HomeMy WebLinkAboutContract #: 011678 - From: 03-31-2014 To: - Kenway Corporation - Town of North AndoverJ -4 SPR Central Register General Contract Submit Confirmation
State Publications and Regulations
William Francis Galvin, Secretary of the Commonwealth
Page 1 of 2
Feedback
The following General Contract submission was successfully
received.
Planned date of publish is 2/27/2013
Awarding Agency
Agency Name
and Address:
Town of North Andover 120 Main Street North
Andover, MA 01845
Project Number:
Estimated Cost:
Contractor
Qualification:
Required for DCAM contracts over $100,000, Massachusetts Highway contracts over $50,000.
Contact Information
Name: JjRgy
Santilli, Assistant Town Manager
Phone:
Email Address:
978-688-9516 11 Fax 978-688-9556
rsantilli(ii)townofnorthandover.com
Notify email address listed when final publish date assigned
Contract Information
Project: The Town of North Andover is soliciting bids to furnish. install,
field test, complete and make ready for service an interior lining
system to reline/recoat one 3,461 gallon sodium hydroxide r
(caustic soda) storage tank in the Chemical Storage Room at the
Water Treatment Plant
Plans/Specifications
Available:
Place, date and time
General Bid
Deadline*:
Sub Bid
Deadline:
Sub Bid
Categories:
The complete Invitation for Bids document will be available on
Wednesday, February 27, 2013 at 11:00 am on the Town's
website (www.townofnorthandover com) by clicking on 'Bids,
Quotes and Proposals'.
03/21/2013 Time 2:00 pm
Time
Additional
Information
http://www.sec.state.ma.us/sprpublicforms/GCSubmitConfinnation.aspx?ID=77418 2/19/2013
.I SPR Central Register General Contract Submit Confirmation
This page can be printed for your records.
F'*;
Acid Another " Return To Menu
Page 2 of 2
http://www.sec.state.ma.us/sprpublicforms/GCSubmitConfirmation.aspx?ID=77418 2/19/2013
N y
JNdcoa.avm) U¢dCO� L�NNR0rnCm! QlaO-Cm7C f76.d `-EU=)'1OCUO�`RN O L d0 w -L c _w `=u T>LO T.c_.Vaw hm
A? .Ld o
� -
omdNa:
.«�da>rdNm,
a-O
prLB O OLa¢00R°'D 0 L cv
mo» o o.oodRa ¢codroNNU EL:E -dWNEmmE oR a °oo E33
>Oa`soQ)Z< OCoN >O•>d NLL O WW J d CO C v•d E -p = om2 °N >UL¢p3` .0
03 �C=L :f�aL3;
Oc06 d DN�OUcca c 2) IL I.- I 13) >1 a>c '
NroW-a«o-W v �p =�}dnO�a o 3 mUo0p 'ID �i .�N ,dO
3Y�N9Nrn ` Rd NM cENZy c• �� yaOd°Z=>v -OJOFm rmO N C Rc N O�c
dC- W O U) Z 2 m
R ro no oR r- -.2
dj d m
-LrQmdc.Rdoo•-- o -,N> --WR p�N°dtiEypO�Cm° ^aoOdN o yd o �Ra moO Z mm¢Gr Emov o cm -y cRmo _am0 p O)rz o Or Nm OmlL '
_=3v0d aE°) o - LL �^odr o -Cav m2�zJO«c J E�ZNLo mz E.c dLRo •-aRoN roRc„ m E c NaNZORR� c ZV-ax y °aNcv o d a
C O° o 0-c.N0R3 Rr Cc Nc)3Om° d¢ OQ zoLQyQE°a) mQCrm3
0) 0-- -rrJ3y_0'NJ d 20 a
-U. _U3c�Mdsi CD co > N ONaC CC�CN;.00N
o3:0o m an c NpN avod°aL20N°AaN FwLL ca �
yCd=rO3Eo�0a>IM4OmE rLm>dd
E Qv�0a
a)t;caR 0p °vm 3=F
aca)
)v'CLcc N°OcamcN lJ U) E 2 3
omaiao 3
��mU9FoEpI
o.R.oEc55
pyoicoo°
y(0°d(ayRm
f -w
-L.. •L.-L'E R O c � ca-NJv oR .0 0
ID
Q O d p N
oCL�
mccRoacL~rn�oiE�O EE'm
= O> N O R V d U c N L N E N � J U
N¢ is N d o LLL 3
- 4 0). fIj � C w m 0 R lay 0
2-aE 3N`° c �°Cm0 M m� E m m �.
NU
'EW yU Chm.O�00 N 2 (CD' •N
E�L j.0 0r%ZU) 00 3_
•��-O d ca N v aJR v 3 M RSO+% W r
W0) 22(C°)c�d;ar-a) dNc n
rL U �_ rnm -rz -w C.N c a3i E E N
z c° •IC L••• d. O 0 >.0 v m a'•CD E C. I
0.
N d L O
- 00M Ec 3 cL.- d UU n0 a lu
o
O.dd 6m�A,•O c V
E5 E •Vdp_ om o
- m
7 ,� r •- U co IC m O
1 OONta4
E
_
•`�°o v
rm.
mmQ.L. a)0ERW m C
IMR Nc .3
c- . a
U�OU
ca `,C l6 m e V ) 0 C y p
.
_3cNo
d '°� R R+- m O p O
(AYom aodc�
m�
3«dry Oi90 d-`- d0 w
TcS
zv0N R..N,�0 W �� E C M
ym�a
0
Q C C►�r 2-O ca L NL o•p Y
Y'ao�
_
Zp'V ;
0.ccara °c
yWm-aul
m 3
��- 'S o
> aL3 T y)
>Oowc�vaNdE J2
yd
m'"m
ow •00 m 0 0)
y; RCF E., -
LL -6-` �Qy=�
CA..°RE
L`- O
dNy0Y0 05° cd00 ,a
N ""Om )`.�; o.•oL a
=mid
z5mr- a)aa)imN «Eu0'
zE Am RLL L•p O 7 m R
idm�'C
a/
O-wn= v0 ;E 2.��°•iYN
~ 0 Od
i'oN n�
n�mo
pdai cdL3CC>QO75
>0 d" d¢C mj.E
E:Od
30
i.E ao ��
'y0 drJL N
�� Oaa C,�p
d Norva>s
-0�r2L�N myRNdp•mU
dLpa NZ'�•aRW d m9 Ci_li
-Fr
o
'��Lc
15
d fa C
0.:D C C yU
0 CN aca
cor-
�,Ipgt.vc�iulcREprimcv
' @�
roil o ca oroaa m or`,
UAt°R3r y'LO OY6n Na)N'c dC 0) CO7a �'p is (DC6
3L «Z NLMd 7 NY �d•-'RU R�LM C 0-O°i E�
N C y C Nw y 0)ca c �r R d 0 nC.y C ¢L OU Too
`c-ydy03c E`=o a Nc:- d3aN
.dUi
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MASSACHUSETTS 01845
Raymond T Santilli
Assistant Town Manager
Mr. Ian Kopp, President
Kenway Corporation
681 Riverside Drive
Augusta, ME 04330
Dear Mr. Kopp:
May 9, 2013
TEL (978) 688-9516
FAX (978) 688-9556
Enclosed please find the executed contract between the Town of North Andover and
Kenway Corporation to furnish, install, field test, complete and ready for service a chemical storage
tank lining system at the Water Treatment Plant.
In accordance with Massachusetts General Laws, you are required to pay prevailing wage
for work performed under this contract. For each week work is performed, you are required to
submit certified weekly payroll records. The certified weekly payroll records are to be sent to:
Ms. Linda Hmurciak, Superintendent
Water Treatment Plant
420 Great Pond Road
North Andover, MA 01845
Also enclosed is the bid bond/deposit submitted with your bid. If you have any questions and/or
concerns, please call me.
Sincerely,
Raymond T. Santilli
Assistant Town Manager
Enclosure
cc., Ms. Linda Hmurciak, Water Treatment Plant
Contract File
goecuosue,aa � wavnpoisa,mezj,Uunoag -..�.____....._..._-. c.
P
Odb��ydf SP���JQO
cn
Er
J
CV) O
O ti o
N O
N O
M N
*
*
*
p w
�Z
uj
y
ca
w2
g
00
O
'O O
0
C O
Q
Q
LO
Z ti
o c
c
To
a�
O
ze
O
Ws
Yo
WO
�o F-
oW
3
}c F-
c
Lo
V
aD
LO
r -
O
O
O
N
M
r
O
N E
O
N y
M >
C
N C
A �
rY1 C
co
rm
O
RJ I)
N
rJ3 O
ry U)
l 5
rL U
L
O U
LPI
1 N
l CL
C� N
ry �
A �
m
A
ry �
0
Cl)
CD N
Ir
V)
1 z u) LU N
C
L Co X
W
O Q O
Oj > IL
O O
c
a Q C))
z
LD Z c
Q O U_
O C J
CL
OF- c)
coz
Y
LO
rl—
C7
O
O
LV
W
U)
m
C
C
Y
C
m
O
m
f0
O
U)
(B
U
N
L
U
N
O
a
N
m
rn
c
Y
U
N
L
U
Y
c
N
CO
0
F-
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible, responsive bidder offering the lowest price for
the work to be performed. All prices are to remain firm for the duration of the Contract.
All bidders are required to attend a mandatory site visit/briefing of the Chemical Storage
Room at the Water Treatment Plan on Thursday, March 7, 2013 at 10:00 a.m. Bids
received from companies who did not attend the mandatory site visit/briefing will be
deemed `non -responsible' and will not be considered.
Total Lump Sum Price to furnish all labor, materials, tools, equipment, and incidentals required to
furnish, install, field test, complete and ready for service an interior lining system to reline/recoat one
3,461 gallon sodium hydroxide (caustic soda) storage tank in accordance with the scope of services and
specifications.
00
$ 101015'
Addenda N t a- are acknowledged:
Si e
Business Name KiftWV a q Co ✓porn h on
Business Address �' ( %2tVt�St G�-P (J✓ Au.asm YI�1 Uy33 U
Business Phone � � ���" (n2'a�i Fax Or -07) (tell
lart 6 Kwo
Name of Person Authorized to sign Price Proposal
Town of North Andover IFB Page 16 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the Ke4wc( aU pom h b,-\
held on 10 13 � 12-0 (Z it was
VOTED,THAT
k4yp P(e st cte ti4-
(Name) (Officer)
of V-'(nW aH %✓ D r Abe and hereby is authorized to execute contracts and bonds in
the name and on behalf of said k"fA wa.y and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of 1LQW(, CJ✓�OeZd. aN on
its behalf by such officer under seal of QnuJA,�j y )
CaO A,! , shall be valid and binding
Q
upon WV J ae C -h,,n
I hereby certify that I am the clerk of the above named Kf AVJ GtA C:�4 OrOl-h')ltd
that is the duly elected officer as above of said
KX nW G� rjjJqN�0—and that the above vote has not been amended or rescinded and
J
remains in full force and effect as the date of this contract.
0.3 - ad - X0%3 A .
(Date) (Clerk)
Town of North Andover IFB Page 39 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signator Date 3120 13
_I A -M t>- K-0 0 ' & (1 t,J A-1 CA /' f_?t 4'10n
Print Name & Title' Company Nan e
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
i Rti b lGOnp , authorized signatory for � w A. 4 Com O rkAo -\_
Name of individual Nataf of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
Sigr�ture Date
Town of North Andover IFB Page 37 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signatr Date 51 Z-0 ( 3
i" C�. 1c, 0,90 , V-LWOcl
Print Name & Title Company Na e
Town of North Andover IFB Page 38 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
PAYMENT BOND
Bond No. 08857139 - effective May 20,2013
KNOW ALL MEN BY THESE PRESENTS, that we Kenway Corporation
with a place of business at 681 Riverside Drive, Augusta, ME 04330
as Principal (the "Principal"), and Fidelity and Deposit Company of Marylan0a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
600 Red Brook Blvd., 4th Floor, Owings Mills, MD 21117 as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts asppOppbligee
(the "Obligee"), in the sum of *Twenty Thousand Eight and No Cents* (* lawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
May 1, 2013 ,for the construction of "install field test, complete and
ready for service a, chemical storage tank lining system at the Water Treatment Plant"
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
17th day of April 2013
PRINCIPAL
SURETY
Kenway C ti
F (d�lity and-Delposit Comp any -Maryland
WSeall��§Aftou
ame and
oorEugene J. Miliard
$oR?Ianrds 42a64106-6952
[Title]
(Address]
Atte
207-239-3534; 207-239-3537.; 207-239-3500
[Pnone]
Attest:
Bernadette Pesce, Attorney -in -Fact
END OF PAYMENT BOND
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by
JAMES M. CARROLL, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies,
which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate,
constitute, and appoint Eugene J. MILIARD, Mary E. ROY, Amanda L. STOBERT, Paula M. DIMILLO, Ann M. MORRISON, Gail
PERRIN, Steven VITORINO and Bernadette PESCE, all of South Portland, Maine, EACH its true and lawful agent and Attorney -in -
Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and
the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to
all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN
INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN
CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND
DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 21 st day of September, A.D. 2012.
ATTEST:
L -id
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
µsin v� ocros ,, '�YiHS�•''•
REAL
i
so,, it'
•4t �
Assistant Secretary Vice President
Eric D. Barnes James M. Carroll
State of Maryland
City of Baltimore
On this 21st day of September, A.D. 2012, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, JAMES
M. CARROLL, Vice President, and ERIC D. BARNES, Assistant Secretary, of the Companies, to me personally known to be the individuals and officers
described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly swom, deposeth and saith, that
he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that
the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said
Corporations.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written.
� ���� �irntn `\•
Maria D. Adamski, Notary Public
My Commission Expires: July 8, 2015
POA -F 063-6030
FIDELITY AND DEPOSIT COMPANY
OF MARYLAND
600 Red Brook Blvd., Suite 600, Owings Mills, MD 21117
Statement of Financial Condition
As Of December 31, 2012
ASSETS
Bonds...............................................................................................................................................
$ 157,177,826
Stocks...............................................................................................................................................
23,000,311
Cash and Short Term Investments....................................................................................................
119,155
Reinsurance Recoverable.................................................................................................................
17,923,564
Other Accounts Receivable..............................................................................................................
35,473,256
TOTAL ADMITTED ASSETS........................................................................................................
$ 233,694,113
LIABILITIES, SURPLUS AND OTHER FUNDS
Reserve for Taxes and Expenses......................................................................................................
$ 74,782
Ceded Reinsurance Premiums Payable............................................................................................
48,323,524
Securities Lending Collateral Liability............................................................................................
1,716,240
TOTALLIABILITIES ....................................................................................................................
$ 50,114,546
Capital Stock, Paid Up........................................................................................ $ 5,000,000
Surplus................................................................................................................ 178,579,567
Surplus as regards Policyholders......................................................................................................
183,579,567
TOTAL.......................................................................................................................................
$ 233,694,113
Securities carried at $59,468,002 in the above statement are deposited as required by law.
Securities carried on the basis prescribed by the National Association of Insurance Commissioners. On the basis of
December 31, 2012 market quotations for all bonds and stocks owned, the Company's total admitted assets would be
$243,518,971 and surplus as regards policyholders $193,404,425.
1, DENNIS F. KERRIGAN, Corporate Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby
certify that the foregoing statement is a correct exhibit of the assets and Iiabilities of the said Company on the 31st
day of December, 2012.
State of Illinois
City of Schaumburg SS:
Subscribed and sworn to, before me, a Notary Public of the State of Illinois, hr the City of Schaumberg, this 15th day of March, 2013.
�v A'otag Public
=P(lblic
AL
ER
of Illinois May 3, 2014
ZURICH'
Advisory notice to policyholders regarding the
mi
Treasury Department's Office of Foreign Assets Control
C' OFAC ") regulations
No coverage is provided by this policyholder notice nor can it be construed to replace any provisions of your policy.
You should read your policy and review your declarations page for complete information on the coverages you are
provided.
This notice provides information concerning possible impact on your insurance coverage due to directives issued by
the U.S. Treasury Department's Office of Foreign Assets Control ("OFAC").
Please read this Notice carefully.
OFAC administers and enforces sanctions policy based on Presidential declarations of "national emergency".
OFAC has identified and listed numerous:
• Foreign agents;
• Front organizations;
• Terrorists;
• Terrorist organizations; and
• Narcotics traffickers;
as "Specially Designated Nationals and Blocked Persons." This list can be located on the United States Treasury's
web site — http://www.treasurv.00v/about/organizational-structure/offices/Pages/Office of Foreign Assets
Control.aspx.
In accordance with OFAC regulations, if it is determined that you or any other insured, or any person or entity
claiming the benefits of this insurance has violated U.S. sanctions law or is a Specially Designated National and
Blocked Person, as identified by OFAC, this insurance will be considered a blocked or frozen contract and all provi-
sions of this insurance are immediately subject to OFAC restrictions. When an insurance policy is considered to be
such a blocked or frozen contract, no payments or premium refunds may be made without authorization from
OFAC. Other limitations on the premiums and payments also apply.
Includes copyrighted material of Insurance Services Office, Inc., with its permission
U -GU -1041-A (March 2011)
Page 1 of 1
Disclosure Statement
NOTICE OF DISCLOSURE FOR AGENT & BROKER COMPENSATION
ZURICHS
If you want to learn more about the compensation Zurich pays agents and brokers visit:
http://www.zurichnaproducercompensation.com
or call the following toll-free number: (866) 903-1192.
This Notice is provided on behalf of Zurich American Insurance Company
and its underwriting subsidiaries.
U -GU -874-A CW (06/11)
Page 1 of 1
KENWCOR OP ID: SC
A11110 Q" CERTIFICATE OF LIABILITY INSURANCE
D0411712013ATE Y)
0411712013
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER Phone: 207-773-8156
Turner Barker Insurance Fax: 207-773-6647
160 Preble Street
Portland, M E 04101
Joan P. Hopkins, CIC
CONTACT
NAME:
PHONE FAX
AIC No Ext: AIC No:
E-MAIL
ADDRESS:
INSURER(S) AFFORDING COVERAGE NAIC A
INSURERA: Peerless Insurance CO 18333
INSURED Kenway Corporation
681 Riverside Drive
Augusta, ME 04330
INSURER B: Great Falls I nsu rance Com pa ny
INSURER C:
INSURER D:
INSURER E:
INSURER F :
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
IAULn.
LTR
LTR
TYPE OF INSURANCE
Town of North Andover
BUSH
POLICY NUMBER
POLICY EFF
MMIDDIYYYY
POLICY EXP
MM/DDIYYYY
LIMBS
GENERAL LIABILITY
EACH OCCURRENCE $ 1,000,000
A
X COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE a OCCUR
X
CBP9791620
10/31/2012
10131/2013
DAMAGE TO RENTE
PREMISES Ea occurrence $ 300,000
MED EXP (Any one person) $ 15,000
PERSONAL & ADV INJURY $ 1,000,000
GENERAL AGGREGATE $ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS- COMPIOP AGG $ 2,000,000
POLICY PRO-
RO LOC
JECT
$
AUTOMOBILE
LIABILITY
COMBINED SINGLE LIMIT
Ea accident $ 1,000,000
A
X
ANY AUTO
BA9648833
10/31/2012
10/31/2013
BODILY INJURY (Per person) $
ALL OWNEDSCHEDULED
AUTOS AUTOS
BODILY INJURY (Per accident) $
HIRED AUTOS NON -OWNED
AUTOS
PROPERTY DAMAGE $
Per accident
X
UMBRELLA LIAB
X
OCCUR
EACH OCCURRENCE $ 6,000,000
A
EXCESS LIAB
CLAIMS -MADE
CU9360845
10/31/2012
10/31/2013
AGGREGATE $ 6,000,000
DED I X I RETENTION$ 10000
Products $ Excluded
B
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITYTORY
ANY PROPRIETORIPARTNERIEXECUTIVE YIN
OFFICER/MEMBER EXCLUDED?
N I A
CD802430011
10/31/2012
10/31/2013
X WC STATU- I OTH-
LIMITS PIP
E.L. EACH ACCIDENT $ 1,000,000
E.L. DISEASE - EA EMPLOYEE $ 1,000,000
(Mandatory In NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
E.L. DISEASE - POLICY LIMIT $ 1,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space Is required)
The Town of North Andover is included as additional insured for General
Liability with regards to the named insured's premises and/or ongoing
operations only where required by a written contract executed prior to the
commencement of the named insured's work for or on behalf of certificate
older.
CERTIFICATE HOLDER r_nNrPi I ATlnN
TOWNN01
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
Town of North Andover
ACCORDANCE WITH THE POLICY PROVISIONS.
120 Main Street
AUTHORIZED REPRESENTATIVE
North Andover, MA 01845
111,.J0rnrn"M&Ialo
O 1988-2010 ACORD CORPORATION. All rights reserved.
ACORD 25 (2010/05) The ACORD name and logo are registered marks of ACORD
PARKER JOHN RAND, 1/1
Project Engineer
EXPERIENCE:
Kenway Corporation, Augusta, Maine
Project Engineer, January 2004 — present
➢ Responsible for design and specification of custom FRP product construction.
➢ Responsible for quoting FRP applications
➢ Manage and oversee field crews and production management
➢ Lincoln Pulp & Paper, Lincoln, Maine
Pulp Mill Maintenance Engineer, March 2001 to January 2004
➢ Lincoln Pulp & Paper, Lincoln, Maine
Tissue Mill Maintenance Engineer, March 2000 to March 2001
➢ Schlumpf Inc., Windham, Maine
Project Engineer, February 1998 to March 2000
➢ S.D. Warren Technology Center, Westbrook, Maine
Mechanical Engineering Co-op, May 1997 to September 1997
EDUCATION:
Bachelors of Science in Mechanical Engineering Technology — University of Maine,
Orono, Maine — December 1997
RELATED ACTIVITIES:
Winner of Team Senior Design Competition, School Of Engineering Technology,
University of Maine.
Attended the Sandler Sales Institute for "Alternative Selling".
COMPUTER SKILLS:
MiniCad (Mac)
MP2
AutoCad
INTERESTS:
VersaCad
Word
Project Scheduler
Snowmobiling, Hunting, Fishing, Boating, Skiing
TurboCad
Excel
Windows 2000/XP/98/95
Custom Composites Fabricator for Industry
KEN WAY
CORPORATION
681 Riverside Drive
Augusta, Maine
04330-9714
(207) 622-6229
Fax(207)622-6611
kenway@kenway.com
www.kenway.com
Kenway Corporation References
1) Evergreen Packaging
175 Main Street
Canton, NC 28716
Tommy Simpson Ton=.SiMpson@ev2Mack.com 828.646.2487
Scope:
Repair of a salt tank from operational malfunction. Kenway also handles all the
annual FRP maintenance for the entire mill
2) Domtar Paper Industries — Hawesville, KY
Hwy 1406 Wescor Road
Hawesville, KY 42348
Hanna Fortwendel Hanna.Fortwendel@domtar.com 270.927.7221
Scope:
Engineered and installed new tank bottoms and floating knuckle in (2) 22'6 x 50'
tall Chlorine Dioxide storage tanks. Kenway also handles all the annual FRP
maintenance for the entire mill
3) Brunswick/Topsham Water District
PO Box 489
Topsham, ME 04086
Craig Douglas cwdouglas@,btwater.org 207.729.9956
Scae:
Repair of a solar salt tank after severe damage occurred from overpressurization.
4) New Page Corporation — Rumford Mill
35 Hartford Street -
Rumford, ME _04276
Dave Martineau David.Martineau@3?e pa eco .com 207.369.2743
Scope:
Engineered and installed new tank bottoms and floating knuckle in (2) 18'0 x 60'
tall Chlorine Dioxide storage tanks. Kenway also handles all the annual FRP
maintenance for the entire mill
5) Woodland Pulp LLC
144 Main St.
Baileyville, ME 04694
Nancy James nancy.jarnes@woodlandpulp.com 207.427.3311 ext 4580
Scope:
Kenway handles all the annual FRP maintenance for the entire mill.
EXPERIENCE OF FRP STRUCTURAL CONTRACTOR,
NOTE: This forin must be completed even if the General Contractor and the Mi P Structul,al
Contractor are the swine entity.
By completing and submitting this Experience of FRP Structural Contractor form, Bidder certifies
that the Contractor performing the FRP Structural work. (as specified in Specification Section 43 41
45) -is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph 1.4 of specification Section 43 4145. Make copies of this page and provide one copy for
each reference,
1 .l
�.
`STRUCTURAL .CONTRACTOR 3VAiVIE
Client Company Name: ryt C_p �f� r SSyG
Extent and Type of Work Performed:
oei.l- Ile t77Tac±c
Contact Person Name, Position, Email Address & Phone Number: 1
J�'� �Vihe�,r-i"�1�r� �����lR-✓aG� ��e-�in'�C�r�R,r'�' 5w�A��„'��?�-s��
COM
Duration of the Work, Manpower Requirements, Length and Number of Shifts Worked;
00300 9 :DECEMBER 14, 2011
BIDFORM
EXPERIENCE OF FRP STRUCTURAL CONTRACTOR
NOTIrw This form must be completed even if the General Contractor And the I<'RP Structural
Contractor are the same entity.
By completing and submitting this Experience of FRP Structural Contractor form, Bidder certifies
that the Contractor performing the .ITP Structural work. (as specified in Specification Section 43 41
45) -is an. experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph 1.4 of specification Section 43 4145. Matte copies of this page and provide one copy for
each reference;
y t�>
:`
iJ .O Wil ftli. •.
TRU TUi2�1 C TRACT(?1R.� :A
.� C N 1� IY1L
Client Company Name: .7t/et'w^ m ��C k)#i /1C
:
Extent and Type of Work Performed:
Contact Person Name, Position, Email Address & Phone Number:
bv+��✓t� Siv�,�SO , i'�{t�1.?A rtC��Cv r `rny,f . S`rY�tpsd�t e.
gab -Gw�- PgS7
Duration of the Work, Manpower Requirements, Length and Number of Shifts Worked:
00300 9 DECEMBER 14, 2011 -
BIDFORM
EXPERIENCE OF FRP STRUCTURAL CONTRACTOR
NOTE: This form mast be completed even if. the General Contractor and the FRP Structural
Contractor are the same entity.
By completing and submitting this Experience of FRP Structural Contractor form, Bidder certifies
that the Contractor performing the Fid' Structural work (as specified in Specification Section 43 41
45) is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph 1.4 of specification Section 43 4145, Make copies of this page and provide one copy for
each reference;
7777777777777'n-7 -
:•.:
i
i
b
LJ CO 1.
TRUGTURA RAGT(}::
NT R �NAMI" ..
Client Company Name: 1 1 CrGt ern Pa C�tq
Extent and Tyle of Work Performed:
#li .f jc,,, t'�' ( � 0
4,a 11
Contact Person Naine, Position, Email Address & Prone Number:
Id►'1'i/�ti..c{ �ln���SO''1, � jPnL?P
j'SI All
Sag - towco — o2 Y81
Duration of the Work, Manpower Requirements, Length and Number of Shifts Worked:
men
00300 9 DECEMBER. 14, 2011
BIDIZORM
EXPERIENCE OF FRP STRUCTURAL CONTRACTOR
NOTE: This forth must be completed every if the General Contractor and the Mt.P Structural
Contractor are the some entity.
By completing and submitting this Experience of FRP Structural Contractor form, Bidder certifies
that the Contractor performing the FRP Structural work (as specified in Specification Section 43 41
45).is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph S .4 of specification Section 43 4145. Make copies of this page and provide one copy for
each rc&Vence.
L' •.C.
TItUCT ,RA .CQ.• TRA Ti?it �ife�i
�S U N N
Client Company Name: A e- �Jor P0✓ -cP,
Extent And Type of Work Performed:
�����t �Cia2 -mak • ��`�'x �`-�r�
Contact Person Name, Position, Email Address & Phone Number:
?� }/Ifs ✓����u� Ain e�r��c� 'l�Cr-nn .r� Am e✓I�wlOr^,�cC���.?�nt
007 R-7 y3
Duration of the Work, Manpower Requirements, Length and Number of Shifts Worked:
/Qj SAF i i a l eve SG ('444 -U rye -v1
00300 9 DECEMBER 14, 2011
BIDFORM
E, X PERIENCE OF FRP STRUCTURAL CONTRACTOR
NOTE: This form must be completed even if the General Contractor and the FRP Structural
Contractor are the same ontity.
By completing and submitting this Experience of FRP Structural Contractor form, Bidder certifies
that the Contractor performing the FRP Structural work (as specified in Specification Section 43 41
45) Is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph a.4 of specification Section 43 4145. Make copies of this page and provide one copy for
each reference:
f.[.
Z R
U I� CO C� r
TR GTURA NTRA .TOl2.•
•S N !Vi
A E
Client Company Name: New I Cjka0&,t h 0 e)
Extent and Type of Work Performed:
Ael ryl c' NOf "1 CL-Oz-
Contact
L..0vContact Person Name, Posltiou,.Email Address & Phone Number:
Gtvt , QA(jjne0u f � t, !�na �� - P1(4nk�4Cr de(vl 0-`l'vipayccor19.61'
Duration of the Work, Manpolver Requirements, Length and Number of Shifts Worked:
00300 9 DECEMBER 14, 2011
BIDFORM
EXPERIENCE OF FRP STRUCTURAL CONTRACTOR,
NOTE: This forin must be completed even if the General Contractor and the FRP Structural
Contractor are the same entity.
By completing and submitting this Experience of PRP Structural Contractor :Form, Bidder certifies
that the Contractor performing the IRP Structural work (as specified in Specification Section 43 41
45) is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph JA of specification Section 43 4145, Matte copies of this page and provide one copy for
each reference:
TURAI t?•• ]EtAC;T(?R �'
f.l
,S TRU G NT .., 1VAIYI. ;. �i7 • ..
Client Company Nance: Dom-t?q,r
Extent and Type of Work Performed.-
---___
DwiiD f �c ling G � C to z 4,�-r k . c ` 3 5-1-A
Contact P'eer^son{ Name, Position, Email Address & Phone Number:
� � /1 f� 1"vf °S'r�� �GQ e � � Y�i A-,' r•,'�Cvt �4 r1 c � � �'� �"� �" J
"A
Duration oftheWork, Manpower Requirements, Length and Number of Shifts Worked:
(Y -t r j
00300 9 DECEMBER 14, 2011
BIDFORM
EXPERIENCE OF FRP STRUCTURAL CONTRACTOR
NOTE: This form must he completed even if the General Contractor and the FRP Structural
Contractor are the some entity.
By completing and submitting this Experience of FRP Structural Contractor form, Bidder certifies
that the Contractor performing the FRP Structural work (as specified in Specification Section 43 41
45) -is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph 1.4 of specification Section 43 4145. Make copies of this page and provide one copy for
each reference:
is
t•
.•.E,�}'r . ,Cts ��¢;::
U .7' RA CO•NRACTt)•
-NAME-..
r•t
Client Company Name: - - Ini'YITr' / t'Gt Pcr
Extent and Type of Work Performed:
OMPIC�r C #;;�' C(
Contact Person Name, Position, Email Address & Phone Number
f+n �} �•��. i` u� � P1,0,160-
70
.A/I+1fir^"7U '7
Duration of the Work, Manpower Requirements, Length and Number of Shifts Worked:
� � � h 1 �,`S � l� dw t,v Sh i �� , J �'• . ��� Ut
00300 9 DECEMBER 14, 2011
BIDFORM
EXPERIENCE OF FRP STRU(7URAL CONTRACTOR
NOTE: This for.un must be completed even if the General Contractor and the FRP Structural
Cantractor Hre the sane entity.
By completing and submitting this Experience of FRP Structural Contractor form, Bidder certifies
that the Contractor performing the .FRP Structural work (as specified in Specification Section 43 41
45) -is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph 1.4 of specification Section 43 4145. Make copies of this page and provide one copy for
each reference;
a4. -
• •
•
J
'
SRCT RAL CONTRACTOR NTUce..
01,
Client Company Name: 0�l�_
-
Extent and Type of Work Performed:
Contact Person Name, Position, Email Address & Phone Number:
fIia"K-y JA-rree, ✓?ice eS 6
Duration of the Work, MRt:poiver Requirements, Length and Number of Shifts Worked;
00300 9 DECEMBER 14, 2011
BIUFORM
EXPERIENCE OF FRP STRUCTURAL CONTRACTOR
NOTE: This form must be completed even if the General. Contractor and the I<'kIP Structural
Contractor are the same entity.
By completing and_ submitting this Experience of FRP Structural Contractor .form, Bidder certifies
that the Contractor performing the PRP Structural work (as specified in Specification Section 43 41
45) -is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph 1.4 of specification Section 43 4145. Make copies of this page and provide one copy for
each reference,
:....�5 -
h
%C
V=01•fL
STiLU.GTURAI� COi`+TTRATOR.NAN1r..►"h
:..:....
Client Company Name: Sf'W, 4 r"?X
Extent and Type of Work Performed:
Contact Persona Name, Position, Email Address & Phone Number:
` L ✓tree , P,� f 4 l�? 4-4 A o tr , y1w 0, e4u✓
v
Duration of the Work, Manpower Requirements, Length and Number of Shifts Worked-.
ao �Vieq , �a �10L.r ,hf s.
00300 9 DECEMBER 14, 2011 .
BIDFORM
IEX.PERIE NCE OF FRP STRUCTURAL CONTRACTOR
NOTE: This form must be completed even if. the General Contractor and the Fl[tP Structural
Contractor are the same entity.
By completing and submitting this Experience of FRP Structural Contractor form, Bidder certifies
that the Contractor performing the .PRP Structural work (as specified in Specification Section 43 41
45) is an experienced FRP Structural Contractor and can meet the qualifications as listed in
paragraph J A of specification Section 43 4145. Make copies of this page and provide one copy for
each reference;
`=P
1
'Ti' eT :`COQ, €'
S U. URAI INTRA TOR
»�l�r,
Client Company Name:
nExtent and Type of Work ^Performed:
Contact Person Name, Position, Email Address & Phone Number:
r
✓� t� 1'24+9nAoe-y', Yvrf3v -` art-ee G Sfr o," ,ion. }
Duration of the Work, Manpower Requirements, Length and Number of Shifts Worked:
00300 9 DECEMBER 14, 2011
BIDFORM
URBELIS & FIELDSTEEL, LLP
155 FEDERAL STREET
BOSTON, MASSACHUSETTS 02110-1727
CAROL HAJJAR MCGRAVEY
OF COUNSEL
e-mail chm@uf-law.com
May 6, 2013
Raymond Santilli
Assistant Town Manager
North Andover Town Offices
120 Main Street
North Andover, MA 01845
RE: CONTRACT WITH KENWAY CORPORATION
Dear Ray:
Telephone 978-475-4552
Telephone 617-338-2200
Telecopier 617-338-0122
Enclosed please find the above -referenced contract, which has been approved as
to form.
Very truly yours,
arol Hajjar McGravey
CHM/km� p
Enclosure
s:\wp51\workNn-andove\cor esp\santil li.ltr -contract 112.docx
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MASSACHUSETTS 01845
Raymond T Santilh
Assistant Town Manager
Mr. Ian Kopp, President
Kenway Corporation
681 Riverside Drive
Augusta, ME 04330
Dear Mr. Kopp:
April 29, 2013
TEL (978) 688-9516
FAX (978) 688-9556
By previous letter, you were advised the Town of North Andover was awarding a contract
to Kenway Corporation to furnish, install, field test, complete and ready for service a chemical
storage tank lining system at the Water Treatment Plant. You were asked to sign and return the
contract documents and "all required accompanying paperwork". Based on the Towns review of
the submitted paperwork, the following deficiencies were noted:
o In accordance with Massachusetts General Laws, you are required to provide a
payment bond, on the Town's form that is enclosed, in the amount of 50% of the
value of the contract. A payment bond is required in the amount of $20,008.
If you have any questions and/or concerns, please call me.
Sincerely,
Raymond T. Santilli
Assistant Town Manager
Form
W'9
Request for Taxpayer
Give Form to the
'Rev. December 2011)Identification
Number and Certification
requester. not
Department of the Treasury
entities, it is your employer identification number (EIN). If you do not have a number, see How to get a
Send to the S.
I
Internal Revenue Service
to this Form W-9.
noted.
Definition of a U.S. person. For federal tax purposes, you are
Name (as shown on your income tax return)
/
N
Business name/disregarded entity name, if different from above
\
• A partnership, corporation, company, or association created or
K.erwa aho,-,
organized in the United States or under -the laws of the United States,
you paid, acquisition or abandonment of secured property, cancellation
. An estate (other than a foreign estate), or
of debt, or contributions you made to an IRA.
Ca
o-
C
Check appropriate box for federal tax classification:
. A domestic trust (as defined in Regulations section 301.7701-7).
alien), to provide your correct TIN to the person requesting it (the
Special rules for partnerships. Partnerships that conduct a trade or
❑ Individual/sole proprietor C Corporation ❑ S Corporation ❑ Partnership ❑ Trust/estate
business in the United States are generally required to pay a withholding
1. Certify that the TIN you are giving is correct (or you are waiting for a
m
moo
ta
o-------------------------------
❑ Limited liability company. Enter the tax classification (C=C corporation, S=S corporation, P=partnership) ►
partnership is required to presume that a partner is a foreign person,
❑Exempt payee
•+ N
C
a
❑ Other (see instructions) ►
!=
v
C
Address (number, street, and apt. or suite no.)
r
Requester's name and address (optional)
Ci , state, and ZIP code
N
KE
List acd6unt number(s) here (optional)
Taxpayer Identification Number (TIN)
Enter your TIN in the appropriate box. The TIN provided must match the name given on the "Name" line
I Social security number
to avoid backup withholding. For individuals, this is your social security number However, for a
resident alien, sole proprietor, or disregarded entity, see the Part I instructions onn page 3. For other
- m _
U.S. person ►0
Date 11 -
General
General Instructlons
Note. If a requester gives you a form other than Form W-9 to request
entities, it is your employer identification number (EIN). If you do not have a number, see How to get a
your TIN, you must use the requester's form if it is substantially similar
Section references are to the Internal Revenue Code unless otherwise
to this Form W-9.
noted.
Definition of a U.S. person. For federal tax purposes, you are
TIN on page 3.
considered a U.S. person if you are:
Note. If the account is in more than one name, see the chart on page 4 for guidelines on whose I Employer identification
number to enter. V i
Certification
Under penalties of perjury, I certify that:
1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me), and
I am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue
Service (IRS) that 1 am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am
no longer subject to backup withholding, and
3. 1 am a U.S. citizen or other U.S. person (defined below).
Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding
because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage
interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and
generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the
instructions on Daae 4. /
Sign
Signature of
A
Here
U.S. person ►0
Date 11 -
General
General Instructlons
Note. If a requester gives you a form other than Form W-9 to request
your TIN, you must use the requester's form if it is substantially similar
Section references are to the Internal Revenue Code unless otherwise
to this Form W-9.
noted.
Definition of a U.S. person. For federal tax purposes, you are
Purpose of Form
considered a U.S. person if you are:
A person who is required to file an information return with the IRS must
• An individual who is a U.S. citizen or U.S. resident alien,
obtain your correct taxpayer identification number (TIN) to report, for
• A partnership, corporation, company, or association created or
example, income paid to you, real estate transactions, mortgage interest
organized in the United States or under -the laws of the United States,
you paid, acquisition or abandonment of secured property, cancellation
. An estate (other than a foreign estate), or
of debt, or contributions you made to an IRA.
Use Form W-9 only if you are a U.S. person (including a resident
. A domestic trust (as defined in Regulations section 301.7701-7).
alien), to provide your correct TIN to the person requesting it (the
Special rules for partnerships. Partnerships that conduct a trade or
requester) and, when applicable, to:
business in the United States are generally required to pay a withholding
1. Certify that the TIN you are giving is correct (or you are waiting for a
tax on any foreign partners' share of income from such business.
Further, in certain cases where a Form W-9 has not been received, a
number to be issued),
partnership is required to presume that a partner is a foreign person,
2. Certify that you are not subject to backup withholding, or
and pay the withholding tax. Therefore, if you are a U.S. person that is a
3. Claim exemption from backup withholding if you are a U.S. exempt partner in a partnership conducting a trade or business in the United
payee. If applicable, you are also certifying that as a U.S. person, your States, provide Form W-9 to the partnership to establish your U.S.
allocable share of any partnership income from a U.S. trade or business status and avoid withholding on your share of partnership income.
is not subject to the withholding tax on foreign partners' share of
effectively connected income.
Cat. No. 10231X Form W-9 (Rev. 12-2011)
Santilli, Ray
From:
Santilli, Ray
Sent:
Tuesday, April 16, 2013 2:14 PM
To:
'Tammy Bernier'
Cc:
John Rand
Subject:
RE: Contract Date
Hi Tammy,
The contract will be dated upon the final signature of the Town Manager and its execution. Unfortunately, I
cannot tell you when that will be because it will depend on when the Town receives all of the required
documentation. For example, although I received the signed contracts in today's mail, I have yet to receive
the payment bond (the reason for your question) as well as the insurance certificates.
Ray Santilli
Assistant Town Manager
Town of North Andover
120 Main Street
North Andover, MA 01845
Phone 978.688.9516
Fax 978.688.9556
Email rsantilli@townofnorthandover.com
Web www.townofnorthandover.com
From: Tammy Bernier [mailto:Tammy(�Okenway.com]
Sent: Thursday, April 11, 2013 1:37 PM
To: Santilli, Ray
Cc: John Rand
Subject: Contract Date
Good Afternoon,
For the bond, I need the date of the contract.
There is no date on the contracts that we signed and returned to you.
Can you let me know what that date will be?
Thanks,
Tammy Bernier
Kenway Corporation
Maritime Marine Group, LLC
(207) 622-6229 Ext. 100
(207) 622-6611 Fax
TOWN OF NORTH ANDOVER
120 MAIN STREET
NORTH ANDOVER, MASSACHUSETTS 01845
Raymond T Santilli ° . p TEL (978) 688-9516
Assistant Town Manager �o e, • FAX (978) 688-9556
March 27, 2013
Mr. Ian Kopp, President
Kenway Corporation
681 Riverside Drive
Augusta, ME 04330
Dear Mr. Kopp:
The Town of North Andover has decided to award a contract to Kenway Corporation to
furnish, install, field test, complete and ready for service a chemical storage tank lining system at
the Water Treatment Plant in accordance with the Invitation for Bids issued on February 27,
2013.
Enclosed please find three (3) original standard Town of North Andover contracts for
appropriate review and signature. Please return the signed contract documents and all required
accompanying paperwork to my attention as soon as possible. Please ensure that all insurance
certificates list the Town of North Andover as an "additional insured".
In accordance with Massachusetts General Laws, you are required to provide a payment
bond, on the Town's form that is enclosed, in the amount of 50% of the value of the contract. A
payment bond is required in the amount of $20,008.
If you have any questions and/or concerns, please call me.
Sincerely,
Raymond T. Santilli
Assistant Town Manager
Enclosures
Is
J.
TOWN OF NORTH ANDOVER
CONTRACT
CONTRACT #
DATE:
This Contract is entered into on, or as of, this date by and between the Town of North Andover
(the "Town"), and
Contractor: Kenway Corporation
Address: 681 Riverside Drive
Augusta, ME 04330
Telephone Number: 207-622-6229
Fax Number: 207-622-6611
1. This is a Contract for the procurement of the following:
Furnish, install, field test, complete and ready for service a chemical storage tank lining
system at the Water Treatment Plant in accordance with the Invitation for Bids issued on
February 27, 2013
2. The Contract price to be paid to the Contractor by the Town of North Andover is:
$40,015
3. Payment will be made as follows:
Upon completion and acceptance of system, and receipt of invoice, net 30
4. Definitions:
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services by
authorized representatives of the Town to insure that the goods or services are complete
and are as specified in the Contract.
(Rev 5-2007) Contract by and between Town of North Andover and Kenway Corporation Page 1
4.2 Contract Documents: All documents relative to the Contract including (where used)
Instructions to Bidders, Proposal Form, General Conditions, Supplementary General
Conditions, General Specifications, Other Specifications included in Project Manual,
Drawings, and all Addenda issued during the bidding period. The Contract documents
are complementary, and what is called for by any one shall be as binding as if called for
by all. The intention of the document is to include all labor and materials, equipment and
transportation necessary for the proper performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as
the sense and particular Contract so require) include Vendor, Contractor, Engineer, or
other label used to identify the other party in the particular Contract. Use of the term
"Contractor" shall be understood to refer to any other such label used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the
services are performed, or the goods delivered, in accordance with Contract documents,
as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes
one who furnished material worked to a special design according to the Drawings or
Specifications of this work, but does not include one who merely furnishes material not so
worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance:
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before March 31, 2014, unless extended pursuant to a provision for
extension contained in the Contract documents at the sole discretion of the Town, and not subject to
assent by the Contractor, and subject to the availability and appropriation of funds as certified by the
Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract.
6. Subject to Appropriation:
Notwithstanding anything in the Contract documents to the contrary, any and all payments which the
Town is required to make under this Contract shall be subject to appropriation or other availability of
funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be
immediately terminated without liability for damages, penalties or other charges.
7. Permits and Approvals:
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance
of the Contract shall be secured and paid for by the Contractor.
(Rev 5-2007) Contract by and between Town of North Andover and Kenway Corporation Page 2
Bid Results — Chemical Storage Tank Lining System (WTP)
Vendor
Kenway Corporation $ 40,015
March 7, 2013
Caustic Tank Site Visit
Name
Company Name
Telephone Number
4,, GR�
3V
c-�
TOWN OF NORTH ANDOVER
INVITATION FOR BIDS
CHEMICAL STORAGE TANK LINING SYSTEM
WATER TREATMENT PLANT
Contact
Address
Telephone Number:
Fax Number:
Email
February 27, 2013
Ray Santilli
Assistant Town Manager
120 Main Street
North Andover, MA 01845
978-688-9516
978-688-9556
rsantilli@townofnorthandover.com
Table of Contents
1. Introduction............................................................... 3
2. Submission Deadline and Instructions ................................. 3
3. Questions, Addendum or Proposed Modifications ................... 4
4. Minimum Requirements..................................................... 5
5. Mandatory Site Visit/Briefing ............................................... 5
6. General Requirements....................................................... 6
7. Specifications.................................................................. 8
8. Prevailing Wage Rates........................................................14
9. Payment Bond..............................................................14
10. Bid Deposit.................................................................14
11. Evaluation of Bids ........................................................ 14
12. Term of Contract......................................................... 15
Appendix A — Price Proposal ............................................... 16
Standard Town of North Andover Contract
With Supplement "C" ....................................................17
Certifications.................................................................. 37
PaymentBond..................................................................40
Prevailing Wage Rates........................................................41
Town of North Andover IFB Page 2 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
1. Introduction
The Town of North Andover is soliciting bids from qualified companies to furnish, install, field
test, complete and ready for service an interior lining system to reline/recoat one 3,461 gallon
sodium hydroxide (caustic soda) storage tank in the Chemical Storage Room at the Water
Treatment Plant. Qualified companies are requested to submit bids to the Assistant Town
Manager at North Andover Town Hall, 120 Main Street, North Andover, MA, in accordance
with the instructions contained within this Invitation for Bids.
Notice of this IFB is published in the Central Register, which is a weekly publication of the
Office of the Secretary of the Commonwealth, the Eagle -Tribune (a newspaper of general
circulation) and posted on the Town website (www.tovmofnorthandover.com) under "Bids,
Quotes and Proposals".
The Town will accept proposals delivered in person or by mail. All proposals must be received
by 2:00 p.m. on Thursday, March 21, 2013 to be considered. Proposals submitted by fax or by
electronic mail will not be considered. All proposals must be submitted to:
Mr. Ray Santilli, Assistant Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
The Town of North Andover may cancel this IFB or reject in whole or in part any and all
proposals, if they determine that cancellation or rejection serves the best interest of the
Town of North Andover.
2. Submission Deadline and Instructions
Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed
envelope marked "Chemical Storage Tank Lining System" with the applicant's name and
address on the front. Applicants should provide one (1) signed original proposal. Fax or
electronic submissions will not be accepted. Applicants must also execute and include in the
sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax
Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The
Town of North Andover, through the Town Manager, is the awarding authority and reserves the
right to reject any and all proposals or parts of proposals; to waive any defects, information, and
minor irregularities; to accept exceptions to these specifications; and to award contracts or to
cancel this Invitation for Bids if it is in the Town of North Andover's best interest to do so.
Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if
the bidder is a partnership, by the name of the partnership, followed by the signature of each
general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature
must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed.
Town of North Andover IFB Page 3 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
All sealed proposals must be received and registered by the Assistant Town Manager's office by
Thursday, March 21, 2013 at 2:00 p.m. All outer envelopes must be labeled "Chemical Storage
Tank Lining System" and mailed or hand delivered to the following address:
Mr. Ray Santilli, Assistant Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
No proposals will be accepted after the time and date noted. Late delivery of materials due to
any type of delivery system shall be cause for rejection. If on the date and time of the submittal
deadline the North Andover Town Hall is closed due to an uncontrolled event such as fire, snow,
ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the
next normal business day.
3. Questions, Addendum or Proposal Modification
Questions concerning this IFB must be submitted in writing to: Mr. Ray Santilli, Assistant Town
Manager, 120 Main Street North Andover, MA 01845, or they may be emailed to Mr. Santilli at
rsantilli@townofnorthandover.com. All questions/inquiries must be received by 4:30 p.m. on
Tuesday, March 12, 2013 to be considered. Questions/inquiries may be delivered, mailed,
emailed or faxed. Written responses will be posted on the Town's website
(www.townofnorthandover.com) in "Bids, Quotes and Proposals" by Thursday, March 14, 2013
at 2:00 p.m.
If any changes are made to this IFB, an addendum will be posted on the Town's website in
"Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence
of any addenda and/or modifications issued by the Town. As this IFB has been published on the
Town's website (www.townofnorthandover.com) all bidders are responsible for checking the
website for any addenda and /or modifications that are subsequently made to this IFB.
The Town accepts no liability for and will provide no accommodations to bidders who fail to
check for amendments and/or modifications to this IFB and subsequently submit inadequate or
incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any
IFB component files. Modifications to the body of the IFB, Scope of Work, terms and
conditions, or which change the intent of this IFB are prohibited and may disqualify a response.
All proposals submitted in response to this IFB shall remain firm for sixty (60) days following
the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days
after the submittal deadline.
Bidders are not to communicate directly with any employee of the Town of North Andover,
except as specified in this IFB, and no other individual employee or representative is authorized
to provide any information or respond to any question or inquiry concerning this IFB.
Town of North Andover IFB Page 4 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the
bidder is having trouble obtaining any part of the IFB electronically through the Town website
(www.townofnorthandover.com), including, and without limitation the form and attachments.
Bidder with disabilities or hardships that seek reasonable accommodations, which may include
the receipt of IFB information and/or addenda and/or modifications in an alternative format,
must communicate such requests in writing to the contact person, and reasonable
accommodation will be made by agreement with the contact person on behalf of the Town of
North Andover.
4. Minimum Requirements
Each bidder must demonstrate that it meets the following minimum requirements:
A. Company must demonstrate a minimum of five (5) years experience for both the
company and the individual foreman assigned to this project in terms of installing
chemical storage tank lining systems. Resume and qualifications of proposed field
supervisor shall be provided.
B. Contractor shall submit a complete list of all similar contracts performed in the past five
(5) years with contact names and telephone numbers.
C. Contractor shall provide evidence that they have successfully recoated/relined at
minimum five (5) fiberglass tanks of similar size over the last five (5) years.
D. The Contractor shall furnish all labor, materials, tools, equipment, and incidentals as
required for the work in accordance with the specifications.
E. The Contractor shall conform to all requirements of federal, state and local laws, including
compliance with the prevailing wage laws.
F. All equipment supplied shall be first quality, the manufacturer's best type and in
continuous production and providing satisfactory service in commercial applications
for at least one year. Obsolescent or obsolete equipment shall not be used.
G. Distributors of acceptable manufacturers' equipment shall provide documentation
indicating that they are authorized by the manufacturer to distribute and service the
equipment and that they have satisfactorily completed all training courses offered by the
manufacturer relating to the equipment provided.
H. Submission of required statements and forms.
5. Mandatory Site Visit/Briefing
A mandatory site visit/briefing of the Chemical Storage Room at the Water Treatment Plant will
be held on Thursday, March 7, 2013 at 10:00 a.m. As -built drawings and other pertinent
Town of North Andover IFB Page 5 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
information will be made available for review. All parties will meet in the meeting room on the
first floor of the Water Treatment Plant at 420 Great Pond Road, North Andover.
Bids received from companies who did not attend the mandatory site visitibriefing will be
deemed `non -responsible' and will not be considered.
6. General Requirements
A. General
1) The Contractor shall furnish all labor, materials, tools, equipment and incidentals
required to furnish, install, field test, complete and ready for service an interior
lining system to reline/recoat one 3,461 gallon sodium hydroxide (caustic soda)
storage tank as described in this specification.
2) These specifications are intended to describe the design concept only. It is the
responsibility of the contractor to visit the site and familiarize themselves with it.
B. Owner's Representative
1) The Town may appoint a coordinator as the Owner's Representative for the duration
of the project. Any reference to the Town in the Contract Documents includes the
Owner's Representative.
C. Quality Assurance
1) The specifications identify the essential functional requirements of the Chemical
Storage Tank Lining System. The Contractor's work shall comply with or exceed
the functional intent of this Specification.
D. Submittals
1) The Contractor shall submit to the Owner two (2) copies of sufficient information
to describe the work efforts to be performed and the materials to be provided. The
Contractor shall certify that he has reviewed the documentation to verify:
dimensions, quantities, installation and fabrication techniques, procedures, and
sequences, and good workmanship and safety precautions and that they are in
conformance with these specifications.
2) These reviews are not the responsibility of the Town. The Town will only review
these documents for the limited purposes of checking for general compliance with
the information provided in the contract documents and general conformance with
the design concept of this part of the project and not to determine accuracy or
completeness of other details such as dimensions and quantities. The Town will
not approve means, methods or procedures of construction or installation nor will
they review for safety precautions. Accuracy and process are the responsibilities of
Town of North Andover IFB Page 6 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
the Contractor.
3) The following shop drawings shall be submitted for review and approval prior to
performing work:
a) A schedule indicating the installation sequence, the time frame, and details on
how the Chemical Storage Tank Lining System will occur. Projected dates
of delivery of the equipment to be supplied, installation completion,
demonstration test, and final test/acceptance dates shall be included.
b) Shop drawings which shall include original manufacturer's specification and
installation instruction sheets. Copies will not be acceptable. All equipment
and devices on the shop drawings to be furnished under this contract shall be
clearly marked in the specification sheets. If any equipment and/or devices
required in the system are not so marked, the Owner shall mark the sheet,
and this equipment and/or devices shall be made part of the system and shall
be provided.
c) Sufficient information so that the exact function is known for each installed
material.
4) The Contractor shall not order any equipment nor perform any installations prior
to completion of review of the submittals and any necessary re -submittals by the
Owner and receipt of written authority to proceed to the next milestone from the
Owner.
a) Correcting and resubmitting submittals shall be performed as follows: A copy
of the previously submitted transmittal including all reviewers' comments and
written responses shall be included in the re -submittal. If changes other than
those noted by the Owner are performed, then direct specific attention in
writing or on the resubmitted document shall be made to those revisions.
5) The Contractor shall not perform the final acceptance test prior to completion of
review of the project completion submittals and any necessary re -submittals by
the Owner and receipt of written authority to proceed to the next milestone from
the Owner.
a) Review of the initial project completion submittal will be completed at no cost.
The cost of reviewing re submittals, for reason of failure of the initial submittal
to meet contract requirements, shall be the responsibility of the contractor. The
Owner will directly invoice the cost at published rates, to review additional
submittals, to the contractor. Payment of the invoices will be required before
written authority to proceed to the next milestone is issued.
b) Correcting and resubmitting of a project
performed as follows. A copy of the
Town of North Andover IFB
Chemical Storage Tank Lining System — Water Treatment Plant
completion submittal shall be
previously submitted transmittal
Page 7 of 41
including all reviewers' comments and written responses shall be included in
the re submittal. If changes other than those noted by the Owner are performed,
then direct specific attention in writing or on the resubmitted document shall be
made to those revisions.
E. Warranty
1) The Contractor shall warrant all work as free from defects in workmanship and
defects for a period of one year from date of the final acceptance.
7. Specifications
The Contractor shall furnish all labor, materials, tools, equipment and incidentals required to
furnish, install, field test, complete and ready for service an interior lining system to reline/recoat
one 3,461 gallon sodium hydroxide (caustic soda) storage tank as specified herein.
A. Quality Assurance
1) Materials and equipment used to recoat chemical storage tank shall be supplied by a
firm regularly engaged in furnishing similar materials and recoating fiberglass
chemical storage tanks and that has been in satisfactory operation for at least five
years.
2) All materials furnished and all construction performed shall be in accordance with the
requirements and safety practices of the Occupational and Safety Health Act of 1970
(OSHA) and amendments thereto, state and municipal laws, regulations, codes,
standards, and/or procedures.
3) All materials and fabrications furnished including the design, fabrication, testing, and
installation of the storage tank lining system shall meet or exceed the following
industry standards:
a) PS 15-69, National Bureau of Standards Voluntary Product Standard, "Custom
Contact -Molded Reinforced -Polyester Chemical Resistant Process Equipment"
b) ASTM D 578, "Standard Specification for Glass Fiber Strands"
c) ASTM D 883, " Definitions of Terms Relating to Plastics"
d) ASTM D 2563-94, "Standard Practice for Classifying Visual Defects in Glass -
Reinforced Plastic Laminate Parts"
e) ASTM D 2583, "Test for Indentation Hardness of Rigid Plastics by Means of a
Barcol Impressor"
f) ASTM D 2584, "Ignition Loss of Cured Reinforced Resins"
Town of North Andover IFB Page 8 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
g) ANSI/ASME RTP -1-2007, "Reinforced Thermoset Plastic Corrosion -Resistant
Equipment"
B. Submittals
1) Submit to the Town shop drawings showing certification that the storage tank lining
system meets the specifications.
2) Submit to the Town test reports for all tests outlined in these specifications and as
required by manufacturer.
3) Submit to the Town material safety data sheets (MSDS) for all products or materials
to be brought on site.
C. Definitions
1) Wrap — One full weld along the circumference of the tank.
2) Segment — A section of weld kit partially achieving part of the tank circumference.
3) Sequence — The full installation of enough segments to make one full trip around the
tank.
4) Weld width — The dimension required to span or cover the joint on each side
(overlay).
5) Weld length — The full length of a weld required to cover the tank circumferentially.
Multiple segments may be required to achieve the weld length.
6) FRP — Fiberglass Reinforced Plastic
D. Products
1) Storage Tank Lining System
a) The lining system shall be suitable for the storage of Sodium Hydroxide (25%
bulk solution strength) at ambient temperatures ranging from 60 to 100°F. The
new tank lining system shall provide for full structural support for the tank when
full of 25% Sodium Hydroxide, without support from the existing tank shell, and
without the corrosion lining, with a safety factor of 10:1. The existing tank shell
shall be used only as a form for the installation of the new tank lining system.
The Contractor shall provide design calculations for the tank lining system.
b) Solvents used for cleaning tools and associated fabrication equipment shall be
non-flammable.
Town of North Andover IFB Page 9 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
c) Primers shall be ATPRIME2 and Derakane 8084 primer resins, or approved
equal.
d) Resin systems proposed for the corrosion liner and structural plies must be of a
premium grade vinyl ester resin system specifically designed for the chemical
exposure and service intended for the vessel. Qualifications of the resin must
include but not be limited to concentration of the chemical and operating
temperature that the resin system will be exposed to during service. A document
shall be provided by the resin manufacturer that qualifies the proposed resin
system for all known and anticipated service conditions associated with the
corrosion liner and structural plies. Lower grade poly ester resin (sometimes
called "boat resin") is not acceptable. The corrosion barrier shall include a nexus
veil.
e) Laminate Reinforcements: All reinforcement materials must be ECR grade glass
reinforcements and qualified as compatible with the resin manufacturer's
recommendations. Reinforcements shall be specifically designed for high alkaline
exposure potentials. Reinforcement material shall be Advantex E -CR Glass, or
approved equal.
f) Reinforcement Types:
M = 1.5 oz per sq ft chopped strand mat (roll form)
R = 24 oz per sq ft woven roving (roll form)
V = Veil (surfacing ply)
N = Nexus (surfacing ply)
g) Catalyst shall be Cobalt/MEKP, or approved equal.
h) The lining system shall comply with FDA regulation 21 CFR 177.2420 covering
materials contacting food products.
i) All interior lining workmanship classified as the interior corrosion liner system
shall meet or exceed laminate quality as deemed acceptable and associated with
Standard ASTM D 2563-94 Classifying Visual Defects for type II laminates
j) All structural layers as constructed shall meet or exceed laminate quality as
deemed acceptable and associated with Standard ASTM D 2563-94 Classifying
Visual Defects for type III laminates.
Town of North Andover 11713 Page 10 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
E. Execution
1) General
a) The equipment, tools, and materials shall be delivered to the site and handled and
stored in compliance with the manufacturer's recommendations.
b) Contractor shall schedule and notify Town and allow for inspection of work to be
performed at the following times during construction:
i. Following surface preparation and before priming and laminate
application.
ii. Following laminate application for inspection of laminate thickness,
sequence, and dimensional tolerances.
iii. Final inspection upon completion of work
c) Solvents used for cleaning tools and associated fabrication equipment must be
approved by the Town prior to bringing onto the work site.
d) Resin manufacturer's recommendations for catalyst measurements, safety
handling, and general procedures shall be adhered to.
e) Proper ventilation and dust control, as well as respiratory, skin, and eye
protection, shall be provided throughout construction in accordance with OSHA
requirements and all Local, State, and Federal regulations. Ventilation shall be
directed to the exterior of the building such that fumes do not accumulate in the
building or effect the normal operation of the plant. Contractor shall submit a
qualified safety and dust control program, and provide MSDS products sheets for
all materials to be brought on site by the vendor. The MSDS sheets shall
accompany all materials while on site during construction. No dust or fumes shall
be allowed into the plant from the construction site.
f) All fabrication refuse shall be removed and disposed of by the Contractor in
accordance with all Federal, State, and Local regulations.
g) All liquids brought to the work site not consumed in the fabrication process shall
be removed from the site by the Contractor in accordance with all Federal, State,
and Local regulations.
h) All materials must be kept clean and dry at all times prior to and during the
installation process. Any contact with foreign agents especially water is a flag for
material rejection and replacement.
Town of North Andover IFB Page 11 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
i) Ambient and surface temperatures must be checked and kept to within the
tolerances for materials application as required by the resin manufacturer.
Surfaces shall be at no less than 50F and indicate a 5 degree separation of surface
temperature to dew point.
j) Multiple sequence applications applied over a previous installed sequence prior to
the first sequence exothem known as (material stacking) as well as sequence
overlaps can significantly affect the laminate. Working time, bonding
characteristics and potentially the quality of a laminate can be affected and
ultimately diminished. Only prepare and apply as much material as can be applied
to maintain the quality requirements of the laminate.
2) Surface Preparation
a) The interior surfaces of the tank must be prepared for secondary bonding by being
ground utilizing a 16 grit abrasive disc in accordance with industry standards and
the resin manufacturer's requirements for secondary bonding.
b) Surfaces being prepared to receive a weld, or laminate are to be ground for 100%
of the surface where the (secondary bonder), or "weld" is to be applied. Once
ground the surface must be protected from water or any other contaminates. All
surfaces must be kept clean, dry and stable after the prep is performed and until
the weld has been allowed to fully cure.
c) All dust should be removed from the prepared surface with a new clean dry chip
brush or shop vacuum with a clean head fixture. Do not use compressed air or
rags. Do not wipe the prepared surface with solvent prior to installing the weld.
d) If the weld is left over night or for more than 24 hours re -grind the surface to re-
establish the proper prep.
e) Just prior to applying the weld laminate coat the surface with a coat of catalyzed
resin to enhance bond at the weld material to surface interface.
f) A bond test shall be performed on all surfaces to be lined to prove an acceptable
bonding interface has been achieved. Testing shall include two (2) test sites per
floor and two (2) test sites per tank shell. Testing shall be performed and qualified
prior to starting the installation of new laminate.
3) Lining System
a) The lining systems shall be installed in accordance with materials manufacturer's
recommendations and requirements and as specified herein.
b) Contractor shall inspect all glass reinforcement prior to use in fabrication and
shall not use any glass that does not meet the manufacturer's acceptance standard.
Town of North Andover IFB Page 12 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
c) Entire interior tank surfaces [M = 1.5 oz per sq ft chopped strand mat (roll form);
R = 24 oz per sq ft woven roving (roll form); V = Veil (surfacing ply); N = Nexus
(surfacing ply)]:
iv. Install a new structural liner in accordance with design thicknesses for
the vessel per manufacturer's requirements. Install the structural plies
in alternating sequences MRMRM-MRMRM up to the required
thickness.
V. Install a new corrosion liner utilizing the following sequence up to but
no less than .250 mils of total liner thickness. MMMM-MMMM-----
up to the required thickness ending with (NV). The corrosion liner
shall not be included in the structural thickness value of the vessel.
d) Repairs to the bottom head to shell knuckle radius are to be in accordance with
design per RTP -1-2007.
e) Resin systems shall be post cured in accordance with the resin manufacturer's
recommendations.
f) Install a properly sized tank wall reinforcement kit at all tank openings in
accordance with design per RTP -1-2007.
g) The new lining system shall extend through all exterior tank penetrations and
fittings, to the face of flanges. Pipe and instrumentation connections to the tank
shall be temporarily removed during the relining process and reconnected when
the process is completed. New EPDM gaskets shall be installed when the pipes
and instrumentation equipment is reconnected. The surfaces of fittings and
accessories exposed to product shall have the same corrosion barrier laminate as
the interior of the tank.
h) Final top coating of the weld is a specially prepared resin system consisting of the
base resin system used in the repair. When the weld is fully cured apply a resin
top coat with a wax surfactant and UV inhibitor to the weld for final cure and
protection. This "waxed or surfactant" resin solution is only used as a resin top
coat. Under no circumstances is this resin used in the actual weld construct. It is
only a top coat use resin system and can cause substandard bonding within a weld
layer if used inside the weld layers.
i) Following installation of the lining system, the Contractor shall perform testing of
tank lining system including but not limited to barcol hardness test, acetone test,
hydrostatic pressure test, and a visual inspection prior to filling with bulk
chemical. A final inspection report with the test results shall be submitted to the
Town.
Town of North Andover IFB Page 13 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
J) The lining system shall have a minimum barcol hardness of 30.
8. Prevailing Wage Rates
The successful bidder will at all times comply with the prevailing wage rates as determined by
the Department of Labor Standards under the provisions of Massachusetts General Laws as shall
be in force and as amended. The prevailing wage rates are attached.
9. Payment Bond
At the time of contract execution, if the contract amount is greater than $25,000, in accordance
with Massachusetts General Laws the successful bidder shall provide a payment bond in the
amount of 50% of the total cost of the contract. The payment bond must be on the Town's form
that is attached.
10. Bid Deposit
In accordance with Massachusetts General Laws, all bidders are required to submit a bid deposit
in the amount of 5% of the value of the total bid.
11. Evaluation of Bids
Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility
of the bidder will then be ascertained. The Town is required to award the contract to the lowest
responsive and responsible bidder.
■ Responsiveness
Bidders must completely fill out and submit the bid form and all other required forms. All
supplies and services that are the subject of the bid must meet the minimum standards and
scope of services set forth in the purchase description including the standards by which the
procurement officer will determine acceptability as to quality, workmanship, results of
inspections and tests, and suitability for a particular purpose.
■ Responsibility
Bidders must demonstrate that they meet measures of responsibility. The Town will not
award a contract to any bidder who cannot furnish satisfactory evidence of his ability and
experience in this type of work and that he has sufficient plant and capital to enable him
to prosecute and complete the work as outlined in the Specifications. The Town may
make such investigations as it deems necessary to determine the above and a bidder shall.
furnish any information requested in this regard.
All costs not listed on the bid price sheet will not be considered part of the contract and therefore
will not be paid. The Town of North Andover will not be charged fuel surcharges or
administrative fees as part of any contract entered into as a result of this IFB. Additionally the
Town of North Andover IFB Page 14 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
Town of North Andover will not be charged late fees unless payment is not made within sixty
(60) days of the receipt of invoice.
The Town of North Andover is a tax exempt entity so no sales tax will be assessed to any
purchases made under this proposed contract.
12. Term of Contract
The successful bidder will be required to execute the standard Town of North Andover contract
and the appropriate supplement as attached.
Town of North Andover IFB Page 15 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible, responsive bidder offering the lowest price for
the work to be performed. All prices are to remain firm for the duration of the Contract.
All bidders are required to attend a mandatory site visit/briefing of the Chemical Storage
Room at the Water Treatment Plan on Thursday, March 7, 2013 at 10:00 a.m. Bids
received from companies who did not attend the mandatory site visit/briefing will be
deemed `non -responsible' and will not be considered.
Total Lump Sum Price to furnish all labor, materials, tools, equipment, and incidentals required to
furnish, install, field test, complete and ready for service an interior lining system to reline/recoat one
3,461 gallon sodium hydroxide (caustic soda) storage tank in accordance with the scope of services and
specifications.
FIX Iwo:.
Business Name
Business Address
Business Phone
are acknowledged:
Signature
Fax
Name of Person Authorized to sign Price Proposal
Title of Person Authorized to sign Price Proposal
Signature of Above Person
Town of North Andover IFB Page 16 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
Town of North Andover
CONTRACT
CONTRACT#
DATE:
This Contract is entered into on, or as of, this date by and between the Town of North
Andover (the "Town"), and
Contractor:
Address:
Telephone Number: _
Fax Number:
1. This is a Contract for the procurement of the following:
2. The Contract price to be paid to the Contractor by the Town of North Andover is:
3. Payment will be made as follows:
4. Definitions:
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services
by authorized representatives of the Town to insure that the goods or services are
complete and are as specified in the Contract.
Town of North Andover IFB Page 17 of 41
Chemical'Storage Tank Lining System — Water Treatment Plant
4.2 Contract Documents: All documents relative to the Contract including (where
used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary
General Conditions, General Specifications, Other Specifications included in
Project Manual, Drawings, and all Addenda issued during the bidding period. The
Contract documents are complementary, and what is called for by any one shall be
as binding as if called for by all. The intention of the document is to include all
labor and materials, equipment and transportation necessary for the proper
performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term
shall (as the sense and particular Contract so require) include Vendor, Contractor,
Engineer, or other label used to identify the other party in the particular Contract.
Use of the term "Contractor" shall be understood to refer to any other such label
used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete,
the services are performed, or the goods delivered, in accordance with Contract
documents, as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 Sub -Contractor: Those having a direct Contract with the Contractor. The term
includes one who furnished material worked to a special design according to the
Drawings or Specifications of this work, but does not include one who merely
furnishes material not so worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance:
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before , unless extended pursuant to a
provision for extension contained in the Contract documents at the sole discretion of the Town,
and not subject to assent by the Contractor, and subject to the availability and appropriation of
funds as certified by the Town Accountant. The time limits stated in the Contract documents are
of the essence of the Contract.
6. Subject to Appropriation:
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the Town is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this
Contract shall be immediately terminated without liability for damages, penalties or other
charges.
Town of North Andover IFB Page 1.8 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
7. Permits and Approvals:
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its
performance of the Contract shall be secured and paid for by the Contractor.
8. Termination and Default:
8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days
notice when in the best interests of the Town by providing notice to the Contractor,
which shall be in writing and shall be deemed delivered and received when given in
person to the Contractor, or when received by fax, express mail, certified mail return
receipt requested, regular mail postage prepaid or delivered by any other appropriate
method evidencing actual receipt by the Contractor. Upon termination without cause,
Contractor will be paid for services rendered to the date of termination.
8.2 For Cause. If the Contractor is determined by the Town to be in default of any term
or condition of this Contract, the Town may terminate this Contract on seven (7) days
notice by providing notice to the Contractor, which shall be in writing and shall be
deemed delivered and received when given in person to the Contractor, or when
received by fax, express mail, certified mail return receipt requested, regular mail
postage prepaid or delivered by any other appropriate method evidencing actual
receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract:
1) any material misrepresentation made by the Contractor to the Town; 2) any
failure to perform any of its obligations under this Contract including, but not
limited to the following: (i) failure to commence performance of this Contract at
the time specified in this Contract due to a reason or circumstance within the
Contractor's reasonable control, (ii) failure to perform this Contract with
sufficient personnel and equipment or with sufficient material to ensure the
completion of this Contract within the specified time due to a reason or
circumstance within the Contractor's reasonable control, (iii) failure to perform
this Contract in a manner reasonably satisfactory to the Town, (iv) failure to
promptly re -perform within a reasonable time the services that were rejected by
the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for
reasons not beyond the Contractor's reasonable control, (vi) failure to comply
with a material term of this Contract, including, but not limited to, the provision
of insurance and non-discrimination, (vii) any other acts specifically and
expressly stated in this Contract as constituting a basis for termination of this
Contact, and (viii) failure to comply with any and all requirements of state law
and/or regulations, and Town bylaw and/or regulations.
9. The Contractor's Breach and the Town's Remedies:
Failure of the Contractor to comply with any of the terms or conditions of this Contract
shall be deemed a material breach of this Contract, and the Town of North Andover shall
Town of North Andover IFB Page 19 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
have all the rights and remedies provided in the Contract documents, the right to cancel,
terminate, or suspend the Contract in whole or in part, the right to maintain any and all
actions at law or in equity or other proceedings with respect to a breach of this Contract,
including damages and specific performance, and the right to select among the remedies
available to it by all of the above.
From any sums due to the Contractor for services, the Town may keep the whole or any
part of the amount for expenses, losses and damages incurred by the Town as a
consequence of procuring services as a result of any failure, omission or mistake of the
Contractor in providing services as provided in this Contract.
10. Statutory Compliance:
10.1 This Contract will be construed and governed by the provisions of applicable
federal, state and local laws and regulations; and wherever any provision of the
Contract or Contract documents shall conflict with any provision or requirement
of federal, state or local law or regulation, then the provisions of law and
regulation shall control. Where applicable to the Contract, the provisions of the
General Laws are incorporated by reference into this Contract, including, but not
limited to, the following:
General Laws Chapter 30B — Procurement of Goods and Services.
General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts.
General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts.
10.2 Wherever applicable law mandates the inclusion of any term and provision into a
municipal contract, this Section shall be understood to import such term or
provision into this Contract. To whatever extent any provision of this Contract
shall be inconsistent with any law or regulation limiting the power or liability of
cities and towns, such law or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations
bearing on the performance of the Contract. If the Contractor performs the
Contract in violation of any applicable law or regulation, the Contractor shall bear
all costs arising therefrom.
10.4 The Contractor shall keep itself fully informed of all existing and future State and
National Laws and Municipal By-laws and Regulations and of all orders and
decrees of any bodies or tribunals having jurisdiction in any manner affecting
those engaged or employed in the work, of the materials used in the work or in any
way affecting the conduct of the work. If any discrepancy or inconsistency is
discovered in the Drawings, Specifications or Contract for this work in violation of
any such law, by-law, regulation, order or decree, it shall forthwith report the same
in writing to the Town. It shall, at all times, itself observe and comply with all
such existing and future laws, by-laws, regulations, orders and decrees; and shall
Town of North Andover IFB Page 20 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
protect and indemnify the Town of North Andover, and its duly appointed agents
against any claim or liability arising from or based on any violation whether by
him or its agents, employees or subcontractors of any such law, by-law, regulation
or decree.
11. Conflict of Interest:
Both the Town and the Contractor acknowledge the provisions of the State Conflict of
Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any
activity which shall constitute a violation of that law. The Contractor shall be deemed to
have investigated the application of M.G.L. c. 268A to the performance of this Contract;
and by executing the Contract documents the Contractor certifies to the Town that neither
it or its agents, employees, or subcontractors are thereby in violation of General Laws
Chapter 268A.
12. Certification of Tax Compliance
This Contract must include a certification of tax compliance by the Contractor, as
required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance
by All Contractors Providing Goods, Services, or Real Estate Space to the
Commonwealth or Subdivision).
13. Discrimination
The Contractor will carry out the obligations of this Contract in full compliance with all
of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended.
14. Assignment:
Assignment of this Contract is prohibited, unless and only to the extent that assignment is
provided for expressly in the Contract documents.
15. Condition of Enforceability Against the Town:
This Contract is only binding upon, and enforceable against, the Town if. (1) the
Contract is signed by the Town Manager or its designee; and (2) endorsed with approval
by the Town Accountant as to appropriation or availability of funds; and (3) endorsed
with approval by the Town Counsel as to form.
16. Corporate Contractor:
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its
Clerk's Certificate certifying the corporate capacity and authority of the party signing this
Contract for the corporation. Such certificate shall be accompanied by a letter or other
Town of North Andover IFB Page 21 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
instrument stating that such authority continues in full force and effect as of the date the
Contract is executed by the Contractor. This Contract shall not be enforceable against the
Town of North Andover unless and until the Contractor complies with this section.
The Contractor, if a foreign corporation, shall comply with the provisions of the General
Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in
addition thereto, relating to the appointment of the Commissioner of Corporations as its
attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly
authenticated copies of its Charter or Certificate of Incorporation; and said Contractor
shall comply with all the laws of the Commonwealth.
17. Liability of Public Officials:
To the full extent permitted by law, no official, employee, agent or representative of the
Town of North Andover shall be individually or personally liable on any obligation of the
Town under this Contract.
18. Indemnification:
The Contractor shall indemnify, defend and save harmless the Town, the Town's officers,
agents and employees, from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every
nature and description (including reasonable attorneys' fees) that may arise in whole or in
part out of or in connection with the work being performed or to be performed, or out of
any act or omission by the Contractor, its employees, agents, subcontractors, material
men, and anyone directly or indirectly employed by any of them or anyone for whose acts
any of them may be liable, regardless of whether or not it is caused in part by any party
indemnified hereunder. The Contractor further agrees to reimburse the Town for damage
to its property caused by the Contractor, its employees, agents, subcontractors or material
men, and anyone directly or indirectly employed by any of them or anyone for whose acts
any of them may be liable, including damages caused by his, its or their use of faulty,
defective, or unsuitable material or equipment, unless the damage is caused by the
Town's gross negligence or willful misconduct. The existence of insurance shall in no
way limit the scope of the Contractor's indemnification under this contract.
19. Workers Compensation Insurance:
The Contractor shall provide by insurance for the payment of compensation and the
furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts
(The Worker's Compensation Act) to all employees of the Contractor who are subject to
the provisions of Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract
shall be deemed a material breach of this Contract, shall operate as an immediate
termination thereof, and Contractor shall indemnify the Town for all losses, claims, and
actions resulting from the failure to provide the insurance required by this Article.
Town of North Andover IFB Page 22 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
The Contractor shall furnish to the Town evidence of such insurance prior to the
execution of this Contract before the same shall be binding on the parties thereto, except
if specifically waived by the Town.
20. Documents, Materials, Etc.
Any materials, reports, information, data, etc. given to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available
to any individual or organization by the Contractor (except agents, servants, or employees
of the Contractor) without the prior written approval of the Town, except as otherwise
required by law. The Contractor shall comply with the provisions Chapter 66A of the
General Laws of Massachusetts as it relates to public documents, and all other state and
federal laws and regulations relating to confidentiality, security, privacy and use of
confidential data.
Any materials produced in whole or in part under this Contract shall not be subject to
copyright, except by the Town, in the United States or any other country. The Town
shall have unrestricted authority to, without payment of any royalty, commission, or
additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise
use, and authorize others to use, in whole or in part, any reports, data or other materials
prepared under this Contract.
All data, reports, programs, software, equipment, furnishings, and any other
documentation or product paid for by the Town shall vest in the Town at the termination
of this Contract. The Contractor shall at all times, during or after termination of this
Contract, obtain the prior written approval of the Town before making any statement
bearing on the work performed or data collected under this Contract to the press or issues
any material for publication through any medium.
21. Audit, Inspection and Recordkeeping
At any time during normal business hours, and as often as the Town may deem it
reasonably necessary, there shall be available in the office of the Contractor for the
purpose of audit, examination, and/or to make excerpts or transcript all records, contracts,
invoices, materials, payrolls, records of personnel, conditions of employment and other
data relating to all matters covered by this Agreement.
22. Payment
The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth
in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice
detailing the work completed and acceptance from the Town of the work completed.
Town of North Andover IFB Page 23 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
23. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all
signatories to the original Agreement, prior to the effective date of the amendment.
To the extent allowed by law, any conditions, duties, and obligations contained in this
Contract may be waived only by written Agreement by both parties.
Forbearance or indulgence in any form or manner by a party shall not be construed as a
waiver, nor in any manner limit the legal or equitable remedies available to that party.
No waiver by either party of any default or breach shall constitute a waiver of any
subsequent default or breach of a similar or different matter.
24. Forum and Choice of Law
This Contract and any performance herein shall be governed by and be construed in
accordance with the laws of the Commonwealth. Any and all proceedings or actions
relating to subject matter herein shall be brought and maintained in the courts of the
Commonwealth or the federal district court sitting in the Commonwealth, which shall
have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any
other legal rights of the parties.
25. Notices
Any notice permitted or required under the provisions of this Contract to be given or
served by either of the parties hereto upon the other party hereto shall be in writing and
signed in the name or on the behalf of the party giving or serving the same. Notice shall
be deemed to have been received at the time of actual service or three (3) business days
after the date of a certified or registered mailing properly addressed. Notice to the
Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to
the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main
Street, North Andover, Massachusetts 01845.
26. Binding on Successors:
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or
successors in interest (and where not corporate, the heirs and estate of the Contractor).
27. Complete Contract:
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no
agreements other than those incorporated herein.
Town of North Andover 1FB Page 24 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
28. Supplemental Conditions:
The foregoing provisions apply to all contracts to which the Town of North Andover
shall be a party. One of the following "Supplements" must be "checked" as applicable to
this Contract, shall be attached hereto, and shall in any event apply as the nature of the
Contract requires. The Supplement contains additional terms governing the Contract:
[ ] GOODS
SUPPLEMENT "G" - Applicable to Contracts for the procurement of
Goods (governed by the provisions of General Laws
Chapter 3013)
[ ] SERVICES
SUPPLEMENT "S" - Applicable to Contracts for the procurement of
Services (governed by the provisions of General
Laws Chapter 3013)
[ X] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for Construction '
Town of North Andover IFB Page 25 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set
forth their hands the day and year first above written.
THE TOWN
Division/Department Head
Contract Manager
Town Manager Date
APPROVED AS TO FORM:
Town Counsel
Date
THE CONTRACTOR
Company Name
Signature
Print Name & Title
CERTIFICATION AS TO AVAILABILITY OF FUNDS:
Town Accountant
Date
Date
Town of North Andover IFB Page 26 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
SUPPLEMENT "C"
[] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for the construction of -
(1)
f
(1) Public Buildings and Public Works
(governed by the provisions of General Laws Chapter 30B);
(2) Public Buildings
(governed by the provisions of General Laws Chapter 149,§ 44A,
et seq.); and
(3) Public Works
(governed by the provisions of General Laws Chapter 30, §39M, et seq)
This form supplements the Town of North Andover "Contract and General Conditions" and applies
only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works
or public buildings.
2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
(where required) in the form required by the Town and provide an original thereof to the Town prior
to the commencement of performance.
E uali :
3.1. In the case of a closed Specification written for a specific item or items to be furnished under
the Base Bid, such specifications shall, as applicable, be in compliance with the
Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq.
3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or
on the Drawings, except as above noted, the intent is to establish a standard and in no way
should be construed to exclude any item or manufacturer not mentioned by name, but whose
product meets the Specifications as to design, utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of
goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of
Chapter 30B.
The Contractor will carry out the obligations of this contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage
Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of
Massachusetts as they may from time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall
be in force and as amended.
The Contractor shall continuously maintain adequate protection of all work from damage and shall
protect the property of the Town and others, including adjacent property, from injury or loss arising
Town of North Andover IFB Page 27 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
in connection with the Contract. The Contractor shall make good any such damage, injury or loss,
except as may be directly due to errors in the Contract Documents or caused by agents or employees
of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or
negligence.
The Contractor shall take all necessary precautions for the safety of employees on the work, and shall
comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents
or injury to persons on, about or adjacent to the premises where the work is being performed. The
Contractor will erect and properly maintain at all times, as required by the conditions and progress of
the work, all necessary safeguards for the protection of workers and the public, shall post danger
signs warning against the hazards created by such features of construction such as pits, protruding
nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling
materials; and shall designate a responsible member of its organization on the work, whose duty shall
be the prevention of accidents.
The Town shall at all times have access to the work wherever it is in preparation or progress and the
Contractor shall provide suitable accommodations for such access.
The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the
construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven
days notice from the Town, the Contractor shall replace such person or persons with people
acceptable to the Town.
10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The
Contractor shall carefully study and compare the drawings, specifications and other instructions and
shall at once report to the Town any error, inconsistency or omission which shall be discovered.
Included in this responsibility shall be supervision of all work performed by subcontractors on the
work.
11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any
of its provisions, the Town, upon three days written notice, may, without prejudice to any other
remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection by the Town's Project Representative
12.1. The Town shall have the right to designate a Project Representative who may make periodic
visits to the site to familiarize the Town generally with the progress and quality of the work,
and to determine in general if the work is proceeding in accordance with the Contract
Documents. The Project Representative will not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the work, and will not be
responsible for the Contractor's failure to carry out the construction work in accordance with
the Contract Documents. During such visits and on the basis of these observations while at
the site, the Project Representative will keep the Town informed on the progress of the work,
will endeavor to guard the Town against defects and deficiencies in the work of contractors,
and may condemn structural work as failing to conform to the Contract Documents. The
Project Representative shall have authority to act on behalf of the Town only to the extent
expressly delegated by the Town, which shall be shown to the Contractor, and shall have
authority to stop the work whenever such stoppage may reasonably be necessary to insure
the proper execution of the Contract.
Town of North Andover IFB Page 28 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
12.2. In connection with the work, the Project Representative shall not be responsible for
construction methods, means, techniques, sequences or procedures employed by the
Contractor or the Contractor's safety programs, requirements, regulations, or precautions.
13. Decisions of the Project Representative
13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of
the Town or the Contractor and on all other matters relating to the execution and progress of
the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision, in matters relating to the project, shall be final, if
within the terms of the Contract Documents.
13.3. If, however, the Project Representative fails to render a decision within ten days after the
parties have presented their evidence, either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Project Representative renders a
decision after such remedies have commenced, such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the parties concerned.
14.1 Use of Premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by law, by-laws, permits or directions of the Town and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or permit any part of the structure to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute,
the Town may remove the rubbish and charge the cost to the several contractors, as the Town
shall determine to be just.
16. Right to Terminate
If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit
of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail
to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently
disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial
violation of any provision of the Contract, then the Town may, without prejudice to any other
right or remedy and after giving the Contractor (or any surety) seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of all materials, tools and appliances thereon and finish the work by whatever method it
deems appropriate.
Town of North Andover IFB Page 29 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
In such cases, the Contractor shall not be entitled to receive any further payment until the work is
finished. If the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of finishing the work, including compensation for additional architectural,
managerial, legal and administrative services, such excess shall be paid to the Contractor. If such
expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town.
The Contractor shall not be relieved of liability to the Town by virtue of any termination of this
contract, and any claim for damages against the Contractor relating to the Contractor's
performance under this contract shall survive any termination hereunder.
Notwithstanding any other provision of this Agreement, the Town reserves the right at any time
in its absolute discretion to suspend or terminate this Agreement in whole or in part for its
convenience upon seven days written notice to the Contractor. The Town shall incur no liability
by reason of such termination except for the obligation to pay compensation for all work
performed by the Contractor and accepted by the Town to the termination date.
17. Progress ss Payments:
17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported
to the extent required by the Town by invoices or other vouchers, showing payments for
materials and labor, payments to Subcontractors and such other evidence of the
Contractor's right to payment.
17.2. The Contractor shall, before the first application, submit to the Town a schedule of values
of the various parts of the work, including quantities aggregating the total sum of the
Contract, divided so as to facilitate payments to Subcontractors, made out in such form as
the Town and the Contractor may agree upon, and, if required, supported by such
evidence as to its correctness. This schedule, when approved by the Town, shall be used
as a basis for payment, unless it is found to be in error. If applying for payments, the
Contractor shall submit a statement based upon this schedule.
18. Withholding of Payments
18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the Town of North Andover from loss on account of-
18.1.1.
f:
l8.1.1. Defective work not remedied.
18.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor.
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5. Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
Town of North Andover IFB Page 30 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
18.2. Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims by Contractor and Liability of Town
All claims by the Contractor against the Town shall, unless otherwise provided by law, be
initiated by a written claim submitted to the Town no later than seven (7) calendar days after the
event or the first appearance of the circumstances causing the claim. The claim shall set forth in
detail all known facts and circumstances supporting the claim. The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims.
The limit of liability of the Town under this Agreement is limited to the compensation provided
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special or consequential damages or lost profits or for damages or loss from causes
beyond the Town's reasonable control.
20. Liquidated Damages:
Because both parties recognize (1) that the time for completion of this Contract is of the essence,
(2) that the Town will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the
delays, expense and difficulties involved in a legal proceeding to detennine the actual loss
suffered by the Town if the work is not completed in time, itis agreed that the Contractor will pay
the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the
sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is
completed, whether the work is completed by the Contractor or some other person. The Town's
right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a
legal action for damages in lieu of or in addition to its option to impose liquidated damages. The
Town may deduct any liquidated damages from money due the Contractor, and if such payment is
insufficient to cover the liquidated damages, then the Contractor shall pay the amount due.
21. The Contractors' Mutual Responsibility:
Should the Contractor cause damage to any separate subcontractor on the work, the Contractor
agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies
provided by law or by the provisions of the contract. If such separate contractor sues the Town
on account of any damage alleged to have been sustained, the Town shall notify the Contractor,
who shall defend such proceedings at the Town's expense and, if any judgment against the Town
arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town.
22. Separate Contracts:
22.1. The Town reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results, upon the
work of any other contractor, the Contractor shall inspect and promptly report to the
Town any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
Town of North Andover IFB Page 31 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
of the other contractor's work as fit and proper for the reception of its work except as to
defects which may develop in the other contractor's work after the execution of its work.
22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work
already in place and shall at once report to the Town any discrepancy between the
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by
them, as it is for the acts and omissions of persons directly employed by it.
23.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the Town.
24. Contractor -Subcontractor Relations:
The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound
by the terms of the Agreement, the General Conditions of the Contract, the Supplementary
General Conditions, the Drawings and Specifications, as far as applicable to its work, including
the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
25. Indemnification:
25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) brought or recovered against them that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or omission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, regardless of whether or not it is
caused in part by any party indemnified hereunder. The Contractor further agrees to
reimburse the Town for damage to its property caused by Contractor, its employees,
agents, subcontractors or material men, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the Town's gross negligence or willful misconduct. The
existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this Contract.
25.2. In any and all claims against the Town or any of their agents or employees by any
employee of the Contractor, any Subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable, the indemnification
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
Town of North Andover IFB Page 32 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
employee benefit acts.
25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. However, it shall be the
Contractor's responsibility to purchase and maintain insurance of such character and in
such amounts as will adequately protect it and the Town from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
26. The Contractor's Insurance:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone
for whose acts any of them may be liable.
26.1.1. Claims under Worker's Compensation, disability benefit and other similar
employee benefit acts;
26.1.2. Claims for damages because of bodily injury, occupational sickness or
disease, or death of its employees, and claims insured by usual personal
injury liability coverage;
26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees, and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
26.2.1. Worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability Insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and Operations, Owners and Contractor's Protective, Products
and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such
insurance shall be written for not less than any limits of liability required by law, unless otherwise
provided in the contract documents, or the following limits, whichever are greater:
Town of North Andover IFB Page 33 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
Comprehensive General Liability Insurance (Broad Form)
Bodily Injury $1,000,000 per person
$3,000,000 per occurrence
Property Damage $1,000,000 per occurrence
$3,000,000 annual aggregate
Automobile Liability Insurance $500,000 per person
$1,000,000 per occurrence
26.3. The above insurance policies shall also be subject to the following requirements:
26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under Paragraph entitled "Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed
with the Town prior to commencement of the work. Renewal certificates shall be
addressed to and filed with the Town at least ten (10) days prior to the expiration
date of required policies.
26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30)
days prior written notice forwarded by registered or certified mail to the Town.
The Town shall also be notified of the attachment of any restrictive amendments
to the policies.
26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of
Insurance form, shall contain true transcripts from the policies, authenticated by
the proper officer of the Insurer, evidencing in particular those insured, the extent
of coverage, the location and operations to which the insurance applies, the
expiration date and the above-mentioned notice clauses.
26.3.5. All premium costs shall be included in the Contractor's bid.
26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
27. Protective Liability Insurance:
27.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the Town from claims which may arise from operations under
the Contract, including operations performed for the named insureds by independent
contractors and general inspection thereof by the named insureds.
27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town
against Automobile Non -Ownership Liability in connection with the Contractor's
Town of North Andover IFB Page 34 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable.
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing the Contractor's General Liability
Policy.
27.4. The Town shall be named as an additional insured on the above referenced liability
Policies, and the Contractor's insurance shall be the primary coverage. The cost of such
insurance, including required endorsements and amendments, shall be the sole
responsibility of the Contractor.
28. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the
Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as
it has knowledge or information, the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149
as amended (as a minimum requirement).
29. Guarantees:
29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this
Contract will be competent to perform the tasks undertaken, that the product of such labor will
yield only first-class results, that materials and equipment furnished will be of good quality and
new unless otherwise permitted by this Contract, and that the Work will be of good quality, free
from faults and defects and in strict conformance with this Contract. All Work not conforming to
these requirements may be considered defective.
29.2. If at any time any part of the work constructed under the terms of this contract shall in the
opinion of the Town Manager require repairing due to defective work or materials furnished by
the Contractor, he may notify the Contractor in writing to make the required repairs. If the
Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof
and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then
the latter may employ other persons to make such repairs. The Town shall charge the expense
thereof to the Contractor and may use any moneys still retained to pay for the same, and if such
sum is insufficient, the Contractor shall be obligated to pay the balance thereof.
29.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the Town before final
payment to the Contractor may be made for the amount of that subtrade or for the phase of work
to which the guarantee or warranty relates. The failure to deliver a required guarantee or
warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in
accordance with the Contract Documents. The Contractor's obligation to correct work is in
addition to, and not in substitution of, such guarantees or warranties as may be required in the
various Sections of the Specifications.
Town of North Andover IFB Page 35 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals
hereto:
Dated:
The Town of North Andover by:
The Contractor by:
Town Manager
Department/Division Head
Town Accountant
Certified as to Appropriation
Town Counsel
Certified as to Form
Authorized Signature
Town of North Andover IFB Page 36 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature Date
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
authorized signatory for
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
Signature
Date
Town of North Andover IFB Page 37 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature
Print Name & Title
Date
Company Name
Town of North Andover IFB Page 38 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the
held on it was
VOTED, THAT
(Name)
(Officer)
of be and hereby is authorized to execute contracts and bonds in
the name and on behalf of said , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of on
its behalf by such officer under seal of , shall be valid and binding
upon
that
I hereby certify that I am the clerk of the above named
and
is the duly elected officer as above of said
and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
(Date)
(Clerk)
Town of North Andover IFB Page 39 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS, that we
with a place of business at
as Principal (the "Principal"), and , a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the sum of lawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
for the construction of
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
day of
PRINCIPAL SURETY
[Name and Seal]
[Title]
Attest:
[Attorney-in-fact] [Seal]
[Address]
[Phone]
Attest:
Town of North Andover IFB Page 40 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
Prevailing Wage Rates
Town of North Andover IFB Page 41 of 41
Chemical Storage Tank Lining System — Water Treatment Plant
�r
i
DEVAL L. PATRICK
G
TIMOTHY P. MURRAY
Lt. G—or
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
smretary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RowE
Director
Town of North Andover
225073.17
City/Town: NORTH ANDOVER
Contractor shall furnish, install, field test, complete and ready for service an interior lining system to reline / recoat
one 3,461 gallon Sodium Hydroxide (Caustic Soda) storage tank at the WTP.
420 Great Pond Road, North Andover, MA 01845
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage
Request Number" on all pages of this schedule.
• Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not
opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule.
• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, §
27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that
project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with
M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the
project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor.
• All apprentices must be registered with the Massachusetts Division of Apprenticeship Training (DAT) in order to be paid at
the lower apprentice rates. All apprentices must keep his/her apprentice identification card on his/her person during all work
hours. If a worker is not registered with DAT, he/she must be paid the "total rate" listed on the wage schedule regardless of
experience or skills.
• The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction
projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule.
Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract
was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from
awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to
27F "rental of equipment" contracts.
• Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll
reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the
employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to
DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw.
• Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at (617) 626-6953.
• Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor
Division of the office of the Attorney General at (617) 727-3465.
• Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who
perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal
penalties.
Issue Date: 02/15/2013 Wage Request Number: 20130215-034
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
Construction
(2 AXLE) DRIVER - EQUIPMENT
12/01/2012
$30.45
$8.91
$8.00
$0.00
$47.36
TEAMSTERS JOINT COUNCIL NO. 107ONE B
(3 AXLE) DRIVER - EQUIPMENT
12/01/2012
$30.52
$8.91
$8.00
$0.00
$47.43
TEAMSTERS JOINT COUNCIL NO. 107ONE B
(4 & 5 AXLE) DRIVER - EQUIPMENT
12/01/2012
$30.64
$9.07
$8.00
$0.00
$47.71
TEAMSTERS JOINT COUNCIL NO. 107.ONE B
ADS/SUBMERSIBLE PILOT
08/01/2012
$82.32
$9.80
$17.67
$0.00
$109.79
PILE DRIVER LOCAL 56 (70NE 1)
08/01/2013
$85.47
$9.80
$17.67
$0.00
$112.94
08/01/2014
$88.62
$9.80
$17.67
$0.00
$116.09
08/01/2015
$91.77
$9.80
$17.67
$0.00
$119.24
AIR TRACK OPERATOR
12/01/2012
$30.35
$7.10
$11.55
$0.00
$49.00
LABORERS -70NE2
06/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
12/01/2013
$31.35
$7.10
$11.55
$0.00
$50.00
06/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
12/01/2014
$32.35
$7.10
$11.55
$0.00
$51.00
06/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
12/01/2015
$33.35
$7.10
$11.55
$0.00
$52.00
06/01/2016
$33.85
$7.10
$11.55
$0.00
$52.50
12/01/2016
$34.60
$7.10
$11.55
$0.00
$53.25
For apprentice rates see "Apprentice- LABORER"
ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
12/01/2012
$29.08
$10.40
$5.95
$0.00
$45.43
ASBESTOS wOI?KFRSLOCAL 6 (BOSTON)
06/01/2013
$29.88
$10.40
$5.95
$0.00
$46.23
12/01/2013
$30.68
$10.40
$5.95
$0.00
$47.03
06/01/2014
$31.58
$10.40
$5.95
$0.00
$47.93
12/01/2014
$32.48
$10.40
$5.95
$0.00
$48.83
06/01/2015
$33.43
$10.40
$5.95
$0.00
$49.78
12/01/2015
$34.38
$10.40
$5.95
$0.00
$50.73
ASPHALT RAKER
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
1-4BORERS-7.ONE2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE
12/01/201.2
$40.09
$10.00
$13.02
$0.00
$63.11
OPERATING ENGINEERS LOCAL 4
06/01/2013
$40.87
$10.00
$13.02
$0.00
$63.89
12/01/2013
$41.65
$10.00
$13.02
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
----------------------------------------------------------------------
Issue Date: 02/15/2013 Wage Request Number:
-----------------------------------
20130215-034
---------------------------'------
Page 2 of 36
Classification
Effective Date
Base Wage
Health
Pension
SupplementalTotal
Rate
$30.35
$7.10
$11.55
$0.00
$49.00
Unemployment
$30.85
BACKHOE/FRONT-END LOADER
12/01/2012
$40.09
$10.00
$13.02
$0.00
$63.11
OPERATING ENGINEERS LOCAL 4
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
06/01/2013
$40.87
$10.00
$13.02
$0.00
$63.89
$51.00
12/01/2013
$41.65
$10.00
$13.02
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
BARCO-TYPE JUMPING TAMPER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS-ZONF.2
For apprentice rates see "Apprentice- LABORER"
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
12/01/2012
$30.35
$7.10
$11.55
$0.00
$49.00
06/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
12/01/2013
$31.35
$7.10
$11.55
$0.00
$50.00
06/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
12/01/2014
$32.35
$7.10
$11.55
$0.00
$51.00
06/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
12/01/2015
$33.35
$7.10
$11.55
$0.00
$52.00
06/01/2016
$33.85
$7.10
$11.55
$0.00
$52.50
12/01/2016
$34.60
$7.10
$11.55
$0.00
$53.25
BOILERMAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00
BOILERMAKERS LOCAL 29
Apprentice- BOILERMAKER -Local 29
Effective Date - 01/01/2010
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 65
$24.51
$6.97
$11.18
2 65
$24.51
$6.97
$11.18
3 70
$26.39
$6.97
$11.18
4 75
$28.28
$6.97
$11.18
5 80
$30.16
$6.97
$11.18
6 85
$32.05
$6.97
$11.18
7 90
$33.93
$6.97
$11.18
8 95
$35.82
$6.97
$11.18
(Notes:
Apprentice to Journeyworker Ratio:]:5
$0.00
$42.66
$0.00
$42.66
$0.00
$44.54
$0.00
$46.43
$0.00
$48.31
$0.00
$50.20
$0.00
$52.08
$0.00
$53.97
$55.85
---------- - - -- ---- ----------------- - ----------------- -- .----------- -- --- ------ ------------------------------ --
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 3 of 36
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$28.45
$10.18
$17.83
$0.00
$56.46
Unemployment
$33.19
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
02/01/2013
$47.41
$10.18
$17.83
$0.00
$75.42
WATERPROOFING)
08/01/2013
$48.31
$10.18
$17.90
$0.00
$76.39
BRICKLAYERS LOCAL 3 (LYNN)
$70.68
$10.18
$17.90
$0.00
$66.73
5
90
02/01/2014
$48.87
$10.18
$17.90
$0.00
$76.95
06/01/2016
08/01/2014
$49.77
$10.18
$17.97
$0.00
$77.92
$39.70
02/01/2015
$50.33
$10.18
$17.97
$0.00
$78.48
08/01/2015
$51.23
$10.18
$18.04
$0.00
$79.45
02/01/2016
$51.80
$10.18
$18.04
$0.00
$80.02
08/01/2016
$52.70
$10.18
$18.12
$0.00
$81.00
02/01/2017
$53.27
$10.18
$18.12
$0.00
$81.57
Apprentice- BRICK/PLASTER/CEMENT MASON -Local 3 Lynn
Effective Date - 02/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.71
$10.18
$17.83
$0.00
$51.72
2 60
$28.45
$10.18
$17.83
$0.00
$56.46
3 70
$33.19
$10.18
$17.83
$0.00
$61.20
4 80
$37.93
$10.18
$17.83
$0.00
$65.94
5 90
$42.67
$10.18
$17.83
$0.00
$70.68
Effective Date - 08/01/2013
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
unemployment
Total Rate
1
50
$24.16
$10.18
$17.90
$0.00
$52.24
2
60
$28.99
$10.18
$17.90
$0.00
$57.07
3
70
$33.82
$10.18
$17.90
$0.00
$61.90
4
80
$38.65
$10.18
$17.90
$0.00
$66.73
5
90
$43.48
$10.18
$17.90
$0.00
$71.56
(Notes:
Apprentice to Journeyworker Ratio:l:5
BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
CAISSON & UNDERPINNING BOTTOM MAN
LABORERS- T OUNDATIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
12/01/2012
$33.45
$7.10
$12.60
$0.00
$53.15
06/01/2013
$34.20
$7.10
$12.60
$0.00
$53.90
12/01/2013
$34.95
$7.10
$12.60
$0.00
$54.65
06/01/2014
$35.70
$7.10
$12.60
$0.00
$55.40
12/01/2014
$36.45
$7.10
$12.60
$0.00
$56.15
06/01/2015
$37.20
$7.10
$12.60
$0.00
$56.90
12/01/2015
$37.95
$7.10
$12.60
$0.00
$57.65
06/01/2016
$38.70
$7.10
$12.60
$0.00
$58.40
12/01/2016
$39.70
$7.10
$12.60
$0.00
$59.40
------------------------------------------- - - ------ ----------------- - - ------------------------------- ---------------------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 4 of 36
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
CAISSON & UNDERPINNING LABORER 12/01/2012 $32.30 $7.10 $12.60 $0.00 $52.00
LABORERS - FOUNDATIONAND MARINE
06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75
12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50
06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25
12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00
06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75
12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50
06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25
12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING TOP MAN
LABORERS - FOUNDATION AND MARINE
For apprentice rates see "Apprentice- LABORER"
CARBIDE CORE DRILL OPERATOR
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
CARPENTER
CARPENTERS -70NE 2 (Eastern Massachusetts)
12/01/2012
$32.30
$7.10
$12.60
$0.00
$52.00
06/01/2013
$33.05
$7.10
$12.60
$0.00
$52.75
12/01/2013
$33.80
$7.10
$12.60
$0.00
$53.50
06/01/2014
$34.55
$7.10
$12.60
$0.00
$54.25
12/01/2014
$35.30
$7.10
$12.60
$0.00
$55.00
06/01/2015
$36.05
$7.10
$12.60
$0.00
$55.75
12/01/2015
$36.80
$7.10
$12.60
$0.00
$56.50
06/01/2016
$37.55
$7.10
$12.60
$0.00
$57.25
12/01/2016
$38.55
$7.10
$12.60
$0.00
$58.25
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
09/01/2012
$33.48
$9.80
$15.61
$0.00
$58.89
03/01/2013
$33.92
$9.80
$15.61
$0.00
$59.33
09/01/2013
$34.53
$9.80
$15.61
$0.00
$59.94
03/01/2014
$35.13
$9.80
$15.61
$0.00
$60.54
09/01/2014
$35.90
$9.80
$15.61
$0.00
$61.31
03/01/2015
$36.67
$9.80
$15.61
$0.00
$62.08
------ ----- -------------------- - ---- -- ---- ------------------------------------ ------------ - - --
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 5 of 36
Classification
Effective Date
Base Wage
Health
Pension Supplemental Total Rate
Unemployment
Apprentice - CARPENTER - Zone 2 Eastern MA
Effective Date - 09/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$16.74
$9.80
$1.57
$0.00
$28.11
2 60
$20.09
$9.80
$1.57
$0.00
$31.46
3 70
$23.44
$9.80
$10.90
$0.00
$44.14
4 75
$25.11
$9.80
$10.90
$0.00
$45.81
5 80
$26.78
$9.80
$12.47
$0.00
$49.05
6 80
$26.78
$9.80
$12.47
$0.00
$49.05
7 90
$30.13
$9.80
$14.04
$0.00
$53.97
8 90
$30.13
$9.80
$14.04
$0.00
$53.97
Effective Date - 03/01/2013
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$16.96
$9.80
$1.57
$0.00
$28.33
2 60
$20.35
$9.80
$1.57
$0.00
$31.72
3 70
$23.74
$9.80
$10.90
$0.00
$44.44
4 75
$25.44
$9.80
$10.90
$0.00
$46.14
5 80
$27.14
$9.80
$12.47
$0.00
$49.41
6 80
$27.14
$9.80
$12.47
$0.00
$49.41
7 90
$30.53
$9.80
$14.04
$0.00
$54.37
8 90
$30.53
$9.80
$14.04
$0.00
$54.37
--____-------____-----V--___.--------
(Notes:
-
I
i _
----------___-------_____..
Apprentice to Journeyworker Ratio:l:5-
-
CEMENT MASONRY/PLASTERING
02/01/2013
$42.87
$10.50
$18.61
$1.30
$73.28
BRICKLAYERS LOCAL 3 (LYNN)
08/01/2013
$43.62
$10.50
$18.61
$1.30
$74.03
02/01/2014
$44.05
$10.50
$18.61
$1.30
$74.46
08/01/2014
$44.80
$10.50
$18.61
$1.30
$75.21
02/01/2015
$45.23
$10.50
$18.61
$1.30
$75.64
08/01/2015
$45.98
$10.50
$18.61
$1.30
$76.39
02/01/2016
$46.43
$10.50
$18.61
$1.30
$76.84
08/01/2016
$47.18
$10.50
$18.61
$1.30
$77.59
02/01/2017
$47.63
$10.50
$18.61
$1.30
$78.04
-------------------------------- ----- - ----- ------- - ----- - ------ ------------- ------ - - ------- --------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 6 of 36
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$1.30
$45.72
2 60
$26.17
Unemployment
Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass
$1.30
$51.58
3 65
$28.35
Effective Date - 02/01/2013
$14.61
$1.30
$54.76
Supplemental
$30.53
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.44
$10.50
$12.11
$1.30
$45.35
2 60
$25.72
$10.50
$13.61
$1.30
$51.13
3 65
$27.87 -
$10.50
$14.61
$1.30
$54.28
4 70
$30.01
$10.50
$15.61
$1.30
$57.42
5 75
$32.15
$10.50
$16.61
$1.30
$60.56
6 80
$34.30
$10.50
$17.61
$1.30
$63.71
7 90
$38.58
$10.50
$18.61
$1.30
$68.99
Effective Date - 08/01/2013
12/01/2015
$32.85
Supplemental
$7.10
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.81
$10.50
$12.11
$1.30
$45.72
2 60
$26.17
$10.50
$13.61
$1.30
$51.58
3 65
$28.35
$10.50
$14.61
$1.30
$54.76
4 70
$30.53
$10.50
$15.61
$1.30
$57.94
5 75
$32.72
$10.50
$16.61
$1.30
$61.13
6 80
$34.90
$10.50
$17.61
$1.30
$64.31
7 90
$39.26
$10.50
$18.61
$1.30
$69.67
.-...._._.a._._.-®.._ --___.--------------_.-...
Notes:
$7.10
$11.55
$0.00
-
Steps are 6000 hours
12/01/2014
$31.85
$7.10
Apprentice to Journeyworker Ratio:1:3
$0.00
$50.50
CHAIN SAW OPERATOR 12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
Irl BORERS - 70NE 2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2012 $41.09 $10.00 $13.02 $0.00 $64.11
OPERATING ENGINEERS LOCAL 4
06/01/2013 $41.87 $10.00 $13.02 $0.00 $64.89
12/01/2013 $42.65 $10.00 $13.02 $0.00 $65.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
COMPRESSOR OPERATOR 12/01/2012 $28.17 $10.00 $13.02 $0.00 $51.19
OPERATING ENGINEERS LOCAL 4
06/01/2013 $28.72 $10.00 $13.02 $0.00 $51.74
12/01/2013 $29.27 $10.00 $13.02 $0.00 $52.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
PAINTERS LOCAL 35 - ZONE 2
01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41
- - ------ --------------------------------- ------------------------ ------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 7 of 36
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2013
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$22.51
$7.80
$0.00
$0.00
$30.31
2 55
$24.76
$7.80
$3.52
$0.00
$36.08
3 60
$27.01
$7.80
$3.84
$0.00
$38.65
4 65
$29.26
$7.80
$4.16
$0.00
$41.22
5 70
$31.51
$7.80
$13.68
$0.00
$52.99
6 75
$33.76
$7.80
$14.00
$0.00
$55.56
7 80
$36.01
$7.80
$14.32
$0.00
$58.13
8 90
$40.51
$7.80
$14.96
$0.00
$63.27
- - - - - - - - - -
Notes:
- - - - - -
- - -
- - -
- - -
- -
- -
Steps are 750 hrs.
- - - - - - - - -
Apprentice to Journeyworker Ratio:1:1
- - - - - -
- - -
- - -
- - -
- -
- -
DEMO:ADZEMAN
12/01/2011
$31.80
$7.10
$12.45
$0.00
$51.35
LABORERS - 7ONE2
For apprentice rates see "Apprentice- LABORER"
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
12/01/2011
$32.80
$7.10
$12.45
$0.00
$52.35
LA BORERS - 7ONF 2
For apprentice rates see "Apprentice- LABORER"
.DEMO: BURNERS
12/01/2011
$32.55
$7.10
$12.45
$0.00
$52.10
LABORERS - 7ONF 2
For apprentice rates see "Apprentice- LABORER"
DEMO: CONCRETE CUTTER/SAWYER
12/01/2011
$32.80
$7.10
$12.45
$0.00
$52.35
LABORERS - 7ONE2
For apprentice rates see "Apprentice- LABORER"
DEMO: JACKHAMMER OPERATOR
12/01/2011
$32.55
$7.10
$12.45
$0.00
$52.10
1-4 RORFRS - 7ONF 2
For apprentice rates see "Apprentice- LABORER"
DEMO: WRECKING LABORER
12/01/2011
$31.80
$7.10
$12.45
$0.00
$51.35
I ABORERS - ZONE2
For apprentice rates see "Apprentice- LABORER"
DIRECTIONAL DRILL MACHINE OPERATOR
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING ENGINEERS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
08/01/2012
$54.88
$9.80
$17.67
$0.00
$82.35
111LE DRIVER LOCAL 56 (70NE 1)
08/01/2013
$56.98
$9.80
$17.67
$0.00
$84.45
08/01/2014
$59.08
$9.80
$17.67
$0.00
$86.55
08/01/2015
$61.18
$9.80
$17.67
$0.00
$88.65
DIVER TENDER
08/01/2012
$54.88
$9.80
$17.67
$0.00
$82.35
PILE, DRI VP R LOCAL 56 (70NE 1)
08/01/2013
$56.98
$9.80
$17.67
$0.00
$84.45
08/01/2014
$59.08
$9.80
$17.67
$0.00
$86.55
08/01/2015
$61.18
$9.80
$17.67
$0.00
$88.65
----------------- --------------------- ---- ------------------------ -----
Issue Date: 02/15/2013 Wage Request Number: 20130215-034
-- ---------------------
------- -----------------------
Page 8 of 36
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
DIVER TENDER (EFFLUENT)
08/01/2012
$58.80
$9.80
$17.67
$0.00
$86.27
PH E DRIVER LOCAL 56 (7.0NE 1)
$14.18
$0.00
$71.38
03/01/2014
$44.92
$13.00
$14.20
08/01/2013
$61.05
$9.80
$17.67
$0.00
$88.52
$0.00
08/01/2014
$63.30
$9.80
$17.67
$0.00
$90.77
$73.56
08/01/2015
$65.55
$9.80
$17.67
$0.00
$93.02
DIVER/SLURRY (EFFLUENT)
08/01/2012
$82.32
$9.80
$17.67
$0.00
$109.79
PILE DRIVER LOCAL 56 (7.0NE 1)
08/01/2013
$85.47
$9.80
$17.67
$0.00
$112.94
08/01/2014
$88.62
$9.80
$17.67
$0.00
$116.09
08/01/2015
$91.77
$9.80
$17.67
$0.00
$119.24
DRAWBRIDGE OPERATOR (Construction)
ELECTRICIANS LOCAL 103
For apprentice rates see "Apprentice- ELECTRICIAN'
ELECTRICIAN
ELECTRICIANS LOCAL 103
09/01/2012
$42.81
$13.00
$14.13
$0.00
$69.94
03/01/2013
$43.52
$13.00
$14.16
$0.00
$70.68
09/01/2013
$44.20
$13.00
$14.18
$0.00
$71.38
03/01/2014
$44.92
$13.00
$14.20
$0.00
$72.12
09/01/2014
$45.60
$13.00
$14.22
$0.00
$72.82
03/01/2015
$46.32
$13.00
$14.24
$0.00
$73.56
09/01/2015
$47.27
$13.00
$14.27
$0.00
$74.54
03/01/2016
$48.23
$13.00
$14.30
$0.00
$75.53
09/01/2012
$42.81
$13.00
$14.13
$0.00
$69.94
03/01/2013
$43.52
$13.00
$14.16
$0.00
$70.68
09/01/2013
$44.20
$13.00
$14.18
$0.00
$71.38
03/01/2014
$44.92
$13.00
$14.20
$0.00
$72.12
09/01/2014
$45.60
$13.00
$14.22
$0.00
$72.82
03/01/2015
$46.32
$13.00
$14.24
$0.00
$73.56
09/01/2015
$47.27
$13.00
$14.27
$0.00
$74.54
03/01/2016
$48.23
$13.00
$14.30
$0.00
$75.53
------------- - -- ---- - ------------------------- ---------- ----------- - ----- - ---- ------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 9 of 36
Classification
Apprentice- ELECTRICIAN- Local 103
Effective Date - 09/01/2012
Step percent
Effective Date Base Wage
Apprentice Base Wage Health
Health
Pension
Pension Supplemental Total Rate
Unemployment
Supplemental
Unemployment Total Rate
1 40
$17.12
$13.00
$0.51
$0.00
$30.63
2 40
$17.12
$13.00
$0.51
$0.00
$30.63
3 45
$19.26
$13.00
$10.52
$0.00
$42.78
4 45
$19.26
$13.00
$10.52
$0.00
$42.78
5 50
$21.41
$13.00
$10.84
$0.00
$45.25
6 55
$23.55
$13.00
$11.18
$0.00
$47.73
7 60
$25.69
$13.00
$11.50
$0.00
$50.19
8 65
$27.83
$13.00
$11.84
$0.00
$52.67
9 70
$29.97
$13.00
$12.16
$0.00
$55.13
10 75
$32.11
$13.00
$12.49
$0.00
$57.60
Effective Date - 03/01/2013
$32.64
$13.00
$12.51
Supplemental
$58.15
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$17.41
$13.00
$0.52
$0.00
$30.93
2
40
$17.41
$13.00
$0.52
$0.00
$30.93
3
45
$19.58
$13.00
$10.53
$0.00
$43.11
4
45
$19.58
$13.00
$10.53
$0.00
$43.11
5
50
$21.76
$13.00
$10.85
$0.00
$45.61
6
55
$23.94
$13.00
$11.19
$0.00
$48.13
7
60
$26.11
$13.00
$11.51
$0.00
$50.62
8
65
$28.29
$13.00
$11.85
$0.00
$53.14
9
70
$30.46
$13.00
$12.17
$0.00
$55.63
10
75
$32.64
$13.00
$12.51
$0.00
$58.15
(Notes::
App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80
_ ---
Apprentice to Journeyworker Ratio:2:3***
- - - -
- - -
- - - -
- - -
- - -
ELEVATOR CONSTRUCTOR
E] EVA CONSTRUCTORS LOCAL 4
01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19
--------- ----- ....... ------------ -------------------------------- - ------ -------- --- - --- -- - -- - ---- -
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 10 of 36
Classification Effective Date Base Wage Health Pension SupplementalTotal Rate
Unemployment
Apprentice- ELEVATOR CONSTRUCTOR - Loca14
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$26.23
$8.78
$0.00
$0.00
$35.01
2 55
$28.85
$8.78
$6.96
$0.00
$44.59
3 65
$34.09
$8.78
$6.96
$0.00
$49.83
4 70
$36.72
$8.78
$6.96
$0.00
$52.46
5 80
$41.96
$8.78
$6.96
$0.00
$57.70
-------...._------_._.-_--------__-._.„.._._._
(Notes:
$7.10
$11.55
$0.00
$49.00
Steps 1-2 are 6 mos.; Steps 3-5 are 1 year
$30.85
$7.10
$11.55
$0.00
$49.50
W -------._-___.-.r
Apprentice to Journeyworker Ratio:I:1
_----------------
$31.35
$7.10
$11.55
$0.00
ELEVATOR CONSTRUCTOR HELPER
01/01/2012
$38.59
$8.78
$6.96
$0.00
$54.33
ELEVATOR CONSTRUCTORS LOCAL 4
FENCE & GUARD RAIL ERECTOR
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
LABORERS - ZONE 2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
11/01/2012
$38.26
$10.00
$12.65
$0.00
$60.91
OPERATING ENGINEERS LOCAL 4
05/01/2013
$38.87
$10.00
$12.65
$0.00
$61.52
11/01/2013
$39.63
$10.00
$12.65
$0.00
$62.28
05/01/2014
$40.40
$10.00
$12.65
$0.00
$63.05
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY
11/01/2012
$39.66
$10.00
$12.65
$0.00
$62.31
OPERATING ENGINEERS LOCAL 4
05/01/2013
$40.28
$10.00
$12.65
$0.00
$62.93
11/01/2013
$41.05
$10.00
$12.65
$0.00
$63.70
05/01/2014
$41.82
$10.00
$12.65
$0.00
$64.47
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
11/01/2012
$21.18
$10.00
$12.65
$0.00
$43.83
OPERATING IiNGINEIiRS LOCAL 4
05/01/2013
$21.54
$10.00
$12.65
$0.00
$44.19
11/01/2013
$22.00
$10.00
$12.65
$0.00
$44.65
05/01/2014
$22.45
$10.00
$12.65
$0.00
$45.10
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
------- -- ----- - ----- ----------------------------------- -- ----- ---- - - -------------------------- -- ------- ------------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 11 of 36
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
03/01/2013
$32.64
$13.00
$12.51
Unemployment
$58.15
FIRE ALARM INSTALLER 09/01/2012
$42.81
$13.00
$14.13
$0.00
$69.94
ELECTRICIANS LOCAL 103
03/01/2013
$43.52
$13.00
$14.1.6
$0.00
$70.68
09/01/2013
$44.20
$13.00
$14.18
$0.00
$71.38
03/01/2014
$44.92
$13.00
$14.20
$0.00
$72.12
09/01/2014
$45.60
$13.00
$14.22
$0.00
$72.82
03/01/2015
$46.32
$13.00
$14.24
$0.00
$73.56
09/01/2015
$47.27
$13.00
$14.27
$0.00
$74.54
03/01/2016
$48.23
$13.00
$14.30
$0.00
$75.53
For apprentice rates see "Apprentice- ELECTRICIAN'
FIRE ALARM REPAIR / MAINTENANCE
/ COMMISSIONINGrircmcmNs
LOCAL 103
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN'
FIREMAN (ASST. ENGINEER)
0111,71M TING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FLAGGER & SIGNALER
LABORERS - 70NE 2
For apprentice rates see "Apprentice- LABORER"
09/01/2012
$32.11
$13.00
$12.49
$0.00
$57.60
03/01/2013
$32.64
$13.00
$12.51
$0.00
$58.15
09/01/2013
$33.15
$13.00
$12.52
$0.00
$58.67
03/01/2014
$33.69
$13.00
$12.54
$0.00
$59.23
09/01/2014
$34.20
$13.00
$12.56
$0.00
$59.76
03/01/2015
$34.74
$13.00
$12.57
$0.00
$60.31
09/01/2015
$35.45
$13.00
$12.59
$0.00
$61.04
03/01/2016
$36.17
$13.00
$12.62
$0.00
$61.79
12/01/2012
$33.61
$10.00
$13.02
$0.00
$56.63
06/01/2013
$34.26
$10.00
$13.02
$0.00
$57.28
12/01/2013
$34.92
$10.00
$13.02
$0.00
$57.94
12/01/2012
$20.50
$7.10
$11.55
$0.00
$39.15
06/01/2013
$20.50
$7.10
$11.55
$0.00
$39.15
12/01/2013
$20.50
$7.10
$11.55
$0.00
$39.15
06/01/2014
$20.50
$7.10
$11.55
$0.00
$39.15
12/01/2014
$20.50
$7.10
$11.55
$0.00
$39.15
06/01/2015
$20.50
$7.10
$11.55
$0.00
$39.15
12/01/2015
$20.50
$7.10
$11.55
$0.00
$39.15
06/01/2016
$20.50
$7.10
$11.55
$0.00
$39.15
12/01/2016
$20.50
$7.10
$11.55
$0.00
$39.15
FLOORCOVERER 03/01/2012 $37.20 $9.80 $16.61 $0.00 $63.61
rLOORCOVERERS LOCAL 2168 ZONE]
--- ------- ------I . ----------------- ------------- ------ --------------- ------ ---------------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 12 of 36
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
Apprentice- FLOORCOVERER -Local 2168 Zone I
Effective Date - 03/01/2012
Step percent Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 50
$18.60
$9.80
$1.79
$0.00
$30.19
2 55
$20.46
$9.80
$1.79
$0.00
$32.05
3 60
$22.32
$9.80
$11.24
$0.00
$43.36
4 65
$24.18
$9.80
$11.24
$0.00
$45.22
5 70
$26.04
$9.80
$13.03
$0.00
$48.87
6 75
$27.90
$9.80
$13.03
$0.00
$50.73
7 80
$29.76
$9.80
$14.82
$0.00
$54.38
8 85
$31.62
$9.80
$14.82
$0.00
$56.24
- - - - - - - - - -
Notes:
- - - - - -
- - --
--- - -
- -- - -
-- - -
Steps are 750 hrs.
8 90
$31.96
$7.80
$14.01
$0.00
Apprentice to Journeyworker Ratio:l:l
- - - - - -
--- -
- - -
- - - -
- - -
FORK LIFT/CHERRY PICKER
OPERA 7 ING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GENERATOR/LIGHTING PLANT/HEATERS
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR
SYSTEMS)
GLAZIERS LOCAL 35 (ZONE 2)
Total Rate
12/01/2012
$40.09
$10.00
$13.02
$0.00
$63.11
06/01/2013
$40.87
$10.00
$13.02
$0.00
$63.89
12/01/2013
$41.65
$10.00
$13.02
$0.00
$64.67
12/01/2012
$28.17
$10.00
$13.02
$0.00
$51.19
06/01/2013
$28.72
$10.00
$13.02
$0.00
$51.74
12/01/2013
$29.27
$10.00
$13.02
$0.00
$52.29
01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91
Apprentice- GLAZIER - Loca135 Zone 2
Effective Date - 01/01/2013
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$17.76
$7.80
$0.00
$0.00
$25.56
2 55
$19.53
$7.80
$3.25
$0.00
$30.58
3 60
$21.31
$7.80
$3.54
$0.00
$32.65
4 65
$23.08
$7.80
$3.84
$0.00
$34.72
5 70
$24.86
$7.80
$12.83
$0.00
$45.49
6 75
$26.63
$7.80
$13.13
$0.00
$47.56
7 80
$28.41
$7.80
$13.42
$0.00
$49.63
8 90
$31.96
$7.80
$14.01
$0.00
$53.77
- - - - - - - - - -
Notes:
- - - - - -
- - -
- - -
- - - -
- - -
Steps are 750 hrs.
- -- - - - - - - -
Apprentice to Journeyworker Ratio:1:1
- - - - -
- - -
- - -
- --- -
-
---------------- --- - ---------------- -------- ----------------- - - ---------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034
------------
---- --------------------
- --- - -
Page 13 of 36
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
1 55
$22.05
$10.00
$0.00
Unemployment
$32.05
HOISTING ENGINEER/CRANES/GRADALLS 12/01/2012
$40.09
$10.00
$13.02
$0.00
$63.11
OPERATING ENGINFERS LOCAL 4
$26.06
$10.00
$13.02
$0.00
$49.08
06/01/2013
$40.87
$10.00
$13.02
$0.00
$63.89
12/01/2013
$41.65
$10.00
$13.02
$0.00
$64.67
Apprentice- OPERATING ENGINEERS -
Effective Date - 12/01/2012
Step percent
Loca14
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 55
$22.05
$10.00
$0.00
$0.00
$32.05
2 60
$24.05
$10.00
$13.02
$0.00
$47.07
3 65
$26.06
$10.00
$13.02
$0.00
$49.08
4 70
$28.06
$10.00
$13.02
$0.00
$51.08
5 75
$30.07
$10.00
$13.02
$0.00
$53.09
6 80
$32.07
$10.00
$13.02
$0.00
$55.09
7 85
$34.08
$10.00
$13.02
$0.00
$57.10
8 90
$36.08
$10.00
$13.02
$0.00
$59.10
Effective Date - 06/01/2013
_.,_ _.. - -
- - ..._.
�......n.... - .-...
Supplemental
- _.....
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$22.48
$10.00
$0.00
$0.00
$32.48
2 60
$24.52
$10.00
$13.02
$0.00
$47.54
3 65
$26.57
$10.00
$13.02
$0.00
$49.59
4 70
$28.61
$10.00
$13.02
$0.00
$51.63
5 75
$30.65
$10.00
$13.02
$0.00
$53.67
6 80
$32.70
$10.00
$13.02
$0.00
$55.72
7 85
$34.74
$10.00
$13.02
$0.00
$57.76
8 90
$36.78
$10.00
$13.02
$0.00
$59.80
_ __._...w......_. - - __.. - - ___.
(Notes:
- - - _ ____
- _._ -
__ - _ __._
_ _ -
- - -
I
- - - ____. - .�....-._ ...-.,
tic
Apprene to_ Journeyworker Ratio:l:6
_.,_ _.. - -
- - ..._.
�......n.... - .-...
- - -
- _.....
HVAC (DUCTWORK)
02/01/2013
$42.32
$9.82
$18.24
$2.11
$72.49
SHF.E7ME7AL WORKERS LOCAL 17 -A
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (ELECTRICAL CONTROLS)
09/01/2012
$42.81
$13.00
$14.13
$0.00
$69.94
ELF.CTRICIANSLOCAL 103
03/01/2013
$43.52
$13.00
$14.16
$0.00
$70.68
09/01/2013
$44.20
$13.00
$14.18
$0.00
$71.38
03/01/2014
$44.92
$13.00
$14.20
$0.00
$72.12
09/01/2014
$45.60
$13.00
$14.22
$0.00
$72.82
03/01/2015
$46.32
$13.00
$14.24
$0.00
$73.56
09/01/2015
$47.27
$13.00
$14.27
$0.00
$74.54
03/01/2016
$48.23
$13.00
$14.30
$0.00
$75.53
For apprentice rates see "Apprentice- ELECTRICIAN'
HVAC (TESTING AND BALANCING - AIR)
02/01/2013
$42.32
$9.82
$18.24
$2.11
$72.49
SHEE7il4E7iAL WORKERS LOCAL. 17 -A
For apprentice rates see "Apprentice- SHEET METAL WORKER"
----------- -------- ------------- -- ---- - -- -- - - -------- --------------- -------- - --------------------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 14 of 36
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
$40.78
2 60
$25.84
Unemployment
$9.18
$0.00
HVAC (TESTING AND BALANCING -WATER)
09/01/2012 $45.76
$8.75
$12.39
$0.00
$66.90
PIPF.FI7TFRS LOCAL 537 (Local 138)
4 80
$34.45
$10.65
$10.34
$0.00
$55.44
03/01/2013 $47.01
$8.75
$12.39
$0.00
$68.15
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
' Steps are I year
HVAC MECHANIC
09/01/2012 $45.76
$8.75
$12.39
$0.00
$66.90
PIPF1'I7TERS LOCAL 537 (Local 138)
-
03/01/2013 $47.01
$8.75
$12.39
$0.00
$68.15
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBERIPIPEFITTER"
HYDRAULIC DRILLS
12/01/2012 $30.35
$7.10
$11.55
$0.00
$49.00
LABORERS - ZONE 2
06/01/2013 $30.85
$7.10
$11.55
$0.00
$49.50
12/01/2013 $31.35
$7.10
$11.55
$0.00
$50.00
06/01/2014 $31.85
$7.10
$11.55
$0.00
$50.50
12/01/2014 $32.35
$7.10
$11.55
$0.00
$51.00
06/01/2015 $32.85
$7.10
$11.55
$0.00
$51.50
12/01/2015 $33.35
$7.10
$11.55
$0.00
$52.00
06/01/2016 $33.85
$7.10
$11.55
$0.00
$52.50
12/01/2016 $34.60
$7.10
$11.55
$0.00
$53.25
For apprentice rates see "Apprentice- LABORER"
INSULATOR (PIPES & TANKS)
09/01/2012 $41.46
$10.65
$11.50
$0.00
$63.61
ASBESTOS WORKERS LOCAL 6 (BOSTON)
09/01/2013 $43.06
$10.65
$11.50
$0.00
$65.21
09/01/2014 $45.06
$10.65
$11.50
$0.00
$67.21
Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston
Effective Date - 09/01/2012
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$20.73 $10.65
$8.60
$0.00
$39.98
2 60
$24.88 $10.65
$9.18
$0.00
$44.71
3 70
$29.02 $10.65
$9.76
$0.00
$49.43
4 80
$33.17 $10.65
$10.34
$0.00
$54.16
Effective Date - 09/01/2013
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$21.53
$10.65
$8.60
$0.00
$40.78
2 60
$25.84
$10.65
$9.18
$0.00
$45.67
3 70
$30.14
$10.65
$9.76
$0.00
$50.55
4 80
$34.45
$10.65
$10.34
$0.00
$55.44
--_____.___..-__.-----------___.----__-_.....-__
Notes:
I
' Steps are I year
I
Apprentice to Journeyworker Ratio:1:4
- -
-
-
IRONWORKER/WELDER
IRONWORKERS LOCAL 7 (LAWRENCE. ARRA)
09/16/2012 $34.57 $7.70 $18.35 $0.00 $60.62
03/16/2013 $35.82 $7.70 $18.35 $0.00 $61.87
- - ------------------------ - - ---- -- --- --------------- .. -..- -- - -------------------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 15 of 36
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- IRONWORKER -Local 7 Lawrence
Effective Date - 09/16/2012
Step
percent
Apprentice Base Wage
Health
1
60
$20.74
$7.70
2
70
$24.20
$7.70
3
75
$25.93
$7.70
4
80
$27.66
$7.70
5
85
$29.38
$7.70
6
90
$31.11
$7.70
Effective Date - 03/16/2013
Step percent Apprentice Base Wage Health
Pension
Supplemental
Unemployment
Total Rate
$18.35
$0.00
$46.79
$18.35
$0.00
$50.25
$18.35
$0.00
$51.98
$18.35
$0.00
$53.71
$18.35
$0.00
$55.43
$18.35
$0.00
$57.16
Supplemental
Pension Unemployment Total Rate
1 60
$21.49
$7.70
$18.35
2 70
$25.07
$7.70
$18.35
3 75
$26.87
$7.70
$18.35
4 80
$28.66
$7.70
$18.35
5 85
$30.45
$7.70
$18.35
6 90
$32.24
$7.70
$18.35
(- ___. - _ - --- -
Notes:
- ---- _.__ _ - __._
- -
_ - -
E Structural 1:6; Ornamental 1:4
I-----_
$50.25
06/01/2015
$32.10
.........__.-----_.._...._---------
Apprentice to Journeyworker Ratio:
$11.55
$0.00
$50.75
JACKHAMMER & PAVING BREAKER OPERATOR
12/01/2012
$29.85
$7.10
LABORERS - 7.0NE 2
$51.25
06/01/2016
$33.10
For apprentice rates see "Apprentice- LABORER"
LABORER
LABORERS - 70NE 2
06/01/2013
$30.35
$7.10
12/01/2013
$30.85
$7.10
06/01/2014
$31.35
$7.10
12/01/2014
$31.85
$7.10
06/01/2015
$32.35
$7.10
12/01/2015
$32.85
$7.10
06/01/2016
$33.35
$7.10
12/01/2016
$34.10
$7.10
$0.00
$47.54
$0.00
$51.12
$0.00
$52.92
$0.00
$54.71
$0.00
$56.50
$0.00
$58.29
$11.55
$0.00
$48.50
$11.55
$0.00
$49.00
$11.55
$0.00
$49.50
$11.55
$0.00
$50.00
$11.55
$0.00
$50.50
$11.55
$0.00
$51.00
$11.55
$0.00
$51.50
$11.55
$0.00
$52.00
$11.55
$0.00
$52.75
12/01/2012
$29.60
$7.10
$11.55
$0.00
$48.25
06/01/2013
$30.10
$7.10
$11.55
$0.00
$48.75
12/01/2013
$30.60
$7.10
$11.55
$0.00
$49.25
06/01/2014
$31.10
$7.10
$11.55
$0.00
$49.75
12/01/2014
$31.60
$7.10
$11.55
$0.00
$50.25
06/01/2015
$32.10
$7.10
$11.55
$0.00
$50.75
12/01/2015
$32.60
$7.10
$11.55
$0.00
$51.25
06/01/2016
$33.10
$7.10
$11.55
$0.00
$51.75
12/01/2016
$33.85
$7.10
$11.55
$0.00
$52.50
----- ---- --------- ----- -- - - ----- - ----- --- - - ------ ----- -- - - - - - -.- -------- - - -- - -------------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 16 of 36
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$36.71
2 70
$21.07
Unemployment
Apprentice - LABORER - Zone 2
$0.00
$39.72
3 80
$24.08
Effective Date - 12/01/2012
$11.55
$0.00
$42.73
4 90
$27.09
$7.10
$11.55
$0.00
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 60
$17.76
$7.10
$11.55
$0.00 $36.41
2 70
$20.72
$7.10
$11.55
$0.00 $39.37
3 80
$23.68
$7.10
$11.55
$0.00 $42.33
4 90
$26.64
$7.10
$11.55
$0.00 $45.29
Effective Date - 06/01/2013
$31.60
$11.55
$7.10
$51.75
$11.55
$33.85
$0.00
$50.25
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 60
$18.06
$7.10
$11.55
$0.00
$36.71
2 70
$21.07
$7.10
$11.55
$0.00
$39.72
3 80
$24.08
$7.10
$11.55
$0.00
$42.73
4 90
$27.09
$7.10
$11.55
$0.00
$45.74
(Notes:
$31.10
- ---'-
$48.75
- - --ice
iI
Apprentice to Journeyworker R.T.wi:5
$31.60
$7.10
$11.55
$11.55
I
LABORER: CARPENTER TENDER 12/01/2012
$29.60
$7.10
$7.10
$0.00
$11.55
LABORERS - ZONE 2
$0.00
$48.25
L4BORERS-ZONF2
06/01/2013
$30.10
$7.10
$11.55
$0.00
$48.75
12/01/2013
06/01/2013
$30.10
$11.55
$7.10
$49.25
$11.55
$31.10
$0.00
$48.75
$0.00
12/01/2013
$30.60
$31.60
$7.10
$11.55
$11.55
$50.25
$0.00
$49.25
$7.10
06/01/2014
$31.10
$50.75
$7.10
$32.60
$11.55
$11.55
$0.00
$49.75
06/01/2016
12/01/2014
$31.60
$11.55
$7.10
$51.75
$11.55
$33.85
$0.00
$50.25
$0.00
06/01/2015
$32.10
$7.10
$11.55
$0.00
$50.75
12/01/2015
$32.60
$7.10
$11.55
$0.00
$51.25
06/01/2016
$33.10
$7.10
$11.55
$0.00
$51.75
12/01/2016
$33.85
$7.10
$11.55
$0.00
$52.50
For apprentice rates see "Apprentice- LABORER"
LABORER: CEMENT FINISHER TENDER 12/01/2012
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS - ZONE 2
06/01/2013
$30.10
$7.10
$11.55
$0.00
$48.75
12/01/2013
$30.60
$7.10
$11.55
$0.00
$49.25
06/01/2014
$31.10
$7.10
$11.55
$0.00
$49.75
12/01/2014
$31.60
$7.10
$11.55
$0.00
$50.25
06/01/2015
$32.10
$7.10
$11.55
$0.00
$50.75
12/01/2015
$32.60
$7.10
$11.55
$0.00
$51.25
06/01/2016
$33.10
$7.10
$11.55
$0.00
$51.75
12/01/2016
$33.85
$7.10
$11.55
$0.00
$52.50
For apprentice rates see "Apprentice- LABORER"
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
L00RERS-7ONF2
For apprentice rates see "Apprentice- LABORER"
12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00
--- --- --- - -- -- -- - - -- - -- --------- ------- --------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page l7 of 36
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$48.25
$48.75
$49.25
$49.75
$50.25
$50.75
$51.25
$51.75
$52.50
LABORER: TREE REMOVER
12/01/2012
$29.60
Unemployment
$11.55
LABORER: MASON TENDER 12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
I.4BORraS - 7ONr 2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
LABORER: MULTI -TRADE TENDER
IA BORERS - 70NE 2
For apprentice rates see "Apprentice- LABORER"
12/01/2012
06/01/2013
12/01/2013
06/01/2014
12/01/2014
06/01/2015
12/01/2015
06/01/2016
12/01/2016
$29.60
$30.10
$30.60
$31.10
$31.60
$32.10
$32.60
$33.10
$33.85
$7.10
$7.10
$7.10
$7.10
$7.10
$7.10
$7.10
$7.10
$7.10
$11.55
$11.55
$11.55
$11.55
$11.55
$11.55
$11.55
$11.55
$11.55
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$48.25
$48.75
$49.25
$49.75
$50.25
$50.75
$51.25
$51.75
$52.50
LABORER: TREE REMOVER
12/01/2012
$29.60
$7.10
$11.55
$0.00
$48.25
LABORERS - 70NE 2
06/01/2013
$30.10
$7.10
$11.55
$0.00
$48.75
12/01/2013
$30.60
$7.10
$11.55
$0.00
$49.25
06/01/2014
$31.10
$7.10
$11.55
$0.00
$49.75
12/01/2014
$31.60
$7.10
$11.55
$0.00
$50.25
06/01/2015
$32.10
$7.10
$11.55
$0.00
$50.75
12/01/2015
$32.60
$7.10
$11.55
$0.00
$51.25
06/01/2016
$33.10
$7.10
$11.55
$0.00
$51.75
12/01/2016
$33.85
$7.10
$11.55
$0.00
$52.50
This classification applies to the wholesale removal
of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches
at locations not
on or around
utility lines. For
apprentice rates see "Apprentice- LABORER"
LASER BEAM OPERATOR
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
LABORERS-70Nr2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
---------------------------------------------------------------------------------------- -I -
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 18 of 36
Classification
MARBLE & TILE FINISHERS
BRICKLAYERS LOCAL 3 - MARBLE & TILE
Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
02/01/2013
$36.20
$10.18
$16.51
$0.00
$62.89
08/01/2013
$36.91
$10.18
$16.58
$0.00
$63.67
02/01/2014
$37.36
$10.18
$16.58
$0.00
$64.12
08/01/2014
$38.07
$10.18
$16.65
$0.00
$64.90
02/01/2015
$38.52
$10.18
$16.65
$0.00
$65.35
08/01/2015
$39.23
$10.18
$16.72
$0.00
$66.13
02/01/2016
$39.68
$10.18
$16.72
$0.00
$66.58
08/01/2016
$40.38
$10.18
$16.80
$0.00
$67.36
02/01/2017
$40.84
$10.18
$16.80
$0.00
$67.82
Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile
Effective Date - 02/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$18.10
$10.18
$16.51
$0.00
$44.79
2 60
$21.72
$10.18
$16.51
$0.00
$48.41
3 70
$25.34
$10.18
$16.51
$0.00
$52.03
4 80
$28.96
$10.18
$16.51
$0.00
$55.65
5 90
$32.58
$10.18
$16.51
$0.00
$59.27
Effective Date - 08/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$18.46
$10.18
$16.58
$0.00
$45.22
2 60
$22.15
$10.18
$16.58
$0.00
$48.91
3 70
$25.84
$10.18
$16.58
$0.00
$52.60
4 80
$29.53
$10.18
$16.58
$0.00
$56.29
5 90
$33.22
$10.18
$16.58
$0.00
$59.98
Notes:
$51.27
$10.18
$18.04
$0.00
$79.49
-_-----_..__------s_____
Apprentice to Journeyworker Ratiwi
$51.84
$10.18
$18.04
$0.00
$80.06
MARBLE MASONS,TILELAYERS & TERRAZZO MECH
BRICKLAYERS LOCAL 3 - MARBLE. & THE
02/01/2013
$47.45
$10.18
$17.83
$0.00
$75.46
08/01/2013
$48.35
$10.18
$17.90
$0.00
$76.43
02/01/2014
$48.91
$10.18
$17.90
$0.00
$76.99
08/01/2014
$49.81
$10.18
$17.97
$0.00
$77.96
02/01/2015
$50.37
$10.18
$17.97
$0.00
$78.52
08/01/2015
$51.27
$10.18
$18.04
$0.00
$79.49
02/01/2016
$51.84
$10.18
$18.04
$0.00
$80.06
08/01/2016
$52.74
$10.18
$18.12
$0.00
$81.04
02/01/2017
$53.31
$10.18
$18.12
$0.00
$81.61
------------ - -- - ----------- - --- -- - -------- ---- ------------------------ -------- - --- - - ---
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 19 of 36
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
Unemplovment
Apprentice- MARBLE -TILE -TERRAZZO
MECHANIC -Local 3 Marble & Tile
Effective Date - 02/01/2013
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$23.73
$10.18
$17.83
$0.00
$51.74
2 60
$28.47
$10.18
$17.83
$0.00
$56.48
3 70
$33.22
$10.18
$17.83
$0.00
$61.23
4 80
$37.96
$10.18
$17.83
$0.00
$65.97
5 90
$42.71
$10.18
$17.83
$0.00
$70.72
Effective Date - 08/01/2013
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$24.18
$10.18
$17.90
$0.00
$52.26
2 60
$29.01
$10.18
$17.90
$0.00
$57.09
3 70
$33.85
$10.18
$17.90
$0.00
$61.93
4 80
$38.68
$10.18
$17.90
$0.00
$66.76
5 90
$43.52
$10.18
$17.90
$0.00
$71.60
--_------_...-...._-___.------._._.--------+
Notes:
1
li
_
Tice
Apprento Journeyworker Ratio:l:5
-_-.......-......--------------_
MECH. SWEEPER OPERATOR (ON CONST. SITES)
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING ENGINFFRS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
MECHANICS MAINTENANCE
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING ENGINEERS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
MILLWRIGHT (Zone 2)
04/01/2011
$31.71
$8.67
$15.61
$0.00
$55.99
MILL 147RIGHYSLOCAL 1121 -7.one 2
--- ---------- - - -------- -------------------- -- ---
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 20 of 36
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MILLWRIGHT- Local 1121 Zone 2
Effective Date - 04/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$15.86
$8.67
$11.64
$0.00
$36.17
2 55
$17.44
$8.67
$11.64
$0.00
$37.75
3 60
$19.03
$8.67
$13.23
$0.00
$40.93
4 65
$20.61
$8.67
$13.23
$0.00
$42.51
5 70
$22.20
$8.67
$14.02
$0.00
$44.89
6 75
$23.78
$8.67
$14.02
$0.00
$46.47
7 80
$25.37
$8.67
$14.82
$0.00
$48.86
8 85
$26.95
$8.67
$14.82
$0.00
$50.44
(Notes:
12/01/2015
$32.85
$7.10
$11.55
Apprentice to Journeyworker Ratio:1:5
$51.50
06/01/2016
$33.35
$7.10
MORTAR MIXER
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
LABORERS - ZONE 2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
OILER (OTHER THAN TRUCK CRANES,GRADALLS)
12/01/2012
$21.28
$10.00
$13.02
$0.00
$44.30
OPERATING ENGINEERS LOCAL 4
06/01/2013
$21.70
$10.00
$13.02
$0.00
$44.72
12/01/2013
$22.12
$10.00
$13.02
$0.00
$45.14
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OILER (TRUCK CRANES, GRADALLS)
12/01/2012
$24.62
$10.00
$13.02
$0.00
$47.64
OPERATING ENGINF,ERS LOCAL 4
06/01/2013
$25.10
$10.00
$13.02
$0.00
$48.12
12/01/2013
$25.59
$10.00
$13.02
$0.00
$48.61
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OTHER POWER DRIVEN EQUIPMENT - CLASS 11
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING ENGINEERS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PAINTER (BRIDGES/TANKS)
01/01/2013
$45.01
$7.80
$15.60
$0.00
$68.41
PAINTERS LOCAL 35 - ZONE 2
------------ - ------------- -- -------------- -- ---------------- -------- ---- ----- - ------ - - -- ---- ------ ------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 21 of 36
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
$17.96
$7.80
$0.00
$0.00
Effective Date- 01/01/2013
2 55
$19.75
$7.80
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$22.51
$7.80
$0.00
$0.00
$30.31
2 55
$24.76
$7.80
$3.52
$0.00
$36.08
3 60
$27.01
$7.80
$3.84
$0.00
$38.65
4 65
$29.26
$7.80
$4.16
$0.00
$41.22
5 70
$31.51
$7.80
$13.68
$0.00
$52.99
6 75
$33.76
$7.80
$14.00
$0.00
$55.56
7 80
$36.01
$7.80
$14.32
$0.00
$58.13
8 90
$40.51
$7.80
$14.96
$0.00
$63.27
-------____--.�..---------__._------___,
Notes: -
PAINTERS LOCAL 35 - ZONE 2
Steps are 750 hrs.
Apprentice to Journeyworker Ratio:11
PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2013 $35.91 $7.80 $15.60 $0.00 $59.31
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONF. 2
Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New
Effective Date - 01/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.96
$7.80
$0.00
$0.00
$25.76
2 55
$19.75
$7.80
$3.52
$0.00
$31.07
3 60
$21.55
$7.80
$3.84
$0.00
$33.19
4 65
$23.34
$7.80
$4.16
$0.00
$35.30
5 70
$25.14
$7.80
$13.68
$0.00
$46.62
6 75
$26.93
$7.80
$14.00
$0.00
$48.73
7 80
$28.73
$7.80
$14.32
$0.00
$50.85
8 90
$32.32
$7.80
$14.96
$0.00
$55.08
----r®__._------....._--------
(Notes:
-- ---_,
--.-...._..,._----.-__...---_.---__..__
Ticeio
Apprene to Journeyworker Ra
PAINTER (SPRAY OR SANDBLAST, REPAINT)
01/01/2013
$33.97
$7.80
$15.60 $0.00
$57.37
PAINTERS LOCAL 35 - ZONE 2
------------------ ------ - - --------- ----- -- --- - ----- --------- ------------------ --- --- -
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 22 of 36
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint
Effective Date - 01/01/2013 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
2
55
3
60
4
65
5
70
6
75
7
80
8
90
- -
Notes:
- - - - - - - - -
Apprentice to Journeyworker Ratio:1:1
PAINTER (TRAFFIC MARKINGS)
LABORERS - 70NE 2
For Apprentice rates see "Apprentice- LABORER"
PAINTER / TAPER (BRUSH, NEW) *
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.iAjN7,ERs LOCAL 35 - ZONE 2
$16.99
$7.80
$0.00
$0.00
$24.79
$18.68
$7.80
$3.52
$0.00
$30.00
$20.38
$7.80
$3.84
$0.00
$32.02
$22.08
$7.80
$4.16
$0.00
$34.04
$23.78
$7.80
$13.68
$0.00
$45.26
$25.48
$7.80
$14.00
$0.00
$47.28
$27.18
$7.80
$14.32
$0.00
$49.30
$30.57
- - - -
$7.80
- - -
$14.96
- - - -
$0.00
- - -
$53.33
- - -
12/01/2012
$29.60
$7.10
$11.55
$0.00
$48.25
06/01/2013
$30.10
$7.10
$11.55
$0.00
$48.75
12/01/2013
$30.60
$7.10
$11.55
$0.00
$49.25
06/01/2014
$31.10
$7.10
$11.55
$0.00
$49.75
12/01/2014
$31.60
$7.10
$11.55
$0.00
$50.25
06/01/2015
$32.10
$7.10
$11.55
$0.00
$50.75
12/01/2015
$32.60
$7.10
$11.55
$0.00
$51.25
06/01/2016
$33.10
$7.10
$11.55
$0.00
$51.75
12/01/2016
$33.85
$7.10
$11.55
$0.00
$52.50
01/01/2013 $34.51 $7.80 $15.60 $0.00 $57.91
---- -------------------------------- --------- --- - -- .- I --- ------------ - --------------- -- - - -------------- --- --- ---
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 23 of 36
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW
Effective Date - 01/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.26
$7.80
$0.00
2 55
$18.98
$7.80
$3.52
3 60
$20.71
$7.80
$3.84
4 65
$22.43
$7.80
$4.16
5 70
$24.16
$7.80
$13.68
6 75
$25.88
$7.80
$14.00
7 80
$27.61
$7.80
$14.32
8 90
$31.06
$7.80
$14.96
---._.._-._......._---_._-........-
(Notes:
-..,._-------
$0.00
$31.18
Steps are 750 hrs.
$21.17
$7.80
$4.16
L- - - - - _.,..._.. - ____ - -
Apprentice to Journeyworker Ratio: 1:1
- - ____ _ _ -
- - -
____ - - -
$0.00
$25.06
$0.00
$30.30
$0.00
$32.35
$0.00
$34.39
$0.00
$45.64
$0.00
$47.68
$0.00
$49.73
$0.00
$53.82
Total Rate
PAINTER / TAPER (BRUSH, REPAINT) 01/01/2013 $32.57 $7.80 $15.60 $0.00 $55.97
PAINTERS LOCAL 35 - 7ON/i 2
Apprentice- PAINTER Local 35 Zone 2
-BRUSH REPAINT
$9.80
$17.67
$0.00
$66.67
Effective Date - 01/01/2013
$40.70
$9.80
$17.67
Supplemental
$68.17
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$16.29
$7.80
$0.00
$0.00
$24.09
2 55
$17.91
$7.80
$3.52
$0.00
$29.23
3 60
$19.54
$7.80
$3.84
$0.00
$31.18
4 65
$21.17
$7.80
$4.16
$0.00
$33.13
5 70
$22.80
$7.80
$13.68
$0.00
$44.28
6 75
$24.43
$7.80
$14.00
$0.00
$46.23
7 80
$26.06
$7.80
$14.32
$0.00
$48.18
8 90
$29.31
$7.80
$14.96
$0.00
$52.07
----._._--_..._._...--------------.-___
(Notes:
- - - -
Steps are 750 hrs.
Apprentice to Journeyworker RatioAA
PANEL & PICKUP TRUCKS DRIVER
12/01/2012
$30.28
$9.07
$8.00
$0.00 $47.35
TEAMSTERS JOINT COUNCIL NO. 10 70NE B
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2012
$39.20
$9.80
$17.67
$0.00
$66.67
DECK)
08/01/2013
$40.70
$9.80
$17.67
$0.00
$68.17
PILE DR/VER LOCAL SG (ZONE /)
08/01/2014
$42.20
$9.80
$17.67
$0.00
$69.67
08/01/2015
$43.70
$9.80
$17.67
$0.00
$71.17
--- --- - - --------------------- - - - ----------------- --- ------------------------------ -----
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 24 of 36
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
PILE DRIVER 08/01/2012
$39.20
$9.80
$17.67
$0.00
$66.67
PILE DRIVER LOCAL 56 (ZONE 1)
$50.99
3
70
$27.44
$9.80
08/01/2013
$40.70
$9.80
$17.67
$0.00
$68.17
08/01/2014
$42.20
$9.80
$17.67
$0.00
$69.67
08/01/2015
$43.70
$9.80
$17.67
$0.00
$71.17
Apprentice- PILE DRIVER - Local 56 Zone I
Effective Date - 08/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$19.60
$9.80
$17.67
$0.00
$47.07
2
60
$23.52
$9.80
$17.67
$0.00
$50.99
3
70
$27.44
$9.80
$17.67
$0.00
$54.91
4
75
$29.40
$9.80
$17.67
$0.00
$56.87
5
80
$31.36
$9.80
$17.67
$0.00
$58.83
6
80
$31.36
$9.80
$17.67
$0.00
$58.83
7
90
$35.28
$9.80
$17.67
$0.00
$62.75
8
90
$35.28
$9.80
$17.67
$0.00
$62.75
Effective Date - 08/01/2013
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$20.35
$9.80
$17.67
$0.00
$47.82
2
60
$24.42
$9.80
$17.67
$0.00
$51.89
3
70
$28.49
$9.80
$17.67
$0.00
$55.96
4
75
$30.53
$9.80
$17.67
$0.00
$58.00
5
80
$32.56
$9.80
$17.67
$0.00
$60.03
6
80
$32.56
$9.80
$17.67
$0.00
$60.03
7
90
$36.63
$9.80
$17.67
$0.00
$64.10
8
90
$36.63
$9.80
$17.67
$0.00
$64.10
-----.__.------._.--------_.__..._.-.--_--___._._,
!(Notes:
II
----®� ---
--------°------
Apprentice to Journeyworker Ratio:l:3
- -
-
-
PIPEFITTER & STEAMFITTER.
PIPEFITT ERS LOCAL 53 7 (Local 138)
09/01/2012 $45.76 $8.75 $12.39 $0.00 $66.90
03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15
--------- ------------------ I --------------- -- --------- -
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 25 of 36
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$4.50
$0.00
$32.05
2
UnemuloYment
Apprentice- PIPEFITTER Local 537
(Local 138)
$12.39
$0.00
$42.29
3
Effective Date - 09/01/2012
$28.21
$8.75
$12.39
Supplemental
$49.35
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 40
$18.30
$8.75
$4.50
$0.00
$31.55
2 45
$20.59
$8.75
$12.39
$0.00
$41.73
3 60
$27.46
$8.75
$12.39
$0.00
$48.60
4 70
$32.03
$8.75
$12.39
$0.00
$53.17
5 80
$36.61
$8.75
$12.39
$0.00
$57.75
Effective Date - 03/01/2013
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$18.80
$8.75
$4.50
$0.00
$32.05
2
45
$21.15
$8.75
$12.39
$0.00
$42.29
3
60
$28.21
$8.75
$12.39
$0.00
$49.35
4
70
$32.91
$8.75
$12.39
$0.00
$54.05
5
80
$37.61
$8.75
$12.39
$0.00
$58.75
--------.---------
(Notes:
12/01/2015
$32.85
---
.-.,-.-._._-------
$0.00
_
I
06/01/2016
** 1:3; 3:15; 1:10 thereafter/ Steps are 1 yr.
$7.10
$11.55
$0.00
$52.00
12/01/2016
--
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
------------------
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
Apprentice to 3ourneyworker Ratio:**
PIPELAYER 12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
LABORERS - 70NE 2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
PLUMBER
PLUMBERS & GA SR17TERS LOCA L 12 (Local
09/01/2012 $43.98 $9.32 $13.29 $0.00 $66.59
03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84
--- ----------------------- --- -- ---- ------------ -------- - - --------------- - ---- ---- - ----- - ----- - -
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 26 of 36
Classification Effective Date Base Wage Health Pension supplemental Total Rate
Unemployment
Apprentice- PLUMBER/GASFITTER -Local 12 (Local 138)
Effective Date - 09/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
35
$15.39
$9.32
$4.97
$0.00
$29.68
2
40
$17.59
$9.32
$5.61
$0.00
$32.52
3
55
$24.19
$9.32
$7.53
$0.00
$41.04
4
65
$28.59
$9.32
$8.81
$0.00
$46.72
5
75
$32.99
$9.32
$10.09
$0.00
$52.40
Effective Date - 03/01/2013
06/01/2014
$31.35
$7.10
Supplemental
$0.00
Step
percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
35
$15.83
$9.32
$4.97
$0.00
$30.12
2
40
$18.09
$9.32
$5.61
$0.00
$33.02
3
55
$24.88
$9.32
$7.53
$0.00
$41.73
4
65
$29.40
$9.32
$8.81
$0.00
$47.53
5
75
$33.92
$9.32
$10.09
$0.00
$53.33
..__..___.___
Notes:
--------------_
POWDERMAN & BLASTER
12/01/2012
----------
$7.10
-
$0.00
Steps are 1 yr
LABORERS -7.ONE2
A --u..,
Step 4 with lic$50.43 Step5 with lic$56.22
_, ------w._.._------------�------_....
06/01/2013
$31.10
$7.10
$11.55
Apprentice to Journeyworker Ratio:l :5
$49.75
12/01/2013
$31.60
$7.10
PNEUMATIC CONTROLS (TEMP.)
PIPEF177ERS LOCAL 537 (Local 138)
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
09/01/2012
03/01/2013
$45.76
$47.01
$8.75
$8.75
$12.39
$12.39
$0.00
$0.00
$66.90
$68.15
PNEUMATIC DRILL/TOOL OPERATOR
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
LABORERS -ZONE2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
POWDERMAN & BLASTER
12/01/2012
$30.60
$7.10
$11.55
$0.00
$49.25
LABORERS -7.ONE2
06/01/2013
$31.10
$7.10
$11.55
$0.00
$49.75
12/01/2013
$31.60
$7.10
$11.55
$0.00
$50.25
06/01/2014
$32.10
$7.10
$11.55
$0.00
$50.75
12/01/2014
$32.60
$7.10
$11.55
$0.00
$51.25
06/01/2015
$33.10
$7.10
$11.55
$0.00
$51.75
12/01/2015
$33.60
$7.10
$11.55
$0.00
$52.25
06/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
12/01/2016
$34.85
$7.10
$11.55
$0.00
$53.50
For apprentice rates see "Apprentice- LABORER"
---- ------------------------- - - --- --- -- ------ - . --------- - - I ------------- - ----------- -
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 27 of 36
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
POWER SHOVEL/DERRICK/TRENCHING MACHINE
12/01/2012
$40.09
$10.00
$13.02
$0.00
$63.11
OPERATING FNGINEERS LOCAL 4
06/01/2013
$40.87
$10.00
$13.02
$0.00
$63.89
12/01/2013
$41.65
$10.00
$13.02
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (CONCRETE)
12/01/2012
$40.09
$10.00
$13.02
$0.00
$63.11
OPF1?ATING ENGINEFRS LOCAL 4
06/01/2013
$40.87
$10.00
$13.02
$0.00
$63.89
12/01/2013
$41.65
$10.00
$13.02
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PUMP OPERATOR (DEWATERING, OTHER)
12/01/2012
$28.17
$10.00
$13.02
$0.00
$51.19
OPERATING ENGINEERS LOCAL 4
06/01/2013
$28.72
$10.00
$13.02
$0.00
$51.74
12/01/2013
$29.27
$10.00
$13.02
$0.00
$52.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
READY -MIX CONCRETE DRIVER
04/30/2009
$25.80
$5.96
$5.34
$0.00
$37.10
TIiAMS7YiRS LOCAL 42
REC.LAIMERS
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING ENGINEERS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
RESIDENTIAL WOOD FRAME (All Other Work)
04/01/2011
$24.24
$8.67
$15.51
$0.00
$48.42
CARPENTERS -ZONE 2 (Residential Wood)
RESIDENTIAL WOOD FRAME CARPENTER **
05/01/2011
$24.24
$6.34
$6.23
$0.00
$36.81
** The Residential Wood Frame Carpenter classification applies
only to the construction ofnew, wood frame residences that do
not exceed four stories including the basement. CA1tPFNTIiRs-ZONE
2 (Residential Wood)
As of 9/I /09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL
WOOD FRAME CARPENTER
rate.
RIDE -ON MOTORIZED BUGGY OPERATOR
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
LABORERS - ZONE 2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
ROLLER/SPREADER/MULCHING MACHINE
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING ENGINI3FRS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
ROOFER (Inc.Roofer Waterproof» g &Roofer Damproofg)
02/01/2013
$37.41
$10.50
$10.70
$0.00
$58.61
ROOFF,RS LOCAL 33
- ------------------------ - - -- --- ------------------- ------- --------- ---- ----
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 28 of 36
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - ROOFER - Local 33
Effective Date - 02/01/2013 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$18.71
$10.50
$3.38
$0.00
$32.59
2 60
$22.45
$10.50
$10.70
$0.00
$43.65
3 65
$24.32
$10.50
$10.70
$0.00
$45.52
4 75
$28.06
$10.50
$10.70
$0.00
$49.26
5 85
$31.80
$10.50
$10.70
$0.00
$53.00
- -___.----_.__------_._.--------._._----
--------------------------Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1
Notes:
$9.82
$8.00
$1.11
$37.97
4 45
Step I is 2000 hrs.; Steps 2-5 are 1000 hrs.
$9.82
$8.00
$1.11
$37.97
5 50
- - - - - - - - - - - -
Apprentice to Journeyworker Ratio:**
- - -
- - - -
- - -
- - -
- - -
ROOFER SLATE / TILE / PRECAST CONCRETE
02/01/2013
$37.66
$10.50
$10.70
$0.00 $58.86
ROGN,RS LOCAL 33
$9.82
$10.24
$1.36
$46.81
8 65
For apprentice rates see "Apprentice- ROOFER"
$9.82
$10.99
$1.45
$49.77
9 75
SHEETMETAL WORKER
SHEE"TMETAL WORKERS LOCAL 17 -A
02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49
Apprentice- SHEET METALWORKER -Local 17-A
Effective Date - 02/01/2013
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 40
$16.93
$9.82
$4.00
$0.00
$30.75
2 40
$16.93
$9.82
$4.00
$0.00
$30.75
3 45
$19.04
$9.82
$8.00
$1.11
$37.97
4 45
$19.04
$9.82
$8.00
$1.11
$37.97
5 50
$21.16
$9.82
$8.75
$1.19
$40.92
6 50
$21.16
$9.82
$9.00
$1.20
$41.18
7 60
$25.39
$9.82
$10.24
$1.36
$46.81
8 65
$27.51
$9.82
$10.99
$1.45
$49.77
9 75
$31.74
$9.82
$12.49
$1.62
$55.67
10 85
$35.97
$9.82
$13.49
$1.78
$61.06
- - - - - ------------------
Notes:
-
- - - -
- - -
I
Steps are 6 mos.
Apprentice to Journeyw orker Ra Tio-1-:4
- -
- - -
- - - -
- - -
SIGN ERECTOR
PAINTERS LOCAL 35 - ZONE 2
06/01/2012 $25.37 $6.82 $6.85 $0.00 $39.04
06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93
------- ------ ---- - - - - ---- - ------ ----- - - -- ----------- -- ---------- -- ----------------- - -- ---- ---- - - ----
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 29 of 36
Classification Effective Date Base Wage
Apprentice- SIGN ERECTOR -Local 35 Zone 2
Effective Date - 06/01/2012
Step percent Apprentice Base Wage Health
Health
Pension
Pension Supplemental Total Rate
Unemployment
Supplemental
Unemployment Total Rate
1 50
$12.69
$6.82
$0.00
$0.00
$19.51
2 55
$13.95
$6.82
$2.35
$0.00
$23.12
3 60
$15.22
$6.82
$2.35
$0.00
$24.39
4 65
$16.49
$6.82
$2.35
$0.00
$25.66
5 70
$17.76
$6.82
$6.85
$0.00
$31.43
6 75
$19.03
$6.82
$6.85
$0.00
$32.70
7 80
$20.30
$6.82
$6.85
$0.00
$33.97
8 85
$21.56
$6.82
$6.85
$0.00
$35.23
9 90
$22.83
$6.82
$6.85
$0.00
$36.50
Effective Date - 06/01/2013
$23.23
$7.07
$7.05
Supplemental
$37.35
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$12.91
$7.07
$0.00
$0.00
$19.98
2
55
$14.20
$7.07
$2.45
$0.00
$23.72
3
60
$15.49
$7.07
$2.45
$0.00
$25.01
4
65
$16.78
$7.07
$2.45
$0.00
$26.30
5
70
$18.07
$7.07
$7.05
$0.00
$32.19
6
75
$19.36
$7.07
$7.05
$0.00
$33.48
7
80
$20.65
$7.07
$7.05
$0.00
$34.77
8
85
$21.94
$7.07
$7.05
$0.00
$36.06
9
90
$23.23
$7.07
$7.05
$0.00
$37.35
----_.-........_._.-..._---_...-----____---._---
Notes:
..
--
Steps are 4 mos.
Apprentice to Journeyworker Ratio:1:1
SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65
7FAMSTEIZS JOIN7' COUNCIL NO. 10 7.ONE B
SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94
7FAMS7FItS JOIN7' COUNCIL NO. 10 7ONF, B
SPRINKLER FITTER
SPRINKLER FITTERS LOCAL 550 - (Section B)
01/01/2013 $47.13 $8.42 $12.60 $0.00 $68.15
03/01/2013 $48.13 $8.42 $12.60 $0.00 $69.15
----------------- - ---- - - ---- --- - ----------- - ----- - - - - -- -- -- --------------------------.-...---- -----------------
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 30 of 36
Classification
Apprentice- SPRINKLER FITTER -Local
Effective Date - 01/01/2013
Step percent
Effective Date Base Wage
550 (Section B)
Apprentice Base Wage Health
Health
Pension
Pension SupplementalTotal Rate
Unemployment
Supplemental
Unemployment Total Rate
1 35
$16.50
$8.42
$8.00
$0.00
$32.92
2 40
$18.85
$8.42
$8.00
$0.00
$35.27
3 45
$21.21
$8.42
$8.00
$0.00
$37.63
4 50
$23.57
$8.42
$8.00
$0.00
$39.99
5 55
$25.92
$8.42
$8.00
$0.00
$42.34
6 60
$28.28
$8.42
$8.00
$0.00
$44.70
7 65
$30.63
$8.42
$8.00
$0.00
$47.05
8 70
$32.99
$8.42
$8.00
$0.00
$49.41
9 75
$35.35
$8.42
$8.00
$0.00
$51.77
10 80
$37.70
$8.42
$8.00
$0.00
$54.12
Effective Date - 03/01/2013
$38.50
$8.42
$8.00
Supplemental
$54.92
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
35
$16.85
$8.42
$8.00
$0.00
$33.27
2
40
$19.25
$8.42
$8.00
$0.00
$35.67
3
45
$21.66
$8.42
$8.00
$0.00
$38.08
4
50
$24.07
$8.42
$8.00
$0.00
$40.49
5
55
$26.47
$8.42
$8.00
$0.00
$42.89
6
60
$28.88
$8.42
$8.00
$0.00
$45.30
7
65
$31.28
$8.42
$8.00
$0.00
$47.70
8
70
$33.69
$8.42
$8.00
$0.00
$50.11
9
75
$36.10
$8.42
$8.00
$0.00
$52.52
10
80
$38.50
$8.42
$8.00
$0.00
$54.92
---_._-.--------_._..-------.-..,„---_.__--
Notes:
Steps are 850 hours
Apprentice to Journeyworker Ratio: .1
STEAM BOILER OPERATOR
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING ENGINEERS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING FNGINFF.ItS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
------------------------------------------------- ----- ------------------------ - ----- -- ---.
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 31 of 36
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
2 40
$12.84
$13.00
$0.39
Unemployment
$26.23
TELECOMMUNICATION TECHNICIAN 09/01/2012
$32.11
$13.00
$12.49
$0.00
$57.60
Is'LLC7'ItICIANS LOCAL 103
$14.45
$13.00
$9.77
$0.00
$37.22
03/01/2013
$32.64
$13.00
$12.51
$0.00
$58.15
09/01/2013
$33.15
$13.00
$12.52
$0.00
$58.67
03/01/2014
$33.69
$13.00
$12.54
$0.00
$59.23
09/01/2014
$34.20
$13.00
$12.56
$0.00
$59.76
03/01/2015
$34.74
$13.00
$12.57
$0.00
$60.31
09/01/2015
$35.45
$13.00
$12.59
$0.00
$61.04
03/01/2016
$36.17
$13.00
$12.62
$0.00
$61.79
Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103
Effective Date - 09/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40
$12.84
$13.00
$0.39
$0.00
$26.23
2 40
$12.84
$13.00
$0.39
$0.00
$26.23
3 45
$14.45
$13.00
$9.77
$0.00
$37.22
4 45
$14.45
$13.00
$9.77
$0.00
$37.22
5 50
$16.06
$13.00
$10.02
$0.00
$39.08
6 55
$17.66
$13.00
$10.27
$0.00
$40.93
7 60
$19.27
$13.00
$10.52
$0.00
$42.79
8 65
$20.87
$13.00
$10.77
$0.00
$44.64
9 70
$22.48
$13.00
$11.02
$0.00
$46.50
10 75
$24.08
$13.00
$11.26
$0.00
$48.34
Effective Date - 03/01/2013
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1
40
$13.06
$13.00
$0.39
$0.00
$26.45
2
40
$13.06
$13.00
$0.39
$0.00
$26.45
3
45
$14.69
$13.00
$9.78
$0.00
$37.47
4
45
$14.69
$13.00
$9.78
$0.00
$37.47
5
50
$16.32
$13.00
$10.03
$0.00
$39.35
6
55
$17.95
$13.00
$10.28
$0.00
$41.23
7
60
$19.58
$13.00
$10.53
$0.00
$43.11
8
65
$21.22
$13.00
$10.78
$0.00
$45.00
9
70
$22.85
$13.00
$11.03
$0.00
$46.88
10
75
$24.48
$13.00
$11.28
$0.00
$48.76
_.-.-------_- - __------__. - .W..._ -----_.._____- ..._,
(Notes:
Apprentice to Journeyworker Ratio:la
- - . ---------------------------------- - - -- --- - --- --- - - - -- ----- ------------------------- ------ - - --
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 32 of 36
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
2 60
$27.81
$10.18
$17.83
Unemployment
$55.82
TERRAZZO FINISHERS 02/01/2013
$46.35
$10.18
$17.83
$0.00
$74.36
BRICKLAYERS LOCAL 3 - MARBLE & TILE
$37.08
$10.18
$17.83
$0.00
$65.09
08/01/2013
$47.25
$10.18
$17.90
$0.00
$75.33
02/01/2014
$47.81
$10.18
$17.90
$0.00
$75.89
08/01/2014
$48.71
$10.18
$17.97
$0.00
$76.86
02/01/2015
$49.27
$10.18
$17.97
$0.00
$77.42
08/01/2015
$50.17
$10.18
$18.04
$0.00
$78.39
02/01/2016
$50.74
$10.18
$18.04
$0.00
$78.96
08/01/2016
$51.64
$10.18
$18.12
$0.00
$79.94
02/01/2017
$52.21
$10.18
$18.12
$0.00
$80.51
Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile
Effective Date - 02/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.18
$10.18
$17.83
$0.00
$51.19
2 60
$27.81
$10.18
$17.83
$0.00
$55.82
3 70
$32.45
$10.18
$17.83
$0.00
$60.46
4 80
$37.08
$10.18
$17.83
$0.00
$65.09
5 90
$41.72
$10.18
$17.83
$0.00
$69.73
Effective Date - 08/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.63
$10.18
$17.90
$0.00
$51.71
2 60
$28.35
$10.18
$17.90
$0.00
$56.43
3 70
$33.08
$10.18
$17.90
$0.00
$61.16
4 80
$37.80
$10.18
$17.90
$0.00
$65.88
5 90
$42.53
$10.18
$17.90
$0.00
$70.61
------- --- --- --------____--____-._
Notes:
$36.70
$7.10
-----_.,_---,
$0.00
q
Apprentice to Journeyworker Ratio:1:3
$37.45
$7.10
$12.60
$0.00
$57.15
TEST BORING DRILLER 12/01/2012
------ ---------
$37.30
$7.10
$12.60
$0.00
$57.00
LABORERS - FOUNDATIONAND MARINE
06/01/2013
$34.45
$7.10
$12.60
$0.00
$54.15
12/01/2013
$35.20
$7.10
$12.60
$0.00
$54.90
06/01/2014
$35.95
$7.10
$12.60
$0.00
$55.65
12/01/2014
$36.70
$7.10
$12.60
$0.00
$56.40
06/01/2015
$37.45
$7.10
$12.60
$0.00
$57.15
12/01/2015
$38.20
$7.10
$12.60
$0.00
$57.90
06/01/2016
$38.95
$7.10
$12.60
$0.00
$58.65
12/01/2016
$39.95
$7.10
$12.60
$0.00
$59.65
For apprentice rates see "Apprentice- LABORER"
- - -----
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 33 of 36
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
TEST BORING DRILLER HELPER
12/01/2012
$32.42
$7.10
$12.60
$0.00
$52.12
LABORERS - FOUNDA7ION AND MARINE
06/01/2013
$33.17
$7.10
$12.60
$0.00
$52.87
12/01/2013
$33.92
$7.10
$12.60
$0.00
$53.62
06/01/2014
$34.67
$7.10
$12.60
$0.00
$54.37
12/01/2014
$35.42
$7.10
$12.60
$0.00
$55.12
06/01/2015
$36.17
$7.10
$12.60
$0.00
$55.87
12/01/2015
$36.92
$7.10
$12.60
$0.00
$56.62
06/01/2016
$37.67
$7.10
$12.60
$0.00
$57.37
12/01/2016
$38.67
$7.10
$12.60
$0.00
$58.37
For apprentice rates see "Apprentice- LABORER"
TEST BORING LABORER
12/01/2012
$32.30
$7.10
$12.60
$0.00
$52.00
LABORERS- FOUNDA77ONANDM41?INE
06/01/2013
$33.05
$7.10
$12.60
$0.00
$52.75
12/01/2013
$33.80
$7.10
$12.60
$0.00
$53.50
06/01/2014
$34.55
$7.10
$12.60
$0.00
$54.25
12/01/2014
$35.30
$7.10
$12.60
$0.00
$55.00
06/01/2015
$36.05
$7.10
$12.60
$0.00
$55.75
12/01/2015
$36.80
$7.10
$12.60
$0.00
$56.50
06/01/2016
$37.55
$7.10
$12.60
$0.00
$57.25
12/01/2016
$38.55
$7.10
$12.60
$0.00
$58.25
For apprentice rates see "Apprentice- LABORER"
TRACTORS/PORTABLE STEAM GENERATORS
12/01/2012
$39.72
$10.00
$13.02
$0.00
$62.74
OPERATING ENGINEERS LOCAL 4
06/01/2013
$40.49
$10.00
$13.02
$0.00
$63.51
12/01/2013
$41.27
$10.00
$13.02
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TRAILERS FOR EARTH MOVING EQUIPMENT
12/01/2012
$31.32
$8.91
$8.00
$0.00
$48.23
TEAMSTERS JOINTCOUNCIL NO. 10 70NE B
TUNNEL WORK - COMPRESSED AIR
12/01/2012
$44.58
$7.10
$13.00
$0.00
$64.68
LABORERS (COM111d SSED All?)
06/01/2013
$45.33
$7.1.0
$13.00
$0.00
$65.43
12/01/2013
$46.08
$7.10
$13.00
$0.00
$66.18
06/01/2014
$46.83
$7.10
$13.00
$0.00
$66.93
12/01/2014
$47.58
$7.10
$13.00
$0.00
$67.68
06/01/2015
$48.33
$7.10
$13.00
$0.00
$68.43
12/01/2015
$49.08
$7.10
$13.00
$0.00
$69.18
06/01/2016
$49.83
$7.10
$13.00
$0.00
$69.93
12/01/2016
$50.83
$7.10
$13.00
$0.00
$70.93
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
12/01/2012
$46.58
$7.10
$13.00
$0.00
$66.68
LABORERS (COMPRI,SSEDAIR)
06/01/2013
$47.33
$7.10
$13.00
$0.00
$67.43
12/01/2013
$48.08
$7.10
$13.00
$0.00
$68.18
06/01/2014
$48.83
$7.10
$13.00
$0.00
$68.93
12/01/2014
$49.58
$7.10
$13.00
$0.00
$69.68
06/01/2015
$50.33
$7.10
$13.00
$0.00
$70.43
12/01/2015
$51.08
$7.10
$13.00
$0.00
$71.18
06/01/2016
$51.83
$7.10
$13.00
$0.00
$71.93
12/01/2016
$52.83
$7.10
$13.00
$0.00
$72.93
For apprentice rates see "Apprentice- LABORER"
------ ---------------------------- ----------------- -----------------------
Issue Date: 02/15/2013 Wage Request Number:
20130215-034
---------
-- ---------
--------------------------------
-
Page 34 of 36
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
LABORERS - ZONE 2
Unemployment
TUNNEL WORK - FREE AIR
12/01/2012
$36.65
$7.10
$13.00
$0.00
$56.75
LABORERS (FREE AIR TUNNEL)
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2013
$37.40
$7.10
$13.00
$0.00
$57.50
12/01/2013
$38.15
$7.10
$13.00
$0.00
$58.25
06/01/2014
$38.90
$7.10
$13.00
$0.00
$59.00
12/01/2014
$39.65
$7.10
$13.00
$0.00
$59.75
06/01/2015
$40.40
$7.10
$13.00
$0.00
$60.50
12/01/2015
$41.15
$7.10
$13.00
$0.00
$61.25
For apprentice rates see "Apprentice- LABORER"
06/01/2016
$41.90
$7.10
$13.00
$0.00
$62.00
WASTE WATER PUMP OPERATOR
12/01/2016
$42.90
$7.10
$13.00
$0.00
$63.00
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - FREE AIR (HAZ. WASTE)
12/01/2012
$38.65
$7.10
$13.00
$0.00
$58.75
LABORERS OWEAIR TUNNEL)
12/01/2013
$41.65
$10.00
$13.02
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2013
$39.40
$7.10
$13.00
$0.00
$59.50
WATER METER INSTALLER
12/01/2013
$40.15
$7.10
$13.00
$0.00
$60.25
III, UMBERS B GASFI7TFRS LOCAL_ 12 (Local 138)
06/01/2014
$40.90
$7.10
$13.00
$0.00
$61.00
12/01/2014
$41.65
$7.10
$13.00
$0.00
$61.75
For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER"
06/01/2015
$42.40
$7.10
$13.00
$0.00
$62.50
12/01/2015
$43.15
$7.10
$13.00
$0.00
$63.25
06/01/2016
$43.90
$7.10
$13.00
$0.00
$64.00
12/01/2016
$44.90
$7.10
$13.00
$0.00
$65.00
For apprentice rates see "Apprentice- LABORER"
VAC -HAUL
12/01/2012
$30.74
$8.91
$8.00
$0.00
$47.65
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
WAGON DRILL OPERATOR
12/01/2012
$29.85
$7.10
$11.55
$0.00
$48.50
LABORERS - ZONE 2
06/01/2013
$30.35
$7.10
$11.55
$0.00
$49.00
12/01/2013
$30.85
$7.10
$11.55
$0.00
$49.50
06/01/2014
$31.35
$7.10
$11.55
$0.00
$50.00
12/01/2014
$31.85
$7.10
$11.55
$0.00
$50.50
06/01/2015
$32.35
$7.10
$11.55
$0.00
$51.00
12/01/2015
$32.85
$7.10
$11.55
$0.00
$51.50
06/01/2016
$33.35
$7.10
$11.55
$0.00
$52.00
12/01/2016
$34.10
$7.10
$11.55
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
WASTE WATER PUMP OPERATOR
12/01/2012
$40.09
$10.00
$13.02
$0.00
$63.11
OPERATING ENGINEERS LOCAL 4
06/01/2013
$40.87
$10.00
$13.02
$0.00
$63.89
12/01/2013
$41.65
$10.00
$13.02
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
WATER METER INSTALLER
09/01/2012
$43.98
$9.32
$13.29
$0.00
$66.59
III, UMBERS B GASFI7TFRS LOCAL_ 12 (Local 138)
03/01/201.3
$45.23
$9.32
$13.29
$0.00
$67.84
For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER"
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 35 of 36
Classification Effective Date Base Wage Health Pension Supplemental Total.Rate
Unemployment
Additional Apprentice Information
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the
Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L.
c. 23, ss. I IE -11L.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -11L.
All steps are six months (1000 hours) unless otherwise specified.
* Ratios are expressed in allowable number of apprentices tojoumeymen or fraction thereof.
** Multiple ratios are listed in the comment field.
*** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc.
**** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc.
-------- ------------------------------------------------------ - --- --- ---- - - ----- -- - - --------- --- - -- - ----- - - --- -
Issue Date: 02/15/2013 Wage Request Number: 20130215-034 Page 36 of 36
Legal Ad for Eagle -Tribune
The Town of North Andover is soliciting bids from qualified companies to furnish, install, field
test, complete and make ready for service an interior lining system to reline/recoat one 3,461
gallon sodium hydroxide (caustic soda) storage tank in the Chemical Storage Room at the Water
Treatment Plant. Qualified companies are requested to submit bids to the Assistant Town
Manager at North Andover Town Hall, 120 Main Street, North Andover, MA, in accordance
with the instructions contained within the Invitation for Bids (IFB).
The complete IFB is available on the Town website (www.townofnorthandover.com) by clicking
on "Bids, Quotes and Proposals". The Town will only accept proposals delivered in person or by
mail. All proposals must be received by 2:00 p.m. on March 21, 2013 to be considered.
The Town of North Andover may cancel this IFB or reject in whole or in part any and all
proposals, if they determine that cancellation or rejection serves the best interest of the Town of
North Andover.
Santilli, Ray
From: REGS@sec. state. ma. us
Sent: Tuesday, February 19, 2013 1:15 PM
To: Santilli, Ray
Subject: Publish Date Assigned for General Contracts
A publish date of 2/27/13 has been assigned to your General Contracts submission with description of:
The Town of North Andover is soliciting bids to furnish, install, field test, complete and make ready for service
an interior lining system to reline/recoat one 3,461 gallon sodium hydroxide (caustic soda) storage tank in the
Chemical Storage Room at the Water Treatment Plant.
Please note the Massachusetts Secretary of State's office has determined that most emails to and from
municipal offices and officials are public records. For more information please refer to:
http://www:sec.state.ma.us/pre/preidx.htm.
Please consider the environment before printing this email.