Loading...
HomeMy WebLinkAboutContract #: 004305 - From: To: - Exception - ExceptionSchool Department Administration Building North Andover, MA Kang Associates, Inc. January 2, 2014 FORM OF SUB -BID To All General Bidders Except those Excluded: A. The undersigned proposes to furnish all labor and materials required for completing, in accordance with the hereinafter described plans, specifications and addenda, all work specified in 04 .21.13 of the specifications and in any plans specified in such section, prepared by Kang Associates, Inc. for the School Department Administration Building,North Andover, MA for the contract sum of: B. C. One Hundred Twenty Seven Thousand 0/100 dollars ($ 127,000.00 ) For Alternate #1: Deduct $ N/A dollars ($ N/A ) For Alternate #2: Adril Deduct $ Forty Thousand 0/100 dollars ($ 40, 000.00 ) For Alternate #3: Deduct $ N/A dollars ($ N/A ) For Alternate #4: Deduct $ N/A dollars ($ N/A ) For Alternate #5: Deduct $ N/A dollars ($ N/A ) This sub -bid includes addenda numbered 1 This sub -bid ❑ may be used by any general bidder except: ❑ may only be used by the following general bidders: (To exclude general bidders, insert an "X" in one box only and fill in blank following that box. Do not answer C if no general bidders are excluded.) FORM OF SUB -BID - 1 School Department Administration Building North Andover, MA Kang Associates, Inc. January 2, 2014 D. The undersigned agrees that, if he is selected as sub -bidder, he will within five days, Saturdays, Sundays, and legal holidays excluded, after presentation of a subcontract by the general bidder selected as the general contractor, execute with such general bidder a subcontract in accordance with the terms of this sub -bid, and contingent upon the execution of the general contract, and, if requested so to do in the general bid by such general bidder, who shall pay the premiums therefor, or if pre -qualification is required pursuant to section 44D 3/4, furnish a performance and payment bond of a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the awarding authority in full sum of the subcontract price. E. The names of all persons, firms and corporations furnishing to the undersigned labor or labor and materials for the class or classes or part thereof work for which the provisions of the section of the specifications for this sub -trade requires a listing in this paragraph, including the undersigned if customarily furnished by persons on his own payroll and in the absence of a contrary provisions in the specifications, the name of each such class of work or part thereto and the Bid price for such class of work or part thereof are: Name Class of Work Bid Price (Do not give bid price for any class or part thereof furnished by undersigned.) F. The undersigned agrees that the above list of bids to the undersigned represents bona fide bids based on the hereinbefore described plans, specifications and addenda and that, if the undersigned is awarded the contract, they will be used for the work indicated at the same amounts stated, if satisfactory to the awarding authority. G. The undersigned further agrees to be bound to the general contractor by the terms of the hereinbefore described plans, specifications, including all general conditions stated therein, and addenda, and to assume toward him all the obligations and responsibilities that he, by those documents, assumes toward the owner. H. The undersigned offers the following information as evidence of his qualifications to perform the work as bid upon according to all the requirements of the plans and specifications: 1. Have been in business under present business name 7 years. 2. Ever failed to complete any work awarded? No 3. List one or more recent buildings with names of the general contractor and architect on which you served as a subcontractor for work of similar character as required for the above named buildings. Building (a) Liston Tower Architect LPBA Architects General Contractor E.A. Colangeli FORM OF SUB -BID - 2 Amount of Contract $714,000 School Department Administration Building North Andover, MA (b) Belmonte School (C) FA Day School 4. Bank reference Fletcher Thompson Consigli HMFH Architects Colantonio Bristol County Saving Kang Associates, Inc. January 2, 2014 $540,000 $340,000 I. The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards of subcontracts subject to section 44F. The undersigned further certifies under penalties of perjury that this sub -bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word "person" shall mean any natural person, joint venture, partnership, corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder. 1/21/2013 Date SUB -BIDDER'S CHECKLIST: X Addenda Recognized X Bid Deposit X DCAM Certificate of Eligibility X Sub -Bidder Update Statement X Certificate of Corporate Bidder D&S Commercial Masonry, Inc. (Name of Sub -Bidder) A By. Sig re i /ef Person Signing Bid 45 Industrial oad Business Address Wrentham, MA 02093 City and State FORM OF SUB -BID - 3 School Department Administration Building North Andover, MA Donald Gibson President Bid Form, and that CERTIFICATE OF CORPORATE BIDDER Cory Vogt Kang Associates, Inc. January 2, 2014 certify that I am the of the corporation named as Bidder in the who signed the Bid Form on behalf of the Bidder was then the General Manager of said corporation and that I know his signature; that his signature thereto is genuine and that the Bid Form was duly signed, sealed and executed for and in behalf of said corporation by authority of its governing body. 1/21/2013 Date CORPORATE BIDDER - 1 CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Cory Vogt Print Name & Title General Manger Date 1/21/2013 D&S Commercial Masonry, Inc. Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I Cory Vogt , authorized signatory for D&S Commercial Masonry, Inc. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. 1/21/2013 Date CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Cory Vogt General Manager Print Name & Title Date 1/21/2013 D&S Commercial Masonry, Inc. Company Name The C.On'clr 0I'llH C(Iltlt of'Alas.sachusetts i fi E.1ecutlVE i.)J*e TUT" Adotinvirotioi ami ','Incmct' t. ��il'iSif)Pi L�,�t Clj11lC 1 :�,,S.SEi(i�'ICUitiyZtllC?11.t and r`'fC1i:ntef1021i;(' .-t� Uile �;shhtil rt�n 1'i,r��.' fiv:;hv1, .iuCJ?u.PCtt.� !;_'.�1' DEVA__L PAIR Cr. �= I syoR co+rrr"'OR Te.. (l %i '2.74'LS0 SECVP'A,tty AW,41111SMAT,w z FINANCL Fa: !!t'/ 72 7-jS6 TI:,1,-)T i" P NluRRAY CAROLE CORhFI_ SCu, 7 EU-L4ANT GCNERNC'I� CLJMKII.SSsONCI Filed Sub -Bid Certificate of Contractor Eligibility CONTRACTOR IDENTIFICATION NUMBER: 2368 This Certificate Shall Be Used for Submittine Filed Sub -Bids Univ 1. CERTIFICATION PERIOD: This Certificate is valid from 3/20/2013 to 3/20,12014 2. CONTRACTOR'S NAME: D & S Commercial Masonry, inc. 3. CONTRACTOR'S ADDRESS: 45 fndustrial Road, Wrentham, MA 02093 4. WORK CATEGORIES: This Contractur is certilied to file bids under Massachusetts General Laws Chapter 119, Chapter 149A and Chapter 25A in the following checked Categories of Work:. :ic.?ultic,il"rile HVA(' _ ly1;_,cetlan,:ou, 6: 01rm-iiuntil Iron ._ Teilanr, Elcclricul Werk L�Ihing & Kism-ill", P1.41111irig Tile Elevaiurs Y1a:bic Plum?ina Wamproufinr, Dmnp Fir„ Purrxtiou Srrinklcr Sgstcros t\'orl, Resi'rem Flu. -is pr' -06(w'! anu Cau!ki,17' Giass,ur,l f la in \tztal 4\ in:Jn : Ronin_. t Flashing 5. EVALUATIONS: Number of Projects Evaluated: 13 Average Project Evatuation Rating: 94 Number of Projects Below Passing Score: U 6, SUPPLIER DIVERSITY OFFICE C KATION: N,'A 1 ! reyn S. Bernstein, Deputy General Counsel, Approval Date to,- Carole J. Cornelison, Commissioner NOTE TO CONTRACTORS. Complete Applications for Renewal of Contractor Eligibility are due no later than three months PRIOR to the Expirution Date of the Certification Period shown above. Failure to submit Completed Applications timely may result in a gap in Certification ora lapse in Certification altagether for your company. / Reviewer's Initials L� AAiS NAS SURETY GROUP CONTRACTOR: (Name. legal status and address) D&S Commercial Masonry, Inc. 45 Industrial Road, Wrentham, MA 02093 OWNER: (Name, legal status and address) Town of North Andover 120 Main Street, North Andover, MA 01845 BOND AMOUNT: 5% Five Percent of Amount Bid SURETY: North American Specialty Insurance Company 475 N. Martingale Road, Suite 850 Schaumburg, IL 60173 PROJECT: (Name. location or address. and Proiect number, if any) Masonry Work - School Department Administration Building This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other parry shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such stptutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shy nsjrped as a statutory bond and not as a common law bond. Signed hid/ . 17th day of January nry, Inc. 2014 By: SEAL. Pim J North Ameri an S ecial Insurance CoW .x 1973 (Witness) Diane ski (Surety)/% 0N*1 By: ..C1M%,riirrrhnUntc (Title) Kathleen M Flanagd& Atto e-yj=iri� This Document conforms to the.41,4 Document A310r'"— 2010 1 I. NAS SURETY GROUP NORTH AMERICAN SPECIALTY INSURANCE COMPANY WASHINGTON INTERNATIONAL INSURANCE COMPANY GENERAL POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, THAT North American Specialty Insurance Company, a corporation duly organized and existing under laws of the State of New Hampshire, and having its principal office in the City of Manchester, New Hampshire, and Washington International Insurance Company, a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Schaumburg, Illinois each does hereby make, constitute and appoint: Kathleen M Flanagan Its true and lawful Attomey-in-Fact, to make, execute, seal and deliver, for and on its behalf and as its act and deed, the following surety bond: Principal: D&S Commercial Masonry, Inc. Obligee: Town of North Andover Bond Number: Bid Bond Bond Amount: See Bond Form Bond Description: Masonry Work - School Department Administration Building Provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed the amount of- FIFTY f FIFTY MILLION ($50,000,000) DOLLARS This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held on the 9"' of May, 2012: "RESOLVED, that any two of the Presidents, any Managing Director, any Senior Vice President, any Vice President, any Assistant Vice President, the Secretary or any Assistant Secretary be, and each or any of them hereby is authorized to execute a Power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds, undertakings and all contracts of surety, and that each or any of them hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be binding upon the Company when so affixed and in the future with regard to any bond, undertaking or contract of surety to which it is attached." p���,I t11U7Y j / °epZ10NA( "a QP By ..........�ti y� GOAPaQfG� Steven P. Anderson, Senior Vice President of Washington International Insurance Company �oRP�Rq� r6 i $E4I &Senior Vico President of Nosh American Specialty Insurance Company s 1973' r hantPs:: . //i/ ���• • • � • �pa;��� David M. layman, Vice President of ashington International Insurance Company & Vice President of North American Specialty Insurance Company IN WITNESS WHEREOF, North American Specialty Insurance Company and Washington International Insurance Company have caused their official seals to be hereunto affixed, and these presents to be signed by their authorized officers this 25th day of- May 2012. North American Specialty Insurance Company Washington International Insurance Company State of Illinois County of Cook ss: On this 25th day of May 20 12 , before me, a Notary Public personally appeared Steven P. Anderson . Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and David M. Layman Vice President of Washington International Insurance Company and Vice President of North American Specialty Insurance Company, personally known to me, who being by me duly swom, acknowledged that they signed the above Power of Attorney as officers of and acknowledged said instrument to be the voluntary act and deed of their respective companies. "OFFICIAL SEAL" DONNA D. SKLENS Notary Public, State of Illinois My Commission Expires 10/06/2015 Donna D. Sklens, Notary Public I, Jeffrey Goldberg_, the duly elected Assistant Secretary of North American Specialty Insurance Company and Washington International Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North American Specialty Insurance Company and Washington International Insurance Company, which is still in full force and effect. IN WITNESS WHEREOF, I have set my hand and affixed the seals of the Companies this 17th day of January .1 2014 Jeffrey Goldberg, Vice President & Assistant Secretary of Washington International Insurance Company & Assistant Secretary of North American Specialty Insurance Company EFFECTIVE MARCII 30, 20 1. 0 Commonwealth of Massachusetts Division of Capital Asset Management D SUB -BIDDER UPDATE STATEMENT TO ALL SUB-BIDDER—S TRADE CONTRACTORS AND AWARDING AUTHORITIES A COMPLETED AND SIGNED SUB -BIDDER UPDATE STATEMENT MUST BE SUBMITTED WITH EVERY FILED SUB -BID PURSUANT TO M.G.L, c.149, §44F AND EVERY TRADE SUB -BID PURSUANT TO M.G.L. c. 149A. ANY FILED SUB -BID OR TRADE SUB -BID SUBMITTED WITHOUT AN APPROPRIATE SUB -BIDDER UPDATE STATEMENT IS INVALID AND MUST BE REJECTED. Caution: This form is to be used for submitting Filed Sub -Bids and Trade Sub -Bids. It is not to be used for submitting Prime/General Contract bids. AWARDING AUTHORITIES If the Awarding Authority determines that the sub -bidder is not competent to perform the work as specified on the project, it should reject the bid. ow SUB -BIDDER'S AFFIDAVIT I swear under the pains and penalties of perjury that I am duly authorized by the bidder named below to sign and submit this Sub -bidder Update Statement on behalf of the bidder named below, that i have read this Sub -bidder Update Statement, and that all of the information provided by the bidder in this Sub -bidder Update Statement is true, accurate, and compete as of the bid date. /Ax/H D&S Commercial Masonry, Inc. Bid Date Print Name of Sub -bidder or Trade Contractor s�ti�d De Ackvh v,4�,�6u,,LAv+j 45 Industrial Rd., Wrentham, MA 02093 Project Number (or Business Address name if no number) __1Z-14 off' V +1-, AWtOjcr' (508) 384-1100 Awarding Authority Telephone Number SIGNATURE* Biddej;4'Authori;Wepresentative Division of Capital Asset Management Page I of ut INSTRUCTIONS INSTRUCTIONS TO BIDDERS This form must be completed and submitted by all Prime/General contractors bidding on projects pursuant to M.G.L. c. 149, §44A and M.G.L. c. 149A. You must give complete and accurate answers to all questions and provide all of the information requested. MAKING A MATERIALLY FALSE STATEMENT IN THIS UPDATE STATEMENT IS GROUNDS FOR REJECTING YOUR BID AND FOR DEBARRING YOU FROM ALL PUBLIC CONTRACTING. This Update Statement must include all requested information that was not previously reported on the Application used for your firm's most recently issued (not extended or amended) Prime/General Contractor Certificate of Eligibility. The Update Statement must cover the entire period since the date of your Application, NOT since the date of your Certification. You must use this official form of Update Statement. Copies of this form may be obtained from the awarding authority and from the Asset Management Web Site: www.mass.gov/dcam. If additional space is needed, please copy the appropriate page of this Update Statement and attach it as an additional sheet. See the section entitled "Bidding Limits" in the Instructions to Awarding Authorities for important information concerning your bidding limits. INSTRUCTIONS TO AWARDING AUTHORITIES Determination of Bidder Qualifications It is the awarding authority's responsibility to determine who is the lowest eligible and responsible bidder. You must consider all of the information in the low bidder's Update Statement in making this determination. RQm r: this information was not available to the Division of Capital Asset Management at the time of certification. The bidder's performance on the projected listed in Parts 1 and 2 must be part of your review. Contact the project references. AWARDING AUTHORITIES ARE STRONGLY ENCOURAGED TO REVIEW THE LOW BIDDER'S ENTIRE CERTIFICATION FILE AT THE DIVISION OF CAPITAL ASSET MANAGEMENT. Telephone (617) 727-9320 for an appointment. Bidding Limits Single Project Limit: -The total amount of the bid, including all alternates, may not exceed the bidder's Single Project Limit. Aggregate Work Limit: The annual value of the work to be performed on the contract for which the bid is submitted, when added to the annual cost to complete the bidder's other currently held contracts, may not exceed the bidder's Aggregate Work Limit. Use the following procedure to determine whether the low bidder is within its Aggregate Work Limit: St&9-1 Review Update Statement Question #2 to make sure that all requested information is provided and that the bidder has accurately calculated and totaled the annualized value of all incomplete work on its currently held contracts (column 9). Steo 22 Determine the annual dollar value of the work to be performed on your project. This is done as follows: (i) If the project is to be completed in less than 12 months, the annual dollar value of the work is equal to the full amount of the bid. (ii) If the project will take more than 12 months to complete, calculate the number of years given to complete the project by dividing the total number of months in the project schedule by 12 (calculate to 3 decimal places), then divide the amount of the bid by the calculated number of years to find the annual dollar value of the work. SteIL2 Add the annualized value of all of the bidder's incomplete contract work (the total of column 9 on page 5) to the annual dollar value of the work to be performed on your project. The total may not exceed the bidder's Aggregate Work Limit. Correction of Errors and Omissions in Update Statements Matters of Form: An awarding authority shall not reject a contractor's bid because there are mistakes or omissions of form in the Update Statement submitted with the bid, provided the contractor promptly corrects those mistakes or omissions upon request of the awarding authority. [810 CMR 8.05(1)]. Qorrection of Other Defects: An awarding authority may, in its discretion, give a contractor notice of defects, other than mistakes or omissions of form, in the contractors Update Statement, and an opportunity to correct such defects, provided the correction of such defects is not prejudicial to fair competition. An awarding authority may reject a corrected Update Statement if it contains unfavorable information about the contractor that was omitted from the Update Statement filed with the contractor's bid. [810 CMR 8.05(2)]. Division of Capital Asset Management Page 2 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 PART 1 - COMPLETED PROJECTS LIST ALL PUBLIC AND PRIVATE BUILDING PROJECTS YOUR FIRM HAS COMPLETED <u>SINCE</u> THE DATE OF APPLICATION FOR YCUR MOST RECENTLY ISSUED (NOT EXTENDED OR AMENDED) DCAM CERTIFICATE OF ELIGIBILITY. YOU MUST REPORT ALL REQUESTED INFORMATION NOT PREVIOUSLY REPORTED ON YOUR MOST RECENT DCAM APPLICATION" Project Title & Location Work Category Contract Price Start date Date completed TD Bank -Warwick - Masonry $79,000,00 01/0112012 02101/2012 Warwick. RI Dry Lab Project - Lowell, Me Masonry $25,000.00 05/0112012 06/01/2012 Inn Street Lighting & Turret Masonry $64,000.00 03/01/2012 07/01,2012 Resoration - Newburyport, Ma TD Bank - Cranston - Masonry $49,00000 07/0112012 08/01!2012 Cranston, RI Comfort Station & Utilities - Masonry $93,000.00 08/01/2012 09/01/2012 Carver, MA Franklin Park Maintenance Masonry S158,000.00 D9/01/2012 12/15/2012 Garage - Boston, MA Mount Hope Cemetery Masonry $110,000.00 07/0112012 12/1512012 Stabilization - Mattapan, MA Intermodal Hub at Union Masonry $365,000.00 09/01/2012 1213012012 Station - Worcester, MA TD Bank Pawtucket - Masonry $105,000.00 0510112013 06/0'112013 Pawtucket, RI Sherwood Middle School - Masonry $199,000.00 12/01/2011 01/01/2013 Shrewsbury, MA Gloucester WTP - Masonry $36,000.00 06/0112012 03101/2013 Gloucester, MA UV Disinfection Facilty - Masonry $418,000.00 10/3112012 04101/2013 Marlboro, MA Division of Cap tal Asset Management Page 3 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 Liston Tower Phase II - Masonry $650,000.00 11101/20'12 04/01/2013 Revere, MA Wellfield Pump No.3 -Upton, Masonry $72,600.00 11/0112012 03/01/2013 MA Lynnfeld High School Masonry $327,800.00 10101/2012 01101;2013 Expansion - Lynnfield, MA Easterly Wastewater Masonry $61,000.00 11/0112012 06/01/2013 Treatment Plant - Fitchburg, MA Clinton Hospital Expansion - Masonry $352,000.00 11/01/2012 01131/2013 Clinton, MA Haverhill Public Schools - Masonry $94,000.00 12!3112012 0310112013 Haverhill, MA Attach additional sheets if necessary ' If your firm has been terminated from a project prior to completion of the work or has failed or refused to complete its work under any contract, full details and an explanation must be provided. See Part 3 of this Update Statement. Division of Capital Asset Management Page 4 of 14 PrimelGeneral Contractor Update Statement Effective March 30, 2010 PROVIDE THE FOLLOWING REFERENCE INFORMATION FOR EACH COMPLETED PROJECT LISTED ON THE PREVIOUS PAGE. PROJECT TITLE COMPANY NAME CONTACT PERSON TELEPHONE TD Bank - Warwick OWNER: TD Bank Larry Decker (856) 533-1170 DESIGNER: Bergmeyer Associates Brian Perlow (617) 542-1025 GC: DF Pray John Marques (50B) 366-3366 Dry Lab Project OWNER: Umass Lowell Rupinder Sembbi (978) 934-4890 DESIGNER: Wilson Architects Jen Wong (617) 338-5990 GC: KGCI, Inc. Alexandra Serrano (781) 233-6999 Inn Street Lighting & Turret Resoration OWNER: City of Newburyport Andy Port (978) 465-4400 DESIGNER: Woodman Associates Architects N/A (978) 462-9522 GC: Brite -Lite Electrical Joe Curran (781) 340-9102 TD Bank - Cranston OWNER: TD Bank Emily Clark (856) 533-1170 DESIGNER: Bergmeyer Associates Brian Perlow (617) 542-1025 GC: DF Pray John Marques (508) 336-3366 Comfort Station & Utilities OWNER: Department of Conservation & Recreation Barbara Farina (617) 626-1439 DESIGNER: Stephen Keliher Architects Stephen Keliher (508) 992-2007 GC: Page Building Construction Anthony DiGiantommaso (781) 341-0004 Franklin Park Maintenance Garage OWNER: City of Boston - Public Facilities Department William Hughes (617) 435-4100 DESIGNER: CSS Architects N/A (781) 245-8400 GC: Paul J. Rogan Co., Inc. John Rogan (781) 843-1900 Mount Hope Cemetery Stabilization OWNER: City of Boston - Public Facilities Department Scott Dupree (617) 435-4100 Division or Capital Asset Management Page 5 of ,14 Prime/General Contractor Update Statement Effective March 30, 2010 Division of Capital Asset Management Page 6 of 14 PdmelGeneral Contractor Update Statement Effective March 30, 2010 DESIGNER: Touloukian, Touloukian Inc. Ted Touloukian (617) 526-0884 GC: Paul J. Rogan Co., Inc. John Rogan (781) 843-1900 Intermodal Hub at Union Station OWNER: WRTA Stephen O'Neil (508) 453-3400 DESIGNER: Wendel Matthew Zinski (716) 688-0766 GC: Consigli Construction Co., Inc. Ryan Jennette (508) 458-0466 TD Bank Pawtucket OWNER: TD Bank Larry Decker (856) 533-1170 DESIGNER: Bergmeyer Associates Brian Perlow (617) 542-1025 GC: DF Pray John Marques (508) 366-3366 Sherwood Middle School OWNER: Town of Shrewsbury Paul Queeny (781) 794-1404 DESIGNER: Lamoureux -Pagano Associates Katie Crocket , (508) 752-2831 GC: Gilbane Building Company Walt Kincaid (617) 478-3305 Gloucester WTP OWNER: City of Gloucester Larry Durken (978) 281-9785 DESIGNER: CDM Smith Tom Casey (617) 452-6736 GC: Methuen Construction Greg Galbraith (603) 328-2222 UV Disinfection Faciity OWNER: Massachusetts Water Resources Authority Janice Brady (617) 242-6000 DESIGNER: AECOM Mark Phalen (617) 482-4930 GC: Daniel O'Connell's Sons Barbara Kelly (508) 520-8900 Liston Tower Phase II OWNER: Revere Housing Authority Peter Ramano (781) 284-0065 DESIGNER: The Jones Payne Group Kerry O'Donnell (617) 790-3747 GC: E.A. Colangeli Const. Co. Rico Colangeli (781) 324-9093 Wellfield Pump No.3 OWNER: Town of Upton Ron Sansouci (508) 529-3565 DESIGNER: Tata & Howard Ryan Cain (508) 303-9400 GC: Waterline Industries Corp. Sue Daily (603) 760-6205 Division of Capital Asset Management Page 6 of 14 PdmelGeneral Contractor Update Statement Effective March 30, 2010 Lynnfield High School Expansion OWNER: City of Lynnfield Mark Lydon (781) 334-9210 DESIGNER: Edward Rowse Architects Jim Partridge (774) 215-0290 GC: E.A. Colangeli Const. Co. Rico Colangeli Jr. (781) 324-9093 Easterly Wastewater Treatment Plant OWNER: City of Fitchburg Denis Meunier (978) 345-9616 DESIGNER: Wright -Pierce Jeff Pinnette (207) 725-8721 GC: Methuen Construction Jay Spooner (603) 328-2222 Clinton Hospital Expansion OWNER: Umass Memorial Medical Center Tom Skowron (508) 334-8250 DESIGNER: SIL/A/M Collaborative David Neil (860) 657-8077 GC: Turner Special Projects Amy Hutchins (617) 247-6400 Haverhill Public Schools OWNER: Haverhill Public Schools Adam Lukowski (781) 952-6000 DESIGNER: CSS Architects Kaja Sarasta (781) 245-8400 GC: New England Builders & Contractors Henry Sarkis (978) 815-6981 (1) Is your company or any individual who owns, manages or controls your company affiliated with any owner, designer or general contractor named above, either through a business or family relationship? (2) Are any of the contact persons named above affiliated with your company or any individual who owns, manages or control your company. either throuoh a business or family relationship? I PROJECT TITLE IRELATIONSHIP EXPLANATION I Division of Capital Asset Management Page 7 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 PART 2 - CURRENTLY HELD CONTRACTS LIST ALL PUBLIC AND PRIVATE PROJECTS OF $20,000 OR MORE THAT YOUR FIRM HAS UNDER CONTRACT ON THIS DATE REGARDLESS OF WHEN OR WHETHER THE WORK COMMENCED. 1 1 2 3 4 5 6 7 Project Ttle and Work Category Start and end On Contract Price % not $ value of Location dates schedule(yes t complete work not no) complete (col. 5 X Col, 6) FA. Day Additions & Masonry 01101/2013 - Yes $335,000.00 5.00% $ 16,750.00 Renovations - Newton, 03/0112013 Me Saugus Belmonte Masonry 1010112012 - Yes $530,000.00 500% $ 26,500.00 Middle School - 02128/2013 Saugus, MA Somerville District Masonry 02/01/2013 - Yes $122,500.00 25.00% $ 30,625.00 Courthouse - 07/31/2013 Somerville, MA Marshfield WWTF - Masonry 06/01/2013- Yes $209,000.00 5.00% S 156,750.00 Marshfield, MA 08/01;2013 Twining Hall - Camp Masonry 08101/2013 - Yes $62,400.00 100.00% $ 62,400.00 Edwards - Bourne, MA 09/30/2013 MATCH Charter Masonry 06/0112013 - Yes $78,400.00 80.00% $ 62,720.00 School - Jamaica 0813112013 Plain, MA Rowley Water Masonry 06/01/2013 - Yes $418,800.00 75.00 % $ 314,100.00 Treatment Plant - 09/0112013 Rowley, MA Nock & Molin Schoot - Masonry 06101/2013 - Yes $562,000.00 90,00% $ 505,800.00 Newburyport, MA 09/01/2014 Voke Lofts - Masonry 06101/2013 - Yes $685,000.00 95.00% $ 340,750.00 Worcester, MA 10/31/2013 Medfield DPW Masonry 08/0112013 - Yes $974,000.00 100.00% $ 974,000.00 Office/Garage - 12/0112013 Medfield, MA Division of Capitai Asset Management Page 8 of 14 Prime/General Contractor Update Statement Effective March 30. 2010 Edward W. Brooke 2 Masonry 08101/2013 - Yes $422,500.00 100.00% $ 422,500.00 Charter School - 10101/2013 Mattapan, MA Carr Elementary Masonry 09/01/2013 - Yes $498,000.00 100.00% $ 498,000.00 School - Newton, MA 03101/2014 Division of Capital Asset Management Page 9 of 14 Porne/General Contractor Update Statement Effective March 30, 2010 PROVIDE THE FOLLOWING REFERENCE INFORMATION FOR EACH INCOMPLETED PROJECT LISTED ON THE PREVIOUS PAGE. PROJECT TITLE COMPANY NAME CONTACT PERSON TELEPHONE F.A. Day Additions & Renovations OWNER: City of Newton Art Cabral (617) 796-1000 DESIGNER: HMFH Architects N/A (617) 492-2200 GC: Colantonio, Inc Kim Joyce (508) 429-8666 Saugus Belmonte Middle School OWNER: Town of Saugus Scott Crabtree (781) 231-4111 DESIGNER: Fletcher Thompson Architectural Engineering, LLC Michael Fazio (617) 502-9065 GC: Consigli Construction Co., Inc. Janine Murdock (508) 458-0462 Somerville District Courthouse OWNER: DCAM Jason Penny (617) 727-4030 DESIGNER: Habeeb & Associates Dmitri Kapalis (781) 871-9804 GC: BC Construction Co., Inc. Jeff Vicente (978) 276-0921 Marshfield WWTF OWNER: Town of Marshfield Kevin Sylva (781) 834-5121 DESIGNER: Tighe & Bond Ian Callow (508) 754-2201 GC: Hart Engineering Corp. Jim Ramos (401) 658-4600 Twining Hall - Camp Edwards OWNER: Mass Military Division Jonathan Carney (508) 968-5843 DESIGNER: Allen M. Lieb Architects & Associates Allen Lieb (978) 646-9333 GC: Contractors Network Dan Goyette (401) 434-5440 MATCH Charter School OWNER: MATCH Charter Public School Michael McCormick (617) 445-3555 DESIGNER: HMFH Architects, Inc. Pip Lewis (617) 492-2200 GC: Consigli Construction Co., Inc. Michelle Conway (508) 473-2580 Rowley Water Treatment Plant OWNER: Town of Rowley Lawna Hamilton (978) 948-2640 DESIGNER: Weston Sampson Ran Neland (978) 532-1900 Division of Capital Asset Management Page 10 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 (1) Is your company or any individual who owns, manages or controls your company affiliated with any owner, designer or general contractor named above, either through a business or family relationship? (2) Are any of the contact persons named above affiliated with your company or any individual who owns, manages or control your corri either through a business or family relationship? 1PROJECTTITLE IRELATIONSHIP EXPLANATION Division of Capital Asset Management Page 11 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 GC: Kinsmen Corporation Gene Connor (603) 625-9199 Nock & Molin School OWNER: City of Newburyport Anthony Pruner (781) 494-9000 DESIGNER: Miller, Dyer, Spears, Inc. Danyul Cho (617) 338-5350 GC: Gilbane Building Company Timothy Lunt (978) 490-6477 Voke Lofts OWNER: Voke Lofts Limited Partnership NIA (617) 742-4500 DESIGNER: The Architectural Team Scott Maenpaa (617) 889-4402 GC: Dellbrook Construction Steve Draleau (781) 380-1678 Medfield DPW Office/Garage OWNER: Town of Medfield Robert Laurent (617) 451-2717 DESIGNER: HNT8 Corportation Roland Lavelle (207) 221-0894 GC: Castagna Construction Jay Farquharson (978) 465-2800 Edward W. Brooke 2 Charter School OWNER: Brooke Charter Schools Melissa Martinez (617) 445-3555 DESIGNER: Arrowstreet Larry Spang (617) 623-5555 GC: W.T. Rich Company, Inc. Keith Derrig (617) 467-6010 Carr Elementary School OWNER: City of Newton Art Cabral (617) 796-1000 DESIGNER: Turowski2 Architecture Derrick Maloney (508) 758-9777 GC: Castagna Construction Wes Rollins (978) 465-2800 (1) Is your company or any individual who owns, manages or controls your company affiliated with any owner, designer or general contractor named above, either through a business or family relationship? (2) Are any of the contact persons named above affiliated with your company or any individual who owns, manages or control your corri either through a business or family relationship? 1PROJECTTITLE IRELATIONSHIP EXPLANATION Division of Capital Asset Management Page 11 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 PART 3 - PROJECT PERFORMANCE For Parts 3 and 4, if you answer YES to any question, please provide on a separate page a complete explanation. Information you provide herein must supplement the Application for your most recently issued (not extended or amended) Sub -Bidder Certificate of Eligibility. You must report all requested information not previously reported on that Application. Include all details (project name(s) and location(s), names of all parties involved, relevant dates, etc.]. Division of Capital Asset Management Page 12 of 14 Prime/General Contractor Update Statement Effective March 30. 2010 YES NO 1. Has your firm been terminated on any contract prior to completing a project or X has any officer, partner or principal of your firm been an officer, partner or principal of another firm that was terminated or failed to complete a project? 2. Has your firm failed or refused either to perform or complete any of its work X under any contract prior to substantial completion? 3. Has your firm failed or refused to complete any punch list work under any X contract? 4. Has your firm filed for bankruptcy, or has any officer, principal or individual with X a financial interest in your current firm been an officer, principal or individual with a financial interest in another firm that filed for bankruptcy? 5. Has your surety taken over or been asked to complete any of your work under X any contract? 6. Has a payment or performance bond been invoked against your current firm, or X has any officer, principal or individual with a financial interest in your current firm been an officer, principal or individual with a financial interest in another firm that had a payment or performance bond invoked? 7. Has your surety made payment to a materials supplier or other party under X your payment bond on any contract? 8. Has any subcontractor filed a demand for direct payment with an awarding X authority for a public project on any of your contracts? 9. Have any of your subcontractors or suppliers filed litigation to enforce a X mechanic's lien against property in connection with work performed or materials supplied under any of your contracts? 10. Have there been any deaths of an employee or others occurring in connection X with any of your projects? 11, Has any employee or other person suffered an injury in connection with any of X your projects resulting in their inability to return to work for a period in excess of one year? Division of Capital Asset Management Page 12 of 14 Prime/General Contractor Update Statement Effective March 30. 2010 PART 4 - Legal or Administrative Proceedings; Compliance with Laws Please answer the following questions. Information must supplement all judicial and administrative proceedings involving bidder's firm, which were instituted or concluded (adversely or otherwise) since your firm's Application for your most recently issued (not extended or amended) Sub -Bidder Certificate of Eligibility. You must report all requested information not previously reported on that DCAM Application. The term "administrative proceeding" as used in this Sub -Bidder Update Statement includes (i) any action taken or proceeding brought by a governmental agency, department or officer to enforce any law, regulation, code, legal, or contractual requirement, except for those brought in state or federal courts, or (ii) any action taken by a governmental agency, department or officer imposing penalties, fines or other sanctions for failure to comply with any such legal or contractual requirement. The term "anyone with a financial interest in your firm" as used in this Section "I", shall mean any person and/or entity with a 5% or greater ownership interest in the applicant's firm. If you answer YES to any question, on a separate page provide a complete explanation of each proceeding or action and any judgment, decision, fine or other sanction or result. Include all details (name of court or administrative agency, title of case or proceeding, case number, date action was commenced, date judgment or decision was entered, fines or penalties imposed, etc.). Division of Capital Asset Management Page 13 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 YES NO 1. Have any civil, judicial or administrative proceedings involving your firm or a X principal or officer or anyone with financial interest in your firm been brought, concluded, or settled relating to the procurement or performance of any construction contract, including but not limited to actions to obtain payment brought by subcontractors, suppliers or others? 2. Have any criminal proceedings involving your firm or a principal or officer or X anyone with a financial interest in your firm been brought, concluded, or settled relating to the procurement or performance of any construction contract including, but not limited to, any of the following offenses. fraud, graft, embezzlement, forgery, bribery, falsification or destruction of records, or receipt of stolen property? 3. Have any judicial or administrative proceedings involving your firm or a X principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of any state's or federal procurement laws arising out of the submission of bids or proposals? 4. Have any judicial or administrative proceedings involving your firm or a X principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of M.G.L. Chapter 268A, the State Ethics Law? Division of Capital Asset Management Page 13 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 PART 4 - Legal or Administrative Proceedings; Compliance with Laws (continued) Division of Capital Asset Management Page 14 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 YES NO 5. Have any judicial or administrative proceedings involving your firm or a X principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of any state or federal law regulating hours of labor, unemployment compensation, minimum wages, prevailing wages, overtime pay, equal pay, child labor or worker's compensation? 6. Have any judicial or administrative proceedings involving your firm or a X principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of any state or federal law prohibiting discrimination in employment? 7. Have any judicial or administrative proceedings involving your firm or a X principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a claim of repeated or aggravated violation of any state or federal law regulating labor relations? 8. Have any proceedings by a municipal, state, or federal agency been brought, X concluded, or settled relating to decertification, debarment, or suspension of your firm or any principal or officer or anyone with a financial interest in your firm from public contracting? 9. Have any judicial or administrative, proceedings involving your firm or a X principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled relating to a violation of state or federal law regulating the environment? 10. Has your firm been fined by OSHA or any other state or federal agency for X violations of any laws or regulations related to occupational health or safety? Note: this information may be obtained from OSHA's Web Site at www.osha.gov 11. Has your firm been sanctioned for failure to achieve DBE/MBE/WBE goals, X workforce goals, or failure to file certified payrolls on any public projects? 12. Other than previously reported in the above paragraphs of this Section I, have X any administrative proceedings or investigations involving your firm or a principal or officer or anyone with a financial interest in your firm been brought, concluded, or settled by any local, state or federal agency relating to the procurement or performance of any construction contract? 13. Are there any other issues that you are aware which may affect your firm's X responsibility and integrity as a building contractor? Division of Capital Asset Management Page 14 of 14 Prime/General Contractor Update Statement Effective March 30, 2010 Consultation Report for D 81 S Commercial Masonry, Inc. 45 Industrial Road Wrentham, MA 02093 Submitted by: The Commonwealth of Massachusetts Division of Occupational Safety On -Site Consultation Program 1001 Watertown Street West Newton, MA 0246 5 . Introduction This reportprovides the resulis of an occupational safety survey at a multi -story residential constmction site owned by the Revere Housing authority and located at 45 Dolphin Avenue, Revere, 1,1A. The project was managed by E.A. Colangeli Construction. Co., Inc., with D & S Commercial Masonry working as a subcontractor. The survey was conducted March 23, 2011. Its findings reflect conditions as observed at thut time, and cannot be presumed to anticipate subsequent changes in site conditions or deviations from safe operating practices. When referring to this report in correspondence, please reference the Case Number (11 -SPP -049) or the Visit Number (50576725t). Summary of the Visic D & S Commercial Masonry is one of several subcontractors operating under E.A. Colangeli Construction on tL: project site. The work involved extensive renovation of a multi-anit elderly housing facility The consultation was conducted at company request, rnade in order to satisfy the tetras of an expedited informal settlement agreement with OSHA. A compliance inspection had resulted in citation for scaffolding issues. The survey is classified as full service in that it encompassed the entire site. This report covtrs one specific hazard for which your company is responsible as one of the subcontractors on the job site. The general contractor, who also had requested consultation service, has been provided with a repurt on all hazards identified on the clay of the survey. Required written programs and doctunentation were reviewed during the opening conference. Physical conditions at the job site then were evaluated during the walkthrough. All identified deficiencies are explained in the following hazard descriptions, Another part of die report discusses general management of safety and health. All of the Serious fiazards identified were corrected on the day of the visit. Accordingly the standard requirement for zrnployen? to abate observed violations has been fulfilled. Further verification ofcorreetivc action is not nrcossary, and this report serves instead as confirmation of the obs.-ved hazards ant the fact. of their bein; abated. Hazard Descriptions and Correction Recommendations The federal Occupational Safety and FIealth Administration (OSHA) s;andards'were used as the basis for determination. The Report of Employer Action Taken lists the hazards by item number. It provides a convenient form to describe briefly the metaods and dates of correction. Please use it to notify us when corrections are completed, and to suitunaritie the action you took to eliminate or control the hazard. Imminent Dangers are hazards that reasonably can be expected to cause death or serious physical harnt immediately or before this written report is received. Corrective action must be taken irtLrnedrately to mitigate the imminent threat to employees, and further action usually is required within a specified time period to control the hazard satisfactorily. Serious Hazards can cause an accident or health hazard exposure resulting in death or serious physical harm. They have been assi,ned a date by which correction is to be completed and verification of corrective action provided. Other Than Serious Hazards Lack the potential for causing serious physical harm, but still co-ald have a direct impact on employee safety and health. No connection due dates have been set, but we encourage you to correct these hazards and notify us of the action taken. Regulatory Bazards reflect violations of OSHA posting requirements, recordkeeping requirements, and reporting requirements as found in 29 GFR 1903 and 1904. No correction due; dates have been set, but we encourage you to correct these violations and notify its of the action taken. Report of Hazards Found Item No. 001 Correction Due pate; March 23, 2011 Instance: A Hazard Type: Serious Condition: Employees were not protected from tripping in or stepping into or through holes, by covers. The decking of a mast -climbing lift/scaffold system was damaged in places, and gaps between sections had not been covered over, Location: Front side of building, at platform of Fraeo system. Potential Effects: Sprains, contusions, fractures and death, from stepping into or falling through holes. Standard: 29 CFR 1926,5 0 1 (b)(4)(ii) Recommended Action: The openings in the decking were covered during the visit, thereby abating the hazard. No further verification of correction is necessary for this item. PART 5 - SUPERVISORY PERSONNEL List all supero sort' personnel who will be assigned to the project if your firm is awarded the contract, Attach the resume of each person listed below NAME TITLE OR FUNCTION DOIYiId Gibson President Cory Vogt - Estirnirtort{ eneral Manager James ncnurgenis V — i s ^ !^ ~Field Supervisor _ Office Manager Jennifer Roberts PART 6 - CHANGES IN BUSINESS ORGANIZATION OR FINANCIAL CONDITION Have there been any changes in your firm's business organization, financial condition or bonding capacity s nce the date your current Certificate of Eligibility was issued? ❑ Yes Z No If YES, attach a separate page providing complete details, PART 7 — LIST OF COMPLETED CONSTRUCTION PROJECTS SUBMITTED TO THE DIVISION OF CAPITAL ASSET MANAGEMENT ALONG WITH CERTIFICATION PAGE, Attach here a copy of tree list of completed construction projects which was submitted with your firm's Application for your most recently issued (not extended or amended) Sub -Bidder Certificate of Eligibility. The Attachment must include a complete copy of the entire Section F— "Completed Projects" (Section G — "Completed Projects" for firms certified based upon their PrimelGeneral Application), and the final page —"Certification Page", (Section I in the Sub -bidder Application or Section J in Prime/General Application) containing the signature and date that the Completed Projects list (Section F or G) was submitted to the Division of Capital Asset Management. Divisior of Capital Asset Management Page 10 ui to Sub -bidder Update Sfatemenl Fffective MArnh 30, 2010 29 Hh&L=D latL a Ties; MoW Hdu,�4on; �3 CamapV ttaeal&1 MOO! IM -1984 Canrl.'Cai� 24e'Jrt4tmmt D!II Caoe�dctldeaaytSa�.Ptdda2 l�tacfxr i.�aathBe�tp�£ardry� l498•Azssuf-li,�dmi US A Cammr�fA Wu& jA dw wAkt 4s= Brm hxa(Cmlc DOCK4C S001 iaceryu:� CmiA=s] L49Id94! ' 00ft d U ddxw MOM I&Mnj� PWW*d C!»ndCd0;**d46av:i107? g VaWaA d&4=% 3.IK000. $�id4Tt SlaaudMli;! 36std J:MI�sACi cwyliagt sdl; A� u -ja r q tknoiat btaa rr, ¢; 4-oceMn tr tam-Innr ;&GaokBarraCo�cOrIDRY ds4 tt3:71,MA tSsiLaeBe�ddt i A -W14.% Bu pI vN q ,+� SiearmyCmp, 4as(p0t�y 1tA, Y3Qws tdrUWA-cYCC ,Wtjq*ltA,2a7MAM llxspl s V*AdAftw,Fb*gt&**. t .cel Pmltw.Ganmi9atbtd boom 2oWh4w .stat,oftewhfmiw Dutra g-6zb=Datk DMdml�oorse I wdlAb acupt-w gammtdeodaea..DlrLlaoMaROdmcnetmdtay �t+�st+m+t�Rts+ A{cllYepattaict�rtmdxrona�amund 32at�lcaa 81uc+�t L6catrne:nd�h,�LabarimdpU Pz�C= a: 2daTM 4owJol My, Ml as Pro,(en Dntic� Ya�nta�3txd egmtlrm�, t,nMt,ct o:p!LAus.rT� aaGgt itao� ooaetaake� awmramdaudsadc �, a#lnt�tt projut mr�naet ugaaiiaoq pozpskc vrKiioHwotvq�g�ad�vutPd�er�B�aShtcn ,Wtnital tmq�t t}uttdt Otcvedcd �a.aes wia4inoeuarl+z �Ls(taeoa�pr�oac*m! xd+�akN+t+r�akdtbndprt awmonwxtW p17%j �atmtdi e44ftt�ttt mitAl. wtafs14 W v vA Todot pxaLaaean�. No�4�tfed ti�1 �kaga4pgjoc[ oxdorta Cnry Vogl Project Estimator and Project Managament Hanscom Air Force Base, Hanscom, MA Boys & Girls Club Roxbury, NIA N E Center for Children, Roxbury MA Mattapan Heights, Boston MA Asnmont TOO, Boston, MA Nashoba Valley Tech, Nashoba MA Fmerson College Piano Row, Boston, MA Harrison Commons, Boston, MA Noble & Greenough School, Dedham MA Bank of America South Bay, Dedra m, MA WGBH Headqua-ters, Brighton, MA Target Store, Watertown, MA Baldwin Pond WTF, Wayland, MA Paxton Pubic Safety Facility, Paxton, MA Forbush Memorial Library. Westminster, MA Ely Library. Westfield State College, MA Veronica Srn th San,or Center, Brighton, MA Target Store, Lowell, MA D&S Camrrrerolef Masonry 2009 -Present Crescent Court Community Center, Brockton, MA Lowell Superior Court, Lowell, MA Fitchburg State, Thompson Hali MA Concord Fire Station Concord MA Alfred Liston Towers. Revere, MA Crompton Park Bu,lding Renovations, Worchester, MA 1060 Belmont Street Apartments, Waledown, MA Salam State Coilege Renovations, Salem, N1A Claredon Towers Apartments, Somerville MA Gloucester WWTF, Gouchester, MA Hyannis Toyota, Hyannis, MA Ultavio et Disinfection Facility, Marlboro, MA Che sea Housing Repairs, Chelsea, MA Hunt Hall, Bridgewater State college Bridgewater ,UtA Newton Fir; Station V, Newton, MA Neponsel Street WWTF, Canton, M Fairhaven WWTF, Fairhaven, MA Lunerburg Dump Station, Lunenburg, MA Natick High School Renovation, Natick, MA Walsh Cate Springs Well WTF, Mansfield, MA Allice Taylor Housing, Boston, MA Stevens Estate Gate House, N Andover Pump Station No. 7 Onset MA Sherwood Nlidale School, Shrewsbury, MA Cardinal Spellman H S. Ftness Center Smith St. WWTF Chelmsford, MA Attleboro Public Schools- Roof Repairs, MA Houghton's Pond Bath House Milton, MA Lout Pond WWTF, Plymouth, MA Andrew J. Petro Pool, Southbridge, MA Ica Rink, Conway Park, Sorrerville, MA WRTA- Ulorcestr, MA Sovereign Bank, Newbnvilie, MA Renecca Johnson School. Springfield, MA Malden F.re Station, Malden, MA TD Bank, Lexington, MA CSX Terminal, Worcester, MA Peter Noyes EI. Sch. Roof Repairs, Sudbury Laurel Hall Co recfional Institute, Gardner, MA Join D. O'Bryant School, Boston, MA TO Bank, Woonsocket R.l Newton South H S, Newton, MA Mental Health Addition, Brockton. MA Hoyden Library, Foxborough, MA Build 22 VA Medical Center, Brockton, MA Bristol Community College, New Bedford, MA N, Leominster Comm iter ,Rail, Leonm nster,MA N Andover Miadie School, N. Andover, MA 125 Amory St, Tenant Fitup, Boston, MA Dry Lab Renovation, UMASS Lowel, MA New East Boston Branch Library, Boston, MA Holliston Town Hall, Holliston, MA Fitchburg Easterly WWTF, Fitchburg, MA Oakdale Facility Upgrade, Oakdale MA Moody Sch. EI. Raaf Replacemen, LowelI,MA Clinton Hospital Expansion, Clinton, MA Rowley Water Treatment Facility, Rowley Hallenborg Ice Rink,Bille.-ica Museum of Fine Arts -Asian Wing- Boston, MA Burnell Hall -Bridgewater State, Bridgewater, MA Tripp Athletic Center-UMA Dartmouth. MA Lynnfield H.S. Expansion, Lynntteld, MA DCR Comfort Station, Plymouth, MA Franklin Park Maint Garage, Boston, MA RNA- Liston Towers Pase II, oaston, MA F A Day School Renovations, Newton, MA Match Charter School, Jamaica Plain, Boston, MA TO Bank Pheonix St., RI 1e:4ics 8lu s;oi, 24 Strk:e`. Ly1111, �V A ,3194 5 T:Je Field &.1;oager; D_+S Co uiavo.^ it l.'arl% _. Edu„ afioar Lyzu Tech Vocarlo,3l High Schroi: 1956-1939 Masa AppRC1 Oce: 199t}- i ora Eleid V3rv&J 7. 'tiLfi-Ptrscrt J'a.�r7lUtTj Uf Qt�li tlCaYtuil;: + \-fer ier 0--trirl-lay;-,s s-id..11:crl Ci titm� ian Urdu, Lacai `u. 3, Dostcn, MA • Ptajzcz Comma-: 19,,J8 to prestnt + k-:orrl Cnsctuc!:cT;',(aru 'acr.�lt: n ltldingy'.:,.uicsrih(u.�r..rnt.�eading, B d :Lchlyee ;LnerAgb-,1, all a:pe�,ts 3;tp,ojn:t? ledt:ling. uwtxials maragMent `orl�sesczh:m:'•39nlypru;�cts ' A; Parrior Sysams instal z Ica qu-dif.-d. ■ "c-ruatisz u i7 t 4lafivaof;?tune, 'C te; W �lti;;, f_crnlc, a, tt ell M rra= Y C9sultJ973, • Qualrti l i'n R8itnrtibxi?111 t\.-f11r,ji5i1 cur mall :u' -?S OELMiso1'u �y PP'Jj�t L'.•JCllirllG�: For':man� D�8 CaLntt;creinl ?f:;saury, inc, ?OQ9-pl:seut • Gt�3 Ston;.: Bevcxly, G�(A • t',hfsas4[ousiuglZcstwrali.J�l,�talsra \sz • "ditcd Latiit Tstwers, P,evera, NIA • Nl wton Gine Station 477, Num—roc, KA • A1ieoTLylo: Hci-iirig Dev�lott!nerr; Roxnuiy, NIA + Steveu's ?kale _ts Huusu, 'N. AndaVur, MA • G1.lrnduttHIM Tnwats, 3c>?terv�le, Nits • Satem :Ougc Rzr;at'atiou:;, Sal°ant, IVIA • Th :u.is El of, School P_auf R q;lul ca:snt, B64i"•.ou, MA • TD Bwjk, Leviaktia, �,LA !'(JrMuas- Capitol ud1;!anrg` CJ)7., WallplL, t.,!A • �-:attapzt:l:Tri;;�Ew, 1?usCui:, rrfa • ["2 Sot, �h'1(�lto� u., .LIA + Ba'dwia Poud vt`2te: Treattterlr. �a�`,;I•,ty, +ti3�(.Tn:i, (y4�. + Newton Plre Station, Newton, Mei Lops Ahpaet Fwliides bnprav=cnt, Boston, MA + Logm Akwit Pomp Station, Boston. hfA CVS, Brighton, MA e Marblehead Vcglago School, Marblehead, Kk 0 Macriott cmtxd, Bostaa, MA • Ekism Comm Apotnants, Boston, MA e PBI, Bedford, MA • 423 Maas Ave. A-putmeate, Roston, MA • Michaels CrattStora, i3Veratt,MA • TOO RMwuant, iverett, MA lennifcr Roheils Adams St. Plymouth, MA O2350 Office Manager. DSS Commercial ldasunrv, Corp. 2009 to Present Skills and Accomplishments: Office Manager for Construction Union Contractor • Front Offix Ila nagurn nt and Supervision • Responsible for company payroll n,"254- enar loyaes. • 'Daily accountrng details; Monthly project =1LLisitions • Accounts Payable Clerk. Responsibilities include constructiori coding, data processing, and check processing of invoices. Heavy emphasis of telephone comnxtn.ication with supplliers &$f order t1ow, tolkrN •uh and payment. • Contract and Docwnant Control. • Order plans aad specification doourrmcnts for bidding purposes. 0 Key offioe support to Estimators, Prgject ?v1a rag.rs and Controller. • Reports Include: Ntorthty AL1 per project, Certified Payroll, Workman's Cr}mp lnsurnnce Claims; and Weekly Child Support, 401 K Contributions, Monthly Union Reports, Unemployment Benefits • Secretary to Company Officers/ Owners Expertise: • Quick Books Accounting and Payroll • Microsoft Word, Excel • CF Data Accounting Soft -,vara. Accounts Payables, Payroll, Contract'Joh set-up. • Skilled communicator, polished telephone and interpersonal skills. • Detail oriettied and able to budaiLec workload effectiveiy. Employment History; OfTice • 9%2006 -2009 Capital Masonry Corp., W,,i pole, Pr[A Office Manager. 1.'2000 to 9l2006: Bustonian Masonry Corp , Walpole, MA- Office Manager, • 9.'1499-12 2000; A. Bonfatti, Ina. (Cenersl Con(ractor} Norwood. MA- Office Support to Control ler and Project Managers during final phase period. s Vlore? -1,2/1999• Dine fmageq, Office Manager Photographers' Assistant. Employment History: Education • 1494 -?996 Kindergarten Teacher Young World Day Sattooi, Ramsey, NJ. I 1955-1973 Ncvsury School Teacher oC3 and 4 ye:!r Olds, Upper Saddle River, NJ. Education. 191 t-19'4 Fairlai�h Dickinson University, Teaneck, NJ Degree. B. A Cslemer tary Elf Teacher of Gmdcs K-8 ,md Teactrer of Eng,'tsh, Grades 5.12, Ccrlitied Hear/ T:.achi, status for teaeh4ig Nursery 46hool. ! - \ . ! } \ \ \ \ \ \; } } � e . � : 2 . , . ) } _ | | | | ! � � f } � � � . ! . � � - . � � i , , , ! ! , ! , \ / �| /. / }{� �� � � �Q� ! .4 �) , z � � � � : - \ / �� � �� : , , ; 2 / l w { . � � , # \ \� / � � � { & } \ \ \ \ : . � �\.: � - �: : �/ j ,\ �\� r� 24. \� ;„ . 5 � \� � � ` / $ - / ` � - : § , ■ : � } 2 \$ ! ) ) { ` \ ] � i ` \ .. | £ ) ) \ � \! ! » � t ƒ 7 � � �| � } � | .|! � f � ` � . � . | ! | , � � | | � � . | \�< (/\: \� » � \ «« , � <'/ ( � { ! -y.� .: § 5 a �` �\\� %,°~ m,. _ : � » a � /6� � � , . 4 , .� _ \\ � ,�� _ � \ > � � | ! \ �+y/\�$ �{�. : . . �� � ! � \. . a , \�� ~ \ } � � \� _ - � | ,�%: � ( ) ! § : \ �`��� ^ *� � � } } / �lK�4� ( ) � � , � � - ! � 3f. .� \: �* ? � /� \ � 7 \ � $ # � | � f ] � /\'§ \��� ¥ �w\ � `'.,> | # ,1�/f% ! � ■ } } � _ � �\a»°� }\ #� /�■ - - - � � \ / � ���\ � ''�: � • . ; , _ - |� � � \ { � � ■. / } � `}\ ! ! � ! z ,' ���° \ ^.�\ | : > n : } \ / a 1 a 1 ; ` .� ■ = n ! 4 z ; : , ! , �! � � .� ! / � ( ( � � { � � � � % ` " | � ! | � � � ) � � � ) � ` � � � � � � ) L Certification (notarization required) The undersia.ned, Donald Gibson hereby ecrtifrcs, (type pante) That f am as owner or principal Inc. (company pante) and that :ill answers and all statements contained in the attached applicrttion (including Sections F, and F) for certificate of eligibility are true and correct. Providing false or misleading infonnation or failure to provide all required information will be considered grounds for d:nial, decertification and/or debarment, f attest to the accuracy of all information contained in this application and ver fy that the information submitted is in fact accurate and true, under oath. Signet and Sworn cinder the Pains and Penalties of Perjury. Dated at 1114/2013 This Nthday of IunuarV, 2013. :-_�.► ..o..�.._r...a a By (signature): Print aamc "title_ or Position' Uorxrla, C ihson resi "( X21. k.c._*Ja.**k****k:k-****4bP*k k**. a*k*d: r:*+N***.M id, K****..*******t++tk#*»aM*+H*K* AAf i k_ ss. n cL?!!�- (county) (State) Before me,J -F1l;rufE ��.. . personally appeared and (notary public) lutown to me to be (name of 0Meer) on satisfactory evidence wkich was his/her driver's license and acknowLed.ged that he/she is authorized to execute the foregoing and that its execution is his/her free act and deed and the free act and deed of the Gran. e, �e2-.i— My conrnissipllpiwl: f (notary public signature) Natory `{+� Comuenw�aflh o4 MayteKituteMr }� my Gommisiion t xplrs� Ape+I 13, 1646 (print nano) ** Upon completion of this Application and the two corresponding Exec[ Spreadsheets, save anti entail them to Cc, rtitication Application, dcam0a)state.ina.us ** Page 14 of 14 Sub -Bidder Appiicatinn March toll Coniputer 1. Certification (notarization required) The undem'uned, Corpk"'o_w hereby Urtifizs; (type. nunmc) That 1 am an owner or principal of D&S Commercial Masong._ (nc. (company narne) and that all answers and all staterncrts contained in the attached application (including Section~ F? and P) J"or certificate of eligibility are true and correct. Providing fulse or misleading information or fai:ure to provide all required information will be considered grounds for denial, decertification and/or debarment. I attest to the accuracy ofaft information contained in this application and verify that tha information submitted is in fact accurate and true, under oath. Signed and Sworn under the Pains and Penalties of Perjury. Hated at 1;1112014 This 14th day of,fynyarv, 2013. By (signatarc): Print name: Title or position: General hfnrt� ##xe*k*A*'kr***# -* *****-******t#+'#'***t*********"", t.p #{+acrtk* (Countyl p (state) Before me, t !�� CO�b f�c",- , personally appeared and r " (notary public) known to ma to be _1 V � ,hased (name of oi'ti� eii on satisfactory evidence which was his/her driver's license and acknowledged that he; she is authorized to execute the foregoing and that its execution is his/her free act and deed and the Free act and eed of the firm. f My camtnixsion���R-�-,�t�st<��+c (notary pkNic signature) Notary Public Commolswoollh of Miwo111wM1A .� i3, rw) l t "= �'b �� ' My (,Aprpne►tuExpYrlt April 13,2016 (prier nave) ** Upon completion of this Application and the two corresponding Excel Spreadsheets, save and email them to Certitic:rtionAnotication.deam(a).state.ma.us TM� Page t4 of la Sub -Bidder Applieution Murch 1011 Computer