Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract #: 020568 - From: 03-01-2012 To: 02-28-2013 - Rafferty Fine Grading, Inc - Town of North Andover
1 Andrew W Maylor Town Manager Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com December 16, 2013 Ms. Rhonda Rafferty, Vice -President Rafferty Fine Grading, Inc 57 South Road Enfield, CT 06092 Dear Ms. Rafferty: Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and Rafferty Find Grading, Inc (Contract #569), the contract and the respective unit prices ($2.325 per square yard) to perform asphalt concrete excavation by cold planer is extended an additional option year (March 1, 2014 through February 28, 2015). Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Department of Public Works 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. Sincerely, Andrew W. Maylor Town Manager cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, Public Works Contract File Andrew W Maylor Town Manager Town of North Andover Office of the Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 amaylor@townofnorthandover.com December 28, 2012 Ms. Rhonda Rafferty, Vice -President Rafferty Fine Grading, Inc 57 South Road Enfield, CT 06092 Dear Ms. Rafferty: Telephone (978)688-9510 Fax (978)688-9556 In accordance with the provisions of the contract between the Town of North Andover and Rafferty Fine Grading, Inc (Contract #569), the contract and the respective unit price ($2.125 per square yard) to perform asphalt concrete excavation by cold planer is extended an additional option year (March 1, 2013 through February 28, 2014). Please provide updated insurance certificates listing the Town of North Andover as `Additional Insured' in accordance with the contract document. The insurance certificates are to be sent to the attention of Ray Santilli, Assistant Town Manager. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. An updated prevailing wage report is enclosed. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Department of Public Works 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call Mr. Santilli at 978-688-9516. Sincerely, /)-T, da,- --� 6, " Andrew W. Maylor Town Manager cc., Ray Santilli, Assistant Town Manager Bruce Thibodeau, Public Works Contract File Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20121227-013 for future inquires. Request another official Wage Schedule http://prevailingwage.detma.org/WageRequest.aspx?wr=121 12/27/2012 TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilli Assistant Town Manager Ms. Rhonda Rafferty, Vice -President Rafferty Fine Grading, Inc 57 South Road Enfield, CT 06092 Dear Ms. Rafferty: March 9, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the executed contract between the Town of North Andover and Rafferty Fine Grading, Inc to perform asphalt concrete excavation by cold planer for the period of March 1, 2012 through February 28, 2013 in accordance with the Invitation for Bids issued on January 11, 2012. In accordance with Massachusetts General Laws, you are required to pay prevailing wage for work performed under this contract. For each week work is performed, you are required to submit certified weekly payroll records. The certified weekly payroll records are to be sent to: Mr. Bruce Thibodeau Public Works Director 384 Osgood Street North Andover, MA 01845 If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure cc., Bruce Thibodeau, Public Works Director Contract File URBELIS & FIELDSTEEL, LLP 155 FEDERAL STREET BOSTON, MASSACHUSETTS 02110-1727 CAROL HAJJAR MCGRAVEY OF COUNSEL e-mail chm@uf-law.com March 5, 2012 Raymond Santilli Assistant Town Manager North Andover Town Offices 120 Main Street North Andover, MA 01845 RE: CONTRACT WITH RAFFERTY FINE GRADING, INC. Dear Ray: Telephone 978-475-4552 Telephone 617-338-2200 Telecopier 617-338-0122 Enclosed please find the above -referenced contract, which has been approved as to form. Very truly yours, Q/ atl_e�L a of Hajjar McGravey CHM/kmp Enclosure w:\wp5l\work\n-andove\corresp\santilli.ltr - contract66.docx TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilh Assistant Town Manager Attorney Carol McGravey Urbelis & Fieldsteel, LLP 155 Federal Street Boston, MA 02110 Dear Ms. McGravey: March 2, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find for your review and approval three (3) original contracts, with accompanying documentation, between the Town of North Andover and Rafferty Fine Grading, Inc to perform asphalt concrete excavation by cold planer on Town owed roads for the period of March 1, 2012 through February 28, 2013 per the Invitation for Bids issued on January 11, 2012, 2011. The value of the first year of the contract is estimated at $50,850 thus the payment bond enclosed is in the amount of $25,425. Also, please note the prevailing wage report is not attached to the contracts being sent to you due to it being quite large. It will be attached to each contract document prior to final execution. Thank you in advance for your attention to this matter. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosures TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilli Assistant Town Manager Ms. Rhonda Rafferty, Vice -President Rafferty Fine Grading, Inc 57 South Road Enfield, CT 06082 Dear Ms. Rafferty: 'A Of,,t,ac ye �ti0 O A ��SSAGHUs�t February 27, 2012 TEL (978) 688-9516 FAX (978) 688-9556 By previous letter, you were advised the Town of North Andover was awarding the contract to Rafferty Fine Grading, Inc to perform asphalt concrete excavation by cold planer on Town owned roads for the period of March 1, 2012 through February 28, 2013. You were asked to sign and return the contract documents and "all required accompanying paperwork". Based on the Towns review of the submitted paperwork, the following deficiencies were noted: o In accordance with the provisions of Supplement `C' of the contract document, the submitted insurance certificates do not list the Town of North Andover as an `additional insured'. Please send the appropriate document to my attention by mail, scan or fax. If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager IN AFFERIrlov F/NE GRAD/NG, INC. Asphalt Reclamation • Fine Grading - Cold Planing • Sweeping February 20, 2012 Mr. Ray Santilli Assistant Town Manager Town of North Andover 120 Main Street North Andover, MA 01845 Dear Mr. Santilli: Enclosed are the three original contracts, payment bond, insurance certificate and W-9 form. Please let us know if you require any additional information. Please contact either Rhonda Rafferty, Vice President, at 860-209-6876 or Sara Mimoso, Project Manager, at 413-335-5207. We look forward to working with you in the Town of North Andover. Regards, Amanda W. Toner Administrative Assistant AWT/t Enclosures 57 South Rd., Enfield, CT 06082 Toll Free 866-763-0100 / Local 860-763-0100 Toll Free Fax 866-763-0400 / Local Fax 860-763-2223 TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilli Assistant Town Manager Ms. Rhonda Rafferty, Vice -President Rafferty Fine Grading, Inc 57 South Road Enfield, CT 06082 Dear Ms. Rafferty: t10RTN O 4 9 �p41�0 r•P S'�h �SgACNUSE February 8, 2012 TEL (978) 688-9516 FAX (978) 688-9556 The Town of North Andover has decided to award a contract to Rafferty Fine Grading, Inc to perform asphalt concrete excavation by cold planer on Town owned roads for the period of March 1, 2012 through February 28, 2013 in accordance with the Invitation for Bids issued on January 11, 2012. Enclosed please find three (3) original standard Town of North Andover contracts for appropriate review and signature. Please return the signed contract documents and all required accompanying paperwork to my attention as soon as possible. Please ensure that all insurance certificates list the Town of North Andover as an "additional insured". In accordance with Massachusetts General Laws, you are required to provide a payment bond, on the Town's form that is enclosed, in the amount of 50% of the projected value3 of the first year of the contract. The projected value of the first year of the contract is $50,850 thus the payment bond is required in the amount of $25,425. If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosures TOWN OF NORTH ANDOVER CONTRACT CONTRACT# DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Rafferty Fine Grading, Inc Address: 57 South Road Enfield, CT 06082 Telephone Number: 866-763-0100 Fax Number: 866-763-0400 1. This is a Contract for the procurement of the following: Perform asphalt concrete excavation by cold planer on Town owned roads for the period of March 1, 2012 through February 28, 2013 in accordance with the Invitation for Bids issued on January 11, 2012 2. The Contract price to be paid to the Contractor by the Town of North Andover is: Excavate, load and dispose of millings $2.034 per square yard 3. Payment will be made as follows: Upon performance of services and receipt of invoice, net 30 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. (Rev 5-2007) Contract by and between Town of North Andover and Rafferty .Fine Grading, Inc Page I ,F 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before February 28, 2013, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. (Rev 5-2007) Contract by and between Town of North Andover and Rafferty Fine Grading, Inc Page 2 Santilli, Ray From: Thibodeau, Bruce Sent: Tuesday, February 07, 2012 1:19 PM To: Santilli, Ray Subject: FW: Rafferty Fine Grading Reference checks.doc Attachments: Rafferty Fine Grading Reference checks.doc Ray, Based on the sterling references, I recommend Rafferty be awarded the contract. From: Concessi, Dan Sent: Tuesday, February 07, 2012 11:15 AM To: Thibodeau, Bruce Subject: Rafferty Fine Grading Reference checks.doc Hi Bruce, I can definitely recommend Rafferty Fine Grading, Inc. to do our milling; five references just love these people. Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: hftp://www,sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. i Rafferty Fine Grading, Inc. Reference Checks 1. Bob Lizotte, Supt of Streets, Torrington, Ct. 860 489-2352 Torrington has 180 miles of road, put milling out to bid on a square yard basis. Rafferty has done approximately $250,000 of milling in the last 3 or 4 years for Torrington. Rafferty has two milling machines and uses his own trucks; they are always in control. The crew is young and very well trained The Superintendents are very good, well educated in what they do as they are sent to schools for this work. No claims, always right there for you when you want to schedule them. Mr. Lizotte would hire them again and he highly recommends them. They are very good at what they do. You will be happy with them. 2. Tom Shanahan, Highway forman, Haverhill, Ma. 978374-2364 Rafferty did 8-10 streets last summer for Haverhill; bid was for 20,000 square yards at $1.90 per square yard. Tom was pleasantly surprised by Rafferty; they are very good, absolutely perfect on cleanup, painting, and keeping everyone happy. Rafferty uses his own equipment and trucks. Haverhill took the millings, mixed gravel with it, screened it, and stored it for sale. Rafferty supt. was excellent, marvelous, very conscientious; always checked with the water dept. before using a hydrant. i No problem with scheduling, no claims; Would rehire them 3. Ron LaBrecque, City Engineer, Lowell, Ma 978 970-3329 Rafferty worked for the city of Lowell last year and milled 6-8 streets at $2.07/square yard. They were good for scheduling and there were no claims. They have a good clean up crew. The equipment seems to be new. He used his own trucks and rents trucks if he needs them. The city saved the millings for use on other projects. The Rafferty supt. was good. Ron LaBrecque would rehire them. 4. Joe'Eriksen, Highway foreman, Chelmsford, Ma. 978 250-5270 Rafferty has been working in Chelmsford for the last 2 or 3 years; They did 5 or 6 streets last year. They are very professional. Their contract was for 1 % inches milling but they have done up to 3 inches without complaint or additional compensation. When you schedule them, they will be there when they say they will be there. Clean up is great. Equipment is brand new and top notch; use their own trucks and rents trucks if necessary. Their supt. is very good. Rafferty is very thorough. They are one of the best contractors Tom has ever had to deal with. He has nothing but good things to say about them. Rafferty is a family company and they do a bang up job. With Rafferty, there is no down time, they work in the rain. He wants them back for more work. 5. Tom Smith, Highway Supt., Holliston, Ma 508429-0616 Rafferty has been working in Holliston for the last few years. Last year they milled about 11 streets at 1 % inches depth. There were no claims and they show up on time and finish on time. They clean up right behind the milling machine. The equipment is brand new; they use their own trucks and also rent trucks. Their supt is no problem; he's been working in Holliston for five years; no problems at all, does good work. Tom has no complaints about Rafferty. They will stay late to get a job done for you; they are very accommodating. Tom is very happy with them and would have them back in a minute japollFFERTYVE ORA DINGO INC. Asphalt Reclamation • Fine Grading • Cold Planing • Sweeping January 31, 2012 Town of North Andover Office of the Town Manager 120 Main Street North Andover, MA 01845 Re: Asphalt Concrete Excavation To Whom It May Concern: Thank you for the opportunity to bid with the Town of North Andover for Asphalt Concrete Excavation. Enclosed are our original Bid Bond, original proposal, Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance, the Certification of Labor Harmony and OSHA Training Requirements and list of similar contracts performed. Due to a schedule conflict, we will not be available to attend the bid opening. Would you please email or fax us the results of all bidders? I can be reached at the office if you require additional information. Thank you for your consideration. Vice President RLR/sim Enclosures 57 South Rd., Enfield, CT 06082 Toll Free 866-763-0100 / Local 860-763-0100 Toll Free Fax 866-763-0400 / Local Fax 860-763-2223 THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we Rafferty Fine Grading Inc. as Principal, hereinafter called the Principal, and Contractors Bonding & Insurance Company a corporation duly organized under the laws of the State of Washington as Surety, hereinafter called the Surety, are held and firmly bound unto Town of North Andover as Obligee, hereinafter called the Obligee, in the sum of Five Percent Dollars ($ 5% ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for asphalt concrete excavation -milling. NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 2nd day of February 2012. (Principal) (•Ses ) (Wi ness) -P (Wit ess) AIA DOCUMENT A310 • BID BOND • AIA ® • FEBRUARY 1970 ED • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006 (Title) Contractors Bonding & Insurance Company (Surety) (Seal) Kelfn` th J. Coco, 60mey-in-Fact (Title) Know All Men by These Presents: POWER OF ATTORNEY Contractors Bonding and Insurance Company That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That Contractors Bonding and Insurance Company, a Washington corporation, does hereby make, constitute and appoint: Kenneth P Morotto Jr Ellen G Coco Kenneth J Coco jointly or severally in the City of Farmington , State of Connecticut its true and lawful Agent and Attorney in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described bond. Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00/100 Dollars ( $10,000,000.00 ) for any single obligation. The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon this Company as if such bond had been executed and acknowledged by the regularly elected officers of this Company. The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of the Resolution adopted by the Board of Directors of Contractors Bonding and Insurance Company, and now in force to -wit: "All bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the corporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the ,Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Corporation. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation. The signature of any such officer and the corporate seal may be printed by facsimile or other electronic image." IN WITNESS WHEREOF, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice President with its corporate seal affixed this 6th day of June 2011 %t1G ANp 1NS�i O • O t)• 'O: SEAL¢. v '° .2: '= °'• 1979 ° State of Washington 1 ,,,,••'• Ss 4SNING1 County of King On this 6th day of June 2011 before me, a Notary Public, personally appeared Roy C. Die , who being by me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of the Contractors Bonding and Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation. 2 'P�,az_ Joseph B. Miuller Notary Public Notary Public state or Washington JOSEPH B. MULLER MY COMMISSION EXPIRES March 29, 2012 Contractors Bonding and Insurance Company Roy C. Die ' / ._� Vice President CERTIFICATE I, the undersigned officer of Contractors Bonding and Insurance Company, a stock corporation of the State of Washington, do hereby certify that the attached Power of Attorney is in full force and effect and is irrevocable; and furthermore, that the Resolution of the Company as set forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the seal of the Contractors Bondingand Insurance Company this 2 rid day of February 01.2 Contractors Bonding and Insurance :bmpany Roy C. Die Vice President 0675388032912 A0059511 Contractors Bonding and Insurance Company c is 1213 Valley Street P.O. Box 9271 an RU company Seattle, WA 98109-0271 Know All Men by These Presents: POWER OF ATTORNEY Contractors Bonding and Insurance Company That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That Contractors Bonding and Insurance Company, a Washington corporation, does hereby make, constitute and appoint: Kenneth P Morotto Jr Ellen G Coco Kenneth J Coco jointly or severally in the City of Farmington , State of Connecticut its true and lawful Agent and Attorney in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described bond. Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00/100 Dollars ( $10,000,000.00 ) for any single obligation. The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon this Company as if such bond had been executed and acknowledged by the regularly elected officers of this Company. The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of the Resolution adopted by the Board of Directors of Contractors Bonding and Insurance Company, and now in force to -wit: "All bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the corporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the ,Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Corporation. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation. The signature of any such officer and the corporate seal may be printed by facsimile or other electronic image." IN WITNESS WHEREOF, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice President with its corporate seal affixed this 6th day of June 2011 %t1G ANp 1NS�i O • O t)• 'O: SEAL¢. v '° .2: '= °'• 1979 ° State of Washington 1 ,,,,••'• Ss 4SNING1 County of King On this 6th day of June 2011 before me, a Notary Public, personally appeared Roy C. Die , who being by me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of the Contractors Bonding and Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation. 2 'P�,az_ Joseph B. Miuller Notary Public Notary Public state or Washington JOSEPH B. MULLER MY COMMISSION EXPIRES March 29, 2012 Contractors Bonding and Insurance Company Roy C. Die ' / ._� Vice President CERTIFICATE I, the undersigned officer of Contractors Bonding and Insurance Company, a stock corporation of the State of Washington, do hereby certify that the attached Power of Attorney is in full force and effect and is irrevocable; and furthermore, that the Resolution of the Company as set forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the seal of the Contractors Bondingand Insurance Company this 2 rid day of February 01.2 Contractors Bonding and Insurance :bmpany Roy C. Die Vice President 0675388032912 A0059511 APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 Base Bid Excavate, load and dispose of millings by contractor Alternate Bid Excavate, load and dispose of millings by contractor Excavate, load and dispose of millings at Cyr Recycling Quantity Unit Price 25,000 sq yds $ 2.034 /sq yd Total Price $50,850 15,000 sq yds $ 2.168 /sq yd $32,520 10,000 sq yds $ 2.285 /sq yd $22,850 TOTAL $106,220.00 March 1. 2013 through February 28.2014 Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds $ 2.125 /sq yd $53,125 Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds $ 2.265 /sq yd $33,975 Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ 2.387 /sq yd $23,870 TOTAL $110,970.00 Town of North Andover IFB Page 8 of 34 Asphalt Concrete Excavation CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the kt%�"�h�=(jrC�l� ( held on 01 / W ) '3y f it was VOTED, THAT (Name) V&,,e �.r, (Officer) of ►�l`� y i�IT- C,{-),, be and hereby is authorized to—axecute contracts and bonds in the name and on behalf of said�Ld-K, affix its corporate seal hereto; and such execution of any contract or obligation in the name of —R(441 / j)�Q_ i � J d .on its behalf by such officer under seal of ��U'�2 (�f1t� dpi �tlnC., shall be valid and binding upon ('pTVY-(,gid . I hereby certify that I am the clerk of the above named til&C.Y�.d' j� C. and that is the duly elected officer as above of said cjk4 . , and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. lay a (Date) (Clerk) Town of North Andover IFB Page 32 of 34 Asphalt Concrete Excavation CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signatur6 t Date Rhonda L. Rafferty, V.P. Rafferty Fine Grading, Inc. Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, S(�ectionl 49A (b), I _ nd� Z 1�", authorized signatory for _�4 t t`� �) �2 'G{��h�jgih l Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. 27 Signature Date Town of North Andover I.FB Page 30 of 34 Asphalt Concrete Excavation CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature -,;4k/'___ Rhonda L. Rafferty, V.P. Print Name & Title Town of North Andover IFB Asphalt Concrete Excavation Date Rafferty Fine Grading, Inc. Company Name Page 31 of 34 UN IU: IVIN •~` ®RO CERTIFICATE OF LIABILITY INSURANCE DAT02/27//VYYY) ozrz7n 2 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 860-652-3235 Smith Brothers Insurance, Inc.$6-652-3236 68 National Drive, Suite 2 Glastonbury, CT 060334314 Pinnacle Group CONTACT NAME: PHONE FAX A/C No EM : AIC, No): E-MAIL PRODUCER cuSTOMERID*: RAFFE-1 INSURER(S) AFFORDING COVERAGE NAIC i INSURED Rafferty Fine Grading, Inc. INSURER A: Ohio Casualty Company 24074 Rafferty Industries, Inc. INSURER B: Great American Insurance Co. 16691 57 South Road X COMMERCIAL GENERAL LIABILITY Enfield, CT 060824511 INSURER C: BKA53318935 04/04/11 INSURER D: INSURER E INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. !NSRADDL LTR TYPE OF INSURANCE INSIR SUB WVDJ POLICY NUMBER POLICY EFF MM/DDNYYY POLICY EXP MMIDDNYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A X COMMERCIAL GENERAL LIABILITY X BKA53318935 04/04/11 04104!12 PREMISES Ea occurrence $ 100,000 CLAIMS -JADE 7 OCCUR MED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS- COMP/OP AGG $ 2,000,000 EBL $ 1,000,000 POLICYFXPRO- LOC A AUTOMOBILE LIABILITY ANY AUTO BAA0653318935 04(04111 04104)12 COMBINED SINGLE LIMIT (Ea accident) $ 1'000'000 BODILY INJURY (Perperson) $ ALL OWNED AUTOS BODILY INJURY (Per accident) $ A A X X SCHEDULED AUTOS HIRED AUTOS PROPERTY DAMAGE $ (Per accident) $ A X NON-OWNEDAUTOS UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 2,000,000 AGGREGATE $ 2,000,000 A EXCESS LIAB CLAIMS -MADE US053318935 04104111 04!04!12 DEDUCTIBLE $ $ X RETENTION $ 10,000 A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE YIN OFFICERIMEMBER EXCLUDED? (Mandatory in NH) N / A XWA0653318936 04/04/11 04104/12 X WC STATU- OTH- TORY LIMITS ER _ E.L EACH ACCIDENT $ 500,000 E L DISEASE - EA EMPLOYEE $ 500,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L DISEASE- POLICY LIMIT $ 500,000 B �ontractors Equipm IMP 1542247 04104/11 04/04112 Limits Per Schedu DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space Is required) SEE NEXT PAGE CERTIFICATE HOLDER L:ANC:ELL.A I IUN TOWNNOA SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. 120 Main Street North Andover, MA 01845 AUTHORIZED REPRESENTATIVE I ©1988-2009 ACORD CORPORATION. All rights reserved. ACORD 25 (2009109) The ACORD name and logo are registered marks of ACORD PAYMENT BOND Bond No. GC 10 5 3 Rafferty Fine KNOW ALL MIEN BY THESE PIZESENTS, that we Gradinq Inc. with a place of business at as Principal (the "Principal*'), and outh Roads Enfield ontrac ors Ron ing nsurance Company CT 06082 corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at 630 Freedom Rusiness Center, King of Prussia,PA0F)asSurety 194 (the "Surety''), are held and firmly bound wtto the Town of'North Andover, h4assachiks eats as Obligee Twenty Five Thousand Four Tiunclred (the "Obligee"), in the sum ofTwent y Five & 001100 Q 25,425.00 lawful tnoney of the United States of America, to be paid to the Obligee, for which pay7nent, well and truly to be made, we bind ourselves. our respective heirs, executors, administrators, successors and assigns.. jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of March 1 , 201 2 , for the construction of milling NOW, THE CONDITIONS of this obligation are such that ifthe Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications. alterations, extensions of time. changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws. Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this oblivation shall become null and void: otherwise, it shall retrain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this 1 s dayaf March, 2012 PRINCIPAL Rafferty Fine 1 Attest: ('/1 Y"j n LLeiV SURETY" Contractors Ponding & Insurance Company [Attorrfey-in-fact] [Seal)(/ 3 Forest Park Drive Farmington, CT 06032 [Address] 86 674-0123 [Phone] Attest: END OI' PAYMENT BOND Know All Men by These Presents: POWER OF ATTORNEY Contractors Bonding and Insurance Company That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That Contractors Bonding and Insurance Company, a Washington corporation, does hereby make, constitute and appoint: Kenneth P. Morotto, Jr., Ellen G. Coco, Kenneth J. Coco, jointly or severally in the City of Farmington , State of Connecticut its true and lawful Agent and Attorney in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described bond. Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00/100 Dollars ( $10,000,000.00 ) for any single obligation. The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon this Company as if such bond had been executed and acknowledged by the regularly elected officers of this Company. The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of the Resolution adopted by the Board of Directors of Contractors Bonding and Insurance Company, and now in force to -wit: "All bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the corporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Corporation. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation. The signature of any such officer and the corporate seal may be printed by facsimile or other electronic image." IN WITNESS WHEREOF, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice President with its corporate seal affixed this 6th day of June , 2011 OaQtNG AND . 9 'e0•'�'PPoaq '•,'yo _0'00 T .F; -� •o= ' � = ;. 0 ' ° 1979 State of Washington 1 J ,,,,,.•'• )} Ssi� 'q SH'NGSON``````��. County of King On this 6th day of June 2011 before me, a Notary Public, personally appeared Roy C. Die who being by me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of the Contractors Bonding and Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation. (Lw,!j V.,e4_ Joseph B. uller Notary Public Notary Public State of Washington JOSEPH B. MULLER MY COMMISSION EXPIRES March 29, 2012 Contractors Bonding and Insurance Company Roy C. DieL—) / Vice President CERTIFICATE I, the undersigned officer of Contractors Bonding and Insurance Company, a stock corporation of the State of Washington, do hereby certify that the attached Power of Attorney is in full force and effect and is irrevocable; and furthermore, that the Resolution of the Company as set forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the seal of the Contractors Bondin and Insurance Company this1;1�, day of March 2012. Contractors Bonding and Insurance Company Roy C. DIK Vice President 0675388032912 A0059511 Bonding and Insurance Company chicContractors 1213 Valley Street P.O. Box 9271 .. Ru eoaa..r Seattle, WA 98109-0271 Know All Men by These Presents: POWER OF ATTORNEY Contractors Bonding and Insurance Company That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the approving officer if desired. That Contractors Bonding and Insurance Company, a Washington corporation, does hereby make, constitute and appoint: Kenneth P. Morotto, Jr., Ellen G. Coco, Kenneth J. Coco, jointly or severally in the City of Farmington , State of Connecticut its true and lawful Agent and Attorney in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, the following described bond. Any and all bonds, undertakings, and recognizances in an amount not to exceed Ten Million and 00/100 Dollars ( $10,000,000.00 ) for any single obligation. The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon this Company as if such bond had been executed and acknowledged by the regularly elected officers of this Company. The Contractors Bonding and Insurance Company further certifies that the following is a true and exact copy of the Resolution adopted by the Board of Directors of Contractors Bonding and Insurance Company, and now in force to -wit: "All bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the corporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Corporation. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation. The signature of any such officer and the corporate seal may be printed by facsimile or other electronic image." IN WITNESS WHEREOF, the Contractors Bonding and Insurance Company has caused these presents to be executed by its Vice President with its corporate seal affixed this 6th day of June , 2011 OaQtNG AND . 9 'e0•'�'PPoaq '•,'yo _0'00 T .F; -� •o= ' � = ;. 0 ' ° 1979 State of Washington 1 J ,,,,,.•'• )} Ssi� 'q SH'NGSON``````��. County of King On this 6th day of June 2011 before me, a Notary Public, personally appeared Roy C. Die who being by me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of the Contractors Bonding and Insurance Company and acknowledged said instrument to be the voluntary act and deed of said corporation. (Lw,!j V.,e4_ Joseph B. uller Notary Public Notary Public State of Washington JOSEPH B. MULLER MY COMMISSION EXPIRES March 29, 2012 Contractors Bonding and Insurance Company Roy C. DieL—) / Vice President CERTIFICATE I, the undersigned officer of Contractors Bonding and Insurance Company, a stock corporation of the State of Washington, do hereby certify that the attached Power of Attorney is in full force and effect and is irrevocable; and furthermore, that the Resolution of the Company as set forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the seal of the Contractors Bondin and Insurance Company this1;1�, day of March 2012. Contractors Bonding and Insurance Company Roy C. DIK Vice President 0675388032912 A0059511 I A =A =A 1==W J 7 1 r low FINE GRADING, /NC. Asphalt Reclamation • Fine Grading • Cold Planing • Sweeping January 31, 2012 Town of North Andover Office of the Town Manager 120 Main Street North Andover, MA 01845 Re: Cold Planing References To Whom It May Concern: The following is a list of similar contracts for municipal work performed by Rafferty Fine Grading, Inc. as requested in the bid specification package. Municipal References: Town Contact Name Title Contact Phone Number Torrington, CT Bob Lizotte Superintendant of Streets 860-489-2352 Mashpee, MA Catherine Laurent Department of Public Works 508-539-1420 Sandwich, MA Stefan Masse Department of Public Works 508-833-8002 Dennis, MA Tom Andrade Town Engineer 508-760-6166 Barnstable, MA Roger Parsons Director 508-790-6302 Chelmsford, MA Joe Eriksen Highway Foreman 978-250-5270 Lowell, MA Ron LaBrecque Town Engineer 978-970-3329 Haverhill, MA Tom Shanahan Highway Foreman 978-374-2364 CT DOT -Aviation Krys Kowalski/Colin Goegel Project Engineer 860-594-2532/860-594-2541 CT DOT Todd Wakefield Bill Eyberse Planning District 11 860-928-4098 860-823-3213 Brewster, MA Bob Bersin Public Works Superintendent 508-896-3212 Holliston, MA Tom Smith Highway Superintendent 508-429-0616 Please contact me if you need any additional information regarding the information above. WL. fferty Vice President/Secretary RLR/sim 57 South Rd., Enfield, CT 06082 Toll Free 866-763-0100 / Local 860-763-0100 Toll Free Fax 866-763-0400 / Local Fax 860-763-2223 APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 Base Bid Excavate, load and dispose of millings by contractor Alternate Bid . Excavate, load and dispose of millings by contractor Excavate, load and dispose of millings at Cyr Recycling uantit Unit Price 25,000 sq yds $ 2.19' /sq yd 15,000 sq'yds $ 2.19 /sq yd 10,000 sq yds $ 2.19 --/sq yd TOTAL March 1. 2013 throuLyh February 28. 2014 Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ 2.29 /sq yd $ 2.29 /sq yd $ 2.29 /sq yd TOTAL Total Price $ 54,750.00 $ 32,850.00 nw nnn nn $ 109,500.00 $ 57,250.00 $ 34,350.00 nn nnn nn $ 1149500.00 Town of North Andover IFB Page 8 of 34 Asphalt Concrete Excavation March 1, 2014 through February 28, 2015 Excavate, load and dispose of millings by contractor 25,000 sq yds $ 2.39 /sq yd $ 59, 750.00 Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds $ 2.39 /sq yd $ 35, 850.00 Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ 2.39 /sq yd $ 23, 900.00 TOTAL $ 119, 500.00 1 Addenda are acknowledged: Marketing Manager &ga Mic ael M.LReilly Business Name BroxxIndustries Inc. Business Address 1471 Methuen Street, Dracut, MA 01826 Business Phone 978-454-9105 Fax 978-805-9775 Michael M. Reilly Name of Person Authorized to sign Price Proposal Michael M. Reilly Marketing Manager Title of Pe(son Authorized to n Pri e Proposal Alb- 1<14n.'ature of Above Person Town of North Andover 1FB Page 9 of 34 Asphalt Concrete Excavation CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean any natural person, business, partnership, corporation, union, committee, club, or other organization, entity, or group of individuals. Marketing Manager xax�% Name of person signing bid Michael M. Reilly BROX INDUSTRIES INC. Name of Business TAX ATTESTATION Pursuant to M.G.L. Chapter 62C, sec. 49A, I certify under the penalties of perjury that I, to my best knowledge and belief, have filed all state tax returns and paid all state taxes required under law. 04-2772247 BROX INDUSTRIES INC. Social Security Number or Signature of Individual or Federal Identification Number Corporate Name By. ;V4Ap-Varketing Manager C rporate Officer (if applicable FABROX INDUSTRIES, INC. $ 5,175,375 1471 Methuen Street •Dracut, MA 01826-5439 Sep -10 (978) 454-9105 FAX: (978) 805-9719 HWY MAINTENANCE, SURFACING & APPURT www.broxindustries.com MHD -RTE GLOUCESTER TO WENHAM #54636 $ 2,019,748 COLDPLANE, RESURFACE & APPURT MAJOR CONTRACTS COMPLETED WITHIN THE LAST FIVE YEARS @09/30/11 CONTRACT CLASS WHEN Jul -10 AMOUNT OF WORK COMPLETED LOCATION & OWNER $ 4,648,467 COLDPLANE, RESURFACE & APPURT - Nov -10 NH DOT - EXETER TO HAMPTON #14922 $ 643,751 HWY MAINTENANCE, SURFACING & APPURT Oct -10 NH -DOT - CONCORD TO PEMBROKE #16065 $ 755,019 HWY MAINTENANCE, SURFACING & APPURT Sep -11 NH DOT - RTE 38 PELHAM #16247 $ 3,787,888 HWY MAINT, COLDPLANING,SURFACING & APPUF Dec -10 MASS DOT -DISTRICT 4, #56293 $ 8,567,760 COLDPLANE, RESURFACE, SIGNALS & APPURT Mar -11 MASS DOT-LYNNFIELD TO PEABODY #55757 $ 558,854 COLDPLANE, RESURFACE, SIGNALS & APPURT Nov -10 MASS DOT- RTE 213 METHUEN #604857 $ 1,444,616 COLDPLANE, RESURFACE & APPURT Sep -11 MASS DOT - DISTRICT #6, #66459 $ 326,279 HWY MAINTENANCE, SURFACING & APPURT JUI-11 MAINE DOT -WELLS #018013.00 $ 805,729 PAVING & APPURTENANCES Sep -11 TOWN OF ROWLEY, MA 2009 $ 720,092 COLDPLANE, RESURFACE & APPURT Jun -11 TOWN OF ANDOVER, MA 2010-2011 $ 446,561 PARKING LOT RECONSTRUCTION Nov -10 RAYTHEON -MARLBORO 2010 $ 1,004,751 COLDPLANE, RESURFACE & APPURT Nov -10 TOWN OF SALEM, NH 2010 $ 5,175,375 HWY MAINTENANCE, SURFACING & APPURT Sep -10 MHD -RTE LAWRENCE-METHUEN #54005 $ 6,558,752 HWY MAINTENANCE, SURFACING & APPURT Jul -10 MHD -RTE GLOUCESTER TO WENHAM #54636 $ 2,019,748 COLDPLANE, RESURFACE & APPURT Oct -09 NH DOT - RESURFACE DISTRICT IV, #15564 $ 2,913,286 COLDPLANE, RESURFACE & APPURT Jul -10 NH DOT - RESURFACE DISTRICT IV, STIMULUS, #15674 $ 1,147,402 COLDPLANE, RESURFACE, SIGNALS & APPURT Jul -10 NH DOT - RTE 111 HAMPSTEAD #15606 $ 1,273,210 PAVING & APPURTENANCES Sep -10 BALTAZAR - TEWKSBURY SEWERS 2009 $ 789,582 PAVING, STRUCTURES & APPURTENANT Oct -09 TOWN OF ANDOVER, MA 2009/2010 $ 1,811,084 PAVING & APPURTENANT Jul -10 CITY OF BEVERLY, MA 2006-2009 $ 1,425,012 COLDPLANE, RESURFACING & APPURT Dec -09 CITY OF NASHUA, NH 2009 STREET RESURFACING $ 1,162,115 HWY MAINTENANCE, SURFACING & APPURT JUI-09 MHD -RTE 110 HAVERHILL #53920 $ 1,774,373 HWY MAINTENANCE, SURFACING & APPURT Mar -09 MHD - DISTRICT 4 MAINT, #51286 $ 727,381 HWY MAINTENANCE, SURFACING & APPURT Jul -09 MHD-RTE 110 AMESBURY #57172 $ 906,515 PAVING & APPURT Dec -08 DOW-MHD-CONCORD ROAD RECONSTR $ 906,117 PAVING & APPURT Deo -08 CITY OF HAVERHILL, MA 2008 $ 717,350 SITE PREP, PAVING & APPURT Dec -08 RMD - DEMOULAS MARKET BASKET $ 565,455 PAVING & APPURTENANCES Aug -09 BALTAZAR - TEWKSBURY SEWERS # $ 1,148,352 COLDPLANING, BRIDGE DECKS, PAVING & APPUF Sep -09 SUB TO SPS -NH DOT 193 MAN -BEDFORD # 14607 $ 2,924,305 COLDPLANE, RESURFACE & APPURT Sep -09 NH DOT - RESURFACE DISTRICT V, STIMULUS, #15675 $ 1,457,168 COLDPLANE, RESURFACE & APPURT Sep -09 NH DOT- RESURFACE DISTRICT VI, #15566 $ 2,038,573 COLDPLANE, RESURFACE (QC/QA) & APPURT Nov -08 NH DOT - SEABROOK TO ROCHESTER #14946 $ 923,268 HWY MAINT, BRIDGE DECKS, PAVING & APPURT Sep -09 SUB TO SUR -NH DOT SPAULDING TURNPIKE # #10620G $ 1,755,226 COLDPLANE, RESURFACING & APPURT Sep -09 CITY OF NASHUA, NH 2007 $ 1,051,547 COLDPLANE, RESURFACING & APPURT Sep -09 CITY OF DOVER, NH 2O09CITY OF DOVER, NH 2009 $ 557,399 COLDPLANE, RESURFACING & APPURT Sep -09 CITY OF MANCHESTER, NH 2008 $ 529,602 COLDPLANE, RESURFACING & APPURT Sep -09 CITY OF SALEM, NH 2009 $ 5,786,437 COLDPLANE, RESURFACE (QC/QA) & APPURT Nov -07 NH DOT - EPPING TO HAMPTON, #14799 $ 1,324,344 COLDPLANE, RESURFACING QC/QA)& APPURT May -08 NH DOT - NASHUA/MERR/HOOKSETT #14520 $ 2,340,921 RECLAIM, RESURFACING PMST & APPURT Sep -08 NH DOT - DISTRICTS IV, #15270 $ 406,775 COLDPLANE, RECLAIM & MACHPAVE Sep -08 TOWN OF HUDSON, NH 2008 $ 405,994 PAVING & APPURT Sep -08 TOWN OF PEMBROKE, NH 2008 $ 330,185 PAVING & APPURT Sep -08 TOWN OF WINDHAM, NH 2008 $ 541,279 PAVING & APPURT Aug -08 SUB TO DOW-CRESENT ROAD, MANCHESTER, NH $ 354,493 PAVING & APPURT Sep -08 SUB TO BUSBY -NH DOT PLAISTOW #13803 $ 404,666 PAVING & APPURT May -08 CAPE ANN - OLD ROCHESTER ROAD $ 740,327 COLDPLANE, RECLAIM, PAVING & APPURT Dec -07 TOWN OF ROWLEY, MA - 2007 $ 350,927 PAVING & APPURTENANT Jun -08 TOWN OF METHUEN, MA - 2007/2008 $ 581,901 PAVING, STRUCTURES & APPURTENANT Jun -08 TOWN OF ANDOVER, MA 2007/2008 $ 655,709 PAVING & APPURT Jun -08 TOWN OF TEWKSBURY, MA 2007/2008TOWN OF TEWKSBURY, MA 2007/2008 $ 515,481 PAVING & APPURT Aug -08 TOWN OF BERLIN, MA 2008 $ 1,300,072 SITE PREP, PAVING & APPURT Oct -07 ZANNI - DEMOULAS WAREHOUSE $ 717,321 DENSE GRADED, PAVING & APPURT Jul -08 SUB TO ET&L - MHD-RTE 129 WILMINGTON $ 4,849,105 BRIDGE DECKS, COLDPLANE, PAVING & APPURT Sep -07 MHD - RTE 495 CHELMSFORD #34060MHD - RTE 495 CHELMSFORD #34060 $ 832,168 DENSE GRADED, COLDPLANE, PAVING & APPUR- Nov -06 SUB TO ET&L - MHD-CROSBY ROAD BEDFORD $ 926,725 PAVING & APPURT May -07 TOWN OF READING, MA - 2005 $ 326,525 RECLAMATION, PAVING & APPURT Nov -06 CITY OF NEWBURYPORT, MA 2006 $ 651,432 PLUM ISLAND OVERLAY-NEWBURYPORT, MA Dec -07 SUB TO D & C CONSTR INC. $ 1,036,545 COLDPLANE, PAVING & APPURT Jun -07 TOWN OF ANDOVER, MA DPW $ 2,620,529 PAVING & APPURT Jun -07 TOWN OF TEWKSBURY, MA 2004-2007TOWN OF TEWKSBURY, MA 20042007 $ 588,040 PAVING & APPURT Sep -07 SUB TO ALBANESE D&S-TEWKSBURY SEWERS $ 363,651 PAVING & APPURT Jun -07 TOWN OF SALISBURY, MA 2005/2006 $ 770,816 COLDPLANE, RECLAIMING, PAVING & APPURT Sep -07 DIAMOND CONT-WOBURN MALL $ 426,463 SITE PREP, PAVING & APPURT Sep -07 MAROIS-ARBOR POINT $ 1,882,472 COLDPLANE, RESURFACE & APPURT Sep -07 NH DOT - HAMP/PORTS/DOVER/ROCH #14522 $ 1,635,198 RESURFACING & APPURT Aug -07 NH DOT - DISTRICTS IV, #14764 $ 2,188,515 RESURFACING & APPURT Oct -06 NH DOT - NASHUA/MERR/HOOKSETT #14507 $ 893,113 COLDPLANE, RESURFACING & APPURT Aug -07 CITY OF NASHUA, NH 2006 $ 1,043,815 RESURFACING & APPURT Nov -06 CITY OF DOVER, NH 2006 BROX INDUSTRIES, INC. 1471 Methuen Street • Dracut, MA 01826-5439 (978) 454.9105 FAX: (978) 805-9720 www.broxindustries.com PAVING EQUIPMENT LISTING DESCRIPTION QTY BLAW KNOW PAVERS 3 CAT PAVERS 1055B PAVERS 3 INGERSOLL RAND PF4410 PAVER 2 TRANSFER MACHINES 2 HYSTER C350D ROLLERS 5 ROLL PAC DELUXE III ROLLERS 2 ROSCO ROLL PAC ROLLERS 3 HYPAC C340D ROLLERS 3 NVGERSOLL RAND DD11OHF ROLLER 1 HYPAC VIBRATORY ROLLER 1 DYNAPAC VIBRATORY ROLLER 1 HYSTER 850B VIBRATORY ROLL 1 HYSTER 530A RUBBER TIRED ROLLER 2 MILLER CURB BUILDERS 4 SWEEPERS 3 HUBER GRADERS 3 CAT GRADERS 2 WRITGEN W2100 MILLING MACHINE 1 WRITGEN W500 COLDPLANER/TRIMMEF 1 10 -WHEELERS 4 TRI -AXLES 12 TRAILER DUMPS 5 LEE -BOY TACK WAGON 3 COMPACTORS 8 COMPRESSORS 6 WATER WAGONS 5 ASSORTED SMALL EQUIPMENT AS REQUIRED Raymond T Santilli Assistant Town Manager Mr. Michael Reilly Brox Industries Inc 1471 Methuen Street Dracut, MA 01826 Dear Mr. Reilly: TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 t NORTH O'�t4•o �^• b� O F �qSS^CHUs�t�y March 9, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the bid bond/deposit submitted with your proposal in response to the Invitation for Bids —'Asphalt Concrete Excavation' issued by the Town of North Andover. The bid bond/deposit is being returned since the contract was awarded to another vendor. If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, THAT WE Brox Industries, Inc. 1471 Methuen Street, Dracut, MA 01826 as Principal, hereinafter called the Principal, and Fidelity and Deposit Company of Maryland 1400 American Lane, Tower I 18th Floor Schaumburg IL 60196-1056 a corporation duly organized under the laws of the State of MD as Surety, hereinafter called the Surety, are held and firmly bound unto Town of North Andover, MA as Obligee, hereinafter called the Obligee, in the sum of Five Percent of the Amount Bid** Dollars ($5%.** for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Bid for "Asphalt Concrete Excavation" NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and materials furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 2nd day of February (Witness) . U-2,-ka� bJY-Lf , Wendy Wrk_ (Witness) Brox Industries, Inc. \ kenn, O.S. 'MICHAEL M. REILLY "^ a Fidelity and Deposit Compam o ---4ziretvl Attomey�� Ju 2012 (Seal) MARKETING MANAGER (Title) of Maryland /V (Seal) RW -L (Title) AIA DOCUMENT A310 • BID BOND a AIN • FEBRUARY 1970 ED. • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006 Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland, by THEODORE G. MARTINEZ, Vice President, and GERALD F. HALEY, Assistant Secretary, in pursuance of authority granted by Article Vl, Section 2, of the By -Laws of said"�ny, which are set forth on ere the reverse side hereof and are hereby certified to be in full force and effect on the date fy bis hereby nominate, constitute and appoint Stephen W. GRANT, Michael S. BALBONI, J I�6;IRJanc]13�� M. PEARSON, all of Boston, Massachusetts, EACH its true and lawful agent and t 1 �t'o � fie -:;and deliver, for, and on its behalf as surety, and as its act and deed: anyi G , k: d u , ntktfie execution of such bonds or undertakings in pursuance of these presents�ftll s.�vjm u� i�}�ar�, as fully and amply, to all intents and purposes, as if they had been d ec t ai a wls� ayjthb4igularly elected officers of the Company at its office in Baltimore, Md., ' J �p�per ns� o attorney revokes that issued on behalf of Stephen W. GRANT, Michael S. BALBO�it� G..MjAi March 17, 2006. 1� 1 C1_ The said Assistant _ ,, � , S et'eby certify that the extract set forth on the reverse side hereof is a true copy of Article VI, Section 2, of the By -Ls' said Company, and is now in force. IN WITNESS WHEREOF, the said Vice -President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 4th day of August, A.D. 2010. ATTEST: 'gyp DfPps�i �a o W � State of Maryland1 ss: City of Baltimore f FIDELITY AND DEPOSIT COMPANY OF MARYLAND Gerald F. Haley Assistant Secretary Theodore G. Martinez On this 4th day of August, A.D. 2010, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came THEODORE G. MARTINEZ, Vice President, and GERALD F. HALEY, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Maria D. Adamski Notary Public My Commission Expires: July 8, 2011 POA -F 063-0078 EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND "Article V1, Section 2. The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice -Presidents, Assistant Vice -Presidents and Attorneys -in -Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,... and to affix the seal of the Company thereto." CERTIFICATE I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that the Vice -President who executed the said Power of Attorney was one of the additional Vice -Presidents specially authorized by the Board of Directors to appoint any Attorney -in -Fact as provided in Article VI, Section 2, of the By -Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 10th day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed." IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company, this 2nd day of February , 2012 Mi I Assistant Secretary 7 APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 Base Bid Excavate, load and dispose of millings by contractor Alternate Bid Excavate, load and dispose of millings by contractor Excavate, load and dispose of millings at Cyr Recycling Quantity Unit Price 25,000 sq yds $ a , a Q /sq yd 15,000 sq yds $ 9.90 /sq yd 10,000 sq yds $ a) Jo /sq yd TOTAL March 1, 2013 through February 28, 2014 Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds $ /sq yd Excavate, load and dispose of millings by contractor Excavate, load and dispose of millings at Cyr Recycling Town of North Andover IFB Asphalt Concrete Excavation 15,000 sq yds $ a. Ll C) /sq yd 10,000 sq yds 0 /sq yd TOTAL Total Price $ SS UOO.UO $ 330000.00 $_ ';�a, v oo. 00 $ s.-, 0C)0' 00 $ Lv aoo. oo $ 3('1000100 $ �'-L , U 00 , C)C $ U o 000, 00 Page 8 of 34 March 1, 2014 through February 28, 2015 Rare Bid Excavate, load and dispose of millings by contractor 25,000 sq yds $ 9,50 /sq yd $ b d, son. co Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds $ 3.60 /sq yd $ 3'l sao,vv Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ a, so /sq yd $ 95, coo, ov Addenda O are acknowledged: Signature TOTAL $ L-�, _Stull. C.D Business Name rl- .� , \ ,, tl .n,, Business Address a q ('e4 -ter s -p, o A , 31on r,-, ', e A (� C.i 06 C)0 9 Business Phone S,C) - aL13 - a,3c)o Fax S , Name of Person Authorized to sign Price Proposal V , e- e ?rC,- S, A e, -)- Title of ftrson Authorizgd to sikn Price Proposal of Above Town of North Andover 11713 Page 9 of 34 Asphalt Concrete Excavation CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date 1 311 19 3 .F eoems, C,,� Y, T,, V I ce ere s , A G I IV, I V I � 8 s i2kaA k- `i eca cL m'. ma I n 0-. Print Name & Title Company ame CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I S rev , C'Sauthorized signatory for V., A s „tom eta,, m-,, 9, lhc-. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature Date Town of North Andover IFB Page 30 of 34 Asphalt Concrete Excavation CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature zsyE Date i 3 f i s S V e..) ewi G aa -r, V, I . V , c e Cres clen, Print Name & Title Town of North Andover IFB Asphalt Concrete Excavation �1h c. Company T4ame Page 31 of 34 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on f� r', � 1-1 p 1 a it was VOTED,THAT Ske;ej-, U'ce 'PreSiiAemy- (Name) ` (Officer) L a(-rI 1 �i (� s pV e A t• of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said G � ;�., 05p)l ..14- and affix its corporate seal hereto; � and such execution of any contract or obligation in the name of on LNC. its behalf by such officer under seal of C,,,,,;, t, flsshall be valid and binding LhG. upon Go, �,F ,r♦9aF 2e�� �,;,. �n L. I hereby certify that I am the clerk of the above named Gam; l„ n:5p1 R �..tu:,�,., a and �h C.. that S V -U e" (; e x r'� }-., is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. 1 131 I la (Date) (Clerk) Town of North Andover IFB Page 32 of 34 Asphalt Concrete Excavation William Francis Galvin Secretary of the Commonwealth February 17, 2011 To Whom It May Concern: I hereby certify that the records of this office show that GARRITY ASPHALT RECLAIMING, INC. a corporation organized under the laws of Connecticut on August 3, 1995 was qualified to do business in this Commonwealth on September 29, 1995 under the provisions of the General Laws, and I further certify that said corporation is still qualified to do business in this Commonwealth. I also certify that said corporation is not delinquent in the filing of any annual reports required to date. Processed By sam In testimony of which, I have hereunto affixed the Great Seal of the Commonwealth on the date first above written. Secretary of the Commonwealth COLD PLANING MUNICIPAL WORK PERFORMED 2010-2011 Town/City Contact Phone No. Holyoke Randy Malak 413-322-5695 Bedford Richard Warrington 781-275-7606 No Attleborough Mark Hollowell 508-695-9621 Haverhill Tom Shanahan 978-374-2364 Danvers Joe Finocchiaro 978-762-0231 Attleboro John Clover 508-223-2222 Medway Jim Smith 508-328-1651 Lowell Ron LaBrecque 978-970-3331 Hopkinton Michael Mansir 508-497-9740 Lancaster Scott MacDonald 978-365-2272 Medford Mark Shea 781-293-2474 Sturbridge Greg Morse 508-347-2515 Westford Richard Barrett Jr. 978-692-5520 Newton Matt Woodruff 617-796-1028 Also, many town jobs worked on for General Contractors. TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilli Assistant Town Manager Mr. Steven Garrity Garrity Asphalt Reclaiming, Inc 22 Peters Road Bloomfield, CT 06002 Dear Mr. Garrity: NOR7F� 3� e.. •. �' .._ a OL O A SSACHUS March 9, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the bid bond/deposit submitted with your proposal in response to the Invitation for Bids —'Asphalt Concrete Excavation' issued by the Town of North Andover. The bid bond/deposit is being returned since the contract was awarded to another vendor. If you have any questions and/or concerns, please call me. Sincerely, Raymond T. Santilli Assistant Town Manager Enclosure Document A310 TM -2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: (,'�'artte, legal.rhrlrrs and addis�.rti) Garrity Asphalt Reclaiming, Inc. 22 Peters Road Bloomfield, CT 06002 OWNER: (Xanre, legal stales and address) Town of North Andover 120 Main Street North Andover, MA 01845 SURETY: (Maine, legal status acrd pdrncil)rll place r fbrucines s) Travelers Casualty and Surety Company of America 300 Windsor Street Hartford, CT 06120 Mailing Address for Notices Travelers Bond, One Tower Square Hartford, CT 06183 BOND AMOUNT: $ 5% Five Percent of Amount Bid PROJECT: (Xame, location or address and Project number, if a)tti} Asphalt Concrete Excavation This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves. their (tcirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond arc such that if the Owner accepts the bid of the Contractor within the tine specified in the bid docantents, or within such time period as ntay be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owyter in accordance with the terns of such bid, and gives such bond or bonds as ntay be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the O%vner, for the faithful performance of such Contract and for the prompt paynent of labor and material famished in the prosecution thereof.. or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner nay in good faith contract with another party to perlbrnt the work covered by said bid, then this obligation shall be null and void, otherwise to remain in lull force and ell'ect. The Surety hereby waives any notice ol'an agreement between the Owner and Contractor to extend the lime in which the Owner may accept the bid. Waiver ol'notice by lite Surety %ball not apply to tiny extension exceeding sixty (60) days in the aggregate beyond the time for acceptance ol'bids.specilied in the bid dtwuntents, and the Owner and Contractor shall obtain the Surety.,; consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid ton Contractor, the tent Contractor in this Bond shall be deemed to be Subcontractor and the tori Owner shall be deemed to be Contractor. When this Bond has been litmished to comply with a statutory or other legal requirement in the location ol'the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefront and provisions confitrnting to such statutory or other legal requirement shall be deemed incorporated herein. When so litmished, the intent is that this Bond shall be construed a%a statutory bond and not as a common law bond. Signed and scaled this 2nd day of February, 2012 (11'irnsss) 1 � (fT'inresa) S-00541AS 8110 Garrity Asphalt Reclaiming, Inc. _ (Pt*)cfpal) (uCal) By: amp, G�. tt i y r i,te Travelers Casualty and Surety Company of America (Strret),) (,Seal) By: (Tn1) T. Deffley I Attorney -in -Fact WARNING: THIS POWER OF ATTORNEY IS POWER Oh ATTORNEY TRAVELERSJ Farmington Casualty Company St. Paul Mercury insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St. Paul Guardian Insurance Company Attorney -In Fact No. 217434 Certificate No. 0 U 4 14 o, ! 3 `i' KNOW ALL MEN BY THESE PRESENTS: That St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company, Travelers Casualty and Surety Company, and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc., is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint S. E. Susanin, T. Deff ley, and W. Krystopa of the City of Hartford , State of Connecticut , their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WgEREOF, the Comp Jtave caused this instrument to be signed and their corporate seals to be hereto affixed, this day of ivim LUU 1t Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc St. Paul Fire and Marine Insurance Company St. Paul Guardian Insurance Company 31 st St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company GAS UA<j Q,��nduo. J1PE�6 O�I•N..�Mg` •C'•f 1� MSV qa.Y T'f ANpsYAYYO fZoPFvRA,es x` PRORA)—, y4 t0 f: 1W o t m HARTFORD, < tNRfrORD,� Fe, tib 1951 SEALioI CONN. nt1,,` can• J£ mO o @�• _.+'�` �Q< .........*. sf �+ • '"� X1'1 AMt State of Connecticut City of Hartford ss. By: Georg Thompson, enior ice President 31 st March 2011 On this the day of before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company. Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. 0 G'TA In Witness Whereof, I hereunto set my hand and official seal. � R My Commission expires the 30th day of June, 2011. pIIBU�s 58440-4-09 Printed in U.S.A. THIS POWER OF ATTORNEY IS INVALID Marie C. Tetreault, Notary Public WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company, Fidelity ' and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kori M. Johanson, the undersigned, Assistant Secretary, of Farmington Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 2nd day of February _,2012 Kori M. Johans Assistant Secretary r OASUq��` (rw;Uq' 91Y gNpB �! "'iYCr �4 f foR POR�Q�: :!LC, c �'HARfPORD,1951 �:SEALio:'�`�SBALia° y COHH.\ �+• JC '�s�� cE c0 �y'.........�yCf o.•.,.. : •'au yr ys! �f\,..,/� To verify the authenticity of this Power of Attorney, call 1-800-421-3880 or contact us at www.travelersbond.com. Please refer to the Attorney -In -Fact number, the above-named individuals and the details of the bond to which the power is attached. WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 March 1, 2013 through February 28.2014 Base Bid Excavate, load and dispose Quantity Unit Price Total Price Base Bid Excavate, load and dispose Z 33� �SZ• Excavate, load and dispose $ • /sq yd $ 17 2 % 2, L 2-Z, 569. of millings by contractor 25,000 sq yds $ /sq yd $ Alternate Bid Excavate load and dispose 17 0° 32, of millings by contractor 15,000 sq yds $ /sq yd $ Excavate, load and dispose Cyr Recycling 10,000 (._ Z1, 7CV• , of millings at sq yds $ /sq yd $ TOTAL $ March 1, 2013 through February 28.2014 Base Bid Excavate, load and dispose CV 2 S�o� of millings by contractor 25,000 sq yds $ /sq yd $ Alternate Bid Excavate, load and dispose Z 33� �SZ• of millings by contractor 15,000 sq yds $ • /sq yd $ Excavate; load and dispose Cyr Recycling % 2, L 2-Z, 569. of millings at 10,000 sq yds $ /sq yd $ TOTAL $ IZ Town of North Andover IFB Page 8 of 34 Asphalt Concrete Excavation March 1. 2014 through February 28. 2015 Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds Addenda D 3� $ /sq yd 37 $ /sq yd 37 $ /sq yd TOTAL $ S�, Z�I are acknowledged: W�I.CJ Signa r Co (r° )1c,/ ✓E�1` z°��. Business Name Costello Industries, Inc. Business Address 123 Costello Rd., Newinpton, CT 06111 Business Phone 860/666-3311 Fax 860/666-2749 John Costello Name of Person Authorized to sign Price Proposal P�esiddnt;. Title oil erson AAhoriAedAo/�sign Price Proposal Si2ndite of Above Person Town of North Andover 11713 Page 9 of 34 Asphalt Concrete Excavation S CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature John Costello, President Print Name & Title Date �\I b -)— Costello ) - Costello Industries,:,; Inc. Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I John Costello , authorized signatory for Costello Industries, Inc. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signatur Date Town of North Andover IFB Page 30 of 34 Asphalt Concrete Excavation CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Wit.— John Costello, President Print Name & Title Town of North Andover IFB Asphalt Concrete Excavation Date Coste]_Io Industries,.Inc. Company Name Page 31 of 34 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the Costello Industsries, Inc. held on Tani arry1,_2012 it was VOTED, THAT John Costello (Name) President (Officer) of Costello Industries, Incbe and hereby is authorized to execute contracts and bonds in the name and on behalf of said Costello Industries, Inc? and affix its corporate seal hereto; and such execution of any contractor obligation in the name ofCos tel_lo Industries, Incon its behalf by such officer under seal ofCos tel l_o Industries,Inc, shall be valid and binding upon signature I hereby certify that I am the clerk of the above named Costello Industries, Inc. and that John Costello is the duly elected officer as above of said eysTe4o Uslrte s f:1�c,. and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. 1�31li� (Date) (Clerk) Robinson, Assistant Secretary Town of North Andover 1FB Page 32 of 34 Asphalt Concrete Excavation TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilh Assistant Town Manager Mr. John Costello Costello Industries, Inc 123 Costello Road Newington, CT 06111 Dear Mr. Costello: March 9, 2012 TEL (978) 688-9516 FAX (978) 688-9556 Enclosed please find the bid bond/deposit submitted with your proposal in response to the Invitation for Bids —'Asphalt Concrete Excavation' issued by the Town of North Andover. The bid bond/deposit is being returned since the contract was awarded to another vendor. If you have any questions and/or concerns, please call me. Sincerely, a7 Raymond T. Santilli Assistant Town Manager Enclosure Document A310 TM - 2010 Conforms with The American Institute of Architects AIA Document 310 Bid Bond CONTRACTOR: (Xiane, legal stales and addr evti) Costello Industries, Inc. 123 Costello Road, P.O. Box 310444 Newington, CT 06131-0444 OWNER: (Xame, legal stattrs mrd addr cgs) Town of North Andover 120 Main Street North Andover, MA 01845 SURETY: ('Fame, legal status mrd principal place r fhavinesti) Liberty Mutual Insurance Company 20 Riverside Road, Mail Stop 03AN Weston, MA 02493-2281 Mailing Address for Notices 450 Plymouth Road. Suite 400 Weston, MA 19462-1644 BOND AMOUNT: $ 5% Five Percent of Amount Bid PROJECT: (,'Faire, location or address mrd Project rranrher.. if m{t} Asphalt Concrete Excavation This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety arc bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors. administrators, successors and assigns, jointly and severally, as provided herein. The conditions of thus Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owncr and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the O%vner, for the faithful perfomtance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difficrence, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perlimn the work: covered by said bid, then this obligation shall be null and void, otherwise to remain in full lirrce and ell'ect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiverol'notic:e by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time Ibr acceptance ol'bids speci lied in the bid documents, and the Owner and Contractor shall obtain the Surely's consent li,r an extension beyond sixty (60) days. If this Bond is issued in connection % ith a subcontractor's bid ton Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been lurnished to comply with a statutory or other legal requirement in the location ol'the Project, any provision in this Bond conllicting %ith said statutory or legal requirement shall be deemed deleted herefrom and provisions conlonning to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common la%v bond. Signed and scaled this 2nd day of February, 2012 (11'In�csss) Costello Industries, Inc. (prince I) (Seal) B: ilitle)Jo (��sic'1' o� �✓ cis] ' e, -c l Liberty Mutual Insurance Company Lr I, t�L (Surety) (Sea!) By: (Title) SSE. Susanin Attorney -in -Fact S•00541AS 8110 *. O CL d y a Yd co aM �c m OW d_> d� _3 M N O i 600 o" CM L �d L £ •S ti Lyr 0 M v i Z 4456963 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON, MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts stock insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint S. E. SUSANIN, T. DEFFLEY, W. KRYSTOPA, ALL OF THE CITY OF HARTFORD, STATE OF CONNECTICUT.......... ............................................................................................................................................................................................... ............................................................................................................................................................................................... , each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the genal sum not exceeding FIFTY MILLION AND 00/100********************************* **** DOLLARS ($ 50,000,000.00************* ******* ) each, and the execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. That this power is made and executed pursuant to and by authority of the following By-law and Authorization: ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys -in -fact: Pursuant to Article XIII, Section 5 of the By -Laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby authorized to appoint such attorneys -in -fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 14th day of March 2011 LIBERTY MUTUAL INSURANCE COMPANY Garnet W. Elliott, Assistant Secretary COMMONWEALTH OF PENNSYLVANIA ss COUNTY OF MONTGOMERY On this 14th day of March 2011 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation. IN TESTIMONY WHE first above written. 444' CERTIFICATE subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year aN �� COMMONWEALTH Of PENNSYLVANIA Notarial Seal --� Teresa PaVmlla, Notary Public i Plymouth Twp , h4ortp. , "Coin:y 4 - �L� My Commission Expires hlamh 28.2013 hi—W, Fcrveywar:sks;ucia:irr+oi NoLrir /A�Qi��iriLyCJ By Ter sa Pastella, Notary Public I, the undersigned, Assistant Secretary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys -in -fact as provided in Article XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF I have hereunto subscribed my name and affixed the corporate seal of the said company, this 2nd day of Fepniary 1012 i;.. By r David M. Carey, Ass' rit Secretary '0 N N d C X C R C ca dW C 0C QC" .-,;i d C 3 c OE aCC yC C C OC 6 >C 1 d C 0.N C *_a OC 0r 0 IC I- r AGGREGATE INDUSTRIES - NER, INC. APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 TOTAL $113,000.00 March 1, 2013 through February Quantily Unit Price Total Price Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds $ 2.26 /sq yd $ 56,500.00 Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds $ 2.26 /sq yd $ 33,900.00 Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ 2.26 /sq yd $ 22,600.00 TOTAL $113,000.00 March 1, 2013 through February 28, 2014 Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds $ 2.46 /sq yd $ 61,500.00 Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds $ 2.46 /sq yd $ 36,900.00 Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ 2.46 /sq yd $ 24,600.00 TOTAL $123,000.00 Town of North Andover 1FB Page 8 of 34 Asphalt Concrete Excavation S a March 1, 2014 through February 28, 2015 Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds Addenda 6 are acknowledged: Signature AGGREGATE INDUSTRIES - NER, INC. $ 2.66 /sq yd $ 66,500.00 $ 2.66 /sq yd $ 39,900.00 $ 2.66 /sq yd $ 26,600.00 TOTAL $133,000.00 Business Name Aggregate Industries— Northeast Region, Inc. Business Address 1715 Broadway, Saugus MA 01906 Business Phone (781) 941-7200 Fax (781) 231-4310 Robert P. Andersson Name of Person Authorized to sign Price Proposal GM — Asphalt/Contracting Divisions Title of Person Authorized to sign PriceXjWsal Signature of Above Person Town of North Andover IFB Asphalt Concrete Excavation Page 9 of 34 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person' shall mean natural person, business, partnership, corporation, committee, union, club or other Signature or group of individuals. Date 2112- Robert P. Andersson, GM-Asphalt/Contracting Divisions Aggregate Industries — Northeast Region, Inc. Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I Robert P. Andersson , authorized signatory for Aggregate Industries — Northeast Region, Inc. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of des and contractors, and withholding and remitting child support. Signature Robert P. Andersson, GM-Asphalt/Contracting Divisions Town of North Andover IFB Asphalt Concrete Excavation Date Page 30 of 34 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the work ' and in the work will have completed an OSHA -approved construction safety an alth course lasting at least ten (10) hours. Signature, Date o7 l,2 //--2 Robert P. Andersson, GM-Asphalt/Contracting Divisions Aggregate Industries — Northeast Region, Inc. Print Name & Title Company Name Town of North Andover IFB Asphalt Concrete Excavation Page 31 of 34 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT O (Name) (Officer) Of be and hereby ito execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or ' n in the name of on its behalf by such officer under s49f , shall be valid and binding upon that I hereby qSti%LtkM am the clerk of the above named and is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) Town of North Andover IFB Asphalt Concrete Excavation (Clerk) Page 32 of 34 Certificate of Authority AGGREGATE INDUSTRIES — NORTHEAST REGION INC. QUGLI EGAUE INDUSTRIES The undersigned, Alan Papemy, Clerk/Secretary of Aggregate Industries — Northeast Region, Inc., a Massachusetts corporation (the "Company'), hereby certifies that pursuant to a Special Action By Unanimous Written Consent of The Board of Directors dated July 21, 2011 it was: RESOLVED: That Graham Hardwick, Robert P. Andersson, Ted Knight, and Barry Powers are each individually and acting alone, authorized, directed, and empowered as agents of the Company, to sign under the Company's corporate seal, obligations of the Company in the name of and on behalf of the Company; and the execution of any such contract, bond or obligation by any agent named above shall be valid and binding upon the Company for all purposes, and that this resolution shall remain in full force and effect unless and until the same has been altered, amended or revoked by a subsequent vote of the Company's Directors and a Certificate of such later vote is attested to by the Clerk/Secretary or Assistant Clerk/Secretary of the Company. I do further certify that the above Vote has not been altered, amended or rescinded and remains in full force and affect. I do further certify that the Company is duly organized and the foregoing Vote is on accordance with the Articles of Organization and By -Laws of the Company. S'r Dated as of this day of r/( , 2011. L Alan Papemy, Cierk/Sel�retary (Sea!) AGGREGATE INDUSTRIES NORTHEAST REGION 1715 Broadway Saugus, MA 01906 Telephone (781)941-7200 Facsimile (781)941-7270 vwvw.aggregate-us.com An EqUA M AGMGATE NDUSfltlES oon juny Ak AGGREGATE INDUSTRIES COLD PLANING PREVIOUS EXPERIENCE 1. Town of Acton, Annual Cold Planing Contract Dave Brown (978) 264-9624 2. City of Beverly, Annual Cold Planing Contract Mike Collins (978) 922-2352 3. City of Medford, Annual Cold Planing Contract Paul Gear (781) 844-8649 4. City of Lynn, Annual Cold Planing Contract Larry Donahue (781) 477-7099 5. Town of Marblehead, Annual Cold Planing Contract Dana Snow (781) 631-1750 6. Town of Stoneham, Annual Cold Planing Contract Larry Brophy (781) 438-0760 7. City of Newton, Annual Cold Planing Contract Jim Devoy (617) 796-1028 8. City of Peabody, Annual Cold Planing Contract Rich Howcroft (978) 536-7119 9. Town of Saugus, Annual Cold Planing Contract Joseph Attubato (781) 231-4145 10. Town of Wilmington, Annual Cold Planing Contract Don Onusseit (978) 658-4481 AGGREGATE INDUSTRIES— NORTHEAST REGION, INC. 1715 BROADWAY, SAUGUS MA 01906 ; TELEPHONE: (781) 941-7200 . FACSIMILE: (781)231-4310 www.aggregate-us.com .1 w111 .i I•,I,..," AGGREGATE INDUSTRIES AVAILABLE COLD PLANING EQUIPMENT (4) CAT Milling Machines (4) Bobcats (6) Roadtec RX Trimmers (1) Ingersoll Rand Trimmer (1) Service Truck with Tools (1) Sweeper (1) Lowbed AGGREGATE INDUSTRIES — NORTHEAST REGION, INC. 1715 BROADWAY, SAURUS MA 01906 TELEPHONE: (751) 941-7200 FACSIMILE: (781)231-4310 www.aggregate-us.com A� �® CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 01/13,2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER MARSH USA, INC. 99 HIGH STREET CONTACT NAME: FAX NDN Ext): JAIC, No): E-MAIL ADDRESS: BOSTON, MA 02110 Attn: Boston.Certrequest@marsh.com Fax 212-948-4377 11/0112011 04/0112012 INSURERS AFFORDING COVERAGE NAIC # INSURER A : National Union Fire Ins. Co. of Pittsburgh, PA 19445 S02583-Corpo-ALL-11-12 INSURED AGGREGATE INDUSTRIES MANAGEMENT, INC. AND ITS SUBSIDIARIES INSURER B New Hampshire Insurance Company 23841 INSURER C : Chartis Casualty Company 40258 INSURER D: Insurance Company Of The St ate Of PA 19429 7529 STANDISH PLACE, SUITE 200 ROCKVILLE, MD 20855 INSURER E: American Guarantee &Liability Ins Co 26247 INSURER F: AUTOMOBILE X COVERAGES CERTIFICATE NUMBER: NYC -005666293-13 REVISION NUMBER:5 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF MMIDD/YYYY POLICY EXP MMIDDM(YY LIMITS A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE r_x1 OCCUR of Marsh USA Inc. 2704959 11/0112011 04/0112012 EACH OCCURRENCE $ 2,000,000 DAMAGE TO RENTED 2,000,000 PREMISES Ea occurrence $ MED ERCP (Any one person) $ 50,000 PERSONAL & ADV INJURY $ 2,000,000 GENERAL AGGREGATE $ 4,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: X POLICY PRO- LOC PRODUCTS - COMP/OP AGG $ 4,000,000 $ B B B AUTOMOBILE X LIABILITY ANY AUTO ALLOWNED SCHEDULED AUTOS AUTOS NON-OWNED HIRED AUTOS AUTOS 4309641 (AOS) 4309642 (MA) 4309643 (VA) 11101/2011 1110112011 11/0112011 04/01/2012 04/0112012 04/01/2012 COMBINED SINGLE LIMIT 3,000,000 Ea accident $__ BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPER accidenPROPERTY t DAMAGE $ E X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE 8249956-00 04/01/2011 04/01/2012 EACH OCCURRENCE $ 5,000,000 AGGREGATE $ 5,000,000 DED I I RETENTION $ $ C B B D WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE a (Mandatory In ER EXCLUDED? (Mandatory in NH) If yes describe under DESCRIPTION OF OPERATIONS below NIA 015884302(DC,IL,IN,MD,OK,SC,VA) 015884303 (CO,MI,MN,NH,TX,WV) 015884300 MA,ND,OH,WA,WI,WY ( ) 015884301 (CA) 1110112011 1110112011 11101/2011 1110112011 0410112012 0410112012 04/01/2012 04/0112012 _R_[ WC oTHOTH- E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - F�1 EMPLOYE $ 1,000,000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space Is required) EVIDENCE OF INSURANCE CERTIFICATE HOLDER CANCELLATION AGGREGATE INDUSTRIES MANAGEMENT, INC. SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE NORTHEAST REGION, INC. THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ASPHALT DIVISION ACCORDANCE WITH THE POLICY PROVISIONS. 1715 BROADWAY SAUGUS, MA 01960 AUTHORIZED REPRESENTATIVE of Marsh USA Inc. Sarah A. Stevenson @ 1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: S02583 LOC #: Boston '® ADDITIONAL REMARKS SCHEDULE Page 2 of 2 AGENCY MARSH USA, INC. POLICY NUMBER CARRIER I NAIC CODE NAMED INSURED AGGREGATE INDUSTRIES MANAGEMENT, INC. AND ITS SUBSIDIARIES 7529 STANDISH PLACE, SUITE 200 ROCKVILLE, MO 20855 EFFECTIVE DATE: ACORD 101 (2008101) vwUor.VVRV %1W"VW, ------ The The ACORD name and logo are registered marks of ACORD TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MASSACHUSETTS 01845 Raymond T Santilli TEL (978) 688-9516 Assistant Town Manager ' FAX (978) 688-9556 March 9, 2012 Mr. Robert Andersson Aggregate Industries — Northeast Region, Inc 1715 Broadway Saugus, MA 01906 Dear Mr. Andersson: Enclosed please find the bid bond/deposit submitted with your proposal in response to the Invitation for Bids —'Asphalt Concrete Excavation' issued by the Town of North Andover. The bid bond/deposit is being returned since the contract was awarded to another vendor. If you have any questions and/or concerns, please call me. Sincerely, /J"d Raymond T. Santilli Assistant Town Manager Enclosure THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond -KNOW ALL MEN BY THESE PRESENTS, that we AGGREGATE INDUSTRIES - NORTHEAST REGION, INC. 1715 BROADWAY SAUGUS, MA 01906 (Here insert full name ,and address or legal title of Contractor) as Principal, hereinafter called the Principal, and WESTERN SURETY COMPANY P.O. BOX 5077 SIOUX FALLS, SD 57117-5077 a corporation duly organized under the laws of the State of SOUTH DAKOTA as Surety, hereinafter called the Surety, are held and firmly bound unto TOWN OF NORTH ANDOVER 120 MAIN STREET NORTH ANDOVER, MA 01845 (Here insert full name ,and address or legal title of Owner) as Obligee, hereinafter called the Obligee, in the sum of Five Percent of the Amount Bid Dollars (5%), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents WHEREAS, the Principal has submitted a bid for Asphalt Concrete Excavation by Cold PlanerHere insert full name, address and description of project) NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid then this obligation shall be null and void, otherwise to remain in full force and effect. Neither the Contractor nor the Surety Under this bond and bid in which it is attached will be held responsible unless prior to the execution of the Contract, the Owner demonstrates to the Surety complete ability to make all payments to the Contractor according to the terms of the Contract. Signed and sealed this 2nd day of February 2012 AGGREGATE INDUSTRIES - NORTHEAST REGI itnes %G/ ! 0/Al ' I� i WESTERN SURETY COMPANY e (Seal) \, Gayle Wood, Attorney -in -Fact S) (Title) AIA DQCUMENT A310 BID BOND AIA® FEBRUARY 1970 ED THE AMERICAN INSTIT TE OF ARCHITECTS, 1735 N.Y. AVE., N.W. WASHINGTON, D.C. 20006 Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Craig B Hurst, Kevin W Andrews, Jeffery G Shields, Wm. Scott Shields, Gayle Wood, Donald R Mayer, Stephanie Garahana, Tracy A Mervin, Jennifer Wallace, Individually of Sandy, UT, its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By -Law printed on the reverse hereof, duly adopted, as indicated, by the shareholders of the corporation. In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Senior Vice President and its corporate seal to be hereto affixed on this 18th day of May, 2011, WESTERN SURETY COMPANY WQ?pPOq c�'l? N:4C 4�i^l>E �s;,SE A�'• p I.-.0^"" Paul VrBruflat, Senior Vice President State of South Dakota I ss County of Minnehaha On this 18th day of May, 2011, before me personally came Paul T. Bruflat, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is the Senior Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expires November 30, 2012 +yyyy�,hyy5hyhy5yyhhwwy5ay+ s D. KRELL r S SEAL NOTARY PUBLIC sL a r iaSOUTH DAKOTA� +Sy�.4 �s44h S4444h5y4yyhh�sh + CERTIFICATE D. Krell, No ry Public I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, and further certify that the By -Law of the corporation printed on the reverse hereof is still in force. In testimoNy whereof I have hereunto subscribed my name and affixed the seal of the said corporation this day of Q toles . o......T, WESTERN SURETY COMPANY ,W�'Q,POgg;ia W1:1 3i h DP Form F4280-09-06 L. Nelson, Assistant Secretary Authorizing By -Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. Bid Results — Asphalt Concrete Excavation Period of March 1, 2012 through February 28, 2013 Base Bid — 25,000 square yards Unit Price Total Price Aggregate Industries $2.26 / sq yd $ 56,500.00 Brox Industries, Inc $2.19 / sq yd $ 54,750.00 Costello Industries, Inc $2.17 / sq yd $ 54,250.00 Garrity Asphalt Reclaiming, Inc $2.20 / sq yd $ 55,000.00 Rafferty Fine Grading, Inc $2.034 / sq yd $ 50,850.00 TOWN OF NORTH ANDOVER INVITATION FOR BIDS ASPHALT CONCRETE EXCAVATION Contact Address Telephone Number: Fax Number: Email January 11, 2012 Ray Santilli Assistant Town Manager 120 Main Street North Andover, MA 01845 978-688-9516 978-688-9556 rsantilli@townofnorthandover.com Table of Contents 1. Introduction.......................................................... 3 2. Submission Deadline and Instructions ............................ 3 3. Questions, Addendum or Proposed Modifications .............. 4 4. Minimum Requirements ............................................. 5 5. Scope of Services...................................................... 5 6. Estimated Quantities ................................................ 6 7. Prevailing Wage Rates ............................................... 6 8. Payment Bond ....................................................... 6 9. Bid Deposit/Bond..................................................... 7 10. Evaluation of Bids .................................................. 7 11. Term of Contract ................................................... 7 Appendix A — Price Proposal ........................................ 8 Standard Town of North Andover Contract With Supplement "C" ............................................. 10 Certifications........................................................... 30 PaymentBond........................................................... 33 Prevailing Wage Rates ................................................. 34 Town of North Andover IFB Page 2 of 34 Asphalt Concrete Excavation 1. Introduction In accordance with M.G.L. c30 §39M, the Town of North Andover is soliciting bids from qualified contractors to perform asphalt concrete excavation by cold planer on Town owned asphalt pavement. Qualified contractors are requested to submit bids to the Assistant Town Manager at North Andover Town Hall, 120 Main Street, North Andover, MA, in accordance with the instructions contained within this Invitation for Bids. The Town of North Andover is seeking to award a one-year contract for the period of March 1, 2012 through February 28, 2013 with two (2) additional one-year renewals, solely at the discretion of the Town. The Town will provide written confirmation of renewal at least sixty (60) days prior to the end of the contract period. Notice of this IFB is published in the Central Register, which is a weekly publication of the Office of the Secretary of the Commonwealth, the Eagle -Tribune (a newspaper of general circulation) and posted on the Town website (www.townofnorthandover.com) under "Available Bids, Quotes and Proposals". The Town will accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on Thursday, February 2, 2012 to be considered. Proposals submitted by fax or by electronic mail will not be considered. All proposals must be submitted to: Mr. Ray Santilli, Assistant Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 The Town of North Andover may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the Town of North Andover. 2. Submission Deadline and Instructions Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed envelope marked "Asphalt Concrete Excavation" with the applicant's name and address on the front. Applicants should provide one (1) signed original proposal. Fax or electronic submissions will not be accepted. Applicants must also execute and include in the sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The Town of North Andover, through the Town Manager, is the awarding authority and reserves the right to reject any and all proposals or parts of proposals; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; and to award contracts or to cancel this Invitation for Bids if it is in the Town of North Andover's best interest to do so. Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if the bidder is a partnership, by the name of the partnership, followed by the signature of each Town of North Andover IFB Page 3 of 34 Asphalt Concrete Excavation general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed. All sealed proposals must be received and registered by the Assistant Town Manager's office by Thursday, February 2, 2012 at 2:002.m. All outer envelopes must be labeled "Asphalt Concrete Excavation" and mailed or hand delivered to the following address: Mr. Ray Santilli, Assistant Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 No proposals will be accepted after the time and date noted. Late delivery of materials due to any type of delivery system shall be cause for rejection. If on the date and time of the submittal deadline the North Andover Town Hall is closed due to an uncontrolled event such as fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the next normal business day. 3. Questions, Addendum or Proposal Modification Questions concerning this IFB must be submitted in writing to: Mr. Ray Santilli, Assistant Town Manager, 120 Main Street North Andover, MA 01845, or they may be emailed to Mr. Santilli at rsantilli@townofnorthandover.com. All questions/inquiries must be received by 4:30 p.m. on Tuesday, January 24, 2012 to be considered. Questions/inquiries may be delivered, mailed, emailed or faxed. Written responses will be posted on the Town's website (www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" by Thursday, January 26, 2012 at 2:00 p.m. If any changes are made to this IFB, an addendum will be posted on the Town's website in "Available Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence of any addenda and/or modifications issued by the Town. As this IFB has been published on the Town's website (www.townofnorthandover.com) all bidders are responsible for checking the website for any addenda and /or modifications that are subsequently made to this IFB. The Town accepts no liability for and will provide no accommodations to bidders who fail to check for amendments and/or modifications to this IFB and subsequently submit inadequate or incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any IFB component files. Modifications to the body of the IFB, Scope of Work, terms and conditions, or which change the intent of this IFB are prohibited and may disqualify a response. All proposals submitted in response to this IFB shall remain firm for sixty (60) days following the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days after the submittal deadline. Town of North Andover IFB Page 4 of 34 Asphalt Concrete Excavation Bidders are not to communicate directly with any employee of the Town of North Andover, except as specified in this IFB, and no other individual employee or representative is authorized to provide any information or respond to any question or inquiry concerning this IFB. Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the bidder is having trouble obtaining any part of the IFB electronically through the Town website (www.townofnorthandover.com), including, and without limitation the form and attachments. Bidder with disabilities or hardships that seek reasonable accommodations, which may include the receipt of IFB information and/or addenda and/or modifications in an alternative format, must communicate such requests in writing to the contact person, and reasonable accommodation will be made by agreement with the contact person on behalf of the Town of North Andover. 4. Minimum Requirements Each bidder must demonstrate that it meets the following minimum requirements: A. Contractor must demonstrate a minimum of five (5) years experience providing the services required in the Scope of Services. B. Contractor shall submit a complete list of all similar contracts performed in the past two (2) years with contact names and telephone numbers. C. The contractor shall furnish all labor, equipment, and vehicles as required for work in accordance with the scope of services. D. Unit price quoted shall include milling, loading, disposal, sweeping and final clean-up. E. The contractor shall conform to all requirements of federal, state and local laws, including compliance with the prevailing wage laws. F. Unit prices shall remain firm for the initial one-year period of the contract. G. Submission of required statements and forms. 5. Scope of Services The contractor shall be responsible for excavating asphalt concrete pavement by cold planer in designated areas to improve curb reveal and re -grade existing surfaces. Depth of planing shall average 2 inches. The Town will require a minimum quantity of 300 square yards per work order. The cold planer shall be capable of planing both asphalt concrete and Portland cement concrete patches if the latter should be encountered in asphalt pavements. The cold planer shall be equipped with all necessary safety devices such as flashing lights and back-up signals so as to operate safely in traffic. Town of North Andover IFB Page 5 of 34 Asphalt Concrete Excavation The cold planer shall be equipped with a cutter drum at least 72 inches wide with an elevating device capable of loading milled material directly into trucks while operating and with a dust control system capable of complying with environmental air quality standards. The contractor will be required to supply auxiliary milling equipment to clean up work along curbs and around castings. Work areas shall be left clean and free from debris at the end of each work day. The use of planing equipment mounted on pneumatic tires will be permitted only for clean-up work or in areas less the 10 feet wide. The contractor will be responsible for damage to existing castings resulting from his operation unless such castings have previously been paved over and are not visible on the surface and have not been marked out in the field by DPW personnel. The contractor may be required to mill as much as 100 feet from intersecting streets to provide proper transition. Loading, trucking, and disposal shall be the responsibility of the contractor. At specific times, the Town may have capacity at the Cyr Recycling Facility on Sharpener's Pond Road for disposal. An alternate pricing proposal is being requested in that event. In most instances, the contractor will be required to dispose of the millings. The Town reserves the right to salvage any material such as granite, brick, or millings. The Town will arrange and pay for all required police details. The Town will provide all necessary barricades, signs and cones for road closures and detours. The contractor will provide cones and barricades for traffic lane control. 6. Estimated Quantities The hours required listed in Appendix A are simply estimates for bid purposes only. The Town will not be obligated to commit to any specific quantity of hours during the period of the contract. 7. Prevailing Wage Rates The successful bidder will at all times comply with the prevailing wage rates as determined by the Department of Labor Standards under the provisions of Massachusetts General Laws as shall be in force and as amended. The prevailing wage rates are attached. 8. Payment Bond Upon award of the contract, the successful bidder shall provide a payment bond in the amount of 50% of the total projected cost of the contract for the first year. The payment bond must be on the Town's form that is attached. Town of North Andover IFB Page 6 of 34 Asphalt Concrete Excavation 9. Bid Deposit/Bond In accordance with M.G.L c30 §39M, all bidders are required to submit a 5% bid deposit/bond of the value bid for the first year of the contract. 10. Evaluation of Bids Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility of the bidder will then be ascertained. Finally, the aggregate price for the services delivered in the base bid only by each responsive and responsible bidder will be calculated for the first year solely of the proposed contract. The Town is required to award the contract to the lowest responsive and responsible bidder. ■ Responsiveness Bidders must completely fill out and submit the bid form and all other required forms. All supplies and services that are the subject of the bid must meet the minimum standards and scope of services set forth in the purchase description including the standards by which the procurement officer will determine acceptability as to quality, workmanship, results of inspections and tests, and suitability for a particular purpose. ■ Responsibility Bidders must demonstrate that they meet measures of responsibility. The Town will not award a contract to any bidder who cannot furnish satisfactory evidence of his ability and experience in this type of work and that he has sufficient plant and capital to enable him to prosecute and complete the work as outlined in the Scope of Services. The Town may make such investigations as it deems necessary to determine the above and a bidder shall furnish any information requested in this regard. All costs not listed on the bid price sheet will not be considered part of the contract and therefore will not be paid. The Town of North Andover will not be charged fuel surcharges or administrative fees as part of any contract entered into as a result of this IFB. Additionally the Town of North Andover will not be charged late fees unless payment is not made within sixty (60) days of the receipt of invoice. The Town of North Andover is a tax exempt entity so no sales tax will be assessed to any purchases made under this proposed contract. 11. Term of Contract The Town of North Andover is seeking to award a one-year contract with two (2) additional one- year renewals, solely at the discretion of the Town. The Town will provide written confirmation of renewal at least sixty (60) days prior to the end of the contract period. Town of North Andover IFB Page 7 of 34 Asphalt Concrete Excavation APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price in the base bid only for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. March 1, 2012 through February 28, 2013 uantit Unit Price Total Price Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds $ /sq yd $ Excavate, load and dispose of millings by contractor 15,000 sq yds $ /sq yd $ Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ /sq yd $ TOTAL $ March 1, 2013 through February 28, 2014 Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds $ /sq yd $ Alternate Bid Excavate, load and dispose of millings by contractor 15,000 sq yds $ /sq yd $ Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ /sq yd $ TOTAL $ Town of North Andover IFB Page 8 of 34 Asphalt Concrete Excavation March 1, 2014 through February 28, 2015 Base Bid Excavate, load and dispose of millings by contractor 25,000 sq yds $ /sq yd Excavate, load and dispose of millings by contractor 15,000 sq yds $ /sq yd Excavate, load and dispose of millings at Cyr Recycling 10,000 sq yds $ /sq yd TOTAL Addenda Business Name Business Address Business Phone are acknowledged: Signature Fax Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person Town of North Andover IFB Page 9 of 34 Asphalt Concrete Excavation Town of North Andover CONTRACT CONTRACT# DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Address: Telephone Number: _ Fax Number: 1. This is a Contract for the procurement of the following: 2. The Contract price to be paid to the Contractor by the Town of North Andover is: 3. Payment will be made as follows: 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. Town of North Andover IFB Page 10 of 34 Asphalt Concrete Excavation 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before , unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. Town of North Andover IFB Page 11 of 34 Asphalt Concrete Excavation 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default: 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall Town of North Andover IFB Page 12 of 34 Asphalt Concrete Excavation have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall Town of North Andover IFB Page 13 of 34 Asphalt Concrete Excavation protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest: Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it or its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability gainst the Town: This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other Town of North Andover IFB Page 14 of 34 Asphalt Concrete Excavation instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. Town of North Andover IFB Page 15 of 34 Asphalt Concrete Excavation The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkegping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. PqMent The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. Town of North Andover IFB Page 16 of 34 Asphalt Concrete Excavation 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. Town of North Andover IFB Page 17 of 34 Asphalt Concrete Excavation 28. Supplemental Conditions: The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 3013) [ ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction Town of North Andover IFB Page 18 of 34 Asphalt Concrete Excavation IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN Division/Department Head Contract Manager Town Manager Date APPROVED AS TO FORM: Town Counsel Date THE CONTRACTOR Company Name Signature Print Name & Title CERTIFICATION AS TO AVAILABILITY OF FUNDS: Town Accountant Town of North Andover IFB Asphalt Concrete Excavation Date Date Page 19 of 34 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of: (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) 1. This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. 3. EgualitX: 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. 6. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property, from injury or loss arising Town of North Andover IFB Page 20 of 34 Asphalt Concrete Excavation in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. Town of North Andover IFB Page 21 of 34 Asphalt Concrete Excavation 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. Town of North Andover IFB Page 22 of 34 Asphalt Concrete Excavation In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Progress ss Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of - 18.1.1. £ 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. Town of North Andover IFB Page 23 of 34 Asphalt Concrete Excavation 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance Town of North Andover IFB Page 24 of 34 Asphalt Concrete Excavation of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or Town of North Andover IFB Page 25 of 34 Asphalt Concrete Excavation any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: Town of North Andover IFB Page 26 of 34 Asphalt Concrete Excavation Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's Town of North Andover IFB Page 27 of 34 Asphalt Concrete Excavation operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's Town of North Andover IFB Page 28 of 34 Asphalt Concrete Excavation obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: The Town of North Andover by: Town Manager Department/Division Head Town Accountant Certified as to Appropriation Town Counsel Certified as to Form The Contractor by: Authorized Signature Town of North Andover IFB Asphalt Concrete Excavation Page 29 of 34 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Print Name & Title Date Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I authorized signatory for Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature Town of North Andover IFB Asphalt Concrete Excavation Date Page 30 of 34 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Print Name & Title Town of North Andover IFB Asphalt Concrete Excavation Date Company Name Page 31 of 34 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon that I hereby certify that I am the clerk of the above named and is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 32 of 34 Asphalt Concrete Excavation PAYMENT BOND I.4 4\• KNOW ALL MEN BY THESE PRESENTS, that we with a place of business at , as Principal (the "Principal"), and a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of for the construction of NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL SURETY [Name and Seal] [Title] Attest: [Attorney-in-fact] [Seal] [Address] [Phone] Attest: Town of North Andover IFB Page 33 of 34 Asphalt Concrete Excavation Prevailing Wage Rates Town of North Andover IFB Page 34 of 34 Asphalt Concrete Excavation Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS se EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT I DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK G -or As determined by the Director under the provisions of the JOANNE F. �GOLDSTEIN az3' TIMOTHY P. MURRAY U. Governor Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.85 $8.56 $7.27 $0.00 $45.68 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.15 $8.56 $7.27 $0.00 $45.98 08/01/2012 $30.15 $8.91 $7.27 $0.00 $46.33 12/01/2012 $30.45 $8.91 $8.00 $0.00 $47.36 (3 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.92 $8.56 $7.27 $0.00 $45.75 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.22 $8.56 $7.27 $0.00 $46.05 08/01/2012 $30.22 $8.91 $7.27 $0.00 $46.40 12/01/2012 $30.52 $8.91 $8.00 $0.00 $47.43 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2011 $30.04 $8.56 $7.27 $0.00 $45.87 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.34 $8.56 $7.27 $0.00 $46.17 08/01/2012 $30.34 $8.91 $7.27 $0.00 $46.52 12/01/2012 $30.64 $9.07 $8.00 $0.00 $47.71 ADS/SUBMERSIBLE PILOT 08/01/2011 $82.60 $8.08 $17.12 $0.00 $107.80 PILE DRIVER LOCAL 56 (ZONE 1) AIR TRACK OPERATOR 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS-ZONE2 ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2011 $28.40 $9.90 $5.95 $0.00 $44.25 ASBESTOS WORKERS LOCAL 6 (BOSTON) ASPHALT RAKER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS -7.ONE2 ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 1 of 56 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS u Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Secretary TIMOTriYP. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE U. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS - ZONE 2 Unemployment BACKHOE/FRONT-END LOADER 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 $0.00 $55.85 BOILERMAKERS LOCAL 29 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 Effective Date - 01/01/2010 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 Apprentice Base Wage 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 $6.97 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 BARCO-TYPE JUMPING TAMPER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 BLOCK PAVER, RAMMER / CURB SETTER 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS - ZONE 2 BOILER MAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 BOILERMAKERS LOCAL 29 Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 ---------------------------- Notes: I �-- Apprentice to Journeyworker Ratio:] :5 -------.,_,_-.�._....._._......�___.---- This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 2 of 56 Awarding Authority: THE COMMONWEALTH OF MASSACHUSETTS u EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT City/Town: DEPARTMENT OF LABOR STANDARDS Description of Work: Prevailing Wage Rates DEVAL L. PATRICK Goor vern As determined by the Director under the provisions of the JOANNE F. eGOLDSTEIN TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover $9.93 Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations $54.38 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $16.51 $0.00 Unemployment BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2011 $46.56 $9.93 $16.51 $0.00 $73.00 WATERPROOFING) 02/01/2012 $47.55 $9.93 $16.51 $0.00 $73.99 BRICKLAYERS LOCAL 3 (LYNN) 5 90 $41.90 Apprentice- BRICK/PLASTERICEMENT MASON -Local 3 Lynn Effective Date- 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.28 $9.93 $16.51 $0.00 $49.72 2 60 $27.94 $9.93 $16.51 $0.00 $54.38 3 70 $32.59 $9.93 $16.51 $0.00 $59.03 4 80 $37.25 $9.93 $16.51 $0.00 $63.69 5 90 $41.90 $9.93 $16.51 $0.00 $68.34 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.78 $9.93 $16.51 $0.00 $50.22 2 60 $28.53 $9.93 $16.51 $0.00 $54.97 3 70 $33.29 $9.93 $16.51 $0.00 $59.73 4 80 $38.04 $9.93 $16.51 $0.00 $64.48 5 90 $42.80 $9.93 $16.51 $0.00 $69.24 -._.._- ..__.--------.____.----------- Notes: - --------------------- Apprentice to Journeyworker Ratiwi.5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 3 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS a Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNEs reGOLDSTEIN vern Goor ry TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/ own: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BULLDOZER/GRADER/SCRAPER 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 CAISSON & UNDERPINNING BOTTOM MAN 12/01/2011 $32.80 $7.10 $12.60 $0.00 $52.50 LABORERS - FOUNDATIONAND MARINE CAISSON & UNDERPINNING LABORER 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDATIONAND MARINE CAISSON & UNDERPINNING TOP MAN 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDATIONAND MARINE CARBIDE CORE DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 CARPENTER 09/01/2011 $32.05 $9.80 $15.51 $0.00 $57.36 CARPENTERS -ZONE 2 (Eastern Massachuse[ls) 03/01/2012 $33.17 $9.80 $15.51 $0.00 $58.48 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 4 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS a Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H xEATaERE. RowE LL Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern MA Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.03 $9.80 $1.57 $0.00 $27.40 2 60 $19.23 $9.80 $1.57 $0.00 $30.60 3 70 $22.44 $9.80 $10.80 $0.00 $43.04 4 75 $24.04 $9.80 $10.80 $0.00 $44.64 5 80 $25.64 $9.80 $12.37 $0.00 $47.81 6 80 $25.64 $9.80 $12.37 $0.00 $47.81 7 90 $28.85 $9.80 $13.94 $0.00 $52.59 8 90 • $28.85 $9.80 $13.94 $0.00 $52.59 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.59 $9.80 $1.57 $0.00 $27.96 2 60 $19.90 $9.80 $1.57 $0.00 $31.27 3 70 $23.22 $9.80 $10.80 $0.00 $43.82 4 75 $24.88 $9.80 $10.80 $0.00 $45.48 5 80 $26.54 $9.80 $12.37 $0.00 $48.71 6 80 $26.54 $9.80 $12.37 $0.00 $48.71 7 90 $29.85 $9.80 $13.94 $0.00 $53.59 8 90 $29.85 $9.80 $13.94 $0.00 $53.59 Notes: Apprentice to Journeyworker Ratio:1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 1.00 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 5 of 56 THE COMMONWEALTH OF MASSACHUSETTS sr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. rGOLDSTEIN Governor ary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perforin asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CEMENT MASONRY/PLASTERING 08/01/2011 $44.33 $9.93 $16.51 $0.00 $70.77 BRICKLAYERS LOCAL 3 (LYNN) 02/01/2012 $45.10 $9.93 $16.51 $0.00 $71.54 CHAIN SAW OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2011 $40.52 $10.00 $12.40 $0.00 $62.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $41.09 $10.00 $12.40 $0.00 $63.49 12/01/2012 $41.71 $10.00 $12.40 $0.00 $64.11 06/01/2013 $42.49 $10.00 $12.40 $0.00 $64.89 12/01/2013 $43.27 $10.00 $12.40 $0.00 $65.67 COMPRESSOR OPERATOR 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 DELEADER (BRIDGE) 01/01/2012 $44.01 $7.80 $14.60 $0.00 $66.41 PAINTERS LOCAL 35 - ZONE 2 07/01/2012 $45.01 $7.80 $14.60 $0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 $0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS atwww.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 6 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 55 Prevailing Wage Rates DEVAL L. PATRICK GovernorSmretaty As determined by the Director under the provisions of the JOANNE F. GOLDSTE N TIMOTHY P. MURRAY Lt. Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHERS. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 $0.00 $0.00 $29.81 2 55 $24.21 $7.80 $3.25 $0.00 $35.26 3 60 $26.41 $7.80 $3.54 $0.00 $37.75 4 65 $28.61 $7.80 $3.84 $0.00 $40.25 5 70 $30.81 $7.80 $12.83 $0.00 $51.44 6 75 $33.01 $7.80 $13.13 $0.00 $53.94 7 80 $35.21 $7.80 $13.42 $0.00 $56.43 8 90 $39.61 $7.80 $14.01 $0.00 $61.42 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.25 $0.00 $35.81 3 60 $27.01 $7.80 $3.54 $0.00 $38.35 4 65 $29.26 $7.80 $3.84 $0.00 $40.90 5 70 $31.51 $7.80 $12.83 $0.00 $52.14 6 75 $33.76 $7.80 $13.13 $0.00 $54.69 7 80 $36.01 $7.80 $13.42 $0.00 $57.23 8 90 $40.51 $7.80 $14.01 $0.00 $62.32 ----------------------------- . .--,----..-------e._-------------___..-Notes: Notes: Steps are 750 hrs. i A_ppre.ce to Jo_urn_wo-rke-r Ra-tio:l-----------_----® -- - -i This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 7 of 56 k DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN �Y Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS - ZONE 2 DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS-7.0NE2 Apprentice - LABORER Demo Backhoe/Loader/Hammer Operator Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.68 $7.10 $12.45 $0.00 $39.23 2 70 $22.96 $7.10 $12.45 $0.00 $42.51 3 80 $26.24 $7.10 $12.45 $0.00 $45.79 4 90 $29.52 $7.10 $12.45 $0.00 $49.07 ------..,..._---,.._--------------_m,--- Notes: { --- .--urn_ . ._....------- Apprentice to Journeyworker Ratio:l:5 - - - _... - - - - ____ DEMO: BURNERS 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS-ZONE2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 8 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W) DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN G-or TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER Demo Burners Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.53 $7.10 $12.45 $0.00 $39.08 2 70 $22.79 $7.10 $12.45 $0.00 $42.34 3 80 $26.04 $7.10 $12.45 $0.00 $45.59 4 90 $29.30 $7.10 $12.45 $0.00 $48.85 ----------------------------- ---------------------------_.-.._,Notes: Notes: '--____--_..----------------_--_-.__._.__ Apprentice to Journeyworker Ratio: 1:5 DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS-ZONF2 DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS - ZONE 2 DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS-7.0NE2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 9 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOvLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER Demo Wrecking Laborer 12/01/2011 $39.16 $10.00 $12.40 $0.00 Effective Date - 12/01/2011 OPERATING ENGINEERS LOCAL 4 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.08 $7.10 $12.45 $0.00 $38.63 2 70 $22.26 $7.10 $12.45 $0.00 $41.81 3 80 $25.44 $7.10 $12.45 $0.00 $44.99 4 90 $28.62 $7.10 $12.45 $0.00 $48.17 -.._....._.-----_.._---._.__..-_._..---------.._---- Notes: DIVER 08/01/2011 $55.07 $8.08 $17.12 _.---___.-------------�--.�_..... Apprentice to Journeyworker Ratio:l:5 $80.27 PILE DIUVFI? LOCAL 56 (ZONE 1) DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 DIVER 08/01/2011 $55.07 $8.08 $17.12 $0.00 $80.27 PILE DIUVFI? LOCAL 56 (ZONE 1) DIVER TENDER 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVE]? LOCAL 56 (ZONE I) DIVER TENDER (EFFLUENT) 08/01/2011 $60.18 $8.08 $17.12 $0.00 $85.38 PILE DRIVER LOCAL 56 (ZONE 1) DIVER/SLURRY (EFFLUENT) 08/01/2011 $82.60 $8.08 $17.12 $0.00 $107.80 PILE DRIVER LOCAL 56 (ZONE 1) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 10 of 56 doll THE COMMONWEALTH OF MASSACHUSETTS u EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT 1 DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ELECTRICIAN 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 11 of 56 THE COMMONWEALTH OF MASSACHUSETTS si EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor secretary TIMOTHY P'MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICIAN- Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.76 $13.00 $7.80 $0.00 $37.56 2 40 $16.76 $13.00 $7.80 $0.00 $37.56 3 45 $18.85 $13.00 $10.26 $0.00 $42.11 4 45 $18.85 $13.00 $10.26 $0.00 $42.11 5 50 $20.95 $13.00 $10.58 $0.00 $44.53 6 55 $23.04 $13.00 $10.91 $0.00 $46.95 7 60 $25.13 $13.00 $11.23 $0.00 $49.36 8 65 $27.23 $13.00 $11.57 $0.00 $51.80 9 70 $29.32 $13.00 $11.89 $0.00 $54.21 10 75 $31.42 $13.00 $12.22 $0.00 $56.64 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.95 $13.00 $7.81 $0.00 $37.76 2 40 $16.95 $13.00 $7.81 $0.00 $37.76 3 45 $19.07 $13.00 $10.26 $0.00 $42.33 4 45 $19.07 $13.00 $10.26 $0.00 $42.33 5 50 $21.19 $13.00 $10.59 $0.00 $44.78 6 55 $23.30 $13.00 $10.92 $0.00 $47.22 7 60 $25.42 $13.00 $11.24 $0.00 $49.66 8 65 $27.54 $13.00 $11.58 $0.00 $52.12 9 70 $29.66 $13.00 $11.90 $0.00 $54.56 10 75 $31.78 $13.00 $12.23 $0.00 $57.01 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 12 of 56 s7 a DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN S u3' Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Various Locations Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment - - - - - - - - - - - - - - - - - fNotes:: App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 - -------------_.._._......-- Apprentice to Journeyworker Ratio.i.3*** ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 ELEVATOR CONSTRUCTORS LOCAL 4 Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 ..-.---_..,...®__.-----------._.-----...._..._._-- ----------------------------- Notes: Notes: [ Steps 1-2 are 6 mos.; Steps 3-5 are 1 year i -��-_ ---------------------------- Apprentice to Journeyworker Ratio:1:l -- ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 ELEVATOR CONSTRUCTORS LOCAL 4 FENCE & GUARD RAIL ERECTOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 1.3 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perforin asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $37.49 $10.00 $12.20 $0.00 $59.69 OPERATING ENGINEERS LOCAL 4 05/01/2012 $38.10 $10.00 $12.20 $0.00 $60.30 11/01/2012 $38.71 $10.00 $12.20 $0.00 $60.91 05/01/2013 $39.32 $10.00 $12.20 $0.00 $61.52 11/01/2013 $40.08 $10.00 $12.20 $0.00 $62.28 05/01/2014 $40.85 $10.00 $12.20 $0.00 $63.05 FIELD ENGTARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2011 $38.88 $10.00 $12.20 $0.00 $61.08 OPERATING ENGINEERS LOCAL 4 05/01/2012 $39.49 $10.00 $12.20 $0.00 $61.69 11/01/2012 $40.11 $10.00 $12.20 $0.00 $62.31 05/01/2013 $40.73 $10.00 $12.20 $0.00 $62.93 11/01/2013 $41.50 $10.00 $12.20 $0.00 $63.70 05/01/2014 $42.27 $10.00 $12.20 $0.00 $64.47 FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $20.91 $10.00 $12.20 $0.00 $43.11 OPERATING ENGINEERS LOCAL 4 05/01/2012 $21.27 $10.00 $12.20 $0.00 $43.47 11/01/2012 $21.63 $10.00 $12.20 $0.00 $43.83 05/01/2013 $21.99 $10.00 $12.20 $0.00 $44.19 11/01/2013 $22.45 $10.00 $12.20 $0.00 $44.65 05/01/2014 $22.90 $10.00 $12.20 $0.00 $45.10 FIRE ALARM INSTALLER 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 14 of 56 THE COMMONWEALTH OF MASSACHUSETTS a EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PAMCR As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN ernor Gov TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. G-or Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FIRE ALARM REPAIR / MAINTENANCE 09/01/2011 $31.42 $13.00 $12.22 $0.00 $56.64 / COMMISSIONINGELECTRICL4Ns 03/01/2012 $31.78 $13.00 $12.23 $0.00 $57.01 LOCAL 103 09/01/2012 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 $0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 $0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 $0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 $0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 $0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 $0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 $0.00 $61.72 FIREMAN (ASST. ENGINEER) 12/01/2011 $33.23 $10.00 $12.40 $0.00 $55.63 OPERATING ENGINEERS LOCAL 4 06/01/2012 $33.70 $10.00 $12.40 $0.00 $56.10 12/01/2012 $34.23 $10.00 $12.40 $0.00 $56.63 06/01/201.3 $34.88 $10.00 $12.40 $0.00 $57.28 12/01/2013 $35.54 $10.00 $12.40 $0.00 $57.94 FLAGGER & SIGNALER 12/01/2011 $20.50 $7.10 $11.55 $0.00 $39.15 LABORERS - ZONE 2 FLOORCOVERER 09/01/2011 $35.95 $9.80 $16.61 $0.00 $62.36 FLOORCOVERERS LOCAL 1168 ZONE] 03/01/2012 $37.20 $9.80 $16.61 $0.00 $63.61 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 15 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: THE COMMONWEALTH OF MASSACHUSETTS sY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS ;t Prevailing Wage Rates DEVAL L. PATRICK Governer As determined by the Director under the provisions of the JOANNE s .rGOLDSTEIN TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations $9.80 $1.79 $0.00 $30.19 2 55 Classification $9.80 Effective Date Base Wage Health Pension Supplemental Total Rate $9.80 $11.24 $0.00 $43.36 4 65 Unemployment Apprentice- FLOORCOVERER -Local 2168 Zone I $0.00 $45.22 5 70 $26.04 Effective Date - 09/01/2011 $13.03 $0.00 $48.87 Supplemental $27.90 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.98 $9.80 $1.79 $0.00 $29.57 2 55 $19.77 $9.80 $1.79 $0.00 $31.36 3 60 $21.57 $9.80 $11.24 $0.00 $42.61 4 65 $23.37 $9.80 $11.24 $0.00 $44.41 5 70 $25.17 $9.80 $13.03 $0.00 $48.00 6 75 $26.96 $9.80 $13.03 $0.00 $49.79 7 80 $28.76 $9.80 $14.82 $0.00 $53.38 8 85 $30.56 $9.80 $14.82 $0.00 $55.18 Effective Date- 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.60 $9.80 $1.79 $0.00 $30.19 2 55 $20.46 $9.80 $1.79 $0.00 $32.05 3 60 $22.32 $9.80 $11.24 $0.00 $43.36 4 65 $24.18 $9.80 $11.24 $0.00 $45.22 5 70 $26.04 $9.80 $13.03 $0.00 $48.87 6 75 $27.90 $9.80 $13.03 $0.00 $50.73 7 80 $29.76 $9.80 $14.82 $0.00 $54.38 8 85 $31.62 $9.80 $14.82 $0.00 $56.24 ..-...------------__,._...._----__.__..----_---t Notes: f Steps are 750 hrs. I AApp-ren_ice i0_Jo-neyeywo_rke-r Ra-tio:l----------_------- _ This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 16 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK overn Gor As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN �Y TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FORK LIFT/CHERRY PICKER 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 GENERATOR/LIGHTING PLANTMEATERS 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 GLAZIER (GLASS PLANK/AIR BARRIER/1NTERIOR 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91 SYSTEMS) GLA7.IERSLOCAL 35(ZONE 2) 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 17 of 56 THE COMMONWEALTH OF MASSACHUSETTS u EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNEF. SGOLDSTEIN GO-GO TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- GLAZIER - Local 35 Zone 2 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.76 $7.80 $0.00 $0.00 $24.56 2 55 $18.43 $7.80 $3.25 $0.00 $29.48 3 60 $20.11 $7.80 $3.54 $0.00 $31.45 4 65 $21.78 $7.80 $3.84 $0.00 $33.42 5 70 $23.46 $7.80 $12.83 $0.00 $44.09 6 75 $25.13 $7.80 $13.13 $0.00 $46.06 7 80 $26.81 $7.80 $13.42 $0.00 $48.03 8 90 $30.16 $7.80 $14.01 $0.00 $51.97 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 $0.00 $0.00 $25.06 2 55 $18.98 $7.80 $3.25 $0.00 $30.03 3 60 $20.71 $7.80 $3.54 $0.00 $32.05 4 65 $22.43 $7.80 $3.84 $0.00 $34.07 5 70 $24.16 $7.80 $12.83 $0.00 $44.79 6 75 $25.88 $7.80 $13.13 $0.00 $46.81 7 80 $27.61 $7.80 $13.42 $0.00 $48.83 8 90 $31.06 $7.80 $14.01 $0.00 $52.87 ---_-----------..._------- ---._....-........, Notes: g Steps are 750 hrs. E Apprentice to Journeyworker Ratio:1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 18 of 56 THE COMMONWEALTH OF MASSACHUSETTS Q) EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor e ar5' TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification HOISTING ENGINEER/CRANES/GRADALLS OPERATING ENGINEERS LOCAL 4 Effective Date Base Wage Health 12/01/2011 $39.52 $10.00 06/01/2012 $40.09 $10.00 12/01/2012 $40.71 $10.00 06/01/2013 $41.49 $10.00 12/01/2013 $42.27 $10.00 Pension Supplemental Total Rate $12.40 $0.00 $61.92 $1.2.40 $0.00 $62.49 $12.40 $0.00 $63.11 $12.40 $0.00 $63.89 $12.40 $0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 19 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- HOIST/PORT. ENG.- Local 4 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 THE COMMONWEALTH OF MASSACHUSETTS sc EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS a Prevailing Wage Rates DEVALL. PATRICK Goor vern As determined by the Director under the provisions of the JOANNE F. roGOLDSTEIN TIMOTHY P. MURRAY Lt. Gocemor Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- HOIST/PORT. ENG.- Local 4 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $21.74 $10.00 $0.00 $0.00 $31.74 2 60 $23.71 $10.00 $12.40 $0.00 $46.11 3 65 $25.69 $10.00 $12.40 $0.00 $48.09 4 70 $27.66 $10.00 $12.40 $0.00 $50.06 5 75 $29.64 $10.00 $12.40 $0.00 $52.04 6 80 $31.62 $10.00 $12.40 $0.00 $54.02 7 85 $33.59 $10.00 $12.40 $0.00 $55.99 8 90 $35.57 $10.00 $12.40 $0.00 $57.97 Effective Date - 06/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.05 $10.00 $0.00 $0.00 $32.05 2 60 $24.05 $10.00 $12.40 $0.00 $46.45 3 65 $26.06 $10.00 $12.40 $0.00 $48.46 4 70 $28.06 $10.00 $12.40 $0.00 $50.46 5 75 $30.07 $10.00 $12.40 $0.00 $52.47 6 80 $32.07 $10.00 $12.40 $0.00 $54.47 7 85 $34.08 $10.00 $12.40 $0.00 $56.48 8 90 $36.08 $10.00 $12.40 $0.00 $58.48 Notes: Apprentice to Journeyworker Ratio:1:6 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 20 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations THE COMMONWEALTH OF MASSACHUSETTS u EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. GOLDSTEM Secretary TIMOTHY P. MURRAY L1. Go -or Massachusetts General Laws, Chapter 149, Sections 26 to 27H t-EAT13ERE. RowE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment HVAC (DUCTWORK) 08/01/2011 $39.83 $9.82 $17.09 $2.00 $68.74 SHEETMETAL WORKERS LOCAL 17 -A 02/01/2012 $40.79 $9.82 $17.34 $2.04 $69.99 08/01/2012 $42.04 $9.82 $17.34 $2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 $2.11 $72.56 HVAC (ELECTRICAL CONTROLS) 09/01/2011 $41.89 $13.00 $13.86 $0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 $0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 $0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 $0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 $0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 $0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 $0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 $0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 $0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 $0.00 $75.52 HVAC (TESTING AND BALANCING - AIR) 08/01/2011 $39.83 $9.82 $17.09 $2.00 $68.74 SHEETMETAL WORKERS LOCAL I7 -A 02/01/2012 $40.79 $9.82 $17.34 $2.04 $69.99 08/01/2012 $42.04 $9.82 $17.34 $2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 $2.11 $72.56 HVAC (TESTING AND BALANCING -WATER) 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) 03/01./2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HVAC MECHANIC 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 HYDRAULIC DRILLS 12/01/2011 $30.10 $7.10 $11.55 $0.00 $48.75 LABORERS - 70NE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 021.08; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 21 of 56 THE COMMONWEALTH OF MASSACHUSETTS WA EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN 0- TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perforin asphalt concrete excavation by cold planer Job Location: Various Locations Classification INSULATOR (PIPES & TANKS) ASBESTOS WORKERS LOCAL 6 (BOSTON) Effective Date Base Wage Health 09/01/2011 $40.66 $10.40 09/01/2012 $42.06 $10.40 09/01/2013 $43.66 $10.40 09/01/2014 $45.66 $10.40 Pension Supplemental Total Rate $11.20 $0.00 $62.26 $11.20 $0.00 $63.66 $11.20 $0.00 $65.26 $11.20 $0.00 $67.26 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston $21.03 $10.40 $8.30 Effective Date - 09/01/2011 $39.73 2 60 $25.24 Supplemental $8.88 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.33 $10.40 $8.30 $0.00 $39.03 2 60 $24.40 $10.40 $8.88 $0.00 $43.68 3 70 $28.46 $10.40 $9.46 $0.00 $48.32 4 80 $32.53 $10.40 $10.04 $0.00 $52.97 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.03 $10.40 $8.30 $0.00 $39.73 2 60 $25.24 $10.40 $8.88 $0.00 $44.52 3 70 $29.44 $10.40 $9.46 $0.00 $49.30 4 80 $33.65 $10.40 $10.04 $0.00 $54.09 -----__._-----------------__..-------+ Notes: y 1 Steps are 1 year Apprentice to Journeyworker Ratio:1:4 IRONWORKER/WELDER 09/16/2011 $32.87 $7.70 $17.95 $0.00 $58.52 IRONWORKERS LOCAL 7 (LAWRENCE AREA) 03/16/2012 $33.87 $7.70 $17.95 $0.00 $59.52 09/16/2012 $34.87 $7.70 $17.95 $0.00 $60.52 03/16/2013 $36.12 $7.70 $17.95 $0.00 $61.77 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 22 of 56 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. rGOLDSTEIN Go error �v TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER. Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - IRONWORKER - Local 7 Lawrence Effective Date - 09/16/2011 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 60 $19.72 $7.70 $17.95 $0.00 $45.37 2 70 $23.01 $7.70 $17.95 $0.00 $48.66 3 75 $24.65 $7.70 $17.95 $0.00 $50.30 4 80 $26.30 $7.70 $17.95 $0.00 $51.95 5 85 $27.94 $7.70 $17.95 $0.00 $53.59 6 90 $29.58 $7.70 $17.95 $0.00 $55.23 Effective Date - 03/16/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.32 $7.70 $17.95 $0.00 $45.97 2 70 $23.71 $7.70 $17.95 $0.00 $49.36 3 75 $25.40 $7.70 $17.95 $0.00 $51.05 4 80 $27.10 $7.70 $17.95 $0.00 $52.75 5 85 $28.79 $7.70 $17.95 $0.00 $54.44 6 90 $30.48 $7.70 $17.95 $0.00 $56.13 ------------------_._.-_._..- ----- Notes: Structural 1:6; Ornamental 1:4 Apprentice to Journeyworker Ratio: JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - 70NE 2 LABORER LABORERS-ZONE2 12/01/2011 $29.35 $7.10 $11.55 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $48.00 Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 23 of 56 THE COMMONWEALTH OF MASSACHUSETTS se EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS a, Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.61 $7.10 $11.55 $0.00 $36.26 2 70 $20.55 $7.10 $11.55 $0.00 $39.20 3 80 $23.48 $7.10 $11.55 $0.00 $42.13 4 90 $26.42 $7.10 $11.55 $0.00 $45.07 ----------------------------- Notes: LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 ----------------------------- Apprentice to Journeyworker Ratio:1:5 $7.10 $11.55 $0.00 $48.00 LABORERS -7.ONE2 LABORER: CARPENTER TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS -7.ONE2 LABORER: CEMENT FINISHER TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - 70NE 2 LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS -7.ONE2 LABORER: MASON TENDER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - 70NE 2 LABORER: MULTI -TRADE TENDER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS -7ONE2 LABORER: TREE REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 L4BORERS-7.ONE,2 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. LASER BEAM OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 24 of 56 Awarding Authority: Town of North Andover THE COMMONWEALTH OF MASSACHUSETTS $9.93 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT City/Town: DEPARTMENT OF LABOR STANDARDS Description of Work: Asphalt Concrete Excavation Works - Contractor to perforin asphalt concrete excavation by cold planer Prevailing Wage Rates DEVAL L. PATRICK Govemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H Lt. Governor I>EATrtER E. RowE Director Awarding Authority: Town of North Andover $17.76 $9.93 Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perforin asphalt concrete excavation by cold planer Job Location: Various Locations $9.93 $15.50 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $24.86 $9.93 Unemployment MARBLE & TILE FINISHERS 08/01/2011 $35.52 $9.93 $15.50 $0.00 $60.95 BRICKLAYERS LOCAL 3 - MARBLE & TILE $9.93 $15.50 $0.00 02/01/2012 $36.31 $9.93 $15.50 $0.00 $61.74 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.76 $9.93 $15.50 $0.00 $43.19 2 60 $21.31 $9.93 $15.50 $0.00 $46.74 3 70 $24.86 $9.93 $15.50 $0.00 $50.29 4 80 $28.42 $9.93 $15.50 $0.00 $53.85 5 90 $31.97 $9.93 $15.50 $0.00 $57.40 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.16 $9.93 $15.50 $0.00 $43.59 2 60 $21.79 $9.93 $15.50 $0.00 $47.22 3 70 $25.42 $9.93 $15.50 $0.00 $50.85 4 80 $29.05 $9.93 $15.50 $0.00 $54.48 5 90 $32.68 $9.93 $15.50 $0.00 $58.11 ----------------------------- Notes: Steps are 800 hrs. Z orker Ratio:l:3 Apprentice Journeyw MARBLE MASONS,TILELAYERS & TERRAZZO MECH 08/01/2011 $46.60 $9.93 $16.51 $0.00 $73.04 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2012 $47.59 $9.93 $16.51 $0.00 $74.03 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 25 of 56 Awarding Authority: Town of North Andover Contract Number: City/ own: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & The Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $9.93 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 60 Prevailing Wage Rates DEVALL. PATRICK Go-or Asdetermined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Lt. Go-or Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/ own: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & The Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.30 $9.93 $16.51 $0.00 $49.74 2 60 $27.96 $9.93 $16.51 $0.00 $54.40 3 70 $32.62 $9.93 $16.51 $0.00 $59.06 4 80 $37.28 $9.93 $16.51 $0.00 $63.72 5 90 $41.94 $9.93 $16.51 $0.00 $68.38 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.80 $9.93 $16.51 $0.00 $50.24 2 60 $28.55 $9.93 $16.51 $0.00 $54.99 3 70 $33.31 $9.93 $16.51 $0.00 $59.75 4 80 $38.07 $9.93 $16.51 $0.00 $64.51 5 90 $42.83 $9.93 $16.51 $0.00 $69.27 _ - - - - - ___ ____ ____ - _ - Notes: - - _ ____ __ __ - - _ ._._ _ - ___ - _. � ._._ '-__ Tice_----.----_____--___�..-__.__-_ Apprentto Journeyworker Ratio:l:3 MECH. SWEEPER OPERATOR (NON -CONSTRUCTION) 07/01/2011 $24.80 $5.49 $0.00 $0.00 $30.29 SWF.FPF.R LOCAL 25 (NON -CONSTRUCTION) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 26 of 56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 27 of 56 THE COMMONWEALTH OF MASSACHUSETTS s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING F_NGINEF.RS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 MECHANICS MAINTENANCE 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 MILLWRIGHT (Zone 2) 04/01/2011 $31.71 $8.67 $15.61 $0.00 $55.99 MILLWRIGHTS LOCAL 1121 - 7one 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 27 of 56 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS a Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN Govemor ttY TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 $11.64 $0.00 $36.17 2 55 $17.44 $8.67 $11.64 $0.00 $37.75 3 60 $19.03 $8.67 $13.23 $0.00 $40.93 4 65 $20.61 $8.67 $13.23 $0.00 $42.51 5 70 $22.20 $8.67 $14.02 $0.00 $44.89 6 75 $23.78 $8.67 $14.02 $0.00 $46.47 7 80 $25.37 $8.67 $14.82 $0.00 $48.86 8 85 $26.95 $8.67 $14.82 $0.00 $50.44 -.._.._._.--------...„__...-----------_-.._-__._,..-..-......, (Notes: --.`._...------- Tice Apprentice to Journeyworker Ratio:l:5 -_ � �----- MORTAR MIXER 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS -ZONE2 OILER (OTHER THAN TRUCK CRANES,GRADALLS) OPERATING ENGINEERS LOCAL 4 12/01/2011 $21.28 $10.00 $12.40 $0.00 $43.68 06/01/2012 $21.56 $10.00 $12.40 $0.00 $43.96 12/01/2012 $21.90 $10.00 $12.40 $0.00 $44.30 06/01/2013 $22.32 $10.00 $12.40 $0.00 $44.72 12/01/2013 $22.74 $10.00 $12.40 $0.00 $45.14 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 28 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perforin asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date THE COMMONWEALTH OF MASSACHUSETTS s>• EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT supplemental DEPARTMENT OF LABOR STANDARDS OPERATING ENGINEERS LOCAL 4 Prevailing Wage Rates DEVAL L. PATRICK GG-e As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN �3' T MOTHY P. MURRAY U Gocemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perforin asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension supplemental Total Rate OPERATING ENGINEERS LOCAL 4 $45.01 $7.80 $14.60 Unemployment $67.41 OILER (TRUCK CRANES, GRADALLS) 12/01/2011 $24.51 $10.00 $12.40 $0.00 $46.91 OPERATING ENGINEERS LOCAL 4 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2012 $24.85 $10.00 $12.40 $0.00 $47.25 12/01/2012 $25.24 $10.00 $12.40 $0.00 $47.64 06/01/2013 $25.72 $10.00 $12.40 $0.00 $48.12 12/01/2013 $26.21 $10.00 $12.40 $0.00 $48.61 OTHER POWER DRIVEN EQUIPMENT - CLASS II 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 $45.01 $7.80 $14.60 $0.00 $67.41 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 PAINTER (BRIDGES/TANKS) PAINTERS LOCAL 35 - ZONE 2 01/01/2012 $44.01 $7.80 $14.60 $0.00 $66.41 07/01/2012 $45.01 $7.80 $14.60 $0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 $0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 29 of 56 THE COMMONWEALTH OF MASSACHUSETTS W) EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN 0-mor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H I EATHERE. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 $0.00 $0.00 $29.81 2 55 $24.21 $7.80 $3.25 $0.00 $35.26 3 60 $26.41 $7.80 $3.54 $0.00 $37.75 4 65 $28.61 $7.80 $3.84 $0.00 $40.25 5 70 $30.81 $7.80 $12.83 $0.00 $51.44 6 75 $33.01 $7.80 $13.13 $0.00 $53.94 7 80 $35.21 $7.80 $13.42 $0.00 $56.43 8 90 $39.61 $7.80 $14.01 $0.00 $61.42 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.25 $0.00 $35.81 3 60 $27.01 $7.80 $3.54 $0.00 $38.35 4 65 $29.26 $7.80 $3.84 $0.00 $40.90 5 70 $31.51 $7.80 $12.83 $0.00 $52.14 6 75 $33.76 $7.80 $13.13 $0.00 $54.69 7 80 $36.01 $7.80 $13.42 $0.00 $57.23 8 90 $40.51 $7.80 $14.01 $0.00 $62.32 - - -.......-.,.. -- - - - - - - - - _.._ -- _.,,., - _... - - - - - - ,_.,.. Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:l:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 30 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Y Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor S ar3' TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2012 $34.91 $7.80 $14.60 $0.00 $57.31 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTFRSLOCAL 35 - ZONE 2 07/01/2012 $35.91 $7.80 $14.60 $0.00 $58.31 01/01/2013 $36.91 $7.80 $14.60 $0.00 $59.31 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 31 of 56 >r t DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. rGOLDSTEIN aY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Various Locations Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.46 $7.80 $0.00 $0.00 $25.26 2 55 $19.20 $7.80 $3.25 $0.00 $30.25 3 60 $20.95 $7.80 $3.54 $0.00 $32.29 4 65 $22.69 $7.80 $3.84 $0.00 $34.33 5 70 $24.44 $7.80 $12.83 $0.00 $45.07 6 75 $26.18 $7.80 $13.13 $0.00 $47.11 7 80 $27.93 $7.80 $13.42 $0.00 $49.15 8 90 $31.42 $7.80 $14.01 $0.00 $53.23 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.96 $7.80 $0.00 $0.00 $25.76 2 55 $19.75 $7.80 $3.25 $0.00 $30.80 3 60 $21.55 $7.80 $3.54 $0.00 $32.89 4 65 $23.34 $7.80 $3.84 $0.00 $34.98 5 70 $25.14 $7.80 $12.83 $0.00 $45.77 6 75 $26.93 $7.80 $13.13 $0.00 $47.86 7 80 $28.73 $7.80 $13.42 $0.00 $49.95 8 90 $32.32 $7.80 $14.01 $0.00 $54.13 ----------------__...-_.._-------...-..--- Notes: - -_--_..-..----------------- Apprentice to Journeyworker Ratio:I:I This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 32 of 56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 33 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK G -G As determined by the Director under the provisions of the JOANNE F. reGOLDSTEIN ar7' TIMOTHY P. HURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension SupplementalTotal Rate Unemployment PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2012 $32.97 $7.80 $14.60 $0.00 $55.37 PAINTERS LOCAL 35 - ZONE 2 07/01/2012 $33.97 $7.80 $14.60 $0.00 $56.37 01/01/2013 $34.97 $7.80 $14.60 $0.00 $57.37 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 33 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. feGOLDSTEIN G- or TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.49 $7.80 $0.00 $0.00 $24.29 2 55 $18.13 $7.80 $3.25 $0.00 $29.18 3 60 $19.78 $7.80 $3.54 $0.00 $31.12 4 65 $21.43 $7.80 $3.84 $0.00 $33.07 5 70 $23.08 $7.80 $12.83 $0.00 $43.71 6 75 $24.73 $7.80 $13.13 $0.00 $45.66 7 80 $26.38 $7.80 $13.42 $0.00 $47.60 8 90 $29.67 $7.80 $14.01 $0.00 $51.48 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.99 $7.80 $0.00 $0.00 $24.79 2 55 $18.68 $7.80 $3.25 $0.00 $29.73 3 60 $20.38 $7.80 $3.54 $0.00 $31.72 4 65 $22.08 $7.80 $3.84 $0.00 $33.72 5 70 $23.78 $7.80 $12.83 $0.00 $44.41 6 75 $25.48 $7.80 $13.13 $0.00 $46.41 7 80 $27.18 $7.80 $13.42 $0.00 $48.40 8 90 $30.57 $7.80 $14.01 $0.00 $52.38 ----_-----......-.._-..._ ----------------t (Notes: I Tice ---------._._.- Apprentice to Journeyworkcr Ratio:l:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 34 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification THE COMMONWEALTH OF MASSACHUSETTS s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Pension DEPARTMENT OF LABOR STANDARDS Total Rate Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. Governor reGOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate PAINTER (TRAFFIC MARKINGS) 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS -zONE2 PAINTER / TAPER (BRUSH, NEW) * 01/01/2012 $33.51 $7.80 $14.60 $0.00 $55.91 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERSLOCAL 35-7ONF2 07/01/2012 $34.51 $7.80 $14.60 $0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 35 of 56 THE COMMONWEALTH OF MASSACHUSETTS Ulf EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Apprentice- PAINTER -Local 35 Zone 2 - BRUSH NEW Effective Date - 01/01/2012 Step percent Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 50 $16.76 $7.80 $0.00 $0.00 $24.56 2 55 $18.43 $7.80 $3.25 $0.00 $29.48 3 60 $20.11 $7.80 $3.54 $0.00 $31.45 4 65 $21.78 $7.80 $3.84 $0.00 $33.42 5 70 $23.46 $7.80 $12.83 $0.00 $44.09 6 75 $25.13 $7.80 $13.13 $0.00 $46.06 7 80 $26.81 $7.80 $13.42 $0.00 $48.03 8 90 $30.16 $7.80 $14.01 $0.00 $51.97 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 $0.00 $0.00 $25.06 2 55 $18.98 $7.80 $3.25 $0.00 $30.03 3 60 $20.71 $7.80 $3.54 $0.00 $32.05 4 65 $22.43 $7.80 $3.84 $0.00 $34.07 5 70 $24.16 $7.80 $12.83 $0.00 $44.79 6 75 $25.88 $7.80 $13.13 $0.00 $46.81 7 80 $27.61 $7.80 $13.42 $0.00 $48.83 8 90 $31.06 $7.80 $14.01 $0.00 $52.87 _--...,._.. - e ---- - _ - __-. - - - ---- - - - - _... - ---- - -- _._ - - - - Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 36 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS uf Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS LL Governor Di a for Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER / TAPER (BRUSH, REPAINT) 01/01/2012 $31.57 $7.80 $14.60 $0.00 $53.97 PAINTERS LOCAL 35 - 70NE 2 07/01/2012 $32.57 $7.80 $14.60 $0.00 $54.97 01/01/2013 $33.57 $7.80 $14.60 $0.00 $55.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 37 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 THE COMMONWEALTH OF MASSACHUSETTS $7.80 $0.00 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $23.59 UW DEPARTMENT OF LABOR STANDARDS $7.80 $3.25 Prevailing Wage Rates $28.41 DEVALL. PATRICK Governor As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor $20.52 Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $15.79 $7.80 $0.00 $0.00 $23.59 2 55 $17.36 $7.80 $3.25 $0.00 $28.41 3 60 $18.94 $7.80 $3.54 $0.00 $30.28 4 65 $20.52 $7.80 $3.84 $0.00 $32.16 5 70 $22.10 $7.80 $12.83 $0.00 $42.73 6 75 $23.68 $7.80 $13.13 $0.00 $44.61 7 80 $25.26 $7.80 $13.42 $0.00 $46.48 8 90 $28.41 $7.80 $14.01 $0.00 $50.22 Effective Date - 07/01/2012 Step percent Apprentice Base Wage Health Pension Supplemental unemployment Total Rate 1 50 $16.29 $7.80 $0.00 $0.00 $24.09 2 55 $17.91 $7.80 $3.25 $0.00 $28.96 3 60 $19.54 $7.80 $3.54 $0.00 $30.88 4 65 $21.17 $7.80 $3.84 $0.00 $32.81 5 70 $22.80 $7.80 $12.83 $0.00 $43.43 6 75 $24.43 $7.80 $13.13 $0.00 $45.36 7 80 $26.06 $7.80 $13.42 $0.00 $47.28 8 90 $29.31 $7.80 $14.01 $0.00 $51.12 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 38 of 56 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Y P secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover $24.07 $8.08 $17.12 $0.00 $49.27 2 65 Contract Number: $8.08 City/Town: NORTH ANDOVER $51.28 3 70 Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer $0.00 Job Location: Various Locations 4 75 $30.09 $8.08 $17.12 $0.00 $55.29 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $34.10 $8.08 $17.12 $0.00 $59.30 Unemployment $36.11 PANEL & PICKUP TRUCKS DRIVER 12/01/2011 $29.68 $8.56 $7.27 $0.00 $45.51 TEAMSTERS JOINT COUNCIL NO. 70 ZONE B $0.00 $63.31 ----------------------------- .._.-.......--_.____--___.-_.._--------_---.._____.--Notes: Notes: 06/01/2012 $29.98 $8.56 $7.27 $0.00 $45.81 08/01/2012 $29.68 $8.91 $7.27 $0.00 $45.86 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 DECK) PILE DRIVER LOCAL 56 (ZONE 1) PILEDRIVER 08/01/2011 $40.12 $8.08 $17.12 $0.00 $65.32 PILE DRIVER LOCAL 56 (ZONE 1) Apprentice- PILEDRIVER - Loca156 Zone 1 Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.07 $8.08 $17.12 $0.00 $49.27 2 65 $26.08 $8.08 $17.12 $0.00 $51.28 3 70 $28.08 $8.08 $17.12 $0.00 $53.28 4 75 $30.09 $8.08 $17.12 $0.00 $55.29 5 80 $32.10 $8.08 $17.12 $0.00 $57.30 6 85 $34.10 $8.08 $17.12 $0.00 $59.30 7 90 $36.11 $8.08 $17.12 $0.00 $61.31 8 95 $38.11 $8.08 $17.12 $0.00 $63.31 ----------------------------- .._.-.......--_.____--___.-_.._--------_---.._____.--Notes: Notes: Apprentice to Journeyworker Ratio:l:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 39 of 56 THE COMMONWEALTH OF MASSACHUSETTS U*4 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE FCfeGOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE D. Govemor Director Awarding Authority: Town of North Andover $17.80 $8.75 $4.50 $0.00 $31.05 Effective Date - 09/01/2011 Contract Number: $8.75 City/Town: NORTH ANDOVER $41.17 Step percent Apprentice Base Wage Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Unemployment Job Location: Various Locations 1 40 $17.50 $8.75 $4.50 $0.00 $30.75 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $26.26 $8.75 $12.39 $0.00 $47.40 Unemployment $30.63 PIPEFITTER & STEAMFITTER 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) $0.00 $56.15 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 Apprentice- PIPEFITTER Local 537 (Local 138) $17.80 $8.75 $4.50 $0.00 $31.05 Effective Date - 09/01/2011 $20.03 $8.75 $12.39 Supplemental $41.17 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.50 $8.75 $4.50 $0.00 $30.75 2 45 $19.69 $8.75 $12.39 $0.00 $40.83 3 60 $26.26 $8.75 $12.39 $0.00 $47.40 4 70 $30.63 $8.75 $12.39 $0.00 $51.77 5 80 $35.01 $8.75 $12.39 $0.00 $56.15 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.80 $8.75 $4.50 $0.00 $31.05 2 45 $20.03 $8.75 $12.39 $0.00 $41.17 3 60 $26.71 $8.75 $12.39 $0.00 $47.85 4 70 $31.16 $8.75 $12.39 $0.00 $52.30 5 80 $35.61 $8.75 $12.39 $0.00 $56.75 ._....__.....------------_._.------------ , (Notes: ** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) Apprentice to Journeyworker Ratio:** PIPELAYER LABORERS-ZONF;2 12/01/2011 $29.60 $7.10 $11.55 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $48.25 Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 40 of 56 THE COMMONWEALTH OF MASSACHUSETTS sk EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. OLDSTEIN vernor Go v3' TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemm Director Awarding Authority: Town of North Andover $9.32 $4.97 $0.00 $28.97 2 40 Contract Number: $9.32 City/Town: NORTH ANDOVER $31.70 Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer $9.32 Job Location: Various Locations $39.91 4 65 $27.25 $9.32 $8.81 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $50.86 ----------------------------- Notes: Unemployment PLUMBER 09/01/2011 $41.93 $9.32 $13.29 $0.00 $64.54 PLUMBERS& GASMITERS LOCAL 12 (Local 138) 03/01/2012 $42.73 $9.32 $13.29 $0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 Apprentice- PL UMBER/GASFITTER -Local 12 (Local 138) Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.68 $9.32 $4.97 $0.00 $28.97 2 40 $16.77 $9.32 $5.61 $0.00 $31.70 3 55 $23.06 $9.32 $7.53 $0.00 $39.91 4 65 $27.25 $9.32 $8.81 $0.00 $45.38 5 75 $31.45 $9.32 $10.09 $0.00 $50.86 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.96 $9.32 $4.97 $0.00 $29.25 2 40 $17.09 $9.32 $5.61 $0.00 $32.02 3 55 $23.50 $9.32 $7.53 $0.00 $40.35 4 65 $27.77 $9.32 $8.81 $0.00 $45.90 5 75 $32.05 $9.32 $10.09 $0.00 $51.46 ----------------------------- Notes: Step 4 with lic$48.12 Step5 with lic$53.58 Apprentice to Journeyworker Ratio:]:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 41 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT j DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. Governor v3' TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations 12/01/2011 06/01/2012 12/01/2012 06/01/2013 12/01/2013 $39.52 $40.09 $40.71 $41.49 $42.27 $10.00 $10.00 $10.00 $10.00 $10.00 $12.40 $12.40 $12.40 $12.40 $12.40 $0.00 $0.00 $0.00 $0.00 $0.00 $61.92 $62.49 $63.11 $63.89 $64.67 Classification Effective Date Base Wage Health Pension Supplemental Total Rate OPERATING ENGINEERS LOCAL 4 Unemployment PNEUMATIC CONTROLS (TEMP.) 09/01/2011 $43.76 $8.75 $12.39 $0.00 $64.90 PIPEFITTERS LOCAL 537 (Local 138) 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 03/01/2012 $44.51 $8.75 $12.39 $0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90 PUMP OPERATOR (DEWATERING, OTHER) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PNEUMATIC DRILL/TOOL OPERATOR LABORERS -ZONE2 POWDERMAN & BLASTER LABORERS - ZONE 2 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 12/01/2011 $30.35 $7.10 $11.55 $0.00 $49.00 POWER SHOVEL/DERRICK/TRENCHING MACHINE OPERATING ENGINEERS LOCAL 4 12/01/2011 06/01/2012 12/01/2012 06/01/2013 12/01/2013 $39.52 $40.09 $40.71 $41.49 $42.27 $10.00 $10.00 $10.00 $10.00 $10.00 $12.40 $12.40 $12.40 $12.40 $12.40 $0.00 $0.00 $0.00 $0.00 $0.00 $61.92 $62.49 $63.11 $63.89 $64.67 PUMP OPERATOR (CONCRETE) 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 PUMP OPERATOR (DEWATERING, OTHER) 12/01/2011 $27.95 $10.00 $12.40 $0.00 $50.35 OPERATING ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 $0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 $0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 $0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 $0.00 $52.29 READY -MIX CONCRETE DRIVER TEAMSTERS LOCAL 42 04/30/2009 $25.80 $5.96 $5.34 $0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $37.10 Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 42 of 56 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gove nor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment RECLAIMERS 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. cARPENTERs-zoNE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 43 of 56 THE COMMONWEALTH OF MASSACHUSETTS ar EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DavALL. PATRICK As determined by the Director under the provisions of the JOANNE S CteGOLDSTEIN Gove nor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE LL Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 ---_._.---------_....._.--------_--..._....-.....__._.-___, Notes: A--_-.--__.. __---------------�....._._ Apprentice to Journeyworker Ratio:l:5 - - RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 ROLLER/SPREADER/MULCHING MACHINE 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 08/01/2011 $35.56 $10.50 $9.80 $0.00 $55.86 ROOFERS LOCAL 33 02/01/2012 $36.56 $10.50 $9.80 $0.00 $56.86 08/01/2012 $37.56 $10.50 $9.80 $0.00 $57.86 02/01/2013 $38.56 $10.50 $9.80 $0.00 $58.86 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 44 of 56 M 9 C) N C/n C)00) 1!f C ~ L N d M U Rn W ,O o e�ye Ors N a 2 a a IS,=2 O rl— N z y m d 'J -- 8 •O� YM .0 N O O 'may[ Q��p M : O E SN !41 .O Q'Q = 41 N d �NU C U N 14. Y IAC d 'M M `. (� U o G� mak+, `"•a •_ M � �/ C � ��M + � p� � M r7' d y « 10 C €N ���' Eoxo r; �b°o3 Q d 6 C c Ev _•d 4!^� '$ �' C rn °°� v E m °-_may .� O�� „y .ti c o0 p a d n E .c f �� m ; u 'Ji 2 m m m �i H '� m m '� �i Ep cp E ~i �,i� ri� �a>$aM6 oc m Nov=ca a $ni N¢ d a N y N E O Fp r O d 1� N N I O .b N O ni N M in r�i 2 — i9 egi Q m .o 2in �N� ¢� I I o b neo a RE ao � N z yl q¢ n C7 N N C H 4N .ted' �y N -T O. C'1p O A �2 �o p .yam E 23 :_i c� nM �� ._ on •� L d O m •= R ,-1 N O 'r" Y Q N N = N N u e rl '-1 c, 41 V t ++ E A Z ,^„ °�° Z '., 4 b ,�., �^ C b f- m N a- •� M R.> E ,Qy ,N�, t� �^p •`l vi q o 6 b 6 ti� �� cqq9 N y m f� Q Zr 2��o,ai, •0��� .:� in c4 f� Bao w codo ¢Nb� Ma ^ rn 10 N ...p Y• w _ y a� t o N N `Cj. N y fh c r�+L- o N�Nz m� E =tic �2�.: ! aum rtv v EE .N- c Y�.RAa� p I ._, H c -1 =.c I m: d � 2 I d oma$ � " i� 2 m a i4$�c3 ��� rc4 d w alb `cr^¢z�� +� M¢ "tiv 3 eEo oo �p .1 q a. ;, v ii a z H N N N O N L N Q M ..• E] W w r N t V M N d V 0 2 d m c 3 a`. ai ,,1l.,, o , N � N c d H �M z �I �p �..N-I dO�C ` _ yy`o 0C 0'.O �jan�j N d 'r.. yam+ '.�"' Q oma" E'6]yc m �� ZLII 4,' -IMG �v.M-I vm%rnaE�3 'L3 �r'•c-, d c �N z�w�Lo'3d�� �� �aQ;y' ...+a�) °zys0 y rW,a;y .�(U",•4W.," •b.,ip �:�iI +.yCao>>i' •"crO-ai."� ^dOpo -- QZ�a.oa.,�oaC °�0AcNo�'.w+.cCo-'i + n��cYc„Jo 'dC�L', - TrnZ o ''”' su'F�La"" wm�U�t f'�--I mo•�� b�„ moSoO ,.., y`�c'ri�'`� OOAIP��1 o N. �a, d "o O :yDViJarcOam-�i, U.Zoj �ys. .F�aa”i>.WbcOcz t34 S. aD .oO..i �-,., �.+�C-��•i T�EcbS� Uw�naCt:o 4' P,> OE M�y 10 cvy�J ~ �arO,,> o UwO+ cz wxyocd "aaa� cc ... o U d W O 41n � ca O m "C� � 0d p p y1na� 040 Z — MA,wgQ Q +� IC�O rO oo yiro O~ -, c oAr.a'1 a� � co Mg CN O > 1�— J O0 p N � NS� �i."'r IZV O A, 2E '"D yaV Num U zp Q d O cn U5 �O O oU d = z % co v C vo r SO ` o= �y ay O �rA rn C's`N d �4.o.o a,t d O �'�O�`z atc's C; O =Z d a) �Oti o Vmo4R'O O 0 00 75 �pkm UD "> eco �no�w O�+oo U � O G,_j cn cd wo .QU � •vlO o �O "'6� cz N W a W cc a �' 0.5Z y:~ ctsZ w w a� m� ro a o� oA cts 014 0) o � 0) LO'. . ^ ~ O: +m cid p f.i -a V2 c) a) yc`ai �°aoNy a000bm yqR w C m E O3 0A. L'3 m .w r -w c=N s.cii 1-4 bZ9 cz a s; U N cd fes' t' :t4 'b T CL F N M o Q.., N O� N O O O " O O OAo �' � � K vi � o> bZ O m dux o a vim. mQ s~ a��AE=a a q a�it� �A clst: E o cd Cd ° ax �� soca zc�ac�c`v�C,3 44 Pa$ p',am�1a3i o� a>A+� c d cd cd C o o d°' -c3 „Z .� «Y at 78.2 00- as s.. . ^ �, y F m •�y . ^ rn F. c. at ca E3 Zo y£io�o o � x � a� ycw,� 2 �.., c0 .-I cd x a.+ v xi U Vl O m aV b �•cz ^ ^ c.o � mow.•, .^`� d d a,0 R a CZ y y £. a o '�V c�jc a •^ .0 E' ooa �->~'`- E°,AdE°Aa�anc d ya ani cd x of c ao Ci Exc� ExN E. dw �Z o �i vi NU c a)NU O a0i 3t a > o o4U C oopCod ago x x w0 wow o od c."b ce o c.' -oma z b Q'i 01-. Opp m PG Obi? A A bB co o m O F y O O d o ep o cZ p oy, cd d a Cl 3 a o a s a vsZ o� awed U� i`4w �w cz co Ca cd C, C h O❑ 0 000 o P w cd �+ O2 :5 O F aa) i~ ami >~ o 7� Com) 7 A �^ N cS dy P 7 75- 0 c N o yEl El O F. c o, R. � E a CV y a >> Y tE> E c+0a=dt9y>� w� o x ssY a>,� a> E ryo E E a .= N °� N °� x �y 3 `dmo�co,�m d omd ❑ mo N� O� 0 0� c"a0 mU sm Z E" d d w w as m rn M 3 m m r'^ o m w ; P,c a m cz as 3 3� x in w as ao c's Lo LM cD bo 46 03 4 c, s ai p i `off � z - w Q'C. W bA .RI C. cqV t� wd 0m oOU� 'A a'a V Vl E$ tiZd a> yo w a 3y a� o a,^ o qua ,o ar' ' ^ > ?? cam ca ? o vi coxcCt3 c�roc�•v+¢>?O�r o m ou Via+x O G7 i-1 5 O iL Fi a c0 C G U V O v �•y«� ,^..alcmo'm �� ani m O P,Acmc' �•so, `moor. ao � m O cC v vi cD U y Fl c� cOi o y f (1) a) co cya � (3, d � o � y a>o s~ cZ � a yam, a� o >, dc" "> $s', a aQi o O��y aG c`ai yA E�,y" yA x O 1-4 vicoay >i3a�oi~ C7 o CZ W oA Go a CL 4.3 a:3�� W W O z J a w J v z V t9 z s a V �a O �eLO�gp cd �''. •yam °� O U tw C 1 s 1 El o Q ro m CZ ami d oa y U a� yN C c Y ca to >=J C 'C G ED - a � czS. 'fox U y O o cme o y w y x-C;� a1 cd w p o a w y �y bll u ami yo �Uo � 00 o � � y � L � In N> yap a� 00 C0.90 00 a s,� c i r~ c �� uc°�.dbaL_ Q i E off.- N >' -• 3 o mc -0- (D CO) m mmN-o T` -T m OI .r _. - �'-'yEtW ccw� U>ON3�E p�NQ p� Z-Z'cis "p mOm -L d o .o o YUd��E 00 o._a(ar2._ c6 mHN..No Em.L-•'N. d-_-Srn n d n£ E� 3 0 orn'I' ' o. W J Cv C~ i6 y C - p m 3:= me' dm >.m 0= 0 L c,'E3c.!E py.o mono m- '7._ >..>No as NL =aN� Nd Cdp`=� OF- �QcUoC7o�m�: w m •Q� E >3aioCn 2 N A .- d -.o L c O ._ S O N a y d 'O O 0 O C E) o f a`,�s..-.c Q L c c_ = Tm v c E«:d-vcoi v �ce'��3�m '-'om LoES �r7(0mCN3CC C N a`�n,-,a>N c'-oo� -W+-�%�Co' =� mv�° o�-M�-Lam'.- MVOe LZ-ncc0t;03:<a) m"o0-- D- <tsiomc� CE,> -•o> -m Z 3 -LID 5'�y E N --f97 w>8P >8 c -'j - "314� ,� E IN0 dN 7 CFL t LL_,._m.7LL UCNN L. "2 dU W 0 amr .' yi? d a I �°oo�8co =a.iq �Qa mc2E�n�H>o3c myECmHm°Z zo980a Z�.3,oE = i a.L. -5.5-V � *dti-_: o c3a_°�-. m'N oZ L_ a)30m>.mym OmD«mQ . t. -Em �< q.-§'"o'$-�2--E-' m?jW p •pi-aQa1M<r- U3 nca`>a gE CLL �u~Sw Eo�'�z'i1O c��'o a>'iv -:Om pm OpCN`mQdfCO �O�>p O -CEN 3N T��Or 21.--a'ccE:° >.c ULC« L 2.20) U 7- NLL OLC ZC7 c°D`¢ `i4 _m U«, om0, Y« m Fv a- I-«mCZ-� O EZw 9'vn^a�Z. o coi -_ R: -1.1..1 as _UO>m(` p Om 'a 7-3- C m00 a) Wm` -E co Cr o cddv Et�o�aN`o�d scy) c yZcm yF-=., >n a` cmom I z q�"�'a's� �� >< rnNUp c� c -o v3' oEa c0.«c3F ¢ 8 m� =E� ¢� N (�x3o._« o'- C)0c1 m moo w+N« m o Ua m� Om o cml-v $c m U C 0f Ljj W z IN= U W r� V W W C) N .c_� c0 = I~ (0 . "o r 7 ..2 N 07 e 95- cz 93--- 92 .EJN S om ai Y U o� �- o¢ ¢ -1.y O >>'t 412E -my c Opa' 0. �= �'a M& m IOJ v m W O ..'_2 gM- `z ym «emc2 0 xo-E dM:> �9!9ecEmwc dM. _m �� t6 mQ C.CC .UT ooEY3 0v9p- fON mo' EL TY C•ON ��«• . tj R -00-s=52=4- w c ? �.�•� U^ tttt•- o�T6 Ng2 J O -c N C 'coi 72- O; CO C �' O m ;n o o-�i d E w•or o^M a- .2 2 n d-. O W, O>•tOH ="2 onto co a -N W r 0 U q ro' Q¢ U 3 � C'•zccn cc2v Ow� r =cn �_" _a N j- J z.-^ N JOUW CNet JMI >y - cP� y 3:6� ZO C E5 ¢ F- d i -o W op-- C ¢QuoF n.o2WL9_- 6i� � 2 _o '_ cn U-wm¢Zv . =o 0 0 5 a o . i- ¢ 5 3 V C_'° C" C ..G m C -°•O C m-. E C o"° m'C m O C O; TO ' O.O c m N() mOD80 0)�Oy010mC ONO 'O N m mm O .L_.m m m cL UL C .0 7._ 001>, m W Cm 0Nm"-100 mm•rn�vm O m -av N w L aNm«t«N mmJ a0'�°-UC mma �Ncr m0 m 00 U- 3• mV m C C O r C>�03 mC a�c`oOpNm C00)C �NOO °Oc16 i0 OQ Ol6 �� m r 42 7 C J N 70 m Cd0' ° .L-.� fC6C� 'C= Oa°ODr 'O m 000W mQ(aOM WC_21p0�OEV mF NCmUS ma d >` Ua C OC Z LNNm Uma '°C maNVLL N10 EQLL o�mo Q•O m$ m i0 '(�-0 7 h mL OCL y 7 .O > >t G1 �_ a 3 ro m rn� :E LD �SNp w >O~ C �'oLL OTS F m.,NoZ Na E ''a U._z ca W m 0« > > v E m N ai c' >O m NCO N V 'j •pQ ca N •O w a.o W �'° ° C>NyOO4) V Y�NO-Up p 5m :" 0) 0 W -@On OY 006 O. aC(DNmv C 6iC >. (a U mpyC.N > Om Nm'C« O O J C m Z'N N'Ov m c00 c0 dN.,,, 6 •- m mid N C N N x 0 U m w U E O` Tm m W 7a ap m m g(Oz N O�� Cnm O m (a .L-. m OM m C N C..m- 16 L C y N- C:O Q apLL V= m 0 Z 1 N N - N Z r I�i U E'rnm» N �� CJ cLimw _o w o m r o N li tm0 d l�i mY m m 3 m- Y o 0 CC m Q m m (OZ ) Q .L-. m fNO N L M IO O N 'O r O dls M C Q W N 0) r- 3:.Q ` CD ` m� C y N •O L m C L Oid N m m�U 10 �2 = o c rn 3Q L 3 � E m 3 c -ca >"ov mai 3M w W =v c°i o 42 c o 2-02cc 2 m am 0 m N Q W OLS � C m 3 E 0 0 N (mir O N N Cn m � Ni.:._•° °•NL N'O >i C O -p M N °'C C m L O o m m cn d 2 Q$vm.N5> EZx0 Lu(D&C a�cm�m(DM" @-O_0t -w cJ •mp�>m�Nf6m (UD 0�0 'Vail -D) YLa c.ro m« �c cmmcm.- o N c and °� am, cmrnoN oQm c�wr �U M30mvC00NCNE OCC'oU6!>"n>N(D(D� Cm•OaCwO Cm UmcCmNi-O.N Om�Ig �NO° •6C foam CLUm0N:O omccNQrnnQr m o m0o(OT m moo°E3Nrn o��mot`�E mm W mo°L�m.L W y caa:0-pmcCVvo,Nd.�E c�iawU(o_ 3 ( (OD° V> mFc :°T°Z2aa)i,~.° cZ . 0-E�pm.0-o�c 0 r-ZCwO.-OMC<QR o,S�0>vE m.6 �YcinEc m°d E»a��cro y °� Q m NZ l00 CN 7v U� m ° Oo O a) 3aca« L m N ma O L. O •O 0 m °-� N_T3 3 a) .O;oa m p•0 O.0 C4. O C� �'.'V Op �� ,O •N 7 lC6N OC m C d=aJ O N"C Lj�,m(QO" N-, mmC j;E c m m c am(n O�NC°Nm0�U NTCmao�Z'OC>(6 y -NC m -m �coLA -O = NC N10 (q ���� NmamZ" c m O,T3Ev N cm> Nya-Q� ymc u/I".m-..o vy mNm3m(ri c °aN'� Ec - ca 0 m(nO O -0)m Q I C._.O •o C N lO7pN J3 «•'Oa•a'_m°' L•- °O.0 pDim'00 L ULo�m°� m `rn._moapc>v v mo o tC am -o a�aom Z� C)Z5 o20C.1_0 LLx�ox�LOccN acimo�m¢N�oyQ°am JNa�3J°C 3m ^m-v�o�coNv ~�«(6My0(°DU> 0WCr-_m3�mma)m oLomn T�3Ta0DD¢ Tn`m°yv m v03Lm( m'"MW>2yUomrny'-c o CLU _>' my�QV1 Lr3:._ 0a m,p«ONa aMQ.L.16TlCa C Nome- E Jiy'gym (D-OCm�m N =UCNmOmdOym SCO.=my�Tm �'JJ TT >,Oti ONa ma OZ,,N �OyNalm y�•�m C IO X. -."6N O.'I r C m >' .O r m C T= T -O O)« C m m 0 m •- O° o E y Vj O m mam[L mt aE d E..v cM °°MC'0 >"C ma >'� )'COLO -W'- oa >, > �a c Nr Mn arnLm c�'a � E cU'w�a�jmvE a aEi ai di Z mc3(06N�oo�~NV NNt1°OZLL3LNLLL�LmmCryL..m•.L�d��E�ym�roQo�a��3La(1::E6 - c >mooLLcoOam�mmvooX » >�lnr�CNrCy-�r�Nv°im�No� EmvY��ocm EL_ T0. -,m 'O"-OO)OOLON(6 rmOOCOm 000 00-m0 O(Om CdO'CLOEC._COOW O 0-._y0 1 m'C U•O _'►,-Orr a>i-F O >,� N(nU a)(nW ZfgZ CZUQ ECA�ZnW 7 OLL y~�.� 7 j'� C 0E -Q m m._.�� m C NO ° m On C«« C � �r-N N > O m N O C .0 m L O - EWUO)Ummmtn Nmorw Q N o. N .0 o dUmEmOm UN E3U�m rii m \`\ _1 b N NPVI� ��� co I N__M,D co I .-1M� r V• I ;!, N 7] V, (:) I •-' ,O 0 I 1� (7 I N M M CS N 0 M M t z ag_ c7f,�Ca" Z8, . a"MG�'g I-Cy`�o lN�i 88 Ca`od,gH as,No,�aS tMi. � N E E o. W e g c W o o c E m E E E d E M E 22.2 NJMV, V, f\O•'jJMMPO,P NJNMin,OPW'SJPV, pO f\I�•>J NMPPf\-G_vm,o',o (:3 0. M� � � N E O' EO EM � n ^ m CL O LL •- a LL> o •- ZC G '> N �R t o'�f- �ry ' '0 a'':?co O ^ - m E c6 E E _ c z• - .N 'EL' if P M O ,D m O � m i E n D o, q E• L o c O c o c E TL N O. O - O GOT - T n m `� � E E U " . ' C n M - 6 E5 OL -... m F np, Vl N n PMM}�' Often OMU m'cnPP -m ..O m n �•' V n,OPPN~ mnmNN On P � ,O 3{ L^ v o x >, � (� n - tai o ' n n n - m 3 3 � o_ n -n v - .. IaG E cm1� c" :d - �" m - m - :Z :3 _ - - In z� �O � c � c .G c o e _� `m _ c31 ..p L E E ' V O v o `n Q t C 1p(�I e C L L= U � [O : i� � {L.. i •� C � CO S � O > ay. B •_ d m �p In yy ry In p Q p Z HQ •_ :V ((.Y.Oo O 'a 9�1-;C pnT c,ti 7 �i � 01(LOC122V 11< BVI -meq, (�g30}j^A O :z qm O c (A N N -n n 1O ¢ - m N O pti `m e " t p V 0 o a O y � � _3 _O 1a d 6 d Q G O L O q L x p _ .-1 d C q In -O• n O N U O� W ��II O 5 C E 5 U i C o C .. - a A c - _ O I.O+"' -'mm GD ._M O "'1� U y Yo c ' O - LII G� C A `� n m - C N IL' G� p --I d r O C q q Q O 1«a �" L q i"G d : v yy IGg- aqp- n to ..' C O p••1 r -I n p..� in q i% N 9�!! Vl N d O C ai' i i o . � o'6c.5� -. o i :e- Ev 31nx a' �`oE$«�I n L3dc qc gg 4?vdq'{p g docozd $ .9 -1 -I i! acorn« cpn no0 ia�i =aEm �Ey rnt ,,, `�$U Anal -a = .9N 4qq++ m�-- 5i alovcl3>O�tls >oc 'Ec vL NC ¢pa Yn =QUI SU m �qda`> cE d 1 -la cL73- �E cv S o c N 6'-°i'3p -E �rE c a16� F5 c .13 3> 1r '- Oc _Ct Yn._EC >Si >Si >Sia rYni vd._ iGdi ddL o `� ii,'- d'Pd qta co Loo d .R o_ sFq, II LS-sA' .R -'5 -P -z A erg' s - � ,N o pS.Rzr`io8u'4$'�0� :. 6 g �3'%�96 Szu �cDo`3nrnzzI N C C z rn N N C V L an of N m P c c I� p" v o I�}I d L, q 2 E � '• Q . y P ryO O -� '� - G -O q'F O S O V U !n !^ O d I �� - t, r•1NP6 22 � N 3. M ++g9�� j *18 'ci EV, O 51GD d . c v ,O O Ih pti H NO m ,ii -= 0 .. n Y' a - -Miti $I� T 1O o p c _ N a .-•I N - Y zp C7 N e2 .•. N q _ o.. c_r'_Psti _ g A N m N 8i N p•y m E % � ' N M !n p=. pti N yy d .Q- N --oma _aE Q'c N t g sM = n li ^ '7 = n` gj' d ne Q - 'c « Ipd 3 E -- r N �I' O e.p tY L N : N 8 _ )C - :I o �p ry.O v P C N t\ F 1 $ O. .-. O a C T N N n - 3G' - - c p N m N w e m p O, c N - n a1 aT;Ap ('6`v N B -^i,�ri 'jV ° o P I TO B.N.'-I.. iiN 11 �~-,p � C nM B. CO` ^ ' n '. 'c E .. C A i1 0 � .`.° c m of c Ii g N -O .-: Vf o c N 'm - ". rn N Nm LI o i d -.ti 3 B ` .-... 'y w v o_ . U [v 6i a m . M N m Z th a '. 8 n .. p y 2 t• z M `M.' Q p�. M_ ty C 'o .L.. O (J v L O a 2 '•'1 n >>•• N O A 9 4 P N M ,b Y ryry yEG� EZm On`"O�,•cVN� 6 O$ dC E d> O - f\ N V, - s - F N N gff.2 in$P• L;-vaz -1�z'b -.8 _:R . � N - - ^O - Z OD '^ Z I/� d Y > N N q . 9 L o-- - x L C. A - - v n m � o - 12 r_ ry d •- a _ 0 C c d= LII C 9.- 41 � o O - c � P d - - N C - M c n O d p a L � d 6 - 'O v m A " T., � - N N O n q N (V d C �'Y m - p 9 N V cI ^� -r S > Nti � ��D =iyA q I Val _on0v n'2" zg;E o=F" tJ' M NOL a O, G' cI 2 L - L O Z C N> V O Z Z n aqi iu -� L O. c.f q M M U n M I c fY « .- p w.. v z N ¢I N -6 C - O 1 m •. N ... N H ' 1.) C L r n 0 q a I O Oi1i>uM �o cdo So ono= c �LG LL N : i Cl } 'NCN N 'C ,D O 'C L d C IO A N 8 LII L lIy L pn u Z n.•+__ d -... y N G N q 1-i1 V 1 6a'CN _ 6 -E-LnO a -N n@ y n%w oa cR ogsv .2 in' vu`dSt 3"qN' c pP^i ''"I.i a E t>iC ` c':oNF.a g.~ -`a. - a�M - .fii N_am -It m=Z m C C `Y Tro .b L W U " ( 3 mL LO .C> m •>.> O ° Oa >p m > 0 m N j OO.m c EOr O.L-. c ° O U c.0 M.E m C °L °-°� C�.O..L °« c a� OL O mLLNN•�p W -mi m op t2"2 cr O 0 O O W- U«.m- w v �EiA ayia�°Cm �'oNr(Na�6c�°->Z(- 0��amcmood Uc mmrn t-�-H UV ma(4' a`)a>CmCO E���3LE-0LDWN�r�oe��L�N`m UV LLmo Wfu¢OmgOid'°mEQ Q� 2as moymcamica)aw�EroEo(�(6v°a«16 cmay LL: L Mo OO:.i OOrLLE�C�°2oR�U myQmomro�m}�° orEO��o aZUZ�UE T 12> C «mmO`m LL O O Qm LL« Om (V Z�_j )-a amN•m 24 m ) 2 t` -QE '. y m T°2I o 0� N._ >, GEcn L 3U N05_c=00) m Z3Q-a�"No�uic��NNmrUmErOCm��Qo2 I OZMOE o pa_ocaa�m�-N.�LUO mOzEr 2«^'4. _ M4 cWcEEn-m`0'=I- OfTm°ocr of6C6a..wNODC.0 �LUL3oE��QU � OCm C T6 L ZmWm m O• 00, %-a EF NmmQN aEr OQmaL �--.as SQ Q 8npq q oO MN c cn•, �'Pi 32D ^cD Nboo,-'nc.'EN�, L.70S M�Q -p .,I I(NV-o«g -c C� M o0 o M09pp^•I N.a o�E o'9. ION bo,a ("�'�'N:�Cp :n (+(rn`�-Q«111,Oo, �'uo �' CO (VONro ,ONb QC^ONN~ry� Gro'Mq'•NO V N ryyryM Iln g± lil $Qo .,b EN yNN ? o aS281" - d a aP2Oai q N - CIF � S i - dtr n��d'd A s d N' - M ,O S 4' ✓ QQ - - p O Ma.NOPi••,Nd,N��ryN��l7KP N�i� N O - L N _ N _ .. N N 'Nd .. p P cq n 3 �C QQ �O�O pQy �_- U AGO �R~n'CN NCNM .-IM O zi= u �g - -b O O M _ V, q N W p••I d ri Q I C q 4 _'p P �°• ggI�! B OT 3�^p_ .22 C�'JicNpvQ,l(N ao o' x'08-, d.�1 G' :$p, pia C'•�IrLNJ ITR'JgbQ2� tn'y [VPOoq��=.5 16 c c n .N•l oc 6 9 P cp b .F 2 I!, LL E S° n o y� 8 r > v M O p O, v c 9 O ma- _- & Z O v 9 v u =ri i2 IZ� ryc N LP c ff I O ur'O-II� MmZ OI} �cS OY CD p E ,E p'. N c z { D I N O 1}_ v rn `o m n I -a - I [ V c � Y Of p L y _ N C a? Z F � Vl V - vP N'O Vj y' -O La m - B n O G' - L d �i d rC q C c Gn 3 ps nj d 2 c 3 " G� d - L d Q} Y - d n n L _ d q I M - C O tY o� ryry>i �= a 3 - C d H M N OO ai C Y>O = FNj C u Q a S.. $ c -Z.ti� O - r - $« O : o o q N - O N _ y d � m 3 _ ri, C m 3 n $ N N ^ m q m � n Y C C !\ C O P P 7 C d O d n M d `:r BM z 'A - -- d O c ^ .. T O L v c _t", _ � v d ^M� n0 a •' d M d N c a a c� � v �n �g EIiIv do e� mopti +-L^w edE E R3y,r'_' o� ccQ'•1 §:E a -' L"'�,"o1cmpB"R. odc c :2; W E C E.~.N mH M H. - (YUMNa ,p P P NOp., n 1MO• ,OO,O O nN r-1 I OOnn.-1 _R_. -....... •L. CON n- .M-1 .N -I r -I .-1 N N P P o .~-I P r -I I••1 N N N a V) a P QI . Q �_____ Q pti Q pp --.i ......:1 Q .N•I m .. <... p -•i .. Q o• .�-1 .�-1 cyA S LL m Q.O.Na-WQMOO2 W $.F."N r.1 .- LL�p--I M.m-iO LLVO.N-1NN•I LL2P ti.�A'Q (� .-I r -I r-1 r -I (' p-1 r -I N N .+ (� ., ., N r-1 .. 0 r-1 .. r-1 .•1 .. (� ., .� ., r -I r•I 0- -5 id'ul' I.'Ol uoi R .moi C S .n lqi c v .�•1 C ie Iloi � v ", a - I`On I'^n lNn c^� C n I°n loo � v (�i ie Mi v v v m $ . W C PPN P,OO .. •DN Vf n O mNOPnW C ro,DNPrn O M•oNmPC mnrinn°t' 41 E E. c. LLN�ONI�f\O•��.. VfO,O.��M1�mp••IM(Wy!II�MNIIIVI ,O .��P,D OO, N;�I�.... r�-1 r'�-Ip-^-INC (:J �C7E L'�_ coC7E nE a EEp,E QQJ....�..1[N10Jpm•I rVCC'-IpL•VIp••INOJ.y.p[-V-IpG-ININOOQJ...••Ip••1 .••INOJ.. p--INp�•I ,NO OJ P.. MOM.O .>,L~Ca 'OCO �� NC GpE I--NjO .M^-Epn E, -o m�O V u3G�, t'BNc't 3a�G`I €1 .°�p01• �L.INNN.iZ--{{00.3 (�a i0 fa (g l�v3i3si(�3Np•. �NNNNN� �(O fO� (d �N cSON�jz§'_, ,I Z(C -fV 'ilAI�GI O. of .ri-2' ZFc r•1 N MNN 'jF M•MMN3 V, V, N•- O-- LO�1N1••Nd T'JV ROZ,_j1<' 2"Q r-IM'EC_vI .80L d'm PPPPP PPPP PPPPP C 3PPPP P PPP PPP P amO L- _ _ e C _ ON0 a a o_ n a `�a > c =�.r T7 E E w - gg Ea ac6 ;oO OO VC7 :Z ip,t7 :p " -pAryIZ �a B., -o.0 ai •yLLn EB.o H 9'� z Q :z iN i iz in I_ pCM>%. Eco O._CL igaq,�a ii a] AQ3q Y'Q tan "s o -U 3'- 9 W o 8« i to o �8 tO M Ya . � m q ICI C :O CN � r � i >. !� z c3 d d ra q - �tyN - q X3 si i O - >'Lv i o is _ i3 - m - YG t�>'ol-•«« pL- - ql n a`l 5 ` .. aa11 a n°I+L'E,c - S, 'aS ai . '9.I o o g xE~ 7✓n M(V=Mm>w. x c e'E ov Cc dd m, Q-ol Cdd - .o O qq c E O 0 =a v c °�, --�l cal cdmco=oaZ' -« . :1 a G+d o0,�j dC n5v v�.'1. o3c2« .B t'-B.� glo-">E �La mo 'd a- t-' ov 3= t-� p B.c ai41 ���3 o>L M< !Ya 8 oa a_�c6d m3 .E. il,= EBc Nc�'-OI EBIg 6?�° ccLN y q 'Si Y Fn Q c 'rd 'I' c E >? j L yy., yp pp L d m C O --O C� L Z E O L}y L L O O n� zazaz Is 2 ¢331"c3 UmozB >i8c3w 8 8nQ •- 3z S'mnSci>z't%lUc3 r=o.�da UUzzom tR pU UO)C M vmo ymNmL m(OC OC CNm!=>E mOU mOv_L� NCO -6N NmC O Ul CO 11 06 00I O'C 70 7116 V L!!) O.U'..NCm E m m _T w.- _N a�7cCmN>+ENmy m ° «•O •yC aU_10.2 a,0 Nmo�a m°vgmmcSmOmEmCvQ3oy ocNpoa�a�c-cEmTE'Q EE m1C0'x0 �rt0r ca �0 onm v ° m 3' N o rrcyo ° mvp at m ma m m m�a'mv �U m m a° > c m m TO °'L E C(D) EL 0,6 N L W E o'pI m m'm'- mU mr E o^� L-. uMiL m m mY cco >,m y m E N m m `o« a Rx E ,L C -=-O 1°00 m N C m N C N O > ° lC0 U y EL�N•'C N �O l0 CU fLA 'Or l�0 N N O E -O 3+N. CL °J C °.l0 NONm�N NYlOm Ooh-Opp'=V �oU 7'00f ULL�-mm OL �.0 O...��yCO Q p�N?i'o 20°2N Ez�o.r-'n (allo L ��m -mac ��v�mom 'O CZ E>mmc -m y av (D c z CL m0EE ,�`c°mpNZmUX-°m°X'm�ot�,°�m° �EtU caimy_3o�Emvm�o rny�� o=?gym >.7 raV!O_ Cm(OLNN�dm30w NL m.N-C�m a�d«C gC C m G«>'(NOc N �y Gm OC "O is O(D>p "1V a o T= c m .. o Tmr wNv az c o E 3 C'E m NL QO -p Om (D m m E> m mco a, N cu E E m 2-1- ac N XZ 0)0 Ua NM o�O"'•CV^Cm Nmmm UmL C 2 m N C UrL(rimQON m, cr _O)V U.) -0 Q.m�m0 _> m E ca XQa 0- U«r._ m� m maL 0-tj 3 U O« m` r ---o 0.0-0 a ^ La N -f0 E L a N W 0) 100 mEmp waMo�Z« v'O ca o -o `o O Qcc' m stn m E _NL c F, JtE 0) c S2 -o E c M aN N N L o x- m ~mILCN 0 Nr Ol._Nmm37-OOmCy 00E U"'V'EiU. �N drp•Cm y aumU, aCm3N . (6 m(DC (L (ncc0.^UpNm«.m mOC 7 Cir 3 >U m> OD) >m _ E ai�Lm•L0N N�r'OOtC>NmCCoE� mmC C CC_C°'CO'�x caE0cu Z o Cp.00 °m� -JO«o is nY=mOyom¢E� `�mwm0 wmoE ZcmLO�. cN-0 E 0E-c-� 3 amaai C"rno1 C Amo°�� cN mp?E->iaNE m -Z T c`o' yL0 m Yo 0 ccE._LL y� m -mUmmLZ (mn ccaar o� C �(O (6a x `.C, 0 N N'o 0 m m .2 � � ° o � � m 0 L C 3 y° v <0 3 c. axi (co m° m.nn m �'- C,v_ o E pld.c m y y N m (ca C•$v a m Q E a0 0w.� o m 'F0,0= ai a� a�°i o Di 3 wa6 3 m:°v._ E 42 -F. N c NU 0 m 01" 111 cY O m1L- o m Z Lam cc � ami Ew c LLmv Nz cma cwc cEm«m..-N m -E (L c-0 m L v-ar E_L._m O 0 O�p m m J m z• -L N° m N 0 16 N C C=�._r-'� N o° N N C ..-a C C L. O R d T� N O _jW050--5 E-p?Cl«�E2-._EcrE(Nuc°c��(ngv,m(mnomLoom3ym 3c�cy a �a QC Mrn N V N'� E"p 3 3 N«m .m- U� m 7 m OUa cCr N-° EL U O 7C d E C m 1-06m ° V N m m C °v 0.O N Nv v o m c c off. o N l0 o O. -E m °'>_ m pY m m' � m« m ymoaaNmZ..�oLa«oiE�e�a�>mQpEU$ooE3Y�Ny� ywao>mm p�(ca�vi TE L5 C -O O(j«._ J yL m U WBW.,-ai a 03: cu 4) Oc��mivo�m:P(Du)aN(a->,M�rny °Nan m•noEL COUmm Or-m°F- •O _Omm'-m>,m C UO>`ONN -pV CC mW V CO_m UO 2f-'� Utmnm«(•0Cm.-O a) 105>'0 I'OR ON N(nmZ'N O°T��vm NES LLL m�m(6E Ty N - O "0c-_°«vvm«-:o c cco N2invo°c0mmom (D« am g'> a' ai>,�iam ON 3 07 -L `ma0-C._ U._•�7C- mU0.03Cj.-ateN Nal .N +L'o 1EaCUN >+ N«L'3 mO 80 Dl'm UN mtm -0 EU = m yoov N ° mgr mr m- ° N v.r,.-=--,o > min v c m o L,� O '� a o = c r 'C J m N L m .- - N v Orn -O (6 C •O O_A O c m m 0 -- N'iU - u) m p O m N a> m o a° �5 >,o `r aC � c N E `a y ca a) E'o Y m y'_ cu E o m U, IUD g Ong m� C 00 d V N E 1 '�:3 l(a °' c� amp mm O O i� m c>,D�m2-C.6 m p -e d E C m 0� oi�(Nc ca« N m C N a L Cn mL 7 m m° 0a"7 C Q m c(a 7 O �r N L._ N 03a)a)MOW c�om��oa°iaoycoYc0v)ooga°iZmu,r�:~:mY�o��N°mo ��y(6oc oLm L _ o> rno OZMLL m TE N m'� E_ _ m E Ev_ m N ao °r c �._ y N� y L o o m p1-gE WaZar-m m:. "O°p3m>°-LmONCOU>N�moO)mL- ONmmNC`mNONO °PNCE O a• C F.�orENc`(caa°,vyiEcoLm�Em�=o�U�cc«`m¢cyaa�aE�moo��E`opm (ccC3�y ui�aYLmEo m0 E7N m70 U.�� mm 7�mm'-N 'o T .0>Nmwm._m U Vlmm FpN mC O LO mild°�C(�y0>yiL..' LmN« •$mLmzmt.-L`�a1� -Q.mOm U�NVa' "OOm30 C Z 0 Cu C�Or N Z,J O'== -- m m E_« d 7 O j�OL N O C O•°� N p N EU C NL 7Y > 0 m('j Z'.0 (°n,N-,- c C C a) 0) -5 w m o -Y�m 3>_°°.'E._�� Eo3cmi•.-°m>mi5,02w rimo"a a %minor me 3� N��o�oa '5Q0 =3E n� a)C;7-xc mcEmcirL2WE3E0-!i'6Ncac '-- ac" °a�oC«o oz°Cco LC� omvc°umpmELnNm3y3a'�r •poi oiuc�Nmm �m _m Pc ° _ c X m O�"C N N� O 130UL'(CLLN w'C •O C m m.0 C O N 0 0 E'16 mJ N °'-E2 0C O-ar NLL 0 .3 Or U N F CU)(D a> ? mYN!= ma0ol�=�tnOVOOC > a) -Oz.-,=- m._Nm«m« dW mmvmmC m•OCC-°p vN0)a)- �NNNaU3N00�'L"COm EmN cm.0 a7 Y7>C«U0i-'NyxOLQLL pUpw C m N O 20 O X m E -C -?5 N0 > m'iN N C o Cow" ai �m c«' cv m v N='=j o c ° c >w.0 a) -0a - ' i E. d-) , m►L-O 1°'6M E ani ayi w' U- O _ r- o - E m cE'a��oU �.. o �rn m �v oLQ m c 5 c c m~ E R E aL ° o mp� - mL rnv Np m C m am m e«°O NLU y no d C(LLnp000i2�o~�ScL(°>mnZam`ioi�aEYm=EcEL3- cCcvoimoccm�vyiE(°amlma(«�a(mi�Sio 3c « Um O L C i .--Z' E m'�CL mCiC °•pm°• -O« E- cu 0u)4 ►. >,W dym-0 CLLN O1°a:_UL TmNUmCEpr°mEmom3Eom«'-aLccUNU^�=>;Po.dCLwr- p">-CL26-ria3EUJoVmir E- m3ai6ca.v_F�cc�EEcmaNEmENmp«a''a-otv='ecmc°��Lrn°mrE�'coLLo�caoa��FQmCjm$m0 pomCa°m(mn c°�-'��'�aOa�U�p�Q- cu. M�C'm (°�•a•.>-.�a3�yEoQ�Ooz o) °0WT (LiH:2d-) , dC - n TTC'^ �RY^N N dM ~N O:Om c Crop (q$ O M IS M �N CLP G N N .p S?Db a� O zob"'$o E3>�ui roM m' M ,oma v mtix.os C Iya cz P AN C� TTI OI - d~SO Nig', �A LcYn .L: '^,i�m cap"aM ,tiymc75�,Q ZT "'i -^v`71A Npo t7-- I I c-Uo, `l p. -I QQNM NNOON/� I I39 °��ID¢ aLt 2Zig OF- ''Py Q' yO __Tac -gip^ yyl 'EN�i GNmN�C-o,`O_V, an�N ll --nn OV ems% OV IA'- b G N,p NN'F ;i -100 Y d PD �Vf d Mp••INLL,�-IG O.�� . (O QCNOM L_�QLQ r•�N �b�«3Nlyg• ,c ��gmq'ir w�No P,D I- min tL c>?-� N a bi _d ,d ^' E�°'Yd Ta0w `a.o.!2't-4n Y y nb a'^ t¢ Erb r -IN Opti rn��H o m bro,yb w dd'N$ "-1N �Nv^=� dr nmg 2, o a..> c8Pb: c m 'i mg o - o aR 4oGy oN o� c �Mrm� O, 'm - ..N 3 0 •c `• - N p pp - NMZ -gi d X m �'Q O, C ' I -t - O 0 � c O p� O C T d N M � N C M N QQ oo u O- O N N >` N r N L u' d N_O iNV ON - H O 'ad- 'P Um nc b ti r. bVf ^O, O O,W dC' 8 O t ~N' - II "'I �d L~ N p� - - NN I - - N - NN c M C Q '� •••. C p --I M J _ ,O fq/� 3 � M d M Y Y O n' --bo Q O .� vN� N Q ^L p� M � P C p � pti U - c V "'I Pi T ' � Ia Iy - N V� . N f^ t E,' � q VN- M p �M = -O OC dp--Id Nv _ A ,D ON3 N U,ON El -o _ Q-- QQ P M n p O •�"I' 8 m Z N C m > V, Y ,b p 2 ,o c- - : 0 ,o _ 2 M B- L"1 0, p _, Y '� - N ay - .V III C E p --I T~ N 6 d ,O C N I� g N ,4 p (7 N- - �> _ Y •Q o -°M - p cg"o - n� E v tiPv p QQ O v O - }yyy� .• b - c O dN �'N ='-I - gqO.Or C BLrb C NL dv0 J _OOI"lm Nm6br-i O� C C > C 3Y�cNNc�gr ��,oBb M>3'!�CyaC5n.lNEcLosE�" Q c ab3° r6'^~ccmC1pp ma°Lnc$�flca WGLIA QMCC�nW �,p rN-iM qJJ,, bl alM gNdOdl�dMtro SF�•O�eR �q CN?".2 +lddq y�P z UM__G9� v1�b Oltlzi Sp-1�>1'In�N nC V In r -'P 2 -IQ n S;N NNUQ 'O�Ed'..._Q ,-1 m 6 N N O ' 66 d 'C e3: c O Y1 1 0= = v;P H. MN P .�9 O O .9:2 U N N 7 '] `-' M n0 p r.o vM tiIcu ^ n y+ T m M'A3-� d.O 0 a A MmC a PNP- ~ NNYd N �v d E= ' td i v M. Sc' .,nd m oO L d. 3> ti 'Ern -3 dd C - q M .o0•jl a�--q'- roq^Y '� vN nO H P OtiN0 N a�O �BON C'nN_ C' ,C NM ' % c Nio -nM C -o aO - � t.yo'u m y . .tq Oyn s O u=a �N.."S C� aro 0 Iai- aa='D>I,2 t 3 - i 3 E �n k G 2 , d C t% c z v N N .i I I ort § rL' o SM - N.I ';!•I NC I J C .... oda . .� b .E 39'S-�'-'a N _ ME •O - 7 QQ C^ n r'O-1 L e -I 4 O _8 N OOoI cgl pti��)_oL^ m d amN Lad 19;42 �l pryry �^.c Siia g = - I `cN-6 L o4B, C . d .~�.NrL m__ - o C N . . " Q .° c >v o pq zR II' x a - "Z-9 c - o II n _Yn k' o i 1anic•cc acEo"bBo>,NooC • O m _ d LO - •cN �n . Lj 5n C7M no YnN i d .. a _ _ 0 v p _ v ^o 1n Lo n C M O • C N C ~ o LLL � s- _1 o o,g°Da c .'a c Z@ ,:.F I O- Q U Q ry i O S9 - - y�o3 o_ 1 I- oc i3 M E o, - € n L > M I 6,4 ( N C \v � ON h d O.' Q NN L O N p••1 ' P •c o '^ � o Q - r Y NdN Y d N r-1 u n d 3 o O c N -flll� � N CIj _ C i Gi g - .A E. d I m •c c xoff 4 Ooo$o c wam o E2,-2mp al oozo go U -a n 'aY%Ea'i ti E II s = ,"�1 p az�F-a io c d c B _ (7 y IG LL I'ys c ^E„ no -� i p 8 E n� v- d q 0 d m«�I o'IE n°CI.a 7a 3 Z'aciFi .£ mit mL._ >E 4'oag ' dP NlN3 p°moo^Lct,, LLIfic tU oO zNt6 - "m�S 5 1 2i77MGp-p ONd V,m c%I�NY_ O Nm S v NU= G'N 1.[39 5mf N m6cRBo N CN$n NE D9p�1ng MM V�d N�.SN I p i V .ti c tiQI N a 49 5 L g-_2 '.nN�� U 1ITx �"�vO iZ NMnv -vY d' n on�OO NnMEv.V�A M> O dqO 09:d�vS^m�Ba= O hS -.?-,id C C $ .O. Tc�"d O n >^�O__ c L cq =bP d d d c. - N D-°nd O N C N.Cn qng_ cWa IgN II nU ti�iv��c�.GM A. O L U C 0 Q fq O A 9 IL IN.. IOi,PP VRpR.RR�e h N N N N M d 9 A c6 ..Pmp, O,ml�1�,0 IPM NNNNNNNNNNNN m J NIS,-INMIIIN tT�NP� CPP9PPP MP o ( - - iEm i :L O ry :n - W N J N O LL U n U _ > O " $ -5 > C� q- - '6'=F- j N 2 c p E a_. U '�•� _ P b = H oh7 E in may__ � cN a 3 Hca $ ,9,%'•A •5"gng b -NN Mb Nd'3 !Ati {=A po Nc`l or? --G�db fi 1 �� Oo(�b d ?Na P . ry2 �� Y g'(an Op YJ Nf\9 f�ZN X C L�NbNH lh C ENNCp (MdJ Hb N 4 . In P•D- �: �" � NN N b -d MN C mN.�y 'Yoj c40_ apOZ-p C OMM ,C7�d $d NE 6:.0 N.ZN€C -N , e"%VpC >N 8� O O ,.- N Nvpbmth-O xdtiUd �_LL�M..M�BN Oc�O c31ry ^b�c:l d> -_�c ^-�'! __s ' I v ADM�O3 B -lL� V zn`O.p� O'"yOpmTAC1-S�6 dG-Cb,QoQpP-NN ac3. w waM'R NppwbZyNA-x"No - 8O�"lOPNOENaM'$�-O (;jMO.O ISO, ,OMMNf�P Q M N N N N N N N N NMpN, N.,n 8Z8 9!� C L C .2 ryry O in C 0,..1NJ - C -p iL .QZ p J .. _ v .- p. o N Fol E d 3 a o _I N ^�aN2 aO1i1- cC N m �N opszg_* rn'a ','psi g a *f $ 3 ^ o d- m E o'al o R lc s g A a-' 9 �' .m. � d GG1 ..'E8 ON O0('l U u C .. - C O _ d NSI -a' 'R� -.a.- -� 'S > 0 •. f7 WII-=9 o..1aEy1p Zvi IT tat vip o`E. cc U O I q 'y N _ Nco vx a v - 'r ryry NO - u c._ Z _.. So V v._ o O •- pl (� GGS L a U 1 N'866 'c d ui o`oo=.�.La � � d Bp - q 9 � OO W m CL O �•' O n N q d U Z c .. tin '•,. d o ai' I d �.tv'G 'C E A ov no N9 c - - y E dL p 8' t - z - p m c g ac�Gl pti 'O - d I OL Em3as6_S{p i.i aS'�o^3L_ryry r:� pIp771 eaizO _ n - M _ N> O p C c(giJS'�egv Sy�B.N-I�-.M-1°e... tr!'>n zU �¢c E m" c n c « a0 4, p' V wd. > IT N 'G N N -h . t .EL- oa`i•-d-. q.% ,;'> in N o ^ z Esc=xy y:? � I ` 4 O I 1 .^.-> oy a .5 _ aDJm j O�O .N. N �I •_ - Gi d C .N.. N -=?E>'I -.'b ��^'ol&I «ae6 No, 8 .. .>Lzo 10 pOOQ J„Na .n~ Q.AQ N E O o d > CNc>!g >, m .== d = ,355533p1II111 . `o y'b « o � .y non � J$_ o U p>po - n 3 Jo i�.52.E-6 g E' a },v^s A ice. Si"S §' -q-q �5M's.s2 ri M .. ,r.r y GF 8 C N O C M N N P c �U v .. c f Nm acE.: Y O • O - N N � �q 1 c r U N > - c -• - 8 > 8 8 e p-1 � .E J a 3 •.ti ._ 'N Y n G� pp ryry Ii° d c m .-: C -N - d CCN I1, N p d C H 6C7 1� 0 j -3' �j .. a o -u� d O W m- GD'� ,'D N N Q C V a`i N - - C T 9 d ay pp11 J1,, > N'C - - ^ C OI _ q d _n ? Vl Ol ,& O6'a'6 ^N E, m - a a a N �'�$'s - ire1O .. g'n v_ ,9! ".4 . Lo-dmL E CIJ rid CLN dA d,p •••. � NE >':'.2 g �.T11 I I"�S OaSN `�N ISNvOM m �H _c�OaN �B J(7 ..QK J IH Z O N 09 O IL N N Z ->,U NOo_j Y MC .Ci5No°° r E V) o Z OOW mQ,O,DIO a EQU E�(no II 0LLO PO O '- LLc (7n"�O�a._°mo Q pm?�U a) r LL g Z N J22 Zr W 'C 0 3 c ¢ E? 2 M EEEEEEE to .o o.cdo.d IO, ~ M M its o i N N t e M L L i v iE N i 0 i 0 i Z I s i f0 i N � i N I .W-. i C i 10 i C i o t a U_ Z c i Q 1 0 0 �8 i U L > i C c - o Z i N o Z y C= C N 1 G - al - N O W = « p � a T7 C �K U 'y Z d .o n 1 ,is o WC io C O O au ~ > %= L 'O = C Y m p o Gi w O - 1 m m N d - au Ho c W W O W U 8 - ON L;�r�'0ww�W 9 73 75 E(DCDXa. I%. q 0, .' n d C N yj ILI �'y T d X L d -+ - d d O N J� �t•E - >o� N s� IINNL tit^�a d��� w� 3 'u 003 GGpp -moo °d - d n ,ob �c SB- 'A O.00�^ pn I r.N Vi m 8> o SE°� E?':r- Vi m N,n -zO NNC dG NNOCpdgC%Y U'' •� Vl 31I-,+Gd� 00.O.tiL. c E- E m@ c c -Z u o ^4 C -aQ d -Z -f='; o. > n x zd dt - _> - C - -+ N N HNV O O n c O - O GGll ~I O C O « � N pp g _ o n :F 'Otis o e• B A N2 :d I p U ` v L 8 ... d - �Q d �q �O m' � d O _ C d g O 2 , n o . o 0 g - C d 1 0 'a �2S cl++' o ac �« - v a y .. ` (¢Ia 6 O! �I -E-:� yy J J O nNagc$�d20'EPm I DRI Qr•I>i•Qto N`,E r2 ,4 � WP •-oo ..aLp�a'. 0i Or O 0 j O V O' O c _O O „• Z q- W E c 0 0 a N w 4 i- f%, N V l y _ O C m u `p, t Eo`�oa'c E c�pd "R 'off vgcrnL E�o�,2i - oO Tczm op mm op Zdf aP2 O a z O 'I'U dOo: m :U d a ]Ia_c>wU�n pNti c : M- �N : - : _ z i3 inw z iL_vc S 5nU ''o - :z > a «V' N No -- po A '- c YG- :O :N Q -r :P o i-- ..p ,p ^ X :X O a iX iX : '- - -.O av�c _ M I':' _ < 'x.�x m X M X X^ -'m-v Pm1�.r b O N N ..m ... - ^ - NF iE Yi i� � i N,O � �MS._c � � � 'L - .in c E _ - - zo �� _ m �-;z d N d d dim � c Cc _ -eco,$ .oyap�N - .. `zn:W G' >w n q T O :Esn, _ I�' -' ^ 1 . P S - 1 m O E' G -I 3 a 'a : W W W W F- C. - - o� 2. - Ez izz~ €z" - i i0 i E i N> a O O io n F U is p �ov :3 `J :o :x iz z ' cQ U .0 `W �Y W OnZ� •30 .1'N C N x z :0p'z ; 0 W ii �; =a Np Korn' c a am O i z iD.z ' O }• l'0 C 3 `LZ w <.Z>yCNj •o WO O s 0 4 Z g p o -9 m 0 >x�xnax i=rGW aQNSr'ISL O j r c ¢ U � o 4"Q.n WW2 !'x4"0'10 > 3 Q u p o � LL z a �m �y.n IiU m a u�.nOnog qa ua gNOO'ca O Umn>�iitn3zci LL �a zU opo IiU3mW W NMpN, N.,n 8Z8 9!� C L C .2 ryry O in C 0,..1NJ - C -p iL .QZ p J .. _ v .- p. o N Fol E d 3 a o _I N ^�aN2 aO1i1- cC N m �N opszg_* rn'a ','psi g a *f $ 3 ^ o d- m E o'al o R lc s g A a-' 9 �' .m. � d GG1 ..'E8 ON O0('l U u C .. - C O _ d NSI -a' 'R� -.a.- -� 'S > 0 •. f7 WII-=9 o..1aEy1p Zvi IT tat vip o`E. cc U O I q 'y N _ Nco vx a v - 'r ryry NO - u c._ Z _.. So V v._ o O •- pl (� GGS L a U 1 N'866 'c d ui o`oo=.�.La � � d Bp - q 9 � OO W m CL O �•' O n N q d U Z c .. tin '•,. d o ai' I d �.tv'G 'C E A ov no N9 c - - y E dL p 8' t - z - p m c g ac�Gl pti 'O - d I OL Em3as6_S{p i.i aS'�o^3L_ryry r:� pIp771 eaizO _ n - M _ N> O p C c(giJS'�egv Sy�B.N-I�-.M-1°e... tr!'>n zU �¢c E m" c n c « a0 4, p' V wd. > IT N 'G N N -h . t .EL- oa`i•-d-. q.% ,;'> in N o ^ z Esc=xy y:? � I ` 4 O I 1 .^.-> oy a .5 _ aDJm j O�O .N. N �I •_ - Gi d C .N.. N -=?E>'I -.'b ��^'ol&I «ae6 No, 8 .. .>Lzo 10 pOOQ J„Na .n~ Q.AQ N E O o d > CNc>!g >, m .== d = ,355533p1II111 . `o y'b « o � .y non � J$_ o U p>po - n 3 Jo i�.52.E-6 g E' a },v^s A ice. Si"S §' -q-q �5M's.s2 ri M .. ,r.r y GF 8 C N O C M N N P c �U v .. c f Nm acE.: Y O • O - N N � �q 1 c r U N > - c -• - 8 > 8 8 e p-1 � .E J a 3 •.ti ._ 'N Y n G� pp ryry Ii° d c m .-: C -N - d CCN I1, N p d C H 6C7 1� 0 j -3' �j .. a o -u� d O W m- GD'� ,'D N N Q C V a`i N - - C T 9 d ay pp11 J1,, > N'C - - ^ C OI _ q d _n ? Vl Ol ,& O6'a'6 ^N E, m - a a a N �'�$'s - ire1O .. g'n v_ ,9! ".4 . Lo-dmL E CIJ rid CLN dA d,p •••. � NE >':'.2 g �.T11 I I"�S OaSN `�N ISNvOM m �H _c�OaN �B J(7 ..QK J IH Z O N 09 O IL N N Z ->,U NOo_j Y MC .Ci5No°° r E V) o Z OOW mQ,O,DIO a EQU E�(no II 0LLO PO O '- LLc (7n"�O�a._°mo Q pm?�U a) r LL g Z N J22 Zr W 'C 0 3 c ¢ E? 2 M EEEEEEE to .o o.cdo.d IO, ~ M M its o i N N t e M L L i v iE N i 0 i 0 i Z I s i f0 i N � i N I .W-. i C i 10 i C i o t a U_ Z c i Q 1 0 0 �8 i U L > i C c - o Z i N o Z y C= C N 1 G - al - N O W = « p � a T7 C �K U 'y Z d .o n 1 ,is o WC io C O O au ~ > %= L 'O = C Y m p o Gi w O - 1 m m N d - au Ho c W W O W U 8 - ON L;�r�'0ww�W 9 73 75 E(DCDXa. I%. q 0, .' n d C N yj ILI �'y T d X L d -+ - d d O N J� �t•E - >o� N s� IINNL tit^�a d��� w� 3 'u 003 GGpp -moo °d - d n ,ob �c SB- 'A O.00�^ pn I r.N Vi m 8> o SE°� E?':r- Vi m N,n -zO NNC dG NNOCpdgC%Y U'' •� Vl 31I-,+Gd� 00.O.tiL. c E- E m@ c c -Z u o ^4 C -aQ d -Z -f='; o. > n x zd dt - _> - C - -+ N N HNV O O n c O - O GGll ~I O C O « � N pp g _ o n :F 'Otis o e• B A N2 :d I p U ` v L 8 ... d - �Q d �q �O m' � d O _ C d g O 2 , n o . o 0 g - C d 1 0 'a �2S cl++' o ac �« - v a y .. ` (¢Ia 6 O! �I -E-:� yy J J O nNagc$�d20'EPm I DRI Qr•I>i•Qto N`,E r2 ,4 � WP •-oo ..aLp�a'. 0i Or THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ROOFER - Loca133 Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.78 $10.50 $2.93 $0.00 $31.21 2 60 $21.34 $10.50 $9.80 $0.00 $41.64 3 65 $23.11 $10.50 $9.80 $0.00 $43.41 4 75 $26.67 $10.50 $9.80 $0.00 $46.97 5 85 $30.23 $10.50 $9.80 $0.00 $50.53 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.28 $10.50 $2.93 $0.00 $31.71 2 60 $21.94 $10.50 $9.80 $0.00 $42.24 3 65 $23.76 $10.50 $9.80 $0.00 $44.06 4 75 $27.42 $10.50 $9.80 $0.00 $47.72 5 85 $31.08 $10.50 $9.80 $0.00 $51.38 ._._..--_____---._.._------------ Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 Step 1 is 2000 hrs.; Steps 2-5 are 1000 firs. ---------------------------i Apprentice to Journeyworker Ratio:** ROOFER SLATE / TILE / PRECAST CONCRETE 08/01/2011 $35.81 $10.50 $9.80 $0.00 $56.11 ROOFERS LOCAL 33 02/01/2012 $36.81 $10.50 $9.80 $0.00 $57.11 08/01/2012 $37.81 $10.50 $9.80 $0.00 $58.11 02/01/2013 $38.81 $10.50 $9.80 $0.00 $59.11 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 45 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. COLDSTEnv Goe , nMOTHYP. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt, Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Ibwn: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER (Slate/Tile/Precast Concrete) - Local 33 Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.91 $10.50 $2.93 $0.00 $31.34 2 60 $21.49 $10.50 $9.80 $0.00 $41.79 3 65 $23.28 $10.50 $9.80 $0.00 $43.58 4 75 $26.86 $10.50 $9.80 $0.00 $47.16 5 85 $30.44 $10.50 $9.80 $0.00 $50.74 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.41 $10.50 $2.93 $0.00 $31.84 2 60 $22.09 $10.50 $9.80 $0.00 $42.39 3 65 $23.93 $10.50 $9.80 $0.00 $44.23 4 75 $27.61 $10.50 $9.80 $0.00 $47.91 5 85 $31.29 $10.50 $9.80 $0.00 $51.59 _.__ - - - - ____ - - - ____ - Notes: - - - - - __ - _._ - - - - ._...__._ - _- ___ -- Tppreniceto ----------------._------ Apprentice to Journeyworker Ratio:** SHEETMETAL WORKER 08/01/2011 $39.83 $9.82 $17.09 $2.00 $68.74 SHFFTMF7AL WORKERS LOCAL 17 -A 02/01/2012 $40.79 $9.82 $17.34 $2.04 $69.99 08/01/2012 $42.04 $9.82 $17.34 $2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 $2.11 $72.56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 46 of 56 THE COMMONWEALTH OF MASSACHUSETTS tr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. rGOLDSTEIN G-or Gor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METAL WORKER -Local 17-A Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.93 $9.82 $3.74 $0.00 $29.49 2 45 $17.92 $9.82 $7.45 $1.06 $36.25 3 50 $19.92 $9.82 $8.42 $1.14 $39.30 4 60 $23.90 $9.82 $9.60 $1.30 $44.62 5 65 $25.89 $9.82 $10.32 $1.38 $47.41 6 75 $29.87 $9.82 $11.76 $1.54 $52.99 7 85 $33.86 $9.82 $12.69 $1.69 $58.06 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.32 $9.82 $3.74 $0.00 $29.88 2 45 $18.36 $9.82 $7.45 $1.07 $36.70 3 50 $20.40 $9.82 $8.42 $1.16 $39.80 4 60 $24.47 $9.82 $9.60 $1.32 $45.21 5 65 $26.51 $9.82 $1032 $1.40 $48.05 6 75 $30.59 $9.82 $11.76 $1.57 $53.74 7 85 $34.67 $9.82 $12.69 $1.72 $58.90 .._......._._._....._.._... (Notes: -...._ ------.----------------r Steps 1-3 are 1 year; Steps 4-7 are 6 mos. 1 1 A __ Apprentice to Journeyworker Ratio:l:4 - - - - - - - - - - - - - - - - _ - SIGN ERECTOR PAINTERS LOCAL 35 - ZONE 1 06/01/2009 $24.81 $7.07 $5.90 $0.00 $37.78 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 1.00 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 47 of 56 THE COMMONWEALTH OF MASSACHUSETTS u EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT j DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the 1OANNE F. GOLDSTEIN Go-or TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E,ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SIGNERECTOR -Local 35 Zone 2 Effective Date - 06/01/2009 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.41 $7.07 $0.00 $0.00 $19.48 2 55 $13.65 $7.07 $2.40 $0.00 $23.12 3 60 $14.89 $7.07 $2.40 $0.00 $24.36 4 65 $16.13 $7.07 $2.40 $0.00 $25.60 5 70 $17.37 $7.07 $5.90 $0.00 $30.34 6 75 $18.61 $7.07 $5.90 $0.00 $31.58 7 80 $19.85 $7.07 $5.90 $0.00 $32.82 8 85 $21.09 $7.07 $5.90 $0.00 $34.06 9 90 $22.33 $7.07 $5.90 $0.00 $35.30 - - - - ---------------_....--- (Notes: ---____- Steps are 4 mos. Apprentice to Journeyworker Ratioa a Tpp ---------------------- -- SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2011 $30.14 $8.56 $7.27 $0.00 $45.97 TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B 06/01/2012 $30.44 $8.56 $7.27 $0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 $0.00 $46.62 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2011 $30.43 $8.56 $7.27 $0.00 $46.26 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.73 $8.56 $7.27 $0.00 $46.56 08/01/2012 $30.73 $8.91 $7.27 $0.00 $46.91 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 48 of 56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 49 of 56 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT i� DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SPRINKLER FITTER 01/01/2012 $46.38 $8.42 $11.60 $0.00 $66.40 SPRINKLER FITTERS LOCAL 550 - (Section B) 03/01/2012 $47.13 $8.42 $11.60 $0.00 $67.15 09/01/2012 $48.13 $8.42 $11.60 $0.00 $68.15 03/01/2013 $49.13 $8.42 $11.60 $0.00 $69.15 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 49 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SPRINKLER FITTER -Local 550 (Section B) Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 THE COMMONWEALTH OF MASSACHUSETTS $8.42 sx EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $32.50 2 40 DEPARTMENT OF LABOR STANDARDS $8.42 $7.85 Prevailing Wage Rates $34.82 DEVALL. PATRICK Go- As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Lt. G- mor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SPRINKLER FITTER -Local 550 (Section B) Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.23 $8.42 $7.85 $0.00 $32.50 2 40 $18.55 $8.42 $7.85 $0.00 $34.82 3 45 $20.87 $8.42 $7.85 $0.00 $37.14 4 50 $23.19 $8.42 $7.85 $0.00 $39.46 5 55 $25.51 $8.42 $7.85 $0.00 $41.78 6 60 $27.83 $8.42 $7.85 $0.00 $44.10 7 65 $30.15 $8.42 $7.85 $0.00 $46.42 8 70 $32.47 $8.42 $7.85 $0.00 $48.74 9 75 $34.79 $8.42 $7.85 $0.00 $51.06 10 80 $37.10 $8.42 $7.85 $0.00 $53.37 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.50 $8.42 $7.85 $0.00 $32.77 2 40 $18.85 $8.42 $7.85 $0.00 $35.12 3 45 $21.21 $8.42 $7.85 $0.00 $37.48 4 50 $23.57 $8.42 $7.85 $0.00 $39.84 5 55 $25.92 $8.42 $7.85 $0.00 $42.19 6 60 $28.28 $8.42 $7.85 $0.00 $44.55 7 65 $30.63 $8.42 $7.85 $0.00 $46.90 8 70 $32.99 $8.42 $7.85 $0.00 $49.26 9 75 $35.35 $8.42 $7.85 $0.00 $51.62 10 80 $37.70 $8.42 $7.85 $0.00 $53.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 50 of 56 Ulf DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: Job Location Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE s .retary GOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Various Locations Effective Date Base Wage Health Pension Supplemental Total Rate - - - - -- -- - - - --- - - - -- - -- --- Unemployment Notes: I Apprentice to Journeyworker Ratio:l:l STEAM BOILER OPERATOR 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TELECOMMUNICATION TECHNICIAN 09/01/2011 $31.42 $13.00 $12.22 $0.00 $56.64 ELECTRICIANS LOCAL 103 03/01/2012 $31.78 $13.00 $12.23 $0.00 $57.01 09/01/2012 $32.29 $13.00 $12.25 $0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 $0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 $0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 $0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 $0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 $0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 $0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 $0.00 $61.72 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 51 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. rGOLDSTEIN Governor �5' TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TELECOMMUNICATION TECHNICIAN -Local 103 Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.57 $13.00 $9.27 $0.00 $34.84 2 40 $12.57 $13.00 $9.27 $0.00 $34.84 3 45 $14.14 $13.00 $9.51 $0.00 $36.65 4 45 $14.14 $13.00 $9.51 $0.00 $36.65 5 50 $15.71 $13.00 $9.76 $0.00 $38.47 6 55 $17.28 $13.00 $10.01 $0.00 $40.29 7 60 $18.85 $13.00 $10.26 $0.00 $42.11 8 65 $20.42 $13.00 $10.50 $0.00 $43.92 9 70 $21.99 $13.00 $10.75 $0.00 $45.74 10 75 $23.57 $13.00 $11.00 $0.00 $47.57 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.71 $13.00 $9.27 $0.00 $34.98 2 40 $12.71 $13.00 $9.27 $0.00 $34.98 3 45 $14.30 $13.00 $9.51 $0.00 $36.81 4 45 $14.30 $13.00 $9.51 $0.00 $36.81 5 50 $15.89 $13.00 $9.76 $0.00 $38.65 6 55 $17.48 $13.00 $10.01 $0.00 $40.49 7 60 $19.07 $13.00 $10.26 $0.00 $42.33 8 65 $20.66 $13.00 $10.50 $0.00 $44.16 9 70 $22.25 $13.00 $10.75 $0.00 $46.00 10 75 $23.84 $13.00 $11.00 $0.00 $47.84 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 52 of 56 DEVAL L. PATRICK Gm mor TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNES feGr�OOLDSTEIN aq Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Various Locations Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment ------------------------ Notes: 7- -_.._..._.--------�...�_.._- - ......._.._-- Apprentice to Journeyworker Ratio: 1:1 TERRAZZO FINISHERS 08/01/2011 $45.50 $9.93 $16.51 $0.00 $71.94 BRICKLAYERS LOCAL 3 - MARBLF. & TILE $27.89 $9.93 $16.51 $0.00 $54.33 3 70 02/01/2012 $46.49 $9.93 $16.51 $0.00 $72.93 Apprentice - TERRAZZO FINISHER - Local 3 Marble & Tile $37.19 $9.93 $16.51 $0.00 Effective Date - 08/01/2011 5 90 $41.84 $9.93 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.75 $9.93 $16.51 $0.00 $49.19 2 60 $27.30 $9.93 $16.51 $0.00 $53.74 3 70 $31.85 $9.93 $16.51 $0.00 $58.29 4 80 $36.40 $9.93 $16.51 $0.00 $62.84 5 90 $40.95 $9.93 $16.51 $0.00 $67.39 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.25 $9.93 $16.51 $0.00 $49.69 2 60 $27.89 $9.93 $16.51 $0.00 $54.33 3 70 $32.54 $9.93 $16.51 $0.00 $58.98 4 80 $37.19 $9.93 $16.51 $0.00 $63.63 5 90 $41.84 $9.93 $16.51 $0.00 $68.28 -__._-------------------- Notes: ----__._-- € Steps are 800 hrs. I _ _ _ Apprentice to Journeyworker Ratio:1:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 021.08; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 53 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75 LABORERS - FOUNDATIONAND MARINE Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 70 Prevailing Wage Rates DEVAL L. PATRICK Go -or As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Lt. Gocemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 $0.00 $52.75 LABORERS - FOUNDATIONAND MARINE Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.83 $7.10 $12.60 $0.00 $39.53 2 70 $23.14 $7.10 $12.60 $0.00 $42.84 3 80 $26.44 $7.10 $12.60 $0.00 $46.14 4 90 $29.75 $7.10 $12.60 $0.00 $49.45 -_.-----._...-_.----.__._.-.......-..._.._._. ----------------------------- Notes: ------Notes: I I ---_-_._--------------------_._-I ----------------------------- Apprentice to Journeyworker Ratio: 1:3 TEST BORING DRILLER HELPER 12/01/2011 $31.77 $7.10 $12.60 $0.00 $51.47 LABORERS - FOUNDATION AND MARINE TEST BORING LABORER 12/01/2011 $31.65 $7.10 $12.60 $0.00 $51.35 LABORERS - FOUNDATIONAND MARINE This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 54 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING LABORER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 THE COMMONWEALTH OF MASSACHUSETTS $18.99 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT Uf DEPARTMENT OF LABOR STANDARDS $38.69 Prevailing Wage Rates DEVAL L. PATRICK Governor As determined by the Director under the provisions of the JOANNES reGOLDSTEIN wY TIMOTHY P. MIJRRAY Lt. Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING LABORER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.99 $7.10 $12.60 $0.00 $38.69 2 70 $22.16 $7.10 $12.60 $0.00 $41.86 3 80 $25.32 $7.10 $12.60 $0.00 $45.02 4 90 $28.49 $7.10 $12.60 $0.00 $48.19 ----------------------------- ----_.---_..-._--.-.--_...-._-----------3Notes: Notes: ----------------------------- 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 Apprentice to Journeyworker Ratio: 1:3 TRACTORS/PORTABLE STEAM GENERATORS 12/01/2011 $39.16 $10.00 $12.40 $0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 $0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 $0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 $0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 $0.00 $64.29 TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2011 $30.72 $8.56 $7.27 $0.00 $46.55 TEAMSTERS JOINT COUNCIL NO. 10 ZONE, B 06/01/2012 $31.02 $8.56 $7.27 $0.00 $46.85 08/01/2012 $31.02 $8.91 $7.27 $0.00 $47.20 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23 TUNNEL WORK - COMPRESSED AIR 12/01/2011 $44.08 $7.10 $13.00 $0.00 $64.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2011 $46.08 $7.10 $13.00 $0.00 $66.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - FREE AIR 12/01/2011 $36.15 $7.10 $13.00 $0.00 $56.25 LABORERS (;REF, AIR TUNNEL) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 55 of 56 �k DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H Town of North Andover JOANNE F. GOLDSTEIN Secretay HEATHER E. ROWE Di—tor City/Town: NORTH ANDOVER Asphalt Concrete Excavation Works - Contractor to perform asphalt concrete excavation by cold planer Job Location: Various Locations Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2011 $38.15 $7.10 $13.00 $0.00 $58.25 LABORERS (FREEAIR TUNNEL) VAC -HAUL 12/01/2011 $30.14 $8.56 $7.27 $0.00 $45.97 TEAMSTERS JOINT COUNCIL NO. 10 70NE B 06/01/2012 $30.44 $8.56 $7.27 $0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 $0.00 $46.62 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 WAGON DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 $0.00 $48.25 LABORERS - ZONE 2 WASTE WATER PUMP OPERATOR 12/01/2011 $39.52 $10.00 $12.40 $0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 $0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 $0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 $0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 $0.00 $64.67 WATER METER INSTALLER 09/01/2011 $41.93 $9.32 $13.29 $0.00 $64.54 PI UMBERS d GASFITTERS LOCAL 12 (Local 138) 03/01/2012 $42.73 $9.32 $13.29 $0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L c. 23, ss. I IE -1 ll-. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -11L. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 01/06/2012 Wage Request Number: 20120106-008 Page 56 of 56 January 18, 2012 Asphalt Concrete Excavation — Questions & Answers The following answers are provided to questions submitted by potential bidders: 1. Which company or companies have been awarded the contract for the past three years? Aggregate Industries has done this work for the Town for the past three years. 2. How much cold planing/milling was done last year? In the past year, approximately 15,200 square yards was milled. 3. In the past, does the Town tend to keep the millings or have contractor dispose of them? In the past, the Town tends to have the contractor dispose of most of the millings. 4. Can fire hydrants be used for on-site water supply? If so, is it free or is there a fee? Fire hydrants can be used for on-site water supply at no charge provided there is no abuse. 5. Will the estimated 25,000 square yards be completed in one mobilization? The 25,000 square yards will most likely be done in several mobilizations. Santilli, Ray From: Concessi, Dan Sent: Friday, January 13, 2012 2:46 PM To: Santilli, Ray Cc: Thibodeau, Bruce Subject: RE: Questions - Asphalt Concrete Excavation I= Aggregate Industries has done our milling for the past three years. Last year approximately 15,230 square yards was milled. In the past the town tends to have the contractor dispose of most of the millings. Fire hydrants can be used for on site water supply at no charge provided there is no abuse. The 25,000 square yards will probably be done in several mobilizations. From: Santilli, Ray Sent: Friday, January 13, 2012 1:36 PM To: Thibodeau, Bruce; Concessi, Dan Subject: FW: Questions - Asphalt Concrete Excavation Please provide me with responses to the below questions. Thanks J Sanaa Assistant Town Manager Town of North Andover From: Sara Mimoso rmaiIto: admin(aOraffertyfinegradinq com] Sent: Friday, January 13, 2012 12:30 PM To: Santilli, Ray Subject: Questions - Asphalt Concrete Excavation Ray, Could you forward a list of the past three years' low vendors used for cold planning? How much cold planning/milling was done last year? In the past does the town tend to keep the millings or have contractor dispose of them? Can fire hydrants be used for on site water supply? If so is it free of charge or is there a fee? Will the estimated 25,000 sq yds be completed in one mobilization? 1 Santilli, Ray From: Sara Mimoso [admin@raffertyfinegrading.com] Sent: Friday, January 13, 2012 12:30 PM To: Santilli, Ray Subject: Questions - Asphalt Concrete Excavation Ray, Could you forward a list of the past three years' low vendors used for cold planning? How much cold planning/milling was done last year? In the past does the town tend to keep the millings or have contractor dispose of them? Can fire hydrants be used for on site water supply? If so is it free of charge or is there a fee? Will the estimated 25,000 sq yds be completed in one mobilization? Thank you in advance for your attention to our questions. Regards, Sara I. W imoso Project Manager Rafferty Fine Grading, Inc. 57 South Road Enfield, CT 06082 0 - 860-763-0100 F - 860-763-2223 M- 413-335-5207 Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. .J Thank you in advance for your attention to our questions. Regards, Sara I. W imoso Project Manager Rafferty Fine Grading, Inc. 57 South Road Enfield, CT 06082 0 - 860-763-0100 F - 860-763-2223 M- 413-335-5207 Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.htm, Please consider the environment before printing this email. SPR Central Register General Contract Submit Confirmation State Publications and Regulations William Francis Galvin, Secretary of the Commonwealth Page 1 of 2 http://www.sec.state.ma.us/sprpublicforms/GCSubmitConfirmation.aspx?ID=71202 1/3/2012 Home Search Index!! 1 k I Contact The following General Contract submission was successfully received. Planned date of publish is 1/11/2012 Awarding Agency Agency Name and Address: Town of North Andover 120 Main Street North Andover, MA 01845 Project Number: Estimated Cost: J$50,000 Contractor Qualification: Required for DCAM contracts over $100,000, Massachusetts Highway contracts over $50,000. Contact Information Name: IlRay Santilli, Assistant Town Manager Phone: 978-688-9516Fax 978-688-9556 Email Address: rsantilli(�),townofnorthandover.com Notify email address listed when final publish date assigned. Contract Information Project: Plans/Specifications Available: Place, date and time General Bid Deadline*: Sub Bid Deadline: Sub Bid Categories: Town is seeking qualified contractor to perform asphalt concrete excavation by cold planer The complete Invitation for Bids document will be available on Wednesday, January 11, 2012 at 11:00 a.m. at www.townofnorthandover.com by clicking on 'Available Bids, Quotes and Proposals' 02/02/2012 Time 2:00 p.m. Time Additional Information This page can be printed for your records. http://www.sec.state.ma.us/sprpublicforms/GCSubmitConfirmation.aspx?ID=71202 1/3/2012 Santilli, Ray From: REGS@sec. state. ma. us Sent: Tuesday, January 03, 2012 3:09 PM To: Santilli, Ray Subject: Publish Date Assigned for General Contracts A publish date of 1/11/12 has been assigned to your General Contracts submission with description of: The Town is seeking qualified contractor to perform asphalt concrete excavation by cold planer. Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20120106-008 for future inquires. Request another official Wage Schedule 7& http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSupp... 1/6/2012 ►� ASPHALT CONCRETE EXCAVATION BY COLD PLANER ep"\ �n � �oo L Introduction: The Town of North Andover is seeking qualified contractors to perform public utility work to supplement the capabilities of the Department of Public Works (DPW). The work will include asphalt concrete excavation by cold planer on Town owned asphalt pavement. All bidders must demonstrate at least five years of experience providing the services requested. Scope of Work and Specificatons: The work consists of excavating asphalt concrete pavements by cold planer in designated areas to improve curb reveal and regrade existing surfaces. The cold planer shall be capable of planning both asphalt concrete and Portland cement concrete patches if the later should be encountered in asphalt pavements. The cold planer shall be equipped with all necessary safety devices such as flashing lights and back-up signals so as to operate safely in traffic. The cold planer shall be equipped with a cutter drum at least 72 inches wide with an elevating device capable of loading milled material directly into trucks while operating and with a dust control system capable of complying with environmental air quality standards. The Contractor shall be required to supply auxiliary milling equipment for clean up work along curbs and around castings. Work areas shall be left clean and free from debris at the end of each work day. Prices quoted shall include milling, loading, sweeping, and final clean up. The use of planing equipment mounted on pneumatic tires will be permitted only for cleanup work or areas less than 10 feet wide. The Town shall reserve the right to salvage any material such as granite, brick, or millings. Depth of planing shall average 2 inches. The Town will require a minimum quantity of not less than 300 square yards per call out. The Town will arrange for all required police details and pay the costs thereof. The Town will also provide all necessary barricades, signs, and cones for detours and road closures. The Contractor will provide cones and barricades for traffic lane control. The Contractor will be responsible for damage to existing castings resulting from his operations unless such castings have previously been paved over and are not visible on the surface and have not been marked out in the field by DPW. The Contractor may be required to mill as much as 100 feet up intersecting streets to provide proper transitions. This work will also be performed at the quoted unit price. Loading, trucking, and disposal shall be the responsibility of the Contractor except when the Town requires disposal in Town. An alternate price is being requested for the Contractor to be responsible for loading and hauling millings to the Town's Cyr Recycling Facility on Sharpner's Pond Road for disposal. In most cases the Town will require the Contractor to dispose of millings. Term: The term of the contract shall be one year with two (2) additional option years at the sole discretion of the Town. R' BID FORM Base bid EXCAVATE, LOAD, AND DISPOSE OF MILLINGS BY CONTRACTOR 25,000 SQUARE YARDS (EST.) X UNIT PRICE PER S.Y. = Alternate bid EXCAVATE, LOAD, AND HAUL MILLINGS TO THE CYR RECYCLING FACILITY 10,000 SQUARE YARDS (EST.) X UNIT PRICE PER S.Y. =