Loading...
HomeMy WebLinkAboutContract #: 009561 - From: 11-30-2013 To: - Exception - Town of North AndoverSantilli, Ray From: Santilli, Ray Sent: Thursday, October 03, 2013 2:38 PM To: Foster, Stephen E. Subject: IFB - Furnish & Install Insulation at Stevens Estate Please advised that no bids were received in response to the'IFB — Furnish & Install Insulation at Stevens Estate' by today's 2:00 p.m. deadline. Ray Santilli Assistant Town Manager Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9516 Fax 978.688.9556 Email rsantilli@townofnorthandover.com Web www.townofnorthandover.com TOWN OF NORTH ANDOVER INVITATION FOR BIDS FURNISH & INSTALL INSULATION AT STEVENS ESTATE September 11, 2013 Contact Ray Santilli Assistant Town Manager Address 120 Main Street North Andover, MA 01845 Telephone Number: 978-688-9516 Fax Number: 978-688-9556 Email rsantilli@townofnorthandover.com Table of Contents 1. Introduction......................................................... 3 2. Submission Deadline and Instructions ........................... 3 3. Questions, Addendum or Proposed Modifications ............. 4 4. Minimum Requirements ............................................ 5 5. Scope of Services ..................................................... 5 6. Insulation Installation Sketches .................................... 8 7. Site Visits............................................................ 11 8. Prevailing Wage Rates .............................................. 11 9. Payment Bond ....................................................... 11 10. Bid Deposit......................................................... 11 11. Evaluation of Bids ................................................... 11 12. Term of Contract .................................................. 12 Appendix A — Price Proposal ........................................ 13 Standard Town of North Andover Contract With Supplement "C" ............................................. 14 Certifications........................................................... 34 Payment Bond Form ................................................... 37 Prevailing Wage Rates ................................................. 38 Town of North Andover IFB Page 2 of 38 Furnish & Install Insulation at Stevens Estate 1. Introduction The Town of North Andover is soliciting bids from qualified contractors to furnish and install blown -in cellulose insulation in P floor sloped ceilings and 4th floor attic floor areas of the Stevens Estate, 723 Osgood Street, North Andover MA. Qualified contractors are requested to submit bids to the Assistant Town Manager at North Andover Town Hall, 120 Main Street, North Andover, MA, in accordance with the instructions contained within this Invitation for Bids. Notice of this IFB is published in the Central Register, which is a weekly publication of the Office of the Secretary of the Commonwealth, the Eagle -Tribune (a newspaper of general circulation) and posted on the Town website (www.townofnorthandover.com) under "Bids, Quotes and Proposals". The Town will accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on Thursday, October 3, 2013 to be considered. Proposals submitted by fax or by electronic mail will not be considered. All proposals must be submitted to: Mr. Ray Santilli, Assistant Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 The Town of North Andover may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the Town of North Andover. 2. Submission Deadline and Instructions Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed envelope marked "Insulation — Stevens Estate" with the applicant's name and address on the front. Applicants should provide one (1) signed original proposal. Fax or electronic submissions will not be accepted. Applicants must also execute and include in the sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The Town of North Andover, through the Town Manager, is the awarding authority and reserves the right to reject any and all proposals or parts of proposals; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; and to award contracts or to cancel this Invitation for Bids if it is in the Town of North Andover's best interest to do so. Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if the bidder is a partnership, by the name of the partnership, followed by the signature of each general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed. Town of North Andover IFB Page 3 of 38 Furnish & Install Insulation at Stevens Estate All sealed proposals must be received and registered by the Assistant Town Manager's office by Thursday, October 3, 2013 at 2:00 p.m. All outer envelopes must be labeled "Insulation — Stevens Estate" and mailed or hand delivered to the following address: Mr. Ray Santilli, Assistant Town Manager North Andover Town Hall 120 Main Street North Andover, MA 01845 No proposals will be accepted after the time and date noted. Late delivery of materials due to any type of delivery system shall be cause for rejection. If on the date and time of the submittal deadline the North Andover Town Hall is closed due to an uncontrolled event such as fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the next normal business day. 3. Questions, Addendum or Proposal Modification Questions concerning this IFB must be submitted in writing to: Mr. Ray Santilli, Assistant Town Manager, 120 Main Street North Andover, MA 01845, or they may be emailed to Mr. Santilli at rsantilli@townofnorthandover.com. All questions/inquiries must be received by 4:30 p.m. on Tuesday, September 24, 2013 to be considered. Questions/inquiries may be delivered, mailed, emailed or faxed. Written responses will be posted on the Town's website (www.townofnorthandover.com) in "Bids, Quotes and Proposals" by Thursday, September 26, 2013 at 2:00 p.m. If any changes are made to this IFB, an addendum will be posted on the Town's website in "Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence of any addenda and/or modifications issued by the Town. As this IFB has been published on the Town's website (www.townofnorthandover.com) all bidders are responsible for checking the website for any addenda and /or modifications that are subsequently made to this IFB. The Town accepts no liability for and will provide no accommodations to bidders who fail to check for amendments and/or modifications to this IFB and subsequently submit inadequate or incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any IFB component files. Modifications to the body of the IFB, Scope of Work, terms and conditions, or which change the intent of this IFB are prohibited and may disqualify a response. All proposals submitted in response to this IFB shall remain firm for sixty (60) days following the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days after the submittal deadline. Bidders are not to communicate directly with any employee of the Town of North Andover, except as specified in this IFB, and no other individual employee or representative is authorized to provide any information or respond to any question or inquiry concerning this IFB. Town of North Andover IFB Page 4 of 38 Furnish & Install Insulation at Stevens Estate Bidders may contact the Contact Person for this IFB in the event this lFB is incomplete or the bidder is having trouble obtaining any part of the IFB electronically through the Town website (www.townofnorthandover.com), including, and without limitation the form and attachments. Bidder with disabilities or hardships that seek reasonable accommodations, which may include the receipt of IFB information and/or addenda and/or modifications in an alternative format, must communicate such requests in writing to the contact person, and reasonable accommodation will be made by agreement with the contact person on behalf of the Town of North Andover. 4. Minimum Requirements Each bidder must demonstrate that it meets the following minimum requirements: A. Contractor must demonstrate a minimum of five (5) years experience providing the services required in the Scope of Services. B. Contractor shall furnish evidence of training, certification and experience in performing scope of services. C. Contractor shall supply all labor, materials and equipment to perform listed scope of services. D. Contractor shall perform the required work prior to this upcoming winter heating season. E. Contractor shall submit a complete list of all contracts performed in the past two (2) years with contact names and telephone numbers. F. Prices shall remain firm for the entire period of the contract. G. Submission of required statements and forms. 5. Scope of Services The Stevens Estate at Osgood Hill was built in 1886 by Moses T. Stevens, a prosperous owner of textile mills and a member of one of the founding families of North Andover. The main house and outbuildings were designed by the Boston architects Hartwell & Richardson. The Town of North Andover purchased the Stevens Estate and its 154 acres in 1995 to protect the buildings and preserve its grounds. On the National Historic Register, the Stevens Estate is one of the few remaining grand estates of the Victorian era. The Town currently operates the Stevens Estate as a function facility. Town of North Andover IFB Page 5 of 38 Furnish & Install Insulation at Stevens Estate A. General 1) Work Included a) The contractor will supply all labor, materials and equipment necessary for the complete and proper installation of cellulose insulation on the drawing herein. b) Material and installation shall conform to all applicable building code requirements. c) Work shall be coordinated with the Estate Director as to not conflict with any scheduled events and shall conform to the normal schedule of Monday through Friday from 7:30 a.m. to 4:30 p.m. d) Contractor shall be responsible for obtaining all proper permits. The Town, through its Board of Selectmen, may waive any and all associated fees for such permits. e) Contractor shall be responsible for cleaning and disposal of all debris at the end of each work day. Disposal of any and all material(s) shall be the contractor's responsibility. 2) Referenced Regulations and Materials Standards a) 16 CFR Part 460 — Labeling and Advertising of Home Insulation (commonly known as the FTC R -Value Rule) b) 16 CFR Part 1209 — Interim Safety Standard for Cellulose Insulation (Consumer Products Safety Commission standard for cellulose insulation) c) ASTM C739 — Standard Specification for Cellulose Fiber Loose -Fill Insulation d) ASTM C1015 — Standard Practice for Installation of Cellulose and Mineral Fiber Loose Fill Insulation e) ASTM C1149 — Standard Specification for Self -Supported Spray Applied Cellulose Thermal Insulation f) ASTM C1497 — Standard Specification for Cellulosic Fiber Stabilized Insulation 3) Quality Assurance a) Contractor shall furnish manufacturer's evidence of conformance with Consumer Products Safety Commission Interim Safety Standard 16 CFR Part 1209 and with the applicable ASTM material standard for the specific type of cellulose insulation. b) Contractor shall furnish evidence of training, certification and experience in performing scope of services. Town of North Andover IFB Page 6 of 38 Furnish & Install Insulation at Stevens Estate 4) Delivery, Storage and Handling a) Materials shall be delivered to the site in clearly labeled packaging conforming with the labeling requirements of the Consumer Products Safety Commission Interim Safety Standard 16 CFR Part 1209 and 1404, Federal Trade Commission R -Value Rule 16 CFR Part 460, and with the applicable ASTM material standard for the specific type of cellulose insulation. b) Materials shall be protected from the weather and other conditions. c) Damaged materials found unsuitable for use will be rejected and shall be removed from the site. 5) Project and Site Conditions a) Cellulose insulation shall not be installed under temperature and humidity conditions not approved by the manufacturer. b) In the case of materials installed with added moisture, provide natural ventilation to properly cure the insulation during and subsequent to its application. 6) Cleaning a) After completion of insulation work in an area, equipment shall be removed and all surfaces shall be cleaned of all deposits of insulation material. B. Products 1) Materials a) Insulation shall be loose -fill cellulose insulation. b) Insulation shall conform with Consumer Products Safety Commission Interim Safety Standard 16 CFR Part 1209 and to the applicable ASTM material standard for the specific type of cellulose insulation. C. Execution 1) Preparatory Work a) Contractor shall verify by inspection that stud and joist spaces are accessible, free of debris and those heat -producing devices and elements that are not inherently fireproof are shielded such that insulation will be held 3" away. 2) Application a) Insulation shall be installed in conformance with applicable codes, the manufacturer's published instructions, or Cellulose Insulation Manufacturers Association Technical Bulletin 2, 3, or 5; and ASTM Standard Designation C1015. Town of North Andover IFB Page 7 of 38 Furnish & Install Insulation at Stevens Estate 3) Field Quality Control a) Installation in attic space — specific R -value shall be based on the manufacturer's coverage chart, developed in conformance with the requirements of 16 CFR Part 460. Contractor shall affix thickness markers labeled in inches or R -values to trusses with at least one marker per 300 square feet throughout the attic area. Each marker shall face the attic access. Contractor shall verify installed R -value with a bag count and shall provide a certificate indicating the number of bags installed and installed R -value. The contractor shall post the certificate in a conspicuous location where it is visible and readable from attic access. b) Wall insulation — insulation shall be installed at the minimum density required by the insulation manufacturer or the job specifications. Contractor shall verify installed density by calculating the total volume of wall cavities in cubic feet and dividing the total amount of insulation installed, by pounds, by this value.. 6. Insulation Installation Sketches Town of North Andover IFB Page 8 of 38 Furnish & Install Insulation at Stevens Estate C7 f ..�- _ .._ .._. _ _ ......�t- 3r'3 '2- 30 ItASuL.AT"30 vLi �-:{{.oF. .-�y4✓f-1lNC� � rGKYEF1b TD S WAc.c_ GA✓/T C-f tOz WA., .. _ Town of North Andover IFB Page 8 of 38 Furnish & Install Insulation at Stevens Estate r 0 r a s N •� L � z � � i 7. Site Visits Site visits to the Stevens Estate can be scheduled by contacting Steve Foster, Facilities Management Director, at 978-305-5850. 8. Prevailing Wage Rates The successful bidder will at all times comply with the prevailing wage rates as determined by the Department of Labor Standards under the provisions of Massachusetts General Laws as shall be in force and as amended. The prevailing wage rates are attached. 9. Payment Bond In accordance with Massachusetts General Laws, for a contract award greater than $25,000, the successful bidder shall provide a payment bond in the amount of 50% of the total cost of the contract. The payment bond must be on the Town's form that is attached. 10. Bid Deposit In accordance with Massachusetts General Laws, all bidders are required to submit a bid deposit in the amount of 5% of the value of the first year total bid. 11. Evaluation of Bids Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility of the bidder will then be ascertained. Finally, the aggregate price for the services delivered by each responsive and responsible bidder will be considered. The Town is required to award the contract to the lowest responsive and responsible bidder. ■ Responsiveness Bidders must completely fill out and submit the bid form and all other required forms. All supplies and services that are the subject of the bid must meet the minimum standards and scope of services set forth in the purchase description including the standards by which the procurement officer will determine acceptability as to quality, workmanship, results of inspections and tests, and suitability for a particular purpose. ■ Responsibility Bidders must demonstrate that they meet measures of responsibility. The Town will not award a contract to any bidder who cannot furnish satisfactory evidence of his ability and experience in this type of work and that he has sufficient plant and capital to enable him to prosecute and complete the work as outlined in the Specifications. The Town may make such investigations as it deems necessary to determine the above and a bidder shall furnish any information requested in this regard. Town of North Andover IFB Page l l of 38 Furnish & Install Insulation at Stevens Estate All costs not listed on the bid price sheet will not be considered part of the contract and therefore will not be paid. The Town of North Andover will not be charged fuel surcharges or administrative fees as part of any contract entered into as a result of this IFB. Additionally the Town of North Andover will not be charged late fees unless payment is not made within sixty (60) days of the receipt of invoice. The Town of North Andover is a tax exempt entity so no sales tax will be assessed to any purchases made under this proposed contract. 12. Term of Contract The successful bidder will be required to execute the standard Town of North Andover contract and the appropriate supplement as attached. Town of North Andover IFB Page 12 of 38 Furnish & Install Insulation at Stevens Estate APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible, responsive bidder offering the lowest price for the work to be performed. All prices are to remain firm for the duration of the Contract. Total Lump Sum Price to furnish all labor, materials, equipment, and incidentals required to furnish and install blown -in cellulose insulation in 3`d floor sloped ceilings and 4th floor attic floor areas of the Stevens Estate, 723 Osgood Street, North Andover MA, in accordance with the scope of services. Addenda Business Name Business Address Business Phone Email Address are acknowledged: Signature Fax Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person Town of North Andover IFB Page 13 of 38 Furnish & Install Insulation at Stevens Estate Town of North Andover CONTRACT CONTRACT# DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Address: Telephone Number: Fax Number: 1. This is a Contract for the procurement of the following: 2. The Contract price to be paid to the Contractor by the Town of North Andover is: 3. Payment will be made as follows: 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. Town of North Andover IFB Page 14 of 38 Furnish & Install Insulation at Stevens Estate 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before November 30, 2013, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. Town of North Andover IFB Page 15 of 38 Furnish & Install Insulation at Stevens Estate 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default: 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the Town's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall Town of North Andover IFB Page 16 of 38 Furnish & Install Insulation at Stevens Estate have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law,mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall Town of North Andover IFB Page 17 of 38 Furnish & Install Insulation at Stevens Estate 11. 12. 13. protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. Conflict of Interest: Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it or its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, by All Contractors Providing Goods Commonwealth or Subdivision). Discrimination Section 49A (Requirement of Tax Compliance , Services, or Real Estate Space to the The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town: This Contract is only binding upon, and enforceable against, the Town if: (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other Town of North Andover IFB Page 18 of 38 Furnish & Install Insulation at Stevens Estate instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. Town of North Andover 11713 Page 19 of 38 Furnish & Install Insulation at Stevens Estate The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkeeping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Pa. moment_ The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. Town of North Andover IFB Page 20 of 38 Furnish & Install Insulation at Stevens Estate 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street, North Andover, Massachusetts 01845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. Town of North Andover IFB Page 21 of 38 Furnish & Install Insulation at Stevens Estate 28. Supplemental Conditions: The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 3013) [ ] SERVICES SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 3013) [X] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction Town of North Andover IFB Page 22 of 38 Furnish & Install Insulation at Stevens Estate IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE TOWN Division/Department Head Contract Manager Town Manager APPROVED AS TO FORM: Town Counsel Date Date THE CONTRACTOR Company Name Signature Print Name & Title CERTIFICATION AS TO AVAILABILITY OF FUNDS: Town Accountant Town of North Andover IFB Furnish & Install Insulation at Stevens Estate Date Date Page 23 of 38 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of - (1) £ (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) 1. This form supplements the Town of North Andover "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. E uali : 3.1. I:n the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property, from injury or loss arising Town of North Andover IFB Page 24 of 38 Furnish & Install Insulation at Stevens Estate in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being perfonned. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. 8. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven days notice from the Town, the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the Town, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. Town of North Andover IFB Page 25 of 38 Furnish & Install Insulation at Stevens Estate 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial violation of any provision of the Contract, then the Town may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. Town of North Andover IFB Page 26 of 38 Furnish & Install Insulation at Stevens Estate In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any tennination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Progress Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of: 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. Town of North Andover IFB Page 27 of 38 Furnish & Install Insulation at Stevens Estate 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained, the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance Town of North Andover IFB Page 28 of 38 Furnish & Install Insulation at Stevens Estate of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or Town of North Andover IFB Page 29 of 38 Furnish & Install Insulation at Stevens Estate any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: Town of North Andover IFB Page 30 of 38 Furnish & Install Insulation at Stevens Estate Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. Town of North Andover IFB Page 31 of 38 Furnish & Install Insulation at Stevens Estate 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non -Ownership Liability in connection with the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees`. 29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. Town of North Andover 1FB Page 32 of 38 Furnish & Install Insulation at Stevens Estate This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: The Town of North Andover by: Town Manager Department/Division Head Town Accountant Certified as to Appropriation Town Counsel Certified as to Form The Contractor by: Authorized Signature Town of North Andover IFB Furnish & Install Insulation at Stevens Estate Page 33 of 38 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I , authorized signatory for Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature Town of North Andover IFB Furnish & Install Insulation at Stevens Estate Date Page 34 of 38 CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Date, Print Name & Title Town of North Andover IFB Furnish & Install Insulation at Stevens Estate Company Name Page 35 of 38 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon that I hereby certify that I am the clerk of the above named and is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 36 of 38 Furnish & Install Insulation at Stevens Estate PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS, that we with a place of business at , as Principal (the "Principal"), and a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of , for the construction of NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL SURETY [Name and Seal] [Title] Attest: [Attorney-in-fact] [Seal] [Address] [Phone] Attest: Town of North Andover 1FB Page 37 of 38 Furnish & Install Insulation at Stevens Estate Town of North Andover IFB Page 38 of 38 Furnish & Install Insulation at Stevens Estate THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gov— Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE U. Govemor Dimtor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Furnish and install blown -in cellulose insulation in 3rd floor sloped ceiling areas and 4th floor attic floor areas at Stevens Estate Job Location: 723 Osgood Street Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number" on all pages of this schedule. • Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor. • All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Training (DAT). Apprentices must keep his/her apprentice identification card on his/her person during all work hours on the project. If an apprentice rate is listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the apprentice must be paid the journeyworker's rate for the trade. • The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F "rental of equipment" contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the, wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at (617) 727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties. Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.45 $8.91 $8.00 $0.00 $47.36 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B (3 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.52 $8.91 $8.00 $0.00 $47.43 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2012 $30.64 $9.07 $8.00 $0.00 $47.71 TEAMSTERS JOINT COUNCIL. NO. I0 ZONE B ADS/SUBMERSIBLE PILOT 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILE DRI VER LOCA! L56(70NE1) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 AIR TRACK OPERATOR 06/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 1✓I BORERS - 70NE 2 12/01/2013 $31.10 $7.10 $11.80 $0.00 $50.00 06/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 12/01/2014 $32.10 $7.10 $11.80 $0.00 $51.00 06/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 12/01/2015 $33.10 $7.10 $11.80 $0.00 $52.00 06/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 12/01/2016 $34.35 $7.10 $11.80 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 06/01/2013 $29.88 $10.40 $5.95 $0.00 $46.23 HEAT & FROST INSULATORS LOCAL 6 (BOSTON) 12/01/2013 $30.68 $10.40 $5.95 $0.00 $47.03 06/01/2014 $31.58 $10.40 $5.95 $0.00 $47.93 12/01/2014 $32.48 $10.40 $5.95 $0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 $0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 $0.00 $50.73 ASPHALT RAKER 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 LABORERS -70NE2 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 06/01/2013 $40.34 $10.00 $13.55 $0.00 $63.89 OPERA77NG ENGINEERS LOCAL 4 12/01/2013 $41.12 $10.00 $13.55 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 06/01/2013 $40.34 $10.00 $13.55 $0.00 $63.89 OPERATING ENGINEERS LOCAL 4 12/01/2013 $41.12 $10.00 $13.55 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" ----------------------------------------------------------------------------------- ------------ -- -- ------------------------------------ Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 2 of 35 Classification BARCO-TYPE JUMPING TAMPER LABORERS -ZONF2 For apprentice rates see "Apprentice- LABORER" BLOCK PAVER, RAMMER / CURB SETTER LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 06/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 12/01/2013 $31.10 $7.10 $11.80 $0.00 $50.00 06/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 12/01/2014 $32.10 $7.10 $11.80 $0.00 $51.00 06/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 12/01/2015 $33.10 $7.10 $11.80 $0.00 $52.00 06/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 12/01/2016 $34.35 $7.10 $11.80 $0.00 $53.25 BOILERMAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85 BOILERMAKERS LOCAL 29 Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 $11.18 $0.00 $42.66 2 65 $24.51 $6.97 $11.18 $0.00 $42.66 3 70 $26.39 $6.97 $11.18 $0.00 $44.54 4 75 $28.28 $6.97 $11.18 $0.00 $46.43 5 80 $30.16 $6.97 $11.18 $0.00 $48.31 6 85 $32.05 $6.97 $11.18 $0.00 $50.20 7 90 $33.93 $6.97 $11.18 $0.00 $52.08 8 95 $35.82 $6.97 $11.18 $0.00 $53.97 (Notes: Apprentice to Journeyworker Ratio:l:5 BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING) BRICKLAYERS LOCAL 3 (LYNN) 08/01/2013 $48.06 $10.18 $18.15 $0.00 $76.39 02/01/2014 $48.62 $10.18 $18.15 $0.00 $76.95 08/01/2014 $49.52 $10.18 $18.22 $0.00 $77.92 02/01/2015 $50.08 $10.18 $18.22 $0.00 $78.48 08/01/2015 $50.98 $10.18 $18.29 $0.00 $79.45 02/01/2016 $51.55 $10.18 $18.29 $0.00 $80.02 08/01/2016 $52.45 $10.18 $18.37 $0.00 $81.00 02/01/2017 $53.02 $10.18 $18.37 $0.00 $81.57 ------------ ------ - --- --------------- ------------------------------------------------ ------------ -------------- -- ------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 3 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $52.64 2 60 $29.17 Unemployment Apprentice- BRICKIPLASTER/CEMENT MASON - Local 3 Lynn $0.00 $57.50 3 70 $34.03 Effective Date - 08/01/2013 $18.15 $0.00 $62.36 Supplemental $38.90 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.03 $10.18 $18.15 $0.00 $52.36 2 60 $28.84 $10.18 $18.15 $0.00 $57.17 3 70 $33.64 $10.18 $18.15 $0.00 $61.97 4 80 $38.45 $10.18 $18.15 $0.00 $66.78 5 90 $43.25 $10.18 $18.15 $0.00 $71.58 Effective Date - 02/01/2014 06/01/2016 $38.70 $7.10 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.31 $10.18 $18.15 $0.00 $52.64 2 60 $29.17 $10.18 $18.15 $0.00 $57.50 3 70 $34.03 $10.18 $18.15 $0.00 $62.36 4 80 $38.90 $10.18 $18.15 $0.00 $67.23 5 90 $43.76 $10.18 $18.15 $0.00 $72.09 -------------------------------- (Notes: $7.10 $12.60 $0.00 $55.40 _----------------___ Apprentice to Journeyworker Ratio -i.5 $36.45 $7.10 $12.60 $0.00 $56.15 BULLDOZER/GRADER/SCRAPER OPF_PATING F_NGINFF2S LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2013 12/01/2013 $39.96 $40.74 $10.00 $10.00 $13.55 $13.55 $0.00 $0.00 $63.51 $64.29 CAISSON & UNDERPINNING BOTTOM MAN 06/01/2013 $34.20 $7.10 $12.60 $0.00 $53.90 LABORERS - FOUNDATION AND MARINE" 12/01/2013 $34.95 $7.10 $12.60 $0.00 $54.65 06/01/2014 $35.70 $7.10 $12.60 $0.00 $55.40 12/01/2014 $36.45 $7.10 $12.60 $0.00 $56.15 06/01/2015 $37.20 $7.10 $12.60 $0.00 $56.90 12/01/2015 $37.95 $7.10 $12.60 $0.00 $57.65 06/01/2016 $38.70 $7.10 $12.60 $0.00 $58.40 12/01/2016 $39.70 $7.10 $12.60 $0.00 $59.40 For apprentice rates see "Apprentice- LABORER" CAISSON & UNDERPINNING LABORER 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 LABORF.I?S - FOUNDA7101VAND MARINF. 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" -------------------- - ---- --------------------------- ----------------------------' --- --- -- --------------------...------------'----------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 4 of 35 Classification CAISSON & UNDERPINNING TOP MAN LABORERS - FOUNDATIONAND MARINE For apprentice rates see "Apprentice- LABORER" CARBIDE CORE DRILL OPERATOR LABORERS - 70NE 2 For apprentice rates see "Apprentice- LABORER" CARPENTER CARPENTERS -70NE 2 (Eastern Massachusetts) Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 09/01/2013 $34.53 $9.80 $15.61 $0.00 $59.94 03/01/2014 $35.13 $9.80 $15.61 $0.00 $60.54 09/01/2014 $35.90 $9.80 $15.61 $0.00 $61.31 03/01/2015 $36.67 $9.80 $15.61 $0.00 $62.08 -- --- -------------------- - ---------------------------- - ----- -- -- -- ------------------- ------ -------------------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 5 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $28.94 2 60 $21.08 Unemplovment Apprentice - CARPENTER - Zone 2 Eastern MA $32.45 3 70 $24.59 $9.80 Effective Date- 09/01/2013 $0.00 $45.29 4 75 Supplemental $9.80 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.27 $9.80 $1.57 $0.00 $28.64 2 60 $20.72 $9.80 $1.57 $0.00 $32.09 3 70 $24.17 $9.80 $10.90 $0.00 $44.87 4 75 $25.90 $9.80 $10.90 $0.00 $46.60 5 80 $27.62 $9.80 $12.47 $0.00 $49.89 6 80 $27.62 $9.80 $12.47 $0.00 $49.89 7 90 $31.08 $9.80 $14.04 $0.00 $54.92 8 90 $31.08 $9.80 $14.04 $0.00 $54.92 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.57 $9.80 $1.57 $0.00 $28.94 2 60 $21.08 $9.80 $1.57 $0.00 $32.45 3 70 $24.59 $9.80 $10.90 $0.00 $45.29 4 75 $26.35 $9.80 $10.90 $0.00 $47.05 5 80 $28.10 $9.80 $12.47 $0.00 $50.37 6 80 $28.10 $9.80 $12.47 $0.00 $50.37 7 90 $31.62 $9.80 $14.04 $0.00 $55.46 8 90 $31.62 $9.80 $14.04 $0.00 $55.46 -__..--------------------_----- Notes: --- ----------- }! --.------.-...__ Apprentice to Journeyworker Ratio: 1:5 --- --- --_.----------® 1 CEMENT MASONRY/PLASTERING 07/01/2013 $42.68 $10.90 $18.71 $1.30 $73.59 BRICKLAYERS LOCAL 3 (LYNN) 01/01/2014 $43.60 $10.90 $18.71 $1.30 $74.51 07/01/2014 $44.20 $10.90 $18.71 $1.30 $75.11 01/01/2015 $45.14 $10.90 $18.71 $1.30 $76.05 07/01/2015 $45.72 $10.90 $18.71 $1.30 $76.63 01/01/2016 $46.64 $10.90 $18.71 $1.30 $77.55 ----------- -- - --- ------ - - ------------------ ------------ ----------- -- ----------------- - Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 6 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $12.21 $1.30 $46.21 2 Unemployment Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn) $10.90 $13.71 $1.30 Effective Date - 07/01/2013 3 65 $28.34 $10.90 $14.71 $1.30 $55.25 4 70 Supplemental $10.90 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.34 $10.90 $12.21 $1.30 $45.75 2 60 $25.61 $10.90 $13.71 $1.30 $51.52 3 65 $27.74 $10.90 $14.71 $1.30 $54.65 4 70 $29.88 $10.90 $15.71 $1.30 $57.79 5 75 $32.01 $10.90 $16.71 $1.30 $60.92 6 80 $34.14 $10.90 $17.71 $1.30 $64.05 7 90 $38.41 $10.90 $18.71 $1.30 $69.32 Effective Date - 01/01/2014 $13.55 $0.00 $64.89 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.80 $10.90 $12.21 $1.30 $46.21 2 60 $26.16 $10.90 $13.71 $1.30 $52.07 3 65 $28.34 $10.90 $14.71 $1.30 $55.25 4 70 $30.52 $10.90 $15.71 $1.30 $58.43 5 75 $32.70 $10.90 $16.71 $1.30 $61.61 6 80 $34.88 $10.90 $17.71 $1.30 $64.79 7 90 $39.24 $10.90 $18.71 $1.30 $70.15 ----------_._------__..._._..._.- Notes: 06/01/2016 $33.10 $7.10 --------+ $0.00 $52.00 Steps 3,4 are 500 hrs. All other steps are 1,000 hrs. $7.10 $11.80 $0.00 $52.75 ..-.�____-------_:3--...�.------.._..------- Apprentice to Journeyworker Ratio:l:3 CHAIN SAW OPERATOR 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 LABORERS - ZONE 2 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 06/01/2013 $41.34 $10.00 $13.55 $0.00 $64.89 OPERATING ENGINEERS LOCAL 4 12/01/2013 $42.12 $10.00 $13.55 $0.00 $65.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" COMPRESSOR OPERATOR 06/01/2013 $28.19 $10.00 $13.55 $0.00 $51.74 OPERATING ENGINEERS LOCAL 4 12/01/2013 $28.74 $10.00 $13.55 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DELEADER (BRIDGE) 01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41 PAINTERS LOCAL 35 - 7.ONE 2 ----------------------------------------------------------------------------------- ------ " --------------------------- --------- -- --------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 7 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 $0.00 $0.00 $30.31 2 55 $24.76 $7.80 $3.52 $0.00 $36.08 3 60 $27.01 $7.80 $3.84 $0.00 $38.65 4 65 $29.26 $7.80 $4.16 $0.00 $41.22 5 70 $31.51 $7.80 $13.68 $0.00 $52.99 6 75 $33.76 $7.80 $14.00 $0.00 $55.56 7 80 $36.01 $7.80 $14.32 $0.00 $58.13 8 90 $40.51 $7.80 $14.96 $0.00 $63.27 ---.--____--__--.. (Notes: ._._._ _._ --e._.._ --....._------_._, Steps are 750 hrs. For apprentice rates see "Apprentice- LABORER" Apprentice to 3ourneyworker Ratio:1:1 DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS - 70NE 2 For apprentice rates see "Apprentice- LABORER" DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: BURNERS 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 $0.00 $52.35 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 $0.00 $52.10 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 $0.00 $51.35 LABORERS - 70NE 2 For apprentice rates see "Apprentice- LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51 OPERTING T:NGINEF.RSLOCA L 4 12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" DIVER 08/01/2013 $56.14 $9.80 $18.17 $0.00 $84.11 PILE DRIVER LOCAL 56 (70NE 1) 08/01/2014 $58.24 $9.80 $18.17 $0.00 $86.21 08/01/2015 $60.34 $9.80 $18.17 $0.00 $88.31 DIVER TENDER 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 PILE DRIVER LOCAL 56 (70NE I) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 DIVER TENDER (EFFLUENT) 08/01/2013 $60.15 $9.80 $18.17 $0.00 $88.12 PILE DRIVER LOCAL 56 (70NE 1) 08/01/2014 $62.40 $9.80 $18.17 $0.00 $90.37 08/01/2015 $64.65 $9.80 $18.17 $0.00 $92.62 -------------------------------- ---- - ----------------------------- ------ ------ ---------------------- - -- ---- - ------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 8 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DIVER/SLURRY (EFFLUENT) 08/01/2013 $84.21 $9.80 $18.17 $0.00 $112.18 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2014 $87.36 $9.80 $18.17 $0.00 $115.33 08/01/2015 $90.51 $9.80 $18.17 $0.00 $118.48 DRAWBRIDGE OPERATOR (Construction) 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' ELECTRICIAN 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 ------------------------------------------------ ----------------- ---- --- --- -- ------ --- --- ------------------- --- --- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 9 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICIAN- Local 103 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.58 $13.00 $0.53 $0.00 $31.11 2 40 $17.58 $13.00 $0.53 $0.00 $31.11 3 45 $19.78 $13.00 $10.78 $0.00 $43.56 4 45 $19.78 $13.00 $10.78 $0.00 $43.56 5 50 $21.98 $13.00 $11.11 $0.00 $46.09 6 55 $24.18 $13.00 $11.45 $0.00 $48.63 7 60 $26.38 $13.00 $11.77 $0.00 $51.15 8 65 $28.57 $13.00 $12.11 $0.00 $53.68 9 70 $30.77 $13.00 $12.43 $0.00 $56.20 10 75 $32.97 $13.00 $12.77 $0.00 $58.74 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.78 $13.00 $0.53 $0.00 $31.31 2 40 $17.78 $13.00 $0.53 $0.00 $31.31 3 45 $20.00 $13.00 $11.04 $0.00 $44.04 4 45 $20.00 $13.00 $11.04 $0.00 $44.04 5 50 $22.23 $13.00 $11.37 $0.00 $46.60 6 55 $24.45 $13.00 $11.70 $0.00 $49.15 7 60 $26.67 $13.00 $12.03 $0.00 $51.70 8 65 $28.89 $13.00 $12.37 $0.00 $54.26 9 70 $31.12 $13.00 $12.69 $0.00 $56.81 10 75 $33.34 $13.00 $13.03 $0.00 $59.37 ----r..--------._.a---_.._-_...--.n...._-.-._._.. INotes:: - App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 $8.78 $6.96 $0.00 $68.19 ELEVATOR CONSTRUCTORS LOCAL 4 ----------------------- --------- -------------- --- --- --- --- - ---- -- --- ----------- ------ - -------- --------- - -------- -- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 10 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.23 $8.78 $0.00 $0.00 $35.01 2 55 $28.85 $8.78 $6.96 $0.00 $44.59 3 65 $34.09 $8.78 $6.96 $0.00 $49.83 4 70 $36.72 $8.78 $6.96 $0.00 $52.46 5 80 $41.96 $8.78 $6.96 $0.00 $57.70 -----.--------- Notes: --- __.._.._-.---__._----__..___.-, $0.00 $49.50 Steps 1-2 are 6 mos.; Steps 3-5 are 1 year $31.10 $7.10 $11.80 $0.00 $50.00 Apprentice to Journeyworker Ratio: 1:1 12/01/2014 $31.60 $7.10 $11.80 $0.00 ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 $0.00 $54.33 ELEVATOR CONSTRUCTORS LOCAL 4 FENCE & GUARD RAIL ERECTOR 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 LABORERS -70NE2 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 05/01/2013 $38.50 $10.00 $13.02 $0.00 $61.52 OPERAT/NG ENGINEERS LOCAL 4 11/01/2013 $39.26 $10.00 $13.02 $0.00 $62.28 05/01/2014 $40.03 $10.00 $13.02 $0.00 $63.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 05/01/2013 $39.91 $10.00 $13.02 $0.00 $62.93 OPERATING ENGINEERS LOCAL 4 11/01/2013 $40.68 $10.00 $13.02 $0.00 $63.70 05/01/2014 $41.45 $10.00 $13.02 $0.00 $64.47 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 05/01/2013 $21.17 $10.00 $13.02 $0.00 $44.19 OPERATING ENGINEERS LOCAL 4 11/01/2013 $21.63 $10.00 $13.02 $0.00 $44.65 05/01/2014 $22.08 $10.00 $13.02 $0.00 $45.10 For apprentice rates see "Apprentice- OPERATING ENGINEERS" FIRE ALARM INSTALLER 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 11 of 35 Classification FIRE ALARM REPAIR / MAINTENANCE / COMMISSIONING ELECTR ams LOCAL 103 For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN' Effective Date Base Wage Health Pension Supplemental Total Rate $39.40 LABORERS - ZONE 2 12/01/2013 $20.50 Unemployment $11.80 09/01/2013 $32.97 $13.00 $12.77 $0.00 $58.74 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 09/01/2015 $35.10 $13.00 $13.08 $0.00 $61.18 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 FIREMAN (ASST. ENGINEER) 06/01/2013 $33.73 $10.00 $13.55 $0.00 $57.28 OPERATING ENGINEERS LOCAL 4 12/01/2013 $34.39 $10.00 $13.55 $0.00 $57.94_ For apprentice rates see "Apprentice- OPERATING ENGINEERS" FLAGGER & SIGNALER 06/01/2013 $20.50 $7.10 $11.80 $0.00 $39.40 LABORERS - ZONE 2 12/01/2013 $20.50 $7.10 $11.80 $0.00 $39.40 06/01/2014 $20.50 $7.10 $11.80 $0.00 $39.40 12/01/2014 $20.50 $7.10 $11.80 $0.00 $39.40 06/01/2015 $20.50 $7.10 $11.80 $0.00 $39.40 12/01/2015 $20.50 $7.10 $11.80 $0.00 $39.40 06/01/2016 $20.50 $7.10 $11.80 $0.00 $39.40 12/01/2016 $20.50 $7.10 $11.80 $0.00 $39.40 For apprentice rates see "Apprentice- LABORER" FLOORCOVERER 09/01/2013 $38.61 $9.80 $16.71 $0.00 $65.12 1ZOORCOVERERS LOCAL 2168 ZONE 1 03/01/2014 $38.61 $9.80 $16.71 $0.00 $65.12 -------------- ------------------ -- --- -- -------------- --- -- - ---------------------- --- - - ------------------------------ Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 12 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $30.90 2 55 $21.24 Unemployment Apprentice- FLOORCOVERER -Local 2168 Zone I $32.83 3 60 $23.17 $9.80 Effective Date - 09/01/2013 $0.00 $44.31 4 65 Supplemental $9.80 Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $19.31 $9.80 $1.79 $0.00 $30.90 2 55 $21.24 $9.80 $1.79 $0.00 $32.83 3 60 $23.17 $9.80 $11.34 $0.00 $44.31 4 65 $25.10 $9.80 $11.34 $0.00 $46.24 5 70 $27.03 $9.80 $13.13 $0.00 $49.96 6 75 $28.96 $9.80 $13.13 $0.00 $51.89 7 80 $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 $9.80 $14.92 $0.00 $57.54 Effective Date - 03/01/2014 Supplemental $41.12 Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $19.31 $9.80 $1.79 $0.00 $30.90 2 55 $21.24 ti $9.80 $1.79 $0.00 $32.83 3 60 $23.17 $9.80 $11.34 $0.00 $44.31 4 65 $25.10 $9.80 $11.34 $0.00 $46.24 5 70 $27.03 $9.80 $13.13 $0.00 $49.96 6 75 $28.96 $9.80 $13.13 $0.00 $51.89 7 80 $30.89 $9.80 $14.92 $0.00 $55.61 8 85 $32.82 $9.80 $14.92 $0.00 $57.54 ------®---- Notes: .._...._.---------__.----, Steps are 750 hrs. A- Apprentic�e to rJour-neyw-... -------------..®.---------- orker Ratioaa FORK LIFT/CHERRY PICKER 06/01/2013 $40.34 $10.00 $13.55 $0.00 $63.89 OPERATING ENGINEERS LOCAL 4 12/01/2013 $41.12 $10.00 $13.55 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GENERATORILIGHTING PLANT/HEATERS 06/01/2013 $28.19 $10.00 $13.55 $0.00 $51.74 OPERATING ENGINEERS LOCAL 4 12/01/2013 $28.74 $10.00 $13.55 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" GLAZIER (GLASS PLANK/AIR BARRIERANTERIOR 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91 SYSTEMS) GLA7_IERS LOCAL 35 (7.0NE 2) --------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 13 of 35 Classification Effective Date Base Wage Health Pension Supplemental Unemployment Apprentice- GLAZIER - Loca135 Zone 2 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.76 $7.80 2 55 $19.53 $7.80 3 60 $21.31 $7.80 4 65 $23.08 $7.80 5 70 $24.86 $7.80 6 75 $26.63 $7.80 7 80 $28.41 $7.80 8 90 $31.96 $7.80 - - Notes: - - - - - - - - - - - - - - - - Steps are 750 hrs. Apprentice to Journeyworker Ratio:l:l HOISTING ENGINEER/CRANES/GRADALLS OJIFRA TING ENGINEERS LOCAL 4 $0.00 $0.00 $25.56 $3.25 $0.00 $30.58 $3.54 $0.00 $32.65 $3.84 $0.00 $34.72 $12.83 $0.00 $45.49 $13.13 $0.00 $47.56 $13.42 $0.00 $49.63 $14.01 - - - - - $0.00 - - - $53.77 - - - Total Rate 06/01/2013 $40.34 $10.00 $13.55 $0.00 $63.89 12/01/2013 $41.12 $10.00 $13.55 $0.00 $64.67 ---------------------- ---- -- - -- --- -- ----- ---- -- ----- --- ---- ------ -------------- --- ---- -- ----- -- --- --- - Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 14 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $32.62 2 60 $24.67 Unemployment Apprentice- OPERATING ENGINEERS -Local 4 $48.22 3 65 $26.73 $10.00 Effective Date - 06/01/2013 $0.00 $50.28 4 70 Supplemental $10.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.19 $10.00 $0.00 $0.00 $32.19 2 60 $24.20 $10.00 $13.55 $0.00 $47.75 3 65 $26.22 $10.00 $13.55 $0.00 $49.77 4 70 $28.24 $10.00 $13.55 $0.00 $51.79 5 75 $30.26 $10.00 $13.55 $0.00 $53.81 6 80 $32.27 $10.00 $13.55 $0.00 $55.82 7 85 $34.29 $10.00 $13.55 $0.00 $57.84 8 90 $36.31 $10.00 $13.55 $0.00 $59.86 Effective Date - 12/01/2013 HVAC (TESTING AND BALANCING - AIR) 02/01/2013 Supplemental $9.82 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.62 $10.00 $0.00 $0.00 $32.62 2 60 $24.67 $10.00 $13.55 $0.00 $48.22 3 65 $26.73 $10.00 $13.55 $0.00 $50.28 4 70 $28.78 $10.00 $13.55 $0.00 $52.33 5 75 $30.84 $10.00 $13.55 $0.00 $54.39 6 80 $32.90 $10.00 $13.55 $0.00 $56.45 7 85 $34.95 $10.00 $13.55 $0.00 $58.50 8 90 $37.01 $10.00 $13.55 $0.00 $60.56 - - - - - - - - - - - (Notes: - - _---_____...----------- 03/01/2015 $45.84 $13.00 $14.72 Tice Apprentice to Journeyworker Ratio:1:6 $73.56 09/01/2015 $46.80 $13.00 HVAC (DUCTWORK) 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHEETMETAL WORKERS LOCAL I7 -A For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (ELECTRICAL CONTROLS) 09/01/2013 $43.96 $13.00 $14.42 $0.00 $71.38 ELECTRICIANS LOCAL 103 03/01/2014 $44.45 $13.00 $14.68 $0.00 $72.13 09/01/2014 $45.12 $13.00 $14.70 $0.00 $72.82 03/01/2015 $45.84 $13.00 $14.72 $0.00 $73.56 09/01/2015 $46.80 $13.00 $14.75 $0.00 $74.55 03/01/2016 $47.75 $13.00 $14.78 $0.00 $75.53 For apprentice rates see "Apprentice- ELECTRICIAN' HVAC (TESTING AND BALANCING - AIR) 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHEETMETAL WORKERS LOCAL 17 - A For apprentice rates see "Apprentice- SHEET METAL WORKER" HVAC (TESTING AND BALANCING -WATER) 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPEFITTERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" HVAC MECHANIC 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPFFITTFRS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER" ---------------------------------------------------------------------------------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 ------------------------------------ ------------------ Page 15 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $26.47 $10.95 $9.62 $0.00 09/01/2014 $44.11 Unemployment $12.10 HYDRAULIC DRILLS 06/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 LABORERS - 70NE 1 Supplemental $57.10 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 12/01/2013 $31.10 $7.10 $11.80 $0.00 $50.00 $25.27 $10.95 06/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 $0.00 12/01/2014 $32.10 $7.10 $11.80 $0.00 $51.00 Effective Date - 09/01/2014 06/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 Pension 12/01/2015 $33.10 $7.10 $11.80 $0.00 $52.00 06/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 12/01/2016 $34.35 $7.10 $11.80 $0.00 $53.25 For apprentice rates see "Apprentice- LABORER" INSULATOR (PIPES & TANKS) 09/01/2013 $42.11 $10.95 $12.10 $0.00 $65.16 HEAT& FROST INSULATORSLOCAL 6 (BOSTON) 2 60 $26.47 $10.95 $9.62 $0.00 09/01/2014 $44.11 $10.95 $12.10 $0.00 $67.16 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston $0.00 $52.07 4 80 Effective Date - 09/01/2013 $10.95 $10.86 Supplemental $57.10 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.06 $10.95 $9.00 $0.00 $41.01 2 60 $25.27 $10.95 $9.62 $0.00 $45.84 3 70 $29.48 $10.95 $10.24 $0.00 $50.67 4 80 $33.69 $10.95 $10.86 $0.00 $55.50 Effective Date - 09/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.06 $10.95 $9.00 $0.00 $42.01 2 60 $26.47 $10.95 $9.62 $0.00 $47.04 3 70 $30.88 $10.95 $10.24 $0.00 $52.07 4 80 $35.29 $10.95 $10.86 $0.00 $57.10 ------___ ---____--_,,....._ Notes: ----._._....._ ----a Steps are 1 year 1 __ ____ Apprentice to 3ourneyworker Ratio:l:4 IRONWORKERIWELDER 1120NWORKFI?S LOCAL 7 (LAWRENCE ARF_A) 03/16/2013 $35.82 $7.70 $18.35 $0.00 $61.87 ------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 16 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 03/16/2013 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 60 $21.49 $7.70 $18.35 $0.00 $47.54 2 70 $25.07 $7.70 $18.35 $0.00 $51.12 3 75 $26.87 $7.70 $18.35 $0.00 $52.92 4 80 $28.66 $7.70 $18.35 $0.00 $54.71 5 85 $30.45 $7.70 $18.35 $0.00 $56.50 6 90 $32.24 $7.70 $18.35 $0.00 $58.29 _.-----------.--..__ Notes: $33.10 $7.10 _...._...------........-.., $0.00 $52.00 Structural 1:6; Ornamental 1:4 $33.85 $7.10 $11.80 $0.00 $52.75 Apprentice to Journeyworker Ratio: JACKHAMMER & PAVING BREAKER OPERATOR LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" LABORER LABORERS-ZONF.2 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 06/01/2013 $29.85 $7.10 $11.80 $0.00 $48.75 12/01/2013 $30.35 $7.10 $11.80 $0.00 $49.25 06/01/2014 $30.85 $7.10 $11.80 $0.00 $49.75 12/01/2014 $31.35 $7.10 $11.80 $0.00 $50.25 06/01/2015 $31.85 $7.10 $11.80 $0.00 $50.75 12/01/2015 $32.35 $7.10 $11.80 $0.00 $51.25 06/01/2016 $32.85 $7.10 $11.80 $0.00 $51.75 12/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 ----- ---- - - ---------------------------- --- --- -- -- --------------------- ------------------------- - ---------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 17 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $37.11 Unemployment Apprentice - LABORER - Zone 2 $7.10 $11.80 $0.00 Effective Date - 06/01/2013 3 80 $24.28 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.91 $7.10 $11.80 $0.00 $36.81 2 70 $20.90 $7.10 $11.80 $0.00 $39.80 3 80 $23.88 $7.10 $11.80 $0.00 $42.78 4 90 $26.87 $7.10 $11.80 $0.00 $45.77 Effective Date - 12/01/2013 - - - Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.21 $7.10 $11.80 $0.00 $37.11 2 70 $21.25 $7.10 $11.80 $0.00 $40.15 3 80 $24.28 $7.10 $11.80 $0.00 $43.18 4 90 $27.32 $7.10 $11.80 $0.00 $46.22 --------------.___..--..--.-----._....-____._.._----+ Notes: - - - Apprentice o Journeyworker R. Tio.i-5 - - - - - - - - - - - - - - - - - LABORER: CARPENTER TENDER 06/01/2013 $29.85 $7.10 $11.80 $0.00 $48.75 LA BORERS - 7OjVE 2 12/01/2013 $30.35 $7.10 $11.80 $0.00 $49.25 06/01/2014 $30.85 $7.10 $11.80 $0.00 $49.75 12/01/2014 $31.35 $7.10 $11.80 $0.00 $50.25 06/01/2015 $31.85 $7.10 $11.80 $0.00 $50.75 12/01/2015 $32.35 $7.10 $11.80 $0.00 $51.25 06/01/2016 $32.85 $7.10 $11.80 $0.00 $51.75 12/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: CEMENT FINISHER TENDER 06/01/2013 $29.85 $7.10 $11.80 $0.00 $48.75 LABORERS - ZONE 2 12/01/2013 $30.35 $7.10 $11.80 $0.00 $49.25 06/01/2014 $30.85 $7.10 $11.80 $0.00 $49.75 12/01/2014 $31.35 $7.10 $11.80 $0.00 $50.25 06/01/2015 $31.85 $7.10 $11.80 $0.00 $50.75 12/01/2015 $32.35 $7.10 $11.80 $0.00 $51.25 06/01/2016 $32.85 $7.10 $11.80 $0.00 $51.75 12/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 $0.00 $48.00 LABORERS - ZONE 2 For apprentice rates see "Apprentice- LABORER" --- -- ------- ------------ --------------------------------------------------------------------- - Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 18 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER: MASON TENDER 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 LABORERS - ZONE 2 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" LABORER: MULTI -TRADE TENDER 06/01/2013 $29.85 $7.10 $11.80 $0.00 $48.75 LABORERS - ZONE 2 12/01/2013 $30.35 $7.10 $11.80 $0.00 $49.25 06/01/2014 $30.85 $7.10 $11.80 $0.00 $49.75 12/01/2014 $31.35 $7.10 $11.80 $0.00 $50.25 06/01/2015 $31.85 $7.10 $11.80 $0.00 $50.75 12/01/2015 $32.35 $7.10 $11.80 $0.00 $51.25 06/01/2016 $32.85 $7.10 $11.80 $0.00 $51.75 12/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 For apprentice rates see "Apprentice- LABORER" LABORER: TREE REMOVER 06/01/2013 $29.85 $7.10 $11.80 $0.00 $48.75 LABORERS - ZONE 2 12/01/2013 $30.35 $7.10 $11.80 $0.00 $49.25 06/01/2014 $30.85 $7.10 $11.80 $0.00 $49.75 12/01/2014 $31.35 $7.10 $11.80 $0.00 $50.25 06/01/2015 $31.85 $7.10 $11.80 $0.00 $50.75 12/01/2015 $32.35 $7.10 $11.80 $0.00 $51.25 06/01/2016 $32.85 $7.10 $11.80 $0.00 $51.75 12/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. For apprentice rates see "Apprentice- LABORER" LASER BEAM OPERATOR 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 Irl BORERS - ZONE 2 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" MARBLE & TILE FINISHERS 08/01/2013 $36.66 $10.18 $16.83 $0.00 $63.67 BRICKLAYERS LOCAL 3 - MARBLE & TILE 02/01/2014 $37.11 $10.18 $16.83 $0.00 $64.12 08/01/2014 $37.82 $10.18 $16.90 $0.00 $64.90 02/01/2015 $38.27 $10.18 $16.90 $0.00 $65.35 08/01/2015 $38.98 $10.18 $16.97 $0.00 $66.13 02/01/2016 $39.43 $10.18 $16.97 $0.00 $66.58 08/01/2016 $40.13 $10.18 $17.05 $0.00 $67.36 02/01/2017 $40.59 $10.18 $17.05 $0.00 $67.82 ------ --------------------- - ------------ Issue Date: 09/03/2013 --- --- - - ----- I - Wage Request Number: 20130903-058 - -- ----- - - --- - -- -- -- - --- Page 19 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2013 Step percent Apprentice Base Wage Health 1 50 $18.33 $10.18 2 60 $22.00 $10.18 3 70 $25.66 $10.18 4 80 $29.33 $10.18 5 90 $32.99 $10.18 Effective Date - 02/01/2014 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate $16.83 $0.00 $45.34 $16.83 $0.00 $49.01 $16.83 $0.00 $52.67 $16.83 $0.00 $56.34 $16.83 $0.00 $60.00 Supplemental Pension Unemployment Total Rate 1 50 $18.56 $10.18 $16.83 $0.00 $45.57 2 60 $22.27 $10.18 $16.83 $0.00 $49.28 3 70 $25.98 $10.18 $16.83 $0.00 $52.99 4 80 $29.69 $10.18 $16.83 $0.00 $56.70 5 90 $33.40 $10.18 $16.83 $0.00 $60.41 Notes: $51.59 $10.18 $18.29 $0.00 $80.06 �- _-----....�.. Apprentice to Journeyworker Ratio:l:3 $52.49 $10.18 $18.37 $0.00 MARBLE MASONS,TILELAYERS & TERRAZZO MECH BRICKLAYERS LOCAL 3 - MARBLE & 711E 08/01/2013 $48.10 $10.18 $18.15 $0.00 $76.43 02/01/2014 $48.66 $10.18 $18.15 $0.00 $76.99 08/01/2014 $49.56 $10.18 $18.22 $0.00 $77.96 02/01/2015 $50.12 $10.18 $18.22 $0.00 $78.52 08/01/2015 $51.02 $10.18 $18.29 $0.00 $79.49 02/01/2016 $51.59 $10.18 $18.29 $0.00 $80.06 08/01/2016 $52.49 $10.18 $18.37 $0.00 $81.04 02/01/2017 $53.06 $10.18 $18.37 $0.00 $81.61 ---------------------------- - . - ----- ------------------------------------------------------ - - ----- --- --- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 20 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile 06/01/2013 $39.96 $10.00 Effective Date - 08/01/2013 $0.00 Step percent Apprentice Base Wage Supplemental Pension Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.05 $10.18 $18.15 $0.00 $52.38 2 60 $28.86 $10.18 $18.15 $0.00 $57.19 3 70 $33.67 $10.18 $18.15 $0.00 $62.00 4 80 $38.48 $10.18 $18.15 $0.00 $66.81 5 90 $43.29 $10.18 $18.15 $0.00 $71.62 Effective Date - 02/01/2014 06/01/2013 $39.96 $10.00 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.33 $10.18 $18.15 $0.00 $52.66 2 60 $29.20 $10.18 $18.15 $0.00 $57.53 3 70 $34.06 $10.18 $18.15 $0.00 $62.39 4 80 $38.93 $10.18 $18.15 $0.00 $67.26 5 90 $43.79 $10.18 $18.15 $0.00 $72.12 -----.---.-------------.-.r__-_..e.._. (Notes: 10/01/2013 $33.06 $9.80 ----_.._. - I I ---------------_-.._--_..�..........,.--_..._ Apprentice to Journeyworker Ratio:L5 04/01/2014 $33.66 $9.80 $15.76 MECH. SWEEPER OPERATOR (ON CONST. SITES) 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51 OPERATING ENGINEERS LOCAL 4 $0.00 $59.98 04/01/2015 $35.19 $9.80 12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MECHANICS MAINTENANCE 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51 OPERATING ENGINEERS LOCAL 4 12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" MILLWRIGHT (Zone 2) 04/01/2013 $32.47 $9.80 $15.76 $0.00 $58.03 MILLWRIGHTS LOCAL 1121- 7.one 2 10/01/2013 $33.06 $9.80 $15.76 $0.00 $58.62 04/01/2014 $33.66 $9.80 $15.76 $0.00 $59.22 10/01/2014 $34.42 $9.80 $15.76 $0.00 $59.98 04/01/2015 $35.19 $9.80 $15.76 $0.00 $60.75 ---- - --- ---- ---- --- ------- -- - --- ---- ------------ - ------ ------------------ --------------------------- - Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 21 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $32.30 2 65 $21.49 $9.80 $13.01 Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 $24.80 $9.80 $13.80 $0.00 Effective Date - 04/01/2013 4 85 $28.10 $9.80 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $17.86 $9.80 $4.32 $0.00 $31.98 2 65 $21.11 $9.80 $13.01 $0.00 $43.92 3 75 $24.35 $9.80 $13.80 $0.00 $47.95 4 85 $27.60 $9.80 $14.58 $0.00 $51.98 Effective Date - 10/01/2013 $0.00 $51.00 Supplemental $32.60 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $18.18 $9.80 $4.32 $0.00 $32.30 2 65 $21.49 $9.80 $13.01 $0.00 $44.30 3 75 $24.80 $9.80 $13.80 $0.00 $48.40 4 85 $28.10 $9.80 $14.58 $0.00 $52.48 (Notes: I Steps are 2,000 hours I Apprentice to Journeyworker Ratio:1:5 MORTAR MIXER 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 LABORERS-ZONE2 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" OILER (OTHER THAN TRUCK CRANES,GRADALLS) 06/01/2013 $21.17 $10.00 $13.55 $0.00 $44.72 OPERATING ENGINEERS LOCAL 4 12/01/2013 $21.59 $10.00 $13.55 $0.00 $45.14 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OILER (TRUCK CRANES, GRADALLS) 06/01/2013 $24.57 $10.00 $13.55 $0.00 $48.12 OPERATING ENGINEERS LOCAL 4 12/01/2013 $25.06 $10.00 $13.55 $0.00 $48.61 For apprentice rates see "Apprentice- OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT - CLASS 11 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51 OIIERA77NG ENGINEERS LOCAL 4 12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" PAINTER (BRIDGES/TANKS) 01/01/2013 $45.01 $7.80 $15.60 $0.00 $68.41 PAINTERS LOCAL 35 - ZONE 2 --- --- ---- ---------------------------------------------------------------------------- -- --------------- -------- ------------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 22 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 2 55 $24.76 3 60 $27.01 4 65 $29.26 5 70 $31.51 6 75 $33.76 7 80 $36.01 8 90 $40.51 - - - - - Notes: __............-....- - _.. _........�........_ , Steps are 750 hrs. $52.99 Apprentice to Journeyworker Ratio:1:1 $14.00 PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2013 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used. PAINTERS LOCAL 35 - ZONE 2 $7.80 $0.00 $0.00 $30.31 $7.80 $3.52 $0.00 $36.08 $7.80 $3.84 $0.00 $38.65 $7.80 $4.16 $0.00 $41.22 $7.80 $13.68 $0.00 $52.99 $7.80 $14.00 $0.00 $55.56 $7.80 $14.32 $0.00 $58.13 $7.80 _---_-_-----.._...._ $14.96 $0.00 $63.27 $35.91 $7.80 $15.60 $0.00 $59.31 Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.96 $7.80 $0.00 $0.00 $25.76 2 55 $19.75 $7.80 $3.52 $0.00 $31.07 3 60 $21.55 $7.80 $3.84 $0.00 $33.19 4 65 $23.34 $7.80 $4.16 $0.00 $35.30 5 70 $25.14 $7.80 $13.68 $0.00 $46.62 6 75 $26.93 $7.80 $14.00 $0.00 $48.73 7 80 $28.73 $7.80 $14.32 $0.00 $50.85 8 90 $32.32 $7.80 $14.96 $0.00 $55.08 Notes: --- Tice to ApprenJourneyworker Ratio:l:l -...._....------_.-------...v. PAINTER (SPRAY OR SANDBLAST, REPAINT) PAINTERS LOCAL 35 - 7.0NE 2 01/01/2013 $33.97 $7.80 $15.60 $0.00 $57.37 Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 23 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -Repaint Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.99 $7.80 $0.00 $0.00 $24.79 2 55 $18.68 $7.80 $3.52 $0.00 $30.00 3 60 $20.38 $7.80 $3.84 $0.00 $32.02 4 65 $22.08 $7.80 $4.16 $0.00 $34.04 5 70 $23.78 $7.80 $13.68 $0.00 $45.26 6 75 $25.48 $7.80 $14.00 $0.00 $47.28 7 80 $27.18 $7.80 $14.32 $0.00 $49.30 8 90 $30.57 $7.80 $14.96 $0.00 $53.33 - - - - - - - - - - - Notes: - - - - - - - - - - - - - - - - - - I - - - - - - - - - Apprentice to Journeyworker Ratio: 1:1 - - - - - - - - - - - - - ..-..- - PAINTER (TRAFFIC MARKINGS) LABOR RS - 7ONE' 2 For Apprentice rates see "Apprentice- LABORER" 06/01/2013 $29.85 $7.10 $11.80 $0.00 $48.75 12/01/2013 $30.35 $7.10 $11.80 $0.00 $49.25 06/01/2014 $30.85 $7.10 $11.80 $0.00 $49.75 12/01/2014 $31.35 $7.10 $11.80 $0.00 $50.25 06/01/2015 $31.85 $7.10 $11.80 $0.00 $50.75 12/01/2015 $32.35 $7.10 $11.80 $0.00 $51.25 06/01/2016 $32.85 $7.10 $11.80 $0.00 $51.75 12/01/2016 $33.60 $7.10 $11.80 $0.00 $52.50 PAINTER / TAPER (BRUSH, NEW) * 01/01/2013 $34.51 $7.80 $15.60 $0.00 $57.91 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.pAiNTFRS LOCAL 35 - ZONE 2 Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 $0.00 $0.00 $25.06 2 55 $18.98 $7.80 $3.52 $0.00 $30.30 3 60 $20.71 $7.80 $3.84 $0.00 $32.35 4 65 $22.43 $7.80 $4.16 $0.00 $34.39 5 70 $24.16 $7.80 $13.68 $0.00 $45.64 6 75 $25.88 $7.80 $14.00 $0.00 $47.68 7 80 $27.61 $7.80 $14.32 $0.00 $49.73 8 90 $31.06 $7.80 $14.96 $0.00 $53.82 - - - - - - - - - - - Notes: - - - - - - - - - - - - - --- - - - I Steps are 750 hrs. - - - - - F - - Apprentice Z Journeywoker Ra to 1:1 - - - - - - - - - - - - - - - - -------- ---------- ---- ------------------------------------ - --- -- -- -------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 ----- ------- ---------------------------------- Page 24 of 35 Classification PAINTER / TAPER (BRUSH, REPAINT) PAINTERS LOCAL 35 - ZONE 2 Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment 01/01/2013 $32.57 $7.80 $15.60 $0.00 $55.97 Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT 12/01/2012 $30.28 $9.07 $8.00 Effective Date - 01/01/2013 $47.35 PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2013 Supplemental $9.80 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.29 $7.80 $0.00 $0.00 $24.09 2 55 $17.91 $7.80 $3.52 $0.00 $29.23 3 60 $19.54 $7.80 $3.84 $0.00 $31.18 4 65 $21.17 $7.80 $4.16 $0.00 $33.13 5 70 $22.80 $7.80 $13.68 $0.00 $44.28 6 75 $24.43 $7.80 $14.00 $0.00 $46.23 7 80 $26.06 $7.80 $14.32 $0.00 $48.18 8 90 $29.31 $7.80 $14.96 $0.00 $52.07 ---w...........-.---.----- ---------------Notes: Steps are 750 hrs. -- - - Apprentice to Journeyworker Ratio:1:1 - - - - - - - - - - - - - - - - - PANEL & PICKUP TRUCKS DRIVER TEAMSTERS JOINT COUNCIL NO IOZONE B 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 DECK) PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 PILE DRIVER 08/01/2013 $40.10 $9.80 $18.17 $0.00 $68.07 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2014 $41.60 $9.80 $18.17 $0.00 $69.57 08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07 --------------------------------------- ------- --- ---------------------- -------------- - -------- ----- ----- -------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 25 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $48.77 2 60 $24.96 Unemployment Apprentice- PILE DRIVER - Local 56 Zone 1 $52.93 3 70 $29.12 $9.80 Effective Date - 08/01/2013 $0.00 $57.09 4 75 Supplemental $9.80 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.05 $9.80 $18.17 $0.00 $48.02 2 60 $24.06 $9.80 $18.17 $0.00 $52.03 3 70 $28.07 $9.80 $18.17 $0.00 $56.04 4 75 $30.08 $9.80 $18.17 $0.00 $58.05 5 80 $32.08 $9.80 $18.17 $0.00 $60.05 6 80 $32.08 $9.80 $18.17 $0.00 $60.05 7 90 $36.09 $9.80 $18.17 $0.00 $64.06 8 90 $36.09 $9.80 $18.17 $0.00 $64.06 Effective Date - 08/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.80 $9.80 $18.17 $0.00 $48.77 2 60 $24.96 $9.80 $18.17 $0.00 $52.93 3 70 $29.12 $9.80 $18.17 $0.00 $57.09 4 75 $31.20 $9.80 $18.17 $0.00 $59.17 5 80 $33.28 $9.80 $18.17 $0.00 $61.25 6 80 $33.28 $9.80 $18.17 $0.00 $61.25 7 90 $37.44 $9.80 $18.17 $0.00 $65.41 8 90 $37.44 $9.80 $18.17 $0.00 $65.41 --------------.-------_.....-_._..._._.._....-_., (Notes: Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) �- `---------..._..-._, Apprentice to Journeyworker Ratio:l:3 ------_..__...---.- --I PIPEFITTER & STEAMFITTER 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15 PIPEFIT'TERS LOCAL 537 (Local 138) Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.80 $8.75 $4.50 $0.00 $32.05 2 45 $21.15 $8.75 $12.39 $0.00 $42.29 3 60 $28.21 $8.75 $12.39 $0.00 $49.35 4 70 $32.91 $8.75 $12.39 $0.00 $54.05 5 80 $37.61 $8.75 $12.39 $0.00 $58.75 -- (Notes: --..._.._...----------.----------- --+ * * 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) Apprentice to Journeyworker Ratio:** -------------------------------- ----- ----- -- ... -- ------------ ----------------------------------- ---------------------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 26 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate PI, UMBERS & GASFI7TF.RSLOCA L 12 (Local 138) $30.60 $7.10 $11.80 Unemployment $49.50 PIPELAYER 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 LABORERS -70NE2 $31.60 $7.10 $11.80 Supplemental $50.50 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" PLUMBER 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 PI, UMBERS & GASFI7TF.RSLOCA L 12 (Local 138) $30.60 $7.10 $11.80 $0.00 $49.50 Apprentice- PLUMBER/GASFITTER -Local 12 (Local 138) $7.10 $11.80 $0.00 $50.00 Effective Date - 03/01/2013 $31.60 $7.10 $11.80 Supplemental $50.50 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $15.83 $9.32 $4.97 $0.00 $30.12 2 40 $18.09 $9.32 $5.61 $0.00 $33.02 3 55 $24.88 $9.32 $7.53 $0.00 $41.73 4 65 $29.40 $9.32 $8.81 $0.00 $47.53 5 75 $33.92 $9.32 $10.09 $0.00 $53.33 Notes: Steps are I yr ff Step 4 with lic$50.43 Step5 with lic$56.22 i --------..,_....._.......-------_._._...------.__.----- Apprentice to Journeyworker Ratio:1:5 PNEUMATIC CONTROLS (TEMP.) 03/01/2013 . $47.01 $8.75 $12.39 $0.00 $68.15 PIPFF17TERS LOCAL 537 (Local 138) For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBERIPIPEFITTER" PNEUMATIC DRILL/TOOL OPERATOR LA BORERS - 7.ONF. 2 For apprentice rates see "Apprentice- LABORER" POWDERMAN & BLASTER LABORERS - 70NE 2 For apprentice rates see "Apprentice- LABORER" 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 06/01/2013 $30.85 $7.10 $11.80 $0.00 $49.75 12/01/2013 $31.35 $7.10 $11.80 $0.00 $50.25 06/01/2014 $31.85 $7.10 $11.80 $0.00 $50.75 12/01/2014 $32.35 $7.10 $11.80 $0.00 $51.25 06/01/2015 $32.85 $7.10 $11.80 $0.00 $51.75 12/01/2015 $33.35 $7.10 $11.80 $0.00 $52.25 06/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 12/01/2016 $34.60 $7.10 $11.80 $0.00 $53.50 ------------------------------------------------------------------------------------- --- -- ----------------------'--------------- ---_ Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 27 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $14.54 $6.34 $6.23 $0.00 $27.11 Unemployment $15.76 POWER SHOVEL/DERRICK/TRENCHING MACHINE 06/01/2013 $40.34 $10.00 $13.55 $0.00 $63.89 OPERATING ENGINEERS LOCAL 4 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 12/01/2013 $41.12 $10.00 $13.55 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 PUMP OPERATOR (CONCRETE) 06/01/2013 $40.34 $10.00 $13.55 $0.00 $63.89 OPERATING ENGINEERS LOCAL 4 06/01/2015 $32.10 ___ Apprentice to Journeyworker Ratio:1:5 $11.80 12/01/2013 $41.12 $10.00 $13.55 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" $7.10 $11.80 $0.00 $51.50 PUMP OPERATOR (DEWATERING, OTHER) 06/01/2013 $28.19 $10.00 $13.55 $0.00 $51.74 OPERATING ENGINEERS LOCAL 4 $52.00 12/01/2016 $33.85 $7.10 12/01/2013 $28.74 $10.00 $13.55 $0.00 $52.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 $0.00 $37.10 TEAMSTERS LOCAL 42 -- Page 28 of 35 RECLAIMERS 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51 OPERATING ENGINEERS LOCAL 4 12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 $0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 $0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction ofnew, wood frame residences that do not exceed four stories including the basement. CARPENTERS -ZONE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 $0.00 $0.00 $20.88 2 60 $14.54 $6.34 $6.23 $0.00 $27.11 3 65 $15.76 $6.34 $6.23 $0.00 $28.33 4 70 $16.97 $6.34 $6.23 $0.00 $29.54 5 75 $18.18 $6.34 $6.23 $0.00 $30.75 6 80 $19.39 $6.34 $6.23 $0.00 $31.96 7 85 $20.60 $6.34 $6.23 $0.00 $33.17 8 90 $21.82 $6.34 $6.23 $0.00 $34.39 iNotes: $50.50 06/01/2015 $32.10 ___ Apprentice to Journeyworker Ratio:1:5 $11.80 $0.00 $51.00 RIDE -ON MOTORIZED BUGGY OPERATOR 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 LABORERS - ZONE 2 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" --------------------------------------- -- --- --- Issue Date: 09/03/2013 Wage Request Number: - - - -- -- 20130903-058 - - -- -------------------------------------- -- Page 28 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 2 60 $22.99 $10.50 $10.70 Unemployment $44.19 ROLLER/SPREADER/MULCHING MACHINE 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51 OPERATING ENGINEERS LOCAL 4 75 $28.73 $10.50 $10.70 $0.00 $49.93 5 12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" Date - 02/01/2014 $42.16 $10.50 $10.70 Supplemental $63.36 ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 08/01/2013 $38.31 $10.50 $10.70 $0.00 $59.51 ROOFERS LOCAL 33 SHEETMETAL WORKER 02/01/2014 $39.21 $10.50 $10.70 $0.00 $60.41 SHEET METAL WORKERS LOCAL 17 - A 08/01/2014 $40.11 $10.50 $10.70 $0.00 $61.31 02/01/2015 $41.01 $10.50 $10.70 $0.00 $62.21 08/01/2015 $41.91 $10.50 $10.70 $0.00 $63.11 02/01/2016 $42.81 $10.50 $10.70 $0.00 $64.01 Apprentice- ROOFER - Loca133 Effective Date - 08/01/2013 Step percent Supplemental Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.16 $10.50 $3.38 $0.00 $33.04 2 60 $22.99 $10.50 $10.70 $0.00 $44.19 3 65 $24.90 $10.50 $10.70 $0.00 $46.10 4 75 $28.73 $10.50 $10.70 $0.00 $49.93 5 85 $32.56 $10.50 $10.70 $0.00 $53.76 Effective Date - 02/01/2014 $42.16 $10.50 $10.70 Supplemental $63.36 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.61 $10.50 $3.38 $0.00 $33.49 2 60 $23.53 $10.50 $10.70 $0.00 $44.73 3 65 $25.49 $10.50 $10.70 $0.00 $46.69 4 75 $29.41 $10.50 $10.70 $0.00 $50.61 5 85 $33.33 $10.50 $10.70 $0.00 $54.53 - - - - _....___. - ,_.._ - - - - - (Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 - - - _ _ - _ _. - - - ____ ____ - - -- _- Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs. $42.16 $10.50 $10.70 $0.00 $63.36 -----�--- .,._...._-------_. Apprentice to Journeyworker Ratio:** 02/01/2016 $43.06 V_.. --_.._.----- $10.70 $0.00 ROOFER SLATE / TILE / PRECAST CONCRETE 08/01/2013 $38.56 $10.50 $10.70 $0.00 $59.76 ROOFERS LOCAL 33 02/01/2014 $39.46 $10.50 $10.70 $0.00 $60.66 08/01/2014 $40.36 $10.50 $10.70 $0.00 $61.56 02/01/2015 $41.26 $10.50 $10.70 $0.00 $62.46 08/01/2015 $42.16 $10.50 $10.70 $0.00 $63.36 02/01/2016 $43.06 $10.50 $10.70 $0.00 $64.26 For apprentice rates see "Apprentice- ROOFER" SHEETMETAL WORKER 02/01/2013 $42.32 $9.82 $18.24 $2.11 $72.49 SHEET METAL WORKERS LOCAL 17 - A - ---- ---------- ---------- ----- - -- ------ ------------------ .... Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 29 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.93 $9.82 $4.00 $0.00 $30.75 2 40 $16.93 $9.82 $4.00 $0.00 $30.75 3 45 $19.04 $9.82 $8.00 $1.11 $37.97 4 45 $19.04 $9.82 $8.00 $1.11 $37.97 5 50 $21.16 $9.82 $8.75 $1.19 $40.92 6 50 $21.16 $9.82 $9.00 $1.20 $41.18 7 60 $25.39 $9.82 $10.24 $1.36 $46.81 8 65 $27.51 $9.82 $10.99 $1.45 $49.77 9 75 $31.74 $9.82 $12.49 $1.62 $55.67 10 85 $35.97 $9.82 $13.49 $1.78 $61.06 - _..- Notes: _.._...._. - - - - _._..,.-...._.. - - - - - - - - -....... - - - - --- - _, ' Apprentice to Journeyworker Ratio:1:1 Steps are 6 mos. Apprentice to Journeyworker Ratio:1:4 SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 PAINTERS LOCAL 35 - ZONE 2 Apprentice- SIGN ERECTOR -Local 35 Zone 2 Effective Date - 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 Notes: -------- .-.,...._... - - - - .�.-------- .�.,....�.,. - i I Steps are 4 mos. i Apprentice to Journeyworker Ratio:1:1 SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B SPRINKLER FITTER SPRINKLER FITTERS LOCAL 550 - (Section B) 03/01/2013 $48.13 $8.42 $12.60 $0.00 $69.15 ------- --- ------------------------ ----- ----------------- - - ------ ------ - Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Pa f ge 30 o35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SPRINKLER FITTER -.Local 550 (Section B) Effective Date - 03/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 35 $16.85 $8.42 $8.00 $13.55 $13.55 $0.00 $33.27 TELECOMMUNICATION TECHNICIAN 2 40 $19.25 $8.42 $12.77 $8.00 $58.74 $0.00 $35.67 3 45 $21.66 $8.42 $8.00 03/01/2014 $0.00 $38.08 $13.03 4 50 $24.07 $8.42 09/01/2014 $8.00 $13.00 $0.00 $40.49 $59.89 5 55 $26.47 $8.42 $13.00 $8.00 $0.00 $0.00 $42.89 09/01/2015 6 60 $28.88 $8.42 $0.00 $8.00 $0.00 $45.30 $13.00 7 65 $31.28 $8.42 $8.00 $0.00 $47.70 8 70 $33.69 $8.42 $8.00 $0.00 $50.11 9 75 $36.10 $8.42 $8.00 $0.00 $52.52 10 80 $38.50 $8.42 $8.00 $0.00 $54.92 „_.,._._..__,_ ---------------_._.--------- Notes: Steps are 850 hours I ___ __®--_..-- rA..�To-Jo App renti-ce to Journey-_wo worker Ratio:l:l �. - _---- - __--- STEAM BOILER OPERATOR 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51 OPFRA TING ENGINEERS LOCAL 4 12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN OPERATING ENGINEERS LOCAL 4 For apprentice rates see "Apprentice- OPERATING ENGINEERS" 06/01/2013 12/01/2013 $39.96 $40.74 $10.00 $10.00 $13.55 $13.55 $0.00 $0.00 $63.51 $64.29 TELECOMMUNICATION TECHNICIAN 09/01/2013 $32.97 $13.00 $12.77 $0.00 $58.74 ELECTRICIANS LOCAL 103 03/01/2014 $33.44 $13.00 $13.03 $0.00 $59.47 09/01/2014 $33.84 $13.00 $13.05 $0.00 $59.89 03/01/2015 $34.38 $13.00 $13.06 $0.00 $60.44 09/01/2015 $35.10 $13.00 $13.08 $0.00 $61.18 03/01/2016 $35.81 $13.00 $13.10 $0.00 $61.91 - -- - ---- - ---------------------------- --- --- - - ----------------- --- ------------------- -- --- ------------ -- ------ Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 31 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 09/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 40 $13.19 $13.00 $0.40 $0.00 $26.59 2 40 $13.19 $13.00 $0.40 $0.00 $26.59 3 45 $14.84 $13.00 $10.04 $0.00 $37.88 4 45 $14.84 $13.00 $10.04 $0.00 $37.88 5 50 $16.49 $13.00 $10.29 $0.00 $39.78 6 55 $18.13 $13.00 $10.53 $0.00 $41.66 7 60 $19.78 $13.00 $10.78 $0.00 $43.56 8 65 $21.43 $13.00 $11.03 $0.00 $45.46 9 70 $23.08 $13.00 $11.28 $0.00 $47.36 10 75 $24.73 $13.00 $11.53 $0.00 $49.26 Effective Date - 03/01/2014 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $13.38 $13.00 $0.40 $0.00 $26.78 2 40 $13.38 $13.00 $0.40 $0.00 $26.78 3 45 $15.05 $13.00 $10.29 $0.00 $38.34 4 45 $15.05 $13.00 $10.29 $0.00 $38.34 5 50 $16.72 $13.00 $10.54 $0.00 $40.26 6 55 $18.39 $13.00 $10.79 $0.00 $42.18 7 60 $20.06 $13.00 $11.04 $0.00 $44.10 8 65 $21.74 $13.00 $11.29 $0.00 $46.03 9 70 $23.41 $13.00 $11.54 $0.00 $47.95 10 75 $25.08 $13.00 $11.79 $0.00 $49.87 (Notes: Apprentice to Journeyworkcr Ratioaa -- - _._. ___. __.. .- .__ _.._ - - TERRAZZO FINISHERS 08/01/2013 $47.00 $10.18 $18.15 $0.00 $75.33 BRICKIAYF,RS LOCAL 3 - MARBLE d T'!LE 02/01/2014 $47.56 $10.18 $18.15 $0.00 $75.89 08/01/2014 $48.46 $10.18 $18.22 $0.00 $76.86 02/01/2015 $49.02 $10.18 $18.22 $0.00 $77.42 08/01/2015 $49.92 $10.18 $18.29 $0.00 $78.39 02/01/2016 $50.49 $10.18 $18.29 $0.00 $78.96 08/01/2016 $51.39 $10.18 $18.37 $0.00 $79.94 02/01/2017 $51.96 $10.18 $18.37 $0.00 $80.51 --- ----- ----------------- - ------------------------- ---- - --- -- ----- --------------------------------------- --- ------- Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 32 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $52.11 2 60 $28.54 Unemployment Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile $56.87 3 70 $33.29 $10.18 Effective Date - 08/01/2013 $0.00 $61.62 4 80 Supplemental $10.18 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.50 $10.18 $18.15 $0.00 $51.83 2 60 $28.20 $10.18 $18.15 $0.00 $56.53 3 70 $32.90 $10.18 $18.15 $0.00 $61.23 4 80 $37.60 $10.18 $18.15 $0.00 $65.93 5 90 $42.30 $10.18 $18.15 $0.00 $70.63 Effective Date - 02/01/2014 $7.10 $12.60 $0.00 $57.15 Supplemental $38.20 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.78 $10.18 $18.15 $0.00 $52.11 2 60 $28.54 $10.18 $18.15 $0.00 $56.87 3 70 $33.29 $10.18 $18.15 $0.00 $61.62 4 80 $38.05 $10.18 $18.15 $0.00 $66.38 5 90 $42.80 $10.18 $18.15 $0.00 $71.13 --_..._------._--.._---_.,__._-.._._-_-_.-_..-..----_ Notes: $54.90 06/01/2014 $35.95 Apprentice to Journeyworker Ratio:f 3 $7.10 $12.60 $0.00 TEST BORING DRILLER - 06/01/2013 $34.45 $7.10 $12.60 $0.00 $54.15 LABORERS - FOUNDATIONAND MARINE 12/01/2013 $35.20 $7.10 $12.60 $0.00 $54.90 06/01/2014 $35.95 $7.10 $12.60 $0.00 $55.65 12/01/2014 $36.70 $7.10 $12.60 $0.00 $56.40 06/01/2015 $37.45 $7.10 $12.60 $0.00 $57.15 12/01/2015 $38.20 $7.10 $12.60 $0.00 $57.90 06/01/2016 $38.95 $7.10 $12.60 $0.00 $58.65 12/01/2016 $39.95 $7.10 $12.60 $0.00 $59.65 For apprentice rates see "Apprentice- LABORER" TEST BORING DRILLER HELPER 06/01/2013 $33.17 $7.10 $12.60 $0.00 $52.87 LABORERS - FOUNDATIONAND MARINE. 12/01/2013 $33.92 $7.10 $12.60 $0.00 $53.62 06/01/2014 $34.67 $7.10 $12.60 $0.00 $54.37 12/01/2014 $35.42 $7.10 $12.60 $0.00 $55.12 06/01/2015 $36.17 $7.10 $12.60 $0.00 $55.87 12/01/2015 $36.92 $7.10 $12.60 $0.00 $56.62 06/01/2016 $37.67 $7.10 $12.60 $0.00 $57.37 12/01/2016 $38.67 $7.10 $12.60 $0.00 $58.37 For apprentice rates see "Apprentice- LABORER" ----------------------------- ---------------- --- ------------ Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 33 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate LABORERS (COMPRESSED AIR) Unemployment TEST BORING LABORER 06/01/2013 $33.05 $7.10 $12.60 $0.00 $52.75 LABORERS - FOUNDATIONAND MARINE 06/01/2014 $46.83 $7.10 $13.00 $0.00 $66.93 12/01/2013 $33.80 $7.10 $12.60 $0.00 $53.50 06/01/2014 $34.55 $7.10 $12.60 $0.00 $54.25 12/01/2014 $35.30 $7.10 $12.60 $0.00 $55.00 06/01/2015 $36.05 $7.10 $12.60 $0.00 $55.75 12/01/2015 $36.80 $7.10 $12.60 $0.00 $56.50 For apprentice rates see "Apprentice- LABORER" 06/01/2016 $37.55 $7.10 $12.60 $0.00 $57.25 TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2016 $38.55 $7.10 $12.60 $0.00 $58.25 For apprentice rates see "Apprentice- LABORER" TRACTORS/PORTABLE STEAM GENERATORS 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51 OPERATING ENGINEERS LOCAL 4 12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29 For apprentice rates see "Apprentice- OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23 T EAMST Ii RS JOINT COUNCIL NO. 10 70N B TUNNEL WORK - COMPRESSED AIR 06/01/2013 $45.33 $7.10 $13.00 $0.00 $65.43 LABORERS (COMPRESSED AIR) 12/01/2013 $46.08 $7.10 $13.00 $0.00 $66.18 06/01/2014 $46.83 $7.10 $13.00 $0.00 $66.93 12/01/2014 $47.58 $7.10 $13.00 $0.00 $67.68 06/01/2015 $48.33 $7.10 $13.00 $0.00 $68.43 12/01/2015 $49.08 $7.10 $13.00 $0.00 $69.18 06/01/2016 $49.83 $7.10 $13.00 $0.00 $69.93 12/01/2016 $50.83 $7.10 $13.00 $0.00 $70.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 06/01/2013 $47.33 $7.10 $13.00 $0.00 $67.43 LABORERS (COMPRESSED AIR) 12/01/2013 $48.08 $7.10 $13.00 $0.00 $68.18 06/01/2014 $48.83 $7.10 $13.00 $0.00 $68.93 12/01/2014 $49.58 $7.10 $13.00 $0.00 $69.68 06/01/2015 $50.33 $7.10 $13.00 $0.00 $70.43 12/01/2015 $51.08 $7.10 $13.00 $0.00 $71.18 06/01/2016 $51.83 $7.10 $13.00 $0.00 $71.93 12/01/2016 $52.83 $7.10 $13.00 $0.00 $72.93 For apprentice rates see "Apprentice- LABORER" TUNNEL WORK - FREE AIR 06/01/2013 $37.40 $7.10 $13.00 $0.00 $57.50 L.ABORI;RS(1REEAIR TUNNEL) 12/01/2013 $38.15 $7.10 $13.00 $0.00 $58.25 06/01/2014 $38.90 $7.10 $13.00 $0.00 $59.00 12/01/2014 $39.65 $7.10 $13.00 $0.00 $59.75 06/01/2015 $40.40 $7.10 $13.00 $0.00 $60.50 12/01/2015 $41.15 $7.10 $13.00 $0.00 $61.25 06/01/2016 $41.90 $7.10 $13.00 $0.00 $62.00 12/01/2016 $42.90 $7.10 $13.00 $0.00 $63.00 For apprentice rates see "Apprentice- LABORER" ----------- - Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 34 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TUNNEL WORK - FREE AIR (HAZ. WASTE) 06/01/2013 $39.40 $7.10 $13.00 $0.00 $59.50 LABORERS (FREFAIR TUNNEL) 12/01/2013 $40.15 $7.10 $13.00 $0.00 $60.25 06/01/2014 $40.90 $7.10 $13.00 $0.00 $61.00 12/01/2014 $41.65 $7.10 $13.00 $0.00 $61.75 06/01/2015 $42.40 $7.10 $13.00 $0.00 $62.50 12/01/2015 $43.15 $7.10 $13.00 $0.00 $63.25 06/01/2016 $43.90 $7.10 $13.00 $0.00 $64.00 12/01/2016 $44.90 $7.10 $13.00 $0.00 $65.00 For apprentice rates see "Apprentice- LABORER" VAC -HAUL 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B WAGON DRILL OPERATOR 06/01/2013 $30.10 $7.10 $11.80 $0.00 $49.00 LABORERS -ZONE2 12/01/2013 $30.60 $7.10 $11.80 $0.00 $49.50 06/01/2014 $31.10 $7.10 $11.80 $0.00 $50.00 12/01/2014 $31.60 $7.10 $11.80 $0.00 $50.50 06/01/2015 $32.10 $7.10 $11.80 $0.00 $51.00 12/01/2015 $32.60 $7.10 $11.80 $0.00 $51.50 06/01/2016 $33.10 $7.10 $11.80 $0.00 $52.00 12/01/2016 $33.85 $7.10 $11.80 $0.00 $52.75 For apprentice rates see "Apprentice- LABORER" WASTE WATER PUMP OPERATOR 06/01/2013 $40.34 $10.00 $13.55 $0.00 $63.89 OPERATING ENGINEERS LOCAL f 12/01/2013 $41.12 $10.00 $13.55 $0.00 $64.67 For apprentice rates see "Apprentice- OPERATING ENGINEERS" WATER METER INSTALLER 03/01/2013 $45.23 $9.32 $13.29 $0.00 $67.84 PLUMBERS & GASFITTERS LOCAL 12 (Local 138) For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER" Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c. 23, ss. I IE -11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -11L. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to joumeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 23, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 23, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 35 of 35 3) Field Quality Control a) Installation in attic space — specific R -value shall be based on the manufacturer's coverage chart, developed in conformance with the requirements of 16 CFR Part 460. Contractor shall affix thickness markers labeled in inches or R -values to trusses with at least one marker per 300 square feet throughout the attic area. Each marker shall face the attic access. Contractor shall verify installed R -value with a bag count and shall provide a certificate indicating the number of bags installed and installed R -value. The contractor shall post the certificate in a conspicuous location where it is visible and readable from attic access. b) Wall insulation — insulation shall be installed at the minimum density required by the insulation manufacturer or the job specifications. Contractor shall verify installed density by calculating the total volume of wall cavities in cubic feet and dividing the total amount of insulation installed, by pounds, by this value. 6. Insulation Installation Sketches Town of North Andover IFB Page 8 of 38 Furnish & Install Insulation at Stevens Estate f�(�G 4CNEe w.4tC� 3 C3 I R-3� tN5u1,.AYcoJ TVL—W'pTj,}._Or-- . _ __. .... — - - - ! 0Sati_,&rnoh1 -ro -Tlb'P PATE_ Town of North Andover IFB Page 8 of 38 Furnish & Install Insulation at Stevens Estate TOWN OF NORTH ANDOVER OFFICE OF FACILITIES DIRECTOR 384 Osgood Street North Andover, Massachusetts 01845 Stephen E. Foster Facilities Director Date: 8.30.13 Project: Stevens Estate — attic insulation Location: 723 Osgood St. Telephone (978) 794-1503 x-41306 sfoster@townofnorthandover.com • See attached hard copy of IFB information for attic insulation project • An electronic copy of same is available if needed • Advise if any additional information is needed in order to process the IFB Location: Stevens estate 723 osgood street North andover, ma 01845 Item: Attic insulation at main building Scope: • Provide necessary materials, labor & equipment to install blown in cellulose insulation in accordance with; o Reference attached sketches; ■ third floor plan ■ attic floor plan ■ typical section o attached specification • provide protection of existing building components & systems • schedule of work: Monday-Friday,7 am — 5 pm • verify in field all dimensions and conditions • mandatory site visit is required on:_j_J< � �� 611 w, °yam' �z 41"� • all questions to be addressed to Ray Santilli� / �i - 13) • bid date:_/_/ • construction completion by October 31,2013 • obtain all necessary permits (permit fees are waived) • arrange for necessary field inspections • final cleanup • on site dumpster provided by owner MN,'i1i Cellulose insularton Manufacturers Association CELLULOSE THERMAL/ACOUSTICAL INSULATION PARTI-GENERAL 1.01 Work Included A. Work under this section consists of the furnishing of all labor, materials and equipment necessary for or incidental to the complete and proper installation of all cellulose insulation as shown on the drawings or specified herein, all in accordance with the contract documents, B. Material and installation sliall conform to applicable building code requirements of all authorities having jurisdiction. 1.02 Referenced Regulations and Material Standards A. 16 CFR Part 460 - Labeling and Advertising of Horne Insulation (commonly known as the FTC R -Value Rule) B. 16 CFR Part 1209 - Interim Safety Standard for Cellulose Insulation (Consumer Products Safety Commission standard for cellulose insulation) C. ASTM C739 — Standard Specification for Cellulosic Fiber Loose -Fill Insula(ion D. ASTM C1015 — Standard Practice for Installation of Cellulosic and Mineral Fiber Loose Fill Insulation E. ASTM C1149 — Standard Specification for Self -Supported Spray Applied Cellulosic Thermal Insulation F. ASTM C1497 — Standard Specification for Cellulosic Fiber Stabilized Insulation 1.03 Quality Assurance A. Manufacturer sliall furnish evidence of conformance with Consumer Products Safety Commission Interim ' teri Safety Standard 16 CFR Part 1209 and with (lie applicable ASTM material standard for the specific type of cellulose insulation. B. If required by the insulation manufacturer applicator sliall furnish evidence of training, experience and approval of the manufacturer. 1.04 Delivery, Storage and Handling A. Materials sliall be delivered to the site in clearly labeled packaging conforming with the labeling requirements of Consumer Products Safety Commission Interim Safety Standard 16 CFR Part 1209 and 1404, Federal Trade Commission R -Value Rule 16 CFR Part 460, and with the applicable ASTM material standard for the specific type of cellulose insulation. B .Materials shall be protected from the weather and other damage. C. Damaged materials found unsuitable for use will be rejected and sliall be removed from the site. 1.05 Project, Site Conditions A. Cellulose insulation shall not be installed under temperature and humidity conditions not approved by the manufacturer. B. In the case of materials installed with added moisture provide natural ventilation to properly cure the insulation during and subsequent to its application. 1.06 Cleaning A. After completion of insulation work in an area, equipment sliall be removed and all surfaces shall be cleaned of all deposits of insulation material. PART 2 - PRODUCTS 2.01 Materials A. Insulation shall be <loose -;fill> cellulose insulation. B. Insulation sliall conform with Consumer Products Safety Commission Interim Safety Standard 16 CFR Part 1209 and with the applicable ASTM material standard for the specific type of cellulose insulation. C. Retention membranes, if required, shall conform with the requirements of the insulation manufacturer and building codes. PART 3 - EXECUTION 3.01 Preparatory Work A. Installer shall verify by inspection and with the general contractor that preparatory work specified has been properly done, including, but not limited to assuring that stud and joist spaces are accessible, free of debris and contain all scheduled pipes, conduits and non -heat producing devices and that heat -producing devices and elements that are not inherently fireproof are shielded such that insulation will be held 3" away. 3.02 Application A. Insulation shall be installed in conformance with applicable codes, the manufacturer's published instructions or Cellulose Insulation Manufacturers Association Technical Bulletins 2, 3, or 5; and ASTM Standard Designation C1015. 3.03 Field Quality Control A. Installation in attic space: specified R -value shall be based on the manufacturer's coverage chart, developed in conformance with the requirements of 16 CFR Part 460. Contractor shall affix thickness markers labeled in inches or R -values to trusses with at least one marker per 300 square feet throughout the attic area. Each marker shall face the attic access. Contractor shall verify installed R -value with a bag count and shall provide a certificate indicating the number of bags installed and the installed R -value. The installer shall post the certificate in a conspicuous location where it is visible and readable from the attic access. B. Wall installation: insulation shall be installed at tine minimum density required by the insulation manufacturer or the job specifications. Contractor shall verify installed density by calculating the total volume of wall cavities in cubic feet and dividing the total amount of insulation installed, in pounds, by this value. C. Continuity: at the architect's or general contractor's discretion, an infrared thermographic inspection may be required. If the test proves the installation is satisfactory, its cost will be borne by tine owner. If the test shows discontinuity, its cost and the cost of achieving continuity shall be home by the contractor. D. It is recommended, but not within tine scope of this specification, that blower door testing be done to verify that adequate air sealing has been done to assure the thermal performance of the building envelope. These specifications are accurate as of May 1, 2012. Please check all local building codes for requirements that may vary within local jurisdictions. Santilli, Ray From: REGS@sec. state. ma. us Sent: Tuesday, September 03, 2013 4:23 PM To: Santilli, Ray Subject: Publish Date Assigned for General Contracts A publish date of 9/11/13 has been assigned to your General Contracts submission with description of. Furnish and install blown -in cellulose insulation in third floor sloped ceiling areas and fourth floor attic floor areas of the Stevens Estate, 723 Osgood St., North Andover. Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. Legal Ad for Eagle -Tribune The Town of North Andover is soliciting bids from qualified companies to furnish and install blown -in cellulose insulation in 3`d floor sloped ceilings and 4t" floor attic floor areas of the Stevens Estate, 723 Osgood Street. Qualified companies are requested to submit bids to the Assistant Town Manager at North Andover Town Hall, 120 Main Street, North Andover, MA, in accordance with the instructions contained within the Invitation for Bids (IFB). The complete IFB is available on the Town's website (www.townofnorthandover.com) by clicking on `Bids, Quotes and Proposals'. The Town will only accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on October 3, 2013 to be considered. The Town of North Andover may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the Town of North Andover. SPR Central Register General Contract Submit Confirmation State Publications and Regulations William Francis Galvin, Secretary of the Commonwealth Page 1 of 2 The following General Contract submission was successfully received. Planned date of publish is 9/11/2013 Awarding Agency Agency Name Town of North Andover 120 Main Street North and Address: Andover, MA 01803 Project Number: Estimated Cost: —11 for DCAM contracts over $1 ame: Address: Massachusetts Highway contracts over $50,000. Contact Information itilli, Assistant Town listed when Contract Information Fax Project: Furnish and install blown -in cellulose insulation in 3rd floor sloped ceilinIZ areas and 4th floor attic floor areas of Stevens Estate, 723 Osgood Street Plans/Specifications Available: Place, date and time The complete Invitation for Bids document will be available on Wednesday, September 11, 2013 at 11:00 a.m. at www.townofnorthandover.com by clicking on 'Bids, Quotes and Proposals' http://www. sec.state.ma.us/sprpubt i cforms/GCS ubmitConfirmation.aspx?ID=81267 9/3/2013 Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20130903-058 for future inquires. Request another official Wage Schedule rntoP http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSupp... 9/3/2013 � � a I f d� C a a 1 jS I N I f yr Wl V P y tC THE EAGLE -TRIBUNE Wednesday, class'if ed' - The mar etplace. Eagle -Tribune, Gloucester Daily Times, The Salem News, Daily News of Newburypiod Monday .....................6pm Friday Tuesday -Saturday ........6pm day prior The Eaglel%ibune THE SALEM NEWS G16—&ester DailyTimes DAILY NEWs Sunday paper ..............6pm Friday (auto only) Sunday paper ..............6pm Friday CALL: 800.927.9200 ONLINE: ClassifiedsNorth.com Carriage Towne News: 12pm Friday MON.-FRI. 8AM-6PM FAX: 978.685.1588 Andover Townsman, Derry News & POLICIES/ADJUSTMENTS: Advertisers must check insertions and report errors immediately. Billing adjustments are made for only one incorrect insertion and Haverhill Gazette: bpm Tuesday then only for the incorrect portion. We are not responsible for failure to publish and reserve the right to reject, edit or cancel any ad. Ads are subject to credit Cancellation/change deadlines: 1 approval unless paid for prior to publication. some as publication deadlines visa "� EXPERIENCED PCA sought by Methuen Male, to assist with bathing, dressing & transfers Mon -Fri, 6:30am - 8:30 am. Own car a must. Call 978-683-1945'after 6pm . �lr]IlUinm' Aeration & Overseeding Now is the Time! HOME CARE/ COMPANION for alert, infirm eld- ► Full Service Landscaping-Father/Daughter arty Haverhill woman. Duties include meal Anything Goes. Free Estimate Owned/Operated preparation, hygiene. Possible live-in. References required. Call (978) 401-7773. ittlItIll eXbw.8, I am CNA's/HHA's looking to take care of your Beyond Home Care LLC loved one in your home. Private Pay Combined 30+yrs. experience, excellent references. Pri- *,144111 vate duty 7 days a week RN support Available (978) 837-2068 Leave message privately held, Woman Owned business I Am Looking For Work with 11 years of experience. Offering private care at competitive rates. Reliable, experienced woman available for The assistance available is flexible and can elderly person in need of personal health care, range from part time aide to a full day of care; companion, and or Dementia. Light versatile 24 hour care is available upon request. home duties. Will travel. Excellent references. Services include: assist with ADL, transportation Call 978-255-2111 to medical appts, customized meals, daily er- LIVE IN CARE NEEDED IN GLOUCESTER rands, housekeeping. We can ensure well -b- Seeking a mature, responsible woman to care eing, safety and socialization, and provide care for an elderly woman with dementia. Rent and assistance in order to maintain the quality free studio apartment plus additional salary. of life that you or your loved ones have be- Help with personal hygiene, meal pep, house - come accustomed! Reasonable, competitive keeping, dispensing medication and compan- rates. All communication is kept strictly confi- ionship. 24 hr. accountability, five days a dental. Licensed, Registered and Insured. Pro- week. Two days off. References and back- fessional references upon your request. ground check needed. Reply via email to: Please consider us in your efforts revotarg@comcast.net to give your loved ones the Quality of Life that they deserve. NANNY FOR GRANNY 25 hours Monday -Friday Above 6 Beyond Home Care, LLC $12.98/hr, 5 mile radius of Beverly www.abhhcare.com caleski@howlings.com. (978) 922-7747 Info@abhhcare.com * * PCA -For male quad in Beverly, MA PT 603-913-5895 flex. hours Good pay! This position must be filled ASAP. Come join our team! Roofing, siding, gutters. Quality work, reason - Vr�� 978 969-2921 Call between I Oam -spm * * PCA NEEDED: Lawrence MA area. Angels, Temp -Perm. Heavy lifing involved. Must be available every other weekend & fill-ins during UVING ASSISTANCE SERVICES the week, and have drivers license. Call 978-683-7437 between gam-2pm ATTENTION: CNA's, LNA's, HHA's PCA - Reliable, responsible with experience Visiting Angels has openings for experienced Caregivers looking to make a difference in an needed in Merrimac 7am till 9 am, more hours elder's life.Minimum requirements include driv- available. Must be able lift. Call 978-346-4342 ers license, experience, references, clean cori. PCA - Starting in Sept. a Bradford man will Call to schedule appointment 978-462-6161 need an experienced personal care attendant. Sat & Sun. from Bam-1 Dam & 5pm-7pm. ROOFING AND REPAIRS, MA LIC#105583 Fully Insured, References, Free Estimates. BUSY LADY SERVICES- A good 2nd job. References helpful. Interviews I am available to do your errands! Drive you to being held now. Call 978-377-0238 doctors, shopping, airport, etc. Experienced 978-423-0754' or 781-842-0504 RESPONSIBLE Certified Care Attendant, PT needed fora'951b. college educated disabled woman in Lynalield, MA. Mornings & afternoon ► CNA AVAILABLE - for homecare in the shits. Must have good communication skills, be No. Shore area. I have 25 yfs experience able to lift & drive. Recent references absolutely Please call Debbie at: required. Email: ladynel89@aol.com or 978-948-2497 or 508-641-5272 Call, 781-598-5585 after 6:30pm RN OPPORTUNITY Doing homecare in our Andover home for an amazing individual, our son! Weekend days available, 8 to 10 hr shift. Salary $43/hr. Must have M.H. provider num ber, or be willing to acquire from MA Health. We prefer experience in homecare, reliable. This is a long term P/r position. Only qualifie innuiries nlease_ Phone days. 917-2FIM794 WOMAN in Swamscott, MA needs help with light chores 6 errands, drive to appointments, car necessary. Flexible hours. 781- 595-5404 ► O GOT MOLD? O Basement/attic? Inspect from $75. Mold Test, removal. IAGA Certified. A.R.S. 978-688.1111 FINISH / REPAIR / NEW CARPENTRY allhandymanmanh.com Registered / Insured. 978-683-8756 3-H HANDYMAN Reasonably priced, basements, carpentry / remodeling, tiles. Call 978-375-1976 �oillio••► ► ► ALL CHILDCARE PROVIDERS IN MASSACHUSETTS ARE REQUIRED TO BE LICENSED. Only NH Childcare Providers May Be Licensed Or Non -Licensed Basement Waterproofing Home Improvements 24 yrs exp. Aureo Reis 978-479-0180 RM CLEANING - Gloucester MA Family owned and operated. Great Rates! Free Estimates 978-601-2902 ALL DAY JUNK REMOVAL - FREE ESTIMATES 978-361=5216 ALL YOUR SPACE BACK Junk Removal 8 Cleanouts Dumpster rentals. Insured 603-5714187 ANYTHING & EVERYTHING Estate Clean -outs, Demolitions, Basement, Garage, Yard Debris Dump runs. Call 978-521-0445 BEST RATES - Call Mike remove junk & anything from A -Z 978-973-2009 1 classiT 0 ed mar etplace... JUNK REMOVAL Aeration & Overseeding Now is the Time! MASTER PLUMBER -Retired looking for small ► Full Service Landscaping-Father/Daughter jobs. MA, NH & Maine. #9563 MA, #1653 NH Anything Goes. Free Estimate Owned/Operated Master gas fitter NH. Call Bill 978-476-9827 Call 978-609-5589 D&S Landscaping 978-335-4710 lies, one for rental income and one to live in. ► Walkways, Patio, Stonewall, New Lawns, Tree *,144111 FRAME TO FINISH Work, Affordable Maintenance. Call Cape Ann Landscape 978-283-4050:978-810-8111 BRITE SIDE * PRESSURE WASHING Repairs, Skim & New Work - Textured Ceilings & colonial with large kitcheMiving room combi- We work well under pressure! 978-685-9545 Metal Studs - Norman @ 603-890-3113 ► , nation plus 2 or 3 bedrooms. Level yard and off street parking. Newer roof and heating in both buildings. Don't wart $189,900 BYFIELD, MA- Spacious Cape on cul de sac- Fireplace Kitchen and dining area, Fireplace Livingroom,PineRoors,Den/office orformal MINICUCCI PRESSURE WASHING/Deck Staining tem, lovely front porch and lots of curb appeal. New Price $214,900. Affordable Masonry Brick, Block,Stone,Cement Service. Vinyl siding, walkways, pool areas & COMMERCIAL & RESIDENTIAL WIRING by Stairs Walks/Patios/Walls/Chimneys/Ceramic decks. Free estimate. Anthony 978-291-8210 ROC Electric. MA Lic #20045A. Tile, Call Ted 978-387-8778/603-893-7321 (978)689=8006 NH Lic #11463M. CALL 978-815-3876 ➢ ALL TYPES OF MASONRY Q 14 M ► 4 QUALITY, SERVICE & PRICE E New work, repairs, small jobs welcome. COUTURE HOME IMPROVEMENT: SPRING SPE - That Wor(t Shock You! Insured. MA#31525E Free estimates. Dave 978-948-2566 CIALS! Decks, Siding, Windows & Doors In- NH#12831 M. WCall Mike 978-423-8510 to traffic circle to Old Rd. stalled & Repairs. Insured. TJ, 978-902-7644 Byfield- 5 room Ranch on private lot, garage/workshop.299,900 EVELYN M. NOYES A.E. 978465 LJC & SONS MASONRY: BRICK - CEMENT - on Armstrong Field Real Estate r ► STUCCO & STONE, All Masonry: Steps, walks, ► ► : ► BEST QUALITY IN TOWN walls, chimney, foundations. Call 978-688-5331 BEST CHOICE CONSTRUCTION 4 WONG FLOORS Er Mario Masonry Roofing, siding, gutters. Quality work, reason - Install - Sand - Refinish s able costs 25 yrs exp. Fully ins. 978-973-5410 FREE estimate - Fully insured Steps,tile,wall,stone, patio,repair 978-682-5499 617-884-3494 or 978-328-9200 MOST AFFORDABLE Roofing & Siding. Decks, www.wongfloors.com , , • , windows. Certified installers. LicAnsured BBB accredited. 978-265-6843 WC, Lisa ► NO JOB TOO SMALL HAGGAR CONSTRUCTION -KRchens, n Kitchens, Available 7 days. Licensed and Insured Discount Prices 978-682-0399 ROOFING AND REPAIRS, MA LIC#105583 Fully Insured, References, Free Estimates. bathrooms, additions & decks.- siding Roofing g VISA/Mastercard Call 800-649-4161 Commercial & Residential (978) 685-04611111111=1, BALDASSARI -Painting Interior/Exterior. ► BEST CHOICE CONSTRUCT11N Wallpapering & removal. Free estimates SELF -STORAGE: Salem, NH; Methuen, MA. Gutters, seamless aluminum, cleanings, 9 978-688-0161; 781-953-6890 4 Automobiles, boats, motorcycles, leaf guard. 25 yrs.experience. FERREIRA'S PAINTING INC household goods, business stock, etc. Pricesfrom $20to$190/mo. ► , Power washing, Commercial & Residential, Call 603-894-4631 www.hampshireroadsefstorage.com ALL THE RIGHT MOVES- Carpentry, Remodeling Interior & Exterior, Deck Finishes, Ceramic Tile, Home Improvements, Painting & Tiling. House Cleaning. Attention to detail. Bill, 978-273-7243, 603-898-1035 Free Estimates Call (774) 327-4086 TILE Installation. Repairs. Bathrooms. Kitchens. Foyers. Guaranteed work. CUSTOM AIR, HEATING, COOLING, DUCTLESS PLEASE NOTE: Free estimates. Jim 978-774-4067. Serving the No. Shore Since 2000 Ads under this classification may be found, , Call (781) 760-3154 Free Estimate online under the Service heading of High Efficiency OUTDOOR WOOD FURNACE General Services DONOVAN TREE REMOVAL, LLC Sizzling Summer Specials. Free Est/Fully Insured from Central Boiler bums less wood. 25 year warranty. C.P. Enterprises 978-927-9663 SAMCO PAVING 603-842-0487 donovantreeremoval.com ► r & Sealcoating. 978-281-0909 / 800-934-4007 LIVINGSTON Tree & Stump Removal Free Est. Fully Ins. www.samcopavingma.com Fast/Quality Service, Free est. BATH LINERS; WALL SURROUNDS 978-689-8373 livmgstonfamilytree.com Bath Tub Reglazing IIC. Insured Free Estimates Mr. Tub 800-453-6171 PLANTE'S TREE Will meet/beat an u y quote! mrtub.com MATTHEW'S PLASTERING Professional climbers. Brush chipping, stump *Reliable, Quality work * Additions, kitchens, grinding, firewood Fully Insured. 978-399-8487 baths, basements. 978-314-0816 QUALITY TREE SERVICE J&F LANDSCAPING: 40+years * MV PLASTERING & DRYWALL* Tree b Hazardous removal, trimming. Firewood. New lawns, sod, trees shrubs loam, mows, best prices, old ceilings and walls new again. Low prices. Fully insured, free estimates dozer. Free estimates insured 978-685-0783 Free estimates. 978-686-5012 Call 603-365-7364 ;, spaper is e best way your home* kd by local TheEagk+'I�iba� :; Place a happy ad in this section to wish a special someone a Happy Birthday, Anniversary, Retirement, Thinking of You, Love You or Just Wish Them a Nice Day. Only $5.00 for 3 lines ($1.00 each additional line. Call today The Classified Connection ON -927-9200 BLACK and white cat. missing from Curtis St Rockport, MA. last seen Aug 22nd. older cat with black ring on tail. 978-546-9759 FOUND - 2 black and white cats on 128 ramp in Swapscott, MA. To claim call Cape Ann Animal Aid at 978-283-6055 FOUND CAMERA at Old Town Hill, Newbury Call to describe (978) 462-2973 FOUND small parrot in Peabody area on 8/29. Call with description to claim him 978-531-8713 LOST: CAT Small all gray tiger in vicinity of North St & West Lowell Ave. Haverhill/Methuen line. Call 978-686-4028 REWARD IF FOUND LOST - Gray short hair cat with white on chin, white bib, white belly and white paws. Missing from Wheeler Street area of Gloucester since Aug 20th. $100 REWARD. 978-290-2900 LOST SMALL SIAMESE CAT in Rockport Last seen on Mannion Way & Shetland Rd. on Aug 23. Friendly. Answers to Baby. Wearing bright pink collar. 978-502-1854 1 AMESBURY - Lovely, open, airy antique in best Point Shore spot — 3-4 bdrms, 2 bths, fine pine and fir floors, excellent storage. Formal dining room, 6 FP, open plan kitchen/Great Room. Features include wainscot and early glass. Large deck overlooks grassy, sheltered lawn. + 2 car garage. Very comfortable with ovely room sizes! $479,900 Call Pat Skibbee 978 502 4782 or office 800 773 9990 RIVER VALLEY RE 00000 ► bedrooms, 2.5 baths, 2400 sq ft on 2+ land- living 9ft ArmstrongField. Com ► ATKINSON Beautiful 4 bedroom Colonial on de- Groveland - Historic 3 bedroom, 2 full bath co- Haverhill: Riverside location! Adorable 3 bed- Lawrence: NEW TO MARKET Two single fami- sirable cul-de-sac! Only $409,900! lonial with period details and charm galore. room home recently renovated with new lies, one for rental income and one to live in. CLASSIC H HOMES RE Huge master Bedroom! Hardwood floors and 2 kitchen, stainless steel appliances, formal din- Come take a look at this recently renovated (603) 382OM fireplaces. $275,000 ing or den with sliders ovedooking a nice level, colonial with large kitcheMiving room combi- spacious units and flexible floor plans. Front Armstrong Field Real Estate fenced in yard. Hardwood floors throughout entire house, newer vinyl replacement win- dows, plus new roof and young heating sys- nation plus 2 or 3 bedrooms. Level yard and off street parking. Newer roof and heating in both buildings. Don't wart $189,900 BYFIELD, MA- Spacious Cape on cul de sac- Fireplace Kitchen and dining area, Fireplace Livingroom,PineRoors,Den/office orformal ArmstrongField.com tem, lovely front porch and lots of curb appeal. New Price $214,900. First Choice Realty room, 3 Bedrooms, dining room, s, er Finished 1.5 bathrooms, Finished lower level, Screen 978-740-8700 First Choice Realty (978)689-8006 porch overlooks fantastic gardens and pool. SAT. &SUN. 9114 9/15 (978)689=8006 978-470-2929 2 car garage. $519,900 9/21 & 9/22; 12-2 PM Lynn- 3 bedroom colonial on a dead end Salisbury -2 family total of8rooms, 2 bathrooms. nice lot. Exit 4 Rte 93 thru De center Chester • 24x26 garage/workshop. $379,0lot Webber Associates to traffic circle to Old Rd. street, Nicely updated eat -in kitchen and 1/2 y P bath the first floor. $199,000 Byfield- 5 room Ranch on private lot, garage/workshop.299,900 EVELYN M. NOYES A.E. 978465 TT T �( on Armstrong Field Real Estate DANVILLE NH Roach Country Condo HAVERHILL MA, Totally renovated, 3 bedroom, bedrooms, 2.5 baths, 2400 sq ft on 2+ land- living 9ft ArmstrongField. Com 1.5 bath, 3 car garage, Asking $159,900 Open Last chance for one of these 4 beautiful units located 8 in dead 978-740-8700 House Sun 9/15, 1la-2p or Call 978-764-7196. on wooded acres a end neighborhood. Spacious open -concept front- f Ncw A}�ordebk H4m� """"°"°^Y• "" / ings on 1 st floor, super insulation package,double low -E windows, 95% efficiency FHA furnace w/- aircleaner, Rinnai hot -to -back floorplans, 2 bedrooms,2 full baths, hardwood & the floors, cathedral ceilings, corner fireplace, central A/C, full basement, 2 Lynn - Investors take notice. 3 family with r \ uAS:.r...pSxR1;.NH.....' 7 car attached garage and no common living walls for maximumprivacy. spacious units and flexible floor plans. Front v< a—k. H ... ' % During pre -construction get a free screen and rear porches. Needs work inside and out. $288,900. 1 Bedroom Luxury Apartments porch option! Construction to begin within 30 Tache RE LaMontagne Builder's new flex -plan design featur- days! ACT NOW!! $219,900 country kitchen w/sliders to private deck, 2 car arae super insulation package, 95% effi- 9. 9 . P P 9 • ciency fha heat with air cleaner, on demand ing state of the art construction techni ues 4 f�$.94G.?300 978 745 2004 / bedrooms, 2.5 baths, 2400 sq ft on 2+ land- living 9ft WEBBER ASSOCIATES scaped acres.Open concept areas, ceil- f Ncw A}�ordebk H4m� """"°"°^Y• "" / ings on 1 st floor, super insulation package,double low -E windows, 95% efficiency FHA furnace w/- aircleaner, Rinnai hot (603)'432-5148 on -demand water and more! The interior design package includes hard - Choose from these 2 New Lamontagne Build- ershomes located in South &North London- wood and tile floors, custom cabinets, granite countertops, ss appliances, gas fireplace & 2 car Adverti, SALEM NH ► derry in great commuter locations close to Rte 93. Both of these energy efficient designs fea- attached garage. Gorgeous backyard for any type of recreational or family type activities. Brand NEW Ready Now! � ;= lL 1 Bedroom Luxury Apartments ture 3 bedrooms, 2.5 baths, open -concept construction Move Right In !I $ 368,500 CALL HEAT & HOT WATER INCLUDED country kitchen w/sliders to private deck, 2 car arae super insulation package, 95% effi- 9. 9 . P P 9 • ciency fha heat with air cleaner, on demand Other designs available in the mid $300's Open House f�$.94G.?300 Call for availability hot water, double low -E !nsult!It win- SAT. &SUN. 9114 9/15 TODAY.Rinnai 711re Eteglrt4aoe 978-470-2929 dows & More. Act now in early construction stage for your personal' design ideas & decor 9/21 & 9/22; 12-2 PM choices. Ready for fall occupancy!! Both Priced at $ 279,900!! Exit 4 Rte 93 thru De center Chester • • Webber Associates to traffic circle to Old Rd. .: • ► ► • . • - : .: • : ► ► Warehouse space from 2,000 to 30,000sf. Lease from $5.00nnn. 11 603-432-5148 WEBBER ASSOCIATES GLOUCESTERMA - Spacious five -bedroom co- lonial with updated kitchen. Newer multi -zone heating -central AC, second -floor laundry, 2-1/2 baths, finished basement, new deck. Conven- ient to town, highway and beach. $398,000. Rick Petralia J. Barrett & Company 978-239-6207 1 h NDERRRY NII (9 ak CLsl D�Iyn Gorgeous Country Colonial located on a wooded acre plus lot just 2 minutes from Rte 93, Exit 4 & close to everything. Nearly 2600 sq ft w/spacious open -concept floorplan, 4 bedrooms, 3 baths, 2nd floor laundry, 9 ft clgs on 1st floor, 2 car attached garage (3rd car option), town water, superior insulation pack- age, 95% efficiency FHA furnace w/air cleaner, Rinnai on -demand hot water & your personal decor choices! Construction to begin within 30 days! ACT NOW!! $ 389,900 WEBBER ASSOCIATES (603) 432-5148 (603) 432-5148 Commercial condos, office & whse/mfg, lease or purchase. =7 : r:Ti FIRST CHOICE REALTY GROUP David Guselli First Choice Realty Group 184 Pleasant Valley St., Suite 1-102 Methuen, MA 01844 978-689-8006 daveg@firstchoicerg.com LN DIrpettel To Be Included in this Directory Call cassif ed ° mar etplace. Monday through Friday, 8 a.m. to 6 p.m. Tel. 1-800-927-9200 Fax: 1-877-927-9400 14 Wednesday, September 11, 2013 THE EAGLE -TRIBUNE CLASSIFIED MARKETPLACE Marblehead- Completely renovated 3 bed- room, 2 %2 bathro home adjacent to Haw- thom Pond Conse ation Area. Plen of rk- ty pa Ing, custom kite n, fireplace, central air, large backyard and ore. $619,000 ArmsJong Field Re Estate ArmstrongField.com 978-740-8700 Newbury - NEW PRICE. Spectacular country Victorian estate on 1.4 AC of pristine land- scape: koi pond, peonie path, lap pool, major bam, sweeping lawps + 9 rm, 5 bdrm, 3 level architecturally imp¢rtant residence, all in su- perior updated condition! This is a lovely home. $788,000 Call Jaanie Purinton 978 462 6898 or 800 773 9990 RIVER VALLEY RE NEWBURY - Spec4cular 2000 top quality Co- lonial 3600+ sq' ft.reproduction in lovely neighborhood of la a homes, phenomenal de- tail, this custom -de igned and built is an abso- lute work of art! I bdrms, 2 C garage, gar- dens fireplaces, oks' kitchen. Come see. $850,000 Call Janie Purinton RIVER ALLEY RE 978 462 68 8 or 800 773 9990 NEWBURY - Stun n g open plan contemporary Shingle Style Cap on almost 2 A along the upper Parker Riv r. 10 rooms, 3500 sq ft home + 2 C gam set well back on private drive. River views, , French doors, wide, pro- tected veranda of s screened porch, cook's kitchen and elega t first floor Master Suite! Bright house, ligh woods, just a gorgeous home! $835,000 Call Joanie Purinttn 978 462 6898 or office 67739990 RIVERALLEY RE *:* New Construction, 11 Zoe Lane $449,900 603-382-1669;603-234-1458 Peabody - Expand New England Cape s tu- ated on lovely le I lot with good privacy. Hardwood floors, ily room, vaulted ceilings. $359,000 Ta he RE . (978) 745-2004 Peabody - Young olonial with grand entry foyer, formal dini large kitchen with center island, hardwood, pacious master . Located on cul-de-sac. $43 ,000 Tache RE (978) 745-2004 Salem - 2 family, 2 bedroom units. Hardwood floors, private backyard and recently paved driveway for 2 cars. $345,000 Salem- Privacy by the water. 3 bedroom, 1 bath Move In Ready Home located on quiet, private street. Features include newer furnace and roof. $254,900 Salem- 2 bedroom, 2 bath Victorian cottage in North Salem. Located close to the commuter mil, Features incluhardwood floors, updated kitchen and private ackyard. $209,000 Salem- Well built Victorian in North Salem close to the train station. Natural woodwork with an open living arrangement. $296,900 Salem- 3 Bedroom, 2 V2 Bathroom Cape with a possible sub -dividable 1.37 acres lot. $499,000 Salem- Rental. Frsshly painted, 2 bedroom apartment in downtwn Salem. All new carpet and a completer remodeled bathroom. $1,200 1 Salem- Rental. 3 Bedroom, 2 A Bathroom Cape with a possible sub -dividable 1.37 acres lot. $1,800 Land Listings Salem - 13,000+sf lot $45,000. 1.1 + acre $185,000 Hamilton - 40,000sf $175,000 See All Open Houses For This Weekend at MassOpenHouses.com Armstrong Field Real Estate See all homes on the market at: ArmstrongField.com 978 -?40-8700 CITY OF METHUEN BOARD OF APPEALS THE SEARLES BUILDING 41 PLEASANT STREET METHUEN, MA 01844 NOTICE OF PUBLIC HEARING Notice is hereby given that the Town of Methuen Zoning Board of Appeals will hdld a public hearing on: September 25th, 2013 at 7:00 P.M. in The Great Hall, at the Sear- les Building, 41 Pleasant Street, Methuen, MA 01844, on the follow- ing Petitions: Troy Sweder 45 North Street, Methuen Mass. A variance to construct an addi- tion that will be Zoo close to the front and side lot -lines and to clarify front set -back on exiting dwelling under section VI -D in a Rural Residential Zoning District @ 45 North Street, Methuen, Mass Matthew J. IYAgostino, Chairman Methuen Zoning Board of Appeals ET - 9/11, 9/18/13 The Town o North Andover is soliciting bids nom qualified com- panies to furniE h and install blown - in cellulose insulation in 3rd floor sloped ceilings and 4th floor attic floor areas of he Stevens Estate, 723 Osgood St eet. Qualified com- panies are req sted to submit bids to the Assistant Town Manager at North Andover flown Hall, 120 Main Street, Northndover, MA, in ac- cordance with a instructions con- tained within t Invitation for Bids (IFB). The complet IFB is available on the Town's w bsite (www.townof- northandover.c m) by clicking on 'Bids, Quotes and Proposals'. The Town will only accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on October 3, 2013 to be con- sidered. The Town of North Andover may cancel this IFB ppr reject in whole or in part any and (all proposals, if they determine that Cancellation or, rejec- tion serves the best interest of the Town of North Andover. ET - 9/11/13 The Town of North Andover is so- liciting Proposals for professional Engineering and Soil Evaluator services to ensure compliance of individual on-site subsurface sew- age disposal systems with 310 CMR 15.000 of the $tate Environmental Code, Title V, and local regulations. Qualified vend, rs are requested to submit their pr posals to the Assis- tant Town Mani ger at the Town Hall, 120 Main Stree North Andover, MA, in accordance Nith the instructions contained with n this Request for Proposals (RFF i. The Town of North Andover is see ing to award a one- year contract m th two (2) additional one-year renevi 31s, solely at the dis- cretion of the T wn. The complet RFP is available on the Town's w ibsite (www.townof- northandover.c m) by clicking on 'Bids, Quotes nd Proposals'. The Town will onli accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on October 2, 2013 to be con- sidered. The Town of North Andover may cancel this RFP or reject in whole or in part any and all proposals, if they determine that Cancellation or rejec- tion serves the best interest of the Town of North Andover. ET -9/11/13 Rockport, So. - Well maintained single family home with breakfast nook, living room with wood burning stove, entertainment bar, sun room, finished attic loft, 2 full baths and first floor laundry. Wrap around deck, private yard with mature plantings, shed and parking. Near Long and Cape Hedge beaches, shopping and highway. $425,000. Rick Petralia J. Barrett & Company 978-239-6207 Salem - 3 bedroom colonial with large finished area in basement. Hardwood floors, open eat- -in kitchen, fireplace. Lovely yard. $339,900 Tache RE (978) 745-2004 Salem - 6 room, 4 bedroom cape In residential neighborhood close to Peabody line. Vinyl ex- terior, parking. Needs TLC. $279,900 Tache RE (978) 745-2004 Salem - Solid 2 family, 584 with wide pine floors, fireplaces, eat -in kitchens, laundry hook-up in basement. Corner lot nicely land- scaped. $339,000 Tache RE (978) 745-2004 NNCMMMZM3s01 KACHADORIAN to be built. Brand new double wide, Energy Star certified, appliances, win- dow treatments and more, $16$000. MERRIMACK MA, North Shore Community Brand New Skyline, 1066, 2 bedrooms, 2 full baths, Whirlpool appliances, window treat- ments, $99,000. Other homes available. Salem Manufactured Homes 603-898-2144 111rMTfflMMT1s rs Gloucester - Sprawling town home with 3 lev- els of huge rooms. Finished lower level walk- out for extended family space. Great location. $299,000 Tache RE (978) 745-2004 Haverhill: NEW TO MARKET, 6 room, 3 bed- room townhouse close to 495 nicely reno- vated down to the studs several years back. Tiled floors, lots of hardwood, stainless steel appliances, , eat in kitchen with maple cabi- nets, formal dining room and good sized living room, 3 bedrooms up plus 1.5 baths. Full basement and walk up attic perfect for expan- sion. $179,900 First Choice Realty (978)689-8006 Lawrence: Huge 3 level Condex /duplex on a beautiful Prospect Hill area featuring 2 over- sized bedrooms, 1.5 baths, huge living room, garage under and much more No condo fee. Motivated sellers. $99,900 First Choice Realty (978)689-8006 Lynn- 2 bedroom condo, freshly painted and looks beautiful. Spacious rooms, high ceilings, built-ins, private porch, parking. $99,900 Tache RE (978) 745-2004 Methuen:This end unit at The Landing offers a large fireplaced living room with dining area and eat in kitchen, 2 levels of living with 3 bathrooms, central air conditioning, master suite with vaulted ceilings, skylights and mas- ter bath, lower level ready for finishing plus 1 stall detached garage. Priced to sell $217,500 First Choice Realty (978)689-8006 CITY OF METHUEN BOARD OF APPEALS THE SEARLES BUILDING 41 PLEASANT STREET METHUEN, MA 01844 PUBLIC HEARING Notice is hereby given that the Town of Methuen Zoning Board of Appeals will hold a public hearing on: September 25', 2013 at 7:00 P.M. in The Great Hall, at the Sear- les Building, 41 Pleasant Street, Methuen, MA 01844, on the follow- ing Petitions: Kevin R. Howe Realty. LLC, 297 Tanner St., Lowell, MA 01852 Special Permit required un- der Section (9) V -D of the City of Methuen Zoning Ordinance to op- erate an Indoor Warehouse in a BL District at 60 Pine St, (Unit M) Matthew J. D' Agostino, Chairman Methuen Zoning Board of Appeals EI' - 9/11, 9/18/13 NEWBURYPORT, MA: NEW PRICE. Half house condo on the sunny side! Three levels of char- acter and features - plant window, wood floors, pretty mantel, deck, gardens, 2bdrms, 2 baths, full basement, on a top street! $319,000. Call Pat Skibbee 978 465 8851 RIVER VALLEY RE . Peabody - Great 1 bedroom condo in the Southwyck condos. Open floor plan, ultra modem kitchen, exposed brick, high ceilings. $105,000 Tache RE (978) 745-2004 Salem - Great location and amazing value for this bright and sunny 2 bedroom condo. Pri- vate entrance, hardwood, laundry 6 storage, parking. $117,000 Tache RE (978) 745-2004 Swampscott -Spacious pet friendly condo with large eat in kitchen and included appliances. Includes washer and dryer in basement and two off-street deeded parking spaces. $209,000 Armstrong Field Real Estate ArmstrongField.com 9787740-8700 r Gloucester, MA - Developer's Special! 3 spa- cious buildable lots on wooded 4 acres. South - em exposure with potential for green home development. Perc tested lots oN 2 with ease of obtaining another. Not a developer? Build your home on 1 lot and sell others. Some land development necessary. Seller may assist. $255,000. . Rick Petralia J. Barrett & Company 978-239-6207 Gloucester, MA -Site your passive solar/green home on this t+acre southern exposed grassy knoll surrounded by mature vegetation.. Order -of -Conditions to develop a single -family or 2 -condo dwelling. Sewer, gas 8 utilities at street Easy access to Rte. 128, train, shopp- ing, downtown and beaches. Building permit within grasp. $128,000. Rick Petralia J. Barrett & Company 978-239-6207 MENUMMMIMM Billerica: Contractor's Yard with professional office space plus equipment storage. Possible Used Car Lot in front of property. Many possi- bilities $499,900 First Choice Realty (978)689-8006 Gloucester - Buy or rent -to -buy this centrally located downtown retail/warehouse free standing building with over 2000 sq ft of space, 12 -foot high ceilings, large store front windows and double -wide entry. Features in- clude full basement,half bath,200 amp CB panel and decorative tin ceiling. High traffic area with great visibility and easy highway ac- cess. $259,000 Rick Petralia J. Barrett & Company 978-239-6207 Methuen: Loop location with direct street frontage on Pleasant Valley St. This 800+/- sf space office condo lends itself to salon us- age(long established) or just to use for office space. Own your own location and build eq- uity $159,900 . First Choice Realty (978)689-8006 PLAISTOW 1350 SF of 1 st floor space perfect for small to medium sized business with excel- lent exposure $9.50/NNN 603-382-0360 Classic Homes RE PLAISTOW NH Auto Repair 8 Body Business, in- cluding equipment, land builidng and bu!sness $279,900.603-382-0360 Classic Homes RE CITY OF METHUEN BOARD OF APPEALS THE SEARLES BUILDING 41 PLEASANT STREET METHUEN, MA 01844 NOTICE OF -PUBLIC HEARING Notice is hereby given. that the Town of Methuen Zoning Board of Appeals will hold a public hearing on: September 25th 2013 at 7:00 P.M. in the Great Hall, at the Sear= les Building, 41 Pleasant Street, Methuen, MA 01844, on the follow- ing Petitions: Joseph & Janice Buck, 357 Pel- ham St. Methuen, MA 01844 Variance requested under .Section VI -D of the City of Methuen Zoning Ordinance for an Open Deck that will be too close to the Right Side Lot Line in an RR District at 357 Pel- ham St. Matthew J. D'Agostino, Chairman Methuen Zoning Board of Appeals ET - 9/11, 9/1 8/1 3 MORTGAGEE'S SALE OF REAL ESTATE By virtue and in execution of the Power of Sale contained in a certain mortgage given by Deborah E. Messineo to First Franklin Financial Cor- poration dated March 5, 2004' and recorded with the Essex County (North- ern District) Registry of Deeds, in Book 8627, Page 2, as assigned by As- signment of Mortgage dated October 10, 2006 and recorded with Essex County (Northern District) Registry of Deeds, Book 10446, Page 26, of which mortgage the undersigned is the present holder, for breach of the conditions of said mortgage and for the purpose of foreclosing the same will be sold at Public Auction at 10:00 AM, on September 18, 2013, on the premises known as 19 Huntress Avenue, Methuen, Massachusetts, the premises described in said mortgage, together with all the rights, ease- ments, and appurtenances thereto, to wit: A CERTAIN PARCEL OF LAND WITH THE BUILDINGS THEREON SITUATED ON HUNTRESS AVENUE IN METHUEN, ESSEX COUNTY, MASSACHUSETTS BEING SHOWN AS LOT C ON A PLAN ENTITLED: PLAN OF LAND IN METHUEN, MASS. PREPARED FOR STANLEY KOWALEZYK, SCALE 1" = 20' SEPTEMBER 1994, STOWERS ASSOCI- ATES, ING REG LAND SURVEYORS, METHUEN, MASS," AND RECORD- ED AT THE NORTH ESSEX REGISTRY OF DEEDS AS PLAN NO 12510. LOT C CONSISTS OF 9240 SQUARE FEET, MORE OR LESS BEING PART OF THE PREMISES CONVEYED TO GRANTOR BY DEED OF STAN- LEY W. KOWALOZYK DATED NOVEMBER 29, 1994 AND RECORDED WITH SAID REGISTRY AT BOOK 4181, PAGE 140. SOURCE OF TITLE: BOOK 4341, PAGE 339 (RECORDED: 09-19-95) Terms of Sale: These premises are being sold subject to any and all unpaid real estate taxes,water rates, municipal charges and assessments, condominium charges, expenses, costs, and assessments, if applicable, federal tax liens, partition wall rights, statutes, regulations, zoning, subdivi- sion control, or other municipal ordinances or bylaws respecting land use, configuration, building or approval, or bylaws, statutes or ordinances re- garding the presence of lead paint, asbestos or other toxic substances, sanitary codes, housing codes, tenancy, and , to the extent that they are recorded prior to the above mortgage, any easements, rights of way, re- strictions, confirmation or other matters of record. Purchaser shall also bear all state and county deeds excise tax. The de- posit of $5,000.00 is to be paid in Cash or bank or certified check at the time and place of the sale, with the balance of the purchase price to be paid by bank or certified check within thirty (30) days after the date of the sale, to be deposited in escrow with Guaetta and Benson, LLC, at 229 Billerica Road, Chelmsford, Massachusetts. In the event that the successful bidder at the foreclosure sale shall default in purchasing the within described property according to the terms of this Notice of Sale and/or the terms of the Memorandum of Sale executed at the time of the foreclosure, the Mortgagee reserves the right to sell the property by foreclosure deed to the second highest bidder or, thereafter, to the next highest bidders, providing that said bidder shall deposit with said attorney, the amount of the required deposit as set forth herein within five (5) busi- ness days after written notice of the default of the previous highest bidder. Other terms, if any, are to be announced at the sale. Present holder of said mortgage Wells Fargo Bank, National Association, Trustee for the Certificate Holders of First Franklin Mortgage Loan Trust 2004-FF4, Mortgage Pass -Through Certificates, Series 2004-FF4 by its Attorneys Guaetta and Benson, LLC Peter V. Guaetta, Esquire P.O. Box 519 . Chelmsford, MA 01824 August 23, 2013 ET - 8/28, 9/4, 9/11/13 HAVERHILL, MA- Industrial building ' 4 story brick - parking. Priced to sell. 978-689-5613 or 978-372-0418 Plaistow: Over 9,000 square feet of space of- fers the new buyer lots of flexibility from man- ufacturing to residential or warehouse. Y22 acre of land close to Rte 125. Lots of new renova- tions including new roof. Need space at a gieat price! $369,900 First Choice Realty (978)689-8006 SOUTHERN NH: Restaurant breakfast 8lunch on major highway REDUCED $59,500 Call Gallant Assoc. (978) 686-7931 508-662-9760 SOUTH LAWRENCE - Classic Mill Office Building with beam and brick decor, from 1236 SF to over 16,000 SF Available, Parking Garage, Excellent Location, less than 1 Mile 1495. Only $9.00 SF NNN (NON -PROFITS SAVE NO REAL ESTATE TAXES) PLAISTOW, NH Rte 125 5,000. SF of Retail, Ideal for Auction House or Restaurant Space, (Plumbing in Place(, Parking Lease $12 SF plus utilities Ask for Steve DeSisto METHUEN - New Professional Office Condo great for Doctor, Lawyer or Accountant. On major highway convenient to 495, 93 and 213. Seven rooms with reception area and private bath. 1,225 SF Only $285,000. HAVERHILL - Retail / Office space. Excellent via- bility! Located in strip mall connected to Dun- kin Donuts. 1,000 to 2,000 SF available. Close to 1-495 $15.00 SF NNN Ask for Charlie Coco SALISBURY - 15,000 SF warehouse on 2 acre tot. Excellent highway access. $849,000 Ask for Austin Spinella Coldwell Banker Commercial NRT 978-373-3897 SUMMERVIEW R.E, www.sresre.com / WE GET RESULTS! BUSINESS FOR SALE So. New Hampshire; MA Restaurant Bar 160 seats, sales 800k, 50k cars. $150,000; BARS from $69,000, PIZZA Shop from.. $35,000. Piz- zeria, Restaurant 6 Bar, near Downtown. $90,000; Butcher Shop, Business and Equip- ment $94,900; Restaurants from $34,900; Va- riety Store $135,000; 7-11 gas c -store $159K, Beauty Salon 4 stations going business only.. $18,500; 7000, sq. ft Restaurant and night- club. Buy just business or RE 8 Business Join our Company and make $$$ in 2013 Southern NH. 8 Mass (603) 432-5453 .................................... Buy?? Sell?? Expand?? Lease?? Make the Right Decision Call for a FREE Consultation Rick Petralia, Real Estate Sales Consultant J. Barrett & Company * **;*978-239#620************ REAL ESTATE CLASSES Get your real estate license! Pre -licensing clas- ses Tuesday/rhursday evenings in September! For more info, go to: AFrealestateschool . com HAVERHILL, MA -Huge Fantastic 4-5 bedroom located on two floors. Washer/dryer included. New carpets, windows etc. $1,395 +utils. No dogs. HAVERHILL,MA -2 bedroom 1.5 bath, townhouse style unit. private yard, laundry hookups. Nice $1,025+ utilities 603-458-1884 Salisbury Beach, Furnished 1 8 2 bedroom units Sept - June 1. Starting @ $750/mo Tom Saab RE 978-465-5116 Gloucester, E. - Short term/Season Winter rental. Available 9/2/13-5/31/14. Fully fur- nished newer contemporary home with cathe- dral wood -beamed ceilings, wood floors and open living and dining area. Washer/dryer in- cluded. Ample parking. Located between Good Harbor Beach and Long Beach with easy access to highways and trains. $1,275/ month. Rick Petralia J. Barrett &Company 978-865-1203 KINGSTON, NH - 2 bedroom house, off New Boston Rd Laundry hookups, parking $J 350+ utilities 8 security. No dogs. 978 373-8394 . SALEM NH -2 bedroom 1 bath single family, completely renovated. No pets /utilities. Available now. $1600,. 9784170-2929 SALISBURY, MA - 3 bedroom Ranch. Formal dining, nice yard. No pets. $1300/mo+ utili- ties. 1 st, last, $500 security. 603-760-2503 Amesbury, MA: LOVELY LONVALE GARDENS Country setting at its finest! Amenities include: Remodeled kitchens, Smart Card laundry, pool and lush landscape. Easy access to seacoast, 1-95 and 495. Call NOTICE OF ACTIVITY AND USE LIMITATION Site Name: Central Square Site Address: 72-76 South Main, Street Haverhill, Massachusetts MassDEP Release Tracking Number: 3-21140 A release of oil and/or hazardous materials has occurred at this loca- tion, which is a disposal site as de- fined by M.G.L. c. 21 E, § 2 and the Massachusetts Contingency Plan, 310 CMR 40.0000. On August 29, 2013, PJC Realty of Haverhill, LLC recorded with the Essex South Reg- istry of Deeds a NOTICE OF ACTIV- ITY AND USE LIMITATION on the disposal site, pursuant to 310 CMR 40.1070 through 40.1080. The NOTICE OF ACTIVITY AND USE LIMITATION will limit the fol- lowing site activities and uses on the above property: (i) Use of Property for residential purposes: (ii) The construction of future oc- cupied buildings without the use of sub -slab vapor barrier and sub -slab depression (SSD) system, which. is designed by an LSP, unless an LSP opinion will be rendered prior to such building constructions that the vapor barrier and SSD system are not required to maintain a condition of No Significant Risk; (iii) The installation of new sub- surface utilities at depths that could potentially intercept the groundwa- ter table at any time of year is pro- hibited unless an LSP Opinion is rendered indicating that either the location, depth and/or method of construction of the utility will not re- sult in the interception and migration of Light Non -Aqueous Phase Liquid: and (iv) The growing of fruit and veg- etables within Site soils. Any person interested in obtain- ing additional information about the NOTICE OF ACTIVITY AND USE LIMITATION may contact Hoffman Engineering, Inc. at 640 Ten Rod Road in North Kingstown, RI 02909 at (401) 294-9032. The NOTICE OF ACTIVITY AND USE LIMITATION and the disposal site file can be reviewed at the Mass - DEP, Northeast Region, 205B Lowell Street, Wilmington, Massachusetts 01887, tel, no. (978) 694-3200. ET - 9/11/13 . i k 4 BRAAt wett FRIENDLY COMMUNITY LIVING AT ITS BEST *Pool *Central A/C •Playground . Basketball/tennis court • Free storage *Free heat, hot water, gas Visit us 28 Forest Acres Or M -F 8:30 to 4:30, Sat 10-2 movetoforestacres.com Gloucester, E. - Long-term rental. 1 bedroom unit in updated 2 family home. Includes 2 car parking, open concept living area, spacious kitchen with granite and ss appliances, break- fast area, fireplaced living room, washer -dryer, central air,hardwood floors and more. Outdoor deck, storage shed and garden. Easy access to shopping, restaurants, beaches, Rte 128 and commuter rail. $1, 875/ month. Rick Petralia J. Barrett & Company 978-865-1203 GROVELAND, MA - 2 bedroom includes heat 8 hot water, hardwood, storage, deck, parking, new pool. Pets considered Starting at $1200/mo. 978-891-3153 + LAWRENCE, MA + Modem 1 6 2 bedroom apartments. Parking on site. Rents start Studios @ $675; 1 bedroom, $775; 2 bedroom includes heat/hot water, $995+ 978-970-2300 • METHUEN, MA - Elm Crest Estates. 2 Bedroom $1,120 mo; 1 Bedroom - $920 mo. All utilities included. No pets.978-682-4891 www.forrent.com/elmcrestestates NO ANDOVER MA 2 8 3 bedroom $975-1275 washer/dryer hookups Deck, back yard, 12 814 Ashland St. No Dogs 617-272-5053 OCEANFRONT SALISBURY BEACH/SEA BROOK. Temporary mo/wkly anytime frame Beautiful Condo 3 Bedrooms+ Parking, On the ocean, $1300 978-975-4001 Rockport, MA- Long Term 2 Bedroom Rental. In downtown business district, well lit unit with hardwood, washer -dryer in building 8 off-street parking.Walk to galleries, concert hall, shops, restaurants, beaches. No smokers or pets. $1,100/mo. Rick Petralia J. Barrett & Company 978-865-1203 SALEM, NH: Best Location! 2 8 3 bedrooms $1,100 - $1,450; includes heat / hot water; Very clean, fully applianced. Coin -op laundry. No dogs. Call 603-458-1884 SALEM, NH -Willows Park, 2 Bedroom - $1000/mo.1 Bedroom - $890/mo. Heat/hot water included. No pets. 603-894-4631 www.forrent.com/,Aillowparknh SALISBURY BEACH - 1 new apartment left. New kitchens 8 baths. 1 bedroom, $1100 per month includes utilities No smoking/pets Call 508-962-3887 SALISBURY Square, 1 bedroom efficiency. $625/mo. + utilities, 1st, last, $300 security. No pets. Call 603-760-2503 SUMMERVIEW R.E. www.sresre.com WE GET RESULTS! N.H. Manchester NH 1 bedroom from $765 Hudson / Nashua 2 bedroom Condo $1,095 Mobile Homes with heat/ hot water from $950 Derry Small 2 bedroom all utilities included $975 Derry 3 bedroom with garage 8 yard $1,295 Nashua 55+1 bedroom, heat allowance $800 Salem 3 bedroom with heat........:. $1,350 Join our Company and make $$$ in 2013 * ** Southern NH. 6 Mass 603-432-5453 ** WINTER RENTALS SALISBURY BEACH Now -June, 1-2 bedrooms Starting at $700/mo Tom Saab RE 978-465-5116 Bradford: NEW TO MARKET: Flex office space in high traffic location. Portray the pro- fessional image that you want to convey to your clients. Many options available from 1 person business settings to stand alone office spaces. Affordable! First Choice Realty (978)689-8006 HAVERHILL, MA- Industrial spaces - 1000 -5000 sq. ft. Loading dock, parking. 978-689-5613 or 978-372-0418 KINGSTON 2,750 sqft retail/office space w/pr- ivate half bath, kitchenette, storage! Choose from 2 units! $2250 Busy 125! 603-382-0360 CLASSIC HOMES RE KINGSTON Commercial property, excellent ex- posure on Rte 125, older mobile home and garage on land. $69,900. (603) 382-0360 CLASSIC HOMES- RE Methuen NEW TO MARKET: Professional Of- fice Space in recently renovated medical facil- ity. Many options to lease areas of 1;000 to, 2500 sf of space. Lots of parking. Immediate availability Starting $14/sf First Choice Realty ' (978)689-8006 NO Andover MA NEW SPACE Jefferson Park Rt 114. Full service individual offices. $495 -up 978-685-5440 www.officesuites.com SALISBURY MA - Storefront 1,600 sq ft. 2 bath, High visibility, parking. Exit 60 off Rte. 95. $1200/mo. No utilities. 603-760-2503 A CLEAN quiet, safe bldg next to YWCA, YMCA, City Hall. Lowest rents. Near public trans. 4 hr move -in. Lawrence, 978-975-5103 AMESBURY, MA - Downtown furnished room, shared bath. Kitchen, cable, parking $120/wk. Call 978-504-0567 ANDOVER, MA - Spacious room in private home. Light cooking. Walk to town 8 train. $450 Includes all. 978 533-9456 Hampton Beach, NH 1 Bedroom Condos, Featur- ing FREE Internet, hot tub spa, fitness room, elevator service, 1 block from beach and boardwalk. No lease required. Starting at $225/week -$550/month. Call 603-929-0685 HAVERHILL MA, Available Now Beautiful 10x16 room, off street parking, washer/dryer. $700 includes all.(Wi-F!, Cable etc.) 1st &last re- quired.978-914-2555 4 LAWRENCE MA best rooming house 59 Tremont 978-689-8924, 362 Essex 978-682-9078 Saba RE 978-687-8706 LAWRENCE, MA - CLEAN, QUIET, SAFE - Lawrence's FINEST.ROOMING HOUSE, Sober/Drug Free, 200 Parker St. 978-590-9060 LAWRENCE, MA - Furnished room starting at $120/wk. Drug-free . For details, 978-794-3039 LAWRENCE, MA Woman seeking same, Non Smoking. IntemettCable/Parking. No Laundry Room can be Furnished or Unfurnished $400/mo. First 8 Last Call 978-204-AB96 s s A-1 RENTALS Getting Divorced? Live at the Salisbury Inn. From $175week. 978-465-5584 rr AMESBURY, MA: Downtown. Roommate wanted for 2nd floor Furnish apartment, 9x12 private room. Full access to kitchen and bath. $520/mo all utilities included 978-388-6148 BEVERLY, MA: Retired widow seeks roommate to share expenses'and house work. I Have 2 cats 8 smoke in house. - $700 includes all utili- ties. Call 978-922-1114. BEVERLY, MA: Share 3 bedroom 2 bath house with professionals. Spacious sunny bedroom, Close to No. Beverly station 8 shopping. Drive- way 8 garage parking, No pets, $750 +1/3 utils. l st/last 8 sec. Call (301) 787-1747 BRADFORD MA - Share home, $550. Non- smoker, no pets. Utilities, Internet close to rail- road/495/125. Call (978) 374-7690 DERRY, NH - Loft bedroom with plenty of natural light. $650 all utilities included. Non-smoker. No pets. Call (603) 369-8997. HAVERHILL,MA share house. Off street parking, enclosed yard, everything included. $625/mo. Call 978-303-5223. HAVERHILL Methuen Line - Gay male, seeks roommate. Private Bedroom/Loft combo. Near 495, Shared Kitchen/Bath. Washer 6 Dryer Clean, Quite, Off street parking, $525/mo. 1 stAast/security. Call 508-847-2058 1 AM LOOKING FOR A ROOM TO RENT! I am thinking that you and 1 can help each other out. (Haverhill Area). 978-476-7855 LAWRENCE: Share 2 bedroom Condo, 3 level. $500 includes utilities. Call 978-807-6581 for more information MAGNOLIA, MA: Share large Victorian near ocean. No pets. No smoking. From $140 per week includes utilities. (978) 774-4704 MASTER Bedroom in 2 bedroom Gloucester apartment centrally located Portuguese Hill. Share bath 8 kitchen. Split utilities. WIFI. Access to cable. Ample closet 8 storage space. Long time roommate is moving. 508-662-8474 MIDDLETON, MA: Furnished bedroom, use of house. $440/mo + 1/4 utilities, 8 Security No smoking/no pets. Call (978) 777-9431 ROWLEY, MA: Professional seeking same to shareLuxury Home in country setting all amenities incl. $1400/mo (781) 405-7340 Salem, MA: Share Apartment $750+ furnished, 5 room washer/dryer in unit walk to Salem State University, Bedroom is 13' x 13' No pet- s/smokersAvail. 10/01 (781)771-0224 SALISBURY, MA -One mile from beach. Mature person seeks same to share house with - ktchen 6 utilities, washer/dryer, cable. Parking. Large yard, deck. No pets. $700. Call Sandy, 978-465-2209 NOTICE Some advertisements running in this category may require an investment ATTENTION CAREGIVERS! If you are a PCA, CNA, Nurse or offer personal care services please go to the business and service directory and check out the category for Adult Care. Yours services are needed! DRIVER'S NEEDED FT/PT -- YOUR CAR OR VAN CALL 781-272-0000 Deliver the Fairpoint phone books 18+ yrs w/insured vehicles to deliver Manches- ter, Auburn, Goofstown, Londonderry, Derry Windham areas. Also looking for office clerks and loaders. Starts Sept. 30. Work min of 6 s daylight hours per day get paid within 72 hours upon completion of route. 800-979-7978, SALISBURY, MA - 2 ,3 bedroom mobile homes 9 6 5:30 pm, M -F. Refer to job# 30122-b starting at $1000/mo+ utilities. No Pets. EOE 1 stAast/securky. A-1 Rentals 978- 465-5584 NOTICE OF FILING AND PUBLIC HEARING D.P.U. 13-102 September 5, 2013 Petition of Bay State Gas Company d/b/a Columbia Gas of Massachu- setts for approval of its Revised Local Distribution Adjustment Clause Tariff. On August 21, 2013, Bay State Gas Company d/b/a Columbia Gas ("Co- lumbia" or "Company") filed a revised Local Distribution Adjustment Clause tariff for effect November 1, 2013 pursuant to the Department of Public Utilities' ("Department") orders in 2013-2015 Energy Efficiency Plans Order, D.P.U. 12-100 through D.P.U. 12-111 (January 31, 2013) and Investigation by the Department of Public Utilities on its own Motion into Updating its Energy Efficiency Guidelines, D.P.U. 11-120-A, Phase II (January 31, 2013) and the Department's August 1, 2013 procedural memorandum in dockets D.P.U. 13 -GAF -P1, P2, P3, P4, P5, P6, and P8. The Department has dock- eted this matter as D.P.U. 13-102. The revised LDAC tariff changes the timing for reconciliation of the ener- gy efficiency surcharge ("EES") such that reconciliation of the EES will now occur at the end of the three-year energy efficiency term, instead of annu- ally. The revised LDAC tariff also allows for collection and recovery of an EES for each plan year, each set at the beginning of the three-year energy efficiency term. These surcharges will remain in effect during the term un- less a threshold trigger is met, as described in the Department's energy ef- ficiency guidelines. See Revised Energy Efficiency Guidelines §§ 3.2.2.3.1. The Department will conduct a public hearing in D.P.U. 13-102 to re- ceive comments on the Company's revised LDAC Tariff. The hearing'will take place on Wednesday, September 25, 2013 at 2:00 p.m. at the De- partment's offices, One South Station - 5th Floor, Boston, Massachusetts 02110. Any person who desires to comment may do so at the time and place noted above or may submit written comments to the Department not later than close of business (5:00 p.m.) on September 25, 2013. Any person who desires to participate in the evidentiary phase of this proceed- ing must file a written petition for leave to intervene with the Department not later than September 18, 2013. A petition for leave to intervene must satisfy the requirements of 220 C.M.R. § 1.03. Receipt by the DQpartment, not mailing, -constitutes filing and determines whether a petition has been timely filed. A petition filed late may be disallowed as untimely, unless good cause is shown for a waiver under 220 C.M.R. § 1.01(4). To be allowed, a petition under 220 C.M.R. § 1.03(1) must satisfy the standing requirements of G. L. c. 30A, § 10. An original and two (2) copies of all written comments or petitions to in- tervene must be filed with Mark D. Marini, Secretary, Department of Public Utilities, One South Station - 5th Floor, Boston, Massachusetts 02110, not later than the.dates noted above. In addition, one (1) copy of all written documents must be sent to counsel for the Company, Kevin Penders, Esq., Keegan Werlin LLP, 265 Franklin Street, Boston, Massachusetts 02110. All documents should also be submitted to the Department in electronic format using one of the following methods: (1) by email attachmenttodpu. efiling@state.ma.us and the hearing officer jessica.buno@state.ma.us or (2) on a CD-ROM. The text of the email or CD-ROM must specify: (1) the docket number of the proceeding (D.P.U. 13-102); (2) the name of the per- son or company submitting the filing; and (3) a brief descriptive title of the document. The electronic filing should also include the name, title, and telephone number of a person to contact in the event of questions about the filing. All documents submitted in electronic format will be posted on the Department's website: http://www.mass.gov/dpu. A copy of the filing is available at the Department's office, One South Station - 5th Floor, Boston, Massachusetts for public view during normal business hours and on the Department's website http://www.mass.gov/ dpu by accessing the file room link. A copy is also on file for public view at the Company's website: www.columbiagasma.com. Any person desiring further information regarding the Company's filing should contact counsel for the Company, Kevin Penders, Esq. at (617) 951-1400. Any person desir ing further information regarding this notice should contact Jessica Buno, Hearing Officer, Department of Public Utilities, at (617) 305-3527. Er - 9/1 1/13