
c. square feet
Sq ft between 100-200 ft
f. square feet
e. square feet
f. square feet
e. square feet
Coastal Resource Area Impacts:
Check all that apply below. (For Approvals Only)
9. ❑ Designated Port
Indicate size under Land Under the Ocean, below
Areas
1o. ❑ Land Under the
Ocean
a. square feet
b. square feet
11. ❑ Barrier Beaches
12. ❑ Coastal Beaches
13. ❑ Coastal Dunes
14. ❑
Coastal Banks
15. ❑
Rocky Intertidal
Shores
16. ❑
Salt Marshes
17. ❑
Land Under Salt
Ponds
18. ❑ Land Containing
Indicate size under Coastal Beaches and/or Coastal Dunes below
a. square feet b. square feet c. c/y nourishmt. d. c/y nourishmt.
a. square feet b. square feet c. c/y nourishmt. d. c/y nourishmt
a. linear feet
a. square feet
b. linear feet
b. square feet
c. cu.yd dredged d. cu.yd dredged
Shellfish a. square feet b. square feet c. square feet d. square feet
19. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
20. ❑ Land Subject to
Coastal Storm Flowage a. square feet b. square feet
wpaform5.doc • rev. 3/1/05 Page 3 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1337
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order maybe extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MA DEP"]
"File Number 242-1337
wpaform5.doc • rev. 3/1/05 Page 4 of 9
Massachusetts Department of Environmental Protection
�- Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 242-1337
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A) to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
If you need more
space for
additional
conditions,
select box to
attach a text
document
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
See attached
wpaform5.doc • rev. 3/1/05 Page 5 of 9
�� LlMassachusetts Department of Environmental Protection
�`
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
If you need more
space for
additional
conditions,
select box to
attach a text
document
DEP File Number:
242-1337
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The North Andover hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a. Municipal Ordinance or Bylaw b. Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ® that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
North Andover Wetland Protection Bylaw Chapter 178
a. Municipal Ordinance or Bylaw b. Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
c. The special conditions relating to municipal ordinance or bylaw are as follows:
See attached
wpaform5.doc • rev. 311105 Page 6 of 9
DEP FILE 4 242 - 1337
Therefore, the North Andover Conservation Commission (hereafter the "NACU)
hereby finds that the following conditions are necessary, in accordance with the
Performance Standards set forth in the State Regulations, the local Bylaw and
Regulations, to protect those interests noted above. 'The NACC orders that all work
shall be performed in accordance with said conditions and with the Notice of Intent
referenced below. To the extent that the following conditions modify or differ from the
plans, specifications or other proposals submitted with the Notice of Intent, the
conditions shall control.
GENERAL CONDITIONS
18. Failure to comply with all conditions stated herein, and with all related statutes and
other regulatory measures, shall be deemed cause to revoke or modify this Order.
19. This Order does not grant any property rights or any exclusive privileges; it does
not authorize any injury to private property or invasion of property rights.
However, the NACC, agent of the NACC or the Department of Environmental
Protection (DEP) reserves the right to enter and inspect the property at all
reasonable times until a Certificate of Compliance is issued, to evaluate compliance
with this Order of Conditions, the Act (310 CMR 10.00), the North Andover Wetland
Bylaw and Regulations, and may require any information, measurements,
photographs, observations, and/or materials, or may require the submittal of any
data or information deemed necessary by the NACC for that evaluation. Further,
work shall be halted on the site if the NACC, agent or DEP determines that any of
the work is not in compliance with this Order of Conditions. Work shall not resume
until the NACC is satisfied that the work will comply and has so notified the
applicant in writing.
20. This Order does not relieve the permittee or any other person of the necessity of
complying with all other applicable federal, state or local statutes, ordinances, by-
laws or regulations.
21. The work authorized hereunder shall be completed within three years from the date
of this order.
22. This Order may be extended by the issuing authority for one or more periods of up
to one year each upon application to the issuing authority at least thirty days (30)
prior to the expiration date of the Order (Refer to Sectioti 8.3 (p.37) of the North
Awfover Wetlivid Regttlatiotts).
C:\Winword\OOC\OldSalemVillage•doc I NACC 1/18/2006
DEP FILE # 242 - 1337
23. The NACC reserves the right to amend this Order of Conditions after a legally
advertised public hearing if plans or circumstances are changed or if new conditions
or information so warrant.
24. Where the Department of Environmental Protection (DEP) is requested to make a
determination and to issue a Superseding Order, the Conservation Commission
shall be a party to all agency proceedings and hearings before the Department.
25. This Order of Conditions is issued under File No. 242-1337.
26. The conditions of this decision shall apply to, and be binding upon, the applicant,
owner, its employees and all successors and assigns in interest or control. These
obligations shall be expressed in covenants in all deeds to succeeding owners of
portions of the property.
27. The term "Applicant" as used in this Order of Conditions shall refer to the owner,
any successor in interest or successor in control of the property referenced in the
Notice of Intent, supporting documents and this Order of Conditions. The NACC
shall be notified in writing within 30 days of all transfers of title of any portion of
property that takes place prior to the issuance of a Certificate of Compliance.
28. The proposed work includes: the construction of thirty-seven (37) multi -family
and single-family townhouses with associated roadways, driveways, utility
installation (including an off-site sewer line along Route 114 designated to service
the development), grading and stormwater management structures within the
buffer zone to several Bordering Vegetated Wetlands and a local jurisdictional
Isolated Vegetated Wetland. Of the thirty-seven units, twenty-six (26) are
jurisdictional (units 1,2, 4, 7, 8, 9, 10, 11, 12, 13, 14, 18, 19, 24, 25, 26, 27, 28, 29, 30, 31,
32, 34, 35, 36, & 37).
29. The work shall conform to the following (except as noted in the remainder of this
document where revisions may be required):
Notice of Intent filed by: Key -Lime, Inc. (Applicant)
60 Beachwood Drive
North Andover, MA 01845
Dated September 2005
Site Plans prepared by: Hayes Engineering, Inc.
603 Salem Street
Wakefield, MA 01880
Entitled "Old Salem Village" dated 10/4/04, revised
through 12,/21/05, consisting of sheets 1-22.
Stamped & Signed by Peter Ogren, P.L.S.
C:`,Wimcord\000A0IdSalemViIlage.doc 2 NACC 1/18/2006
DEP FILE # 242 - 1337
Drainage Report prepared by:
Operation & Maintenance
Plan prepared by:
Other Record Plans &
Documents:
Hayes Engineering, Inc.
603 Salem Street
Wakefield, MA 01880
Entitled "Drainage Study"
Revised June 6, 2005.
dated August 27,2004;
Hayes Engineering, Inc. (included in the NOI)
dated August 27, 2004, Revised September 1,
2005.
Letter from New England Engineering dated
October 6,2005;
Stromwater Management Review Letter
prepared by Eggleston Environmental dated
October 12, 2005;
Stormwater Management Review Response
Letter prepared by Hayes Engineering, Inc. dated
November 10, 2005;
Proposed Watershed Plan prepared by hayes
Engineering, Inc. dated July 6, 2004; revised June
7, 2005;
Existing Watershed Plan prepared by Hayes
Engineering, Inc. dated July 6, 2004; revised
November 7,2005;
Stromwater Management Review Letter
prepared by Eggleston Environmental dated
November 16, 2005;
Stormwater Management Review Response
Letter prepared by Hayes Engineering, Inc. dated
November 16, 2005;
Stromwater Management Review Letter
prepared by Eggleston Environmental dated
December 13, 2005.
30. The following wetland resource areas are affected by the proposed work: Buffer
Zone to Bordering Vegetated Wetlands (BVW's) and an Isolated Vegetated
Wetland (IVW). These resource areas are significant to the interests of the Act and
C:''\Vdinword\OOC\OldSalemViI age.doc 3 NACC 118/2006
DEP FILE # 242 - 1337
Town ByLaw as noted above and therein. The applicant has not attempted to
overcome the presumption of significance of these resource areas to the identified
interests. An additional IVW of less than 1,000 s.f. (approx. 641 s.f.) was identified
on the site and is noted on the approved plan referenced herein, but was
confirmed to be a non -jurisdictional wetland resource area and is therefore not
subject to protection under the Act or the North Andover Wetlands Protection
Bylaw. It is also important to note that a small area of BLSF (elevation unknown)
is shown on the approved plan referenced herein, but is limited to within the
BVW boundary at the western/southwestern corner of the site and has no impact
on the approved project.
31. The NACC agrees with the applicant's delineation of the wetland resource areas on
the site as shown on the plans dated referenced herein except for wetland flags
WG -11 & 12, WG -25 through WG -43, WF #EP1-1 through WF #EP1-22 (to the
southwest of the site and parallel and down gradient to that section of Turnpike
Street), WF #EP1-1 & WF #EP1-2 (to the south/southeast of the site and parallel
and down gradient to Turnpike Street), WF #EP1-36 through WF #EP1-39 (to the
northeast of the site and parallel and down gradient to Towne Street). Excluded
wetland flags were noted in this manner as two of the same wetland series were
identified on the final approved plan.
32. The NACC finds that the intensive use of the upland areas and buffer zone
proposed on this site will cause further alteration of the wetland resource areas. In
order to prevent any alteration of wetland resource areas a twenty five foot (25')
No -Disturbance Zone and a fifty foot (50') No -Construction Zone shall be
established from the edge of the adjacent wetland resource area except in those
locations as depicted on the approved plan referenced herein. The Conservation
Administrator and/or other agents of the NACC do not have the authority to waive
these setbacks as established under the local bylaw. No disturbance of existing
grade, soils or vegetation is permitted in the No -Disturbance zone. (See Section 3.4 &
Appendix F of the local Regulations).
33. This document shall be included in all construction contracts, subcontracts, and
specifications dealing with the work proposed and shall supersede any conflicting
contract requirements. The applicant shall assure that all contractors,
subcontractors, and other personnel performing the permitting work are fully aware
of the permits terms and conditions. Thereafter, the contractor will be held jointly
liable for any violation of this Order resulting from failure to comply with its
conditions.
34. The owners of the project and their successors in title, in the event they proceed to
alter areas subject to the Commission's jurisdiction under the order, agree that the
Order does not in itself impose upon the Town any responsibility to maintain the
proposed drainage system and that said Town shall not be liable for any damage in
l::AWinword"OO(.'\oldsalcrnVillagc.doe 4 NACC 1/18/2006
DEP FILE # 242 - 1337
the event of failure. By acceptance of this Order, the owners agree to indemnify and
hold harmless to the Town and its residents for any damage attributable to
alterations undertaken on this property pursuant to the Order. Maintenance of the
drainage system, if accepted by the Town as part of a public way, becomes the
responsibility of the Town.
35. Issuance of these Conditions does not in any way imply or certify that the site or
downstream areas will not be subject to flooding, storm damage or any other form
of water damage.
PRIOR TO CONSTRUCTION
36. No work shall be undertaken until all administrative appeal periods from this Order
have elapsed or, if such an appeal has been filed, until all proceedings before the
Department or Court have been completed.
37. This Order shall be recorded by the applicant at the Registry of Deeds immediately
after the expiration of all appeal periods. No work shall be undertaken until the
Final Order has been recorded in the Registry of Deeds or the Land Court for the
district in which the land is located, within the chain of title of the affected property.
In the case of recorded land, the Final Order shall also be noted in the Registry's
Grantor Index under the name of the owner of the land upon which the proposed
work is to be done. In the case of registered land, the Final Order shall also be noted
on the Land Court Certificate of Title of the owner of the land upon which the
proposed work is to be done. The recording information shall be submitted to the
North Andover Conservation Commission on the form at the end of this Order
prior to commencement of the work. Any Order not recorded by the applicant
before work commences may be recorded by the NACC at the applicant's expense.
38. A sign shall be displayed at the site not less than two square feet or more than three
square feet in size bearing the words "Massachusetts DEP, File Number 242-1337."
39. Any changes in the submitted plans caused by the applicant, another Board's
decision or resulting from this Order of Conditions must be submitted to the NACC
for approval prior to implementation. If the NACC finds said changes to be
significant, the NACC will call for another public hearing (at the expense of the
applicant). Within 21 days of the close of said public hearing the NACC will issue an
amended or new Order of Conditions. Any errors found in the plans or information
submitted by the applicant shall be considered as changes. The proposed project
may be still under review by other local or state boards or agencies. This may result
in changes to the project plans or wetland impacts. If any such changes occur a
revised plan and an explanation of the revisions shall be submitted to the NACC for
C:\\Viimord\0000 Id Salem ViIlage.doc 5 NACC 1/18/2006
DEP FILE # 242 - 1337
review and approval prior to the start of construction. No work shall begin on a
project until written approval has been granted by the NACC.
40. It is the responsibility of the applicant, owner, and/or successor(s) to ensure that all
conditions of this Order of Conditions are complied with. The project engineer and
contractors are to be provided with a copy of this Order of Conditions and
referenced documents before commencement of construction.
41. Prior to any work commencing on site, the applicant shall submit to the NACC for
approval, a detailed construction sequence, including a dated timetable of
construction, the construction of compensation and retention areas, installation of
sedimentation/erosion control devices, roadway infrastructure, phasing associated
with the development and the construction of the associated stormwater
management structures. This timetable must continue to be updated throughout
the project.
42. Prior to any work commencing on site, a revised O & M plan shall be submitted to
the Conservation Department for review and approval. The revised O & M plan
shall adequately address and incorporate items #7, 8, & 9 as referenced in the
Eggleston Environmental drainage review letter dated November 16, 2005. Upon
review and approval of this O & M plan, the revised document shall be recorded
at the registry of deeds with the Order of Conditions. Proof of recording►:�1
submitted to the Conservation Department.
43. Prior to the work associated with each jurisdictional unit, a 20' scale plan shall be
submitted to the Conservation Department for review. The 20' scale plan can be
submitted during the pre -construction meeting for that unit.
44. Prior to the work associated with the installation of the sewer line, the applicant
shall submit in writing to the Conservation Department specifications on the
amount of trench that will be open at any one time (i.e - during each day) for
review and approval. Upon receipt and review of this document, the
Conservation Department shall determine if the specified amount of open trench
allowable at one time is acceptable and reserves the right to limit the specified
amount of open trench.
45. Wetland flagging shall'be checked prior to start of construction and shall be re-
established where missing. All wetland flagging shall remain visible and
enumerated per the approved plan(s) throughout the life of the project and until a
Certificate of Compliance is issued so that erosion control measures can be properly
placed and wetland impacts can be monitored. The proposed limit of work shall be
shall be clearly marked with stakes or flags and shall be confirmed by the NACC.
Such markers shall be checked and replaced as necessary and shall be maintained
until all construction is complete. Workers should be informed that no use of
C:\Wimmord\00C\oldSalemVillage.doc 6 NACC 1!18/2006
DEP FILE # 242 - 1337
machinery, storage of machinery or materials, stockpiling of soil, or construction
activity is to occur beyond this line at any time. All flags used for the above
purposes shall be of a color different from other flagging used on the site.
46. A row of staked hay bales backed by trenched siltation fence shall be placed
between all construction areas and wetlands. The erosion control barrier will be
properly installed and placed as shown on the plans approved and referenced
herein and shall be inspected and approved by theNACC prior to the start of
construction and shall remain intact until all disturbed areas have been permanently
stabilized to prevent erosion. All erosion prevention and sedimentation protection
measures found necessary during construction shall be implemented at the direction
of the NACC. The NACC reserves the right to impose additional conditions on
portions of this project to mitigate any impacts which could result from site erosion,
or any noticeable degradation of surface water quality discharging from the site.
For example, installation of erosion control measures may be required in areas not
shown on the plan(s) referenced in this Order of Conditions. Should such
installation be required by the NACC, they shall be installed within 48 hours of the
Commission's request.
47. The applicant shall have on hand at the start of any soil disturbance, removal or
stockpiling, a minimum of 50 hay bales and sufficient stakes for staking these bales
(or an equivalent amount of silt fence). Said bales shall be used only for the control
of emergency erosion problems and shall not be used for the normal control of
erosion.
48. A check payable to the Town of North Andover shall be provided in the amount of
$55,000, which shall be in all respects satisfactory to Town Counsel, Town Treasurer,
and the NACC, and shall be posted with the North Andover Town Treasurer
through the NACC before commencement of work. Said deposit of money shall be
conditioned on the completion of all conditions hereof, shall be signed by a party or
parties satisfactory to the NACC, and Town Counsel, and shall be released after
completion of the project, provided that provisions, satisfactory to the NACC, have
been made for performance of any conditions which are of continuing nature. The
applicant may propose a monetary release schedule keyed to completion of specific
portions of the project for the NACC's review and approval. This condition is
issued under the authority of the local Bylaw.
49. Prior to the commencement of any work on lots at units 7, 8, 10, 11, 12, 13, 19, 29,
30, 31, 32, 35, 36, the corners of the dwelling foundations (and decks on units 10,
11, 12, 29, 30, 31, 32, & 36) shall be staked in the field by a Registered Land
Surveyor (R.L.S.). Measurements shall be taken and verified by the Conservation
Department during the Pre -Construction meeting.
C:\Wim�ord\OUC\01dSalemVi11age.doc 7 NACC 1/18/2000
DEP FILE # 242 -1337
50. The applicant shall be responsible for placing signs on each jurisdictional unit
designating the applicable unit number as depicted on the plans approved and
referenced herein.
51. The applicant shall designate a Wetland Scientist as an "Erosion Control Monitor"
to oversee any emergency placement of controls and regular inspection or
replacement of sedimentation control devices. The name and phone number of the
erosion control monitor must be provided to the NACC in the event that this person
has to be contacted, due to an emergency at the site, during any 24-hour period,
including weekends. Proof of the retained monitor must be submitted to the
Conservation Department on letterhead by the retained consulting firm. This
person shall be given the authority to stop construction for erosion control
purposes. The erosion control monitor will be required to inspect all such devices
and oversee cleaning and the proper disposal of waste products. Cleaning shall
include removal of any entrapped silt.
52. ON EVERY MONDAY of each week, or otherwise arranged by the NACC, in
which construction activities occurs on-site and for as long thereafter as ground
remains unstable, it is the applicant's responsibility that the Environmental/
Erosion Control Monitor (EMC) monitor the site and submit written reports to the
NACC. The EMC shall certify that, to the best of his / her knowledge and belief
based on a careful site inspection, all work is being performed in compliance with
this Order of Conditions and that approved setbacks are being adhered to. The
EMC must visually inspect all sedimentation / erosion control measures and assume
responsibility for their maintenance on a weekly basis and that they are functioning
as intended. In addition, all wetland resource areas must be visually inspected for
siltation, turbidity, and/or other water quality impacts. The reports shall also
include current condition of erosion and sedimentation controls; describe any
erosion or sedimentation repair and / or replacement; and describe any erosion or
sedimentation problems and mitigation measures implemented. Such reports shall
continue until the applicant requests a less frequent reporting schedule or an end to
reports. This request must be submitted in writing and is subject to approval by the
Conservation Administrator.
53. The applicant and/or the legal owner of that portion of land upon which these
Orders of Conditions have been placed shall provide to the NACC prior to
transferring, or assigning any portion of said land to another party, subject to said
Orders of Conditions, the "Compliance Certification Form Affidavit" attached via
"Appendix A" signed under the pains and penalties of perjury, stating that said
applicant and/or owner has read these Orders of Conditions and is in compliance
with each and every condition. This document shall apply to each of the conditions
referenced herein and shall be provided to the Conservation Department at least
five (5) business days after to the closing of said land transaction.
CAW lnNNord\ooC\o1d8alcmViIkige.doc 8 NACC 1/18/2006
DEP FILE # 242 - 1337
54. Once these above mentioned pre -construction requirements are complete, the
applicant shall contact the Conservation Office prior to site preparation or
construction and shall arrange an on-site conference with an NACC
representative, the contractor, the engineer, wetland scientist and the applicant for
each jurisdictional unit as referenced herein and the associated sewer line
installation (a separate pre -construction meeting shall be held for every
jurisdictional unit and for the sewer work) to ensure that all of the Conditions of
this Order are understood. This Order shall be included in all construction
contracts, subcontracts, and specifications dealing with the work proposed and shall
supersede any conflicting contract requirements. The applicant shall assure that all
contractors, subcontractors and other personnel performing the permitted work are
fully aware of the permit's terms and conditions. Thereafter, the contractor will be
held jointly liable for any violation of this Order of Conditions resulting from failure
to comply with its conditions. The applicant or contractor shall notify the NACC in
writing of the identity of the on-site construction supervisor hired to coordinate
construction and to ensure compliance with this Order. A reasonable period of
time shall be provided as notice for each pre -construction meeting (e.g. 72 hours).
STORMWATER MANAGEMENT CONDITIONS
55. All construction and post -construction stormwater management shall be conducted
in accordance with supporting documents and plans submitted with the Notice of
Intent, the Department of Environmental Protection Stormwater Management Policy
and as approved by the NACC in this Order of Conditions.
56. Evidence of maintenance of the stormwater management system shall be
provided to the NACC on an annual basis by a Registered Professional Civil
Engineer. The first report shall be submitted to the NACC one year after the first
stormwater structure goes on-line and annual reports must continue to be submitted
until a Certificate of Compliance is issued. Compliance with the designed
stormwater management system and associated stormwater management conditions
shall be satisfied prior to the issuance of a Certificate of Compliance.
57. All drainage structures shall be properly installed and functional. During
construction, all drainage structures shall be maintained, as outlined in the approved
Operation and Maintenance Plan.
58. Construction of the stormwater structures shall be constructed and functioning as
part of the initial project phase, immediately following clearing and rough grading of
the site to serve as siltation control during construction. Runoff from the site shall be
directed towards the basin.
C:\Wim%ord,000 )IdSalemVillage.doc 9 NACC H18/2006
DEP FILE # 242 - 1337
59. The approved stormwater structures shall be designed & constructed in
accordance with the approved plans referenced herein.
60. Temporary and/or permanent basins being used for sedimentation and
dewatering during construction shall be cleaned of sediment when levels exceed six
(6) inches. The basins shall be cleaned of sediment prior to final grading and
construction of permanent stormwater basins.
61 There shall be no increase in the post development discharges from the storm
drainage system or any other changes in post development conditions that alter the
post development watershed boundaries as currently depicted in the Notice of Intent
and approved by this Order of Conditions, unless specifically approved in writing by
the Commission.
62. Water quality down gradient of BVW's shall not differ significantly following
completion of the project from the pre -development conditions. There shall be no
sedimentation into wetlands or water bodies from discharge pipes or surface runoff
leaving the site.
63. Stormwater runoff shall be directed to the cultec infiltrators to provide
groundwater recharge, as shown on the approved plans referenced herein.
64. Prior to the issuance of. the Certificate of Compliance, the applicant shall be
responsible for cleaning all stormwater structures, in accordance with the approved
Operation & Maintenance Procedures Plan and the associated. stormwater
management conditions referenced herein.
65. The applicants, owners, and their successors and assignees, shall maintain all
culverts, collections basins, traps, outlet structures, subsurface storage areas, and other
elements of the drainage system, unless put into an easement to the Town of North
Andover, in order to avoid blockages and siltation which might cause failure of the
system and/or detrimental impacts to on-site or off-site resource areas, and shall
maintain the integrity of vegetative cover on the site.
11 SUBDIVISION LOT DEVELOPMENT
66. The NACC shall be notified in writing of any lot line or unit number changes with a
copy of a plan showing these changes prior to any work on these lots/ units.
DURING CONSTRUCTION
C:\Winword\OOC\OldSalemVillagc.doc . 10 NACC 1/18/2006
DEP FILE # 242 - 1337
67. Accepted engineering and Best Management Practices (BMPs) for construction
standards shall be followed in the conduct of all work.
68. A crushed stone construction entrance shall be designated at the entrance drive
(Old Salem Village Drive) to minimize soil/material tracking in accordance with the
approved standards and specifications. This entrance shall be maintained and
reinforced as necessary.
69. Prior to the construction and installation of the proposed Cultec infiltration units,
soil testing shall be conducted in these locations to ensure and verify infiltration
capacity and to ensure that the fill material used will have similar or better
infiltration capacity. Results of the soil testing and supporting verification for each
unit shall be submitted to the Conservation Department for review and approval.
70. Erosion control devices shall be inspected regularly; any entrapped silt shall be
removed to an area outside of the buffer zone and wetland resource areas; silt fence and
hay bales shall be replaced as necessary. The areas of construction shall remain in stable
condition at the close of each construction day. All erosion controls shall be in place
throughout the duration of any construction on site or unless authorized by the
Conservation personnel.
71. IMPORTANT: Immediately upon completion of the dwelling foundations for
each jurisdictional unit as referenced herein and prior to further construction
activities associated -with the site, the applicant shall complete a plan prepared by a
Registered Professional Land Surveyor of the Commonwealth (R.P.L.S.) which
accurately depicts the foundation location and it's proximity to wetland resource areas
as approved under this Order of Conditions. Said plan shall be submitted to the
Conservation Administrator for approval
72. During construction of the forebay and the pocket wetland, field verification of
the available storage capacity (i.e. verification of groundwater elevations) shall be
documented and confirmed by the erosion control monitor and submitted to the
Conservation Department in writing for review.
73. Upon beginning work,. the applicant shall submit written progress reports every
month detailing what work has been done in or near resource areas, and what work is
anticipated to be done over the next period. This will update the construction sequence.
74. All catch basins shall contain oil/ gasoline traps, and it shall be a continuing
condition of this order, even after a Certificate of Compliance is issued, that the
oil/ gasoline traps in the catch basins be maintained. All catch basins shall be free of all
accumulated silt and debris before Compliance is issued and the owner or his/her
agent shall so specify in the request for Compliance.
C:\Winvord\000\01dSalemViIlage•doc II NACC Ii 182006
DEP FILE # 242 - 1337
75. The sewer lines on the site, where they cross wetland resource areas, shall be tested
for water tightness in accordance with North Andover DPW standards.
76. Silt sacs/filter fabric or other siltation/sedimentation protection methods shall be
installed at any catch basins within 100 feet of the work specific to the off-site sewer
installation.
77. The Erosion Control Monitor shall be on site during and/or following a major
storm event of 1 inch of rain or greater to ensure that soils remain stable, erosion
controls are adequate and secure, and that all BMP's are adequately functioning.
78.Approved de -watering activities anticipated shall be supervised and witnessed by
the designated erosion control monitor. This designee must be on-site while
dewatering is occurring. De -watering activities shall be conducted as shown on the
approved plans and shall be monitored. daily by the erosion control monitor to ensure
that sediment laden water is appropriately settled prior to discharge toward the
wetland resource areas. No discharge of water is allowed directly into an area subject
to jurisdiction of the Wetlands Protection Act and/or the North Andover Wetland
Bylaw. If emergency de -watering requirements arise, the applicant shall submit a
contingency plan to the Commission for approval, which provides for the pumped
water to be contained in a settling basin, to reduce turbidity prior to discharge into a
resource area.
79. The roadways shall be swept at least once per week or as directed by the Erosion
Control monitor, the Site Supervisor, Project Manager, or the Conservation staff for
as long as the site remains exposed and unstabilized.
80. The permanent fieldstone/barrier walls and fencing shall be constructed/installed
upslope of the 25' No Disturbance Zone as shown on the approved plan referenced
herein.
81. Any fill used in connection with this project shall be clean fill, containing no trash,
refuse, rubbish or debris, including but not limited to lumber, bricks, plaster, wire, lath,
paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts on any of the
foregoing.
82. All exposed soil finish grade surfaces shall be immediately landscaped and
stabilized, or loamed, seeded and mulched, with a layer of mulch hay. All disturbed
areas must be graded, loamed and seeded prior to November 1St of each year. Outside
of the growing season, exposed soil finish grade surfaces shall be stabilized with a layer
of mulch hay until climate conditions allow for seeding. During construction, any area
of exposed soils that will be left idle for more than 30 days shall be stabilized with a
layer of mulch hay or other means approved by the NACC.
C:\w'i1xvord\00C\01dSa1emViIlage.doc 12 NACC 11118/2006
DEP FILE # 242 - 1337
83. No re -grading in the buffer zone shall have a slope steeper than 2:1 (horizontal:
vertical). Slopes of steeper grade shall be rip -rapped to provide permanent
stabilization.
84. Equipment shall not be staged overnight within 50 -feet of a wetland resource
area.
85. There shall be no stockpiling of soil or other materials within twenty-five (25) feet of
any resource area.
86. Washings from concrete trucks, or surplus concrete, shall not be directed to, any
drainage system, or wetland resource area.
87. All waste generated by, or associated with, the construction activity shall be
contained within the construction area, and away from any wetland resource area.
There shall be no burying of spent construction materials or disposal of waste on the
site by any other means. The applicant shall maintain dumpsters (or other suitable
means) at the site for the storage and removal of such spent construction materials off-
site. However, no trash dumpsters will be allowed within 50' of areas subject to
protection under the Act or local Bylaw.
88. During and after work on this project, there shall be no discharge or spillage of fuel,
or other pollutants into any wetland resource area. If there is a spill or discharge of any
pollutant during any phase of construction the NACC shall be notified by the applicant
within one (1) business day. No construction vehicles are to be stored within 100 feet of
wetland resource areas, and no vehicle refueling, equipment lubrication, or
maintenance is to be done within 100 feet of a resource area.
AFTER CONSTRUCTION
89. No underground storage of fuel oils shall be allowed on any lot within one hundred
(100) feet of any wetland resource area. This condition shall survive this Order of
Conditions and shall run with the title of the property. This condition is issued under
the authority of the Town's Wetland protection Bylaw.
90. Fertilizers utilized for landscaping and lawn care shall be slow release, low -nitrogen
types (< 5%), and shall not be used within 25 feet of a resource area. Pesticides and
herbicides shall not be used within. 1.00 feet of a wetland resource area. This condition
shall survive this Order of Conditions and shall run with the title of the property. This
condition is issued under the authority of the Town's Wetland Protection Bylaw and
shall remain in perpetuity.
CAW invord\00C\OldSalernViIlage.doc 13 NnCC 1/18/2006
DEP FILE # 242 - 1337
91. The approved Operation & Maintenance Plan is fully binding upon the applicant,
and or owners, successors, agents, associations, heirs and assigns and must be
adhered to in perpetuity. The North Andover Conservation Commission must be
notified in writing upon the creation of an Association or any other assignee
responsible for the perpetual implementation of the Operation & Maintenance Plan.
92. Prior to the issuance of the Certificate of Compliance, the applicant shall submit
to the Conservation Department an Affidavit from the Homeowners Association or
other assignee (if applicable) acknowledging the Operation & Maintenance
responsibilities of the stormwater management systems in accordance with the
approved Operation & Maintenance Plan referenced and attached herein.
93. No road salt, sodium chloride, or other de-icing chemicals shall be used on paved
surfaces within the buffer zone, and any arrangement for snow removal shall so
stipulate due to the importance of the site and wetlands. Permanent signs designating
"No -Salt Zone" and "No -Snow Stockpiling Zones" shall be displayed in prominent
locations as depicted on the approved plan referenced herein. Additional signs may
be assigned in other locations as directed by the Conservation Administrator if
necessary. The location and placement of these signs are subject to review and
subsequent approval by the NACC or Agent thereof. Signs are available for
purchase at the Conservation Department for a fee. Additional snow management
procedures and snow storage/removal operations shall be addressed in the approved
Operation & Maintenance Plan.
94. After completion of work, the applicant shall permanently mark the edge of the
"25' No -Disturbance Zone" with forty-eight (48) signs or markers spaced evenly
every 40 feet incorporating the following text: "Protected Wetland Resource Area".
This will designate their sensitivity and assure no further inadvertent encroachment
into the wetland. These permanent markers are subject to review and approval by the
NACC. The applicant shall instruct all agents to explain these markers to
buyers/lessees/landscapers and all persons taking over the property from the
applicant.
95. Upon completion of construction and grading, all disturbed areas located outside
resource areas shall be stabilized permanently against erosion. This shall be done either
by loaming and seeding according to SCS standards. If the latter course is chosen,
stabilization will be considered complete once vegetative cover has been achieved.
96. Upon approved site stabilization by Conservation staff, the erosion controls shall
be removed and properly disposed of and all exposed unvegetated areas shall be
seeded.
97. Upon completion of the project the applicant shall submit the following to the
Conservation Commission as part of a request for a Certificate of Compliance:
C':\Winvord\000\OldSal em ViIlage.doc 14 NACC 1/18/2006
DEP FILE # 242 - 1337
a. WPA Form 8A - "Request for a Certificate of Compliance."
b. A letter from the applicant requesting a Certificate of Compliance.
c. The name and address of the current landowner.
d. Signed statements from. the individual property owners shall be submitted
with the request for a Certificate of Compliance indicating that they read and
understood the recorded Order of Conditions prior to purchasing their
property.
e. The name and address of the individual/ trust or corporation to whom the
compliance is to be granted.
f. The street address and assessor's map/ parcel number for the project.
g. The DEP file number.
h. A written statement from a Registered Professional Civil Engineer (and/or
Registered Professional Land Surveyor) of the Commonwealth certifying
that the work has been conducted as shown on the plan(s) and documents
referenced above, and as conditioned by the Commission.
i. An "As -Built" plan prepared and signed and stamped by a Registered
Professional Civil Engineer (and/or Registered Professional Land Surveyor)
of the Commonwealth, for the public record. This plan will include:
"As -Built" post -development elevations of all drainage & stormwater
management structures constructed within 100 feet of any wetland
resource area. NOTE: If portions of the stormwater systems exist
partially within the Buffer Zone than the entire structure must be
depicted to accurately verify compliance.
"As -Built" post -development elevations and grades of all filled or
altered wetland resource areas including the encompassing buffer
zone, which is regulated as a resource area under the local Wetland
Protection Bylaw.
y Distances from structures to wetland resource areas. Structures
include (but are not limited to) septic systems, additions, fences, sheds,
stone walls, pools, retaining walls, subsurface utilities and decks.
r A line showing the limit of work and the extent of existing erosion
control devices. "Work" includes any disturbance of soils or
vegetation.
y Location of all subsurface utilities entering the property.
CAW inword\0000ldSal cmViIlage.doc 15 NACC 1/18/2006
DEP FILE # 242 - 1337
98. The following special conditions shall survive the issuance of a Certificate of
Compliance (COC) for this project:
r 25' No -Disturbance Zone and a 50' No -Construction Zone shall be
established from the edge of adjacent wetland resource areas except in
those locations approved under this filing. Future work within 1.00' of
existing wetland resource areas. will require a separate filing with the
NACC. The Conservation Administrator and/ or other agents of the
NACC do not have the authority to waive these setbacks as established
under the local Bylaw (Condition #32);
Discharge or spillage of pollutants (Condition #88);
Y Maintenance of catch basins (Condition #74);
Maintenance of all culverts, collections basins, traps, outlet structures,
subsurface storage areas, and other elements of the drainage system,
unless put into an easement to the Town of North Andover, in order to
avoid blockages and siltation, which might cause failure of the system
and/or detrimental impacts to on-site or off-site resource areas (Condition
#65);
Prohibition of underground fuels (Condition #89);
r Limitations on the use of fertilizers, herbicides, road salts, de-icing
compounds and pesticides (Conditions #90 & #93).
r The attached "Stormwater Operations and Management Plan", including
Best Management Practices. No additional filings will be required to
conduct maintenance of the above referenced system and plan.
C:\Winword\000\01dSalemVi11age.doc 16 NACC 1/18/2006
A jr
DEP FILE # 242 - 1337
I,
1)
APPENDIX A — AFFIDAVIT
(authorized agent of applicant and / or owner)
I am the
on oath do hereby depose and state:
(PLEASE CHECK AT LEAST ONE BLOCK)
(position with applicant)
of.
the applicant upon whom the Order of Conditions
(applicant's name) -
(DEP or NACC File #)
have been
placed upon by the North Andover Conservation Commission (NACC).
2) I am the
and / or
(position with owner)
of
the owner upon whose land Order of Conditions
placed upon by the NACC.
(owner)
(DEP or NACC File #)
have been
♦ I hereby affirm and acknowledge that I have received said Order of
Conditions and have read the same and understand each and every
condition, which has been set forth in said Order of Conditions.
I hereby affirm and acknowledge that on this day of
'20_, I inspected said property together with any
and all improvements, which have been made to the same and hereby certify
that each and every condition set forth in the Order of Conditions are
presently in compliance.
♦ I hereby affirm and acknowledge that this document will be relied upon by
the NACC, as well as any potential buyers of said property, which is subject
to the Order of Conditions.
Signed under the pain and penalties of perjury this day of _ 20
C':\W imaorcl\OOC\OldSulemV illage.doe 17
(Authorized agent of applicant or owner)
NACC 1/18/3006
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions 242-1337 _
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special
condition pursuant to General Conditions #4, from the date of issuance. 1. Date of Issu nce
Please indicate the number of members who will sign this form: _3
This Order must be signed by a majority of the Conservation Commission. 2. Number of signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office;)f not filing electronically, and the property owner, if different
from applicant. ��
Signatures:
AAA
�i
r"
Notary Acknowledgement
Commonwealth of Massachusetts County of
I ) 4,t N
On thisof
Day
Before me, the undersigned Notary Public,
personally appeared
Essex North
Month Year
Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
Massachusetts License
Description of evidence of identification
�2 (y, -
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of North Andover C
DONNA 14 WEDGE
' COMU EATMOF W�
NYSUCHUSMS
tiN comm Eow Aug. 7, 2009
City/Town
Place notary seal and/or any stamp above
This Order is issued to the applicant as follows:
by hand delivery on
Date
Conservation ommisslon
2;7-1 za ..,
ignature of Notary Public
Printed Name of Notary Public
My Commisssiorl/Expires (Date)
❑ by certified mail, return receipt requested, on
Date
wpaform5.doc • rev. 3/1/05 Page 7 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
242-1337
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in.the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, § 40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpaform5.doc • rev. 3/1/05 Page 8 of 9
Massachusetts Department of Environmental Protection
�_ Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
DEP File Number:
242-1337
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
North Andover
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
------------------------ -----------------------------------------------------------------------------------------------
To:
North Andover
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
Project Location
Has been recorded at the Registry of Deeds of:
for:
County
Property Owner
242-1337
DEP File Number
Book Page
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.doc - rev. 3/1/05 Page 9 of 9