Loading...
HomeMy WebLinkAboutContract #: 016099 - From: 02-01-2012 To: 01-31-2013 - FM Generator - Town of North Andovert Andrew W. Maylor Town Manager Ms. Rebecca A. King FM Generator, Inc P.O. Box 528 Canton, MA 02021 Dear Ms. King: Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com November 14, 2013 Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and FM Generator, Inc (Contract #566), the contract and the respective unit prices (see enclosed) to perform preventative maintenance and as -needed repairs of emergency power generators located at all municipal and school facilities is extended an additional option year (February 1, 2014 through January 31, 2015). Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Stephen Foster Facilities Management Department 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. Sincerely, Andrew W. Maylo Town Manager cc., Ray Santilli, Assistant Town Manager Stephen Foster, Facilities Management Contract File ATTACHMENT A - UNIT PRICES Year 2 - February 1, 2014 through January 31, 2015 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $1,400.00 WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $300.00 UNIT # 3: 98 Rosemont Drive $300.00 UNIT # 4:174 Sutton Hill Road $350.00 UNIT # 5: 71 Bear Hill Road $300.00 UNIT # 6: Orchard Village $300.00 SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $300.00 UNIT # 8: 87 Flagship Drive $300.00 UNIT # 9: Jasmine Plaza, 720 Turnpike Street $300.00 UNIT 410: Alcott Village, 105 Andover By -Pass $250.00 UNIT #11: Boston Hill, 1280 Turnpike Street $300.00 UNIT # 12: Located at Forest View, 14 Palomino Drive $300.00 UNIT # 13: Located at Campbell, 1875 Salem Street $300.00 UNIT # 14: Bonny Lane, 133 Bonny Lane $300.00 UNIT # 15: Rea's Pond, 1653 Great Pond Road $300.00 UNIT # 16: Butcher Boy, 1945 Great Pond Road $300.00 UNIT 4 17: Located at Coachmen, 70 Coachmen Lane $300.00 UNIT # 18: Saile Way, 89 Saile Way $300.00 UNIT # 19: Winter Street, 60 Winter Street $300.00 UNIT # 20: Hawthorne Place, 45 Hawthorne Place $300.00 UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $300.00 UNIT # 22: Johnson Circle, 85 Johnson Circle $300.00 UNIT # 23: Blue Ridge, 410 Blue Ridge Road $350.00 UNIT # 24: Dale Street, 595 Dale Street $350.00 UNIT # 25: Meeting House, 44 Meeting House Commons $300.00 UNIT # 26: Carter Field, 75 Carter Road $300.00 FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $300.00 UNIT #28: Fire Station 2, 9 Salem Street $300.00 UNIT #29: Located on Engine 1 $300.00 UNIT #30: Located on Engine 2 $300.00 SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $200.00 UNIT #36 Franklin Elementary School, 2 Cypress Terrace $300.00 UNIT #37: Sargent Elementary School, 300 Abbott Street $425.00 UNIT #38: High School, 430 Osgood Street $400.00 UNIT #39: High School, 430 Osgood Street $400.00 UNIT #40: Middle School, 495 Main Street $400.00 POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $600.00 PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street UNIT 943: Senior Center 120R Main Street. As -need service Regular business hours $ 84.00 per hour Non -business hours $ 126.00 per hour $300.00 $300.00 Santilli, Ray From: Foster, Stephen E. Sent: Wednesday, November 13, 2013 9:01 AM To: Santilli, Ray Subject: generators Contacts: Ray Santilli Ray: I received feedback from the major users of Fm generator services in the town of North Andover, MA All respondents have provided positive feedback Given the forgoing I would recommend a renewal of FM generator contract Stephen E. Foster Facilities Director Town of North Andover 384 Osgood Steet North Andover, MA 01845 Phone 978.685-0950 x-41306 Fax 978.688.9573 Email sfoster@TownofNorthAndover.com Web www.TownofNorthAndover.com Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: hffl)://www.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20131113-016 for future inquires. Request another official Wage Schedule Return to Prevailinq Waqe Website http://prevailingwage.detma.oralWaszeRequest.asi)x?wr=121 &Asi)xAutoDetectCookieSu... 11/13/2013 Request Official Wage Schedule r^ 8h} Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20121120-050 for future inquires. Request another official Wage Schedule http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSu... 11/20/2012 Raymond T Santilh Assistant Town Manager Ms. Rebecca A. King FM Generator P.O. Box 528 Canton, MA 02021 Dear Ms. King: TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 January 27, 2012 TEL (978) 688-9516 FAX (978) 688-9556 The Town of North Andover has decided to award a contract to FM Generator to perform preventative maintenance and as -needed repairs of emergency power generators located at all municipal and school facilities for the period of February 1, 2012 through January 31, 2013 in accordance with the Invitation for Bids issued on December 21, 2011. Enclosed please find three (3) original standard Town of North Andover contracts for appropriate review and signature. Please return the signed contract documents and all required accompanying paperwork to my attention as soon as possible. Please ensure that all insurance certificates list the Town of North Andover as an "additional insured". In accordance with Massachusetts General Laws, you are required to provide a payment bond, on the Town's form that is enclosed, in the amount of 50% of the projected value of the first year of the contract. The projected value of the first year of the contract is $27,175 thus the payment bond is required in the amount of $13,587. If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosures TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilh Assistant Town Manager Attorney Carol McGravey Urbelis & Fieldsteel, LLP 155 Federal Street Boston, MA 02110 Dear Ms. McGravey: NORTH O A �9SSACHUSE�ty February 17, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find for your review and approval three (3) original contracts, with accompanying documentation, between the Town of North Andover and FM Generator to perform preventative maintenance and as -need repairs of emergency power generators located at all school and municipal facilities for the period of February 1, 2012 through January 31, 2013 per the Invitation for Bids issued on December 21, 2011. Please note the prevailing wage report is not attached to the contracts being sent to you due to it being quite voluminous. It will be attached to each contract document prior to final execution. Thank you in advance for your attention to this matter. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosures URBELIS & FIELDSTEEL, LLP 155 FEDERAL STREET BOSTON, MASSACHUSETTS 02110-1727 CAROL HADAR MCGRAVEY OF COUNSEL e-mail chm@uf-law.com February 22, 2012 Raymond Santilli Assistant Town Manager North Andover Town Offices 120 Main Street North Andover, MA 01845 RE: CONTRACT WITH FM GENERATOR Dear Ray: Telephone 978-475-4552 Telephone 617-338-2200 Telecopier 617-338-0122 Enclosed please find the above -referenced contract, which has been approved as to form. Very truly yours, Grol Hajjar McGravey CHM/kmp Enclosure w\wp5l\work\n-andove\corresp\santilli.ltr - contract66.docx Raymond T Santilli Assistant Town Manager Ms. Rebecca A. King FM Generator P.O. Box 528 Canton, MA 02021 Dear Ms. King: TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 March 1, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the executed contract between the Town of North Andover and FM Generator to perform preventative maintenance and as -needed repairs of municipal and school emergency power generators for the period of February 1, 2012 through January 31, 2013 in accordance with the Invitation for Bids issued on December 21, 2011. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Stephen Foster Facilities Management Director Town of North Andover 1600 Osgood Street, Suite 3-59 North Andover, MA 01845 If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure cc., Stephen Foster, Facilities Management Director Contract File CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the N held on it was VOTED, THAT Wtvbu �. f X Pi (Name) (Offices of 0� (-VankX&W be and hereby is authorized to execute contracts and bonds in the name and on behalf of said and affix its corporate seal hereto; and such execution of any contract or obligation in the name of(�P�l'12>�U;I U� on its behalf by such officer under seal of (M ���s(I r , , shall be valid and binding upon nA [2LVZAU'� I hereby certify that I am the clerk of the above named I �f; .PXI�.r FD� and that 6UMA-)60t is the duly elected officer as above of said 0A -(Wlf (,)1j , and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. \ 1'�\ 2 W.., � (Date) (Clerk) Town of North Andover IFB Page 44 of 46 Emergency Power Generator Services CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature 1 CAW Date Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I Qt i ) , authorized signatory for A Cie"+CLW Name of individual Name of contractor do hereby certify unJ the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature D to Town of North Andover IFB Page 42 of 46 Emergency Power Generator Services CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature L Print Name & Title Town of North Andover IFB Emergency Power Generator Services Date V-�V \'? Company Name Page 43 of 46 COIR ® 4 `�...CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 2i2i2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Elliot Whittier Insurance 3 Centennial Drive Peabody MA 01960 CONTACT NAME: Lin Schwarz PHONE (978) 977-4884 AIC No: (978)977-0850 ADDRESS:lschwarz@elliotwhittier.com PRODUCERCUSTOMER ID p0059670 INSURERS AFFORDING COVERAGE NAIC # INSURED FM Generator, Inc. PO BOX 528 35 Pequit St. Canton MA 02021 INSURERA:Hanover Insurance Group 22292 INSURER B.National Union Fire Insurance INSURER C : INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:11/12 Liability REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTR TYPE OF INSURANCE ADDL INSR SUER WVD POLICY NUMBER POLICY EFF MMIDD/YYYY POLICY EXP MMIDDIYYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED 100,000 PREMISES Ea occurrence $ X COMMERCIAL GENERAL LIABILITY MED EXP (Any one person) $ 10,000 A CLAIMS -MADE ❑X OCCUR ZDN909048700 /1/2011 /1/2012 PERSONAL &ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GENT AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 $ POLICYjE X LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 (Ea accident) X ANY AUTO BODILY INJURY (Per person) $ 908943900 /1/2011 /1/2012 BODILY INJURY (Per accident) $ A ALL OWNED AUTOS SCHEDULED AUTOS PROPERTY DAMAGE $ HIRED AUTOS (Per accident) PIP -Basic $ NON -OWNED AUTOS Uninsured motorist BI split limit $ A X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000, 000 AGGREGATE $ 10,000,000 EXCESS LIAB CLAIMS -MADE DEDUCTIBLE $ $ 909048900 /1/2011 /1/2012 RETENTION $ WORKERS COMPENSATION 0TH-ORYLJ — X I WC STATU- I ER B AND EMPLOYERS' LIABILITY Y I N E.L. EACH ACCIDENT $ 500 000 ANY PROPRIETOR/PARTNER/EXECUTIVE NIA E.L. DISEASE - EA EMPLOYEE $ 500,000 OF EXCLUDED? (Mandatory in NH) 051750606 /1/2011 /1/2012 E.L. DISEASE -POLICY LIMIT $ 500,000 It yes, describe under DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS / LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Town of North Andover is Additional Insured for General Liability as required by written contract with the Named Insured, but only in accordance with the policy terms, conditions and exclusions. CERTIFICATE HOLDER CANCELLATION Town of North Andover 120 Main Street North Andover, MA 01845 ACORD 25 (2009/09) INS025 (200909) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Guyer/LIN ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD PAYMENT BOND Bond No. 6944 KNOW ALL MEN BY THESE PRESENTS, that we F.M. Generator, Inc. with a place of business at 35 Pequit Street, P.O. Box 528, Canton, MA 02021 as Principal (tile "Principal'), and United Casualty & Surety Insurance Companya corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 170 Milk Street, Boston, MA 02109 as Surety (the "Surety"), are held and firmly bound unto the TowsQfNogh l ndov Mla sac�usetts as Obligee Thirteen Thousand Five un red'ig y- even (the "Obligee"), in the sum of Dollars & 00/100 ($13,587.00) lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of 2/2/2012 , for the construction of Generator Maintenance Multiple Locations NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Caws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation sliall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this 8th day of February, 2012. PRINCIPAL F.M. Generator, Inc. [N ne and Seal] [Title] Attest: SURETY Casu4lty and Sure,,',y Insurance Company c J [Attorney -it act] [ 170 Milk StNet; [Address] (617) 542-3232 Todd S. Carrigan ston, MA 02109 END OF PAYMENT BOND - I 1&S Power No: 6944 U1VTT D=C— ASt h , SURELYC AY . S��SETTS VIII INSII pll MP .N =Contract Amount_ $�7,1�SQ _ - - - =Bd Amount. R(_)FATT KNOW ALL MEN BY THESE PRESENTS: ThatTED CSUTY AND SURETY1iZANCE1vIPANY, a corpora; pn of thI omrii''wealth of Massachuse 01 — _ — I Ili tnakenstittite�nil�p�ciint III��', - - - — Todd S. Carrigan its true and lawful Attorney -in -Fact, with full power and authority, for and on behalf of the Company as surety, to execute and deliver and affix the seal oirthgomMy eto, if a seal is required, b� ds, until 'akings, recognizancess consentsut other written obligatjq in the r _ - del Titus, undertaken s rec izance�, — — — B ' u U Ab Bents kurety or other written obiigationsAin to u> and to bind UNITED CASUALTY AND SURETY INSURANCE COMPANY, thereby, and all of the acts of said Attorney -in -Fact pursuant to these presents, are hereby ratified and confirmed. -ThisWwCpf torr q5y signed and si dEy cst_il �i�der�d by authontyi ►'fthe II' II owmg'i eIoluti��s adopted by e Bt�ar�-o-f-Di s g ' ilk ailed a1l1 held oln the i�' dayof ijclt= - �TtmWs are no � n fallforceUandEeffe - ���-��ANY at a meets dui.. All I - — — Resolved that the President, Treasurer, or secretary be and they are hereby authorized and empowered to appoint Artomcys-in-Fact of the Company, in its name and as its acts, to execute and acknowledge for and on its behalf as surety any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the naturethereof with power to attach thereto the seal of the Company. Any such writings so executed by such Attomeys-in-Fact.shall be binding upon the Company as if they had been Auly exscni ackmowledgcd by the regal jy elec O> eers bi 'i Company in their oRv�rop_4=oms I_ _ EAffis—w iFUn is signed and sea d byf �4rnile iiII' t and by the au o ty f ME #wow resolution ado ted b the Soard ff ZCTWVUTUTED CASUALTY ANDIh, II 4supANCE COMPANY, U mMting duly called and held on the 1't day o�July, 1-993: That the signatureof any officer authorized by Resolutions of this Board and the Company seal may beaffixed ed by facsimile to any power of attomey or special power of attomey or certification of either given for the execution of any bond, undertaking, recognizance or other written obligation in the nature-thereot such signature and seal, when so used being hereby adopted by the Company as the original signature ofsuch officer and the original seal of the Company, to be valid and binding upon the Company with the same force and —_ 33�ITNES& 1EOF, UNITED�1ZTYAD��UIETY INS CO` IIII aus e ecu s=_thI -- nanu affixed, _ IIII Lill er��er �d its -co orate seal to b euf xix� tht 14t1i I� II� ied these presences t60 RM i i P corporate = dayofJuly, q,�I�D. lO _-- UNITED CASU AND SURETYINSURANCE COMPANY �S.Carrigan,Pre ' II'' IIII _ - II Ilil� ' i1;1, III - tmoi aTth oTlAassachusetts, County of Suffolk ss:'' On this 14th day ofluly in the year 2010 before me personally came Todd S- Carrigan tome known, who, being by me duly sworn, did depose and say: that he resides in the Commonwealth of Massachusetts; that he is President of UNITED CASUALTY AND SURETY INSURANCE COMPANY the corporation described in and which -exec-uted the above instrument; that be signledlll} Is name thereto by the above gt�te utha at t now -she seal of Bair orR©r n �iia a seaLaffised to said i'i�stl t:tneni l such orate seal, and tha-it vias— ca IM &IiMoffir�-under the b -laws # ait��o rain V - I qu iiiuulir —_ _ tY Y _ III Caitlin L. Flanagan Notary Public 6V Commonwealth of Massachusetts My Commission Expires Notary Public 05/14/2015 - I 'll I o _ li}1 _gaTreasurer of 1 tlNIT1y'!IIII ASVI 1 Y SURETY INTIE�L�ICO1vIPPAertify that the Tore�oirg power of aim ti AM quoted Resolut 8,s of I „ e Boarl of Directors of July 1,1220- Ji -V -_t)t l�e��i-idged or revoked aiid are_now engin - _ ilp 4i i— — - - e ani effect - Signed and sealed by its proper officer and its corporate seal to be hereunto affixed this day, 8th day of February, 2012 — uiioihy M. Carn —IS I �2"TO CONFIRbAUINTIUITY�-THIS BOND OR I ALL (800) 829-26W37 _- -i 1 PAYMENT BOND Bond No. 6944 KNOW ALL MEN BY THESE PRESENTS, that we F.M. Generator, Inc. with a place of business at 35 Pequit Street, P.O. Box 528, Canton, MA 02021 as Principal (the "Principal"), and United Casualty & Surety Insurance Companya corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 170 Milk Street, Boston, MA 02109 as Surety (the "Surety"), are held and firmly bound unto the Town of North A�❑❑do er �ssachusetts as Obligee Thirteen Thousand Five Hu id= >;igZity-Seven (the "Obligee"), in the sum of Dollars &-00/100 ($13.587.00) lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of 2/2012 , for the construction of Generator Maintenance Multiple Locations NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this 8th day of February, 2012. PRINCIPAL F.M. Generator, Inc. [N e and Seal] [Title] - Attest: SURETY United Casual v and [Attorney - 170 Milk Strut; [Address] (617) 542-3232 Phone ety Insurance Company Carrigan Boston, MA 02109 END OF PAYMENT BOND C&S Power Nob944 TJNITED�CAUALTY �AND SURETY SDURETY — = INSURANCE COANY LI p —anyact Amourst2=7,1 75.00 III- - I — J v �°i 1 y Bond Amount: 587.00 KNOW ALL MEN BY THESE PRESENTS: —That UNITED CASUALTY -AND SURETY = — _S N MPANY, a corporateonof the Com oII n�iI w' ealth of Massachusetts, doe_s-h ereby ni tean9fimt I, III II — = Todd S. Carrig'yh IIIIIfIII - — its trite and lawful Attorney -in -Fact, with full power and authority, for and on behalf of the Company as surety, to execute and deliver and affix the seal of the CompanK-ftepreto, if a seal is required, bonds, undertakings, recognizances, consents ofsttr� or other written obligations in the nature t ie{i _Annyan&Wf , undertakings, r.e� Piz g ionsen b'�surety or other wntten fins t _e7 ureic eieof and to bind UNITED CASUALTY AND SURETY INSURANCE COMPANY, thereby, and all of the acts of said Attorney -in -Fact pursuant to these presents, are hereby ratified and confirmed. This power ofattorrre s signed and se led It > d by authority loathe fofill;' ik ng her' I lutions adopted byte B t boys 111 of UI`iITED CASMM AND SURE JN�G � NY at a meetin' duly, d anld 1�td on the I" day of ] 2-93 whichm — osolutions are -now -in full force and e �' IMI I I IIIIIIrJI', — Resolved that the President. Treasurer, or Secretary be and they are hereby authorized and empowered to appoint Attomeys-in-Fact of the Company, in its name and as its acts, to execute and acknowledge for and on its behalf as Surety any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the naturethereoi with power to attach thereto the seal of the Company. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the Company as if they had been duly gul y Ill III �Ii fthe Company in their own proper persons �_ shower zs signed and Fled by IIII Ies>nt�i� I� dei) and by the a or y f ®a tng 2esolution adopfecJ�y�.`he Board of cn o e ! URE c rmIkJ T ASUALTYAN llllIIII III' II iINS CE COMPANY, IMI dt -c-0-and held on the f�July, 1993` That the signature ofany officer authorized by Resolutions of this Board and the Company seal maybe affixed by facsimile to any power of anomey or special power of attorney or certification ofeither given for the execution of any bond, undertaking, recognizance or other written obligation in the nature -thereat such signature and seal, when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same farce and effect as though manually affixed - JN r WITNESSOF, UNITEDyIt T TY INS URANGJ p�� II hi 111111 'sed these preseiged icy=t# - -proper o fficer ddW&rporate seal to be erPfn__ - M � 4th day of July, 20 - - -- - UNITED CASUA& ANU?SURETY INSURANCE COMPANY o -MS. Camgan, ..re ill III ommAnw Cusetts, County of Suffol s On this 14th day of July in the year 2010 before me personally came Todd S. Carrigan tome [mown, who, being by me duly sworn, did depose and say: that he resides in the Commonwealth of Massachusetts; that he is President of UNITED CASUALTY AND SURETY INSURANCE COMPANY the corporation described in and which executed the above instrument; that h such e s name thereto by the above quoted ty corp trot- - 'i 'I'Ied hi --authority of hW6 der the b -lawsx fsa_ _r ln= _ -- — — III at e signed late seal, and that it wft—Wired-6y_ - authors that#elmaw� the seal of said co ora the �� affixed to said. mst to tP — n III Caitlin L Flanagan = — 1 Nota Pu61i Notary Public -Yc Commonwealth of Massachusetts My Commission Expires 0 511 4/2 0 1 5 I TIM y - D he )3o ;I SURETY I IEi 1 O AI.TY==certify that the omgmpg power- of `I rer of ttr�rrr arra t uo et duResol 1t ons I t II of Di 111 - - tors of July U-31-990 veten ahnrlged or revoked�re now in full AS II 111111'. � - - Signed and sealed by its proper officer and its corporate seal to be hereunto affixed this day, 8th day of February, 2012 oC _ #hy M. Carri& II' L II li �T ONFIRM AUT- E1 DTKTOPU 'HIS BOND 09 DCDiI° 'UME CALL (800) 829-2— - »�}MCD !/}} 72 & 0 ( o E2. » « £ \/ID 0 \\ !§E32 ) (0'&� , [\ E\ !/2} l22k :/on }0 'n 0C) !m 20 7\#a) ,7 I{}% ƒ\f) 22 ƒ/n(;( k� !§ (\&] !=, (\33 . § ) }0 . (\qty & �x �x »�}MCD !/}} 72 & 0 ( o E2. » « £ \/ID 0 \\ !§E32 ) (0'&� , „f t TOWN OF NORTH ANDOVER CONTRACT CONTRACT# DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: FM Generator Address: P.O. Box 528 Canton, MA 02021 Telephone Number: 781-828-0026 Fax Number: 781-821-2545 1. This is a Contract for the procurement of the following: Perform preventative maintenance and as -need repairs of emergency power generators located at all municipal and school buildings as well as water booster and sewer pump stations for the period of February 1, 2012 through January 31, 2013 in accordance with the Invitation for Bids issued on December 21, 2011 2. The Contract price to be paid to the Contractor by the Town of North Andover is: Preventative maintenance per the unit prices in Attachment A As -needed service Regular business hours $84.00 per hour Non business hours $126.00 per hour 3. Payment will be made as follows: Upon services being rendered and receipt of invoice, net 30 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by (Rev 5-2007) Contract by and between Town of North Andover and FM Generator Page 1 authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before January 31, 2013, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. (Rev 5-2007) Contract by and between Town of Nortb Andover and FM Generator Page 2 Corporate Headquarters 35 Pequit Street P.O. Box 528 Canton, MA 02021 Phone: 781.828.0026 Fax: 781.821.2545 www.fmnnnar=Mn — 24 HOUR EMERGENCY SERVICE FM Generator, Inc. is headquartered in Canton, MA and has offices located in West Springfield, MA and Burlington, NC. FM Generator was founded in 1970 and was incorporated in 2005. We have been providing comprehensive maintenance programs for over 40 years. We provide a variety of generator set and automatic transfer switch services to over generator sets on a regular basis. FM Generator consists of several divisions which, when combined, comprise one of�he most comprehensive generator companies in the Northeast. The service department of FM Generator consists of approximately 40 generator set technicians who have completed a variety of training sessions on multiple generator sets and possess EGSA certifications. Our technician structure consists of maintenance technicians as well as troubleshooting technicians whose primary goal is to keep generators running and to get them up and running in the event of a failure. 9 One division of our service department includes fully trained repair staff for automatic transfer switch repair service and maintenance as well as replacement of transfer switches. FM Generator is one of the only companies who offers transfer switch services. Our customers find this to be a huge benefit as they do not need to call in testing companies or the transfer switch manufacturer for services. Operation Support Division; Ops is a supporting division to our service department. It includes parts, rentals, customized repairs, and disaster recovery. The ops team regularly works hand in hand with the service managers to help them fulfill their required goals. The philosophy is that the service department services generator sets and it is the role of department to give them the necessary tools and equipment to get the job done. Many of the functions below are ops related and help satisfy our customer base. p 1) Rental generator sets and automatic transfer switches We have in our rental inventory 30 generator sets which are used during emergencies to provide backup power to various facilities. The generators are all diesel and range from 35 KW to 500 KW. 2) In house radiator repair services. FM Generator has an in house radiator repair and rebuilding department which affords us the opportunity to repair and rebuild radiators in a fraction of the time it would take an OEM to ship new radiator. i p a 3) Fueling services• FM Generator has diesel fuel in our service trucks and we also have 5,000 gallons of rollin diesel fuel available twenty four hours a day. g 4) Disaster recovery services: In the event of a disaster, FM Generator combines all its resources to deal with the disaster at hand. We .have been called to support state and federal governments and communication centers around the country. Our staff has been recognized by the Massachusetts state senate and the President of the United States for our services. You can get a full picture of our disaster recovery program on our website which is located at w 88M!MRenerator com. Our customer base consists of several customers who are dependent on generator sets and require a hi h d generator maintenance. Below please find a partial list of customers for your review. 9 errand in Commonwealth of Massachusetts statewide contract which includes State Police, DOC, and Health and Hospitals 1. Deb.Combra 617-720-3329 B) City of Boston, Boston Fire Department, Boston Police Department 1. Joe Mayo 617-343-3312 C) Massachusetts Department of Conservation and Recreation statewide contract 1. Yvonne Jones 781-799-3266 D) State of New Hampshire statewide contract for all state agencies 1. Paul Rhodes 603-271-3350 E) Philadelphia International. Airport 1. John Garofalo 215-937-6992 F) Various counties and cities in New Jersey and New York Branch Offices 178 New Bridge Street Springfield, 7.02200 089 (p) 413.737. 2459 Corporation Parkway Burlington, NC 27215 (f] 413.737.2288 (p) 336.222.8ni7 FM GE ' NERAT OR,INC.....:........ . We are available twenty four hours a day, seven days a week to meet our telephone at 781-828-0026 or at 800-253-6617. The on-call manager will be ableo o ass seds. We can be reached by normal business hours. t you if you contact us after Our commitment to our customers is to provide them with exceptional services a there when our customers need us most. We are truly specialists in our field with all types of and maintenance, and most importantly be transfer switches: yP generator sets and automatic Serving You Yesterday, Today and Tomnrrn%Ai APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible, responsive bidder offering the lowest aggregate price for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. Year 1- February 1, 2012 through January 31, 2013 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $ WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $1300-01) UNIT # 3: 98 Rosemont Drive $!�%D . p0 UNIT # 4: 1.74 Sutton Hill Road $ ; 5D .0 UNIT # 5: 71 Bear Hill Road $'�. Do UNIT # 6: Orchard Village $ -,3x, Qd SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $,-3w. a) UNIT # 8: 87 Flagship Drive $. OQ UNIT # 9: Jasmine Plaza, 720 Turnpike Street $,-3txi. 0C) UNIT #10: Alcott Village, 105 Andover By -Pass $250.00 UNIT #11: Boston Hill, 1280 Turnpike Street $ .DO UNIT # 12: Located at Forest View, 14 Palomino Drive UNIT # 13: Located at Campbell, 1875 Salem Street $ . 00 UNIT # 14: Bonny Lane, 133 Bonny Lane $5ca on UNIT # 15: Rea's Pond, 1653 Great Pond Road $ 30b. 00 Town of North Andover IFB - Emergency Power Generator Services Page 2 of 9 Addenda #1 UNIT # 16: Butcher Boy, 1945 Great Pond Road $ 30 UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ OD. UNIT # 18: Saile Way, 89 Saile Way $300.00 UNIT # 19: Winter Street, 60 Winter Street $ Ob.00 UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ 50D ZO UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ :50D.06 UNIT # 22: Johnson Circle, 85 Johnson Circle $ DO UNIT # 23: Blue Ridge, 410 Blue Ridge Road $,1T) -OO UNIT # 24: Dale Street, 595 Dale Street $ 0. 00 UNIT # 25: Meeting House, 44 Meeting House Commons $ -.3CQ. 00 UNIT # 26: Carter Field, 75 Carter Road $ 500.00 FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ 300.00 UNIT #28: Fire Station 2, 9 Salem Street $ 300 . 00 UNIT #29: Located on Engine 1 $.�po. no UNIT #30: Located on Engine 2 $300-00 UNIT 43 1: beeated onEngine —3 $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ 0. 0 UNIT 436 Franklin Elementary School, 2 Cypress Terrace $ (). 0O Town of North Andover IFB - Emergency Power Generator Services Page 3 of 9 Addenda #1 UNIT #37: Sargent Elementary School, 300 Abbott Street $ . DD UNIT #38: High School, 430 Osgood Street $ 400. O0 UNIT #39: High School, 430 Osgood Street $ -400 , DO UNIT #40: Middle School, 495 Main Street $AMDO POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $� PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street $ �QD, Dt1 UNIT #43: Senior Center 120R Main Street. $ �300. C)U As -Needed Service $ 3W . Do Regular business hours 50 hours sekoo $ Q0.00 Non business hours 75 hours $ tp • 00 $ 1% 00 TOTAL $ -76, 00 Year 2 - February 1, 2013 through January 31, 2014 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $ 4Q WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ 3W . Do UNIT # 3: 98 Rosemont Drive $boa . oD UNIT # 4: 174 Sutton Hill Road $ Of) UNIT # 5: 71 Bear Hill Road $ 0.00 Town of North Andover IFB - Emergency Power Generator Services Page 4 of 9 Addenda #I UNIT # 6: Orchard Village $ 3Q, DQ SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $. 00 UNIT # 8: 87 Flagship Drive $ ,d(7 UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ �5oo, DO UNIT #10: Alcott Village, 105 Andover By -Pass $ UNIT #11: Boston Hill, 1280 Turnpike Street $ , Do UNIT # 12: Located at Forest View, 14 Palomino Drive $50D. ov UNIT # 13: Located at Campbell, 1875 Salem Street $ smoo UNIT # 14: Bonny Lane, 133 Bonny Lane $ 300, 0o UNIT # 15: Rea's Pond, 1653 Great Pond Road $ �60Q. DO UNIT # 16: Butcher Boy, 1945 Great Pond Road $ ?)W. 00 UNIT # 17: Located at Coachmen, 70 Coachmen Lane $3W. DD UNIT # 18: Saile Way, 89 Saile Way $ 3w, co UNIT # 19: Winter Street, 60 Winter Street $ 5 UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ 500. 00 UNIT # 21: Holly Ridge., I Holly Ridge Drive $ , , 0o UNIT # 22: Johnson Circle, 85 Johnson Circle $ 3MDO UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ ?FD. 00 UNIT # 24: Dale Street, 595 Dale Street $350,c) UNIT # 25: Meeting House, 44 Meeting House Commons $ JOa Dc UNIT # 26: Carter Field, 75 Carter Road $ , DO Town of North Andover IFB - Emergency Power Generator Services Page 5 of 9 Addenda #I FIRE DEPARTMENT UNIT 427: Fire Station 1, 124 Main Street $ -5w, no UNIT #28: Fire Station 2, 9 Salem Street $W UNIT #29: Located on Engine 1 $ ao . n UNIT #30: Located on Engine 2 $ fib' Q� t TIT #31 : heeated en Engine 3 $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 11 I Phillips Brook Road $ 'L.Do UNIT #36 Franklin Elementary School, 2 Cypress Terrace UNIT #37: Sargent Elementary School, 300 Abbott Street UNIT #38: High School, 430 Osgood Street UNIT #39: High School, 430 Osgood Street UNIT #40: Middle School, 495 Main Street POLICE DEPARTMENT UNIT #41: 1475 Osgood Street PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street UNIT #43: Senior Center 120R Main Street. As -Needed Service $ 0DD - $ 'l.°-5 . co $ ADD . DD $ !nOD D 0 $4op.w Regular business hours 50 hours $ 4, nd $ Z b Town of North Andover IFB - Emergency Power Generator Services Addenda #1 Page 6 of 9 Non business hours 75 hours sln . 06 $ TOTAL $J�OD Year 3 - February 1, 2014 through January 31, 2015 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $ WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ 0.00 UNIT # 3: 98 Rosemont Drive $ -jc 0. oo UNIT # 4: 174 Sutton Hill Road $ 00 UNIT # 5: 71 Bear Hill Road $� UNIT # 6: Orchard Village $ W, DO SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ �)OO. [B UNIT # 8: 87 Flagship Drive $COQ -DO UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ 25u) Z UNIT #10: Alcott Village, 105 Andover By -Pass $ -5 0. DD UNIT #11: Boston Hill, 1280 Turnpike Street $ SM. OD UNIT # 12: Located at Forest View, 14 Palomino Drive $ 1) () UNIT # 13: Located at Campbell, 1875 Salem Street $p UNIT # 14: Bonny Lane, 133 Bonny Lane $ ADD, 60 UNIT # 15: Rea's Pond, 1653 Great Pond Road $ Bao, oo Town of North Andover IFB - Emergency Power Generator Services Page 7 of 9 Addenda #I UNIT # 16: Butcher Boy, 1945 Great Pond Road $ �Joo. OD UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ 300. DO UNIT # 18: Saile Way, 89 Saile Way $ X00.00 UNIT # 19: Winter Street, 60 Winter Street $ tea. Do UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ sm. 00 UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ HiQ . DO UNIT # 22: Johnson Circle, 85 Johnson Circle $ �SW. (0 UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ -550. 60 UNIT # 24: Dale Street, 595 Dale Street $�Mcp UNIT # 25: Meeting House, 44 Meeting House Commons $ 300. O UNIT # 26: Carter Field, 75 Carter Road $ FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ 5100. aD UNIT #28: Fire Station 2, 9 Salem Street UNIT #29: Located on Engine 1 $ -co. OD UNIT #30: Located on Engine 2 $ 300. DD UNIT #3 1 -; Leeated en Engine 3 a SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ �-300• to Town of North Andover IFB - Emergency Power Generator Services Page 8 of 9 Addenda #1 UNIT #37: Sargent Elementary School, 300 Abbott Street $ A25 . 04 UNIT #38: High School, 430 Osgood Street $ to, D Q UNIT #39: High School, 430 Osgood Street $ UNIT #40: Middle School, 495 Main Street $40O, 00 POLICE DEPARTMENT UNIT #41: 1475 Osgood Street PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street UNIT #43: Senior Center 120R Main Street. As -Needed Service Regular business hours 50 hours Non business hours 75 hours $12,U . 00 $ 6.0(6 TOTAL $ 2105-00 Addenda 2 are acknowledged: L.�AA� x �' A. Signalure Business Name U &M&� (Mpr Business Address Pb59A C p , HA 6QA11 Business Phone -1 � I- j � �('Z�,j Fax -76142-1 Name of Person Authoriz`eyl to sign Price Proposal UGYa4s Title of Person Authorized to sign Pr' e Proposal Signature of Above Person Town of North Andover IFB - Emergency Power Generator Services Page 9 of 9 Addenda #I .e United Casualty and Surety Insurance Company BID BOND Bond'No: UC16919 KNOW ALL MEN BY THESE PRESENTS, that we F.M. GENERATOR, INC. 35 PEQUIT STREET CANTON P. 0. BOX 528 MA 02021 as Principal, hereinafter called the Principal, and UNITED CASUALTY AND SURETY INSURANCE COMPANY of 170 Milk Street, Boston, Massachusetts 02109, a corporation duly organized under the laws of the State of Massachusetts as Surety, hereinafter called the Surety, are held and firmly bound unto TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MA 01845 as Obligee, hereinafter called the Obligee, in the sum of NOT TO EXCEED 5 % OF ATTACHED BID -----DOLLARS ($------) for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for GENERATOR MAINTENANCE AND REPAIRS - MULTIPLE LOCATIONS NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 10th of January 2012 1 n ---.`r F.M. GENERATOR, INC. Witn s AKo-- Witness Todd S. ALTY AND SURETY INSURAI4��1R�i'T� `rG� Q.qPA1 - v ys 4,�� • �O, i w. VCS UNITED CASUALTY AND SURETY INSUR ANCE COMPANY BOSTON, MASSACHUSETTS Power No: UC 16919 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That UNITED CASUALTY AND SURETY INSURANCE COMPANY, a corporation of the Commonwealth of Massachusetts, does hereby make, constitute and appoint Todd S. Carrigan its true and lawful Attomey-in-Fact, with full power and authority, for and on behalf of the Company as surety, to execute and deliver and affix the seal of the Company thereto, if a seal is required, bonds, undertakings, recognizances, consents of surety or other written obligations in the nature thereof, as follows: Any and all bonds, undertakings, recognizances, consents of surety or other written obligations in the nature thereof and to bind UNITED CASUALTY AND SURETY INSURANCE COMPANY, thereby, and all of the acts of said Attorney -in -Fact pursuant to these presents, are hereby ratified and confirmed_ This power of attorney is signed and sealed by facsimile under and by authority of the following Resolutions adopted by the Board of Directors of UNITED CASUALTYAND SURETYINSURANCE COMPANY ata meeting duly called and held on the P day of July, 1993 which Resolutions are now in full force and effect: Resolved that the President_ Treasurer, or Secretary be and they arc hereby authorized and empowered to appoint Attomeys-in-Fact of the Company, in its name and as its acts, to execute and acknowledge for and on its behalf as Surety any and all bonds, recognizanccs, contracts of indemnity, waivers of citation and all other writings obligatory in the uaturethercof with power to atrach thereto the seal ofthe Company. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the Company as if they had been duly executed and a6mowledged by the regularly elected Officers of the Company in their own proper persons. This power of attomey is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of UNITED CASUALTYAND SURETY INSURANCE COMPANY, at a meeting duly called and held on the 1" day of July,1993: That the sionatune of any officer authorized by Resolutions of this Board and the Company seal may be affixed by facsimile to any power of attorney or special power of attorney or cerafieation of either given for the execution of any bond, undertaking_ recognizance or other written obligation in the namrcthercot such signature and seal, when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and cffcct as though manually afrnxcd IN WITNESS WHEREOF, UNITED CASUALTYAND SURETY INSURANCE COMPANY has caused these prese6pid bV 5igp�d by its proper officer and its corporate seal to be hereunto affixed this 14th day of July, 2010. ���`0 SURE%y��,�� ���P�•��PORq UNITED CASU AND SURETYINSURANCE COMPANY 0 =cn E :m_ Todd S_ Carrigan, Pre v' 1993. Aco • o Commonwealth of Massachusetts, County of Suffolk ss: � ',��ti .... *�a �,. On this 14th day of July in the year 2010 before me personally came Todd S_ Carrigan to me known, who, being by mttitjpq sw; rT did Wose and say that he resides in the Commonwealth of Massachusetts; that he is President of UMTED CASUAMYAND StAgV 043ek 1igCE COMPANY, the corporation described in and which executed the above instrument; that be signed his name thereto by the above quoted authority; that he knows the seal of said corporation; that said seal affixed to said instrument is such corporate seal, and that it was so affixed by authority of his office under the by-laws of said corporation -� caitlln L_ Flanagan Notary Public Commonwealth of MassachusetL, My Commission Ixplres Not Public osnarzots 1, Timothy M- Carrigan, Treasurer of UNITED. CASUALTY AND SURETY INSURANCE COMPANY, certify that the foregoing power of anomey, and the above quoted Resolutions of the Board of Directors of July 1, 1993 have not been abridged or revoked and are now in full force and effect_ Signed and sealed by its proper officer and its corporate seal to be hereunto affixed this day, 10th day of January, 2012 EC Timothy M_ Carrig , T asurer TO CONFTRlvl AUTHENTICITY OF THIS BOND OR DOCUMENT CALL (800) 829-2663 L =—==l, =; DEVAL L- PATRICK GOVERNOR TIMOTHY P. MURRAY LIEUTENANT GOVERNOR COMMONWEALTH OF MASSACHUSETTS Office of Consumer Affairs and Business Regulation DIVISION OF INSURANCE One South Station • Boston, MA 02110 - 2208 (617) 521-7794 • FAX (617) 521-7576 TTY/TDD (617) 521-7490 http://www.mass.gov/doi DANIEL C. CRANE DIRECTOR DANIEL O'CONNELL NONNIE S. BURNES SECRETARY OF HOUSING AND COMMISSIONER OF INSURANCE ECONOMIC DEVELOPMENT Serial #: 000530876000 Effective Date: 1/1/2008 NAIC #: 36226 Federal ID #: 581847495 DOMESTIC COMPANY CERTIFICATE OF COMPLIANCE THIS IS TO CERTIFY THAT United Casualty and Surety Insurance Company is duly organized under the laws of this Commonwealth, and that it is authorized under the Sections of Chapter 175 of the General Laws of Massachusetts and amendments thereto described by the following designations: 4 DESIGNATION CODES: 1 Fire 15 Reinsurance (Reinsurance Companies Only) 2A Ocean & Inland Marine 16A Life - All Kinds 2B Inland Marine Only 16B Group Life Only 4 Fidelity and Surety 16C Variable Annuity Authorization 5A Boiler 16D Annuities Only 5B Boiler (No Inspector) 16E Variable Life Authorization 6A Accident - All Kinds 17 Repair - Replacement 6B Health -All Kinds 19 Legal Services 6C Group Accident & Health 20 Credit Involuntary Unemployment 6D Non -Can. Acc. & Health 51 Stock Companies >(Extension of coverage 6E Workers' Compensation 54 Mutual Companies >not specified in Section 47) 6F Liability other than Auto 54BX Reinsurance except Life 6G Auto Liability 54BY Nuclear Energy 7 Glass 54BZ Special Hazards 8 Water Damage and Sprinkler Leakage 54C Comprehensive M.V. & Aircraft 9 Elevator Property Damage and Collision 54D Personal Property Floater 10 Credit 54E Dwellings 11 Title 54F Commercial Property. 12 Burglary, Robbery, Theft 54G Reinsurance - Life Companies Only 13 Livestock This certifiq.atej all remain in effect for an indefinite term unless said authority is amended or rev oked-it>*with law. y9' b COMP004 - Domestic Company Certificate of Compliance Nonnie .S. Burnes Commissioner of Insurance Santilli, Ray From: Foster, Stephen E. Sent: Friday, January 27, 2012 2:18 PM To: Santilli, Ray Subject: RE: EMERGENCY GENERATOR Ray: It is my opinion based upon my discussion with FM GENERATOR furnished references B,C,D that no valid reason exists for not awarding the low bid for emergency generator to FM GENERATOR. From: Santilli, Ray Sent: Friday, January 27, 2012 12:30 PM To: Foster, Stephen E. Subject: RE: EMERGENCY GENERATOR As the Facilities Management Director overseeing this issue, what is your recommendation? Please submit in writing. Thanks scig Sa. di i Assistant Town Manager Town of North Andover From: Foster, Stephen E. Sent: Friday, January 27, 2012 12:27 PM To: Santilli, Ray Subject: EMERGENCY GENERATOR Ray: See attached Call to discuss as/if necessary Stephen E. Foster Facilities Director -Town of North Andover, MA office: 978-794-1503 x-41306 mobile: 978-305-5850 sfoster@townofnorthandover.com Emergency generator Low Bidder F.M. GENERATOR (Reference checks) State of New Hampshire Paul Rhodes (PR) • 1.5 yrs into contract with FM • Recent state wide consolidation of generator service & mtce contract • Each state agency calls directly to FM for response to generator problems • "no news = good news" as concerns agency complaints to PR • Agency complaints to date (to PR) = "unable to use previous (local) S & M contractor" • 136 generators included in contract of different models, mfgr, etc. • Previously each agency contracted separately for emergy gen. S & M contract • FM state wide bid much lower than competitors • -->how will FM make up bid difference ?; 'push' added service work ? OEM parts pricing ? • No current signs of aforementioned to date City of Boston Fire & Police Dept. Joe Mayo (JM) 0 FM low bid per city/state procurement process • 3 yrs into contract • Responsive to emergency generator repairs • Fair pricing on service work — at time of std. mtce visit • No cost over runs on service work • 16 generators in S & M contract • Previous JM job used FM — good results • Tight spec/scope provided on rfb Dept. of Conservation & Recreation: Tom Morello (TM) • FM S & M contract 10 yrs (5 separate 2 yr. terms — low bid award) 0 No reservations — would use again • 20 generators: 6 kw — 300 kw • Service charges are fair 0 Cooperative contractor ADDENDA #2 — January 5, 2012 INVITATION FOR BIDS EMERGENCY POWER GENERATOR SERVICES TOWN OF NORTH ANDOVER, MASSACHUSETTS In accordance with Massachusetts General Laws, Chapter 71, Section 38R, the North Andover School Department requires criminal offender records checks be performed on all personnel of contractors authorized to do work on school grounds that may have direct and unmonitored contact with children. The successful contractor will be required to submit a `CORI Request Form' for any person who may be assigned to work on school department property. The forms will be submitted directly to the designated contact person at the North Andover School Department. The `CORI Request Form' may be viewed at http://www.northandoveEpublicschools.com/cms files/resources/coriFormEmployee pdf NORTH f 1 b<<.�•� .,,�o NOAPS _ O CH 385 �, ,>•�. G �,SS�CHUS NORTH ANDOVER PUBLIC SCHOOLS Administration Offices Christopher Hottel 1600 Osgood Sty Suite 3/59 Kevin Hutchinson, Ed.D. Superintendent North Andover, MA 01845 Assistant Superintendent 978 -794.-1503 www.northandovemublicschools.com CORI REQUEST FORM North Andover Public Schools has been certified by the Criminal History Systems Board for access to all criminal case data including conviction, non -conviction and pending. As an employee for the position of , 1 understand that a criminal record check will be conducted for conviction, non -conviction and pending criminal case information only and that it will not necessarily disqualify me. The information below is correct to the best of my knowledge. Please Note: A CORI form is valid for 3 yrs. Last Name Employee Signature EMPLOYEE INFORMATION (PLEASE PRINT CLEARLY) First Name Maiden Name or Alias (if applicable) Place of Birth Date of Birth Social Security Number (requested but not required) Current Address: Date Middle Name Mother's Maiden Name ID Theft Index Pin (if applicable) Former Address: Sex: Height: ft. in. Weight: Eye Color: State Driver's License Number: (ID MUST BE ATTACHED IN ORDER TO PROCESS CORI FORM) **THE ABOVE INFORMATION WAS VERIFIED BY REVIEWING THE FOLLOWING FORM OF GOVERNMENT ISSUED PHOTOGRAPHIC IDENTIFICATION: Identification: Requested by: Signature of CORI Authorized Employee *The CHSB Identify Theft Index PIN Number is to be completed by those applicants that have been issued an Identity Theft Index PIN Number by CHSB. Certified agencies are required to provide all applicants the opportunity to include this information to ensure the accuracy of the CORI request process. All CORI request forms that include this field are required to be submitted to the CHSB via mail or by fax to 617-660-4614. Rev. 8/09 ADDENDA #1— December 28, 2011 INVITATION FOR BIDS EMERGENCY POWER GENERATOR SERVICES TOWN OF NORTH ANDOVER, MASSACHUSETTS Section 6 —'List of Generators (Location and Type)' is hereby modified: FIRE DEPARTMENT UNIT 427: Fire Station 1, 124 Main Street Kohler Electric Plant, Model 1504E02JK, with General Motors Engine, Model 20148 UNIT #28: Fire Station 2, 9 Salem Street Onan Eleetfie Plant, Madel QRX03R, with Onan Engine, Model P2 Kohler Power Fast Response 125, Model 50RZ282, with a Ford Motor co -engine Model LSG87516005A UNIT #29: Located on Engine 1 Mitsubishi Eleetr-ie arare, Model del In nuTD ny , with Mitsubishi ish Engine, Model 97556 EY06 Wester Beker 75BTDAR UNIT #30: Located on Engine 2 Mitsubishi zeetrie Plant, Model In 0BTD A D with Mitsubishi b ishi Wester Beker 75BTDAR U, - UNIT #32! Leeated on Ladder- 1 DELETE NPei4able DELETE Onan Eleetfie Plant,•SAK, S40 111 C673 003, Engine Info �. - 2. Appendix A —'Price Proposal' is hereby modified: APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible, responsive bidder offering the lowest aggregate price for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. Year 1 - February 1, 2012 through January 31, 2013 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ UNIT # 3: 98 Rosemont Drive $ UNIT # 4: 174 Sutton Hill Road $ UNIT # 5: 71 Bear Hill Road $ UNIT # 6: Orchard Village $ SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ UNIT # 8: 87 Flagship Drive $ UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $ UNIT # 13: Located at Campbell, 1875 Salem Street $ UNIT # 14: Bonny Lane, 133 Bonny Lane $ UNIT # 15: Rea's Pond, 1653 Great Pond Road $ Town of North Andover IFB - Emergency Power Generator Services Addenda #I Page 2 of 9 UNIT # 16: Butcher Boy, 1945 Great Pond Road $ UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ UNIT # 18: Saile Way, 89 Saile Way $ UNIT # 19: Winter Street, 60 Winter Street $ UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ UNIT # 22: Johnson Circle,. 85 Johnson Circle $ UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ UNIT #28: Fire Station 2, 9 Salem Street $ UNIT #29: Located on Engine 1 $ UNIT #30: Located on Engine 2 $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ Town of North Andover IFB - Emergency Power Generator Services Page 3 of 9 Addenda # 1 UNIT #37: Sargent Elementary School, 300 Abbott Street UNIT #38: High School, 430 Osgood Street UNIT #39: High School, 430 Osgood Street UNIT #40: Middle School, 495 Main Street POLICE DEPARTMENT UNIT #41: 1475 Osgood Street PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street UNIT #43: Senior Center 120R Main Street. As -Needed Service Regular business hours 50 hours $ Non business hours 75 hours $ F19 d' TOTAL $ Year 2 - February 1. 2013 throueh January 31. 2014 Preventative Maintenance (two service calls Der Scone of Services DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $ WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ UNIT # 3: 98 Rosemont Drive $ UNIT # 4: 174 Sutton Hill Road $ UNIT # 5: 71 Bear Hill Road $ Town of North Andover IFB - Emergency Power Generator Services Addenda #I Page 4 of 9 UNIT # 6: Orchard Village $ SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ UNIT # 8: 87 Flagship Drive $ UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $ UNIT # 13: Located at Campbell, 1875 Salem Street $ UNIT # 14: Bonny Lane, 133 Bonny Lane $, UNIT # 15: Rea's Pond, 1653 Great Pond Road $ UNIT # 16: Butcher Boy, 1945 Great Pond Road $ UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ UNIT # 18: Saile Way, 89 Saile Way $ UNIT # 19: Winter Street, 60 Winter Street $ UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ UNIT # 22: Johnson Circle, 85 Johnson Circle $ UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ Town of North Andover IFB - Emergency Power Generator Services Addenda #1 Page 5 of 9 FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ UNIT #28: Fire Station 2, 9 Salem Street $ UNIT #29: Located on Engine 1 Q UNIT #30: Located on Engine 2 $ UNIT�_beeatrett en En Q UAB2. heeated-en-baddef , $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ UNIT #37: Sargent Elementary School, 300 Abbott Street $ UNIT #3.8: High School, 430 Osgood Street $ UNIT #39: High School, 430 Osgood Street $ UNIT #40: Middle School, 495 Main Street $ POLICE DEPARTMENT UNIT #41: 1475 Osgood Street M PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street $ UNIT #43: Senior Center 120R Main Street. $ As -Needed Service Regular business hours 50 hours $ $ Town of North Andover IFB - Emergency Power Generator Services Page 6 of 9 Addenda #I Non business hours 75 hours $ $ TOTAL $ Year 3 - February 1, 2014 throueh January 31, 2015 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $ WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ UNIT # 3: 98 Rosemont Drive $ UNIT # 4: 174 Sutton Hill Road $ UNIT # 5: 71 Bear Hill Road $ UNIT # 6: Orchard Village $ SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ UNIT # 8: 87 Flagship Drive $ UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $ UNIT # 13: Located at Campbell, 1875 Salem Street $ UNIT # 14: Bonny Lane, 133 Bonny Lane $ UNIT # 15: Rea's Pond, 1653 Great Pond Road $ Town of North Andover IFB - Emergency Power Generator Services Page 7 of 9 Addenda #I UNIT # 16: Butcher Boy, 1945 Great Pond Road $ UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ UNIT # 18: Saile Way, 89 Saile Way $ UNIT # 19: Winter Street, 60 Winter Street $ UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ UNIT # 22: Johnson Circle, 85 Johnson Circle $ UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ UNIT #28: Fire Station 2, 9 Salem Street $ UNIT #29: Located on Engine 1 UNIT 430: Located on Engine 2 $ UNIT #31: Loeated- on 3 $ UNIT #32; Leeated-enhaddef ' % SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ Town of North Andover IFB - Emergency Power Generator Services Page 8 of 9 Addenda #1 UNIT #37: Sargent Elementary School, 300 Abbott Street $ UNIT #38: High School, 430 Osgood Street $ UNIT #39: High School, 430 Osgood Street $ UNIT #40: Middle School, 495 Main Street $ POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ 17i7C iI[�li.�I�77:�.y UNIT #42: Garage, 384 Osgood Street UNIT #43: Senior Center 120R Main Street. As -Needed Service Regular business hours Non business hours Addenda Business Name Business Address Business Phone 50 hours $ 75 hours $ TOTAL $ are acknowledged: Signature Fax Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person Town of North Andover IFB - Emergency Power Generator Services Page 9 of 9 Addenda #I as 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 M M M M M M M M M M M M M as ti cd b > d 44 N p°q a w b 0 w 0 UO b 0 w :�kkkkkk a, w Gg� 6s 6s 69 61 6s 6s 6s 6s 6s 6s sus 6s 0 0 0 0 0 o O O o o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �. vi vi vi O vi vi vi tl� kt� vi o O O O r -O O 00 v) O O O O O M M M 3 �o v, kn v, v, v, V) v , v, V) V) V) kn 6s 6s 6s 63 6s bs 63 63 6s 69 b9 6s rzoq O O O O O O O O O O O O O O O O O O O O O O O O O O yam„ O C O O O O O O O O O O O O O O O kr) O O O O O vl O O O N M M M w C7 6s 6s 6s 6s 6s 64 6s 6s 6s 6s 6s 6s 6s w O O o 0 0 0 0 0 o O O O o O O o 0 0 0 0 0 0 0 0 0 0 �j O 00 00 v1 N 00 O� 011 00 O1, N N N O M M to 00 M Ol, O*1 M O*l 00 00 00 rO z Cl M M It M M N N M N M M M d O 69 6s 69 bs 63 6s 69 bs 6s 6s 6s 6s 6s Q O �' z w C7 ' ¢ 04 O o rn c oct va b x x m > O z d Q, o o0 ° N w opo as ti cd b > d 44 N p°q a w b 0 w 0 UO b 0 w :�kkkkkk 0 o O O O O O O o O O O o O o O O O o 0 o O O o 0 0 o O o o O o o O v; � vi vi Vi Vi O � v; vi vi Vi vi o vi Vi vi O O O O O O O O O m M O O M O V) V) M M M M M M M M M M M M M M M M M 69 69 b9 69 69 69 69 6R 69 69 69 69 69 69 6F3 69 69 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O v1 v1 V1 V1 V) Lfi V1 Lr� V) Vl O O V1 Lf� O N N N O O O O O O O O O m M O O M O V) V) kn V1 V) V) Ln V1 Vl V) V1 V1 to V) V) kn V) N N 69 69 69 69 6e 69 69 6A 69 60q 69 69 69 69 69 69 69 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O V1 V1 O O O O O O M M M M M M M M M M M M M M M Cl) M 69 6<i 64 64 69 64 69 69 69 69 69 69 69 69 69 69 69 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O� 00 C� O� C� N C� C� Q� N N 00 00 cl O U o V kl� C\ a1 O M Q\ C� 0\ 00 C\ 0\ C\ 00 00 M M V1 V1 O� N M N N N M N N N M M M M d N N 69 69 69 69 69 69 69 69 6R 69 69 69 69 6R 64 69 69 U C cts U Cd a Lcd w o •�, w 0 a 0 b a b W ❑ U U M ❑ o M cbd -OC C cd M cd co O � v U cl O U o V � Cd a, ?" U °�' O �' � 3 Q N � x 04C -?� x U ,� 00 0 02 U rx W va Q N cts U H w z v Q a Lcd w o •�, w 0 a 0 b a O W) Lr) O O O O O O O O O O N 06 O O O O O O O O O O Or� O N v1 O O v) Lf' kf� O vl O M 16 00 06 N l— CII - 00 00 00 00 O O kf) ' O M M It It It d M M Ile lzl. r�' � v) Q) C*� (71, M 00 M It 69 6A 69 69 69 69 69 69 69 69 69 69 O O O O O O O O O O O O O O O O O O O O O O O O Or� O N triO O vl v) vi vl vi vi 00 C� M O M 00 vl v) r- vl O O kf) D\ O N M N V \O M M -11� cp� r�' � v) Q) C*� (71, M 00 M N 69 69 69 69 69 69 69 69 69 69 69 69 O O O O O O O O O O O O O O O O O O O O O O O O O O O O lr� O O O O O O O O O O O N O O O O O O N It vi N M N V \O M M -11� cp� r�' � v) Q) C*� (71, M 00 M N 69 69 69 69 69 69 69 69 69 69 69 69 O O O O O O O O O O O O O O O O O O O O O O O O O vl O 00 r� lf� vi v) vi N 00 O N N M � v) Q) C*� (71, M 00 M v) --' M l� 00 00 00 69 69 69 69 69 69 69 69 6R 69 69 69 'O cd O Ln CA O CL ° VU) Cn a sC• W x kn M 4t O U Cn W M 4t .D U Cn W M 4t O Ln O o Q 'con 00 M :t O ° o Ln mon M Z;t ��+ D\ W d W a y o on ° � U4ta� a L40)�Crd O 00 M O o d kr) '~ i w l� Z TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 (11011-(100 Raymond T Santilli = p TEL (978) 688-9516 Assistant Town Manager FAX (978) 688-9556 March 1, 2012 Mr. Arjen Steegstra Power Products Systems, LLC 107 Audubon Road, Suite 10 Wakefield, MA 01880 Dear Mr. Steegstra: Enclosed please find the bid bond/deposit submitted with your proposal in response to the Invitation for Bids —'Emergency Power Generator Services' issued by the Town of North Andover. The bid bond/deposit is being returned since the contract was awarded to another vendor. If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure N O LL a c rn d' Ln rl a Ycl ULL W¢ 2� Uz d oo J a _J Q Cl)-� mo Lu _j LL LL LL w N3N F- Uo �a 0C O, as LU �Q O m a� Am Ln cN 00 r -i O E -L H> CO 0 z H Ex -E N r-Iz a Ir cc Ln rm ry Lo a CL- rm r. a ti a� Ir Ln 1 a O Y y O cc z w x ¢ O in LrH w� N z0 2 D z z Lr LO Lr 01 ' Z w i a Ln jr Lri CC O a FCP a Y M O a > a jc -x N Ok W Z CIJ Nrn Z¢ O w`oN �U F -x U poo ic W 0 O ¢ J -x J Ir 0 C%l O 0 cl, E-1 z Z O O w U O U s Ln UzL 1 Lr p o N N ¢ U1Lf 0 LO LC rn z ¢¢ w � a o, J ,Z tlN z a a O w UW OQ N = Lr a0 z o U40 °C 0 w CC A Um O w Z z _z r-1 O C Am Ln cN 00 r -i O E -L H> CO 0 z H Ex -E N r-Iz a Ir cc Ln rm ry Lo a CL- rm r. a ti a� Ir Ln 1 a O n .�- DM M N � CIC w D z z Lr °r o ' w i a Ln jr Lri CC 1 a FCP a Y M O a > a jc -x N Ok Z CIJ Nrn pQpino cr w`oN �U -x Zm> C poo ic O Z -x Ir 0 C%l ta Z cl, E-1 Z w U Ln N 0 z � a ° tlN z a a w V = Lr a0 O � � U40 °C A O w W A w ca 0 H x 0 H a R m d W O 0 z W. -50 3 A w w - N C4 O U) 0 �;yo m o A z z =0��� ,� x o 0 i CL E '£ co W d 3 z W Lr �° rn >-°aUQ = w �CF-0Z5 a0c0 F— 0 Am Ln cN 00 r -i O E -L H> CO 0 z H Ex -E N r-Iz a Ir cc Ln rm ry Lo a CL- rm r. a ti a� Ir Ln 1 a O Ray Santilli Assistant Town Manager 120 Main St. North Andover, Ma 01845 January 10, 2012 RE: BID PROPOSAL — "Emergency Power Generator Services" December 21, 2011 Dear Mr. Santilli: Thank you for the opportunity to propose service to the Town of North Andover. Enclosed is our response to your R.F.P. Power Products has over thirty years of experience in the Generator Service Industry and our technicians are all fully qualified to work on your equipment (see attached Company Profile and Technician Listing). The quality and the professionalism of our field technicians separates us from our competition. Power Products values the relationships we have developed with our existing customers and we look forward to working with the Town of North Andover (see the attached references). Please contact me if you have questions regarding the enclosed proposal. Sincerely: John Cervone, Generator Support Services Power Products Systems, LLC Phone: (781)287-7327 Fax: (781)246-5321 Enclosures: Appendix A Price Proposal, * Option for Unit #1, Statement of Qualifications and Company Information, References, Emergency Response Time and 24/7 Live Emergency Phone Line, 5% requested Bid Check, Certification, Certificate of Vote, and Certifications. APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible, responsive bidder offering the lowest aggregate price for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. Year 1- February 1, 2012 through January 31, 2013 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT q UNIT # 1: 420 Great Pond Road $ 3 )0 +1 WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ 3 �s UNIT # 3: 98 Rosemont Drive $ 37 -5 - UNIT 7� UNIT # 4: 174 Sutton Hill Road $ 3 90 UNIT # 5: 71 Bear Hill Road $ Y �-S— UNIT # 6: Orchard Village $ 3 7 r SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ 3 UNIT # 8: 87 Flagship Drive $ UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ 3� UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $ J UNIT # 13: Located at Campbell, 1875 Salem Street $SI UNIT # 14: Bonny Lane, 133 Bonny Lane $ UNIT # 15: Rea's Pond, 1653 Great Pond Road $S Town of North Andover IFB - Emergency Power Generator Services Page 2 of 9 Addenda #1 N UNIT # 16: Butcher Boy, 1945 Great Pond Road $s UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ 37,5-- 375UNIT UNIT# 18: Saile Way, 89 Saile Way $mss UNIT # 19: Winter Street, 60 Winter Street $ UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ 3 9� UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ UNIT # 22: Johnson Circle, 85 Johnson Circle $ UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ 7s� UNIT # 24: Dale Street, 595 Dale Street $ J �� UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ 7� FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ 3 /U 7 UNIT #28: Fire Station 2, 9 Salem Street $ 7 37f UNIT #29: Located on Engine 1 $ UNIT #30: Located on Engine 2 $ 3 7f SCHOOL DEPARTMENT � UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ 37S UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ 3 qO- Town of North Andover IFB - Emergency Power Generator Services Page 3 of 9 Addenda #1 POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ (/ PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street $ UNIT 443: Senior Center 120R Main Street. $ As -Needed Service Year V(0 UNIT #37: Sargent Elementary School, 300 Abbott Street $ UNIT #38: High School, 430 Osgood Street J TOTAL $ L U 30 UNIT #39: High School, 430 Osgood Street $ l� UNIT # 4: 174 Sutton Hill Road $ UNIT #40: Middle School, 495 Main Street $ POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ (/ PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street $ UNIT 443: Senior Center 120R Main Street. $ As -Needed Service Year Regular business hours 50 hours $ �d� � $03m Non business hours 75 hours $ j �� % S/ $ l TOTAL ,7S $ 3,7S- Year 2 - February 1, 2013 through January 31, 2014 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT C f� p UNIT # 1:420 Great Pond Road $�0 kL WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ f 3� '1 UNIT # 3: 98 Rosemont Drive $ 30 L� UNIT # 4: 174 Sutton Hill Road $ Mt— UNIT # 5: 71 Bear Hill Road $ Town of North Andover IFB - Emergency Power Generator Services Page 4 of 9 Addenda #1 UNIT # 6: Orchard Village $ Yh/ SEWER PUMP STATIONS UNIT 47: Willows, 805 Turnpike Street $ UNIT # 8: 87 Flagship Drive $ 7 a 7 UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ �0 7 UNIT #10: Alcott Village, 105 Andover By -Pass $ UNIT #11: Boston Hill, 1280 Turnpike Street $ M UNIT # 12: Located at Forest View, 14 Palomino Drive $ 2�N UNIT # 13: Located at Campbell, 1875 Salem Street $ UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ 3°y UNIT # 14: Bonny Lane, 133 Bonny Lane $ UNIT # 15: Rea's Pond, 1653 Great Pond Road $ 07 UNIT # 16: Butcher Boy, 1945 Great Pond Road $ UNIT # 17: Located Coachmen, 70 Coachmen Lane $ at UNIT # 18: Saile Way, 89 Saile Way $ *7 UNIT # 19: Winter Street, 60 Winter Street $ .7 07 1/00 UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ 3°y UNIT # 22: Johnson Circle, 85 Johnson Circle $ 3/ UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ 59 UNIT # 24: Dale Street, 595 Dale Street $ 3ffq UNIT # 25: Meeting House, 44 Meeting House Commons $ 30 UNIT # 26: Carter Field, 75 Carter Road $ 3 �rq Town of North Andover IFB - Emergency Power Generator Services Addenda #1 Page 5 of 9 FIRE DEPARTMENT UNIT #27: Fire Station 1,124 Main Street $ UNIT #28: Fire Station 2, 9 Salem Street $ UNIT #29: Located on Engine 1 $ UNIT #30: Located on Engine 2 $ U 4 #3 P heeeted on Engine 3 Q T INIT #32- r .,eeAed en hadde - 1 Q` x=#33! Peftable Q UNIT PeftableQ` SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ 3W `� UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ / cv UNIT #37: Sargent Elementary School, 300 Abbott Street $ Y d(✓ UNIT #38: High School, 430 Osgood Street $ Y9 UNIT #39: High School, 430 Osgood Street $ lit) UNIT #40: Middle School, 495 Main Street $ POLICE DEPARTMENT UNIT #41: 1475 Osgood Street le PUBLIC WORKS ( f UNIT #42: Garage, 384 Osgood Street $ UNIT #43: Senior Center 120R Main Street. $ As -Needed Service J r - Regular business hours 50 hours $ Town of North Andover IFB - Emergency Power Generator Services Addenda #1 Page 6 of 9 Non business hours 75 hours $ 9 V is- $ i -1/ 1% ` TOTAL $ yt1g, ?,( Year 3 - February 1, 2014 through January 31, 2015 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT $ S 1 y UNIT # 1: 420 Great Pond Road $� WATER BOOSTER PUMPING STATIONS $ J UNIT # 2: 00 Foxwood Drive / Pole #3 $ UNIT # 13: Located at Campbell, 1875 Salem Street > UNIT # 3: 98 Rosemont Drive $ UNIT # 4: 174 Sutton Hill Road $ v 3711 UNIT # 5: 71 Bear Hill Road $ UNIT # 6: Orchard Village $ SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ 3 9 q UNIT # 8: 87 Flagship Drive $ 3 / V UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ 3N UNIT #10: Alcott Village, 105 Andover By -Pass $ 3 9 -1 UNIT #11: Boston Hill, 1280 Turnpike Street $ S 1 y q I UNIT # 12: Located at Forest View, 14 Palomino Drive $ J r UNIT # 13: Located at Campbell, 1875 Salem Street $ # 14: Bonny Lane, 133 Bonny Lane $ 3 Y UNIT 3711 UNIT # 15: Rea's Pond, 1653 Great Pond Road $ Town of North Andover IFB - Emergency Power Generator Services Addenda #1 _* &?j. X40<t,(4,A Page 7 of 9 FIRE DEPARTMENT 9Y UNIT # 16: Butcher Boy, 1945 Great Pond Road $ r UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ 7 UNIT # 18: Saile Way, 89 Saile Way $ 7 UNIT # 19: Winter Street, 60 Winter Street $ UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ ` 1/0 UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ UNIT # 22: Johnson Circle, 85 Johnson Circle $ 3 9 UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ 7 1 7 FIRE DEPARTMENT SCHOOL DEPARTMENT Q ( UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ 3 // UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ 4( 0 Town of North Andover IFB - Emergency Power Generator Services Page 8 of 9 Addenda # 1 �'[ //0— UNIT #27: Fire Station 1, 124 Main Street $ 3 UNIT #28: Fire Station 2, 9 Salem Street $ O l UNIT #29: Located on Engine 1 $ UNIT #30: Located on Engine 2 eT 4Il3Phe UN ���ttec�-en-L�g�3 $ 3 -- $ SCHOOL DEPARTMENT Q ( UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ 3 // UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ 4( 0 Town of North Andover IFB - Emergency Power Generator Services Page 8 of 9 Addenda # 1 UNIT #37: Sargent Elementary School, 300 Abbott Street $ / k UNIT #38: High School, 430 Osgood Street $ UNIT #39: High School, 430 Osgood Street $ v v J UNIT #40: Middle School, 495 Main Street $ 5� r POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ S—o l PUBLIC WORKS 7�� UNIT #42: Garage, 384 Osgood Street $ L UNIT #43: Senior Center 120R Main Street. $ / `b As -Needed Service Regular business hours 50 hours $J � yt K $_ , �b Non business hours 75 hours $ CD3; s— Addenda W Business Name TOTAL $i 7 � , 7s Business Address" t/�� Si Business Phone — Fax ' —5- 3d 1 Name 6f Pkrson Authorized to rignPrice Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person Town of North Andover IFB - Emergency Power Generator Services Page 9 of 9 Addenda #1 * Prices below based on taking a test sample of lube oil, and not replacing lube oil. If oil needs to be changed please refer to Appendix A- Price Proposal. Year 1 -February 1. 2012 through January 31, 2013 *Drinking Water Treatment Plant *Unit #1: 420 Great Pond Rd. 420 Year 2 February 1. 2013 through January 31, 2014 *Drinking Water Treatment Plant *Unit #1: 420 Great Pond Rd. 430 Year 3 February 1. 2014 through January 31, 2015 *Drinking Water Treatment Plant *Unit #1: 420 Great Pond Rd. 441 Pvver Products Branch 107' Audubon Rd, Bld. 1, Suite 10 432 Warren Avenue "Wakefield;, MA 01,880 Portland,; ME 04103• Tel 781-246-1811' Tel 207-797-5188 Fax'781-246-6321 Fax 207-797=5953 POWERPRODUCTS SYSTEMS, LLC. - COMPANY PROFILE STATEMENT OF QUALIFACTIONS PowerProducts Systems, LLC. is a long established and respected New England company which has been operated by its present management since 1974. During this time, the company has demonstrated significant growth as a Detroit Diesel distributor for engines and Kohler Generators. PowerProducts occupies a 10,000 sq.ft. office/warehouse located in Wakefield, MA and is a stock distributor for Kohler Generators. Our team of generator/engine technicians are Kohler factory -trained and capable of handling any problem with the engine generator package whether it is under warranty or any time thereafter. Our talented office staff is available to fully support our valuable customers and compliment our experienced technicians. PowerProducts offers Planned Maintenance customers special low rates plus 24 hour, 7 days per week emergency service, load -bank testing, and generator rentals. Our company policy is to continue to expand and develop new customers, while maintaining the versatility and reputation for being the one company that cares for, and is willing to respond to, its customers' needs. We are all very proud of our development in the stationary generator market, which we are continually concentrating on improving to better serve our customers needs. PowerProducts currently employs over 22 technicians placed strategically throughout New England, including Wakefield, MA, Portland, ME & Cranston, RI. We are proud of our staff and their extensive talent with some technicians having over 40 years of field service experience. References for. Power Products Systems, LLC Brandeis University 34 Generators + Fire Pump Engines; Contractor; Equipment Purchases, Equipment Rentals, Maintenance, Load banks, and Repairs Client for 8 years Joe Castronovo 515 South St. Waltham, Ma 02254 781-736-4377 Needham Public Facilities + Water & Sewer Department 15 Generators: Equipment Rentals, Maintenance, Load banks, and Repairs Completing Year 3 of Contract Chip Laffey 470 Dedham Ave. Needham, Ma 02492 Bedford Public Buildings Department 8 Generators, Contractor; Equipment Rentals, Maintenance, Loadbanks and Repairs Client Since 2003 Marcia Pyles 101 McMahan Rd. Bedford, Ma 01730 Ray Santilli Assistant Town Manager 120 Main St. North Andover, Ma 01845 January 10, 2012 RE: EMERGENCY RESPONSE TIME — BACKUP GENERATORS Mr. Crespo: EMERGENCY TELEPHONE # after 5PM or Weekends: (781)721-4344 At Power Products we always endeavor to respond to customer needs taking into account their expectations and the urgency of the situation. In most cases our technicians can respond to urgent conditions within a few minutes by telephone, and be on site within two hours depending on travel, weather conditions, etc. Actual repair time is somewhat unpredictable, depending on requirements for labor, availability of replacement parts, and unit accessibility. Furthermore, if conditions warrant, Power Products can supply a portable rental generator that can be moved to your site and temporarily connected to power critical loads. I trust this answers any questions regarding this issue, but please feel free to contact me if I can be of further assistance. Sincerely: John Cervone, Generator Support Services Power Products Systems, LLC Main Telephone: (781)246-1811, Fax: (781)246-5321 Direct Telephone: 781287-7327 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Print Name & Date Powtr Company Name Town of North Andover IFB Page 43 of 46 Emergency Power Generator Services a CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the ,r -i/ EA) i held on s,/ it was VOTED,THAT 4 P, N A (Name) ' C. " (Officer) of�Tt Y and hereby is authorized to execute contracts and bonds in the name and on behalf of said ��✓�'�Z►-� , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of Pd"y IR -114T C its behalf by such officer under seal of �✓? , shall be valid and binding upon �U I hereby certify that I am the clerk of the above named ��`���/ ��n`'� < < C that �� ,`�1VVVtj is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. kr, ( ate) ZII& (Clerk) Town of North Andover IFB Emergency Power Generator Services Page 44 of 46 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature .�tA'm Print Name & Title Date b �� Pdoer PSSS ! LGC Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I D () -Vfh R ('1A11,1 t - l �, authorized signatory for d W e r P.-r)-LG �— S fj, f �-�c, J/ (. CSL Name of indivi ual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Town of North Andover IFB Emergency Power Generator Services ///0//,-7, Date Page 42 of 46 I TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilli Assistant Town Manager Mr. Michael Kelleher Kraft Power Corporation 199 Wildwood Avenue Woburn, MA 01888 Dear Mr. Kelleher: March 1, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the bid bond/deposit submitted with your proposal in response to the Invitation for Bids —'Emergency Power Generator Services' issued by the Town of North Andover. The bid bond/deposit is being returned since the contract was awarded to another vendor. If you have any questions and/or concerns, please call me. Enclosure Sincerely, Raymond T. Santilli Assistant Town Manager ru O in ru r r ■ m 3 O z 0 D z Q 0 a O O r a M co yic 7^19 r r+ Me m H 7C■ CB c v 0 t 0--KRAFer TLDOperfoU1FN January 10, 2012 Mr. Ray Santilli Assist�at,Town Manager Town�of North Andover 120 Maira_St. N. Andover, MA 01845 Dear Mr. Santilli: Kraft is pleased to respond to N. Andover's bid request for "Emergency Power Generator Services." Please let us know if you have any questions or comments. Kraft appreciates this opportunity. Sincerely, Margie DeStefano Contract Service Administrator /md Kraft. -Power Corporation • 199 Wildwood Ave., PO Box 2189 • Woburn, MA 01888-0389 - Tel 781-938-9100 • Fax 781-933-7812 9 www.KraftPower.com s APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible, responsive bidder offering the lowest aggregate price fagr,4h&f4rst year of thGproposed contract. All prices are to remain firm for the duration of the Cgntract. Year 1- February 1, 2012 through January 31, 2013 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $2,675.00 WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ 505.00 UNIT # 3: 98 Rosemont Drive $ 505.00 UNIT # 4: 174 Sutton Hill Road $ 580.00 UNIT # 5: 71 Bear Hill Road $ 555.00 UNIT # 6: Orchard Village $ 505.00 SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ 505.00 UNIT # 8: 87 Flagship Drive $ 505.00 UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ 505.00 UNIT # 10: Alcott Village, 105 Andover By -Pass $ 5 0 5.0 0 UNIT #11: Boston Hill, 1280 Turnpike Street $ 530.00 UNIT # 12: Located at Forest View, 14 Palomino Drive $ 530.00 UNIT # 13: Located at Campbell, 1875 Salem Street $ 530.00 UNIT-# 14: Benny Lane, 133 Bonny Lane $ 505.00 UNIT # 15: Rea's Pond, 1.653 Great Pond Road $ 505.00 Town o*KpTih Andover IFB - Emergency Power Generator Services Page 2 of 9 Addenda #1 i UNIT # 16: Butcher Boy, 1945 Great Pond Road $ 505.00 UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ 505.00 UNIT # 18: Saile Way, 89 Saile Way $ 505.00 UNIT # 19: Winter Street, 60 Winter Street $ 505.00 UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ 505.00 UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ 505.00 UNIT # 22: Johnson Circle, 85 Johnson Circle $ 505.00 UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ 530.00 UNIT # 24: Dale Street, 595 Dale Street $ 530.00 UNIT # 25: Meeting House, 44 Meeting House Commons $ 505.00 UNIT # 26: Carter Field, 75 Carter Road $ 505.00 FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ 530.00 UNIT 928:_Fire Station 2, 9 Salem Street $ 505.00 UNIT #29: Located on Engine 1 $ 252.50 UNIT#30: Located on Engine 2 $ 252.50 UNIT 1Lee. ted on Engine 3 $ UPai #32: beeated on hadde 1 $ UNIT #333.. Poftable IV Q SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ 505.00 UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ 630.00 Town ofNorth Andover IFB - Emergency Power Generator Services Addenda #1 Page 3 of 9 ,t UNIT #37: Sargent Elementary School, 300 Abbott Street $ 580.00 UNIT # 3: 98 Rosemont Drive UNIT #38: High School, 430 Osgood Street $ 655.00 UNIT #39: High School, 430 Osgood Street $ 655.00 UNIT #40:• Middle School, 495 Main Street $ 675.00 POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ 655.00 PUBLIC WORKS 505.00 UNIT #42: Garage, 384 Osgood Street $ UNIT #43: Senior Center 120R Main Street. $ 505.00 As -Needed Service Regular business hours 50 hours $ 111.60 $ 5,580.00 Non business hours 75 hours $ 159.96 $ 11,997.00 TOTAL $40,032.00 Year 2 - February 1, 2013 through January 31, 2014 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $ 2,675.00 WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ 505.00 UNIT # 3: 98 Rosemont Drive $ 505.00 UNIT # 4: 174 Sutton Hill Road $ 580.00 UNIT # 5: 71 Bear Hill Road $ 555.00 Town oftvrth Andover IFB - Emergency Power Generator Services Addenda #I Page 4 of 9 V UNIT # 6: Orchard Village $ 505.00 SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ 505. 0 0 UNIT # 8: 87 Flagship Drive $ 505.00 UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ 505.00 UNIT #10: Alcott Village, 105 Andover By -Pass $ 505.00 UNIT 411: Boston Hill, 1280 Turnpike Street $ 530.00 UNIT # 12: Located at Forest View, 14 Palomino Drive $ 530.00 UNIT # 13: Located at Campbell, 1875 Salem Street $ 530.00 UNIT* 14: Bonny Lang; 133 Bonny Lane $ 505.00 UNIT # 15: Rea's Pond, 1653 Great Pond Road $ 505.00 UNIT # 16: Butcher Boy, 1945 Great Pond Road $ 505.00 UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ 505.00 UNIT # 1.8: Saile Way, 89 Saile Way $ 505.00 UNIT # 19: Winter Street, 60 Winter Street $ 505.00 UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ 505.00 UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ 505.00 UNIT '# 22: Johnson Circle, 85 Johnson Circle $ 505.00 UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ 530.00 UNIT # 24: Dale Street, 595 Dale Street $ 530.00 505.00 UNIT=# 25: Meeting House, 44 Meeting House Commons $ U1fIT # 26: Carter Field, 75 Carter Road $ 505.00 Town of -North Andover IFB - Emergency Power Generator Services Addenda #1 Page 5 of 9 FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ S10-00 UNIT #28: Fire Station 2, 9 Salem Street $ 505.00 UNIT #29: Located on Engine 1 $ 252.50 252 50 UNIT #30: Located on Engine 2 $ UNIT #3 1 • T Q „����tec�-e��g�i�e�� UNIT -7#32- boated -en -Ladder 1 Q r 1>`r�-1 : PeFtablee rrn.1�: RA;tphlpe SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ 505.00 UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ 630.00_ UNIT #37: Sargent Elementary School, 300 Abbott Street $ 580.00 UNIT #38: High School, 430 Osgood Street $ 655.00 UNIT #39: High School, 430 Osgood Street $ 655.00 675.00 UNIT #40. Middle School, 495 Main Street $ POLICE DEPARTMENT UNIT #41: 1475 Osgood Street PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street UNIT #43: Senior Center 120R Main Street. As -Needed Service Regular business hours 50 hours $ 120.00 Town ofttnih Andover IFB - Emergency Power Generator Services Addenda #1 d' 655.00 $ 505.00 $ 505.00 m c nnn nn Page 6 of 9 Non business hours 75 hours $ 172.00 $ 12,900.00 TOTAL $ 41,355.00 Year 3 - February 1, 2014 through January 31, 2015 Preventative Maintenance (two service calls ner Scone of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $2,675.00 WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ 505.00 UNIT # 3: 98 Rosemont Drive $ 505.00 UNIT # 4:174 Sutton Hill Road $ 580.00 UNIT # 5: 71 Bear Hill Road $ 555.00 UNIT # 6: Orchard Village $ 505.00 SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ 505.00 UNIT # 8: 87 Flagship Drive $ 505.00 UNIT # 9�: Jasmine Plaza, 720 Turnpike Street $ 505.00 UNIT #10: Alcott Village, 105 Andover By -Pass $ 505.00 UNIT #11: Boston Hill, 1280 Turnpike Street $ 530.00 UNIT # 12: Located at Forest View, 14 Palomino Drive $ 530.00 UNIT # 13: Located at Campbell, 1875 Salem Street $ 530.00 UNIT # 14: Bonny Lane, 133 Bonny Lane $ 505.00 UNIT # 15: Rea's Pond, 1653 Great Pond Road $ 505.00 Town of arth Andover IFB - Emergency Power Generator Services Page 7 of 9 Addenda #1 UNIT # 16: Butcher Boy, 1945 Great Pond Road $ 505.00 UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ 505.00 UNIT # 18: Saile Way, 89 Saile Way $ 505.00 UNIT # 19: Winter Street, 60 Winter Street $ 505.00 UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ 505.00 UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ 505.00 UNIT # 22: Johnson Circle, 85 Johnson Circle $ 505.00 UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ 530.00 UNIT*-24:'DatcStreet; 595 Dale Street $ • 530.00 505.00 UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ 505.00 FIRE DEPARTMENT UNIT #27: Fire Station 1, 1.24 Main Street $ 530.00 UNIT 428: Fire Station 2, 9 Salem Street $ 505.00 UNIT #29: Located on Engine 1 $ 252.50 UNIT #30: Located on Engine 2 $ 252.50 UWT 431. Leeatedon Engine 3 IV Q � #3 0e-ated off Ladder , st SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 1 I 1 Phillips Brook Road $ 505.00 UNIT 436 Franklin Elementary School, 2 Cypress Terrace $ 630.00 Town of North Andover IFB - Emergency Power Generator Services Page 8 of 9 Addenda #1 UNIT #37: Sargent Elementary School, 300 Abbott Street $ 580.00 UNIT 438: High School, 430 Osgood Street $ 655.00 UNIT #39: High School, 430 Osgood Street $ 655.00 UNIT 440: Middle School, 495 Main Street $ 675.00 POLICE DEPARTMENT UNIT: #41: 1475 Osgood Street $ 655.00 PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street $ 505.00 UNIT #43: Senior Center 120R Main Street. $ 505.00 As -Needed Service Regular business hours 50 hours $ 120.00 $ 6,000.00 Non business hours 75 hours $ 172.00 $ 12,900.00 Addenda. 1 TOTAL $41,355.00 are acknowledged: Signature Business Name 1\.J- CE t Power CU.L.P. Business Address 199 Wildwood Ave . , Woburn, MA 01888 Business Phone 781-938-9100 Fax 781-933-7812 Michael R. Kelleher Name of Person Authorized to sign Price Proposal Service Manager Title of Peysop Auth,,� to,#ign Yrice�Proposal Signature of Above Person Town o€North Andover IFB - Emergency Power Generator Services Addenda #I Page 9 of 9 i CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signatur l��,J Ar%q aM.- '(2-NY)Xvvx " Print 74.qme & Title Date 1 1 @ 2 Y�or, Ito Company Name CERTIFICATE OF TAX COMPLIANCE i Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I /� I F vt a\ ChN ` o ►� , authorized signatory for �l rc� V Pow e C a rPa re. 10 1', NamV of individual I Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. S' ature Town of North Andover IFB Emergency Power Generator Services t�-- Date Page 42 of 46 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Date 1 l 2- Nc�aei ke(Ieher, Servia Mar, Print Name & Title Town of North Andover IFB Emergency Power Generator Services �ra- f i 0 ('v- r Company Name Page 43 of 46 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the Kroco� Pm4-Y[r`61rNre-; 10 � held on n f it was VOTED,THAT M,'C,�UL,J I�J\Aevr` (Name) of Krc,k Pcx,t be and hereby is authorized to execute contracts and bonds in the name and on behalf of said KrJ.+PDwe#' Ccr Cra,,,--, and affix its corporate seal hereto; and such execution of any contract or obligation in the name of G rr)6r J ics V -'N on its behalf by such officer under seal of Cr rna res, �o rn , shall be valid and binding upon Kr-JA-Qawsl car9 ". , { y -c.^�, dker I hereby certify that I am the e{erk of the above named Kra Pew-e,r �rar.w �k� and that ,.`p 101% is the duly elected officer as above of said co coc and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. 10 i� (Date) Town of North Andover IFB Emergency Power Generator Services CA-4&)2- Ud Page 44 of 46 OP ID: RW A� 1'' CERTIFICATE OF LIABILITY INSURANCE DATE01/10D/YYYI� 01/10/12 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. 'A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 781-914-1000 TGA Cross Insurance Inc 401 Edgewater Place S220 781-246-2601 Wakefield, MA 01880 Thomas I. Gregory CNTACT NAME: PHONE No xt : FF—AX No): E-MAIL PRODUCER CUSTOMER ID #: KRAF000 INSURER(S) AFFORDING COVERAGE NAIC # INSURED Kraft Power Corporation Attn: Angela Champigny 199 Wildwood Avenue Woburn, MA 01888-0389 INSURER A: Lexington Insurance Company INSURER B: Travelers Prop Cas.of America 25674 INSURER C: North River Insurance Company 21105 INSURER D: Liberty Mutual Insurance Co. 23043 INSURER E: Steadfast Insurance Co. INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE D L B POLICY NUMBER POLICY EFF MM/DD POLICY EXP MM/DD LIMITS North Andover, MA 01845 GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00 A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE I -X-1 OCCUR 031238624 06/30/11 06/30/12 DAMAGE TO RE= PREMISES Ea occurrence $ 250,00 MED EXP (Any one person) $ NI PERSONAL &ADV INJURY $ 1,000,00 $30,000 DED. BI, PI, & PD GENERAL AGGREGATE $ 2,000,00 $5MIL MAX POLICY AGG GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,00 POLICY X PRC LOC $ B AUTOMOBILE X LIABILITY ANY AUTO 8103A761490TIL11 06130/11 06/30112 O(EaMaccident) $ 1,000,00BINED SINGLE LIMIT COM BODILY INJURY (Per person) $ ALL OWNED AUTOS BODILY INJURY (Per accident) $ X SCHEDULEDAUTOS HIREDAUTOS PROPERTY DAMAGE $ (Per accident) $ X NON -OWNED AUTOS X UMBRELLA LIAB I X OCCUR EACH OCCURRENCE $ 25,000,00 AGGREGATE $ 25,000,00 C EXCESS LIAB CLAIMS -MADE 5530924512 06/30111 06/30112 DEDUCTIBLE $ $ X RETENTION $ Nil D WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY PROPRIETOR/PARTNER/EXECUTIVE FN OF EXCLUDED? (Mandatory in NH) NIA C1Z91446090011 (MA, DE GA,MI,N.J,NY,NC,WV,WI, TX 06/30/11 06/30/12 - X I WC STATU- OH_ TORY LIMITS ER E.L. EACH ACCIDENT $ 500,00 E.L. DISEASE - EA EMPLOYE $ 500,00 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 500,00 E Pollution Liabilit CLP9670944-03 06/30/11 06/30/12 Per Claim 2,000,00 Occurrence Form $25,000 DEDUCTIBLE/CLAIM Aggregate 2,000,00 DESCRIPTION OF OPERATIONS 1 LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Evidence of Insurance CERTIFICATE HOLDER CANCELLATION NORTHAN SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN North Andover Town Hall ACCORDANCE WITH THE POLICY PROVISIONS. Attn: Ray Santilli AUTHORIZED REPRESENTATIVE 120 Main Street North Andover, MA 01845 �J ©1988-2009 ACORD CORPORATION. All rights reserved. ACORD 25 (2009/09) The ACORD name and logo are registered marks of ACORD v.,.. DATE: REQUEST FOR DISBURSEMENT PAY TO: ADDRESS: AMOUNT P.O. # REA$ON: 5Z Q b i JOB NAME: �3( -k( N NA71O(Off X16 0,9)d . oU � r-e—g�,r -I�JY rPVatam u legry Toj Sc� ACCT. # AMOUNT ACCT. # AMOUNT 0/Iq-1-0-06a jo? /, 6da REQUESTED BY: APPROVED BY: CHECK # SPECIAL INSTRUCTIONS: Disbursement 3196 z 4A DATE SENT: '27/[RAFTpThe power of 0'► IM About Kraft Power Corporation Kraft Power has been a leader in the power generation business since 1965. We are a major U.S. distributor for generators, engines and heavy duty power transmission products. Kraft Power's corporate headquarters are located in Woburn, MA with seven locations in New Jersey, New York, Georgia, North Carolina, Wisconsin, Ohio, and Michigan. Kraft Power offers full sales, service and parts at all locations; rental generator depots are in Massachusetts, New York, and Georgia. Factory trained and certified service technicians are on-call 24 hours a day, 365 days a year. Kraft Power's decades of comprehensive power experience offers an unmatched service and knowledge -base, as well as an extensive industry dealer network. Forward thinking and use of innovative technologies, along with our proven track record for performance in availability and reliability have helped us develop our solid customer base. Kraft Power is well-known for its expertise in power generation systems for prime power, cogeneration/CHP, emergency -standby, marine, and mobile power. Our capabilities and experience enable us to bring innovative, reliable, and cost-effective solutions to customer needs. Power generation fuel options include: diesel, natural gas, gasoline, propane, bio -diesel, biogas, landfill gas, and vegetable oils, and can be custom designed to suit the needs of most facilities. We offer a range of field services, including planned maintenance, emergency repair, load bank testing, and emissions testing. Major repairs and overhauls can be performed either in-house or on-site. Kraft Power's expertise extends into heavy duty power transmission products as well. Fluid couplings, variable speed drives, brakes, clutches, couplings and hydraulic transmissions constitute the core of the product line, utilizing innovative technology and careful selection of manufacturer's products. Our Power Transmission products solve problems for OEMs in a wide range of industries including mining, crushing, recycling, agricultural machinery and material handling. Our key manufacturing partners include Kohler Power Systems, Waukesha Engine, Transfluid Industrial Transmissions, Deutz Engine, and Mitsubishi Engine. An extensive network of manufacturing partners allows us to provide a wide variety of the best and most reliable power products. We offer large stocking facilities, $10 Million in inventory, and a fully integrated online computer network. Kraft Power's custom packaging capabilities allow us to combine existing products, and increase options to suit each customer's needs. The key to Kraft Power's success resides in its continued investment in tools, facilities, and equipment to enable increased value-added services. Investment in PEOPLE, our staff, has truly been the backbone of our organization. We are constantly involved in certified factory training programs that promote a knowledgeable and skilled talent base. As a result we have very high retention rates: of the 172 Kraft Power employees, 20% have been with the company more than 15 years, 7% more than 25 years. That level of experience and dedication sets Kraft Power apart indeed, as an expert -level organization in the power systems field. For more information, please refer to www. Kra fWower.com, or call us at 800-969-6121. 017 /[RAFT010MIFa The power of performance. Kraft Power References Biogas Application, Landis Sewerage Authority, Vineland New Jersey ➢ (1) Schmitt Enertec MB -185 -BSM generator ➢ Digester gas ➢ Hot water production Biodiesel Cogeneration Application, Iggy's Bread of the World, Cambridge, MA ➢ (1) Schmitt Enertec MB -50 -DA biodiesel generator ➢ Utility runs parallel ➢ Hot water production Combined Heat and Power (CHP), New York City, New York ➢ (4) Schmitt Enertec MB-400-GSKR generators ➢ Natural gas ➢ Hot water production Cogeneration/Prime Power, New England Confectionary Co. (Necco), Revere, MA ➢ (2) Waukesha natural gas 16VAT27GL, (2) 3 mW units ➢ Utility, parallel and standby modes ➢ Steam and hot water production ➢ SCR emissions control Cogeneration/Prime Power, Component Technologies, Newington, CT ➢ Primary: Waukesha VGFI8GLD, rated 250 kW ➢ Secondary: Kohler 70 RZ ➢ Standby: Kohler 250ROZD diesel generator ➢ Heat recovery from Waukesha unit 247° F water ➢ System efficiency - 84% ➢ Isolated from utility Cogeneration, Prime and Standby Power, Bradley Airport, Hartford, CT ➢ (2) Waukesha VHP7100GSI Enginators rated 1050 continuous duty, 1200kW intermittent, 4800 volts ➢ (1) Waukesha VHP9500GSI Enginator, rated 1400 continuous, 1500 intermittent ➢ Operation at approx 210 °, the hot water is reclaimed from the engine jacket and exhaust for building heat and cooling. ➢ Paralleling control and switchgear is by Russelectric Prime and Standby Power, The Hartford Insurance Co., Hartford, CT ➢ 750kW Waukesha VGF48GLD natural gas fueled generator ➢ Unit powers a Trane CVHF chiller and provides standby power For more information, please refer to www. KraftPower. com, or call us at 800-969-6121. ' KRAFT51GYL T 'The power of performance. Mechanical Drive, Jet Fuel Distribution Pumps, Buckeye Pipeline & Newark Airport, NJ ➢ (4) Waukesha 16VAT25GL, 3000 HP, natural gas fueled pump drive engines ➢ SCR emissions control Standby Power, MGM Expansion at Foxwoods Casino, Mashantucket, CT ➢ (4) Waukesha VHP7100GS1 1300 kW natural gas engine generators ➢ Russelectric paralleling gear ➢ This project started at the main Foxwoods casino complex, and has grown over time to included 18 units installed and serviced by Kraft Power ➢ Total power provided at Foxwoods now exceeds 30mW Standby Power, Pawtucket Regional Water Treatment Facility, Pawtucket, RI - ➢ �1) Kohler 1820REOZDB with Kohler PD -400 paralleling switchgear, 4160 volts ➢ (1) Kohler 600REOZDB Prime Power, Cuttyhunk Island, MA ➢ (2) Kohler 275REOZJD, (2) Kohler 100REOZJD ➢ Paralleling switchgear Standby Power, Fresenius Medical Care, North America ➢ Approx. 500 Kohler generators of varying sizes, 100 — 500kW ➢ Appropriately sized Kohler automatic transfer switches for each ➢ These 500+ medical centers span the continent, with a national service agreement in place to maintain the equipment Standby Power, Bush Compound, Kennebunkport, ME ➢ Kohler 50REOZJB diesel generator ➢ Kohler KSS-DFNA-260 automatic transfer switch For more information, please refer to www. Kraf Power. com, or callus at 800-969-6121. o17, LCL . KRAFTpO��' The gr"r "er-of performance. Kraft -Power Service Technician Capabilities The Kraft Power Service team boasts an extensive record of factory training and expertise. Kraft Power Technicians can travel to your site, or offer repair & overhaul work to be completed in any of our 8 convenient locations. Kraft Power factory schools include (but are not limited to): • Kohler Industrial Training • Kohler Transfer Switches • Westinghouse Automatic Transfer Switches • ASCO Automatic Transfer Switches • Waukesha Engine Training (all current engines & controls) • Deutz • Man • Detroit Diesel Gas • Mitsubishi • Perkins • John Deere • Volvo • Schmitt Enertec • Woodward Governors For more information, please refer to www. KraftPower. com, or call us at 800-969-6121. r TY7XRAFTM0NY1YN Tkr.-"vrvr-v-t performance. REFERENCES - (9) Current Clients Of Kraft Power Corporation I . Childrens Hospital Med. Ctr. 300 Longwood Ave. Boston, MA *Mr. Michael Rizzo 617-355-6000 40+ years of PM and Repair Services 2. Boston University 120 Ashford Street Boston, MA *Mr. Mike Lyons 617-353-4944 20+.years of PM and Repair Services 3. Massachusetts General Hospital c/o Partners Healthcare Facility 32 Fruit Street Boston, MA *Mr. Rick Lakmen 617-726-2422 8+ years of PM and Repair Services 4. Mass Eye & Ear 243 Charles St. Boston,.MA 02114 *Omar Beland 617-573-3175 40+ years of PM and Repair Services S. Beth Israel Medical Center 330 Brookline Ave. : Boston, MA 02215 *Chris Kimball 617-63_2-3285 30+ years of PM and Repair Services /m.4 Nov. 2011 6. Town of Saugus/Public Works Dept 24 Lincoln Ave. Saugus, MA 01906 Tom DiNocco 781-231-4145 20+ years of PM and Repair Services 7. Newton Wellesley Hospital 2014 Washington St. Newton, MA Rick Mastrioanni 617-243-6837 10+ years of PM and Repair Services 8. Town of Brookline 333 Washington St. Brookline, MA 02445 Marc Sacco 617-908-5179 5+ years of PM and Repair Services 9. Babson College Babson Park Wellesley, MA Andy Moutinho 781-239-5868 10+ years of PM and Repair Services Kraft -Power Corporation • 199 Wildwood Ave., PO Box 2189 • Woburn, MA 01888-0389 Tel 781-938-9100 9 Fax 781-933-7812 • www.KraftPower.com KRAFTpGFOIT F A January 10, 2012 Mr. Ray Santilli Assistant Town Manager Town Of North Andover 120 Main,St. N. Andover, MA 01845 Dear Mr. Santilli: This letter is in response to your request for information regarding our 24-hour emergency service. Kraft Power Corporation has a technician on call twenty-four (24) hours a day, seven days a week. To contact the on-call technician, call the Kraft Corporation main phone number at 781- 938-9100.or 1-800-969-6121 and a recorded message will play. Dial I and this will put you in contact with the answering service. They will page an on-call technician, and the on-call technician will call you. The response time is approximately four (4) hours for the technician to return the emergency call and arrive on site. Kraft Power Corporation will do its best to help during an emergency situation. If you have any questions or concern, please feel free to call me at 781-404-2271. Sincerely, Micheal R. Kelleher Service Manager Kraft. Power.Corporation • 199 Wildwood Ave., PO Box 2189 • Woburn, MA 01888-0389 Tel 781-938-9100 • Fax 781-933-7812 • www.KraftPower.com TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 f NORTH 1 O °Std°C M°• tiO Raymond T Santini oM A Assistant Town Manager �� __ ,- + o L4 CHUs�t4y March 1, 2012 Ms. Deborah Kingsley Authorized Services of New England, LLC 410 Forest Street Marlborough, MA 01752 Dear Ms. Kingsley: TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the bid bond/deposit submitted with your proposal in response to the Invitation for Bids —'Emergency Power Generator Services' issued by the Town of North Andover. The bid bond/deposit is being returned since the contract was awarded to another vendor. If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure x n � n � N x � � (D N n tb U1 N `rd C1 •• (D Ol ;i7 H o � •• t9 O o X A 7J o Z QO0) z � z � tlj c H rJ n U1 n Ot1i x N C) 00 bd 'rd H W 5O 4 H tri r �oID H �mn O �(a o (� m �7 O 07 no H .< = O O< ao My 0o0 0 n c'o =ro my <�c m:q �CD m» N OV d C crJ Ul Z (DD O �O 0y O C0 0 3 a .p O� l<() =0 V a O� (D 0— (D GENERAL il\IC_ STRIAL 4 ervices of New E land LL - _ .: Yi Corporate Headquarters • 410 Forest Street, Suite 3 • Marlborough, MA 01752 • Tel: (888)890-9886 • Fax: (508)229-1423 • www.ASNE.com Bwkvw Histmy: Authorization Services of New England, LLC (ASNE) is the authorized Generac Power Systems dealer for the New England area covering Massachusetts, Maine, New Hampshire, Vermont, and Rhode Island. ASNE has been in business for over 6 years providing generator maintenance service and is centrally located in Marlborough MA off of Route 495 and the Massachusetts Turnpike. ASNE is fully staffed with factory trained service technicians available to provide certified preventative maintenance, 24X7 emergency service and scheduled repairs. ASNE current business hours are 8AM — 5PM in additional the Marlborough office has a Network Operations Center (NOC) that works from 7:00 AM — 10:00 PM. GENERAC NINDUSTRIAL kutliodzed Services of New E land LL `�' • ='-' �. Corporate Headquarters • 410 Forest Street, Suite 3 • Marlborough, MA 01752 • Tel: (888)890-9886 • Fax: (508)229-1423 • www.ASNE.com ASNE Coa>bad Cus mas Cust Name City State Mass Water Resources Authority Marlborough MA Mass Bay Community College Wellesley Hills MA Genelco Marlboro MA Wannacomet Water Co. Nantucket MA City of Lowell Lowell MA Paychex North Reading MA Kelly Generator & Equipment Nashua NH Apple Inc Boston MA Arizona Generator Technology Milford MA Nantucket Memorial Airport Nantucket MA Cybex Medway MA Wakefern Food Corp. Worcester MA Wakefern Food Corp. Westfield MA Wakefern Food Corp. Hyde Park MA New Falmouth Golf, LLC East Falmouth MA Hexagon Metrology Inc North RI Kingstown The Tavares Pediatric Center Providence RI Injured Workers Pharmacy Andover MA Highfields Golf & Country Club Grafton MA Wakefern Food Corp. Revere MA Ownes & Minor Franklin MA Home & Hospice Care of RI Providence RI Intex Solutions Inc. Needham MA Independence Bank East Greenwich RI Barry Waxman E. Dummerston VT Perkins School for the Blind Watertown MA Seven Hills at Groton MA Groton MA MLS Property Information Network, Shrewsbury MA Inc. Town of Paxton Mcpl Light Dept Paxton MA Lyudmila Averbukh Framingham MA Glenridge Apartments Salem NH Town of Belmont Belmont MA Plymouth County Sheriffs Dept Cohasset MA Plymouth County Sheriffs Dept Plymouth MA Plymouth County Sheriffs Dept Plymouth MA Plymouth County Sheriffs Dept Hanson MA Boston Cedar Inc. Mansfield MA Jeff Cohen Weston MA Mersen USA Newburyport-MA, LLC Newburyport MA Veterans of Foreign Wars Middleboro MA Corporate Headquarters r Armstrong Ambulance Service Davol Inc Blackstone Valley Healthcare Town of West Bridgewater Todd Realty Bruce Leicher Wilmington Housing United Controls Town of Bolton DPW RI Community Food Bank Terrence Murray NASDI Watertown Mall Management Town of Sherborn Granite Telecommunications LLC Fulfillment America Inc. Charles River Endoscopy, LLC East Fairhaven Elem School Roger Williams Park Zoo Rhode Island State Police HQ Rhode Island Air National Guard Biomedical Structures David Lizotte Short Ridge Academy Peter Zohdi Town of Swansea Police Dpt Phoenix Houses of New England, Inc IMT Services Corp. Stuart Jacobs Stephen Quill Shawn Johnson Paul Morin Lisa Collins Kurt Schuffels Jon Bennett Frank P. Fechner, MD Robert C. Frank Oxford Global Resource Finagle A Bagel Delmar Fire Department Mechanics Cooperative Bank Phred's Drug, Inc. Lowell Memorial Auditorium Safety Signal Foxrock Longwater Realty LLC CPEX Pharmaceuticals, Inc. United Refrigeration GENERAL® s IN13USTRIAL MA 01752 • Tel: (888)890-9886 • Fax: (508)229-1423 • www.ASNE.com Arlington Warwick Pawtucket West Bridgewater Colchester Harvard Wilmington Watertown Bolton Providence Narragansett Waltham Watertown Sherborn Quincy Billerica Framingham Fairhaven Providence North Scituate North Kingstown Warwick Norwell Milton Windham Swansea Exeter Warwick Hudson Lancaster Winchester Westminster Southborough Lancaster Sudbury Worcester Lincoln Beverly Auburndale Delmar Taunton Cranston Lowell Millis Norwell Exeter Taunton MA RI RI MA VT MA MA MA MA RI RI MA MA MA MA MA MA MA RI RI RI RI MA NH NH MA RI RI MA MA MA MA MA MA MA MA MA MA MA NY MA RI MA MA MA NH MA Corporate Headquarters • 410 Forest Street, Suite 3 • Marlborough, MA 01752 • Tel: (8 Prestige Home Care Wayland MA Middleton Aerospace Corp Haverhill MA Charles McVea Harvard MA Belmont Police Department Belmont MA Distributor Corporation of NE Malden MA Robert Popeo Osterville MA Pond View Village Gloucester MA John C. Henry Rochester MA Stephen Whitney Windham NH MBL International Woburn MA Bert Galipeau Bellingham MA Tim Steele Groton MA Mike DiPierro Shrewsbury MA Immaculate Conception School Cranston RI Brenda Dias Westford MA Richard Sheldon Littleton MA Our Lady of Loreto Church East RI Providence John Brooks Middletown RI Michael McNeice North Easton MA UMASS Amherst Amherst MA Town of Wareham Wareham MA RI School for the Deaf Providence RI Dealer.com Burlington VT Camp Fogarty Readiness Center East Greenwich RI Boston Transportation Dept Boston MA GENERAGO INDUSTRIAL • Fax: (508)229-1423 • www 1. Contact ASNE at our toll-free number: 888-890-9886 2. State that there is an emergency situation 3. Provide the following information • Your name • Company name • Site address, city and state • The telephone number where someone can reach you • A brief description of the problem When ASNE's Central Dispatch Center answers the call, the service coordinator will manage the response directly and give you an Estimated Time of Arrival (ETA) for the Field Service Technician. If they are unable to give you an ETA, they will immediately contact an ASNE Field Service Technician who will respond to you by telephone within 15 minutes. In the unlikely event that you do not receive a return phone call, follow the escalation procedure as listed in the order below. Escalati®n Procedure 1. Network Operations Center Service Dispatch Coordinator .................................. 774-266-4614 2. Service Manager Walter Magurn........................................................ 774-249-0620 3. Managing Director Charles Levey........................................................... 781-910-7154 4. President Mike Kingsley........................................................... 617-877-8251 AMA APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible, responsive bidder offering the lowest aggregate price for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. Year 1 - February 1, 2012 through January 31, 2013 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ 3 $ . ro UNIT # 3: 98 Rosemont Drive $ 0.7 0 60 UNIT # 4: 174 Sutton Hill Road $ Yq Q UNIT # 5: 71 Bear Hill Road $_f 6c5 f UNIT # 6: Orchard Village $ 3391, SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ ON?. " UNIT # 8: 87 Flagship Drive $� UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ A % - Oa UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $ UNIT # 13: Located at Campbell, 1875 Salem Street $ 3 ®a UNIT # 14: Bonny Lane, 133 Bonny Lane $ 4 0 UNIT # 15: Rea's Pond, 1653 Great Pond Road $ j,3 g, 6Z Town of North Andover IFB - Emergency Power Generator Services Addenda #1 Page 2 of 9 UNIT # 16: Butcher Boy, 1945 Great Pond Road $ UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ UNIT # 18: Saile Way, 89 Saile Way $ 6� 7? UNIT # 19: Winter Street, 60 Winter Street $ 30, � UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $2 UNIT # 22: Johnson Circle, 85 Johnson Circle $ ��- UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ sr"I- UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ 8 = 6D FIRE DEPARTMENT /// UNIT #27: Fire Station 1, 124 Main Street $ 't16� • 6T UNIT #28: Fire Station 2, 9 Salem Street $ ' %T UNIT #29: Located on Engine 1 $ 02 (?' Oa UNIT #30: Located on Engine 2 SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ 5 UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ 707 00 Town of North Andover IFB - Emergency Power Generator Services Addenda #1 Page 3 of 9 UNIT #37: Sargent Elementary School, 300 Abbott Street $ W 0� UNIT #38: High School, 430 Osgood Street $ UNIT #39: High School, 430 Osgood Street $ UNIT #40: Middle School, 495 Main Street $ POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street $ �'� , UNIT #43: Senior Center 120R Main Street. $ S'2 C - As -Needed Service Regular business hours 50 hours $ 00 $ 00 Non business hours 75 hours $ , Q Q $ l '� J` 00 TOTAL Year 2 - February 1, 2013 through January 31, 2014 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ 33f'. M UNIT # 3: 98 Rosemont Drive $ cJ 3 �-- 0-0 UNIT # 4: 174 Sutton Hill Road $ yo UNIT # 5: 71 Bear Hill Road $_� Town of North Andover IFB - Emergency Power Generator Services Page 4 of 9 Addenda #I UNIT # 6: Orchard Village $ 3,3 �-_ fo SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ c;9 q` (D UNIT # 8: 87 Flagship Drive $ 1,17 0-0 UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ d qq- B� UNIT #11: Boston Hill, 1280 Turnpike Street $ 'MI -0 UNIT # 12: Located at Forest View, 14 Palomino Drive $ 3 `g , " UNIT # 13: Located at Campbell, 1875 Salem Street $ SCC - " UNIT # 14: Bonny Lane, 133 Bonny Lane $ UNIT # 15: Rea's Pond, 1653 Great Pond Road $ 3,3 ?-� 6-0 UNIT # 16: Butcher Boy, 1945 Great Pond Road $� UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ �9 UNIT # 18: Saile Way, 89 Saile Way $ qq ey UNIT # 19: Winter Street, 60 Winter Street $� UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ o� UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ 19- 6D UNIT # 22: Johnson Circle, 85 Johnson Circle $ C.qq. 6V UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ UNIT # 25: Meeting House, 44 Meeting House Commons $ 33 UNIT # 26: Carter Field, 75 Carter Road $.dZ? Town of North Andover IFB - Emergency Power Generator Services Addenda #1 Page 5 of 9 A �* FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ Y4,- ev UNIT #28: Fire Station 2, 9 Salem Street $ UNIT #29: Located on Engine 1 $ 9% UNIT #30: Located on Engine 2 $ T TATTT #3 1; bersated an Engine $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 11 I Phillips Brook Road $ 23 9�- 0 UNIT #36 Franklin Elementary School, 2 Cypress Terrace UNIT #37: Sargent Elementary School, 300 Abbott Street UNIT #38: High School, 430 Osgood Street UNIT #39: High School, 430 Osgood Street UNIT #40: Middle School, 495 Main Street POLICE DEPARTMENT UNIT #41: 1475 Osgood Street PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street UNIT #43: Senior Center 120R Main Street. As -Needed Service Regular business hours 50 hours $ 96 . dy Town of North Andover IFB - Emergency Power Generator Services Addenda #I , $ 6,q Z'- e 0 -Z ,� zz 9-6 e �A�-' 6T Page 6 of 9 Non business hours 75 hours $/9 0j", n $ Id, OLD ` do TOTAL $ go?, /OW ' "© Year 3 - February 1, 2014 through January 31, 2015 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT p UNIT # 1: 420 Great Pond Road $ / od • 0 1.: C �Z�I►�Y�Ia�I1Tl�l�[�I.��:rlr[�]�[.`� UNIT # 2: 00 Foxwood Drive / Pole #3 $ 3� UNIT # 3: 98 Rosemont Drive $ UNIT # 4:174 Sutton Hill Road $ y0� UNIT # 5: 71 Bear Hill Road $0_ UNIT # 6: Orchard Village $ 8` SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ C 9/' dD UNIT # 8: 87 Flagship Drive $i:7� D UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ 0L7 UNIT #10: Alcott Village, 105 Andover By -Pass $ / 9' UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $a UNIT # 13: Located at Campbell, 1875 Salem Street $ UNIT # 14: Bonny Lane, 133 Bonny Lane $ 9 �� ' o UNIT # 15: Rea's Pond, 1653 Great Pond Road $ b Town of North Andover IFB - Emergency Power Generator Services Page 7 of 9 Addenda #1 UNIT # 16: Butcher Boy, 1945 Great Pond Road $ 00 UNIT # 17: Located at Coachmen, 70 Coachmen Lane $6rO UNIT # 18: Saile Way, 89 Saile Way $� UNIT # 19: Winter Street, 60 Winter Street $�Ud UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ �0 UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ 110 UNIT # 22: Johnson Circle, 85 Johnson Circle $o UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ �D UNIT # 24: Dale Street, 595 Dale Street $�o`Z 0 v UNIT # 25: Meeting House, 44 Meeting House Commons $ �� 4 d UNIT # 26: Carter Field, 75 Carter Road $' ® 0 FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ 100 UNIT #28: Fire Station 2, 9 Salem Street $ d © UNIT #29: Located on Engine 1 $ 9 / ' D 0 UNIT #30: Located on Engine 2 $ 0 T N1T- #3 1. on Eqigiae-3 $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, I I 1 Phillips Brook Road $ L9 UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ /& '7' Town of North Andover rFB - Emergency Power Generator Services Page 8 of 9 Addenda #1 UNIT #37: Sargent Elementary School, 300 Abbott Street $S �l UNIT #38: High School, 430 Osgood Street $ v UNIT #39: High School, 430 Osgood Street $� d UNIT #40: Middle School, 495 Main Street $ Q 0 POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ lD 37' 0 PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street $�Ohh UNIT #43: Senior Center 120R Main Street. $� As -Needed Service Regular business hours 50 hours $ �� ' $ Non business hours 75 hours $ 60 $ 6 TOTAL $� Addenda are acknowledged: 444-tl� " 'Signature Business Name / (// C PS Ci/Q�Gt C Business Address ly e,4l Business Phone j ", �' 13 �fl Fax �Uhor" kln'aEleq Name of Person Aut orize to sign Price Proposal of Person Authoriz4to sigp Price Proposal C1.1 Vl�v 6a& ignature of Above Per/so) Town of North Andover IFB - Emergency Power Addenda #I Services Page 9 of 9 a CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date//1b l Z 1 . kvg��l Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE PursuanL to QtApter 62C of the Massachusetts General Laws, Section 49A (b), I ,authorized signatory forj�fL7i 'IGS O1� liew /hob lArame of individual Name of contractor do hereby certify Jner the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Town of North Andover IFB Emergency Power Generator Services Date Page 42 of 46 1 ,l sS CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signatur4y/,,",4,;, X -L iUlPS � �t1 U�l� Print Name & Title Town of North Andover IFB Emergency Power Generator Services Date�- Company Name Page 43 of 46 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the g t) &Q'i C OrAj, C`_, held on ' 0G it was VOTED, THAT kj,e Ile" N .L� (Name) allkir-ido (Officer) of k6 N a be and hereby is authorized to execute contracts and bonds in the name and on behalf of said AsA-- I , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of A, s a on its behalf by such officer under seal of lb , shall be valid and binding upon S1aV CUe,-- I hereby certify that I am the clerk of the above named , and that kle - L 91A)&,e to Y is the duly elected officer as above of said AS!Q 1.6- , and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. --- (hate)/ (Clerk) Town of North Andover IFB Emergency Power Generator Services Page 44 of 46 TOWN OF NORTH ANDOVER INVITATION FOR BIDS EMERGENCY POWER GENERATOR SERVICES Contact Address Telephone Number: Fax Number: Email December 21, 2011 Ray Santilli Assistant Town Manager 120 Main Street North Andover, MA 01845 978-688-9516 978-688-9556 rsantilli@townofnorthandover.com Table of Contents 1. Introduction.......................................................... 3 2. Submission Deadline and Instructions ............................ 3 3. Questions, Addendum or Proposed Modifications .............. 4 4. Minimum Requirements ............................................. 5 5. Scope of Services...................................................... 5 6. List of Generators ................................................... 7 7. Responsible Department ............................................. l l 8. Estimated Quantities................................................12 9. Prevailing Wage Rates ............................................... 12 10. Payment Bond ....................................................... 12 11. Bid Deposit/Bond................................................... 12 12. Evaluation of Bids ................................................. 12 13. Term of Contract .................................................. 13 Appendix A — Price Proposal ........................................ 14 Standard Town of North Andover Contract With Supplement "C" ............................................. 22 Certifications........................................................... 42 Payment Bond Form ................................................... 45 Prevailing Wage Rates ................................................. 46 Town of North Andover IFB Page 2 of 46 Emergency Power Generator Services 1. Introduction In accordance with M.G.L. 649, the Town of North Andover is soliciting bids from qualified contractors to perform preventative maintenance and as -need repairs of emergency power generators located at all municipal and school buildings as well as water booster and sewer pump stations. Qualified contractors are requested to submit bids to the Assistant Town Manager at North Andover Town Hall, 120 Main Street, North Andover, MA, in accordance with the instructions contained within this Invitation for Bids. The Town of North Andover is seeking to award a one-year contract for the period of February 1, 2012 through January 31, 2013 with two (2) additional one-year renewals, solely at the discretion of the Town. The Town will provide written confirmation of renewal at least sixty (60) days prior to the end of the contract period. Notice of this IFB is published in the Central Register, which is a weekly publication of the Office of the Secretary of the Commonwealth, the Eagle -Tribune (a newspaper of general circulation) and posted on the Town website (www.townofnorthandover.com) under "Available Bids, Quotes and Proposals". The Town will accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on Thursday, January 12, 2012 to be considered. Proposals submitted by fax or by electronic mail will not be considered. All proposals must be submitted to: Mr. Ray Santilli, Assistant Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 The Town of North Andover may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the Town of North Andover. 2. Submission Deadline and Instructions Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed envelope marked "Emergency Power Generator Services" with the applicant's name and address on the front. Applicants should provide one (1) signed original proposal. Fax or electronic submissions will not be accepted. Applicants must also execute and include in the sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The Town of North Andover, through the Town Manager, is the awarding authority and reserves the right to reject any and all proposals or parts of proposals; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; and to award contracts or to cancel this Invitation for Bids if it is in the Town of North Andover's best interest to do so. Town of North Andover IFB Page 3 of 46 Emergency Power Generator Services Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if the bidder is a partnership, by the name of the partnership, followed by the signature of each general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed. All sealed proposals must be received and registered by the Assistant Town Manager's office by Thursday, January 12, 2012 at 2:00 p.m. All outer envelopes must be labeled "Emergency Power Generator Services" and mailed or hand delivered to the following address: Mr. Ray Santilli, Assistant Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 No proposals will be accepted after the time and date noted. Late delivery of materials due to any type of delivery system shall be cause for rejection. If on the date and time of the submittal deadline the North Andover Town Hall is closed due to an uncontrolled event such as fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the next normal business day. 3. Questions, Addendum or Proposal Modification Questions concerning this IFB must be submitted in writing to: Mr. Ray Santilli, Assistant Town Manager, 120 Main Street North Andover, MA 01845, or they may be emailed to Mr. Santilli at rsantilli@townofnorthandover.com. All questions/inquiries must be received by 4:30 p.m. on Tuesday, January 3, 2012 to be considered. Questions/inquiries may be delivered, mailed, emailed or faxed. Written responses will be posted on the Town's website (www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" by Thursday, January 5, 2012 at 2:00 p.m. If any changes are made to this IFB, an addendum will be posted on the Town's website in "Available Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence of any addenda and/or modifications issued by the Town. As this IFB has been published on the Town's website (www.townofnorthandover.com) all bidders are responsible for checking the website for any addenda and /or modifications that are subsequently made to this IFB. The Town accepts no liability for and will provide no accommodations to bidders who fail to check for amendments and/or modifications to this IFB and subsequently submit inadequate or incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any IFB component files. Modifications to the body of the IFB, Scope of Work, terms and conditions, or which change the intent of this IFB are prohibited and may disqualify a response. All proposals submitted in response to this IFB shall remain firm for sixty (60) days following the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days after the submittal deadline. Town of North Andover IFB Page 4 of 46 Emergency Power Generator Services Bidders are not to communicate directly with any employee of the Town of North Andover, except as specified in this IFB, and no other individual employee or representative is authorized to provide any information or respond to any question or inquiry concerning this IFB. Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the bidder is having trouble obtaining any part of the IFB electronically through the Town website (www.townofnorthandover.com), including, and without limitation the form and attachments. Bidder with disabilities or hardships that seek reasonable accommodations, which may include the receipt of IFB information and/or addenda and/or modifications in an alternative format, must communicate such requests in writing to the contact person, and reasonable accommodation will be made by agreement with the contact person on behalf of the Town of North Andover. 4. Minimum Requirements Each bidder must demonstrate that it meets the following minimum requirements: A. Contractor must demonstrate a minimum of five (5) years experience providing emergency power generator services. B. Contractor shall submit a complete list of all contracts performed in the past three (3) years with contact names and telephone numbers. C. Contractor shall include a listing of emergency off -hours contact names and telephone numbers as well as a statement of availability on a 24/7 basis. D. Unit prices shall remain firm for the initial one-year period of the contract. E. Submission of required statements and forms. 5. Scope of Services The contractor shall furnish all labor, materials, equipment, and vehicles as required to perform preventative maintenance and as -need repairs of emergency power generators located at all municipal and school buildings as well as water booster and sewer pump stations. The contractor shall furnish all labor, materials, equipment, and vehicles as required for work in accordance with this scope of services. All authorized work will be performed by a certified mechanic. All materials and workmanship, whether specifically designated, shown or implied shall be first quality, new and of a grade satisfactory to the Town or its representative. The Town or its representative shall have the right to reject any part of the work if the material or workmanship is not of satisfactory quality. Town of North Andover IFB Page 5 of 46 Emergency Power Generator Services The contractor shall conform to all requirements of state and local laws, including compliance with the prevailing wage laws. The contractor shall be one whose primary business is emergency power generator service and who can furnish an adequate labor force to provide 24-hour service, 365 days per year. This shall include the responsibility of contacting other Town contractors to coordinate work involving himself and one or more additional trades. All material and debris shall be cleaned up immediately and removed from the building, leaving the premises in a clean condition. The contractor shall replace, repair or make whole, without cost to the Town, any defects or faults arising within one (1) year after date of acceptance of the work. A. Preventative Maintenance Preventative maintenance shall be performed during normal business hours and be appropriately scheduled with the respective municipal or school department. Preventative maintenance will be scheduled every six months and shall include the following: 1) Replace lube oil (once per year) 2) Replace lube oil filter(s) (once per year) 3) Replace fuel filter(s) (once per year) 4) Replace coolant filter(s) (once per year) 5) Service/Clean air filter(s) 6) Perform air inlet restriction test (diesel units). 7) Check coolant level, condition of coolant, freeze protection rating and perform pressure test. 8) Inspect/adjust hoses, belts and linkages. 9) Diesel engines: Inspect injection system and fuel lines. 10) Gas/LP engines: Inspect complete ignition system, check timing, and replace points, condenser and spark plugs. 11) Check engine heater operation. 12) Inspect fuel supply system including piping, solenoid valve and transfer tank where applicable. 13) Inspect exhaust system and drain condensation if system has drain provision (i.e. valve). 14) Check battery charger operation and charge rate. 15) Check battery electrolyte levels and specific gravity, clean terminals as needed, spray terminals with corrosion proof solvents. 16) Check all engine and generator shutdown and alarm systems. 17) Adjust output voltage and frequency as required. 18) Confirm proper operation of all engine gauges and AC metering. 19) After proper notification to contact person, operate transfer switch(s) and confirm proper operation of all timers and accessories. 20) Inspect transfer switch main contacts. Town of North Andover IFB Page 6 of 46 Emergency Power Generator Services 21) Conduct Load Transfer Test (20-30 minutes) by dropping breaker under a load to see how it responds to the load & transfer. 22) Operate unit under available connected load for duration required to evaluate operation of system. 23) Prepare report of each service visit to be signed by the proper contact person with a copy in a maintenance log to be left with the unit. B. As -Needed Emergency Service The contractor shall provide certified mechanics to responds to as -needed emergency service for repair of generators. These services could occur during regular business hours, after business hours, on weekends or on holidays. Billing of as -needed emergency service begins when mechanics are on site. Contractors must respond within four (4) hours of receiving call from the respective municipal or school personnel. 6. List of Generators (Location and T)pe) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road Waukesha Electric Plant, Model#: P310461, S/N#: 95624, 1075 KW, Natural gas Waukesha Engine Model#: VHP9500G, S/N#: RU19430. Equipment ID#: R119430. WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 Kohler Electric Plant, Model 50RZ82, with Ford Engine, Model LSG-8751-6005A. Natural gas, 50 KW UNIT # 3: 98 Rosemont Drive Kohler Electric Plant, Model 50RZ82, with Ford Engine, Model LSG-8751-6005A, Natural gas, 50 KW UNIT # 4: 174 Sutton Hill Road Kohler Electric Plant, Model 125BZG, with a General Motors Engine, Model 8.1 L-07402, Natural gas, 125 KW UNIT # 5: 71 Bear Hill Road Kohler Model 8080REOZ JE, with a John Deere 4.51 Engine, Model 4045HF285H.1.J Diesel, 80 KW UNIT # 6: Orchard Village Kohler Model # 60REZG, with a General Motors 5.01 Engine, Model BPSIB5.702ED Natural gas, 60 KW Town of North Andover IFB Page 7 of 46 Emergency Power Generator Services SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street Onan Electric Plant, Model 35EK, with Ford Engine, Model CSG -6491, Natural gas, 30 KW UNIT # 8: 87 Flagship Drive Kohler Electric Plant, Model 30RZ62, with Ford Engine, Model CSG -6491, Natural gas, 30 KW UNIT # 9: Jasmine Plaza, 720 Turnpike Street, Kohler Electric Plant, Model 50RZ, with Ford Engine, Model LSG-875 1, Propane, 50 KW UNIT #10: Alcott Village, 105 Andover By -Pass Generac Electric Plant, Model 87A02538-5, with Generac Engine, Model 1.3L, Natural gas, 20 KW UNIT #11: Boston Hill, 1280 Turnpike Street Kohler Electric Plant, Model 80RZ, with Ford Engine, Model LSG-875 1, Propane, 80 KW UNIT # 12: Located at Forest View, 14 Palomino Drive Kohler Electric Plant, Model 8ORZ, with Ford Engine, Model LSG-875 1, Propane, 80 KW UNIT # 13: Located at Campbell, 1875 Salem Street Kohler Electric Plant, Model 100RZ, with Ford Engine, Model LSG-875 1, Natural gas, KW UNIT # 14: Bonny Lane, 133 Bonny Lane Onan Electric Plant, Model 35EK-15R, with Ford Engine, Model CSG -6491, Propane, 30 KW UNIT # 15: Rea's Pond, 1653 Great Pond Road Kohler Electric Plant, Model SORZ, with Ford Engine, Model LSG-8751, Propane, 55 KW UNIT # 16: Butcher Boy, 1945 Great Pond Road Generac Electric Plant, Model 91A02795-5, with Generac Engine, Model 5.OL, Natural gas, 30 KW UNIT # 17: Located at Coachmen, 70 Coachmen Lane Kohler Electric Plant, Model 30R7.62, with Ford Engine, Model CSG -6491, Natural gas, 30 KW UNIT # 18: Saile Way, 89 Saile Way Kohler Electric Plant, Model 30RZ72, with Ford Engine, Model CSG -6491-6005F, Natural gas, 30 KW Town of North Andover IFB Page 8 of 46 Emergency Power Generator Services UNIT # 19: Winter Street, 60 Winter Street Kohler Electric Plant, Model 30RZ62, with Ford Engine, Model CSG -6491, Propane, 80 KW UNIT # 20: Hawthorne Place, 45 Hawthorne Place Generac Electric Plant, Model 95A01795-5, with Generac Engine, Model 5.7L, Natural gas, 30 KW UNIT # 21: Holly Ridge., 1 Holly Ridge Drive Generac Electric Plant, Model 87AD2838, with Generac Engine, Model 4.OL, #3 Diesel, 30 KW UNIT # 22: Johnson Circle, 85 Johnson Circle Kohler Electric Plant, Model 30RZG, S/N#: 759635 with a General Motors Engine, Model 4.3L, Propane, 30 KW UNIT # 23: Blue Ridge, 410 Blue Ridge Road Onan Electric Plant, Model 100.ODCV-15R, #2 Diesel, 100 KW UNIT # 24: Dale Street, 595 Dale Street DMT Corp Electric Plant, Model DMT 80C, #2 Diesel, 80 KW UNIT # 25: Meeting House, 44 Meeting House Commons Kohler generator, Model #60RCG, Natural gas, 60 KW UNIT # 26: Carter Field, 75 Carter Road Kohler Electric Plant, Model #50RZGB, S/N 0777922, General Motors engine 5.OL, propane, 50KW FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street Kohler Electric Plant, Model 1504E02JK, with General Motors Engine, Model 20148 UNIT #28: Fire Station 2, 9 Salem Street Onan Electric Plant, Model 12RJC03R, with Onan Engine, Model P2305 UNIT #29: Located on Engine 1 Mitsubishi Electric Plant, Model 1O.OBTDAR, with Mitsubishi Engine, Model 97556-EY06 UNIT #30: Located on Engine 2 Mitsubishi Electric Plant, Model 10.OBTDAR, with Mitsubishi Engine, Model 97560E405 UNIT #31: Located on Engine 3 Hale Electric Plant, Model 5000 GE, with Brigg & Stratton Engine, Model 10 HP Town of North Andover IFB Page 9 of 46 Emergency Power Generator Services UNIT #32: Located on Ladder 1 Onan Electric Plant, Model 7.5KDFB, with Onan Engine, Model F953384478. UNIT #33: Portable Onan Electric Plant, Model IOSAK, S/N# I I lC673003, Engine Info -N/A UNIT #34: Portable Hale Electric Plant, Model 59018, with Brigg & Stratton Engine, Model 8 HP SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road Kohler Electric Plant, Model 45R081, S/N#: 253565, Engine Info -N/A. UNIT 436 Franklin Elementary School, 2 Cypress Terrace Cummins Electric Plant, Model 400FOC260A, S/N#: SH917-23, Engine Info - N/A UNIT #37: Sargent Elementary School, 300 Abbott Street C.P.I. Electric Plant, Model 125G8TA, S/N: E940543466, with a GJA 4800 Engine UNIT #38: High School, 430 Osgood Street CAT Electric Plant, Model SR4, S/N#: CBP 00184, Engine Info 43406 UNIT #39: High School, 430 Osgood Street CAT Electric Plant, Model SR4, S/N#: CBP 00185, Engine Info 43406 UNIT #40: Middle School, 495 Main Street CAT Electric Plant, Model G3406. Engine Info - N/A POLICE DEPARTMENT UNIT #41: 1475 Osgood Street Kohler Electric Plant, Model 350REOZDD, S/N#: 2287708, Engine S/N 06RIO37657 PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street Kohler LS6-8751-6005-A, 80 KW UNIT #43: Senior Center 120R Main Street. Kohler Electric Plant, with a Chevy Engine, Model#: 454. Town of North Andover IFB Page 10 of 46 Emergency Power Generator Services 7. Responsible Department Each department will be responsible for the maintenance and payment of services for their respective units. The communication, coordination for maintenance and repairs, and invoices will be directed to the contact person for the department as listed below. A. Drinking Water Treatment Plant, Booster Pump Stations, & Sewer Pump Stations Drinking Water Treatment Plant Attention: Plant Superintendent 420 Great Pond Road North Andover, MA 01845 Telephone: 978-688-9574 B. Fire Department North Andover Fire Department Attention: Chief s Office 124 Main Street North Andover, MA 01845 Telephone: 978-688-9590 C. School Department North Andover School Department Attention: Superintendent Operations/Maintenance 1600 Osgood Street North Andover, MA 01845 Telephone: 978-794-1503 D. Police Department North Andover Police Department Attention: Chief s Office 1475 Osgood Street North Andover, MA 01845 Telephone: 978-683-3168 E. Public Works Public Works Department Attention: Operations Manager 384 Osgood Street North Andover, MA 01845 Telephone: 978-685-0950 Town of North Andover IFB Page 11 of 46 Emergency Power Generator Services 8. Estimated Quantities The number of hours listed in Appendix A for emergency services are simply estimates for bid purposes only. The Town will not be obligated to commit to any specific quantity of hours during the period of the contract. 9. Prevailing Wage Rates The successful bidder will at all times comply with the prevailing wage rates as determined by the Department of Labor Standards under the provisions of Massachusetts General Laws as shall be in force and as amended. The prevailing wage rates are attached. 10. Payment Bond Upon award of the contract, the successful bidder shall provide a payment bond in the amount of 50% of the total projected cost of the contract for the first year. The payment bond must be on the Town's form that is attached. 11. Bid Deposit/Bond In accordance with M.G.L c149, all bidders are required to submit a 5% bid depositibond of the value of the first year of the contract. 12. Evaluation of Bids Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility of the bidder will then be ascertained. Finally, the aggregate price for the products delivered offered by each responsive and responsible bidder will be calculated for the first year solely of the proposed contract. The Town is required to award the contract to the lowest responsive and responsible bidder. ■ Responsiveness Bidders must completely fill out and submit the bid form and all other required forms. All supplies and services that are the subject of the bid must meet the minimum standards and scope of services set forth in the purchase description including the standards by which the procurement officer will determine acceptability as to quality, workmanship, results of inspections and tests, and suitability for a particular purpose. ■ Responsibility Bidders must demonstrate that they meet measures of responsibility. The Town will not award a contract to any bidder who cannot furnish satisfactory evidence of his ability and experience in this type of work and that he has sufficient plant and capital to enable him to prosecute and complete the work as outlined in the Specifications. The Town may Town of North Andover IFB Page 12 of 46 Emergency Power Generator Services make such investigations as it deems necessary to determine the above and a bidder shall furnish any information requested in this regard. All costs not listed on the bid price sheet will not be considered part of the contract and therefore will not be paid. The Town of North Andover will not be charged fuel surcharges or administrative fees as part of any contract entered into as a result of this IFB. Additionally the Town of North Andover will not be charged late fees unless payment is not made within sixty (60) days of the receipt of invoice. The Town of North Andover is a tax exempt entity so no sales tax will be assessed to any purchases made under this proposed contract. 13. Term of Contract The Town of North Andover is seeking to award a one-year contract with two (2) additional one- year renewals, solely at the discretion of the Town. The Town will provide written confirmation of renewal at least sixty (60) days prior to the end of the contract period. Town of North Andover IFB Page 13 of 46 Emergency Power Generator Services APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible, responsive bidder offering the lowest aggregate price for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. Year 1- February 1, 2012 through January 31, 2013 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road 0 WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ UNIT # 3: 98 Rosemont Drive $ UNIT # 4: 174 Sutton Hill Road S UNIT # 5: 71 Bear Hill Road $ UNIT # 6: Orchard Village $ SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ UNIT # 8: 87 Flagship Drive $ UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $ UNIT # 13: Located at Campbell, 1875 Salem Street $ UNIT # 14: Bonny Lane, 133 Bonny Lane $ UNIT # 15: Rea's Pond, 1653 Great Pond Road $ Town of North Andover IFB Page 14 of 46 Emergency Power Generator Services UNIT # 16: Butcher Boy, 1945 Great Pond Road $ UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ UNIT # 18: Saile Way, 89 Saile Way $ UNIT # 19: Winter Street, 60 Winter Street $ UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ UNIT # 22: Johnson Circle, 85 Johnson Circle $ UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ UNIT #28: Fire Station 2, 9 Salem Street $ UNIT #29: Located on Engine 1 $ UNIT #30: Located on Engine 2 $ UNIT #31: Located on Engine 3 $ UNIT #32: Located on Ladder 1 $ UNIT #33: Portable $ UNIT #34: Portable $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ Town of North Andover IFB Page 15 of 46 Emergency Power Generator Services UNIT #37: Sargent Elementary School, 300 Abbott Street UNIT #38: High School, 430 Osgood Street UNIT #39: High School, 430 Osgood Street UNIT #40: Middle School, 495 Main Street POLICE DEPARTMENT UNIT #41: 1475 Osgood Street PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street UNIT #43: Senior Center 120R Main Street. As -Needed Service Regular business hours 50 hours $ Non business hours 75 hours $ m m TOTAL $ Year 2 - February 1, 2013 through January 31, 2014 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 UNIT # 3: 98 Rosemont Drive UNIT # 4: 174 Sutton Hill Road UNIT # 5: 71 Bear Hill Road Town of North Andover IFB Emergency Power Generator Services ra Page 16 of 46 UNIT # 6: Orchard Village $ SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ UNIT # 8: 87 Flagship Drive $ UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $ UNIT # 13: Located at Campbell, 1875 Salem Street $ UNIT # 14: Bonny Lane, 133 Bonny Lane $ UNIT # 15: Rea's Pond, 1653 Great Pond Road $ UNIT # 16: Butcher Boy, 1945 Great Pond Road $ UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ UNIT # 18: Saile Way, 89 Saile Way $ UNIT # 19: Winter Street, 60 Winter Street $ UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ UNIT # 21: Holly Ridge., I Holly Ridge Drive $ UNIT # 22: Johnson Circle, 85 Johnson Circle $ UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ Town of North Andover IFB Page 17 of 46 Emergency Power Generator Services FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ UNIT #28: Fire Station 2, 9 Salem Street $ UNIT #29: Located on Engine 1 $ UNIT #30: Located on Engine 2 $ UNIT #31: Located on Engine 3 $ UNIT #32: Located on Ladder 1 $ UNIT #33: Portable $ UNIT #34: Portable $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ UNIT #37: Sargent Elementary School, 300 Abbott Street $ UNIT #38: High School, 430 Osgood Street $ UNIT #39: High School, 430 Osgood Street $ UNIT #40: Middle School, 495 Main Street $ POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ PUBLIC WORKS UNIT 942: Garage, 384 Osgood Street $ UNIT #43: Senior Center 120R Main Street. $ As -Needed Service Regular business hours 50 hours $ $ Town of North Andover IFB Page 18 of 46 Emergency Power Generator Services Non business hours 75 hours $ $ TOTAL $ Year 3 - February 1. 2014 through January 31. 2015 Preventative Maintenance (two service calls per Scope of Services) DRINKING WATER TREATMENT PLANT UNIT # 1: 420 Great Pond Road $ WATER BOOSTER PUMPING STATIONS UNIT # 2: 00 Foxwood Drive / Pole #3 $ UNIT # 3: 98 Rosemont Drive UNIT # 4: 174 Sutton Hill Road $ UNIT # 5: 71 Bear Hill Road $ UNIT # 6: Orchard Village $ SEWER PUMP STATIONS UNIT #7: Willows, 805 Turnpike Street $ UNIT # 8: 87 Flagship Drive $ UNIT # 9: Jasmine Plaza, 720 Turnpike Street $ UNIT #10: Alcott Village, 105 Andover By -Pass $ UNIT #11: Boston Hill, 1280 Turnpike Street $ UNIT # 12: Located at Forest View, 14 Palomino Drive $ UNIT # 13: Located at Campbell, 1875 Salem Street $ UNIT # 14: Bonny Lane, 133 Bonny Lane $ UNIT # 15: Rea's Pond, 1653 Great Pond Road $ Town of North Andover IFB Page 19 of 46 Emergency Power Generator Services UNIT # 16: Butcher Boy, 1945 Great Pond Road $ UNIT # 17: Located at Coachmen, 70 Coachmen Lane $ UNIT # 18: Saile Way, 89 Saile Way $ UNIT # 19: Winter Street, 60 Winter Street $ UNIT # 20: Hawthorne Place, 45 Hawthorne Place $ UNIT # 21: Holly Ridge., 1 Holly Ridge Drive $ UNIT # 22: Johnson Circle, 85 Johnson Circle $ UNIT # 23: Blue Ridge, 410 Blue Ridge Road $ UNIT # 24: Dale Street, 595 Dale Street $ UNIT # 25: Meeting House, 44 Meeting House Commons $ UNIT # 26: Carter Field, 75 Carter Road $ FIRE DEPARTMENT UNIT #27: Fire Station 1, 124 Main Street $ UNIT #28: Fire Station 2, 9 Salem Street $ UNIT #29: Located on Engine 1 $ UNIT #30: Located on Engine 2 $ UNIT #31: Located on Engine 3 $ UNIT #32: Located on Ladder 1 $ UNIT #33: Portable $ UNIT #34: Portable $ SCHOOL DEPARTMENT UNIT #35: Atkinson Elementary School, 111 Phillips Brook Road $ UNIT #36 Franklin Elementary School, 2 Cypress Terrace $ Town of North Andover IFB Page 20 of 46 Emergency Power Generator Services UNIT #37: Sargent Elementary School, 300 Abbott Street $ UNIT #38: High School, 430 Osgood Street $ UNIT #39: High School, 430 Osgood Street $ UNIT #40: Middle School, 495 Main Street $ POLICE DEPARTMENT UNIT #41: 1475 Osgood Street $ PUBLIC WORKS UNIT #42: Garage, 384 Osgood Street $ UNIT #43: Senior Center 120R Main Street. $ As -Needed Service Regular business hours 50 hours $ $ Non business hours 75 hours $ $ TOTAL $ Addenda are acknowledged: Signature Business Name Business Address Business Phone Fax Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person Town of North Andover IFB Page 21 of 46 Emergency Power Generator Services Town of North Andover CONTRACT CONTRACT# DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Address: Telephone Number: _ Fax Number: 1. This is a Contract for the procurement of the following: 2. The Contract price to be paid to the Contractor by the Town of North Andover is: 3. Payment will be made as follows: 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. Town of North Andover IFB Page 22 of 46 Emergency Power Generator Services 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before , unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. Town of North Andover IFB Page 23 of 46 Emergency Power Generator Services 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default: 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall Town of North Andover IFB Page 24 of 46 Emergency Power Generator Services have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of ail existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall Town of North Andover IFB Page 25 of 46 Emergency Power Generator Services protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest: Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it or its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town: This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other Town of North Andover IFB Page 26 of 46 Emergency Power Generator Services instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. Town of North Andover IFB Page 27 of 46 Emergency Power Generator Services The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkeeping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Payment The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. Town of North Andover IFB Page 28 of 46 Emergency Power Generator Services 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. Town of North Andover IFB Page 29 of 46 Emergency Power Generator Services 28. Supplemental Conditions: The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Sup lep ments" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 3013) [ ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction Town of North Andover IFB Page 30 of 46 Emergency Power Generator Services IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN Division/Department Head Contract Manager Town Manager APPROVED AS TO FORM: Town Counsel Date Date THE CONTRACTOR Company Name Signature Print Name & Title CERTIFICATION AS TO AVAILABILITY OF FUNDS: Town Accountant Town of.North Andover IFB Emergency Power Generator Services Date Date Page 31 of 46 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. Ems: 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property, from injury or loss arising Town of North Andover IFB Page 32 of 46 Emergency Power Generator Services in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to cavy out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. Town of North Andover IFB Page 33 of 46 Emergency Power Generator Services 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. Town of North Andover IFB Page 34 of 46 Emergency Power Generator Services In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Pro erg ss Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding o�yments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. Town of North Andover IFB Page 35 of 46 Emergency Power Generator Services 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance Town of North Andover IFB Page 36 of 46 Emergency Power Generator Services of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or Town of North Andover IFB Page 37 of 46 Emergency Power Generator Services any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: Town of North Andover IFB Page 38 of 46 Emergency Power Generator Services Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insured by independent contractors and general inspection thereof by the named insured. 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's Town of North Andover IFB Page 39 of 46 Emergency Power Generator Services operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's Town of North Andover IFB Page 40 of 46 Emergency Power Generator Services obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: The Town of North Andover by: Town Manager Department/Division Head Town Accountant Certified as to Appropriation Town Counsel Certified as to Form The Contractor by: Authorized Signature Town of North Andover IFB Emergency Power Generator Services Page 41 of 46 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I , authorized signatory for Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature Town of North Andover IFB Emergency Power Generator Services Date Page 42 of 46 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Print Name & Title Town of North Andover IFB Emergency Power Generator Services Date Company Name Page 43 of 46 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon that I hereby certify that I am the clerk of the above named and is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 44 of 46 Emergency Power Generator Services PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS, that we with a place of business at as Principal (the "Principal"), and , a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of for the construction of NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL SURETY [Name and Seal] [Title] Attest: [Attorney-in-fact] [Seal] [Address] [Phone] Attest: Town of North Andover IFB Page 45 of 46 Emergency Power Generator Services Prevailing Wage Rates Town of North Andover IFB Page 46 of 46 Emergency Power Generator Services THE COMMONWEALTH OF MASSACHUSETTS 6 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN GovernorSeerwm TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.85 $8.56 $7.27 $0.00 $45.68 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.15 $8.56 $7.27 $0.00 $45.98 08/01/2012 $30.15 $8.91 $7.27 $0.00 $46.33 12/01/2012 $30.45 $8.91 $8.00 $0.00 $47.36 (3 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.92 $8.56 $7.27 $0.00 $45.75 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.22 $8.56 $7.27 $0.00 $46.05 08/01/2012 $30.22 $8.91 $7.27 $0.00 $46.40 12/01/2012 $30.52 $8.91 $8.00 $0.00 $47.43 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2011 $30.04 $8.56 $7.27 $0.00 $45.87 TEAMSTERS JOINT COUNCIL NO. ]OZONE B 06/01/2012 $30.34 $8.56 $7.27 $0.00 $46.17 08/01/2012 $30.34 $8.91 $7.27 $0.00 $46.52 12/01/2012 $30.64 $9.07 $8.00 $0.00 $47.71 ADS/SUBMERSIBLE PILOT 08/01/2011 $82.60 $8.08 $17.12 $0.00 $107.80 PILE DRIVER LOCAL 56 (ZONE 1) AIR TRACK OPERATOR 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS - ZONE 2 ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2011 $28.40 $9.90 $5.95 $0.00 $44.25 ASBESTOS WORKERS LOCAL 6 (BOSTON) ASPHALT RAKER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $1.2.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 1 of 59 THE COMMONWEALTH OF MASSACHUSETTS 6 lk EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT WL DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN Govemor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Governor Direclor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Health Pension Supplemental Unemployment Total Rate $24.51 $6.97 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $42.66 $26.39 $6.97 $11.18 $0.00 ment Unemployment $28.28 BACKHOE/FRONT-END LOADER 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 $48.31 $32.05 $6.97 $11.18 $0.00 $50.20 $33.93 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 $11.18 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 BARCO-TYPE JUMPING TAMPER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 BLOCK PAVER, RAMMER / CURB SETTER LABORERS - ZONE 2 BOILER MAKER BOILERMAKERS LOCAL 29 Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 Step percent 1 65 2 65 3 70 4 75 5 80 6 85 7 90 8 95 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $24.51 $6.97 $11.18 $0.00 $42.66 $24.51 $6.97 $11.18 $0.00 $42.66 $26.39 $6.97 $11.18 $0.00 $44.54 $28.28 $6.97 $11.18 $0.00 $46.43 $30.16 $6.97 $11.18 $0.00 $48.31 $32.05 $6.97 $11.18 $0.00 $50.20 $33.93 $6.97 $11.18 $0.00 $52.08 $35.82 $6.97 $11.18 $0.00 $53.97 ---------.__.____.-_...-_...------------ iI Notes: 1 `---- - ----------------- Apprentice to Journeyworker Ratio:1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 2 of 59 THE COMMONWEALTH OF MASSACHUSETTS .6 1h EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK Asdetermined by the Director under the provisions of the JOANNE F. GOLDSTEIN GovernorSecmtary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2011 $46.56 $9.93 $16.51 $0.00 $73.00 WATERPROOFING) BRICKLAYERS LOCAL 3(LYNN) 02/01/2012 $47.55 $9.93 $16.51 $0.00 $73.99 Apprentice- BRICKIPLASTERICEMENT MASON - Local 3 Lynn Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.28 $9.93 $16.51 $0.00 $49.72 2 60 $27.94 $9.93 $16.51 $0.00 $54.38 3 70 $32.59 $9.93 $16.51 $0.00 $59.03 4 80 $37.25 $9.93 $16.51 $0.00 $63.69 5 90 $41.90 $9.93 $16.51 $0.00 $68.34 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.78 $9.93 $16.51 $0.00 $50.22 2 60 $28.53 $9.93 $16.51 $0.00 $54.97 3 70 $33.29 $9.93 $16.51 $0.00 $59.73 4 80 $38.04 $9.93 $16.51 $0.00 $64.48 5 90 $42.80 $9.93 $16.51 $0.00 $69.24 --------------------------------r (Notes: � -------------------------- Apprentice to Journeyworker Ratio: 1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 3 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) THE COMMONWEALTH OF MASSACHUSETTS tr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $12.60 DEPARTMENT OF LABOR STANDARDS $51.35 Prevailing Wage Rates DEVAL L. PATRICK Govemorsecrctatv TIMOTHY P MURRAY Lt. Govemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate CAISSON & UNDERPINNING TOP MAN 12/01/2011 $31.65 $7.10 $12.60 Unemployment $51.35 BULLDOZER/GRADER/SCRAPER 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 CARPENTER 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 CARPENTERS -70NE 2 (Eastern Massachusetts) 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 CAISSON & UNDERPINNING BOTTOM MAN 12/01/2011 $32.80 $7.10 $12.60 $0.00 $52.50 LABORERS - FOUNDATION AND MARINE CAISSON & UNDERPINNING LABORER 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDATION AND MARINE_ CAISSON & UNDERPINNING TOP MAN 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDATIONAND MARINE CARBIDE CORE DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 CARPENTER 09/01/2011 $32.05 $9.80 $15.51 $0.00 $57.36 CARPENTERS -70NE 2 (Eastern Massachusetts) 03/01/2012 $33.17 $9.80 $15.51 $0.00 $58.48 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 4 of 59 THE COMMONWEALTH OF MASSACHUSETTS fi EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE s . GOLDSTEIN Govemr TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Governor Direaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) $9.80 $1.57 $0.00 $27.96 2 60 Classification $9.80 Effective Date Base Wage Health Pension Supplemental Total Rate $23.22 $9.80 $10.80 $0.00 $43.82 Unemployment $24.88 Apprentice - CARPENTER - Zone 2 Eastern MA $0.00 $45.48 5 80 $26.54 Effective Date - 09/01/2011 $12.37 $0.00 $48.71 Supplemental $26.54 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.03 $9.80 $1.57 $0.00 $27.40 2 60 $19.23 $9.80 $1.57 $0.00 $30.60 3 70 $22.44 $9.80 $10.80 $0.00 $43.04 4 75 $24.04 $9.80 $10.80 $0.00 $44.64 5 80 $25.64 $9.80 $12.37 $0.00 $47.81 6 80 $25.64 $9.80 $12.37 $0.00 $47.81 7 90 $28.85 $9.80 $13.94 $0.00 $52.59 8 90 $28.85 $9.80 $13.94 $0.00 $52.59 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.59 $9.80 $1.57 $0.00 $27.96 2 60 $19.90 $9.80 $1.57 $0.00 $31.27 3 70 $23.22 $9.80 $10.80 $0.00 $43.82 4 75 $24.88 $9.80 $10.80 $0.00 $45.48 5 80 $26.54 $9.80 $12.37 $0.00 $48.71 6 80 $26.54 $9.80 $12.37 $0.00 $48.71 7 90 $29.85 $9.80 $13.94 $0.00 $53.59 8 90 $29.85 $9.80 $13.94 $0.00 $53.59 --- -----------.----____-..-..-..__._.._.___ ----- Notes: { Apprentice to Journeyworker Ratio: 1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 5 of 59 THE COMMONWEALTH OF MASSACHUSETTS t EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN Governor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govewr Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CEMENT MASONRY/PLASTERING 08/01/2011 $44.33 $9.93 $16.51 $0.00 $70.77 BRICKLAYERS LOCAL 3(LYNN) 02/01/2012 $45.10 $9.93 $16.51 $0.00 $71.54 CHAIN SAW OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 1 CLAM SHELLS/SLURRY BUCKETS/IIEADING MACHINES 12/01/2011 $40.52 $10.00 $12.40 $0.00 $62.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $41.09 $10.00 $12.40 $0.00 $63.49 12/01/2012 $41.71 $10.00 $12.40 $0.00 $64.11 06/01/2013 $42.49 $10.00 $12.40 $0.00 $64.89 12/01/2013 $43.27 $10.00 $12.40 $0.00 $65.67 COMPRESSOR OPERATOR 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 DELEADER (BRIDGE) 07/01/2011 $43.51 $7.80 $14.10 $0.00 $65.41 PAINTERS LOCAL 35 - ZONE 1 01/01/2012 $44.01 $7.80 $14.60 $0.00 $66.41 07/01/2012 $45.01 $7.80 $14.60 $0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 $0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 6 of 59 st DEVAL L. PATRICK Govcmr TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Various (Municipal and School) Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 07/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.76 $7.80 $0.00 $0.00 $29.56 2 55 $23.93 $7.80 $3.11 $0.00 $34.84 3 60 $26.11 $7.80 $3.39 $0.00 $37.30 4 65 $28.28 $7.80 $3.67 $0.00 $39.75 5 70 $30.46 $7.80 $12.44 $0.00 $50.70 6 75 $32.63 $7.80 $12.69 $0.00 $53.1.2 7 80 $34.81 $7.80 $12.97 $0.00 $55.58 8 90 $39.16 $7.80 $13.54 $0.00 $60.50 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 $0.00 $0.00 $29.81 2 55 $24.21 $7.80 $3.25 $0.00 $35.26 3 60 $26.41 $7.80 $3.54 $0.00 $37.75 4 65 $28.61 $7.80 $3.84 $0.00 $40.25 5 70 $30.81 $7.80 $12.83 $0.00 $51.44 6 75 $33.01 $7.80 $13.13 $0.00 $53.94 7 80 $35.21 $7.80 $13.42 $0.00 $56.43 8 90 $39.61 $7.80 $14.01 $0.00 $61.42 ---._.._------._..-_.._-..._----.-.-----._._._.-_, (Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 7 of 59 THE COMMONWEALTH OF MASSACHUSETTS s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Seumn. TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS - ZONE 2 DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE 2 Apprentice - LABORER Demo Backhoe/Loader/Hammer Operator Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.68 $7.10 $12.45 $0.00 $39.23 2 70 $22.96 $7.10 $12.45 $0.00 $42.51 3 80 $26.24 $7.10 $12.45 $0.00 $45.79 4 90 $29.52 $7.10 $12.45 $0.00 $49.07 --.__.-----------------._._.__._... ----- Notes: -Notes: } ------------------------------ Apprentice ._ ------------------------.----._.. -- Apprentice to Journeyworker Ratio: 1:5 DEMO: BURNERS 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 8 of 59 THE COMMONWEALTH OF MASSACHUSETTS 61, EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT WL DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates °EVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Dimctor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER Demo Burners Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.53 $7.10 $12.45 $0.00 $39.08 2 70 $22.79 $7.10 $12.45 $0.00 $42.34 3 80 $26.04 $7.10 $12.45 $0.00 $45.59 4 90 $29.30 $7.10 $12.45 $0.00 $48.85 ._..___.-----.-____.-.-----------"._._------+ INotes: I I '-- - --------------- Apprentice to Journeyworker Ratio: 1:5 .- ___. ( -- DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS -7.ONF2 DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS - ZONE 2 DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS -ZONE2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 9 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEtN Govemor y A Sccretan nmoTHYP. MuRRAv Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Gmvemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- LABORER Demo Wrecking Laborer Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.08 $7.10 $12.45 $0.00 $38.63 2 70 $22.26 $7.10 $12.45 $0.00 $41.81 3 80 $25.44 $7.10 $12.45 $0.00 $44.99 4 90 $28.62 $7.10 $12.45 $0.00 $48.17 - - - - - - - - - - - Notes: - - ---------.._._..__._.----, $0.00 $62.74 I -------------.-._ Apprentice to Journeyworker Ratio:l:5 $10.00 $12.40 _.--.--- _._._.._._ - DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL, 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 DIVER 08/01/2011 $55.07 $8.08 $17.12 $0.00 $80.27 PILE DRIVER LOCAL 56 (ZONE, I) DIVER TENDER 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER LOCAL 56 (ZONE I) DIVER TENDER (EFFLUENT) 08/01/2011 $60.18 $8.08 $17.12 $0.00 $85.38 PILE DRIVER LOCAL 56 (ZONE 1) DIVER/SLURRY (EFFLUENT) 08/01/2011 $82.60 $8.08 $17.12 $0.00 $107.80 PILE DRIVER LOCAL 56 (ZONE, 1) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 10 of 59 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNEs GOLDSTEIN Goy emor 0 TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. GUYemW Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ELECTRICIAN 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 FLEC7RICIANSLOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 11 of 59 DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govcmor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN secmtary Massachusetts General Laws, Chapter 149, Sections 26 to 27H FATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Various (Municipal and School) Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ELECTRICIAN - Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.76 $13.00 $7.80 $0.00 $37.56 2 40 $16.76 $13.00 $7.80 $0.00 $37.56 3 45 $18.85 $13.00 $10.26 $0.00 $42.11 4 45 $18.85 $13.00 $10.26 $0.00 $42.11 5 50 $20.95 $13.00 $10.58 $0.00 $44.53 6 55 $23.04 $13.00 $10.91 $0.00 $46.95 7 60 $25.13 $13.00 $11.23 $0.00 $49.36 8 65 $27.23 $13.00 $11.57 $0.00 $51.80 9 70 $29.32 $13.00 $11.89 $0.00 $54.21 10 75 $31.42 $13.00 $12.22 $0.00 $56.64 Effective Date - 03/01/2012 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 40 $16.95 $13.00 $7.81 $0.00 $37.76 2 40 $16.95 $13.00 $7.81 $0.00 $37.76 3 45 $19.07 $13.00 $10.26 $0.00 $42.33 4 45 $19.07 $13.00 $10.26 $0.00 $42.33 5 50 $21.19 $13.00 $10.59 $0.00 $44.78 6 55 $23.30 $13.00 $10.92 $0.00 $47.22 7 60 $25.42 $13.00 $11.24 $0.00 $49.66 8 65 $27.54 $13.00 $11.58 $0.00 $52.12 9 70 $29.66 $13.00 $11.90 $0.00 $54.56 10 75 $31.78 $13.00 $12.23 $0.00 $57.01 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 12 of 59 THE COMMONWEALTH OF MASSACHUSETTS sY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTTEIN Govemr Y P Secntam TTMDTHYP MURRAv Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Direcaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment -_------------------------- _.-_-.__.-- r, INotes:: App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 -- - ___--I--_..,____----------- Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2011 $50.95 $8.78 $6.96 $0.00 $66.69 ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.48 $8.78 $0.00 $0.00 $34.26 2 55 $28.02 $8.78 $6.96 $0.00 $43.76 3 65 $33.12 $8.78 $6.96 $0.00 $48.86 4 70 $35.67 $8.78 $6.96 $0.00 $51.41 5 80 $40.76 $8.78 $6.96 $0.00 $56.50 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 ._-..._._.____..-____.____------_......r_.._. ------------ Notes: Steps 1-2 are 6 mos.; Steps 3-5 are 1 year I �- _-_.__......___.-.__..--------._.---- Apprento Journeyworker Ratio:l:l Tice This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 13 of 59 THE COMMONWEALTH OF MASSACHUSETTS # EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK Asdetermined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E!ROWE LL Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ELEVATOR CONSTRUCTOR HELPER 01/01/2011 $37.09 $8.78 $6.96 $0.00 $52.83 ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 FENCE & GUARD RAIL ERECTOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $37.49 $10.00 $12.20 $0.00 $59.69 OPERATING ENGINEERS LOCAL 4 05/01/2012 $38.10 $10.00 $12.20 $0.00 $60.30 11/01/2012 $38.71 $10.00 $12.20 $0.00 $60.91 05/01/2013 $39.32 $10.00 $12.20 $0.00 $61.52 11/01/2013 $40.08 $10.00 $12.20 $0.00 $62.28 05/01/2014 $40.85 $10.00 $12.20 $0.00 $63.05 FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2011 $38.88 $10.00 $12.20 $0.00 $61.08 OPERATING ENGINEERS LOCAL 4 05/01/2012 $39.49 $10.00 $12.20 $0.00 $61.69 11/01/2012 $40.11 $10.00 $12.20 $0.00 $62.31 05/01/2013 $40.73 $10.00 $12.20 $0.00 $62.93 11/01/2013 $41.50 $10.00 $12.20 $0.00 $63.70 05/01/2014 $42.27 $10.00 $12.20 $0.00 $64.47 FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $20.91 $10.00 $12.20 $0.00 $43.11 OPERATING ENGINEERS LOCAL 4 05/01/2012 $21.27 $10.00 $12.20 $0.00 $43.47 11/01/2012 $21.63 $10.00 $12.20 $0.00 $43.83 05/01/2013 $21.99 $10.00 $12.20 $0.00 $44.19 11/01/2013 $22.45 $10.00 $12.20 $0.00 $44.65 05/01/2014 $22.90 $10.00 $12.20 $0.00 $45.10 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 14 of 59 THE COMMONWEALTH OF MASSACHUSETTS # EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govewr Y P Secreta? TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Go, ertmr Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate / COMMISSIONINGELECTRIciANs Unemployment FIRE ALARM INSTALLER 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 FIRE ALARM REPAIR / MAINTENANCE 09/01/2011 $31.42 $13.00 $12.22 $0.00 $56.64 / COMMISSIONINGELECTRIciANs 03/01/2012 LOCAL 103 $31.78 $13.00 $12.23 $0.00 $57.01 09/01/2012 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 $0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 $0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 $0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 $0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 $0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 $0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 $0.00 $61.72 FIREMAN (ASST. ENGINEER) 12/01/2011 $33.23 $10.00 $12.40 $0.00 $55.63 OPERATING ENGINEERS LOCAL S 06/01/2012 $33.70 $10.00 $12.40 $0.00 $56.10 12/01/2012 $34.23 $10.00 $12.40 $0.00 $56.63 06/01/2013 $34.88 $10.00 $12.40 $0.00 $57.28 12/01/2013 $35.54 $10.00 $12.40 $0.00 $57.94 FLAGGER & SIGNALER LABORERS - ZONE 2 12/01/2011 $20.50 $7.10 $11.55 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $39.15 Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 15 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemorsemlary TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Dimaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FLOORCOVERER 09/01/2011 $35.95 $9.80 $16.61 $0.00 $62.36 FLOORCOVERERS LOCAL 2168 7.ONF,1 03/01/2012 $37.20 $9.80 $16.61 $0.00 $63.61 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 16 of 59 4 LIN THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. G LDSTEIN mo Gover TIMOTHY F. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govcmor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.98 $9.80 $1.79 $0.00 $29.57 2 55 $19.77 $9.80 $1.79 $0.00 $31.36 3 60 $21.57 $9.80 $11.24 $0.00 $42.61 4 65 $23.37 $9.80 $11.24 $0.00 $44.41 5 70 $25.17 $9.80 $13.03 $0.00 $48.00 6 75 $26.96 $9.80 $13.03 $0.00 $49.79 7 80 $28.76 $9.80 $14.82 $0.00 $53.38 8 85 $30.56 $9.80 $14.82 $0.00 $55.18 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.60 2 55 $20.46 3 60 $22.32 4 65 $24.18 5 70 $26.04 6 75 $27.90 7 80 $29.76 8 85 $31.62 (Notes: $13.03 Steps are 750 hrs. $48.87 Apprentice to Journeyworker Ratio:la $13.03 $9.80 $1.79 $0.00 $30.19 $9.80 $1.79 $0.00 $32.05 $9.80 $11.24 $0.00 $43.36 $9.80 $11.24 $0.00 $45.22 $9.80 $13.03 $0.00 $48.87 $9.80 $13.03 $0.00 $50.73 $9.80 $14.82 $0.00 $54.38 $9.80 $14.82 $0.00 $56.24 'f This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 17 of 59 st DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Scamary Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate FORK LIFT/CHERRY PICKER 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 $14.60 $0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 GENERATOR/LIGHTING PLANT/HEATERS 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $1.2.40 $0.00 $52.29 GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS) GLAZIERS LOCAL 35 (ZONE 2) 07/01/2011 $33.01 $7.80 $14.10 $0.00 $54.91 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 18 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Gov- Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - GLAZIER - Local 35 Zone 2 Effective Date - 07/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.51 $7.80 $0.00 $0.00 $24.31 2 55 $18.16 $7.80 $3.11 $0.00 $29.07 3 60 $19.81 $7.80 $3.39 $0.00 $31.00 4 65 $21.46 $7.80 $3.67 $0.00 $32.93 5 70 $23.11 $7.80 $12.44 $0.00 $43.35 6 75 $24.76 $7.80 $12.69 $0.00 $45.25 7 80 $26.41 $7.80 $12.97 $0.00 $47.18 8 90 $29.71 $7.80 $13.54 $0.00 $51.05 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.76 $7.80 $0.00 $0.00 $24.56 2 55 $18.43 $7.80 $3.25 $0.00 $29.48 3 60 $20.11 $7.80 $3.54 $0.00 $31.45 4 65 $21.78 $7.80 $3.84 $0.00 $33.42 5 70 $23.46 $7.80 $12.83 $0.00 $44.09 6 75 $25.13 $7.80 $13.13 $0.00 $46.06 7 80 $26.81 $7.80 $13.42 $0.00 $48.03 8 90 $30.16 $7.80 $14.01 $0.00 $51.97 ------__.._-._..._-__ Notes: --- _..._.__.r__------_, ` Steps are 750 hrs. I ! Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 19 of 59 THE COMMONWEALTH OF MASSACHUSETTS sY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN no Goverr TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment HOISTING ENGINEER/CRANES/GRADALLS 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 20 of 59 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN Govemor TIMOTHY P. MURRAY - Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Ll Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- HOIST/PORT. ENG.- Local 4 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $21.74 $10.00 $0.00 $0.00 $31.74 2 60 $23.71 $10.00 $12.40 $0.00 $46.11 3 65 $25.69 $10.00 $12.40 $0.00 $48.09 4 70 $27.66 $10.00 $12.40 $0.00 $50.06 5 75 $29.64 $10.00 $1.2.40 $0.00 $52.04 6 80 $31.62 $10.00 $12.40 $0.00 $54.02 7 85 $33.59 $10.00 $12.40 $0.00 $55.99 8 90 $35.57 $10.00 $12.40 $0.00 $57.97 Effective Date - 06/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 2 60 $24.05 $10.00 $12.40 $0.00 $46.45 3 65 $26.06 $10.00 $12.40 $0.00 $48.46 4 70 $28.06 $10.00 $12.40 $0.00 $50.46 5 75 $30.07 $10.00 $12.40 $0.00 $52.47 6 80 $32.07 $10.00 $12.40 $0.00 $54.47 7 85 $34.08 $10.00 $12.40 $0.00 $56.48 8 90 $36.08 $10.00 $12.40 $0.00 $58.48 (._ --` M. - - - - - - - - - - ---- __---_.. ----- Notes: Apprentice to Journeyworker Ratio:l :6 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 21 of 59 THE COMMONWEALTH OF MASSACHUSETTS # EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN GovemorSecmtary TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate $68.75 ELECTRICIANS LOCAL 103 Unemployment HVAC (DUCTWORK) 08/01/2011 $39.83 $9.82 $17.09 $0.00 $66.74 SHEETMETAL WORKERS LOCAL 17 -A $0.00 $69.24 09/01/2012 $43.05 02/01/2012 $41.08 $9.82 $17.09 $0.00 $67.99 08/01/2012 $42.33 $9.82 $17.09 $0.00 $69.24 02/01/2013 $43.58 $9.82 $17.09 $0.00 $70.49 HVAC (ELECTRICAL CONTROLS) 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 HVAC (TESTING AND BALANCING - AIR) 08/01/2011 $39.83 $9.82 $17.09 $0.00 $66.74 SHEETMETAL WORKERS LOCAL I7 -A 02/01/2012 $41.08 $9.82 $17.09 $0.00 $67.99 08/01/2012 $42.33 $9.82 $17.09 $0.00 $69.24 02/01/2013 $43.58 $9.82 $17.09 $0.00 $70.49 HVAC (TESTING AND BALANCING -WATER) 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPF.FITTERS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HVAC MECHANIC 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HYDRAULIC DRILLS 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS -ZONE2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 22 of 59 THE COMMONWEALTH OF MASSACHUSETTS a? EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. G LDSTEIN mo Gover TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) $20.33 $10.40 $8.30 $0.00 $39.03 2 60 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $10.40 $9.46 $0.00 $48.32 4 80 Unemployment $10.40 INSULATOR (PIPES & TANKS) 09/01/2011 $40.66 $10.40 $11.20 $0.00 $62.26 ASBESTOS wOPKERSLOCAL 6 (BOSTON) Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 09/01/2012 $42.06 $10.40 $11.20 $0.00 $63.66 09/01/2013 $43.66 $10.40 $11.20 $0.00 $65.26 09/01/2014 $45.66 $10.40 $11.20 $0.00 $67.26 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.33 $10.40 $8.30 $0.00 $39.03 2 60 $24.40 $10.40 $8.88 $0.00 $43.68 3 70 $28.46 $10.40 $9.46 $0.00 $48.32 4 80 $32.53 $10.40 $10.04 $0.00 $52.97 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.03 $10.40 $8.30 $0.00 $39.73 2 60 $25.24 $10.40 $8.88 $0.00 $44.52 3 70 $29.44 $10.40 $9.46 $0.00 $49.30 4 80 $33.65 $10.40 $10.04 $0.00 $54.09 -._._.---------------------------� Notes: Steps are 1 year Apprentice to Journeyworker Ratio: 1:4 IRONWORKER/WELDER 09/16/2011 $32.87 $7.70 $17.95 $0.00 IRONWORKERS LOCAL 7(LA WRENCEAREA) 03/16/2012 $33.87 $7.70 $17.95 $0.00 09/16/2012 $34.87 $7.70 $17.95 $0.00 03/16/2013 $36.12 $7.70 $17.95 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $58.52 $59.52 $60.52 $61.77 Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 23 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 09/16/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 THE COMMONWEALTH OF MASSACHUSETTS sY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 70 Prevailing Wage Rates DEVALL. PATRICK Govemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary TIMOTHY P MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROwe Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 09/16/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.72 $7.70 $17.95 $0.00 $45.37 2 70 $23.01 $7.70 $17.95 $0.00 $48.66 3 75 $24.65 $7.70 $17.95 $0.00 $50.30 4 80 $26.30 $7.70 $17.95 $0.00 $51.95 5 85 $27.94 $7.70 $17.95 $0.00 $53.59 6 90 $29.58 $7.70 $17.95 $0.00 $55.23 Effective Date - 03/16/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.32 $7.70 $17.95 $0.00 $45.97 2 70 $23.71 $7.70 $17.95 $0.00 $49.36 3 75 $25.40 $7.70 $17.95 $0.00 $51.05 4 80 $27.10 $7.70 $17.95 $0.00 $52.75 5 85 $28.79 $7.70 $17.95 $0.00 $54.44 6 90 $30.48 $7.70 $17.95 $0.00 $56.13 --------____-.-._._.._----------------� !Notes: IStructural 1:6; Ornamental 1:4 -._.--�.-.-.-_._._._...._------- Apprentice to Journeyworker Ratio: --- JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 LABORER LABORF,RS - ZONE 2 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 24 of 59 THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gowmor Secretan TIMOTHYP MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LC Govemor Direaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.61 $7.10 $11.55 $0.00 $36.26 2 70 $20.55 $7.10 $11.55 $0.00 $39.20 3 80 $23.48 $7.10 $11.55 $0.00 $42.13 4 90 $26.42 $7.10 $11.55 $0.00 $45.07 . ---------------._....---__._.-------- Notes: LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 `- --_____..._----.-_..----.-�.---- Apprentice to Journeyworker Ratio:l:5 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: CARPENTER TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: CEMENT FINISHER TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: MASON TENDER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 LABORER: MULTI -TRADE TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: TREE REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. LASER BEAM OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 25 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MARBLE & TILE FINISHERS 08/01/2011 $35.52 $9.93 $15.50 $0.00 $60.95 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2012 $36.31 $9.93 $15.50 $0.00 $61.74 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $9.93 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 60 Prevailing Wage Rates DEVALL. PATRICK rno Gover As determined by the Director under the provisions of the JOANNE . GOLDSTEIN TIMOTHY P MURRAY LL Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATEER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MARBLE & TILE FINISHERS 08/01/2011 $35.52 $9.93 $15.50 $0.00 $60.95 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2012 $36.31 $9.93 $15.50 $0.00 $61.74 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.76 $9.93 $15.50 $0.00 $43.19 2 60 $21.31 $9.93 $15.50 $0.00 $46.74 3 70 $24.86 $9.93 $15.50 $0.00 $50.29 4 80 $28.42 $9.93 $15.50 $0.00 $53.85 5 90 $31.97 $9.93 $15.50 $0.00 $57.40 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.16 $9.93 $15.50 $0.00 $43.59 2 60 $21.79 $9.93 $15.50 $0.00 $47.22 3 70 $25.42 $9.93 $15.50 $0.00 $50.85 4 80 $29.05 $9.93 $15.50 $0.00 $54.48 5 90 $32.68 $9.93 $15.50 $0.00 $58.11 .._..._.-..._------__._-_.._------__`.__.-- ---_, (Notes: Steps are 800 hrs. j _...-._._.-..-----------------_ Apprentice to Journeyworker Ratio:l:3 MARBLE MASONS,TILELAYERS & TERRAZZO MECH 08/01/2011 $46.60 $9.93 $16.51 $0.00 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2012 $47.59 $9.93 $16.51 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $73.04 $74.03 Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 26 of 59 THE COMMONWEALTH OF MASSACHUSETTS ft EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Go, entor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.30 $9.93 $16.51 $0.00 $49.74 2 60 $27.96 $9.93 $16.51 $0.00 $54.40 3 70 $32.62 $9.93 $16.51 $0.00 $59.06 4 80 $37.28 $9.93 $16.51 $0.00 $63.72 5 90 $41.94 $9.93 $16.51 $0.00 $68.38 Effective Date - 02/01/2012 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $23.80 $9.93 $16.51 $0.00 $50.24 2 60 $28.55 $9.93 $16.51 $0.00 $54.99 3 70 $33.31 $9.93 $16.51 $0.00 $59.75 4 80 $38.07 $9.93 $16.51 $0.00 $64.51 5 90 $42.83 $9.93 $16.51 $0.00 $69.27 Notes: - -- -- -._ - - - - - - -- -- Apprentice to Journeyworker Ratio:1:3 MECH. SWEEPER OPERATOR (NON -CONSTRUCTION) 07/01/2011 $24.80 $5.49 $0.00 $0.00 SWEEPER LOCAL 25 (NON -CONSTRUCTION) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $30.29 Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 27 of 59 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gowmor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E ROWE LL Gmvenmr Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 MECHANICS MAINTENANCE 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 MILLWRIGHT (Zone 2) MILLWRIGHTS LOCAL 1111 -Zone 2 04/01/2011 $31.71 $8.67 $15.61 $0.00 $55.99 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at w-Aw.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 28 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT -Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $8.67 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 55 Prevailing Wage Rates DEVAL L. PATnucK Gocemor As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN y p Secretary .rmtOTHY P MURRAY LL Govenmr Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATEERE. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT -Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 $11.64 $0.00 $36.17 2 55 $17.44 $8.67 $11.64 $0.00 $37.75 3 60 $19.03 $8.67 $13.23 $0.00 $40.93 4 65 $20.61 $8.67 $13.23 $0.00 $42.51 5 70 $22.20 $8.67 $14.02 $0.00 $44.89 6 75 $23.78 $8.67 $14.02 $0.00 $46.47 7 80 $25.37 $8.67 $14.82 $0.00 $48.86 8 85 $26.95 $8.67 $14.82 $0.00 $50.44 ---._... --_._..___.-----------___..,__..-_._.._.,..._-- Notes: I `._ _ - --___---.-------___._._.----- Apprentice to Journeyworker Ratio: 1:5 MORTAR MIXER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2011 $21.28 $10.00 $12.40 $0.00 $43.68 OPERATING ENGINEERS LOCAL 4 06/01/2012 $21.56 $10.00 $12.40 $0.00 $43.96 12/01/2012 $21.90 $10.00 $12.40 $0.00 $44.30 06/01/2013 $22.32 $10.00 $12.40 $0.00 $44.72 12/01/2013 $22.74 $10.00 $12.40 $0.00 $45.14 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 29 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Supplemental DEPARTMENT OF LABOR STANDARDS $61.56 Prevailing Wage Rates DEVAL L. PATRICK Gocemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Lt. Gocemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate $61.56 OPERATING ENGINEERS LOCAL 4 Unemployment OILER (TRUCK CRANES. GRADALLS) 12/01/2011 $24.51 $10.00 $12.40 $0.00 $46.91 OPERATING ENGINEERS LOCAL 4 $0.00 $62.12 12/01/2012 $40.34 06/01/2012 $24.85 $10.00 $12.40 $0.00 $47.25 12/01/2012 $25.24 $10.00 $12.40 $0.00 $47.64 06/01/2013 $25.72 $10.00 $12.40 $0.00 $48.12 12/01/2013 $26.21 $10.00 $12.40 $0.00 $48.61 OTHER POWER DRIVEN EQUIPMENT - CLASS II 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 PAINTER(BRIDGES/TANKS) 07/01/2011 $43.51 $7.80 $14.10 $0.00 $65.41 PAINTERS LOCAL 35 - ZONE 2 01/01/2012 $44.01 $7.80 $14.60 $0.00 $66.41 07/01/2012 $45.01 $7.80 $14.60 $0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 $0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at nww.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 30 of 59 THE COMMONWEALTH OF MASSACHUSETTS 4 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension SupplementalUnemploYmeut Total Rate Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 07/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.76 $7.80 $0.00 $0.00 $29.56 2 55 $23.93 $7.80 $3.11 $0.00 $34.84 3 60 $26.11 $7.80 $3.39 $0.00 $37.30 4 65 $28.28 $7.80 $3.67 $0.00 $39.75 5 70 $30.46 $7.80 $12.44 $0.00 $50.70 6 75 $32.63 $7.80 $12.69 $0.00 $53.12 7 80 $34.81 $7.80 $12.97 $0.00 $55.58 8 90 $39.16 $7.80 $13.54 $0.00 $60.50 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 $0.00 $0.00 $29.81 2 55 $24.21 $7.80 $3.25 $0.00 $35.26 3 60 $26.41 $7.80 $3.54 $0.00 $37.75 4 65 $28.61 $7.80 $3.84 $0.00 $40.25 5 70 $30.81 $7.80 $12.83 $0.00 $51.44 6 75 $33.01 $7.80 $13.13 $0.00 $53.94 7 80 $35.21 $7.80 $13.42 $0.00 $56.43 8 90 $39.61 $7.80 $14.01 $0.00 $61.42 --------- .. -------.-..._._._..._....-- _---__.._-._, Notes: i Steps are 750 hrs. !i Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 31 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PAriucx As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN mo Gocer TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, NEW) * 07/01/2011 $34.41 $7.80 $14.10 $0.00 $56.31 * If 30% or more of surfaces to be painted are new construction, 01/01/2012 $34.91 $7.80 $14.60 $0.00 $57.31 NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2 07/01/2012 $35.91 $7.80 $14.60 $0.00 $58.31 01/01/2013 $36.91 $7.80 $14.60 $0.00 $59.31 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 32 of 59 DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Gov - Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Sectetary Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dimclor Town of North Andover City/Town: NORTH ANDOVER Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Various (Municipal and School) Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New Effective Date - 07/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.21 $7.80 $0.00 $0.00 $25.01 2 55 $18.93 $7.80 $3.11 $0.00 $29.84 3 60 $20.65 $7.80 $3.39 $0.00 $31.84 4 65 $22.37 $7.80 $3.67 $0.00 $33.84 5 70 $24.09 $7.80 $12.44 $0.00 $44.33 6 75 $25.81 $7.80 $12.69 $0.00 $46.30 7 80 $27.53 $7.80 $12.97 $0.00 $48.30 8 90 $30.97 $7.80 $13.54 $0.00 $52.31 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.46 $7.80 $0.00 $0.00 $25.26 2 55 $19.20 $7.80 $3.25 $0.00 $30.25 3 60 $20.95 $7.80 $3.54 $0.00 $32.29 4 65 $22.69 $7.80 $3.84 $0.00 $34.33 5 70 $24.44 $7.80 $12.83 $0.00 $45.07 6 75 $26.18 $7.80 $13.13 $0.00 $47.11 7 80 $27.93 $7.80 $13.42 $0.00 $49.15 8 90 $31.42 $7.80 $14.01 $0.00 $53.23 (Notes: Apprentice to Journeyworker Ratio:l:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 33 of 59 t, THE COMMONWEALTH OF MASSACHUSETTS 616 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Govemr As determined by the Director under the provisions of the JOANNE S F.GDL DSTEIN TIMOTHY P MURRAY Lt. Govemr Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rowe Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, REPAINT) 07/01/2011 $32.47 $7.80 $14.10 $0.00 $54.37 PAINTERS LOCAL, 35 - ZONE 2 01/01/2012 $32.97 $7.80 $14.60 $0.00 $55.37 07/01/2012 $33.97 $7.80 $14.60 $0.00 $56.37 01/01/2013 $34.97 $7.80 $14.60 $0.00 $57.37 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 34 of 59 THE COMMONWEALTH OF MASSACHUSETTS xt EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint Effective Date - 07/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.24 $7.80 $0.00 $0.00 $24.04 2 55 $17.86 $7.80 $3.11 $0.00 $28.77 3 60 $19.48 $7.80 $3.39 $0.00 $30.67 4 65 $21.11 $7.80 $3.67 $0.00 $32.58 5 70 $22.73 $7.80 $12.44 $0.00 $42.97 6 75 $24.35 $7.80 $12.69 $0.00 $44.84 7 80 $25.98 $7.80 $12.97 $0.00 $46.75 8 90 $29.22 $7.80 $13.54 $0.00 $50.56 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.49 $7.80 $0.00 $0.00 $24.29 2 .55 $18.13 $7.80 $3.25 $0.00 $29.18 3 60 $19.78 $7.80 $3.54 $0.00 $31.12 4 65 $21.43 $7.80 $3.84 $0.00 $33.07 5 70 $23.08 $7.80 $12.83 $0.00 $43.71 6 75 $24.73 $7.80 $13.13 $0.00 $45.66 7 80 $26.38 $7.80 $13.42 $0.00 $47.60 8 90 $29.67 $7.80 $14.01 $0.00 $51.48 ---------_._.-----_---- - _-__ --- Notes: - - - . _ _ . - - _ - ._._. - ____. - __.. _.._ - Apprentice to Journeyworker Ratio:]:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 35 of 59 THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN rn Goveor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (TRAFFIC MARKINGS) 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS-7_ONF.2 PAINTER / TAPER (BRUSH, NEW) * * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PA1NTERS LOCAL 3s - ZONE 2 07/01/2011 $33.01 $7.80 $14.10 $0.00 $54.91 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 36 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: THE COMMONWEALTH OF MASSACHUSETTS �c EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 55 Prevailing Wage Rates DEVALL. PATRICK Govemor As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Y P secreta, TIMOTHY P MURRAY Ll Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) $7.80 $0.00 $0.00 $24.56 2 55 Classification $7.80 Effective Date Base Wage Health Pension Supplemental Total Rate $20.11 $7.80 $3.54 $0.00 $31.45 Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSH NEW $3.84 $0.00 $33.42 5 70 Effective Date - 07/01/2011 $7.80 $12.83 $0.00 Supplemental 6 75 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.51 $7.80 $0.00 $0.00 $24.31 2 55 $18.16 $7.80 $3.11 $0.00 $29.07 3 60 $19.81 $7.80 $3.39 $0.00 $31.00 4 65 $21.46 $7.80 $3.67 $0.00 $32.93 5 70 $23.11 $7.80 $12.44 $0.00 $43.35 6 75 $24.76 $7.80 $12.69 $0.00 $45.25 7 80 $26.41 $7.80 $12.97 $0.00 $47.18 8 90 $29.71 $7.80 $13.54 $0.00 $51.05 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.76 $7.80 $0.00 $0.00 $24.56 2 55 $18.43 $7.80 $3.25 $0.00 $29.48 3 60 $20.11 $7.80 $3.54 $0.00 $31.45 4 65 $21.78 $7.80 $3.84 $0.00 $33.42 5 70 $23.46 $7.80 $12.83 $0.00 $44.09 6 75 $25.13 $7.80 $13.13 $0.00 $46.06 7 80 $26.81 $7.80 $13.42 $0.00 $48.03 8 90 $30.16 $7.80 $14.01 $0.00 $51.97 (Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 37 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE S . GOrLDSTEIN rn Goveor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H. HEATHER E. ROWE Lr. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER / TAPER (BRUSH, REPAINT) 07/01/2011 $31.07 $7.80 $14.10 $0.00 $52.97 PAIN7ERS LOCAL 35 - ZONE 2 01/01/2012 $31.57 $7.80 $14.60 $0.00 $53.97 07/01/2012 $32.57 $7.80 $14.60 $0.00 $54.97 01/01/2013 $33.57 $7.80 $14.60 $0.00 $55.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 38 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT WL DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the Joys .GOLDSTEIN Goy e- TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Gocemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 07/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.54 $7.80 $0.00 $0.00 $23.34 2 55 $17.09 $7.80 $3.11 $0.00 $28.00 3 60 $18.64 $7.80 $3.39 $0.00 $29.83 4 65 $20.20 $7.80 $3.67 $0.00 $31.67 5 70 $21.75 $7.80 $12.44 $0.00 $41.99 6 75 $23.30 $7.80 $12.69 $0.00 $43.79 7 80 $24.86 $7.80 $12.97 $0.00 $45.63 8 90 $27.96 $7.80 $13.54 $0.00 $49.30 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.79 $7.80 $0.00 $0.00 $23.59 2 55 $17.36 $7.80 $3.25 $0.00 $28.41 3 60 $18.94 $7.80 $3.54 $0.00 $30.28 4 65 $20.52 $7.80 $3.84 $0.00 $32.16 5 70 $22.10 $7.80 $12.83 $0.00 $42.73 6 75 $23.68 $7.80 $13.13 $0.00 $44.61 7 80 $25.26 $7.80 $13.42 $0.00 $46.48 8 90 $28.41 $7.80 $14.01 $0.00 $50.22 -_--------.-,-_._._-----._-----__------,---- Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:l:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 39 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $17.12 DEPARTMENT OF LABOR STANDARDS PILE DRIVER Prevailing Wage Rates DEVAL L. PATRICK Govem, As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN TIMOTHY P. MURRAY Lt. Govem, Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER Classification Effective Date Base Wage Health Pension Supplemental Total Rate Apprentice - PILE DRIVER - Local 56 Zone I Unemployment PANEL & PICKUP TRUCKS DRIVER 12/01/2011 $29.68 $8.56 $7.27 $0.00 $45.51 TEAMSTERS JOINT COUNCIL NO. 107.ONE B Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 06/01/2012 $29.98 $8.56 $7.27 $0.00 $45.81 $26.08 08/01/2012 $29.68 $8.91 $7.27 $0.00 $45.86 $8.08 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND DECK) PILE DRIVER LOCAL 56 (70NE 1) 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER LOCAL 56 (ZONE 1) Apprentice - PILE DRIVER - Local 56 Zone I Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.07 $8.08 $17.12 $0.00 $49.27 2 65 $26.08 $8.08 $17.12 $0.00 $51.28 3 70 $28.08 $8.08 $17.12 $0.00 $53.28 4 75 $30.09 $8.08 $17.12 $0.00 $55.29 5 80 $32.10 $8.08 $17.12 $0.00 $57.30 6 85 $34.10 $8.08 $17.12 $0.00 $59.30 7 90 $36.11 $8.08 $17.12 $0.00 $61.31 8 95 $38.11 $8.08 $17.12 $0.00 $63.31 ----------___.---_-._._.-___.--------.-_- Notes: -- - Apprentice to Journeyworker Ratio: 1:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor .Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 40 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK Asdetermined by the Director under the provisions of the JOANNE S F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) $17.80 $8.75 $4.50 $0.00 Effective Date - 09/01/2011 2 45 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Pension Unemployment Total Rate 1 40 $17.50 Unemployment $4.50 PIPEFITTER & STEAMFITTER 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEF177ERSLOCAL 537(local 138) 3 60 $26.26 $8.75 $12.39 $0.00 $47.40 4 70 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 $35.01 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 Apprentice- PIPEFITTER Local 537 (Local 138) $17.80 $8.75 $4.50 $0.00 Effective Date - 09/01/2011 2 45 $20.03 $8.75 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.50 $8.75 $4.50 $0.00 $30.75 2 45 $19.69 $8.75 $12.39 $0.00 $40.83 3 60 $26.26 $8.75 $12.39 $0.00 $47.40 4 70 $30.63 $8.75 $12.39 $0.00 $51.77 5 80 $35.01 $8.75 $12.39 $0.00 $56.15 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.80 $8.75 $4.50 $0.00 $31.05 2 45 $20.03 $8.75 $12.39 $0.00 $41.17 3 60 $26.71 $8.75 $12.39 $0.00 $47.85 4 70 $31.16 $8.75 $12.39 $0.00 $52.30 5 80 $35.61 $8.75 $12.39 $0.00 $56.75 `Notes: t ** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. I Refrig/AC Mechanic **1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) - - - - - - - - - - ------------ Apprentice to Journeyworker Ratio:** PIPELAYER LABORERS-7ONF.2 12/01/2011 $29.60 $7.10 $11.55 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $48.25 Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 41 of 59 THE COMMONWEALTH OF MASSACHUSETTS 0EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN mo Gover TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govcmor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) $14.68 $9.32 $4.97 $0.00 $28.97 2 40 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $9.32 $7.53 $0.00 $39.91 4 65 Unemployment $9.32 PLUMBER 09/01/2011 $41.93 $9.32 $13.29 $0.00 $64.54 NUMBERS & GASEITTERS LOCAL 12 (Local 138) $50.86 Effective Date - 03/01/2012 Supplemental 03/01/2012 $42.73 $9.32 $13.29 $0.00 $65.34 $14.96 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 $9.32 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138) Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.68 $9.32 $4.97 $0.00 $28.97 2 40 $16.77 $9.32 $5.61 $0.00 $31.70 3 55 $23.06 $9.32 $7.53 $0.00 $39.91 4 65 $27.25 $9.32 $8.81 $0.00 $45.38 5 75 $31.45 $9.32 $10.09 $0.00 $50.86 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.96 $9.32 $4.97 $0.00 $29.25 2 40 $17.09 $9.32 $5.61 $0.00 $32.02 3 55 $23.50 $9.32 $7.53 $0.00 $40.35 4 65 $27.77 $9.32 $8.81 $0.00 $45.90 5 75 $32.05 $9.32 $10.09 $0.00 $51.46 (Notes: Step 4 with lic$48.12 Step5 with lic$53.58 Apprentice to Journeyworker Ratio: 1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 42 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT WL DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F GOLDSTE[N Govemor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Gocemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PNEUMATIC CONTROLS (TEMP.) 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEF17TERS LOCAL, 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PNEUMATIC DRILL/TOOL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 POWDERMAN & BLASTER 12/01/2011 $30.35 $7.10 $11.55 $0.00 $49.00 LABORERS - ZONE 2 POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 PUMP OPERATOR (CONCRETE) 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 PUMP OPERATOR (DEWATERING, OTHER) 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 TEAMSTERS LOCAL 42 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 43 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date THE COMMONWEALTH OF MASSACHUSETTS "r EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Supplemental DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Go,emr As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary TIMOTHY P MURRAY LL Gow-, Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Direaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment RECLAIMERS 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERA TING ENGINEERS LOCAL a 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS -ZONE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 44 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Step percent Apprentice Base Wage THE COMMONWEALTH OF MASSACHUSETTS Pension EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT i DEPARTMENT OF LABOR STANDARDS $14.54 Prevailing Wage Rates DEVALL. PATRICK Govemor TJMOTM P MURRAY Lt. Goremor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretarc Massachusetts General Laws, Chapter 149, Sections 26 to 27H xEATxER E. RowE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 (- ._ _ - - ___. - ..._ - - Notes: - - - - - ._._ - - - - ` - - - - i� _ _ _ _ _ :1 Apprentice to Journeyworker Ratio: 1:5 $9.80 $0.00 $56.86 i RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 ROLLER/SPREADER/MULCHING MACHINE 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 08/01/2011 $35.56 $10.50 $9.80 $0.00 $55.86 ROOFERS LOCAL 33 02/01/2012 $36.56 $10.50 $9.80 $0.00 $56.86 08/01/2012 $37.56 $10.50 $9.80 $0.00 $57.86 02/01/2013 $38.56 $10.50 $9.80 $0.00 $58.86 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 45 of 59 THE COMMONWEALTH OF MASSACHUSETTS 4 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE s �GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Dirmtor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.78 $10.50 $2.93 $0.00 $31.21 2 60 $21.34 $10.50 $9.80 $0.00 $41.64 3 65 $23.11 $10.50 $9.80 $0.00 $43.41 4 75 $26.67 $10.50 $9.80 $0.00 $46.97 5 85 $30.23 $10.50 $9.80 $0.00 $50.53 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.28 $10.50 $2.93 $0.00 $31.71 2 60 $21.94 $10.50 $9.80 $0.00 $42.24 3 65 $23.76 $10.50 $9.80 $0.00 $44.06 4 75 $27.42 $10.50 $9.80 $0.00 $47.72 5 85 $31.08 $10.50 $9.80 $0.00 $51.38 -.--------____--_...r...r-.__ (Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 ----.----- __---, Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs. Apprentice to Journeyworker Ratio:** ROOFER SLATE / TILE / PRECAST CONCRETE 08/01/2011 $35.81 $10.50 $9.80 $0.00 $56.11 ROOFERS LOCAL 33 02/01/2012 $36.81 $10.50 $9.80 $0.00 $57.11 08/01/2012 $37.81 $10.50 $9.80 $0.00 $58.11 02/01/2013 $38.81 $10.50 $9.80 $0.00 $59.11 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 46 of 59 DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN secretan Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Various (Municipal and School) Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER (Slate/Tile/Precast Concrete) - Local 33 Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.91 $10.50 $2.93 $0.00 $31.34 2 60 $21.49 $10.50 $9.80 $0.00 $41.79 3 65 $23.28 $10.50 $9.80 $0.00 $43.58 4 75 $26.86 $10.50 $9.80 $0.00 $47.16 5 85 $30.44 $10.50 $9.80 $0.00 $50.74 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.41 $10.50 $2.93 $0.00 $31.84 2 60 $22.09 $10.50 $9.80 $0.00 $42.39 3 65 $23.93 $10.50 $9.80 $0.00 $44.23 4 75 $27.61 $10.50 $9.80 $0.00 $47.91 5 85 $31.29 $10.50 $9.80 $0.00 $51.59 Notes: _ _ _ _ _ Apprentice to Journeyworker Ratio:** SHEETMETAL WORKER 08/01/2011 $39.83 $9.82 $17.09 $0.00 $66.74 SHEF_TMF.TAL WORKERS LOCAL 17 -A 02/01/2012 $41.08 $9.82 $17.09 $0.00 $67.99 08/01/2012 $42.33 $9.82 $17.09 $0.00 $69.24 02/01/2013 $43.58 $9.82 $17.09 $0.00 $70.49 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 47 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 THE COMMONWEALTH OF MASSACHUSETTS $15.93 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $3.74 DEPARTMENT OF LABOR STANDARDS $29.49 Prevailing Wage Rates DEVAL L. PATRICK Goremor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN $9.82 Seemam Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY LL Goremor HEATHER E. RowE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.93 $9.82 $3.74 $0.00 $29.49 2 45 $17.92 $9.82 $7.45 $0.00 $35.19 3 50 $19.92 $9.82 $8.42 $0.00 $38.16 4 60 $23.90 $9.82 $9.60 $0.00 $43.32 5 65 $25.89 $9.82 $10.32 $0.00 $46.03 6 75 $29.87 $9.82 $11.76 $0.00 $51.45 7 85 $33.86 $9.82 $12.69 $0.00 $56.37 Notes: ------------------ - --- - - --- -r Steps 1-3 are 1 year; Steps 4-7 are 6 mos. L-.._ -___--------------------- I Apprentice to Journeyworker Ratio:1:4 SIGN ERECTOR PAINTERS LOCAL 35 - ZONE 2 06/01/2009 $24.81 $7.07 $5.90 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS atwww.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $37.78 Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 48 of 59 THE COMMONWEALTH OF MASSACHUSETTS # EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Y P Secreta, TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - SIGN ERECTOR - Local 35 Zone 2 Effective Date - 06/01/2009 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.41 $7.07 $0.00 $0.00 $19.48 2 55 $13.65 $7.07 $2.40 $0.00 $23.12 3 60 $14.89 $7.07 $2.40 $0.00 $24.36 4 65 $16.13 $7.07 $2.40 $0.00 $25.60 5 70 $17.37 $7.07 $5.90 $0.00 $30.34 6 75 $18.61 $7.07 $5.90 $0.00 $31.58 7 80 $19.85 $7.07 $5.90 $0.00 $32.82 8 85 $21.09 $7.07 $5.90 $0.00 $34.06 9 90 $22.33 $7.07 $5.90 $0.00 $35.30 ---------------------.-.-----------+ (Notes: Steps are 4 mos. e--- ------ Apprentice to Journeyworker Ratioa a --- - __--------- SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2011 $30.14 $8.56 $7.27 $0.00 $45.97 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.44 $8.56 $7.27 $0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 $0.00 $46.62 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2011 $30.43 $8.56 $7.27 $0.00 $46.26 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.73 $8.56 $7.27 $0.00 $46.56 08/01/2012 $30.73 $8.91 $7.27 $0.00 $46.91 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 49 of 59 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT WL DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Secreta, TRMO.RJRr P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATRRER E. ROWE LL Govemor Direaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SPRINKLER FITTER 09/01/2011 $46.85 $8.10 $11.45 $0.00 $66.40 SPRINKLER FITTERS LOCAL 550 - REDUCED RATE 01/01/2012 $46.85 $8.10 $11.60 $0.00 $66.55 03/01/2012 $47.60 $8.10 $11.60 $0.00 $67.30 09/01/2012 $48.60 $8.10 $11.60 $0.00 $68.30 01/01/2013 $48.60 $8.10 $11.75 $0.00 $68.45 03/01/2013 $49.60 $8.10 $11.75 $0.00 $69.45 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 50 of 59 THE COMMONWEALTH OF MASSACHUSETTS 6 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Goy emor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE U. Go%emor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - SPRINKLER FITTER - Local 550 (Section B) Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.74 $8.10 $7.70 $0.00 $34.54 2 45 $21.08 $8.10 $7.70 $0.00 $36.88 3 50 $23.43 $8.10 $7.70 $0.00 $39.23 4 55 $25.77 $8.10 $7.70 $0.00 $41.57 5 60 $28.11 $8.10 $7.70 $0.00 $43.91 6 65 $30.45 $8.10 $7.70 $0.00 $46.25 7 70 $32.80 $8.10 $7.70 $0.00 $48.60 8 75 $35.14 $8.10 $7.70 $0.00 $50.94 9 80 $37.48 $8.10 $7.70 $0.00 $53.28 10 85 $39.82 $8.10 $7.70 $0.00 $55.62 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.74 $8.10 $7.85 $0.00 $34.69 2 45 $21.08 $8.10 $7.85 $0.00 $37.03 3 50 $23.43 $8.10 $7.85 $0.00 $39.38 4 55 $25.77 $8.10 $7.85 $0.00 $41.72 5 60 $28.11 $8.10 $7.85 $0.00 $44.06 6 65 $30.45 $8.10 $7.85 $0.00 $46.40 7 70 $32.80 $8.10 $7.85 $0.00 $48.75 8 75 $35.14 $8.10 $7.85 $0.00 $51.09 9 80 $37.48 $8.10 $7.85 $0.00 $53.43 10 85 $39.82 $8.10 $7.85 $0.00 $55.77 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 51 of 59 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W) DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govemr Y P Secreiary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate -- ----------_.._____- --- ---_.--- Unemployment iNotes: -. --r.- -, I - - -- - Apprentice to Journeyworker Ratio:l:l - ____ ___. - - - - - - __._ - _._. ___. v. - - - STEAM BOILER OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL a 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TELECOMMUNICATION TECHNICIAN 09/01/2011 $31.42 $13.00 $12.22 $0.00 $56.64 ELECTRICIANS LOCAL 103 03/01/2012 $31.78 $13.00 $12.23 $0.00 $57.01 09/01/2012 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 $0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 $0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 $0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 $0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 $0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 $0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 $0.00 $61.72 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 52 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $9.27 DEPARTMENT OF LABOR STANDARDS $34.84 Prevailing Wage Rates DEVALL. PATRICK Govemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN MOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. G-emor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.57 $13.00 $9.27 $0.00 $34.84 2 40 $12.57 $13.00 $9.27 $0.00 $34.84 3 45 $14.14 $13.00 $9.51 $0.00 $36.65 4 45 $14.14 $13.00 $9.51 $0.00 $36.65 5 50 $15.71 $13.00 $9.76 $0.00 $38.47 6 55 $17.28 $13.00 $10.01 $0.00 $40.29 7 60 $18.85 $13.00 $10.26 $0.00 $42.11 8 65 $20.42 $13.00 $10.50 $0.00 $43.92 9 70 $21.99 $13.00 $10.75 $0.00 $45.74 10 75 $23.57 $13.00 $11.00 $0.00 $47.57 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.71 $13.00 $9.27 $0.00 $34.98 2 40 $12.71 $13.00 $9.27 $0.00 $34.98 3 45 $14.30 $13.00 $9.51 $0.00 $36.81 4 45 $14.30 $13.00 $9.51 $0.00 $36.81 5 50 $15.89 $13.00 $9.76 $0.00 $38.65 6 55 $17.48 $13.00 $10.01 $0.00 $40.49 7 60 $19.07 $13.00 $10.26 $0.00 $42.33 8 65 $20.66 $13.00 $10.50 $0.00 $44.16 9 70 $22.25 $13.00 $10.75 $0.00 $46.00 10 75 $23.84 $13.00 $11.00 $0.00 $47.84 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 53 of 59 THE COMMONWEALTH OF MASSACHUSETTS fch EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Asdetermined by the Director under the provisions of the JOANNE S F. GOLDSTEIN Governor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate ------------------------------� Unemployment Notes: �- - ._._.-.-.-.--------------- Apprentice to Journeyworker Ratio: 1:1 TERRAZZO FINISHERS 08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94 BRICKLAYERS LOCAL 3 - MARBLE & 7ILF. 02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93 Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.75 $9.93 $16.51 $0.00 $49.19 2 60 $27.30 $9.93 $16.51 $0.00 $53.74 3 70 $31.85 $9.93 $16.51 $0.00 $58.29 4 80 $36.40 $9.93 $16.51 $0.00 $62.84 5 90 $40.95 $9.93 $16.51 $0.00 $67.39 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.25 $9.93 $16.51 $0.00 $49.69 2 60 $27.89 $9.93 $16.51 $0.00 $54.33 3 70 $32.54 $9.93 $16.51 $0.00 $58.98 4 80 $37.19 $9.93 $16.51 $0.00 $63.63 5 90 $41.84 $9.93 $16.51 $0.00 $68.28 -._...----____._._.-.-___...._.---....._----_..-.- -._, Notes: Steps are 800 hrs. i Apprentice to Journeyworker Ratio:1:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 54 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75 LABORERS - FOUNDA77ON AND MARINE Apprentice - TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 70 Prevailing Wage Rates DEVALL. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P MURRAY LL Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Direclor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75 LABORERS - FOUNDA77ON AND MARINE Apprentice - TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.83 $7.10 $12.60 $0.00 $39.53 2 70 $23.14 $7.10 $12.60 $0.00 $42.84 3 80 $26.44 $7.10 $12.60 $0.00 $46.14 4 90 $29.75 $7.10 $12.60 $0.00 $49.45 (Notes: - - - __._ _ ^ _ _. __.- - ._..._.- - - -. _... Apprentice to Journeyworker Ratio: 1:3 TEST BORING DRILLER HELPER 12/01/2011 $31.77 $7.10 $12.60 $0.00 $51.47 LABORERS - FOUNDATIONAND MARINE TEST BORING LABORER LABORERS - FOUNDATIONAND MARINE 12/01/2011 $31.65 $7.10 $12.60 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $51.35 Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 55 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING LABORER (Laborers Foundation & Marine) THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Effective Date - 12/01/2011 Prevailing Wage Rates DEVALL. PATRICK mo Gover As determined by the Director under the provisions of the JOANNE F. GGOLDSTEIN TIMOTHY P. MURRAY Lt. Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING LABORER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.99 $7.10 $12.60 $0.00 $38.69 2 70 $22.16 $7.10 $12.60 $0.00 $41.86 3 80 $25.32 $7.10 $12.60 $0.00 $45.02 4 90 $28.49 $7.10 $12.60 $0.00 $48.19 -------------- (Notes: ----------------------. Apprentice to Journeyworker Ratio:1:3 TRACTORS/PORTABLE STEAM GENERATORS 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2011 $30.72 $8.56 $7.27 $0.00 $46.55 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $31.02 $8.56 $7.27 $0.00 $46.85 08/01/2012 $31.02 $8.91 $7.27 $0.00 $47.20 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23 TUNNEL WORK - COMPRESSED AIR 12/01/2011 $44.08 $7.10 $13.00 $0.00 $64.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2011 $46.08 $7.10 $1.3.00 $0.00 $66.18 LA BORERS (COMPRESSED AIR) TUNNEL WORK - FREE AIR 12/01/2011 $36.15 $7.10 $13.00 $0.00 $56.25 LABORERS (FREE AIR TUNNEL) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 56 of 59 THE COMMONWEALTH OF MASSACHUSETTS * EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE S GOLDSTEIN Govemm TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Di.a., Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2011 $38.15 $7.10 $13.00 $0.00 $58.25 LABORERS (FREE AIR TUNNEL) VAC -HAUL 12/01/2011 $30.14 $8.56 $7.27 $0.00 $45.97 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.44 $8.56 $7.27 $0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 $0.00 $46.62 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 WAGON DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 WASTE WATER PUMP OPERATOR 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 WATER METER INSTALLER 09/01/2011 $41.93 $9.32 $13.29 $0.00 $64.54 PLUMBERS& GASFITTERS LOCAL 12 (Local 138) 03/01/2012 $42.73 $9.32 $13.29 $0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 Outside Electrical - East CABLE TECHNICIAN (Power Zone) 08/29/2011 $27.11 $6.70 $1.50 $0.00 $35.31 O UTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 CABLEMAN (Underground Ducts & Cables) 08/29/2011 $38.41 $6.70 $1.00 $0.00 $46.11 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 DRIVER / GROUNDMAN CDL 08/29/2011 $31.63 $6.70 $2.50 $0.00 $40.83 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs) 08/29/2011 $24.85 $6.70 $1.50 $0.00 $33.05 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 EQUIPMENT OPERATOR (Class A CDL) 08/29/2011 $38.41 $6.70 $5.00 $0.00 $50.11 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 57 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment EQUIPMENT OPERATOR (Class B CDL) 08/29/2011 $33.89 $6.70 $2.75 $0.00 $43.34 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 GROUNDMAN 08/29/2011 $24.85 $6.70 $1.00 $0.00 $32.55 OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104 GROUNDMAN -Inexperienced (<2000 Hrs.) 08/29/2011 $20.34 $6.70 $0.75 $0.00 $27.79 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 JOURNEYMAN LINEMAN 08/29/2011 $45.19 $6.70 $7.86 $0.00 $59.75 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 Apprentice - LINEMAN (Outside Electrical) - East Local 104 THE COMMONWEALTH OF MASSACHUSETTS WL EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Effective Date - 08/29/2011 Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY LL Govemor HEATHER E'ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment EQUIPMENT OPERATOR (Class B CDL) 08/29/2011 $33.89 $6.70 $2.75 $0.00 $43.34 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 GROUNDMAN 08/29/2011 $24.85 $6.70 $1.00 $0.00 $32.55 OUTSIDE ELECTRICAL WORKERS -EAST LOCAL 104 GROUNDMAN -Inexperienced (<2000 Hrs.) 08/29/2011 $20.34 $6.70 $0.75 $0.00 $27.79 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 JOURNEYMAN LINEMAN 08/29/2011 $45.19 $6.70 $7.86 $0.00 $59.75 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 Apprentice - LINEMAN (Outside Electrical) - East Local 104 Effective Date - 08/29/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $27.11 $6.70 $2.11 $0.00 $35.92 2 65 $29.37 $6.70 $2.36 $0.00 $38.43 3 70 $31.63 $6.70 $2.86 $0.00 $41.19 4 75 $33.89 $6.70 $3.36 $0.00 $43.95 5 80 $36.15 $6.70 $3.86 $0.00 $46.71 6 85 $38.41 $6.70 $4.36 $0.00 $49.47 7 90 $40.67 $6.70 $5.36 $0.00 $52.73 _-__--_...._.._._.._.__---------------_._.____. Notes: --- --�, ! fl _ Apprentice to Journeyworker Ratio:1:2 -__.._-___.-------.._--_.,.__--- TELEDATA CABLE SPLICER 07/18/2011 $25.94 $4.18 $2.78 $0.00 $32.90 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 07/16/2012 $26.33 $4.18 $2.79 $0.00 $33.30 TELEDATA LINEMAN/EQUIPMENT OPERATOR 07/18/2011 $24.42 $4.18 $2.73 $0.00 $31.33 OUTSIDE. ELECTRICAL WORKERS - EAST LOCAL 104 07/16/2012 $24.78 $4.18 $2.74 $0.00 $31.70 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 58 of 59 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TELEDATA WIREMAN/INSTALLER/TECHNICIAN 07/18/2011 $24.42 $4.18 $2.73 $0.00 $31.33 O UTS11)F. ELECTRICAL WORKERS- FAST LOCAL 104 07/16/2012 $24.78 $4.18 $2.74 $0.00 $31.70 TREE TRIMMER OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. TREE TRIMMER GROUNDMAN OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. 02/01/2009 $16.59 $2.42 $0.00 02/01/2009 $14.64 $2.42 $0.00 $0.00 $19.01 $0.00 $17.06 Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. 11E -11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 11 E-1 1L. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 59 of 59 THE COMMONWEALTH OF MASSACHUSETTS s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Lt. Gocemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Emergency Power Generator Works - Preventative repair and as -needed emergency service for emergency power generators (municipal and school) Job Location: Various (Municipal and School) Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TELEDATA WIREMAN/INSTALLER/TECHNICIAN 07/18/2011 $24.42 $4.18 $2.73 $0.00 $31.33 O UTS11)F. ELECTRICAL WORKERS- FAST LOCAL 104 07/16/2012 $24.78 $4.18 $2.74 $0.00 $31.70 TREE TRIMMER OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. TREE TRIMMER GROUNDMAN OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. 02/01/2009 $16.59 $2.42 $0.00 02/01/2009 $14.64 $2.42 $0.00 $0.00 $19.01 $0.00 $17.06 Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. 11E -11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 11 E-1 1L. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 12/19/2011 Wage Request Number: 20111219-029 Page 59 of 59 Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20111219-029 for future inquires. Request another official Wage Schedule to Prevailin http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSu... 12/19/2011 Santilli, Ray From: REGS@sec. state. ma. us Sent: Tuesday, December 13, 20113:38 PM To: Santilli, Ray Subject: Publish Date Assigned for General Contracts A publish date of 12/21/11 has been assigned to your General Contracts submission with description of: Preventative maintenance service and as -needed repairs of emergency power generators located at all municipal and school buildings as well as water booster and sewer pumping stations. Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.httn. Please consider the environment before printing this email. SPR Central Register General Contract Submit Confirmation A% btate Publications and 'Regulations William Francis Galvin, Secretary of the Commonwealth Page 1 of 2 IndexHorne I Search I ., The following General Contract submission was successfully received. Planned date of publish is 12/21/2011 Awarding Agency Agency Name and Address: Town of North Andover 120 Main Street North Andover, MA 01845 Project Number: Estimated Cost: —� Contractor Qualification: Required for DCAM contracts over $100,000, Massachusetts Highway contracts over $50,000. Contact Information Name: IRa_y Santilli, Assistant Town Manager Phone: 978-688-9516 Fax978-688-9556 Email Address: rsantilli(i,townofnorthandover.com Notify email address listed when final publish date assigned. Contract Information Project: Plans/Specifications Available: Place, date and time General Bid Deadline*: Sub Bid Deadline: Preventative maintenance service and as -needed repairs of emergency power generators located at all municipal and school buildings as well as water booster and sewer pumping stations Complete Invitation for Bids document available at www.townofnorthandover.com by clicking on 'Available Bids, Quotes and Proposals' on Wednesday, December 21, 2011 at 11.00 a.m. 01/12/2012 Time 2:00 p.m. Time Sub Bid Categories: Additional Information F- I http://www. sec. state. ma. us/sprpublicforms/GC SubmitConfirmation. aspx?ID=71072 12/13/2011 INVITATION FOR BID Emergency Power Generator (EPG) Services Introduction The Town is seeking bids from qualified contractors for both scheduled service and on call emergency service for forty four (44) emergency power generators (EPG) at various locations through out Town. Scope of Services Task A. Scheduled Service Work shall be performed during normal business hours and shall include the following: 1. Replace lube oil annually. (waste oil legally disposed ofi 2. Replace lube oil filter(s) annually. 3. Replace fuel filter(s) annually. 4. Replace coolant filter(s) annually. 5. Service/Clean air filter(s) as required. 6. Perform air inlet restriction test (diesel units). 7. Check coolant level, condition of coolant, freeze protection rating and perform pressure test. 8. Inspect/Adjust hoses, belts and linkages. 9. Diesel engines: Inspect injection system and fuel lines. 10. Gas/LP engines: Inspect complete ignition system, check timing, and replace points, condenser and spark plugs. 11. Check engine heater operation. 12. Inspect fuel supply system including piping, solenoid valve and transfer tank where applicable. 13. Inspect exhaust system and drain condensation if system has drain provision (i.e. valve). 14. Check battery charger operation and charge rate. 15. Check battery electrolyte levels and specific gravity, clean terminals as needed, spray terminals with corrosion proof solvents. 16. Check all engine and generator shutdown and alarm systems. 17. Adjust output voltage and frequency as required. 18. Confirm proper operation of all engine gauges and AC metering. 19. After notifying CUSTOMER, operate transfer switch(s) and confirm proper operation of all timers and accessories. 20. Inspect transfer switch main contacts. 21. Operate unit under available connected load for duration required to evaluate operation of system. 22. Instruct CUSTOMER'S personnel on the operation and regular inspection of the equipment. Page 1 of 7 23. Prepare report of each service visit to be signed by the CUSTOMER'S representative with a copy in a maintenance log to be left with the unit. 24. Conduct Load Transfer Test (20-30 mins) by dropping breaker under a load to see how it responds to the load & transfer. Repair work if needed shall be scheduled, based on service work findings. Major Preventative Maintenance (PM) shall include Items 1 through 24 described above and will be performed once per annum. Minor PM will also be conducted once per annum and shall consist of items 5 through 24 described above and will be performed no sooner than six (6) months following Major PM. The scope being priced shall include one Major PM plus one Minor PM annually. Task B. On Call Emergency Service Provide certified mechanics to answer emergency call in from Town personnel for repair of generators. Call -ins could occur during regular working hours, after hours, or on weekends and holidays. Billing of emergency call in time begins when mechanics are on site. Contractors must respond within four (4) hours of receiving call from the Town personnel. Length of contract The contract shall be for one (1) year from the date of the Town of North Andover's letter of Bid Award Notifications. The contract may be extended for up to two (2) additional 12 - month periods at the sole discretion of the Town of North Andover. Equipment and Responsible Departments The list of the forty four (44) EPGs, type, location and Town Department responsible for the units are listed in Schedule "A" attached. Each department will be in charge of the maintenance and payment of services for the units under their responsibility. The communication, coordination for maintenance and repairs, and invoices will be directed to the contact person for the responsible department as listed below. Drinking Water Facility, Booster Pump Stations, & Sewer Pump Stations: North Andover Drinking Water Treatment 420 Great Pond Road North Andover, MA 01845 Attn: Linda Hmurciak Plant Superintendent Telephone: 978-688-9574 Fire Department: North Andover Fire Dept 124 Main St North Andover, MA 01845 Attn: Chief Andrew Melnikas Page 2 of 7 Telephone: 978-688-9590 School Department: Vinnie Valentino Superintendent Operations/Maintenance Middle School 495 Main St North Andover, MA 01845 Telephone: 978-557-7913 Police Department North Andover Police Dept 1475 Osgood Street North Andover, MA 01845 Attn: Robert Hilner Telephone: 978-683-3168 Dept of Public Works (DPW) & Senior Center North Andover DPW 384 Osgood St North Andover, MA 01845 Attn: Tim Willett Telephone: 978 685-0950 Page 3 of 7 t Bid Sheet Year #1 Task A. Scheduled Service 1.) Drinking Water Facility Unit 41 Major PM: $ Junit x 1 unit(s) _ $ Minor PM: $ /unit x 1 unit(s) _ $ 2.) Water Booster Pump Stations Unit #2 through #6 Major PM: $ /unit x 5 unit(s) _ $ Minor PM: $ /unit x 5 unit(s) _ $ 3.) Sewer Pump Stations Units #7 Through #25 Major PM: $ /unit x 19 unit(s) _ $ Minor PM: $ /unit x 19 unit(s) _ $ 4.) Fire Departments Units #26 through #33 Major PM: $ Junit x 8 unit(s) _ $ Minor PM: $ /unit x 8 unit(s) _ $ 5.) School Department Units # 34 Through #39 Major PM: $ /unit x 6 unit(s) _ $ Minor PM: $ /unit x 6 unit(s) _ $ 6.) Police Department Unit #40 Major PM: $ /unit x 1 unit(s) _ $ Minor PM: $ /unit x 1 unit(s) _ $ 7.) Department of Public Works Units # 41 & #42 Major PM: $ Junit x 2 unit(s) _ $ Minor PM: $ Junit x 2 unit(s) _ $ Sub Total Year 1 for Task A. _ $ Task B. Emergency Call In 1.) Normal Business Hours 24 hrs. x $ /Hr. _ $ 2.) After Business Hours 24 hrs. x $ /Hr. _ $ 3.) Sunday and Holidays 24 hrs. x $ /Hr. _ $ Sub Total Year 1 Task B. _ $ Total Year 1 for Task A. & B. _ $ Page 4 of 7 Year #2 Task A. Scheduled Service 8.) Drinking Water Facility Unit # 1 Major PM: $ /unit x 1 unit(s) _ $ Minor PM: $ /unit x 1 unit(s) _ $ 9.) Water Booster Pump Stations Unit #2 through #6 Major PM: $ /unit x 5 unit(s) _ $ Minor PM: $ /unit x 5 unit(s) _ $ 10.)Sewer Pump Stations Units #7 Through 425 Major PM: $ /unit x 19 unit(s) _ $ Minor PM: $ /unit x 19 unit(s) _ $ 11.)Fire Departments Units #26 through #33 Major PM: $ /unit x 8 unit(s) _ $ Minor PM: $ /unit x 8 unit(s) _ $ 12.)School Department Units # 34 Through 439 Major PM: $ /unit x 6 unit(s) _ $ Minor PM: $ /unit x 6 unit(s) _ $ 13.)Police Department Unit #40 Major PM: $ /unit x 1 unit(s) _ $ Minor PM: $ /unit x 1 unit(s) _ $ 14.)Department of Public Works Units # 41 & #42 Major PM: $ /unit x 2 unit(s) _ $ Minor PM: $ /unit x 2 unit(s) _ $ Sub Total Year 2 for Task A. _ $ Task B. Emergency Call In 4.) Normal Business Hours 24 hrs. x $ /Hr. _ $ 5.) After Business Hours 24 hrs. x $ /Hr. _ $ 6.) Sunday and Holidays 24 hrs. x $ /Hr. _ $ Sub Total Year 1 Task B. _ $ Total Year 2 for Task A. & B. _ $ Page 5 of 7 Year #3 /unit x 6 unit(s) _ $ Task A. Scheduled Service /unit x 6 unit(s) _ $ 15.)Drinking Water Facility Unit #1 Major PM: $ /unit x 1 unit(s) _ $ Minor PM: $ /unit x 1 unit(s) _ $ 16.)Water Booster Pump Stations Unit #2 through #6 Major PM: $ Major PM: $ /unit x 5 unit(s) _ $ Minor PM: $ Junit x 5 unit(s) _ $ 17.)Sewer Pump Stations Units #7 Through #25 Task B. Emergency Call In Major PM: $ /unit x 19 unit(s) _ $ Minor PM: $ Junit x 19 unit(s) _ $ 18.)Fire Departments Units #26 through #33 $ 9.) Sunday and Holidays Major PM: $ /unit x 8 unit(s) _ $ Minor PM: $ /unit x 8 unit(s) _ $ 19.)School Department Units # 34 Through #39 Major PM: $ /unit x 6 unit(s) _ $ Minor PM: $ /unit x 6 unit(s) _ $ 20.)Police Department Unit #40 Major PM: $ /unit x 1 unit(s) _ $ Minor PM: $ /unit x 1 unit(s) _ $ 21.)Department of Public Works Units # 41 & #42 Major PM: $ /unit x 2 unit(s) _ $ Minor PM: $ /unit x 2 unit(s) _ $ Sub Total Year 3 for Task A. _ $ Task B. Emergency Call In 7.) Normal Business Hours 24 hrs. x $ /Hr. _ $ 8.) After Business Hours 24 hrs. x $ /Hr. _ $ 9.) Sunday and Holidays 24 hrs. x $ /Hr. _ $ Sub Total Year 3 Task B. _ $ Page 6 of 7 Total Year 3 for Task A. & B. Page 7 of 7 "SCHEDULE A " TOWN OF NORTH ANDOVER EMERGENCY POWER LIST OF GENERATORS BY DEPARTMENT WITH LOCATION AND TYPE Drinkinz Water Facility UNIT # 1: 420 GREAT POND ROAD. Waukesha Electric Plant, Model#: P310461, S/N#: 95624, 1075 KW, Nat. gas Waukesha Engine Model#: VHP9500G, S/N#: RU19430. Equipment ID#: RI 19430. Water Booster Pump Stations UNIT # 2: Located at Foxwood. Kohler Electric Plant, Model 50RZ82, with Ford Engine, Model LSG-8751-6005A. Nat gas., 50 KW UNIT # 3: Located at Rosemont. Kohler Electric Plant, Model 50RZ82, with Ford Engine, Model LSG-8751-6005A. Nat gas., 50 KW UNIT # 4: Located at Sutton Hill. Kohler Electric Plant, Model 125BZG, with a General Motors Engine, Model 8.1 L-07402. Nat gas, 125 KW UNIT # 5: Located at Bear Hill Reservoir. Kohler Model 808OREOZ JE, with a John Deere 4.51 Engine, Model 4045HF285H.1.J Diesel, 80 KW UNIT # 6: Located at Orchard Village. Kohler Model # 60REZG, with a General Motors 5.01 Engine, Model BPSIB5.702ED Nat gas, 60 KW Sewer Pump Stations UNIT #7: Located at Willows, 805 Turnpike Street. Onan Electric Plant, Model 35EK, with Ford Engine, Model CSG -6491. Nat gas, 30 KW UNIT # 8: Located at Flagship Drive. Kohler Electric Plant, Model 30RZ62, with Ford Engine, Model CSG -6491. Nat gas, 30 KW UNIT # 9: Located at Jasmine Plaza. Kohler Electric Plant, Model 50RZ, with Ford Engine, Model LSG-875 1. Propane, 50 KW Schedule A Page 1 of 4 UNIT #10: Located at Alcott Village. Generac Electric Plant, Model 87A02538-5, with Generac Engine, Model 1.3L. Nat gas, 20 KW UNIT #11: Located at Boston Hill. Kohler Electric Plant, Model 80RZ, with Ford Engine, Model LSG-875 1. Propane, 80 KW UNIT # 12: Located at Forest View. Kohler Electric Plant, Model 8ORZ, with Ford Engine, Model LSG-875 1. Propane, 80 KW UNIT # 13: Located at Campbell. Kohler Electric Plant, Model 100RZ, with Ford Engine, Model LSG-875 1. Nat gas, KW UNIT # 14: Located at Bonny Lane, 133 Bonny Lane. Onan Electric Plant, Model 35EK-15R, with Ford Engine, Model CSG -6491. Propane, 30 KW UNIT # 15: Located at Rae Pond., 1653 Great Pond Road. Kohler Electric Plant, Model SORZ, with Ford Engine, Model LSG-8751. Propane, 55 KW UNIT # 16: Located at Butcher Boy., 1077 Great Pond Road. Generac Electric Plant, Model 91 A02795-5, with Generac Engine, Model 5.OL. Nat gas, 30 KW UNIT # 17: Located at Coachmen., Coachmen Lane. Kohler Electric Plant, Model 30R7,62, with Ford Engine, Model CSG -6491. Nat gas, 30 KW UNIT # 18: Located at Saileway., at the end of Sailewqy Drive. Kohler Electric Plant, Model 30RZ72, with Ford Engine, Model CSG -6491-6005F. Nat gas, 30 KW UNIT # 19: Located at Winter Street., Bridle Path/Great Pond Road. Kohler Electric Plant, Model 30RZ62, with Ford Engine, Model CSG -6491. Propane, 80 KW UNIT # 20: Located at Hawthorne., Hawthorne Place. Generac Electric Plant, Model 95A01795-5, with Generac Engine, Model 5.7L. Nat gas, 30 KW UNIT # 21: Located at Holly Ridge., HollyRid Ridge Drive. Generac Electric Plant, Model 87AD2838, with Generac Engine, Model 4.OL. #3 Diesel, 30 KW Schedule A Page 2 of 4 UNIT # 22: Located at Johnson Circle Off Johnson St. Kohler Electric Plant, Model 30RZG, S/N#: 759635 with a General Motors Engine, Model 4.3L. Propane, 30 KW UNIT # 23: Located at Blue Rid-ge. Onan Electric Plant, Model I00.ODCV-15R. #2 Diesel, 100 KW UNIT # 24: Located at Dale Street. DMT Corp Electric Plant, Model DMT 80C. #2 Diesel, 80 KW UNIT # 25: Meeting House Commons Kohler generator, Model #60RCG Nat gas, 60 KW Fire Departments: UNIT #26: Located at Station 1. Kohler Electric Plant, Model 1504E02JK, with General Motors Engine, Model 20148. UNIT #27: Located at Station 2. Onan Electric Plant, Model 12RJC03R, with Onan Engine, Model P2305. UNIT 428: Located at Engine 1. Mitsubishi Electric Plant, Model 1O.013TDAR, with Mitsubishi Engine, Model 97556-EY06. UNIT #29: Located at Engine 2. Mitsubishi Electric Plant, Model 10.013TDAR, with Mitsubishi Engine, Model 97560E405. UNIT #30: Located at Engine 3. Hale Electric Plant, Model 5000 GE, with Brigg & Stratton Engine, Model 10 HP. UNIT #31: Located at Ladder 1. Onan Electric Plant, Model 7.5KDFB, with Onan Engine, Model F953384478. UNIT #32: Located at Others Not On Trucks. Onan Electric Plant, Model IOSAK, S/N# 1110673003, Engine Info -N/A. UNIT #33: Located at Others Not On Trucks. Hale Electric Plant, Model 59018, with Brigg & Stratton Engine, Model 8 HP. Public Schools: UNIT #34: Located at Atkinson School. Kohler Electric Plant, Model 45R081, S/N#: 253565, Engine Info -N/A. UNIT #35 L Located at Franklin School. Schedule A Page 3 of 4 Cummins Electric Plant, Model 400FOC260A, S/N#: SH917-23, Engine Info - N/A. UNIT #36: Located at Sergeant School. C.P.I. Electric Plant, Model 125G8TA, S/N#: E940543466, with a GJA 4800 Engine. UNIT #37: Located at High School. CAT Electric Plant, Model SR4, S/N#: CBP 00184, Engine Info -#3406. UNIT #38: Located at High School. CAT Electric Plant, Model SR4, S/N#: CBP 00185, Engine Info -#3406. UNIT #39: Located at Middle School. CAT Electric Plant, Model G3406. Engine Info - N/A. Police Department: UNIT 40: Located at Police Department. Kohler Electric Plant, Model 350REOZDD, S/N#: 2287708, Engine SN 06R1037657. Department of Public Works: UNIT #43: DPW/HighwU Garage, 384 Osgood Street. Onan Electrical Plant Model #35 E/T. S/N: 06R1037657, with a Ford Engine. Engine Info - N/A. UNIT #44: Located at Rear of Senior Center 120R Main Street. Kohler Electric Plant, with a Chevy Engine, Model#: 454. Schedule A Page 4 of 4 INTEROFFICE MEMORANDUM DATE: 6-10-10 TO: Ray Santilli, Asst Town Manager/Personnel Director FROM: Dennis L. Bedrosian, Supt., Drinking WTPJ)q CC: Bruce Thibodeau, DPW Director P RE: Out to bid for the Service and Repair of Emergency Power Generators Need to go out to bid for the preventative maintenance service and repair of the emergency power generators located at the Drinking Water Treatment Facility, Water Booster and Sewer Pumping Stations I have updated a list of the generators that I am responsible for within my area, but did not acquire the prevailing wage rates. If you want me to provide you with the wage rates I will do so. For your reference I have included what I know of the other department's generators and added that list with mine. Also included is the scope of services for all of the generator systems in Town as well contact names for billing purposes. If there is any other procurement that I may help or assist you with for this work then do not hesitate to ask, thank you. r v � l a --j --° ,e , 10 EXHIBIT A TOWN OF NORTH ANDOVER, MA EMERGENCY PWER GENERATORS SCOPE OF SERVICES Provide for two years, scheduled Standby Emergency Generator system service. Work shall be performed during normal business hours and shall include the following: 1. Replace lube oil annually. (waste oil legally disposed) 2. Replace lube oil filter(s) annually. 3. Replace fuel filter(s) annually. 4. Replace coolant filter(s) annually. 5. Service/Clean air filter(s) as required. 6. Perform air inlet restriction test (diesel units). 7. Check coolant level, condition of coolant, protection rating and perform pressure test. 8. Inspect/Adjust hoses, belts and linkages. 9. Diesel engines: Inspect injection system and fuel lines. 10. Gas/LP engines: Inspect complete ignition system, check timing, and replace points, condenser and spark plugs. 11. Check engine heater operation. 12. Inspect fuel supply system including piping, solenoid valve and transfer tank where applicable. 13. Inspect exhaust system and drain condensation if system has drain provision. 14. Check battery charger operation and charge rate. 15. Check battery electrolyte levels and specific gravity, clean terminals as needed, spray terminals with corrosion proof solvents. 16. Check all engine and generator shutdown and alarm systems. 17. Adjust output voltage and frequency as required. 18. Confirm proper operation of all engine gauges and AC metering. 19. After notifying CUSTOMER, operate transfer switch(s) and confirm proper operation of all timers and accessories. 20. Inspect transfer switch main contacts. 21. Operate unit under available connected load for duration required to evaluate operation of system. 22. Instruct CUSTOMER'S personnel on the operation and regular inspection of the equipment. 23. Prepare report of each service visit to be signed by the CUSTOMER'S representative with a copy in a maintenance log to be left with the unit. 24. Conduct Load Transfer Test (20-30 mins) by dropping breaker under a load to see how it responds to the load & transfer. Repair work if needed shall be scheduled, based on service work findings. EXHIBIT B TOWN OF NORTH ANDOVER, MA EMERGENCY PWER GENERATORS PAYMENTS The following is a directory listing the names and addresses of those Departments involved for individual billing purposes. Invoices shall be made out to them in respects service and/or repair to their emergency powered generators. For Water & Sewer related stations send invoices to North Andover Drinking Water Treatment 420 Great Pond Road North Andover, MA 01845 Attn: Dennis Bedrosian Plant Superintendent For the Fire Department send invoices to North Andover Fire Dept 124 Main St North Andover, MA 01845 Attn: Chief Andrew Melnikas 978-688-9590 School Systems Vinnie Valentino Superintendent Operations/Maintenance Middle School 495 Main St North Andover, MA 01845 Tel 978-557-7913 For the Police Dept North Andover Police Dept 566 Main St North Andover, MA 01845 Attn: Richard Boettcher For the Dept of Public Works (DPW) & Senior Center North Andover DPW 384 Osgood St North Andover, MA 01845 Attn: John Cyr "SCHEDULE A " TOWN OF NORTH ANDOVER EMERGENCY POWER GENERATORS LIST FOR THE WATER & SEWER PUMPING STATIONS Drinking Water Facility UNIT # 1: 420 GREAT POND ROAD. Waukesha Electric Plant, Model#: P310461, SIN#: 95624, 1075 KW, Nat. gas Waukesha Engine Model#: VHP9500G, S/N#: RU19430. Equipment ID#: RI 19430. Water Booster Pump Stations UNIT # 2: Located at Foxwood. Kohler Electric Plant, Model 50RZ82, with Ford Engine, Model LSG-8751-6005A. Nat gas., 50 KW UNIT #3: Located at Rosemont. Kohler Electric Plant, Model 50RZ82, with Ford Engine, Model LSG-8751-6005A. Nat gas., 50 KW UNIT 94: Located at Sutton Hill. Kohler Electric Plant, Model 125BZG, with a General Motors Engine, Model 8.1 L-07402. Nat gas, 125 KW Sewer Pump Stations UNIT #5: Located at Willows. 805 Turnpike Street. Onan Electric Plant, Model 35EK, with Ford Engine, Model CSG -6491. Nat gas, 30 KW UNIT #6: Located at Flagship Drive. Kohler Electric Plant, Model 30RZ62, with Ford Engine, Model CSG -6491. Nat gas, 30 KW UNIT #7: Located at Jasmine Plaza. Kohler Electric Plant, Model 50RZ, with Ford Engine, Model LSG-875 1. Propane, 50 KW UNIT #8: Located at Alcott Village. Generac Electric Plant, Model 87A02538-5, with Generac Engine, Model 1.3L. Nat gas, 20 KW UNIT #9: Located at Boston Hill. Kohler Electric Plant, Model 80RZ, with Ford Engine, Model LSG-875 1. Propane, 80 KW UNIT #10: Located at Forest View. Kohler Electric Plant, Model 80RZ, with Ford Engine, Model LSG-875 1. Propane, 80 KW "SCHEDULE A - Page 2" TOWN OF NORTH ANDOVER EMERGENCY POWER GENERATORS LIST FOR THE WATER & SEWER PUMPING STATIONS UNIT #11: Located at Campbell. Kohler Electric Plant, Model 100RZ, with Ford Engine, Model LSG-875 1. Nat gas, KW UNIT #12: Located at Bonny Lane, 133 Bonny Lane. Onan Electric Plant, Model 35EK-15R, with Ford Engine, Model CSG -6491. Propane, 30 KW UNIT #13: Located at Rae Pond., 1653 Great Pond Road. Kohler Electric Plant, Model SORZ, with Ford Engine, Model LSG-8751. Propane, 55 KW UNIT #14: Located at Butcher Boy., 1077 Great Pond Road. Generac Electric Plant, Model 91A02795-5, with Generac Engine, Model 5.OL. Nat gas, 30 KW UNIT # 15: Located at Coachmen., Coachmen Lane. Kohler Electric Plant, Model 30R7,62, with Ford Engine, Model CSG -6491. Nat gas, 30 KW UNIT # 16: Located at Saileway., at the end of Saileway Drive. Kohler Electric Plant, Model 30RZ72, with Ford Engine, Model CSG -6491-6005F. Nat gas, 30 KW UNIT #17: Located at Winter Street., Bridle Path/Great Pond Road. Kohler Electric Plant, Model 30RZ62, with Ford Engine, Model CSG -6491. Propane, 80 KW UNIT # 18: Located at Hawthorne., Hawthorne Place. Generac Electric Plant, Model 95A01795-5, with Generac Engine, Model 5.7L. Nat gas, 30 KW UNIT #19: Located at Holly Ridge., Holly Ridge_Drive. Generac Electric Plant, Model 87AD2838, with Generac Engine, Model 4.OL. #3 Diesel, 30 KW UNIT # 20: Located at Johnson Circle Off Johnson St, Kohler Electric Plant, Model 30RZG, S/N#: 759635 with a General Motors Engine, Model 4.3L. Propane, 30 KW UNIT # 21: Located at Blue Ridee. Onan Electric Plant, Model 100.ODCV-15R. #2 Diesel, 100 KW UNIT # 22: Located at Dale Street. DMT Corp Electric Plant, Model DMT 84C. #2 Diesel, 80 KW UNIT # 23: Meeting House Commons Kohler generator, Model #60RCG Nat gas, 60 KW "SCHEDULE A - Page 3 " TOWN OF NORTH ANDOVER EMERGENCY POWER GENERATOR LIST Fire Departments: UNIT #24: Located at Station 1. Kohler Electric Plant, Model 1504E02JK, with General Motors Engine, Model 20148. UNIT #25: Located at Station 2. Onan Electric Plant, Model 12RJC03R, with Onan Engine, Model P2305. UNIT 926: Located at Engine 1. Mitsubishi Electric Plant, Model 10.OBTDAR, with Mitsubishi Engine, Model 97556-EY06. UNIT #27: Located at Engine 2. Mitsubishi Electric Plant, Model 10.OBTDAR, with Mitsubishi Engine, Model 97560E405. UNIT #28: Located at Engine 3. Hale Electric Plant, Model 5000 GE, with Brigg & Stratton Engine, Model 10 HP. UNIT #29: Located at Ladder 1. Onan Electric Plant, Model 7.5KDFB, with Onan Engine, Model F953384478. UNIT #30: Located at Others Not On Trucks. Onan Electric Plant, Model IOSAK, S/N# I I IC673003, Engine Info -N/A. UNIT #31: Located at Others Not On Trucks. Hale Electric Plant, Model 59018, with Brigg & Stratton Engine, Model 8 HP. Public Schools: UNIT #32: Located at Atkinson School. Kohler Electric Plant, Model 45R081, S/N#: 253565, Engine Info -N/A. UNIT #33 L Located at Franklin School. Cummins Electric Plant, Model 400FOC260A, S/N#: SH917-23, Engine Info - N/A UNIT #34: Located at Sergeant School. C.P.I. Electric Plant, Model 125G8TA, S/N#: E940543466, with a GJA 4800 Engine. UNIT #35: Located at High School. CAT Electric Plant, Model SR4, S/N#: CBP 00184, Engine Info -#3406. UNIT #36: Located at High School. CAT Electric Plant, Model SR4, S/N#: CBP 00185, Engine Info -#3406. UNIT #37: Located at Middle School. CAT Electric Plant, Model G3406. Engine Info - N/A. Police Department: UNIT #38: Located at Police Department. Onan Electric Plant, Model 30EK4R8, S/N#: 769118473, with a Ford Engine, Model#: 24C1. DPW Units: UNIT #39: DPW/Highway Garage, 384 Osgood Street. Onan Electric Plant, with a Ford Engine. Engine Info - N/A. UNIT #40: DPW/Highway Garage, 385 Osgood Street. Onan Electric Plant. Engine Info - N/A Senior Center: UNIT #41: Located at 120 Main Street. Kohler Electric Plant, with a Chevy Engine, Model#: 454. Santilli, Ray From: James Geary Ugeary@weld-power.com] Sent: Thursday, May 27, 201011:40 AM To: Santilli, Ray Subject: Generator PM Contract- June Ray, Please send an RFQ for the generator PM contract. Regards, James Geary Marketing & Sales Representative iaeary(fteld-power.com Weld Power Service Company, Inc. 14 Technology Drive Auburn, MA 01501-3295 Tel: (508)832-3550 Fax: (508)832-7353 Please visit us at: www.weld-power.com Privileged/ Confidential Information may be contained in this message. If you are not the addressee indicated in this message (or responsible for delivery of the message to such person), you may not copy or deliver this message to anyone. In such case, please destroy this message, and notify us immediately. Information expressed in this message shall not alter Weld Power's standard Terms and Conditions and Limited Warranty Statement, a copy of which is available upon request.