North Andover Conservation Commission Meeting Minutes
April 11, 2018
Members Present, Albert P. Manzi, Jr. Vice Chairman, John T. Mabon, Joseph W. Lynch, Jr and
Douglas W. Saal and Deborah A. Feltovic
Members Absent: Louis A. Napoli and Sean F. McDonough,
Staff Member Present: Jennifer A. Hughes, Conservation Administrator
Meeting came to Order at: 7:05 pm Quorum Present.
Pledge of Allegiance
Acceptance of Minutes
Motion to accept the minutes of March 28, 2018 as written and reviewed is made by Deborah
Feltovic, seconded by John Mabon
Vote 5-0 unanimous
Small Project
NACC #93, 660 Great Pond Road Rolling Ridge
The Administrator states that this request is for the annual renewal of a small project permit for
farming at Rolling Ridge located at 660 Great Pond Road.
Emily Strong, Giving Garden at Rolling Ridge, gives a brief description on what is grown and the
distribution of the produce and fruit.
Ms. Feltovic inquiries about the condition of the bee hives.
Ms. Strong states that the last report since the winter is that both hives are still alive.
Mr. Saal asks if all products are grown organically.
Ms. Strong confirms that yes everything is organically grown.
Ms. Feltovic questions if the organic products used are certified organic.
Ms. Strong states that they have not gone through the certification process but that no products
exempt limestone and compost are used on the produce.
Mr. Manzi questions if the expansion area will be tilled.
Ms. Strong states that no tilling will take place on that section.
Mr. Manzi asks if any abutters are present. (There is no response). Mr. Manzi declares no abutters
present.
A motion to approve the renewal of NACC #93 for one year is made by Mr. Mabon, seconded by Ms.
Feltovic.
Vote 5-0 unanimous
Documents
End of Season Report with Photos from South Church Giving Garden Dated: March 2018
Garden Expansion Photo and Plan
Request for Determination of Applicability
177 Salem Street Ridgewood Cemetery
The Administrator states that this request is for the restoration of a historic building at the Ridgewood
Cemetery part of the project is to lift the existing structure and replace the foundation.
Joe Pelich and James LaFond, representing Ridgewood Cemetery, states that the existing foundation
will be removed using compressed power shovels or a very small excavator.
Mr. Lynch asks what type of concrete will be used, block or poured, to construct the new foundation.
Mr. Pelich states that it will be a poured concrete foundation with a cut stone exterior veneer.
Mr. Lynch asks what type of protection will be installed to protect the wetland resource area.
Mr. Pelich states that a stilt sock has already been installed on-site.
The Administrator states that the silt sock was installed over the winter and will need to be inspected.
Mr. Lynch asks what the building will be used for after the restoration.
Mr. Pelich states that the building was d for
storage and it will remain a maintenance storage building.
Mr. Lynch asks if it will be used to store any fuels, pesticides, herbicides or oils.
Mr. LaFond states that no nothing of the sort will be stored there.
Mr. Mabon asks what the approximate dimensions of the building are.
Mr. LaFond and Mr. Pelich state that it is approximately 30 feet by 15 feet.
There is discussion amongst the Commission and the Administrator as the conditions for the Negative
Determination and the current site conditions.
Mr. Manzi asks if any abutters are present. (There is no response) Mr. Manzi declares no abutters
present.
A motion by Mr. Mabon to issue a negative determination #3 for work in Buffer Zone with special
conditions for no soil stockpiling, erosion controls, no concrete washing, monumentation of the
resource area per the Conservation Administrator and for a pre and post construction inspection
seconded by Ms. Feltovic
Vote 5-0 unanimous
Documents
Application Checklist Request for Determination of Applicability (RDA)
WPA form 1- Request for Determination of Applicability, prepared by James Lafond, dated
03/29/2018
Ridgewood Cemetery Hearse House Plot Plan, dated 03/22/18
Ridgewood Cemetery Aerial Photograph dated 04/20/2014
Notification to Abutters
North Andover Conservation Commission Waiver Request Form, prepared by James Lafond
dated 03/29/2018
Abutters Listing dated 03/29/2018
Notice of Intent (NOI)
242-1721, 562 Boxford Street
The Administrator states that this project was before the Zoning Board of Appeals last night, Tuesday
April 10, 2018 for a variance, no decision rendered at that meeting due to the outstanding waiver
approval still needed from the Board of Health. The Variance request has been continued until the
next regularly scheduled meeting on May 08, 2018. The Administrator states that revised plans were
updated today with soil stocking information, construction access & dewatering. Still missing from
the plan is the monumentation.
T.J Melvin, Christiansen & Sergi, is here on behalf of the owners Sirius Development regarding the
proposed project. Mr. Melvin would like the Commission to review the revised plan submitted today
and determine what if anything is missing or that still needs to be address on the plan.
The Administrator gives the Commission background information on the property and the existing
in comparison to what is being proposed by the new project and the increased
distance to the Ephemeral pool habitat.
Mr. Lynch questions if this has received approval from the Board of Health.
Mr. Melvin states that the Board of Health approved the plan this morning and that a letter will be
sent out next week.
Mr. Lynch clarifies that the existing home is non-compliant and that the new proposed home will still
need waivers is more conforming and an improvement.
The Administrator and Mr. Lynch are discussing the need for the waiver and for monumentation of
the resource area.
The Administrator recommends some planting restoration on this property.
Mr. Mabon would like to see something more permanent as monumentation of the resource area
versus the proposed 4x4 posts.
Mr. Melvin proposes to the Commission 2x2 foot stone wall as monumentation.
The Commission and the Administrator discuss the need for permanent monumentation of the
resource area with a stone wall and plantings.
Mr. Manzi asks if any abutters are present. (There is no response) Mr. Manzi states there are no
abutters present.
A motion is made to grant the waivers -Disturb Zone fr
No-Build Zone from an Ep from Ephemeral
Pool Habitat by Mr. Mabon, seconded by Mr. Lynch.
Vote 5-0 unanimous
A motion to continue until the April 25, 2018 meeting is made by Ms. Feltovic, seconded by Mr.
Mabon.
Vote 5-0 unanimous
Documents
Notice of Intent Plan, prepared by Philip Christiansen, dated 10/30/2017, revs 11/07/17,
11/28/17, 12/06/17, 03/02/2018
242-1729, 213 Berry Street
The Administrator advises the Commission that the plans have been revised and submitted to include
the requested items.
Ann McMenemy, Hancock Associates, presents the plan changes on behalf of the owner Jonathan
Bonny, 25 Hesper Street LLC. She updates the Commission on the items that were missing and or
requested by the Commission at the March 28, 2018 meeting. Two flags were field tape measured and
added to the plan per the Administrator-Disturbance zones were
added to the plan as well a note regarding the annual mowing with specifications as to the time for the
mowing to occur due to the potential of ground bird nests. Another note was added regarding the
hand removal of all debris and trash within the wetland and buffer zones.
Mr. Manzi asks if any abutters are present. (There is no response) Mr. Manzi declares no abutters
present.
A motion is made to grant the waiver to remove an existing shed and revegetate with-
Disturbance Zone to a Bordering Vegetated Wetland by Ms. Feltovic, seconded by Mr. Lynch.
Vote 5-0 Unanimous
A motion to close the public hearing and issue a decision in 21 days is made by Mr. Lynch and
seconded by Ms. Feltovic.
Vote 5-0 unanimous
Documents
Permit Site Plan of Land, prepared by Vaclav V. Talacko, dated 03/15/18, revs 04/03/18
242-1117, COC Request 213 Berry Street (25 Hesper St LLC) (Casey) (taken out of order to keep
related matters together)
The Administrator reviews the septic system project with the Commission and recommends issuing a
complete Certificate of Compliance for DEP #242-11117. She states the fact that the required
retaining wall was not built will not matter now that the new Order will permit a connection to sewer.
A motion is made to issue a Certificate of Compliance by Ms. Feltovic, seconded by Mr. Lynch.
Vote 5-0 unanimous
Documents
Appendix A Affidavit, prepared by Jonathan Bonney dated 01/10/2018
North Andover Conservation Commission Order of Conditions Compliance Certificate Form,
prepared by Kyle Lally dated 12/26/2017.
WPA Form 8A Request for Certificate of Compliance, prepared by Stantec
Sewage Disposal System As-Built Plan, prepared by Richard Doherty dated 01/06/2005
Letter prepared by Vaclav V. Talacko, Hancock Associates, dated 12/26/2017
4 Site Photographs
NACC #207, 535 Salem Street (Bulduc) (Sullivan Engineering Group)
Jack Sullivan, Sullivan Engineering Group on behalf of the owner Matthew Bolduc, states this project
is being filed under the Local Bylaw only. There is an isolated Wetland to the rear of this property
approximately 1400 square feet flagged by Williams & Sparages. All work is proposed outside the
No-Build Zone of the Isolated Wetland. The owner is seeking to demolish the existing breezeway
and single car garage and construct a new breezeway and three car garage as well as relocation of the
driveway for Salem Street to English Circle. A portion of the breezeway and garage will be with the
such the runoff drainage cannot go into the public way and must be maintained onsite. Due to this a
crushed stone infiltration trench is proposed on the low side of the driveway. When English Circle
was constructed, a natural swale was formed that feeds the Isolated Wetland. In order to maintain the
with a rip rap spreader installed at each end will need to be
installed under the proposed driveway. There will be some sapling tree growth removed as part of
this proposed project. A soil stockpile area is
Buffer Zone. The existing driveway off Salem Street will serve as the Construction access, this home
has an upgraded septic system as well.
The Administrator states that there is some debris in the Wetland that needs to be removed.
Mr. Lynch question whether or not the garage foundation will have a perimeter drain around it.
Mr. Sullivan states that the garage is a slab so there are no perimeter drains.
Mr. Lynch questions if the Breezeway is an enclosed or open.
Mr. Sullivan states that it is not enclosed that it is an open breezeway.
Mr. Mabon would like some clarification on the plan for the culvert.
x 4 rip rap
Mr. Mabon questions if the DPW reviews the plan.
Mr. Sullivan states that as part of the driveway plan DPW will review the plan.
The Administrator would like to see some monumentation of the wetland
markers.
Mr. Manzi asks if any abutters are present. (There is no response) Mr. Manzi declares no abutters
present.
A motion to close the public hearing and issue a decision in 21 days is made by Ms. Feltovic and
seconded by Mr. Lynch.
Vote 5-0 unanimous
Documents
Project Summary, prepared by Sullivan Engineering Group, LLC.
Application Checklist Notice of Intent (NOI) prepared by Williams & Sparages dated 03/2018
WPA Form 3 Notice of Intent, dated 03/22/2018, prepared by Jack Sullivan, Sullivan
Engineering Group, LLC.
Town of North Andover Abutters Listing, dated 03/07/18
Copy of Checks for Filing fees to the Town of North Andover
NOI Wetland Fee Transmittal Form
Portion of USGS Map
Notification to Abutters, prepared by Jack Sullivan
Plot Plan of Land, prepared by John Sullivan, Sullivan engineering Group, LLC. dated
03/20/2018
242-1731, 60 Deer Meadow (Mukherjee) (Williams & Sparages)
The Administrator states that this address was before the Commission in October and received an
OOC for DEP #242-1718 for the replacement of a failed septic system. The work for the septic
system is done but the site has not stabilized due to the timing of the project just before winter.
Greg Hochmuth of Williams & Sparages presents on behalf of the owner Mr. Mukherjee. Mr.
Hochmuth reminds the Commission that as part of the prior filing 242-1718 Peter Breen had to create
a temporary access way to get down to the bottom of the property. Some slope stabilization was done
in the prior filing and the owners would now like to stabilize the remaining portion of the slope,
which is failing. There has been several attempts over the years to stabilize it with pieces of rebar
being driven into the slope, boulders, rocks everything rolls down the slope. The slope is settling: the
consensus is that materials were not removed before the fill was placed in the back of the property,
due to this, the deck that was built in the back of the house has settled over a foot and has had to be
jacked up. The project design is to give the owners a useable space behind the house that is somewhat
level and grade it down to as manageable a slope as possible, the areas in green on the plan would be
no steeper than 2:1 in some locations, 3:1 where possible which can be vegetated, the area noted in
gray on the plan is a steeper grade 1.5:1 as a result we are proposing to hog it out put in a silt fence
keyed into the top and then put down stone and flat boulders packed in to make it a boulder slope.
(Plan to Accompany a Notice of Intent Application, prepared by Richard Williams, Williams &
Sparages, dated 03/15/2018). Mr. Hochmuth notes that a Geotechnical Engineer will inspect the
excavation before the fabric is placed to insure stability. Peter Breen has been contracted again for
this project.
Mr. Lynch asks what type of fabric is being used is it jute or a geotech.
Mr. Hochmuth states it will be a geotech fabric below the stone.
fencing along the
edge that the plan calls for Mr. Breen plans to bring in large rolled hay bales placed on their sides to
prevent anything rolling down the slope the larger hay bales will be there to protect the Wetlands.
The Administrator states no waiver is required for a retaining wall if there is no alternative. There is
discussion around whether this is a structure or just a boulder slope.
Mr. Hochmuth states that no tree removal is proposed under this project and only some shrubs on the
slope that will be removed.
Mr. Mabon asks if all the disturbance is going to happen out the 25 foot NoDisturb Zone.
Mr. Hochmuth states that yes it is outside the 25 foot No-Disturb Zone.
Mr. Lynch asks when the Geotechnical Engineer will be consulted.
Mr. Hochmuth states that the timing will have to be worked out with the Contractor.
Mr. Lynch has concerns about the soils on the property and that the Boulder Slope weight load could
cause further settling to happen.
Mr. Hochmuth states that when excavation for the new septic system was done they found that before
the fill was dumped on the site the top layers were not removed and the belief is that the foot
settlement that has already happened was due to the layers compressing.
Mr. Saal asks if there is ledge on either side of the house and if ledge was taken out to construct the
house.
Mr. Hochmuth states that there is ledge on either side but it is unknown if ledge was removed to
construct the house.
Mr. Saal asks if any test pits were done to determine what is under the property.
Mr. Hochmuth states that no test pits were done. It will be a boulder slope open to the elements.
Ms. Feltovic questions what will replace the wooden fence that is being removed.
Mr. Hochmuth states that nothing is currently being proposed to replace it, there is a steep slope that
drops down to the Wetland.
The Administrator states that currently the trees on the other side are monumented with placards and
that the rest of the trees could be monumented with placards as part of this project.
Mr. Manzi asks if any abutters are present. (There is no response) Mr. Manzi declares no abutters
present.
A motion to close the public hearing and issue a decision in 21 days is made by Ms. Feltovic and
seconded by Mr. Lynch.
Vote 5-0 unanimous
Documents
Application Checklist Notice of Intent (NOI) prepared by Gregory Hochmuth, dated 03/22/2018
WPA Form 3 Notice of Intent, dated 03/21/2018, prepared by Gregory Hochmuth, Williams &
Sparages.
Copy of Checks for Filing fees to the Town of North Andover
NOI Wetland Fee Transmittal Form
Locus Map prepared by Williams & Sparages
Narrative
Affidavit of Service, prepared by Gregory Hochmuth, dated 03/21/2017
Notification to Abutters
Town of North Andover Abutters Listing, dated 02/22/18
Plan to Accompany A Notice of Intent Application, prepared by Richard Williams, Williams &
Sparages, dated 03/15/2018
242-1730, Western Route MP 28.46 Culvert #28.46 (Keolis) (Fair Dermody Consulting)
The Administrator reviews the proposal with the Commission which is for culvert replacement under
the train tracks.
Kyle Fair, Fair Dermody Consulting Engineers, is representing Keolis for this project. Mr. Fair
directs the Commission to look at Exhibit C photos of the site.
Mr. Fair states that this is a small box style culvert, various parts of rail for the roof structure. The
Railroad is looking to open cut this to remove the existing stone masonry and both head and wing
concrete pipe which will be imbedded the railways standard 6 inches to provide a substrate bottom.
The Administrator discusses the project with the Commission. The Administrator also notes that the
location is no longer listed as priority habitat.
Mr. Lynch asks if the location of the construction access point will be from the rail bed itself.
Mr. Fair confirms that the access point will be from the rail bed.
Mr. Mabon asks if the new pipe is more flow area or less.
Mr. Fair states that it is slightly more than what is currently there the old is 1632 square inches the
new pipe will be 1679 square inches.
Mr. Mabon asks if this will be done in a day.
Mr. Fair states that is the plan due to the area being shut down and the cost to run busses around.
Mr. Manzi asks if any abutters are present. (There is no response) Mr. Manzi declares no abutters
present.
Mr. Lynch asks is Keolis is doing the work on their own or are they contracting out the work.
Mr. Fair states that the work does get contracted out.
Mr. Lynch states that the Order of Conditions should be made part of the contract for the work.
Mr. Fair states that yes it would be made part of the contract.
A motion to close the public hearing and issue a decision in 21 days is made by Ms. Feltovic and
seconded by Mr. Lynch.
Vote 5-0 unanimous
Documents
Letter prepared by Fair Dermody Consulting Engineers dated 03/28/2018
Application Checklist, prepared by Mary Rimmer dated 03/29/2018
Western Route Culvert #28.46 North Andover, MA Open Cut Replacement Permit Plan,
prepared by Kyle Fair, dated 03/01/2018
Introduction & Project Narrative, prepared by Fair Dermody Consulting Engineers, dated
03/28/2018
Exhibit A -WPA Form 3 Notice of Intent, prepared by Mary Rimmer, dated 03/29/2018
NOI Wetland Fee Transmittal Form
Letter MassDOT, prepared by Janis O. Kearney
Exhibit B -Location Flood Map dated 03/21/2018
Exhibit C -Photo Right of Way Looking North
Exhibit C -Photo Right of Way Looking South
Exhibit C -Photo East Invert
Exhibit C -Photo East Invert looking West
Exhibit C -Photo West Invert Looking West
Exhibit C -Photo West Invert
Exhibit C -Photo Interior View
Exhibit C -Photo interior View
Exhibit D -Western Route Culvert #28.46 North Andover, MA Open Cut Replacement Permit
Plan, prepared by Kyle Fair, dated 03/01/2018
Exhibit E -Wetland Resource Evaluation Culvert Repair, prepared by Rimmer Environmental
dated 03/12/2018
Exhibit F -Alternatives Analysis, prepared by Fair Dermody Consulting Engineers dated March
28, 2018
Exhibit G Applicable WPA Regs. 310 CMR 10.54 Inland Bank, 310 CMR 10.55 Bordering
Vegetated Wetlands, 310 CMR 10.57 Land Subject to Flooding, 310 CMR 10.58 Riverfront Area
Affidavit of Service, prepared by Kyle Fair, dated 03/30/2018
Town of North Andover Abutters Listing, dated 03/15/18
Notification to Abutters
242-1728, 500 Boxford Street (Donovan) (Andover Consultants)
The Administrator states the applicant requests to continue the hearing and that there was some
confusion as to the continuance date either being April 11, 2018 or April 25, 2018. This matter was
added to the agenda after posting.
A motion to continue the public hearing until the April 25, 2018 meeting is made by Mr. Lynch,
seconded by Ms. Feltovic.
Vote 5-0 unanimous
Documents
Email from Dennis Griecci
Enforcement Order/ Violation
193 Foster Street
The Administrator states that a delineation is needed therefore they are requesting a continuance until
April 25, 2018 and that she has a meeting scheduled with them on April 12, 2018.
A motion to continue the matter until the April 25, 2018 meeting is made by Ms. Feltovic. seconded
by Mr. Lynch,
Vote 5-0 unanimous
General Business
242-1691, COC Request, Phase 2 Sidewalk & Pedestrian Improvements Route 114/125 (VHB)
(MassDOT)
A Motion to continue to the June 13, 2018 meeting is made by Ms. Feltovic seconded by Mr. Mabon
Vote 5-0 unanimous
Documents
Letter prepared by Jay Quattrocchi VHB dated 03/28/2018
WPA Form 8A Request for Certificate of Compliance
Letter prepared by Wayne P. Amico, VHB dated 03/23/2018
As-Built Plan, prepared by Richard D. Beati dated 12/10/2017
242-231, COC Request, 492 Sutton Street, Hangars (Stantec) (Lawrence Municipal Airport)
Randy Christiansen, Stantec Consulting Services is here on behalf of Lawrence Municipal Airport.
He states the COC requests before the commission tonight go back as far as 1984, 1989, 1997. This
COC request is for the North Ramp hangars which was filed by the North Andover Hangar
Association this Association has decreased in uniformity, attendance and size, as a result of this Mr.
Miller the Airport Manager and the Airport Commission has requested Stantec complete the request.
Mr. Christiansen states that the project was
on or near the North Side of the Airport. The four hangars were constructed but no As-Built plan or
Certificate of Compliance was ever filed. Attempts have been made to obtain the original survey data
from the office of Richard Kaminski but were unable to do so. A new survey was done based on the
plan that was on file in the Conservation filing. So the survey that was conducted by Stantec is in red
and superimposed on the plan of record and that is what is on the plan. Substantial Compliance was
found with the hangar locations and the edge of pavement relative to the old Wetland boundary
however upon a field inspection with the Conservation Administrator a new Wetland Delineation was
requested due to the Delineation was from 1984. In doing so the new Wetland Delineation as shown
in red is closer to the Hangars on an average of 10 to 15 feet comparative to the old boundary. Based
on the old setbacks when the Hangars were permitted and constructed the Hangars meet those
requirements set forth in the Order of Conditions. The old flags and data were not able to be found.
Photos with location descriptions were added to the plan. The updated plan has been signed and
stamped by David Rich a registered professional engineer, however David Rich was not the original
engineer on the project, but he did oversee the survey and the remaking/updating of the plan and
oversaw the comparison of the old plan and the new data, which is the best that could be done in this
situation with the project occurring thirty plus years ago.
The Administrator states that only one item is left outstanding which is the letter from the engineering
stating that the work was in substantial Compliance with the Order of Conditions.
Mr. Christiansen states that David Rich is willing to confirm this information in a letter to the
Commission if requested.
The Commission is discussing the merits and reason behind potentially having a letter from Mr. Rich
or not.
The Commission agree that a letter is not needed for this filing based on the fact that Mr. Rich is not
the design engineer.
Mr. Lynch asks if the new Wetland line is for informational purposes only or if it is needed for
something else.
The Administrator and Mr. Christiansen state that the delineation was needed for this filing and for
another filing that had a restoration requirement.
A motion to close and issue a Certificate of Compliance for 242-231 is made by Ms. Feltovic
seconded by Mr. Lynch.
Vote 5-0 unanimous
Documents
Notice of Intent Site Plan of land, prepared by Richard Kaminski and Assoc. dated 06/21/1984,
stamped by signed by David Rich.
WPA Form 8A Request for Certificate of Compliance
Letter, prepared by Randall Christiansen, dated 08/26/2016
242-491, COC Request, Taxiway E Construction (Stantec) (Lawrence Municipal Airport)
Randy Christiansen, Stantec Consulting Services, is here on behalf of Lawrence Municipal Airport to
request a COC for Taxiway E which goes along the East side of the cross wind runway. This Notice
of Intent was filed in response to an Enforcement Action by the Conservation Commission and was
an after the fact filing for the construction of Taxiway E whereupon it was discovered that there was
impact to the Wetlands due to sedimentation from the Taxiway construction. As part of the Orders of
Conditions restoration was required. Upon review of the project file no mention of an inspection of
the restoration site was noted therefore a site inspection was done by Mr. Christiansen and the
Administrator and at that time a delineation was done. In the area of where the restoration was
supposed to be approximately 1245 square feet. Upon inspection of that area a restoration of 1335
feet was found. The planting plan called for 200 cattails. The site it is now covered in native shrubs
and ground cover.
Mr. Lynch asks if due to its location to the runway if the area will be subject to pruning and cutting.
Mr. Christiansen states that -between.
The Administrator states that only one item is left outstanding which is the letter from the engineering
stating that the work was in substantial Compliance with the Order of Conditions.
The Commission agree that a letter is not needed for this filing also because Mr. Rich is not the
design engineer.
A motion to close and issue a Certificate of Compliance for 242-231 is made by Ms. Feltovic
seconded by Mr. Mabon.
Vote 5-0 unanimous
Documents
Letter, prepared by Randall Christiansen, Stantec, dated 02/06/2018
Copy of Order of Conditions, 242-491
WPA Form 8A Request for Certificate of Compliance, prepared by Stantec
Record Drawings, prepared by Stantec dated July 2016
242-872, COC Request, Taxiway B Rehibilitation (Stantec) (Lawrence Municipal Airport)
Randy Christiansen, Stantec Consulting Services, is here on behalf of Lawrence Municipal Airport
request a COC for Taxiway B which done in 1997 by Stantec.
Mr. Christiansen gives the Commission a brief review of the project. Which included a reduction in
pavement along the Runway. The proposed plan for the runway safety area project was used as the
as-built plan because it reflected the existing condition of Taxiway B post construction. The plan
showed full compliance on the taxiway location but the drainage was found to slightly off.
The Administrator states that this project does have the Engineers letter of Certification.
A motion is made to close and issue a Certificate of Compliance for 242-231 is made by Mr. Lynch
seconded by Mr. Saal.
Vote 5-0 unanimous
Documents
Letter, prepared by Randall Christiansen, Stantec, dated 02/06/2018
Copy of Order of Conditions, 242-872
WPA Form 8A Request for Certificate of Compliance, prepared by Stantec
Record Drawings, prepared by Stantec dated July 2016
242-1714, Minor Modification, 865 Johnson Street (Lots 1A & 1B)
The Administrator gives a brief background on this project request. The Administrator states that after
the project was approved by the Conservation Commission it required a land disturbance permit from
New
work is not proposed including grassed Bio-retention Areas on both lots. The bio-retention areas
which were mainly for the roof drainage have over flows. Both lots have additional stormwater
structures on them mostly LID type to handle single family house drainage.
The Commission and the Administrator review the plans.
Mr. Mabon asks about the locations of the Septic systems
The Administrator states that they are both outside the 100 foot in the front of the homes.
A motion to approve the Minor Modification for 242-1714 is made by Ms. Feltovic, seconded by Mr.
Mabon.
Vote 5-0 unanimous.
Documents
Email request dated 04/03/2018 sent from Thomas Zahoruiko
Plan of Subsurface Sewage Disposal System, prepared by Vladimir Nemchenok dated
09/10/2016, revs 06/06/17, 01/08/18, 01/24/18, and 02/01/18.
209 Vest Way resigning of previously issued documents.
The Administrator states that the COC was previously issued but a copy of the signed COC could not
be located so this request is to resign a previously approved COC. Copies of the forms were not
available so this issue will be addressed at the next meeting.
Decision
242-1729, 213 Berry Street (Hancock) (Jonathan Bonney c/o 25 Hesper Street)
The Administrator reviews the drafted Order of Conditions with the Commission
A motion to approve the Order of Conditions as drafted and reviewed is made by Mr. Lynch seconded by
Ms. Feltovic.
Adjournment
A motion to adjourn is made by Mr. Lynch seconded by Ms. Feltovic at 8:34pm
Vote 5-0 unanimous