HomeMy WebLinkAboutContract #: 020390 - From: 03-01-2012 To: 02-28-2013 - Murray Paving & Reclamation Inc - Town of North Andover�J' $°
91
r
i !` or-&
Andrew W Maylor
Town Manager
Town of North Andover
Office of the
Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
amaylor@townofnorthandover.com
December 19, 2013
Mr. Stephen Johnson
Murray Paving & Reclamation, Inc
33 Whitney Street
Holliston, MA 01746
Dear Mr. Johnson:
Telephone (978)688-9510
Fax (978)688-9556
In accordance with the provisions of the contract between the Town of North Andover and Murray
Paving & Reclamation, Inc (Contract #568), the contract and the respective unit price ($1.43 per square yard)
for pavement reclamation and grading on various projects is extended an additional option year (March 1,
2014 through February 28, 2015).
Please provide updated insurance certificates listing the Town of North Andover as `Additional
Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention
of Ray Santilli, Assistant Town Manager.
In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work
performed under this contract. An updated prevailing wage report is enclosed. For each week work is .
performed, you are required to submit certified weekly payroll records. The certified weekly payroll records
are to be sent to:
Mr. Bruce Thibodeau
Department of Public Works
384 Osgood Street
North Andover, MA 01845
If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516.
Sincerely
f
Andrew W. Maylor
Town Manager
cc., Ray Santilli, Assistant Town Manager
Bruce Thibodeau, Public Works
Contract File
Request Official Wage Schedule
Confirmation
Page 1 of 2
Your request for an Official Prevailing Wage
Schedule has been successfully received and
is being processed by DOS. The schedule will
be emailed to the email address provided in
your request.
Please note the wage request number
20131219-006 for future inquires.
Request another official Wage Schedule
http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSu... 12/19/2013
IN
Andrew W. Maylor
Town Manager
Town of North Andover
Mr. Stephen Johnson
Murray Paving & Reclamation, Inc
55 Whitney Street
Holliston, MA 01746
Dear Mr. Johnson:
Office of the
Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
amaylor@townofnorthandover.com
December 28, 2012
Telephone (978)688-9510
Fax (978)688-9556
In accordance with the provisions of the contract between the Town of North Andover and
Murray Paving & Reclamation, Inc (Contract #568), the contract and the respective unit price ($1.36 per
square yard) for pavement reclamation and grading on various projects is extended an additional option
year (March 1, 2013 through February 28, 2014).
Please provide updated insurance certificates listing the Town of North Andover as `Additional
Insured' in accordance with the contract document. The insurance certificates are to be sent to the
attention of Ray Santilli, Assistant Town Manager.
In accordance with Massachusetts General Laws, you are required to pay prevailing wage for
work performed under this contract. An updated prevailing wage report is enclosed. For each week work
is performed, you are required to submit certified weekly payroll records. The certified weekly payroll
records are to be sent to:
Mr. Bruce Thibodeau
Department of Public Works
384 Osgood Street
North Andover, MA 01845
If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516.
Sincerely,
P'n d ,�
Andrew W. Maylor
Town Manager
cc., Ray Santilli, Assistant Town Manager
Bruce Thibodeau, Public Works
Contract File
Request Official Wage Schedule
Confirmation
Page 1 of 2
Your request for an Official Prevailing Wage
Schedule has been successfully received and
is being processed by DOS. The schedule will
be emailed to the email address provided in
your request.
Please note the wage request number
20121227-012 for future inquires.
Request another official Wage Schedule
Return to
http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSu... 12/27/2012
Bid Results — Pavement Reclamation and Grading
Period of March 1, 2012 through February 28, 2013
Base Bid —12,000 square yards
Unit Price Total Price
All States Asphalt, Inc $1.42 / sq yd $ 17,040.00
Busby Construction Co., Inc $1.37 / sq yd $ 16,440.00
Garrity Asphalt Reclaiming, Inc $1.65 / sq yd $ 19,800.00
Murray Paving & Reclamation Inc $1.29 / sq yd $ 15,480.00
Rafferty Fine Grading, Inc $1.478 / sq yd $ 17,736.00
U.S. Pavement Services Inc $22.86 / sq yd $ 274,320.00
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible and responsive bidder offering the lowest
aggregate price in the base bid only for the first year of the proposed contract. All prices are to
remain firm for the duration of the Contract.
March 1, 2012 through February 28, 2013
Quantity
Pavement Reclamation
and Grading 12,000 sq yards
March 1, 2013 through February 28, 2014
Pavement Reclamation
and Grading 12,000 sq yards
March 1, 2014 through February 28, 2015
Pavement Reclamation
and Grading
Addenda 'N041 &-
12,000 sq yards
Unit Price Total Price
$ (,aq /sgyd $ I�ygo.00
$ 1.3(o Esq yd
are acknowledged: '4/1
Sig11
nature
Esq yd $ 1-7, 14 & - 6 c'
Business Name/Z,Z,9 y -F
Business Address c.��„ -�,vG� s T c ! �► S �c ✓ ,�+ �-r �( 6
Business Phone S'0'7 H a g g 4 a 0 Fax Sw F g x 9 g Y a 1
S +P/'At,✓ /— 3-c46&,j
Name of Person Authorized to sign Price Proposal
Title of Perso Authorized to sign Price Proposal
Signature of Above Person
Town of North Andover IFB Page 8 of 33
Pavement Reclamation and Grading
CERTIFICATE OF VOTE
At a dulyauthorized meeting the Board of Directors of the t-���'z
held on 1/11 ! //;- it was
VOTED, THAT
(Name) (Officer)
of MC'c't4, be and hereby is authorized to execute contracts and bonds in
the name -1 on behalf of said-riv�s�c�- , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of P,grX— on
its behalf by such officer under seal of rt✓4 :r, , shall be valid and binding
upon r^ v t 4v, 2.e(-Gftn0- T- -
I hereby certify that I am the clerk of the above named and
that Z---r6'X'Se- is the duly elected officer as above of said
.'n 'M P,9 -,7a *- , and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
,a / q/ / - (�/ � / 4�' X
(Date) (Cler
Town of North Andover IFB Page 31 of 33
Pavement Reclamation and Grading
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature Date a /y
e_ -� G� ,is �.� —� �vrs �,r,� R��" f f ll�cl. a7«.r c
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
Z' Ta^a s C-', , authorized signatory for ,�r�d�c.0 6 p/fr��y f Z-11 -
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
Signat re Date
Town of North Andover IFB Page 29 of 33
Pavement Reclamation and Grading
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature
. 4
Print Name & Title
Town of North Andover IFB
Pavement Reclamation and Grading
Date .2/ g 1I.2-
Company e
Page 30 of 33
FEB -17,2012 1:44PM HART INSURANCE
N0. 725 P. 1
4 CERTIFICATE OF LIABILITY INSURANCE � °"02/1 0' 2"'
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the cartificate holder Is an ADDITIONAL INSURED, the policy(its) most be endorsed. if SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement A statement on this Certificate does not confer rights to the
certificate holder in lieu ofsuch endorsament(s).
PRODUCER HART INSURANCE AGENCY, INC.
243 MAIN STREET
PO BOX 700
BUZZARDS BAY, MA 025320700
INSURED Murray Paving & Reclamation Inc ID61
55 Whitney Street
PO Box 6438
Holliston, MA 01746
LSUra
759-
rlsuRERA: SAFETY INDEMNITY INSURANCE CO 33618
INSURER e ; TRAVELERS PROPERTY CASUALTY INS CO 36161
,uauoco rt. EASTGUARD INSURANCE COMPANY 14702
COVERAGES CERTIFICATE NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER 00,
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE. INSURANCE AFFORDED BY THE POLICIES DESCRIBED t
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
NSR DL 5UeR POLICY EFF POLICY EXP
LTR TYPE OF INSURANCE POLICY NUMBER M MMID
A GENERALLIABItm 680-3198C616 04/01/2010 04/01/2011
COIMMERGAL GENERAL LIA91UTY
CLAIMS -MADE [2 OCCUR
g UMBRELLaLtA6 I occuR CUP3295Y922 1 04101/2010104/0112011
EXOEBS LIAR rl AIMLMADE
C wORNERSCOMPEN5ATION MUWC806772 04/01/2010
AND EMPLOYERS' LIA0I411Y Y I N
ANY OFFICER/MEM ERR EXCLU0201 uTIVE j N'j 111 A
DESCRIPTION OF OPERATWNS / LOCATIONS !VEHICLES (Attaetl AGORD 101, Additional Romarks Schadula, N nim spaw Is roqulred)
OPerabons aS performed by Terms S Conditions in the policy.
town of North Andover additional insured as respects Liability performed by named insured
RFVI.RION NLIMRFR:
VAMED ABOVE FOR THE POLICY PERIOD
GEN'L AGGREGATE LIMIT APPLIES PER:
EREIN IS SUBJECT TO ALL THE
TERMS,
L1MIT5
EACH OCCURRENCE
POUCY PRO LOC
I;RGMIS
300,000
MED EXP one 158MOn
S 5,000
A
AUTDMO»IL6LIABlUTY
GENERALAGOREGATE
S 2,000,000
3948925
04/01/2010
ANY AU70
COMBINED SINULF LIMIT
1,000,000
adeidaw
BODILY INJURY (Perpetaal)
ALLOWNEb SCHEDULED
BODILY INJURY (Par aeddeml
S Included
PR ERTY DAMAGE
n
$ Included
AUTOS AUTOS
EACH OCCURRENCE
$ 3,000.000
AGGREGATE
s 31000,000
V HIREDAU70S AUTOSWNED
I M�
WC STATUUMT- 0TH•
E.L. EACH ACCIDENT
5 1,000,000
g UMBRELLaLtA6 I occuR CUP3295Y922 1 04101/2010104/0112011
EXOEBS LIAR rl AIMLMADE
C wORNERSCOMPEN5ATION MUWC806772 04/01/2010
AND EMPLOYERS' LIA0I411Y Y I N
ANY OFFICER/MEM ERR EXCLU0201 uTIVE j N'j 111 A
DESCRIPTION OF OPERATWNS / LOCATIONS !VEHICLES (Attaetl AGORD 101, Additional Romarks Schadula, N nim spaw Is roqulred)
OPerabons aS performed by Terms S Conditions in the policy.
town of North Andover additional insured as respects Liability performed by named insured
RFVI.RION NLIMRFR:
VAMED ABOVE FOR THE POLICY PERIOD
;UMENT WITH RESPECT TO WHICH THIS
EREIN IS SUBJECT TO ALL THE
TERMS,
L1MIT5
EACH OCCURRENCE
S 1,000,000
I;RGMIS
300,000
MED EXP one 158MOn
S 5,000
PERSONAL & ADV INJURY
3 1,000,000
GENERALAGOREGATE
S 2,000,000
PRODUCTS - COMP/OP AGG
S 2,000,000
S
COMBINED SINULF LIMIT
1,000,000
adeidaw
BODILY INJURY (Perpetaal)
s Included
BODILY INJURY (Par aeddeml
S Included
PR ERTY DAMAGE
n
$ Included
S
EACH OCCURRENCE
$ 3,000.000
AGGREGATE
s 31000,000
S
WC STATUUMT- 0TH•
E.L. EACH ACCIDENT
5 1,000,000
E.L.DISEASE- EAEMPLOYEE
S 1,000,000
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
CERTIFICATE HOLDER I Ivim
Town of North Andover
Attention: RM Santilli, Assistant Town Manager SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
120 Main Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
North Andover, Ma. 01845 ACCORDANCE WITH THE POLICY PROVISIONS,
Faxed 978.688-9556 AUTHORIZED PEPRLSENTA71VF
(b1988-2010 ACORD COR)IORATION. All rights reserved.
ACORD 25 (2Di0105) The ACORD name and logo are registered marks of ACORD
MURRAYPAVING & RECLAMATION INC
55 Whitney Street
Holliston, Ma 01746
Tel 508-429-9400 Fax 508-429-9401
Listing of References
Town of Milford DPW
30 Front Street
Milford, Ma 01757
Contact: Scott Crisafulli
508-473-1274
Road Reclamation, Surfacing Project
Work Dates: 7/1/09-6/30/10
Road Reclamation, Surfacing, Curbing
Town of Natick DPW
75 West Street
Natick, Ma 01760
Contact: Mark Coviello
508-647-6560
Road Reconstruction
Work Dates: 6/30/10-11/20/10
Road Reclamation, Surfacing, Drainage,
Granite Curbing, Walks
Town of Ludlow Engineering
198 Sportsmen's Road
Ludlow, Ma 01056
Contact: Ken Batista
413-583-5625
Work Dates: 2007-2011
Road Reclamation & Grading
Various Roads
Town of Upton DPW
P.O. Box 479
Upton, Ma 01568
Contact: John Johnson
508-529-3067
Road Reconstruction
Work Dates: 6/1 /10-10/1 /10
Road Reclamation, Surfacing,
Curbing, Drainage
Town of Norwood DPW
566 Washington Street
Norwood, Ma 02063
Contact: Andy Murphy
781-762-8530
Road Reconstruction
Work Dates: 5/1/09-10/20/09
Road Reclamation, Surfacing,
Curbing, Drainage, Walks
Town of Brookline DPW
333 Washington Street
Brookline, Ma 02475
Contact: Charlie Barry
617-828-5618
Work Dates: 6/1/10-11/20/10
Road Reclamation, ReSurfacing,
Granite Curb, Drainage, Sidewalks
List of current & Past Pulverize Contracts
Town of Townsend
177 Main Street
Townsend, MA 01465
978-597-1712
Contact ED Kukkula
Town of Upton
1 Main Street
Upton, MA 01568
508-726-7619
Contact: John Johnson
Town of Winchendon
109 Front Street
Winchendon, MA 01475
978-297-0170
Contact: Mike Murphy
Town of Mashpee
530 Meetinghouse Rd
Mashpee, MA 02649
508-539-1420
Contact: Katherine Laurent
Town of Milford
30 Front Street
Milford, MA 01757
508-473-1274
Contact: Scott Crisafulli
Town of Paxton
697 Pleasant Street
Paxton, MA 01612
774-696-6288
Contact: Mike Putnam
Town of Rockland
841 Market Street
Rockland, MA 02370
781-878-0634
Contact: Bob Corvi
Work 2009, 2010, 2011
Work 2006, 2007, 2008, 2010, 2011
Work 2009, 2010
Work 2007, 2008, 2010, 2011
Work 2006, 2007, 2008, 2009, 2010, 2011
Work 2006, 2008, 2010, 2011
Work 2009, 2010, 2011
Town of Raynham
1555 King Phillip Street
Raynham, MA 02767
508-824-2718
Contact: Roger Stolte
Town of Bolton
12 Forbush Mill Rd
Bolton, MA 01740
978-779-6402
Contact: Harold Brown
Town of Blackstone
15 St. Paul Street
Blackstone, MA 01504
508-962-1871
Contact: Jim Sullivan
Town of Hopedale
7 Depot Street
Hopedale, MA 01747
508-294-2528
Attn: Bob Daponte
Town of Bellingham
Blackstone Street
Bellingham, MA 02019
508-962-4128
Contact: Dan Drake
Town of Charlton
37 Main Street
Charlton, MA 01507
508-248-2212
Contact: Jerry Foskett
Town of Ayer
25 Brock Street
Ayer, MA 01432
978-772-8244
Contact: Dan Nason
Town of Ashby
895 Main Street
Ashby, MA 01431
978-386-2272
Contact: Bill Davis
Work 2008, 2009, 2011
Work 2010, 2011
Work 2007, 2008, 2009, 2010, 2011
Work 2006, 2007, 2008, 2009, 2010
Work 2008, 2009, 2010, 2011
Work 2008, 2009, 2010, 2011
Work 2010, 2011
Work 2010, 2011
Town of Bedford
314 The Great Road
Bedford, MA 01730
781-275-7605
Contact: Adrien St. John
City of Beverly
191 Cabot Street
Beverly, MA 01915
978-490-0228
Contact: Paul Ruggiero
Work 2006, 2007, 2008, 2009, 2010, 2011
Work 2007, 2008, 2009, 2010, 2011
Town of Grafton Work 2006, 2008, 2009
30 Providence Rd
Grafton, MA 01519
508-839-5335 Ext124
Contact: Brian @ Engineering Dept.
Town of Holliston
30 Arch Street
Holliston, MA 01746
508-922-4623
Contact: Tom Smith
Town of Hubbardston
7 Main Street
Hubbardston, MA 01452
978-928-1408
Contact: Lynn Gauthier
Town of Harvard
47 Depot Street
Harvard, MA 01451
978-456-4130
Contact: Richard Nota
Town of Ludlow
198 Sportsmens Rd
Ludlow, MA 01056
413-583-5625
Contact: Ken Batista
Town of Douglas
56 Main Street
Douglas, MA 01516
508-476-3378
Contact: John Furno
Work 2005, 2006, 2009, 2010, 2011
Work 2008, 2009, 2011
Work 2010
Work 2006, 2007, 2008, 2009, 2010, 2011
Work 2006, 2007, 2008, 2009, 2010
Town of Dracut
833 Hildreth Street
Dracut, MA 01820
978-957-0411
Contact: Mike Buxton
City of Everett
484 Broadway Street
Everett, MA 03149
617-908-8534
Contact: Julius Ofurie
Town of Franklin
257 Fisher Street
Franklin, MA 02038
508-922-9789
Contact: Bill Yardisernia
Work 2007, 2009, 2010
Work 2007, 2008, 2009, 2010, 2011
Work 2006, 2007, 2008, 2009, 2010, 2011
The Commonwealth of Massachusetts FEE: $125.00
William Francis Galvin
Secretary of the Commonwealth
One Ashburton Place, Boston, Massachusetts 02108.1512
Telephone: (617) 727.9640
NOTE: PLEASE TYPE OR PRINT CLEARLYI
MASSACHUSETTS CORPORATION ANNUAL REPORT
Federal Identification No. 0 4 — 317 812 2
1. The exact name of the corporation is: MURRAY PAVING & RECLAMATION, INC.
2. Location of its principal office in Massachusetts: 3 9 TAYLOR ST . , P . 0 . BOX 32 9
(number and street)
FRAMINGHAM MA 01701
(city or town) (state) (zip)
NOTE: If corporation is organized wholly to do business outside Massachusetts, state location of that office also:
(number & street)
3. Name and address of the Resident Agent, if any:
(city or town)
(state) (zip)
(name)
(number & street) (city or town) (zip)
4. Date of the end of the last fiscal year was: DECEMBER 31 2003
(month) (day) (year)
5. Check here if the corporation stock is publicly traded: 0 .
6 The caoital stock of each class as of the end of Its last floral vear was -
CLASS OF STOCK
E PER SHARE
PAR VALUE
STATE E E PAR
TOTAL AUTHORIZED BY ARTICLES
OF ORGANIZATION OR AMENDMENTS
Number of Shares Total Par Value
TOTAL ISSUED
AND OUTSTANDING
Number of Shares
COMMON:
ARNOLD G. JOHNSON,JR
9 CRESTVIEW AVE, MEDWAY, MA
NO PAP,
100
100
PREFERRED:
CLERK
STEPHEN E. JOHNSON
182 WASHINGTON, HOLLISTON, MA
DIRECTORS
ARNOLD G. JOHNSON,JR
7. State the names and addresses of the officers specified below and of all the directors of the corporation, and the date on which
the term of office of each exnires-
OFFICERS
NAME
ADDRESS
Number, Street, City or Town, State, Zip Code
EXPIRATION
OF TERM
PRESIDENT
ARNOLD G. JOHNSON,JR
9 CRESTVIEW AVE, MEDWAY, MA
TREASURER
STEPHEN E. JOHNSON
182 WASHINGTON, HOLLISTON, MA
CLERK
STEPHEN E. JOHNSON
182 WASHINGTON, HOLLISTON, MA
DIRECTORS
ARNOLD G. JOHNSON,JR
9 CRESTVIEW AVE, MEDWAY, MA
STEPHEN E. JOHNSON
182 WASHINGTON, HOLLISTON, MA
* UNTIL SUCCESSOR IS ELECTED AND DULY QUALIFIED
I, the undersigned , being the
of the above-named corporation, in compliance with the General Laws, Chapter 156B, hereby certify that the above Information is true and
correct as of the dates shown. IN WITNESS WHEREOF AND UNDER PENALTIES OF PERJURY, I hereto sign my name on this
day of 20 V
Signature: Title:
Contact Person: Contact Person Telephone fr:
357481 156bmcar4/5(00
10-15-03
D F The Commonwealth of Massachusetts
William Francis Galvin
Secretary of the Commonwealth
One Ashburton Place . Room 1717, Boston, Massachusetts 02108-1512
Annual Report for Domestic
FORM MUST BE TYPED and Foreign Corporations
(General Laws Chapter 156D, Section 16.22; 950 CMR 113.57)
(1) Exact name of the corporation: MURRAY PAVING & RECLAMATION, INC.
(2) Jurisdiction of incorporation: MASSACHUSETTS
(3) Street address of the corporation's registered office in the commonwealth (number, street, city or town, state, ZIP code)
55 WHITNEY STREET, HOLLISTON, MA 01746
(4) Name of the registered agent at the registered office: STEPHEN E JOHNSON
(5) Street address of the corporation's principal office (number, street, city or town, state, ZIP code)
55 WHITNEY STREET
HOLLISTON, MA 01746
(6) Provide the names and addresses of the corporation's board of directors and its president, treasurer, secretary, and if different, its chief
executive officer and chief financial officer.
Filing Fee: $125.00
Late Fee: $25.00
(7) Briefly describe the business of the corporation:
PAVING & RECLAMATION
(8-9) Caoital stock of each class and series -
CLASS OF STOCK
NAME
TOTAL ISSUED AND OUTSTANDING
ADDRESS
ORGANIZATION OR AMENDMENTS
Number of Shares
Number of Shares
President: ARNOLD G .
JOHNSON, JR
55
WHITNEY
STREET,
HOLLISTON,
MA
01746
Treasurer: STEPHEN E.
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA
01746'
Secretary: STEPHEN E.
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA
01746
Chief Executive Officer:
Chief Financial Officer:
Directors:ARNOLD G.
JOHNSON,JR
55
WHITNEY
STREET,
HOLLISTON,
MA
-01746
STEPHEN E.
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA
01746
(7) Briefly describe the business of the corporation:
PAVING & RECLAMATION
(8-9) Caoital stock of each class and series -
CLASS OF STOCK
TOTAL AUTHORIZED BY ARTICLES OF
TOTAL ISSUED AND OUTSTANDING
ORGANIZATION OR AMENDMENTS
Number of Shares
Number of Shares
COMMON
100.
100.
PREFERRED
(10) Check if the stock of the corporation is publicly traded. 0
(11) Report is filed for fiscal year ending: DECEMBER 31 2009
Signed by:
EJ Chairman of the board of directors
on this
® President
day of
(month, day, year)
0 Other officer I--] Court-appointed fiduciary
957461
11.24-09
056ds162295001357 11/23/09
D F The Commonwealth of Massachusetts
William Francis Galvin
Secretary of the Commonwealth
One Ashburton Place - Room 1717, Boston, Massachusetts 02108.1512
Annual Report for Domestic
FORM MUST BE TYPED and Foreign Corporations
(General Laws Chapter 156D, Section 16.22; 950 CMR 113.57)
(1) Exact name of the corporation: MURRAY PAVING & RECLAMATION, INC.
(2) Jurisdiction of incorporation: 'MASSACHUSETTS
(3) Street address of the corporation's registered office in the commonwealth (number, street, city or town, state, ZIP code)
55 WHITNEY STREET, HOLLISTON, MA 01746
(4) Name of the registered agent at the registered office: STEPHEN E. JOHNSON
(5) Street address of the corporation's principal office (number, street, city or town, state, ZIP code)
55 WHITNEY STREET
HOLLISTON, MA 01746 t
(6) Provide the names and addresses of the corporation's board of directors and its president, treasurer, secretary, and if different, its chief
executive officer and chief financial officer.
President: ARNOLD G.
Treasurer: STEPHEN E.
Secretary: STEPHEN E.
Chief Executive Officer:
Chief financial Officer:
Directors: ARNOLD G.
STEPHEN E.
Filing Fee: $125.00
Late Fee: $25.00
NAME
TOTAL AUTHORIZED BY ARTICLES OF
ADDRESS
ORGANIZATION OR AMENDMENTS
Number of Shares
JOHNSON, JR
55
WHITNEY
STREET,
HOLLISTON,
MA 01746
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA 01746'
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA 01746
JOHNSON,JR
55
WHITNEY
STREET,
HOLLISTON,
MA.01746
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA 01746
(7) Briefly describe the business of the corporation:
PAVING & RECLAMATION
(8-9) CaDltal stock of each r.lass and spripc-
CLASS OF STOCK
TOTAL AUTHORIZED BY ARTICLES OF
TOTAL ISSUED AND OUTSTANDING
ORGANIZATION OR AMENDMENTS
Number of Shares
Number of Shares
COMMON
100.
100.
PREFERRED
(10) Check if the stock of the corporation is publicly traded. (7
(11) Report is filed for fiscal year ending: DECEMBER 31 2009
Signed by:
a Chairman of the board of directors
on this
® President
day of
(month, day, year)
0 Other officer = Court-appointed fiduciary
957461
11.24-09
c156ds1622950c11357 11/23/09
D F The Commonwealth of Massachusetts Filing Fee: $125.00
William Francis Galvin Late Fee: $25.00
Secretary of the Commonwealth
One Ashburton Place, Boston, Massachusetts 021081512
Annual Report for Domestic
FORM MUST BE TYPED and Foreign Corporations
(General Laws Chapter 156D Section 16.22; 950 CMR 113.57)
(1) The exact name of the corporation: MURRAY PAVING & RECLAMATION, INC.
(2) Jurisdiction of incorporation: MASSACHUSETTS
(3) The street address of the corporation's registered office in the commonwealth:
55 WHITNEY STREET, HOLLISTON, MA 01746
(number, street, city or town, state, ZIP code)
(4) The name of the registered agent at the registered office: STEPHEN E. JOHNSON
(5) The street address of the corporation's principal office: 55 WHITNEY STREET
HOLLISTON, MA 01746
(number, street, city or town, state, ZIP code)
(6) Provide the name and business address of the corporation's board of directors and its president, treasurer and secretary, and
if different, its chief executive officer and chief financial officer.
President: ARNOLD G.
NAME
JOHNSON, JR
55
ADDRESS
WHITNEY
STREET,
HOLLISTON,
MA
01746
Treasurer: STEPHEN E.
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA
01746
Secretary: STEPHEN E.
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA
01746
Chief Executive Officer:
Chief Financial Officer:
Directors:ARNOLD G.
JOHNSON,JR
55
WHITNEY
STREET,
HOLLISTON,
MA
01746
STEPHEN E.
JOHNSON
55
WHITNEY
STREET,
HOLLISTON,
MA
01746
(7) Briefly describe the business of the corporation:
PAVING & RECLAMATION
(8-9) The capital stock of each class and series:
CLASS OF STOCK
TOTAL AUTHORIZED BY ARTICLES OF
TOTAL ISSUED AND OUTSTANDING
ORGANIZATION OR AMENDMENTS
Number of Shares
Number of Shares
COMMON
100.
100.
PREFERRED
(10) Check if the stock of the corporation is publicly traded. El
(11) Report is filed for fiscal vear ending: DECEMBER 31 2008
(month, day, year)
Signed by: ( AZ -0
Chairman of the bgaAf directors FX President 0 Other officer
on this (!-! f 0 Court appointed fiduciary
day of /ZjG �G 2 -r'�(
657481
04-25-08 c156ds1622950c11357 01/13/05
All States Asphalt, Inc.
All States Materials Group@
February 9, 2012
Mr. Ray Santilli
Assistant Town Manager
Town of North Andover
Town Hall
120 Main Street
North Andover, MA 01845
Dear Mr. Santilli:
PO Box 91
Sunderland, MA 01375
413-665-7021
We are pleased to submit the following proposal for Pavement Reclamation and Grading.
We guarantee that all materials supplied and work done shall comply with the State of
Massachusetts Department of Transportation Standard Specifications for Roads, Bridges and
Highways, as well as the Town of North Andover.
We hope the attached will permit our being of service to you.
Very Truly Yours,
ALL STATES ASPHALT, INC.
at:ke
Division Manager
An Equal Opportunity Employer
3
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible and responsive bidder offering the lowest
aggregate price in the base bid only for the first year of the proposed contract. All prices are to
remain firm for the duration of the Contract.
March 1, 2012 through February 28, 2013
Quantily Unit Price Total Price
Pavement Reclamation
and Grading 12,000 sq yards $ . 4a /sq yd $ 1 70+a
March 1, 2013 through February 28, 2014
Pavement Reclamation
and Grading 12,000 sq yards $ . 44- /sq yd $ S o
March 1, 2014 through February 28, 2015
Pavement Reclamation
and Grading 12,000 sq yards $ / • .So /sq yd $ $ o o a
el:MITIM
are acknowledged:
Signature
Business Name All States Asphalt, Inc.
Business Address 325 Amherst Rd., PO Boy 91 Sunderland, MA 01375
Business Phone 413.665.7021 Fax 413.665.9027
Alan L. Chicoine
Name of Person Authorized to sign Price Proposal
Division Manager
Title of Person Authorize to sign Price Proposal
/',. 10 1
Town of North Andover IFB
Pavement Reclamation and Grading
Page 8 of 33
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the All States Asphalt, Inc.
held on February 1, 2012 it was
VOTED, THAT
Alan L. Chicoine
(Name)
Division Manager
(Officer)
of All States Asphalt, Incbe and hereby is authorized to execute contracts and bonds in
the name and on behalf of said corporation , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of All States Asphalt, Incen
its behalf by such officer under seal of corporation , shall be valid and binding
upon All States Asphalt, Inc.
Asst.
I hereby certify that I am the clerk of the above named All States Asphalt, In%nd
that Alan L. Chicoine
is the duly elected officer as above of said
corporation , and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
February 9, 2012 lam'
(Date) Asst. (Clerk)
Rebecca A. Bland
Town of North Andover IFB Page 31 of 33
Pavement Reclamation and Grading
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature Date February 9, 2012
Alan L. Chicoine, Division Manager All States Asphalt, Inc.
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
Alan L. Chicoine , authorized signatory for All States Asphalt, Inc.
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
Si�a f (7���
gnature Alan L. Chicoine
Division Manager
Town of North Andover IFB
Pavement Reclamation and Grading
February 9, 2012
Date
Page 29 of 33
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature
Alan L. Chicoine, Division Manager
Print Name & Title
Town of North Andover IFB
Pavement Reclamation and Grading
Date February 9, 2012
All States Asphalt, Inc.
Company Name
Page 30 of 33
All States Asphalt, Inc.
PO Box 91, Sunderland, MA 01375 • 413.665.7021
ALL STATES ASPHALT, INC., AND SUBSIDIARIES
It is the continuing policy of All States Asphalt, Inc., and Subsidiaries to recruit and employ the
best qualified individuals without regard to race, color, creed, religion, national origin, age, sex,
sexual orientation, handicap or status as a disabled Vietnam era veteran as defined and required
by federal and state laws and regulations.
Equal employment opportunity applies to all personnel actions including, but not limited to, the
following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising;
layoff or termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeships.
ALL STATES ASPHALT, INC., AND SUBSIDIARIES shall post in conspicuous places,
available to employees and applicants for employment, notices to be provided by the
Government setting forth the provisions of this non-discrimination clause.
An Equal Opportunity Employer
WAGE RATE CERTIFICATION
This is to certify that ALL STATES ASPHALT, INC., AND SUBSIDIARIES, P.O. BOX 91,
SUNDERLAND, MA 01375 will pay the prevailing wage rates as determined by the
Massachusetts Department of Labor and Industries as required by M.G.L. Chapter 149 Section
26 and 27D.
Alan L. Chicome, Division Manager
ALL STATES ASPHALT, INC., AND SUBSIDIARIES
• s
All States Asphalt, Inc. PO Box 91
Sunderland, MA 01375
All States Materials Group TM 413-665-7021
Town of Berlin, MA
Town of Randolph, VT
City of Newburyport, MA
Town of Franklin, NH
Town of Orange, MA
Town of Pomfret, CT
RECLAMATION
REFERENCES
Highway Department
PO Box 274
Berlin, MA 01503
Dennis Bartlett
$ 22,604.40 / 2010
Public Works Department
Drawer B
Randolph, VT 05060
Robert Runnals
$ 29,282.77 / 2010
978.838.2898
802.728.5110
Department of Public Services 978.465.4464
16A Perry Way
Newburyport, MA 01950
Joe McKay
$ 53,975.00 / 2010
Highway Department
43 West Bow Street
Franklin, NH 03235
George Turcotte
$ 39,429.94 / 2010
Highway Department
6 Prospect Street
Orange, MA 01364
David Frye
$ 11,264.00 / 2010
Highway Department
5 Haven Road
Pomfret Center, CT 06259
Glenn Postemski
$ 28,735.00 / 2010
— An Equal Opportunity Employer
603.934.4103
978.544.1111
860.974.3358
All States Asphalt, Inc. PO Box 91
Sunderland, MA 01375
All States Materials Group- 413-665-7021
RECLAMATION EQUIPMENT
DESCRIPTION
YEAR
MAKE
MODEL / SERIAL #
Reclaimer
2006
Wirtgen
WR -2500 / 04WRO178
Reclaimer
2002
CAT
RM350 / 7FS00219
Truck
1993
Mack
RD688SO15884
Lowbed
1999
Etnyre
RTN50T / Q26574
Vibratory Roller
1997
CAT
CS563C / 4KNO0867
Vibratory Roller
1998
CAT
CS563C / 4KN1047
Vibratory Roller
2007
CAT
CS563D / JCNG02091
Grader
1995
CAT
140G
Grader
1995
John Deere
672
Calcium Distributor
1997
Mack
RD600GKO01689
All Equipment is OWNED and not rented or leased.
An Equal Opportunity Employer
All States Asphalt, Inc.
All States Materials Group o
CORPORATION CERTIFICATE TO ACTION
I, Rebecca A. Bland, do hereby certify:
PO Box 91
Sunderland, MA 01375
413-665-7021
THAT I am the Assistant Clerk of All States Asphalt, Inc., and Subsidiaries, a
Massachusetts Corporation having its usual place of business in Sunderland,
Massachusetts;
THAT pursuant to prior authority granted by the Directors of All States Asphalt, Inc., and
Subsidiaries, pursuant to Massachusetts General Laws Chapter 156B, Section 59, the
following continuing and durable power and authority has been
VOTED: That Richard J. Miller, or Alan L. Chicoine, or James P.
Tudryn, or either of them, is authorized and empowered to alone, make, enter into,
sign, seal, and deliver on its behalf, all bids, offers, and resulting contracts and
agreements on behalf of the Corporation and lawfully obligate it in connection therewith.
I hereby certify that the above is a true and correct copy of the record; that said authority
has not been amended or repealed, and is in full force and effect as of this date; and that
the said Richard J. Miller, Alan L. Chicoine and James P. Tudryn remain as
authorized agents of the Corporation for such purposes, without exception.
Seal ATTEST:
February 9, 2012
Date
Assistant Clerk — Rebecca A. Bland
An Equal Opportunity Employer
A
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible and responsive bidder offering the lowest
aggregate price in the base bid only for the first year of the proposed contract. All prices are to
remain firm for the duration of the Contract.
March 1, 2012 through February 28, 2013
uantit
Pavement Reclamation
and Grading 12,000 sq yards
March 1, 2013 through February 28, 2014
Pavement Reclamation
and Grading 12,000 sq yards
March 1, 2014 through February 28, 2015
Pavement Reclamation
Unit Price Total Price
$ 1 .37 /sq yd $ 16,440.00
$ 1 .40 /sq yd $ 16,800.00
and Grading 12,000 sq yards $ 1 .44 /sq yd $ 17, 280 . 0 0
Addenda R% are acknowledged:
Signature
Business Name BUSBY CONSTRUCTION CO., INC.
Business Phone 603-362-4650 Fax 603-362-5051
PALTI, D RLJSBY
Name of Person Authorized to sign Price Proposal
PRESIDENT
Title of Persqp Authorized to sign Price Proposal
Signature of Above Person
Town of North Andover IFB
Pavement Reclamation and Grading
Page 8 of 33
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature Date 2/9/12
PAUL D. BUSBY, PRESIDENT BUSBY CONSTRUCTION CO., INC.
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
PATTT. 1)_ RUSRY , authorized signatory for BUSBY CONSTRUCTION CO. , INC.
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
Signature
PAUL D. BUSBY, PRE NT
Town of North Andover TFB
Pavement Reclamation and Grading
2/9/12
Date
Page 29 of 33
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature Date 2/9/12
Print Name & Title
Town of North Andover IFB
Pavement Reclamation and Grading
MEN 6*1 •R RN Q "110 [so IN I lei v welq_qv
Company
Page 30 of 33
BUSBY CONSTRUCTION CO., INC
9 POND LANE
ATKINSON, NH 03811
(603) 3624650
FAX (603) 362-5051
CERTIFICATE OF VOTE
I, Virginia A. BusbX hereby certify that I am duly elected Secretary/Treasurer of Busby
Construction Co., Inc., I hereby certify the following is a true copy of a vote taken at a meeting
of the Board of Directors of the Corporation, duly called and held on July 1, 2011 at which a
quorum of the Board was present and voting.
VOTED: That Paul D. Busby is duly authorized to enter into a specific agreement: Pavement
Reclamation and Grading Project namely with Town of North Andover, Massachusetts and
further authorized to execute any documents which may in her judgment be desirable or
necessary to effect the purpose of this vote.
I hereby certify that said vote has not been amended or repealed and remains in full force and
effect as of February 1, 2012, and that Virginia A. Busbx is duly elected Secretary/Treasurer of
this Corporation.
DATED: February 8, 2012 ATTEST: A x Corp. Seal)
Virginia A. usby, Secretakeasurer
On February 8, 2012 before me, the undersigned, a Notary Public in and for the State of New
Hampshire personally appeared Virginia A. Busbx of Busby Construction Co., Inc. personally
known to me has proven to me on the basis of satisfactory evidence to be the person whose
name is subscribed to the within instrument and acknowledged that she exe ut the'same in
the capacity stated above. Notary Public ,_
MICHAEL P. H
Notary Public - New Hampshire
My Commission Expires July 13, 2016
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the
held on it was
VOTED, THAT
(Name)
(Officer)
of be and hereby is authorized to execute contracts and bonds in
the name and on behalf of said , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of on
its behalf by such officer under seal of , shall be valid and binding
upon
that
I hereby certify that I am the clerk of the above named
and
is the duly elected officer as above of said
and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
(Date)
(Clerk)
Town of North Andover IFB Page 31 of 33
Pavement Reclamation and Grading
BUSBY CONSTRUCTION CO., INC
9 POND LANE
ATKINSON, NH 03811
(603) 362-4650
FAX (603) 362-5051
�21
Proof of 5 years experience/ prequalification in pavement reclamation.
Massachusetts D.O.T State Prequalification Certificates
New Hampshire D. 0. T. State Prequalification Certificates
ITEM A:
Proof of S years experience/ prequalification in pavement reclamation.
Massachusetts D.O.T State Prequalification Certificates
New Hampshire D. 0. T. State Prequalification Certificates
DEVAL L. PATRICK, GOVERNOR
TIMOTHY R MURRAY, LT. GOVERNOR
JEFFREY B. MULLAN, SECRETARY & CEO
LUISA PAIEWONM, ADMINISTRATOR
Busby Construction Co., Inc.
9 Pond Lane
Atkinson, NH 03811 -
Dear Contractor:
Moving Massachusetts forward
M X, K,'D
�'AY OT
•� Highway
February 22, 2011
Prequalification Certificate No B143-19
In accordance with the Regulations Governing Prequalification of Contractors, as approved by the Massachusetts Highway
Department Prequalification Committee, you are hereby notified that the following class(es) of work, Single Contract Limitation(s)
(if applicable) and Aggregate Bonding Capacity have been assigned to you as of date of this letter. If in the opinion of the Committee
you failed to submit proper documentation or have not demonstrated the ability to perform all classes of work requested then you
were denied Prequalification Status for that class(es) of work.
Qualified Categories Limit Amount
Sewer and Water $500,000.00
Drainage $500,000.00
Highway - Construction $2,000,000.00
Pavement - Reclamation $1,500,000.00
Qualified Categories Limit Amount
Bonding Capacity $10,000,000.00 Bond Single Limit $7,500,000.00 Expiration Date 2/28/2012
The class(es) of work, Single Contract Limits and Aggregate Bonding Capacity set forth will continue in effect until February 28,
2012 unless previously modified or rescinded in accordance with the Regulations, or by law. In order to be continuously eligible to
bid on projects to be undertaken for this Department, your next Prequalification Statement should be submitted at least 30 days prior
to expiration of this Certificate. If there are any questions or concerns contact the Prequalification & Contract Administrator at (617)
973-7620.
Contractors may only obtain an Official Proposal Book for work in the categories for which they are listed on this certificate.
No official proposal books shall be given to contractors unless the contractor has received prior approval from the
Prequalification Office to bid on the project.
Very truly yours,
THE PRE ALIFICATION
M' e .C.OMpM�I
EE
�
By: ;G �
le Mochnoc Higgins, ;7/E
Director of Prequalification
KI
DEVAL L. PATRICK, GOVERNOR
TIMOTHY P. MURRAY, LT. GOVERNOR
JEFFREY B. MULLAN, SECRETARY & CEO
LUISA PAIEWONSKY, ADMINISTRATOR
Busby Construction Co., Inc.
9 Pond Lane
Atkinson, NH 03811 -
Dear Contractor:
Mo ving Massacharettr Forward.
MaSSLJOT
its % APORk
Highway
,„s.
December 21, 2009
Prequalification Certificate No B143-18
In accordance with the Regulations Governing Prequalification of Contractors, as approved by the Massachusetts Highway
Department Prequalification Committee, you are hereby notified that the following class(es) of work, Single Contract Limitation(s)
(if applicable) and Aggregate Bonding Capacity have been assigned to you as of date of this letter. If in the opinion of the Committee
you failed to submit proper documentation or have not demonstrated the ability to perform all classes of work requested then you
were denied Prequalification Status for that class(es) of work.
Qualified Categories
Highway Construction
Landscaping & Roadside Dev
Reclamation
Sewer & Water
Utilities
Limit Amount Qualified Categories
$2,000,000.00
$250,000.00
$1,500,000.00
$500,000.00
$300,000.00
Bonding Capacity $10,000,000.00 Bond Single Limit $7,500,000.00
Limit Amount
Expiration Date 1213112010
The class(es) of work, Single Contract Limits and Aggregate Bonding Capacity set forth will continue in effect until December 31,
2010 unless previously modified or rescinded in accordance with the Regulations, or by law. In order to be continuously eligible to
bid on projects to be undertaken for this Department, your next Prequalification Statement should be submitted at least 30 days prior
to expiration of this Certificate. If there are any questions or concerns contact the Prequalification & Contract Administrator at (617)
973-7620.
Contractors may only obtain an Official Proposal Book for work in the categories for which they are listed on this certificate.
No official proposal books shall be given to contractors unless the contractor has received prior approval from the
Prequalification Office to bid on the project.
Very truly yours,
THELPREALIFICATION COMMITTEE
B/
F cis H. Kucharski, P.
Construction Contracts Engineer
M
TRAO THY P, 1atorxrx4r
Busby Construction Co., Inc.
9 Pond Lane
Atkinson, NH 03811 -
Dear Contractor:
THE COMMONWEALTH, 0fy EV
> O.UTI E. arm -01 OF ` RiANSPORTATI $ .
MA8SACHUSETTS HictiwAY DFP.RTMENT
November 3, 2008
Prequalification Certificate No B143-17
RERNARD cyi�.±i3;'NhiKy� ...
LurSr #grit u,a.raS�.v
In accordance with the Regulations Governing Prequalification of Contractors, as approved by the Massachusetts Highway
Department Prequalification Committee, you are hereby notified that the following class(es) of work, Single Contract Limitation(s)
(if applicable) and Aggregate Bonding Capacity have been assigned to you as of date of this letter. If in the opinion of the Committee
you failed to submit proper documentation or have not demonstrated the ability to perform all classes of work requested then you
were denied Prequalification Status for that class(es) of work.
Qualified Categories Linrit Amount
Qualified Calegorie,5 Li1nit.,4n:ourrt
Highway Construction $2,000,000.00
Landscaping & Roadside Dev. $250,000.00
Reclamation $1,500,000.00
Sewer & Water $500,000.00
Bonding Capacity $10,000,000.00
Bond Single Limit $7,500,000.00 Expiration Date 11!3012009
The class(es) of work, Single Contract Limits and Aggregate Bonding Capacity set forth will continue in effect until November 30
2009 unless previously modified or rescinded in accordance with the Regulations, or by law. In order to be continuously eligible to
id on projects to be undertaken for this Department, your next Prequalification Statement should be submitted at least 30 days prior
to expiration of this Certificate. If there are any questions or concerns contact the Prequalification & Contract Administrator at (617)
973-7620.
Contractors may only obtain an Official Proposal Book for work in the categories for which they are listed on this certificate.
No official proposal books shall be given to contractors unless the contractor has received prior approval from the
Prequalification Office to bid on the project.
Very truly yours,
THE PRE�UALIFICATION COMMITTEE
By -
C'
Fra cis H. Kucharski, P. E.
Construction Contracts Engineer
e�
ly
t /
t 1
0t.,n L. PAtRwr,
Lit :tatrto_ni Gsr.rt:ur,m
Busby Construction Co., Inc.
9 Pond Lane
Atkinson, NH 03811 -
Dear Contractor:
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF TRANSPORTATION
MASSACI-tUSET'1'S HIGI-IWA.Y DEPARTMENT
October 22, 2007
Prequalification Certificate No B143-16
E07
13rtt!imin, Com!i
S P C!tI -ARY
Lvisn. Pm€n '3?V;KY
In accordance with the Regulations Governing Prequalification of Contractors, as approved by the Massachusetts Highway
Department Prequalification Committee, you are hereby notified that the following class(es) of work, Single Contract Limitation(s)
(if applicable) and Aggregate Bonding Capacity have been assigned to you as of date of this letter. If in the opinion of the Committee
You failed to submit proper documentation or have not demonstrated the ability to perform all classes of work requested then you
were denied Prequalification Status for that class(es) of work.
Qualified Categories Liniit Amount
Highway Construction $2,000,000.00
Landscaping & Roadside Dev. $250,000.00
Reclamation $1,500,000.00
Sewer & Water $500,000.00
Qualirted Categories Limit Amount
Bonding Capacity $8,000,000.00 Bond Single Limit $5,000,000.00 Cvpiration Date 10/31/2008
The class(es) of work, Single Contract Limits and Aggregate Bonding Capacity set forth will continue in effect until October 31,
2008 unless previously modified or rescinded in accordance with the Regulations, or by law. In order to be continuously eligible to
bid on projects to be undertaken for this Department, your next Prequalification Statement should be submitted at least 30 days prior
to expiration of this Certificate. If there are any questions or concerns contact the Prequalification & Contract Administrator at (617)
973-7620.
Contractors may only obtain an Official Proposal Book for work in the categories for which they are listed on this certificate.
No official proposal books shall be given to contractors unless the contractor has received prior approval from the
Prequalification Office to bid on the project.
Very truly yours,
THE PREQ,ALIPICATIO'N CIOMMITfEE
Francis H. KudharskP. E.
Acting Construction Contracts Engineer
THE STATE OF NEW HAMPSHIRE
�wR jsJ'w7 DEPARTMENT OF TRANSPORTATION x
Department of Transportation
GEORGE N. CAMPBELL, JR. JEFF BRILLHART, P.E.
COMMISSIONER January 5, 2011 ASSISTANT COMMISSIONER
REVISED
Busby Construction Company, Inc.
9 Pond Lane
Atkinson, NH 03811
Gentlemen:
Your request for prequalification in order that you may bid on construction
projects advertised and let by this Department has been reviewed and analyzed by the
Prequalification Committee. The Department assigns ratings in various
classifications, some of which are listed below:
Road Construction
Site
Water
Traffic Signals
Building Construction
Mechanical
Asbestos Removal
Bridge Construction
Utilities
Sewer
Highway Lighting
Bridge Painting
Electrical
Paving
Eligibility for bidding on a particular project will be determined by the
Prequalification Conn iittee at the time that the request for plans, specifications and a
proposal is made. Their decision will be based on the magnitude and complexity of
the project in question and on the requesting firm's capability to successfully
prosecute to completion the particular project.
Your firm has been rated on a project -by -project basis for those projects in
the following classifications: Road Construction and Road Reclamation, Small
Bridge Construction, Box Culverts, Site Work, Water, Sewer, Tank Removal
and Tank Replacement. Your prequalification will expire on March 31, 2011.
All prequalification information supplied to this office will be held in strict
confidence and used for no other purpose than for prequalification for bidding on
projects advertised and let by this Department.
Sincerply,
eborah A. Weil
Prequalification Administrator
JOHN 0. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483
TELEPHONE: 603-271-3402• FAX: 603-271-1558 • TDD ACCESS: RELAY NH 1-800-735-2964 . INTERNET: WWW.NHDOT.COM
rev. 3/07
THE STATE OF NEW HAMPSHIRE
DEPARTMENT OF TRANSPORTATION
Deportment of Transportation
GEORGE N. CAMPBELL, JR.
COMMISSIONER
REVISED
Busby Construction Company, Inc.
9 Pond Lane
Atkinson. NH 03811
Gentlemen:
JEFFBRILLIIART, P.E.
February 1, 2010 ASSISTANT COMMISSIONER
Your request for prequalification in order that you may bid on projects
advertised and let by this Department has been reviewed and is in compliance with the
prequalification regulations for Public Works and/or Specialty projects valued at under
$500,000. The Department assigns ratings in the various classifications, some of which are
listed below:
Site
Water
Traffic Signals
Building Construction
Mechanical
Asbestos Removal
Flooring
Utilities
Sewer
Highway Lighting
Bridge Painting
Electrical
Landscaping
Roofing
Eligibility for bidding on a particular project will be determined by the
Prequalification Committee at the time that the request for plans, specifications and a
proposal is made. Their decision will be based on the magnitude and complexity of the
project in question and on the requesting firm's capability to successfully prosecute to
completion the particular project.
Your firm has been rated on a project by- project basis for those projects in the
followinn, classifications: Road Construction and Road Reclamation, Small Bridge
Construction, Box Culverts, Site Work, Water, Sewer, Tank Removal and Tank
Replacement. This Prequalification will expire on March 31, 2010.
All prequalification information supplied to this office will be held in strict
confidence and used for no other purpose than for prequalification for bidding on projects
advertised and let by this Department.
�rncerely,
Deborah A. Weil
Prequalification Administrator
JOHN 0. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483
TELEPHONE: 603-271-3402• FAX: 603-271-1558 • TDD ACCESS. RELAY NH 1-800-735-2964 • INTERNET: WWW.NHDOT.COM
rec. 10'
GEORGE N. CAMPBELL, JR.
COMMISSIONER
THE STATE OF NEW_ HAMPSHIRE
DEPARTMENT OF TRANSPORTATION
Busby Construction Co., hlc.
9 Pond Lane
Atkinson, NH 03811
Gentlemen:
JEFFBRILLIIART, P.E.
March 18, 2009 ASSISTANT COMMISSIONER
Your request for prequalification in order that you may bid on projects
advertised and let by this Department has been reviewed and is in compliance with the
prequalification regulations for Public Works and/or Specialty projects valued at under
$500,000. The Department assigns ratings in the various classifications, some of which are
listed below:
Site
Water
Traffic Signals
Building Construction
Mechanical
Asbestos Removal
Flooring
Utilities
Sewer
Highway Lighting
Bridge Painting
Electrical
Landscaping
Roofing
Eligibility for bidding on a particular project will be determined by the
Prequalification Connnittee at the time that the request for plans, specifications and a
proposal is made. Their decision will be based on the magnitude and complexity of the
project in question and on the requesting firm's capability to successfully prosecute to
completion the particular project.
Your firm has been rated on a project -by -project basis for those projects in the
following classifications: Road Construction and Road Reclamation, Box Culverts, Site
Work, Water, Sewer; Tank Removal and Tank Replacement. This prequalification will
expire on March 31, 2010.
All prequalification information supplied to this office will be held in strict
confidence and used for no other purpose than for prequalification for bidding on projects
advertised and let by this Department.
Sincerely,
eborah A. Weil
Prequalification Administrator
JOHN 0. MORTON BUILDING . 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483
TELEPHONE: 603-271-34029 FAX: 603-271-1558 • TDD ACCESS: RELAY NH 1-800-735-2964 • INTERNET: WWW.NHDOT.COM
rev. 3/07
r r
r
' 4
/vow � i���� THE STATE OFNET� ILAMPSHIRE
DEPARTMENT OF TRANSPORTATION
CHARLES P. O'LEARY, JR
COMMISSIONER
March 22, 2008
Busby Construction Company, Inc.
9 Pond Lane
Atkinson, NH 03 811
Gentlemen:
Jeff Brillhart, P.E.
Assistant Commissioner
Your request for prequalification in order that you may bid on construction
projects advertised and let by this Department has been reviewed and analyzed by the
Prequalification Committee. The Department assigns ratings in several classifications
some of which are listed below:
Road Construction
Bridge Construction
Site
Utilities
Water
Sewer
Traffic Signals
Highway Lighting
Building Construction
Bridge Painting
Mechanical
Electrical
Asbestos Removal
Paving
Your firm has a Maximum Capacity Rating of $8,000,000 for the following
classifications: Road Construction and Road Reclamation Construction, Box
Culverts, Site Work, Water, Sewer, Tank Removal and Tank Replacement. This
prequalification will expire on March 31, 2009.
All prequalification information supplied to this office will be held in strict
confidence and used for no other purpose than for prequalification for bidding on
projects. advertised and let by this Department.
Sincerely,
Deborah A. Well
Prequalification Administrator
JOHN 0. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483
TELEPHONE: 603-271-3402 • FAX: 603-271-1558 • TDD ACCESS: RELAY NH 1-800-735-2964 • INTERNET:
' S
/vow �'w� Ire THE STATE OF ATEW HAMPSHIRE
DEPARTMENT OF TRANSPORTATION
CHARLES P. O'LEARY, JR
COMMISSIONER
April 26, 2007
Busby Construction Co., Inc.
9 Pond Lane
Atkinson, NH 03811
Gentlemen:
S`PtE OF,�
S� E�
Z
17 7b'
JeffBrillhart, P.E.
Assistant Commissioner
Your request for prequalification in order that you may bid on construction
prs�jects advertised and let by this. Department has been reviewed and analyzed by the
Prequalification Committee. The Department assigns ratings in several classifications
some of which are listed below:
Road Construction
Bridge Construction
Site
Utilities
Water
Sewer
Traffic Signals
Highway Lighting
Building Construction
Bridge Painting
Mechanical
Electrical
Asbestos Removal
Paving
Your firm has a Maximum Capacity Rating of $8,000,000 for the following
classifications: Road Construction and Road Reclamation, Box Culverts, Site
Work, Water, Sewer, Tank Removal and Tank Replacement. This prequalification
will expire on March 31, 2008.
All prequalification information supplied to this office will be held in strict
confidence and used for no other purpose than for prequalification for bidding on
proiects advertised and let by this Department.
Sincerely,
eborah A. Weil
Prequalification Administrator
JOHN 0. MORTON BUILDING • 7 HAZEN DRIVE • P.O. BOX 483 • CONCORD, NEW HAMPSHIRE 03302-0483
TELEPHONE: 603-271-3402 • FAX: 603-271-1558 9 TDD ACCESS: RELAY NH 1-800-735-2964 • INTERNET:
9
ITEM B
BUSBY CONSTRUCTION CO., INC
9 POND LANE
ATKINSON, NH 03811
(603) 362-4650
FAX (603) 362-5051
LIST OF SIMILAR PROJECTS 2/9/2012
Owner
Town of Salem
Capital Projects & Eng.
33 Geremonty Drive
Salem, NH 03079
Town of Hampstead
11 Main Street
Hampstead, NH 03841
City of Laconia
Engineering Office
45 Beacon Street East
Laconia, NH 03246
Project Description
North Main Street
Reconstruction
2009
Asphalt Reclamation
Project 2011
Road Reconstruction
Proect: 2009,2010,2011
Contact
Robert Puff,Director
603-890-2033
Jon Worthen, Road Agent
603-235-9813
Paul Moynihan
527-1226
City of Lowell Pavement Reclamation Ron Labrecque
375 Merrimack Street 2010 978-399-3342
Lowell, MA 01852
BUSBY CONSTRUCTION CO., INC
9 POND LANE
ATKINSON, NH 03811
(603) 362-4650
FAX (603) 362-5051
ITEM �C
EQUIPMENT OWNED AND AVAILABLE FOR PROPOSED WORK
QTY.
DESCRIPTION
CONDITION
YR
SIZE
1
ROADTEC SX -7 RECLAIMER
EXCELLENT
11
1
CMI RS650 RECLAIMER
GOOD / EXCELLENT
00
1
CAT 14H GRADER
GOOD
96
16' Mow Board
1
CAT 140G GRADER
GOOD
93
14' Mow Board
1
CAT 980GII LOADER
EXCELLENT
05
8.0 CY
1
CAT 966F LOADER
GOOD / EXCELLENT
97
5.0 CY
1
CAT 966D LOADER
GOOD
86
4.0 CY
1
CAT 938G LOADER
EXCELLENT
01
3.5 CY
1
CAT 930G LOADER
EXCELLENT
07
3.0 CY
1
CAT IT28F LOADER
GOOD / EXCELLENT
96
3.0 CY
1
KOMATSU WA250 LOADER
GOOD
83
2.5 CY
1
CAT 236 SKIDSTEER LOADER
EXCELLENT
00
Skid Steer
1
KUBOTA R520 LOADER
EXCELLENT
03
Mini
1
HYUNDAI 450 EXCAVATOR
GOOD / EXCELLENT
07
3.0 CY Track
1
CAT 325 EXCAVATOR
EXCELLENT
05
1.5 CY Track
1
CAT 321 DCLR EXCAVATOR
EXCELLENT
10
1.0 CY Track
1
CAT M318D EXCAVATOR
EXCELLENT
07
1.5 CY Rubber Tire
1
CAT 214B EXCAVATOR
GOOD
95
1.0 CY Rubber Tire
1
CAT 315 EXCAVATOR
GOOD / EXCELLENT
96
5/8 CY Track
1
CAT E120 EXCAVATOR
GOOD
91
5/8 CY Track
1
KUBOTA KX121 MINI EXCAVATOR
EXCELLENT
02
Mini
1
KUBOTA KX080 MINI EXCAVATOR
EXCELLENT
09
Mini
3
JCB 215S BACKHOES
GOOD / EXCELLENT
98,96,94
4WD Rubber Tire
1
KOMATSU D61 EX CRAWLER/DOZER
EXCELLENT
00
Medium
1
CAT D -3C DOZER
GOOD
95
Small
1
JOHN DEERE 850 DOZER
GOOD
85
Small
2
ARTICULATED HAULERS
GOOD
90
25.0 CY
3
MACK TRACTORS
GOOD / EXCELLENT
07,00,92
4
LOWBED TRAILERS
EXCELLENT
11,05,99,96
2
TRIAXLE DUMP TRAILERS
GOOD / EXCELLENT
97,94
30.0 CY Body
5
MACK TRIAXLES
GOOD / EXCELLENT
03,01,01,99,87
20.0 CY Body
2
MACK WATER TRUCKS
GOOD
86,77
4,000 Gallon
2
INGERSOLL-RAND SD -115D ROLLERS
EXCELLENT
01,01
Padfoot
1
CAT CS563 COMPACTOR
GOOD / EXCELLENT
95
12 Ton
1
CAT CS533E COMPACTOR
EXCELLENT
00
10 Ton
1
HYPAC C830B COMPACTOR
GOOD / EXCELLENT
96
8 Ton
1
M9 DUMP SWEEPER
GOOD / EXCELLENT
88
1
REED SCREENALL
GOOD
88
RD 90
1
SHOULDER WIDENER
EXCELLENT
99
3
SIGN BOARDS
GOOD
04,04,96
MISC. TRAILERS, SAWS, SM. EQUIP
v
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible and responsive bidder offering the lowest
aggregate price in the base bid only for the first year of the proposed contract. All prices are to
remain firm for the duration of the Contract.
March 1, 2012 through February 28, 2013
Quantity
Pavement Reclamation
and Grading 12,000 sq yards
March 1, 2013 through February 28, 2014
Pavement Reclamation
and Grading 12,000 sq yards
March 1, 2014 through February 28, 2015
Unit Price
$ 1 . (, S /sq yd
$ 1 ., o /sq yd
Pavement Reclamation
and Grading 12,000 sq yards $9,10 /sq yd
Addenda - C> are acknowledged:
Signature
Business Name Gpko-AVR)Pp+ 0 yy�. �,y1C.
Business Address as Pele-r -s C-- 0 6 00s,
Business Phone S 6 0- Lt 3- 93D0 Fax 86 o- o y 3- 3 i o 0
51 C,Q ef,n C-0nr r k j -
Name of Person Authorized to sign Price Proposal
Title of Person Authorized to sign Price Proposal
of Above
Town of North Andover IFB
Pavement Reclamation and Grading
Total Price
$ 1 soo, Cc
$Vis: oo. o
Page 8 of 33
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature Date i •a
�,C'M Cmrr,t. �1•,c_e.P11-5Iae;, c�^y'I 1 s e M 11
Print Name & Title Company ame
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
S 1-e,,,e o G o cr-A•, , authorized signatory for Cir-, 1,1 q pVo, � I- ?eeAe"'
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
A' 4d a
Signatur JDate
Town of North Andover IFB Page 29 of 33
Pavement Reclamation and Grading
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature
S Vu) env, Gcx, . i c,e Pres, A
Print Name & Title
Town of North Andover IFB
Pavement Reclamation and Grading
Date
Go -C-1 �,4 as01,, V'
Company Name
Page 30 of 33
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the C,},� c��nh� y i- l�e�cz,vr;, ►�,Ine.
held on �, 1, ap 1 I it was
VOTED, THAT
(Name) (Officer)
Gc,-Nr%�t Aa- PhaA1-
of Re1"; rs� \,,,, . be and hereby is authorized to execute contracts and bonds in
the name and on behalf of said and affix its corporate seal hereto;
C,+,x-r. 1- y Yip P6taA h
and such execution of any contract or obligation in the name of R ��c, ; , ; �on
its behalf by such officer under seal of 2 ; , shall be valid and binding
Gamer; V-A f+!2 P►"Jt--
upon ., t Y)C .
I hereby certify that I am the clerk of the above named and
that �t-� ,f,,, Co,rr,l-., is the duly elected officer as above of said
and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
(Date) (Clerk)
Town of North Andover IFB Page 31 of 33
Pavement Reclamation and Grading
coty r
A
V Z(.mo, OIC 02A33
�M s�
William Francis Galvin
Secretary of the
COD1monwealth February 1, 2012
To Whom It May Concern:
I hereby certify that the records of this office show that
GARRITY ASPHALT RECLAIMING, INC.
a corporation organized der -the. .laws of Connecticut,nnA„ugust-3;,1995-vas-qualified-to-do------ --
business in this Commonwealth on September 29, 1995 under the provisions of the General
Laws, and I further certify that said corporation is still qualified to do business in this
Commonwealth.
I also certify that said corporation is not delinquent in the filing of any annual reports
required to date.
Processed By crm
In testimony of which,
I have hereunto affixed the
Great Seal of the Commonwealth
on the date first above written.
Secretary of the Commonwealth
RECLAIMING
AND/OR
RECLAIM, FINE GRADE AND ROLL
MUNICIPAL WORK PERFORMED
2010-2011
Town/City
Contact
Phone No.
Dartmouth
David Hickox
508-999-0740
Hopkinton
J.T. Gaucher
508-497-9740
Medway
Thomas Holder
508-533-3275
Spencer
Rob McNeil
508-885-7525
Haverhill
Tom Shanahan
978-374-2364
Shelburne
Pete Hillman
413-625-0311
Also, many town jobs worked on for other General Contractors.
��AFFERTY
F/NE GRAD/NG, INC.
Asphalt Reclamation - Fine Grading - Cold Planing - Sweeping
February 7, 2012
Town of North Andover
Office of the Town Manager
120 Main Street
North Andover, MA 01845
Re: Pavement Reclamation and Grading
To Whom It May Concern:
Thank you for the opportunity to bid with the Town of North Andover for Pavement Reclamation and
Grading. Enclosed are our original proposal, Certificate of Vote, Certificate of Non -Collusion, the
Certificate of Tax Compliance, the Certification of Labor Harmony and OSHA Training Requirements
and list of similar contracts performed.
Due to a schedule conflict, we will not be available to attend the bid opening. Would you please email
or fax us the results of all bidders?
I can be reached at the office if you require additional information. Thank you for your consideration.
Vice President
RLR/sim
Enclosures
57 South Rd., Enfield, CT 06082
Toll Free 866-763-0100 / Local 860-763-0100
Toll Free Fax 866-763-0400 / Local Fax 860-763-2223
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible and responsive bidder offering the lowest
aggregate price in the base bid only for the first year of the proposed contract. All prices are to
remain firm for the duration of the Contract.
March 1, 2012 through February 28, 2013
Quantily Unit Price Total Price
Pavement Reclamation
and Grading 12,000 sq yards $ 1 .478 /sq yd $17,736.00
March 1, 2013 through February 28, 2014
Pavement Reclamation
and Grading 12,000 sq yards $ 1 .574 /sq yd $18,888.00
March 1, 2014 through February 28, 2015
Pavement Reclamation
and Grading 12,000 sq yards $ 1 .676 /sq yd $20,112.00
Addenda �`"``.. are
Business Name Rafferty Fine Grading, Inc.
Business Address 57 South Road, Enfield, CT 06082
Business Phone 860-763-0100 Fax 860-763-2223
Rhonda L. Rafferty, Vice President
Name of Person Authorized to sign Price Proposal
Vice resident
Tirson Authori4d t) sign Price Proposal
of Above Person
Town of North Andover IFB Page 8 of 33
Pavement Reclamation and Grading
CERTIFICATE OF VOTE
Ata my authorized meeting the Board of Directors of the RaffErtY Fine GradiM► Inc.
held on130 ) )-- it was
VOTED, THAT
Rha -da L. Rafferty Viae Presi�Semtmy
(Name) (Officer)
of Rafferty Fine Gradizrg, Inc, be and hereby is authorized to execute contracts and bonds in
the name and on behalf of said Rafferty FSne Grading, Inc. , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of Rafferty Fine Grading, Inc. on
its behalf by such officer under seal of Rafferty Fim Grading,IM. , shall be valid and binding
upon antract ema±icn
I hereby certify that I am the clerk of the above named Rafferty Fine Grading, Inc, and
that Ria L. Paff�Y is the duly elected officer as above of said
Rafferty Fine Gading, Inc. , and that the above vote has not been amended or rescinded and
remains in full force and effect as the d;
Town of North Andover IFB
Pavement Reclamation and Grading
Page 31 of 33
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Si
Date ��/] � I �
Rhonda L. Rafferty, Vice President Rafferty Fine Grading, Inc.
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
Rhonda T,_ Rafferty , authorized signatory for Ra f f Prty Fine Grading, Inc.
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
i
(7/v�
a re Date
Town of North Andover IFB Page 29 of 33
Pavement Reclamation and Grading
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Date a /-7 / J),
Rhonda L. Raffertv, Vice President Rafferty Fine Grading, Inc.
Print Name & Title Company Name
Town of North Andover IFB Page 30 of 33
Pavement Reclamation and Grading
��AFFERTY
F/NE GRAD/NG, INC.
Asphalt Reclamation • Fine Grading • Cold Planing • Sweeping
February 7, 2012.
Town of North Andover
Office of the Town Manager
120 Main Street
North Andover, MA 01 845
Re: Pavement Reclamation and Grading
To Whom It May Concern:
The following is a list of references for municipal work performed by Rafferty Fine Grading, Inc. as requested in the bid
specification package.
Municipal References:
Town
Contact Name
Title
Contact Phone Number
Torrington, CT
Bob Lizotte
Superintendant of Streets
860-489-2352
Vernon, CT
Ron Levesque
Foreman
860-870-3500
Belchertown, MA
Steve Williams
Department of Public Works
413-323-0415
Dennis, MA
Tom. Andrade
Town Engineer
508-760-6166
Falmouth, MA
Peter McConarty
Town Engineer
508495-7432
Sandwich. MA
Stefan Masse
Department of Public Works
508-833-8002
Holliston, MA
Tom Smith
Highway Superintendent
508-429-0616
Somerset, MA
Tom Fitzgerald
Superintendent of Public Works
508-646-2836
Plymouth, CT
Jim Shultz
Superintendent of Public Works
860-585-4030
State of CT DOT District #4
Glen Durante
Transportation Maintenance
General Supervisor
860-379-4414
State of CT DOT District #2
Bill Eyberse
Planning
860-823-3213
State of Connecticut — DOT
Colin Goegel
Aviation Division
860-594-2541
Chatham, MA
Jeff Colby
Superintendent of Public Works
508 -945-5155
Burrillville, RI
Jeff McCormick
Director of Public Works
401-5684440
Please contact me if yoy need any additional information regarding the information above.
R)(6nda L. Rafferty
Vice President
RLR/sim
57 South Rd., Enfield, CT 06082
Toll Free 866-763-0100 / Local 860-763-0100
Toll Free Fax 866-763-0400 / Local Fax 860-763-2223
A
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible and responsive bidder offering the lowest
aggregate price in the base bid only for the first year of the proposed contract. All prices are to
remain firm for the duration of the Contract.
March 1, 2012 through February 28, 2013
Quantity
Pavement Reclamation
and Grading 12,000 sq yards
March 1, 2013 through February 28, 2014
Pavement Reclamation
and Grading 12,000 sq yards
March 1, 2014 through February 28, 2015
Pavement Reclamation
and Grading
Addenda
Business Name
12,000 sq yards
Unit Price Total Price
/sq yd $ O I `10,16
$ a 3.5 a /sg yd $ a 02��
$ a q. j qo /sq yd $ � qa, 36 q
are acknowledged:
Signature
mu4, S�fxes
Business Address J`1 inaujim C w LW r r r i) N U l
Business Phone 3(o,&O Fax ' g 3a • Baa
�Vjrw s - W
Name of Person Authorized to sign Price Proposal
I iuC; vi Eulbuli
Signature
Town of North Andover IFB
Pavement Reclamation and Grading
Page 8 of 33
CERTIFICATE OF VOTE
At a dulyth rized meeting the Board of Directors of the
held on it was
VOTED, THAT
;Nllu� �--
tA- roLvk"at-,6,t --c�4a
CIO., V.
(Officer)
of (I -S , PaW"*Jhp and hereby is authorized to execute contracts and bonds in
the name and on behalf of said (& pp 4 -ti. , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of Q • S• Pact on
its behalf by such officer under seal of S, Pa_� , shall be valid and binding
upon
I hereby certify that I am the clerk of the above named Coe>go r-JaA-*-- and
that rocj ku" is the duly elected officer as above of said
and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
(Date) (Clerk)
Town of North Andover IFB Page 31 of 33
Pavement Reclamation and Grading
14
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature W V
rint Name & Title
Date 2' Z
U.S.Gmmnv sorv'v5 lyp
Company Name
CERTIFICATE OF TAX COMPLIANCE
.Pursuant to Chapter 62C of the Massachusetts General Laws, rSection 49A (b), I
authorized signatory for
arne of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
atur
Town of North Andover IFB
Pavement Reclamation and Grading
2 2
/ / z --
Date
Page 29 of 33
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature
Print Name & Title
Town of North Andover IFB
Pavement Reclamation and Grading
Date Z 12, Z
Company Name
Page 30 of 33
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MASSACHUSETTS 01845
Raymond T Santilh
Assistant Town Manager
Mr. Stephen Johnson
Murray Paving & Reclamation, Inc
55 Whitney Street
Holliston, MA 01746
Dear Mr. Johnson:
NORTf{
Ott«a° 1y
1O F
'� •Oe�r�° ���y4y
�SSACHUs��
March 9, 2012
TEL (978) 688-9516
FAX (978) 688-9556
Enclosed please find the executed contract between the Town of North Andover and
Murray Paving & Reclamation, Inc for pavement reclamation and grading on various projects for
the period of March 1, 2012 through February 28, 2013 in accordance with the Invitation for
Bids issued on January 18, 2012.
In accordance with Massachusetts General Laws, you are required to pay prevailing wage
for work performed under this contract. For each week work is performed, you are required to
submit certified weekly payroll records. The certified weekly payroll records are to be sent to:
Mr. Bruce Thibodeau
Public Works Director
384 Osgood Street
North Andover, MA 01845
If you have any questions and/or concerns, please call me.
Sincerely,
Raymond T. Santilli
Assistant Town Manager
Enclosure
cc., Bruce Thibodeau, Public Works Director
Contract File
URBELIS & FIELDSTEEL, LLP
155 FEDERAL STREET
BOSTON, MASSACHUSETTS 02110-1727
CAROL HAJJAR MCGRAVEY
OF COUNSEL
e-mail chm@uf-law.com
March 6, 2012
Raymond Santilli
Assistant Town Manager
North Andover Town Offices
120 Main Street
North Andover, MA 01845
RE: CONTRACT WITH MURRAY PAVING & RECLAMATION INC.
Dear Ray:
Telephone 978-475-4552
Telephone 617-338-2200
Telecopier 617-338-0122
Enclosed is the above -referenced contract, which has been approved as to form.
Please note that the insurance policies on the certificate expire on April 1, 2012, so you
should obtain updated certificates for the renewed policies when they are issued.
Very truly yours,
&Z4,-,&
04ol Hajjar McGravey
CHM/kmp
Enclosure
w:\wp5I\work\n-andove\corresp\santilli.ltr - contract%docx
MAR. 6,2012 1:06PM HART INSURANCE
N0, 900 P. 2
DAZE (MMIDD/YYM
ACORvF CERTIFICATE OF LIABILITY' INSURANCE 03/06/2012
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS, CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: if the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIV90, subject to
the terns and conditions of the policy, Certain policios may require an endorsement A statement on this certificate does not confer rights to the
certificate holder in lieu of such andorsemenUs). QVNIAUI
Laura Murphy
N
PaoDucER HART INSURANCE AGENCY, INC. PHONE rX6_ (508} 759-7326 508.759-7366
lam a
243 MAIN STREET 6MAL
PO BOX 700 rtessr
prig 6AY MA 0 S25370700 INSURERAFFORDING CovERAGE MAIC s
IsuuA ,
AGGREGATE LIMB' APPLIES PER:
SAFETY INDEMNITY INSURANCE CO 33618
TERMS,
INSLIRP_R A
TRAVELERS PROPERTY CASUALTY INS CO 36161
INSURES Murray Paving & Reclamation Inc 10613866
INSURER B:
14702
55 Whitney Street
NSURER C :
EASTCUARD INSURANCE COMPANY
PO Box 6438
INSURER D
A
Holliston, MA 01746
PRODUCTS.COMP/OPAGG 5
2,000'000
S
INSURER E
Mn SIN WMR
1,000,aaaccida000
INSURER F :
.-.�. n-.,.... ui waorD.
yTHIS . IS- O CERTIFY THAT TME POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DO(
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED h
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
ADDL U PODGY EFF POU
VSR 1SXP
TYPE OF INSURANCE P0UgY NUMBER MrOD MMI
A �EIIERaLuAMUTY 660-3198C615 04/07!2011 04/0112012
COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE W OCCUR
DESORIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 1011, Additional R*FnzFMa Soh9C6% M more sPheo In required)
Operations as performed by Terms & Conditions in the policy.
Town of North Andover additional insured as respects Liability performed by named insured
UAMED ABOVE FOR THE POLICY PERIOD
AGGREGATE LIMB' APPLIES PER:
EREIN IS SUBJECT TO ALL THE
TERMS,
uMITs
EACH OCCURRENCE S
1,000,OOD
MGEN'L
POLICY V PRO LOO
$00,000
c
PREMISES (Ea MEC EXP (Anyono I S
3948825
04/01/2011
04/01/2012
A
AUTOMOBILE UABIt1TY
PRODUCTS.COMP/OPAGG 5
2,000'000
S
Mn SIN WMR
1,000,aaaccida000
ANY AVrO
BODILY INJURY (Pot pereen) $
Included
ODD LYINJURY (Pee a0rAd Al $
Included
PROPER AMAGE $
ED SCHEDULED
Pet
5
EACH OCCURRENCE $
3,000,000
AALL UTOS AUTOS
NON-OWN90
3,000,000
8
VSTAFU- OTH-
HIRED AL1T05 AUTOS
E.L, EACHACCIDENT S
1,000.000
E.L, DISEASE - EA EMPLOYEE S
1.000,000
F.L. DISEASE -POLICY LIMIT 3
1,000,000
CUP -3295Y922
04/01/2011
04/01/2012
g
UMBRELLAL1Aa OCCUR
MEXCESS
LIA6 CLAIM"ADE
DED I I RETENTION
WOMR5COMPENSATION
C
MUWC606772
04/01/2011
04/01/2012
AND EMPL01'E>ZS' LIABILITY YIN
ANY PROPRIETORrPARTNERIE>SEOVTIVE Q
N / A
CPFICE tmeu! 9M EXCLUDED?
DESORIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 1011, Additional R*FnzFMa Soh9C6% M more sPheo In required)
Operations as performed by Terms & Conditions in the policy.
Town of North Andover additional insured as respects Liability performed by named insured
UAMED ABOVE FOR THE POLICY PERIOD
UMENT WITH RESPECT TO WHICH THIS
EREIN IS SUBJECT TO ALL THE
TERMS,
uMITs
EACH OCCURRENCE S
1,000,OOD
DMA R N
5
$00,000
c
PREMISES (Ea MEC EXP (Anyono I S
5,000
VERSONAL&ADVINJURY S
1,000,000
GENERAL AGGREGATE $
2,000,000
PRODUCTS.COMP/OPAGG 5
2,000'000
S
Mn SIN WMR
1,000,aaaccida000
BODILY INJURY (Pot pereen) $
Included
ODD LYINJURY (Pee a0rAd Al $
Included
PROPER AMAGE $
Included
Pet
5
EACH OCCURRENCE $
3,000,000
AGGREGATE $
3,000,000
8
VSTAFU- OTH-
E.L, EACHACCIDENT S
1,000.000
E.L, DISEASE - EA EMPLOYEE S
1.000,000
F.L. DISEASE -POLICY LIMIT 3
1,000,000
CERTIFICATE HOLDER 4r►rv..�,.,s, r rvr.
Town of North Andover
Attention: RM Santilli, Assistant Town Manager SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
120 Main Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
North Andover, Ma. 01845 ACCORDANCE WITH THE POLICY PROVISIONS.
Faxed 878-688-9556 AlrrrtORMm REPRESENTATIVE
01988-2D1O ACORD CORPORATION. All rights reserved.
ACORD 26 (2010105) The ACORD name and IDgo are registered marks of ACORD
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MASSACHUSETTS 01845
Raymond T Santilli
Assistant Town Manager
Attorney Carol McGravey
Urbelis & Fieldsteel, LLP
155 Federal Street
Boston, MA 02110
Dear Ms. McGravey:
NORTH
O�tt�eo ,6 q�0
O A
SSACMUSES
February 22, 2012
TEL (978) 688-9516
FAX (978) 688-9556
Enclosed please find for your review and approval three (3) original contracts, with
accompanying documentation, between the Town of North Andover and Murray Paving &
Reclamation Inc to perform various pavement reclamation and paving projects for Public Works
for the period of March 1, 2012 through February 28, 2013 per the Invitation for Bids issued on
January 18, 2012, 2011.
As the value of the first year of the contact is less than $16,000, a payment bond is not
required. Please note the prevailing wage report is not attached to the contracts being sent to you
due to it being quite large. It will be attached to each contract document prior to final execution.
Thank you in advance for your attention to this matter.
Sincerely,
Raymond T. Santilli
Assistant Town Manager
Enclosures
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MASSACHUSETTS 01845
Raymond T Santilli
Assistant Town Manager
Mr. Stephen Johnson
Murray Paving & Reclamation Inc
55 Whitney Street
Holliston, MA 01746
Dear Mr. Johnson:
February 15, 2012
TEL (978) 688-9516
FAX (978) 688-9556
The Town of North Andover has decided to award a contract to Murray Paving &
Reclamation Inc for pavement reclamation and grading on various projects for the period of
March 1, 2012 through February 28, 2013 in accordance with the Invitation for Bids issued on
January 18, 2012.
Enclosed please find three (3) original standard Town of North Andover contracts for
appropriate review and signature. Please return the signed contract documents and all required
accompanying paperwork to my attention as soon as possible. Please ensure that all insurance
certificates list the Town of North Andover as an "additional insured".
If you have any questions and/or concerns, please call me.
Sincerely,
Raymond T. Santilli
Assistant Town Manager
Enclosures
TOWN OF NORTH ANDOVER
CONTRACT
CONTRACT#
DATE:
This Contract is entered into on, or as of, this date by and between the Town of North Andover
(the "Town"), and
Contractor: Murray Paving & Reclamation Inc
Address: 55 Whitney Street
Holliston, MA 01746
Telephone Number: 508-429-9400
Fax Number: 508-429-9401
1. This is a Contract for the procurement of the following:
Pavement reclamation and grading for various projects for the period of March 1, 2012
through February 28, 2013 in accordance with the Invitation for Bids issued on January 18,
2012
2. The Contract price to be paid to the Contractor by the Town of North Andover is:
Pavement reclamation and grading - $1.29 per square yard
3. Payment will be made as follows:
Upon providing services and receipt of invoice, net 30
4. Definitions:
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services by
authorized representatives of the Town to insure that the goods or services are complete
and are as specified in the Contract.
(Rev 5-2007) Contract by and between Town of North Andover and Murray Paving & Reclamation Inc Page 1
r A
4.2 Contract Documents: All documents relative to the Contract including (where used)
Instructions to Bidders, Proposal Form, General Conditions, Supplementary General
Conditions, General Specifications, Other Specifications included in Project Manual,
Drawings, and all Addenda issued during the bidding period. The Contract documents
are complementary, and what is called for by any one shall be as binding as if called for
by all. The intention of the document is to include all labor and materials, equipment and
transportation necessary for the proper performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as
the sense and particular Contract so require) include Vendor, Contractor, Engineer, or
other label used to identify the other party in the particular Contract. Use of the term
"Contractor" shall be understood to refer to any other such label used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the
services are performed, or the goods delivered, in accordance with Contract documents,
as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes
one who furnished material worked to a special design according to the Drawings or
Specifications of this work, but does not include one who merely furnishes material not so
worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance:
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before February 28, 2013, unless extended pursuant to a provision for
extension contained in the Contract documents at the sole discretion of the Town, and not subject to
assent by the Contractor, and subject to the availability and appropriation of funds as certified by the
Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract.
6. Subject to Appropriation:
Notwithstanding anything in the Contract documents to the contrary, any and all payments which the
Town is required to make under this Contract shall be subject to appropriation or other availability of
funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be
immediately terminated without liability for damages, penalties or other charges.
7. Permits and Approvals:
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance
of the Contract shall be secured and paid for by the Contractor.
(Rev 5-2007) Contract by and between Town of North Andover and Murray Paving & Reclamation Inc Page 2
J
t
Santilli, Ray
From: Thibodeau, Bruce
Sent: Wednesday, February 15, 2012 2:04 PM
To: Santilli, Ray
Subject: FW: Murray Paving and Reclamation Reference Checks.doc
Attachments: Murray Paving and Reclamation Reference Checks.doc
Ray,
We recommend award.
From: Concessi, Dan
Sent: Wednesday, February 15, 2012 2:00 PM
To: Thibodeau, Bruce
Subject: Murray Paving and Reclamation Reference Checks.doc
Hi Bruce,
We can recommend Murray Paving and Reclamation, Inc. based on these references.
Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more
information please refer to: hftp://www.sec.state.ma.us/pre/preidx.htm,
Please consider the environment before printing this email.
7
3. Mike Buxton, town of Dracut, 978 957-0411
Murray does good work; he uses a three man crew, reclaiming machine
operator, grader operator, and roller operator.
Murray has done around 50,000 square yards of reclaiming for Dracut
When scheduled they show up when they are supposed to.
The equipment is pretty good with no breakdowns.
The grader operator is top notch, gets the water to the catch basins and
puts a nice crown back in the road
They will use a laser and a level to check their grades.
They do a good job and work well together
Mike would rehire them
,i
Murray Paving and Reclamation, Inc.
Reference Checks
2/25/12
1. Julius Ofurie, City of Everett 617 908-8534
Murray has been doing reclamation work for the city of Everett for the past
six years.
Murray shows up when scheduled; he did 23 streets last year for Everett.
His equipment is good, he owns the reclaiming machine, road grader,
vibratory roller, and trucks.
The crew is very good, when grading they get the water to the catch basins
Murray is very, very clean, cleaner than most.
Julius believes that Murray is the best around and would rehire them
2. Paul Dooley, Town of Rockport 781878-0634
Never any problem with Murray even if he considerably low on his bid.
The water will get to the catch basins when he is done grading.
Murray did 3 or 4 street for Rockport over the last 3 years
He has good equipment, a couple of big late model reclaimers that never
break down. He owns graders but subcontracts grading sometimes. He also
has a big vibratory roller.
No complaints about scheduling; he always get the job done and doesn't
leave a mess.
Paul would rehire Murray for future work
Santilli, Ray
From: Santilli, Ray
Sent: Wednesday, February 15, 2012 9:27 AM
To: Thibodeau, Bruce
Subject: IFB - Pavement Reclamation & Grading
Attachments: List of current and past pulverize contracts 2012.docx; bid results - pavement reclamation &
grading.docx
Attached are the bid results in response to the IFB — Pavement Reclamation & Grading. The low bidder was
Murray Paving & Reclamation Inc. Attached is a listing of their recent contracts with other municipalities.
Please conduct appropriate reference checks and submit your recommendation for award, in writing, to this
office.
If you have any questions, please call me. Thanks
JZaV Santuffi
Assistant Town Manager
Town of North Andover
4
January 30, 2012
Pavement Reclamation and Grading — Questions & Answers
The following answers are provided to questions submitted by potential bidders:
1. What were the bid results for the past four years?
The bid results from the past four years are not available.
2. How many square yards were reclaimed last year?
Last year, approximately 25,300 square yards were reclaimed.
3. How many mobilizations were there last year?
Last year there were two (2) mobilizations.
4. On average, what is the thickness of the asphalt?
The average thickness of the asphalt is 3" to 615
.
5. Typically, is there more material taken out or added by the Town?
Typically, material is neither taken out nor added.
6. Are the roads to be reclaimed grouped together or spread throughout Town?
The roads are typically in different locations throughout the Town.
7. In past years, what has been used for dust control?
Calcium chloride
8. Will the Town be responsible for unmarked utilities, structures, etc?
Yes
9. Section 6 — Estimated Quantities mentions hours; should this have been square yards?
Yes, Section 6 should read: "The square yards required listed in Appendix A are
simply estimates for bid purposes only. The Town will not be obligated to commit to
any specific quantity of square yards during the period of the contract."
10. Is a bid bond required?
No, a bid bond is not required.
A
Santilli, Ray
From: rfg admin [admin@raffertyfinegrading.com]
Sent: Thursday, January 26, 2012 11:45 AM
To: Santilli, Ray
Subject: Questions in RE: Pavement Reclamation and Grading
Please see the following question we have in regards to the above referenced bid:
1. What are the bid results for the past 4 years?
2. How many square yards were reclaimed last year?
3. In how many mobilizations?
4. On average what is the thickness of asphalt, 0" -3", 3" -6" or over 6"?
5. In past years what has been used for dust control?
6. Typically is there more material taken out or added by the town?
7. Are the roads to be reclaimed grouped together? Or spread throughout town?
8. Is a bid bond required?
Thank you for your time.
Regards,
Sara Mimoso
Project Manager
Rafferty Fine Grading Inc.
57 South Road
Enfield, CT 06082
Phone: 860-763-0100
Fax: 860-763-2223
Mobile: 413-335-5207
Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more
information please refer to: hftp://www.sec.state.ma.us/pre/preidx.htm.
Please consider the environment before printing this email.
Santilli, Ray
From: plymouthcountypaving@comcast.net
Sent: Monday, January 30, 2012 11:38 AM
To: Santilli, Ray
Subject: Pavement Reclamation and Grading
Ray,
1. Concerning the above mentioned bid, could you clarify or estimate the minimum size of a
mobilization?
2. Also a guess on how many " various projects" historically has been.
3. IFB page six section six, mentions hours required in Appendix A; should this have been quantity's,
not hours?
4. Because of the dollar amount of bid is no bid bond required? I noted upon award a payment bond
is required.
5. Could you clarify IFB page five section five where "full depth" of pavement is to be reclaimed, is
there an average or is this unlimited?
6. Will the town be responsible for unmarked utilities, structures etc.?
Thanks,
David Smith, Estimator
Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more
information please refer to: http://www.sec.state.ma.us/pre/preidx.htm.
Please consider the environment before printing this email.
TOWN OF NORTH ANDOVER
INVITATION FOR BIDS
PAVEMENT RECLAMATION AND GRADING
Contact
Address
Telephone Number:
Fax Number:
Email
January 18, 2012
Ray Santilli
Assistant Town Manager
120 Main Street
North Andover, MA 01845
978-688-9516
978-688-9556
rsantilh@townofnorthandover.com
Table of Contents
1. Introduction.......................................................... 3
2. Submission Deadline and Instructions ............................ 3
3. Questions, Addendum or Proposed Modifications .............. 4
4. Minimum Requirements ............................................. 5
5. Scope of Services...................................................... 5
6. Estimated Quantities ................................................ 6
7. Prevailing Wage Rates ............................................... 6
8. Payment Bond ....................................................... 6
9. Evaluation of Bids .................................................... 6
10. Term of Contract ................................................... 7
Appendix A — Price Proposal ......................................... 8
Standard Town of North Andover Contract
With Supplement "C" ............................................. 9
Certifications........................................................... 29
PaymentBond........................................................... 32
Prevailing Wage Rates ................................................. 33
Town of North Andover IFB Page 2 of 33
Pavement Reclamation and Grading
1. Introduction
In accordance with M.G.L. c30 §39M, the Town of North Andover is soliciting bids from
qualified contractors to provide pavement reclamation and grading for various projects.
Qualified contractors are requested to submit bids to the Assistant Town Manager at North
Andover Town Hall, 120 Main Street, North Andover, MA, in accordance with the instructions
contained within this Invitation for Bids.
The Town of North Andover is seeking to award a one-year contract for the period of March 1,
2012 through February 28, 2013 with two (2) additional one-year renewals, solely at the
discretion of the Town. The Town will provide written confirmation of renewal at least sixty
(60) days prior to the end of the contract period.
Notice of this IFB is published in the Central Register, which is a weekly publication of the
Office of the Secretary of the Commonwealth, the Eagle -Tribune (a newspaper of general
circulation) and posted on the Town website (www.townof iorthandover.com) under "Available
Bids, Quotes and Proposals".
The Town will accept proposals delivered in person or by mail. All proposals must be received
by 2:00 p.m. on Thursday, February 9, 2012 to be considered. Proposals submitted by fax or by
electronic mail will not be considered. All proposals must be submitted to:
Mr. Ray Santilli, Assistant Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
The Town of North Andover may cancel this IFB or reject in whole or in part any and all
proposals, if they determine that cancellation or rejection serves the best interest of the
Town of North Andover.
2. Submission Deadline and Instructions
Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed
envelope marked "Pavement Reclamation and Grading" with the applicant's name and address
on the front. Applicants should provide one (1) signed original proposal. Fax or electronic
submissions will not be accepted. Applicants must also execute and include in the sealed
submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax
Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The
Town of North Andover, through the Town Manager, is the awarding authority and reserves the
right to reject any and all proposals or parts of proposals; to waive any defects, information, and
minor irregularities; to accept exceptions to these specifications; and to award contracts or to
cancel this Invitation for Bids if it is in the Town of North Andover's best interest to do so.
Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if
the bidder is a partnership, by the name of the partnership, followed by the signature of each
Town of North Andover IFB Page 3 of 33
Pavement Reclamation and Grading
general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature
must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed.
All sealed proposals must be received and registered by the Assistant Town Manager's office by
Thursday, February 9, 2012 at 2:00 p.m. All outer envelopes must be labeled "Pavement
Reclamation and Grading" and mailed or hand delivered to the following address:
Mr. Ray Santilli, Assistant Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
No proposals will be accepted after the time and date noted. Late delivery of materials due to
any type of delivery system shall be cause for rejection. If on the date and time of the submittal
deadline the North Andover Town Hall is closed due to an uncontrolled event such as fire, snow,
ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the
next normal business day.
3. Questions, Addendum or Proposal Modification
Questions concerning this IFB must be submitted in writing to: Mr. Ray Santilli, Assistant Town
Manager, 120 Main Street North Andover, MA 01845, or they may be emailed to Mr. Santilli at
rsantilli@townofnorthandover.com. All questions/inquiries must be received by 4:30 p.m. on
Tuesday, January 31, 2012 to be considered. Questions/inquiries may be delivered, mailed,
emailed or faxed. Written responses will be posted on the Town's website
(www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" by Thursday,
February 2, 2012 at 2:00 p.m.
If any changes are made to this IFB, an addendum will be posted on the Town's website in
"Available Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the
existence of any addenda and/or modifications issued by the Town. As this IFB has been
published on the Town's website (www.townofnorthandover.com) all bidders are responsible for
checking the website for any addenda and /or modifications that are subsequently made to this
IFB.
The Town accepts no liability for and will provide no accommodations to bidders who fail to
check for amendments and/or modifications to this IFB and subsequently submit inadequate or
incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any
IFB component files. Modifications to the body of the IFB, Scope of Work, terms and
conditions, or which change the intent of this IFB are prohibited and may disqualify a response.
All proposals submitted in response to this IFB shall remain firm for sixty (60) days following
the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days
after the submittal deadline.
Town of North Andover IFB Page 4 of 33
Pavement Reclamation and Grading
Bidders are not to communicate directly with any employee of the Town of North Andover,
except as specified in this IFB, and no other individual employee or representative is authorized
to provide any information or respond to any question or inquiry concerning this IFB.
Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the
bidder is having trouble obtaining any part of the IFB electronically through the Town website
(www.townofnorthandover.com), including, and without limitation the form and attachments.
Bidder with disabilities or hardships that seek reasonable accommodations, which may include
the receipt of IFB information and/or addenda and/or modifications in an alternative format,
must communicate such requests in writing to the contact person, and reasonable
accommodation will be made by agreement with the contact person on behalf of the Town of
North Andover.
4. Minimum Requirements
Each bidder must demonstrate that it meets the following minimum requirements:
A. Contractor must demonstrate a minimum of five (5) years experience providing the
services required in the Scope of Services.
B. Contractor shall submit a complete list of all similar contracts performed in the past two
(2) years with contact names and telephone numbers.
C. The contractor shall furnish all labor, equipment, and vehicles as required for work in
accordance with the scope of services.
D. Unit price quoted shall include a trained operator for the particular piece of equipment.
E. The contractor shall conform to all requirements of federal, state and local laws, including
compliance with the prevailing wage laws.
F. Unit prices shall remain firm for the initial one-year period of the contract.
G. Submission of required statements and forms.
5. Scope of Services
The contractor shall be responsible for grinding or pulverizing, grading, and compacting asphalt
concrete pavement.
The Town will remove all large castings prior to the commencement of reclamation. The contractor
will reclaim existing pavement to its full depth and grade the reclaimed material to ensure proper
drainage. The Town will supply additional material if needed and remove any surplus material if
required.
Town of North Andover IFB Page 5 of 33
Pavement Reclamation and Grading
Contractor will compact grades areas to a density acceptable for paving. Contractor will complete
all hand work required at joints with side streets, sidewalks, end points, and driveway aprons
including sweeping to provide a clean sharp joint for paving. Contractor shall furnish and apply
calcium chloride, or some other acceptable product, as required for dust control until the reclaimed
area is paved.
The Town will arrange and pay for all required police details. The Town will provide all necessary
barricades, signs and cones for road closures and detours.
6. Estimated Quantities
The hours required listed in Appendix A are simply estimates for bid purposes only. The
Town will not be obligated to commit to any specific quantity of hours during the period of
the contract.
7. Prevailing Wage Rates
The successful bidder will at all times comply with the prevailing wage rates as determined by
the Department of Labor Standards under the provisions of Massachusetts General Laws as shall
be in force and as amended. The prevailing wage rates are attached.
8. Payment Bond
Upon award of the contract, the successful bidder shall provide a payment bond in the amount of
50% of the total projected cost of the contract for the first year. The payment bond must be on
the Town's form that is attached.
9. Evaluation of Bids
Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility
of the bidder will then be ascertained. Finally, the aggregate price for the services delivered by each
responsive and responsible bidder will be calculated for the first year solely of the proposed
contract. The Town is required to award the contract to the lowest responsive and responsible
bidder.
■ Responsiveness
Bidders must completely fill out and submit the bid form and all other required forms. All
supplies and services that are the subject of the bid must meet the minimum standards and
scope of services set forth in the purchase description including the standards by which the
procurement officer will determine acceptability as to quality, workmanship, results of
inspections and tests, and suitability for a particular purpose.
Town of North Andover IFB Page 6 of 33
Pavement Reclamation and Grading
■ Responsibility
Bidders must demonstrate that they meet measures of responsibility. The Town will not
award a contract to any bidder who cannot furnish satisfactory evidence of his ability and
experience in this type of work and that he has sufficient plant and capital to enable him
to prosecute and complete the work as outlined in the Scope of Services. The Town may
make such investigations as it deems necessary to determine the above and a bidder shall
furnish any information requested in this regard.
All costs not listed on the bid price sheet will not be considered part of the contract and therefore
will not be paid. The Town of North Andover will not be charged fuel surcharges or
administrative fees as part of any contract entered into as a result of this IFB. Additionally the
Town of North Andover will not be charged late fees unless payment is not made within sixty
(60) days of the receipt of invoice.
The Town of North Andover is a tax exempt entity so no sales tax will be assessed to any
purchases made under this proposed contract.
10. Term of Contract
The Town of North Andover is seeking to award a one-year contract with two (2) additional one-
year renewals, solely at the discretion of the Town. The Town will provide written confirmation
of renewal at least sixty (60) days prior to the end of the contract period.
Town of North Andover IFB Page 7 of 33
Pavement Reclamation and Grading
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible and responsive bidder offering the lowest
aggregate price in the base bid only for the first year of the proposed contract. All prices are to
remain firm for the duration of the Contract.
March 1, 2012 through February 28, 2013
uantit Unit Price Total Price
Pavement Reclamation
and Grading 12,000 sq yards $ /sq yd $
March 1, 2013 through February 28, 2014
Pavement Reclamation
and Grading 12,000 sq yards $ /sq yd $
March 1, 2014 through February 28, 2015
Pavement Reclamation
and Grading 12,000 sq yards $ /sq yd $
Addenda
Business Name
Business Address
Business Phone
are acknowledged:
Signature
Fax
Name of Person Authorized to sign Price Proposal
Title of Person Authorized to sign Price Proposal
Signature of Above Person
Town of North Andover IFB
Pavement Reclamation and Grading
Page 8 of 33
Town of North Andover
CONTRACT
CONTRACT#
DATE:
This Contract is entered into on, or as of, this date by and between the Town of North
Andover (the "Town"), and
Contractor:
Address:
Telephone Number: _
Fax Number:
1. This is a Contract for the procurement of the following:
2. The Contract price to be paid to the Contractor by the Town of North Andover is:
3. Payment will be made as follows:
4. Definitions:
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services
by authorized representatives of the Town to insure that the goods or services are
complete and are as specified in the Contract.
Town of North Andover IFB Page 9 of 33
Pavement Reclamation and Grading
4.2 Contract Documents: All documents relative to the Contract including (where
used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary
General Conditions, General Specifications, Other Specifications included in
Project Manual, Drawings, and all Addenda issued during the bidding period. The
Contract documents are complementary, and what is called for by any one shall be
as binding as if called for by all. The intention of the document is to include all
labor and materials, equipment and transportation necessary for the proper
performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term
shall (as the sense and particular Contract so require) include Vendor, Contractor,
Engineer, or other label used to identify the other party in the particular Contract.
Use of the term "Contractor" shall be understood to refer to any other such label
used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete,
the services are performed, or the goods delivered, in accordance with Contract
documents, as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term
includes one who furnished material worked to a special design according to the
Drawings or Specifications of this work, but does not include one who merely
furnishes material not so worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance:
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before , unless extended pursuant to a
provision for extension contained in the Contract documents at the sole discretion of the Town,
and not subject to assent by the Contractor, and subject to the availability and appropriation of
funds as certified by the Town Accountant. The time limits stated in the Contract documents are
of the essence of the Contract.
6. Subject to Appropriation:
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the Town is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this
Contract shall be immediately terminated without liability for damages, penalties or other
charges.
Town of North Andover IFB Page 10 of 33
Pavement Reclamation and Grading
7. Permits and Approvals:
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its
performance of the Contract shall be secured and paid for by the Contractor.
8. Termination and Default:
8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days
notice when in the best interests of the Town by providing notice to the Contractor,
which shall be in writing and shall be deemed delivered and received when given in
person to the Contractor, or when received by fax, express mail, certified mail return
receipt requested, regular mail postage prepaid or delivered by any other appropriate
method evidencing actual receipt by the Contractor. Upon termination without cause,
Contractor will be paid for services rendered to the date of termination.
8.2 For Cause. If the Contractor is determined by the Town to be in default of any term
or condition of this Contract, the Town may terminate this Contract on seven (7) days
notice by providing notice to the Contractor, which shall be in writing and shall be
deemed delivered and received when given in person to the Contractor, or when
received by fax, express mail, certified mail return receipt requested, regular mail
postage prepaid or delivered by any other appropriate method evidencing actual
receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract:
1) any material misrepresentation made by the Contractor to the Town; 2) any
failure to perform any of its obligations under this Contract including, but not
limited to the following: (i) failure to commence performance of this Contract at
the time specified in this Contract due to a reason or circumstance within the
Contractor's reasonable control, (ii) failure to perform this Contract with
sufficient personnel and equipment or with sufficient material to ensure the
completion of this Contract within the specified time due to a reason or
circumstance within the Contractor's reasonable control, (iii) failure to perform
this Contract in a manner reasonably satisfactory to the Town, (iv) failure to
promptly re -perform within a reasonable time the services that were rejected by
the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for
reasons not beyond the Contractor's reasonable control, (vi) failure to comply
with a material term of this Contract, including, but not limited to, the provision
of insurance and non-discrimination, (vii) any other acts specifically and
expressly stated in this Contract as constituting a basis for termination of this
Contact, and (viii) failure to comply with any and all requirements of state law
and/or regulations, and Town bylaw and/or regulations.
9. The Contractor's Breach and the Town's Remedies:
Failure of the Contractor to comply with any of the terms or conditions of this Contract
shall be deemed a material breach of this Contract, and the Town of North Andover shall
Town of North Andover IFB Page 11 of 33
Pavement Reclamation and Grading
have all the rights and remedies provided in the Contract documents, the right to cancel,
terminate, or suspend the Contract in whole or in part, the right to maintain any and all
actions at law or in equity or other proceedings with respect to a breach of this Contract,
including damages and specific performance, and the right to select among the remedies
available to it by all of the above.
From any sums due to the Contractor for services, the Town may keep the whole or any
part of the amount for expenses, losses and damages incurred by the Town as a
consequence of procuring services as a result of any failure, omission or mistake of the
Contractor in providing services as provided in this Contract.
10. Statutory Compliance:
10.1 This Contract will be construed and governed by the provisions of applicable
federal, state and local laws and regulations; and wherever any provision of the
Contract or Contract documents shall conflict with any provision or requirement
of federal, state or local law or regulation, then the provisions of law and
regulation shall control. Where applicable to the Contract, the provisions of the
General Laws are incorporated by reference into this Contract, including, but not
limited to, the following:
General Laws Chapter 30B — Procurement of Goods and Services.
General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts.
General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts.
10.2 Wherever applicable law mandates the inclusion of any term and provision into a
municipal contract, this Section shall be understood to import such term or
provision into this Contract. To whatever extent any provision of this Contract
shall be inconsistent with any law or regulation limiting the power or liability of
cities and towns, such law or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations
bearing on the performance of the Contract. If the Contractor performs the
Contract in violation of any applicable law or regulation, the Contractor shall bear
all costs arising therefrom.
10.4 The Contractor shall keep itself fully informed of all existing and future State and
National Laws and Municipal By-laws and Regulations and of all orders and
decrees of any bodies or tribunals having jurisdiction in any manner affecting
those engaged or employed in the work, of the materials used in the work or in any
way affecting the conduct of the work. If any discrepancy or inconsistency is
discovered in the Drawings, Specifications or Contract for this work in violation of
any such law, by-law, regulation, order or decree, it shall forthwith report the same
in writing to the Town. It shall, at all times, itself observe and comply with all
such existing and future laws, by-laws, regulations, orders and decrees; and shall
Town of North Andover IFB Page 12 of 33
Pavement Reclamation and Grading
protect and indemnify the Town of North Andover, and its duly appointed agents
against any claim or liability arising from or based on any violation whether by
him or its agents, employees or subcontractors of any such law, by-law, regulation
or decree.
11. Conflict of Interest:
Both the Town and the Contractor acknowledge the provisions of the State Conflict of
Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any
activity which shall constitute a violation of that law. The Contractor shall be deemed to
have investigated the application of M.G.L. c. 268A to the performance of this Contract;
and by executing the Contract documents the Contractor certifies to the Town that neither
it or its agents, employees, or subcontractors are thereby in violation of General Laws
Chapter 268A.
12. Certification of Tax Compliance
This Contract must include a certification of tax compliance by the Contractor, as
required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance
by All Contractors Providing Goods, Services, or Real Estate Space to the
Commonwealth or Subdivision).
13. Discrimination
The Contractor will carry out the obligations of this Contract in full compliance with all
of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended.
14. Assignment:
Assignment of this Contract is prohibited, unless and only to the extent that assignment is
provided for expressly in the Contract documents.
15. Condition of Enforceability Against the Town:
This Contract is only binding upon, and enforceable against, the Town if. (1) the
Contract is signed by the Town Manager or its designee; and (2) endorsed with approval
by the Town Accountant as to appropriation or availability of funds; and (3) endorsed
with approval by the Town Counsel as to form.
16. Corporate Contractor:
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its
Clerk's Certificate certifying the corporate capacity and authority of the party signing this
Contract for the corporation. Such certificate shall be accompanied by a letter or other
Town of North Andover IFB Page 13 of 33
Pavement Reclamation and Grading
instrument stating that such authority continues in full force and effect as of the date the
Contract is executed by the Contractor. This Contract shall not be enforceable against the
Town of North Andover unless and until the Contractor complies with this section.
The Contractor, if a foreign corporation, shall comply with the provisions of the General
Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in
addition thereto, relating to the appointment of the Commissioner of Corporations as its
attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly
authenticated copies of its Charter or Certificate of Incorporation; and said Contractor
shall comply with all the laws of the Commonwealth.
17. Liability of Public Officials:
To the full extent permitted by law, no official, employee, agent or representative of the
Town of North Andover shall be individually or personally liable on any obligation of the
Town under this Contract.
18. Indemnification:
The Contractor shall indemnify, defend and save harmless the Town, the Town's officers,
agents and employees, from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every
nature and description (including reasonable attorneys' fees) that may arise in whole or in
part out of or in connection with the work being performed or to be performed, or out of
any act or omission by the Contractor, its employees, agents, subcontractors, material
men, and anyone directly or indirectly employed by any of them or anyone for whose acts
any of them may be liable, regardless of whether or not it is caused in part by any party
indemnified hereunder. The Contractor further agrees to reimburse the Town for damage
to its property caused by the Contractor, its employees, agents, subcontractors or material
men, and anyone directly or indirectly employed by any of them or anyone for whose acts
any of them may be liable, including damages caused by his, its or their use of faulty,
defective, or unsuitable material or equipment, unless the damage is caused by the
Town's gross negligence or willful misconduct. The existence of insurance shall in no
way limit the scope of the Contractor's indemnification under this contract.
19. Workers Compensation Insurance:
The Contractor shall provide by insurance for the payment of compensation and the
furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts
(The Worker's Compensation Act) to all employees of the Contractor who are subject to
the provisions of Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract
shall be deemed a material breach of this Contract, shall operate as an immediate
termination thereof, and Contractor shall indemnify the Town for all losses, claims, and
actions resulting from the failure to provide the insurance required by this Article.
Town of North Andover IFB Page 14 of 33
Pavement Reclamation and Grading
The Contractor shall furnish to the Town evidence of such insurance prior to the
execution of this Contract before the same shall be binding on the parties thereto, except
if specifically waived by the Town.
20. Documents, Materials, Etc.
Any materials, reports, information, data, etc. given to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available
to any individual or organization by the Contractor (except agents, servants, or employees
of the Contractor) without the prior written approval of the Town, except as otherwise
required by law. The Contractor shall comply with the provisions Chapter 66A of the
General Laws of Massachusetts as it relates to public documents, and all other state and
federal laws and regulations relating to confidentiality, security, privacy and use of
confidential data.
Any materials produced in whole or in part under this Contract shall not be subject to
copyright, except by the Town, in the United States or any other country. The Town
shall have unrestricted authority to, without payment of any royalty, commission, or
additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise
use, and authorize others to use, in whole or in part, any reports, data or other materials
prepared under this Contract.
All data, reports, programs, software, equipment, furnishings, and any other
documentation or product paid for by the Town shall vest in the Town at the termination
of this Contract. The Contractor shall at all times, during or after termination of this
Contract, obtain the prior written approval of the Town before making any statement
bearing on the work performed or data collected under this Contract to the press or issues
any material for publication through any medium.
21. Audit, Inspection and Recordkegping
At any time during normal business hours, and as often as the Town may deem it
reasonably necessary, there shall be available in the office of the Contractor for the
purpose of audit, examination, and/or to make excerpts or transcript all records, contracts,
invoices, materials, payrolls, records of personnel, conditions of employment and other
data relating to all matters covered by this Agreement.
22. Payment
The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth
in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice
detailing the work completed and acceptance from the Town of the work completed.
Town of North Andover IFB Page 15 of 33
Pavement Reclamation and Grading
23. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all
signatories to the original Agreement, prior to the effective date of the amendment.
To the extent allowed by law, any conditions, duties, and obligations contained in this
Contract may be waived only by written Agreement by both parties.
Forbearance or indulgence in any form or manner by a party shall not be construed as a
waiver, nor in any manner limit the legal or equitable remedies available to that party.
No waiver by either party of any default or breach shall constitute a waiver of any
subsequent default or breach of a similar or different matter.
24. Forum and Choice of Law
This Contract and any performance herein shall be governed by and be construed in
accordance with the laws of the Commonwealth. Any and all proceedings or actions
relating to subject matter herein shall be brought and maintained in the courts of the
Commonwealth or the federal district court sitting in the Commonwealth, which shall
have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any
other legal rights of the parties.
25. Notices
Any notice permitted or required under the provisions of this Contract to be given or
served by either of the parties hereto upon the other party hereto shall be in writing and
signed in the name or on the behalf of the party giving or serving the same. Notice shall
be deemed to have been received at the time of actual service or three (3) business days
after the date of a certified or registered mailing properly addressed. Notice to the
Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to
the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main
Street, North Andover, Massachusetts 01845.
26. Binding on Successors:
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or
successors in interest (and where not corporate, the heirs and estate of the Contractor).
27. Complete Contract:
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no
agreements other than those incorporated herein.
Town of North Andover IFB Page 16 of 33
Pavement Reclamation and Grading
28. Supplemental Conditions:
The foregoing provisions apply to all contracts to which the Town of North Andover
shall be a party. One of the following "Supplements" must be "checked" as applicable to
this Contract, shall be attached hereto, and shall in any event apply as the nature of the
Contract requires. The Supplement contains additional terms governing the Contract:
[ ] GOODS
SUPPLEMENT "G" - Applicable to Contracts for the procurement of
Goods (governed by the provisions of General Laws
Chapter 30B)
[ ] SERVICES
SUPPLEMENT "S" - Applicable to Contracts for the procurement of
Services (governed by the provisions of General
Laws Chapter 30B)
[ X] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for Construction
Town of North Andover IFB Page 17 of 33
Pavement Reclamation and Grading
IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set
forth their hands the day and year first above written.
THE TOWN
Division/Department Head
Contract Manager
Town Manager Date
APPROVED AS TO FORM:
Town Counsel
Date
THE CONTRACTOR
Company Name
Signature
Print Name & Title
CERTIFICATION AS TO AVAILABILITY OF FUNDS:
Town Accountant
Town of North Andover IFB
Pavement Reclamation and Grading
Date
Date
Page 18 of 33
SUPPLEMENT "C"
[] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for the construction of.
(1) Public Buildings and Public Works
(governed by the provisions of General Laws Chapter 30B);
(2) Public Buildings
(governed by the provisions of General Laws Chapter 149,§ 44A,
et seq.); and
(3) Public Works
(governed by the provisions of General Laws Chapter 30, §39M, et seq)
This form supplements the Town of North Andover "Contract and General Conditions" and applies
only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works
or public buildings.
2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
(where required) in the form required by the Town and provide an original thereof to the Town prior
to the commencement of performance.
E ualit :
3.1. In the case of a closed Specification written for a specific item or items to be furnished under
the Base Bid, such specifications shall, as applicable, be in compliance with the
Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq.
3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or
on the Drawings, except as above noted, the intent is to establish a standard and in no way
should be construed to exclude any item or manufacturer not mentioned by name, but whose
product meets the Specifications as to design, utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of
goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of
Chapter 30B.
5. The Contractor will carry out the obligations of this contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage
Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of
Massachusetts as they may from time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall
be in force and as amended.
6. The Contractor shall continuously maintain adequate protection of all work from damage and shall
protect the property of the Town and others, including adjacent property, from injury or loss arising
Town of North Andover IFB Page 19 of 33
Pavement Reclamation and Grading
in connection with the Contract. The Contractor shall make good any such damage, injury or loss,
except as may be directly due to errors in the Contract Documents or caused by agents or employees
of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or
negligence.
7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall
comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents
or injury to persons on, about or adjacent to the premises where the work is being performed. The
Contractor will erect and properly maintain at all times, as required by the conditions and progress of
the work, all necessary safeguards for the protection of workers and the public, shall post danger
signs warning against the hazards created by such features of construction such as pits, protruding
nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling
materials; and shall designate a responsible member of its organization on the work, whose duty shall
be the prevention of accidents.
The Town shall at all times have access to the work wherever it is in preparation or progress and the
Contractor shall provide suitable accommodations for such access.
9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the
construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven
days notice from the Town, the Contractor shall replace such person or persons with people
acceptable to the Town.
10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The
Contractor shall carefully study and compare the drawings, specifications and other instructions and
shall at once report to the Town any error, inconsistency or omission which shall be discovered.
Included in this responsibility shall be supervision of all work performed by subcontractors on the
work.
11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any
of its provisions, the Town, upon three days written notice, may, without prejudice to any other
remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection by the Town's Project Representative
12.1. The Town shall have the right to designate a Project Representative who may make periodic
visits to the site to familiarize the Town generally with the progress and quality of the work,
and to determine in general if the work is proceeding in accordance with the Contract
Documents. The Project Representative will not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the work, and will not be
responsible for the Contractor's failure to carry out the construction work in accordance with
the Contract Documents. During such visits and on the basis of these observations while at
the site, the Project Representative will keep the Town informed on the progress of the work,
will endeavor to guard the Town against defects and deficiencies in the work of contractors,
and may condemn structural work as failing to conform to the Contract Documents. The
Project Representative shall have authority to act on behalf of the Town only to the extent
expressly delegated by the Town, which shall be shown to the Contractor, and shall have
authority to stop the work whenever such stoppage may reasonably be necessary to insure
the proper execution of the Contract.
Town of North Andover IFB Page 20 of 33
Pavement Reclamation and Grading
12.2. In connection with the work, the Project Representative shall not be responsible for
construction methods, means, techniques, sequences or procedures employed by the
Contractor or the Contractor's safety programs, requirements, regulations, or precautions.
13. Decisions of the Project Representative
13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of
the Town or the Contractor and on all other matters relating to the execution and progress of
the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision, in matters relating to the project, shall be final, if
within the terms of the Contract Documents.
13.3. If, however, the Project Representative fails to render a decision within ten days after the
parties have presented their evidence, either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Project Representative renders a
decision after such remedies have commenced, such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the parties concerned.
14.1 Use of Premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by law, by-laws, permits or directions of the Town and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or permit any part of the structure to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute,
the Town may remove the rubbish and charge the cost to the several contractors, as the Town
shall determine to be just.
16. Right to Terminate
If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit
of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail
to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently
disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial
violation of any provision of the Contract, then the Town may, without prejudice to any other
right or remedy and after giving the Contractor (or any surety) seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of all materials, tools and appliances thereon and finish the work by whatever method it
deems appropriate.
Town of North Andover IFB Page 21 of 33
Pavement Reclamation and Grading
In such cases, the Contractor shall not be entitled to receive any further payment until the work is
finished. If the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of finishing the work, including compensation for additional architectural,
managerial, legal and administrative services, such excess shall be paid to the Contractor. If such
expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town.
The Contractor shall not be relieved of liability to the Town by virtue of any termination of this
contract, and any claim for damages against the Contractor relating to the Contractor's
performance under this contract shall survive any termination hereunder.
Notwithstanding any other provision of this Agreement, the Town reserves the right at any time
in its absolute discretion to suspend or terminate this Agreement in whole or in part for its
convenience upon seven days written notice to the Contractor. The Town shall incur no liability
by reason of such termination except for the obligation to pay compensation for all work
performed by the Contractor and accepted by the Town to the termination date.
17. Progress Payments:
17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported
to the extent required by the Town by invoices or other vouchers, showing payments for
materials and labor, payments to Subcontractors and such other evidence of the
Contractor's right to payment.
17.2. The Contractor shall, before the first application, submit to the Town a schedule of values
of the various parts of the work, including quantities aggregating the total sum of the
Contract, divided so as to facilitate payments to Subcontractors, made out in such form as
the Town and the Contractor may agree upon, and, if required,. supported by such
evidence as to its correctness. This schedule, when approved by the Town, shall be used
as a basis for payment, unless it is found to be in error. If applying for payments, the
Contractor shall submit a statement based upon this schedule.
18. Withholding of Payments
18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the Town of North Andover from loss on account of -
18.1.1.
f
18.1.1. Defective work not remedied.
18.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor.
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5. Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
Town of North Andover IFB Page 22 of 33
Pavement Reclamation and Grading
18.2. Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims by Contractor and Liability of Town
All claims by the Contractor against the Town shall, unless otherwise provided by law, be
initiated by a written claim submitted to the Town no later than seven (7) calendar days after the
event or the first appearance of the circumstances causing the claim. The claim shall set forth in
detail all known facts and circumstances supporting the claim. The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims.
The limit of liability of the Town under this Agreement is limited to the compensation provided
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special or consequential damages or lost profits or for damages or loss from causes
beyond the Town's reasonable control.
20. Liquidated Damages:
Because both parties recognize (1) that the time for completion of this Contract is of the essence,
(2) that the Town will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the
delays, expense and difficulties involved in a legal proceeding to determine the actual loss
suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay
the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the
sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is
completed, whether the work is completed by the Contractor or some other person. The Town's
right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a
legal action for damages in lieu of or in addition to its option to impose liquidated damages. The
Town may deduct any liquidated damages from money due the Contractor, and if such payment is
insufficient to cover the liquidated damages, then the Contractor shall pay the amount due.
21. The Contractors' Mutual Responsibility:
Should the Contractor cause damage to any separate subcontractor on the work, the Contractor
agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies
provided by law or by the provisions of the contract. If such separate contractor sues the Town
on account of any damage alleged to have been sustained, the Town shall notify the Contractor,
who shall defend such proceedings at the Town's expense and, if any judgment against the Town
arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town.
22. Separate Contracts:
22.1. The Town reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results, upon the
work of any other contractor, the Contractor shall inspect and promptly report to the
Town any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
Town of North Andover IFB Page 23 of 33
Pavement Reclamation and Grading
of the other contractor's work as fit and proper for the reception of its work except as to
defects which may develop in the other contractor's work after the execution of its work.
22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work
already in place and shall at once report to the Town any discrepancy between the
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by
them, as it is for the acts and omissions of persons directly employed by it.
23.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the Town.
24. Contractor -Subcontractor Relations:
The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound
by the terms of the Agreement, the General Conditions of the Contract, the Supplementary
General Conditions, the Drawings and Specifications, as far as applicable to its work, including
the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
25. Indemnification:
25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) brought or recovered against them that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or omission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, regardless of whether or not it is
caused in part by any party indemnified hereunder. The Contractor further agrees to
reimburse the Town for damage to its property caused by Contractor, its employees,
agents, subcontractors or material men, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the Town's gross negligence or willful misconduct. The
existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this Contract.
25.2. In any and all claims against the Town or any of their agents or employees by any
employee of the Contractor, any Subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable, the indemnification
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
Town of North Andover IFB Page 24 of 33
Pavement Reclamation and Grading
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
employee benefit acts.
25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. However, it shall be the
Contractor's responsibility to purchase and maintain insurance of such character and in
such amounts as will adequately protect it and the Town from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
26. The Contractor's Insurance:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone
for whose acts any of them may be liable.
26.1.1. Claims under Worker's Compensation, disability benefit and other similar
employee benefit acts;
26.1.2. Claims for damages because of bodily injury, occupational sickness or
disease, or death of its employees, and claims insured by usual personal
injury liability coverage;
26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees, and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
26.2.1. Worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability Insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and Operations, Owners and Contractor's Protective, Products
and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such
insurance shall be written for not less than any limits of liability required by law, unless otherwise
provided in the contract documents, or the following limits, whichever are greater:
Town of North Andover IFB Page 25 of 33
Pavement Reclamation and Grading
Comprehensive General Liability Insurance (Broad Form)
Bodily Injury $1,000,000 per person
$3,000,000 per occurrence
Property Damage $1,000,000 per occurrence
$3,000,000 annual aggregate
Automobile Liability Insurance $500,000 per person
$1,000,000 per occurrence
26.3. The above insurance policies shall also be subject to the following requirements:
26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under Paragraph entitled "Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed
with the Town prior to commencement of the work. Renewal certificates shall be
addressed to and filed with the Town at least ten (10) days prior to the expiration
date of required policies.
26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30)
days prior written notice forwarded by registered or certified mail to the Town.
The Town shall also be notified of the attachment of any restrictive amendments
to the policies.
26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of
Insurance form, shall contain true transcripts from the policies, authenticated by
the proper officer of the Insurer, evidencing in particular those insured, the extent
of coverage, the location and operations to which the insurance applies, the
expiration date and the above-mentioned notice clauses.
26.3.5. All premium costs shall be included in the Contractor's bid.
26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
27. Protective Liability Insurance:
27.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the Town from claims which may arise from operations under
the Contract, including operations performed for the named insured by independent
contractors and general inspection thereof by the named insured.
27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town
against Automobile Non -Ownership Liability in connection with the Contractor's
Town of North Andover IFB Page 26 of 33
Pavement Reclamation and Grading
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable.
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing the Contractor's General Liability
Policy.
27.4. The Town shall be named as an additional insured on the above referenced liability
Policies, and the Contractor's insurance shall be the primary coverage. The cost of such
insurance, including required endorsements and amendments, shall be the sole
responsibility of the Contractor.
28. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the
Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as
it has knowledge or information, the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149
as amended (as a minimum requirement).
29. Guarantees:
29.1 The Contractor guarantees and warrants to the Town that all labor furnished under
this Contract will be competent to perform the tasks undertaken, that the product of such
labor will yield only first-class results, that materials and equipment furnished will be of
good quality and new unless otherwise permitted by this Contract, and that the Work will
be of good quality, free from faults and defects and in strict conformance with this
Contract. All Work not conforming to these requirements may be considered defective.
29.2. If at any time any part of the work constructed under the terms of this contract shall in the
opinion of the Town Manager require repairing due to defective work or materials
furnished by the Contractor, he may notify the Contractor in writing to make the required
repairs. If the Contractor shall neglect to start such repairs within ten days of the date of
giving it notice thereof and to complete the same to the satisfaction of the Town Manager
with reasonable dispatch, then the latter may employ other persons to make such repairs.
The Town shall charge the expense thereof to the Contractor and may use any moneys
still retained to pay for the same, and if such sum is insufficient, the Contractor shall be
obligated to pay the balance thereof.
29.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the Town before
final payment to the Contractor may be made for the amount of that subtrade or for the
phase of work to which the guarantee or warranty relates. The failure to deliver a
required guarantee or warranty shall be held to constitute a failure of the Subcontractor to
fully complete his work in accordance with the Contract Documents. The Contractor's
Town of North Andover IFB Page 27 of 33
Pavement Reclamation and Grading
obligation to correct work is in addition to, and not in substitution of, such guarantees or
warranties as may be required in the various Sections of the Specifications.
This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals
hereto:
Dated:
The Town of North Andover by:
Town Manager
Department/Division Head
Town Accountant
Certified as to Appropriation
Town Counsel
Certified as to Form
The Contractor by:
Authorized Signature
Town of North Andover IFB
Pavement Reclamation and Grading
Page 28 of 33
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature Date
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
authorized signatory for
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
Signature
Date
Town of North Andover IFB Page 29 of 33
Pavement Reclamation and Grading
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature
Print Name & Title
Date
Company Name
Town of North Andover IFB Page 30 of 33
Pavement Reclamation and Grading
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the
held on it was
VOTED, THAT
(Name)
(Officer)
of be and hereby is authorized to execute contracts and bonds in
the name and on behalf of said , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of on
its behalf by such officer under seal of , shall be valid and binding
upon
that
I hereby certify that I am the clerk of the above named
and
is the duly elected officer as above of said
and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
(Date)
(Clerk)
Town of North Andover IFB Page 31 of 33
Pavement Reclamation and Grading
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS, that we
with a place of business at
as Principal (the "Principal"), and , a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the sum of lawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
, for the construction of
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
day of
PRINCIPAL
[Name and Seal]
[Title]
Attest:
SURETY
[Attorney-in-fact] [Seal]
[Address]
[Phone]
Attest:
Town of North Andover IFB Page 32 of 33
Pavement Reclamation and Grading
Prevailing Wage Rates
Town of North Andover IFB Page 33 of 33
Pavement Reclamation and Grading
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 1 of 56
THE COMMONWEALTH OF MASSACHUSETTS
s EXECUTIVE OFFICE OF LABOR AND WORKFORCE
DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of
the
JOANNE S F. GOLDSTEIN
aY
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26
to 27H
HEATHER E. ROWE
Lt. Governor
Director
Awarding Authority: Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing,
grading & compacting asphalt concrete
paving. Dust
control using
calcium chloride or other acceptable product also
included in this work.
Job Location: Various Locations
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
Construction
(2 AXLE) DRIVER - EQUIPMENT
12/01/2011
$29.85
$8.56
$7.27
$0.00
$45.68
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.15
$8.56
$7.27
$0.00
$45.98
08/01/2012
$30.15
$8.91
$7.27
$0.00
$46.33
12/01/2012
$30.45
$8.91
$8.00
$0.00
$47.36
(3 AXLE) DRIVER - EQUIPMENT
12/01/2011
$29.92
$8.56
$7.27
$0.00
$45.75
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.22
$8.56
$7.27
$0.00
$46.05
08/01/2012
$30.22
$8.91
$7.27
$0.00
$46.40
12/01/2012
$30.52
$8.91
$8.00
$0.00
$47.43
(4 & 5 AXLE) DRIVER - EQUIPMENT
12/01/2011
$30.04
$8.56
$7.27
$0.00
$45.87
TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B
06/01/2012
$30.34
$8.56
$7.27
$0.00
$46.17
08/01/2012
$30.34
$8.91
$7.27
$0.00
$46.52
12/01/2012
$30.64
$9.07
$8.00
$0.00
$47.71
ADS/SUBMERSIBLE PILOT
08/01/2011
$82.60
$8.08
$17.12
$0.00
$107.80
PILE DRIVER LOCAL 56 (ZONE 1)
AIR TRACK OPERATOR
12/01/2011
$30.10
$7.10
$11.55
$0.00
$48.75
LABORERS-ZONE2
ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2011
$28.40
$9.90
$5.95
$0.00
$44.25
ASBESTOS WORKERS LOCAL 6 (BOSTON)
ASPHALT RAKER
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS -7ONE2
ASPHALT/CONCRETE/CRUSHERPLANT-ON SITE 12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 1 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
UW Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F.
GOLDSTEIN
Govemor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
$24.51
$6.97
$11.18
$0.00
$42.66
2 65
Contract Number:
$6.97
City/Town: NORTH ANDOVER
$0.00
Description of Work: Pavement Reclamation & Grading
- Grinding or pulverizing, grading & compacting asphalt
concrete paving. Dust
$6.97
control using calcium chloride or other
acceptable product also included in
this work.
4 75
$28.28
$6.97
Job Location: Various Locations
$0.00
$46.43
5 80
$30.16
$6.97
$11.18
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$50.20
7 90
$33.93
$6.97
$11.18
Unemployment
$52.08
BACKHOE/FRONT-END LOADER
12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
--- --_._�,
L-._ -------------.-----
Apprentice to Journeyworker Ratio:1:5
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
BARCO-TYPE JUMPING TAMPER
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORLRS-ZONE2
BLOCK PAVER, RAMMER / CURB SETTER
12/01/2011
$30.10
$7.10
$11.55
$0.00
$48.75
LABORERS - ZONE 2
BOILERMAKER
01/01/2010
$37.70
$6.97
$11.18
$0.00
$55.85
BOILERMAKERS LOCAL 29
Apprentice - BOILERMAKER - Local 29
Effective Date - 01/01/2010
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 65
$24.51
$6.97
$11.18
$0.00
$42.66
2 65
$24.51
$6.97
$11.18
$0.00
$42.66
3 70
$26.39
$6.97
$11.18
$0.00
$44.54
4 75
$28.28
$6.97
$11.18
$0.00
$46.43
5 80
$30.16
$6.97
$11.18
$0.00
$48.31
6 85
$32.05
$6.97
$11.18
$0.00
$50.20
7 90
$33.93
$6.97
$11.18
$0.00
$52.08
8 95
$35.82
$6.97
$11.18
$0.00
$53.97
_.....__.._---._._-----_._
Notes:
-------_.--
--- --_._�,
L-._ -------------.-----
Apprentice to Journeyworker Ratio:1:5
�_
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 2 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Govemor S
&Y
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/7'own: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2011 $46.56 $9.93 $16.51 $0.00 $73.00
WATERPROOFING)
BRICKLAYERS LOCAL 3 (LYNN) 02/01/2012 $47.55 $9.93 $16.51 $0.00 $73.99
Apprentice- BRICKIPLASTERICEMENT MASON - Local 3 Lynn
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.28
$9.93
$16.51
$0.00
$49.72
2 60
$27.94
$9.93
$16.51
$0.00
$54.38
3 70
$32.59
$9.93
$16.51
$0.00
$59.03
4 80
$37.25
$9.93
$16.51
$0.00
$63.69
5 90
$41.90
$9.93
$16.51
$0.00
$68.34
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.78
$9.93
$16.51
$0.00
$50.22
2 60
$28.53
$9.93
$16.51
$0.00
$54.97
3 70
$33.29
$9.93
$16.51
$0.00
$59.73
4 80
$38.04
$9.93
$16.51
$0.00
$64.48
5 90
$42.80
$9.93
$16.51
$0.00
$69.24
----------------------_._.----_....
iI Notes:
_
i
t__ _
Apprentice to Journeyworker Ratio.f 5
�- --
_-_..---_------
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 3 of 56
THE COMMONWEALTH OF MASSACHUSETTS
s7 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the
Governor
JOANNES . GOLDSTEIN
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H
cretary
m;ATi-¢.RE, xowE
LL Governor
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health
Pension
Supplemental
Total Rate
Unemployment
BULLDOZER/GRADER/SCRAPER 12/01/2011 $39.16 $10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012 $39.72 $10.00
$12.40
$0.00
$62.12
12/01/2012 $40.34 $10.00
$12.40
$0.00
$62.74
06/01/2013 $41.11 $10.00
$12.40
$0.00
$63.51
12/01/2013 $41.89 $10.00
$12.40
$0.00
$64.29
CAISSON & UNDERPINNING BOTTOM MAN 12/01/2011 $32.80 $7.10
$12.60
$0.00
$52.50
LABORERS - FOUNDATION AND MARINE
CAISSON & UNDERPINNING LABORER 12/01/2011 $31.65 $7.10
$12.60
$0.00
$51.35
LABORERS - FOUNDATION AND MARINE;
CAISSON & UNDERPINNING TOP MAN 12/01/2011 $31.65 $7.10
$12.60
$0.00
$51.35
LABORERS - FOUNDAT IONAND MARINE
CARBIDE CORE DRILL OPERATOR 12/01/2011 $29.60 $7.10
$11.55
$0.00
$48.25
LABORERS - 70NE 2
CARPENTER 09/01/2011 $32.05 $9.80
$15.51
$0.00
$57.36
CARPENTERS -ZONE 2 (Eastern Massachusetts)
03/01/2012 $33.17 $9.80
$15.51
$0.00
$58.48
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 4 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
UT Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE s F.
GOLDSTEIN
em
Govor
n
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage
Apprentice - CARPENTER - Zone 2 Eastern MA
Effective Date - 09/01/2011
Step percent Apprentice Base Wage Health
Health
Pension
Pension Supplemental Total Rate
Unemployment
Supplemental
Unemployment Total Rate
1
50
$16.03
$9.80
$1.57
$0.00
$27.40
2
60
$19.23
$9.80
$1.57
$0.00
$30.60
3
70
$22.44
$9.80
$10.80
$0.00
$43.04
4
75
$24.04
$9.80
$10.80
$0.00
$44.64
5
80
$25.64
$9.80
$12.37
$0.00
$47.81
6
80
$25.64
$9.80
$12.37
$0.00
$47.81
7
90
$28.85
$9.80
$13.94
$0.00
$52.59
8
90
$28.85
$9.80
$13.94
$0.00
$52.59
Effective Date - 03/01/2012
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$16.59
$9.80
$1.57
$0.00
$27.96
2
60
$19.90
$9.80
$1.57
$0.00
$31.27
3
70
$23.22
$9.80
$10.80
$0.00
$43.82
4
75
$24.88
$9.80
$10.80
$0.00
$45.48
5
80
$26.54
$9.80
$12.37
$0.00
$48.71
6
80
$26.54
$9.80
$12.37
$0.00
$48.71
7
90
$29.85
$9.80
$13.94
$0.00
$53.59
8
90
$29.85
$9.80
$13.94
$0.00
$53.59
.-._._.._.._r.._..------------------..._..---
Notes: i
fi
�- _ ---------------------_ _
Apprentice to Journeyworker Ratio:1:5
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 5 of 56
THE COMMONWEALTH OF MASSACHUSETTS
u EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. rGOLDSTEIN
vern
Goor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Ll. Govemor Director
Awarding Authority:
Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
$48.25
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
06/01/2012
Unemployment
CEMENT MASONRY/PLASTERING 08/01/2011 $44.33 $9.93 $16.51 $0.00 $70.77
BRICKLA YERS LOCAL 3 (LYNN)
$40.52
$10.00
02/01/2012 $45.10 $9.93 $16.51 $0.00 $71.54
CHAIN SAW OPERATOR
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS -7.0NE2
$7.80
$14.60
$0.00
$67.41
06/01/2012
$28.34
CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES
12/01/2011
$40.52
$10.00
$12.40
$0.00
$62.92
OPERATING ENGINEERS LOCAL 4
$0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
$0.00
06/01/2012
$41.09
$10.00
$12.40
$0.00
$63.49
$52.29
12/01/2012
$41.71
$10.00
$12.40
$0.00
$64.11
06/01/2013
$42.49
$10.00
$12.40
$0.00
$64.89
12/01/2013
$43.27
$10.00
$12.40
$0.00
$65.67
COMPRESSOR OPERATOR 12/01/2011
$27.95
$10.00
$12.40
$0.00
$50.35
OPERATING ENGINEERS LOCAL 4
$45.01
$7.80
$14.60
$0.00
$67.41
06/01/2012
$28.34
$10.00
$12.40
$0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
$0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
$0.00
$51.74
12/01/2013
$29.89
$10.00
$12.40
$0.00
$52.29
DELEADER (BRIDGE)
PAINTERS LOCAL 35 - ZONE 2
01/01/2012
$44.01
$7.80
$14.60
$0.00
$66.41
07/01/2012
$45.01
$7.80
$14.60
$0.00
$67.41
01/01/2013
$46.01
$7.80
$14.60
$0.00
$68.41
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 1.00 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 6 of 56
Awarding Authority: Town of North Andover
Contract Number: City/ own: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE COMMONWEALTH OF MASSACHUSETTS
$7.80
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
2 55
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Secretary
TIMOTHY P. MURRAY
Lt, Lt. Governor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
Director
Awarding Authority: Town of North Andover
Contract Number: City/ own: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$22.01
$7.80
$0.00
$0.00
$29.81
2 55
$24.21
$7.80
$3.25
$0.00
$35.26
3 60
$26.41
$7.80
$3.54
$0.00
$37.75
4 65
$28.61
$7.80
$3.84
$0.00
$40.25
5 70
$30.81
$7.80
$12.83
$0.00
$51.44
6 75
$33.01
$7.80
$13.13
$0.00
$53.94
7 80
$35.21
$7.80
$13.42
$0.00
$56.43
8 90
$39.61
$7.80
$14.01
$0.00
$61.42
Effective Date - 07/01/2012
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 50
$22.51
$7.80
$0.00
$0.00
$30.31
2 55
$24.76
$7.80
$3.25
$0.00
$35.81
3 60
$27.01
$7.80
$3.54
$0.00
$38.35
4 65
$29.26
$7.80
$3.84
$0.00
$40.90
5 70
$31.51
$7.80
$12.83
$0.00
$52.14
6 75
$33.76
$7.80
$13.13
$0.00
$54.69
7 80
$36.01
$7.80
$13.42
$0.00
$57.23
8 90
$40.51
$7.80
$14.01
$0.00
$62.32
Notes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 7 of 56
DEVAL L. PATRICK
Gov—
TIMOTHY P. MURRAY
Lt. Goc ,
Awarding Authority:
Contract Number:
Description of Work:
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
Town of North Andover
JOANNE F. GOLDSTEIN
Secretary
HEATHER E. ROWE
Director
City/Town: NORTH ANDOVER
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35
LABORERS-ZONE2
DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35
LABORERS-ZONE2
Apprentice - LABORER Demo Backhoe/Loader/Hammer Operator
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.68
$7.10
$12.45
$0.00
$39.23
2 70
$22.96
$7.10
$12.45
$0.00
$42.51
3 80
$26.24
$7.10
$12.45
$0.00
$45.79
4 90
$29.52
$7.10
$12.45
$0.00
$49.07
___.--___.---._-------__..------__----
Notes:
--- -
� ppre_c--._.--------------.��...
Apprentice to Journeyworker Ratio:l:5
---_.__--
DEMO: BURNERS
12/01/2011
$32.55
$7.10
$12.45
$0.00 $52.10
LABORERS-ZONE2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 8 of 56
THE COMMONWEALTH OF MASSACHUSETTS
x EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN
Governor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - LABORER Demo Burners
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.53
$7.10
$12.45
$0.00
$39.08
2 70
$22.79
$7.10
$12.45
$0.00
$42.34
3 80
$26.04
$7.10
$12.45
$0.00
$45.59
4 90
$29.30
$7.10
$12.45
$0.00
$48.85
..._----.,._...-------------_..-._----
-----------------------------
Notes:
--_-----Notes:
'
---------_..--.._-__----------------
Apprentice to Journeyworker Ratio: 1:5
DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35
LABORERS-ZONE2
DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10
LABORERS -ZONE2
DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35
LABORERS-ZONT:2
This wage schedule must be posted by the contractor at the work site in accordance with M.C.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 9 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- LABORER Demo Wrecking Laborer
THE COMMONWEALTH OF MASSACHUSETTS
$39.16
$10.00
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
Effective Date - 12/01/2011
DEPARTMENT OF LABOR STANDARDS
06/01/2012
$39.72
Prevailing Wage Rates
$12.40
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the
JOANNE
s reGOLDSTEIN
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
HEATHER E. ROwE
Lt. Govemor
$7.10
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- LABORER Demo Wrecking Laborer
12/01/2011
$39.16
$10.00
$12.40
$0.00
Effective Date - 12/01/2011
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
Supplemental
$12.40
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$19.08
$7.10
$12.45
$0.00
$38.63
2 70
$22.26
$7.10
$12.45
$0.00
$41.81
3 80
$25.44
$7.10
$12.45
$0.00
$44.99
4 90
$28.62
$7.10
$12.45
$0.00
$48.17
Notes:
PILE DRIVER LOCAL 56 (70NE l)
p
- - - - - ....... _ - _. - _. _
Apprentice to Journeyworker Ratio: 1:5
_,. - - .-
- ._..
- --- _,_
- ---- --
- - --...
DIRECTIONAL DRILL MACHINE OPERATOR
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
DIVER
08/01/2011
$55.07
$8.08
$17.12
$0.00
$80.27
PILE DRIVER LOCAL 56 (70NE l)
DIVER TENDER
08/01/2011
$40.12
$8.08
$17.12
$0.00
$65.32
PILE DRIVER LOCAL 56 (ZONE 1)
DIVER TENDER (EFFLUENT)
08/01/2011
$60.18
$8.08
$17.12
$0.00
$85.38
PILE DRIVER LOCAL 56 (ZONE 1)
DIVER/SLURRY (EFFLUENT)
08/01/2011
$82.60
$8.08
$17.12
$0.00
$107.80
PILE DRIVER LOCAL 56 (ZONE I)
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 10 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Effective Date
Base Wage
Prevailing Wage Rates
Pension
DEVAL L. PATRICK
co-r
As determined by the Director under the provisions of the
JOANNE F. GOLDSTEIN
n
TIMOTHY P. MURRAY
Lt. Governor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
HEATHER E. ROWE
Dirator
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
ELECTRICIAN
09/01/2011
$41.89
$13.00
$13.86
$0.00
$68.75
ELECTRICIANS LOCAL 103
03/01/2012
$42.37
$13.00
$13.87
$0.00
$69.24
09/01/2012
$43.05
$13.00
$13.89
$0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
$0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
$0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
$0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
$0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
$0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
$0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
$0.00
$75.52
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 11 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- ELECTRICIAN- Local 103
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
THE COMMONWEALTH OF MASSACHUSETTS
$16.76
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
W)
DEPARTMENT OF LABOR STANDARDS
$37.56
Prevailing Wage Rates
DEVALL. PATRICK
Govemor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
ar7'
TIMOTHY P. MURRAY
Lt. Govemor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- ELECTRICIAN- Local 103
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$16.76
$13.00
$7.80
$0.00
$37.56
2
40
$16.76
$13.00
$7.80
$0.00
$37.56
3
45
$18.85
$13.00
$10.26
$0.00
$42.11
4
45
$18.85
$13.00
$10.26
$0.00
$42.11
5
50
$20.95
$13.00
$10.58
$0.00
$44.53
6
55
$23.04
$13.00
$10.91
$0.00
$46.95
7
60
$25.13
$13.00
$11.23
$0.00
$49.36
8
65
$27.23
$13.00
$11.57
$0.00
$51.80
9
70
$29.32
$13.00
$11.89
$0.00
$54.21
10
75
$31.42
$13.00
$12.22
$0.00
$56.64
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$16.95
$13.00
$7.81
$0.00
$37.76
2
40
$16.95
$13.00
$7.81
$0.00
$37.76
3
45
$19.07
$13.00
$10.26
$0.00
$42.33
4
45
$19.07
$13.00
$10.26
$0.00
$42.33
5
50
$21.19
$13.00
$10.59
$0.00
$44.78
6
55
$23.30
$13.00
$10.92
$0.00
$47.22
7
60
$25.42
$13.00
$11.24
$0.00
$49.66
8
65
$27.54
$13.00
$11.58
$0.00
$52.12
9
70
$29.66
$13.00
$11.90
$0.00
$54.56
10
75
$31.78
$13.00
$12.23
$0.00
$57.01
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 12 of 56
sY
DEVAL L. PATRICK
Governor
TIMOTHY P. MURRAY
Lt. Gocemor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNES rGOLDSTEIN
�Y
Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE
Di -tor
Town of North Andover
City/Town: NORTH ANDOVER
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Various Locations
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
- - - - - - - - - - - - - - - - - -
(Notes::
App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80
Apprentice to Journeyworker Ratio:2:3***
ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19
ELEVATOR CONSTRUCTORS LOCAL 4
Apprentice- ELEVATOR CONSTRUCTOR -Local 4
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$26.23
$8.78
$0.00
$0.00
$35.01
2 55
$28.85
$8.78
$6.96
$0.00
$44.59
3 65
$34.09
$8.78
$6.96
$0.00
$49.83
4 70
$36.72
$8.78
$6.96
$0.00
$52.46
5 80
$41.96
$8.78
$6.96
$0.00
$57.70
. -_._......._-------------------.--_._..-_-
Notes:
Steps 1-2 are 6 mos.; Steps 3-5 are 1 year
Apprentice to Journeyworker RatioA:I
ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33
ELEVATOR CONSTRUCTORS LOCAL 4
FENCE & GUARD RAIL ERECTOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25
LABORERS - ZONE 1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 13 of 56
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 14 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
T)
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK
Gmemor
As determined b the Director under the provisions of the
y p
JOANNE F. GOLDSTEIN
Secretary
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26
to 27H
HEATHER E. ROWE
Lt. Govemor
Director
Awarding Authority:
Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing,
grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other acceptable product also
included in this work.
Job Location:
Various Locations
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2011
$37.49
$10.00
$12.20
$0.00
$59.69
OPERATING ENGINEERS LOCAL 4
05/01/2012
$38.10
$10.00
$12.20
$0.00
$60.30
11/01/2012
$38.71
$10.00
$12.20
$0.00
$60.91
05/01/2013
$39.32
$10.00
$12.20
$0.00
$61.52
11/01/2013
$40.08
$10.00
$12.20
$0.00
$62.28
05/01/2014
$40.85
$10.00
$12.20
$0.00
$63.05
FIELD ENGTARTY CREF-BLDG,SITE,HVY/HWY 11/01/2011
$38.88
$10.00
$12.20
$0.00
$61.08
OPERATING ENGINEERS LOCAL 4
05/01/2012
$39.49
$10.00
$12.20
$0.00
$61.69
11/01/2012
$40.11
$10.00
$12.20
$0.00
$62.31
05/01/2013
$40.73
$10.00
$12.20
$0.00
$62.93
11/01/2013
$41.50
$10.00
$12.20
$0.00
$63.70
05/01/2014
$42.27
$10.00
$12.20
$0.00
$64.47
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2011
$20.91
$10.00
$12.20
$0.00
$43.11
OPERATING ENGINEERS LOCAL 4
05/01/2012
$21.27
$10.00
$12.20
$0.00
$43.47
11/01/2012
$21.63
$10.00
$12.20
$0.00
$43.83
05/01/2013
$21.99
$10.00
$12.20
$0.00
$44.19
11/01/2013
$22.45
$10.00
$12.20
$0.00
$44.65
05/01/2014
$22.90
$10.00
$12.20
$0.00
$45.10
FIRE ALARM INSTALLER
09/01/2011
$41.89
$13.00
$13.86
$0.00
$68.75
ELECTRICIANS LOCAL 103
03/01/2012
$42.37
$13.00
$13.87
$0.00
$69.24
09/01/2012
$43.05
$13.00
$13.89
$0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
$0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
$0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
$0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
$0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
$0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
$0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
$0.00
$75.52
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 14 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
THE COMMONWEALTH OF MASSACHUSETTS
.
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
OPERATING ENGINEERS LOCAL 4
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. reGr�OOLDSTEIN
TIMOTHY P. MURRAY
Lt. Governor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
$33.23
$10.00
$12.40
$0.00
$55.63
OPERATING ENGINEERS LOCAL 4
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$10.00
$12.40
$0.00
$56.10
12/01/2012
Unemployment
$10.00
FIRE ALARM REPAIR / MAINTENANCE
09/01/2011
$31.42
$13.00
$12.22
$0.00
$56.64
ICOMMISSIONINGELECTRIc1ANs
$57.28
12/01/2013
$35.54
$10.00
$12.40
$0.00
LOCAL 103
03/01/2012
$31.78
$13.00
$12.23
$0.00
$57.01
09/01/2012
$32.29
$13.00
$12.25
$0.00
$57.54
03/01/2013
$32.83
$13.00
$12.26
$0.00
$58.09
09/01/2013
$33.34
$13.00
$12.28
$0.00
$58.62
03/01/2014
$33.88
$13.00
$12.30
$0.00
$59.18
09/01/2014
$34.38
$13.00
$12.31
$0.00
$59.69
03/01/2015
$34.91
$13.00
$12.33
$0.00
$60.24
09/01/2015
$35.63
$13.00
$12.35
$0.00
$60.98
03/01/2016
$36.35
$13.00
$12.37
$0.00
$61.72
FIREMAN (ASST. ENGINEER) 12/01/2011
$33.23
$10.00
$12.40
$0.00
$55.63
OPERATING ENGINEERS LOCAL 4
06/01/2012
$33.70
$10.00
$12.40
$0.00
$56.10
12/01/2012
$34.23
$10.00
$12.40
$0.00
$56.63
06/01/2013
$34.88
$10.00
$12.40
$0.00
$57.28
12/01/2013
$35.54
$10.00
$12.40
$0.00
$57.94
FLAGGER & SIGNALER 12/01/2011 $20.50 $7.10 $11.55 $0.00 $39.15
LABORERS-ZONE2
FLOORCOVERER
FLOORCOVERERS LOCAL 2168 ZONE 1
09/01/2011 $35.95 $9.80 $16.61 $0.00
03/01/2012 $37.20 $9.80 $16.61 $0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
$62.36
$63.61
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 15 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- FLOORCOVERER -Local 2168 Zone I
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE COMMONWEALTH OF MASSACHUSETTS
s
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
2 55
Prevailing Wage Rates
DEVALL. PATRICK
Go% mor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
v7'
TIMOTHY P. MURRAY
Lt. Governor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- FLOORCOVERER -Local 2168 Zone I
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.98
$9.80
$1.79
$0.00
$29.57
2 55
$19.77
$9.80
$1.79
$0.00
$31.36
3 60
$21.57
$9.80
$11.24
$0.00
$42.61
4 65
$23.37
$9.80
$11.24
$0.00
$44.41
5 70
$25.17
$9.80
$13.03
$0.00
$48.00
6 75
$26.96
$9.80
$13.03
$0.00
$49.79
7 80
$28.76
$9.80
$14.82
$0.00
$53.38
8 85
$30.56
$9.80
$14.82
$0.00
$55.18
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$18.60
$9.80
$1.79
$0.00
$30.19
2 55
$20.46
$9.80
$1.79
$0.00
$32.05
3 60
$22.32
$9.80
$11.24
$0.00
$43.36
4 65
$24.18
$9.80
$11.24
$0.00
$45.22
5 70
$26.04
$9.80
$13.03
$0.00
$48.87
6 75
$27.90
$9.80
$13.03
$0.00
$50.73
7 80
$29.76
$9.80
$14.82
$0.00
$54.38
8 85
$31.62
$9.80
$14.82
$0.00
$56.24
--__..._...-...-._.._.------------- -...._..._.------
Notes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio:1:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 16 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
W)
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK
Governor
TIMOTHY P. MURRAY
Lt. G -or
As determined by the Director under the provisions of the JOANNE Se
. GOLDSTEIN
arr
Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
FORK LIFT/CHERRY PICKER
12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
GENERATOR/LIGHTING PLANTMEATERS
12/01/2011
$27.95
$10.00
$12.40
$0.00
$50.35
OPERATING ENGINEERS LOCAL 4
06/01/2012
$28.34
$10.00
$12.40
$0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
$0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
$0.00
$51.74
12/01/2013
$29.89
$10.00
$12.40
$0.00
$52.29
GLAZIER (GLASS PLANK/AIR BARRIERANI'ERIOR
01/01/2012
$33.51
$7.80
$14.60
$0.00
$55.91
SYSTEMS)
GLA71F.RSLOCAL 35(ZONE 2)
07/01/2012
$34.51
$7.80
$14.60
$0.00
$56.91
01/01/2013
$35.51
$7.80
$14.60
$0.00
$57.91
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 17 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN
Gm error
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- GLAZIER - Local 35 Zone 2
Effective Date- 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$16.76
$7.80
$0.00
$0.00
$24.56
2 55
$18.43
$7.80
$3.25
$0.00
$29.48
3 60
$20.11
$7.80
$3.54
$0.00
$31.45
4 65
$21.78
$7.80
$3.84
$0.00
$33.42
5 70
$23.46
$7.80
$12.83
$0.00
$44.09
6 75
$25.13
$7.80
$13.13
$0.00
$46.06
7 80
$26.81
$7.80
$13.42
$0.00
$48.03
8 90
$30.16
$7.80
$14.01
$0.00
$51.97
Effective Date - 07/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.26
$7.80
$0.00
$0.00
$25.06
2 55
$18.98
$7.80
$3.25
$0.00
$30.03
3 60
$20.71
$7.80
$3.54
$0.00
$32.05
4 65
$22.43
$7.80
$3.84
$0.00
$34.07
5 70
$24.16
$7.80
$12.83
$0.00
$44.79
6 75
$25.88
$7.80
$13.13
$0.00
$46.81
7 80
$27.61
$7.80
$13.42
$0.00
$48.83
8 90
$31.06
$7.80
$14.01
$0.00
$52.87
._...-_.._--___....,._-,-__., -._.,.-....._------_....-___.------
Notes:
Steps are 750 his.
Apprentice to Journeyworker Ratio:l:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 18 of 56
THE COMMONWEALTH OF MASSACHUSETTS
W
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN
em
Govor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H BEATEERE. ROWE
Lt. Governor Director
Awarding Authority:
Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
Classification
Effective Date
Base Wage Health
Pension
Supplemental
Total Rate
Unemployment
HOISTING ENGINEER/CRANES/GRADALLS 12/01/2011
$39.52 $10.00
$12.40
$0.00
$61.92
OPERA77NG ENGINEERS LOCAL 4
06/01/2012
$40.09 $10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71 $10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49 $10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27 $10.00
$12.40
$0.00
$64.67
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 19 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Apprentice- HOIST/PORT. ENG.-
Effective Date - 12/01/2011
Step percent
THE COMMONWEALTH OF MASSACHUSETTS
Health
Pension
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
t)
DEPARTMENT OF LABOR STANDARDS
$21.74
Prevailing Wage Rates
DEVALL. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN
TIMOTHY P. MURRAY
LL Governor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Apprentice- HOIST/PORT. ENG.-
Effective Date - 12/01/2011
Step percent
Effective Date Base Wage
Local 4
Apprentice Base Wage Health
Health
Pension
Pension Supplemental Total Rate
Unemployment
Supplemental
Unemployment Total Rate
1
55
$21.74
$10.00
$0.00
$0.00
$31.74
2
60
$23.71
$10.00
$12.40
$0.00
$46.11
3
65
$25.69
$10.00
$12.40
$0.00
$48.09
4
70
$27.66
$10.00
$12.40
$0.00
$50.06
5
75
$29.64
$10.00
$12.40
$0.00
$52.04
6
80
$31.62
$10.00
$12.40
$0.00
$54.02
7
85
$33.59
$10.00
$12.40
$0.00
$55.99
8
90
$35.57
$10.00
$12.40
$0.00
$57.97
Effective
Date- 06/01/2012
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
55
$22.05
$10.00
$0.00
$0.00
$32.05
2
60
$24.05
$10.00
$12.40
$0.00
$46.45
3
65
$26.06
$10.00
$12.40
$0.00
$48.46
4
70
$28.06
$10.00
$12.40
$0.00
$50.46
5
75
$30.07
$10.00
$12.40
$0.00
$52.47
6
80
$32.07
$10.00
$12.40
$0.00
$54.47
7
85
$34.08
$10.00
$12.40
$0.00
$56.48
8
90
$36.08
$10.00
$12.40
$0.00
$58.48
.._----_--------------------------a
Notes:
Tice
----------------
Apprentice to Journeyworker Ratio:1:6
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.C.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 20 of 56
THE COMMONWEALTH OF MASSACHUSETTS
s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Goo met
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
HVAC (DUCTWORK)
08/01/2011
$39.83
$9.82
$17.09
$2.00
$68.74
SHEETMETAL WORKERS LOCAL 17 - A
02/01/2012
$40.79
$9.82
$17.34
$2.04
$69.99
08/01/2012
$42.04
$9.82
$17.34
$2.08
$71.28
02/01/2013
$43.29
$9.82
$17.34
$2.11
$72.56
HVAC (ELECTRICAL CONTROLS)
09/01/2011
$41.89
$13.00
$13.86
$0.00
$68.75
ELECTRICIANS LOCAL 103
03/01/2012
$42.37
$13.00
$13.87
$0.00
$69.24
09/01/2012
$43.05
$13.00
$13.89
$0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
$0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
$0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
$0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
$0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
$0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
$0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
$0.00
$75.52
HVAC (TESTING AND BALANCING - AIR)
08/01/2011
$39.83
$9.82
$17.09
$2.00
$68.74
SHEETMETAL WORKERS LOCAL 17 -A
02/01/2012
$40.79
$9.82
$17.34
$2.04
$69.99
08/01/2012
$42.04
$9.82
$17.34
$2.08
$71.28
02/01/2013
$43.29
$9.82
$17.34
$2.11
$72.56
HVAC (TESTING AND BALANCING -WATER)
09/01/2011
$43.76
$8.75
$12.39
$0.00
$64.90
PIPEFITTERS LOCAL 537 (Local 138)
03/01/2012
$44.51
$8.75
$12.39
$0.00
$65.65
09/01/2012
$45.76
$8.75
$12.39
$0.00
$66.90
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
HVAC MECHANIC
09/01/2011
$43.76
$8.75
$12.39
$0.00
$64.90
PIPEFITTERS LOCAL 537 (Local 138)
03/01/2012
$44.51
$8.75
$12.39
$0.00
$65.65
09/01/2012
$45.76
$8.75
$12.39
$0.00
$66.90
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
HYDRAULIC DRILLS
12/01/2011
$30.10
$7.10
$11.55
$0.00
$48.75
LABORERS - ZONE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 21 of 56
Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE COMMONWEALTH OF MASSACHUSETTS
$10.40
$8.30
$0.00
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
2 60
$24.40
$10.40
$8.88
DEPARTMENT OF LABOR STANDARDS
$43.68
3 70
$28.46
Prevailing Wage Rates
$9.46
$0.00
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the
JOANNE F. GOLDSTEIN
azY
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
HEATHER E. ROWE
Lt. Governor
----------------------------
Notes:
Di=tor
$7.70
Awarding Authority:
Town of North Andover
$61.77
Steps are 1 year
Contract Number:
City/Town: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
Apprentice to Journeyworker Ratio:I A
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
Classification
Effective Date Base Wage Health Pension
Supplemental
Total Rate
Unemployment
INSULATOR (PIPES & TANKS) 09/01/2011 $40.66 $10.40 $11.20
$0.00
$62.26
ASBESTOS WORKERS LOCAL 6 (BOSTON)
09/01/2012 $42.06 $10.40 $11.20
$0.00
$63.66
09/01/2013 $43.66 $10.40 $11.20
$0.00
$65.26
09/01/2014 $45.66 $10.40 $11.20
$0.00
$67.26
Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$20.33
$10.40
$8.30
$0.00
$39.03
2 60
$24.40
$10.40
$8.88
$0.00
$43.68
3 70
$28.46
$10.40
$9.46
$0.00
$48.32
4 80
$32.53
$10.40
$10.04
$0.00
$52.97
Effective Date - 09/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$21.03
$10.40
$8.30
$0.00
$39.73
2 60
$25.24
$10.40
$8.88
$0.00
$44.52
3 70
$29.44
$10.40
$9.46
$0.00
$49.30
4 80
$33.65
$10.40
$10.04
$0.00
$54.09
----------------------------
Notes:
$36.12
$7.70
$17.95
$0.00
$61.77
Steps are 1 year
i
I
Apprentice to Journeyworker Ratio:I A
IRONWORKER/WELDER 09/16/2011
$32.87
$7.70
$17.95
$0.00
$58.52
IRONWORKERS LOCAL 7 (LA WRENCEARLA)
03/16/2012
$33.87
$7.70
$17.95
$0.00
$59.52
09/16/2012
$34.87
$7.70
$17.95
$0.00
$60.52
03/16/2013
$36.12
$7.70
$17.95
$0.00
$61.77
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 22 of 56
THE COMMONWEALTH OF MASSACHUSETTS
si EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE $ F. G,OLDSTEIN
Governor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
U. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - IRONWORKER - Local 7 Lawrence
Effective Date - 09/16/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.72
$7.70
$17.95
$0.00
$45.37
2 70
$23.01
$7.70
$17.95
$0.00
$48.66
3 75
$24.65
$7.70
$17.95
$0.00
$50.30
4 80
$26.30
$7.70
$17.95
$0.00
$51.95
5 85
$27.94
$7.70
$17.95
$0.00
$53.59
6 90
$29.58
$7.70
$17.95
$0.00
$55.23
Effective Date - 03/16/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$20.32
$7.70
$17.95
$0.00
$45.97
2 70
$23.71
$7.70
$17.95
$0.00
$49.36
3 75
$25.40
$7.70
$17.95
$0.00
$51.05
4 80
$27.10
$7.70
$17.95
$0.00
$52.75
5 85
$28.79
$7.70
$17.95
$0.00
$54.44
6 90
$30.48
$7.70
$17.95
$0.00
$56.13
.--.___-------_.__----...._...,_...-----
(Notes:
--
- - -
Structural 1:6; Ornamental 1:4
Apprentice to Journeyworker Ratio:
JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25
LABORERS-7.0NE2
LABORER
LABORERS - ZONE 2
12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.C.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 23 of 56
Awarding Authority: Town of North Andover
Contract Number: City/ own: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - LABORER - Zone 2
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
THE COMMONWEALTH OF MASSACHUSETTS
$7.10
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
l
DEPARTMENT OF LABOR STANDARDS
2 70
Prevailing Wage Rates
DEVALL. PATRICK
Go -r
As determined by the Director under the provisions of the JOANNE F. reGO}LDSTEIN
TIMOTHY P. MURRAY
Lt. G -or
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/ own: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - LABORER - Zone 2
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$17.61
$7.10
$11.55
$0.00
$36.26
2 70
$20.55
$7.10
$11.55
$0.00
$39.20
3 80
$23.48
$7.10
$11.55
$0.00
$42.13
4 90
$26.42
$7.10
$11.55
$0.00
$45.07
- - - - - - - - - - -
(Notes:
- - - - -
- - -
- - - -
- - -
- - --w
A._. --------------
Apprentice to Journeyworker Ratio:l:5
$7.10
- -
- -
- -
� -
LABORER: CARPENTER TENDER
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
LABORERS - ZONE 2
LABORER: CEMENT FINISHER TENDER
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
LABORERS - ZONE 2
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
LABORERS - ZONE 2
LABORER: MASON TENDER
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS - ZONE 2
LABORER: MULTI -TRADE TENDER
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
1-413ORERS-7.ONF.2
LABORER: TREE REMOVER
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
LABORERS-ZONE2
This classification applies to the wholesale removal
of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches
at locations not on or around
utility lines.
LASER BEAM OPERATOR
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS-ZONE2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 24 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
W) DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Governor
Secretary
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS
LL Governor Director
Awarding Authority:
Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
2 60
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
3 70
Unemployment
MARBLE & TILE FINISHERS 08/01/2011 $35.52 $9.93 $15.50 $0.00 $60.95
BRICKLAYERS LOCAL 3 - MARBLE & TILE
$0.00
02/01/2012 $36.31 $9.93 $15.50 $0.00 $61.74
Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.76
$9.93
$15.50
$0.00
$43.19
2 60
$21.31
$9.93
$15.50
$0.00
$46.74
3 70
$24.86
$9.93
$15.50
$0.00
$50.29
4 80
$28.42
$9.93
$15.50
$0.00
$53.85
5 90
$31.97
$9.93
$15.50
$0.00
$57.40
Effective Date - 02/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$18.16
$9.93
$15.50
$0.00
$43.59
2 60
$21.79
$9.93
$15.50
$0.00
$47.22
3 70
$25.42
$9.93
$15.50
$0.00
$50.85
4 80
$29.05
$9.93
$15.50
$0.00
$54.48
5 90
$32.68
$9.93
$15.50
$0.00
$58.11
__....--_._.----.__.---__..._.__-_--_-_..__.,.--.......--_,
Notes:
Steps are 800 hrs.
t..... - __._ - __.. _._. _ -
Apprentice to Journeyworker Ratio: 1:3
._....._. _ - _
- __._ _
- - -
- _... v -
- -
MARBLE MASONS,TILELAYERS & TERRAZZO MECH
08/01/2011
$46.60
$9.93
$16.51
$0.00 $73.04
BRICKLAYERS LOCAL 3 - MARBLE & TILE
02/01/2012
$47.59
$9.93
$16.51
$0.00 $74.03
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 25 of 56
THE COMMONWEALTH OF MASSACHUSETTS
s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S CteGOLDSTEIN
Govemor ,
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - MARBLE -TILE -TERRAZZO MECHANIC - Local 3 Marble & Tile
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.30
$9.93
$16.51
$0.00
$49.74
2 60
$27.96
$9.93
$16.51
$0.00
$54.40
3 70
$32.62
$9.93
$16.51
$0.00
$59.06
4 80
$37.28
$9.93
$16.51
$0.00
$63.72
5 90
$41.94
$9.93
$16.51
$0.00
$68.38
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.80
$9.93
$16.51
$0.00
$50.24
2 60
$28.55
$9.93
$16.51
$0.00
$54.99
3 70
$33.31
$9.93
$16.51
$0.00
$59.75
4 80
$38.07
$9.93
$16.51
$0.00
$64.51
5 90
$42.83
$9.93
$16.51
$0.00
$69.27
_._ _ , _._. - -- - - _ _ ___. - - -
€Notes:
_ - - __._
_. _ _._ -
- - -
- ____ . - _
- _ _,
----._-- -..._.------------
Apprentice to Journeyworker Ratio:] :3
- - s
MECH. SWEEPER OPERATOR (NON -CONSTRUCTION)
07/01/2011
$24.80
$5.49
$0.00 $0.00
$30.29
SWEEPER LOCAL 25 (NON -CONSTRUCTION)
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 26 of 56
THE COMMONWEALTH OF MASSACHUSETTS
s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. Secretary vern
Goor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Goveroor Director
Awarding Authority: Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also
included in
this work.
Job Location: Various Locations
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
MECH. SWEEPER OPERATOR (ON CONST. SITES)
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
MECHANICS MAINTENANCE
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
MILLWRIGHT (Zone 2)
04/01/2011
$31.71
$8.67
$15.61
$0.00
$55.99
MILL WRIGHTS LOCAL 1121- 7one 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 27 of 56
THE COMMONWEALTH OF MASSACHUSETTS
sI EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. reGrOLDSTEIN
Governor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MILLWRIGHT- Local 1121 Zone 2
Effective Date - 04/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$15.86
$8.67
$11.64
$0.00
$36.17
2 55
$17.44
$8.67
$11.64
$0.00
$37.75
3 60
$19.03
$8.67
$13.23
$0.00
$40.93
4 65
$20.61
$8.67
$13.23
$0.00
$42.51
5 70
$22.20
$8.67
$14.02
$0.00
$44.89
6 75
$23.78
$8.67
$14.02
$0.00
$46.47
7 80
$25.37
$8.67
$14.82
$0.00
$48.86
8 85
$26.95
$8.67
$14.82
$0.00
$50.44
------.-.,..------.._.,._-_..__---_.....-_._., -- - -
'Notes:
----_____.__....___._--_-----_.__----_---_
Apprentice to Journeyworker Ratio: 1:5
MORTAR MIXER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25
LABORERS - ZONE 2
OILER (OTHER THAN TRUCK CRANES,GRADALLS)
OPERATING ENGINEERS LOCAL 4
12/01/2011
$21.28
$10.00
$12.40
$0.00
$43.68
06/01/2012
$21.56
$10.00
$12.40
$0.00
$43.96
12/01/2012
$21.90
$10.00
$12.40
$0.00
$44.30
06/01/2013
$22.32
$10.00
$12.40
$0.00
$44.72
12/01/2013
$22.74
$10.00
$12.40
$0.00
$45.14
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 28 of 56
THE COMMONWEALTH OF MASSACHUSETTS
sx EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
a
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S CteGOLDSTEIN
Governor
trY
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading
- Grinding or pulverizing, grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other
acceptable product also included in this work.
Job Location: Various Locations
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
OILER (TRUCK CRANES, GRADALLS)
12/01/2011
$24.51
$10.00
$12.40
$0.00
$46.91
OPERATING ENGINEERS LOCAL 4
06/01/2012
$24.85
$10.00
$12.40
$0.00
$47.25
12/01/2012
$25.24
$10.00
$12.40
$0.00
$47.64
06/01/2013
$25.72
$10.00
$12.40
$0.00
$48.12
12/01/2013
$26.21
$10.00
$12.40
$0.00
$48.61
OTHER POWER DRIVEN EQUIPMENT - CLASS II
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
PAINTER (BRIDGES/TANKS)
01/01/2012
$44.01
$7.80
$14.60
$0.00
$66.41
PAINTERS LOCAL 35 - ZONE 2
07/01/2012
$45.01
$7.80
$14.60
$0.00
$67.41
01/01/2013
$46.01
$7.80
$14.60
$0.00
$68.41
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 1.00 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 29 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE COMMONWEALTH OF MASSACHUSETTS
$7.80
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
2 55
Prevailing Wage Rates
DEVALL. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN
TIMOTHY P. MURRAY
Lt. Governor
Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$22.01
$7.80
$0.00
$0.00
$29.81
2 55
$24.21
$7.80
$3.25
$0.00
$35.26
3 60
$26.41
$7.80
$3.54
$0.00
$37.75
4 65
$28.61
$7.80
$3.84
$0.00
$40.25
5 70
$30.81
$7.80
$12.83
$0.00
$51.44
6 75
$33.01
$7.80
$13.13
$0.00
$53.94
7 80
$35.21
$7.80
$13.42
$0.00
$56.43
8 90
$39.61
$7.80
$14.01
$0.00
$61.42
Effective Date - 07/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$22.51
$7.80
$0.00
$0.00
$30.31
2 55
$24.76
$7.80
$3.25
$0.00
$35.81
3 60
$27.01
$7.80
$3.54
$0.00
$38.35
4 65
$29.26
$7.80
$3.84
$0.00
$40.90
5 70
$31.51
$7.80
$12.83
$0.00
$52.14
6 75
$33.76
$7.80
$13.13
$0.00
$54.69
7 80
$36.01
$7.80
$13.42
$0.00
$57.23
8 90
$40.51
$7.80
$14.01
$0.00
$62.32
--., - ........._- .o- ._....._ _......_. _.. - ._..„ - - _ - _ - _. - - - - - - - - -
Notes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio.1:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 30 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
G--.
Secretory
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. RON'E
Lc Governor Director
Awarding Authority: Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding
or pulverizing, grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Effective Date Base Wage Health Pension
Supplemental
Total Rate
Unemployment
PAINTER (SPRAY OR SANDBLAST, NEW) *
01/01/2012 $34.91 $7.80 $14.60
$0.00
$57.31
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.raiNrr:RSLOCAL 35 - ZONF 2
07/01/2012 $35.91 $7.80 $14.60
$0.00
$58.31
01/01/2013 $36.91 $7.80 $14.60
$0.00
$59.31
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 31 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEvnL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEtrr
GO,M., Y P sect y
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE
LL Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.46
$7.80
$0.00
$0.00
$25.26
2 55
$19.20
$7.80
$3.25
$0.00
$30.25
3 60
$20.95
$7.80
$3.54
$0.00
$32.29
4 65
$22.69
$7.80
$3.84
$0.00
$34.33
5 70
$24.44
$7.80
$12.83
$0.00
$45.07
6 75
$26.18
$7.80
$13.13
$0.00
$47.11
7 80
$27.93
$7.80
$13.42
$0.00
$49.15
8 90
$31.42
$7.80
$14.01
$0.00
$53.23
Effective Date - 07/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.96
$7.80
$0.00
$0.00
$25.76
2 55
$19.75
$7.80
$3.25
$0.00
$30.80
3 60
$21.55
$7.80
$3.54
$0.00
$32.89
4 65
$23.34
$7.80
$3.84
$0.00
$34.98
5 70
$25.14
$7.80
$12.83
$0.00
$45.77
6 75
$26.93
$7.80
$13.13
$0.00
$47.86
7 80
$28.73
$7.80
$13.42
$0.00
$49.95
8 90
$32.32
$7.80
$14.01
$0.00
$54.13
-----------__.---..__._.____--------___.--._.,
(Notes:
i
-- _ 7...r._....--------------.,.__
Apprentice to Journeyworker Ratio:l:l
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 32 of 56
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 33 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the
JOANNE F. GOLDSTEIN
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
HEATHER E. ROWE
Lt. Governor
Director
Awarding Authority:
Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
Classification
Effective Date Base Wage Health Pension
Supplemental
Total Rate
Unemployment
PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2012 $32.97 $7.80 $14.60
$0.00
$55.37
PAINTERS LOCAL 35 - ZONE 2
07/01/2012 $33.97 $7.80 $14.60
$0.00
$56.37
01/01/2013 $34.97 $7.80 $14.60
$0.00
$57.37
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 33 of 56
THE COMMONWEALTH OF MASSACHUSETTS
sY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN
Governor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
$7.80
$0.00
$0.00
$24.79
2 55
Classification
$7.80
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
$20.38
$7.80
$3.54
$0.00
$31.72
Unemployment
$22.08
Apprentice
- PAINTER Local 35 Zone 2
- Spray/Sandblast - Repaint
$33.72
5 70
$23.78
$7.80
Effective
Date - 01/01/2012
$44.41
6 75
$25.48
Supplemental
$13.13
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$16.49
$7.80
$0.00
$0.00
$24.29
2
55
$18.13
$7.80
$3.25
$0.00
$29.18
3
60
$19.78
$7.80
$3.54
$0.00
$31.12
4
65
$21.43
$7.80
$3.84
$0.00
$33.07
5
70
$23.08
$7.80
$12.83
$0.00
$43.71
6
75
$24.73
$7.80
$13.13
$0.00
$45.66
7
80
$26.38
$7.80
$13.42
$0.00
$47.60
8
90
$29.67
$7.80
$14.01
$0.00
$51.48
Effective Date - 07/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$16.99
$7.80
$0.00
$0.00
$24.79
2 55
$18.68
$7.80
$3.25
$0.00
$29.73
3 60
$20.38
$7.80
$3.54
$0.00
$31.72
4 65
$22.08
$7.80
$3.84
$0.00
$33.72
5 70
$23.78
$7.80
$12.83
$0.00
$44.41
6 75
$25.48
$7.80
$13.13
$0.00
$46.41
7 80
$27.18
$7.80
$13.42
$0.00
$48.40
8 90
$30.57
$7.80
$14.01
$0.00
$52.38
- _.._ - _ -- - - - _ - - - - _ - _.....,._ _ - - - - - - _._, - __.. -r
Notes: i
Apprentice to Journeyworker Ratio:l:l
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; TO:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 34 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
UI) Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNES GOLDSTEIN
Govemor
�7'
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt, Govemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
PAINTER (TRAFFIC MARKINGS) 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00
LABORERS -7.ONE.2
PAINTER / TAPER (BRUSH, NEW) * 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91
* If 30% or more of surfaces to be painted are new construction, 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91
NEW paint rate shall be used.PAINTERSLOCAL 35-70NE2
01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91
This wage schedule must be posted by the contractor at the work site in accordance with M.C.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 35 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE COMMONWEALTH OF MASSACHUSETTS
$7.80
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
I
DEPARTMENT OF LABOR STANDARDS
2 55
Prevailing Wage Rates
DEVAL L. PATRICK
As determined by the Director under the provisions of the JOANNE F. DSTEIN
Gov-
rGO
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
LL Govemor
Dimaor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$16.76
$7.80
$0.00
$0.00
$24.56
2 55
$18.43
$7.80
$3.25
$0.00
$29.48
3 60
$20.11
$7.80
$3.54
$0.00
$31.45
4 65
$21.78
$7.80
$3.84
$0.00
$33.42
5 70
$23.46
$7.80
$12.83
$0.00
$44.09
6 75
$25.13
$7.80
$13.13
$0.00
$46.06
7 80
$26.81
$7.80
$13.42
$0.00
$48.03
8 90
$30.16
$7.80
$14.01
$0.00
$51.97
Effective Date - 07/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.26
$7.80
$0.00
$0.00
$25.06
2 55
$18.98
$7.80
$3.25
$0.00
$30.03
3 60
$20.71
$7.80
$3.54
$0.00
$32.05
4 65
$22.43
$7.80
$3.84
$0.00
$34.07
5 70
$24.16
$7.80
$12.83
$0.00
$44.79
6 75
$25.88
$7.80
$13.13
$0.00
$46.81
7 80
$27.61
$7.80
$13.42
$0.00
$48.83
8 90
$31.06
$7.80
$14.01
$0.00
$52.87
_--._-._--..__.._......_-------_..._._-_....._.,......-----
(Notes:
Steps are 750 hrs.
1
Apprentice to Journeyworker Ratio:I:l
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 36 of 56
THE COMMONWEALTH OF MASSACHUSETTS
W
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. mGOLDSTEM
ernor
Gov
TIMOTUrP. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority:
Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
Classification
Effective Date Base Wage Health Pension
SupplementalTotal
Rate
Unemployment
PAINTER / TAPER (BRUSH,
REPAINT) 01/01/2012 $31.57 $7.80 $14.60
$0.00
$53.97
PAINTERS LOCAL 35 - ZONE 2
07/01/2012 $32.57 $7.80 $14.60
$0.00
$54.97
01/01/2013 $33.57 $7.80 $14.60
$0.00
$55.97
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 37 of 56
THE COMMONWEALTH OF MASSACHUSETTS
UI
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE S eGOLDSTEIN
ov
Gernor
y
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT
Effective Date- 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$15.79
$7.80
$0.00
$0.00
$23.59
2 55
$17.36
$7.80
$3.25
$0.00
$28.41
3 60
$18.94
$7.80
$3.54
$0.00
$30.28
4 65
$20.52
$7.80
$3.84
$0.00
$32.16
5 70
$22.10
$7.80
$12.83
$0.00
$42.73
6 75
$23.68
$7.80
$13.13
$0.00
$44.61
7 80
$25.26
$7.80
$13.42
$0.00
$46.48
8 90
$28.41
$7.80
$14.01
$0.00
$50.22
Effective Date - 07/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$16.29
$7.80
$0.00
$0.00
$24.09
2 55
$17.91
$7.80
$3.25
$0.00
$28.96
3 60
$19.54
$7.80
$3.54
$0.00
$30.88
4 65
$21.17
$7.80
$3.84
$0.00
$32.81
5 70
$22.80
$7.80
$12.83
$0.00
$43.43
6 75
$24.43
$7.80
$13.13
$0.00
$45.36
7 80
$26.06
$7.80
$13.42
$0.00
$47.28
8 90
$29.31
$7.80
$14.01
$0.00
$51.12
(Notes:
Steps are 750 hrs.
Apprentice to Journeyworker Ratio:l :l
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 38 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
THE COMMONWEALTH OF MASSACHUSETTS
se
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$17.12
DEPARTMENT OF LABOR STANDARDS
PILE DRIVER
Prevailing Wage Rates
DEVALL. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. eGOLDSTEIN
TIMOTHY P. MURRAY
Lt. Governor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROwE
Dirmtor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
08/01/2011
$40.12
$8.08
$17.12
$0.00 $65.32
PILE DRIVER
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Apprentice- PILEDRIVER - Local 56 Zone I
Unemployment
PANEL & PICKUP TRUCKS DRIVER
12/01/2011
$29.68
$8.56
$7.27
$0.00
$45.51
TEAMSTERS JOINT COUNCIL NO. 10 7.0NE B
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
06/01/2012
$29.98
$8.56
$7.27
$0.00
$45.81
$26.08
08/01/2012
$29.68
$8.91
$7.27
$0.00
$45.86
$8.08
12/01/2012
$30.28
$9.07
$8.00
$0.00
$47.35
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND
DECK)
PILE DRIVER LOCAL 56 (ZONE 1)
08/01/2011
$40.12
$8.08
$17.12
$0.00 $65.32
PILE DRIVER
08/01/2011
$40.12
$8.08
$17.12
$0.00 $65.32
PILE DRIVER LOCAL, 56 (ZONE 1)
Apprentice- PILEDRIVER - Local 56 Zone I
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$24.07
$8.08
$17.12
$0.00
$49.27
2 65
$26.08
$8.08
$17.12
$0.00
$51.28
3 70
$28.08
$8.08
$17.12
$0.00
$53.28
4 75
$30.09
$8.08
$17.12
$0.00
$55.29
5 80
$32.10
$8.08
$17.12
$0.00
$57.30
6 85
$34.10
$8.08
$17.12
$0.00
$59.30
7 90
$36.11
$8.08
$17.12
$0.00
$61.31
8 95
$38.11
$8.08
$17.12
$0.00
$63.31
-----------------------------
Notes:
-__-a..-------...__....-------...._
Apprentice to Journeyworker Ratio: 1:3
---_._-®-
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 39 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE s . GOLDSTEIN
Govemor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority:
Town of North Andover
$8.75
$4.50
$0.00
Contract Number:
City/Town: NORTH ANDOVER
$19.69
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete
paving. Dust
$40.83
3 60
control using calcium chloride or other acceptable product also included in this work.
$8.75
$12.39
$0.00
Job Location:
Various Locations
$30.63
$8.75
$12.39
Classification
Effective Date Base Wage Health
Pension
Supplemental
Total Rate
$12.39
$0.00
$56.15
Unemployment
$8.75
PIPEFITTER & STEAMFITTER 09/01/2011 $43.76 $8.75
$12.39
$0.00
$64.90
PIPEFITTERS LOCAL 537 (Local 138)
03/01/2012 $44.51 $8.75
$12.39
$0.00
$65.65
09/01/2012 $45.76 $8.75
$12.39
$0.00
$66.90
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
03/01/2013 $47.01 $8.75
$12.39
$0.00
$68.15
Apprentice- PIPEFITTER Local 537 (Local 138)
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40
$17.50
$8.75
$4.50
$0.00
$30.75
2 45
$19.69
$8.75
$12.39
$0.00
$40.83
3 60
$26.26
$8.75
$12.39
$0.00
$47.40
4 70
$30.63
$8.75
$12.39
$0.00
$51.77
5 80
$35.01
$8.75
$12.39
$0.00
$56.15
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$17.80
$8.75
$4.50
$0.00
$31.05
2
45
$20.03
$8.75
$12.39
$0.00
$41.17
3
60
$26.71
$8.75
$12.39
$0.00
$47.85
4
70
$31.16
$8.75
$12.39
$0.00
$52.30
5
80
$35.61
$8.75
$12.39
$0.00
$56.75
--------------------------------
Notes:
** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr.
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
Apprentice to Journeyworker Ratio:**
PIPELAYER
LABORERS-ZONE2
12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 40 of 56
Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138)
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
THE COMMONWEALTH OF MASSACHUSETTS
$9.32
$4.97
$0.00
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
2 40
$16.77
$9.32
Ulf
DEPARTMENT OF LABOR STANDARDS
$31.70
3 55
$23.06
Prevailing Wage Rates
$7.53
$0.00
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the
JOANNE F. GOLDSTEIN
$Ccrclilry
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H
HEATHER E. ROWE
Lt. Governor
5 75
Director
$9.32
Awarding Authority:
Town of North Andover
$50.86
Notes:
Contract Number:
Cityffown: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
- - _
_..- - -
Classification
Effective Date Base Wage Health Pension
Supplemental
Total Rate
Unemployment
PLUMBER
09/01/2011 $41.93 $9.32 $13.29
$0.00
$64.54
PLUMBERS & GASFITTERSLOCA L 12 (Local 138)
03/01/2012 $42.73 $9.32 $13.29
$0.00
$65.34
09/01/2012 $43.98 $9.32 $13.29
$0.00
$66.59
03/01/2013 $45.23 $9.32 $13.29
$0.00
$67.84
Apprentice- PLUMBERIGASFITTER -Local 12 (Local 138)
Effective Date - 09/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
$14.68
$9.32
$4.97
$0.00
$28.97
2 40
$16.77
$9.32
$5.61
$0.00
$31.70
3 55
$23.06
$9.32
$7.53
$0.00
$39.91
4 65
$27.25
$9.32
$8.81
$0.00
$45.38
5 75
$31.45
$9.32
$10.09
$0.00
$50.86
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
$14.96
$9.32
$4.97
$0.00
$29.25
2 40
$17.09
$9.32
$5.61
$0.00
$32.02
3 55
$23.50
$9.32
$7.53
$0.00
$40.35
4 65
$27.77
$9.32
$8.81
$0.00
$45.90
5 75
$32.05
$9.32
$10.09
$0.00
$51.46
Notes:
Step 4 with lic$48.12 Steps with lic$53.58
___
--- _ _.,
Apprentice to Journeyworker Ratio:1:5
_ _ ..
- - _
_..- - -
- - -
_ ---- _
This wage schedule must be posted by the contractor at the work site in accordance with M.C.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 41 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Ulf
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the
Governor
JOANNE S F. GOLDSTEIN
arr
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26
to 27H
HEATHER E. ROWE
Lt. Govemor
Director
Awarding Authority: Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing,
grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in
this work.
Job Location: Various Locations
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
PNEUMATIC CONTROLS (TEMP.) 09/01/2011
$43.76
$8.75
$12.39
$0.00
$64.90
PIPEFITTERSLOCAL 537 (Local 138)
03/01/2012
$44.51
$8.75
$12.39
$0.00
$65.65
09/01/2012
$45.76
$8.75
$12.39
$0.00
$66.90
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
PNEUMATIC DRILL/TOOL OPERATOR 12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS - ZONE 2
POWDERMAN & BLASTER 12/01/2011
$30.35
$7.10
$11.55
$0.00
$49.00
LABORERS - ZONE 2
POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
PUMP OPERATOR (CONCRETE) 12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
PUMP OPERATOR (DEWATERING, OTHER) 12/01/2011
$27.95
$10.00
$12.40
$0.00
$50.35
OPERATING ENGINEERS LOCAL 4
06/01/2012
$28.34
$10.00
$12.40
$0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
$0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
$0.00
$51.74
12/01/2013
$29.89
$10.00
$12.40
$0.00
$52.29
READY -MIX CONCRETE DRIVER 04/30/2009
$25.80
$5.96
$5.34
$0.00
$37.10
TEAMSTERS LOCAL 42
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 42 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date
THE COMMONWEALTH OF MASSACHUSETTS
s
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Supplemental
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK
Gr
overno
As determined by the Director under the provisions of the JOANNE F. feGOLDSTEIN
TIMOTHY P. MURRAY
Lt. Govemor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
RECLAIMERS 12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42
CARPENTERS -ZONE 2 (Residential Wood)
RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81
** The Residential Wood Frame Carpenter classification applies
only to the construction of new, wood frame residences that do
not exceed four stories including the basement. CARPENTERS -ZONE
2 (Residential Wood)
As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate.
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 43 of 56
THE COMMONWEALTH OF MASSACHUSETTS
st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
u
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN
oc
Gr
arY
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
LL Gm error Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- CARPENTER (Residential Wood Frame) -Zone 2
Effective Date - 05/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$14.54
$6.34
$0.00
$0.00
$20.88
2 60
$14.54
$6.34
$6.23
$0.00
$27.11
3 65
$15.76
$6.34
$6.23
$0.00
$28.33
4 70
$16.97
$6.34
$6.23
$0.00
$29.54
5 75
$18.18
$6.34
$6.23
$0.00
$30.75
6 80
$19.39
$6.34
$6.23
$0.00
$31.96
7 85
$20.60
$6.34
$6.23
$0.00
$33.17
8 90
$21.82
$6.34
$6.23
$0.00
$34.39
--._.____-_._.....__......_-_-----._.__--
i8 Notes:
ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg)
08/01/2011
---®T-._..,
$10.50
$9.80
i
Apprentice to Journeyworker Ratio:l:5
$55.86
ROOFERS LOCAL 33
RIDE -ON MOTORIZED BUGGY OPERATOR
LABORERS - 70NE 2
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
ROLLER/SPREADER/MULCHING MACHINE
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg)
08/01/2011
$35.56
$10.50
$9.80
$0.00
$55.86
ROOFERS LOCAL 33
02/01/2012
$36.56
$10.50
$9.80
$0.00
$56.86
08/01/2012
$37.56
$10.50
$9.80
$0.00
$57.86
02/01/2013
$38.56
$10.50
$9.80
$0.00
$58.86
This wage schedule must be posted by the contractor at the work site in accordance with M.C.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 44 of 56
DEVAL L. PATRICK
Go -
TIMOTHY P. MURRAY
Lt. Governor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE sGOLDSTEIN
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
D -tor
Town of North Andover
City/Town: NORTH ANDOVER
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Various Locations
Apprentice- ROOFER - Local 33
Effective Date - 08/01/2011
Step percent
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Supplemental
Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.78
$10.50
$2.93
$0.00
$31.21
2 60
$21.34
$10.50
$9.80
$0.00
$41.64
3 65
$23.11
$10.50
$9.80
$0.00
$43.41
4 75
$26.67
$10.50
$9.80
$0.00
$46.97
5 85
$30.23
$10.50
$9.80
$0.00
$50.53
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$18.28
$10.50
$2.93
$0.00
$31.71
2 60
$21.94
$10.50
$9.80
$0.00
$42.24
3 65
$23.76
$10.50
$9.80
$0.00
$44.06
4 75
$27.42
$10.50
$9.80
$0.00
$47.72
5 85
$31.08
$10.50
$9.80
$0.00
$51.38
Notes: ** 1:5, 2:6-10, the 1:10; Reroofmg: 1:4, then 1:1
Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs.
®®.-------.----___.--------__.-r-----
Apprentice to Journeyworker Ratio:**
ROOFER SLATE / TILE / PRECAST CONCRETE
08/01/2011
$35.81
$10.50
$9.80
$0.00
$56.11
ROOFERS LOCAL 33
02/01/2012
$36.81
$10.50
$9.80
$0.00
$57.11
08/01/2012
$37.81
$10.50
$9.80
$0.00
$58.11
02/01/2013
$38.81
$10.50
$9.80
$0.00
$59.11
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 45 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - ROOFER (Slate/Tile/Precast Concrete) - Local 33
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE COMMONWEALTH OF MASSACHUSETTS
tY
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
2 60
Prevailing Wage Rates
DEVALL. PATRICK
Governor
As determined by the Director under the provisions of the JOANNES .reGOLDSTEIN
TIMOTHY P. MURRAY
Lt. Go-or
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - ROOFER (Slate/Tile/Precast Concrete) - Local 33
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.91
$10.50
$2.93
$0.00
$31.34
2 60
$21.49
$10.50
$9.80
$0.00
$41.79
3 65
$23.28
$10.50
$9.80
$0.00
$43.58
4 75
$26.86
$10.50
$9.80
$0.00
$47.16
5 85
$30.44
$10.50
$9.80
$0.00
$50.74
Effective Date - 02/01/2012
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 50
$18.41
$10.50
$2.93
$0.00
$31.84
2 60
$22.09
$10.50
$9.80
$0.00
$42.39
3 65
$23.93
$10.50
$9.80
$0.00
$44.23
4 75
$27.61
$10.50
$9.80
$0.00
$47.91
5 85
$31.29
$10.50
$9.80
$0.00
$51.59
- -------_.--.
Notes:
-------------___.-----..
-----._. --------------------
Apprentice to Journeyworker Ratio:**
SHEETMETAL WORKER
08/01/2011
$39.83
$9.82
$17.09
$2.00
$68.74
SHEF,TMETAL WORKERS LOCAL 17 -A
02/01/2012
$40.79
$9.82
$17.34
$2.04
$69.99
08/01/2012
$42.04
$9.82
$17.34
$2.08
$71.28
02/01/2013
$43.29
$9.82
$17.34
$2.11
$72.56
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 1.00 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 46 of 56
THE COMMONWEALTH OF MASSACHUSETTS
UT
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN
overnor
G
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- SHEET METALWORKER -Local 17-A
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40
$15.93
$9.82
$3.74
$0.00
$29.49
2 45
$17.92
$9.82
$7.45
$1.06
$36.25
3 50
$19.92
$9.82
$8.42
$1.14
$39.30
4 60
$23.90
$9.82
$9.60
$1.30
$44.62
5 65
$25.89
$9.82
$10.32
$1.38
$47.41
6 75
$29.87
$9.82
$11.76
$1.54
$52.99
7 85
$33.86
$9.82
$12.69
$1.69
$58.06
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$16.32
$9.82
$3.74
$0.00
$29.88
2
45
$18.36
$9.82
$7.45
$1.07
$36.70
3
50
$20.40
$9.82
$8.42
$1.16
$39.80
4
60
$24.47
$9.82
$9.60
$1.32
$45.21
5
65
$26.51
$9.82
$10.32
$1.40
$48.05
6
75
$30.59
$9.82
$11.76
$1.57
$53.74
7
85
$34.67
$9.82
$12.69
$1.72
$58.90
-----------_..____.-------.._
Notes:
---------
Steps 1-3 are 1 year; Steps 4-7 are 6 mos.
Apprentice to Journeyworker Ratio: 1:4
- - -
- -
- - -
SIGN ERECTOR
PAINTERS LOCAL 35 - ZONE 2
06/01/2009 $24.81 $7.07 $5.90 $0.00 $37.78
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 47 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
W)
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK
Go -or
As determined by the Director under the provisions of the JOANNE F. .reGOLDSTEIN
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rowe
Lt. Governor
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Effective Date
Base Wage
Health
Pension Supplemental
Total Rate
Unemployment
Apprentice- SIGN ERECTOR -Local 35 Zone 2
Effective Date - 06/01/2009
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$12.41
$7.07
$0.00
$0.00
$19.48
2 55
$13.65
$7.07
$2.40
$0.00
$23.12
3 60
$14.89
$7.07
$2.40
$0.00
$24.36
4 65
$16.13
$7.07
$2.40
$0.00
$25.60
5 70
$17.37
$7.07
$5.90
$0.00
$30.34
6 75
$18.61
$7.07
$5.90
$0.00
$31.58
7 80
$19.85
$7.07
$5.90
$0.00
$32.82
8 85
$21.09
$7.07
$5.90
$0.00
$34.06
9 90
$22.33
$7.07
$5.90
$0.00
$35.30
- - ._..__...._ _._ - __..._ -
Notes:
.._ - - - - -
- ___ - ___
- -
__ - --- ._
_ _
- __,
I
Steps are 4 mos.
Apprentice to Journeyworker Ratio: 1:1
SPECIALIZED EARTH MOVING EQUIP < 35 TONS
12/01/2011
$30.14
$8.56
$7.27
$0.00
$45.97
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.44
$8.56
$7.27
$0.00
$46.27
08/01/2012
$30.44
$8.91
$7.27
$0.00
$46.62
12/01/2012
$30.74
$8.91
$8.00
$0.00
$47.65
SPECIALIZED EARTH MOVING EQUIP > 35 TONS
12/01/2011
$30.43
$8.56
$7.27
$0.00
$46.26
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.73
$8.56
$7.27
$0.00
$46.56
08/01/2012
$30.73
$8.91
$7.27
$0.00
$46.91
12/01/2012
$31.03
$8.91
$8.00
$0.00
$47.94
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 48 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN
Govemor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority:
Town of North Andover
Contract Number:
City/Town: NORTH ANDOVER
Description of Work:
Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete
paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location:
Various Locations
Classification
Effective Date Base Wage Health
Pension
Supplemental
Total Rate
Unemployment
SPRINKLER FITTER
01/01/2012 $46.38 $8.42
$11.60
$0.00
$66.40
SPRINKLER FITTERS LOCAL 550
- (Section BJ
03/01/2012 $47.13 $8.42
$11.60
$0.00
$67.15
09/01/2012 $48.13 $8.42
$11.60
$0.00
$68.15
03/01/2013 $49.13 $8.42
$11.60
$0.00
$69.15
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 021.08; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 49 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- SPRINKLER FITTER -Local 550 (Section B)
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
THE COMMONWEALTH OF MASSACHUSETTS
$8.42
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
W
DEPARTMENT OF LABOR STANDARDS
2 40
Prevailing Wage Rates
DEVALL. PATRICK
Goor
vern
As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN
TIMOTHY P. MURRAY
Lt. Governor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- SPRINKLER FITTER -Local 550 (Section B)
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
$16.23
$8.42
$7.85
$0.00
$32.50
2 40
$18.55
$8.42
$7.85
$0.00
$34.82
3 45
$20.87
$8.42
$7.85
$0.00
$37.1.4
4 50
$23.19
$8.42
$7.85
$0.00
$39.46
5 55
$25.51
$8.42
$7.85
$0.00
$41.78
6 60
$27.83
$8.42
$7.85
$0.00
$44.10
7 65
$30.15
$8.42
$7.85
$0.00
$46.42
8 70
$32.47
$8.42
$7.85
$0.00
$48.74
9 75
$34.79
$8.42
$7.85
$0.00
$51.06
10 80
$37.10
$8.42
$7.85
$0.00
$53.37
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35
$16.50
$8.42
$7.85
$0.00
$32.77
2 40
$18.85
$8.42
$7.85
$0.00
$35.12
3 45
$21.21
$8.42
$7.85
$0.00
$37.48
4 50
$23.57
$8.42
$7.85
$0.00
$39.84
5 55
$25.92
$8.42
$7.85
$0.00
$42.19
6 60
$28.28
$8.42
$7.85
$0.00
$44.55
7 65
$30.63
$8.42
$7.85
$0.00
$46.90
8 70
$32.99
$8.42
$7.85
$0.00
$49.26
9 75
$35.35
$8.42
$7.85
$0.00
$51.62
10 80
$37.70
$8.42
$7.85
$0.00
$53.97
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 50 of 56
THE COMMONWEALTH OF MASSACHUSETTS
s7 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOA�s . GOLDSTEIN
Governor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
Notes: 1
. _---------._.----._...-_..,........
Apprentice to Journeyworker Ratio:1:1
STEAM BOILER OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
12/01/2012
$40.34
$10.00
$12.40
$0.00
06/01/2013
$41.11
$10.00
$12.40
$0.00
12/01/2013
$41.89
$10.00
$12.40
$0.00
Total Rate
$61.56
$62.12
$62.74
$63.51
$64.29
TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
$31.78
$13.00
$12.23
$0.00
$57.01
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
TELECOMMUNICATION TECHNICIAN
ELECTRICIANS LOCAL 103
09/01/2011
$31.42
$13.00
$12.22
$0.00
$56.64
03/01/2012
$31.78
$13.00
$12.23
$0.00
$57.01
09/01/2012
$32.29
$13.00
$12.25
$0.00
$57.54
03/01/2013
$32.83
$13.00
$12.26
$0.00
$58.09
09/01/2013
$33.34
$13.00
$12.28
$0.00
$58.62
03/01/2014
$33.88
$13.00
$12.30
$0.00
$59.18
09/01/2014
$34.38
$13.00
$12.31
$0.00
$59.69
03/01/2015
$34.91
$13.00
$12.33
$0.00
$60.24
09/01/2015
$35.63
$13.00
$12.35
$0.00
$60.98
03/01/2016
$36.35
$13.00
$12.37
$0.00
$61.72
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 51 of 56
THE COMMONWEALTH OF MASSACHUSETTS
ie EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNEF.
rGOLDSTEIN
overno
Gr
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. G -or Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103
Effective Date - 09/01/2011
Step percent Apprentice Base Wage Health
1
40
$12.57
2
40
$12.57
3
45
$14.14
4
45
$14.14
5
50
$15.71
6
55
$17.28
7
60
$18.85
8
65
$20.42
9
70
$21.99
10
75
$23.57
$13.00
$13.00
$13.00
$13.00
$13.00
$13.00
$13.00
$13.00
$13.00
$13.00
Pension
$9.27
$9.27
$9.51
$9.51
$9.76
$10.01
$10.26
$10.50
$10.75
$11.00
Supplemental
Unemployment
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment
Total Rate
$34.84
$34.84
$36.65
$36.65
$38.47
$40.29
$42.11
$43.92
$45.74
$47.57
Total Rate
1 40
$12.71
$13.00
$9.27
$0.00
$34.98
2 40
$12.71
$13.00
$9.27
$0.00
$34.98
3 45
$14.30
$13.00
$9.51
$0.00
$36.81
4 45
$14.30
$13.00
$9.51
$0.00
$36.81
5 50
$15.89
$13.00
$9.76
$0.00
$38.65
6 55
$17.48
$13.00
$10.01
$0.00
$40.49
7 60
$19.07
$13.00
$10.26
$0.00
$42.33
8 65
$20.66
$13.00
$10.50
$0.00
$44.16
9 70
$22.25
$13.00
$10.75
$0.00
$46.00
10 75
$23.84
$13.00
$11.00
$0.00
$47.84
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DL•S at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 52 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
- ----.._._---------------
Notes:
- _-_._.-----------.®-------„---
Apprentice to Journeyworker Ratio:1:1
TERRAZZO FINISHERS 08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94
BRICKLAYERS LOCAL 3 - MARBLE & TILE
02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93
Apprentice - TERRAZZO FINISHER - Local 3 Marble & Tile
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
THE COMMONWEALTH OF MASSACHUSETTS
$9.93
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
$0.00
DEPARTMENT OF LABOR STANDARDS
2 60
Prevailing Wage Rates
DEVAL L. PATRICK
G-
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Secretary
TIMOTHY P. MURRAY
Lt. Goeemor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
- ----.._._---------------
Notes:
- _-_._.-----------.®-------„---
Apprentice to Journeyworker Ratio:1:1
TERRAZZO FINISHERS 08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94
BRICKLAYERS LOCAL 3 - MARBLE & TILE
02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93
Apprentice - TERRAZZO FINISHER - Local 3 Marble & Tile
Effective Date - 08/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$22.75
$9.93
$16.51
$0.00
$49.19
2 60
$27.30
$9.93
$16.51
$0.00
$53.74
3 70
$31.85
$9.93
$16.51
$0.00
$58.29
4 80
$36.40
$9.93
$16.51
$0.00
$62.84
5 90
$40.95
$9.93
$16.51
$0.00
$67.39
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.25
$9.93
$16.51
$0.00
$49.69
2 60
$27.89
$9.93
$16.51
$0.00
$54.33
3 70
$32.54
$9.93
$16.51
$0.00
$58.98
4 80
$37.19
$9.93
$16.51
$0.00
$63.63
5 90
$41.84
$9.93
$16.51
$0.00
$68.28
--.-....---_--_..,_.....___.....-----_.......-.-....------
Notes:
Steps are 800 hrs.
__ - - _._...-....._._
Apprentice to Journeyworker Ratio:l:3
- .� __........_
_. - -
_.._ - - ._.._........
_.._ _._.. -._.
- --
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 53 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75
LABORERS - FOUNDATION AND MARINE
Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine)
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 60
THE COMMONWEALTH OF MASSACHUSETTS
'i
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
r
DEPARTMENT OF LABOR STANDARDS
2 70
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
S
TIMOTHY P. MURRAY
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt, Governor
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75
LABORERS - FOUNDATION AND MARINE
Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine)
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 60
$19.83
$7.10
$12.60
$0.00
$39.53
2 70
$23.14
$7.10
$12.60
$0.00
$42.84
3 80
$26.44
$7.10
$12.60
$0.00
$46.14
4 90
$29.75
$7.10
$12.60
$0.00
$49.45
----------------------------
......--.,--_.-----..._._.----__..-..._----.-.._-__---®_--Notes:
Notes:
-----------------------------
Apprentice to Journeyworker Ratio:1:3
TEST BORING DRILLER HELPER 12/01/2011 $31.77 $7.10 $12.60 $0.00 $51.47
LABORERS- FOUNDATIONAND MARINE
TEST BORING LABORER 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35
LABORERS - FO UNDA TION AND MARINE
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 54 of 56
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
T)
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK
Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
&1'
TIMOTHY P. MURRAY
Lt. Govemor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
Unemployment
Apprentice- TEST BORING LABORER (Laborers Foundation & Marine)
Effective Date - 12/01/2011
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$18.99
$7.10
$12.60
$0.00
$38.69
2 70
$22.16
$7.10
$12.60
$0.00
$41.86
3 80
$25.32
$7.10
$12.60
$0.00
$45.02
4 90
$28.49
$7.10
$12.60
$0.00
$48.19
...-._--------------------------
Notes:
�...-�.----------------------_
Apprentice to Journeyworker Ratio:l:3
TRACTORS/PORTABLE STEAM GENERATORS
12/01/2011
$39.16
$10.00
$12.40
$0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
$0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
$0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
$0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
$0.00
$64.29
TRAILERS FOR EARTH MOVING EQUIPMENT
12/01/2011
$30.72
$8.56
$7.27
$0.00
$46.55
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$31.02
$8.56
$7.27
$0.00
$46.85
08/01/2012
$31.02
$8.91
$7.27
$0.00
$47.20
12/01/2012
$31.32
$8.91
$8.00
$0.00
$48.23
TUNNEL WORK - COMPRESSED AIR
12/01/2011
$44.08
$7.10
$13.00
$0.00
$64.18
LABORERS (COMPRESSED AIR)
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
12/01/2011
$46.08
$7.10
$13.00
$0.00
$66.18
LABORERS (COMPRESSED AIR)
TUNNEL WORK - FREE AIR
12/01/2011
$36.15
$7.10
$13.00
$0.00
$56.25
LABORERS (FREE AIR TUNNEL)
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 55 of 56
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Govemar
Secretary
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. xowE
LL Goeemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Pavement Reclamation & Grading - Grinding or pulverizing, grading & compacting asphalt concrete paving. Dust
control using calcium chloride or other acceptable product also included in this work.
Job Location: Various Locations
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
TUNNEL WORK -FREE AIR (HAZ. WASTE)
12/01/2011
$38.15
$7.10
$13.00
$0.00
$58.25
LABORERS (FREE AIR TUNNEL)
VAC -HAUL
12/01/2011
$30.14
$8.56
$7.27
$0.00
$45.97
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.44
$8.56
$7.27
$0.00
$46.27
08/01/2012
$30.44
$8.91
$7.27
$0.00
$46.62
12/01/2012
$30.74
$8.91
$8.00
$0.00
$47.65
WAGON DRILL OPERATOR
12/01/2011
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS - ZONE 2
WASTE WATER PUMP OPERATOR
12/01/2011
$39.52
$10.00
$12.40
$0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
$0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
$0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
$0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
$0.00
$64.67
WATER METER INSTALLER
09/01/2011
$41.93
$9.32
$13.29
$0.00
$64.54
PLUMBERS & GA SFITTERS LOCAL 12 (Local 138)
03/01/2012
$42.73
$9.32
$13.29
$0.00
$65.34
09/01/2012
$43.98
$9.32
$13.29
$0.00
$66.59
03/01/2013
$45.23
$9.32
$13.29
$0.00
$67.84
Additional Apprentice Information:
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage ofthe pre -determined hourly wage rate established by the
Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L
c. 23, ss. 11E -11L.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I I&I IL
All steps are six months (1000 hours) unless otherwise specified.
* Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof.
** Multiple ratios are listed in the comment field.
*** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc.
**** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc.
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 01/13/2012 Wage Request Number: 20120113-020 Page 56 of 56
SPR Central Register General Contract Submit Confirmation
StatePublications and Regulations
1/Villiarn Francis Calvin, secretary of the Commonwealth
Page 1 of 2
http://www.sec.state.ma.us/sprpublieforms/GCSubmitConfirmation.asi)x?ID=71227 1/4/2012
Feedback
The following General Contract submission was successfully
received.
Planned date of publish is 1/18/2012
Awarding Agency
Agency Name
and Address:
Town of North Andover 120 Main Street North
Andover, MA 01845
Project Number:
Estimated Cost:
$30,000
Contractor
Qualification:
Required for DCAM contracts over $100,000, Massachusetts Highway contracts over $50,000.
Contact Information
Lame: IlRay
Santilli, Assistant Town Manager
Phone:
978-688-9516 Fax 978-688-9556
Email Address:
rsantilli(atownofnorthandover.com
Notify email address listed when final publish date assigned.
Contract Information
Project:
Plans/Specifications
Available:
Place, date and time
General Bid
Deadline*:
Sub Bid
Deadline:
Sub Bid
Categories: —IF—
Town is seeking qualified contractor to perform pavement
reclamation and grading for the Department of Public Works
The complete Invitation for Bids document will be available on
Wednesday, January 18, 2012 at 11:00 a.m. at
www.townofnorthandover.com by clicking on 'Available Bids,
Quotes and Proposals'
02/09/2012 Time 2:00 p.m.
Time
Additional
Information
This page can be printed for your records.
http://www.sec.state.ma.us/sprpublieforms/GCSubmitConfirmation.asi)x?ID=71227 1/4/2012
Santilli, Ray
From: REGS@sec. state. ma. us
Sent: Wednesday, January 04, 2012 3:49 PM
To: Santilli, Ray
Subject: Publish Date Assigned for General Contracts
A publish date of 1/18/12 has been assigned to your General Contracts submission with description of.
Town is seeking qualified contractor to perform pavement reclamation and grading for the Department of Public Works.
Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices
and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.htm.
Please consider the environment before printing this email.
Request Official Wage Schedule
Confirmation
Page 1 of 2
Your request for an Official Prevailing Wage
Schedule has been successfully received and
is being processed by DOS. The schedule will
be emailed to the email address provided in
your request.
Please note the wage request number
20120106-009 for future inquires.
Request another official Wage Schedule
http://prevailingwage.detma.org/WageRequest.aspx?wr=121 1/6/2012
Request Official Wage Schedule
rVbe. bib
Confirmation
Page 1 of 2
Your request for an Official Prevailing Wage
Schedule has been successfully received and
is being processed by DOS. The schedule will
be emailed to the email address provided in
your request.
Please note the wage request number
20120113-020 for future inquires.
Request another official Wage Schedule
http://prevailinp,wa2e.detma.orv-/Wav-eReciuest.asDx?wr=121&AsnxAutoDeteetCookieSun.__ 1/13/2012
r
O
N
L_
z
C
M
.
;�_
b
[_
W
=
u
W.
41
ya
� m
-
N
_
`
y-
o
6o "'
O�en ^
�
ma-
'i
t0 (n
.n -
c�
oro�o
c`
tmv
_
o>'s
-
oc
00 'a,
y ym s-
c�c�momm
` Sui
.�
ii
�. ,o
Z=.
. o
=� cM
a..=en
mot°,'
3
P'
0.-
".Zr >
U oM
¢¢sv
yN
>6 - cr
o ` o
m ism
c.� �_
o
Q
N a
I
00
y!5 mw
Owom
m a`ai m'LLa4
t '-2 d
O
�=gz�8
�
W cmo'n
-
��
MEe
-s
w\`»o
OcE
o mac-
ern._ .-
aL�ci
".am
-
�.orn
Q
_Uv~i
mm
cy c>_
"
NQv
62m
H �U
^
1..�
,b .-
--.'C_[U
o
oo2
awF
U_
x'. y v
O a =
-
FL o•p-_0 �!='LL2OaFU�C
m_2 c Co ��
to
¢
c o
-
U
�
.`-o
U M
of
c mmm
U - �
a'<
T
-
N
_
`
y-
o
6o "'
O�en ^
�
ma-
'i
t0 (n
.n -
c�
oro�o
'-
�
y= -
y ym s-
c�c�momm
M
Otn�C)>, O -a
_
ui .o
n.6
"m
-
E
�
d
d.Mm
z �'
N
�
LL
Esou=y^o
-=.n
= -
L6 E - m
�
^-
3�Em
i'"
nM
o€�a
c
y'-iOm
"i
c
Ig
0,em
aE
_°_ -m
�-
moo- >
0-yO
3-
te-
d
zaiy
-yW,
-
co26H
_--
y=
O 203
v
f�O
nz
-
yHWy-_GU
m -mo
�
oom
.z�L�o'-
o
gs �>+
.ias3
m
USF QO
v
M
oF.
z�ALULLO
zoo 30
o
oo2
�z
W Q c6UOa'> o)3rC IZ
woZC nW.yO�mmcc yorom~moo
Em
eIn-v mL
e_
Q
FL o•p-_0 �!='LL2OaFU�C
m_2 c Co ��
Cn Q
SS.w
o
c o
ooC
�
'anm
m
m
.
J
Nc
iY-Z"a
s lO
O,aai�
CM-
Wo
>$
m o
co
-
�
Zoo-
m
My=
=
�F-� ``4.-E.tit-' �
zCn W
Q d cd as O roNN7fAro aV7CC>+N -0 C6 Cm 0) N- roCC aC:Y ma me NNCeN, .Lm C>,a a0N N C W
am 2 v .c roe canm `"d VG.-000LuNs>,*: 3:�paN m� ala) Q ° �- C oN�p�'°p>moCo$00 o�t'd��>°cmy�p�� Wo y.'¢
c3Q O O C ml6 mj�7N N7U n 3E053E.cm d0 mp LL O r0U ->,L OJ t'mn N roZ LZ�CmOLO aNN•�O W� '`OO
E v¢ O L o$ o�c a7oo3 roasmom� cV O . ¢ I° na)Ne of `o cc6) N acc_ N o S oao
- OfpFLL V a0 'C aD a- �--Ua)°NL.6- T0,4:r m2'7-' N~NN� cm OC' N W Ci (W.i am Nam. C0°i��'°api{'.EU C m o n= N O.m C as f7 N'O Uc f�6 NM
F -° O Of' w NOOa OU7:0 mrLNa 7 �m�L n'-' as NO F do NO Nm` yr `-03Na) NZ'N N'-00`7md�N m U° a2M
E ° ¢ U -
J> x >- C NI�Or� Til O Oaf` m Lir m E U O c «N y J�Fx mF - E Ci c aa) a.o \-0 mr O'Or pro LU•� a0 6)L N!" '
-.inJFOJ0amO)NtoVFLDm <Ia),Soc TaENNV7rOrVWOCm0~07...Om m00a F NNa mCY C.N _0 a7 -QOmma a~ �N o L 0
C w _ N._ >,m m 7 .a- W¢ �U C' E c� Cm �_ d= TN C 2' C W
_.. a?V�N OtnO�WXZri+' �027dN �05NCML m_OmL N'�N m�ro�'C Q 7 2ONrom 3N�LL OF NLL .c05NQ 6jro�'>NUcu 7OmE���C �E�•-•y0C `O am 4«m U m
3 JLLOTmQ�ZWOcEL TaU UNr OU�riE�y �� N.L CmN OOa C2c, N 'U � O Old m NoU ofmaN >O- O 05tH O ror =O-Zw O O
x m a o `o U S F o n N
�� a _ > y c o 7 m o mOC Z N m Z > Q ami m y m.- m E �" 0 c 7 O m °>'L
o ZV-Ga 'a0 �NLLV ComOn °m cCaCZ c°`° ma E U o m c i6 ro 0-�m 2` O� lEtl OUGZO 2 E'wu) rna7CC-omc°lI Z'l°6)'2zE aS _d�md c>. m omLLo7 <W
ZZ
r' m
d- - O a¢ Z x E N - Y 0 Q O L m a m> ro` d ro a O m m d >,C d 0 r>,C u) m L O 1p O m fa to x 0 ro (a 24 Z W U w Y aN J Q O L m ro C m _ N y m m p y ca N j a) m 2 c E- a) G=° ry N >,:0 Y Q O
w'�m fyWWv) (oomsoVa�c�QtUctno�o�onmo3rmoLp ' oo`°��Ec a«oi��u�'►c N �vyig� ¢ =zooi�ooma�onhrn 0°).c°- 40"a4)-2°ELm,3`�m8n...m m
-. �axFm Mtn O d-Owm2w�ya a)0-0 NN��EmcmiomcmLNC2��ro 0a ¢ O Ncu ym°Omi>1 ir0)o E oc°�aL'Z7� ro �°-%wwcN
a 02P LU F O"tm0 ro mSTaCE eor•-mN C COEe-L WILD m CM a J aO m`CNN c6 m,_,aOC°jam c m�,°fn C��.3 ^-'Oyyr' d)
r-Zz
m O - O d m m'0 NL `p N 0 ro 0 7 0 3: .-- C f60._ O.d3r a)dZ w C m.2 o m- TN m aro--O C 7 C >,u) n'N m• -y my N 70
w.y- C.i O Z and c;; 7�RC'3Y -°CO cEd 0-82 C�.T roM>-. r_7ia C.L-. jFCw x W w Ea.-QOcErorn>�� Uy•-m��0'-7ro .-mro- 7.0 t•C�N.. -
C=') -C ¢ � H c m 7 07 c° 7 m >,a•°) `8'Fa t°) �'0 0.'C 3 mr O oCU �'o)� I F 0 f� F°m m c °)wU., t7n cmi o aCiLL dL.« N oL m c m E TCL E= L7Z59 y 3 0 `o o,.� �'= y� N
= C. y •-ro6, ;,' mmol n0 7a ocm°a m mm 0p>Em=Nn°=romO�N=Nw0ZC., :1c0C Taa))3L2'x
d oc¢mUww > 3a1�Ea)6. oEro�`oU: -IID[ r ru no[ �coo)�a30toE3aooE no>,oQo�Emao`oon UroQ ril
16-
'3._ag
Q
¢I 0)
N C•-•«a•�•� m
E�Y`-CO>°>apiai
F ZFZO C 'y >,'C -
WQW�Ho c ccm"cl ca`
C m
NO m0
oO Ion
LL 0>
X
JCQC)Ycoomm
t
m2�OW� 3NoaE7.L
cV o
Oa
y ym s-
c�c�momm
M
Otn�C)>, O -a
_
O ZJ_O - > m m-0 O
v 03: nEmma=
-
OnccOcco ro °"O)y.7-. C°jN~
O� Oz maa'-E C_
-L d _
}QQWQ
C N
aMr alio
m6d
ay 000�
JWGJ�NO^jN�ON
- r O O
oYTFLL ayi a)6$d�Op3
.�.. m O L•L••= c
?_'Z'
O
w�yya`,o
W�VaaUO�w «rompQ dOaW ci/)am�CNnL
°i"m �Gc\u C ror
_O
OJmmOT 7 y,m.,NrfmO OL
w 2� C -d `o
_L)m
UN m
_°_ -m
�-
moo- >
JLL C mQ� F. m'O•-
ro
x y m' N E
3VQpmN�n?wW«NCmLLa05 Oa�roNC
E U'
2 lLLZ o nor N
-OWN70 COasEU
N
CNa)E2
Y.-i"Ua,U
Za ¢Z �d ECD. TJ c dB1 W00 a)N 7°L-na •WOtoW Z2 ->'N Um>,�Oro
�NFaaLL y O y0>'000Fe�
=�na
y
c o'm�e_
�� .5 E=
C) d o
Nn D.t.. fa
W O - 0)
W o m
0Q=F--- -O c�
NiaOU¢ N n•N0r2Q N
-
N:- ` aZ
-a E�
3m0 F anac'o c ro 700�Q
C� C)� ro d e C�
Z a
z O L
° a) _Z_r
«
y N
N U
2•` N
- o�'
-
USF QO
m C
J ZLL
=
z�ALULLO
zoo 30
y
¢m
ro a� j Na'Fa
o C jO}W
b> o03ndYt
W Q c6UOa'> o)3rC IZ
woZC nW.yO�mmcc yorom~moo
C
I
w o'm
t
O.w
FL o•p-_0 �!='LL2OaFU�C
m_2 c Co ��
n)n...L-.. p)Tyc3
FFQQOQ m y 7 3 a E En
�❑ F
L W
FN Lo2ZUQ 0)--L Q) C-0 C Min C.T N'a .y-No`p �YNOC WOE 05
W WW2 7 cmo.-a m0 >, O ?7
Uf> >C_ammo Cno>a) E04)2 p7 OdE9Nmc c2a Oy oN.0 Vl anI O°
U. OFyF r0rz w ==�W2rnca aoi c $QMp tmi oc_nm. Eo'- 6) 'D- L:=> m T� o- y d W,nL NU
F.x 7JOm �)z _roQ2W-•Oro UE m'L."Y yONH�U NCL�C YU-0�3:-@ me O Cd -0
F tml7 °». cF0 o xOFgLL ro'a mM C c0 `O'er' m O 0-.0 fC y N y m m Nn 5 2 0 oN 0`)
QyWUUU a'UOQ-aNF -0 tEaZ N U �N O- m0c c, EN j O O C m C r0 N c U «. � � N � � oM 2'05UN
W=ay�y WQ Nu.�cWZO>U�cNZ°m Xa ccaNwoU-o�cy cEEoD 3n aW mm�mE o
C. O OO m OOaWW QMmm°)ro Nm U>fD Omroocaam c�yrLcoO7m�05croL -
MCA,, ON NUWa m�'f6=WWNQ.-L_' N o 7 W LL y�'yL OEOy� mUm7>,-°OL m'�mm _�30~ �N
> _ c ' m._
G c
Cit m ¢mc03�FLLIOo 3« y->�d m7 �'a ro 2a m C ro c CTa= � f/ia) J N i�
2a N 0.2- N'- _ N N
02 F tii O VUcWLL2w 0C3., L>>7o��oYcCo�7NO7ood7E arra m
C) 2 > o OY._ c-2'd.._C7QU m� c ro m af6 pUT- C o 0 7 mjYU ro v�
N E cn O JZcca �'� rmf>a axo7 cmm TN oomEU c _a r�
9wEzE'ol
jwm'=" n28'6roy�'m!0)0. _0= �a'oam)mT 33�or t°
OOE: 2 iN m m 0 O m-- m O- d F
CUtnwUQ C c$ $,= E rnOw NL o O)r m o E oQ o >,am `o 0 > vUZ Uw
E 6, 2'� cr `o',oma m c� a) o r- Cc -_a)- o 3 m d)m m 3 aai r c `oc d a) o c 0 f36na) � ao fb 7� ayU mLO 0 000p
p'^O�In Yr Q d y 7 N t -'-L mNJ 00a �° rodd ma CJ
t:�NOO -U y E y2't mO >' t-- y�-• nym�-•L �..y M Uc NQ OC NOm
N n mr � a`) N 2'rj p y ro .- 3 c 2 d L n fxi m y `� m o c >, ° 3 N c •o ° o o I m
Ua N ro m 0 roIO N .O dM N :p > E n Cr2 7-=. U) m N C T L N roc O d> Ofn 7n .0 InUOM'
m>'a) 0000. cEmy°'S-:E �y�mF�'N =ro�o3= `onE�cO'o NNoo wroQnr
W C m°^YYi.•L•'-n CL 7 yn ;6z .E' L_ O N N 'O V m m m m yN EQU C�In I.
F-YoUr_,COE0LLOO O -E, U)NLL>dNLC'CmC7No j c_0o0)c N�a7NN0.0�� dQyayLLO IZ7
Fa- aai \a mm o Ca acorn m cti N tauE 7-`oLfrn 16 r roOn' _E
CS 0 3 c N Nr ma N=o y o c oc'm t.W:t 0.-M
CYa min N°Oram OOQ 0-o 2yCCr 6)°7 y U aNE OZ:E NyC N-� .0 0) a) mm OUC(-°
W'.4-dNOJro Oa0. Oro m a co co ro N IO a c �y C L y°EO N 0) x fcaocmcc05 O> U YNNy'�r 8U° 3om -
JQ C aE¢� �O- X m� 6i fora m�F CN -0 y 0 Na p o m °) cmi E o >,m y y 7n ac pLL N N . 0Z N
W U.° -mmU•,aj-)rm`°Z'C� N°=NeL-rOd�L�CNNE>,°cLi - WN'TU.y--fy60`)cea 6a U)-o0m' o��° z-
¢ d NaL 0)ro't' mL.-OpLL 7 ro LL mUW CO mr Z.0 05 N N =U 6i a L N ^c 3a y E is 1- m N 3 ro v3wt O.
zor37'- 00) M_ Ln LV)+^'OOmcaamE mndUN c6 Cmyp`L a)U
LLroLL 00 UN pOMUt_ mNr NNN .O Cr ')p cc W= ENV1 N m
CD 0) om¢� �_to o c3Y._y LL3mm mm�omo 3al'nOEicy7>c oy.0 Maa))I �W- W ¢
0 nor �e"E _ X cfa Lo I_ c c N N opo pro m y Q
U) 7 - a m CL y
J 0>'67 �'U m NU c m m y E N J ro� U a� C� mC o� ��� LC•jc aC C�a ^` O _050 N m N m NL N 2
vai3Yo7 mmN ��dW H U de nLlny0an6NNm�E OMNyjc N0)60 OaNOc-wt: i67 cma
U > m O m
3 e X m O O
U) mUo e ° m rn� (.0 .=- - C N a' p m2 c C•ea_) -0= 0 2 EMQ 0 mY o ° E 3.N ma otm m a rno � E ai=F
W N LLx---Z±QON'a ymC7 UL Oro 20)tnmc(0 InMr 'OO°o> NCy lO UZ V UNNF- .
LUZC a) U)
`°"E"NN� yW=Ca•�Nc .O NN�°�m Nmc yEc� Oy -.a T6 C SYN jCpo
L n
a pC NW�oyNaC N2U pE)L NV'in •Oa NOO>,.L..,�ac6LCNmc �CmmO-SNL UL •0:0.0 2p"OaC_ CO'�d
F CLL3L mU a)i6 ma N N -.N 70 O cc yLL z ov ° c rn.NZ nd .D m -, 'c� yC y N m n'fo 3L cmi'a f6 'C� N
¢o Ora 73U•�ai 7•° a7UN Ulm 7cnc°-m '>osE ya051605r-n `lr yaac6mr 6)N 'C.)Om
O=arL 05 wO-0 a•cy mVrolN '-aacnx7NdNO Um6w(D NN�U C ona-cZ EC - ca ow(wa 0)
�U>,N=M O.0050•p-_N no (aaNc mCL-O•�--�.c•�m NYU n'�'_m - L' LO'n MOp�-•O yQ'C
LLXaO.30n NaUOmmo. Uoro )NO me ome'UOa OOnL^o_° a+y, a�� F_r O•C fD w.ao _Q O
mYaaMy.m- Nro.oE ymiEm2pdaw=°cw.Cycy - 3L°raciromm myymoT7o-cC.2
w�nN-22Y�Ernc=_ro$ 'mam0 g2°:>�L3mEcc600�aonN�p)� E�oE�-�'NU��o)�amor°-mo
Uc C >,O O yF O U 3 EUL 0)_- C aYLL r-.0 O« d� Nn N a-5 ro N a�mm N y o Om a) Nww N cin x,'2 m :3 '5
mz f'
Fro>mmmromL 21
N '0+_' LroOO 2EZ m`L-'c°o dmm°Emro�Er CNN c c N LL° m�mMUNNyZYO
z(D0) �cc�LmELmo�a..o>y-O°purl�?�cmLL>�c�omv-�rnL_`�my�cO n�a�j 2aZcccn
Zr6)isc`E'=m°mc2°13oSaroCuLa-EcO�ccaLccZNyE�N=Cmn`o C w3:Laa=_,La_•C�Cacm6o
>10) m N° °a UL m N (DE aa y- ° m N- y N O p m N N y m m y °'Cj E2�YF N O C 8. EL_U'j y
m'C -M'*0 °° rnmrNLL'OOF_ N y 6) c 'L'
C °-ya mr c•U N -.L-•-°1002 p E� CC C 0-
05 0 J pL--
°000rocamOMC E N N d=L O mro05a)Cfa'Cmmyy c l6 -Id cFQLm mit OCU V'C
EalloQQmn�N)nro ? OO-3UnMmQoov)03ma `m N mEm`oN L)2 E3L) -ro
Z�-- yM -&j �.c _C O y Ca �Na dd0)dN jmc T td cd 6�,L -om -Z i6"'CO Na7C -Z- N o � '-- . W . N WF cy�, dL NVa a m>,maa m --- O L ON a CO a - dOmdN
t>_� �' m m m3' -d tC EUL O d� L3 dam• U C m C U LU CON EdQ m' --C Na E>LC Cm ON•8j «• fA lU 7C N(D >.- N
_ E _: a °1 U i0 N N r� 3 =L.. C7 L m y ..- U« y p .G O 4= ._ d m C ._ m ._ C> roC O C C r E d C m d O •- _ m U N roe•'
- W � c ui � y ess � O J '- C C_ f, >� 3- .` «- n O L s d m C y ro n 7 L 7 �a `� y e- m m E ._ >+ ` is
ro CZ m m E O c C C 2Z ro Tcr E m d'- m m _ N° a yLL
ooEo Lo _ _ E BYO) y __ aim COQ ONmmT yU dd Om i"' m N O` `c O�c y Ey yE•- W t: (n7 mo m -0 p Y a3 m N Om•- L CN c co
v J ,� o� v a c O F O ro a n N n o m O m 2= O)�i' C 2 M W «• c6 m -0 CD
.- -- W- y O a m
y ro C N n 3 L m N'C moo C m a Cr ro ro oaa m am Ea C y- 7 m
rn�'a m tiO v y co Z «. °.SO d1r 7 L ro 7.- C d n E 3 a m d V OQ-LO2Lf0 E ca N O m d O w� U C° Un m U c `-rO Na d O U U E fa y O m •p -c da m m m n Td U° rot: a 0 U m
.��Qv6 m cyp E°y'N " - n dOLf 7 Oa =2)" U U n >, dNr N: -)n �. OUL mrm �� LCN> m dX« nmU-p d _dOi -d-m O'er -do L >,-Z V
�- N - n o 0o NmNEo Y m oe d 0) L'3 giro N a emm roa)3 ammo 0
a=" g ccE -- o W m p 6)aUU y�•'-E O >w a) 0.- ro •c ml. cdU� °3 O mn=_'Oror 2 ca'a-x Or 02 -Nm .tea-. m Ud _ N°a cnm t0 mem 06�.-•-"O ro>, `,� W
= c..) z o W . l Cn > o' c.; << = a N ;,a N as c •° L c n c >. r y as o m o 3 a a ti 't E L.. i 3 `o '- m w d" m 3 r c« y
o O o o`� cM o._o jyN a•- Cfq L Ci CSN L OCO O'>vm N O C7a V)N° Q W C_rod,�,�..-mCV'O •OyQU•--rLc •Om m pinC.""U ro n O �yNlCdyc -N CtA
El' -oma, ¢ =J.ay - _ o- rnm �� ' a d N m of m m o m 7 �d m ro M m d$ 3 c Q m o 6i NL p cro o o� c p ro p)o vn o m y a fD m'oL:-- ro >, d o` O U -o 0
y O;oHrn E E-� y 'E _ iso a>i F cpy n 'O mr ccO >` L l6 y mN c�6M0°° O� y0 CEZ1M a Nm in P92 Co_ 'O a F 4105°c UON OdL-23Er O ro 7 otS3U cr >,r EAd ddmt'N'.-n dj +'L O
U mLL� �[ oo ori `m 3=� o� `m.mm zr __ U ZZ p� C 3:= cm >, 7nm od dc1�N Cj a c �= SW a_ E -a) '= y" cm Y:t--C UW J•�
a o 3 =en> O F m m o� m d L -'c O y C E N m d N d U
UrnQ O o= ,c yin C d ..t. Uy OMN E" N N L M N 7 a WNNd y E C U mm 00NroC U t=m_ J
Xo - O .Cn .' z .Q u7 ��^ W ( O 7Z N N O C OLa L E c C N U N._ U U ror C_ ui M y- - aN O C y H L) U m ro Nw y (a J
As my -- �� o^ trn m fn Oy c y y nm = O C n �•� d O ro'rn mC O> N m "y O -w d L 3 y C m dr E p E UM XCn ro O o m 7 E._ ro.,- m m
O 2•- O �L 7 N -5 c 0 2 m a) c Oo N o or _� C 0 3 O 7 O m an d a 7 3'- U- U o d 7 W y c0?
.� y "woo O y L O O y m_ .O _R ro,_ w �- (,�j O Y WC7 2.c CV -N N c fn mN C•- N O F- m� Lx N` J
C15.� EaF-m `�- o v v, v FF � C Oi6L ym3 >°•-'GaCm CL.G1OC o a) .- aro C x C}U ro- X6032 a m W f0 N C m N CC E a) Umm N d morn o mrN
vent Mc y.o t 3^ e, Cj m - - p ov_� F Z O.¢ y O N d m _ y >,3 7 ro 2 d E a e y N... O N aM a 7a `10 Q� IT: C U C y a a n m._ N- m ro_ W 3 N c O O 7- ro N
ro y C m s+ m� N'- c O T N O C� N._ y._ m O d N
'.049 -Waw mo , *�� Nay w w d a CC d �a d d E LO ' �- m EN�`� c O c ZZ L m 3^�� m c mro 7-- �'aia n Y opt mF m� aco 0
c 6- y _ C•�- E �N O m2 ro O. 69 0 3 c a J C U �-- O 2'd EO tp dYa y �� fCa 'c L d m CuL d 0 La, y N C OfmLL m y CSO
w �. Q� c0 u�<n rn o - m ��.' N aa� N CV% p._ .L- ro m O C m d U O ro ¢L rd^- C �,� aNM Ur dt0 CO U O._.- m U J'0 ro 0 ma ca m ro c U a r U U N N m N
OM -W C.0 _� m �o m U) F� Mn N aLN O - a) O C�VOdc QQ C._ mm m
m>u�-o r O�m -o wy ¢ Y ¢ d`-'- md" p)r C7>+7 C.)C'07C a do m CE aOEn_ai2O ay6S N'- Md O m �Q Ii�oO arom7L a Na d ON m`mm dma. W C C .L-N"O- dF m �� Oy>�rom0 CUCmcoQ�
Q m2N >Q yA¢� 'moo Z o.� .-: _� O 7 U C GIf7a Ur ron LCC Croyo•Co O �OdQ N EC-32aNE�'' 7 c 0>,l6 OZa dC C-0) a 3 Olma Cl. - W2 ¢m+`-•3 O CCNN �"_L LY CCmE Ver CX O EroEO�`oU m O°0007
Hd 2a oro N fn om cti- x �O O O OwcO9N Lm -0r ° 0) LO ° 7 O c d 000 a) CO m O�'� 7 J UaC >'an �' NO op -g Ec .0ErU OYmO-°N `°tba LNYc. O V'o NL orro �yLC mW 2 g�
Y mw weft oZ .1 3: N "e mss ¢ E ` m �''- dt- p7 E `d y ' d , Fa ro d dt�'y 'fO px mgr C U F e -a U @ Nn d ca U Nam d -6 m oN = y o'Cm �e-�
>.__ ov 3„ y Q men y m V OU O QLLF in 07 'L- c- m v U 3.. W oin Uo oU tn�av d m Q LL an d Y m>,L o- -o a Ew m ori i x
awe `y O L o Q o "- - d' ]G � E y H e U 7 m' ._'C F" 7 L d > y'G N •� - E ro m 7 a O a f0 7 LL- C to E U a •p N la 0 C 0 0 0 a7 O m d 2' O O e Q O C
O w-> ON ny Qoo o.y oa3 Q o QFC)>, m�ZammCctn°LC O�j0 pN30a ()�Odm G -m ILZ3�o0-7L p 3 cl` _ro dot° fJ �y0 U°N o U2 OUw�oNa 7 CI Cq,. a3�7 py cGo LL 3 N m7d E•�-�m� J-mU m ci
�om o O U O a FO n« c m L C dC O. of "' d--''-' d U.-. °dy NCa 7'C CNC J Cm 'T C -O UN m ya Oa OAU .L. Glmw Z_-dQ aL O0) dL EJN dM Cm o C•
y a>mci Z ti ��b y.2 - N Oy �. y m¢}._�^ ..«F .:O 0) 3N.p)N IC O.L..O N�'r-.�>,m FE'O L m� Oma CCC CddEd 3c 2'cnNC nG'am C III'.-= T 4. WO O�'�dOC WC7 N��U -O roG0 7= Wo Tc NY� -° C Qi7 '`K Urr dL yd Qm-m 050
�t�ym Q �°' Z>` Q"''m oZ� =.nm m CO) O a N amv «.70rorm d) 9 N mm e C dZO m0 m CI.. N O y 3 dm" Le- _ d
2• (A LZ d-()�- C NC OO CLL O m._ E ro y._ C C O ` O -0 O °" N••7 -O t" C O J moY OL .N N ro jar f6 m«_ 3t- W CU C O 3 c me, ro 7 O- ro L:O 2 N >,'cO OL
_ 'E=sc_ CNm .-o = �y>< r'J'a2E aO-LLf,r dw.m>Ha `�=ELc f6 NOS roOiy Z d>«dd oO EO) n --S m� NFUE�-%O m N c6 m L ya,J ro 0W- -r� cOdm Y O .L -•E O` omroNmro tpOa `fro_ C UmmmYcNCN..-ry.-�E3L
O� c ro O"_ roN aaN U >` O d O y Q as e d L d C C yQr m OZ a O a mC� Om.L-•'� 7 L L N >, N e 05 0 a N 2 ro--cn ,� L mro y oW e-C70-mOLL'm0.
�U U J C 7 U L E F«N O$m y N3 O N N' E Z ro m--« «- d
O m m E nc n� E e m daY o E E ere 6 fa 7 ron m a 3 a� m
n C C yn O O� O C O
}'._ ¢ LL m fn0 d em„ °FQ UL a)r O ror (`c an d CL m T a.. E Er- N- n L ° m F
53 as 2 5y m it nv mv`� O��w co C O NO U amc� c 7 m y n N L" ma ate._ m i6
aa_Q aW y M o ro F X ZCq1O Nrn3 O m m N ° y me d03 LL Crd Oai L mL N _ O� mere` NONr._ C C
I m m d m N d 7 7'-- a U Y yv C d c C a C�,,, ro C m.� ono N �'p
LLJLL m� d�z'� CaVJN oC ro a)OL•c7L C O- N ro U Z E E d E C d•Cb -Z c aU c a mn cN lu (� Ntn '-• pp d N i0�m:0 m C) C O .00 a° ro ro 05.00- p 7� ... O L ma d f6LU Cg ciao a o'C a0 J n 7 N C 7 y i a'-- 07
- - c `b d S. y y w L ,�
04, m E O nor LL Z CS -_ - a7 Y �' N m d« m a >`�6 « N'� a m O t m d d O D E n'y M= fD ._ Z >, C) E C n 3 0 E E E =p 7 ._ C 'm -0 2 N c a C ro L 0 N'e- m r �_ E °-L C C C r r 3 -7i 00 m m p c 05 Y m y U -° Y N a ro 'p
yon .-� ma �a d Fn O FC« >, L nTm n.0 EoyGt=d COL->, .,-' mmm mm>, OF N nm roN 05U pCLC \O d mm E c T^ 7r OC Cmc� ° L7and U
o mm tg=_yc am - mE y:�-o^ x�Zr m'- roL roE a o� n- >e- FdEro= c6 Sao wL o amL moa N Lo
Ueay3 N �+'€U _ 6).NE �C/Op O OroL m� Odm""G CLj7C nm �'¢a.-F afO�m Fa> -Lr 7Na Ean xN d.,�mCS°OmL (a C O .L-. fa Qom' 00 °-mr' mmmwa.,3rr 310-0 y'O y 05.2 e -d cN dC L Oror Uf6�Gir�`p`aroC CC
3 iI� 'o o c `a�y NN ai.E o. FFa LL =04) �' ¢ aC7 L Ci p UGO-r.- d a F -m ya d d,�m dM« ro in Ci '_'""Oc Q -roy do O NC 7d�= Y•0U cd > '0Qm n L« m'N 7
Wcm� ^� .�..'-�� do 3o y.n c Jw n N w cOWOFCL d:... V!°' -'(C c"'3°L fu m«E W�� 7 6i r- >,Nao U- COy NN NmL N _
OCron O0� L .pmtn >,� d N > O a c U E Nmr y roo Cm rod N Cm O Nmrom L 677m O
-C6 m v $ ytE�yE _ mc' ec��'Lo a W Ocoro C 2 C) F Eye, e-CmO d Ta yaaC•` d.+ m7 d Cro'-O �'`- d` eC Eato C'-' U Ld Hod Lmm2 e2,CO C ere- d ° O �y .03V -C6 NOS CM'C n Um0 aLt:c:-O
oNcmD Qo_ ori �a� m - m«.tn �c�o WxFC`_Mtn m CZ-LLZLCodOrdnrdroe->+_Y�aC�U Mc4) C LAZE _ .!= EmtnNY LNGCmr O.c O -'- rod Cd C Or N 2 O m L'� 7 Oarofp Z`pEp N �a`p O 2C. .
_ roy N _0200 �N O d mC O 00 c L OU O a10Qtn -0Z U- r f/i F O
N y .-� v ._ m� yno�"-" Fa ••F O'-7 7 mm m C ZE c,� ° l6 "' d LQ� Nd -C Jl�w•yCOU ma m"'-yroE m mN O.>, Q LLmLd N 2OUC
v en u'i s:$-2°626 m f=_mv x oe - m Zae O EONd >, �--Oy tae - -° t-.xN nU >, m'-y� t.) Cee _ N c Zo o- Oa aa) eE,rO a •aON� a ca yf°p mLc UYd LrY d CNL ro
nwc, rno- �� o- X Or U 0e,, as a) O`O N cUC O O 00) N.- -�2' a° C� m O7 N yN•-L co d m °L roF L6Jn•--Omenn
yam O 3 - cmm we °X'E Ny3m n��y 3 ma d�OaGdNnmLp -n0 Q= ncd' aeoT da TOYm3 EL md�+T•C00M._"` E'-33e•� C' -HON r h•- 2` UN a 72,:_. U Oyr YU ° 2'� e m �m EOr N
aiZ F=�a O¢E���mo � mo>aYcmC - >i x'e= �pyuo-i3n Z ON Q Z -V -82=d. n eQ)-2 (D O C-« ori 7 U E Cta 05 0722 ONOroN L U 7 mr der a �rmeroa Emo Nw. IaL°NUa Oma NLS JE OL m=' OL yen LNa
O OOin C N 2 ay m. c° N U Q7.-. °r m Oymt`n7 7 Nr dCro n
y 0 ¢ E m--�"77iC .-. >, cN m��a p-�� Ea aa3p y�O9Nm 2d nF nC Nan QC yd W tiro mca 3 C m m NO C 707,... O m N -O o err-- O N
m"' Oo jm .�� y ¢:o'a�as`�°�v O.w 0¢¢Ooa)C3ra aa)ma)'-L .-t. c d mOro'-mnOUy IACQr EC Oa OO N O N7 WxNn'p707•�4f3p.303ma'-ICO Ea Cc.-..!0m�cZCL3: MCN p7d �o� (yil 2Uo C Y ymm« 'E W.2 lz
U `.0 -�U O Ey zy 2 Z 7n > yNrEN L' -'e- m y7 d N 4 ro� dE Z O U L a p d" nC7 Fa g. -y 2 m -O
,kms 5Ly,t Z rn �� pLp •= no2n �'m U oro y Q o y �� a yCS O d d m.- L n .- m O ¢�6L 2m y mF y c� d d'�.-- m y m E•- N;E-a O C) N a CS N-' m d m m UJ C 9f 7 d m -a m T._° c m- 3 m m d f6 N U E y dL
.L -•Z aym oc cro ,n ��� �u7y�_ ?i"-ey- »C'mf6n C2Y 6)e7�y6)C NEm05d da)Ga .N O-0, pd NN- d CCro - dU O V'=LU aro'3p e' >2 >,LL2 Z5 :8 OYJT ir- cm N 05�NaciO fNape a 2a am mWW and Xa >.ddd N� m� >+ O
Eo U O m % C Oa �+ m CLnL O��'a+•• U 3.-• 2 mN:O :_•mm qC _ >_0C N+_, d moa W yj�mJ nNpro yL am a"'c N
yy om .,,E rn o' �2 : �-o o¢o2 �.Sm CS 2-- mNy Q -L Com' 3 Cr •¢gyp•- m dd�WO7 05'OC C d `1 y,p°yL V' -n a°7m ~---�� -7'0 OO a)m Cmddm OC._(d2Ca (C� m�,r dro COro it O.�'0Ud«dT m Cro -
.§�,� a� "was O _ €moo Qv _ U O U N m roL N E�-O 0=•jr d W O oc.sr- CCSS y O -'_,>,O"„' m d C N f6r err C y m!' N a �' > me U a- CJ a C C ,n N C d L _w
c.)�o oc `_6 p._ yo oy >.c m- LL a= '0 'O d m d L 2' OZ U Ce6 fj m idnV aOMV prontC y a3C>ONr c F-'ocd� ate' m c° OT °-°EL-•--O O ro 'O� m .Em o+-'UCn� °�"d^y d m�V
Nz� N:e., c)F . . 5€ m n�o2 Cj ����' =yago= ZO mQ�m°eiammr emoo)` y EE•ga x me L` M = La _e_7EY- d3YnLm ¢e a) Y7e Cmc 7rY« p'>d yLL-y dy d Nd7 d;=. a p« LO 7E o« y of
ro w.2 go mO. o dm 7 Lmm�- cDm ro �imoc LLo roc? �cd d
m�� �y o _ �a� LLa �°s` �, zn �S O > c� 7cdfpO mo roT odcd mdic N taiLEE. amo OoM OMOaO a CpLLy taZ U n �' N ro> yd._mJ m Qm'- O- N aN 050 m m o g�
cr, m 3 O=_ � E C7 L err C d - m y >, N r O a._ m- U�•' O m aWr c N�-• U(n m00 m m m«U L OdE
3 d =r a;� 3 r ,- n m m c O d d m- cn N'm L'= ry c0 L c6 d" -M•- c U •pL c mU v d O?-
Z�rn .y- oL 'E4 0. �e� mn'- C7 •- U U C is .- a m O - y mar N x _ r
a „yo o -o yo ��o oho, o a� ca a��d. F e C7 me ro>g�roda?eroa d)e ENf6 N c y e= 2 mdy =o' -a -m °a>mn�Li63 a7 �7 O«�v..0_cro U.- Lo6o•.7e_ o e7oeaeo N YEy7m y a�i'�o 7mee�+ CGm
W I-- y � Ooa.y y� M Ovc, z. og,- vmoy �m3 a aQ ro�d'p'or W O 7>'v:,�O. W W-) {�'p [Ln p O mm"' Ly O dUCd Op7 C LCA C d yr._ N d G ddiC O ymO7 Or m,., N
=; c- en "m yv �' o�+-' ° ro:- ap �'r C CZ2�n d0 U -O m a dm«, C m - i N d d C� On C m O y L O(nU ed. -L ,Md.U adLO. L s
Owo O�� zpy•- mo ¢m > `Y' acDfny Ococ> F Nd� amNct>,QI a._NM O Cd - U _f6 in...d�3 yom�o._�y0� .�mcmm m �7YC7yCoaca OcEmc3_ ycr vy~�C m$ -7._E> m oOpC Gr:...�m
<n �� oy «m °'E o_y� �o•� Y:.= Om y0 n° Y c m py c d Z_ U nC•- E T `- ro- roU N O a c O._ C a- N ._ a0
0 0o wy-c» ca .D= CD c.n-�vo$' r_jcaG7yc� V) yy r� U 7 d f0 U 7 C LO _ 'r _ OF U- T L _ ° L.0 E.-. dQ 7Q 0- dQ Er mr 2 Or« G m y.
\ ,,y d O L. C p ,C@. '0 O U O n d '- d Cn U d d m C m 01 d N d to r
Iloo m� c't �cm' Z'N cy, i- --& 'o o^y. _ ¢mma OyULCS t-~n>,O-Od07m L a�C 030 I M• O .i 9" imd dC7 '070 OroOLCNy-dL OLE I T�N�CLn."'Ip LtO �Z 3r UdaL En L 207 O«7d �OZL dL.-y roW-°OdLUCY� mr 7c C..+
o� m z` y Nm�_ a.n o''� v3=" mg F e F CLO >, 3« _ W V �c 3m7tneetnUaZaU.oQ>dmymmFd F 000E Or= F xOLroe.roF�O-cNm=r dMf6roCYT LLx CjmFeyaFQ"'a LCNm-m«.� C I
en e� pQ na�cyi a7 zmw oe c��v, l_cn._rn3a, C7�O.� d Nm fU6 00 N I"' 4 ` LLLLLL W or•�- o y d N>' LSC roL UC yC m ere• -v `0d d dM d o o and -mom- mL�m y�
M c s - & ct nmcm a0.E >,--04-=- 3 Z.21 w 903 W A t7$U3mtnm �m m 0-omEC a w �m?io3Y. ton.°yy3mv7U �m dOco y- CD - mar Eoc n3w3nFnoNm$�I tu
,nrno • Ow CCNmddmCY O m LL .L-.00 p--N-mc--°QL rjjUm
E -"'v YAM Uaom=LLC.O_NL N O L7Eabcc�mco'>2,roaF�NE
- _d, Id6"f�! QQrr'3cdocm. Y G m=_oE�' oroQa'cadU ti;;�m
a r.��.=' rni?�E L"Mi U2cac•00Ex0a3 a) Q -'3UUtaYEd�>2 aom L
- .-mm m N yc d N d+-• mU
.:.0 _ z m 3
U a m
o
N Q m
� N F y
.12'p y L a C U
U
E
NM m c
y �-
ti� V c O L
m LL
J_ .- >a� o m - ��m QN rn� rna= m mY m c. 2 m > roUOo cp a N
y^ Q� �JO�L �.12 22 1. M -p O O ma gda)�cc.rr •._� Oc m
Oo��.a»Ye T W _ '�" 3>,-0@04:32 2 d;- CSNrnadc�l°�L'cai--moo-�_n°i>ami
Fo `� ¢ Eo-�� V/ 3oC700 Z=Z '. +. Niq dr« d« m i 7N ?J >,aF= mr 7 c!_ry roC Ma a
my2i =ma.�'m C�>wT-r-- CL"■" �" 0 �mammtM�id t� `row -9>'< QN�UmEM°-°ymLm IaN
J c.� 5 Od-.2rn `}NM. I -ti - = L JL 0.7 CNtaNw..d dNm Oa N.,-_S� aO3N�Cp Um a�QQ\
O o --m mi`-' ;. Cn sa��� ��o E ,�w.r� D'(A •z,d o� m�appo>,yN ��� NC. a°aY odV amN'C do om
U)
� � .�_L. TE Ld N�00r aNi �.�a ie '\r/ Zw N•ey-, .L 16N �r^�n7 O L �T WaL� �U UN N5 lON C C O m U C '��_
a�NM d��E = I�Op. W m A1r++ hof+ QzUro -7 _mmaommcoF- c7N U vlmo acima)�.'�poa�c Q
fj Oir - CA m .....i OW.- mo m � O•I�L CO dam Z o 0) CaL m LN Ofn N'+, .-• � ON
r ~.=>;a in o -m •moi cnUC2NU 4" YO Ea:TmV ID -L� W 00 p N 3 L.0 c C n U NO 0c 0) m�
_ - N[+7 i` 2cn 3p .a VJ d ^V m!_ X L U I ¢ - m=n y O y mU mC m R N m_-
3Nm '~" a Qama0'=IO fla�my~Eril 3 zccm�'°'oMmr_Ec`)aO-occ I
�� Na d m a E a cro _ C±- 3° o- m FF-
ininr7� �, U)p o2N ate. (%No aI :� o N coo -* aacro 3 �Nj COca!�u`.NW
da-Z3o>;�Z dam: ' E•8)OYma) c0
yq €m
O C O d U€ N 2 y F
L 7 E Or V N NfAUw j.2'. a
N -� -
_o
ro E a
•. 2 m .
ori a
�- m
�'-U o ILpoCUo mTcLQ
ZQ�Q 3�ULa tn� a, o4 c N 7 m m«C (0v
0 IL > � U 8 c .. -- Ca aUi 2 m m - _'o ")-i 0 -5 _2
O a W 'm aL N p N CO am E' 0 O m 5 p r 7 ro
LU TQI- mQ d -ir =.L- ca m oro io C -M
()LLF NZOO ,� M2C.j W fa ro'-' at0 N O N NQ mN
wGZL "s 6�N .a c -o roc;)
C-0
ro craaN c orn
¢¢ UU Oro..- yaN.-UCm �
3O dmL y mN C Om :3 P.2
6220 m CL_ cLLNc�
gm S2 rn��� L mIr'LO E c°) o°l o m= cr-a
O Cn E N /� p NN,- C N N N
zca.0 cra�Qro:co'E3:."
N cc, ' � a OLE
C 2 C a) U) _j ECD CL2
41C cNa)N`pc G.NL�amc MC-NRIE EN
as m?
a
y
m=m
o
oc
P
3 LL y >-m
O
=am
rn
Z
oya
O��m
-i
o'a'cm
N__y
mUa
m
y
3o>m
c c
v.9m
Cm TO
_ E
rn �
U �
¢ m t0
E
LLS
3yo
O1
Cr Enm
¢
H-
NC^
v.;v
c�'J Y'E
- -�3a
E
�cn._
Uma
_
Q
m-
t°.b E
U
G
rn
m
y
g OU
O
2 m m
H m V
Z` M
m
_ rn
U m
-
c:)
mrnrn
¢ U
69
2i ac -
c�¢ o.3m
Ccz 2M
¢
Q ym
Zmrn
o Eco
m
-
o >3
v `0
�m
3.cN
~
o rn > S v 2 y o Q t o N ¢ c m o c
car Ec C
1- `O w . m C .m Y Y in j SJ N O m aD
�m #� a'� z._ 5--
E r u� �a aci mimeo ai cn� o o_ <n m m_ 3 ~_2-
Hca dm pm Simi �°:rn >`oS ��'� o.W tUoE m m`�° E. m3m Ems Oo a'tO myd.
Eny� -mo jSm 3rn �� p�ro-� m y� > o a�M tz �m >✓m m c�cE
3m zrn E`nm5 o S oom s _ Eocon E CA > am -
�m y_•co wN ? _ om'. m -o o' - y 'n F-U,cJ� ¢�'v .�c = o y - � �5 m o� M w E yet
c� o E m
t mrn o¢ y Zd T p u a a'� �' _ z E ova ti>-ui m N� m �$
c',
n m5 � ci m 6FD L6 w- 3 m Z �^ m E c�L y m Z o, 23 _--
W'm l-� a cWr.n - �Z? U � 00 0._= ma �i use O` Q Nm - Zrn mc-, ..O U' m H>mr"' om-
'2� of mc=a cm.. o� 9 U j W rn- m cci in v, o Ecom o- m ay' zm T ��'= aY _ d (22
Lu
m w -
2 t �� N c mo ^ ¢cn' O m N.. om o' C7a o'..n c`� a p �c� �' E cm.� E�a=i
Q- ¢ a n> �m.i = m5. m.c .o an a`� ¢ o o °' E �a o m'y- _ i.o�m C oN� x o �w z+✓ -.E
L7 mm 3 y
3 3 o U' -
¢�'U� # c ¢ °��' 00 F y mz� moi° o� °�'� c=.�� d m d z�� vim wo c
-j m 3 m -mo N W e � O - a o, m v d> -c)
x a c.� a s
J¢w`rv' a 3 m oom m _ m `J" ow O o- J z2i °' o 'E o
m m c
a
y
m=m
Ups
O M
d
= v
Z
oya
m m^
-
-i
o'a'cm
N__y
mUa
m
W o-n'oa
�0
pdtim
i:- A E
Nm y m
3.9 �_-
ob
O m
U 3
_ E
rn �
U �
¢ m t0
E
pY'
rn
¢¢mac
m a If -W
m�E
O1
Cr Enm
¢
H-
Q ��
E
N
U.�rn
- -�3a
E
�cn._
Uma
_
Q
m-
t°.b E
-M
G
rn
m
m=ma"yi
-(3"'Q
O
2 m m
H m V
Z` M
m
_ rn
a
a
c`y
Ups
S'y oo'
yi'am
O
M
mm IV
¢ V O y
Qym
aayt
d2U
y- 3:
a
O
_
¢ �� ai
O
¢ d c
Z - TU
_
- C) a ti
pL t -a O
rn �
U �
¢ m t0
E
U d
L7
O m
Y
w^
cm
oda
E
J
c`
"a
M
`
" m
cm
•'o-m
on
Hc' --
0D
=m¢>
m=m
O oW
3°°
to ~a�
E
-
C:)H
^
U}
NO
O mac
m
C
W s0
Q ��
°
Em
r
m 3
ma0
�. LCA
m a
m
w
G
rn
Y .°�' o
zEm/����
a Ea"am
a E �, m ro
-(3"'Q
O
2 m m
H m V
Z` M
m
_ rn
�S
-
c:)
mrnrn
°°>m
mmrLrn
-
Ccz 2M
¢
Q ym
Zmrn
N`- N
_
E 3 m E y�
CD
a crn
Z.
o >3
v `0
�m
3.cN
E `2c"
UW
ny-N
-
- O
y3 ci
`5
�¢
o
W .1
Q E
¢>
E E
d
o rime-
~Y 00
E
m v! U
p
Qw>
m
o
�EE
z¢OD
UNQ'
cOm
O
v�^W
O m
Y
w^
cm
oda
E
m
m
c`
`
M
`
" m
cm
•'o-m
on
Hc' --
0D
=m¢>
m=m
O oW
3°°
to ~a�
E
-
d m�
J a o
¢ @m
B -m
>-
N W
Z= cUOD
-�
- E
F N
m do.
�m
W
m
O m t
`mY
gym
c
��M
ZEm•p�p
ma0
�' 3=
^-• .t
Y
o
o f
c�= mmn
a Ea"am
a E �, m ro
= m
c� c
w ai vi
EA
om
O T
m
_ rn
C o.«=m of
WF a 0D
Z r.;m
Z'- m
~ ` r
wino
O Z.m
�._�
Ywd
W o'
- 2y
cD
zmo
J.�_
Qpm
J � - a,
a��•
Q ym
Zmrn
N`- N
_
E 3 m E y�
CD
a crn
Z.
o >3
v `0
�m
3.cN
E `2c"
UW
ny-N
-
- O
y3 ci
`5
�¢
o
W .1
Q E
¢>
E E
d
o rime-
~Y 00
E
m v! U
p
y(mn
O -Y
W
C
..m
ca
o
UNQ'
YN
v�^W
Cap
NanT�m
m y m o �.,¢
(n 1p LY
_
ga`��
do
Vro
^r
�JO
NNo
O m
a
c�
E
-o
.O .' m
N OU >^
E ..vy'v
o'�m
D c
ao
ai c
to
3 76
cm
•'o-m
on
Hc' --
0D
=m¢>
m
O a
Lu- o
Orn
Oi
M
oc L9
cDcv
Zs'aU
o
•"
O m t
S
m�
U
U¢ c
��
O e
�N
m �M
-Z
aim
W
- am
y
U m
4] Z
¢a
O.e
o `m
¢ Ev
¢ om
aL«, vuoi
f>mo
W .
O¢
m
J= om
� w
g•}
O
� g
Y�=
¢
>
m�
°' mss
U
Y w
- C
O O
o
c�
r.
O N
=
-o
.O .' m
N OU >^
E ..vy'v
o'�m
D c
ao
ai c
to
3 76
3=
m U
c m
Y c
O M
o
- 'O c
y ry 0- -
-
m<
W -
m
d
c?O
C Em
O
_
m
M
oc L9
E
co
O
jar
a`� m
'O c
00
�.0�
-�'E ,E
O C CO
CL
- N.0 0
'a-�'co
` �m'mm`�
m �M
Em
d
_ -r
_
is 0'n'
.-_S
�'O a`. tam^ 3
m 3`n
- Cn
E�jo
N
NN
O¢
-
m�
U o
�mEm
vs
4f >
>o �rn
_
m
Up
moN
nett
m�
°' mss
-
- wet
v
Otm
o
N`- N
_
E 3 m E y�
CD
a crn
ss
O
oY
o >3
v `0
�m
3.cN
E `2c"
UW
ny-N
-
- O
y3 ci
Y N�`O-~
a
3 �''
o^
Q�ro
I -U
¢om
Pimmfns
�¢
d
o rime-
~Y 00
E
m v! U
p
y(mn
O -Y
W
C
..m
ca
o
UNQ'
YN
v�^W
Cap
NanT�m
m y m o �.,¢
(n 1p LY
_
ga`��
do
Vro
^r
�JO
NNo
Nd,.-
w y.> o
0
0 oo vY
=Om
- mo
�mm
`2
(n 69N
12 Y o
mem
-Oo d'-
m
C70�
T
>m-
h>✓� N
O LAS C>>
-OmN
cz Ems'
ow
a'Q'
vet
r
in rna`�
•- o
�2
- °y'
Z5
;° am
Amo
cco�m
-
m33y�
-
w y
L �-
¢ m o
mm•�
w acv
Y
rn�
rn mm
^ 3r
Via_
am
'bs
e
N._. o'90
z-o� m�Y
o
omm
o y�
mus=
N o
Q c�
w«.o
>>�'
m
���
»v
.n rev
3
E
�U LO 0
Z
6H
t v
morn
OV
��
�¢-o
-
- £Em
-
mci
oL�mmm
O
w -
�'Oo o
d
oom
m
ma=
in mcg
V_o
m
moU
¢moo
>m "oma
m o'm'O"
_
z�,m
>-^
¢oma
U
J>
J`3
Q %-
msm
mv�
�j am
om
�9 oo
v¢it
o>
�Clfi�
O o
Om¢
N
mom
z
g mE
"m
o�y
3 =o
Eo
otm
z a'a 3 m
O
w o E
mrn
W mcJ
W
x dr
\
Q c
m o y o
Y a v °_'
vcn
- -
¢'i -Q
U >�
aNw
cOiv
Y c^
2 d^
co=m
¢�
0
a -7O
d
tnU
`o
OE
m
2 V
a'
i-
-'ot'o
cn+-'cnm
3 y o
-3 5
>-
mo
cam'
o o�
-
oL
o=
E
va¢
y �
�tN
}�
a
E^
m
2i Oi
ci3
~
=oui
^i»
o.c
cN
>
maw
�m�
Q�dN
�M ov::
O-�^�`.0=a
tf
po.�
W s c
col
t- `o. �o� m
E
o
LN
o'n n
=oo
o v
mom
>
-
¢
¢o:c
arms -3rn
-
wymv
mo
u�oo
moo
`c
-col
mt«
o a
Amo o
co3`
a
¢
-
m
_
mrn
o m
¢
¢
x
�Y
wet o f
O "
o
om
��E
��cam
paroi�mrn
zE
O��
_
¢�^'o
¢Emm
odmt `mm
¢my
W a'
o^vJ
mmd
oom
oo'a
Yo�voi�dmc
Uo`mc9mm�
o03
Ornp_
t mcMs
nig
4-
- E�
O_O>tO"o�dE
o c y
F- am H
zQU
Qcn m
2o.0
w a'c`i
- `o
y .w.a2ui..
pEE
F-
p
4a c" E
m
ao
pUEU
Oma
O
F-
Q>
�_ y
d
J mU
m=E
W W ani o v
F—� mY� `>�
zom
YLus
'ret
m
zNm3:
coo o
O o
c��ma
O^ mm
c�oLQ
am
u3
aEo
�-�� Yp from aci LD N O aEi O m� C= �C' m vet Z C.3 '�� �c
ov usr hoar O'°'o N aci - mW ' cm."`n
- us yet mcri OSay 1.^ ^ mo a��'Tm E o am Yom mrncm °1pN £
00 �rn m am 75c�� LL crn y� oN 'mo co m^o - o ai col E m� o_am Ngo vim E -"N iO --
L nci _ m om �-' Dov - riM w�v oao W y xo�Nm �xo roi' EDa
rn om o'"Wr mdmrn N �o °'mo -- ��^ mom om yL m c- o_o °'. gym Eam aEi - mo
-75+ u ��m m,.;v F- dm a`tm =m cc°ym >E"' Etio -mm E'Em mN��
a I '' Yin m� m- - m Uo ai m �rn ac.53
:E Y mo o� mom Ze m E � Ev c m >� c o'> E c m m� m
C C � off - mU m - U O
¢ _ m r�o m m _
� - Y U
d m m
3 3 ._
�� L Y y
a ~ m
vi Lm c U o' E aioc`3 am Y.m.-i» my .
= m �yv Nm meta C/�,_m am� iEm gmoE ���m �'tiJ am dm .-om ¢U m�o0 r"jy am
yon m w d� rns o M aim n d� y -°'m m Eo v a `o' ds naca.� Ea aiom w� c �:E m - w �ii2 ti ai E'm
d d N'.' OOV Vlw u'Y- r� ` r 2 N �'v' y dC "'"""���
O3� n_at 3n m\E p us o_vumso ai>- m moo `uso a vE o�� O tri ao ¢
O E o a w- a E oa v p.mm c, ',G aa`� Econv
¢c.v .0=_d g^� mEM _o�@) a o a�w �Y`Ni' m.°io a -dim WLa iom C:) t2
d`
o ooL 3 w�� w yc m To yainm �m�'
¢ do CC �� �$= E rnv z Y >c us p -= Nm `° Em•` >, o nm p a c_m
Qoy 2c`i' O mE gn mmo o�a2 CD
W aooa ao6 mSo t-- 6 m0 ¢c LE Qc
a`�mm ¢tn oo p ¢yss s p oUrn cN -3 a; Jesus poet aa`� �m 3 aci w«m. rn w_Nr�i'
pw S- pa. � m .O H L- U m , ay d �a a`
mi
xNo coo =L Umo Z wE mE'�•m ¢c'3 - - cnm M VV-- zm- m
r>p LJ3 =VJ 69 U r=i'CJ = y� U M I �.rn b9 p0 EU mm E� m U O =,-m X23 w C �rD �Ln d_ Q d U OAU O d d
U U U U n_ mcg �' � � >" >
o m o 3 „
00
yet
rn '
cE o_o
a y v
- c y
O N
E o m m
E n
_ m C
m � E
`oL
m�
r o? � O O O W N C O 63 O� � � N y N C m
I
» v Fns dao din = bio m Ev Eom m
- c E -o corn _ r� corm N -o
'-E
zcai Z i E•c-?`M mc``o �c.:�aa i xym m -a -o oS
- c� �N o o3M
O o n cs E - - orn
v� _ Em a- "m ca
m "n yet vo
aym Cm ��'-m am L3'�m nam �'mro gc Omvc� Y33m
�3 -129g mY qo ¢cN Lvm pQa �f avZm jmw
o =
c:�U z v;Gm m mOwovi ai ran"E
Lu
oa bm o cal Ea > o0 o�M maa * �� cLLa� m'�ao crime cns �m o� m -
=a z`°y� Q a3y =>EH�m¢cv z^-
C_��o�Q' _
LOQ rp�r p r`a �d N Ca Oinw E H m HNA dY >a U ESN m(n -
>m 3L �c'i ay`O` -oEy m= wF-waciY z 3aci W.c'm ao
mQ N� to �l' N a (y0 X00 = "�z 3 YN� J �Y > O- - `=
< E U S y Y � u-+ o 'V o_ c.' Q m = O .v �' o� W c
z`� Q�o_.� mo ¢ ma��^ o�>Ea + LLS actin �u'S� SEE Z.ES Q'E
n
c
rn Y
m o
0
cN
,O
- Y
a >
Q N'fW]
am
cf)
co
y
c
�
'
�
tg m
m 3
m aoi
y�
V!'00
C=J ti�
M
m.3
m
mo
O�
c?O
C Em
m
M
oc L9
z EW
co
¢ c0
jar
i
o a.O
CL
m
ao
v
-3m
m�W
mar
Oma
3m
mcY
�3 MW
co-i�o
no
¢v
O
�mEm
-am
Q os u
>o �rn
_
m
a.a
a�" m
m E
g'=.2
S
w cob
m m=
z >
r ^ orn
LU 4
m
$ 3rn
N
d °= - m
M
worn
3
co-
w _o m
m `.�
- O
_
-cam
o o
o¢
urn
C, m m�
r-
v
O
U
>�1
N
c
m
a
c
-am
2i2i o.m ."
<a oj
n�
m¢waoE
¢m
O-oo m-
c>a
unm
UU-
o-- �n
'
aaE
* 'm'
n
¢-oo
•a)
ow
soooonv
7Ecmo
a
a¢L
a
¢
m UU
H
m�U
H
z
z0
Amy
mL
"o
>
o
us
�m
3
a
cmc
o
CUL
U
t v
o
O
F— CU
_
�-�� Yp from aci LD N O aEi O m� C= �C' m vet Z C.3 '�� �c
ov usr hoar O'°'o N aci - mW ' cm."`n
- us yet mcri OSay 1.^ ^ mo a��'Tm E o am Yom mrncm °1pN £
00 �rn m am 75c�� LL crn y� oN 'mo co m^o - o ai col E m� o_am Ngo vim E -"N iO --
L nci _ m om �-' Dov - riM w�v oao W y xo�Nm �xo roi' EDa
rn om o'"Wr mdmrn N �o °'mo -- ��^ mom om yL m c- o_o °'. gym Eam aEi - mo
-75+ u ��m m,.;v F- dm a`tm =m cc°ym >E"' Etio -mm E'Em mN��
a I '' Yin m� m- - m Uo ai m �rn ac.53
:E Y mo o� mom Ze m E � Ev c m >� c o'> E c m m� m
C C � off - mU m - U O
¢ _ m r�o m m _
� - Y U
d m m
3 3 ._
�� L Y y
a ~ m
vi Lm c U o' E aioc`3 am Y.m.-i» my .
= m �yv Nm meta C/�,_m am� iEm gmoE ���m �'tiJ am dm .-om ¢U m�o0 r"jy am
yon m w d� rns o M aim n d� y -°'m m Eo v a `o' ds naca.� Ea aiom w� c �:E m - w �ii2 ti ai E'm
d d N'.' OOV Vlw u'Y- r� ` r 2 N �'v' y dC "'"""���
O3� n_at 3n m\E p us o_vumso ai>- m moo `uso a vE o�� O tri ao ¢
O E o a w- a E oa v p.mm c, ',G aa`� Econv
¢c.v .0=_d g^� mEM _o�@) a o a�w �Y`Ni' m.°io a -dim WLa iom C:) t2
d`
o ooL 3 w�� w yc m To yainm �m�'
¢ do CC �� �$= E rnv z Y >c us p -= Nm `° Em•` >, o nm p a c_m
Qoy 2c`i' O mE gn mmo o�a2 CD
W aooa ao6 mSo t-- 6 m0 ¢c LE Qc
a`�mm ¢tn oo p ¢yss s p oUrn cN -3 a; Jesus poet aa`� �m 3 aci w«m. rn w_Nr�i'
pw S- pa. � m .O H L- U m , ay d �a a`
mi
xNo coo =L Umo Z wE mE'�•m ¢c'3 - - cnm M VV-- zm- m
r>p LJ3 =VJ 69 U r=i'CJ = y� U M I �.rn b9 p0 EU mm E� m U O =,-m X23 w C �rD �Ln d_ Q d U OAU O d d
U U U U n_ mcg �' � � >" >
o m o 3 „
00
yet
rn '
cE o_o
a y v
- c y
O N
E o m m
E n
_ m C
m � E
`oL
m�
r o? � O O O W N C O 63 O� � � N y N C m
I
» v Fns dao din = bio m Ev Eom m
- c E -o corn _ r� corm N -o
'-E
zcai Z i E•c-?`M mc``o �c.:�aa i xym m -a -o oS
- c� �N o o3M
O o n cs E - - orn
v� _ Em a- "m ca
m "n yet vo
aym Cm ��'-m am L3'�m nam �'mro gc Omvc� Y33m
�3 -129g mY qo ¢cN Lvm pQa �f avZm jmw
o =
c:�U z v;Gm m mOwovi ai ran"E
Lu
oa bm o cal Ea > o0 o�M maa * �� cLLa� m'�ao crime cns �m o� m -
=a z`°y� Q a3y =>EH�m¢cv z^-
C_��o�Q' _
LOQ rp�r p r`a �d N Ca Oinw E H m HNA dY >a U ESN m(n -
>m 3L �c'i ay`O` -oEy m= wF-waciY z 3aci W.c'm ao
mQ N� to �l' N a (y0 X00 = "�z 3 YN� J �Y > O- - `=
< E U S y Y � u-+ o 'V o_ c.' Q m = O .v �' o� W c
z`� Q�o_.� mo ¢ ma��^ o�>Ea + LLS actin �u'S� SEE Z.ES Q'E
n
c
rn Y
m o
0
cN
,O
- Y
a >
Q N'fW]
am
cf)
co
�
U
�
m
m >'
-
m
cs Q
v In Eo
V!'00
C=J ti�
M
m.3
m
mo
O�
c?O
C Em
M
oc L9
O_N
T-
O
c
i
C-> -c
CL
m
ao
v
O
mar
Oma
aim
Osco
F ��
Ew
d�rn
omr�
�mEm
-am
Q os u
>o �rn
J�
Tcm
pjj 3a
- -a-
Emm
S
Yet
oto
N 3�
r ^ orn
LU 4
�V/
a�
Nm
If
C13
°� o
gm
- O
_
-cam
�Eo
Om>mn�°mm
?>a
xp�d
c
O 3m
O
m3N
>�1
coc
2 >
r
% 1
U
- .t!
cnm
o do
¢m
O-oo m-
U o
_
=Ea
- c
O le
m
,-
w
to mrn
•a)
wcc
o00
cDEl
Doc
�-�� Yp from aci LD N O aEi O m� C= �C' m vet Z C.3 '�� �c
ov usr hoar O'°'o N aci - mW ' cm."`n
- us yet mcri OSay 1.^ ^ mo a��'Tm E o am Yom mrncm °1pN £
00 �rn m am 75c�� LL crn y� oN 'mo co m^o - o ai col E m� o_am Ngo vim E -"N iO --
L nci _ m om �-' Dov - riM w�v oao W y xo�Nm �xo roi' EDa
rn om o'"Wr mdmrn N �o °'mo -- ��^ mom om yL m c- o_o °'. gym Eam aEi - mo
-75+ u ��m m,.;v F- dm a`tm =m cc°ym >E"' Etio -mm E'Em mN��
a I '' Yin m� m- - m Uo ai m �rn ac.53
:E Y mo o� mom Ze m E � Ev c m >� c o'> E c m m� m
C C � off - mU m - U O
¢ _ m r�o m m _
� - Y U
d m m
3 3 ._
�� L Y y
a ~ m
vi Lm c U o' E aioc`3 am Y.m.-i» my .
= m �yv Nm meta C/�,_m am� iEm gmoE ���m �'tiJ am dm .-om ¢U m�o0 r"jy am
yon m w d� rns o M aim n d� y -°'m m Eo v a `o' ds naca.� Ea aiom w� c �:E m - w �ii2 ti ai E'm
d d N'.' OOV Vlw u'Y- r� ` r 2 N �'v' y dC "'"""���
O3� n_at 3n m\E p us o_vumso ai>- m moo `uso a vE o�� O tri ao ¢
O E o a w- a E oa v p.mm c, ',G aa`� Econv
¢c.v .0=_d g^� mEM _o�@) a o a�w �Y`Ni' m.°io a -dim WLa iom C:) t2
d`
o ooL 3 w�� w yc m To yainm �m�'
¢ do CC �� �$= E rnv z Y >c us p -= Nm `° Em•` >, o nm p a c_m
Qoy 2c`i' O mE gn mmo o�a2 CD
W aooa ao6 mSo t-- 6 m0 ¢c LE Qc
a`�mm ¢tn oo p ¢yss s p oUrn cN -3 a; Jesus poet aa`� �m 3 aci w«m. rn w_Nr�i'
pw S- pa. � m .O H L- U m , ay d �a a`
mi
xNo coo =L Umo Z wE mE'�•m ¢c'3 - - cnm M VV-- zm- m
r>p LJ3 =VJ 69 U r=i'CJ = y� U M I �.rn b9 p0 EU mm E� m U O =,-m X23 w C �rD �Ln d_ Q d U OAU O d d
U U U U n_ mcg �' � � >" >
o m o 3 „
00
yet
rn '
cE o_o
a y v
- c y
O N
E o m m
E n
_ m C
m � E
`oL
m�
r o? � O O O W N C O 63 O� � � N y N C m
I
» v Fns dao din = bio m Ev Eom m
- c E -o corn _ r� corm N -o
'-E
zcai Z i E•c-?`M mc``o �c.:�aa i xym m -a -o oS
- c� �N o o3M
O o n cs E - - orn
v� _ Em a- "m ca
m "n yet vo
aym Cm ��'-m am L3'�m nam �'mro gc Omvc� Y33m
�3 -129g mY qo ¢cN Lvm pQa �f avZm jmw
o =
c:�U z v;Gm m mOwovi ai ran"E
Lu
oa bm o cal Ea > o0 o�M maa * �� cLLa� m'�ao crime cns �m o� m -
=a z`°y� Q a3y =>EH�m¢cv z^-
C_��o�Q' _
LOQ rp�r p r`a �d N Ca Oinw E H m HNA dY >a U ESN m(n -
>m 3L �c'i ay`O` -oEy m= wF-waciY z 3aci W.c'm ao
mQ N� to �l' N a (y0 X00 = "�z 3 YN� J �Y > O- - `=
< E U S y Y � u-+ o 'V o_ c.' Q m = O .v �' o� W c
z`� Q�o_.� mo ¢ ma��^ o�>Ea + LLS actin �u'S� SEE Z.ES Q'E
n
c
rn Y
m o
0
cN
,O
- Y
a >
Q N'fW]
am
cf)
co
m N ti c o
E N E E c
cw ?E.--`
o
a -
m
Y O
m� Y
>cm
EEW
�`+ m'm ` > Em
rnav +gym -m
O o t
O V O p
vo y�
cO a a
E Ew
- No
.59
ow 3Y M
metro aZ o
-m
O
0 0 o cco 0
m �O NO
mo oy muy
w a o
O m W OZ y
n 3 a S E W
wcYo ocm LL>'
O LL O -
od4 00= p 3
CD C) O c
z `o�
E a C
'o yO o
>E mYE o
�v m 3�n
oy
a J u-'
E >
o c
.> 2 E U'm` o dm
Yc E m -.2- m
j m
Tm mr m
N_
o.
m `
- m
cEE --�
pm `�oU >
m�E�3o mm�
(ana da yU � aci fn
m
Y a `o
d"W
Ta mus
L �cn^ a Zvi«
oma^ -
o
EEm
E c
M ��m< aooy
3 y O.rn > O
N > 3 `
m o
m o 0 8) 3 0 '-' a c m
a y
•- v
> cv Qac
U
U P y m ~ a ya' m
,2 p m v'o
m m m dri
Vl p.r v._ p- o.yvi
0 m
C Ta r Y d
E m m y
E
mm .oma m
c6
OYO y O d.Lrn N mm
1—oto o m �'3'rn crn
o2W
;a E; E .
W m4 _ d Y � N
m4-aN g�;
Q > Ems' gE-E �loaom
o�o3c
> OE�
3E
38ay'3m xc -m
m U c
C;
r�
�
U
�
m
m >'
-
m
cs Q
v In Eo
;�
V
•�
00
I`
I
O�
U'YZp
Cca
i
CL
m
ao
p
rn
Mon
O
�
aim
Odd m
F ��
Ew
�
omr�
m o
�pv
Dm m
W m
Tcm
U
- -a-
Emm
S
.-,A
win
o_¢ v
¢LZ`
<cn coo
Lu 2
ms z-
Z m y<`+
z 3
�V/
cv�m
Nm
If
Ups Z
zam
°� o
gm
- O
_
-cam
O aro
nmv
xp�d
c
>`y"
O
nmu-'
Q�o
=
U
JQoJ
¢w�
O ai mm
o m o-
% 1
U
- .t!
cnm
o do
¢m
O-oo m-
m� m
w_.= -o
_
_ mM�
v
- c
O le
m
,-
w
to mrn
•a)
rcm
C
70 mcc
Q
Q
d
m UU
H
m�U
H
uYN
v
oy�
E
o f
ala
mL
"o
>
o
us
�m
3
a
cmc
o
CUL
U
t v
o
O
F— CU
_
cooa'
cc
-
E
o
m ��
m
C O°
2
c 0
U
�?co_n
a Tobsr
•!=-ov
O J
z>ao
rn
cz
mom
J
s w
mmE mcnp
mEo
L L¢
a �jj
moi
zo,
cL o
E
_
=v
nom
- T0
m
w i-cO m
m E
- m
>om
A
U N �
y¢ o
O
-
- E-
I
O
tnU
00
'a o0
E S
Y• y o�
'C y g
E °'m
�w�m
O't
-
o=
o v
mOva
y m
o
in my
w ug
>-
-cn.
m
}amd
QpC�
tf
rn Z -U
m
=Um
2. ai
o'n n
O>
y
tiro
N
O
uS
c
c
o a
m E
¢w
m
m C a
w
E
O �'
m�2
'a
3 m
_
mrn
o m
¢
¢
x
�Y
wet o f
O "
o
CCD) o E
nv
Dov
m N cb
oom
¢
���
an. � cn w
� —c'
amm
�tico
i.Yro
t mcMs
nig
Zca.�-^
- E�
O_O>tO"o�dE
o c y
F- am H
zQU
Qcn m
2o.0
w a'c`i
- `o
y .w.a2ui..
m
4a c" E
m
ao
o_" c3j._
tions
3 c�
Q>
�_ y
an d mm a
Y E
J mU
m=E
W W ani o v
F—� mY� `>�
zom
YLus
'ret
m
zNm3:
coo o
O o
c��ma
O^ mm
c�oLQ
am
u3
aEo
o J E
QQ Lm m
m
LLEW
nw m
LL
Y
wgbb
o E
m
z^ m
z o
oo,"-�
oc 3L
mm
g°m
U� NU
(9
Um
4E m
m j,
pY0
U U A
w�
i
o m
¢
¢ �
3� o
Q
m
m N ti c o
E N E E c
cw ?E.--`
o
a -
m
Y O
m� Y
>cm
EEW
�`+ m'm ` > Em
rnav +gym -m
O o t
O V O p
vo y�
cO a a
E Ew
- No
.59
ow 3Y M
metro aZ o
-m
O
0 0 o cco 0
m �O NO
mo oy muy
w a o
O m W OZ y
n 3 a S E W
wcYo ocm LL>'
O LL O -
od4 00= p 3
CD C) O c
z `o�
E a C
'o yO o
>E mYE o
�v m 3�n
oy
a J u-'
E >
o c
.> 2 E U'm` o dm
Yc E m -.2- m
j m
Tm mr m
N_
o.
m `
- m
cEE --�
pm `�oU >
m�E�3o mm�
(ana da yU � aci fn
m
Y a `o
d"W
Ta mus
L �cn^ a Zvi«
oma^ -
o
EEm
E c
M ��m< aooy
3 y O.rn > O
N > 3 `
m o
m o 0 8) 3 0 '-' a c m
a y
•- v
> cv Qac
U
U P y m ~ a ya' m
,2 p m v'o
m m m dri
Vl p.r v._ p- o.yvi
0 m
C Ta r Y d
E m m y
E
mm .oma m
c6
OYO y O d.Lrn N mm
1—oto o m �'3'rn crn
o2W
;a E; E .
W m4 _ d Y � N
m4-aN g�;
Q > Ems' gE-E �loaom
o�o3c
> OE�
3E
38ay'3m xc -m
m U c
C;
r�
'= E A o 0 0 m y [ 3. a 3 o ti c g
=a' 00 y o cn v v o u E
u> ani U 0"' El ay., -'O
c s G v a, v a c o ;, « q x ❑ v a o
E
v -IV> 0 3 - ' o. ° -!: E a° c
q[ o `[q 7 .� m •o W
o
A c o
S
[
" y>O
a
Cl.
'
eCV
o
b.v.
OV OO b b wO
_q
,
'O °� "' ° G
bb
> o y Q v o @� n, tt
IM
up
v F _ ❑❑ `a43 �1 C. .r. F_. , d 3 0 o [ o x y N O [ v
ai G N •a"'� O
CD Q °
rn 8
/W v 0 gm. .oyv [y [[S
pp7
h C[ 7 v c=za w O Oq Cr O W Q OA p O H t '27, p 242 O
Oi'� N O 0
Qw o &c $ n wd inwU 3 u �F1 Uw
J.
N
O
Cl) ANA,,
i
00
I`
I
cc
Cca
i
CL
m
ao
p
.
■
L
NC
O
�
O
cr
L00
■
�
L
O OO
•�I
U
-U
m
0
3
i
E oo
m
°� o
- O
O aro
2) U
O
CL CO'
CO1vi
=
U
i m
c�
N
t
Q 0
ca
U c
T
'
_
cm 00
m
_
cz
•a)
C)
C
70 mcc
Q
i
W CU
_�
CUL
U
t v
W
w
F— CU
Z Ea
cc
Q
U
=
'= E A o 0 0 m y [ 3. a 3 o ti c g
=a' 00 y o cn v v o u E
u> ani U 0"' El ay., -'O
c s G v a, v a c o ;, « q x ❑ v a o
E
v -IV> 0 3 - ' o. ° -!: E a° c
q[ o `[q 7 .� m •o W
o
A c o
S
[
" y>O
a
Cl.
'
eCV
o
b.v.
OV OO b b wO
_q
,
'O °� "' ° G
bb
> o y Q v o @� n, tt
IM
up
v F _ ❑❑ `a43 �1 C. .r. F_. , d 3 0 o [ o x y N O [ v
ai G N •a"'� O
CD Q °
rn 8
/W v 0 gm. .oyv [y [[S
pp7
h C[ 7 v c=za w O Oq Cr O W Q OA p O H t '27, p 242 O
Oi'� N O 0
Qw o &c $ n wd inwU 3 u �F1 Uw
J.
4.
PAVEMENT RECLAMATION AND GRADING
Introduction:
The Town of North Andover is seeking qualified contractors to undertake public
utility work to supplement the capabilities of the Department of Public Works
(DPW). This work shall consist of grinding or pulverizing, grading, and
compacting asphalt concrete pavement. Dust Control using calcium chloride or
some other acceptable product shall be included in this work. All bidders must
demonstrate at least five years of experience in providing the services requested.
Scope of Work:
The town of North Andover will remove all large castings prior to the
commencement of reclamation.
The Town will arrange for and pay for police details, detours, signs, barricades,
and cones.
Reclamation contractor will reclaim existing pavement to its full depth and grade
the reclaimed material to ensure proper drainage.
The Town will supply additional material if required and will remove any surplus
material if required.
Reclamation contractor will compact graded areas to a density acceptable for
paving. Contractor will complete all hand work required at joints with side
streets, sidewalks, end points, and driveway aprons including sweeping to provide
a clean sharp joint for paving. Contractor shall furnish and apply calcium chloride
as required for dust control until the reclaimed area is paved.
Bid Form:
1. Laborer
2. Reclaiming machine with operator
3. Road grader with operator
PER DAY
PER DAY
PER DAY
4. Vibratory compactor with operator PER DAY
Tota
Term•
The term of the contract shall be one year with two (2) additional option years at
the sole discretion of the Town of North Andover