JOB MEETING NOTES:
NORTH ANDOVER SCHOOL ADMINISTRATION BUILDING
PAGE 1OF 2
Date of Meeting: May 19, 2015
Place of Meeting: Jobsite
Those Present: Ray Santilli, Asst. Town Manager
James Mealey, School Department
Henry Sarkis, New England Builders & Contractors (NEB)
Heather Oldroyd Cocker, Kang Associates, Inc. (KAI)
Distribution: Those attending, G. Brown, P. Saitta, S. Foster
The following represents a summary of relevant observations and issues discussed. Dates in parentheses
indicate when an issue was initially discussed. Action items are underlined.
A. JOB PROGRESS
1. Sidewalks are complete.
2. Light poles are installed.
3. River stones have been placed.
4. Cleaning of the building interior has begun.
5. Plumbing Inspector is scheduled for tomorrow morning.
B. OLD BUSINESS
1. Carpet installation (3/24/15): All in attendance met with Brian Bishop from Milliken Carpet
and Jeffrey Paglione from Capital Carpet and Flooring. R. Santilli walked them through the
offices and meeting room areas where the distance between the seams varies and is not
consistent. B. Bishop explained the manufacturing process and how pattern and color
contributes to seams showing. It was agreed by all that Capital would try using a tool that
brushes the carpet fibers of separate tiles together and then H. Cocker, R. Santilli, and J. Mealy
will come back to look at the results. B. Bishop stated that using this tool would create a mark
around all of the seams where it was used until vacuuming and normal wear quieted it down.
2. Room ID signs (4/7/15): H. Cocker stated she had chosen a color for the sign background but
did not bring the color chip with her. She will email H. Sarkis with the color name.
3. Entrance canopy columns (4/21/15): J. Mealey stated he liked the look of the columns with the
canopy now that they were painted. He and R. Santilli requested an escutcheon at the top of the
column to cover the joint where the column goes through the soffit board. H. Sarkis had no
objections to this. H. Cocker will look for something that can be Uainted to match and will send
the information to H. Sarkis.
C. NEW BUSINESS
1. Seeding: H. Sarkis asked if the seed mix submittal had been reviewed yet. H. Cocker stated it
was sent to the landscape architect on Monday for review. She will forward the results to H.
Sarkis when she receives them. H. Sarkis stated he would like to get the seeding done soon along
with the remaining site items including landscaping, berms, and the final coat of asphalt.
2. Building turn over: R. Santilli stated that June 5 was the last day that the building could be
turned over to the Town. He has scheduled the window shade and furniture installation for the
week of June 8. H. Sarkis did not see a problem with that date.
JOB MEETING NOTES: ,
NORTH ANDOVER SCHOOL ADMINISTRATION BUILDING
PAGE 20F 2 ,
m
3. Punch list: H. Sarkis stated that he was ready for a punch list to be done. H. Cocker will
coordinate with K. Kang and one of them will be out the next week to complete the punch list.
H. Cocker also stated that MacRitchie Engineering is coordinating a date within their office to
have someone come out for their punch list. She will have them coordinate a day and time with
H. Sarkis so he can let them in the building.
D. FIELD OBSERVATIONS
1. Display case: H. Cocker pointed out to H. Sarkis that the interior of the display cabinet still
needed to be sanded and polyurethaned. He will speak with the painter.
Please report any oversights or discrepancies to the Architect. The next meeting has been scheduled for
June 2, 2015 at 10:00AM.
Prepared by,
Heather Oldroyd Cocker
Date of preparation: May 21, 2015
PROJECT: WHOLESALE DISTRIBUTION -PROMO
DATE: 05.08.2015 DRAWN BY: KATIE BLANCHFIELD
PROJECT# 01150501 R1
REVISION# 1 SCALE NTS 1R 1-0'
L
11U�LI,
ORW]The MarvelGroup lr2. All rghh eE. Rrgodq ifNs deui�g eMe nwtgp ar'npatl,
Marelc Mresppns4le lwb ltl'gtl' onssuppl'Epy NM1 sin Ne rasefM1al
YUIWng enYidm dwpY ng endo preps 1'nn ofdxivaY ks M1ned la anYre®nxiltwipmr
dinensions res nw wppged. TM1 Ye sl rerlYalcal tlimenamnsbefvaoNaMg.
iillAi7111O
wMlenpmnissgn ¢eVgly p'oAUied M el may billlw deg elerafe of §5000 pa Mu
Mar�elS IrespmsLk lw eny asks ega nM code.
���C�111 PU�U�WIi1
BUSINESS
102
WA
M.
i 47/84 �
47/86
MB6
MRV
48W
48W
4824
48/24
N
O
0
W
U
w
w
O
W
z
w
c7
0
N
Q
w
PLANTING NOTES
PLANT SCHEDULE
1. PRIOR TO THE START OF ANY EXCAVATION FOR THE PROIECT BOTH ON AND OF THE SITE, THE
CONTRACTOR SHALL NOTIFY DIGSAFE AND BE PROVIDED WITH A DIGSAFE NUMBER
SYMBOL
BOTANICAL NAME
INDICATING THAT ALL EXISTING UTILITIES HAVE BEEN LOCATED AND MARKED.
DEg0UW5
TREES
LA
2. CONTRACTOR SHALL BEGIN MAINTENANCE IMMEDIATELY AFTER PUNTING AND WILL
CONTINUE UNTIL FINAL ACCEPTANCE.
AR
AGER RUBRUM 'OCTOBI
GT
GLEOIiSIA TRIACANTHO
3. CONTRACTOR SHALL VERIFY ALL TREE REMOVALS WITH OWNER'S REPRESENTATIVE PRIOR TO
ORNAMENTAL TREES
CONSTRUCTION START.
BJ
BETULA 'NIGRA' RIPER
4. CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM ALL BUILDING
EVERGREEN TREES
FOUNDATIONS, STRUCTURES, AND PLANTING BEDS.
IF
THUJA PUCATA
SHRUBS
S. MAXIMUM SLOPE WITHIN DISTURBED AREAS SHALL NOT EXCEED 3:1, UNLESS OTHERWISE
NOTED.
IM
ILEX MESERVAE 'BLUE
HM
HYDRANGEA MACROPH'
6. THE LANDSCAPE CONTRACTOR SHALL SUPPLY ALL PLANT MATERIALS IN QUANTITIES
RB
RHODODENDRON BOULE
SUFFICIENT TO COMPLETE ALL PLANTINGS SHOWN ON THIS DRAWING.
RM
RHODODENDRON MAXIM
VO
VIBURNUM DENTATUM '
7. ALL MATERIALS SHALL CONFORM TO THE GUIDELINES ESTABLISHED BY THE AMERICAN
NURSERY AND LANDSCAPE ASSOCIATION.
VM
VIBURNUM PUCATUM Y
PERENNIALS AND CROUNDCOVER
B. ALL PLANTS SHALL BEAR THE SAME RELATIONSHIP TO FINISH GRADE AS TO ORIGINAL GRADES
BEFORE DIGGING.
HH
I HEMEROCALUS'HAPPY
9. ALL PLANTS TO BE BALLED IN BURLAP OR CONTAINERIZED.
1D. MULCH FOR PLANTED AREAS TO BE AGED PINE BARK: PARTIALLY DECOMPOSED, DARK BROWN
IN COLOR AND FREE OF WOOD CHIPS THICKER THAN 1/4 INCH.
11. PLANTING SOIL MIX: LOAM THOROUGHLY INCORPORATED WITH ROTTED MANURE
PROPORTIONED 5 C.Y. TO 1 C.Y. OR EQUIVALENT. PEAT MOSS WITH FERTILIZER ADDED PER
MANUFACTURER'S RECOMMENDED RATES.
12. THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIALS FOR ONE (1) FULL
YEAR FROM DATE OF ACCEPTANCE.
13. ALL PLANT MATERIALS ARE SUB]ECTTO THE APPROVAL OF THE OWNER'S REPRESENTATIVE, AT
THE NURSERY, AND AT THE SITE.
14. LANDSCAPE ARCHITECT TO FLAG ALL TREES TO BE TRANSPLANTED PRIOR TO CONSTRUCTION
START.
15. ALL AREAS OF THE SITE WHICH HAVE BEEN DISTURBED AND NOT OTHERWISE DEVELOPED
SHALL BE LOAMED AND SEEDED WITH A MINIMUM DEPTH OF 6' DEPTH TOPSOIL
16. SCREENED IMAGES SHOW EXISTING CONDITIONS. WHERE EXISTING CONDITIONS LIE UNDER
OR ARE IMPINGED UPON BY PROPOSED BUILDINGS AND/OR SITE ELEMENTS, THE EXISTING
CONDITION WILL BE REMOVED, ABANDONED, AND/OR CAPPED OR DEMOLISHED AS
REQUIRED.
17. PLANT SPECIES AS INDICATED IN THE PLANT LIST ARE SUGGESTIONS ONLY. FINAL
SELECTION OF SPECIES SHALL OCCUR AT THE TIME OF PLANT PURCHASE, DEPENDING ON
AVAILABILTY. PLANT SIZE AND PLANT AMOUNT SHALL NOT CHANGE.
COMMON NAME QTY SIZE
OCTOBER GLORY MAPLE 1 4 13 —3 1/2'
BIRCH 3 I7-8' HT.
RMTAE 12 7-8' HT.
S HOLLY 13 30-36'
JER HYDRANGEA 7 24-36'
IENDRON 18 24-36"
DODENDRON 5 24-36'
ABRUNUM 5 30-36'
RNUM 2 JO -36 -
NS DAYLILY 50 I CAL
V�
zfl.A
NJ
OSGOOD
GRAPHIC SCALE
a IV 2B 4a
STREET
��er�i>zwa=N
SCHOOL
DEPARTMENT
ADMINISTRATION
BUILDING
NORTH ANDOVER, MA
PLANTING LEGEND
--- PROPERTY LINE
GROUNDCOVER/
PERENNIAL PLANTING
OOc) SHRUB PLANTING
ORNAMENTAL TREE
EVERGREEN TREE
DECIDUOUS TREE
%( SEE DEDUCT
ALTERNATE
land P `q CMI Engn ft
D T I LanArchlrecare
B.. 30
L. av 30)
FModoragR MA
de mm
td SC@ 193b5839315M
DeVellis Zrein Inc.
PLANTING
PLAN
5(.11E:
—W
10E: 2G1S-343
fIL 2GI5-1U-LM C —
D0.A1VN: Int
OIFIXEO: IAZ
-E: 01.02.14
/pQ u•
ehry
v
/
k
_OT AREA
,4T Q
IAWN
rl"Ass FREn
8,190 S.f�.f
114'
X
X
X
O
/
STREET
��er�i>zwa=N
SCHOOL
DEPARTMENT
ADMINISTRATION
BUILDING
NORTH ANDOVER, MA
PLANTING LEGEND
--- PROPERTY LINE
GROUNDCOVER/
PERENNIAL PLANTING
OOc) SHRUB PLANTING
ORNAMENTAL TREE
EVERGREEN TREE
DECIDUOUS TREE
%( SEE DEDUCT
ALTERNATE
land P `q CMI Engn ft
D T I LanArchlrecare
B.. 30
L. av 30)
FModoragR MA
de mm
td SC@ 193b5839315M
DeVellis Zrein Inc.
PLANTING
PLAN
5(.11E:
—W
10E: 2G1S-343
fIL 2GI5-1U-LM C —
D0.A1VN: Int
OIFIXEO: IAZ
-E: 01.02.14