Loading...
HomeMy WebLinkAboutContract #: 020390 - From: 03-01-2012 To: 02-28-2013 - Murray Paving & Reclamation Inc - Town of North Andover�J' $° 91 r i !` or-& Andrew W Maylor Town Manager Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com December 19, 2013 Mr. Stephen Johnson Murray Paving & Reclamation, Inc 33 Whitney Street Holliston, MA 01746 Dear Mr. Johnson: Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and Murray Paving & Reclamation, Inc (Contract #568), the contract and the respective unit price ($1.43 per square yard) for pavement reclamation and grading on various projects is extended an additional option year (March 1, 2014 through February 28, 2015). Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is . performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Department of Public Works 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. Sincerely f Andrew W. Maylor Town Manager cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, Public Works Contract File Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20131219-006 for future inquires. Request another official Wage Schedule http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSu... 12/19/2013 IN Andrew W. Maylor Town Manager Town of North Andover Mr. Stephen Johnson Murray Paving & Reclamation, Inc 55 Whitney Street Holliston, MA 01746 Dear Mr. Johnson: Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com December 28, 2012 Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and Murray Paving & Reclamation, Inc (Contract #568), the contract and the respective unit price ($1.36 per square yard) for pavement reclamation and grading on various projects is extended an additional option year (March 1, 2013 through February 28, 2014). Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Department of Public Works 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. Sincerely, P'n d ,� Andrew W. Maylor Town Manager cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, Public Works Contract File Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20121227-012 for future inquires. Request another official Wage Schedule Return to http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSu... 12/27/2012 Bid Results — Pavement Reclamation and Grading Period of March 1, 2012 through February 28, 2013 Base Bid —12,000 square yards Unit Price Total Price All States Asphalt, Inc $1.42 / sq yd $ 17,040.00 Busby Construction Co., Inc $1.37 / sq yd $ 16,440.00 Garrity Asphalt Reclaiming, Inc $1.65 / sq yd $ 19,800.00 Murray Paving & Reclamation Inc $1.29 / sq yd $ 15,480.00 Rafferty Fine Grading, Inc $1.478 / sq yd $ 17,736.00 U.S. Pavement Services Inc $22.86 / sq yd $ 274,320.00 APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 Quantity Pavement Reclamation and Grading 12,000 sq yards March 1, 2013 through February 28, 2014 Pavement Reclamation and Grading 12,000 sq yards March 1, 2014 through February 28, 2015 Pavement Reclamation and Grading Addenda 'N041 &- 12,000 sq yards Unit Price Total Price $ (,aq /sgyd $ I�ygo.00 $ 1.3(o Esq yd are acknowledged: '4/1 Sig11 nature Esq yd $ 1-7, 14 & - 6 c' Business Name/Z,Z,9 y -F Business Address c.��„ -�,vG� s T c ! �► S �c ✓ ,�+ �-r �( 6 Business Phone S'0'7 H a g g 4 a 0 Fax Sw F g x 9 g Y a 1 S +P/'At,✓ /— 3-c46&,j Name of Person Authorized to sign Price Proposal Title of Perso Authorized to sign Price Proposal Signature of Above Person Town of North Andover IFB Page 8 of 33 Pavement Reclamation and Grading CERTIFICATE OF VOTE At a dulyauthorized meeting the Board of Directors of the t-���'z held on 1/11 ! //;- it was VOTED, THAT (Name) (Officer) of MC'c't4, be and hereby is authorized to execute contracts and bonds in the name -1 on behalf of said-riv�s�c�- , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of P,grX— on its behalf by such officer under seal of rt✓4 :r, , shall be valid and binding upon r^ v t 4v, 2.e(-Gftn0- T- - I hereby certify that I am the clerk of the above named and that Z---r6'X'Se- is the duly elected officer as above of said .'n 'M P,9 -,7a *- , and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. ,a / q/ / - (�/ � / 4�' X (Date) (Cler Town of North Andover IFB Page 31 of 33 Pavement Reclamation and Grading CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date a /y e_ -� G� ,is �.� —� �vrs �,r,� R��" f f ll�cl. a7«.r c Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I Z' Ta^a s C-', , authorized signatory for ,�r�d�c.0 6 p/fr��y f Z-11 - Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signat re Date Town of North Andover IFB Page 29 of 33 Pavement Reclamation and Grading CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature . 4 Print Name & Title Town of North Andover IFB Pavement Reclamation and Grading Date .2/ g 1I.2- Company e Page 30 of 33 FEB -17,2012 1:44PM HART INSURANCE N0. 725 P. 1 4 CERTIFICATE OF LIABILITY INSURANCE � °"02/1 0' 2"' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the cartificate holder Is an ADDITIONAL INSURED, the policy(its) most be endorsed. if SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this Certificate does not confer rights to the certificate holder in lieu ofsuch endorsament(s). PRODUCER HART INSURANCE AGENCY, INC. 243 MAIN STREET PO BOX 700 BUZZARDS BAY, MA 025320700 INSURED Murray Paving & Reclamation Inc ID61 55 Whitney Street PO Box 6438 Holliston, MA 01746 LSUra 759- rlsuRERA: SAFETY INDEMNITY INSURANCE CO 33618 INSURER e ; TRAVELERS PROPERTY CASUALTY INS CO 36161 ,uauoco rt. EASTGUARD INSURANCE COMPANY 14702 COVERAGES CERTIFICATE NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER 00, CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE. INSURANCE AFFORDED BY THE POLICIES DESCRIBED t EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. NSR DL 5UeR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE POLICY NUMBER M MMID A GENERALLIABItm 680-3198C616 04/01/2010 04/01/2011 COIMMERGAL GENERAL LIA91UTY CLAIMS -MADE [2 OCCUR g UMBRELLaLtA6 I occuR CUP3295Y922 1 04101/2010104/0112011 EXOEBS LIAR rl AIMLMADE C wORNERSCOMPEN5ATION MUWC806772 04/01/2010 AND EMPLOYERS' LIA0I411Y Y I N ANY OFFICER/MEM ERR EXCLU0201 uTIVE j N'j 111 A DESCRIPTION OF OPERATWNS / LOCATIONS !VEHICLES (Attaetl AGORD 101, Additional Romarks Schadula, N nim spaw Is roqulred) OPerabons aS performed by Terms S Conditions in the policy. town of North Andover additional insured as respects Liability performed by named insured RFVI.RION NLIMRFR: VAMED ABOVE FOR THE POLICY PERIOD GEN'L AGGREGATE LIMIT APPLIES PER: EREIN IS SUBJECT TO ALL THE TERMS, L1MIT5 EACH OCCURRENCE POUCY PRO LOC I;RGMIS 300,000 MED EXP one 158MOn S 5,000 A AUTDMO»IL6LIABlUTY GENERALAGOREGATE S 2,000,000 3948925 04/01/2010 ANY AU70 COMBINED SINULF LIMIT 1,000,000 adeidaw BODILY INJURY (Perpetaal) ALLOWNEb SCHEDULED BODILY INJURY (Par aeddeml S Included PR ERTY DAMAGE n $ Included AUTOS AUTOS EACH OCCURRENCE $ 3,000.000 AGGREGATE s 31000,000 V HIREDAU70S AUTOSWNED I M� WC STATUUMT- 0TH• E.L. EACH ACCIDENT 5 1,000,000 g UMBRELLaLtA6 I occuR CUP3295Y922 1 04101/2010104/0112011 EXOEBS LIAR rl AIMLMADE C wORNERSCOMPEN5ATION MUWC806772 04/01/2010 AND EMPLOYERS' LIA0I411Y Y I N ANY OFFICER/MEM ERR EXCLU0201 uTIVE j N'j 111 A DESCRIPTION OF OPERATWNS / LOCATIONS !VEHICLES (Attaetl AGORD 101, Additional Romarks Schadula, N nim spaw Is roqulred) OPerabons aS performed by Terms S Conditions in the policy. town of North Andover additional insured as respects Liability performed by named insured RFVI.RION NLIMRFR: VAMED ABOVE FOR THE POLICY PERIOD ;UMENT WITH RESPECT TO WHICH THIS EREIN IS SUBJECT TO ALL THE TERMS, L1MIT5 EACH OCCURRENCE S 1,000,000 I;RGMIS 300,000 MED EXP one 158MOn S 5,000 PERSONAL & ADV INJURY 3 1,000,000 GENERALAGOREGATE S 2,000,000 PRODUCTS - COMP/OP AGG S 2,000,000 S COMBINED SINULF LIMIT 1,000,000 adeidaw BODILY INJURY (Perpetaal) s Included BODILY INJURY (Par aeddeml S Included PR ERTY DAMAGE n $ Included S EACH OCCURRENCE $ 3,000.000 AGGREGATE s 31000,000 S WC STATUUMT- 0TH• E.L. EACH ACCIDENT 5 1,000,000 E.L.DISEASE- EAEMPLOYEE S 1,000,000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 CERTIFICATE HOLDER I Ivim Town of North Andover Attention: RM Santilli, Assistant Town Manager SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 120 Main Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN North Andover, Ma. 01845 ACCORDANCE WITH THE POLICY PROVISIONS, Faxed 978.688-9556 AUTHORIZED PEPRLSENTA71VF (b1988-2010 ACORD COR)IORATION. All rights reserved. ACORD 25 (2Di0105) The ACORD name and logo are registered marks of ACORD MURRAYPAVING & RECLAMATION INC 55 Whitney Street Holliston, Ma 01746 Tel 508-429-9400 Fax 508-429-9401 Listing of References Town of Milford DPW 30 Front Street Milford, Ma 01757 Contact: Scott Crisafulli 508-473-1274 Road Reclamation, Surfacing Project Work Dates: 7/1/09-6/30/10 Road Reclamation, Surfacing, Curbing Town of Natick DPW 75 West Street Natick, Ma 01760 Contact: Mark Coviello 508-647-6560 Road Reconstruction Work Dates: 6/30/10-11/20/10 Road Reclamation, Surfacing, Drainage, Granite Curbing, Walks Town of Ludlow Engineering 198 Sportsmen's Road Ludlow, Ma 01056 Contact: Ken Batista 413-583-5625 Work Dates: 2007-2011 Road Reclamation & Grading Various Roads Town of Upton DPW P.O. Box 479 Upton, Ma 01568 Contact: John Johnson 508-529-3067 Road Reconstruction Work Dates: 6/1 /10-10/1 /10 Road Reclamation, Surfacing, Curbing, Drainage Town of Norwood DPW 566 Washington Street Norwood, Ma 02063 Contact: Andy Murphy 781-762-8530 Road Reconstruction Work Dates: 5/1/09-10/20/09 Road Reclamation, Surfacing, Curbing, Drainage, Walks Town of Brookline DPW 333 Washington Street Brookline, Ma 02475 Contact: Charlie Barry 617-828-5618 Work Dates: 6/1/10-11/20/10 Road Reclamation, ReSurfacing, Granite Curb, Drainage, Sidewalks List of current & Past Pulverize Contracts Town of Townsend 177 Main Street Townsend, MA 01465 978-597-1712 Contact ED Kukkula Town of Upton 1 Main Street Upton, MA 01568 508-726-7619 Contact: John Johnson Town of Winchendon 109 Front Street Winchendon, MA 01475 978-297-0170 Contact: Mike Murphy Town of Mashpee 530 Meetinghouse Rd Mashpee, MA 02649 508-539-1420 Contact: Katherine Laurent Town of Milford 30 Front Street Milford, MA 01757 508-473-1274 Contact: Scott Crisafulli Town of Paxton 697 Pleasant Street Paxton, MA 01612 774-696-6288 Contact: Mike Putnam Town of Rockland 841 Market Street Rockland, MA 02370 781-878-0634 Contact: Bob Corvi Work 2009, 2010, 2011 Work 2006, 2007, 2008, 2010, 2011 Work 2009, 2010 Work 2007, 2008, 2010, 2011 Work 2006, 2007, 2008, 2009, 2010, 2011 Work 2006, 2008, 2010, 2011 Work 2009, 2010, 2011 Town of Raynham 1555 King Phillip Street Raynham, MA 02767 508-824-2718 Contact: Roger Stolte Town of Bolton 12 Forbush Mill Rd Bolton, MA 01740 978-779-6402 Contact: Harold Brown Town of Blackstone 15 St. Paul Street Blackstone, MA 01504 508-962-1871 Contact: Jim Sullivan Town of Hopedale 7 Depot Street Hopedale, MA 01747 508-294-2528 Attn: Bob Daponte Town of Bellingham Blackstone Street Bellingham, MA 02019 508-962-4128 Contact: Dan Drake Town of Charlton 37 Main Street Charlton, MA 01507 508-248-2212 Contact: Jerry Foskett Town of Ayer 25 Brock Street Ayer, MA 01432 978-772-8244 Contact: Dan Nason Town of Ashby 895 Main Street Ashby, MA 01431 978-386-2272 Contact: Bill Davis Work 2008, 2009, 2011 Work 2010, 2011 Work 2007, 2008, 2009, 2010, 2011 Work 2006, 2007, 2008, 2009, 2010 Work 2008, 2009, 2010, 2011 Work 2008, 2009, 2010, 2011 Work 2010, 2011 Work 2010, 2011 Town of Bedford 314 The Great Road Bedford, MA 01730 781-275-7605 Contact: Adrien St. John City of Beverly 191 Cabot Street Beverly, MA 01915 978-490-0228 Contact: Paul Ruggiero Work 2006, 2007, 2008, 2009, 2010, 2011 Work 2007, 2008, 2009, 2010, 2011 Town of Grafton Work 2006, 2008, 2009 30 Providence Rd Grafton, MA 01519 508-839-5335 Ext124 Contact: Brian @ Engineering Dept. Town of Holliston 30 Arch Street Holliston, MA 01746 508-922-4623 Contact: Tom Smith Town of Hubbardston 7 Main Street Hubbardston, MA 01452 978-928-1408 Contact: Lynn Gauthier Town of Harvard 47 Depot Street Harvard, MA 01451 978-456-4130 Contact: Richard Nota Town of Ludlow 198 Sportsmens Rd Ludlow, MA 01056 413-583-5625 Contact: Ken Batista Town of Douglas 56 Main Street Douglas, MA 01516 508-476-3378 Contact: John Furno Work 2005, 2006, 2009, 2010, 2011 Work 2008, 2009, 2011 Work 2010 Work 2006, 2007, 2008, 2009, 2010, 2011 Work 2006, 2007, 2008, 2009, 2010 Town of Dracut 833 Hildreth Street Dracut, MA 01820 978-957-0411 Contact: Mike Buxton City of Everett 484 Broadway Street Everett, MA 03149 617-908-8534 Contact: Julius Ofurie Town of Franklin 257 Fisher Street Franklin, MA 02038 508-922-9789 Contact: Bill Yardisernia Work 2007, 2009, 2010 Work 2007, 2008, 2009, 2010, 2011 Work 2006, 2007, 2008, 2009, 2010, 2011 The Commonwealth of Massachusetts FEE: $125.00 William Francis Galvin Secretary of the Commonwealth One Ashburton Place, Boston, Massachusetts 02108.1512 Telephone: (617) 727.9640 NOTE: PLEASE TYPE OR PRINT CLEARLYI MASSACHUSETTS CORPORATION ANNUAL REPORT Federal Identification No. 0 4 — 317 812 2 1. The exact name of the corporation is: MURRAY PAVING & RECLAMATION, INC. 2. Location of its principal office in Massachusetts: 3 9 TAYLOR ST . , P . 0 . BOX 32 9 (number and street) FRAMINGHAM MA 01701 (city or town) (state) (zip) NOTE: If corporation is organized wholly to do business outside Massachusetts, state location of that office also: (number & street) 3. Name and address of the Resident Agent, if any: (city or town) (state) (zip) (name) (number & street) (city or town) (zip) 4. Date of the end of the last fiscal year was: DECEMBER 31 2003 (month) (day) (year) 5. Check here if the corporation stock is publicly traded: 0 . 6 The caoital stock of each class as of the end of Its last floral vear was - CLASS OF STOCK E PER SHARE PAR VALUE STATE E E PAR TOTAL AUTHORIZED BY ARTICLES OF ORGANIZATION OR AMENDMENTS Number of Shares Total Par Value TOTAL ISSUED AND OUTSTANDING Number of Shares COMMON: ARNOLD G. JOHNSON,JR 9 CRESTVIEW AVE, MEDWAY, MA NO PAP, 100 100 PREFERRED: CLERK STEPHEN E. JOHNSON 182 WASHINGTON, HOLLISTON, MA DIRECTORS ARNOLD G. JOHNSON,JR 7. State the names and addresses of the officers specified below and of all the directors of the corporation, and the date on which the term of office of each exnires- OFFICERS NAME ADDRESS Number, Street, City or Town, State, Zip Code EXPIRATION OF TERM PRESIDENT ARNOLD G. JOHNSON,JR 9 CRESTVIEW AVE, MEDWAY, MA TREASURER STEPHEN E. JOHNSON 182 WASHINGTON, HOLLISTON, MA CLERK STEPHEN E. JOHNSON 182 WASHINGTON, HOLLISTON, MA DIRECTORS ARNOLD G. JOHNSON,JR 9 CRESTVIEW AVE, MEDWAY, MA STEPHEN E. JOHNSON 182 WASHINGTON, HOLLISTON, MA * UNTIL SUCCESSOR IS ELECTED AND DULY QUALIFIED I, the undersigned , being the of the above-named corporation, in compliance with the General Laws, Chapter 156B, hereby certify that the above Information is true and correct as of the dates shown. IN WITNESS WHEREOF AND UNDER PENALTIES OF PERJURY, I hereto sign my name on this day of 20 V Signature: Title: Contact Person: Contact Person Telephone fr: 357481 156bmcar4/5(00 10-15-03 D F The Commonwealth of Massachusetts William Francis Galvin Secretary of the Commonwealth One Ashburton Place . Room 1717, Boston, Massachusetts 02108-1512 Annual Report for Domestic FORM MUST BE TYPED and Foreign Corporations (General Laws Chapter 156D, Section 16.22; 950 CMR 113.57) (1) Exact name of the corporation: MURRAY PAVING & RECLAMATION, INC. (2) Jurisdiction of incorporation: MASSACHUSETTS (3) Street address of the corporation's registered office in the commonwealth (number, street, city or town, state, ZIP code) 55 WHITNEY STREET, HOLLISTON, MA 01746 (4) Name of the registered agent at the registered office: STEPHEN E JOHNSON (5) Street address of the corporation's principal office (number, street, city or town, state, ZIP code) 55 WHITNEY STREET HOLLISTON, MA 01746 (6) Provide the names and addresses of the corporation's board of directors and its president, treasurer, secretary, and if different, its chief executive officer and chief financial officer. Filing Fee: $125.00 Late Fee: $25.00 (7) Briefly describe the business of the corporation: PAVING & RECLAMATION (8-9) Caoital stock of each class and series - CLASS OF STOCK NAME TOTAL ISSUED AND OUTSTANDING ADDRESS ORGANIZATION OR AMENDMENTS Number of Shares Number of Shares President: ARNOLD G . JOHNSON, JR 55 WHITNEY STREET, HOLLISTON, MA 01746 Treasurer: STEPHEN E. JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746' Secretary: STEPHEN E. JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746 Chief Executive Officer: Chief Financial Officer: Directors:ARNOLD G. JOHNSON,JR 55 WHITNEY STREET, HOLLISTON, MA -01746 STEPHEN E. JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746 (7) Briefly describe the business of the corporation: PAVING & RECLAMATION (8-9) Caoital stock of each class and series - CLASS OF STOCK TOTAL AUTHORIZED BY ARTICLES OF TOTAL ISSUED AND OUTSTANDING ORGANIZATION OR AMENDMENTS Number of Shares Number of Shares COMMON 100. 100. PREFERRED (10) Check if the stock of the corporation is publicly traded. 0 (11) Report is filed for fiscal year ending: DECEMBER 31 2009 Signed by: EJ Chairman of the board of directors on this ® President day of (month, day, year) 0 Other officer I--] Court-appointed fiduciary 957461 11.24-09 056ds162295001357 11/23/09 D F The Commonwealth of Massachusetts William Francis Galvin Secretary of the Commonwealth One Ashburton Place - Room 1717, Boston, Massachusetts 02108.1512 Annual Report for Domestic FORM MUST BE TYPED and Foreign Corporations (General Laws Chapter 156D, Section 16.22; 950 CMR 113.57) (1) Exact name of the corporation: MURRAY PAVING & RECLAMATION, INC. (2) Jurisdiction of incorporation: 'MASSACHUSETTS (3) Street address of the corporation's registered office in the commonwealth (number, street, city or town, state, ZIP code) 55 WHITNEY STREET, HOLLISTON, MA 01746 (4) Name of the registered agent at the registered office: STEPHEN E. JOHNSON (5) Street address of the corporation's principal office (number, street, city or town, state, ZIP code) 55 WHITNEY STREET HOLLISTON, MA 01746 t (6) Provide the names and addresses of the corporation's board of directors and its president, treasurer, secretary, and if different, its chief executive officer and chief financial officer. President: ARNOLD G. Treasurer: STEPHEN E. Secretary: STEPHEN E. Chief Executive Officer: Chief financial Officer: Directors: ARNOLD G. STEPHEN E. Filing Fee: $125.00 Late Fee: $25.00 NAME TOTAL AUTHORIZED BY ARTICLES OF ADDRESS ORGANIZATION OR AMENDMENTS Number of Shares JOHNSON, JR 55 WHITNEY STREET, HOLLISTON, MA 01746 JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746' JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746 JOHNSON,JR 55 WHITNEY STREET, HOLLISTON, MA.01746 JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746 (7) Briefly describe the business of the corporation: PAVING & RECLAMATION (8-9) CaDltal stock of each r.lass and spripc- CLASS OF STOCK TOTAL AUTHORIZED BY ARTICLES OF TOTAL ISSUED AND OUTSTANDING ORGANIZATION OR AMENDMENTS Number of Shares Number of Shares COMMON 100. 100. PREFERRED (10) Check if the stock of the corporation is publicly traded. (7 (11) Report is filed for fiscal year ending: DECEMBER 31 2009 Signed by: a Chairman of the board of directors on this ® President day of (month, day, year) 0 Other officer = Court-appointed fiduciary 957461 11.24-09 c156ds1622950c11357 11/23/09 D F The Commonwealth of Massachusetts Filing Fee: $125.00 William Francis Galvin Late Fee: $25.00 Secretary of the Commonwealth One Ashburton Place, Boston, Massachusetts 021081512 Annual Report for Domestic FORM MUST BE TYPED and Foreign Corporations (General Laws Chapter 156D Section 16.22; 950 CMR 113.57) (1) The exact name of the corporation: MURRAY PAVING & RECLAMATION, INC. (2) Jurisdiction of incorporation: MASSACHUSETTS (3) The street address of the corporation's registered office in the commonwealth: 55 WHITNEY STREET, HOLLISTON, MA 01746 (number, street, city or town, state, ZIP code) (4) The name of the registered agent at the registered office: STEPHEN E. JOHNSON (5) The street address of the corporation's principal office: 55 WHITNEY STREET HOLLISTON, MA 01746 (number, street, city or town, state, ZIP code) (6) Provide the name and business address of the corporation's board of directors and its president, treasurer and secretary, and if different, its chief executive officer and chief financial officer. President: ARNOLD G. NAME JOHNSON, JR 55 ADDRESS WHITNEY STREET, HOLLISTON, MA 01746 Treasurer: STEPHEN E. JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746 Secretary: STEPHEN E. JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746 Chief Executive Officer: Chief Financial Officer: Directors:ARNOLD G. JOHNSON,JR 55 WHITNEY STREET, HOLLISTON, MA 01746 STEPHEN E. JOHNSON 55 WHITNEY STREET, HOLLISTON, MA 01746 (7) Briefly describe the business of the corporation: PAVING & RECLAMATION (8-9) The capital stock of each class and series: CLASS OF STOCK TOTAL AUTHORIZED BY ARTICLES OF TOTAL ISSUED AND OUTSTANDING ORGANIZATION OR AMENDMENTS Number of Shares Number of Shares COMMON 100. 100. PREFERRED (10) Check if the stock of the corporation is publicly traded. El (11) Report is filed for fiscal vear ending: DECEMBER 31 2008 (month, day, year) Signed by: ( AZ -0 Chairman of the bgaAf directors FX President 0 Other officer on this (!-! f 0 Court appointed fiduciary day of /ZjG �G 2 -r'�( 657481 04-25-08 c156ds1622950c11357 01/13/05 All States Asphalt, Inc. All States Materials Group@ February 9, 2012 Mr. Ray Santilli Assistant Town Manager Town of North Andover Town Hall 120 Main Street North Andover, MA 01845 Dear Mr. Santilli: PO Box 91 Sunderland, MA 01375 413-665-7021 We are pleased to submit the following proposal for Pavement Reclamation and Grading. We guarantee that all materials supplied and work done shall comply with the State of Massachusetts Department of Transportation Standard Specifications for Roads, Bridges and Highways, as well as the Town of North Andover. We hope the attached will permit our being of service to you. Very Truly Yours, ALL STATES ASPHALT, INC. at:ke Division Manager An Equal Opportunity Employer 3 APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 Quantily Unit Price Total Price Pavement Reclamation and Grading 12,000 sq yards $ . 4a /sq yd $ 1 70+a March 1, 2013 through February 28, 2014 Pavement Reclamation and Grading 12,000 sq yards $ . 44- /sq yd $ S o March 1, 2014 through February 28, 2015 Pavement Reclamation and Grading 12,000 sq yards $ / • .So /sq yd $ $ o o a el:MITIM are acknowledged: Signature Business Name All States Asphalt, Inc. Business Address 325 Amherst Rd., PO Boy 91 Sunderland, MA 01375 Business Phone 413.665.7021 Fax 413.665.9027 Alan L. Chicoine Name of Person Authorized to sign Price Proposal Division Manager Title of Person Authorize to sign Price Proposal /',. 10 1 Town of North Andover IFB Pavement Reclamation and Grading Page 8 of 33 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the All States Asphalt, Inc. held on February 1, 2012 it was VOTED, THAT Alan L. Chicoine (Name) Division Manager (Officer) of All States Asphalt, Incbe and hereby is authorized to execute contracts and bonds in the name and on behalf of said corporation , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of All States Asphalt, Incen its behalf by such officer under seal of corporation , shall be valid and binding upon All States Asphalt, Inc. Asst. I hereby certify that I am the clerk of the above named All States Asphalt, In%nd that Alan L. Chicoine is the duly elected officer as above of said corporation , and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. February 9, 2012 lam' (Date) Asst. (Clerk) Rebecca A. Bland Town of North Andover IFB Page 31 of 33 Pavement Reclamation and Grading CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date February 9, 2012 Alan L. Chicoine, Division Manager All States Asphalt, Inc. Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I Alan L. Chicoine , authorized signatory for All States Asphalt, Inc. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Si�a f (7��� gnature Alan L. Chicoine Division Manager Town of North Andover IFB Pavement Reclamation and Grading February 9, 2012 Date Page 29 of 33 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Alan L. Chicoine, Division Manager Print Name & Title Town of North Andover IFB Pavement Reclamation and Grading Date February 9, 2012 All States Asphalt, Inc. Company Name Page 30 of 33 All States Asphalt, Inc. PO Box 91, Sunderland, MA 01375 • 413.665.7021 ALL STATES ASPHALT, INC., AND SUBSIDIARIES It is the continuing policy of All States Asphalt, Inc., and Subsidiaries to recruit and employ the best qualified individuals without regard to race, color, creed, religion, national origin, age, sex, sexual orientation, handicap or status as a disabled Vietnam era veteran as defined and required by federal and state laws and regulations. Equal employment opportunity applies to all personnel actions including, but not limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeships. ALL STATES ASPHALT, INC., AND SUBSIDIARIES shall post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Government setting forth the provisions of this non-discrimination clause. An Equal Opportunity Employer WAGE RATE CERTIFICATION This is to certify that ALL STATES ASPHALT, INC., AND SUBSIDIARIES, P.O. BOX 91, SUNDERLAND, MA 01375 will pay the prevailing wage rates as determined by the Massachusetts Department of Labor and Industries as required by M.G.L. Chapter 149 Section 26 and 27D. Alan L. Chicome, Division Manager ALL STATES ASPHALT, INC., AND SUBSIDIARIES • s All States Asphalt, Inc. PO Box 91 Sunderland, MA 01375 All States Materials Group TM 413-665-7021 Town of Berlin, MA Town of Randolph, VT City of Newburyport, MA Town of Franklin, NH Town of Orange, MA Town of Pomfret, CT RECLAMATION REFERENCES Highway Department PO Box 274 Berlin, MA 01503 Dennis Bartlett $ 22,604.40 / 2010 Public Works Department Drawer B Randolph, VT 05060 Robert Runnals $ 29,282.77 / 2010 978.838.2898 802.728.5110 Department of Public Services 978.465.4464 16A Perry Way Newburyport, MA 01950 Joe McKay $ 53,975.00 / 2010 Highway Department 43 West Bow Street Franklin, NH 03235 George Turcotte $ 39,429.94 / 2010 Highway Department 6 Prospect Street Orange, MA 01364 David Frye $ 11,264.00 / 2010 Highway Department 5 Haven Road Pomfret Center, CT 06259 Glenn Postemski $ 28,735.00 / 2010 — An Equal Opportunity Employer 603.934.4103 978.544.1111 860.974.3358 All States Asphalt, Inc. PO Box 91 Sunderland, MA 01375 All States Materials Group- 413-665-7021 RECLAMATION EQUIPMENT DESCRIPTION YEAR MAKE MODEL / SERIAL # Reclaimer 2006 Wirtgen WR -2500 / 04WRO178 Reclaimer 2002 CAT RM350 / 7FS00219 Truck 1993 Mack RD688SO15884 Lowbed 1999 Etnyre RTN50T / Q26574 Vibratory Roller 1997 CAT CS563C / 4KNO0867 Vibratory Roller 1998 CAT CS563C / 4KN1047 Vibratory Roller 2007 CAT CS563D / JCNG02091 Grader 1995 CAT 140G Grader 1995 John Deere 672 Calcium Distributor 1997 Mack RD600GKO01689 All Equipment is OWNED and not rented or leased. An Equal Opportunity Employer All States Asphalt, Inc. All States Materials Group o CORPORATION CERTIFICATE TO ACTION I, Rebecca A. Bland, do hereby certify: PO Box 91 Sunderland, MA 01375 413-665-7021 THAT I am the Assistant Clerk of All States Asphalt, Inc., and Subsidiaries, a Massachusetts Corporation having its usual place of business in Sunderland, Massachusetts; THAT pursuant to prior authority granted by the Directors of All States Asphalt, Inc., and Subsidiaries, pursuant to Massachusetts General Laws Chapter 156B, Section 59, the following continuing and durable power and authority has been VOTED: That Richard J. Miller, or Alan L. Chicoine, or James P. Tudryn, or either of them, is authorized and empowered to alone, make, enter into, sign, seal, and deliver on its behalf, all bids, offers, and resulting contracts and agreements on behalf of the Corporation and lawfully obligate it in connection therewith. I hereby certify that the above is a true and correct copy of the record; that said authority has not been amended or repealed, and is in full force and effect as of this date; and that the said Richard J. Miller, Alan L. Chicoine and James P. Tudryn remain as authorized agents of the Corporation for such purposes, without exception. Seal ATTEST: February 9, 2012 Date Assistant Clerk — Rebecca A. Bland An Equal Opportunity Employer A APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 uantit Pavement Reclamation and Grading 12,000 sq yards March 1, 2013 through February 28, 2014 Pavement Reclamation and Grading 12,000 sq yards March 1, 2014 through February 28, 2015 Pavement Reclamation Unit Price Total Price $ 1 .37 /sq yd $ 16,440.00 $ 1 .40 /sq yd $ 16,800.00 and Grading 12,000 sq yards $ 1 .44 /sq yd $ 17, 280 . 0 0 Addenda R% are acknowledged: Signature Business Name BUSBY CONSTRUCTION CO., INC. Business Phone 603-362-4650 Fax 603-362-5051 PALTI, D RLJSBY Name of Person Authorized to sign Price Proposal PRESIDENT Title of Persqp Authorized to sign Price Proposal Signature of Above Person Town of North Andover IFB Pavement Reclamation and Grading Page 8 of 33 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date 2/9/12 PAUL D. BUSBY, PRESIDENT BUSBY CONSTRUCTION CO., INC. Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I PATTT. 1)_ RUSRY , authorized signatory for BUSBY CONSTRUCTION CO. , INC. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature PAUL D. BUSBY, PRE NT Town of North Andover TFB Pavement Reclamation and Grading 2/9/12 Date Page 29 of 33 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Date 2/9/12 Print Name & Title Town of North Andover IFB Pavement Reclamation and Grading MEN 6*1 •R RN Q "110 [so IN I lei v welq_qv Company Page 30 of 33 BUSBY CONSTRUCTION CO., INC 9 POND LANE ATKINSON, NH 03811 (603) 3624650 FAX (603) 362-5051 CERTIFICATE OF VOTE I, Virginia A. BusbX hereby certify that I am duly elected Secretary/Treasurer of Busby Construction Co., Inc., I hereby certify the following is a true copy of a vote taken at a meeting of the Board of Directors of the Corporation, duly called and held on July 1, 2011 at which a quorum of the Board was present and voting. VOTED: That Paul D. Busby is duly authorized to enter into a specific agreement: Pavement Reclamation and Grading Project namely with Town of North Andover, Massachusetts and further authorized to execute any documents which may in her judgment be desirable or necessary to effect the purpose of this vote. I hereby certify that said vote has not been amended or repealed and remains in full force and effect as of February 1, 2012, and that Virginia A. Busbx is duly elected Secretary/Treasurer of this Corporation. DATED: February 8, 2012 ATTEST: A x Corp. Seal) Virginia A. usby, Secretakeasurer On February 8, 2012 before me, the undersigned, a Notary Public in and for the State of New Hampshire personally appeared Virginia A. Busbx of Busby Construction Co., Inc. personally known to me has proven to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged that she exe ut the'same in the capacity stated above. Notary Public ,_ MICHAEL P. H Notary Public - New Hampshire My Commission Expires July 13, 2016 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon that I hereby certify that I am the clerk of the above named and is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 31 of 33 Pavement Reclamation and Grading BUSBY CONSTRUCTION CO., INC 9 POND LANE ATKINSON, NH 03811 (603) 362-4650 FAX (603) 362-5051 �21 Proof of 5 years experience/ prequalification in pavement reclamation. Massachusetts D.O.T State Prequalification Certificates New Hampshire D. 0. T. State Prequalification Certificates ITEM A: Proof of S years experience/ prequalification in pavement reclamation. Massachusetts D.O.T State Prequalification Certificates New Hampshire D. 0. T. State Prequalification Certificates DEVAL L. PATRICK, GOVERNOR TIMOTHY R MURRAY, LT. GOVERNOR JEFFREY B. MULLAN, SECRETARY & CEO LUISA PAIEWONM, ADMINISTRATOR Busby Construction Co., Inc. 9 Pond Lane Atkinson, NH 03811 - Dear Contractor: Moving Massachusetts forward M X, K,'D �'AY OT •� Highway February 22, 2011 Prequalification Certificate No B143-19 In accordance with the Regulations Governing Prequalification of Contractors, as approved by the Massachusetts Highway Department Prequalification Committee, you are hereby notified that the following class(es) of work, Single Contract Limitation(s) (if applicable) and Aggregate Bonding Capacity have been assigned to you as of date of this letter. If in the opinion of the Committee you failed to submit proper documentation or have not demonstrated the ability to perform all classes of work requested then you were denied Prequalification Status for that class(es) of work. Qualified Categories Limit Amount Sewer and Water $500,000.00 Drainage $500,000.00 Highway - Construction $2,000,000.00 Pavement - Reclamation $1,500,000.00 Qualified Categories Limit Amount Bonding Capacity $10,000,000.00 Bond Single Limit $7,500,000.00 Expiration Date 2/28/2012 The class(es) of work, Single Contract Limits and Aggregate Bonding Capacity set forth will continue in effect until February 28, 2012 unless previously modified or rescinded in accordance with the Regulations, or by law. In order to be continuously eligible to bid on projects to be undertaken for this Department, your next Prequalification Statement should be submitted at least 30 days prior to expiration of this Certificate. If there are any questions or concerns contact the Prequalification & Contract Administrator at (617) 973-7620. Contractors may only obtain an Official Proposal Book for work in the categories for which they are listed on this certificate. No official proposal books shall be given to contractors unless the contractor has received prior approval from the Prequalification Office to bid on the project. Very truly yours, THE PRE ALIFICATION M' e .C.OMpM�I EE � By: ;G � le Mochnoc Higgins, ;7/E Director of Prequalification KI DEVAL L. PATRICK, GOVERNOR TIMOTHY P. MURRAY, LT. GOVERNOR JEFFREY B. MULLAN, SECRETARY & CEO LUISA PAIEWONSKY, ADMINISTRATOR Busby Construction Co., Inc. 9 Pond Lane Atkinson, NH 03811 - Dear Contractor: Mo ving Massacharettr Forward. MaSSLJOT its % APORk Highway ,„s. December 21, 2009 Prequalification Certificate No B143-18 In accordance with the Regulations Governing Prequalification of Contractors, as approved by the Massachusetts Highway Department Prequalification Committee, you are hereby notified that the following class(es) of work, Single Contract Limitation(s) (if applicable) and Aggregate Bonding Capacity have been assigned to you as of date of this letter. If in the opinion of the Committee you failed to submit proper documentation or have not demonstrated the ability to perform all classes of work requested then you were denied Prequalification Status for that class(es) of work. Qualified Categories Highway Construction Landscaping & Roadside Dev Reclamation Sewer & Water Utilities Limit Amount Qualified Categories $2,000,000.00 $250,000.00 $1,500,000.00 $500,000.00 $300,000.00 Bonding Capacity $10,000,000.00 Bond Single Limit $7,500,000.00 Limit Amount Expiration Date 1213112010 The class(es) of work, Single Contract Limits and Aggregate Bonding Capacity set forth will continue in effect until December 31, 2010 unless previously modified or rescinded in accordance with the Regulations, or by law. In order to be continuously eligible to bid on projects to be undertaken for this Department, your next Prequalification Statement should be submitted at least 30 days prior to expiration of this Certificate. If there are any questions or concerns contact the Prequalification & Contract Administrator at (617) 973-7620. Contractors may only obtain an Official Proposal Book for work in the categories for which they are listed on this certificate. No official proposal books shall be given to contractors unless the contractor has received prior approval from the Prequalification Office to bid on the project. Very truly yours, THELPREALIFICATION COMMITTEE B/ F cis H. Kucharski, P. Construction Contracts Engineer M TRAO THY P, 1atorxrx4r Busby Construction Co., Inc. 9 Pond Lane Atkinson, NH 03811 - Dear Contractor: THE COMMONWEALTH, 0fy EV > O.UTI E. arm -01 OF ` RiANSPORTATI $ . MA8SACHUSETTS HictiwAY DFP.RTMENT November 3, 2008 Prequalification Certificate No B143-17 RERNARD cyi�.±i3;'NhiKy� ... LurSr #grit u,a.raS�.v In accordance with the Regulations Governing Prequalification of Contractors, as approved by the Massachusetts Highway Department Prequalification Committee, you are hereby notified that the following class(es) of work, Single Contract Limitation(s) (if applicable) and Aggregate Bonding Capacity have been assigned to you as of date of this letter. If in the opinion of the Committee you failed to submit proper documentation or have not demonstrated the ability to perform all classes of work requested then you were denied Prequalification Status for that class(es) of work. Qualified Categories Linrit Amount Qualified Calegorie,5 Li1nit.,4n:ourrt Highway Construction $2,000,000.00 Landscaping & Roadside Dev. $250,000.00 Reclamation $1,500,000.00 Sewer & Water $500,000.00 Bonding Capacity $10,000,000.00 Bond Single Limit $7,500,000.00 Expiration Date 11!3012009 The class(es) of work, Single Contract Limits and Aggregate Bonding Capacity set forth will continue in effect until November 30 2009 unless previously modified or rescinded in accordance with the Regulations, or by law. In order to be continuously eligible to id on projects to be undertaken for this Department, your next Prequalification Statement should be submitted at least 30 days prior to expiration of this Certificate. If there are any questions or concerns contact the Prequalification & Contract Administrator at (617) 973-7620. Contractors may only obtain an Official Proposal Book for work in the categories for which they are listed on this certificate. No official proposal books shall be given to contractors unless the contractor has received prior approval from the Prequalification Office to bid on the project. Very truly yours, THE PRE�UALIFICATION COMMITTEE By - C' Fra cis H. Kucharski, P. E. Construction Contracts Engineer e� ly t / t 1 0t.,n L. PAtRwr, Lit :tatrto_ni Gsr.rt:ur,m Busby Construction Co., Inc. 9 Pond Lane Atkinson, NH 03811 - Dear Contractor: THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF TRANSPORTATION MASSACI-tUSET'1'S HIGI-IWA.Y DEPARTMENT October 22, 2007 Prequalification Certificate No B143-16 E07 13rtt!imin, Com!i S P C!tI -ARY Lvisn. Pm€n '3?V;KY In accordance with the Regulations Governing Prequalification of Contractors, as approved by the Massachusetts Highway Department Prequalification Committee, you are hereby notified that the following class(es) of work, Single Contract Limitation(s) (if applicable) and Aggregate Bonding Capacity have been assigned to you as of date of this letter. If in the opinion of the Committee You failed to submit proper documentation or have not demonstrated the ability to perform all classes of work requested then you were denied Prequalification Status for that class(es) of work. Qualified Categories Liniit Amount Highway Construction $2,000,000.00 Landscaping & Roadside Dev. $250,000.00 Reclamation $1,500,000.00 Sewer & Water $500,000.00 Qualirted Categories Limit Amount Bonding Capacity $8,000,000.00 Bond Single Limit $5,000,000.00 Cvpiration Date 10/31/2008 The class(es) of work, Single Contract Limits and Aggregate Bonding Capacity set forth will continue in effect until October 31, 2008 unless previously modified or rescinded in accordance with the Regulations, or by law. In order to be continuously eligible to bid on projects to be undertaken for this Department, your next Prequalification Statement should be submitted at least 30 days prior to expiration of this Certificate. If there are any questions or concerns contact the Prequalification & Contract Administrator at (617) 973-7620. Contractors may only obtain an Official Proposal Book for work in the categories for which they are listed on this certificate. No official proposal books shall be given to contractors unless the contractor has received prior approval from the Prequalification Office to bid on the project. Very truly yours, THE PREQ,ALIPICATIO'N CIOMMITfEE Francis H. KudharskP. E. Acting Construction Contracts Engineer THE STATE OF NEW HAMPSHIRE �wR jsJ'w7 DEPARTMENT OF TRANSPORTATION x Department of Transportation GEORGE N. CAMPBELL, JR. JEFF BRILLHART, P.E. COMMISSIONER January 5, 2011 ASSISTANT COMMISSIONER REVISED Busby Construction Company, Inc. 9 Pond Lane Atkinson, NH 03811 Gentlemen: Your request for prequalification in order that you may bid on construction projects advertised and let by this Department has been reviewed and analyzed by the Prequalification Committee. The Department assigns ratings in various classifications, some of which are listed below: Road Construction Site Water Traffic Signals Building Construction Mechanical Asbestos Removal Bridge Construction Utilities Sewer Highway Lighting Bridge Painting Electrical Paving Eligibility for bidding on a particular project will be determined by the Prequalification Conn iittee at the time that the request for plans, specifications and a proposal is made. Their decision will be based on the magnitude and complexity of the project in question and on the requesting firm's capability to successfully prosecute to completion the particular project. Your firm has been rated on a project -by -project basis for those projects in the following classifications: Road Construction and Road Reclamation, Small Bridge Construction, Box Culverts, Site Work, Water, Sewer, Tank Removal and Tank Replacement. Your prequalification will expire on March 31, 2011. All prequalification information supplied to this office will be held in strict confidence and used for no other purpose than for prequalification for bidding on projects advertised and let by this Department. Sincerply, eborah A. Weil Prequalification Administrator JOHN 0. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483 TELEPHONE: 603-271-3402• FAX: 603-271-1558 • TDD ACCESS: RELAY NH 1-800-735-2964 . INTERNET: WWW.NHDOT.COM rev. 3/07 THE STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION Deportment of Transportation GEORGE N. CAMPBELL, JR. COMMISSIONER REVISED Busby Construction Company, Inc. 9 Pond Lane Atkinson. NH 03811 Gentlemen: JEFFBRILLIIART, P.E. February 1, 2010 ASSISTANT COMMISSIONER Your request for prequalification in order that you may bid on projects advertised and let by this Department has been reviewed and is in compliance with the prequalification regulations for Public Works and/or Specialty projects valued at under $500,000. The Department assigns ratings in the various classifications, some of which are listed below: Site Water Traffic Signals Building Construction Mechanical Asbestos Removal Flooring Utilities Sewer Highway Lighting Bridge Painting Electrical Landscaping Roofing Eligibility for bidding on a particular project will be determined by the Prequalification Committee at the time that the request for plans, specifications and a proposal is made. Their decision will be based on the magnitude and complexity of the project in question and on the requesting firm's capability to successfully prosecute to completion the particular project. Your firm has been rated on a project by- project basis for those projects in the followinn, classifications: Road Construction and Road Reclamation, Small Bridge Construction, Box Culverts, Site Work, Water, Sewer, Tank Removal and Tank Replacement. This Prequalification will expire on March 31, 2010. All prequalification information supplied to this office will be held in strict confidence and used for no other purpose than for prequalification for bidding on projects advertised and let by this Department. �rncerely, Deborah A. Weil Prequalification Administrator JOHN 0. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483 TELEPHONE: 603-271-3402• FAX: 603-271-1558 • TDD ACCESS. RELAY NH 1-800-735-2964 • INTERNET: WWW.NHDOT.COM rec. 10' GEORGE N. CAMPBELL, JR. COMMISSIONER THE STATE OF NEW_ HAMPSHIRE DEPARTMENT OF TRANSPORTATION Busby Construction Co., hlc. 9 Pond Lane Atkinson, NH 03811 Gentlemen: JEFFBRILLIIART, P.E. March 18, 2009 ASSISTANT COMMISSIONER Your request for prequalification in order that you may bid on projects advertised and let by this Department has been reviewed and is in compliance with the prequalification regulations for Public Works and/or Specialty projects valued at under $500,000. The Department assigns ratings in the various classifications, some of which are listed below: Site Water Traffic Signals Building Construction Mechanical Asbestos Removal Flooring Utilities Sewer Highway Lighting Bridge Painting Electrical Landscaping Roofing Eligibility for bidding on a particular project will be determined by the Prequalification Connnittee at the time that the request for plans, specifications and a proposal is made. Their decision will be based on the magnitude and complexity of the project in question and on the requesting firm's capability to successfully prosecute to completion the particular project. Your firm has been rated on a project -by -project basis for those projects in the following classifications: Road Construction and Road Reclamation, Box Culverts, Site Work, Water, Sewer; Tank Removal and Tank Replacement. This prequalification will expire on March 31, 2010. All prequalification information supplied to this office will be held in strict confidence and used for no other purpose than for prequalification for bidding on projects advertised and let by this Department. Sincerely, eborah A. Weil Prequalification Administrator JOHN 0. MORTON BUILDING . 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483 TELEPHONE: 603-271-34029 FAX: 603-271-1558 • TDD ACCESS: RELAY NH 1-800-735-2964 • INTERNET: WWW.NHDOT.COM rev. 3/07 r r r ' 4 /vow � i���� THE STATE OFNET� ILAMPSHIRE DEPARTMENT OF TRANSPORTATION CHARLES P. O'LEARY, JR COMMISSIONER March 22, 2008 Busby Construction Company, Inc. 9 Pond Lane Atkinson, NH 03 811 Gentlemen: Jeff Brillhart, P.E. Assistant Commissioner Your request for prequalification in order that you may bid on construction projects advertised and let by this Department has been reviewed and analyzed by the Prequalification Committee. The Department assigns ratings in several classifications some of which are listed below: Road Construction Bridge Construction Site Utilities Water Sewer Traffic Signals Highway Lighting Building Construction Bridge Painting Mechanical Electrical Asbestos Removal Paving Your firm has a Maximum Capacity Rating of $8,000,000 for the following classifications: Road Construction and Road Reclamation Construction, Box Culverts, Site Work, Water, Sewer, Tank Removal and Tank Replacement. This prequalification will expire on March 31, 2009. All prequalification information supplied to this office will be held in strict confidence and used for no other purpose than for prequalification for bidding on projects. advertised and let by this Department. Sincerely, Deborah A. Well Prequalification Administrator JOHN 0. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483 TELEPHONE: 603-271-3402 • FAX: 603-271-1558 • TDD ACCESS: RELAY NH 1-800-735-2964 • INTERNET: ' S /vow �'w� Ire THE STATE OF ATEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION CHARLES P. O'LEARY, JR COMMISSIONER April 26, 2007 Busby Construction Co., Inc. 9 Pond Lane Atkinson, NH 03811 Gentlemen: S`PtE OF,� S� E� Z 17 7b' JeffBrillhart, P.E. Assistant Commissioner Your request for prequalification in order that you may bid on construction prs�jects advertised and let by this. Department has been reviewed and analyzed by the Prequalification Committee. The Department assigns ratings in several classifications some of which are listed below: Road Construction Bridge Construction Site Utilities Water Sewer Traffic Signals Highway Lighting Building Construction Bridge Painting Mechanical Electrical Asbestos Removal Paving Your firm has a Maximum Capacity Rating of $8,000,000 for the following classifications: Road Construction and Road Reclamation, Box Culverts, Site Work, Water, Sewer, Tank Removal and Tank Replacement. This prequalification will expire on March 31, 2008. All prequalification information supplied to this office will be held in strict confidence and used for no other purpose than for prequalification for bidding on proiects advertised and let by this Department. Sincerely, eborah A. Weil Prequalification Administrator JOHN 0. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483 TELEPHONE: 603-271-3402 • FAX: 603-271-1558 9 TDD ACCESS: RELAY NH 1-800-735-2964 • INTERNET: 9 ITEM B BUSBY CONSTRUCTION CO., INC 9 POND LANE ATKINSON, NH 03811 (603) 362-4650 FAX (603) 362-5051 LIST OF SIMILAR PROJECTS 2/9/2012 Owner Town of Salem Capital Projects & Eng. 33 Geremonty Drive Salem, NH 03079 Town of Hampstead 11 Main Street Hampstead, NH 03841 City of Laconia Engineering Office 45 Beacon Street East Laconia, NH 03246 Project Description North Main Street Reconstruction 2009 Asphalt Reclamation Project 2011 Road Reconstruction Proect: 2009,2010,2011 Contact Robert Puff,Director 603-890-2033 Jon Worthen, Road Agent 603-235-9813 Paul Moynihan 527-1226 City of Lowell Pavement Reclamation Ron Labrecque 375 Merrimack Street 2010 978-399-3342 Lowell, MA 01852 BUSBY CONSTRUCTION CO., INC 9 POND LANE ATKINSON, NH 03811 (603) 362-4650 FAX (603) 362-5051 ITEM �C EQUIPMENT OWNED AND AVAILABLE FOR PROPOSED WORK QTY. DESCRIPTION CONDITION YR SIZE 1 ROADTEC SX -7 RECLAIMER EXCELLENT 11 1 CMI RS650 RECLAIMER GOOD / EXCELLENT 00 1 CAT 14H GRADER GOOD 96 16' Mow Board 1 CAT 140G GRADER GOOD 93 14' Mow Board 1 CAT 980GII LOADER EXCELLENT 05 8.0 CY 1 CAT 966F LOADER GOOD / EXCELLENT 97 5.0 CY 1 CAT 966D LOADER GOOD 86 4.0 CY 1 CAT 938G LOADER EXCELLENT 01 3.5 CY 1 CAT 930G LOADER EXCELLENT 07 3.0 CY 1 CAT IT28F LOADER GOOD / EXCELLENT 96 3.0 CY 1 KOMATSU WA250 LOADER GOOD 83 2.5 CY 1 CAT 236 SKIDSTEER LOADER EXCELLENT 00 Skid Steer 1 KUBOTA R520 LOADER EXCELLENT 03 Mini 1 HYUNDAI 450 EXCAVATOR GOOD / EXCELLENT 07 3.0 CY Track 1 CAT 325 EXCAVATOR EXCELLENT 05 1.5 CY Track 1 CAT 321 DCLR EXCAVATOR EXCELLENT 10 1.0 CY Track 1 CAT M318D EXCAVATOR EXCELLENT 07 1.5 CY Rubber Tire 1 CAT 214B EXCAVATOR GOOD 95 1.0 CY Rubber Tire 1 CAT 315 EXCAVATOR GOOD / EXCELLENT 96 5/8 CY Track 1 CAT E120 EXCAVATOR GOOD 91 5/8 CY Track 1 KUBOTA KX121 MINI EXCAVATOR EXCELLENT 02 Mini 1 KUBOTA KX080 MINI EXCAVATOR EXCELLENT 09 Mini 3 JCB 215S BACKHOES GOOD / EXCELLENT 98,96,94 4WD Rubber Tire 1 KOMATSU D61 EX CRAWLER/DOZER EXCELLENT 00 Medium 1 CAT D -3C DOZER GOOD 95 Small 1 JOHN DEERE 850 DOZER GOOD 85 Small 2 ARTICULATED HAULERS GOOD 90 25.0 CY 3 MACK TRACTORS GOOD / EXCELLENT 07,00,92 4 LOWBED TRAILERS EXCELLENT 11,05,99,96 2 TRIAXLE DUMP TRAILERS GOOD / EXCELLENT 97,94 30.0 CY Body 5 MACK TRIAXLES GOOD / EXCELLENT 03,01,01,99,87 20.0 CY Body 2 MACK WATER TRUCKS GOOD 86,77 4,000 Gallon 2 INGERSOLL-RAND SD -115D ROLLERS EXCELLENT 01,01 Padfoot 1 CAT CS563 COMPACTOR GOOD / EXCELLENT 95 12 Ton 1 CAT CS533E COMPACTOR EXCELLENT 00 10 Ton 1 HYPAC C830B COMPACTOR GOOD / EXCELLENT 96 8 Ton 1 M9 DUMP SWEEPER GOOD / EXCELLENT 88 1 REED SCREENALL GOOD 88 RD 90 1 SHOULDER WIDENER EXCELLENT 99 3 SIGN BOARDS GOOD 04,04,96 MISC. TRAILERS, SAWS, SM. EQUIP v APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 Quantity Pavement Reclamation and Grading 12,000 sq yards March 1, 2013 through February 28, 2014 Pavement Reclamation and Grading 12,000 sq yards March 1, 2014 through February 28, 2015 Unit Price $ 1 . (, S /sq yd $ 1 ., o /sq yd Pavement Reclamation and Grading 12,000 sq yards $9,10 /sq yd Addenda - C> are acknowledged: Signature Business Name Gpko-AVR)Pp+ 0 yy�. �,y1C. Business Address as Pele-r -s C-- 0 6 00s, Business Phone S 6 0- Lt 3- 93D0 Fax 86 o- o y 3- 3 i o 0 51 C,Q ef,n C-0nr r k j - Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal of Above Town of North Andover IFB Pavement Reclamation and Grading Total Price $ 1 soo, Cc $Vis: oo. o Page 8 of 33 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date i •a �,C'M Cmrr,t. �1•,c_e.P11-5Iae;, c�^y'I 1 s e M 11 Print Name & Title Company ame CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I S 1-e,,,e o G o cr-A•, , authorized signatory for Cir-, 1,1 q pVo, � I- ?eeAe"' Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. A' 4d a Signatur JDate Town of North Andover IFB Page 29 of 33 Pavement Reclamation and Grading CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature S Vu) env, Gcx, . i c,e Pres, A Print Name & Title Town of North Andover IFB Pavement Reclamation and Grading Date Go -C-1 �,4 as01,, V' Company Name Page 30 of 33 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the C,},� c��nh� y i- l�e�cz,vr;, ►�,Ine. held on �, 1, ap 1 I it was VOTED, THAT (Name) (Officer) Gc,-Nr%�t Aa- PhaA1- of Re1"; rs� \,,,, . be and hereby is authorized to execute contracts and bonds in the name and on behalf of said and affix its corporate seal hereto; C,+,x-r. 1- y Yip P6taA h and such execution of any contract or obligation in the name of R ��c, ; , ; �on its behalf by such officer under seal of 2 ; , shall be valid and binding Gamer; V-A f+!2 P►"Jt-- upon ., t Y)C . I hereby certify that I am the clerk of the above named and that �t-� ,f,,, Co,rr,l-., is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 31 of 33 Pavement Reclamation and Grading coty r A V Z(.mo, OIC 02A33 �M s� William Francis Galvin Secretary of the COD1monwealth February 1, 2012 To Whom It May Concern: I hereby certify that the records of this office show that GARRITY ASPHALT RECLAIMING, INC. a corporation organized der -the. .laws of Connecticut,nnA„ugust-3;,1995-vas-qualified-to-do------ -- business in this Commonwealth on September 29, 1995 under the provisions of the General Laws, and I further certify that said corporation is still qualified to do business in this Commonwealth. I also certify that said corporation is not delinquent in the filing of any annual reports required to date. Processed By crm In testimony of which, I have hereunto affixed the Great Seal of the Commonwealth on the date first above written. Secretary of the Commonwealth RECLAIMING AND/OR RECLAIM, FINE GRADE AND ROLL MUNICIPAL WORK PERFORMED 2010-2011 Town/City Contact Phone No. Dartmouth David Hickox 508-999-0740 Hopkinton J.T. Gaucher 508-497-9740 Medway Thomas Holder 508-533-3275 Spencer Rob McNeil 508-885-7525 Haverhill Tom Shanahan 978-374-2364 Shelburne Pete Hillman 413-625-0311 Also, many town jobs worked on for other General Contractors. ��AFFERTY F/NE GRAD/NG, INC. Asphalt Reclamation - Fine Grading - Cold Planing - Sweeping February 7, 2012 Town of North Andover Office of the Town Manager 120 Main Street North Andover, MA 01845 Re: Pavement Reclamation and Grading To Whom It May Concern: Thank you for the opportunity to bid with the Town of North Andover for Pavement Reclamation and Grading. Enclosed are our original proposal, Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance, the Certification of Labor Harmony and OSHA Training Requirements and list of similar contracts performed. Due to a schedule conflict, we will not be available to attend the bid opening. Would you please email or fax us the results of all bidders? I can be reached at the office if you require additional information. Thank you for your consideration. Vice President RLR/sim Enclosures 57 South Rd., Enfield, CT 06082 Toll Free 866-763-0100 / Local 860-763-0100 Toll Free Fax 866-763-0400 / Local Fax 860-763-2223 APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 Quantily Unit Price Total Price Pavement Reclamation and Grading 12,000 sq yards $ 1 .478 /sq yd $17,736.00 March 1, 2013 through February 28, 2014 Pavement Reclamation and Grading 12,000 sq yards $ 1 .574 /sq yd $18,888.00 March 1, 2014 through February 28, 2015 Pavement Reclamation and Grading 12,000 sq yards $ 1 .676 /sq yd $20,112.00 Addenda �`"``.. are Business Name Rafferty Fine Grading, Inc. Business Address 57 South Road, Enfield, CT 06082 Business Phone 860-763-0100 Fax 860-763-2223 Rhonda L. Rafferty, Vice President Name of Person Authorized to sign Price Proposal Vice resident Tirson Authori4d t) sign Price Proposal of Above Person Town of North Andover IFB Page 8 of 33 Pavement Reclamation and Grading CERTIFICATE OF VOTE Ata my authorized meeting the Board of Directors of the RaffErtY Fine GradiM► Inc. held on130 ) )-- it was VOTED, THAT Rha -da L. Rafferty Viae Presi�Semtmy (Name) (Officer) of Rafferty Fine Gradizrg, Inc, be and hereby is authorized to execute contracts and bonds in the name and on behalf of said Rafferty FSne Grading, Inc. , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of Rafferty Fine Grading, Inc. on its behalf by such officer under seal of Rafferty Fim Grading,IM. , shall be valid and binding upon antract ema±icn I hereby certify that I am the clerk of the above named Rafferty Fine Grading, Inc, and that Ria L. Paff�Y is the duly elected officer as above of said Rafferty Fine Gading, Inc. , and that the above vote has not been amended or rescinded and remains in full force and effect as the d; Town of North Andover IFB Pavement Reclamation and Grading Page 31 of 33 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Si Date ��/] � I � Rhonda L. Rafferty, Vice President Rafferty Fine Grading, Inc. Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I Rhonda T,_ Rafferty , authorized signatory for Ra f f Prty Fine Grading, Inc. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. i (7/v� a re Date Town of North Andover IFB Page 29 of 33 Pavement Reclamation and Grading CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Date a /-7 / J), Rhonda L. Raffertv, Vice President Rafferty Fine Grading, Inc. Print Name & Title Company Name Town of North Andover IFB Page 30 of 33 Pavement Reclamation and Grading ��AFFERTY F/NE GRAD/NG, INC. Asphalt Reclamation • Fine Grading • Cold Planing • Sweeping February 7, 2012. Town of North Andover Office of the Town Manager 120 Main Street North Andover, MA 01 845 Re: Pavement Reclamation and Grading To Whom It May Concern: The following is a list of references for municipal work performed by Rafferty Fine Grading, Inc. as requested in the bid specification package. Municipal References: Town Contact Name Title Contact Phone Number Torrington, CT Bob Lizotte Superintendant of Streets 860-489-2352 Vernon, CT Ron Levesque Foreman 860-870-3500 Belchertown, MA Steve Williams Department of Public Works 413-323-0415 Dennis, MA Tom. Andrade Town Engineer 508-760-6166 Falmouth, MA Peter McConarty Town Engineer 508495-7432 Sandwich. MA Stefan Masse Department of Public Works 508-833-8002 Holliston, MA Tom Smith Highway Superintendent 508-429-0616 Somerset, MA Tom Fitzgerald Superintendent of Public Works 508-646-2836 Plymouth, CT Jim Shultz Superintendent of Public Works 860-585-4030 State of CT DOT District #4 Glen Durante Transportation Maintenance General Supervisor 860-379-4414 State of CT DOT District #2 Bill Eyberse Planning 860-823-3213 State of Connecticut — DOT Colin Goegel Aviation Division 860-594-2541 Chatham, MA Jeff Colby Superintendent of Public Works 508 -945-5155 Burrillville, RI Jeff McCormick Director of Public Works 401-5684440 Please contact me if yoy need any additional information regarding the information above. R)(6nda L. Rafferty Vice President RLR/sim 57 South Rd., Enfield, CT 06082 Toll Free 866-763-0100 / Local 860-763-0100 Toll Free Fax 866-763-0400 / Local Fax 860-763-2223 A APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 Quantity Pavement Reclamation and Grading 12,000 sq yards March 1, 2013 through February 28, 2014 Pavement Reclamation and Grading 12,000 sq yards March 1, 2014 through February 28, 2015 Pavement Reclamation and Grading Addenda Business Name 12,000 sq yards Unit Price Total Price /sq yd $ O I `10,16 $ a 3.5 a /sg yd $ a 02�� $ a q. j qo /sq yd $ � qa, 36 q are acknowledged: Signature mu4, S�fxes Business Address J`1 inaujim C w LW r r r i) N U l Business Phone 3(o,&O Fax ' g 3a • Baa �Vjrw s - W Name of Person Authorized to sign Price Proposal I iuC; vi Eulbuli Signature Town of North Andover IFB Pavement Reclamation and Grading Page 8 of 33 CERTIFICATE OF VOTE At a dulyth rized meeting the Board of Directors of the held on it was VOTED, THAT ;Nllu� �-- tA- roLvk"at-,6,t --c�4a CIO., V. (Officer) of (I -S , PaW"*Jhp and hereby is authorized to execute contracts and bonds in the name and on behalf of said (& pp 4 -ti. , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of Q • S• Pact on its behalf by such officer under seal of S, Pa_� , shall be valid and binding upon I hereby certify that I am the clerk of the above named Coe>go r-JaA-*-- and that rocj ku" is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 31 of 33 Pavement Reclamation and Grading 14 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature W V rint Name & Title Date 2' Z U.S.Gmmnv sorv'v5 lyp Company Name CERTIFICATE OF TAX COMPLIANCE .Pursuant to Chapter 62C of the Massachusetts General Laws, rSection 49A (b), I authorized signatory for arne of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. atur Town of North Andover IFB Pavement Reclamation and Grading 2 2 / / z -- Date Page 29 of 33 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Print Name & Title Town of North Andover IFB Pavement Reclamation and Grading Date Z 12, Z Company Name Page 30 of 33 TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilh Assistant Town Manager Mr. Stephen Johnson Murray Paving & Reclamation, Inc 55 Whitney Street Holliston, MA 01746 Dear Mr. Johnson: NORTf{ Ott«a° 1y 1O F '� •Oe�r�° ���y4y �SSACHUs�� March 9, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the executed contract between the Town of North Andover and Murray Paving & Reclamation, Inc for pavement reclamation and grading on various projects for the period of March 1, 2012 through February 28, 2013 in accordance with the Invitation for Bids issued on January 18, 2012. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Public Works Director 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure cc., Bruce Thibodeau, Public Works Director Contract File URBELIS & FIELDSTEEL, LLP 155 FEDERAL STREET BOSTON, MASSACHUSETTS 02110-1727 CAROL HAJJAR MCGRAVEY OF COUNSEL e-mail chm@uf-law.com March 6, 2012 Raymond Santilli Assistant Town Manager North Andover Town Offices 120 Main Street North Andover, MA 01845 RE: CONTRACT WITH MURRAY PAVING & RECLAMATION INC. Dear Ray: Telephone 978-475-4552 Telephone 617-338-2200 Telecopier 617-338-0122 Enclosed is the above -referenced contract, which has been approved as to form. Please note that the insurance policies on the certificate expire on April 1, 2012, so you should obtain updated certificates for the renewed policies when they are issued. Very truly yours, &Z4,-,& 04ol Hajjar McGravey CHM/kmp Enclosure w:\wp5I\work\n-andove\corresp\santilli.ltr - contract%docx MAR. 6,2012 1:06PM HART INSURANCE N0, 900 P. 2 DAZE (MMIDD/YYM ACORvF CERTIFICATE OF LIABILITY' INSURANCE 03/06/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS, CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: if the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIV90, subject to the terns and conditions of the policy, Certain policios may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such andorsemenUs). QVNIAUI Laura Murphy N PaoDucER HART INSURANCE AGENCY, INC. PHONE rX6_ (508} 759-7326 508.759-7366 lam a 243 MAIN STREET 6MAL PO BOX 700 rtessr prig 6AY MA 0 S25370700 INSURERAFFORDING CovERAGE MAIC s IsuuA , AGGREGATE LIMB' APPLIES PER: SAFETY INDEMNITY INSURANCE CO 33618 TERMS, INSLIRP_R A TRAVELERS PROPERTY CASUALTY INS CO 36161 INSURES Murray Paving & Reclamation Inc 10613866 INSURER B: 14702 55 Whitney Street NSURER C : EASTCUARD INSURANCE COMPANY PO Box 6438 INSURER D A Holliston, MA 01746 PRODUCTS.COMP/OPAGG 5 2,000'000 S INSURER E Mn SIN WMR 1,000,aaaccida000 INSURER F : .-.�. n-.,.... ui waorD. yTHIS . IS- O CERTIFY THAT TME POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DO( CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED h EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, ADDL U PODGY EFF POU VSR 1SXP TYPE OF INSURANCE P0UgY NUMBER MrOD MMI A �EIIERaLuAMUTY 660-3198C615 04/07!2011 04/0112012 COMMERCIAL GENERAL LIABILITY CLAIMS -MADE W OCCUR DESORIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 1011, Additional R*FnzFMa Soh9C6% M more sPheo In required) Operations as performed by Terms & Conditions in the policy. Town of North Andover additional insured as respects Liability performed by named insured UAMED ABOVE FOR THE POLICY PERIOD AGGREGATE LIMB' APPLIES PER: EREIN IS SUBJECT TO ALL THE TERMS, uMITs EACH OCCURRENCE S 1,000,OOD MGEN'L POLICY V PRO LOO $00,000 c PREMISES (Ea MEC EXP (Anyono I S 3948825 04/01/2011 04/01/2012 A AUTOMOBILE UABIt1TY PRODUCTS.COMP/OPAGG 5 2,000'000 S Mn SIN WMR 1,000,aaaccida000 ANY AVrO BODILY INJURY (Pot pereen) $ Included ODD LYINJURY (Pee a0rAd Al $ Included PROPER AMAGE $ ED SCHEDULED Pet 5 EACH OCCURRENCE $ 3,000,000 AALL UTOS AUTOS NON-OWN90 3,000,000 8 VSTAFU- OTH- HIRED AL1T05 AUTOS E.L, EACHACCIDENT S 1,000.000 E.L, DISEASE - EA EMPLOYEE S 1.000,000 F.L. DISEASE -POLICY LIMIT 3 1,000,000 CUP -3295Y922 04/01/2011 04/01/2012 g UMBRELLAL1Aa OCCUR MEXCESS LIA6 CLAIM"ADE DED I I RETENTION WOMR5COMPENSATION C MUWC606772 04/01/2011 04/01/2012 AND EMPL01'E>ZS' LIABILITY YIN ANY PROPRIETORrPARTNERIE>SEOVTIVE Q N / A CPFICE tmeu! 9M EXCLUDED? DESORIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 1011, Additional R*FnzFMa Soh9C6% M more sPheo In required) Operations as performed by Terms & Conditions in the policy. Town of North Andover additional insured as respects Liability performed by named insured UAMED ABOVE FOR THE POLICY PERIOD UMENT WITH RESPECT TO WHICH THIS EREIN IS SUBJECT TO ALL THE TERMS, uMITs EACH OCCURRENCE S 1,000,OOD DMA R N 5 $00,000 c PREMISES (Ea MEC EXP (Anyono I S 5,000 VERSONAL&ADVINJURY S 1,000,000 GENERAL AGGREGATE $ 2,000,000 PRODUCTS.COMP/OPAGG 5 2,000'000 S Mn SIN WMR 1,000,aaaccida000 BODILY INJURY (Pot pereen) $ Included ODD LYINJURY (Pee a0rAd Al $ Included PROPER AMAGE $ Included Pet 5 EACH OCCURRENCE $ 3,000,000 AGGREGATE $ 3,000,000 8 VSTAFU- OTH- E.L, EACHACCIDENT S 1,000.000 E.L, DISEASE - EA EMPLOYEE S 1.000,000 F.L. DISEASE -POLICY LIMIT 3 1,000,000 CERTIFICATE HOLDER 4r►rv..�,.,s, r rvr. Town of North Andover Attention: RM Santilli, Assistant Town Manager SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 120 Main Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN North Andover, Ma. 01845 ACCORDANCE WITH THE POLICY PROVISIONS. Faxed 878-688-9556 AlrrrtORMm REPRESENTATIVE 01988-2D1O ACORD CORPORATION. All rights reserved. ACORD 26 (2010105) The ACORD name and IDgo are registered marks of ACORD TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilli Assistant Town Manager Attorney Carol McGravey Urbelis & Fieldsteel, LLP 155 Federal Street Boston, MA 02110 Dear Ms. McGravey: NORTH O�tt�eo ,6 q�0 O A SSACMUSES February 22, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find for your review and approval three (3) original contracts, with accompanying documentation, between the Town of North Andover and Murray Paving & Reclamation Inc to perform various pavement reclamation and paving projects for Public Works for the period of March 1, 2012 through February 28, 2013 per the Invitation for Bids issued on January 18, 2012, 2011. As the value of the first year of the contact is less than $16,000, a payment bond is not required. Please note the prevailing wage report is not attached to the contracts being sent to you due to it being quite large. It will be attached to each contract document prior to final execution. Thank you in advance for your attention to this matter. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosures TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilli Assistant Town Manager Mr. Stephen Johnson Murray Paving & Reclamation Inc 55 Whitney Street Holliston, MA 01746 Dear Mr. Johnson: February 15, 2012 TEL (978) 688-9516 FAX (978) 688-9556 The Town of North Andover has decided to award a contract to Murray Paving & Reclamation Inc for pavement reclamation and grading on various projects for the period of March 1, 2012 through February 28, 2013 in accordance with the Invitation for Bids issued on January 18, 2012. Enclosed please find three (3) original standard Town of North Andover contracts for appropriate review and signature. Please return the signed contract documents and all required accompanying paperwork to my attention as soon as possible. Please ensure that all insurance certificates list the Town of North Andover as an "additional insured". If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosures TOWN OF NORTH ANDOVER CONTRACT CONTRACT# DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Murray Paving & Reclamation Inc Address: 55 Whitney Street Holliston, MA 01746 Telephone Number: 508-429-9400 Fax Number: 508-429-9401 1. This is a Contract for the procurement of the following: Pavement reclamation and grading for various projects for the period of March 1, 2012 through February 28, 2013 in accordance with the Invitation for Bids issued on January 18, 2012 2. The Contract price to be paid to the Contractor by the Town of North Andover is: Pavement reclamation and grading - $1.29 per square yard 3. Payment will be made as follows: Upon providing services and receipt of invoice, net 30 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. (Rev 5-2007) Contract by and between Town of North Andover and Murray Paving & Reclamation Inc Page 1 r A 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before February 28, 2013, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. (Rev 5-2007) Contract by and between Town of North Andover and Murray Paving & Reclamation Inc Page 2 J t Santilli, Ray From: Thibodeau, Bruce Sent: Wednesday, February 15, 2012 2:04 PM To: Santilli, Ray Subject: FW: Murray Paving and Reclamation Reference Checks.doc Attachments: Murray Paving and Reclamation Reference Checks.doc Ray, We recommend award. From: Concessi, Dan Sent: Wednesday, February 15, 2012 2:00 PM To: Thibodeau, Bruce Subject: Murray Paving and Reclamation Reference Checks.doc Hi Bruce, We can recommend Murray Paving and Reclamation, Inc. based on these references. Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: hftp://www.sec.state.ma.us/pre/preidx.htm, Please consider the environment before printing this email. 7 3. Mike Buxton, town of Dracut, 978 957-0411 Murray does good work; he uses a three man crew, reclaiming machine operator, grader operator, and roller operator. Murray has done around 50,000 square yards of reclaiming for Dracut When scheduled they show up when they are supposed to. The equipment is pretty good with no breakdowns. The grader operator is top notch, gets the water to the catch basins and puts a nice crown back in the road They will use a laser and a level to check their grades. They do a good job and work well together Mike would rehire them ,i Murray Paving and Reclamation, Inc. Reference Checks 2/25/12 1. Julius Ofurie, City of Everett 617 908-8534 Murray has been doing reclamation work for the city of Everett for the past six years. Murray shows up when scheduled; he did 23 streets last year for Everett. His equipment is good, he owns the reclaiming machine, road grader, vibratory roller, and trucks. The crew is very good, when grading they get the water to the catch basins Murray is very, very clean, cleaner than most. Julius believes that Murray is the best around and would rehire them 2. Paul Dooley, Town of Rockport 781878-0634 Never any problem with Murray even if he considerably low on his bid. The water will get to the catch basins when he is done grading. Murray did 3 or 4 street for Rockport over the last 3 years He has good equipment, a couple of big late model reclaimers that never break down. He owns graders but subcontracts grading sometimes. He also has a big vibratory roller. No complaints about scheduling; he always get the job done and doesn't leave a mess. Paul would rehire Murray for future work Santilli, Ray From: Santilli, Ray Sent: Wednesday, February 15, 2012 9:27 AM To: Thibodeau, Bruce Subject: IFB - Pavement Reclamation & Grading Attachments: List of current and past pulverize contracts 2012.docx; bid results - pavement reclamation & grading.docx Attached are the bid results in response to the IFB — Pavement Reclamation & Grading. The low bidder was Murray Paving & Reclamation Inc. Attached is a listing of their recent contracts with other municipalities. Please conduct appropriate reference checks and submit your recommendation for award, in writing, to this office. If you have any questions, please call me. Thanks JZaV Santuffi Assistant Town Manager Town of North Andover 4 January 30, 2012 Pavement Reclamation and Grading — Questions & Answers The following answers are provided to questions submitted by potential bidders: 1. What were the bid results for the past four years? The bid results from the past four years are not available. 2. How many square yards were reclaimed last year? Last year, approximately 25,300 square yards were reclaimed. 3. How many mobilizations were there last year? Last year there were two (2) mobilizations. 4. On average, what is the thickness of the asphalt? The average thickness of the asphalt is 3" to 615 . 5. Typically, is there more material taken out or added by the Town? Typically, material is neither taken out nor added. 6. Are the roads to be reclaimed grouped together or spread throughout Town? The roads are typically in different locations throughout the Town. 7. In past years, what has been used for dust control? Calcium chloride 8. Will the Town be responsible for unmarked utilities, structures, etc? Yes 9. Section 6 — Estimated Quantities mentions hours; should this have been square yards? Yes, Section 6 should read: "The square yards required listed in Appendix A are simply estimates for bid purposes only. The Town will not be obligated to commit to any specific quantity of square yards during the period of the contract." 10. Is a bid bond required? No, a bid bond is not required. A Santilli, Ray From: rfg admin [admin@raffertyfinegrading.com] Sent: Thursday, January 26, 2012 11:45 AM To: Santilli, Ray Subject: Questions in RE: Pavement Reclamation and Grading Please see the following question we have in regards to the above referenced bid: 1. What are the bid results for the past 4 years? 2. How many square yards were reclaimed last year? 3. In how many mobilizations? 4. On average what is the thickness of asphalt, 0" -3", 3" -6" or over 6"? 5. In past years what has been used for dust control? 6. Typically is there more material taken out or added by the town? 7. Are the roads to be reclaimed grouped together? Or spread throughout town? 8. Is a bid bond required? Thank you for your time. Regards, Sara Mimoso Project Manager Rafferty Fine Grading Inc. 57 South Road Enfield, CT 06082 Phone: 860-763-0100 Fax: 860-763-2223 Mobile: 413-335-5207 Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: hftp://www.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. Santilli, Ray From: plymouthcountypaving@comcast.net Sent: Monday, January 30, 2012 11:38 AM To: Santilli, Ray Subject: Pavement Reclamation and Grading Ray, 1. Concerning the above mentioned bid, could you clarify or estimate the minimum size of a mobilization? 2. Also a guess on how many " various projects" historically has been. 3. IFB page six section six, mentions hours required in Appendix A; should this have been quantity's, not hours? 4. Because of the dollar amount of bid is no bid bond required? I noted upon award a payment bond is required. 5. Could you clarify IFB page five section five where "full depth" of pavement is to be reclaimed, is there an average or is this unlimited? 6. Will the town be responsible for unmarked utilities, structures etc.? Thanks, David Smith, Estimator Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. TOWN OF NORTH ANDOVER INVITATION FOR BIDS PAVEMENT RECLAMATION AND GRADING Contact Address Telephone Number: Fax Number: Email January 18, 2012 Ray Santilli Assistant Town Manager 120 Main Street North Andover, MA 01845 978-688-9516 978-688-9556 rsantilh@townofnorthandover.com Table of Contents 1. Introduction.......................................................... 3 2. Submission Deadline and Instructions ............................ 3 3. Questions, Addendum or Proposed Modifications .............. 4 4. Minimum Requirements ............................................. 5 5. Scope of Services...................................................... 5 6. Estimated Quantities ................................................ 6 7. Prevailing Wage Rates ............................................... 6 8. Payment Bond ....................................................... 6 9. Evaluation of Bids .................................................... 6 10. Term of Contract ................................................... 7 Appendix A — Price Proposal ......................................... 8 Standard Town of North Andover Contract With Supplement "C" ............................................. 9 Certifications........................................................... 29 PaymentBond........................................................... 32 Prevailing Wage Rates ................................................. 33 Town of North Andover IFB Page 2 of 33 Pavement Reclamation and Grading 1. Introduction In accordance with M.G.L. c30 §39M, the Town of North Andover is soliciting bids from qualified contractors to provide pavement reclamation and grading for various projects. Qualified contractors are requested to submit bids to the Assistant Town Manager at North Andover Town Hall, 120 Main Street, North Andover, MA, in accordance with the instructions contained within this Invitation for Bids. The Town of North Andover is seeking to award a one-year contract for the period of March 1, 2012 through February 28, 2013 with two (2) additional one-year renewals, solely at the discretion of the Town. The Town will provide written confirmation of renewal at least sixty (60) days prior to the end of the contract period. Notice of this IFB is published in the Central Register, which is a weekly publication of the Office of the Secretary of the Commonwealth, the Eagle -Tribune (a newspaper of general circulation) and posted on the Town website (www.townof iorthandover.com) under "Available Bids, Quotes and Proposals". The Town will accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on Thursday, February 9, 2012 to be considered. Proposals submitted by fax or by electronic mail will not be considered. All proposals must be submitted to: Mr. Ray Santilli, Assistant Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 The Town of North Andover may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the Town of North Andover. 2. Submission Deadline and Instructions Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed envelope marked "Pavement Reclamation and Grading" with the applicant's name and address on the front. Applicants should provide one (1) signed original proposal. Fax or electronic submissions will not be accepted. Applicants must also execute and include in the sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The Town of North Andover, through the Town Manager, is the awarding authority and reserves the right to reject any and all proposals or parts of proposals; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; and to award contracts or to cancel this Invitation for Bids if it is in the Town of North Andover's best interest to do so. Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if the bidder is a partnership, by the name of the partnership, followed by the signature of each Town of North Andover IFB Page 3 of 33 Pavement Reclamation and Grading general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed. All sealed proposals must be received and registered by the Assistant Town Manager's office by Thursday, February 9, 2012 at 2:00 p.m. All outer envelopes must be labeled "Pavement Reclamation and Grading" and mailed or hand delivered to the following address: Mr. Ray Santilli, Assistant Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 No proposals will be accepted after the time and date noted. Late delivery of materials due to any type of delivery system shall be cause for rejection. If on the date and time of the submittal deadline the North Andover Town Hall is closed due to an uncontrolled event such as fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the next normal business day. 3. Questions, Addendum or Proposal Modification Questions concerning this IFB must be submitted in writing to: Mr. Ray Santilli, Assistant Town Manager, 120 Main Street North Andover, MA 01845, or they may be emailed to Mr. Santilli at rsantilli@townofnorthandover.com. All questions/inquiries must be received by 4:30 p.m. on Tuesday, January 31, 2012 to be considered. Questions/inquiries may be delivered, mailed, emailed or faxed. Written responses will be posted on the Town's website (www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" by Thursday, February 2, 2012 at 2:00 p.m. If any changes are made to this IFB, an addendum will be posted on the Town's website in "Available Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence of any addenda and/or modifications issued by the Town. As this IFB has been published on the Town's website (www.townofnorthandover.com) all bidders are responsible for checking the website for any addenda and /or modifications that are subsequently made to this IFB. The Town accepts no liability for and will provide no accommodations to bidders who fail to check for amendments and/or modifications to this IFB and subsequently submit inadequate or incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any IFB component files. Modifications to the body of the IFB, Scope of Work, terms and conditions, or which change the intent of this IFB are prohibited and may disqualify a response. All proposals submitted in response to this IFB shall remain firm for sixty (60) days following the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days after the submittal deadline. Town of North Andover IFB Page 4 of 33 Pavement Reclamation and Grading Bidders are not to communicate directly with any employee of the Town of North Andover, except as specified in this IFB, and no other individual employee or representative is authorized to provide any information or respond to any question or inquiry concerning this IFB. Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the bidder is having trouble obtaining any part of the IFB electronically through the Town website (www.townofnorthandover.com), including, and without limitation the form and attachments. Bidder with disabilities or hardships that seek reasonable accommodations, which may include the receipt of IFB information and/or addenda and/or modifications in an alternative format, must communicate such requests in writing to the contact person, and reasonable accommodation will be made by agreement with the contact person on behalf of the Town of North Andover. 4. Minimum Requirements Each bidder must demonstrate that it meets the following minimum requirements: A. Contractor must demonstrate a minimum of five (5) years experience providing the services required in the Scope of Services. B. Contractor shall submit a complete list of all similar contracts performed in the past two (2) years with contact names and telephone numbers. C. The contractor shall furnish all labor, equipment, and vehicles as required for work in accordance with the scope of services. D. Unit price quoted shall include a trained operator for the particular piece of equipment. E. The contractor shall conform to all requirements of federal, state and local laws, including compliance with the prevailing wage laws. F. Unit prices shall remain firm for the initial one-year period of the contract. G. Submission of required statements and forms. 5. Scope of Services The contractor shall be responsible for grinding or pulverizing, grading, and compacting asphalt concrete pavement. The Town will remove all large castings prior to the commencement of reclamation. The contractor will reclaim existing pavement to its full depth and grade the reclaimed material to ensure proper drainage. The Town will supply additional material if needed and remove any surplus material if required. Town of North Andover IFB Page 5 of 33 Pavement Reclamation and Grading Contractor will compact grades areas to a density acceptable for paving. Contractor will complete all hand work required at joints with side streets, sidewalks, end points, and driveway aprons including sweeping to provide a clean sharp joint for paving. Contractor shall furnish and apply calcium chloride, or some other acceptable product, as required for dust control until the reclaimed area is paved. The Town will arrange and pay for all required police details. The Town will provide all necessary barricades, signs and cones for road closures and detours. 6. Estimated Quantities The hours required listed in Appendix A are simply estimates for bid purposes only. The Town will not be obligated to commit to any specific quantity of hours during the period of the contract. 7. Prevailing Wage Rates The successful bidder will at all times comply with the prevailing wage rates as determined by the Department of Labor Standards under the provisions of Massachusetts General Laws as shall be in force and as amended. The prevailing wage rates are attached. 8. Payment Bond Upon award of the contract, the successful bidder shall provide a payment bond in the amount of 50% of the total projected cost of the contract for the first year. The payment bond must be on the Town's form that is attached. 9. Evaluation of Bids Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility of the bidder will then be ascertained. Finally, the aggregate price for the services delivered by each responsive and responsible bidder will be calculated for the first year solely of the proposed contract. The Town is required to award the contract to the lowest responsive and responsible bidder. ■ Responsiveness Bidders must completely fill out and submit the bid form and all other required forms. All supplies and services that are the subject of the bid must meet the minimum standards and scope of services set forth in the purchase description including the standards by which the procurement officer will determine acceptability as to quality, workmanship, results of inspections and tests, and suitability for a particular purpose. Town of North Andover IFB Page 6 of 33 Pavement Reclamation and Grading ■ Responsibility Bidders must demonstrate that they meet measures of responsibility. The Town will not award a contract to any bidder who cannot furnish satisfactory evidence of his ability and experience in this type of work and that he has sufficient plant and capital to enable him to prosecute and complete the work as outlined in the Scope of Services. The Town may make such investigations as it deems necessary to determine the above and a bidder shall furnish any information requested in this regard. All costs not listed on the bid price sheet will not be considered part of the contract and therefore will not be paid. The Town of North Andover will not be charged fuel surcharges or administrative fees as part of any contract entered into as a result of this IFB. Additionally the Town of North Andover will not be charged late fees unless payment is not made within sixty (60) days of the receipt of invoice. The Town of North Andover is a tax exempt entity so no sales tax will be assessed to any purchases made under this proposed contract. 10. Term of Contract The Town of North Andover is seeking to award a one-year contract with two (2) additional one- year renewals, solely at the discretion of the Town. The Town will provide written confirmation of renewal at least sixty (60) days prior to the end of the contract period. Town of North Andover IFB Page 7 of 33 Pavement Reclamation and Grading APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 uantit Unit Price Total Price Pavement Reclamation and Grading 12,000 sq yards $ /sq yd $ March 1, 2013 through February 28, 2014 Pavement Reclamation and Grading 12,000 sq yards $ /sq yd $ March 1, 2014 through February 28, 2015 Pavement Reclamation and Grading 12,000 sq yards $ /sq yd $ Addenda Business Name Business Address Business Phone are acknowledged: Signature Fax Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person Town of North Andover IFB Pavement Reclamation and Grading Page 8 of 33 Town of North Andover CONTRACT CONTRACT# DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Address: Telephone Number: _ Fax Number: 1. This is a Contract for the procurement of the following: 2. The Contract price to be paid to the Contractor by the Town of North Andover is: 3. Payment will be made as follows: 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. Town of North Andover IFB Page 9 of 33 Pavement Reclamation and Grading 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before , unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. Town of North Andover IFB Page 10 of 33 Pavement Reclamation and Grading 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default: 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall Town of North Andover IFB Page 11 of 33 Pavement Reclamation and Grading have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall Town of North Andover IFB Page 12 of 33 Pavement Reclamation and Grading protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest: Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it or its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town: This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other Town of North Andover IFB Page 13 of 33 Pavement Reclamation and Grading instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. Town of North Andover IFB Page 14 of 33 Pavement Reclamation and Grading The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkegping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Payment The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. Town of North Andover IFB Page 15 of 33 Pavement Reclamation and Grading 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. Town of North Andover IFB Page 16 of 33 Pavement Reclamation and Grading 28. Supplemental Conditions: The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) [ ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction Town of North Andover IFB Page 17 of 33 Pavement Reclamation and Grading IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN Division/Department Head Contract Manager Town Manager Date APPROVED AS TO FORM: Town Counsel Date THE CONTRACTOR Company Name Signature Print Name & Title CERTIFICATION AS TO AVAILABILITY OF FUNDS: Town Accountant Town of North Andover IFB Pavement Reclamation and Grading Date Date Page 18 of 33 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of. (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. E ualit : 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. 5. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. 6. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property, from injury or loss arising Town of North Andover IFB Page 19 of 33 Pavement Reclamation and Grading in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. Town of North Andover IFB Page 20 of 33 Pavement Reclamation and Grading 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. Town of North Andover IFB Page 21 of 33 Pavement Reclamation and Grading In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Progress Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required,. supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of - 18.1.1. f 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. Town of North Andover IFB Page 22 of 33 Pavement Reclamation and Grading 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance Town of North Andover IFB Page 23 of 33 Pavement Reclamation and Grading of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or Town of North Andover IFB Page 24 of 33 Pavement Reclamation and Grading any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: Town of North Andover IFB Page 25 of 33 Pavement Reclamation and Grading Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insured by independent contractors and general inspection thereof by the named insured. 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's Town of North Andover IFB Page 26 of 33 Pavement Reclamation and Grading operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's Town of North Andover IFB Page 27 of 33 Pavement Reclamation and Grading obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: The Town of North Andover by: Town Manager Department/Division Head Town Accountant Certified as to Appropriation Town Counsel Certified as to Form The Contractor by: Authorized Signature Town of North Andover IFB Pavement Reclamation and Grading Page 28 of 33 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I authorized signatory for Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature Date Town of North Andover IFB Page 29 of 33 Pavement Reclamation and Grading CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Print Name & Title Date Company Name Town of North Andover IFB Page 30 of 33 Pavement Reclamation and Grading CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon that I hereby certify that I am the clerk of the above named and is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 31 of 33 Pavement Reclamation and Grading PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS, that we with a place of business at as Principal (the "Principal"), and , a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of , for the construction of NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL [Name and Seal] [Title] Attest: SURETY [Attorney-in-fact] [Seal] [Address] [Phone] Attest: Town of North Andover IFB Page 32 of 33 Pavement Reclamation and Grading Prevailing Wage Rates Town of North Andover IFB Page 33 of 33 Pavement Reclamation and Grading This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 1 of 56 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN aY TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.85 $8.56 $7.27 $0.00 $45.68 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.15 $8.56 $7.27 $0.00 $45.98 08/01/2012 $30.15 $8.91 $7.27 $0.00 $46.33 12/01/2012 $30.45 $8.91 $8.00 $0.00 $47.36 (3 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.92 $8.56 $7.27 $0.00 $45.75 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.22 $8.56 $7.27 $0.00 $46.05 08/01/2012 $30.22 $8.91 $7.27 $0.00 $46.40 12/01/2012 $30.52 $8.91 $8.00 $0.00 $47.43 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2011 $30.04 $8.56 $7.27 $0.00 $45.87 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B 06/01/2012 $30.34 $8.56 $7.27 $0.00 $46.17 08/01/2012 $30.34 $8.91 $7.27 $0.00 $46.52 12/01/2012 $30.64 $9.07 $8.00 $0.00 $47.71 ADS/SUBMERSIBLE PILOT 08/01/2011 $82.60 $8.08 $17.12 $0.00 $107.80 PILE DRIVER LOCAL 56 (ZONE 1) AIR TRACK OPERATOR 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS-ZONE2 ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2011 $28.40 $9.90 $5.95 $0.00 $44.25 ASBESTOS WORKERS LOCAL 6 (BOSTON) ASPHALT RAKER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS -7ONE2 ASPHALT/CONCRETE/CRUSHERPLANT-ON SITE 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 1 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS UW Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover $24.51 $6.97 $11.18 $0.00 $42.66 2 65 Contract Number: $6.97 City/Town: NORTH ANDOVER $0.00 Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust $6.97 control using calcium chloride or other acceptable product also included in this work. 4 75 $28.28 $6.97 Job Location: Various Locations $0.00 $46.43 5 80 $30.16 $6.97 $11.18 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $50.20 7 90 $33.93 $6.97 $11.18 Unemployment $52.08 BACKHOE/FRONT-END LOADER 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 --- --_._�, L-._ -------------.----- Apprentice to Journeyworker Ratio:1:5 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 BARCO-TYPE JUMPING TAMPER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORLRS-ZONE2 BLOCK PAVER, RAMMER / CURB SETTER 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS - ZONE 2 BOILERMAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 BOILERMAKERS LOCAL 29 Apprentice - BOILERMAKER - Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 _.....__.._---._._-----_._ Notes: -------_.-- --- --_._�, L-._ -------------.----- Apprentice to Journeyworker Ratio:1:5 �_ This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 2 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor S &Y TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/7'own: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2011 $46.56 $9.93 $16.51 $0.00 $73.00 WATERPROOFING) BRICKLAYERS LOCAL 3 (LYNN) 02/01/2012 $47.55 $9.93 $16.51 $0.00 $73.99 Apprentice- BRICKIPLASTERICEMENT MASON - Local 3 Lynn Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.28 $9.93 $16.51 $0.00 $49.72 2 60 $27.94 $9.93 $16.51 $0.00 $54.38 3 70 $32.59 $9.93 $16.51 $0.00 $59.03 4 80 $37.25 $9.93 $16.51 $0.00 $63.69 5 90 $41.90 $9.93 $16.51 $0.00 $68.34 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.78 $9.93 $16.51 $0.00 $50.22 2 60 $28.53 $9.93 $16.51 $0.00 $54.97 3 70 $33.29 $9.93 $16.51 $0.00 $59.73 4 80 $38.04 $9.93 $16.51 $0.00 $64.48 5 90 $42.80 $9.93 $16.51 $0.00 $69.24 ----------------------_._.----_.... iI Notes: _ i t__ _ Apprentice to Journeyworker Ratio.f 5 �- -- _-_..---_------ This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 3 of 56 THE COMMONWEALTH OF MASSACHUSETTS s7 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the Governor JOANNES . GOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H cretary m;ATi-¢.RE, xowE LL Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BULLDOZER/GRADER/SCRAPER 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 CAISSON & UNDERPINNING BOTTOM MAN 12/01/2011 $32.80 $7.10 $12.60 $0.00 $52.50 LABORERS - FOUNDATION AND MARINE CAISSON & UNDERPINNING LABORER 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDATION AND MARINE; CAISSON & UNDERPINNING TOP MAN 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDAT IONAND MARINE CARBIDE CORE DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - 70NE 2 CARPENTER 09/01/2011 $32.05 $9.80 $15.51 $0.00 $57.36 CARPENTERS -ZONE 2 (Eastern Massachusetts) 03/01/2012 $33.17 $9.80 $15.51 $0.00 $58.48 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 4 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS UT Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE s F. GOLDSTEIN em Govor n TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Apprentice - CARPENTER - Zone 2 Eastern MA Effective Date - 09/01/2011 Step percent Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 50 $16.03 $9.80 $1.57 $0.00 $27.40 2 60 $19.23 $9.80 $1.57 $0.00 $30.60 3 70 $22.44 $9.80 $10.80 $0.00 $43.04 4 75 $24.04 $9.80 $10.80 $0.00 $44.64 5 80 $25.64 $9.80 $12.37 $0.00 $47.81 6 80 $25.64 $9.80 $12.37 $0.00 $47.81 7 90 $28.85 $9.80 $13.94 $0.00 $52.59 8 90 $28.85 $9.80 $13.94 $0.00 $52.59 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.59 $9.80 $1.57 $0.00 $27.96 2 60 $19.90 $9.80 $1.57 $0.00 $31.27 3 70 $23.22 $9.80 $10.80 $0.00 $43.82 4 75 $24.88 $9.80 $10.80 $0.00 $45.48 5 80 $26.54 $9.80 $12.37 $0.00 $48.71 6 80 $26.54 $9.80 $12.37 $0.00 $48.71 7 90 $29.85 $9.80 $13.94 $0.00 $53.59 8 90 $29.85 $9.80 $13.94 $0.00 $53.59 .-._._.._.._r.._..------------------..._..--- Notes: i fi �- _ ---------------------_ _ Apprentice to Journeyworker Ratio:1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 5 of 56 THE COMMONWEALTH OF MASSACHUSETTS u EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. rGOLDSTEIN vern Goor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Ll. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust $48.25 control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate 06/01/2012 Unemployment CEMENT MASONRY/PLASTERING 08/01/2011 $44.33 $9.93 $16.51 $0.00 $70.77 BRICKLA YERS LOCAL 3 (LYNN) $40.52 $10.00 02/01/2012 $45.10 $9.93 $16.51 $0.00 $71.54 CHAIN SAW OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS -7.0NE2 $7.80 $14.60 $0.00 $67.41 06/01/2012 $28.34 CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2011 $40.52 $10.00 $12.40 $0.00 $62.92 OPERATING ENGINEERS LOCAL 4 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 06/01/2012 $41.09 $10.00 $12.40 $0.00 $63.49 $52.29 12/01/2012 $41.71 $10.00 $12.40 $0.00 $64.11 06/01/2013 $42.49 $10.00 $12.40 $0.00 $64.89 12/01/2013 $43.27 $10.00 $12.40 $0.00 $65.67 COMPRESSOR OPERATOR 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 $45.01 $7.80 $14.60 $0.00 $67.41 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 DELEADER (BRIDGE) PAINTERS LOCAL 35 - ZONE 2 01/01/2012 $44.01 $7.80 $14.60 $0.00 $66.41 07/01/2012 $45.01 $7.80 $14.60 $0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 $0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 1.00 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 6 of 56 Awarding Authority: Town of North Andover Contract Number: City/ own: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $7.80 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 55 Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary TIMOTHY P. MURRAY Lt, Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H Director Awarding Authority: Town of North Andover Contract Number: City/ own: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 $0.00 $0.00 $29.81 2 55 $24.21 $7.80 $3.25 $0.00 $35.26 3 60 $26.41 $7.80 $3.54 $0.00 $37.75 4 65 $28.61 $7.80 $3.84 $0.00 $40.25 5 70 $30.81 $7.80 $12.83 $0.00 $51.44 6 75 $33.01 $7.80 $13.13 $0.00 $53.94 7 80 $35.21 $7.80 $13.42 $0.00 $56.43 8 90 $39.61 $7.80 $14.01 $0.00 $61.42 Effective Date - 07/01/2012 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.25 $0.00 $35.81 3 60 $27.01 $7.80 $3.54 $0.00 $38.35 4 65 $29.26 $7.80 $3.84 $0.00 $40.90 5 70 $31.51 $7.80 $12.83 $0.00 $52.14 6 75 $33.76 $7.80 $13.13 $0.00 $54.69 7 80 $36.01 $7.80 $13.42 $0.00 $57.23 8 90 $40.51 $7.80 $14.01 $0.00 $62.32 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 7 of 56 DEVAL L. PATRICK Gov— TIMOTHY P. MURRAY Lt. Goc , Awarding Authority: Contract Number: Description of Work: THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H Town of North Andover JOANNE F. GOLDSTEIN Secretary HEATHER E. ROWE Director City/Town: NORTH ANDOVER Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS-ZONE2 DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS-ZONE2 Apprentice - LABORER Demo Backhoe/Loader/Hammer Operator Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.68 $7.10 $12.45 $0.00 $39.23 2 70 $22.96 $7.10 $12.45 $0.00 $42.51 3 80 $26.24 $7.10 $12.45 $0.00 $45.79 4 90 $29.52 $7.10 $12.45 $0.00 $49.07 ___.--___.---._-------__..------__---- Notes: --- - � ppre_c--._.­--------------.��... Apprentice to Journeyworker Ratio:l:5 ---_.__-- DEMO: BURNERS 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS-ZONE2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 8 of 56 THE COMMONWEALTH OF MASSACHUSETTS x EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER Demo Burners Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.53 $7.10 $12.45 $0.00 $39.08 2 70 $22.79 $7.10 $12.45 $0.00 $42.34 3 80 $26.04 $7.10 $12.45 $0.00 $45.59 4 90 $29.30 $7.10 $12.45 $0.00 $48.85 ..._----.,._...-------------_..-._---- ----------------------------- Notes: --_-----Notes: ' ---------_..--.._-__---------------- Apprentice to Journeyworker Ratio: 1:5 DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS-ZONE2 DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS -ZONE2 DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS-ZONT:2 This wage schedule must be posted by the contractor at the work site in accordance with M.C.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 9 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- LABORER Demo Wrecking Laborer THE COMMONWEALTH OF MASSACHUSETTS $39.16 $10.00 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 Effective Date - 12/01/2011 DEPARTMENT OF LABOR STANDARDS 06/01/2012 $39.72 Prevailing Wage Rates $12.40 DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE s reGOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROwE Lt. Govemor $7.10 Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- LABORER Demo Wrecking Laborer 12/01/2011 $39.16 $10.00 $12.40 $0.00 Effective Date - 12/01/2011 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 Supplemental $12.40 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.08 $7.10 $12.45 $0.00 $38.63 2 70 $22.26 $7.10 $12.45 $0.00 $41.81 3 80 $25.44 $7.10 $12.45 $0.00 $44.99 4 90 $28.62 $7.10 $12.45 $0.00 $48.17 Notes: PILE DRIVER LOCAL 56 (70NE l) p - - - - - ....... _ - _. - _. _ Apprentice to Journeyworker Ratio: 1:5 _,. - - .- - ._.. - --- _,_ - ---- -- - - --... DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 DIVER 08/01/2011 $55.07 $8.08 $17.12 $0.00 $80.27 PILE DRIVER LOCAL 56 (70NE l) DIVER TENDER 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER LOCAL 56 (ZONE 1) DIVER TENDER (EFFLUENT) 08/01/2011 $60.18 $8.08 $17.12 $0.00 $85.38 PILE DRIVER LOCAL 56 (ZONE 1) DIVER/SLURRY (EFFLUENT) 08/01/2011 $82.60 $8.08 $17.12 $0.00 $107.80 PILE DRIVER LOCAL 56 (ZONE I) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 10 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Effective Date Base Wage Prevailing Wage Rates Pension DEVAL L. PATRICK co-r As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN n TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dirator Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ELECTRICIAN 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 11 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICIAN- Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 THE COMMONWEALTH OF MASSACHUSETTS $16.76 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W) DEPARTMENT OF LABOR STANDARDS $37.56 Prevailing Wage Rates DEVALL. PATRICK Govemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN ar7' TIMOTHY P. MURRAY Lt. Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICIAN- Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.76 $13.00 $7.80 $0.00 $37.56 2 40 $16.76 $13.00 $7.80 $0.00 $37.56 3 45 $18.85 $13.00 $10.26 $0.00 $42.11 4 45 $18.85 $13.00 $10.26 $0.00 $42.11 5 50 $20.95 $13.00 $10.58 $0.00 $44.53 6 55 $23.04 $13.00 $10.91 $0.00 $46.95 7 60 $25.13 $13.00 $11.23 $0.00 $49.36 8 65 $27.23 $13.00 $11.57 $0.00 $51.80 9 70 $29.32 $13.00 $11.89 $0.00 $54.21 10 75 $31.42 $13.00 $12.22 $0.00 $56.64 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.95 $13.00 $7.81 $0.00 $37.76 2 40 $16.95 $13.00 $7.81 $0.00 $37.76 3 45 $19.07 $13.00 $10.26 $0.00 $42.33 4 45 $19.07 $13.00 $10.26 $0.00 $42.33 5 50 $21.19 $13.00 $10.59 $0.00 $44.78 6 55 $23.30 $13.00 $10.92 $0.00 $47.22 7 60 $25.42 $13.00 $11.24 $0.00 $49.66 8 65 $27.54 $13.00 $11.58 $0.00 $52.12 9 70 $29.66 $13.00 $11.90 $0.00 $54.56 10 75 $31.78 $13.00 $12.23 $0.00 $57.01 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 12 of 56 sY DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Gocemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNES rGOLDSTEIN �Y Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Di -tor Town of North Andover City/Town: NORTH ANDOVER Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Various Locations Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment - - - - - - - - - - - - - - - - - - (Notes:: App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 ELEVATOR CONSTRUCTORS LOCAL 4 Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 . -_._......._-------------------.--_._..-_- Notes: Steps 1-2 are 6 mos.; Steps 3-5 are 1 year Apprentice to Journeyworker RatioA:I ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 ELEVATOR CONSTRUCTORS LOCAL 4 FENCE & GUARD RAIL ERECTOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 13 of 56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 14 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT T) DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Gmemor As determined b the Director under the provisions of the y p JOANNE F. GOLDSTEIN Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $37.49 $10.00 $12.20 $0.00 $59.69 OPERATING ENGINEERS LOCAL 4 05/01/2012 $38.10 $10.00 $12.20 $0.00 $60.30 11/01/2012 $38.71 $10.00 $12.20 $0.00 $60.91 05/01/2013 $39.32 $10.00 $12.20 $0.00 $61.52 11/01/2013 $40.08 $10.00 $12.20 $0.00 $62.28 05/01/2014 $40.85 $10.00 $12.20 $0.00 $63.05 FIELD ENGTARTY CREF-BLDG,SITE,HVY/HWY 11/01/2011 $38.88 $10.00 $12.20 $0.00 $61.08 OPERATING ENGINEERS LOCAL 4 05/01/2012 $39.49 $10.00 $12.20 $0.00 $61.69 11/01/2012 $40.11 $10.00 $12.20 $0.00 $62.31 05/01/2013 $40.73 $10.00 $12.20 $0.00 $62.93 11/01/2013 $41.50 $10.00 $12.20 $0.00 $63.70 05/01/2014 $42.27 $10.00 $12.20 $0.00 $64.47 FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $20.91 $10.00 $12.20 $0.00 $43.11 OPERATING ENGINEERS LOCAL 4 05/01/2012 $21.27 $10.00 $12.20 $0.00 $43.47 11/01/2012 $21.63 $10.00 $12.20 $0.00 $43.83 05/01/2013 $21.99 $10.00 $12.20 $0.00 $44.19 11/01/2013 $22.45 $10.00 $12.20 $0.00 $44.65 05/01/2014 $22.90 $10.00 $12.20 $0.00 $45.10 FIRE ALARM INSTALLER 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 14 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS . EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS OPERATING ENGINEERS LOCAL 4 Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. reGr�OOLDSTEIN TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations $33.23 $10.00 $12.40 $0.00 $55.63 OPERATING ENGINEERS LOCAL 4 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $10.00 $12.40 $0.00 $56.10 12/01/2012 Unemployment $10.00 FIRE ALARM REPAIR / MAINTENANCE 09/01/2011 $31.42 $13.00 $12.22 $0.00 $56.64 ICOMMISSIONINGELECTRIc1ANs $57.28 12/01/2013 $35.54 $10.00 $12.40 $0.00 LOCAL 103 03/01/2012 $31.78 $13.00 $12.23 $0.00 $57.01 09/01/2012 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 $0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 $0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 $0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 $0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 $0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 $0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 $0.00 $61.72 FIREMAN (ASST. ENGINEER) 12/01/2011 $33.23 $10.00 $12.40 $0.00 $55.63 OPERATING ENGINEERS LOCAL 4 06/01/2012 $33.70 $10.00 $12.40 $0.00 $56.10 12/01/2012 $34.23 $10.00 $12.40 $0.00 $56.63 06/01/2013 $34.88 $10.00 $12.40 $0.00 $57.28 12/01/2013 $35.54 $10.00 $12.40 $0.00 $57.94 FLAGGER & SIGNALER 12/01/2011 $20.50 $7.10 $11.55 $0.00 $39.15 LABORERS-ZONE2 FLOORCOVERER FLOORCOVERERS LOCAL 2168 ZONE 1 09/01/2011 $35.95 $9.80 $16.61 $0.00 03/01/2012 $37.20 $9.80 $16.61 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $62.36 $63.61 Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 15 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 55 Prevailing Wage Rates DEVALL. PATRICK Go% mor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN v7' TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.98 $9.80 $1.79 $0.00 $29.57 2 55 $19.77 $9.80 $1.79 $0.00 $31.36 3 60 $21.57 $9.80 $11.24 $0.00 $42.61 4 65 $23.37 $9.80 $11.24 $0.00 $44.41 5 70 $25.17 $9.80 $13.03 $0.00 $48.00 6 75 $26.96 $9.80 $13.03 $0.00 $49.79 7 80 $28.76 $9.80 $14.82 $0.00 $53.38 8 85 $30.56 $9.80 $14.82 $0.00 $55.18 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.60 $9.80 $1.79 $0.00 $30.19 2 55 $20.46 $9.80 $1.79 $0.00 $32.05 3 60 $22.32 $9.80 $11.24 $0.00 $43.36 4 65 $24.18 $9.80 $11.24 $0.00 $45.22 5 70 $26.04 $9.80 $13.03 $0.00 $48.87 6 75 $27.90 $9.80 $13.03 $0.00 $50.73 7 80 $29.76 $9.80 $14.82 $0.00 $54.38 8 85 $31.62 $9.80 $14.82 $0.00 $56.24 --__..._...-...-._.._.------------- -...._..._.------ Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 16 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W) DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK Governor TIMOTHY P. MURRAY Lt. G -or As determined by the Director under the provisions of the JOANNE Se . GOLDSTEIN arr Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FORK LIFT/CHERRY PICKER 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 GENERATOR/LIGHTING PLANTMEATERS 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 GLAZIER (GLASS PLANK/AIR BARRIERANI'ERIOR 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91 SYSTEMS) GLA71F.RSLOCAL 35(ZONE 2) 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 17 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN Gm error TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- GLAZIER - Local 35 Zone 2 Effective Date- 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.76 $7.80 $0.00 $0.00 $24.56 2 55 $18.43 $7.80 $3.25 $0.00 $29.48 3 60 $20.11 $7.80 $3.54 $0.00 $31.45 4 65 $21.78 $7.80 $3.84 $0.00 $33.42 5 70 $23.46 $7.80 $12.83 $0.00 $44.09 6 75 $25.13 $7.80 $13.13 $0.00 $46.06 7 80 $26.81 $7.80 $13.42 $0.00 $48.03 8 90 $30.16 $7.80 $14.01 $0.00 $51.97 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 $0.00 $0.00 $25.06 2 55 $18.98 $7.80 $3.25 $0.00 $30.03 3 60 $20.71 $7.80 $3.54 $0.00 $32.05 4 65 $22.43 $7.80 $3.84 $0.00 $34.07 5 70 $24.16 $7.80 $12.83 $0.00 $44.79 6 75 $25.88 $7.80 $13.13 $0.00 $46.81 7 80 $27.61 $7.80 $13.42 $0.00 $48.83 8 90 $31.06 $7.80 $14.01 $0.00 $52.87 ._...-_.._--___....,._-,-__., -._.,.-....._------_....-___.------ Notes: Steps are 750 his. Apprentice to Journeyworker Ratio:l:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 18 of 56 THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN em Govor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H BEATEERE. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment HOISTING ENGINEER/CRANES/GRADALLS 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERA77NG ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 19 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Apprentice- HOIST/PORT. ENG.- Effective Date - 12/01/2011 Step percent THE COMMONWEALTH OF MASSACHUSETTS Health Pension EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT t) DEPARTMENT OF LABOR STANDARDS $21.74 Prevailing Wage Rates DEVALL. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN TIMOTHY P. MURRAY LL Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Apprentice- HOIST/PORT. ENG.- Effective Date - 12/01/2011 Step percent Effective Date Base Wage Local 4 Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 55 $21.74 $10.00 $0.00 $0.00 $31.74 2 60 $23.71 $10.00 $12.40 $0.00 $46.11 3 65 $25.69 $10.00 $12.40 $0.00 $48.09 4 70 $27.66 $10.00 $12.40 $0.00 $50.06 5 75 $29.64 $10.00 $12.40 $0.00 $52.04 6 80 $31.62 $10.00 $12.40 $0.00 $54.02 7 85 $33.59 $10.00 $12.40 $0.00 $55.99 8 90 $35.57 $10.00 $12.40 $0.00 $57.97 Effective Date- 06/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 2 60 $24.05 $10.00 $12.40 $0.00 $46.45 3 65 $26.06 $10.00 $12.40 $0.00 $48.46 4 70 $28.06 $10.00 $12.40 $0.00 $50.46 5 75 $30.07 $10.00 $12.40 $0.00 $52.47 6 80 $32.07 $10.00 $12.40 $0.00 $54.47 7 85 $34.08 $10.00 $12.40 $0.00 $56.48 8 90 $36.08 $10.00 $12.40 $0.00 $58.48 .._----_--------------------------a Notes: Tice ---------------- Apprentice to Journeyworker Ratio:1:6 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.C.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 20 of 56 THE COMMONWEALTH OF MASSACHUSETTS s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Goo met TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment HVAC (DUCTWORK) 08/01/2011 $39.83 $9.82 $17.09 $2.00 $68.74 SHEETMETAL WORKERS LOCAL 17 - A 02/01/2012 $40.79 $9.82 $17.34 $2.04 $69.99 08/01/2012 $42.04 $9.82 $17.34 $2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 $2.11 $72.56 HVAC (ELECTRICAL CONTROLS) 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 HVAC (TESTING AND BALANCING - AIR) 08/01/2011 $39.83 $9.82 $17.09 $2.00 $68.74 SHEETMETAL WORKERS LOCAL 17 -A 02/01/2012 $40.79 $9.82 $17.34 $2.04 $69.99 08/01/2012 $42.04 $9.82 $17.34 $2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 $2.11 $72.56 HVAC (TESTING AND BALANCING -WATER) 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HVAC MECHANIC 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HYDRAULIC DRILLS 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 21 of 56 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $10.40 $8.30 $0.00 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT 2 60 $24.40 $10.40 $8.88 DEPARTMENT OF LABOR STANDARDS $43.68 3 70 $28.46 Prevailing Wage Rates $9.46 $0.00 DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN azY TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor ---------------------------- Notes: Di=tor $7.70 Awarding Authority: Town of North Andover $61.77 Steps are 1 year Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust Apprentice to Journeyworker Ratio:I A control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment INSULATOR (PIPES & TANKS) 09/01/2011 $40.66 $10.40 $11.20 $0.00 $62.26 ASBESTOS WORKERS LOCAL 6 (BOSTON) 09/01/2012 $42.06 $10.40 $11.20 $0.00 $63.66 09/01/2013 $43.66 $10.40 $11.20 $0.00 $65.26 09/01/2014 $45.66 $10.40 $11.20 $0.00 $67.26 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.33 $10.40 $8.30 $0.00 $39.03 2 60 $24.40 $10.40 $8.88 $0.00 $43.68 3 70 $28.46 $10.40 $9.46 $0.00 $48.32 4 80 $32.53 $10.40 $10.04 $0.00 $52.97 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.03 $10.40 $8.30 $0.00 $39.73 2 60 $25.24 $10.40 $8.88 $0.00 $44.52 3 70 $29.44 $10.40 $9.46 $0.00 $49.30 4 80 $33.65 $10.40 $10.04 $0.00 $54.09 ---------------------------- Notes: $36.12 $7.70 $17.95 $0.00 $61.77 Steps are 1 year i I Apprentice to Journeyworker Ratio:I A IRONWORKER/WELDER 09/16/2011 $32.87 $7.70 $17.95 $0.00 $58.52 IRONWORKERS LOCAL 7 (LA WRENCEARLA) 03/16/2012 $33.87 $7.70 $17.95 $0.00 $59.52 09/16/2012 $34.87 $7.70 $17.95 $0.00 $60.52 03/16/2013 $36.12 $7.70 $17.95 $0.00 $61.77 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 22 of 56 THE COMMONWEALTH OF MASSACHUSETTS si EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE $ F. G,OLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE U. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - IRONWORKER - Local 7 Lawrence Effective Date - 09/16/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.72 $7.70 $17.95 $0.00 $45.37 2 70 $23.01 $7.70 $17.95 $0.00 $48.66 3 75 $24.65 $7.70 $17.95 $0.00 $50.30 4 80 $26.30 $7.70 $17.95 $0.00 $51.95 5 85 $27.94 $7.70 $17.95 $0.00 $53.59 6 90 $29.58 $7.70 $17.95 $0.00 $55.23 Effective Date - 03/16/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.32 $7.70 $17.95 $0.00 $45.97 2 70 $23.71 $7.70 $17.95 $0.00 $49.36 3 75 $25.40 $7.70 $17.95 $0.00 $51.05 4 80 $27.10 $7.70 $17.95 $0.00 $52.75 5 85 $28.79 $7.70 $17.95 $0.00 $54.44 6 90 $30.48 $7.70 $17.95 $0.00 $56.13 .--.___-------_.__----...._...,_...----- (Notes: -- - - - Structural 1:6; Ornamental 1:4 Apprentice to Journeyworker Ratio: JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS-7.0NE2 LABORER LABORERS - ZONE 2 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.C.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 23 of 56 Awarding Authority: Town of North Andover Contract Number: City/ own: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 THE COMMONWEALTH OF MASSACHUSETTS $7.10 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT l DEPARTMENT OF LABOR STANDARDS 2 70 Prevailing Wage Rates DEVALL. PATRICK Go -r As determined by the Director under the provisions of the JOANNE F. reGO}LDSTEIN TIMOTHY P. MURRAY Lt. G -or Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/ own: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.61 $7.10 $11.55 $0.00 $36.26 2 70 $20.55 $7.10 $11.55 $0.00 $39.20 3 80 $23.48 $7.10 $11.55 $0.00 $42.13 4 90 $26.42 $7.10 $11.55 $0.00 $45.07 - - - - - - - - - - - (Notes: - - - - - - - - - - - - - - - - - --w A._. -------------- Apprentice to Journeyworker Ratio:l:5 $7.10 - - - - - - � - LABORER: CARPENTER TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: CEMENT FINISHER TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 LABORER: MASON TENDER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 LABORER: MULTI -TRADE TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 1-413ORERS-7.ONF.2 LABORER: TREE REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS-ZONE2 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. LASER BEAM OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS-ZONE2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 24 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W) DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS LL Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust 2 60 control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 70 Unemployment MARBLE & TILE FINISHERS 08/01/2011 $35.52 $9.93 $15.50 $0.00 $60.95 BRICKLAYERS LOCAL 3 - MARBLE & TILE $0.00 02/01/2012 $36.31 $9.93 $15.50 $0.00 $61.74 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.76 $9.93 $15.50 $0.00 $43.19 2 60 $21.31 $9.93 $15.50 $0.00 $46.74 3 70 $24.86 $9.93 $15.50 $0.00 $50.29 4 80 $28.42 $9.93 $15.50 $0.00 $53.85 5 90 $31.97 $9.93 $15.50 $0.00 $57.40 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.16 $9.93 $15.50 $0.00 $43.59 2 60 $21.79 $9.93 $15.50 $0.00 $47.22 3 70 $25.42 $9.93 $15.50 $0.00 $50.85 4 80 $29.05 $9.93 $15.50 $0.00 $54.48 5 90 $32.68 $9.93 $15.50 $0.00 $58.11 __....--_._.----.__.---__..._.__-_--_-_..__.,.--.......--_, Notes: Steps are 800 hrs. t..... - __._ - __.. _._. _ - Apprentice to Journeyworker Ratio: 1:3 ._....._. _ - _ - __._ _ - - - - _... v - - - MARBLE MASONS,TILELAYERS & TERRAZZO MECH 08/01/2011 $46.60 $9.93 $16.51 $0.00 $73.04 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2012 $47.59 $9.93 $16.51 $0.00 $74.03 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 25 of 56 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S CteGOLDSTEIN Govemor , TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - MARBLE -TILE -TERRAZZO MECHANIC - Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.30 $9.93 $16.51 $0.00 $49.74 2 60 $27.96 $9.93 $16.51 $0.00 $54.40 3 70 $32.62 $9.93 $16.51 $0.00 $59.06 4 80 $37.28 $9.93 $16.51 $0.00 $63.72 5 90 $41.94 $9.93 $16.51 $0.00 $68.38 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.80 $9.93 $16.51 $0.00 $50.24 2 60 $28.55 $9.93 $16.51 $0.00 $54.99 3 70 $33.31 $9.93 $16.51 $0.00 $59.75 4 80 $38.07 $9.93 $16.51 $0.00 $64.51 5 90 $42.83 $9.93 $16.51 $0.00 $69.27 _._ _ , _._. - -- - - _ _ ___. - - - €Notes: _ - - __._ _. _ _._ - - - - - ____ . - _ - _ _, ----._-- -..._.------------ Apprentice to Journeyworker Ratio:] :3 - - s MECH. SWEEPER OPERATOR (NON -CONSTRUCTION) 07/01/2011 $24.80 $5.49 $0.00 $0.00 $30.29 SWEEPER LOCAL 25 (NON -CONSTRUCTION) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 26 of 56 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. Secretary vern Goor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Goveroor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 MECHANICS MAINTENANCE 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 MILLWRIGHT (Zone 2) 04/01/2011 $31.71 $8.67 $15.61 $0.00 $55.99 MILL WRIGHTS LOCAL 1121- 7one 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 27 of 56 THE COMMONWEALTH OF MASSACHUSETTS sI EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. reGrOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 $11.64 $0.00 $36.17 2 55 $17.44 $8.67 $11.64 $0.00 $37.75 3 60 $19.03 $8.67 $13.23 $0.00 $40.93 4 65 $20.61 $8.67 $13.23 $0.00 $42.51 5 70 $22.20 $8.67 $14.02 $0.00 $44.89 6 75 $23.78 $8.67 $14.02 $0.00 $46.47 7 80 $25.37 $8.67 $14.82 $0.00 $48.86 8 85 $26.95 $8.67 $14.82 $0.00 $50.44 ------.-.,..------.._.,._-_..__---_.....-_._., -- - - 'Notes: ----_____.__....___._--_-----_.__----_---_ Apprentice to Journeyworker Ratio: 1:5 MORTAR MIXER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 OILER (OTHER THAN TRUCK CRANES,GRADALLS) OPERATING ENGINEERS LOCAL 4 12/01/2011 $21.28 $10.00 $12.40 $0.00 $43.68 06/01/2012 $21.56 $10.00 $12.40 $0.00 $43.96 12/01/2012 $21.90 $10.00 $12.40 $0.00 $44.30 06/01/2013 $22.32 $10.00 $12.40 $0.00 $44.72 12/01/2013 $22.74 $10.00 $12.40 $0.00 $45.14 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 28 of 56 THE COMMONWEALTH OF MASSACHUSETTS sx EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS a Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S CteGOLDSTEIN Governor trY TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment OILER (TRUCK CRANES, GRADALLS) 12/01/2011 $24.51 $10.00 $12.40 $0.00 $46.91 OPERATING ENGINEERS LOCAL 4 06/01/2012 $24.85 $10.00 $12.40 $0.00 $47.25 12/01/2012 $25.24 $10.00 $12.40 $0.00 $47.64 06/01/2013 $25.72 $10.00 $12.40 $0.00 $48.12 12/01/2013 $26.21 $10.00 $12.40 $0.00 $48.61 OTHER POWER DRIVEN EQUIPMENT - CLASS II 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 PAINTER (BRIDGES/TANKS) 01/01/2012 $44.01 $7.80 $14.60 $0.00 $66.41 PAINTERS LOCAL 35 - ZONE 2 07/01/2012 $45.01 $7.80 $14.60 $0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 $0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 1.00 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 29 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $7.80 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 55 Prevailing Wage Rates DEVALL. PATRICK Governor As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 $0.00 $0.00 $29.81 2 55 $24.21 $7.80 $3.25 $0.00 $35.26 3 60 $26.41 $7.80 $3.54 $0.00 $37.75 4 65 $28.61 $7.80 $3.84 $0.00 $40.25 5 70 $30.81 $7.80 $12.83 $0.00 $51.44 6 75 $33.01 $7.80 $13.13 $0.00 $53.94 7 80 $35.21 $7.80 $13.42 $0.00 $56.43 8 90 $39.61 $7.80 $14.01 $0.00 $61.42 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.25 $0.00 $35.81 3 60 $27.01 $7.80 $3.54 $0.00 $38.35 4 65 $29.26 $7.80 $3.84 $0.00 $40.90 5 70 $31.51 $7.80 $12.83 $0.00 $52.14 6 75 $33.76 $7.80 $13.13 $0.00 $54.69 7 80 $36.01 $7.80 $13.42 $0.00 $57.23 8 90 $40.51 $7.80 $14.01 $0.00 $62.32 --., - ........._- .o- ._....._ _......_. _.. - ._..„ - - _ - _ - _. - - - - - - - - - Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio.1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 30 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN G--. Secretory TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. RON'E Lc Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2012 $34.91 $7.80 $14.60 $0.00 $57.31 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.raiNrr:RSLOCAL 35 - ZONF 2 07/01/2012 $35.91 $7.80 $14.60 $0.00 $58.31 01/01/2013 $36.91 $7.80 $14.60 $0.00 $59.31 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 31 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEvnL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEtrr GO,M., Y P sect y TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE LL Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.46 $7.80 $0.00 $0.00 $25.26 2 55 $19.20 $7.80 $3.25 $0.00 $30.25 3 60 $20.95 $7.80 $3.54 $0.00 $32.29 4 65 $22.69 $7.80 $3.84 $0.00 $34.33 5 70 $24.44 $7.80 $12.83 $0.00 $45.07 6 75 $26.18 $7.80 $13.13 $0.00 $47.11 7 80 $27.93 $7.80 $13.42 $0.00 $49.15 8 90 $31.42 $7.80 $14.01 $0.00 $53.23 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.96 $7.80 $0.00 $0.00 $25.76 2 55 $19.75 $7.80 $3.25 $0.00 $30.80 3 60 $21.55 $7.80 $3.54 $0.00 $32.89 4 65 $23.34 $7.80 $3.84 $0.00 $34.98 5 70 $25.14 $7.80 $12.83 $0.00 $45.77 6 75 $26.93 $7.80 $13.13 $0.00 $47.86 7 80 $28.73 $7.80 $13.42 $0.00 $49.95 8 90 $32.32 $7.80 $14.01 $0.00 $54.13 -----------__.---..__._.____--------___.--._., (Notes: i -- _ 7...r._....--------------.,.__ Apprentice to Journeyworker Ratio:l:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 32 of 56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 33 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2012 $32.97 $7.80 $14.60 $0.00 $55.37 PAINTERS LOCAL 35 - ZONE 2 07/01/2012 $33.97 $7.80 $14.60 $0.00 $56.37 01/01/2013 $34.97 $7.80 $14.60 $0.00 $57.37 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 33 of 56 THE COMMONWEALTH OF MASSACHUSETTS sY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations $7.80 $0.00 $0.00 $24.79 2 55 Classification $7.80 Effective Date Base Wage Health Pension Supplemental Total Rate $20.38 $7.80 $3.54 $0.00 $31.72 Unemployment $22.08 Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint $33.72 5 70 $23.78 $7.80 Effective Date - 01/01/2012 $44.41 6 75 $25.48 Supplemental $13.13 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.49 $7.80 $0.00 $0.00 $24.29 2 55 $18.13 $7.80 $3.25 $0.00 $29.18 3 60 $19.78 $7.80 $3.54 $0.00 $31.12 4 65 $21.43 $7.80 $3.84 $0.00 $33.07 5 70 $23.08 $7.80 $12.83 $0.00 $43.71 6 75 $24.73 $7.80 $13.13 $0.00 $45.66 7 80 $26.38 $7.80 $13.42 $0.00 $47.60 8 90 $29.67 $7.80 $14.01 $0.00 $51.48 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.99 $7.80 $0.00 $0.00 $24.79 2 55 $18.68 $7.80 $3.25 $0.00 $29.73 3 60 $20.38 $7.80 $3.54 $0.00 $31.72 4 65 $22.08 $7.80 $3.84 $0.00 $33.72 5 70 $23.78 $7.80 $12.83 $0.00 $44.41 6 75 $25.48 $7.80 $13.13 $0.00 $46.41 7 80 $27.18 $7.80 $13.42 $0.00 $48.40 8 90 $30.57 $7.80 $14.01 $0.00 $52.38 - _.._ - _ -- - - - _ - - - - _ - _.....,._ _ - - - - - - _._, - __.. -r Notes: i Apprentice to Journeyworker Ratio:l:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; TO: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 34 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS UI) Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNES GOLDSTEIN Govemor �7' TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt, Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (TRAFFIC MARKINGS) 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS -7.ONE.2 PAINTER / TAPER (BRUSH, NEW) * 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91 * If 30% or more of surfaces to be painted are new construction, 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91 NEW paint rate shall be used.PAINTERSLOCAL 35-70NE2 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.C.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 35 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $7.80 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT I DEPARTMENT OF LABOR STANDARDS 2 55 Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. DSTEIN Gov- rGO TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Dimaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.76 $7.80 $0.00 $0.00 $24.56 2 55 $18.43 $7.80 $3.25 $0.00 $29.48 3 60 $20.11 $7.80 $3.54 $0.00 $31.45 4 65 $21.78 $7.80 $3.84 $0.00 $33.42 5 70 $23.46 $7.80 $12.83 $0.00 $44.09 6 75 $25.13 $7.80 $13.13 $0.00 $46.06 7 80 $26.81 $7.80 $13.42 $0.00 $48.03 8 90 $30.16 $7.80 $14.01 $0.00 $51.97 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 $0.00 $0.00 $25.06 2 55 $18.98 $7.80 $3.25 $0.00 $30.03 3 60 $20.71 $7.80 $3.54 $0.00 $32.05 4 65 $22.43 $7.80 $3.84 $0.00 $34.07 5 70 $24.16 $7.80 $12.83 $0.00 $44.79 6 75 $25.88 $7.80 $13.13 $0.00 $46.81 7 80 $27.61 $7.80 $13.42 $0.00 $48.83 8 90 $31.06 $7.80 $14.01 $0.00 $52.87 _--._-._--..__.._......_-------_..._._-_....._.,......----- (Notes: Steps are 750 hrs. 1 Apprentice to Journeyworker Ratio:I:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 36 of 56 THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. mGOLDSTEM ernor Gov TIMOTUrP. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension SupplementalTotal Rate Unemployment PAINTER / TAPER (BRUSH, REPAINT) 01/01/2012 $31.57 $7.80 $14.60 $0.00 $53.97 PAINTERS LOCAL 35 - ZONE 2 07/01/2012 $32.57 $7.80 $14.60 $0.00 $54.97 01/01/2013 $33.57 $7.80 $14.60 $0.00 $55.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 37 of 56 THE COMMONWEALTH OF MASSACHUSETTS UI EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE S eGOLDSTEIN ov Gernor y TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date- 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.79 $7.80 $0.00 $0.00 $23.59 2 55 $17.36 $7.80 $3.25 $0.00 $28.41 3 60 $18.94 $7.80 $3.54 $0.00 $30.28 4 65 $20.52 $7.80 $3.84 $0.00 $32.16 5 70 $22.10 $7.80 $12.83 $0.00 $42.73 6 75 $23.68 $7.80 $13.13 $0.00 $44.61 7 80 $25.26 $7.80 $13.42 $0.00 $46.48 8 90 $28.41 $7.80 $14.01 $0.00 $50.22 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.29 $7.80 $0.00 $0.00 $24.09 2 55 $17.91 $7.80 $3.25 $0.00 $28.96 3 60 $19.54 $7.80 $3.54 $0.00 $30.88 4 65 $21.17 $7.80 $3.84 $0.00 $32.81 5 70 $22.80 $7.80 $12.83 $0.00 $43.43 6 75 $24.43 $7.80 $13.13 $0.00 $45.36 7 80 $26.06 $7.80 $13.42 $0.00 $47.28 8 90 $29.31 $7.80 $14.01 $0.00 $51.12 (Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:l :l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 38 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS se EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $17.12 DEPARTMENT OF LABOR STANDARDS PILE DRIVER Prevailing Wage Rates DEVALL. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. eGOLDSTEIN TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROwE Dirmtor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER Classification Effective Date Base Wage Health Pension Supplemental Total Rate Apprentice- PILEDRIVER - Local 56 Zone I Unemployment PANEL & PICKUP TRUCKS DRIVER 12/01/2011 $29.68 $8.56 $7.27 $0.00 $45.51 TEAMSTERS JOINT COUNCIL NO. 10 7.0NE B Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 06/01/2012 $29.98 $8.56 $7.27 $0.00 $45.81 $26.08 08/01/2012 $29.68 $8.91 $7.27 $0.00 $45.86 $8.08 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND DECK) PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER LOCAL, 56 (ZONE 1) Apprentice- PILEDRIVER - Local 56 Zone I Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.07 $8.08 $17.12 $0.00 $49.27 2 65 $26.08 $8.08 $17.12 $0.00 $51.28 3 70 $28.08 $8.08 $17.12 $0.00 $53.28 4 75 $30.09 $8.08 $17.12 $0.00 $55.29 5 80 $32.10 $8.08 $17.12 $0.00 $57.30 6 85 $34.10 $8.08 $17.12 $0.00 $59.30 7 90 $36.11 $8.08 $17.12 $0.00 $61.31 8 95 $38.11 $8.08 $17.12 $0.00 $63.31 ----------------------------- Notes: -__-a..-------...__....-------...._ Apprentice to Journeyworker Ratio: 1:3 ---_._-®- This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 39 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE s . GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover $8.75 $4.50 $0.00 Contract Number: City/Town: NORTH ANDOVER $19.69 Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust $40.83 3 60 control using calcium chloride or other acceptable product also included in this work. $8.75 $12.39 $0.00 Job Location: Various Locations $30.63 $8.75 $12.39 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $12.39 $0.00 $56.15 Unemployment $8.75 PIPEFITTER & STEAMFITTER 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.50 $8.75 $4.50 $0.00 $30.75 2 45 $19.69 $8.75 $12.39 $0.00 $40.83 3 60 $26.26 $8.75 $12.39 $0.00 $47.40 4 70 $30.63 $8.75 $12.39 $0.00 $51.77 5 80 $35.01 $8.75 $12.39 $0.00 $56.15 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.80 $8.75 $4.50 $0.00 $31.05 2 45 $20.03 $8.75 $12.39 $0.00 $41.17 3 60 $26.71 $8.75 $12.39 $0.00 $47.85 4 70 $31.16 $8.75 $12.39 $0.00 $52.30 5 80 $35.61 $8.75 $12.39 $0.00 $56.75 -------------------------------- Notes: ** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) Apprentice to Journeyworker Ratio:** PIPELAYER LABORERS-ZONE2 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 40 of 56 Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138) Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 THE COMMONWEALTH OF MASSACHUSETTS $9.32 $4.97 $0.00 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT 2 40 $16.77 $9.32 Ulf DEPARTMENT OF LABOR STANDARDS $31.70 3 55 $23.06 Prevailing Wage Rates $7.53 $0.00 DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN $Ccrclilry TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor 5 75 Director $9.32 Awarding Authority: Town of North Andover $50.86 Notes: Contract Number: Cityffown: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations - - _ _..- - - Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PLUMBER 09/01/2011 $41.93 $9.32 $13.29 $0.00 $64.54 PLUMBERS & GASFITTERSLOCA L 12 (Local 138) 03/01/2012 $42.73 $9.32 $13.29 $0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138) Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.68 $9.32 $4.97 $0.00 $28.97 2 40 $16.77 $9.32 $5.61 $0.00 $31.70 3 55 $23.06 $9.32 $7.53 $0.00 $39.91 4 65 $27.25 $9.32 $8.81 $0.00 $45.38 5 75 $31.45 $9.32 $10.09 $0.00 $50.86 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.96 $9.32 $4.97 $0.00 $29.25 2 40 $17.09 $9.32 $5.61 $0.00 $32.02 3 55 $23.50 $9.32 $7.53 $0.00 $40.35 4 65 $27.77 $9.32 $8.81 $0.00 $45.90 5 75 $32.05 $9.32 $10.09 $0.00 $51.46 Notes: Step 4 with lic$48.12 Steps with lic$53.58 ___ --- _ _., Apprentice to Journeyworker Ratio:1:5 _ _ .. - - _ _..- - - - - - _ ---- _ This wage schedule must be posted by the contractor at the work site in accordance with M.C.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 41 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Ulf Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the Governor JOANNE S F. GOLDSTEIN arr TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PNEUMATIC CONTROLS (TEMP.) 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERSLOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PNEUMATIC DRILL/TOOL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 POWDERMAN & BLASTER 12/01/2011 $30.35 $7.10 $11.55 $0.00 $49.00 LABORERS - ZONE 2 POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 PUMP OPERATOR (CONCRETE) 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 PUMP OPERATOR (DEWATERING, OTHER) 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 TEAMSTERS LOCAL 42 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 42 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Supplemental DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK Gr overno As determined by the Director under the provisions of the JOANNE F. feGOLDSTEIN TIMOTHY P. MURRAY Lt. Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment RECLAIMERS 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS -ZONE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 43 of 56 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS u Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN oc Gr arY TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Gm error Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 --._.____-_._.....__......_-_-----._.__-- i8 Notes: ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 08/01/2011 ---®T-._.., $10.50 $9.80 i Apprentice to Journeyworker Ratio:l:5 $55.86 ROOFERS LOCAL 33 RIDE -ON MOTORIZED BUGGY OPERATOR LABORERS - 70NE 2 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 ROLLER/SPREADER/MULCHING MACHINE 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 08/01/2011 $35.56 $10.50 $9.80 $0.00 $55.86 ROOFERS LOCAL 33 02/01/2012 $36.56 $10.50 $9.80 $0.00 $56.86 08/01/2012 $37.56 $10.50 $9.80 $0.00 $57.86 02/01/2013 $38.56 $10.50 $9.80 $0.00 $58.86 This wage schedule must be posted by the contractor at the work site in accordance with M.C.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 44 of 56 DEVAL L. PATRICK Go - TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE sGOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE D -tor Town of North Andover City/Town: NORTH ANDOVER Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Various Locations Apprentice- ROOFER - Local 33 Effective Date - 08/01/2011 Step percent Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Supplemental Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.78 $10.50 $2.93 $0.00 $31.21 2 60 $21.34 $10.50 $9.80 $0.00 $41.64 3 65 $23.11 $10.50 $9.80 $0.00 $43.41 4 75 $26.67 $10.50 $9.80 $0.00 $46.97 5 85 $30.23 $10.50 $9.80 $0.00 $50.53 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.28 $10.50 $2.93 $0.00 $31.71 2 60 $21.94 $10.50 $9.80 $0.00 $42.24 3 65 $23.76 $10.50 $9.80 $0.00 $44.06 4 75 $27.42 $10.50 $9.80 $0.00 $47.72 5 85 $31.08 $10.50 $9.80 $0.00 $51.38 Notes: ** 1:5, 2:6-10, the 1:10; Reroofmg: 1:4, then 1:1 Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs. ®®.-------.----___.--------__.-r----- Apprentice to Journeyworker Ratio:** ROOFER SLATE / TILE / PRECAST CONCRETE 08/01/2011 $35.81 $10.50 $9.80 $0.00 $56.11 ROOFERS LOCAL 33 02/01/2012 $36.81 $10.50 $9.80 $0.00 $57.11 08/01/2012 $37.81 $10.50 $9.80 $0.00 $58.11 02/01/2013 $38.81 $10.50 $9.80 $0.00 $59.11 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 45 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER (Slate/Tile/Precast Concrete) - Local 33 Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS tY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 60 Prevailing Wage Rates DEVALL. PATRICK Governor As determined by the Director under the provisions of the JOANNES .reGOLDSTEIN TIMOTHY P. MURRAY Lt. Go-or Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER (Slate/Tile/Precast Concrete) - Local 33 Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.91 $10.50 $2.93 $0.00 $31.34 2 60 $21.49 $10.50 $9.80 $0.00 $41.79 3 65 $23.28 $10.50 $9.80 $0.00 $43.58 4 75 $26.86 $10.50 $9.80 $0.00 $47.16 5 85 $30.44 $10.50 $9.80 $0.00 $50.74 Effective Date - 02/01/2012 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $18.41 $10.50 $2.93 $0.00 $31.84 2 60 $22.09 $10.50 $9.80 $0.00 $42.39 3 65 $23.93 $10.50 $9.80 $0.00 $44.23 4 75 $27.61 $10.50 $9.80 $0.00 $47.91 5 85 $31.29 $10.50 $9.80 $0.00 $51.59 - -------_.--. Notes: -------------___.-----.. -----._. -------------------- Apprentice to Journeyworker Ratio:** SHEETMETAL WORKER 08/01/2011 $39.83 $9.82 $17.09 $2.00 $68.74 SHEF,TMETAL WORKERS LOCAL 17 -A 02/01/2012 $40.79 $9.82 $17.34 $2.04 $69.99 08/01/2012 $42.04 $9.82 $17.34 $2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 $2.11 $72.56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 1.00 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 46 of 56 THE COMMONWEALTH OF MASSACHUSETTS UT EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN overnor G TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.93 $9.82 $3.74 $0.00 $29.49 2 45 $17.92 $9.82 $7.45 $1.06 $36.25 3 50 $19.92 $9.82 $8.42 $1.14 $39.30 4 60 $23.90 $9.82 $9.60 $1.30 $44.62 5 65 $25.89 $9.82 $10.32 $1.38 $47.41 6 75 $29.87 $9.82 $11.76 $1.54 $52.99 7 85 $33.86 $9.82 $12.69 $1.69 $58.06 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.32 $9.82 $3.74 $0.00 $29.88 2 45 $18.36 $9.82 $7.45 $1.07 $36.70 3 50 $20.40 $9.82 $8.42 $1.16 $39.80 4 60 $24.47 $9.82 $9.60 $1.32 $45.21 5 65 $26.51 $9.82 $10.32 $1.40 $48.05 6 75 $30.59 $9.82 $11.76 $1.57 $53.74 7 85 $34.67 $9.82 $12.69 $1.72 $58.90 -----------_..____.-------.._ Notes: --------- Steps 1-3 are 1 year; Steps 4-7 are 6 mos. Apprentice to Journeyworker Ratio: 1:4 - - - - - - - - SIGN ERECTOR PAINTERS LOCAL 35 - ZONE 2 06/01/2009 $24.81 $7.07 $5.90 $0.00 $37.78 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 47 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W) DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Go -or As determined by the Director under the provisions of the JOANNE F. .reGOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rowe Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SIGN ERECTOR -Local 35 Zone 2 Effective Date - 06/01/2009 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.41 $7.07 $0.00 $0.00 $19.48 2 55 $13.65 $7.07 $2.40 $0.00 $23.12 3 60 $14.89 $7.07 $2.40 $0.00 $24.36 4 65 $16.13 $7.07 $2.40 $0.00 $25.60 5 70 $17.37 $7.07 $5.90 $0.00 $30.34 6 75 $18.61 $7.07 $5.90 $0.00 $31.58 7 80 $19.85 $7.07 $5.90 $0.00 $32.82 8 85 $21.09 $7.07 $5.90 $0.00 $34.06 9 90 $22.33 $7.07 $5.90 $0.00 $35.30 - - ._..__...._ _._ - __..._ - Notes: .._ - - - - - - ___ - ___ - - __ - --- ._ _ _ - __, I Steps are 4 mos. Apprentice to Journeyworker Ratio: 1:1 SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2011 $30.14 $8.56 $7.27 $0.00 $45.97 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.44 $8.56 $7.27 $0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 $0.00 $46.62 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2011 $30.43 $8.56 $7.27 $0.00 $46.26 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.73 $8.56 $7.27 $0.00 $46.56 08/01/2012 $30.73 $8.91 $7.27 $0.00 $46.91 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 48 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SPRINKLER FITTER 01/01/2012 $46.38 $8.42 $11.60 $0.00 $66.40 SPRINKLER FITTERS LOCAL 550 - (Section BJ 03/01/2012 $47.13 $8.42 $11.60 $0.00 $67.15 09/01/2012 $48.13 $8.42 $11.60 $0.00 $68.15 03/01/2013 $49.13 $8.42 $11.60 $0.00 $69.15 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 021.08; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 49 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SPRINKLER FITTER -Local 550 (Section B) Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 THE COMMONWEALTH OF MASSACHUSETTS $8.42 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W DEPARTMENT OF LABOR STANDARDS 2 40 Prevailing Wage Rates DEVALL. PATRICK Goor vern As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SPRINKLER FITTER -Local 550 (Section B) Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.23 $8.42 $7.85 $0.00 $32.50 2 40 $18.55 $8.42 $7.85 $0.00 $34.82 3 45 $20.87 $8.42 $7.85 $0.00 $37.1.4 4 50 $23.19 $8.42 $7.85 $0.00 $39.46 5 55 $25.51 $8.42 $7.85 $0.00 $41.78 6 60 $27.83 $8.42 $7.85 $0.00 $44.10 7 65 $30.15 $8.42 $7.85 $0.00 $46.42 8 70 $32.47 $8.42 $7.85 $0.00 $48.74 9 75 $34.79 $8.42 $7.85 $0.00 $51.06 10 80 $37.10 $8.42 $7.85 $0.00 $53.37 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.50 $8.42 $7.85 $0.00 $32.77 2 40 $18.85 $8.42 $7.85 $0.00 $35.12 3 45 $21.21 $8.42 $7.85 $0.00 $37.48 4 50 $23.57 $8.42 $7.85 $0.00 $39.84 5 55 $25.92 $8.42 $7.85 $0.00 $42.19 6 60 $28.28 $8.42 $7.85 $0.00 $44.55 7 65 $30.63 $8.42 $7.85 $0.00 $46.90 8 70 $32.99 $8.42 $7.85 $0.00 $49.26 9 75 $35.35 $8.42 $7.85 $0.00 $51.62 10 80 $37.70 $8.42 $7.85 $0.00 $53.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 50 of 56 THE COMMONWEALTH OF MASSACHUSETTS s7 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOA�s . GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Unemployment Notes: 1 . _---------._.----._...-_..,........ Apprentice to Journeyworker Ratio:1:1 STEAM BOILER OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 12/01/2012 $40.34 $10.00 $12.40 $0.00 06/01/2013 $41.11 $10.00 $12.40 $0.00 12/01/2013 $41.89 $10.00 $12.40 $0.00 Total Rate $61.56 $62.12 $62.74 $63.51 $64.29 TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 $31.78 $13.00 $12.23 $0.00 $57.01 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TELECOMMUNICATION TECHNICIAN ELECTRICIANS LOCAL 103 09/01/2011 $31.42 $13.00 $12.22 $0.00 $56.64 03/01/2012 $31.78 $13.00 $12.23 $0.00 $57.01 09/01/2012 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 $0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 $0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 $0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 $0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 $0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 $0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 $0.00 $61.72 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 51 of 56 THE COMMONWEALTH OF MASSACHUSETTS ie EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNEF. rGOLDSTEIN overno Gr TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. G -or Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 09/01/2011 Step percent Apprentice Base Wage Health 1 40 $12.57 2 40 $12.57 3 45 $14.14 4 45 $14.14 5 50 $15.71 6 55 $17.28 7 60 $18.85 8 65 $20.42 9 70 $21.99 10 75 $23.57 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 Pension $9.27 $9.27 $9.51 $9.51 $9.76 $10.01 $10.26 $10.50 $10.75 $11.00 Supplemental Unemployment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate $34.84 $34.84 $36.65 $36.65 $38.47 $40.29 $42.11 $43.92 $45.74 $47.57 Total Rate 1 40 $12.71 $13.00 $9.27 $0.00 $34.98 2 40 $12.71 $13.00 $9.27 $0.00 $34.98 3 45 $14.30 $13.00 $9.51 $0.00 $36.81 4 45 $14.30 $13.00 $9.51 $0.00 $36.81 5 50 $15.89 $13.00 $9.76 $0.00 $38.65 6 55 $17.48 $13.00 $10.01 $0.00 $40.49 7 60 $19.07 $13.00 $10.26 $0.00 $42.33 8 65 $20.66 $13.00 $10.50 $0.00 $44.16 9 70 $22.25 $13.00 $10.75 $0.00 $46.00 10 75 $23.84 $13.00 $11.00 $0.00 $47.84 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DL•S at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 52 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment - ----.._._--------------- Notes: - _-_._.-----------.®-------„--- Apprentice to Journeyworker Ratio:1:1 TERRAZZO FINISHERS 08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93 Apprentice - TERRAZZO FINISHER - Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $9.93 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 60 Prevailing Wage Rates DEVAL L. PATRICK G- As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary TIMOTHY P. MURRAY Lt. Goeemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment - ----.._._--------------- Notes: - _-_._.-----------.®-------„--- Apprentice to Journeyworker Ratio:1:1 TERRAZZO FINISHERS 08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93 Apprentice - TERRAZZO FINISHER - Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.75 $9.93 $16.51 $0.00 $49.19 2 60 $27.30 $9.93 $16.51 $0.00 $53.74 3 70 $31.85 $9.93 $16.51 $0.00 $58.29 4 80 $36.40 $9.93 $16.51 $0.00 $62.84 5 90 $40.95 $9.93 $16.51 $0.00 $67.39 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.25 $9.93 $16.51 $0.00 $49.69 2 60 $27.89 $9.93 $16.51 $0.00 $54.33 3 70 $32.54 $9.93 $16.51 $0.00 $58.98 4 80 $37.19 $9.93 $16.51 $0.00 $63.63 5 90 $41.84 $9.93 $16.51 $0.00 $68.28 --.-....---_--_..,_.....___.....-----_.......-.-....------ Notes: Steps are 800 hrs. __ - - _._...-....._._ Apprentice to Journeyworker Ratio:l:3 - .� __........_ _. - - _.._ - - ._.._........ _.._ _._.. -._. - -- This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 53 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75 LABORERS - FOUNDATION AND MARINE Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 60 THE COMMONWEALTH OF MASSACHUSETTS 'i EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT r DEPARTMENT OF LABOR STANDARDS 2 70 Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN S TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt, Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75 LABORERS - FOUNDATION AND MARINE Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 60 $19.83 $7.10 $12.60 $0.00 $39.53 2 70 $23.14 $7.10 $12.60 $0.00 $42.84 3 80 $26.44 $7.10 $12.60 $0.00 $46.14 4 90 $29.75 $7.10 $12.60 $0.00 $49.45 ---------------------------- ......--.,--_.-----..._._.----__..-..._----.-.._-__---®_--Notes: Notes: ----------------------------- Apprentice to Journeyworker Ratio:1:3 TEST BORING DRILLER HELPER 12/01/2011 $31.77 $7.10 $12.60 $0.00 $51.47 LABORERS- FOUNDATIONAND MARINE TEST BORING LABORER 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FO UNDA TION AND MARINE This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 54 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT T) DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN &1' TIMOTHY P. MURRAY Lt. Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING LABORER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.99 $7.10 $12.60 $0.00 $38.69 2 70 $22.16 $7.10 $12.60 $0.00 $41.86 3 80 $25.32 $7.10 $12.60 $0.00 $45.02 4 90 $28.49 $7.10 $12.60 $0.00 $48.19 ...-._-------------------------- Notes: �...-�.----------------------_ Apprentice to Journeyworker Ratio:l:3 TRACTORS/PORTABLE STEAM GENERATORS 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2011 $30.72 $8.56 $7.27 $0.00 $46.55 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $31.02 $8.56 $7.27 $0.00 $46.85 08/01/2012 $31.02 $8.91 $7.27 $0.00 $47.20 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23 TUNNEL WORK - COMPRESSED AIR 12/01/2011 $44.08 $7.10 $13.00 $0.00 $64.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2011 $46.08 $7.10 $13.00 $0.00 $66.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - FREE AIR 12/01/2011 $36.15 $7.10 $13.00 $0.00 $56.25 LABORERS (FREE AIR TUNNEL) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 55 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemar Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. xowE LL Goeemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust control using calcium chloride or other acceptable product also included in this work. Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TUNNEL WORK -FREE AIR (HAZ. WASTE) 12/01/2011 $38.15 $7.10 $13.00 $0.00 $58.25 LABORERS (FREE AIR TUNNEL) VAC -HAUL 12/01/2011 $30.14 $8.56 $7.27 $0.00 $45.97 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.44 $8.56 $7.27 $0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 $0.00 $46.62 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 WAGON DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 WASTE WATER PUMP OPERATOR 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 WATER METER INSTALLER 09/01/2011 $41.93 $9.32 $13.29 $0.00 $64.54 PLUMBERS & GA SFITTERS LOCAL 12 (Local 138) 03/01/2012 $42.73 $9.32 $13.29 $0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage ofthe pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L c. 23, ss. 11E -11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I I&I IL All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 56 of 56 SPR Central Register General Contract Submit Confirmation StatePublications and Regulations 1/Villiarn Francis Calvin, secretary of the Commonwealth Page 1 of 2 http://www.sec.state.ma.us/sprpublieforms/GCSubmitConfirmation.asi)x?ID=71227 1/4/2012 Feedback The following General Contract submission was successfully received. Planned date of publish is 1/18/2012 Awarding Agency Agency Name and Address: Town of North Andover 120 Main Street North Andover, MA 01845 Project Number: Estimated Cost: $30,000 Contractor Qualification: Required for DCAM contracts over $100,000, Massachusetts Highway contracts over $50,000. Contact Information Lame: IlRay Santilli, Assistant Town Manager Phone: 978-688-9516 Fax 978-688-9556 Email Address: rsantilli(atownofnorthandover.com Notify email address listed when final publish date assigned. Contract Information Project: Plans/Specifications Available: Place, date and time General Bid Deadline*: Sub Bid Deadline: Sub Bid Categories: —IF— Town is seeking qualified contractor to perform pavement reclamation and grading for the Department of Public Works The complete Invitation for Bids document will be available on Wednesday, January 18, 2012 at 11:00 a.m. at www.townofnorthandover.com by clicking on 'Available Bids, Quotes and Proposals' 02/09/2012 Time 2:00 p.m. Time Additional Information This page can be printed for your records. http://www.sec.state.ma.us/sprpublieforms/GCSubmitConfirmation.asi)x?ID=71227 1/4/2012 Santilli, Ray From: REGS@sec. state. ma. us Sent: Wednesday, January 04, 2012 3:49 PM To: Santilli, Ray Subject: Publish Date Assigned for General Contracts A publish date of 1/18/12 has been assigned to your General Contracts submission with description of. Town is seeking qualified contractor to perform pavement reclamation and grading for the Department of Public Works. Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20120106-009 for future inquires. Request another official Wage Schedule http://prevailingwage.detma.org/WageRequest.aspx?wr=121 1/6/2012 Request Official Wage Schedule rVbe. bib Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20120113-020 for future inquires. Request another official Wage Schedule http://prevailinp,wa2e.detma.orv-/Wav-eReciuest.asDx?wr=121&AsnxAutoDeteetCookieSun.__ 1/13/2012 r O N L_ z C M . ;�_ b [_ W = u W. 41 ya � m - N _ ` y- o 6o "' O�en ^ � ma- 'i t0 (n .n - c� oro�o c` tmv _ o>'s - oc 00 'a, y ym s- c�c�momm ` Sui .� ii �. ,o Z=. . o =� cM a..=en mot°,' 3 P' 0.- ".Zr > U oM ¢¢sv yN >6 - cr o ` o m ism c.� �_ o Q N a I 00 y!5 mw Owom m a`ai m'LLa4 t '-2 d O �=gz�8 � W cmo'n - �� MEe -s w\`»o OcE o mac- ern._ .- aL�ci ".am - �.orn Q _Uv~i mm cy c>_ " NQv 62m H �U ^ 1..� ,b .- --.'C_[U o oo2 awF U_ x'. y v O a = - FL o•p-_0 �!='LL2OaFU�C m_2 c Co �� to ¢ c o - U � .`-o U M of c mmm U - � a'< T - N _ ` y- o 6o "' O�en ^ � ma- 'i t0 (n .n - c� oro�o '- � y= - y ym s- c�c�momm M Otn�C)>, O -a _ ui .o n.6 "m - E � d d.Mm z �' N � LL Esou=y^o -=.n = - L6 E - m � ^- 3�Em i'" nM o€�a c y'-iOm "i c Ig 0,em aE _°_ -m �- moo- > 0-yO 3- te- d zaiy -yW, - co26H _-- y= O 203 v f�O nz - yHWy-_GU m -mo � oom .z�L�o'- o gs �>+ .ias3 m USF QO v M oF. z�ALULLO zoo 30 o oo2 �z W Q c6UOa'> o)3rC IZ woZC nW.yO�mmcc yorom~moo Em eIn-v mL e_ Q FL o•p-_0 �!='LL2OaFU�C m_2 c Co �� Cn Q SS.w o c o ooC � 'anm m m . J Nc iY-Z"a s lO O,aai� CM- Wo >$ m o co - � Zoo- m My= = �F-� ``4.-E.tit-' � zCn W Q d cd as O roNN7fAro aV7CC>+N -0 C6 Cm 0) N- roCC aC:Y ma me NNCeN, .Lm C>,a a0N N C W am 2 v .c roe canm `"d VG.-000LuNs>,*: 3:�paN m� ala) Q ° �- C oN�p�'°p>moCo$00 o�t'd��>°cmy�p�� Wo y.'¢ c3Q O O C ml6 mj�7N N7U n 3E053E.cm d0 mp LL O r0U ->,L OJ t'mn N roZ LZ�CmOLO aNN•�O W� '`OO E v¢ O L o$ o�c a7oo3 roasmom� cV O . ¢ I° na)Ne of `o cc6) N acc_ N o S oao - OfpFLL V a0 'C aD a- �--Ua)°NL.6- T0,4:r m2'7-' N~NN� cm OC' N W Ci (W.i am Nam. C0°i��'°api{'.EU C m o n= N O.m C as f7 N'O Uc f�6 NM F -° O Of' w NOOa OU7:0 mrLNa 7 �m�L n'-' as NO F do NO Nm` yr `-03Na) NZ'N N'-00`7md�N m U° a2M E ° ¢ U - J> x >- C NI�Or� Til O Oaf` m Lir m E U O c «N y J�Fx mF - E Ci c aa) a.o \-0 mr O'Or pro LU•� a0 6)L N!" ' -.inJFOJ0amO)NtoVFLDm <Ia),Soc TaENNV7rOrVWOCm0~07...Om m00a F NNa mCY C.N _0 a7 -QOmma a~ �N o L 0 C w _ N._ >,m m 7 .a- W¢ �U C' E c� Cm �_ d= TN C 2' C W _.. a?V�N OtnO�WXZri+' �027dN �05NCML m_OmL N'�N m�ro�'C Q 7 2ONrom 3N�LL OF NLL .c05NQ 6jro�'>NUcu 7OmE���C �E�•-•y0C `O am 4«m U m 3 JLLOTmQ�ZWOcEL TaU UNr OU�riE�y �� N.L CmN OOa C2c, N 'U � O Old m NoU ofmaN >O- O 05tH O ror =O-Zw O O x m a o `o U S F o n N �� a _ > y c o 7 m o mOC Z N m Z > Q ami m y m.- m E �" 0 c 7 O m °>'L o ZV-Ga 'a0 �NLLV ComOn °m cCaCZ c°`° ma E U o m c i6 ro 0-�m 2` O� lEtl OUGZO 2 E'wu) rna7CC-omc°lI Z'l°6)'2zE aS _d�md c>. m omLLo7 <W ZZ r' m d- - O a¢ Z x E N - Y 0 Q O L m a m> ro` d ro a O m m d >,C d 0 r>,C u) m L O 1p O m fa to x 0 ro (a 24 Z W U w Y aN J Q O L m ro C m _ N y m m p y ca N j a) m 2 c E- a) G=° ry N >,:0 Y Q O w'�m fyWWv) (oomsoVa�c�QtUctno�o�onmo3rmoLp ' oo`°��Ec a«oi��u�'►c N �vyig� ¢ =zooi�ooma�onhrn 0°).c°- 40"a4)-2°ELm,3`�m8n...m m -. �axFm Mtn O d-Owm2w�ya a)0-0 NN��EmcmiomcmLNC2��ro 0a ¢ O Ncu ym°Omi>1 ir0)o E oc°�aL'Z7� ro �°-%wwcN a 02P LU F O"tm0 ro mSTaCE eor•-mN C COEe-L WILD m CM a J aO m`CNN c6 m,_,aOC°jam c m�,°fn C��.3 ^-'Oyyr' d) r-Zz m O - O d m m'0 NL `p N 0 ro 0 7 0 3: .-- C f60._ O.d3r a)dZ w C m.2 o m- TN m aro--O C 7 C >,u) n'N m• -y my N 70 w.y- C.i O Z and c;; 7�RC'3Y -°CO cEd 0-82 C�.T roM>-. r_7ia C.L-. jFCw x W w Ea.-QOcErorn>�� Uy•-m��0'-7ro .-mro- 7.0 t•C�N.. - C=') -C ¢ � H c m 7 07 c° 7 m >,a•°) `8'Fa t°) �'0 0.'C 3 mr O oCU �'o)� I F 0 f� F°m m c °)wU., t7n cmi o aCiLL dL.« N oL m c m E TCL E= L7Z59 y 3 0 `o o,.� �'= y� N = C. y •-ro6, ;,' mmol n0 7a ocm°a m mm 0p>Em=Nn°=romO�N=Nw0ZC., :1c0C Taa))3L2'x d oc¢mUww > 3a1�Ea)6. oEro�`oU: -IID[ r ru no[ �coo)�a30toE3aooE no>,oQo�Emao`oon UroQ ril 16- '3._ag Q ¢I 0) N C•-•«a•�•� m E�Y`-CO>°>apiai F ZFZO C 'y >,'C - WQW�Ho c ccm"cl ca` C m NO m0 oO Ion LL 0> X JCQC)Ycoomm t m2�OW� 3NoaE7.L cV o Oa y ym s- c�c�momm M Otn�C)>, O -a _ O ZJ_O - > m m-0 O v 03: nEmma= - OnccOcco ro °"O)y.7-. C°jN~ O� Oz maa'-E C_ -L d _ }QQWQ C N aMr alio m6d ay 000� JWGJ�NO^jN�ON - r O O oYTFLL ayi a)6$d�Op3 .�.. m O L•L••= c ?_'Z' O w�yya`,o W�VaaUO�w «rompQ dOaW ci/)am�CNnL °i"m �Gc\u C ror _O OJmmOT 7 y,m.,NrfmO OL w 2� C -d `o _L)m UN m _°_ -m �- moo- > JLL C mQ� F. m'O•- ro x y m' N E 3VQpmN�n?wW«NCmLLa05 Oa�roNC E U' 2 lLLZ o nor N -OWN70 COasEU N CNa)E2 Y.-i"Ua,U Za ¢Z �d ECD. TJ c dB1 W00 a)N 7°L-na •WOtoW Z2 ->'N Um>,�Oro �NFaaLL y O y0>'000Fe� =�na y c o'm�e_ �� .5 E= C) d o Nn D.t.. fa W O - 0) W o m 0Q=F--- -O c� NiaOU¢ N n•N0r2Q N - N:- ` aZ -a E� 3m0 F anac'o c ro 700�Q C� C)� ro d e C� Z a z O L ° a) _Z_r « y N N U 2•` N - o�' - USF QO m C J ZLL = z�ALULLO zoo 30 y ¢m ro a� j Na'Fa o C jO}W b> o03ndYt W Q c6UOa'> o)3rC IZ woZC nW.yO�mmcc yorom~moo C I w o'm t O.w FL o•p-_0 �!='LL2OaFU�C m_2 c Co �� n)n...L-.. p)Tyc3 FFQQOQ m y 7 3 a E En �❑ F L W FN Lo2ZUQ 0)--L Q) C-0 C Min C.T N'a .y-No`p �YNOC WOE 05 W WW2 7 cmo.-a m0 >, O ?7 Uf> >C_ammo Cno>a) E04)2 p7 OdE9Nmc c2a Oy oN.0 Vl anI O° U. OFyF r0rz w ==�W2rnca aoi c $QMp tmi oc_nm. Eo'- 6) 'D- L:=> m T� o- y d W,nL NU F.x 7JOm �)z _roQ2W-•Oro UE m'L."Y yONH�U NCL�C YU-0�3:-@ me O Cd -0 F tml7 °». cF0 o xOFgLL ro'a mM C c0 `O'er' m O 0-.0 fC y N y m m Nn 5 2 0 oN 0`) QyWUUU a'UOQ-aNF -0 tEaZ N U �N O- m0c c, EN j O O C m C r0 N c U «. � � N � � oM 2'05UN W=ay�y WQ Nu.�cWZO>U�cNZ°m Xa ccaNwoU-o�cy cEEoD 3n aW mm�mE o C. O OO m OOaWW QMmm°)ro Nm U>fD Omroocaam c�yrLcoO7m�05croL - MCA,, ON NUWa m�'f6=WWNQ.-L_' N o 7 W LL y�'yL OEOy� mUm7>,-°OL m'�mm _�30~ �N > _ c ' m._ G c Cit m ¢mc03�FLLIOo 3« y->�d m7 �'a ro 2a m C ro c CTa= � f/ia) J N i� 2a N 0.2- N'- _ N N 02 F tii O VUcWLL2w 0C3., L>>7o��oYcCo�7NO7ood7E arra m C) 2 > o OY._ c-2'd.._C7QU m� c ro m af6 pUT- C o 0 7 mjYU ro v� N E cn O JZcca �'� rmf>a axo7 cmm TN oomEU c _a r� 9wEzE'ol jwm'=" n28'6roy�'m!0)0. _0= �a'oam)mT 33�or t° OOE: 2 iN m m 0 O m-- m O- d F CUtnwUQ C c$ $,= E rnOw NL o O)r m o E oQ o >,am `o 0 > vUZ Uw E 6, 2'� cr `o',oma m c� a) o r- Cc -_a)- o 3 m d)m m 3 aai r c `oc d a) o c 0 f36na) � ao fb 7� ayU mLO 0 000p p'^O�In Yr Q d y 7 N t -'-L mNJ 00a �° rodd ma CJ t:�NOO -U y E y2't mO >' t-- y�-• nym�-•L �..y M Uc NQ OC NOm N n mr � a`) N 2'rj p y ro .- 3 c 2 d L n fxi m y `� m o c >, ° 3 N c •o ° o o I m Ua N ro m 0 roIO N .O dM N :p > E n Cr2 7-=. U) m N C T L N roc O d> Ofn 7n .0 InUOM' m>'a) 0000. cEmy°'S-:E �y�mF�'N =ro�o3= `onE�cO'o NNoo wroQnr W C m°^YYi.•L•'-n CL 7 yn ;6z .E' L_ O N N 'O V m m m m yN EQU C�In I. F-YoUr_,COE0LLOO O -E, U)NLL>dNLC'CmC7No j c_0o0)c N�a7NN0.0�� dQyayLLO IZ7 Fa- aai \a mm o Ca acorn m cti N tauE 7-`oLfrn 16 r roOn' _E CS 0 3 c N Nr ma N=o y o c oc'm t.W:t 0.-M CYa min N°Oram OOQ 0-o 2yCCr 6)°7 y U aNE OZ:E NyC N-� .0 0) a) mm OUC(-° W'.4-dNOJro Oa0. Oro m a co co ro N IO a c �y C L y°EO N 0) x fcaocmcc05 O> U YNNy'�r 8U° 3om - JQ C aE¢� �O- X m� 6i fora m�F CN -0 y 0 Na p o m °) cmi E o >,m y y 7n ac pLL N N . 0Z N W U.° -mmU•,aj-)rm`°Z'C� N°=NeL-rOd�L�CNNE>,°cLi - WN'TU.y--fy60`)cea 6a U)-o0m' o��° z- ¢ d NaL 0)ro't' mL.-OpLL 7 ro LL mUW CO mr Z.0 05 N N =U 6i a L N ^c 3a y E is 1- m N 3 ro v3wt O. zor37'- 00) M_ Ln LV)+^'OOmcaamE mndUN c6 Cmyp`L a)U LLroLL 00 UN pOMUt_ mNr NNN .O Cr ')p cc W= ENV1 N m CD 0) om¢� �_to o c3Y._y LL3mm mm�omo 3al'nOEicy7>c oy.0 Maa))I �W- W ¢ 0 nor �e"E _ X cfa Lo I_ c c N N opo pro m y Q U) 7 - a m CL y J 0>'67 �'U m NU c m m y E N J ro� U a� C� mC o� ��� LC•jc aC C�a ^` O _050 N m N m NL N 2 vai3Yo7 mmN ��dW H U de nLlny0an6NNm�E OMNyjc N0)60 OaNOc-wt: i67 cma U > m O m 3 e X m O O U) mUo e ° m rn� (.0 .=- - C N a' p m2 c C•ea_) -0= 0 2 EMQ 0 mY o ° E 3.N ma otm m a rno � E ai=F W N LLx---Z±QON'a ymC7 UL Oro 20)tnmc(0 InMr 'OO°o> NCy lO UZ V UNNF- . LUZC a) U) `°"E"NN� yW=Ca•�Nc .O NN�°�m Nmc yEc� Oy -.a T6 C SYN jCpo L n a pC NW�oyNaC N2U pE)L NV'in •Oa NOO>,.L..,�ac6LCNmc �CmmO-SNL UL •0:0.0 2p"OaC_ CO'�d F CLL3L mU a)i6 ma N N -.N 70 O cc yLL z ov ° c rn.NZ nd .D m -, 'c� yC y N m n'fo 3L cmi'a f6 'C� N ¢o Ora 73U•�ai 7•° a7UN Ulm 7cnc°-m '>osE ya051605r-n `lr yaac6mr 6)N 'C.)Om O=arL 05 wO-0 a•cy mVrolN '-aacnx7NdNO Um6w(D NN�U C ona-cZ EC - ca ow(wa 0) �U>,N=M O.0050•p-_N no (aaNc mCL-O•�--�.c•�m NYU n'�'_m - L' LO'n MOp�-•O yQ'C LLXaO.30n NaUOmmo. Uoro )NO me ome'UOa OOnL^o_° a+y, a�� F_r O•C fD w.ao _Q O mYaaMy.m- Nro.oE ymiEm2pdaw=°cw.Cycy - 3L°raciromm myymoT7o-cC.2 w�nN-22Y�Ernc=_ro$ 'mam0 g2°:>�L3mEcc600�aonN�p)� E�oE�-�'NU��o)�amor°-mo Uc C >,O O yF O U 3 EUL 0)_- C aYLL r-.0 O« d� Nn N a-5 ro N a�mm N y o Om a) Nww N cin x,'2 m :3 '5 mz f' Fro>mmmromL 21 N '0+_' LroOO 2EZ m`L-'c°o dmm°Emro�Er CNN c c N LL° m�mMUNNyZYO z(D0) �cc�LmELmo�a..o>y-O°purl�?�cmLL>�c�omv-�rnL_`�my�cO n�a�j 2aZcccn Zr6)isc`E'=m°mc2°13oSaroCuLa-EcO�ccaLccZNyE�N=Cmn`o C w3:Laa=_,La_•C�Cacm6o >10) m N° °a UL m N (DE aa y- ° m N- y N O p m N N y m m y °'Cj E2�YF N O C 8. EL_U'j y m'C -M'*0 °° rnmrNLL'OOF_ N y 6) c 'L' C °-ya mr c•U N -.L-•-°1002 p E� CC C 0- 05 0 J pL-- °000rocamOMC E N N d=L O mro05a)Cfa'Cmmyy c l6 -Id cFQLm mit OCU V'C EalloQQmn�N)nro ? OO-3UnMmQoov)03ma `m N mEm`oN L)2 E3L) -ro Z�-- yM -&j �.c _C O y Ca �Na dd0)dN jmc T td cd 6�,L -om -Z i6"'CO Na7C -Z- N o � '-- . W . N WF cy�, dL NVa a m>,maa m --- O L ON a CO a - dOmdN t>_� �' m m m3' -d tC EUL O d� L3 dam• U C m C U LU CON EdQ m' --C Na E>LC Cm ON•8j «• fA lU 7C N(D >.- N _ E _: a °1 U i0 N N r� 3 =L.. C7 L m y ..- U« y p .G O 4= ._ d m C ._ m ._ C> roC O C C r E d C m d O •- _ m U N roe•' - W � c ui � y ess � O J '- C C_ f, >� 3- .` «- n O L s d m C y ro n 7 L 7 �a `� y e- m m E ._ >+ ` is ro CZ m m E O c C C 2Z ro Tcr E m d'- m m _ N° a yLL ooEo Lo _ _ E BYO) y __ aim COQ ONmmT yU dd Om i"' m N O` `c O�c y Ey yE•- W t: (n7 mo m -0 p Y a3 m N Om•- L CN c co v J ,� o� v a c O F O ro a n N n o m O m 2= O)�i' C 2 M W «• c6 m -0 CD .- -- W- y O a m y ro C N n 3 L m N'C moo C m a Cr ro ro oaa m am Ea C y- 7 m rn�'a m tiO v y co Z «. °.SO d1r 7 L ro 7.- C d n E 3 a m d V OQ-LO2Lf0 E ca N O m d O w� U C° Un m U c `-rO Na d O U U E fa y O m •p -c da m m m n Td U° rot: a 0 U m .��Qv6 m cyp E°y'N " - n dOLf 7 Oa =2)" U U n >, dNr N: -)n �. OUL mrm �� LCN> m dX« nmU-p d _dOi -d-m O'er -do L >,-Z V �- N - n o 0o NmNEo Y m oe d 0) L'3 giro N a emm roa)3 ammo 0 a=" g ccE -- o W m p 6)aUU y�•'-E O >w a) 0.- ro •c ml. cdU� °3 O mn=_'Oror 2 ca'a-x Or 02 -Nm .tea-. m Ud _ N°a cnm t0 mem 06�.-•-"O ro>, `,� W = c..) z o W . l Cn > o' c.; << = a N ;,a N as c •° L c n c >. r y as o m o 3 a a ti 't E L.. i 3 `o '- m w d" m 3 r c« y o O o o`� cM o._o jyN a•- Cfq L Ci CSN L OCO O'>vm N O C7a V)N° Q W C_rod,�,�..-mCV'O •OyQU•--rLc •Om m pinC.""U ro n O �yNlCdyc -N CtA El' -oma, ¢ =J.ay - _ o- rnm �� ' a d N m of m m o m 7 �d m ro M m d$ 3 c Q m o 6i NL p cro o o� c p ro p)o vn o m y a fD m'oL:-- ro >, d o` O U -o 0 y O;oHrn E E-� y 'E _ iso a>i F cpy n 'O mr ccO >` L l6 y mN c�6M0°° O� y0 CEZ1M a Nm in P92 Co_ 'O a F 4105°c UON OdL-23Er O ro 7 otS3U cr >,r EAd ddmt'N'.-n dj +'L O U mLL� �[ oo ori `m 3=� o� `m.mm zr __ U ZZ p� C 3:= cm >, 7nm od dc1�N Cj a c �= SW a_ E -a) '= y" cm Y:t--C UW J•� a o 3 =en> O F m m o� m d L -'c O y C E N m d N d U UrnQ O o= ,c yin C d ..t. Uy OMN E" N N L M N 7 a WNNd y E C U mm 00NroC U t=m_ J Xo - O .Cn .' z .Q u7 ��^ W ( O 7Z N N O C OLa L E c C N U N._ U U ror C_ ui M y- - aN O C y H L) U m ro Nw y (a J As my -- �� o^ trn m fn Oy c y y nm = O C n �•� d O ro'rn mC O> N m "y O -w d L 3 y C m dr E p E UM XCn ro O o m 7 E._ ro.,- m m O 2•- O �L 7 N -5 c 0 2 m a) c Oo N o or _� C 0 3 O 7 O m an d a 7 3'- U- U o d 7 W y c0? .� y "woo O y L O O y m_ .O _R ro,_ w �- (,�j O Y WC7 2.c CV -N N c fn mN C•- N O F- m� Lx N` J C15.� EaF-m `�- o v v, v FF � C Oi6L ym3 >°•-'GaCm CL.G1OC o a) .- aro C x C}U ro- X6032 a m W f0 N C m N CC E a) Umm N d morn o mrN vent Mc y.o t 3^ e, Cj m - - p ov_� F Z O.¢ y O N d m _ y >,3 7 ro 2 d E a e y N... O N aM a 7a `10 Q� IT: C U C y a a n m._ N- m ro_ W 3 N c O O 7- ro N ro y C m s+ m� N'- c O T N O C� N._ y._ m O d N '.049 -Waw mo , *�� Nay w w d a CC d �a d d E LO ' �- m EN�`� c O c ZZ L m 3^�� m c mro 7-- �'aia n Y opt mF m� aco 0 c 6- y _ C•�- E �N O m2 ro O. 69 0 3 c a J C U �-- O 2'd EO tp dYa y �� fCa 'c L d m CuL d 0 La, y N C OfmLL m y CSO w �. Q� c0 u�<n rn o - m ��.' N aa� N CV% p._ .L- ro m O C m d U O ro ¢L rd^- C �,� aNM Ur dt0 CO U O._.- m U J'0 ro 0 ma ca m ro c U a r U U N N m N OM -W C.0 _� m �o m U) F� Mn N aLN O - a) O C�VOdc QQ C._ mm m m>u�-o r O�m -o wy ¢ Y ¢ d`-'- md" p)r C7>+7 C.)C'07C a do m CE aOEn_ai2O ay6S N'- Md O m �Q Ii�oO arom7L a Na d ON m`mm dma. W C C .L-N"O- dF m �� Oy>�rom0 CUCmcoQ� Q m2N >Q yA¢� 'moo Z o.� .-: _� O 7 U C GIf7a Ur ron LCC Croyo•Co O �OdQ N EC-32aNE�'' 7 c 0>,l6 OZa dC C-0) a 3 Olma Cl. - W2 ¢m+`-•3 O CCNN �"_L LY CCmE Ver CX O EroEO�`oU m O°0007 Hd 2a oro N fn om cti- x �O O O OwcO9N Lm -0r ° 0) LO ° 7 O c d 000 a) CO m O�'� 7 J UaC >'an �' NO op -g Ec .0ErU OYmO-°N `°tba LNYc. O V'o NL orro �yLC mW 2 g� Y mw weft oZ .1 3: N "e mss ¢ E ` m �''- dt- p7 E `d y ' d , Fa ro d dt�'y 'fO px mgr C U F e -a U @ Nn d ca U Nam d -6 m oN = y o'Cm �e-� >.__ ov 3„ y Q men y m V OU O QLLF in 07 'L- c- m v U 3.. W oin Uo oU tn�av d m Q LL an d Y m>,L o- -o a Ew m ori i x awe `y O L o Q o "- - d' ]G � E y H e U 7 m' ._'C F" 7 L d > y'G N •� - E ro m 7 a O a f0 7 LL- C to E U a •p N la 0 C 0 0 0 a7 O m d 2' O O e Q O C O w-> ON ny Qoo o.y oa3 Q o QFC)>, m�ZammCctn°LC O�j0 pN30a ()�Odm G -m ILZ3�o0-7L p 3 cl` _ro dot° fJ �y0 U°N o U2 OUw�oNa 7 CI Cq,. a3�7 py cGo LL 3 N m7d E•�-�m� J-mU m ci �om o O U O a FO n« c m L C dC O. of "' d--''-' d U.-. °dy NCa 7'C CNC J Cm 'T C -O UN m ya Oa OAU .L. Glmw Z_-dQ aL O0) dL EJN dM Cm o C• y a>mci Z ti ��b y.2 - N Oy �. y m¢}._�^ ..«F .:O 0) 3N.p)N IC O.L..O N�'r-.�>,m FE'O L m� Oma CCC CddEd 3c 2'cnNC nG'am C III'.-= T 4. WO O�'�dOC WC7 N��U -O roG0 7= Wo Tc NY� -° C Qi7 '`K Urr dL yd Qm-m 050 �t�ym Q �°' Z>` Q"''m oZ� =.nm m CO) O a N amv «.70rorm d) 9 N mm e C dZO m0 m CI.. N O y 3 dm" Le- _ d 2• (A LZ d-()�- C NC OO CLL O m._ E ro y._ C C O ` O -0 O °" N••7 -O t" C O J moY OL .N N ro jar f6 m«_ 3t- W CU C O 3 c me, ro 7 O- ro L:O 2 N >,'cO OL _ 'E=sc_ CNm .-o = �y>< r'J'a2E aO-LLf,r dw.m>Ha `�=ELc f6 NOS roOiy Z d>«dd oO EO) n --S m� NFUE�-%O m N c6 m L ya,J ro 0W- -r� cOdm Y O .L -•E O` omroNmro tpOa `fro_ C UmmmYcNCN..-ry.-�E3L O� c ro O"_ roN aaN U >` O d O y Q as e d L d C C yQr m OZ a O a mC� Om.L-•'� 7 L L N >, N e 05 0 a N 2 ro--cn ,� L mro y oW e-C70-mOLL'm0. �U U J C 7 U L E F«N O$m y N3 O N N' E Z ro m--« «- d O m m E nc n� E e m daY o E E ere 6 fa 7 ron m a 3 a� m n C C yn O O� O C O }'._ ¢ LL m fn0 d em„ °FQ UL a)r O ror (`c an d CL m T a.. E Er- N- n L ° m F 53 as 2 5y m it nv mv`� O��w co C O NO U amc� c 7 m y n N L" ma ate._ m i6 aa_Q aW y M o ro F X ZCq1O Nrn3 O m m N ° y me d03 LL Crd Oai L mL N _ O� mere` NONr._ C C I m m d m N d 7 7'-- a U Y yv C d c C a C�,,, ro C m.� ono N �'p LLJLL m� d�z'� CaVJN oC ro a)OL•c7L C O- N ro U Z E E d E C d•Cb -Z c aU c a mn cN lu (� Ntn '-• pp d N i0�m:0 m C) C O .00 a° ro ro 05.00- p 7� ... O L ma d f6LU Cg ciao a o'C a0 J n 7 N C 7 y i a'-- 07 - - c `b d S. y y w L ,� 04, m E O nor LL Z CS -_ - a7 Y �' N m d« m a >`�6 « N'� a m O t m d d O D E n'y M= fD ._ Z >, C) E C n 3 0 E E E =p 7 ._ C 'm -0 2 N c a C ro L 0 N'e- m r �_ E °-L C C C r r 3 -7i 00 m m p c 05 Y m y U -° Y N a ro 'p yon .-� ma �a d Fn O FC« >, L nTm n.0 EoyGt=d COL->, .,-' mmm mm>, OF N nm roN 05U pCLC \O d mm E c T^ 7r OC Cmc� ° L7and U o mm tg=_yc am - mE y:�-o^ x�Zr m'- roL roE a o� n- >e- FdEro= c6 Sao wL o amL moa N Lo Ueay3 N �+'€U _ 6).NE �C/Op O OroL m� Odm""G CLj7C nm �'¢a.-F afO�m Fa> -Lr 7Na Ean xN d.,�mCS°OmL (a C O .L-. fa Qom' 00 °-mr' mmmwa.,3rr 310-0 y'O y 05.2 e -d cN dC L Oror Uf6�Gir�`p`aroC CC 3 iI� 'o o c `a�y NN ai.E o. FFa LL =04) �' ¢ aC7 L Ci p UGO-r.- d a F -m ya d d,�m dM« ro in Ci '_'""Oc Q -roy do O NC 7d�= Y•0U cd > '0Qm n L« m'N 7 Wcm� ^� .�..'-�� do 3o y.n c Jw n N w cOWOFCL d:... V!°' -'(C c"'3°L fu m«E W�� 7 6i r- >,Nao U- COy NN NmL N _ OCron O0� L .pmtn >,� d N > O a c U E Nmr y roo Cm rod N Cm O Nmrom L 677m O -C6 m v $ ytE�yE _ mc' ec��'Lo a W Ocoro C 2 C) F Eye, e-CmO d Ta yaaC•` d.+ m7 d Cro'-O �'`- d` eC Eato C'-' U Ld Hod Lmm2 e2,CO C ere- d ° O �y .03V -C6 NOS CM'C n Um0 aLt:c:-O oNcmD Qo_ ori �a� m - m«.tn �c�o WxFC`_Mtn m CZ-LLZLCodOrdnrdroe->+_Y�aC�U Mc4) C LAZE _ .!= EmtnNY LNGCmr O.c O -'- rod Cd C Or N 2 O m L'� 7 Oarofp Z`pEp N �a`p O 2C. . _ roy N _0200 �N O d mC O 00 c L OU O a10Qtn -0Z U- r f/i F O N y .-� v ._ m� yno�"-" Fa ••F O'-7 7 mm m C ZE c,� ° l6 "' d LQ� Nd -C Jl�w•yCOU ma m"'-yroE m mN O.>, Q LLmLd N 2OUC v en u'i s:$-2°626 m f=_mv x oe - m Zae O EONd >, �--Oy tae - -° t-.xN nU >, m'-y� t.) Cee _ N c Zo o- Oa aa) eE,rO a •aON� a ca yf°p mLc UYd LrY d CNL ro nwc, rno- �� o- X Or U 0e,, as a) O`O N cUC O O 00) N.- -�2' a° C� m O7 N yN•-L co d m °L roF L6Jn•--Omenn yam O 3 - cmm we °X'E Ny3m n��y 3 ma d�OaGdNnmLp -n0 Q= ncd' aeoT da TOYm3 EL md�+T•C00M._"` E'-33e•� C' -HON r h•- 2` UN a 72,:_. U Oyr YU ° 2'� e m �m EOr N aiZ F=�a O¢E���mo � mo>aYcmC - >i x'e= �pyuo-i3n Z ON Q Z -V -82=d. n eQ)-2 (D O C-« ori 7 U E Cta 05 0722 ONOroN L U 7 mr der a �rmeroa Emo Nw. IaL°NUa Oma NLS JE OL m=' OL yen LNa O OOin C N 2 ay m. c° N U Q7.-. °r m Oymt`n7 7 Nr dCro n y 0 ¢ E m--�"77iC .-. >, cN m��a p-�� Ea aa3p y�O9Nm 2d nF nC Nan QC yd W tiro mca 3 C m m NO C 707,... O m N -O o err-- O N m"' Oo jm .�� y ¢:o'a�as`�°�v O.w 0¢¢Ooa)C3ra aa)ma)'-L .-t. c d mOro'-mnOUy IACQr EC Oa OO N O N7 WxNn'p707•�4f3p.303ma'-ICO Ea Cc.-..!0m�cZCL3: MCN p7d �o� (yil 2Uo C Y ymm« 'E W.2 lz U `.0 -�U O Ey zy 2 Z 7n > yNrEN L' -'e- m y7 d N 4 ro� dE Z O U L a p d" nC7 Fa g. -y 2 m -O ,kms 5Ly,t Z rn �� pLp •= no2n �'m U oro y Q o y �� a yCS O d d m.- L n .- m O ¢�6L 2m y mF y c� d d'�.-- m y m E•- N;E-a O C) N a CS N-' m d m m UJ C 9f 7 d m -a m T._° c m- 3 m m d f6 N U E y dL .L -•Z aym oc cro ,n ��� �u7y�_ ?i"-ey- »C'mf6n C2Y 6)e7�y6)C NEm05d da)Ga .N O-0, pd NN- d CCro - dU O V'=LU aro'3p e' >2 >,LL2 Z5 :8 OYJT ir- cm N 05�NaciO fNape a 2a am mWW and Xa >.ddd N� m� >+ O Eo U O m % C Oa �+ m CLnL O��'a+•• U 3.-• 2 mN:O :_•mm qC _ >_0C N+_, d moa W yj�mJ nNpro yL am a"'c N yy om .,,E rn o' �2 : �-o o¢o2 �.Sm CS 2-- mNy Q -L Com' 3 Cr •¢gyp•- m dd�WO7 05'OC C d `1 y,p°yL V' -n a°7m ~---�� -7'0 OO a)m Cmddm OC._(d2Ca (C� m�,r dro COro it O.�'0Ud«dT m Cro - .§�,� a� "was O _ €moo Qv _ U O U N m roL N E�-O 0=•jr d W O oc.sr- CCSS y O -'_,>,O"„' m d C N f6r err C y m!' N a �' > me U a- CJ a C C ,n N C d L _w c.)�o oc `_6 p._ yo oy >.c m- LL a= '0 'O d m d L 2' OZ U Ce6 fj m idnV aOMV prontC y a3C>ONr c F-'ocd� ate' m c° OT °-°EL-•--O O ro 'O� m .Em o+-'UCn� °�"d^y d m�V Nz� N:e., c)F . . 5€ m n�o2 Cj ����' =yago= ZO mQ�m°eiammr emoo)` y EE•ga x me L` M = La _e_7EY- d3YnLm ¢e a) Y7e Cmc 7rY« p'>d yLL-y dy d Nd7 d;=. a p« LO 7E o« y of ro w.2 go mO. o dm 7 Lmm�- cDm ro �imoc LLo roc? �cd d m�� �y o _ �a� LLa �°s` �, zn �S O > c� 7cdfpO mo roT odcd mdic N taiLEE. amo OoM OMOaO a CpLLy taZ U n �' N ro> yd._mJ m Qm'- O- N aN 050 m m o g� cr, m 3 O=_ � E C7 L err C d - m y >, N r O a._ m- U�•' O m aWr c N�-• U(n m00 m m m«U L OdE 3 d =r a;� 3 r ,- n m m c O d d m- cn N'm L'= ry c0 L c6 d" -M•- c U •pL c mU v d O?- Z�rn .y- oL 'E4 0. �e� mn'- C7 •- U U C is .- a m O - y mar N x _ r a „yo o -o yo ��o oho, o a� ca a��d. F e C7 me ro>g�roda?eroa d)e ENf6 N c y e= 2 mdy =o' -a -m °a>mn�Li63 a7 �7 O«�v..0_cro U.- Lo6o•.7e_ o e7oeaeo N YEy7m y a�i'�o 7mee�+ CGm W I-- y � Ooa.y y� M Ovc, z. og,- vmoy �m3 a aQ ro�d'p'or W O 7>'v:,�O. W W-) {�'p [Ln p O mm"' Ly O dUCd Op7 C LCA C d yr._ N d G ddiC O ymO7 Or m,., N =; c- en "m yv �' o�+-' ° ro:- ap �'r C CZ2�n d0 U -O m a dm«, C m - i N d d C� On C m O y L O(nU ed. -L ,Md.U adLO. L s Owo O�� zpy•- mo ¢m > `Y' acDfny Ococ> F Nd� amNct>,QI a._NM O Cd - U _f6 in...d�3 yom�o._�y0� .�mcmm m �7YC7yCoaca OcEmc3_ ycr vy~�C m$ -7._E> m oOpC Gr:...�m <n �� oy «m °'E o_y� �o•� Y:.= Om y0 n° Y c m py c d Z_ U nC•- E T `- ro- roU N O a c O._ C a- N ._ a0 0 0o wy-c» ca .D= CD c.n-�vo$' r_jcaG7yc� V) yy r� U 7 d f0 U 7 C LO _ 'r _ OF U- T L _ ° L.0 E.-. dQ 7Q 0- dQ Er mr 2 Or« G m y. \ ,,y d O L. C p ,C@. '0 O U O n d '- d Cn U d d m C m 01 d N d to r Iloo m� c't �cm' Z'N cy, i- --& 'o o^y. _ ¢mma OyULCS t-~n>,O-Od07m L a�C 030 I M• O .i 9" imd dC7 '070 OroOLCNy-dL OLE I T�N�CLn."'Ip LtO �Z 3r UdaL En L 207 O«7d �OZL dL.-y roW-°OdLUCY� mr 7c C..+ o� m z` y Nm�_ a.n o''� v3=" mg F e F CLO >, 3« _ W V �c 3m7tneetnUaZaU.oQ>dmymmFd F 000E Or= F xOLroe.roF�O-cNm=r dMf6roCYT LLx CjmFeyaFQ"'a LCNm-m«.� C I en e� pQ na�cyi a7 zmw oe c��v, l_cn._rn3a, C7�O.� d Nm fU6 00 N I"' 4 ` LLLLLL W or•�- o y d N>' LSC roL UC yC m ere• -v `0d d dM d o o and -mom- mL�m y� M c s - & ct nmcm a0.E >,--04-=- 3 Z.21 w 903 W A t7$U3mtnm �m m 0-omEC a w �m?io3Y. ton.°yy3mv7U �m dOco y- CD - mar Eoc n3w3nFnoNm$�I tu ,nrno • Ow CCNmddmCY O m LL .L-.00 p--N-mc--°QL rjjUm E -"'v YAM Uaom=LLC.O_NL N O L7Eabcc�mco'>2,roaF�NE - _d, Id6"f�! QQrr'3cdocm. Y G m=_oE�' oroQa'cadU ti;;�m a r.��.=' rni?�E L"Mi U2cac•00Ex0a3 a) Q -'3UUtaYEd�>2 aom L - .-mm m N yc d N d+-• mU .:.0 _ z m 3 U a m o N Q m � N F y .12'p y L a C U U E NM m c y �- ti� V c O L m LL J_ .- >a� o m - ��m QN rn� rna= m mY m c. 2 m > roUOo cp a N y^ Q� �JO�L �.12 22 1. M -p O O ma gda)�cc.rr •._� Oc m Oo��.a»Ye T W _ '�" 3>,-0@04:32 2 d;- CSNrnadc�l°�L'cai--moo-�_n°i>ami Fo `� ¢ Eo-�� V/ 3oC700 Z=Z '. +. Niq dr« d« m i 7N ?J >,aF= mr 7 c!_ry roC Ma a my2i =ma.�'m C�>wT-r-- CL"■" �" 0 �mammtM�id t� `row -9>'< QN�UmEM°-°ymLm IaN J c.� 5 Od-.2rn `}NM. I -ti - = L JL 0.7 CNtaNw..d dNm Oa N.,-_S� aO3N�Cp Um a�QQ\ O o --m mi`-' ;. Cn sa��� ��o E ,�w.r� D'(A •z,d o� m�appo>,yN ��� NC. a°aY odV amN'C do om U) � � .�_L. TE Ld N�00r aNi �.�a ie '\r/ Zw N•ey-, .L 16N �r^�n7 O L �T WaL� �U UN N5 lON C C O m U C '��_ a�NM d��E = I�Op. W m A1r++ hof+ QzUro -7 _mmaommcoF- c7N U vlmo acima)�.'�poa�c Q fj Oir - CA m .....i OW.- mo m � O•I�L CO dam Z o 0) CaL m LN Ofn N'+, .-• � ON r ~.=>;a in o -m •moi cnUC2NU 4" YO Ea:TmV ID -L� W 00 p N 3 L.0 c C n U NO 0c 0) m� _ - N[+7 i` 2cn 3p .a VJ d ^V m!_ X L U I ¢ - m=n y O y mU mC m R N m_- 3Nm '~" a Qama0'=IO fla�my~Eril 3 zccm�'°'oMmr_Ec`)aO-occ I �� Na d m a E a cro _ C±- 3° o- m FF- ininr7� �, U)p o2N ate. (%No aI :� o N coo -* aacro 3 �Nj COca!�u`.NW da-Z3o>;�Z dam: ' E•8)OYma) c0 yq €m O C O d U€ N 2 y F L 7 E Or V N NfAUw j.2'. a N -� - _o ro E a •. 2 m . ori a �- m �'-U o ILpoCUo mTcLQ ZQ�Q 3�ULa tn� a, o4 c N 7 m m«C (0v 0 IL > � U 8 c .. -- Ca aUi 2 m m - _'o ")-i 0 -5 _2 O a W 'm aL N p N CO am E' 0 O m 5 p r 7 ro LU TQI- mQ d -ir =.L- ca m oro io C -M ()LLF NZOO ,� M2C.j W fa ro'-' at0 N O N NQ mN wGZL "s 6�N .a c -o roc;) C-0 ro craaN c orn ¢¢ UU Oro..- yaN.-UCm � 3O dmL y mN C Om :3 P.2 6220 m CL_ cLLNc� gm S2 rn��� L mIr'LO E c°) o°l o m= cr-a O Cn E N /� p NN,- C N N N zca.0 cra�Qro:co'E3:." N cc, ' � a OLE C 2 C a) U) _j ECD CL2 41C cNa)N`pc G.NL�amc MC-NRIE EN as m? a y m=m o oc P 3 LL y >-m O =am rn Z oya O��m -i o'a'cm N__y mUa m y 3o>m c c v.9m Cm TO _ E rn � U � ¢ m t0 E LLS 3yo O1 Cr Enm ¢ H- NC^ v.;v c�'J Y'E - -�3a E �cn._ Uma _ Q m- t°.b E U G rn m y g OU O 2 m m H m V Z` M m _ rn U m - c:) mrnrn ¢ U 69 2i ac - c�¢ o.3m Ccz 2M ¢ Q ym Zmrn o Eco m - o >3 v `0 �m 3.cN ~ o rn > S v 2 y o Q t o N ¢ c m o c car Ec C 1- `O w . m C .m Y Y in j SJ N O m aD �m #� a'� z._ 5-- E r u� �a aci mimeo ai cn� o o_ <n m m_ 3 ~_2- Hca dm pm Simi �°:rn >`oS ��'� o.W tUoE m m`�° E. m3m Ems Oo a'tO myd. Eny� -mo jSm 3rn �� p�ro-� m y� > o a�M tz �m >✓m m c�cE 3m zrn E`nm5 o S oom s _ Eocon E CA > am - �m y_•co wN ? _ om'. m -o o' - y 'n F-U,cJ� ¢�'v .�c = o y - � �5 m o� M w E yet c� o E m t mrn o¢ y Zd T p u a a'� �' _ z E ova ti>-ui m N� m �$ c', n m5 � ci m 6FD L6 w- 3 m Z �^ m E c�L y m Z o, 23 _-- W'm l-� a cWr.n - �Z? U � 00 0._= ma �i use O` Q Nm - Zrn mc-, ..O U' m H>mr"' om- '2� of mc=a cm.. o� 9 U j W rn- m cci in v, o Ecom o- m ay' zm T ��'= aY _ d (22 Lu m w - 2 t �� N c mo ^ ¢cn' O m N.. om o' C7a o'..n c`� a p �c� �' E cm.� E�a=i Q- ¢ a n> �m.i = m5. m.c .o an a`� ¢ o o °' E �a o m'y- _ i.o�m C oN� x o �w z+✓ -.E L7 mm 3 y 3 3 o U' - ¢�'U� # c ¢ °��' 00 F y mz� moi° o� °�'� c=.�� d m d z�� vim wo c -j m 3 m -mo N W e � O - a o, m v d> -c) x a c.� a s J¢w`rv' a 3 m oom m _ m `J" ow O o- J z2i °' o 'E o m m c a y m=m Ups O M d = v Z oya m m^ - -i o'a'cm N__y mUa m W o-n'oa �0 pdtim i:- A E Nm y m 3.9 �_- ob O m U 3 _ E rn � U � ¢ m t0 E pY' rn ¢¢mac m a If -W m�E O1 Cr Enm ¢ H- Q �� E N U.�rn - -�3a E �cn._ Uma _ Q m- t°.b E -M G rn m m=ma"yi -(3"'Q O 2 m m H m V Z` M m _ rn a a c`y Ups S'y oo' yi'am O M mm IV ¢ V O y Qym aayt d2U y- 3: a O _ ¢ �� ai O ¢ d c Z - TU _ - C) a ti pL t -a O rn � U � ¢ m t0 E U d L7 O m Y w^ cm oda E J c` "a M ` " m cm •'o-m on Hc' -- 0D =m¢> m=m O oW 3°° to ~a� E - C:)H ^ U} NO O mac m C W s0 Q �� ° Em r m 3 ma0 �. LCA m a m w G rn Y .°�' o zEm/���� a Ea"am a E �, m ro -(3"'Q O 2 m m H m V Z` M m _ rn �S - c:) mrnrn °°>m mmrLrn - Ccz 2M ¢ Q ym Zmrn N`- N _ E 3 m E y� CD a crn Z. o >3 v `0 �m 3.cN E `2c" UW ny-N - - O y3 ci `5 �¢ o W .1 Q E ¢> E E d o rime- ~Y 00 E m v! U p Qw> m o �EE z¢OD UNQ' cOm O v�^W O m Y w^ cm oda E m m c` ` M ` " m cm •'o-m on Hc' -- 0D =m¢> m=m O oW 3°° to ~a� E - d m� J a o ¢ @m B -m >- N W Z= cUOD -� - E F N m do. �m W m O m t `mY gym c ��M ZEm•p�p ma0 �' 3= ^-• .t Y o o f c�= mmn a Ea"am a E �, m ro = m c� c w ai vi EA om O T m _ rn C o.«=m of WF a 0D Z r.;m Z'- m ~ ` r wino O Z.m �._� Ywd W o' - 2y cD zmo J.�_ Qpm J � - a, a��• Q ym Zmrn N`- N _ E 3 m E y� CD a crn Z. o >3 v `0 �m 3.cN E `2c" UW ny-N - - O y3 ci `5 �¢ o W .1 Q E ¢> E E d o rime- ~Y 00 E m v! U p y(mn O -Y W C ..m ca o UNQ' YN v�^W Cap NanT�m m y m o �.,¢ (n 1p LY _ ga`�� do Vro ^r �JO NNo O m a c� E -o .O .' m N OU >^ E ..vy'v o'�m D c ao ai c to 3 76 cm •'o-m on Hc' -- 0D =m¢> m O a Lu- o Orn Oi M oc L9 cDcv Zs'aU o •" O m t S m� U U¢ c �� O e �N m �M -Z aim W - am y U m 4] Z ¢a O.e o `m ¢ Ev ¢ om aL«, vuoi f>mo W . O¢ m J= om � w g•} O � g Y�= ¢ > m� °' mss U Y w - C O O o c� r. O N = -o .O .' m N OU >^ E ..vy'v o'�m D c ao ai c to 3 76 3= m U c m Y c O M o - 'O c y ry 0- - - m< W - m d c?O C Em O _ m M oc L9 E co O jar a`� m 'O c 00 �.0� -�'E ,E O C CO CL - N.0 0 'a-�'co ` �m'mm`� m �M Em d _ -r _ is 0'n' .-_S �'O a`. tam^ 3 m 3`n - Cn E�jo N NN O¢ - m� U o �mEm vs 4f > >o �rn _ m Up moN nett m� °' mss - - wet v Otm o N`- N _ E 3 m E y� CD a crn ss O oY o >3 v `0 �m 3.cN E `2c" UW ny-N - - O y3 ci Y N�`O-~ a 3 �'' o^ Q�ro I -U ¢om Pimmfns �¢ d o rime- ~Y 00 E m v! U p y(mn O -Y W C ..m ca o UNQ' YN v�^W Cap NanT�m m y m o �.,¢ (n 1p LY _ ga`�� do Vro ^r �JO NNo Nd,.- w y.> o 0 0 oo vY =Om - mo �mm `2 (n 69N 12 Y o mem -Oo d'- m C70� T >m- h>✓� N O LAS C>> -OmN cz Ems' ow a'Q' vet r in rna`� •- o �2 - °y' Z5 ;° am Amo cco�m - m33y� - w y L �- ¢ m o mm•� w acv Y rn� rn mm ^ 3r Via_ am 'bs e N._. o'90 z-o� m�Y o omm o y� mus= N o Q c� w«.o >>�' m ��� »v .n rev 3 E �U LO 0 Z 6H t v morn OV �� �¢-o - - £Em - mci oL�mmm O w - �'Oo o d oom m ma= in mcg V_o m moU ¢moo >m "oma m o'm'O" _ z�,m >-^ ¢oma U J> J`3 Q %- msm mv� �j am om �9 oo v¢it o> �Clfi� O o Om¢ N mom z g mE "m o�y 3 =o Eo otm z a'a 3 m O w o E mrn W mcJ W x dr \ Q c m o y o Y a v °_' vcn - - ¢'i -Q U >� aNw cOiv Y c^ 2 d^ co=m ¢� 0 a -7O d tnU `o OE m 2 V a' i- -'ot'o cn+-'cnm 3 y o -3 5 >- mo cam' o o� - oL o= E va¢ y � �tN }� a E^ m 2i Oi ci3 ~ =oui ^i» o.c cN > maw �m� Q�dN �M ov:: O-�^�`.0=a tf po.� W s c col t- `o. �o� m E o LN o'n n =oo o v mom > - ¢ ¢o:c arms -3rn - wymv mo u�oo moo `c -col mt« o a Amo o co3` a ¢ - m _ mrn o m ¢ ¢ x �Y wet o f O " o om ��E ��cam paroi�mrn zE O�� _ ¢�^'o ¢Emm odmt `mm ¢my W a' o^vJ mmd oom oo'a Yo�voi�dmc Uo`mc9mm� o03 Ornp_ t mcMs nig 4- - E� O_O>tO"o�dE o c y F- am H zQU Qcn m 2o.0 w a'c`i - `o y .w.a2ui.. pEE F- p 4a c" E m ao pUEU Oma O F- Q> �_ y d J mU m=E W W ani o v F—� mY� `>� zom YLus 'ret m zNm3: coo o O o c��ma O^ mm c�oLQ am u3 aEo �-�� Yp from aci LD N O aEi O m� C= �C' m vet Z C.3 '�� �c ov usr hoar O'°'o N aci - mW ' cm."`n - us yet mcri OSay 1.^ ^ mo a��'Tm E o am Yom mrncm °1pN £ 00 �rn m am 75c�� LL crn y� oN 'mo co m^o - o ai col E m� o_am Ngo vim E -"N iO -- L nci _ m om �-' Dov - riM w�v oao W y xo�Nm �xo roi' EDa rn om o'"Wr mdmrn N �o °'mo -- ��^ mom om yL m c- o_o °'. gym Eam aEi - mo -75+ u ��m m,.;v F- dm a`tm =m cc°ym >E"' Etio -mm E'Em mN�� a I '' Yin m� m- - m Uo ai m �rn ac.53 :E Y mo o� mom Ze m E � Ev c m >� c o'> E c m m� m C C � off - mU m - U O ¢ _ m r�o m m _ � - Y U d m m 3 3 ._ �� L Y y a ~ m vi Lm c U o' E aioc`3 am Y.m.-i» my . = m �yv Nm meta C/�,_m am� iEm gmoE ���m �'tiJ am dm .-om ¢U m�o0 r"jy am yon m w d� rns o M aim n d� y -°'m m Eo v a `o' ds naca.� Ea aiom w� c �:E m - w �ii2 ti ai E'm d d N'.' OOV Vlw u'Y- r� ` r 2 N �'v' y dC "'"""��� O3� n_at 3n m\E p us o_vumso ai>- m moo `uso a vE o�� O tri ao ¢ O E o a w- a E oa v p.mm c, ',G aa`� Econv ¢c.v .0=_d g^� mEM _o�@) a o a�w �Y`Ni' m.°io a -dim WLa iom C:) t2 d` o ooL 3 w�� w yc m To yainm �m�' ¢ do CC �� �$= E rnv z Y >c us p -= Nm `° Em•` >, o nm p a c_m Qoy 2c`i' O mE gn mmo o�a2 CD W aooa ao6 mSo t-- 6 m0 ¢c LE Qc a`�mm ¢tn oo p ¢yss s p oUrn cN -3 a; Jesus poet aa`� �m 3 aci w«m. rn w_Nr�i' pw S- pa. � m .O H L- U m , ay d �a a` mi xNo coo =L Umo Z wE mE'�•m ¢c'3 - - cnm M VV-- zm- m r>p LJ3 =VJ 69 U r=i'CJ = y� U M I �.rn b9 p0 EU mm E� m U O =,-m X23 w C �rD �Ln d_ Q d U OAU O d d U U U U n_ mcg �' � � >" > o m o 3 „ 00 yet rn ' cE o_o a y v - c y O N E o m m E n _ m C m � E `oL m� r o? � O O O W N C O 63 O� � � N y N C m I » v Fns dao din = bio m Ev Eom m - c E -o corn _ r� corm N -o '-E zcai Z i E•c-?`M mc``o �c.:�aa i xym m -a -o oS - c� �N o o3M O o n cs E - - orn v� _ Em a- "m ca m "n yet vo aym Cm ��'-m am L3'�m nam �'mro gc Omvc� Y33m �3 -129g mY qo ¢cN Lvm pQa �f avZm jmw o = c:�U z v;Gm m mOwovi ai ran"E Lu oa bm o cal Ea > o0 o�M maa * �� cLLa� m'�ao crime cns �m o� m - =a z`°y� Q a3y =>EH�m¢cv z^- C_��o�Q' _ LOQ rp�r p r`a �d N Ca Oinw E H m HNA dY >a U ESN m(n - >m 3L �c'i ay`O` -oEy m= wF-waciY z 3aci W.c'm ao mQ N� to �l' N a (y0 X00 = "�z 3 YN� J �Y > O- - `= < E U S y Y � u-+ o 'V o_ c.' Q m = O .v �' o� W c z`� Q�o_.� mo ¢ ma��^ o�>Ea + LLS actin �u'S� SEE Z.ES Q'E n c rn Y m o 0 cN ,O - Y a > Q N'fW] am cf) co y c � ' � tg m m 3 m aoi y� V!'00 C=J ti� M m.3 m mo O� c?O C Em m M oc L9 z EW co ¢ c0 jar i o a.O CL m ao v -3m m�W mar Oma 3m mcY �3 MW co-i�o no ¢v O �mEm -am Q os u >o �rn _ m a.a a�" m m E g'=.2 S w cob m m= z > r ^ orn LU 4 m $ 3rn N d °= - m M worn 3 co- w _o m m `.� - O _ -cam o o o¢ urn C, m m� r- v O U >�1 N c m a c -am 2i2i o.m ." <a oj n� m¢waoE ¢m O-oo m- c>a unm UU- o-- �n ' aaE * 'm' n ¢-oo •a) ow soooonv 7Ecmo a a¢L a ¢ m UU H m�U H z z0 Amy mL "o > o us �m 3 a cmc o CUL U t v o O F— CU _ �-�� Yp from aci LD N O aEi O m� C= �C' m vet Z C.3 '�� �c ov usr hoar O'°'o N aci - mW ' cm."`n - us yet mcri OSay 1.^ ^ mo a��'Tm E o am Yom mrncm °1pN £ 00 �rn m am 75c�� LL crn y� oN 'mo co m^o - o ai col E m� o_am Ngo vim E -"N iO -- L nci _ m om �-' Dov - riM w�v oao W y xo�Nm �xo roi' EDa rn om o'"Wr mdmrn N �o °'mo -- ��^ mom om yL m c- o_o °'. gym Eam aEi - mo -75+ u ��m m,.;v F- dm a`tm =m cc°ym >E"' Etio -mm E'Em mN�� a I '' Yin m� m- - m Uo ai m �rn ac.53 :E Y mo o� mom Ze m E � Ev c m >� c o'> E c m m� m C C � off - mU m - U O ¢ _ m r�o m m _ � - Y U d m m 3 3 ._ �� L Y y a ~ m vi Lm c U o' E aioc`3 am Y.m.-i» my . = m �yv Nm meta C/�,_m am� iEm gmoE ���m �'tiJ am dm .-om ¢U m�o0 r"jy am yon m w d� rns o M aim n d� y -°'m m Eo v a `o' ds naca.� Ea aiom w� c �:E m - w �ii2 ti ai E'm d d N'.' OOV Vlw u'Y- r� ` r 2 N �'v' y dC "'"""��� O3� n_at 3n m\E p us o_vumso ai>- m moo `uso a vE o�� O tri ao ¢ O E o a w- a E oa v p.mm c, ',G aa`� Econv ¢c.v .0=_d g^� mEM _o�@) a o a�w �Y`Ni' m.°io a -dim WLa iom C:) t2 d` o ooL 3 w�� w yc m To yainm �m�' ¢ do CC �� �$= E rnv z Y >c us p -= Nm `° Em•` >, o nm p a c_m Qoy 2c`i' O mE gn mmo o�a2 CD W aooa ao6 mSo t-- 6 m0 ¢c LE Qc a`�mm ¢tn oo p ¢yss s p oUrn cN -3 a; Jesus poet aa`� �m 3 aci w«m. rn w_Nr�i' pw S- pa. � m .O H L- U m , ay d �a a` mi xNo coo =L Umo Z wE mE'�•m ¢c'3 - - cnm M VV-- zm- m r>p LJ3 =VJ 69 U r=i'CJ = y� U M I �.rn b9 p0 EU mm E� m U O =,-m X23 w C �rD �Ln d_ Q d U OAU O d d U U U U n_ mcg �' � � >" > o m o 3 „ 00 yet rn ' cE o_o a y v - c y O N E o m m E n _ m C m � E `oL m� r o? � O O O W N C O 63 O� � � N y N C m I » v Fns dao din = bio m Ev Eom m - c E -o corn _ r� corm N -o '-E zcai Z i E•c-?`M mc``o �c.:�aa i xym m -a -o oS - c� �N o o3M O o n cs E - - orn v� _ Em a- "m ca m "n yet vo aym Cm ��'-m am L3'�m nam �'mro gc Omvc� Y33m �3 -129g mY qo ¢cN Lvm pQa �f avZm jmw o = c:�U z v;Gm m mOwovi ai ran"E Lu oa bm o cal Ea > o0 o�M maa * �� cLLa� m'�ao crime cns �m o� m - =a z`°y� Q a3y =>EH�m¢cv z^- C_��o�Q' _ LOQ rp�r p r`a �d N Ca Oinw E H m HNA dY >a U ESN m(n - >m 3L �c'i ay`O` -oEy m= wF-waciY z 3aci W.c'm ao mQ N� to �l' N a (y0 X00 = "�z 3 YN� J �Y > O- - `= < E U S y Y � u-+ o 'V o_ c.' Q m = O .v �' o� W c z`� Q�o_.� mo ¢ ma��^ o�>Ea + LLS actin �u'S� SEE Z.ES Q'E n c rn Y m o 0 cN ,O - Y a > Q N'fW] am cf) co � U � m m >' - m cs Q v In Eo V!'00 C=J ti� M m.3 m mo O� c?O C Em M oc L9 O_N T- O c i C-> -c CL m ao v O mar Oma aim Osco F �� Ew d�rn omr� �mEm -am Q os u >o �rn J� Tcm pjj 3a - -a- Emm S Yet oto N 3� r ^ orn LU 4 �V/ a� Nm If C13 °� o gm - O _ -cam �Eo Om>mn�°mm ?>a xp�d c O 3m O m3N >�1 coc 2 > r % 1 U - .t! cnm o do ¢m O-oo m- U o _ =Ea - c O le m ,- w to mrn •a) wcc o00 cDEl Doc �-�� Yp from aci LD N O aEi O m� C= �C' m vet Z C.3 '�� �c ov usr hoar O'°'o N aci - mW ' cm."`n - us yet mcri OSay 1.^ ^ mo a��'Tm E o am Yom mrncm °1pN £ 00 �rn m am 75c�� LL crn y� oN 'mo co m^o - o ai col E m� o_am Ngo vim E -"N iO -- L nci _ m om �-' Dov - riM w�v oao W y xo�Nm �xo roi' EDa rn om o'"Wr mdmrn N �o °'mo -- ��^ mom om yL m c- o_o °'. gym Eam aEi - mo -75+ u ��m m,.;v F- dm a`tm =m cc°ym >E"' Etio -mm E'Em mN�� a I '' Yin m� m- - m Uo ai m �rn ac.53 :E Y mo o� mom Ze m E � Ev c m >� c o'> E c m m� m C C � off - mU m - U O ¢ _ m r�o m m _ � - Y U d m m 3 3 ._ �� L Y y a ~ m vi Lm c U o' E aioc`3 am Y.m.-i» my . = m �yv Nm meta C/�,_m am� iEm gmoE ���m �'tiJ am dm .-om ¢U m�o0 r"jy am yon m w d� rns o M aim n d� y -°'m m Eo v a `o' ds naca.� Ea aiom w� c �:E m - w �ii2 ti ai E'm d d N'.' OOV Vlw u'Y- r� ` r 2 N �'v' y dC "'"""��� O3� n_at 3n m\E p us o_vumso ai>- m moo `uso a vE o�� O tri ao ¢ O E o a w- a E oa v p.mm c, ',G aa`� Econv ¢c.v .0=_d g^� mEM _o�@) a o a�w �Y`Ni' m.°io a -dim WLa iom C:) t2 d` o ooL 3 w�� w yc m To yainm �m�' ¢ do CC �� �$= E rnv z Y >c us p -= Nm `° Em•` >, o nm p a c_m Qoy 2c`i' O mE gn mmo o�a2 CD W aooa ao6 mSo t-- 6 m0 ¢c LE Qc a`�mm ¢tn oo p ¢yss s p oUrn cN -3 a; Jesus poet aa`� �m 3 aci w«m. rn w_Nr�i' pw S- pa. � m .O H L- U m , ay d �a a` mi xNo coo =L Umo Z wE mE'�•m ¢c'3 - - cnm M VV-- zm- m r>p LJ3 =VJ 69 U r=i'CJ = y� U M I �.rn b9 p0 EU mm E� m U O =,-m X23 w C �rD �Ln d_ Q d U OAU O d d U U U U n_ mcg �' � � >" > o m o 3 „ 00 yet rn ' cE o_o a y v - c y O N E o m m E n _ m C m � E `oL m� r o? � O O O W N C O 63 O� � � N y N C m I » v Fns dao din = bio m Ev Eom m - c E -o corn _ r� corm N -o '-E zcai Z i E•c-?`M mc``o �c.:�aa i xym m -a -o oS - c� �N o o3M O o n cs E - - orn v� _ Em a- "m ca m "n yet vo aym Cm ��'-m am L3'�m nam �'mro gc Omvc� Y33m �3 -129g mY qo ¢cN Lvm pQa �f avZm jmw o = c:�U z v;Gm m mOwovi ai ran"E Lu oa bm o cal Ea > o0 o�M maa * �� cLLa� m'�ao crime cns �m o� m - =a z`°y� Q a3y =>EH�m¢cv z^- C_��o�Q' _ LOQ rp�r p r`a �d N Ca Oinw E H m HNA dY >a U ESN m(n - >m 3L �c'i ay`O` -oEy m= wF-waciY z 3aci W.c'm ao mQ N� to �l' N a (y0 X00 = "�z 3 YN� J �Y > O- - `= < E U S y Y � u-+ o 'V o_ c.' Q m = O .v �' o� W c z`� Q�o_.� mo ¢ ma��^ o�>Ea + LLS actin �u'S� SEE Z.ES Q'E n c rn Y m o 0 cN ,O - Y a > Q N'fW] am cf) co m N ti c o E N E E c cw ?E.--` o a - m Y O m� Y >cm EEW �`+ m'm ` > Em rnav +gym -m O o t O V O p vo y� cO a a E Ew - No .59 ow 3Y M metro aZ o -m O 0 0 o cco 0 m �O NO mo oy muy w a o O m W OZ y n 3 a S E W wcYo ocm LL>' O LL O - od4 00= p 3 CD C) O c z `o� E a C 'o yO o >E mYE o �v m 3�n oy a J u-' E > o c .> 2 E U'm` o dm Yc E m -.2- m j m Tm mr m N_ o. m ` - m cEE --� pm `�oU > m�E�3o mm� (ana da yU � aci fn m Y a `o d"W Ta mus L �cn^ a Zvi« oma^ - o EEm E c M ��m< aooy 3 y O.rn > O N > 3 ` m o m o 0 8) 3 0 '-' a c m a y •- v > cv Qac U U P y m ~ a ya' m ,2 p m v'o m m m dri Vl p.r v._ p- o.yvi 0 m C Ta r Y d E m m y E mm .oma m c6 OYO y O d.Lrn N mm 1—oto o m �'3'rn crn o2W ;a E; E . W m4 _ d Y � N m4-aN g�; Q > Ems' gE-E �loaom o�o3c > OE� 3E 38ay'3m xc -m m U c C; r� � U � m m >' - m cs Q v In Eo ;� V •� 00 I` I O� U'YZp Cca i CL m ao p rn Mon O � aim Odd m F �� Ew � omr� m o �pv Dm m W m Tcm U - -a- Emm S .-,A win o_¢ v ¢LZ` <cn coo Lu 2 ms z- Z m y<`+ z 3 �V/ cv�m Nm If Ups Z zam °� o gm - O _ -cam O aro nmv xp�d c >`y" O nmu-' Q�o = U JQoJ ¢w� O ai mm o m o- % 1 U - .t! cnm o do ¢m O-oo m- m� m w_.= -o _ _ mM� v - c O le m ,- w to mrn •a) rcm C 70 mcc Q Q d m UU H m�U H uYN v oy� E o f ala mL "o > o us �m 3 a cmc o CUL U t v o O F— CU _ cooa' cc - E o m �� m C O° 2 c 0 U �?co_n a Tobsr •!=-ov O J z>ao rn cz mom J s w mmE mcnp mEo L L¢ a �jj moi zo, cL o E _ =v nom - T0 m w i-cO m m E - m >om A U N � y¢ o O - - E- I O tnU 00 'a o0 E S Y• y o� 'C y g E °'m �w�m O't - o= o v mOva y m o in my w ug >- -cn. m }amd QpC� tf rn Z -U m =Um 2. ai o'n n O> y tiro N O uS c c o a m E ¢w m m C a w E O �' m�2 'a 3 m _ mrn o m ¢ ¢ x �Y wet o f O " o CCD) o E nv Dov m N cb oom ¢ ��� an. � cn w � —c' amm �tico i.Yro t mcMs nig Zca.�-^ - E� O_O>tO"o�dE o c y F- am H zQU Qcn m 2o.0 w a'c`i - `o y .w.a2ui.. m 4a c" E m ao o_" c3j._ tions 3 c� Q> �_ y an d mm a Y E J mU m=E W W ani o v F—� mY� `>� zom YLus 'ret m zNm3: coo o O o c��ma O^ mm c�oLQ am u3 aEo o J E QQ Lm m m LLEW nw m LL Y wgbb o E m z^ m z o oo,"-� oc 3L mm g°m U� NU (9 Um 4E m m j, pY0 U U A w� i o m ¢ ¢ � 3� o Q m m N ti c o E N E E c cw ?E.--` o a - m Y O m� Y >cm EEW �`+ m'm ` > Em rnav +gym -m O o t O V O p vo y� cO a a E Ew - No .59 ow 3Y M metro aZ o -m O 0 0 o cco 0 m �O NO mo oy muy w a o O m W OZ y n 3 a S E W wcYo ocm LL>' O LL O - od4 00= p 3 CD C) O c z `o� E a C 'o yO o >E mYE o �v m 3�n oy a J u-' E > o c .> 2 E U'm` o dm Yc E m -.2- m j m Tm mr m N_ o. m ` - m cEE --� pm `�oU > m�E�3o mm� (ana da yU � aci fn m Y a `o d"W Ta mus L �cn^ a Zvi« oma^ - o EEm E c M ��m< aooy 3 y O.rn > O N > 3 ` m o m o 0 8) 3 0 '-' a c m a y •- v > cv Qac U U P y m ~ a ya' m ,2 p m v'o m m m dri Vl p.r v._ p- o.yvi 0 m C Ta r Y d E m m y E mm .oma m c6 OYO y O d.Lrn N mm 1—oto o m �'3'rn crn o2W ;a E; E . W m4 _ d Y � N m4-aN g�; Q > Ems' gE-E �loaom o�o3c > OE� 3E 38ay'3m xc -m m U c C; r� '= E A o 0 0 m y [ 3. a 3 o ti c g =a' 00 y o cn v v o u E u> ani U 0"' El ay., -'O c s G v a, v a c o ;, « q x ❑ v a o E v -IV> 0 3 - ' o. ° -!: E a° c q[ o `[q 7 .� m •o W o A c o S [ " y>O a Cl. ' eCV o b.v. OV OO b b wO _q , 'O °� "' ° G bb > o y Q v o @� n, tt IM up v F _ ❑❑ `a43 �1 C. .r. F_. , d 3 0 o [ o x y N O [ v ai G N •a"'� O CD Q ° rn 8 /W v 0 gm. .oyv [y [[S pp7 h C[ 7 v c=za w O Oq Cr O W Q OA p O H t '27, p 242 O Oi'� N O 0 Qw o &c $ n wd inwU 3 u �F1 Uw J. N O Cl) ANA,, i 00 I` I cc Cca i CL m ao p . ■ L NC O � O cr L00 ■ � L O OO •�I U -U m 0 3 i E oo m °� o - O O aro 2) U O CL CO' CO1vi = U i m c� N t Q 0 ca U c T ' _ cm 00 m _ cz •a) C) C 70 mcc Q i W CU _� CUL U t v W w F— CU Z Ea cc Q U = '= E A o 0 0 m y [ 3. a 3 o ti c g =a' 00 y o cn v v o u E u> ani U 0"' El ay., -'O c s G v a, v a c o ;, « q x ❑ v a o E v -IV> 0 3 - ' o. ° -!: E a° c q[ o `[q 7 .� m •o W o A c o S [ " y>O a Cl. ' eCV o b.v. OV OO b b wO _q , 'O °� "' ° G bb > o y Q v o @� n, tt IM up v F _ ❑❑ `a43 �1 C. .r. F_. , d 3 0 o [ o x y N O [ v ai G N •a"'� O CD Q ° rn 8 /W v 0 gm. .oyv [y [[S pp7 h C[ 7 v c=za w O Oq Cr O W Q OA p O H t '27, p 242 O Oi'� N O 0 Qw o &c $ n wd inwU 3 u �F1 Uw J. 4. PAVEMENT RECLAMATION AND GRADING Introduction: The Town of North Andover is seeking qualified contractors to undertake public utility work to supplement the capabilities of the Department of Public Works (DPW). This work shall consist of grinding or pulverizing, grading, and compacting asphalt concrete pavement. Dust Control using calcium chloride or some other acceptable product shall be included in this work. All bidders must demonstrate at least five years of experience in providing the services requested. Scope of Work: The town of North Andover will remove all large castings prior to the commencement of reclamation. The Town will arrange for and pay for police details, detours, signs, barricades, and cones. Reclamation contractor will reclaim existing pavement to its full depth and grade the reclaimed material to ensure proper drainage. The Town will supply additional material if required and will remove any surplus material if required. Reclamation contractor will compact graded areas to a density acceptable for paving. Contractor will complete all hand work required at joints with side streets, sidewalks, end points, and driveway aprons including sweeping to provide a clean sharp joint for paving. Contractor shall furnish and apply calcium chloride as required for dust control until the reclaimed area is paved. Bid Form: 1. Laborer 2. Reclaiming machine with operator 3. Road grader with operator PER DAY PER DAY PER DAY 4. Vibratory compactor with operator PER DAY Tota Term• The term of the contract shall be one year with two (2) additional option years at the sole discretion of the Town of North Andover