HomeMy WebLinkAboutContract #: 009561 - From: 11-30-2013 To: - Exception - Town of North AndoverSantilli, Ray
From: Santilli, Ray
Sent: Thursday, October 03, 2013 2:38 PM
To: Foster, Stephen E.
Subject: IFB - Furnish & Install Insulation at Stevens Estate
Please advised that no bids were received in response to the'IFB — Furnish & Install Insulation at Stevens
Estate' by today's 2:00 p.m. deadline.
Ray Santilli
Assistant Town Manager
Town of North Andover
120 Main Street
North Andover, MA 01845
Phone 978.688.9516
Fax 978.688.9556
Email rsantilli@townofnorthandover.com
Web www.townofnorthandover.com
TOWN OF NORTH ANDOVER
INVITATION FOR BIDS
FURNISH & INSTALL INSULATION
AT STEVENS ESTATE
September 11, 2013
Contact Ray Santilli
Assistant Town Manager
Address 120 Main Street
North Andover, MA 01845
Telephone Number: 978-688-9516
Fax Number: 978-688-9556
Email rsantilli@townofnorthandover.com
Table of Contents
1. Introduction......................................................... 3
2. Submission Deadline and Instructions ........................... 3
3. Questions, Addendum or Proposed Modifications ............. 4
4. Minimum Requirements ............................................ 5
5. Scope of Services ..................................................... 5
6. Insulation Installation Sketches .................................... 8
7. Site Visits............................................................ 11
8. Prevailing Wage Rates .............................................. 11
9. Payment Bond ....................................................... 11
10. Bid Deposit......................................................... 11
11. Evaluation of Bids ................................................... 11
12. Term of Contract .................................................. 12
Appendix A — Price Proposal ........................................ 13
Standard Town of North Andover Contract
With Supplement "C" ............................................. 14
Certifications........................................................... 34
Payment Bond Form ................................................... 37
Prevailing Wage Rates ................................................. 38
Town of North Andover IFB Page 2 of 38
Furnish & Install Insulation at Stevens Estate
1. Introduction
The Town of North Andover is soliciting bids from qualified contractors to furnish and install
blown -in cellulose insulation in P floor sloped ceilings and 4th floor attic floor areas of the
Stevens Estate, 723 Osgood Street, North Andover MA. Qualified contractors are requested to
submit bids to the Assistant Town Manager at North Andover Town Hall, 120 Main Street,
North Andover, MA, in accordance with the instructions contained within this Invitation for
Bids.
Notice of this IFB is published in the Central Register, which is a weekly publication of the
Office of the Secretary of the Commonwealth, the Eagle -Tribune (a newspaper of general
circulation) and posted on the Town website (www.townofnorthandover.com) under "Bids,
Quotes and Proposals".
The Town will accept proposals delivered in person or by mail. All proposals must be received
by 2:00 p.m. on Thursday, October 3, 2013 to be considered. Proposals submitted by fax or by
electronic mail will not be considered. All proposals must be submitted to:
Mr. Ray Santilli, Assistant Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
The Town of North Andover may cancel this IFB or reject in whole or in part any and all
proposals, if they determine that cancellation or rejection serves the best interest of the
Town of North Andover.
2. Submission Deadline and Instructions
Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed
envelope marked "Insulation — Stevens Estate" with the applicant's name and address on the
front. Applicants should provide one (1) signed original proposal. Fax or electronic submissions
will not be accepted. Applicants must also execute and include in the sealed submission the
Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance and the
Certification of Labor Harmony and OSHA Training Requirements. The Town of North
Andover, through the Town Manager, is the awarding authority and reserves the right to reject
any and all proposals or parts of proposals; to waive any defects, information, and minor
irregularities; to accept exceptions to these specifications; and to award contracts or to cancel this
Invitation for Bids if it is in the Town of North Andover's best interest to do so.
Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if
the bidder is a partnership, by the name of the partnership, followed by the signature of each
general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature
must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed.
Town of North Andover IFB Page 3 of 38
Furnish & Install Insulation at Stevens Estate
All sealed proposals must be received and registered by the Assistant Town Manager's office by
Thursday, October 3, 2013 at 2:00 p.m. All outer envelopes must be labeled "Insulation —
Stevens Estate" and mailed or hand delivered to the following address:
Mr. Ray Santilli, Assistant Town Manager
North Andover Town Hall
120 Main Street
North Andover, MA 01845
No proposals will be accepted after the time and date noted. Late delivery of materials due to
any type of delivery system shall be cause for rejection. If on the date and time of the submittal
deadline the North Andover Town Hall is closed due to an uncontrolled event such as fire, snow,
ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the
next normal business day.
3. Questions, Addendum or Proposal Modification
Questions concerning this IFB must be submitted in writing to: Mr. Ray Santilli, Assistant Town
Manager, 120 Main Street North Andover, MA 01845, or they may be emailed to Mr. Santilli at
rsantilli@townofnorthandover.com. All questions/inquiries must be received by 4:30 p.m. on
Tuesday, September 24, 2013 to be considered. Questions/inquiries may be delivered, mailed,
emailed or faxed. Written responses will be posted on the Town's website
(www.townofnorthandover.com) in "Bids, Quotes and Proposals" by Thursday, September 26,
2013 at 2:00 p.m.
If any changes are made to this IFB, an addendum will be posted on the Town's website in
"Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence
of any addenda and/or modifications issued by the Town. As this IFB has been published on the
Town's website (www.townofnorthandover.com) all bidders are responsible for checking the
website for any addenda and /or modifications that are subsequently made to this IFB.
The Town accepts no liability for and will provide no accommodations to bidders who fail to
check for amendments and/or modifications to this IFB and subsequently submit inadequate or
incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any
IFB component files. Modifications to the body of the IFB, Scope of Work, terms and
conditions, or which change the intent of this IFB are prohibited and may disqualify a response.
All proposals submitted in response to this IFB shall remain firm for sixty (60) days following
the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days
after the submittal deadline.
Bidders are not to communicate directly with any employee of the Town of North Andover,
except as specified in this IFB, and no other individual employee or representative is authorized
to provide any information or respond to any question or inquiry concerning this IFB.
Town of North Andover IFB Page 4 of 38
Furnish & Install Insulation at Stevens Estate
Bidders may contact the Contact Person for this IFB in the event this lFB is incomplete or the
bidder is having trouble obtaining any part of the IFB electronically through the Town website
(www.townofnorthandover.com), including, and without limitation the form and attachments.
Bidder with disabilities or hardships that seek reasonable accommodations, which may include
the receipt of IFB information and/or addenda and/or modifications in an alternative format,
must communicate such requests in writing to the contact person, and reasonable
accommodation will be made by agreement with the contact person on behalf of the Town of
North Andover.
4. Minimum Requirements
Each bidder must demonstrate that it meets the following minimum requirements:
A. Contractor must demonstrate a minimum of five (5) years experience providing the
services required in the Scope of Services.
B. Contractor shall furnish evidence of training, certification and experience in performing
scope of services.
C. Contractor shall supply all labor, materials and equipment to perform listed scope of
services.
D. Contractor shall perform the required work prior to this upcoming winter heating season.
E. Contractor shall submit a complete list of all contracts performed in the past two (2) years
with contact names and telephone numbers.
F. Prices shall remain firm for the entire period of the contract.
G. Submission of required statements and forms.
5. Scope of Services
The Stevens Estate at Osgood Hill was built in 1886 by Moses T. Stevens, a prosperous owner of
textile mills and a member of one of the founding families of North Andover. The main house
and outbuildings were designed by the Boston architects Hartwell & Richardson. The Town of
North Andover purchased the Stevens Estate and its 154 acres in 1995 to protect the buildings
and preserve its grounds. On the National Historic Register, the Stevens Estate is one of the few
remaining grand estates of the Victorian era. The Town currently operates the Stevens Estate as
a function facility.
Town of North Andover IFB Page 5 of 38
Furnish & Install Insulation at Stevens Estate
A. General
1) Work Included
a) The contractor will supply all labor, materials and equipment necessary for the
complete and proper installation of cellulose insulation on the drawing herein.
b) Material and installation shall conform to all applicable building code
requirements.
c) Work shall be coordinated with the Estate Director as to not conflict with any
scheduled events and shall conform to the normal schedule of Monday through
Friday from 7:30 a.m. to 4:30 p.m.
d) Contractor shall be responsible for obtaining all proper permits. The Town,
through its Board of Selectmen, may waive any and all associated fees for such
permits.
e) Contractor shall be responsible for cleaning and disposal of all debris at the end of
each work day. Disposal of any and all material(s) shall be the contractor's
responsibility.
2) Referenced Regulations and Materials Standards
a) 16 CFR Part 460 — Labeling and Advertising of Home Insulation (commonly
known as the FTC R -Value Rule)
b) 16 CFR Part 1209 — Interim Safety Standard for Cellulose Insulation (Consumer
Products Safety Commission standard for cellulose insulation)
c) ASTM C739 — Standard Specification for Cellulose Fiber Loose -Fill Insulation
d) ASTM C1015 — Standard Practice for Installation of Cellulose and Mineral Fiber
Loose Fill Insulation
e) ASTM C1149 — Standard Specification for Self -Supported Spray Applied
Cellulose Thermal Insulation
f) ASTM C1497 — Standard Specification for Cellulosic Fiber Stabilized Insulation
3) Quality Assurance
a) Contractor shall furnish manufacturer's evidence of conformance with Consumer
Products Safety Commission Interim Safety Standard 16 CFR Part 1209 and with
the applicable ASTM material standard for the specific type of cellulose
insulation.
b) Contractor shall furnish evidence of training, certification and experience in
performing scope of services.
Town of North Andover IFB Page 6 of 38
Furnish & Install Insulation at Stevens Estate
4) Delivery, Storage and Handling
a) Materials shall be delivered to the site in clearly labeled packaging conforming
with the labeling requirements of the Consumer Products Safety Commission
Interim Safety Standard 16 CFR Part 1209 and 1404, Federal Trade Commission
R -Value Rule 16 CFR Part 460, and with the applicable ASTM material standard
for the specific type of cellulose insulation.
b) Materials shall be protected from the weather and other conditions.
c) Damaged materials found unsuitable for use will be rejected and shall be removed
from the site.
5) Project and Site Conditions
a) Cellulose insulation shall not be installed under temperature and humidity
conditions not approved by the manufacturer.
b) In the case of materials installed with added moisture, provide natural ventilation
to properly cure the insulation during and subsequent to its application.
6) Cleaning
a) After completion of insulation work in an area, equipment shall be removed and
all surfaces shall be cleaned of all deposits of insulation material.
B. Products
1) Materials
a) Insulation shall be loose -fill cellulose insulation.
b) Insulation shall conform with Consumer Products Safety Commission Interim
Safety Standard 16 CFR Part 1209 and to the applicable ASTM material standard
for the specific type of cellulose insulation.
C. Execution
1) Preparatory Work
a) Contractor shall verify by inspection that stud and joist spaces are accessible, free
of debris and those heat -producing devices and elements that are not inherently
fireproof are shielded such that insulation will be held 3" away.
2) Application
a) Insulation shall be installed in conformance with applicable codes, the
manufacturer's published instructions, or Cellulose Insulation Manufacturers
Association Technical Bulletin 2, 3, or 5; and ASTM Standard Designation
C1015.
Town of North Andover IFB Page 7 of 38
Furnish & Install Insulation at Stevens Estate
3) Field Quality Control
a) Installation in attic space — specific R -value shall be based on the manufacturer's
coverage chart, developed in conformance with the requirements of 16 CFR Part
460. Contractor shall affix thickness markers labeled in inches or R -values to
trusses with at least one marker per 300 square feet throughout the attic area.
Each marker shall face the attic access. Contractor shall verify installed R -value
with a bag count and shall provide a certificate indicating the number of bags
installed and installed R -value. The contractor shall post the certificate in a
conspicuous location where it is visible and readable from attic access.
b) Wall insulation — insulation shall be installed at the minimum density required by
the insulation manufacturer or the job specifications. Contractor shall verify
installed density by calculating the total volume of wall cavities in cubic feet and
dividing the total amount of insulation installed, by pounds, by this value..
6. Insulation Installation Sketches
Town of North Andover IFB Page 8 of 38
Furnish & Install Insulation at Stevens Estate
C7 f
..�-
_ .._ .._. _ _ ......�t- 3r'3
'2- 30 ItASuL.AT"30
vLi �-:{{.oF.
.-�y4✓f-1lNC�
�
rGKYEF1b TD S WAc.c_
GA✓/T
C-f tOz WA., ..
_
Town of North Andover IFB Page 8 of 38
Furnish & Install Insulation at Stevens Estate
r
0
r
a
s
N •� L �
z � �
i
7. Site Visits
Site visits to the Stevens Estate can be scheduled by contacting Steve Foster, Facilities
Management Director, at 978-305-5850.
8. Prevailing Wage Rates
The successful bidder will at all times comply with the prevailing wage rates as determined by
the Department of Labor Standards under the provisions of Massachusetts General Laws as shall
be in force and as amended. The prevailing wage rates are attached.
9. Payment Bond
In accordance with Massachusetts General Laws, for a contract award greater than $25,000, the
successful bidder shall provide a payment bond in the amount of 50% of the total cost of the
contract. The payment bond must be on the Town's form that is attached.
10. Bid Deposit
In accordance with Massachusetts General Laws, all bidders are required to submit a bid deposit
in the amount of 5% of the value of the first year total bid.
11. Evaluation of Bids
Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility
of the bidder will then be ascertained. Finally, the aggregate price for the services delivered by each
responsive and responsible bidder will be considered. The Town is required to award the contract to
the lowest responsive and responsible bidder.
■ Responsiveness
Bidders must completely fill out and submit the bid form and all other required forms. All
supplies and services that are the subject of the bid must meet the minimum standards and
scope of services set forth in the purchase description including the standards by which the
procurement officer will determine acceptability as to quality, workmanship, results of
inspections and tests, and suitability for a particular purpose.
■ Responsibility
Bidders must demonstrate that they meet measures of responsibility. The Town will not
award a contract to any bidder who cannot furnish satisfactory evidence of his ability and
experience in this type of work and that he has sufficient plant and capital to enable him
to prosecute and complete the work as outlined in the Specifications. The Town may
make such investigations as it deems necessary to determine the above and a bidder shall
furnish any information requested in this regard.
Town of North Andover IFB Page l l of 38
Furnish & Install Insulation at Stevens Estate
All costs not listed on the bid price sheet will not be considered part of the contract and therefore
will not be paid. The Town of North Andover will not be charged fuel surcharges or
administrative fees as part of any contract entered into as a result of this IFB. Additionally the
Town of North Andover will not be charged late fees unless payment is not made within sixty
(60) days of the receipt of invoice.
The Town of North Andover is a tax exempt entity so no sales tax will be assessed to any
purchases made under this proposed contract.
12. Term of Contract
The successful bidder will be required to execute the standard Town of North Andover contract
and the appropriate supplement as attached.
Town of North Andover IFB Page 12 of 38
Furnish & Install Insulation at Stevens Estate
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible, responsive bidder offering the lowest price for
the work to be performed. All prices are to remain firm for the duration of the Contract.
Total Lump Sum Price to furnish all labor, materials, equipment, and incidentals required to furnish
and install blown -in cellulose insulation in 3`d floor sloped ceilings and 4th floor attic floor areas of
the Stevens Estate, 723 Osgood Street, North Andover MA, in accordance with the scope of services.
Addenda
Business Name
Business Address
Business Phone
Email Address
are acknowledged:
Signature
Fax
Name of Person Authorized to sign Price Proposal
Title of Person Authorized to sign Price Proposal
Signature of Above Person
Town of North Andover IFB Page 13 of 38
Furnish & Install Insulation at Stevens Estate
Town of North Andover
CONTRACT
CONTRACT#
DATE:
This Contract is entered into on, or as of, this date by and between the Town of North
Andover (the "Town"), and
Contractor:
Address:
Telephone Number:
Fax Number:
1. This is a Contract for the procurement of the following:
2. The Contract price to be paid to the Contractor by the Town of North Andover is:
3. Payment will be made as follows:
4. Definitions:
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services
by authorized representatives of the Town to insure that the goods or services are
complete and are as specified in the Contract.
Town of North Andover IFB Page 14 of 38
Furnish & Install Insulation at Stevens Estate
4.2 Contract Documents: All documents relative to the Contract including (where
used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary
General Conditions, General Specifications, Other Specifications included in
Project Manual, Drawings, and all Addenda issued during the bidding period. The
Contract documents are complementary, and what is called for by any one shall be
as binding as if called for by all. The intention of the document is to include all
labor and materials, equipment and transportation necessary for the proper
performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term
shall (as the sense and particular Contract so require) include Vendor, Contractor,
Engineer, or other label used to identify the other party in the particular Contract.
Use of the term "Contractor" shall be understood to refer to any other such label
used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete,
the services are performed, or the goods delivered, in accordance with Contract
documents, as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term
includes one who furnished material worked to a special design according to the
Drawings or Specifications of this work, but does not include one who merely
furnishes material not so worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance:
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before November 30, 2013, unless extended pursuant to a provision
for extension contained in the Contract documents at the sole discretion of the Town, and not
subject to assent by the Contractor, and subject to the availability and appropriation of funds as
certified by the Town Accountant. The time limits stated in the Contract documents are of the
essence of the Contract.
6. Subject to Appropriation:
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the Town is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this
Contract shall be immediately terminated without liability for damages, penalties or other
charges.
Town of North Andover IFB Page 15 of 38
Furnish & Install Insulation at Stevens Estate
7. Permits and Approvals:
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its
performance of the Contract shall be secured and paid for by the Contractor.
8. Termination and Default:
8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days
notice when in the best interests of the Town by providing notice to the Contractor,
which shall be in writing and shall be deemed delivered and received when given in
person to the Contractor, or when received by fax, express mail, certified mail return
receipt requested, regular mail postage prepaid or delivered by any other appropriate
method evidencing actual receipt by the Contractor. Upon termination without cause,
Contractor will be paid for services rendered to the date of termination.
8.2 For Cause. If the Contractor is determined by the Town to be in default of any term
or condition of this Contract, the Town may terminate this Contract on seven (7) days
notice by providing notice to the Contractor, which shall be in writing and shall be
deemed delivered and received when given in person to the Contractor, or when
received by fax, express mail, certified mail return receipt requested, regular mail
postage prepaid or delivered by any other appropriate method evidencing actual
receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract:
1) any material misrepresentation made by the Contractor to the Town; 2) any
failure to perform any of its obligations under this Contract including, but not
limited to the following: (i) failure to commence performance of this Contract at
the time specified in this Contract due to a reason or circumstance within the
Contractor's reasonable control, (ii) failure to perform this Contract with
sufficient personnel and equipment or with sufficient material to ensure the
completion of this Contract within the specified time due to a reason or
circumstance within the Contractor's reasonable control, (iii) failure to perform
this Contract in a manner reasonably satisfactory to the Town, (iv) failure to
promptly re -perform within a reasonable time the services that were rejected by
the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for
reasons not beyond the Contractor's reasonable control, (vi) failure to comply
with a material term of this Contract, including, but not limited to, the provision
of insurance and non-discrimination, (vii) any other acts specifically and
expressly stated in this Contract as constituting a basis for termination of this
Contact, and (viii) failure to comply with any and all requirements of state law
and/or regulations, and Town bylaw and/or regulations.
9. The Contractor's Breach and the Town's Remedies:
Failure of the Contractor to comply with any of the terms or conditions of this Contract
shall be deemed a material breach of this Contract, and the Town of North Andover shall
Town of North Andover IFB Page 16 of 38
Furnish & Install Insulation at Stevens Estate
have all the rights and remedies provided in the Contract documents, the right to cancel,
terminate, or suspend the Contract in whole or in part, the right to maintain any and all
actions at law or in equity or other proceedings with respect to a breach of this Contract,
including damages and specific performance, and the right to select among the remedies
available to it by all of the above.
From any sums due to the Contractor for services, the Town may keep the whole or any
part of the amount for expenses, losses and damages incurred by the Town as a
consequence of procuring services as a result of any failure, omission or mistake of the
Contractor in providing services as provided in this Contract.
10. Statutory Compliance:
10.1 This Contract will be construed and governed by the provisions of applicable
federal, state and local laws and regulations; and wherever any provision of the
Contract or Contract documents shall conflict with any provision or requirement
of federal, state or local law or regulation, then the provisions of law and
regulation shall control. Where applicable to the Contract, the provisions of the
General Laws are incorporated by reference into this Contract, including, but not
limited to, the following:
General Laws Chapter 30B — Procurement of Goods and Services.
General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts.
General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts.
10.2 Wherever applicable law,mandates the inclusion of any term and provision into a
municipal contract, this Section shall be understood to import such term or
provision into this Contract. To whatever extent any provision of this Contract
shall be inconsistent with any law or regulation limiting the power or liability of
cities and towns, such law or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations
bearing on the performance of the Contract. If the Contractor performs the
Contract in violation of any applicable law or regulation, the Contractor shall bear
all costs arising therefrom.
10.4 The Contractor shall keep itself fully informed of all existing and future State and
National Laws and Municipal By-laws and Regulations and of all orders and
decrees of any bodies or tribunals having jurisdiction in any manner affecting
those engaged or employed in the work, of the materials used in the work or in any
way affecting the conduct of the work. If any discrepancy or inconsistency is
discovered in the Drawings, Specifications or Contract for this work in violation of
any such law, by-law, regulation, order or decree, it shall forthwith report the same
in writing to the Town. It shall, at all times, itself observe and comply with all
such existing and future laws, by-laws, regulations, orders and decrees; and shall
Town of North Andover IFB Page 17 of 38
Furnish & Install Insulation at Stevens Estate
11.
12.
13.
protect and indemnify the Town of North Andover, and its duly appointed agents
against any claim or liability arising from or based on any violation whether by
him or its agents, employees or subcontractors of any such law, by-law, regulation
or decree.
Conflict of Interest:
Both the Town and the Contractor acknowledge the provisions of the State Conflict of
Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any
activity which shall constitute a violation of that law. The Contractor shall be deemed to
have investigated the application of M.G.L. c. 268A to the performance of this Contract;
and by executing the Contract documents the Contractor certifies to the Town that neither
it or its agents, employees, or subcontractors are thereby in violation of General Laws
Chapter 268A.
Certification of Tax Compliance
This Contract must include a certification of tax compliance by the Contractor, as
required by General Laws Chapter 62C,
by All Contractors Providing Goods
Commonwealth or Subdivision).
Discrimination
Section 49A (Requirement of Tax Compliance
, Services, or Real Estate Space to the
The Contractor will carry out the obligations of this Contract in full compliance with all
of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended.
14. Assignment:
Assignment of this Contract is prohibited, unless and only to the extent that assignment is
provided for expressly in the Contract documents.
15. Condition of Enforceability Against the Town:
This Contract is only binding upon, and enforceable against, the Town if: (1) the
Contract is signed by the Town Manager or its designee; and (2) endorsed with approval
by the Town Accountant as to appropriation or availability of funds; and (3) endorsed
with approval by the Town Counsel as to form.
16. Corporate Contractor:
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its
Clerk's Certificate certifying the corporate capacity and authority of the party signing this
Contract for the corporation. Such certificate shall be accompanied by a letter or other
Town of North Andover IFB Page 18 of 38
Furnish & Install Insulation at Stevens Estate
instrument stating that such authority continues in full force and effect as of the date the
Contract is executed by the Contractor. This Contract shall not be enforceable against the
Town of North Andover unless and until the Contractor complies with this section.
The Contractor, if a foreign corporation, shall comply with the provisions of the General
Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in
addition thereto, relating to the appointment of the Commissioner of Corporations as its
attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly
authenticated copies of its Charter or Certificate of Incorporation; and said Contractor
shall comply with all the laws of the Commonwealth.
17. Liability of Public Officials:
To the full extent permitted by law, no official, employee, agent or representative of the
Town of North Andover shall be individually or personally liable on any obligation of the
Town under this Contract.
18. Indemnification:
The Contractor shall indemnify, defend and save harmless the Town, the Town's officers,
agents and employees, from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every
nature and description (including reasonable attorneys' fees) that may arise in whole or in
part out of or in connection with the work being performed or to be performed, or out of
any act or omission by the Contractor, its employees, agents, subcontractors, material
men, and anyone directly or indirectly employed by any of them or anyone for whose acts
any of them may be liable, regardless of whether or not it is caused in part by any party
indemnified hereunder. The Contractor further agrees to reimburse the Town for damage
to its property caused by the Contractor, its employees, agents, subcontractors or material
men, and anyone directly or indirectly employed by any of them or anyone for whose acts
any of them may be liable, including damages caused by his, its or their use of faulty,
defective, or unsuitable material or equipment, unless the damage is caused by the
Town's gross negligence or willful misconduct. The existence of insurance shall in no
way limit the scope of the Contractor's indemnification under this contract.
19. Workers Compensation Insurance:
The Contractor shall provide by insurance for the payment of compensation and the
furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts
(The Worker's Compensation Act) to all employees of the Contractor who are subject to
the provisions of Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract
shall be deemed a material breach of this Contract, shall operate as an immediate
termination thereof, and Contractor shall indemnify the Town for all losses, claims, and
actions resulting from the failure to provide the insurance required by this Article.
Town of North Andover 11713 Page 19 of 38
Furnish & Install Insulation at Stevens Estate
The Contractor shall furnish to the Town evidence of such insurance prior to the
execution of this Contract before the same shall be binding on the parties thereto, except
if specifically waived by the Town.
20. Documents, Materials, Etc.
Any materials, reports, information, data, etc. given to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available
to any individual or organization by the Contractor (except agents, servants, or employees
of the Contractor) without the prior written approval of the Town, except as otherwise
required by law. The Contractor shall comply with the provisions Chapter 66A of the
General Laws of Massachusetts as it relates to public documents, and all other state and
federal laws and regulations relating to confidentiality, security, privacy and use of
confidential data.
Any materials produced in whole or in part under this Contract shall not be subject to
copyright, except by the Town, in the United States or any other country. The Town
shall have unrestricted authority to, without payment of any royalty, commission, or
additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise
use, and authorize others to use, in whole or in part, any reports, data or other materials
prepared under this Contract.
All data, reports, programs, software, equipment, furnishings, and any other
documentation or product paid for by the Town shall vest in the Town at the termination
of this Contract. The Contractor shall at all times, during or after termination of this
Contract, obtain the prior written approval of the Town before making any statement
bearing on the work performed or data collected under this Contract to the press or issues
any material for publication through any medium.
21. Audit, Inspection and Recordkeeping
At any time during normal business hours, and as often as the Town may deem it
reasonably necessary, there shall be available in the office of the Contractor for the
purpose of audit, examination, and/or to make excerpts or transcript all records, contracts,
invoices, materials, payrolls, records of personnel, conditions of employment and other
data relating to all matters covered by this Agreement.
22. Pa. moment_
The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth
in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice
detailing the work completed and acceptance from the Town of the work completed.
Town of North Andover IFB Page 20 of 38
Furnish & Install Insulation at Stevens Estate
23. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all
signatories to the original Agreement, prior to the effective date of the amendment.
To the extent allowed by law, any conditions, duties, and obligations contained in this
Contract may be waived only by written Agreement by both parties.
Forbearance or indulgence in any form or manner by a party shall not be construed as a
waiver, nor in any manner limit the legal or equitable remedies available to that party.
No waiver by either party of any default or breach shall constitute a waiver of any
subsequent default or breach of a similar or different matter.
24. Forum and Choice of Law
This Contract and any performance herein shall be governed by and be construed in
accordance with the laws of the Commonwealth. Any and all proceedings or actions
relating to subject matter herein shall be brought and maintained in the courts of the
Commonwealth or the federal district court sitting in the Commonwealth, which shall
have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any
other legal rights of the parties.
25. Notices
Any notice permitted or required under the provisions of this Contract to be given or
served by either of the parties hereto upon the other party hereto shall be in writing and
signed in the name or on the behalf of the party giving or serving the same. Notice shall
be deemed to have been received at the time of actual service or three (3) business days
after the date of a certified or registered mailing properly addressed. Notice to the
Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to
the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main
Street, North Andover, Massachusetts 01845.
26. Binding on Successors:
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or
successors in interest (and where not corporate, the heirs and estate of the Contractor).
27. Complete Contract:
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no
agreements other than those incorporated herein.
Town of North Andover IFB Page 21 of 38
Furnish & Install Insulation at Stevens Estate
28. Supplemental Conditions:
The foregoing provisions apply to all contracts to which the Town of North Andover
shall be a party. One of the following "Supplements" must be "checked" as applicable to
this Contract, shall be attached hereto, and shall in any event apply as the nature of the
Contract requires. The Supplement contains additional terms governing the Contract:
[ ] GOODS
SUPPLEMENT "G" - Applicable to Contracts for the procurement of
Goods (governed by the provisions of General Laws
Chapter 3013)
[ ] SERVICES
SUPPLEMENT "S" - Applicable to Contracts for the procurement of
Services (governed by the provisions of General
Laws Chapter 3013)
[X] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for Construction
Town of North Andover IFB Page 22 of 38
Furnish & Install Insulation at Stevens Estate
IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set
forth their hands the day and year first above written.
THE TOWN
Division/Department Head
Contract Manager
Town Manager
APPROVED AS TO FORM:
Town Counsel
Date
Date
THE CONTRACTOR
Company Name
Signature
Print Name & Title
CERTIFICATION AS TO AVAILABILITY OF FUNDS:
Town Accountant
Town of North Andover IFB
Furnish & Install Insulation at Stevens Estate
Date
Date
Page 23 of 38
SUPPLEMENT "C"
[] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for the construction of -
(1)
£
(1) Public Buildings and Public Works
(governed by the provisions of General Laws Chapter 30B);
(2) Public Buildings
(governed by the provisions of General Laws Chapter 149,§ 44A,
et seq.); and
(3) Public Works
(governed by the provisions of General Laws Chapter 30, §39M, et seq)
1. This form supplements the Town of North Andover "Contract and General Conditions" and applies
only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works
or public buildings.
Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
(where required) in the form required by the Town and provide an original thereof to the Town prior
to the commencement of performance.
E uali :
3.1. I:n the case of a closed Specification written for a specific item or items to be furnished under
the Base Bid, such specifications shall, as applicable, be in compliance with the
Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq.
3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or
on the Drawings, except as above noted, the intent is to establish a standard and in no way
should be construed to exclude any item or manufacturer not mentioned by name, but whose
product meets the Specifications as to design, utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of
goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of
Chapter 30B.
The Contractor will carry out the obligations of this contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage
Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of
Massachusetts as they may from time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall
be in force and as amended.
The Contractor shall continuously maintain adequate protection of all work from damage and shall
protect the property of the Town and others, including adjacent property, from injury or loss arising
Town of North Andover IFB Page 24 of 38
Furnish & Install Insulation at Stevens Estate
in connection with the Contract. The Contractor shall make good any such damage, injury or loss,
except as may be directly due to errors in the Contract Documents or caused by agents or employees
of the Town, or due to causes beyond the Contractor's control and not the Contractor's fault or
negligence.
7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall
comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents
or injury to persons on, about or adjacent to the premises where the work is being perfonned. The
Contractor will erect and properly maintain at all times, as required by the conditions and progress of
the work, all necessary safeguards for the protection of workers and the public, shall post danger
signs warning against the hazards created by such features of construction such as pits, protruding
nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling
materials; and shall designate a responsible member of its organization on the work, whose duty shall
be the prevention of accidents.
8. The Town shall at all times have access to the work wherever it is in preparation or progress and the
Contractor shall provide suitable accommodations for such access.
9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the
construction superintendent, foreman, or assistants are unacceptable to the Town, then upon seven
days notice from the Town, the Contractor shall replace such person or persons with people
acceptable to the Town.
10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The
Contractor shall carefully study and compare the drawings, specifications and other instructions and
shall at once report to the Town any error, inconsistency or omission which shall be discovered.
Included in this responsibility shall be supervision of all work performed by subcontractors on the
work.
11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any
of its provisions, the Town, upon three days written notice, may, without prejudice to any other
remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection by the Town's Project Representative
12.1. The Town shall have the right to designate a Project Representative who may make periodic
visits to the site to familiarize the Town generally with the progress and quality of the work,
and to determine in general if the work is proceeding in accordance with the Contract
Documents. The Project Representative will not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the work, and will not be
responsible for the Contractor's failure to carry out the construction work in accordance with
the Contract Documents. During such visits and on the basis of these observations while at
the site, the Project Representative will keep the Town informed on the progress of the work,
will endeavor to guard the Town against defects and deficiencies in the work of contractors,
and may condemn structural work as failing to conform to the Contract Documents. The
Project Representative shall have authority to act on behalf of the Town only to the extent
expressly delegated by the Town, which shall be shown to the Contractor, and shall have
authority to stop the work whenever such stoppage may reasonably be necessary to insure
the proper execution of the Contract.
Town of North Andover IFB Page 25 of 38
Furnish & Install Insulation at Stevens Estate
12.2. In connection with the work, the Project Representative shall not be responsible for
construction methods, means, techniques, sequences or procedures employed by the
Contractor or the Contractor's safety programs, requirements, regulations, or precautions.
13. Decisions of the Project Representative
13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of
the Town or the Contractor and on all other matters relating to the execution and progress of
the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision, in matters relating to the project, shall be final, if
within the terms of the Contract Documents.
13.3. If, however, the Project Representative fails to render a decision within ten days after the
parties have presented their evidence, either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Project Representative renders a
decision after such remedies have commenced, such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the parties concerned.
14.1 Use of Premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by law, by-laws, permits or directions of the Town and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or permit any part of the structure to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute,
the Town may remove the rubbish and charge the cost to the several contractors, as the Town
shall determine to be just.
16. Right to Terminate
If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit
of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail
to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently
disregard laws and regulations or lawful directives of the Town, or (7) be guilty of a substantial
violation of any provision of the Contract, then the Town may, without prejudice to any other
right or remedy and after giving the Contractor (or any surety) seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of all materials, tools and appliances thereon and finish the work by whatever method it
deems appropriate.
Town of North Andover IFB Page 26 of 38
Furnish & Install Insulation at Stevens Estate
In such cases, the Contractor shall not be entitled to receive any further payment until the work is
finished. If the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of finishing the work, including compensation for additional architectural,
managerial, legal and administrative services, such excess shall be paid to the Contractor. If such
expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the Town.
The Contractor shall not be relieved of liability to the Town by virtue of any tennination of this
contract, and any claim for damages against the Contractor relating to the Contractor's
performance under this contract shall survive any termination hereunder.
Notwithstanding any other provision of this Agreement, the Town reserves the right at any time
in its absolute discretion to suspend or terminate this Agreement in whole or in part for its
convenience upon seven days written notice to the Contractor. The Town shall incur no liability
by reason of such termination except for the obligation to pay compensation for all work
performed by the Contractor and accepted by the Town to the termination date.
17. Progress Payments:
17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported
to the extent required by the Town by invoices or other vouchers, showing payments for
materials and labor, payments to Subcontractors and such other evidence of the
Contractor's right to payment.
17.2. The Contractor shall, before the first application, submit to the Town a schedule of values
of the various parts of the work, including quantities aggregating the total sum of the
Contract, divided so as to facilitate payments to Subcontractors, made out in such form as
the Town and the Contractor may agree upon, and, if required, supported by such
evidence as to its correctness. This schedule, when approved by the Town, shall be used
as a basis for payment, unless it is found to be in error. If applying for payments, the
Contractor shall submit a statement based upon this schedule.
18. Withholding of Payments
18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the Town of North Andover from loss on account of:
18.1.1. Defective work not remedied.
18.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor.
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5. Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
Town of North Andover IFB Page 27 of 38
Furnish & Install Insulation at Stevens Estate
18.2. Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims by Contractor and Liability of Town
All claims by the Contractor against the Town shall, unless otherwise provided by law, be
initiated by a written claim submitted to the Town no later than seven (7) calendar days after the
event or the first appearance of the circumstances causing the claim. The claim shall set forth in
detail all known facts and circumstances supporting the claim. The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims.
The limit of liability of the Town under this Agreement is limited to the compensation provided
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special or consequential damages or lost profits or for damages or loss from causes
beyond the Town's reasonable control.
20. Liquidated Damages:
Because both parties recognize (1) that the time for completion of this Contract is of the essence,
(2) that the Town will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the
delays, expense and difficulties involved in a legal proceeding to determine the actual loss
suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay
the Town as liquidated damages representing an estimate of delay damages, not as a penalty, the
sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is
completed, whether the work is completed by the Contractor or some other person. The Town's
right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a
legal action for damages in lieu of or in addition to its option to impose liquidated damages. The
Town may deduct any liquidated damages from money due the Contractor, and if such payment is
insufficient to cover the liquidated damages, then the Contractor shall pay the amount due.
21. The Contractors' Mutual Responsibility:
Should the Contractor cause damage to any separate subcontractor on the work, the Contractor
agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies
provided by law or by the provisions of the contract. If such separate contractor sues the Town
on account of any damage alleged to have been sustained, the Town shall notify the Contractor,
who shall defend such proceedings at the Town's expense and, if any judgment against the Town
arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town.
22. Separate Contracts:
22.1. The Town reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results, upon the
work of any other contractor, the Contractor shall inspect and promptly report to the
Town any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
Town of North Andover IFB Page 28 of 38
Furnish & Install Insulation at Stevens Estate
of the other contractor's work as fit and proper for the reception of its work except as to
defects which may develop in the other contractor's work after the execution of its work.
22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work
already in place and shall at once report to the Town any discrepancy between the
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by
them, as it is for the acts and omissions of persons directly employed by it.
23.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the Town.
24. Contractor -Subcontractor Relations:
The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound
by the terms of the Agreement, the General Conditions of the Contract, the Supplementary
General Conditions, the Drawings and Specifications, as far as applicable to its work, including
the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
25. Indemnification:
25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) brought or recovered against them that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or omission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, regardless of whether or not it is
caused in part by any party indemnified hereunder. The Contractor further agrees to
reimburse the Town for damage to its property caused by Contractor, its employees,
agents, subcontractors or material men, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the Town's gross negligence or willful misconduct. The
existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this Contract.
25.2. In any and all claims against the Town or any of their agents or employees by any
employee of the Contractor, any Subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable, the indemnification
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
Town of North Andover IFB Page 29 of 38
Furnish & Install Insulation at Stevens Estate
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
employee benefit acts.
25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. However, it shall be the
Contractor's responsibility to purchase and maintain insurance of such character and in
such amounts as will adequately protect it and the Town from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
26. The Contractor's Insurance:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone
for whose acts any of them may be liable.
26.1.1. Claims under Worker's Compensation, disability benefit and other similar
employee benefit acts;
26.1.2. Claims for damages because of bodily injury, occupational sickness or
disease, or death of its employees, and claims insured by usual personal
injury liability coverage;
26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees, and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
26.2.1. Worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability Insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and Operations, Owners and Contractor's Protective,
Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles.
All such insurance shall be written for not less than any limits of liability required by law,
unless otherwise provided in the contract documents, or the following limits, whichever
are greater:
Town of North Andover IFB Page 30 of 38
Furnish & Install Insulation at Stevens Estate
Comprehensive General Liability Insurance (Broad Form)
Bodily Injury $1,000,000 per person
$3,000,000 per occurrence
Property Damage $1,000,000 per occurrence
$3,000,000 annual aggregate
Automobile Liability Insurance $500,000 per person
$1,000,000 per occurrence
26.3. The above insurance policies shall also be subject to the following requirements:
26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under Paragraph entitled "Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed
with the Town prior to commencement of the work. Renewal certificates shall be
addressed to and filed with the Town at least ten (10) days prior to the expiration
date of required policies.
26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30)
days prior written notice forwarded by registered or certified mail to the Town.
The Town shall also be notified of the attachment of any restrictive amendments
to the policies.
26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of
Insurance form, shall contain true transcripts from the policies, authenticated by
the proper officer of the Insurer, evidencing in particular those insured, the extent
of coverage, the location and operations to which the insurance applies, the
expiration date and the above-mentioned notice clauses.
26.3.5. All premium costs shall be included in the Contractor's bid.
26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
27. Protective Liability Insurance:
27.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the Town from claims which may arise from operations under
the Contract, including operations performed for the named insureds by independent
contractors and general inspection thereof by the named insureds.
Town of North Andover IFB Page 31 of 38
Furnish & Install Insulation at Stevens Estate
27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town
against Automobile Non -Ownership Liability in connection with the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable.
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing the Contractor's General Liability
Policy.
27.4. The Town shall be named as an additional insured on the above referenced liability
Policies, and the Contractor's insurance shall be the primary coverage. The cost of such
insurance, including required endorsements and amendments, shall be the sole
responsibility of the Contractor.
28. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the
Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as
it has knowledge or information, the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149
as amended (as a minimum requirement).
29. Guarantees`.
29.1 The Contractor guarantees and warrants to the Town that all labor furnished under this
Contract will be competent to perform the tasks undertaken, that the product of such labor will
yield only first-class results, that materials and equipment furnished will be of good quality and
new unless otherwise permitted by this Contract, and that the Work will be of good quality, free
from faults and defects and in strict conformance with this Contract. All Work not conforming to
these requirements may be considered defective.
29.2. If at any time any part of the work constructed under the terms of this contract shall in the
opinion of the Town Manager require repairing due to defective work or materials furnished by
the Contractor, he may notify the Contractor in writing to make the required repairs. If the
Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof
and to complete the same to the satisfaction of the Town Manager with reasonable dispatch, then
the latter may employ other persons to make such repairs. The Town shall charge the expense
thereof to the Contractor and may use any moneys still retained to pay for the same, and if such
sum is insufficient, the Contractor shall be obligated to pay the balance thereof.
29.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the Town before final
payment to the Contractor may be made for the amount of that subtrade or for the phase of work
to which the guarantee or warranty relates. The failure to deliver a required guarantee or
warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in
accordance with the Contract Documents. The Contractor's obligation to correct work is in
addition to, and not in substitution of, such guarantees or warranties as may be required in the
various Sections of the Specifications.
Town of North Andover 1FB Page 32 of 38
Furnish & Install Insulation at Stevens Estate
This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals
hereto:
Dated:
The Town of North Andover by:
Town Manager
Department/Division Head
Town Accountant
Certified as to Appropriation
Town Counsel
Certified as to Form
The Contractor by:
Authorized Signature
Town of North Andover IFB
Furnish & Install Insulation at Stevens Estate
Page 33 of 38
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature
Date
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
, authorized signatory for
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
Signature
Town of North Andover IFB
Furnish & Install Insulation at Stevens Estate
Date
Page 34 of 38
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature Date,
Print Name & Title
Town of North Andover IFB
Furnish & Install Insulation at Stevens Estate
Company Name
Page 35 of 38
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the
held on it was
VOTED, THAT
(Name)
(Officer)
of be and hereby is authorized to execute contracts and bonds in
the name and on behalf of said , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of on
its behalf by such officer under seal of , shall be valid and binding
upon
that
I hereby certify that I am the clerk of the above named
and
is the duly elected officer as above of said
and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
(Date)
(Clerk)
Town of North Andover IFB Page 36 of 38
Furnish & Install Insulation at Stevens Estate
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS, that we
with a place of business at ,
as Principal (the "Principal"), and a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the sum of
lawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
, for the construction of
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
day of
PRINCIPAL SURETY
[Name and Seal]
[Title]
Attest:
[Attorney-in-fact] [Seal]
[Address]
[Phone]
Attest:
Town of North Andover 1FB Page 37 of 38
Furnish & Install Insulation at Stevens Estate
Town of North Andover IFB Page 38 of 38
Furnish & Install Insulation at Stevens Estate
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gov— Secretary
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
U. Govemor Dimtor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Furnish and install blown -in cellulose insulation in 3rd floor sloped ceiling areas and 4th floor attic floor areas at
Stevens Estate
Job Location: 723 Osgood Street
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage
Request Number" on all pages of this schedule.
• Awarding authorities must request an updated wage schedule from the Department of Labor Standards ("DLS") if it has not
opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule.
• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, §
27. Once a contractor has been selected by the awarding authority, the wage schedule shall be made a part of the contract for that
project. The wage schedule must be posted in a conspicuous place at the work site during the life of the project in accordance with
M.G.L. c. 149, § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the
project regardless of whether they are employed by the prime contractor, a filed sub -bidder, or any sub -contractor.
• All apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Training
(DAT). Apprentices must keep his/her apprentice identification card on his/her person during all work hours on the project. If an
apprentice rate is listed on the prevailing wage schedule for the trade in which an apprentice is registered with the DAT, the
apprentice may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. If an
apprentice rate is not listed on the prevailing wage schedule for the trade in which an apprentice is registered with the
DAT, the apprentice must be paid the journeyworker's rate for the trade.
• The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction
projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule.
Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract
was executed by the awarding authority and the general contractor. Contractors are required to obtain the wage schedules from
awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to
27F "rental of equipment" contracts.
• Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll
reports directly to the awarding authority and keep them on file for three years. Each weekly payroll report must contain: the
employee's name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to
DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw.
• Contractors with questions about the wage rates or classifications included on the, wage schedule have an affirmative
obligation to inquire with DLS at (617) 626-6953.
• Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor
Division of the office of the Attorney General at (617) 727-3465.
• Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who
perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal
penalties.
Issue Date: 09/03/2013 Wage Request Number: 20130903-058
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
Construction
(2 AXLE) DRIVER - EQUIPMENT
12/01/2012
$30.45
$8.91
$8.00
$0.00
$47.36
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
(3 AXLE) DRIVER - EQUIPMENT
12/01/2012
$30.52
$8.91
$8.00
$0.00
$47.43
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
(4 & 5 AXLE) DRIVER - EQUIPMENT
12/01/2012
$30.64
$9.07
$8.00
$0.00
$47.71
TEAMSTERS JOINT COUNCIL. NO. I0 ZONE B
ADS/SUBMERSIBLE PILOT
08/01/2013
$84.21
$9.80
$18.17
$0.00
$112.18
PILE DRI VER LOCA! L56(70NE1)
08/01/2014
$87.36
$9.80
$18.17
$0.00
$115.33
08/01/2015
$90.51
$9.80
$18.17
$0.00
$118.48
AIR TRACK OPERATOR
06/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
1✓I BORERS - 70NE 2
12/01/2013
$31.10
$7.10
$11.80
$0.00
$50.00
06/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
12/01/2014
$32.10
$7.10
$11.80
$0.00
$51.00
06/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
12/01/2015
$33.10
$7.10
$11.80
$0.00
$52.00
06/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
12/01/2016
$34.35
$7.10
$11.80
$0.00
$53.25
For apprentice rates see "Apprentice- LABORER"
ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
06/01/2013
$29.88
$10.40
$5.95
$0.00
$46.23
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
12/01/2013
$30.68
$10.40
$5.95
$0.00
$47.03
06/01/2014
$31.58
$10.40
$5.95
$0.00
$47.93
12/01/2014
$32.48
$10.40
$5.95
$0.00
$48.83
06/01/2015
$33.43
$10.40
$5.95
$0.00
$49.78
12/01/2015
$34.38
$10.40
$5.95
$0.00
$50.73
ASPHALT RAKER
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
LABORERS -70NE2
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE
06/01/2013
$40.34
$10.00
$13.55
$0.00
$63.89
OPERA77NG ENGINEERS LOCAL 4
12/01/2013
$41.12
$10.00
$13.55
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
BACKHOE/FRONT-END LOADER
06/01/2013
$40.34
$10.00
$13.55
$0.00
$63.89
OPERATING ENGINEERS LOCAL 4
12/01/2013
$41.12
$10.00
$13.55
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
----------------------------------------------------------------------------------- ------------ -- -- ------------------------------------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 2 of 35
Classification
BARCO-TYPE JUMPING TAMPER
LABORERS -ZONF2
For apprentice rates see "Apprentice- LABORER"
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
06/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
12/01/2013
$31.10
$7.10
$11.80
$0.00
$50.00
06/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
12/01/2014
$32.10
$7.10
$11.80
$0.00
$51.00
06/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
12/01/2015
$33.10
$7.10
$11.80
$0.00
$52.00
06/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
12/01/2016
$34.35
$7.10
$11.80
$0.00
$53.25
BOILERMAKER 01/01/2010 $37.70 $6.97 $11.18 $0.00 $55.85
BOILERMAKERS LOCAL 29
Apprentice- BOILERMAKER -Local 29
Effective Date - 01/01/2010
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 65
$24.51
$6.97
$11.18
$0.00
$42.66
2 65
$24.51
$6.97
$11.18
$0.00
$42.66
3 70
$26.39
$6.97
$11.18
$0.00
$44.54
4 75
$28.28
$6.97
$11.18
$0.00
$46.43
5 80
$30.16
$6.97
$11.18
$0.00
$48.31
6 85
$32.05
$6.97
$11.18
$0.00
$50.20
7 90
$33.93
$6.97
$11.18
$0.00
$52.08
8 95
$35.82
$6.97
$11.18
$0.00
$53.97
(Notes:
Apprentice to Journeyworker Ratio:l:5
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3 (LYNN)
08/01/2013
$48.06
$10.18
$18.15
$0.00
$76.39
02/01/2014
$48.62
$10.18
$18.15
$0.00
$76.95
08/01/2014
$49.52
$10.18
$18.22
$0.00
$77.92
02/01/2015
$50.08
$10.18
$18.22
$0.00
$78.48
08/01/2015
$50.98
$10.18
$18.29
$0.00
$79.45
02/01/2016
$51.55
$10.18
$18.29
$0.00
$80.02
08/01/2016
$52.45
$10.18
$18.37
$0.00
$81.00
02/01/2017
$53.02
$10.18
$18.37
$0.00
$81.57
------------ ------ - --- --------------- ------------------------------------------------ ------------ -------------- -- -------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 3 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$52.64
2 60
$29.17
Unemployment
Apprentice- BRICKIPLASTER/CEMENT MASON - Local 3 Lynn
$0.00
$57.50
3 70
$34.03
Effective Date - 08/01/2013
$18.15
$0.00
$62.36
Supplemental
$38.90
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$24.03
$10.18
$18.15
$0.00
$52.36
2 60
$28.84
$10.18
$18.15
$0.00
$57.17
3 70
$33.64
$10.18
$18.15
$0.00
$61.97
4 80
$38.45
$10.18
$18.15
$0.00
$66.78
5 90
$43.25
$10.18
$18.15
$0.00
$71.58
Effective Date - 02/01/2014
06/01/2016
$38.70
$7.10
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$24.31
$10.18
$18.15
$0.00
$52.64
2 60
$29.17
$10.18
$18.15
$0.00
$57.50
3 70
$34.03
$10.18
$18.15
$0.00
$62.36
4 80
$38.90
$10.18
$18.15
$0.00
$67.23
5 90
$43.76
$10.18
$18.15
$0.00
$72.09
--------------------------------
(Notes:
$7.10
$12.60
$0.00
$55.40
_----------------___
Apprentice to Journeyworker Ratio -i.5
$36.45
$7.10
$12.60
$0.00
$56.15
BULLDOZER/GRADER/SCRAPER
OPF_PATING F_NGINFF2S LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2013
12/01/2013
$39.96
$40.74
$10.00
$10.00
$13.55
$13.55
$0.00
$0.00
$63.51
$64.29
CAISSON & UNDERPINNING BOTTOM MAN
06/01/2013
$34.20
$7.10
$12.60
$0.00
$53.90
LABORERS - FOUNDATION AND MARINE"
12/01/2013
$34.95
$7.10
$12.60
$0.00
$54.65
06/01/2014
$35.70
$7.10
$12.60
$0.00
$55.40
12/01/2014
$36.45
$7.10
$12.60
$0.00
$56.15
06/01/2015
$37.20
$7.10
$12.60
$0.00
$56.90
12/01/2015
$37.95
$7.10
$12.60
$0.00
$57.65
06/01/2016
$38.70
$7.10
$12.60
$0.00
$58.40
12/01/2016
$39.70
$7.10
$12.60
$0.00
$59.40
For apprentice rates see "Apprentice- LABORER"
CAISSON & UNDERPINNING LABORER
06/01/2013
$33.05
$7.10
$12.60
$0.00
$52.75
LABORF.I?S - FOUNDA7101VAND MARINF.
12/01/2013
$33.80
$7.10
$12.60
$0.00
$53.50
06/01/2014
$34.55
$7.10
$12.60
$0.00
$54.25
12/01/2014
$35.30
$7.10
$12.60
$0.00
$55.00
06/01/2015
$36.05
$7.10
$12.60
$0.00
$55.75
12/01/2015
$36.80
$7.10
$12.60
$0.00
$56.50
06/01/2016
$37.55
$7.10
$12.60
$0.00
$57.25
12/01/2016
$38.55
$7.10
$12.60
$0.00
$58.25
For apprentice rates see "Apprentice- LABORER"
-------------------- - ---- --------------------------- ----------------------------' --- --- -- --------------------...------------'-----------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 4 of 35
Classification
CAISSON & UNDERPINNING TOP MAN
LABORERS - FOUNDATIONAND MARINE
For apprentice rates see "Apprentice- LABORER"
CARBIDE CORE DRILL OPERATOR
LABORERS - 70NE 2
For apprentice rates see "Apprentice- LABORER"
CARPENTER
CARPENTERS -70NE 2 (Eastern Massachusetts)
Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
06/01/2013
$33.05
$7.10
$12.60
$0.00
$52.75
12/01/2013
$33.80
$7.10
$12.60
$0.00
$53.50
06/01/2014
$34.55
$7.10
$12.60
$0.00
$54.25
12/01/2014
$35.30
$7.10
$12.60
$0.00
$55.00
06/01/2015
$36.05
$7.10
$12.60
$0.00
$55.75
12/01/2015
$36.80
$7.10
$12.60
$0.00
$56.50
06/01/2016
$37.55
$7.10
$12.60
$0.00
$57.25
12/01/2016
$38.55
$7.10
$12.60
$0.00
$58.25
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
09/01/2013
$34.53
$9.80
$15.61
$0.00
$59.94
03/01/2014
$35.13
$9.80
$15.61
$0.00
$60.54
09/01/2014
$35.90
$9.80
$15.61
$0.00
$61.31
03/01/2015
$36.67
$9.80
$15.61
$0.00
$62.08
-- --- -------------------- - ---------------------------- - ----- -- -- -- ------------------- ------ --------------------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 5 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$28.94
2 60
$21.08
Unemplovment
Apprentice - CARPENTER - Zone 2
Eastern MA
$32.45
3 70
$24.59
$9.80
Effective Date- 09/01/2013
$0.00
$45.29
4 75
Supplemental
$9.80
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$17.27
$9.80
$1.57
$0.00
$28.64
2 60
$20.72
$9.80
$1.57
$0.00
$32.09
3 70
$24.17
$9.80
$10.90
$0.00
$44.87
4 75
$25.90
$9.80
$10.90
$0.00
$46.60
5 80
$27.62
$9.80
$12.47
$0.00
$49.89
6 80
$27.62
$9.80
$12.47
$0.00
$49.89
7 90
$31.08
$9.80
$14.04
$0.00
$54.92
8 90
$31.08
$9.80
$14.04
$0.00
$54.92
Effective Date - 03/01/2014
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$17.57
$9.80
$1.57
$0.00
$28.94
2 60
$21.08
$9.80
$1.57
$0.00
$32.45
3 70
$24.59
$9.80
$10.90
$0.00
$45.29
4 75
$26.35
$9.80
$10.90
$0.00
$47.05
5 80
$28.10
$9.80
$12.47
$0.00
$50.37
6 80
$28.10
$9.80
$12.47
$0.00
$50.37
7 90
$31.62
$9.80
$14.04
$0.00
$55.46
8 90
$31.62
$9.80
$14.04
$0.00
$55.46
-__..--------------------_-----
Notes:
---
-----------
}!
--.------.-...__
Apprentice to Journeyworker Ratio: 1:5
--- ---
--_.----------®
1
CEMENT MASONRY/PLASTERING 07/01/2013
$42.68
$10.90
$18.71
$1.30
$73.59
BRICKLAYERS LOCAL 3 (LYNN) 01/01/2014
$43.60
$10.90
$18.71
$1.30
$74.51
07/01/2014
$44.20
$10.90
$18.71
$1.30
$75.11
01/01/2015
$45.14
$10.90
$18.71
$1.30
$76.05
07/01/2015
$45.72
$10.90
$18.71
$1.30
$76.63
01/01/2016
$46.64
$10.90
$18.71
$1.30
$77.55
----------- -- - --- ------ - - ------------------ ------------ ----------- -- ----------------- -
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 6 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$12.21
$1.30
$46.21
2
Unemployment
Apprentice- CEMENT MASONRY/PLASTERING -Eastern Mass (Lynn)
$10.90
$13.71
$1.30
Effective Date - 07/01/2013
3
65
$28.34
$10.90
$14.71
$1.30
$55.25
4
70
Supplemental
$10.90
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.34
$10.90
$12.21
$1.30
$45.75
2 60
$25.61
$10.90
$13.71
$1.30
$51.52
3 65
$27.74
$10.90
$14.71
$1.30
$54.65
4 70
$29.88
$10.90
$15.71
$1.30
$57.79
5 75
$32.01
$10.90
$16.71
$1.30
$60.92
6 80
$34.14
$10.90
$17.71
$1.30
$64.05
7 90
$38.41
$10.90
$18.71
$1.30
$69.32
Effective Date - 01/01/2014
$13.55
$0.00
$64.89
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$21.80
$10.90
$12.21
$1.30
$46.21
2
60
$26.16
$10.90
$13.71
$1.30
$52.07
3
65
$28.34
$10.90
$14.71
$1.30
$55.25
4
70
$30.52
$10.90
$15.71
$1.30
$58.43
5
75
$32.70
$10.90
$16.71
$1.30
$61.61
6
80
$34.88
$10.90
$17.71
$1.30
$64.79
7
90
$39.24
$10.90
$18.71
$1.30
$70.15
----------_._------__..._._..._.-
Notes:
06/01/2016
$33.10
$7.10
--------+
$0.00
$52.00
Steps 3,4 are 500 hrs. All other steps are
1,000 hrs.
$7.10
$11.80
$0.00
$52.75
..-.�____-------_:3--...�.------.._..-------
Apprentice to Journeyworker Ratio:l:3
CHAIN SAW OPERATOR
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
LABORERS - ZONE 2
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES
06/01/2013
$41.34
$10.00
$13.55
$0.00
$64.89
OPERATING ENGINEERS LOCAL 4
12/01/2013
$42.12
$10.00
$13.55
$0.00
$65.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
COMPRESSOR OPERATOR
06/01/2013
$28.19
$10.00
$13.55
$0.00
$51.74
OPERATING ENGINEERS LOCAL 4
12/01/2013
$28.74
$10.00
$13.55
$0.00
$52.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
01/01/2013
$45.01
$7.80
$15.60
$0.00
$68.41
PAINTERS LOCAL 35 - 7.ONE 2
----------------------------------------------------------------------------------- ------ " --------------------------- --------- -- ---------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 7 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$22.51
$7.80
$0.00
$0.00
$30.31
2 55
$24.76
$7.80
$3.52
$0.00
$36.08
3 60
$27.01
$7.80
$3.84
$0.00
$38.65
4 65
$29.26
$7.80
$4.16
$0.00
$41.22
5 70
$31.51
$7.80
$13.68
$0.00
$52.99
6 75
$33.76
$7.80
$14.00
$0.00
$55.56
7 80
$36.01
$7.80
$14.32
$0.00
$58.13
8 90
$40.51
$7.80
$14.96
$0.00
$63.27
---.--____--__--..
(Notes:
._._._ _._ --e._.._
--....._------_._,
Steps are 750 hrs.
For apprentice rates see "Apprentice- LABORER"
Apprentice to 3ourneyworker Ratio:1:1
DEMO: CONCRETE CUTTER/SAWYER
12/01/2011
$32.80
DEMO: ADZEMAN
12/01/2011
$31.80
$7.10
$12.45
$0.00
$51.35
LABORERS - 70NE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
12/01/2011
$32.80
$7.10
$12.45
$0.00
$52.35
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: BURNERS
12/01/2011
$32.55
$7.10
$12.45
$0.00
$52.10
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: CONCRETE CUTTER/SAWYER
12/01/2011
$32.80
$7.10
$12.45
$0.00
$52.35
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: JACKHAMMER OPERATOR
12/01/2011
$32.55
$7.10
$12.45
$0.00
$52.10
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
DEMO: WRECKING LABORER
12/01/2011
$31.80
$7.10
$12.45
$0.00
$51.35
LABORERS - 70NE 2
For apprentice rates see "Apprentice- LABORER"
DIRECTIONAL DRILL MACHINE OPERATOR
06/01/2013
$39.96
$10.00
$13.55
$0.00
$63.51
OPERTING T:NGINEF.RSLOCA L 4
12/01/2013
$40.74
$10.00
$13.55
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
08/01/2013
$56.14
$9.80
$18.17
$0.00
$84.11
PILE DRIVER LOCAL 56 (70NE 1)
08/01/2014
$58.24
$9.80
$18.17
$0.00
$86.21
08/01/2015
$60.34
$9.80
$18.17
$0.00
$88.31
DIVER TENDER
08/01/2013
$40.10
$9.80
$18.17
$0.00
$68.07
PILE DRIVER LOCAL 56 (70NE I)
08/01/2014
$41.60
$9.80
$18.17
$0.00
$69.57
08/01/2015
$43.10
$9.80
$18.17
$0.00
$71.07
DIVER TENDER (EFFLUENT)
08/01/2013
$60.15
$9.80
$18.17
$0.00
$88.12
PILE DRIVER LOCAL 56 (70NE 1)
08/01/2014
$62.40
$9.80
$18.17
$0.00
$90.37
08/01/2015
$64.65
$9.80
$18.17
$0.00
$92.62
-------------------------------- ---- - ----------------------------- ------ ------ ---------------------- - -- ---- - -------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 8 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
DIVER/SLURRY (EFFLUENT)
08/01/2013
$84.21
$9.80
$18.17
$0.00
$112.18
PILE DRIVER LOCAL 56 (ZONE 1)
08/01/2014
$87.36
$9.80
$18.17
$0.00
$115.33
08/01/2015
$90.51
$9.80
$18.17
$0.00
$118.48
DRAWBRIDGE OPERATOR (Construction)
09/01/2013
$43.96
$13.00
$14.42
$0.00
$71.38
ELECTRICIANS LOCAL 103
03/01/2014
$44.45
$13.00
$14.68
$0.00
$72.13
09/01/2014
$45.12
$13.00
$14.70
$0.00
$72.82
03/01/2015
$45.84
$13.00
$14.72
$0.00
$73.56
09/01/2015
$46.80
$13.00
$14.75
$0.00
$74.55
03/01/2016
$47.75
$13.00
$14.78
$0.00
$75.53
For apprentice rates see "Apprentice- ELECTRICIAN'
ELECTRICIAN
09/01/2013
$43.96
$13.00
$14.42
$0.00
$71.38
ELECTRICIANS LOCAL 103
03/01/2014
$44.45
$13.00
$14.68
$0.00
$72.13
09/01/2014
$45.12
$13.00
$14.70
$0.00
$72.82
03/01/2015
$45.84
$13.00
$14.72
$0.00
$73.56
09/01/2015
$46.80
$13.00
$14.75
$0.00
$74.55
03/01/2016
$47.75
$13.00
$14.78
$0.00
$75.53
------------------------------------------------ ----------------- ---- --- --- -- ------
--- --- ------------------- --- ---
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 9 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- ELECTRICIAN- Local 103
Effective Date - 09/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40
$17.58
$13.00
$0.53
$0.00
$31.11
2 40
$17.58
$13.00
$0.53
$0.00
$31.11
3 45
$19.78
$13.00
$10.78
$0.00
$43.56
4 45
$19.78
$13.00
$10.78
$0.00
$43.56
5 50
$21.98
$13.00
$11.11
$0.00
$46.09
6 55
$24.18
$13.00
$11.45
$0.00
$48.63
7 60
$26.38
$13.00
$11.77
$0.00
$51.15
8 65
$28.57
$13.00
$12.11
$0.00
$53.68
9 70
$30.77
$13.00
$12.43
$0.00
$56.20
10 75
$32.97
$13.00
$12.77
$0.00
$58.74
Effective Date - 03/01/2014
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 40
$17.78
$13.00
$0.53
$0.00
$31.31
2 40
$17.78
$13.00
$0.53
$0.00
$31.31
3 45
$20.00
$13.00
$11.04
$0.00
$44.04
4 45
$20.00
$13.00
$11.04
$0.00
$44.04
5 50
$22.23
$13.00
$11.37
$0.00
$46.60
6 55
$24.45
$13.00
$11.70
$0.00
$49.15
7 60
$26.67
$13.00
$12.03
$0.00
$51.70
8 65
$28.89
$13.00
$12.37
$0.00
$54.26
9 70
$31.12
$13.00
$12.69
$0.00
$56.81
10 75
$33.34
$13.00
$13.03
$0.00
$59.37
----r..--------._.a---_.._-_...--.n...._-.-._._..
INotes::
-
App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80
Apprentice to Journeyworker Ratio:2:3***
ELEVATOR CONSTRUCTOR
01/01/2012
$52.45
$8.78
$6.96
$0.00 $68.19
ELEVATOR CONSTRUCTORS LOCAL 4
----------------------- --------- -------------- --- --- --- --- - ---- -- --- ----------- ------ - -------- --------- - -------- --
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 10 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- ELEVATOR CONSTRUCTOR -Local 4
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$26.23
$8.78
$0.00
$0.00
$35.01
2 55
$28.85
$8.78
$6.96
$0.00
$44.59
3 65
$34.09
$8.78
$6.96
$0.00
$49.83
4 70
$36.72
$8.78
$6.96
$0.00
$52.46
5 80
$41.96
$8.78
$6.96
$0.00
$57.70
-----.---------
Notes:
---
__.._.._-.---__._----__..___.-,
$0.00
$49.50
Steps 1-2 are 6 mos.; Steps 3-5 are 1 year
$31.10
$7.10
$11.80
$0.00
$50.00
Apprentice to Journeyworker Ratio: 1:1
12/01/2014
$31.60
$7.10
$11.80
$0.00
ELEVATOR CONSTRUCTOR HELPER
01/01/2012
$38.59
$8.78
$6.96
$0.00
$54.33
ELEVATOR CONSTRUCTORS LOCAL 4
FENCE & GUARD RAIL ERECTOR
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
LABORERS -70NE2
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
05/01/2013
$38.50
$10.00
$13.02
$0.00
$61.52
OPERAT/NG ENGINEERS LOCAL 4
11/01/2013
$39.26
$10.00
$13.02
$0.00
$62.28
05/01/2014
$40.03
$10.00
$13.02
$0.00
$63.05
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY
05/01/2013
$39.91
$10.00
$13.02
$0.00
$62.93
OPERATING ENGINEERS LOCAL 4
11/01/2013
$40.68
$10.00
$13.02
$0.00
$63.70
05/01/2014
$41.45
$10.00
$13.02
$0.00
$64.47
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
05/01/2013
$21.17
$10.00
$13.02
$0.00
$44.19
OPERATING ENGINEERS LOCAL 4
11/01/2013
$21.63
$10.00
$13.02
$0.00
$44.65
05/01/2014
$22.08
$10.00
$13.02
$0.00
$45.10
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FIRE ALARM INSTALLER
09/01/2013
$43.96
$13.00
$14.42
$0.00
$71.38
ELECTRICIANS LOCAL 103
03/01/2014
$44.45
$13.00
$14.68
$0.00
$72.13
09/01/2014
$45.12
$13.00
$14.70
$0.00
$72.82
03/01/2015
$45.84
$13.00
$14.72
$0.00
$73.56
09/01/2015
$46.80
$13.00
$14.75
$0.00
$74.55
03/01/2016
$47.75
$13.00
$14.78
$0.00
$75.53
For apprentice rates see "Apprentice- ELECTRICIAN'
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 11 of 35
Classification
FIRE ALARM REPAIR / MAINTENANCE
/
COMMISSIONING ELECTR ams
LOCAL 103
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN'
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$39.40
LABORERS - ZONE 2
12/01/2013
$20.50
Unemployment
$11.80
09/01/2013
$32.97
$13.00
$12.77
$0.00
$58.74
03/01/2014
$33.44
$13.00
$13.03
$0.00
$59.47
09/01/2014
$33.84
$13.00
$13.05
$0.00
$59.89
03/01/2015
$34.38
$13.00
$13.06
$0.00
$60.44
09/01/2015
$35.10
$13.00
$13.08
$0.00
$61.18
03/01/2016
$35.81
$13.00
$13.10
$0.00
$61.91
FIREMAN (ASST. ENGINEER) 06/01/2013 $33.73 $10.00 $13.55 $0.00 $57.28
OPERATING ENGINEERS LOCAL 4
12/01/2013 $34.39 $10.00 $13.55 $0.00 $57.94_
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
FLAGGER & SIGNALER
06/01/2013
$20.50
$7.10
$11.80
$0.00
$39.40
LABORERS - ZONE 2
12/01/2013
$20.50
$7.10
$11.80
$0.00
$39.40
06/01/2014
$20.50
$7.10
$11.80
$0.00
$39.40
12/01/2014
$20.50
$7.10
$11.80
$0.00
$39.40
06/01/2015
$20.50
$7.10
$11.80
$0.00
$39.40
12/01/2015
$20.50
$7.10
$11.80
$0.00
$39.40
06/01/2016
$20.50
$7.10
$11.80
$0.00
$39.40
12/01/2016
$20.50
$7.10
$11.80
$0.00
$39.40
For apprentice rates see "Apprentice- LABORER"
FLOORCOVERER
09/01/2013
$38.61
$9.80
$16.71
$0.00
$65.12
1ZOORCOVERERS LOCAL 2168 ZONE 1
03/01/2014
$38.61
$9.80
$16.71
$0.00
$65.12
-------------- ------------------ -- --- -- -------------- --- -- - ---------------------- --- - - ------------------------------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 12 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$30.90
2 55
$21.24
Unemployment
Apprentice- FLOORCOVERER
-Local 2168 Zone I
$32.83
3 60
$23.17
$9.80
Effective Date - 09/01/2013
$0.00
$44.31
4 65
Supplemental
$9.80
Step percent
Apprentice Base Wage
Health
Pension
unemployment
Total Rate
1 50
$19.31
$9.80
$1.79
$0.00
$30.90
2 55
$21.24
$9.80
$1.79
$0.00
$32.83
3 60
$23.17
$9.80
$11.34
$0.00
$44.31
4 65
$25.10
$9.80
$11.34
$0.00
$46.24
5 70
$27.03
$9.80
$13.13
$0.00
$49.96
6 75
$28.96
$9.80
$13.13
$0.00
$51.89
7 80
$30.89
$9.80
$14.92
$0.00
$55.61
8 85
$32.82
$9.80
$14.92
$0.00
$57.54
Effective Date - 03/01/2014
Supplemental
$41.12
Step percent
Apprentice Base Wage
Health
Pension
unemployment
Total Rate
1 50
$19.31
$9.80
$1.79
$0.00
$30.90
2 55
$21.24
ti
$9.80
$1.79
$0.00
$32.83
3 60
$23.17
$9.80
$11.34
$0.00
$44.31
4 65
$25.10
$9.80
$11.34
$0.00
$46.24
5 70
$27.03
$9.80
$13.13
$0.00
$49.96
6 75
$28.96
$9.80
$13.13
$0.00
$51.89
7 80
$30.89
$9.80
$14.92
$0.00
$55.61
8 85
$32.82
$9.80
$14.92
$0.00
$57.54
------®----
Notes:
.._...._.---------__.----,
Steps are 750 hrs.
A-
Apprentic�e to rJour-neyw-... -------------..®.----------
orker Ratioaa
FORK LIFT/CHERRY PICKER
06/01/2013
$40.34
$10.00
$13.55 $0.00
$63.89
OPERATING ENGINEERS LOCAL 4
12/01/2013
$41.12
$10.00
$13.55 $0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GENERATORILIGHTING PLANT/HEATERS 06/01/2013 $28.19 $10.00 $13.55 $0.00 $51.74
OPERATING ENGINEERS LOCAL 4
12/01/2013 $28.74 $10.00 $13.55 $0.00 $52.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GLAZIER (GLASS PLANK/AIR BARRIERANTERIOR 01/01/2013 $35.51 $7.80 $14.60 $0.00 $57.91
SYSTEMS)
GLA7_IERS LOCAL 35 (7.0NE 2)
---------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 13 of 35
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
Apprentice- GLAZIER - Loca135 Zone 2
Effective Date - 01/01/2013 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$17.76
$7.80
2
55
$19.53
$7.80
3
60
$21.31
$7.80
4
65
$23.08
$7.80
5
70
$24.86
$7.80
6
75
$26.63
$7.80
7
80
$28.41
$7.80
8
90
$31.96
$7.80
- -
Notes:
- - - - - - -
- - - - - - -
- -
Steps are 750 hrs.
Apprentice to Journeyworker Ratio:l:l
HOISTING ENGINEER/CRANES/GRADALLS
OJIFRA TING ENGINEERS LOCAL 4
$0.00
$0.00
$25.56
$3.25
$0.00
$30.58
$3.54
$0.00
$32.65
$3.84
$0.00
$34.72
$12.83
$0.00
$45.49
$13.13
$0.00
$47.56
$13.42
$0.00
$49.63
$14.01
- - - - -
$0.00
- - -
$53.77
- - -
Total Rate
06/01/2013 $40.34 $10.00 $13.55 $0.00 $63.89
12/01/2013 $41.12 $10.00 $13.55 $0.00 $64.67
---------------------- ---- -- - -- --- -- ----- ---- -- ----- --- ---- ------ -------------- --- ---- -- ----- -- --- --- -
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 14 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$32.62
2 60
$24.67
Unemployment
Apprentice- OPERATING ENGINEERS
-Local 4
$48.22
3 65
$26.73
$10.00
Effective Date - 06/01/2013
$0.00
$50.28
4 70
Supplemental
$10.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$22.19
$10.00
$0.00
$0.00
$32.19
2 60
$24.20
$10.00
$13.55
$0.00
$47.75
3 65
$26.22
$10.00
$13.55
$0.00
$49.77
4 70
$28.24
$10.00
$13.55
$0.00
$51.79
5 75
$30.26
$10.00
$13.55
$0.00
$53.81
6 80
$32.27
$10.00
$13.55
$0.00
$55.82
7 85
$34.29
$10.00
$13.55
$0.00
$57.84
8 90
$36.31
$10.00
$13.55
$0.00
$59.86
Effective Date - 12/01/2013
HVAC (TESTING AND BALANCING - AIR)
02/01/2013
Supplemental
$9.82
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$22.62
$10.00
$0.00
$0.00
$32.62
2 60
$24.67
$10.00
$13.55
$0.00
$48.22
3 65
$26.73
$10.00
$13.55
$0.00
$50.28
4 70
$28.78
$10.00
$13.55
$0.00
$52.33
5 75
$30.84
$10.00
$13.55
$0.00
$54.39
6 80
$32.90
$10.00
$13.55
$0.00
$56.45
7 85
$34.95
$10.00
$13.55
$0.00
$58.50
8 90
$37.01
$10.00
$13.55
$0.00
$60.56
- - - - - - - - - - -
(Notes:
- - _---_____...-----------
03/01/2015
$45.84
$13.00
$14.72
Tice Apprentice to Journeyworker Ratio:1:6
$73.56
09/01/2015
$46.80
$13.00
HVAC (DUCTWORK)
02/01/2013
$42.32
$9.82
$18.24
$2.11
$72.49
SHEETMETAL WORKERS LOCAL I7 -A
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (ELECTRICAL CONTROLS)
09/01/2013
$43.96
$13.00
$14.42
$0.00
$71.38
ELECTRICIANS LOCAL 103
03/01/2014
$44.45
$13.00
$14.68
$0.00
$72.13
09/01/2014
$45.12
$13.00
$14.70
$0.00
$72.82
03/01/2015
$45.84
$13.00
$14.72
$0.00
$73.56
09/01/2015
$46.80
$13.00
$14.75
$0.00
$74.55
03/01/2016
$47.75
$13.00
$14.78
$0.00
$75.53
For apprentice rates see "Apprentice- ELECTRICIAN'
HVAC (TESTING AND BALANCING - AIR)
02/01/2013
$42.32
$9.82
$18.24
$2.11
$72.49
SHEETMETAL WORKERS LOCAL 17 - A
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (TESTING AND BALANCING -WATER)
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
PIPEFITTERS LOCAL 537 (Local 138)
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
HVAC MECHANIC
03/01/2013
$47.01
$8.75
$12.39
$0.00
$68.15
PIPFFITTFRS LOCAL 537 (Local 138)
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
----------------------------------------------------------------------------------
Issue Date: 09/03/2013 Wage Request Number:
20130903-058
------------------------------------
------------------
Page 15 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$26.47
$10.95
$9.62
$0.00
09/01/2014 $44.11
Unemployment
$12.10
HYDRAULIC DRILLS
06/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
LABORERS - 70NE 1
Supplemental
$57.10
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
12/01/2013
$31.10
$7.10
$11.80
$0.00
$50.00
$25.27 $10.95
06/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
$0.00
12/01/2014
$32.10
$7.10
$11.80
$0.00
$51.00
Effective Date - 09/01/2014
06/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
Pension
12/01/2015
$33.10
$7.10
$11.80
$0.00
$52.00
06/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
12/01/2016
$34.35
$7.10
$11.80
$0.00
$53.25
For apprentice rates see "Apprentice- LABORER"
INSULATOR (PIPES & TANKS)
09/01/2013 $42.11
$10.95
$12.10
$0.00 $65.16
HEAT& FROST INSULATORSLOCAL 6 (BOSTON)
2 60
$26.47
$10.95
$9.62
$0.00
09/01/2014 $44.11
$10.95
$12.10
$0.00 $67.16
Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston
$0.00
$52.07
4 80
Effective Date - 09/01/2013
$10.95
$10.86
Supplemental
$57.10
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$21.06 $10.95
$9.00
$0.00
$41.01
2 60
$25.27 $10.95
$9.62
$0.00
$45.84
3 70
$29.48 $10.95
$10.24
$0.00
$50.67
4 80
$33.69 $10.95
$10.86
$0.00
$55.50
Effective Date - 09/01/2014
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$22.06
$10.95
$9.00
$0.00
$42.01
2 60
$26.47
$10.95
$9.62
$0.00
$47.04
3 70
$30.88
$10.95
$10.24
$0.00
$52.07
4 80
$35.29
$10.95
$10.86
$0.00
$57.10
------___ ---____--_,,....._
Notes:
----._._....._
----a
Steps are 1 year
1
__ ____
Apprentice to 3ourneyworker Ratio:l:4
IRONWORKERIWELDER
1120NWORKFI?S LOCAL 7 (LAWRENCE ARF_A)
03/16/2013 $35.82 $7.70 $18.35 $0.00 $61.87
-------------------------------------------------------------------------------------------------------------------------------------------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 16 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- IRONWORKER -Local 7 Lawrence
Effective Date - 03/16/2013
Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 60
$21.49
$7.70
$18.35
$0.00
$47.54
2 70
$25.07
$7.70
$18.35
$0.00
$51.12
3 75
$26.87
$7.70
$18.35
$0.00
$52.92
4 80
$28.66
$7.70
$18.35
$0.00
$54.71
5 85
$30.45
$7.70
$18.35
$0.00
$56.50
6 90
$32.24
$7.70
$18.35
$0.00
$58.29
_.-----------.--..__
Notes:
$33.10
$7.10
_...._...------........-..,
$0.00
$52.00
Structural 1:6; Ornamental 1:4
$33.85
$7.10
$11.80
$0.00
$52.75
Apprentice to Journeyworker Ratio:
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
LABORER
LABORERS-ZONF.2
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
06/01/2013
$29.85
$7.10
$11.80
$0.00
$48.75
12/01/2013
$30.35
$7.10
$11.80
$0.00
$49.25
06/01/2014
$30.85
$7.10
$11.80
$0.00
$49.75
12/01/2014
$31.35
$7.10
$11.80
$0.00
$50.25
06/01/2015
$31.85
$7.10
$11.80
$0.00
$50.75
12/01/2015
$32.35
$7.10
$11.80
$0.00
$51.25
06/01/2016
$32.85
$7.10
$11.80
$0.00
$51.75
12/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
----- ---- - - ---------------------------- --- --- -- -- --------------------- ------------------------- - ----------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 17 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$37.11
Unemployment
Apprentice - LABORER - Zone 2
$7.10
$11.80
$0.00
Effective Date - 06/01/2013
3 80
$24.28
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 60
$17.91
$7.10
$11.80
$0.00 $36.81
2 70
$20.90
$7.10
$11.80
$0.00 $39.80
3 80
$23.88
$7.10
$11.80
$0.00 $42.78
4 90
$26.87
$7.10
$11.80
$0.00 $45.77
Effective Date - 12/01/2013
-
- -
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 60
$18.21
$7.10
$11.80
$0.00
$37.11
2 70
$21.25
$7.10
$11.80
$0.00
$40.15
3 80
$24.28
$7.10
$11.80
$0.00
$43.18
4 90
$27.32
$7.10
$11.80
$0.00
$46.22
--------------.___..--..--.-----._....-____._.._----+
Notes:
- - -
Apprentice o Journeyworker R. Tio.i-5
- - - - -
- - -
- -
- - - -
-
- -
LABORER: CARPENTER TENDER
06/01/2013
$29.85
$7.10
$11.80
$0.00
$48.75
LA BORERS - 7OjVE 2
12/01/2013
$30.35
$7.10
$11.80
$0.00
$49.25
06/01/2014
$30.85
$7.10
$11.80
$0.00
$49.75
12/01/2014
$31.35
$7.10
$11.80
$0.00
$50.25
06/01/2015
$31.85
$7.10
$11.80
$0.00
$50.75
12/01/2015
$32.35
$7.10
$11.80
$0.00
$51.25
06/01/2016
$32.85
$7.10
$11.80
$0.00
$51.75
12/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
For apprentice rates see "Apprentice- LABORER"
LABORER: CEMENT FINISHER TENDER
06/01/2013
$29.85
$7.10
$11.80
$0.00
$48.75
LABORERS - ZONE 2
12/01/2013
$30.35
$7.10
$11.80
$0.00
$49.25
06/01/2014
$30.85
$7.10
$11.80
$0.00
$49.75
12/01/2014
$31.35
$7.10
$11.80
$0.00
$50.25
06/01/2015
$31.85
$7.10
$11.80
$0.00
$50.75
12/01/2015
$32.35
$7.10
$11.80
$0.00
$51.25
06/01/2016
$32.85
$7.10
$11.80
$0.00
$51.75
12/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
For apprentice rates see "Apprentice- LABORER"
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
12/01/2011
$29.35
$7.10
$11.55
$0.00
$48.00
LABORERS - ZONE 2
For apprentice rates see "Apprentice- LABORER"
--- -- ------- ------------ --------------------------------------------------------------------- -
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 18 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
LABORER: MASON TENDER
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
LABORERS - ZONE 2
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
LABORER: MULTI -TRADE TENDER
06/01/2013
$29.85
$7.10
$11.80
$0.00
$48.75
LABORERS - ZONE 2
12/01/2013
$30.35
$7.10
$11.80
$0.00
$49.25
06/01/2014
$30.85
$7.10
$11.80
$0.00
$49.75
12/01/2014
$31.35
$7.10
$11.80
$0.00
$50.25
06/01/2015
$31.85
$7.10
$11.80
$0.00
$50.75
12/01/2015
$32.35
$7.10
$11.80
$0.00
$51.25
06/01/2016
$32.85
$7.10
$11.80
$0.00
$51.75
12/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
For apprentice rates see "Apprentice- LABORER"
LABORER: TREE REMOVER
06/01/2013
$29.85
$7.10
$11.80
$0.00
$48.75
LABORERS - ZONE 2
12/01/2013
$30.35
$7.10
$11.80
$0.00
$49.25
06/01/2014
$30.85
$7.10
$11.80
$0.00
$49.75
12/01/2014
$31.35
$7.10
$11.80
$0.00
$50.25
06/01/2015
$31.85
$7.10
$11.80
$0.00
$50.75
12/01/2015
$32.35
$7.10
$11.80
$0.00
$51.25
06/01/2016
$32.85
$7.10
$11.80
$0.00
$51.75
12/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
This classification applies to the wholesale removal
of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches
at locations not
on or around
utility lines.
For
apprentice rates see "Apprentice- LABORER"
LASER BEAM OPERATOR
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
Irl BORERS - ZONE 2
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
MARBLE & TILE FINISHERS
08/01/2013
$36.66
$10.18
$16.83
$0.00
$63.67
BRICKLAYERS LOCAL 3 - MARBLE & TILE
02/01/2014
$37.11
$10.18
$16.83
$0.00
$64.12
08/01/2014
$37.82
$10.18
$16.90
$0.00
$64.90
02/01/2015
$38.27
$10.18
$16.90
$0.00
$65.35
08/01/2015
$38.98
$10.18
$16.97
$0.00
$66.13
02/01/2016
$39.43
$10.18
$16.97
$0.00
$66.58
08/01/2016
$40.13
$10.18
$17.05
$0.00
$67.36
02/01/2017
$40.59
$10.18
$17.05
$0.00
$67.82
------ --------------------- - ------------
Issue Date: 09/03/2013
--- --- - - ----- I -
Wage Request Number: 20130903-058
- -- -----
- - ---
-
-- -- --
- ---
Page 19 of 35
Classification
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile
Effective Date - 08/01/2013
Step
percent
Apprentice Base Wage
Health
1
50
$18.33
$10.18
2
60
$22.00
$10.18
3
70
$25.66
$10.18
4
80
$29.33
$10.18
5
90
$32.99
$10.18
Effective Date - 02/01/2014
Step percent Apprentice Base Wage Health
Pension
Supplemental
Unemployment
Total Rate
$16.83
$0.00
$45.34
$16.83
$0.00
$49.01
$16.83
$0.00
$52.67
$16.83
$0.00
$56.34
$16.83
$0.00
$60.00
Supplemental
Pension Unemployment Total Rate
1 50
$18.56
$10.18
$16.83
$0.00
$45.57
2 60
$22.27
$10.18
$16.83
$0.00
$49.28
3 70
$25.98
$10.18
$16.83
$0.00
$52.99
4 80
$29.69
$10.18
$16.83
$0.00
$56.70
5 90
$33.40
$10.18
$16.83
$0.00
$60.41
Notes:
$51.59
$10.18
$18.29
$0.00
$80.06
�- _-----....�..
Apprentice to Journeyworker Ratio:l:3
$52.49
$10.18
$18.37
$0.00
MARBLE MASONS,TILELAYERS & TERRAZZO MECH
BRICKLAYERS LOCAL 3 - MARBLE & 711E
08/01/2013
$48.10
$10.18
$18.15
$0.00
$76.43
02/01/2014
$48.66
$10.18
$18.15
$0.00
$76.99
08/01/2014
$49.56
$10.18
$18.22
$0.00
$77.96
02/01/2015
$50.12
$10.18
$18.22
$0.00
$78.52
08/01/2015
$51.02
$10.18
$18.29
$0.00
$79.49
02/01/2016
$51.59
$10.18
$18.29
$0.00
$80.06
08/01/2016
$52.49
$10.18
$18.37
$0.00
$81.04
02/01/2017
$53.06
$10.18
$18.37
$0.00
$81.61
---------------------------- - . - ----- ------------------------------------------------------ - - ----- --- ---
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 20 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile
06/01/2013
$39.96
$10.00
Effective Date - 08/01/2013
$0.00
Step percent
Apprentice Base Wage
Supplemental
Pension
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$24.05
$10.18
$18.15
$0.00
$52.38
2 60
$28.86
$10.18
$18.15
$0.00
$57.19
3 70
$33.67
$10.18
$18.15
$0.00
$62.00
4 80
$38.48
$10.18
$18.15
$0.00
$66.81
5 90
$43.29
$10.18
$18.15
$0.00
$71.62
Effective Date - 02/01/2014
06/01/2013
$39.96
$10.00
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$24.33
$10.18
$18.15
$0.00
$52.66
2 60
$29.20
$10.18
$18.15
$0.00
$57.53
3 70
$34.06
$10.18
$18.15
$0.00
$62.39
4 80
$38.93
$10.18
$18.15
$0.00
$67.26
5 90
$43.79
$10.18
$18.15
$0.00
$72.12
-----.---.-------------.-.r__-_..e.._.
(Notes:
10/01/2013
$33.06
$9.80
----_.._.
-
I
I
---------------_-.._--_..�..........,.--_..._
Apprentice to Journeyworker Ratio:L5
04/01/2014
$33.66
$9.80
$15.76
MECH. SWEEPER OPERATOR (ON CONST. SITES)
06/01/2013
$39.96
$10.00
$13.55
$0.00 $63.51
OPERATING ENGINEERS LOCAL 4
$0.00
$59.98
04/01/2015
$35.19
$9.80
12/01/2013
$40.74
$10.00
$13.55
$0.00 $64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
MECHANICS MAINTENANCE
06/01/2013
$39.96
$10.00
$13.55
$0.00
$63.51
OPERATING ENGINEERS LOCAL 4
12/01/2013
$40.74
$10.00
$13.55
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
MILLWRIGHT (Zone 2)
04/01/2013
$32.47
$9.80
$15.76
$0.00
$58.03
MILLWRIGHTS LOCAL 1121- 7.one 2
10/01/2013
$33.06
$9.80
$15.76
$0.00
$58.62
04/01/2014
$33.66
$9.80
$15.76
$0.00
$59.22
10/01/2014
$34.42
$9.80
$15.76
$0.00
$59.98
04/01/2015
$35.19
$9.80
$15.76
$0.00
$60.75
---- - --- ---- ---- --- ------- -- - --- ---- ------------ - ------ ------------------ --------------------------- -
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 21 of 35
Classification
Effective Date Base Wage
Health
Pension
Supplemental Total Rate
$32.30
2 65
$21.49
$9.80
$13.01
Unemployment
Apprentice- MILLWRIGHT- Local
1121 Zone 2
$24.80
$9.80
$13.80
$0.00
Effective Date - 04/01/2013
4 85
$28.10
$9.80
Supplemental
$0.00
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$17.86
$9.80
$4.32
$0.00
$31.98
2 65
$21.11
$9.80
$13.01
$0.00
$43.92
3 75
$24.35
$9.80
$13.80
$0.00
$47.95
4 85
$27.60
$9.80
$14.58
$0.00
$51.98
Effective Date - 10/01/2013
$0.00
$51.00
Supplemental
$32.60
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 55
$18.18
$9.80
$4.32
$0.00
$32.30
2 65
$21.49
$9.80
$13.01
$0.00
$44.30
3 75
$24.80
$9.80
$13.80
$0.00
$48.40
4 85
$28.10
$9.80
$14.58
$0.00
$52.48
(Notes:
I Steps are 2,000 hours
I
Apprentice to Journeyworker Ratio:1:5
MORTAR MIXER
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
LABORERS-ZONE2
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
OILER (OTHER THAN TRUCK CRANES,GRADALLS)
06/01/2013
$21.17
$10.00
$13.55
$0.00
$44.72
OPERATING ENGINEERS LOCAL 4
12/01/2013
$21.59
$10.00
$13.55
$0.00
$45.14
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OILER (TRUCK CRANES, GRADALLS)
06/01/2013
$24.57
$10.00
$13.55
$0.00
$48.12
OPERATING ENGINEERS LOCAL 4
12/01/2013
$25.06
$10.00
$13.55
$0.00
$48.61
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
OTHER POWER DRIVEN EQUIPMENT - CLASS 11
06/01/2013
$39.96
$10.00
$13.55
$0.00
$63.51
OIIERA77NG ENGINEERS LOCAL 4
12/01/2013
$40.74
$10.00
$13.55
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
PAINTER (BRIDGES/TANKS)
01/01/2013
$45.01
$7.80
$15.60
$0.00
$68.41
PAINTERS LOCAL 35 - ZONE 2
--- --- ---- ---------------------------------------------------------------------------- -- --------------- -------- -------------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 22 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$22.51
2 55
$24.76
3 60
$27.01
4 65
$29.26
5 70
$31.51
6 75
$33.76
7 80
$36.01
8 90
$40.51
- - - - -
Notes: __............-....-
- _.. _........�........_ ,
Steps are 750 hrs.
$52.99
Apprentice to Journeyworker Ratio:1:1
$14.00
PAINTER (SPRAY OR SANDBLAST, NEW) *
01/01/2013
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used. PAINTERS LOCAL 35 - ZONE 2
$7.80
$0.00
$0.00
$30.31
$7.80
$3.52
$0.00
$36.08
$7.80
$3.84
$0.00
$38.65
$7.80
$4.16
$0.00
$41.22
$7.80
$13.68
$0.00
$52.99
$7.80
$14.00
$0.00
$55.56
$7.80
$14.32
$0.00
$58.13
$7.80
_---_-_-----.._...._
$14.96
$0.00
$63.27
$35.91 $7.80 $15.60 $0.00 $59.31
Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New
Effective Date - 01/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.96
$7.80
$0.00
$0.00
$25.76
2 55
$19.75
$7.80
$3.52
$0.00
$31.07
3 60
$21.55
$7.80
$3.84
$0.00
$33.19
4 65
$23.34
$7.80
$4.16
$0.00
$35.30
5 70
$25.14
$7.80
$13.68
$0.00
$46.62
6 75
$26.93
$7.80
$14.00
$0.00
$48.73
7 80
$28.73
$7.80
$14.32
$0.00
$50.85
8 90
$32.32
$7.80
$14.96
$0.00
$55.08
Notes:
---
Tice to
ApprenJourneyworker Ratio:l:l
-...._....------_.-------...v.
PAINTER (SPRAY OR SANDBLAST, REPAINT)
PAINTERS LOCAL 35 - 7.0NE 2
01/01/2013 $33.97 $7.80 $15.60 $0.00 $57.37
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 23 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -Repaint
Effective Date - 01/01/2013 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$16.99
$7.80
$0.00
$0.00
$24.79
2 55
$18.68
$7.80
$3.52
$0.00
$30.00
3 60
$20.38
$7.80
$3.84
$0.00
$32.02
4 65
$22.08
$7.80
$4.16
$0.00
$34.04
5 70
$23.78
$7.80
$13.68
$0.00
$45.26
6 75
$25.48
$7.80
$14.00
$0.00
$47.28
7 80
$27.18
$7.80
$14.32
$0.00
$49.30
8 90
$30.57
$7.80
$14.96
$0.00
$53.33
- - - - - - - - - - -
Notes:
- - - - -
- - -
- - - -
- - -
- - -
I
- - - - - - - - -
Apprentice to Journeyworker Ratio: 1:1
- - - - -
- - -
- - - -
- ..-..- -
PAINTER (TRAFFIC MARKINGS)
LABOR RS - 7ONE' 2
For Apprentice rates see "Apprentice- LABORER"
06/01/2013
$29.85
$7.10
$11.80
$0.00
$48.75
12/01/2013
$30.35
$7.10
$11.80
$0.00
$49.25
06/01/2014
$30.85
$7.10
$11.80
$0.00
$49.75
12/01/2014
$31.35
$7.10
$11.80
$0.00
$50.25
06/01/2015
$31.85
$7.10
$11.80
$0.00
$50.75
12/01/2015
$32.35
$7.10
$11.80
$0.00
$51.25
06/01/2016
$32.85
$7.10
$11.80
$0.00
$51.75
12/01/2016
$33.60
$7.10
$11.80
$0.00
$52.50
PAINTER / TAPER (BRUSH, NEW) * 01/01/2013 $34.51 $7.80 $15.60 $0.00 $57.91
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.pAiNTFRS LOCAL 35 - ZONE 2
Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW
Effective Date - 01/01/2013 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.26
$7.80
$0.00
$0.00
$25.06
2 55
$18.98
$7.80
$3.52
$0.00
$30.30
3 60
$20.71
$7.80
$3.84
$0.00
$32.35
4 65
$22.43
$7.80
$4.16
$0.00
$34.39
5 70
$24.16
$7.80
$13.68
$0.00
$45.64
6 75
$25.88
$7.80
$14.00
$0.00
$47.68
7 80
$27.61
$7.80
$14.32
$0.00
$49.73
8 90
$31.06
$7.80
$14.96
$0.00
$53.82
- - - - - - - - - - -
Notes:
- - - - -
- - -
- - - -
- ---
- - -
I
Steps are 750 hrs.
- - - - - F - -
Apprentice Z Journeywoker Ra to 1:1
- - - - -
- - -
- - - -
- - - -
-------- ---------- ---- ------------------------------------ - --- -- -- --------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058
----- -------
----------------------------------
Page 24 of 35
Classification
PAINTER / TAPER (BRUSH, REPAINT)
PAINTERS LOCAL 35 - ZONE 2
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
01/01/2013 $32.57 $7.80 $15.60 $0.00 $55.97
Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT
12/01/2012
$30.28
$9.07
$8.00
Effective Date - 01/01/2013
$47.35
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND
08/01/2013
Supplemental
$9.80
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$16.29
$7.80
$0.00
$0.00
$24.09
2 55
$17.91
$7.80
$3.52
$0.00
$29.23
3 60
$19.54
$7.80
$3.84
$0.00
$31.18
4 65
$21.17
$7.80
$4.16
$0.00
$33.13
5 70
$22.80
$7.80
$13.68
$0.00
$44.28
6 75
$24.43
$7.80
$14.00
$0.00
$46.23
7 80
$26.06
$7.80
$14.32
$0.00
$48.18
8 90
$29.31
$7.80
$14.96
$0.00
$52.07
---w...........-.---.-----
---------------Notes:
Steps are 750 hrs.
-- - -
Apprentice to Journeyworker Ratio:1:1
- - - - - -
- - -
- - -
- - - -
-
PANEL & PICKUP TRUCKS DRIVER
TEAMSTERS JOINT COUNCIL NO IOZONE B
12/01/2012
$30.28
$9.07
$8.00
$0.00
$47.35
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND
08/01/2013
$40.10
$9.80
$18.17
$0.00
$68.07
DECK)
PILE DRIVER LOCAL 56 (ZONE 1)
08/01/2014
$41.60
$9.80
$18.17
$0.00
$69.57
08/01/2015
$43.10
$9.80
$18.17
$0.00
$71.07
PILE DRIVER
08/01/2013
$40.10
$9.80
$18.17
$0.00
$68.07
PILE DRIVER LOCAL 56 (ZONE 1)
08/01/2014
$41.60
$9.80
$18.17
$0.00
$69.57
08/01/2015 $43.10 $9.80 $18.17 $0.00 $71.07
--------------------------------------- ------- --- ---------------------- -------------- - -------- ----- ----- --------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 25 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$48.77
2 60
$24.96
Unemployment
Apprentice- PILE DRIVER -
Local 56 Zone 1
$52.93
3 70
$29.12
$9.80
Effective Date - 08/01/2013
$0.00
$57.09
4 75
Supplemental
$9.80
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.05
$9.80
$18.17
$0.00
$48.02
2 60
$24.06
$9.80
$18.17
$0.00
$52.03
3 70
$28.07
$9.80
$18.17
$0.00
$56.04
4 75
$30.08
$9.80
$18.17
$0.00
$58.05
5 80
$32.08
$9.80
$18.17
$0.00
$60.05
6 80
$32.08
$9.80
$18.17
$0.00
$60.05
7 90
$36.09
$9.80
$18.17
$0.00
$64.06
8 90
$36.09
$9.80
$18.17
$0.00
$64.06
Effective Date - 08/01/2014
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.80
$9.80
$18.17
$0.00
$48.77
2 60
$24.96
$9.80
$18.17
$0.00
$52.93
3 70
$29.12
$9.80
$18.17
$0.00
$57.09
4 75
$31.20
$9.80
$18.17
$0.00
$59.17
5 80
$33.28
$9.80
$18.17
$0.00
$61.25
6 80
$33.28
$9.80
$18.17
$0.00
$61.25
7 90
$37.44
$9.80
$18.17
$0.00
$65.41
8 90
$37.44
$9.80
$18.17
$0.00
$65.41
--------------.-------_.....-_._..._._.._....-_.,
(Notes:
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
�- `---------..._..-._,
Apprentice to Journeyworker Ratio:l:3
------_..__...---.-
--I
PIPEFITTER & STEAMFITTER 03/01/2013 $47.01 $8.75 $12.39 $0.00 $68.15
PIPEFIT'TERS LOCAL 537 (Local 138)
Apprentice- PIPEFITTER Local 537 (Local 138)
Effective Date - 03/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$18.80
$8.75
$4.50
$0.00
$32.05
2
45
$21.15
$8.75
$12.39
$0.00
$42.29
3
60
$28.21
$8.75
$12.39
$0.00
$49.35
4
70
$32.91
$8.75
$12.39
$0.00
$54.05
5
80
$37.61
$8.75
$12.39
$0.00
$58.75
--
(Notes:
--..._.._...----------.-----------
--+
* * 1:3; 3:15; 1:10 thereafter / Steps are 1 yr.
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
Apprentice to Journeyworker Ratio:**
-------------------------------- ----- ----- -- ... -- ------------ ----------------------------------- ----------------------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 26 of 35
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
PI, UMBERS & GASFI7TF.RSLOCA L 12 (Local 138)
$30.60
$7.10
$11.80
Unemployment
$49.50
PIPELAYER 06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
LABORERS -70NE2
$31.60
$7.10
$11.80
Supplemental
$50.50
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
PLUMBER
03/01/2013
$45.23
$9.32
$13.29
$0.00 $67.84
PI, UMBERS & GASFI7TF.RSLOCA L 12 (Local 138)
$30.60
$7.10
$11.80
$0.00
$49.50
Apprentice- PLUMBER/GASFITTER
-Local 12 (Local 138)
$7.10
$11.80
$0.00
$50.00
Effective Date - 03/01/2013
$31.60
$7.10
$11.80
Supplemental
$50.50
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 35
$15.83
$9.32
$4.97
$0.00
$30.12
2 40
$18.09
$9.32
$5.61
$0.00
$33.02
3 55
$24.88
$9.32
$7.53
$0.00
$41.73
4 65
$29.40
$9.32
$8.81
$0.00
$47.53
5 75
$33.92
$9.32
$10.09
$0.00
$53.33
Notes:
Steps are I yr ff
Step 4 with lic$50.43 Step5 with lic$56.22 i
--------..,_....._.......-------_._._...------.__.-----
Apprentice to Journeyworker Ratio:1:5
PNEUMATIC CONTROLS (TEMP.) 03/01/2013 . $47.01 $8.75 $12.39 $0.00 $68.15
PIPFF17TERS LOCAL 537 (Local 138)
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBERIPIPEFITTER"
PNEUMATIC DRILL/TOOL OPERATOR
LA BORERS - 7.ONF. 2
For apprentice rates see "Apprentice- LABORER"
POWDERMAN & BLASTER
LABORERS - 70NE 2
For apprentice rates see "Apprentice- LABORER"
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
06/01/2013
$30.85
$7.10
$11.80
$0.00
$49.75
12/01/2013
$31.35
$7.10
$11.80
$0.00
$50.25
06/01/2014
$31.85
$7.10
$11.80
$0.00
$50.75
12/01/2014
$32.35
$7.10
$11.80
$0.00
$51.25
06/01/2015
$32.85
$7.10
$11.80
$0.00
$51.75
12/01/2015
$33.35
$7.10
$11.80
$0.00
$52.25
06/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
12/01/2016
$34.60
$7.10
$11.80
$0.00
$53.50
------------------------------------------------------------------------------------- --- -- ----------------------'--------------- ---_
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 27 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$14.54
$6.34
$6.23
$0.00
$27.11
Unemployment
$15.76
POWER SHOVEL/DERRICK/TRENCHING MACHINE
06/01/2013
$40.34
$10.00
$13.55
$0.00
$63.89
OPERATING ENGINEERS LOCAL 4
$0.00
$29.54
5 75
$18.18
$6.34
$6.23
$0.00
12/01/2013
$41.12
$10.00
$13.55
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
7 85
$20.60
$6.34
$6.23
$0.00
$33.17
PUMP OPERATOR (CONCRETE)
06/01/2013
$40.34
$10.00
$13.55
$0.00
$63.89
OPERATING ENGINEERS LOCAL 4
06/01/2015
$32.10
___
Apprentice to Journeyworker Ratio:1:5
$11.80
12/01/2013
$41.12
$10.00
$13.55
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
$7.10
$11.80
$0.00
$51.50
PUMP OPERATOR (DEWATERING, OTHER)
06/01/2013
$28.19
$10.00
$13.55
$0.00
$51.74
OPERATING ENGINEERS LOCAL 4
$52.00
12/01/2016
$33.85
$7.10
12/01/2013
$28.74
$10.00
$13.55
$0.00
$52.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
READY -MIX CONCRETE DRIVER
04/30/2009
$25.80
$5.96
$5.34
$0.00
$37.10
TEAMSTERS LOCAL 42
--
Page 28 of 35
RECLAIMERS
06/01/2013
$39.96
$10.00
$13.55
$0.00
$63.51
OPERATING ENGINEERS LOCAL 4
12/01/2013
$40.74
$10.00
$13.55
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
RESIDENTIAL WOOD FRAME (All Other Work)
04/01/2011
$24.24
$8.67
$15.51
$0.00
$48.42
CARPENTERS -ZONE 2 (Residential Wood)
RESIDENTIAL WOOD FRAME CARPENTER **
05/01/2011
$24.24
$6.34
$6.23
$0.00
$36.81
** The Residential Wood Frame Carpenter classification applies
only to the construction ofnew, wood frame residences that do
not exceed four stories including the basement. CARPENTERS -ZONE
2 (Residential Wood)
As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL
WOOD FRAME CARPENTER
rate.
Apprentice- CARPENTER (Residential Wood Frame) -Zone 2
Effective Date - 05/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$14.54
$6.34
$0.00
$0.00
$20.88
2 60
$14.54
$6.34
$6.23
$0.00
$27.11
3 65
$15.76
$6.34
$6.23
$0.00
$28.33
4 70
$16.97
$6.34
$6.23
$0.00
$29.54
5 75
$18.18
$6.34
$6.23
$0.00
$30.75
6 80
$19.39
$6.34
$6.23
$0.00
$31.96
7 85
$20.60
$6.34
$6.23
$0.00
$33.17
8 90
$21.82
$6.34
$6.23
$0.00
$34.39
iNotes:
$50.50
06/01/2015
$32.10
___
Apprentice to Journeyworker Ratio:1:5
$11.80
$0.00
$51.00
RIDE -ON MOTORIZED BUGGY OPERATOR
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
LABORERS - ZONE 2
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
--------------------------------------- -- --- ---
Issue Date: 09/03/2013 Wage Request Number:
- - - -- --
20130903-058
-
- --
--------------------------------------
--
Page 28 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
2
60
$22.99
$10.50
$10.70
Unemployment
$44.19
ROLLER/SPREADER/MULCHING MACHINE
06/01/2013
$39.96
$10.00
$13.55
$0.00
$63.51
OPERATING ENGINEERS LOCAL 4
75
$28.73
$10.50
$10.70
$0.00
$49.93
5
12/01/2013
$40.74
$10.00
$13.55
$0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
Date - 02/01/2014
$42.16
$10.50
$10.70
Supplemental
$63.36
ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg)
08/01/2013
$38.31
$10.50
$10.70
$0.00
$59.51
ROOFERS LOCAL 33
SHEETMETAL WORKER
02/01/2014
$39.21
$10.50
$10.70
$0.00
$60.41
SHEET METAL WORKERS LOCAL 17 - A
08/01/2014
$40.11
$10.50
$10.70
$0.00
$61.31
02/01/2015
$41.01
$10.50
$10.70
$0.00
$62.21
08/01/2015
$41.91
$10.50
$10.70
$0.00
$63.11
02/01/2016
$42.81
$10.50
$10.70
$0.00
$64.01
Apprentice- ROOFER - Loca133
Effective Date - 08/01/2013
Step percent
Supplemental
Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$19.16
$10.50
$3.38
$0.00
$33.04
2
60
$22.99
$10.50
$10.70
$0.00
$44.19
3
65
$24.90
$10.50
$10.70
$0.00
$46.10
4
75
$28.73
$10.50
$10.70
$0.00
$49.93
5
85
$32.56
$10.50
$10.70
$0.00
$53.76
Effective
Date - 02/01/2014
$42.16
$10.50
$10.70
Supplemental
$63.36
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$19.61
$10.50
$3.38
$0.00
$33.49
2 60
$23.53
$10.50
$10.70
$0.00
$44.73
3 65
$25.49
$10.50
$10.70
$0.00
$46.69
4 75
$29.41
$10.50
$10.70
$0.00
$50.61
5 85
$33.33
$10.50
$10.70
$0.00
$54.53
- - - - _....___. - ,_.._ - - - - -
(Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1
- -
- _ _ - _
_. - - -
____ ____ -
- -- _-
Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs.
$42.16
$10.50
$10.70
$0.00
$63.36
-----�--- .,._...._-------_.
Apprentice to Journeyworker Ratio:**
02/01/2016
$43.06
V_.. --_.._.-----
$10.70
$0.00
ROOFER SLATE / TILE / PRECAST CONCRETE
08/01/2013
$38.56
$10.50
$10.70
$0.00
$59.76
ROOFERS LOCAL 33
02/01/2014
$39.46
$10.50
$10.70
$0.00
$60.66
08/01/2014
$40.36
$10.50
$10.70
$0.00
$61.56
02/01/2015
$41.26
$10.50
$10.70
$0.00
$62.46
08/01/2015
$42.16
$10.50
$10.70
$0.00
$63.36
02/01/2016
$43.06
$10.50
$10.70
$0.00
$64.26
For apprentice rates see "Apprentice- ROOFER"
SHEETMETAL WORKER
02/01/2013
$42.32
$9.82
$18.24
$2.11
$72.49
SHEET METAL WORKERS LOCAL 17 - A
- ---- ---------- ---------- ----- - -- ------ ------------------
....
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 29 of 35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- SHEET METALWORKER -Local 17-A
Effective Date - 02/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$16.93
$9.82
$4.00
$0.00
$30.75
2
40
$16.93
$9.82
$4.00
$0.00
$30.75
3
45
$19.04
$9.82
$8.00
$1.11
$37.97
4
45
$19.04
$9.82
$8.00
$1.11
$37.97
5
50
$21.16
$9.82
$8.75
$1.19
$40.92
6
50
$21.16
$9.82
$9.00
$1.20
$41.18
7
60
$25.39
$9.82
$10.24
$1.36
$46.81
8
65
$27.51
$9.82
$10.99
$1.45
$49.77
9
75
$31.74
$9.82
$12.49
$1.62
$55.67
10
85
$35.97
$9.82
$13.49
$1.78
$61.06
- _..-
Notes:
_.._...._. - - - - _._..,.-...._..
- - - - -
- - -
-....... - -
- - ---
- _,
'
Apprentice to Journeyworker Ratio:1:1
Steps are 6 mos.
Apprentice to Journeyworker Ratio:1:4
SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93
PAINTERS LOCAL 35 - ZONE 2
Apprentice- SIGN ERECTOR -Local 35 Zone 2
Effective Date - 06/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$12.91
$7.07
$0.00
$0.00
$19.98
2
55
$14.20
$7.07
$2.45
$0.00
$23.72
3
60
$15.49
$7.07
$2.45
$0.00
$25.01
4
65
$16.78
$7.07
$2.45
$0.00
$26.30
5
70
$18.07
$7.07
$7.05
$0.00
$32.19
6
75
$19.36
$7.07
$7.05
$0.00
$33.48
7
80
$20.65
$7.07
$7.05
$0.00
$34.77
8
85
$21.94
$7.07
$7.05
$0.00
$36.06
9
90
$23.23
$7.07
$7.05
$0.00
$37.35
Notes:
-------- .-.,...._...
- - - -
.�.--------
.�.,....�.,.
- i
I
Steps are 4 mos.
i
Apprentice to Journeyworker Ratio:1:1
SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2012 $30.74 $8.91 $8.00 $0.00 $47.65
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2012 $31.03 $8.91 $8.00 $0.00 $47.94
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
SPRINKLER FITTER
SPRINKLER FITTERS LOCAL 550 - (Section B)
03/01/2013 $48.13 $8.42 $12.60 $0.00 $69.15
------- --- ------------------------ ----- ----------------- - - ------ ------ -
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Pa
f ge 30 o35
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- SPRINKLER FITTER -.Local 550 (Section B)
Effective Date - 03/01/2013
Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 35
$16.85
$8.42
$8.00
$13.55
$13.55
$0.00
$33.27
TELECOMMUNICATION TECHNICIAN
2 40
$19.25
$8.42
$12.77
$8.00
$58.74
$0.00
$35.67
3 45
$21.66
$8.42
$8.00
03/01/2014
$0.00
$38.08
$13.03
4 50
$24.07
$8.42
09/01/2014
$8.00
$13.00
$0.00
$40.49
$59.89
5 55
$26.47
$8.42
$13.00
$8.00
$0.00
$0.00
$42.89
09/01/2015
6 60
$28.88
$8.42
$0.00
$8.00
$0.00
$45.30
$13.00
7 65
$31.28
$8.42
$8.00
$0.00
$47.70
8 70
$33.69
$8.42
$8.00
$0.00
$50.11
9 75
$36.10
$8.42
$8.00
$0.00
$52.52
10 80
$38.50
$8.42
$8.00
$0.00
$54.92
„_.,._._..__,_ ---------------_._.---------
Notes:
Steps are 850 hours
I
___ __®--_..--
rA..�To-Jo
App renti-ce to Journey-_wo worker Ratio:l:l
�.
- _----
- __---
STEAM BOILER OPERATOR
06/01/2013
$39.96
$10.00
$13.55 $0.00
$63.51
OPFRA TING ENGINEERS LOCAL 4
12/01/2013
$40.74
$10.00
$13.55 $0.00
$64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN
OPERATING ENGINEERS LOCAL 4
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
06/01/2013
12/01/2013
$39.96
$40.74
$10.00
$10.00
$13.55
$13.55
$0.00
$0.00
$63.51
$64.29
TELECOMMUNICATION TECHNICIAN
09/01/2013
$32.97
$13.00
$12.77
$0.00
$58.74
ELECTRICIANS LOCAL 103
03/01/2014
$33.44
$13.00
$13.03
$0.00
$59.47
09/01/2014
$33.84
$13.00
$13.05
$0.00
$59.89
03/01/2015
$34.38
$13.00
$13.06
$0.00
$60.44
09/01/2015
$35.10
$13.00
$13.08
$0.00
$61.18
03/01/2016
$35.81
$13.00
$13.10
$0.00
$61.91
- -- - ---- - ---------------------------- --- --- - - ----------------- --- ------------------- -- --- ------------ -- ------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 31 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
Unemployment
Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103
Effective Date - 09/01/2013
Supplemental
Step percent
Apprentice Base Wage Health
Pension
unemployment
Total Rate
1 40
$13.19 $13.00
$0.40
$0.00
$26.59
2 40
$13.19 $13.00
$0.40
$0.00
$26.59
3 45
$14.84 $13.00
$10.04
$0.00
$37.88
4 45
$14.84 $13.00
$10.04
$0.00
$37.88
5 50
$16.49 $13.00
$10.29
$0.00
$39.78
6 55
$18.13 $13.00
$10.53
$0.00
$41.66
7 60
$19.78 $13.00
$10.78
$0.00
$43.56
8 65
$21.43 $13.00
$11.03
$0.00
$45.46
9 70
$23.08 $13.00
$11.28
$0.00
$47.36
10 75
$24.73 $13.00
$11.53
$0.00
$49.26
Effective Date - 03/01/2014
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 40
$13.38 $13.00
$0.40
$0.00
$26.78
2 40
$13.38 $13.00
$0.40
$0.00
$26.78
3 45
$15.05 $13.00
$10.29
$0.00
$38.34
4 45
$15.05 $13.00
$10.29
$0.00
$38.34
5 50
$16.72 $13.00
$10.54
$0.00
$40.26
6 55
$18.39 $13.00
$10.79
$0.00
$42.18
7 60
$20.06 $13.00
$11.04
$0.00
$44.10
8 65
$21.74 $13.00
$11.29
$0.00
$46.03
9 70
$23.41 $13.00
$11.54
$0.00
$47.95
10 75
$25.08 $13.00
$11.79
$0.00
$49.87
(Notes:
Apprentice to Journeyworkcr Ratioaa
--
- _._. ___.
__.. .- .__
_.._ - -
TERRAZZO FINISHERS
08/01/2013 $47.00
$10.18
$18.15
$0.00
$75.33
BRICKIAYF,RS LOCAL 3 - MARBLE d T'!LE
02/01/2014 $47.56
$10.18
$18.15
$0.00
$75.89
08/01/2014 $48.46
$10.18
$18.22
$0.00
$76.86
02/01/2015 $49.02
$10.18
$18.22
$0.00
$77.42
08/01/2015 $49.92
$10.18
$18.29
$0.00
$78.39
02/01/2016 $50.49
$10.18
$18.29
$0.00
$78.96
08/01/2016 $51.39
$10.18
$18.37
$0.00
$79.94
02/01/2017 $51.96
$10.18
$18.37
$0.00
$80.51
--- ----- ----------------- - ------------------------- ---- - --- -- ----- --------------------------------------- --- -------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 32 of 35
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$52.11
2 60
$28.54
Unemployment
Apprentice- TERRAZZO FINISHER
-Local 3 Marble & Tile
$56.87
3 70
$33.29
$10.18
Effective Date - 08/01/2013
$0.00
$61.62
4 80
Supplemental
$10.18
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$23.50
$10.18
$18.15
$0.00
$51.83
2 60
$28.20
$10.18
$18.15
$0.00
$56.53
3 70
$32.90
$10.18
$18.15
$0.00
$61.23
4 80
$37.60
$10.18
$18.15
$0.00
$65.93
5 90
$42.30
$10.18
$18.15
$0.00
$70.63
Effective Date - 02/01/2014
$7.10
$12.60
$0.00
$57.15
Supplemental
$38.20
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$23.78
$10.18
$18.15
$0.00
$52.11
2 60
$28.54
$10.18
$18.15
$0.00
$56.87
3 70
$33.29
$10.18
$18.15
$0.00
$61.62
4 80
$38.05
$10.18
$18.15
$0.00
$66.38
5 90
$42.80
$10.18
$18.15
$0.00
$71.13
--_..._------._--.._---_.,__._-.._._-_-_.-_..-..----_
Notes:
$54.90
06/01/2014
$35.95
Apprentice to Journeyworker Ratio:f 3
$7.10
$12.60
$0.00
TEST BORING DRILLER
-
06/01/2013
$34.45
$7.10
$12.60
$0.00
$54.15
LABORERS - FOUNDATIONAND MARINE
12/01/2013
$35.20
$7.10
$12.60
$0.00
$54.90
06/01/2014
$35.95
$7.10
$12.60
$0.00
$55.65
12/01/2014
$36.70
$7.10
$12.60
$0.00
$56.40
06/01/2015
$37.45
$7.10
$12.60
$0.00
$57.15
12/01/2015
$38.20
$7.10
$12.60
$0.00
$57.90
06/01/2016
$38.95
$7.10
$12.60
$0.00
$58.65
12/01/2016
$39.95
$7.10
$12.60
$0.00
$59.65
For apprentice rates see "Apprentice- LABORER"
TEST BORING DRILLER HELPER
06/01/2013
$33.17
$7.10
$12.60
$0.00
$52.87
LABORERS - FOUNDATIONAND MARINE.
12/01/2013
$33.92
$7.10
$12.60
$0.00
$53.62
06/01/2014
$34.67
$7.10
$12.60
$0.00
$54.37
12/01/2014
$35.42
$7.10
$12.60
$0.00
$55.12
06/01/2015
$36.17
$7.10
$12.60
$0.00
$55.87
12/01/2015
$36.92
$7.10
$12.60
$0.00
$56.62
06/01/2016
$37.67
$7.10
$12.60
$0.00
$57.37
12/01/2016
$38.67
$7.10
$12.60
$0.00
$58.37
For apprentice rates see "Apprentice- LABORER"
----------------------------- ---------------- --- ------------
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 33 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
LABORERS (COMPRESSED AIR)
Unemployment
TEST BORING LABORER
06/01/2013
$33.05
$7.10
$12.60
$0.00
$52.75
LABORERS - FOUNDATIONAND MARINE
06/01/2014
$46.83
$7.10
$13.00
$0.00
$66.93
12/01/2013
$33.80
$7.10
$12.60
$0.00
$53.50
06/01/2014
$34.55
$7.10
$12.60
$0.00
$54.25
12/01/2014
$35.30
$7.10
$12.60
$0.00
$55.00
06/01/2015
$36.05
$7.10
$12.60
$0.00
$55.75
12/01/2015
$36.80
$7.10
$12.60
$0.00
$56.50
For apprentice rates see "Apprentice- LABORER"
06/01/2016
$37.55
$7.10
$12.60
$0.00
$57.25
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
12/01/2016
$38.55
$7.10
$12.60
$0.00
$58.25
For apprentice rates see "Apprentice- LABORER"
TRACTORS/PORTABLE STEAM GENERATORS 06/01/2013 $39.96 $10.00 $13.55 $0.00 $63.51
OPERATING ENGINEERS LOCAL 4
12/01/2013 $40.74 $10.00 $13.55 $0.00 $64.29
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2012 $31.32 $8.91 $8.00 $0.00 $48.23
T EAMST Ii RS JOINT COUNCIL NO. 10 70N B
TUNNEL WORK - COMPRESSED AIR
06/01/2013
$45.33
$7.10
$13.00
$0.00
$65.43
LABORERS (COMPRESSED AIR)
12/01/2013
$46.08
$7.10
$13.00
$0.00
$66.18
06/01/2014
$46.83
$7.10
$13.00
$0.00
$66.93
12/01/2014
$47.58
$7.10
$13.00
$0.00
$67.68
06/01/2015
$48.33
$7.10
$13.00
$0.00
$68.43
12/01/2015
$49.08
$7.10
$13.00
$0.00
$69.18
06/01/2016
$49.83
$7.10
$13.00
$0.00
$69.93
12/01/2016
$50.83
$7.10
$13.00
$0.00
$70.93
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
06/01/2013
$47.33
$7.10
$13.00
$0.00
$67.43
LABORERS (COMPRESSED AIR)
12/01/2013
$48.08
$7.10
$13.00
$0.00
$68.18
06/01/2014
$48.83
$7.10
$13.00
$0.00
$68.93
12/01/2014
$49.58
$7.10
$13.00
$0.00
$69.68
06/01/2015
$50.33
$7.10
$13.00
$0.00
$70.43
12/01/2015
$51.08
$7.10
$13.00
$0.00
$71.18
06/01/2016
$51.83
$7.10
$13.00
$0.00
$71.93
12/01/2016
$52.83
$7.10
$13.00
$0.00
$72.93
For apprentice rates see "Apprentice- LABORER"
TUNNEL WORK - FREE AIR
06/01/2013
$37.40
$7.10
$13.00
$0.00
$57.50
L.ABORI;RS(1REEAIR TUNNEL)
12/01/2013
$38.15
$7.10
$13.00
$0.00
$58.25
06/01/2014
$38.90
$7.10
$13.00
$0.00
$59.00
12/01/2014
$39.65
$7.10
$13.00
$0.00
$59.75
06/01/2015
$40.40
$7.10
$13.00
$0.00
$60.50
12/01/2015
$41.15
$7.10
$13.00
$0.00
$61.25
06/01/2016
$41.90
$7.10
$13.00
$0.00
$62.00
12/01/2016
$42.90
$7.10
$13.00
$0.00
$63.00
For apprentice rates see "Apprentice- LABORER"
----------- -
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 34 of 35
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
TUNNEL WORK - FREE AIR (HAZ. WASTE)
06/01/2013
$39.40
$7.10
$13.00
$0.00
$59.50
LABORERS (FREFAIR TUNNEL)
12/01/2013
$40.15
$7.10
$13.00
$0.00
$60.25
06/01/2014
$40.90
$7.10
$13.00
$0.00
$61.00
12/01/2014
$41.65
$7.10
$13.00
$0.00
$61.75
06/01/2015
$42.40
$7.10
$13.00
$0.00
$62.50
12/01/2015
$43.15
$7.10
$13.00
$0.00
$63.25
06/01/2016
$43.90
$7.10
$13.00
$0.00
$64.00
12/01/2016
$44.90
$7.10
$13.00
$0.00
$65.00
For apprentice rates see "Apprentice- LABORER"
VAC -HAUL
12/01/2012
$30.74
$8.91
$8.00
$0.00
$47.65
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
WAGON DRILL OPERATOR
06/01/2013
$30.10
$7.10
$11.80
$0.00
$49.00
LABORERS -ZONE2
12/01/2013
$30.60
$7.10
$11.80
$0.00
$49.50
06/01/2014
$31.10
$7.10
$11.80
$0.00
$50.00
12/01/2014
$31.60
$7.10
$11.80
$0.00
$50.50
06/01/2015
$32.10
$7.10
$11.80
$0.00
$51.00
12/01/2015
$32.60
$7.10
$11.80
$0.00
$51.50
06/01/2016
$33.10
$7.10
$11.80
$0.00
$52.00
12/01/2016
$33.85
$7.10
$11.80
$0.00
$52.75
For apprentice rates see "Apprentice- LABORER"
WASTE WATER PUMP OPERATOR
06/01/2013
$40.34
$10.00
$13.55
$0.00
$63.89
OPERATING ENGINEERS LOCAL f
12/01/2013
$41.12
$10.00
$13.55
$0.00
$64.67
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
WATER METER INSTALLER
03/01/2013
$45.23
$9.32
$13.29
$0.00
$67.84
PLUMBERS & GASFITTERS LOCAL 12 (Local 138)
For apprentice rates see "Apprentice- PLUMBER/PIPEFITTER" or "PLUMBER/GASFITTER"
Additional Apprentice Information:
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the
Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L.
c. 23, ss. I IE -11L.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I IE -11L.
All steps are six months (1000 hours) unless otherwise specified.
* Ratios are expressed in allowable number of apprentices to joumeymen or fraction thereof.
** Multiple ratios are listed in the comment field.
*** APP to JM; 1:1, 2:2, 23, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc.
**** APP to JM; 1:1, 1:2, 23, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc.
Issue Date: 09/03/2013 Wage Request Number: 20130903-058 Page 35 of 35
3) Field Quality Control
a) Installation in attic space — specific R -value shall be based on the manufacturer's
coverage chart, developed in conformance with the requirements of 16 CFR Part
460. Contractor shall affix thickness markers labeled in inches or R -values to
trusses with at least one marker per 300 square feet throughout the attic area.
Each marker shall face the attic access. Contractor shall verify installed R -value
with a bag count and shall provide a certificate indicating the number of bags
installed and installed R -value. The contractor shall post the certificate in a
conspicuous location where it is visible and readable from attic access.
b) Wall insulation — insulation shall be installed at the minimum density required by
the insulation manufacturer or the job specifications. Contractor shall verify
installed density by calculating the total volume of wall cavities in cubic feet and
dividing the total amount of insulation installed, by pounds, by this value.
6. Insulation Installation Sketches
Town of North Andover IFB Page 8 of 38
Furnish & Install Insulation at Stevens Estate
f�(�G 4CNEe w.4tC�
3 C3
I
R-3� tN5u1,.AYcoJ
TVL—W'pTj,}._Or-- . _
__.
....
—
- - - ! 0Sati_,&rnoh1 -ro
-Tlb'P PATE_
Town of North Andover IFB Page 8 of 38
Furnish & Install Insulation at Stevens Estate
TOWN OF NORTH ANDOVER
OFFICE OF
FACILITIES DIRECTOR
384 Osgood Street
North Andover, Massachusetts 01845
Stephen E. Foster
Facilities Director
Date: 8.30.13
Project: Stevens Estate — attic insulation
Location: 723 Osgood St.
Telephone (978) 794-1503 x-41306
sfoster@townofnorthandover.com
• See attached hard copy of IFB information for attic insulation project
• An electronic copy of same is available if needed
• Advise if any additional information is needed in order to process the IFB
Location:
Stevens estate
723 osgood street
North andover, ma 01845
Item:
Attic insulation at main building
Scope:
• Provide necessary materials, labor & equipment to install blown in cellulose insulation in
accordance with;
o Reference attached sketches;
■ third floor plan
■ attic floor plan
■ typical section
o attached specification
• provide protection of existing building components & systems
• schedule of work: Monday-Friday,7 am — 5 pm
• verify in field all dimensions and conditions
• mandatory site visit is required on:_j_J< � �� 611 w, °yam' �z 41"�
• all questions to be addressed to Ray Santilli� / �i - 13)
• bid date:_/_/
• construction completion by October 31,2013
• obtain all necessary permits (permit fees are waived)
• arrange for necessary field inspections
• final cleanup
• on site dumpster provided by owner
MN,'i1i
Cellulose insularton
Manufacturers Association
CELLULOSE THERMAL/ACOUSTICAL INSULATION
PARTI-GENERAL
1.01 Work Included
A. Work under this section consists of the furnishing of all labor, materials and equipment necessary for or
incidental to the complete and proper installation of all cellulose insulation as shown on the drawings or
specified herein, all in accordance with the contract documents,
B. Material and installation sliall conform to applicable building code requirements of all authorities having
jurisdiction.
1.02 Referenced Regulations and Material Standards
A. 16 CFR Part 460 - Labeling and Advertising of Horne Insulation (commonly known as the FTC R -Value
Rule)
B. 16 CFR Part 1209 - Interim Safety Standard for Cellulose Insulation (Consumer Products Safety
Commission standard for cellulose insulation)
C. ASTM C739 — Standard Specification for Cellulosic Fiber Loose -Fill Insula(ion
D. ASTM C1015 — Standard Practice for Installation of Cellulosic and Mineral Fiber Loose Fill Insulation
E. ASTM C1149 — Standard Specification for Self -Supported Spray Applied Cellulosic Thermal Insulation
F. ASTM C1497 — Standard Specification for Cellulosic Fiber Stabilized Insulation
1.03 Quality Assurance
A. Manufacturer sliall furnish evidence of conformance with Consumer Products Safety Commission Interim
' teri
Safety Standard 16 CFR Part 1209 and with (lie applicable ASTM material standard for the specific type of
cellulose insulation.
B. If required by the insulation manufacturer applicator sliall furnish evidence of training, experience and
approval of the manufacturer.
1.04 Delivery, Storage and Handling
A. Materials sliall be delivered to the site in clearly labeled packaging conforming with the labeling
requirements of Consumer Products Safety Commission Interim Safety Standard 16 CFR Part 1209 and
1404, Federal Trade Commission R -Value Rule 16 CFR Part 460, and with the applicable ASTM material
standard for the specific type of cellulose insulation.
B .Materials shall be protected from the weather and other damage.
C.
Damaged materials found unsuitable for use will be rejected and sliall be removed from the site.
1.05 Project, Site Conditions
A. Cellulose insulation shall not be installed under temperature and humidity conditions not approved by the
manufacturer.
B. In the case of materials installed with added moisture provide natural ventilation to properly cure the
insulation during and subsequent to its application.
1.06 Cleaning
A. After completion of insulation work in an area, equipment sliall be removed and all surfaces shall be
cleaned of all deposits of insulation material.
PART 2 - PRODUCTS
2.01 Materials
A. Insulation shall be <loose -;fill> cellulose insulation.
B. Insulation sliall conform with Consumer Products Safety Commission Interim Safety Standard 16 CFR Part
1209 and with the applicable ASTM material standard for the specific type of cellulose insulation.
C. Retention membranes, if required, shall conform with the requirements of the insulation manufacturer and
building codes.
PART 3 - EXECUTION
3.01 Preparatory Work
A. Installer shall verify by inspection and with the general contractor that preparatory work specified has been
properly done, including, but not limited to assuring that stud and joist spaces are accessible, free of debris
and contain all scheduled pipes, conduits and non -heat producing devices and that heat -producing devices
and elements that are not inherently fireproof are shielded such that insulation will be held 3" away.
3.02 Application
A. Insulation shall be installed in conformance with applicable codes, the manufacturer's published
instructions or Cellulose Insulation Manufacturers Association Technical Bulletins 2, 3, or 5; and ASTM
Standard Designation C1015.
3.03 Field Quality Control
A. Installation in attic space: specified R -value shall be based on the manufacturer's coverage chart, developed
in conformance with the requirements of 16 CFR Part 460. Contractor shall affix thickness markers labeled
in inches or R -values to trusses with at least one marker per 300 square feet throughout the attic area. Each
marker shall face the attic access. Contractor shall verify installed R -value with a bag count and shall
provide a certificate indicating the number of bags installed and the installed R -value. The installer shall
post the certificate in a conspicuous location where it is visible and readable from the attic access.
B. Wall installation: insulation shall be installed at tine minimum density required by the insulation
manufacturer or the job specifications. Contractor shall verify installed density by calculating the total
volume of wall cavities in cubic feet and dividing the total amount of insulation installed, in pounds, by this
value.
C. Continuity: at the architect's or general contractor's discretion, an infrared thermographic inspection may
be required. If the test proves the installation is satisfactory, its cost will be borne by tine owner. If the test
shows discontinuity, its cost and the cost of achieving continuity shall be home by the contractor.
D. It is recommended, but not within tine scope of this specification, that blower door testing be done to verify
that adequate air sealing has been done to assure the thermal performance of the building envelope.
These specifications are accurate as of May 1, 2012. Please check all local building codes for requirements that may
vary within local jurisdictions.
Santilli, Ray
From: REGS@sec. state. ma. us
Sent: Tuesday, September 03, 2013 4:23 PM
To: Santilli, Ray
Subject: Publish Date Assigned for General Contracts
A publish date of 9/11/13 has been assigned to your General Contracts submission with description of.
Furnish and install blown -in cellulose insulation in third floor sloped ceiling areas and fourth floor attic floor
areas of the Stevens Estate, 723 Osgood St., North Andover.
Please note the Massachusetts Secretary of State's office has determined that most emails to and from
municipal offices and officials are public records. For more information please refer to:
http://www.sec.state.ma.us/pre/preidx.htm.
Please consider the environment before printing this email.
Legal Ad for Eagle -Tribune
The Town of North Andover is soliciting bids from qualified companies to furnish and install
blown -in cellulose insulation in 3`d floor sloped ceilings and 4t" floor attic floor areas of the
Stevens Estate, 723 Osgood Street. Qualified companies are requested to submit bids to the
Assistant Town Manager at North Andover Town Hall, 120 Main Street, North Andover, MA, in
accordance with the instructions contained within the Invitation for Bids (IFB).
The complete IFB is available on the Town's website (www.townofnorthandover.com) by
clicking on `Bids, Quotes and Proposals'. The Town will only accept proposals delivered in
person or by mail. All proposals must be received by 2:00 p.m. on October 3, 2013 to be
considered.
The Town of North Andover may cancel this IFB or reject in whole or in part any and all
proposals, if they determine that cancellation or rejection serves the best interest of the Town of
North Andover.
SPR Central Register General Contract Submit Confirmation
State Publications and Regulations
William Francis Galvin, Secretary of the Commonwealth
Page 1 of 2
The following General Contract submission was successfully
received.
Planned date of publish is 9/11/2013
Awarding Agency
Agency Name Town of North Andover 120 Main Street North
and Address: Andover, MA 01803
Project Number:
Estimated Cost: —11
for DCAM contracts over $1
ame:
Address:
Massachusetts Highway contracts over $50,000.
Contact Information
itilli, Assistant Town
listed when
Contract Information
Fax
Project:
Furnish and install blown -in cellulose insulation in 3rd floor
sloped ceilinIZ areas and 4th floor attic floor areas of Stevens
Estate, 723 Osgood Street
Plans/Specifications
Available:
Place, date and time
The complete Invitation for Bids document will be available on
Wednesday, September 11, 2013 at 11:00 a.m. at
www.townofnorthandover.com by clicking on 'Bids, Quotes and
Proposals'
http://www. sec.state.ma.us/sprpubt i cforms/GCS ubmitConfirmation.aspx?ID=81267 9/3/2013
Request Official Wage Schedule
Confirmation
Page 1 of 2
Your request for an Official Prevailing Wage
Schedule has been successfully received and
is being processed by DOS. The schedule will
be emailed to the email address provided in
your request.
Please note the wage request number
20130903-058 for future inquires.
Request another official Wage Schedule
rntoP
http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSupp... 9/3/2013
� �
a
I
f
d�
C a
a
1
jS
I N
I
f
yr Wl
V P y
tC
THE EAGLE -TRIBUNE Wednesday,
class'if
ed' -
The mar etplace. Eagle -Tribune, Gloucester Daily Times,
The Salem News, Daily News of Newburypiod
Monday .....................6pm Friday
Tuesday -Saturday ........6pm day prior
The Eaglel%ibune THE SALEM NEWS G16—&ester DailyTimes DAILY NEWs Sunday paper ..............6pm Friday (auto only)
Sunday paper ..............6pm Friday
CALL: 800.927.9200 ONLINE: ClassifiedsNorth.com Carriage Towne News: 12pm Friday
MON.-FRI. 8AM-6PM FAX: 978.685.1588 Andover Townsman, Derry News &
POLICIES/ADJUSTMENTS: Advertisers must check insertions and report errors immediately. Billing adjustments are made for only one incorrect insertion and Haverhill Gazette: bpm Tuesday
then only for the incorrect portion. We are not responsible for failure to publish and reserve the right to reject, edit or cancel any ad. Ads are subject to credit Cancellation/change deadlines: 1
approval unless paid for prior to publication.
some as publication deadlines visa "�
EXPERIENCED PCA sought by Methuen Male,
to assist with bathing, dressing & transfers
Mon -Fri, 6:30am - 8:30 am. Own car a must.
Call 978-683-1945'after 6pm .
�lr]IlUinm'
Aeration & Overseeding Now is the Time!
HOME CARE/ COMPANION for alert, infirm eld-
►
Full Service Landscaping-Father/Daughter
arty Haverhill woman. Duties include meal
Anything Goes. Free Estimate
Owned/Operated
preparation, hygiene. Possible live-in.
References required. Call (978) 401-7773.
ittlItIll
eXbw.8,
I am CNA's/HHA's looking to take care of your
Beyond Home Care LLC
loved one in your home. Private Pay Combined
30+yrs. experience, excellent references. Pri-
*,144111
vate duty 7 days a week RN support Available
(978) 837-2068 Leave message
privately held, Woman Owned business
I Am Looking For Work
with 11 years of experience.
Offering private care
at competitive rates.
Reliable, experienced woman available for
The assistance available is flexible and can
elderly person in need of personal health care,
range from part time aide to a full day of care;
companion, and or Dementia. Light versatile
24 hour care is available upon request.
home duties. Will travel. Excellent references.
Services include: assist with ADL, transportation
Call 978-255-2111
to medical appts, customized meals, daily er-
LIVE IN CARE NEEDED IN GLOUCESTER
rands, housekeeping. We can ensure well -b-
Seeking a mature, responsible woman to care
eing, safety and socialization, and provide care
for an elderly woman with dementia. Rent
and assistance in order to maintain the quality
free studio apartment plus additional salary.
of life that you or your loved ones have be-
Help with personal hygiene, meal pep, house -
come accustomed! Reasonable, competitive
keeping, dispensing medication and compan-
rates. All communication is kept strictly confi-
ionship. 24 hr. accountability, five days a
dental. Licensed, Registered and Insured. Pro-
week. Two days off. References and back-
fessional references upon your request.
ground check needed. Reply via email to:
Please consider us in your efforts
revotarg@comcast.net
to give your loved ones the
Quality of Life that they deserve.
NANNY FOR GRANNY 25 hours Monday -Friday
Above 6 Beyond Home Care, LLC
$12.98/hr, 5 mile radius of Beverly
www.abhhcare.com
caleski@howlings.com. (978) 922-7747
Info@abhhcare.com
* * PCA -For male quad in Beverly, MA PT
603-913-5895
flex. hours Good pay! This position must be
filled ASAP. Come join our team!
Roofing, siding, gutters. Quality work, reason -
Vr��
978 969-2921 Call between I Oam -spm * *
PCA NEEDED: Lawrence MA area.
Angels,
Temp -Perm. Heavy lifing involved. Must be
available every other weekend & fill-ins during
UVING ASSISTANCE SERVICES
the week, and have drivers license.
Call 978-683-7437 between gam-2pm
ATTENTION: CNA's, LNA's, HHA's
PCA - Reliable, responsible with experience
Visiting Angels has openings for experienced
Caregivers looking to make a difference in an
needed in Merrimac 7am till 9 am, more hours
elder's life.Minimum requirements include driv-
available. Must be able lift. Call 978-346-4342
ers license, experience, references, clean cori.
PCA - Starting in Sept. a Bradford man will
Call to schedule appointment 978-462-6161
need an experienced personal care attendant.
Sat & Sun. from Bam-1 Dam & 5pm-7pm.
ROOFING AND REPAIRS, MA LIC#105583
Fully Insured, References, Free Estimates.
BUSY LADY SERVICES-
A good 2nd job. References helpful. Interviews
I am available to do your errands! Drive you to
being held now. Call 978-377-0238
doctors, shopping, airport, etc. Experienced
978-423-0754' or 781-842-0504
RESPONSIBLE Certified Care Attendant, PT
needed fora'951b. college educated disabled
woman in Lynalield, MA. Mornings & afternoon
►
CNA AVAILABLE - for homecare in the
shits. Must have good communication skills, be
No. Shore area. I have 25 yfs experience
able to lift & drive. Recent references absolutely
Please call Debbie at:
required. Email: ladynel89@aol.com or
978-948-2497 or 508-641-5272
Call, 781-598-5585 after 6:30pm
RN OPPORTUNITY
Doing homecare in our Andover home for
an amazing individual, our son!
Weekend days available, 8 to 10 hr shift.
Salary $43/hr. Must have M.H. provider num
ber, or be willing to acquire from MA Health.
We prefer experience in homecare, reliable.
This is a long term P/r position. Only qualifie
innuiries nlease_ Phone days. 917-2FIM794
WOMAN in Swamscott, MA needs help with
light chores 6 errands, drive to appointments,
car necessary. Flexible hours. 781- 595-5404
►
O GOT MOLD? O
Basement/attic? Inspect from $75. Mold Test,
removal. IAGA Certified. A.R.S. 978-688.1111
FINISH / REPAIR / NEW CARPENTRY
allhandymanmanh.com
Registered / Insured. 978-683-8756
3-H HANDYMAN
Reasonably priced, basements, carpentry /
remodeling, tiles. Call 978-375-1976
�oillio••► ► ►
ALL CHILDCARE PROVIDERS IN
MASSACHUSETTS ARE REQUIRED TO BE
LICENSED. Only NH Childcare Providers May Be
Licensed Or Non -Licensed
Basement Waterproofing
Home Improvements
24 yrs exp. Aureo Reis 978-479-0180
RM CLEANING - Gloucester MA
Family owned and operated. Great Rates!
Free Estimates 978-601-2902
ALL DAY JUNK REMOVAL - FREE ESTIMATES
978-361=5216
ALL YOUR SPACE BACK
Junk Removal 8 Cleanouts
Dumpster rentals. Insured 603-5714187
ANYTHING & EVERYTHING Estate Clean -outs,
Demolitions, Basement, Garage, Yard Debris
Dump runs. Call 978-521-0445
BEST RATES - Call Mike
remove junk & anything from A -Z 978-973-2009
1
classiT 0 ed
mar etplace...
JUNK REMOVAL
Aeration & Overseeding Now is the Time!
MASTER PLUMBER -Retired looking for small
►
Full Service Landscaping-Father/Daughter
jobs. MA, NH & Maine. #9563 MA, #1653 NH
Anything Goes. Free Estimate
Owned/Operated
Master gas fitter NH. Call Bill 978-476-9827
Call 978-609-5589
D&S Landscaping 978-335-4710
lies, one for rental income and one to live in.
►
Walkways, Patio, Stonewall, New Lawns, Tree
*,144111
FRAME TO FINISH
Work, Affordable Maintenance. Call Cape Ann
Landscape 978-283-4050:978-810-8111
BRITE SIDE
* PRESSURE WASHING
Repairs, Skim & New Work - Textured Ceilings &
colonial with large kitcheMiving room combi-
We work well under pressure! 978-685-9545
Metal Studs - Norman @ 603-890-3113
► ,
nation plus 2 or 3 bedrooms. Level yard and
off street parking. Newer roof and heating in
both buildings. Don't wart $189,900
BYFIELD, MA- Spacious Cape on cul de sac-
Fireplace Kitchen and dining area, Fireplace
Livingroom,PineRoors,Den/office orformal
MINICUCCI PRESSURE WASHING/Deck Staining
tem, lovely front porch and lots of curb appeal.
New Price $214,900.
Affordable Masonry Brick, Block,Stone,Cement
Service. Vinyl siding, walkways, pool areas &
COMMERCIAL & RESIDENTIAL WIRING by
Stairs Walks/Patios/Walls/Chimneys/Ceramic
decks. Free estimate. Anthony 978-291-8210
ROC Electric. MA Lic #20045A.
Tile, Call Ted 978-387-8778/603-893-7321
(978)689=8006
NH Lic #11463M. CALL 978-815-3876
➢ ALL TYPES OF MASONRY Q
14 M ►
4 QUALITY, SERVICE & PRICE E
New work, repairs, small jobs welcome.
COUTURE HOME IMPROVEMENT: SPRING SPE -
That Wor(t Shock You! Insured. MA#31525E
Free estimates. Dave 978-948-2566
CIALS! Decks, Siding, Windows & Doors In-
NH#12831 M. WCall Mike 978-423-8510
to traffic circle to Old Rd.
stalled & Repairs. Insured. TJ, 978-902-7644
Byfield- 5 room Ranch on private lot,
garage/workshop.299,900
EVELYN M. NOYES A.E. 978465
LJC & SONS MASONRY: BRICK - CEMENT -
on
Armstrong Field
Real Estate
r ►
STUCCO & STONE, All Masonry: Steps, walks,
► ► : ►
BEST QUALITY IN TOWN
walls, chimney, foundations. Call 978-688-5331
BEST CHOICE CONSTRUCTION
4 WONG FLOORS Er
Mario Masonry
Roofing, siding, gutters. Quality work, reason -
Install - Sand - Refinish
s
able costs 25 yrs exp. Fully ins. 978-973-5410
FREE estimate - Fully insured
Steps,tile,wall,stone, patio,repair 978-682-5499
617-884-3494 or 978-328-9200
MOST AFFORDABLE Roofing & Siding. Decks,
www.wongfloors.com
, , • ,
windows. Certified installers. LicAnsured BBB
accredited. 978-265-6843 WC, Lisa
►
NO JOB TOO SMALL
HAGGAR CONSTRUCTION -KRchens,
n
Kitchens,
Available 7 days. Licensed and Insured
Discount Prices 978-682-0399
ROOFING AND REPAIRS, MA LIC#105583
Fully Insured, References, Free Estimates.
bathrooms, additions & decks.- siding
Roofing g
VISA/Mastercard Call 800-649-4161
Commercial & Residential (978) 685-04611111111=1,
BALDASSARI -Painting Interior/Exterior.
►
BEST CHOICE CONSTRUCT11N
Wallpapering & removal. Free estimates
SELF -STORAGE: Salem, NH; Methuen, MA.
Gutters, seamless aluminum, cleanings,
9 978-688-0161; 781-953-6890 4
Automobiles, boats, motorcycles,
leaf guard. 25 yrs.experience.
FERREIRA'S PAINTING INC
household goods, business stock, etc.
Pricesfrom $20to$190/mo.
► ,
Power washing, Commercial & Residential,
Call 603-894-4631
www.hampshireroadsefstorage.com
ALL THE RIGHT MOVES- Carpentry, Remodeling
Interior & Exterior, Deck Finishes, Ceramic Tile,
Home Improvements, Painting & Tiling.
House Cleaning. Attention to detail.
Bill, 978-273-7243, 603-898-1035
Free Estimates Call (774) 327-4086
TILE Installation. Repairs. Bathrooms. Kitchens.
Foyers. Guaranteed work.
CUSTOM AIR, HEATING, COOLING, DUCTLESS
PLEASE NOTE:
Free estimates. Jim 978-774-4067.
Serving the No. Shore Since 2000
Ads under this classification may be found,
,
Call (781) 760-3154 Free Estimate
online under the Service heading of
High Efficiency OUTDOOR WOOD FURNACE
General Services
DONOVAN TREE REMOVAL, LLC
Sizzling Summer Specials. Free Est/Fully Insured
from Central Boiler bums less wood. 25 year
warranty. C.P. Enterprises 978-927-9663
SAMCO PAVING
603-842-0487 donovantreeremoval.com
► r
& Sealcoating. 978-281-0909 / 800-934-4007
LIVINGSTON Tree & Stump Removal
Free Est. Fully Ins. www.samcopavingma.com
Fast/Quality Service, Free est.
BATH LINERS; WALL SURROUNDS
978-689-8373 livmgstonfamilytree.com
Bath Tub Reglazing IIC.
Insured Free Estimates Mr. Tub 800-453-6171
PLANTE'S TREE Will meet/beat an u
y quote!
mrtub.com
MATTHEW'S PLASTERING
Professional climbers. Brush chipping, stump
*Reliable, Quality work * Additions, kitchens,
grinding, firewood Fully Insured. 978-399-8487
baths, basements. 978-314-0816
QUALITY TREE SERVICE
J&F LANDSCAPING: 40+years
* MV PLASTERING & DRYWALL*
Tree b Hazardous removal, trimming. Firewood.
New lawns, sod, trees shrubs loam, mows,
best prices, old ceilings and walls new again.
Low prices. Fully insured, free estimates
dozer. Free estimates insured 978-685-0783
Free estimates. 978-686-5012
Call 603-365-7364
;, spaper is
e best way
your home*
kd by local
TheEagk+'I�iba� :;
Place a happy ad in this
section to wish a special someone a
Happy Birthday, Anniversary,
Retirement, Thinking of You, Love
You or Just Wish Them a Nice Day.
Only $5.00 for 3 lines ($1.00 each
additional line. Call today
The Classified Connection
ON -927-9200
BLACK and white cat. missing from Curtis St
Rockport, MA. last seen Aug 22nd. older cat
with black ring on tail. 978-546-9759
FOUND - 2 black and white cats on 128 ramp
in Swapscott, MA. To claim call
Cape Ann Animal Aid at 978-283-6055
FOUND CAMERA at Old Town Hill, Newbury
Call to describe
(978) 462-2973
FOUND small parrot in Peabody area on 8/29.
Call with description to claim him
978-531-8713
LOST: CAT Small all gray tiger in vicinity of North
St & West Lowell Ave. Haverhill/Methuen line.
Call 978-686-4028 REWARD IF FOUND
LOST - Gray short hair cat with white on chin,
white bib, white belly and white paws. Missing
from Wheeler Street area of Gloucester since
Aug 20th. $100 REWARD. 978-290-2900
LOST SMALL SIAMESE
CAT in Rockport
Last seen on Mannion Way & Shetland Rd.
on Aug 23. Friendly. Answers to Baby.
Wearing bright pink collar. 978-502-1854
1
AMESBURY - Lovely, open, airy antique in best
Point Shore spot — 3-4 bdrms, 2 bths, fine
pine and fir floors, excellent storage. Formal
dining room, 6 FP, open plan kitchen/Great
Room. Features include wainscot and early
glass. Large deck overlooks grassy, sheltered
lawn. + 2 car garage. Very comfortable with
ovely room sizes! $479,900
Call Pat Skibbee 978 502 4782 or office
800 773 9990
RIVER VALLEY RE
00000
►
bedrooms, 2.5 baths, 2400 sq ft on 2+ land-
living 9ft
ArmstrongField. Com
►
ATKINSON Beautiful 4 bedroom Colonial on de-
Groveland - Historic 3 bedroom, 2 full bath co-
Haverhill: Riverside location! Adorable 3 bed-
Lawrence: NEW TO MARKET Two single fami-
sirable cul-de-sac! Only $409,900!
lonial with period details and charm galore.
room home recently renovated with new
lies, one for rental income and one to live in.
CLASSIC H
HOMES RE
Huge master Bedroom! Hardwood floors and 2
kitchen, stainless steel appliances, formal din-
Come take a look at this recently renovated
(603) 382OM
fireplaces. $275,000
ing or den with sliders ovedooking a nice level,
colonial with large kitcheMiving room combi-
spacious units and flexible floor plans. Front
Armstrong Field
Real Estate
fenced in yard. Hardwood floors throughout
entire house, newer vinyl replacement win-
dows, plus new roof and young heating sys-
nation plus 2 or 3 bedrooms. Level yard and
off street parking. Newer roof and heating in
both buildings. Don't wart $189,900
BYFIELD, MA- Spacious Cape on cul de sac-
Fireplace Kitchen and dining area, Fireplace
Livingroom,PineRoors,Den/office orformal
ArmstrongField.com
tem, lovely front porch and lots of curb appeal.
New Price $214,900.
First Choice Realty
room, 3 Bedrooms,
dining room, s, er Finished
1.5 bathrooms, Finished lower level, Screen
978-740-8700
First Choice Realty
(978)689-8006
porch overlooks fantastic gardens and pool.
SAT. &SUN. 9114 9/15
(978)689=8006
978-470-2929
2 car garage. $519,900
9/21 & 9/22; 12-2 PM
Lynn- 3 bedroom colonial on a dead end
Salisbury -2 family total of8rooms,
2 bathrooms. nice lot.
Exit 4 Rte 93 thru De center
Chester
•
24x26 garage/workshop. $379,0lot
Webber Associates
to traffic circle to Old Rd.
street, Nicely updated eat -in kitchen and 1/2
y P
bath the first floor. $199,000
Byfield- 5 room Ranch on private lot,
garage/workshop.299,900
EVELYN M. NOYES A.E. 978465
TT
T �(
on
Armstrong Field
Real Estate
DANVILLE NH
Roach Country Condo
HAVERHILL MA, Totally renovated, 3 bedroom,
bedrooms, 2.5 baths, 2400 sq ft on 2+ land-
living 9ft
ArmstrongField. Com
1.5 bath, 3 car garage, Asking $159,900 Open
Last chance for one of these 4 beautiful units
located 8 in dead
978-740-8700
House Sun 9/15, 1la-2p or Call 978-764-7196.
on wooded acres a end
neighborhood. Spacious open -concept front-
f Ncw A}�ordebk H4m�
""""°"°^Y• "" /
ings on 1 st floor, super insulation package,double
low -E windows, 95% efficiency FHA furnace w/-
aircleaner, Rinnai hot
-to -back floorplans, 2 bedrooms,2 full baths,
hardwood & the floors, cathedral ceilings,
corner fireplace, central A/C, full basement, 2
Lynn - Investors take notice. 3 family with
r \
uAS:.r...pSxR1;.NH.....'
7
car attached garage and no common living
walls for maximumprivacy.
spacious units and flexible floor plans. Front
v< a—k. H ...
' %
During pre -construction get a free screen
and rear porches. Needs work inside and out.
$288,900.
1 Bedroom Luxury Apartments
porch option! Construction to begin within 30
Tache RE
LaMontagne Builder's new flex -plan design featur-
days! ACT NOW!! $219,900
country kitchen w/sliders to private deck, 2 car
arae super insulation package, 95% effi-
9. 9 . P P 9 •
ciency fha heat with air cleaner, on demand
ing state of the art construction techni ues 4
f�$.94G.?300
978 745 2004
/
bedrooms, 2.5 baths, 2400 sq ft on 2+ land-
living 9ft
WEBBER ASSOCIATES
scaped acres.Open concept areas, ceil-
f Ncw A}�ordebk H4m�
""""°"°^Y• "" /
ings on 1 st floor, super insulation package,double
low -E windows, 95% efficiency FHA furnace w/-
aircleaner, Rinnai hot
(603)'432-5148
on -demand water and
more! The interior design package includes hard
-
Choose from these 2 New Lamontagne Build-
ershomes located in South &North London-
wood and tile floors, custom cabinets, granite
countertops, ss appliances, gas fireplace & 2 car
Adverti,
SALEM NH
►
derry in great commuter locations close to Rte
93. Both of these energy efficient designs fea-
attached garage. Gorgeous backyard for any type
of recreational or family type activities. Brand
NEW Ready Now!
�
;=
lL
1 Bedroom Luxury Apartments
ture 3 bedrooms, 2.5 baths, open -concept
construction Move Right In !I
$ 368,500
CALL
HEAT & HOT WATER INCLUDED
country kitchen w/sliders to private deck, 2 car
arae super insulation package, 95% effi-
9. 9 . P P 9 •
ciency fha heat with air cleaner, on demand
Other designs available in the mid $300's
Open House
f�$.94G.?300
Call for availability
hot water, double low -E !nsult!It win-
SAT. &SUN. 9114 9/15
TODAY.Rinnai
711re Eteglrt4aoe
978-470-2929
dows & More. Act now in early construction
stage for your personal' design ideas & decor
9/21 & 9/22; 12-2 PM
choices. Ready for fall occupancy!!
Both Priced at $ 279,900!!
Exit 4 Rte 93 thru De center
Chester
•
•
Webber Associates
to traffic circle to Old Rd.
.: • ► ► • . •
- : .: • : ► ►
Warehouse space from 2,000 to
30,000sf. Lease from $5.00nnn. 11
603-432-5148
WEBBER ASSOCIATES
GLOUCESTERMA - Spacious five -bedroom co-
lonial with updated kitchen. Newer multi -zone
heating -central AC, second -floor laundry, 2-1/2
baths, finished basement, new deck. Conven-
ient to town, highway and beach. $398,000.
Rick Petralia
J. Barrett & Company
978-239-6207
1 h NDERRRY NII
(9 ak CLsl D�Iyn
Gorgeous Country Colonial located on a
wooded acre plus lot just 2 minutes from Rte
93, Exit 4 & close to everything. Nearly 2600
sq ft w/spacious open -concept floorplan, 4
bedrooms, 3 baths, 2nd floor laundry, 9 ft clgs
on 1st floor, 2 car attached garage (3rd car
option), town water, superior insulation pack-
age, 95% efficiency FHA furnace w/air cleaner,
Rinnai on -demand hot water & your personal
decor choices! Construction to begin within 30
days! ACT NOW!! $ 389,900
WEBBER ASSOCIATES
(603) 432-5148
(603) 432-5148 Commercial condos, office & whse/mfg, lease or purchase.
=7 : r:Ti
FIRST CHOICE
REALTY GROUP
David Guselli
First Choice Realty Group
184 Pleasant Valley St., Suite 1-102
Methuen, MA 01844
978-689-8006
daveg@firstchoicerg.com
LN DIrpettel
To Be Included in this Directory Call
cassif ed
°
mar etplace.
Monday through Friday,
8 a.m. to 6 p.m.
Tel. 1-800-927-9200
Fax: 1-877-927-9400
14 Wednesday, September 11, 2013 THE EAGLE -TRIBUNE CLASSIFIED MARKETPLACE
Marblehead- Completely renovated 3 bed-
room, 2 %2 bathro home adjacent to Haw-
thom Pond Conse ation Area. Plen of rk-
ty pa
Ing, custom kite n, fireplace, central air,
large backyard and ore. $619,000
ArmsJong Field
Re Estate
ArmstrongField.com
978-740-8700
Newbury - NEW PRICE. Spectacular country
Victorian estate on 1.4 AC of pristine land-
scape: koi pond, peonie path, lap pool, major
bam, sweeping lawps + 9 rm, 5 bdrm, 3 level
architecturally imp¢rtant residence, all in su-
perior updated condition! This is a lovely
home. $788,000
Call Jaanie Purinton
978 462 6898 or 800 773 9990
RIVER VALLEY RE
NEWBURY - Spec4cular 2000 top quality Co-
lonial 3600+ sq' ft.reproduction in lovely
neighborhood of la a homes, phenomenal de-
tail, this custom -de igned and built is an abso-
lute work of art! I bdrms, 2 C garage, gar-
dens fireplaces, oks' kitchen. Come see.
$850,000
Call Janie Purinton
RIVER ALLEY RE
978 462 68 8 or 800 773 9990
NEWBURY - Stun n g open plan contemporary
Shingle Style Cap on almost 2 A along the
upper Parker Riv r. 10 rooms, 3500 sq ft
home + 2 C gam set well back on private
drive. River views, , French doors, wide, pro-
tected veranda of s screened porch, cook's
kitchen and elega t first floor Master Suite!
Bright house, ligh woods, just a gorgeous
home! $835,000
Call Joanie Purinttn
978 462 6898 or office
67739990
RIVERALLEY RE
*:* New Construction, 11 Zoe Lane $449,900
603-382-1669;603-234-1458
Peabody - Expand New England Cape s tu-
ated on lovely le I lot with good privacy.
Hardwood floors, ily room, vaulted ceilings.
$359,000
Ta he RE
. (978) 745-2004
Peabody - Young olonial with grand entry
foyer, formal dini large kitchen with center
island, hardwood, pacious master . Located
on cul-de-sac. $43 ,000
Tache RE
(978) 745-2004
Salem - 2 family, 2 bedroom units. Hardwood
floors, private backyard and recently paved
driveway for 2 cars. $345,000
Salem- Privacy by the water. 3 bedroom, 1
bath Move In Ready Home located on quiet,
private street. Features include newer furnace
and roof. $254,900
Salem- 2 bedroom, 2 bath Victorian cottage in
North Salem. Located close to the commuter
mil, Features incluhardwood floors, updated
kitchen and private ackyard. $209,000
Salem- Well built Victorian in North Salem
close to the train station. Natural woodwork
with an open living arrangement. $296,900
Salem- 3 Bedroom, 2 V2 Bathroom Cape with
a possible sub -dividable 1.37 acres lot.
$499,000
Salem- Rental. Frsshly painted, 2 bedroom
apartment in downtwn Salem. All new carpet
and a completer remodeled bathroom.
$1,200 1
Salem- Rental. 3 Bedroom, 2 A Bathroom
Cape with a possible sub -dividable 1.37 acres
lot. $1,800
Land Listings
Salem - 13,000+sf lot $45,000. 1.1 + acre
$185,000
Hamilton - 40,000sf $175,000
See All Open Houses For This Weekend at
MassOpenHouses.com
Armstrong Field
Real Estate
See all homes on the market at:
ArmstrongField.com
978 -?40-8700
CITY OF METHUEN
BOARD OF APPEALS
THE SEARLES BUILDING
41 PLEASANT STREET
METHUEN, MA 01844
NOTICE OF PUBLIC HEARING
Notice is hereby given that the
Town of Methuen Zoning Board of
Appeals will hdld a public hearing
on: September 25th, 2013 at 7:00
P.M. in The Great Hall, at the Sear-
les Building, 41 Pleasant Street,
Methuen, MA 01844, on the follow-
ing Petitions:
Troy Sweder
45 North Street, Methuen Mass.
A variance to construct an addi-
tion that will be Zoo close to the front
and side lot -lines and to clarify front
set -back on exiting dwelling under
section VI -D in a Rural Residential
Zoning District @ 45 North Street,
Methuen, Mass
Matthew J. IYAgostino, Chairman
Methuen Zoning Board of Appeals
ET - 9/11, 9/18/13
The Town o North Andover is
soliciting bids nom qualified com-
panies to furniE h and install blown -
in cellulose insulation in 3rd floor
sloped ceilings and 4th floor attic
floor areas of he Stevens Estate,
723 Osgood St eet. Qualified com-
panies are req sted to submit bids
to the Assistant Town Manager at
North Andover flown Hall, 120 Main
Street, Northndover, MA, in ac-
cordance with a instructions con-
tained within t Invitation for Bids
(IFB).
The complet IFB is available on
the Town's w bsite (www.townof-
northandover.c m) by clicking on
'Bids, Quotes and Proposals'. The
Town will only accept proposals
delivered in person or by mail. All
proposals must be received by 2:00
p.m. on October 3, 2013 to be con-
sidered.
The Town of North Andover may
cancel this IFB ppr reject in whole or
in part any and (all proposals, if they
determine that Cancellation or, rejec-
tion serves the best interest of the
Town of North Andover.
ET - 9/11/13
The Town of North Andover is so-
liciting Proposals for professional
Engineering and Soil Evaluator
services to ensure compliance of
individual on-site subsurface sew-
age disposal systems with 310 CMR
15.000 of the $tate Environmental
Code, Title V, and local regulations.
Qualified vend, rs are requested to
submit their pr posals to the Assis-
tant Town Mani ger at the Town Hall,
120 Main Stree North Andover, MA,
in accordance Nith the instructions
contained with n this Request for
Proposals (RFF i. The Town of North
Andover is see ing to award a one-
year contract m th two (2) additional
one-year renevi 31s, solely at the dis-
cretion of the T wn.
The complet RFP is available on
the Town's w ibsite (www.townof-
northandover.c m) by clicking on
'Bids, Quotes nd Proposals'. The
Town will onli accept proposals
delivered in person or by mail. All
proposals must be received by 2:00
p.m. on October 2, 2013 to be con-
sidered.
The Town of North Andover may
cancel this RFP or reject in whole or
in part any and all proposals, if they
determine that Cancellation or rejec-
tion serves the best interest of the
Town of North Andover.
ET -9/11/13
Rockport, So. - Well maintained single family
home with breakfast nook, living room with
wood burning stove, entertainment bar, sun
room, finished attic loft, 2 full baths and first
floor laundry. Wrap around deck, private yard
with mature plantings, shed and parking. Near
Long and Cape Hedge beaches, shopping and
highway. $425,000.
Rick Petralia
J. Barrett & Company
978-239-6207
Salem - 3 bedroom colonial with large finished
area in basement. Hardwood floors, open eat-
-in kitchen, fireplace. Lovely yard. $339,900
Tache RE
(978) 745-2004
Salem - 6 room, 4 bedroom cape In residential
neighborhood close to Peabody line. Vinyl ex-
terior, parking. Needs TLC. $279,900
Tache RE
(978) 745-2004
Salem - Solid 2 family, 584 with wide pine
floors, fireplaces, eat -in kitchens, laundry
hook-up in basement. Corner lot nicely land-
scaped. $339,000
Tache RE
(978) 745-2004
NNCMMMZM3s01
KACHADORIAN to be built. Brand new double
wide, Energy Star certified, appliances, win-
dow treatments and more, $16$000.
MERRIMACK MA, North Shore Community
Brand New Skyline, 1066, 2 bedrooms, 2 full
baths, Whirlpool appliances, window treat-
ments, $99,000.
Other homes available.
Salem Manufactured Homes 603-898-2144
111rMTfflMMT1s rs
Gloucester - Sprawling town home with 3 lev-
els of huge rooms. Finished lower level walk-
out for extended family space. Great location.
$299,000
Tache RE
(978) 745-2004
Haverhill: NEW TO MARKET, 6 room, 3 bed-
room townhouse close to 495 nicely reno-
vated down to the studs several years back.
Tiled floors, lots of hardwood, stainless steel
appliances, , eat in kitchen with maple cabi-
nets, formal dining room and good sized living
room, 3 bedrooms up plus 1.5 baths. Full
basement and walk up attic perfect for expan-
sion. $179,900
First Choice Realty
(978)689-8006
Lawrence: Huge 3 level Condex /duplex on a
beautiful Prospect Hill area featuring 2 over-
sized bedrooms, 1.5 baths, huge living room,
garage under and much more No condo fee.
Motivated sellers. $99,900
First Choice Realty
(978)689-8006
Lynn- 2 bedroom condo, freshly painted and
looks beautiful. Spacious rooms, high ceilings,
built-ins, private porch, parking. $99,900
Tache RE
(978) 745-2004
Methuen:This end unit at The Landing offers a
large fireplaced living room with dining area
and eat in kitchen, 2 levels of living with 3
bathrooms, central air conditioning, master
suite with vaulted ceilings, skylights and mas-
ter bath, lower level ready for finishing plus 1
stall detached garage. Priced to sell $217,500
First Choice Realty
(978)689-8006
CITY OF METHUEN
BOARD OF APPEALS
THE SEARLES BUILDING
41 PLEASANT STREET
METHUEN, MA 01844
PUBLIC HEARING
Notice is hereby given that the
Town of Methuen Zoning Board of
Appeals will hold a public hearing
on: September 25', 2013 at 7:00
P.M. in The Great Hall, at the Sear-
les Building, 41 Pleasant Street,
Methuen, MA 01844, on the follow-
ing Petitions:
Kevin R. Howe Realty. LLC, 297
Tanner St., Lowell, MA 01852
Special Permit required un-
der Section (9) V -D of the City of
Methuen Zoning Ordinance to op-
erate an Indoor Warehouse in a BL
District at 60 Pine St, (Unit M)
Matthew J. D' Agostino,
Chairman
Methuen Zoning Board
of Appeals
EI' - 9/11, 9/18/13
NEWBURYPORT, MA: NEW PRICE. Half house
condo on the sunny side! Three levels of char-
acter and features - plant window, wood
floors, pretty mantel, deck, gardens, 2bdrms,
2 baths, full basement, on a top street!
$319,000.
Call Pat Skibbee 978 465 8851
RIVER VALLEY RE .
Peabody - Great 1 bedroom condo in the
Southwyck condos. Open floor plan, ultra
modem kitchen, exposed brick, high ceilings.
$105,000
Tache RE
(978) 745-2004
Salem - Great location and amazing value for
this bright and sunny 2 bedroom condo. Pri-
vate entrance, hardwood, laundry 6 storage,
parking. $117,000
Tache RE
(978) 745-2004
Swampscott -Spacious pet friendly condo with
large eat in kitchen and included appliances.
Includes washer and dryer in basement and
two off-street deeded parking spaces.
$209,000
Armstrong Field
Real Estate
ArmstrongField.com
9787740-8700
r
Gloucester, MA - Developer's Special! 3 spa-
cious buildable lots on wooded 4 acres. South -
em exposure with potential for green home
development. Perc tested lots oN 2 with ease
of obtaining another. Not a developer? Build
your home on 1 lot and sell others. Some land
development necessary. Seller may assist.
$255,000. .
Rick Petralia
J. Barrett & Company
978-239-6207
Gloucester, MA -Site your passive solar/green
home on this t+acre southern exposed
grassy knoll surrounded by mature vegetation..
Order -of -Conditions to develop a single -family
or 2 -condo dwelling. Sewer, gas 8 utilities at
street Easy access to Rte. 128, train, shopp-
ing, downtown and beaches. Building permit
within grasp. $128,000.
Rick Petralia
J. Barrett & Company
978-239-6207
MENUMMMIMM
Billerica: Contractor's Yard with professional
office space plus equipment storage. Possible
Used Car Lot in front of property. Many possi-
bilities $499,900
First Choice Realty
(978)689-8006
Gloucester - Buy or rent -to -buy this centrally
located downtown retail/warehouse free
standing building with over 2000 sq ft of
space, 12 -foot high ceilings, large store front
windows and double -wide entry. Features in-
clude full basement,half bath,200 amp CB
panel and decorative tin ceiling. High traffic
area with great visibility and easy highway ac-
cess. $259,000
Rick Petralia
J. Barrett & Company
978-239-6207
Methuen: Loop location with direct street
frontage on Pleasant Valley St. This 800+/- sf
space office condo lends itself to salon us-
age(long established) or just to use for office
space. Own your own location and build eq-
uity $159,900 .
First Choice Realty
(978)689-8006
PLAISTOW 1350 SF of 1 st floor space perfect
for small to medium sized business with excel-
lent exposure $9.50/NNN 603-382-0360
Classic Homes RE
PLAISTOW NH Auto Repair 8 Body Business, in-
cluding equipment, land builidng and bu!sness
$279,900.603-382-0360
Classic Homes RE
CITY OF METHUEN
BOARD OF APPEALS
THE SEARLES BUILDING
41 PLEASANT STREET
METHUEN, MA 01844
NOTICE OF -PUBLIC HEARING
Notice is hereby given. that the
Town of Methuen Zoning Board of
Appeals will hold a public hearing
on: September 25th 2013 at 7:00
P.M. in the Great Hall, at the Sear=
les Building, 41 Pleasant Street,
Methuen, MA 01844, on the follow-
ing Petitions:
Joseph & Janice Buck, 357 Pel-
ham St. Methuen, MA 01844
Variance requested under .Section
VI -D of the City of Methuen Zoning
Ordinance for an Open Deck that
will be too close to the Right Side
Lot Line in an RR District at 357 Pel-
ham St.
Matthew J. D'Agostino,
Chairman
Methuen Zoning Board of Appeals
ET - 9/11, 9/1 8/1 3
MORTGAGEE'S SALE OF REAL ESTATE
By virtue and in execution of the Power of Sale contained in a certain
mortgage given by Deborah E. Messineo to First Franklin Financial Cor-
poration dated March 5, 2004' and recorded with the Essex County (North-
ern District) Registry of Deeds, in Book 8627, Page 2, as assigned by As-
signment of Mortgage dated October 10, 2006 and recorded with Essex
County (Northern District) Registry of Deeds, Book 10446, Page 26, of
which mortgage the undersigned is the present holder, for breach of the
conditions of said mortgage and for the purpose of foreclosing the same
will be sold at Public Auction at 10:00 AM, on September 18, 2013, on
the premises known as 19 Huntress Avenue, Methuen, Massachusetts,
the premises described in said mortgage, together with all the rights, ease-
ments, and appurtenances thereto, to wit:
A CERTAIN PARCEL OF LAND WITH THE BUILDINGS THEREON
SITUATED ON HUNTRESS AVENUE IN METHUEN, ESSEX COUNTY,
MASSACHUSETTS BEING SHOWN AS LOT C ON A PLAN ENTITLED:
PLAN OF LAND IN METHUEN, MASS. PREPARED FOR STANLEY
KOWALEZYK, SCALE 1" = 20' SEPTEMBER 1994, STOWERS ASSOCI-
ATES, ING REG LAND SURVEYORS, METHUEN, MASS," AND RECORD-
ED AT THE NORTH ESSEX REGISTRY OF DEEDS AS PLAN NO 12510.
LOT C CONSISTS OF 9240 SQUARE FEET, MORE OR LESS BEING
PART OF THE PREMISES CONVEYED TO GRANTOR BY DEED OF STAN-
LEY W. KOWALOZYK DATED NOVEMBER 29, 1994 AND RECORDED
WITH SAID REGISTRY AT BOOK 4181, PAGE 140.
SOURCE OF TITLE: BOOK 4341, PAGE 339 (RECORDED: 09-19-95)
Terms of Sale: These premises are being sold subject to any and all
unpaid real estate taxes,water rates, municipal charges and assessments,
condominium charges, expenses, costs, and assessments, if applicable,
federal tax liens, partition wall rights, statutes, regulations, zoning, subdivi-
sion control, or other municipal ordinances or bylaws respecting land use,
configuration, building or approval, or bylaws, statutes or ordinances re-
garding the presence of lead paint, asbestos or other toxic substances,
sanitary codes, housing codes, tenancy, and , to the extent that they are
recorded prior to the above mortgage, any easements, rights of way, re-
strictions, confirmation or other matters of record.
Purchaser shall also bear all state and county deeds excise tax. The de-
posit of $5,000.00 is to be paid in Cash or bank or certified check at the time
and place of the sale, with the balance of the purchase price to be paid by
bank or certified check within thirty (30) days after the date of the sale, to be
deposited in escrow with Guaetta and Benson, LLC, at 229 Billerica Road,
Chelmsford, Massachusetts.
In the event that the successful bidder at the foreclosure sale shall default
in purchasing the within described property according to the terms of this
Notice of Sale and/or the terms of the Memorandum of Sale executed at the
time of the foreclosure, the Mortgagee reserves the right to sell the property
by foreclosure deed to the second highest bidder or, thereafter, to the next
highest bidders, providing that said bidder shall deposit with said attorney,
the amount of the required deposit as set forth herein within five (5) busi-
ness days after written notice of the default of the previous highest bidder.
Other terms, if any, are to be announced at the sale.
Present holder of said mortgage
Wells Fargo Bank, National Association, Trustee for the
Certificate Holders of First Franklin Mortgage Loan Trust 2004-FF4,
Mortgage Pass -Through Certificates, Series 2004-FF4
by its Attorneys
Guaetta and Benson, LLC
Peter V. Guaetta, Esquire
P.O. Box 519
. Chelmsford, MA 01824
August 23, 2013
ET - 8/28, 9/4, 9/11/13
HAVERHILL, MA- Industrial building '
4 story brick - parking. Priced to sell.
978-689-5613 or 978-372-0418
Plaistow: Over 9,000 square feet of space of-
fers the new buyer lots of flexibility from man-
ufacturing to residential or warehouse. Y22 acre
of land close to Rte 125. Lots of new renova-
tions including new roof. Need space at a
gieat price! $369,900
First Choice Realty
(978)689-8006
SOUTHERN NH: Restaurant breakfast 8lunch on
major highway REDUCED $59,500 Call
Gallant Assoc. (978) 686-7931 508-662-9760
SOUTH LAWRENCE - Classic Mill Office Building
with beam and brick decor, from 1236 SF to
over 16,000 SF Available, Parking Garage,
Excellent Location, less than 1 Mile 1495.
Only $9.00 SF NNN (NON -PROFITS SAVE NO
REAL ESTATE TAXES)
PLAISTOW, NH Rte 125 5,000. SF of Retail,
Ideal for Auction House or Restaurant Space,
(Plumbing in Place(, Parking Lease $12 SF plus
utilities
Ask for Steve DeSisto
METHUEN - New Professional Office Condo
great for Doctor, Lawyer or Accountant. On
major highway convenient to 495, 93 and 213.
Seven rooms with reception area and private
bath. 1,225 SF Only $285,000.
HAVERHILL - Retail / Office space. Excellent via-
bility! Located in strip mall connected to Dun-
kin Donuts. 1,000 to 2,000 SF available. Close
to 1-495 $15.00 SF NNN
Ask for Charlie Coco
SALISBURY - 15,000 SF warehouse on 2 acre
tot. Excellent highway access. $849,000
Ask for Austin Spinella
Coldwell Banker Commercial NRT
978-373-3897
SUMMERVIEW R.E,
www.sresre.com / WE GET RESULTS!
BUSINESS FOR SALE
So. New Hampshire; MA Restaurant Bar 160
seats, sales 800k, 50k cars. $150,000; BARS
from $69,000, PIZZA Shop from.. $35,000. Piz-
zeria, Restaurant 6 Bar, near Downtown.
$90,000; Butcher Shop, Business and Equip-
ment $94,900; Restaurants from $34,900; Va-
riety Store $135,000; 7-11 gas c -store $159K,
Beauty Salon 4 stations going business only..
$18,500; 7000, sq. ft Restaurant and night-
club. Buy just business or RE 8 Business
Join our Company and make $$$ in 2013
Southern NH. 8 Mass
(603) 432-5453
....................................
Buy?? Sell??
Expand?? Lease??
Make the Right Decision
Call for a FREE Consultation
Rick Petralia,
Real Estate Sales Consultant
J. Barrett & Company
* **;*978-239#620************
REAL ESTATE CLASSES
Get your real estate license! Pre -licensing clas-
ses Tuesday/rhursday evenings in September!
For more info, go to:
AFrealestateschool . com
HAVERHILL, MA -Huge Fantastic 4-5 bedroom
located on two floors. Washer/dryer included.
New carpets, windows etc. $1,395 +utils. No
dogs. HAVERHILL,MA -2 bedroom 1.5 bath,
townhouse style unit. private yard, laundry
hookups. Nice $1,025+ utilities 603-458-1884
Salisbury Beach, Furnished 1 8 2 bedroom units
Sept - June 1. Starting @ $750/mo
Tom Saab RE 978-465-5116
Gloucester, E. - Short term/Season Winter
rental. Available 9/2/13-5/31/14. Fully fur-
nished newer contemporary home with cathe-
dral wood -beamed ceilings, wood floors and
open living and dining area. Washer/dryer in-
cluded. Ample parking. Located between
Good Harbor Beach and Long Beach with easy
access to highways and trains. $1,275/
month.
Rick Petralia
J. Barrett &Company
978-865-1203
KINGSTON, NH - 2 bedroom house, off New
Boston Rd Laundry hookups, parking $J 350+
utilities 8 security. No dogs. 978 373-8394 .
SALEM NH -2 bedroom 1 bath single family,
completely renovated. No pets /utilities.
Available now. $1600,. 9784170-2929
SALISBURY, MA - 3 bedroom Ranch. Formal
dining, nice yard. No pets. $1300/mo+ utili-
ties. 1 st, last, $500 security. 603-760-2503
Amesbury, MA:
LOVELY LONVALE GARDENS
Country setting at its finest!
Amenities include: Remodeled kitchens,
Smart Card laundry, pool and lush landscape.
Easy access to seacoast, 1-95 and 495. Call
NOTICE OF ACTIVITY AND
USE LIMITATION
Site Name: Central Square
Site Address: 72-76 South Main,
Street
Haverhill, Massachusetts
MassDEP Release Tracking
Number: 3-21140
A release of oil and/or hazardous
materials has occurred at this loca-
tion, which is a disposal site as de-
fined by M.G.L. c. 21 E, § 2 and the
Massachusetts Contingency Plan,
310 CMR 40.0000. On August 29,
2013, PJC Realty of Haverhill, LLC
recorded with the Essex South Reg-
istry of Deeds a NOTICE OF ACTIV-
ITY AND USE LIMITATION on the
disposal site, pursuant to 310 CMR
40.1070 through 40.1080.
The NOTICE OF ACTIVITY AND
USE LIMITATION will limit the fol-
lowing site activities and uses on the
above property:
(i) Use of Property for residential
purposes:
(ii) The construction of future oc-
cupied buildings without the use of
sub -slab vapor barrier and sub -slab
depression (SSD) system, which. is
designed by an LSP, unless an LSP
opinion will be rendered prior to
such building constructions that the
vapor barrier and SSD system are
not required to maintain a condition
of No Significant Risk;
(iii) The installation of new sub-
surface utilities at depths that could
potentially intercept the groundwa-
ter table at any time of year is pro-
hibited unless an LSP Opinion is
rendered indicating that either the
location, depth and/or method of
construction of the utility will not re-
sult in the interception and migration
of Light Non -Aqueous Phase Liquid:
and
(iv) The growing of fruit and veg-
etables within Site soils.
Any person interested in obtain-
ing additional information about the
NOTICE OF ACTIVITY AND USE
LIMITATION may contact Hoffman
Engineering, Inc. at 640 Ten Rod
Road in North Kingstown, RI 02909
at (401) 294-9032.
The NOTICE OF ACTIVITY AND
USE LIMITATION and the disposal
site file can be reviewed at the Mass -
DEP, Northeast Region, 205B Lowell
Street, Wilmington, Massachusetts
01887, tel, no. (978) 694-3200.
ET - 9/11/13 .
i k
4
BRAAt
wett
FRIENDLY COMMUNITY LIVING AT ITS BEST
*Pool *Central A/C •Playground
. Basketball/tennis court • Free storage
*Free heat, hot water, gas
Visit us 28 Forest Acres Or M -F 8:30 to 4:30,
Sat 10-2 movetoforestacres.com
Gloucester, E. - Long-term rental. 1 bedroom
unit in updated 2 family home. Includes 2 car
parking, open concept living area, spacious
kitchen with granite and ss appliances, break-
fast area, fireplaced living room, washer -dryer,
central air,hardwood floors and more. Outdoor
deck, storage shed and garden. Easy access
to shopping, restaurants, beaches, Rte 128
and commuter rail. $1, 875/ month.
Rick Petralia
J. Barrett & Company
978-865-1203
GROVELAND, MA - 2 bedroom includes heat 8
hot water, hardwood, storage, deck, parking,
new pool. Pets considered Starting at
$1200/mo. 978-891-3153
+ LAWRENCE, MA +
Modem 1 6 2 bedroom apartments. Parking on
site. Rents start Studios @ $675;
1 bedroom, $775; 2 bedroom includes heat/hot
water, $995+ 978-970-2300
• METHUEN, MA - Elm Crest Estates. 2 Bedroom
$1,120 mo; 1 Bedroom - $920 mo. All utilities
included. No pets.978-682-4891
www.forrent.com/elmcrestestates
NO ANDOVER MA 2 8 3 bedroom $975-1275
washer/dryer hookups Deck, back yard,
12 814 Ashland St. No Dogs 617-272-5053
OCEANFRONT SALISBURY BEACH/SEA
BROOK. Temporary mo/wkly anytime frame
Beautiful Condo 3 Bedrooms+ Parking, On the
ocean, $1300 978-975-4001
Rockport, MA- Long Term 2 Bedroom Rental.
In downtown business district, well lit unit
with hardwood, washer -dryer in building 8
off-street parking.Walk to galleries, concert
hall, shops, restaurants, beaches. No smokers
or pets. $1,100/mo.
Rick Petralia
J. Barrett & Company
978-865-1203
SALEM, NH: Best Location! 2 8 3 bedrooms
$1,100 - $1,450; includes heat / hot water;
Very clean, fully applianced. Coin -op laundry.
No dogs. Call 603-458-1884
SALEM, NH -Willows Park, 2 Bedroom -
$1000/mo.1 Bedroom - $890/mo. Heat/hot
water included. No pets. 603-894-4631
www.forrent.com/,Aillowparknh
SALISBURY BEACH - 1 new apartment left.
New kitchens 8 baths. 1 bedroom, $1100 per
month includes utilities No smoking/pets
Call 508-962-3887
SALISBURY Square, 1 bedroom efficiency.
$625/mo. + utilities, 1st, last, $300 security.
No pets. Call 603-760-2503
SUMMERVIEW R.E.
www.sresre.com WE GET RESULTS!
N.H. Manchester NH 1 bedroom from $765
Hudson / Nashua 2 bedroom Condo $1,095
Mobile Homes with heat/ hot water from $950
Derry Small 2 bedroom all utilities included $975
Derry 3 bedroom with garage 8 yard $1,295
Nashua 55+1 bedroom, heat allowance $800
Salem 3 bedroom with heat........:. $1,350
Join our Company and make $$$ in 2013 *
** Southern NH. 6 Mass 603-432-5453 **
WINTER RENTALS SALISBURY BEACH
Now -June, 1-2 bedrooms Starting at $700/mo
Tom Saab RE 978-465-5116
Bradford: NEW TO MARKET: Flex office
space in high traffic location. Portray the pro-
fessional image that you want to convey to
your clients. Many options available from 1
person business settings to stand alone office
spaces. Affordable!
First Choice Realty
(978)689-8006
HAVERHILL, MA- Industrial spaces -
1000 -5000 sq. ft. Loading dock, parking.
978-689-5613 or 978-372-0418
KINGSTON 2,750 sqft retail/office space w/pr-
ivate half bath, kitchenette, storage! Choose
from 2 units! $2250 Busy 125! 603-382-0360
CLASSIC HOMES RE
KINGSTON Commercial property, excellent ex-
posure on Rte 125, older mobile home and
garage on land. $69,900. (603) 382-0360
CLASSIC HOMES- RE
Methuen NEW TO MARKET: Professional Of-
fice Space in recently renovated medical facil-
ity. Many options to lease areas of 1;000 to,
2500 sf of space. Lots of parking. Immediate
availability Starting $14/sf
First Choice Realty '
(978)689-8006
NO Andover MA NEW SPACE Jefferson
Park Rt 114. Full service individual offices.
$495 -up 978-685-5440 www.officesuites.com
SALISBURY MA - Storefront 1,600 sq ft. 2
bath, High visibility, parking. Exit 60 off Rte.
95. $1200/mo. No utilities. 603-760-2503
A CLEAN quiet, safe bldg next to YWCA, YMCA,
City Hall. Lowest rents. Near public trans. 4 hr
move -in. Lawrence, 978-975-5103
AMESBURY, MA - Downtown furnished room,
shared bath. Kitchen, cable, parking $120/wk.
Call 978-504-0567
ANDOVER, MA - Spacious room in private
home. Light cooking. Walk to town 8 train.
$450 Includes all. 978 533-9456
Hampton Beach, NH 1 Bedroom Condos, Featur-
ing FREE Internet, hot tub spa, fitness room,
elevator service, 1 block from beach and
boardwalk. No lease required. Starting at
$225/week -$550/month. Call 603-929-0685
HAVERHILL MA, Available Now Beautiful 10x16
room, off street parking, washer/dryer. $700
includes all.(Wi-F!, Cable etc.) 1st &last re-
quired.978-914-2555 4
LAWRENCE MA best rooming house
59 Tremont 978-689-8924, 362 Essex
978-682-9078 Saba RE 978-687-8706
LAWRENCE, MA - CLEAN, QUIET, SAFE -
Lawrence's FINEST.ROOMING HOUSE,
Sober/Drug Free, 200 Parker St. 978-590-9060
LAWRENCE, MA - Furnished room
starting at $120/wk. Drug-free .
For details, 978-794-3039
LAWRENCE, MA Woman seeking same, Non
Smoking. IntemettCable/Parking. No Laundry
Room can be Furnished or Unfurnished
$400/mo. First 8 Last Call 978-204-AB96
s s
A-1 RENTALS
Getting Divorced? Live at the Salisbury
Inn. From $175week. 978-465-5584
rr
AMESBURY, MA: Downtown. Roommate
wanted for 2nd floor Furnish apartment, 9x12
private room. Full access to kitchen and bath.
$520/mo all utilities included 978-388-6148
BEVERLY, MA: Retired widow seeks roommate
to share expenses'and house work. I Have 2
cats 8 smoke in house. - $700 includes all utili-
ties. Call 978-922-1114.
BEVERLY, MA: Share 3 bedroom 2 bath house
with professionals. Spacious sunny bedroom,
Close to No. Beverly station 8 shopping. Drive-
way 8 garage parking, No pets, $750 +1/3
utils. l st/last 8 sec. Call (301) 787-1747
BRADFORD MA - Share home, $550. Non-
smoker, no pets. Utilities, Internet close to rail-
road/495/125. Call (978) 374-7690
DERRY, NH - Loft bedroom with plenty of natural
light. $650 all utilities included. Non-smoker.
No pets. Call (603) 369-8997.
HAVERHILL,MA share house. Off street parking,
enclosed yard, everything included. $625/mo.
Call 978-303-5223.
HAVERHILL Methuen Line - Gay male, seeks
roommate. Private Bedroom/Loft combo. Near
495, Shared Kitchen/Bath. Washer 6 Dryer
Clean, Quite, Off street parking, $525/mo.
1 stAast/security. Call 508-847-2058
1 AM LOOKING FOR A ROOM TO RENT!
I am thinking that you and 1 can help each
other out. (Haverhill Area). 978-476-7855
LAWRENCE: Share 2 bedroom Condo, 3 level.
$500 includes utilities. Call 978-807-6581
for more information
MAGNOLIA, MA: Share large Victorian near
ocean. No pets. No smoking. From $140 per
week includes utilities. (978) 774-4704
MASTER Bedroom in 2 bedroom Gloucester
apartment centrally located Portuguese Hill.
Share bath 8 kitchen. Split utilities. WIFI.
Access to cable. Ample closet 8 storage space.
Long time roommate is moving. 508-662-8474
MIDDLETON, MA: Furnished bedroom, use of
house. $440/mo + 1/4 utilities, 8 Security
No smoking/no pets. Call (978) 777-9431
ROWLEY, MA: Professional seeking same to
shareLuxury Home in country setting all
amenities incl. $1400/mo (781) 405-7340
Salem, MA: Share Apartment $750+ furnished,
5 room washer/dryer in unit walk to Salem
State University, Bedroom is 13' x 13' No pet-
s/smokersAvail. 10/01 (781)771-0224
SALISBURY, MA -One mile from beach. Mature
person seeks same to share house with -
ktchen 6 utilities, washer/dryer, cable.
Parking. Large yard, deck. No pets. $700.
Call Sandy, 978-465-2209
NOTICE
Some advertisements running in this
category may require an investment
ATTENTION CAREGIVERS!
If you are a PCA, CNA, Nurse or offer personal
care services please go to the business and
service directory and check out the category
for Adult Care. Yours services are needed!
DRIVER'S NEEDED
FT/PT -- YOUR CAR OR VAN
CALL 781-272-0000
Deliver the Fairpoint phone books
18+ yrs w/insured vehicles to deliver Manches-
ter, Auburn, Goofstown, Londonderry, Derry
Windham areas. Also looking for office clerks
and loaders. Starts Sept. 30. Work min of 6
s daylight hours per day get paid within 72 hours
upon completion of route. 800-979-7978,
SALISBURY, MA - 2 ,3 bedroom mobile homes 9 6 5:30 pm, M -F. Refer to job# 30122-b
starting at $1000/mo+ utilities. No Pets. EOE
1 stAast/securky. A-1 Rentals 978- 465-5584
NOTICE OF FILING AND PUBLIC HEARING
D.P.U. 13-102 September 5, 2013
Petition of Bay State Gas Company d/b/a Columbia Gas of Massachu-
setts for approval of its Revised Local Distribution Adjustment Clause Tariff.
On August 21, 2013, Bay State Gas Company d/b/a Columbia Gas ("Co-
lumbia" or "Company") filed a revised Local Distribution Adjustment Clause
tariff for effect November 1, 2013 pursuant to the Department of Public
Utilities' ("Department") orders in 2013-2015 Energy Efficiency Plans Order,
D.P.U. 12-100 through D.P.U. 12-111 (January 31, 2013) and Investigation
by the Department of Public Utilities on its own Motion into Updating its
Energy Efficiency Guidelines, D.P.U. 11-120-A, Phase II (January 31, 2013)
and the Department's August 1, 2013 procedural memorandum in dockets
D.P.U. 13 -GAF -P1, P2, P3, P4, P5, P6, and P8. The Department has dock-
eted this matter as D.P.U. 13-102.
The revised LDAC tariff changes the timing for reconciliation of the ener-
gy efficiency surcharge ("EES") such that reconciliation of the EES will now
occur at the end of the three-year energy efficiency term, instead of annu-
ally. The revised LDAC tariff also allows for collection and recovery of an
EES for each plan year, each set at the beginning of the three-year energy
efficiency term. These surcharges will remain in effect during the term un-
less a threshold trigger is met, as described in the Department's energy ef-
ficiency guidelines. See Revised Energy Efficiency Guidelines §§ 3.2.2.3.1.
The Department will conduct a public hearing in D.P.U. 13-102 to re-
ceive comments on the Company's revised LDAC Tariff. The hearing'will
take place on Wednesday, September 25, 2013 at 2:00 p.m. at the De-
partment's offices, One South Station - 5th Floor, Boston, Massachusetts
02110. Any person who desires to comment may do so at the time and
place noted above or may submit written comments to the Department
not later than close of business (5:00 p.m.) on September 25, 2013. Any
person who desires to participate in the evidentiary phase of this proceed-
ing must file a written petition for leave to intervene with the Department
not later than September 18, 2013. A petition for leave to intervene must
satisfy the requirements of 220 C.M.R. § 1.03. Receipt by the DQpartment,
not mailing, -constitutes filing and determines whether a petition has been
timely filed. A petition filed late may be disallowed as untimely, unless good
cause is shown for a waiver under 220 C.M.R. § 1.01(4). To be allowed, a
petition under 220 C.M.R. § 1.03(1) must satisfy the standing requirements
of G. L. c. 30A, § 10.
An original and two (2) copies of all written comments or petitions to in-
tervene must be filed with Mark D. Marini, Secretary, Department of Public
Utilities, One South Station - 5th Floor, Boston, Massachusetts 02110, not
later than the.dates noted above. In addition, one (1) copy of all written
documents must be sent to counsel for the Company, Kevin Penders, Esq.,
Keegan Werlin LLP, 265 Franklin Street, Boston, Massachusetts 02110.
All documents should also be submitted to the Department in electronic
format using one of the following methods: (1) by email attachmenttodpu.
efiling@state.ma.us and the hearing officer jessica.buno@state.ma.us or
(2) on a CD-ROM. The text of the email or CD-ROM must specify: (1) the
docket number of the proceeding (D.P.U. 13-102); (2) the name of the per-
son or company submitting the filing; and (3) a brief descriptive title of the
document. The electronic filing should also include the name, title, and
telephone number of a person to contact in the event of questions about
the filing. All documents submitted in electronic format will be posted on
the Department's website: http://www.mass.gov/dpu.
A copy of the filing is available at the Department's office, One South
Station - 5th Floor, Boston, Massachusetts for public view during normal
business hours and on the Department's website http://www.mass.gov/
dpu by accessing the file room link. A copy is also on file for public view at
the Company's website: www.columbiagasma.com. Any person desiring
further information regarding the Company's filing should contact counsel
for the Company, Kevin Penders, Esq. at (617) 951-1400. Any person desir
ing further information regarding this notice should contact Jessica Buno,
Hearing Officer, Department of Public Utilities, at (617) 305-3527.
Er - 9/1 1/13