Contract #: 012034 - From: To: - Exception - Exception
NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 ADDENDUM No .1 9 September, 2014 PART 1 — GENERAL 1.1 DESCRIPTION A. This addendum shall supplement, amend and become part of the bid documents. Bid Documents are the Contract Documents, Drawings and Specifications, for the North Andover Central Fire Station dated August 28, 2014. All bids and the construction contract shall be based on these modifications. 1.2 PROCEDURES A. The attention of bidders submitting proposals for the above subject project is called to the following addendum to the specifications and drawings. The items set forth herein, whether of omission, addition, substitution, or clarifications are all to be included in and form a part of the proposal submitted. B. THE NUMBER OF THIS ADDENDUM (1 ) MUST BE ENTERED IN THE APPROPRIATE SPACE "B" PROVIDED AFTER THE WORD "NUMBERS" OF THE CONTRACT FORM ENTITLED "FORM FOR GENERAL BID," AND IN SPACE "B" OF THE "FORM FOR SUB - BID." 1.3 RELATED WORK A. All work shall comply with requirements specified for similar work unless otherwise described. 1.4 THIS ADDENDUM CONTAINS A. Revisions to the: 1. Answers to Contractor's Questions 2. Project Manual, dated 08/28/2014 (Specifications) 3. Bid Set Documents, dated 08/28/2014 (Construction Drawings) B. Publications listed below form a part of the Specifications and Construction Documents to the extent referenced. 1. Revised Specification Sections (attached) a. Specification Section 01 10 00 SUMMARY b. Specification Section 0123 00 ALTERNATES c. Specification Section 07 54 23 PVC MEMBRANE ROOFING 2. Revised Drawing Sheets (attached) a. SP1.1 b. A5.1 c. A5.3 d. A5.4 e. A5.6 f. A7.1 g. M5.01 09/09/2014 ADDENDUM No. 1 Page -1 kJ -J NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 3. Sketches (attached) a. SKC-1 b. SKA-1 to SKA-10 c. SKS-1 d. SKM-1 to SKM-5 e. SKE-1 to SKE-3 PART 2 — ANSWERS TO CONTRACTORS' QUESTIONS 2.1 DESCRIPTION A. Bidder Question: Please provide completion date and whether there are Liquidated Damages for this project. Response: Project Completion and Liquidated Damages are addressed in Revised Section 01 1000 SUMMARY, 1.13. B. Bidder Question: Would D&S consider an alternate transaction window for the interior window specified? Response: Interior window shall remain as specified in Section 08 44 13. C. Bidder Question: Please clarify glass thickness noted on Sheet A7.2, details 3, 4, 7 and 8. Response: Refer to revised sheet A7.1 and revisions to detail notes for Sheet A7.2 D. Bidder Question: Clarification of ACT #1 and location for ACT #2 as specified in Section 09 51 00. Response: Refer to revision to Specification Section 09 5100 contained in this Addendum and location for ACT #2 shown on SKA3. E. Bidder Question: Can a Canton, GAL or Abell elevator package be submitted in lieu of the specified MRL elevator due to designed size of hoist way? Response: Plans and specification for MRL elevator shall remain per the Contract Documents. The elevator manufacturers listed in Specification Section 14 22 00, 2.3 can supply an MRL elevator that fits in the designed hoist way. F. Bidder Question: HVAC Specifications call for Alternate #2 Radiant floor heating in Apparatus Room. The general specifications and bid form do not reflect Alternate #2. Please advise if this will be included in the bid Response: Reference to Alternate #2 has been removed. G. Bidder Question: Please confirm that ductless splits are not applicable to this project. The specifications call for them, but the drawings do not show them. Response: Ductless split units are required. Refer to drawings changes. PART 3 — PROJECT MANUAL 3.1 DESCRIPTION A. The following Specification Sections are revised as follows: 1. TABLE OF CONTENTS ADDENDUM No. 1 09/09/2014 Page -2 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 a. Document 00 54 01 Certificate of Corporate Clerk Revise to read "Document 00 54 01 Certificate of Vote" b. Document 00 54 02 Certificate of Non -Collusion Revise to read "Document 00 54 02 Certifications" c. Section 01 23 00 Pricing Alternatives Revise to read "Section 0123 00 Alternates" d. Section 07 46 46 Fiber Cement Siding Insert "Trim" after Siding e. Section 07 54 23 TPO Roofing Replace TPO with "PVC' f. Section 0811 13 Hollow Metal Doors and Frames Delete "Hollow" g. Section 08 3613 Sectional Doors Insert "Overhead" between Sectional and Doors h. Section 09 51 00 Acoustical Ceilings Insert "Systems" after Acoustical Ceilings i. Section 09 6513 Resilient Base Insert "Accessories" after Resilient Base j. Section 09 68 00 Carpet Tile Delete "09 68 00" and insert "09 68 10" 2. Document 00 21 13 Instructions to Bidders a. Insert the following after ARTICLE 3 —REQUEST FOR INTERPRETATION, 3.5: "3.6 Questions relating to General Bid will be accepted until 2:00 PM on Thursday, September 25, 2014." 3. Document 00 54 01 Certificate of Vote a. Change footer to the following: "CERTIFICATE OF VOTE" 4. Document 00 54 02 Certifications a. Change footer to the following: "CERTIFICATIONS" 5. Section 01 10 00 Summary a. Delete in its entirety and replace with attached "Section 01 10 00 Summary". 6. Section 0123 00 Pricing Alternatives a. Replace with attached "Section 0123 00 Alternates" in its entirety. 09/09/2014 ADDENDUM No. 1 Page -3 F 7 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 7. Section 0143 39 Mock-up Construction a. 1.1, E, Delete in the third sentence: "(smooth, composite & corrugated)" 8. Section 0145 00 Quality Control a. Delete "1.4, B, 1." in its entirety 9. Section 0150 00 Temporary Facilities a. 1. 1, 3, e. Add the following after site enclosure fence: "Temporary 6'tall galvanized chain link fencing and gate. Refer to Sheet SPI. 1 for Limit of Work Area." b. 2.06, D. Delete the following: "2. Comply with Weston.... included in this specification." 10. Section 04 20 00 Unit Masonry a. 1.7 Add the following: "L. 07 42 13 — METAL PARAPET PANELS" 11. Section 06 10 00 Rough Carpentry a. 1.2, A. Add the following: "9. Section 07 42 13 — METAL PARAPET PANELS" "10. Section 07 54 23 — PVC MEMBRANE ROOFING" 12. Section 07 00 02 Roofing and Flashing Filed Sub -Bid Requirements a. 1.1, C, 2: Delete "TPO" and insert "PVC MEMBRANE" before ROOFING 13. Section 07 2100 Thermal/Acoustic Insulation a. 1.2 Add the following: "D. Section 07 42 13 — METAL PARAPET PANELS" 14. Section 07 26 00 Vapor Retarders/Air Barriers a. 1.2, C. Delete "TPO" and insert "PVC MEMBRANE" before ROOFING b. 1.2, D. Delete "WALL" and insert "PARAPET' c. 2.2 Insert the following: E. Air Barrier: self-adhesive water -resistive and vapor permeable air barrier sheet by Delta, WR Meadows, Carlisle, or approved equal. Air Barrier product to meet or exceed Massachusetts Commercial Energy Code for Building Envelope Systems. 15. Section 07 42 13 Metal Parapet Panels a. 1.1, B, 7: Delete 7PO" and insert "PVC MEMBRANE" before ROOFING 16. Section 07 54 23 Thermoplastic Membrane Roofing a. Delete in its entirety and replace with attached "Section 07 53 23 PVC MEMBRANE ROOFING". 17. Section 08 14 16 Flush Wood Doors a. Page 2 Header: Delete "Newton" and insert "North Andover" ADDENDUM No. 1 09/09/2014 Page -4 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 18. Section 08 3613 Sectional Overhead Doors a. 2. 1, F: Delete "8" in its entirety. b. 2.1, F, 9: In the second line delete "Newton" and insert "North Andover" 19. Section 09 00 09 Painting Filed Sub -Bid Requirements a. 1. 1, D: After Architectural Drawings, Delete "ASP1.1"and insert "SPI. I" 20. Section 09 22 16 Non -Structural Metal Framing a. Page 2 Header: Delete "Newton" and insert "North Andover" b. Page 2 Footer: Delete "08 80 00-2" and insert "09 22 16-2" 21. Section 09 51 00 Acoustical Ceiling Systems a. 1.1 C: After Architectural Drawings, delete `x" after A2.1 b. Delete 2.1 C & D and insert the following: C. ACT #1 (lay -in panels throughout first and second floorACT ceilings except Kitchen 202 ceiling): Millennia Climaplus high -NRC ceiling panels by USG or approved equal Size: 2'x2'x3/4" thick with SL edge. Class A file NRC:. 70 Color: White D. ACT #2 (Lay -in washable panels in Kitchen 202 ceiling ONL1): Clean Room Climaplus perforated by USG or approved equal Size: 2'x2'x5/8" thick with square edge Class: Firecode NRC:.55 Color. White c. Insert the following after 2.2 E. 1. Grid to be DX/DWL, 15/16". White, by USG or approved equal 22. Section 09 68 10 Carpet Tile a. Footer: Delete "CARPETING" and insert "CARPET TILE" Delete "09 68 00" and insert "09 68 10". 23. Section 09 96 99 Water Vapor Emission Control Systems a. 1.2, A, 1: After Section 01 50 00 - delete "Construction Facilities and Temporary Controls" and insert "Temporary Facilities" 24. Section 11 30 00 Appliances a. Page 2 Header: Delete "Newton" and insert "North Andover" 25. Section 14 22 00 Compact Traction Elevator a. 1.4, F: Delete "09 68 00" and insert "09 68 10". 09/09/2014 ADDENDUM No. 1 Page -5 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 26. Section 2100 00 Fire Protection a. 2.6, A: In second line, delete "brass plate" and insert "chrome plate" 27. Section 23 05 48 Vibration Control and Seismic Restraint a. Insert below Vibration Control and Seismic Restraint the following: "(FILED SUB -BID REQUIRED AS PART OF SECTION 23 00 00) 28. Section 26 00 00 Electrical a. 2.24, C: Delete "Intrusion Alarm System" in its entirety. 29. Section 3120 00 Demolition and Site Clearing a. 1.2, A: Insert the following: "3. Remove existing trees noted to be removed on Drawings and clear completely all undergrowth in existing swale from Chickering Road property line to former emergency access road and from Prescott Street property line to just south of existing chain link fencing." 30. Section 23 00 00 — HVAC a. Paragraph 1.1 GENERAL PROVISIONS: Add the following sub -paragraph: G. Sub Sub -Bid Requirements: 1. Sub -bidders' attention is directed to Massachusetts General Laws, Chapter 149, Section 44F as amended which provides in part as follows: a. Each sub -bidder shall list in Paragraph E of the "form for Sub -bids" the name and bid price of each person, firm or corporation performing each class of work or part thereof for which (the Section of the specifications for that sub -trade) requires such listing; provided that, in the absence of a contrary provision in the Specifications, any sub -bidder may, without listing any bid price, list his/her own name in said paragraph E for any such class of work or part thereof and perform that work with persons on his/her own payroll; if such sub -bidder, after sub -bid openings, shows to the satisfaction of the awarding authority that s/he does customarily perform such class of work or the part thereof with persons on his/her own payroll and is qualified so to do. This Section of the Specifications requires that the following classes of work shall be listed in paragraph E under the conditions indicated herein. CLASSES OF WORK REFERENCE PARAGRAPH Insulation 2.6, 2.19, 3.5, 3.17 Sheet metal & Accessories 2.17, 2.18, 2.20, 2.21, 3.15, 3.16, 3.18, 3.19 Automatic Temperature Control 2.27, 3.25 Air & Water Balancing 3.26 31. Section 23 00 00 — HVAC a. Paragraph 1.24 ALTERNATES: Sub -paragraph B: Delete sub -paragraph in its entirety. 32. Section 23 00 00 — HVAC a. Paragraph 2.27 AUTOMATIC TEMPERATURE CONTROLS, sub -paragraph PA.a: ADDENDUM No. 1 09/09/2014 Page -6 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 Change sub -sub paragraph title to read as follows: "Web Based Operator Interface". 33. Section 23 00 00 — HVAC a. Paragraph 2.27 AUTOMATIC TEMPERATURE CONTROLS, sub -paragraph V: Delete and replace with the following: V. Manufacturers: The Automatic Temperature Control System shall be manufactured by one of the following: 1. Johnson Controls 2. Honeywell 3. Delta 4. Schneider 5. Siemens 6. Or equal 34. Section 23 00 00 — HVAC a. Part 3 —Execution: Add the following paragraph: 3.27 INSTALLATION OF ENERGY RECOVERY UNITS A. VIBRATION CONTROL AND SEISMIC RESTRAINT. Refer to section 230548 and drawing VS.1 & VS.2 for the appropriate support of each piece of HVAC equipment noted as requiring such. The vibration control and seismic restraint manufacturer shall recommend the correct connection and device as outlined in section 230548 and drawing VS.1 & VS. 2. B. General: Install units where indicated, in accordance with equipment manufacturer's published installation instructions, and with recognized industry practices, to ensure that units comply with requirements and serve intended purposes. C. Roof Curbs: Furnish roof curbs to roofing Installer for installation D. Coordination: Coordinate with other work, including ductwork, floor construction, and roof decking, and piping, as necessary to interface installation of units with other work. E. Access: Provide access space around units for service as indicated, but in no case less than that recommended by manufacturer. F. Electrical Wiring: Install electrical devices furnished by manufacturer but not specified to be factory -mounted. Furnish copy of manufacturer's wiring diagram submittal to Electrical Installer. 1. Verify that electrical wiring installation is in accordance with manufacturer's submittal and installation requirements of Division 26. Do not proceed with equipment start-up until wiring installation is acceptable to equipment Installer. G. Duct Connections: Provide ductwork, accessories, and flexible connections as indicated. H. Grounding: Provide positive equipment ground for unit components. 09/09/2014 ADDENDUM No. 1 Page -7 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 I. Testing: Upon completion of installation of units, start-up and operate equipment to demonstrate capability and compliance with requirements. Field correct malfunctioning units, than retest to demonstrate compliance. J. Provide one spare set of belts for each belt -driven unit, obtain receipt from Owner that belts have been received. PART 4 — BID SET DOCUMENTS 4.1 DESCRIPTION A. The following Drawings are revised as follows:: 1. Sheet C2.0: Add the following note and revised dimension: Poured concrete entry pad at Fire Station entrance — width to be revised to 13'-0" to align with canopy roof over. Refer to revised Sheet SPI. 1 for exact pad and control joint layout. Refer to SKC-1 for revised generator & hydrant locations and combined concrete pad. 2. Sheet C4.0: Add the following note: Refer to SKC-1 for revised generator & hydrant locations and combined concrete pad. 3. Sheet C5.0: Add the following note: Refer to SKC-1 for revised generator & hydrant locations and combined concrete pad. 4. Sheet SP1.1: Revise as follows: Replace sheet in its entirety with the attached. 5. Sheet A1.1: Revise Building Code Analysis as follows: Building Height & Area by Occupancy: change referenced section from 602.3 to 603.1 Construction Type: change referenced section from 602.3 to 603.1 Insert after Non-combustible: (Combustible nailing and furring strips allowed) 6. Sheet A2.1: Revise as follows: Incorporate revisions per SKA-9 7. Sheet A2.2: Revise as follows: Fitness Room 219: Extend 1 hour fire rating of shaft in NE corner along exterior wall. 8. Sheet A2.3: Revise as follows: Middle Roof — extend leader to gravity ventilator just west of walk -way pads. 9. Sheet A3.1: Revise as follows: Elevation Note #2 -replace with the following: 2. Refer to Sheet A7.1 for window dimensions and operation. Refer to Sheet A5.5 for window head, jamb & sill details. 10. Sheet A4.1: Revise as follows: Building Section #1: Insert Room Tag LOFT EMO STORAGE 221 at south end. ADDENDUM No. 1 09/09/2014 Page -8 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 11. Sheet A5.1: Revise as follows: Replace sheet in its entirety with the attached. 12. Sheet A5.2: Revise as follows Detail #2: Delete "tie -back" insert "fasten" Detail #3: Change thickness of horizontal joint in sheathing from 1/4" to 5/8" wide Details #1, #7, #8 and #9: Delete hat channels at tube steel columns. Wrap cold form framing around tube steel columns. Incorporate revisions per SKA-6 13. Sheet A5.3: Revise as follows: Replace sheet in its entirety with the attached. 14. Sheet A5.4: Revise as follows: Replace sheet in its entirety with the attached. 15. Sheet A5.5: Revise as follows: Incorporate revisions per SKA-7 16. Sheet A5.6: Revise as follows: Replace sheet in its entirety with the attached. 17. Sheet A6.4: Revise as follows: Elevator Section #s 5 & 6: Revise wall rating reference note from 1 to 2 hour 18. Sheet A7.1: Revise as follows: Replace sheet in its entirety with the attached. 19. Sheet A7.3: Revise as follows: Incorporate revisions per SKA-10 20. Sheet A8.1: Revise as follows: Incorporate revisions per SKA-1 and SKA-2 21. Sheet A8.2: Revise as follows: Incorporate revisions per SKA-3 and SKA-4 22. Sheet A9.1: Revise as follows: Incorporate revisions per SKA-5 23. Sheet A9.4: Revise as follows: Incorporate revisions per SKA-8 24. Sheet A9.3: Revise as follows: Incorporate revisions per SKA-5 09/09/2014 ADDENDUM No. 1 Page -9 1 T NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 25. Sheet S3.2: Revise as follows: Incorporate revisions per SKS-1 26. Sheet M1.03: HVAC - Roof Plan: Incorporate the clarifications and/or revisions on the following sketches: SKM-3 & SKM-4 27. Sheet M2.01 — HVAC - First Floor Piping Plan: Incorporate the clarifications and/or revisions on the following sketches: SKM-1 28. Sheet M2.02 — HVAC Second floor Piping Plan: Incorporate the clarifications and/or revisions on the following sketches: SKM-2. 29. Sheet M3.00 — HVAC — Schedules: Incorporate the clarifications and/or revisions on the following sketches: SKM-5. 30. Sheet M5.01 - HVAC - Control Diagrams I: Replace sheet in its entirety with the attached. Content on sheet has not changed. Sheet was reformatted to move text away from binding edge for readability. 31. Sheet E0.3 - Electrical Site Plan: Incorporate the clarifications and/or revisions on the following sketches: SKE-1. 32. Sheet E2.1 - First Floor Plan — Power: Incorporate the clarifications and/or revisions on the following sketches: SKE-2. 33. Sheet E2.3 - Roof Plan — Power: Incorporate the clarifications and/or revisions on the following sketches: SKE-2. 34. Sheet E3.3 - Mechanical & Plumbing Schedules: Incorporate the clarifications and/or revisions on the following sketches: SKE-3. END OF ADDENDUM NO. 1 ADDENDUM No. 1 09/09/2014 Page -10 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 Section 01 10 00 SUMMARY PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Project identification and Description of the Work of this Contract. 2. Type of the Contract. 3. Work under other contracts. 4. Products ordered in advance. 5. Owner -furnished products. 6. Use of premises. 7. Owner's occupancy requirements. 8. Work restrictions. 9. Specification formats and conventions. 10. Existing conditions. 11. Vehicular access and parking. 12. Duration of construction. B. Related Sections include the following: 1. Section 015000, TEMPORARY FACILITIES AND CONTROLS for limitations and procedures governing temporary use of Owner's facilities. 1.02 PROJECT IDENTIFICATION AND DESCRIPTION OF WORK OF THE CONTRACT A. Project Identification: The name of the Project on Contract Documents is the NORTH ANDOVER CENTRAL FIRE STATION, located in North Andover, Massachusetts. B. Description of Work of the Contract: The Town of North Andover, Massachusetts is proposing to construct a new 14,500 SF Fire Station. Refer to Drawings and Specifications for scope of work. The Central Fire Station is a new 14,500 SF steel frame building with brick veneer and cement fiber board siding. The building will include a public lobby, a training room, fire administration offices and a four bay apparatus room on the first floor. The second floor will include fire fighter's living quarters, a fitness room and storage. A two stop elevator will serve the two floors. The site work will include excavation and filling as called for, shown, and detailed on the Contract Documents, new paved driveways and parking for visitors, fire administration staff and fire fighters, concrete sidewalks and pads for new equipment as well as new drainage structures and infiltration structures. 1.03 TYPE OF CONTRACT A. Project will be constructed under a single prime contract. 1.04 OWNER -FURNISHED PRODUCTS A. Owner will furnish products indicated. The Work includes providing support systems to receive Owner's equipment and making plumbing, mechanical, and electrical connections. 1. Owner will arrange for and deliver Shop Drawings, Product Data, and Samples of Addendum No. 1 SUMMARY 09/09/2014 01 10 00 -1 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 Owner -Furnished Items to Contractor. 2. Owner will arrange and pay for delivery of Owner -furnished items according to Contractor's Construction Schedule. 3. After delivery, Owner will inspect delivered items for damage. Contractor shall be present for and assist in Owner's inspection. 4. If Owner -furnished items are damaged, defective, or missing, Owner will arrange for replacement. 5. Owner will arrange for manufacturer's field services and for delivery of copies of manufacturer's warranties to Contractor. 6. Owner will furnish Contractor the earliest possible delivery date for Owner -furnished products. Using Owner -furnished earliest possible delivery dates, Contractor shall designate delivery dates of Owner -furnished items in Contractor's Construction Schedule. 7. Contractor shall review Shop Drawings, Product Data, and Samples and return them to Architect noting discrepancies or anticipated problems in use of product. 8. Contractor is responsible for receiving, unloading, and handling Owner -furnished items at Project site. 9. Contractor is responsible for protecting Owner -furnished items from damage during storage and handling, including damage from exposure to the elements. 10. If Owner -furnished items are damaged as a result of Contractor's operations, Contractor shall repair or replace them. 11. Contractor shall install and otherwise incorporate Owner -furnished items into the Work. 12. Contractor shall install and otherwise incorporate Mechanical, Electrical, and Plumbing work to Owner -furnished items per manufacturer's specifications. B. List of Owner -Furnished Products: 1. Products within FF&E contract. 2. Landscaping and some Hardscaping. 1.05 WORK UNDER OTHER CONTRACTS A. General: Cooperate and coordinate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. General Contractor on this Contract shall be responsible for coordination. Coordinate the Work of this Contract with work performed under separate contracts. B. Owner will award separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract. 1. FF&E 2. IT and AV equipment installation. 3. Zetron public safety communication system 4. Communication equipment and installation 5. CATV equipment and installation C. Contractor shall install and otherwise incorporate Mechanical, Electrical, and Plumbing work to items installed under other Contracts per manufacturer's specifications. 1.06 OWNER'S OCCUPANCY REQUIREMENTS IN AREAS OF COMPLETED CONSTRUCTION A. Owner Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed areas of building, before Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work. SUMMARY Addendum No. 1 01 10 00 -2 09/09/2014 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied before Owner occupancy. 2. Obtain a Certificate of Occupancy from authorities having jurisdiction before Owner occupancy. 3. Before partial Owner occupancy, Owner may require that mechanical and electrical systems be fully operational, and required tests and inspections be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of building. 4. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of building. 5. All warranties shall commence on Date of Substantial Completion. 1.07 WORK RESTRICTIONS A. On -Site Work Hours: Work hour restrictions will be governed by the rules and regulations of the Town of North Andover, and include Noise Restrictions and Hours of Work. 1. Typical Work Hours: 7:00 AM to 5:00 PM, Monday through Friday and 8:00 AM to 5:00 PM Saturday. Unless coordinated with Owner, no overtime or premium time will be permitted without prior written authorization. 2. Construction Traffic. No vehicles may be parked or standing on Prescott Street . 3. All worker parking shall be on the site. B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated: 1. Notify Architect and Owner not less than two business days in advance of proposed utility interruptions. 2. Do not proceed with utility interruptions without Owner's written permission. 3. Refer to Coordination plan in Construction Documents. C. General Contractor Must be Present: No work, including work by any subcontractor shall occur on site without the presence of the Senior Supervisor or higher authority from the General Contractor. D. Advertisement Restrictions: No mention of the Owner's name or this Project shall be made in any advertising or articles in any publication relating to the Project without the prior approval of the copy and written permission of the Owner. All notices shall be in accordance with Owner's Nondisclosure Agreement, if applicable. 1.08 USE OF PREMISES A. The Owner will not occupy existing site during work of this Contract, but will occupy existing adjacent buildings at all times during construction operations. B. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Roadways, Driveways and Entrances: Keep Chickering Road and Prescott Street clear and available to the Public and emergency vehicles at all times. Do not use these areas for parking or storage of materials. C. SANITATION: Use special care in maintaining the Work areas free from food debris and food wrappers. Provide covered trash containers and be responsible for the sanitary collection and prompt removal of such trash in these containers from the site on a daily basis. Addendum No. 1 SUMMARY 09/09/2014 01 10 00 -3 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 D. FLAMMABLE LIQUID STORAGE: All flammable liquids and/or gas shall be stored and used in accordance with applicable State and Federal regulations. E. ALCOHOLIC BEVERAGES: Alcoholic beverages shall not be brought to or consumed on the premises. Intoxicated personnel will not be permitted on the premises. F. SECURITY: Contractors shall be responsible for security of their own materials from theft and vandalism. This includes the personal tools and materials of persons working for the Contractor and subcontractors, even when stored in the Owner's buildings. Contractors are responsible for video monitoring the project site as described in the Weston Security Standard Operating Procedure included in this specification. G. The Contractor shall be responsible for excluding all but authorized personnel from work sites. 1.09 JOB CONDITIONS A. Prior to doing any digging on Owner's property, the Contractor must ensure all underground services are properly located. Provide minimum 48 hour notice when requesting Owner personnel to locate Owner owned utilities. B. Job sites are to be maintained clean and free from trash and debris. Construction materials will be maintained neatly stacked and stored in designated areas. Do not store materials on lawns, in flower beds or under trees. 1.10 SPECIFICATION FORMATS AND CONVENTIONS A. Specification Format: The Specifications are organized into Divisions and Sections using the 2004 format CSI/CSC's "MasterFormat" numbering system. 1. Section Identification: The Specifications use Section numbers and titles to help cross- referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete because all available Section numbers are not used. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of Sections in the Contract Documents. 2. Division 1: Sections in Division 1 govern the execution of the Work of all Sections in the Specifications. B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates. Imperative mood and streamlined language are generally used in the Specifications. Requirements expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted. a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase. SUMMARY Addendum No. 1 01 10 00 -4 09/09/2014 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 1.11 PERSONNEL STANDARDS A. The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, age or national origin. B. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all applicants will receive consideration for employment without regard to race, color, religion, sex, age, or national origin; or that it is an "Equal Opportunity Employer". C. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated fairly during employment without regard to race, color, religion, sex, age or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment, or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. D. It is the Contractor's responsibility to ensure the security of the job site. The Owner will not be held liable for missing or damaged materials, tools or equipment. E. Project workforce shall be in compliance with the Massachusetts Criminal Offender Records Information (CORI) statutes. A CORI information form is attached at the end of this Section; this form shall be processed for each worker, and shall be submitted to allow time for processing of applications prior to persons working on site. A description of the Weston Standard Operating Procedure for CORI applications is included in this specification. 1.12 VEHICULAR ACCESS AND PARKING A. Access, Traffic Control, Parking: Limit site traffic to one access and egress point approved by the Owner, Architect, and authorities having jurisdiction to the greatest extent possible. Flaggers: Control traffic and provide flag persons at public ways to minimize damage to surrounding areas and danger to the public. Parking: Park only on site. Do not obstruct streets, public ways, driveways, or sidewalks. Comply with local ordinances and requirements of authorities having jurisdiction. Vehicle and Equipment Security: Lock all unattended vehicles including construction machinery and equipment. Never leave vehicles or equipment unattended with the motor running or keys easily accessible. Approval Required Outside Work Limits: Obtain the Owner's approval of Contractor's use of site areas outside the work limits. Approval Required Outside Property Lines: Obtain approval of authorities having jurisdiction for Contractor's use of all areas outside the Owner's property lines including on street parking and stopping. Emergency Vehicles: Do not obstruct emergency vehicles at any time. Maintain clear access to fire hydrants and other locations as directed by authorities having jurisdiction. Parking Tickets and Fines: The Contractor shall be responsible for all fines and tickets. Penalties, fines, and ticket expenses are not a valid "cost" of the work and will not be paid or reimbursed by the Owner under any circumstances. Police Details: Control traffic and provide police details as required by authorities having jurisdiction. This is not an "allowance" item or a "Change Order' item. The Contractor shall provide all police details required at no additional cost to the Owner. B. Trucking Routes: Prior to beginning any trucking, submit a proposal to the Owner and authorities having jurisdiction showing proposed trucking routes from the Project Site to major thoroughfares. Obtain approval from the Owner and authorities having jurisdiction. Require all trucks to strictly comply with the approved trucking route. Addendum No. 1 SUMMARY 09/09/2014 01 10 00 -5 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 C. Truck Traffic Hours: Schedule deliveries at non -peak traffic hours to the greatest extent practical. D. Truck Loads: Do not over load trucks and dumpsters. E. Truck Covers: Cover open trucks and dumpsters to control dust and debris. F. Truck Idling: Restrict and minimize the idling of truck engines. Comply with state law, local ordinances and requirements of authorities having jurisdiction. 1.13 DURATION OF CONSTRUCTION A. The duration of construction from date of Notice to Proceed to Substantial Completion is 300 calendar days. B. Liquidated Damages are described in Article 20 in the Town of North Andover's Supplement "C" to the Contract. END OF SECTION SUMMARY Addendum No. 1 01 10 00 -6 09/09/2014 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 SECTION 01 23 00 ALTERNATES PART 1 - GENERAL 1.1 SUMMARY A. For each of the alternates Scheduled at the end of this Section, state the amount in the proposal to be added to or deducted from the Contract Sum for the work. 1.2 ALTERNATES A. Definition: "Alternates" are alternate products, materials, equipment, systems, methods, units of work or major elements of the construction, which may, at the Owner's option and under the terms established by the Contract or Agreement, be selected for the work in lieu of the corresponding requirements of the Contract Documents. 1. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate the alternate into the Work. No other adjustments are made to the Contract Sum. B. Alternate Requirements: A Schedule of Alternates is included at the end of this Section. Each alternate is defined using abbreviated language, recognizing that the Contract Documents define the requirements. Coordinate related work to ensure that work affected by each alternate is complete and properly interfaced with work of each selected alternate. C. Provide written proposals for each alternate on the Form of Proposal for Owner's consideration. Each proposal amount shall include the entire cost of the alternate portion of the work including overhead, profit, and other costs including cost of interfacing and coordinating the alternate with related and adjacent work. D. Selection of Alternates: Selection of alternates to be included in the work will be by the Owner. E. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project. 1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate. F. Execute accepted alternates under the same conditions as other work of the Contract. G. Notification: Immediately following award of Contract, prepare and distribute to each entity a notification of status of each alternate. 1.3 DESCRIPTION OF ALTERNATES A. Add Alternate No. 1: Substitute a reinforced concrete, 4000 PSI, apron from the Chickering Road Apparatus Overhead doors to edge of Chickering Road in lieu of a bituminous concrete apron. Refer to sheet SP1.1 for plan and details for this Add Alternate, END OF SECTION Addendum No.1 ALTERNATES 09/09/2014 01 23 00 -1 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 Section 07 54 23 PVC MEMBRANE ROOFING (FILED SUB -BID REQUIRED AS PART OF SECTION 07 00 02) PART 1 - GENERAL 1.1 REFERENCES: A. General provisions of Contract, including General and Supplementary Conditions and Division I, General Requirements, apply to work specified in this Section. B. Sub -Bid requirements: as provided under Section 07 00 02 — Roofing and Flashing combined Filed Sub -Bid Requirements and supplemented under the Bidding requirements, Contact Forms, and Condition of the Contract, and applicable parts of Division 1 — GENERAL REQUIREMENTS. 1. Work of this Filed Sub -Bid includes all individual specification sections listed in Section 07 00 02. 1.2 WORK INCLUDED IN THIS SECTION A. Polyvinyl Chloride (PVC) roofing membrane adhered to mechanically attached roof insulation and accessories for a complete installation on Fire Station roofs, as shown on the Drawings and as specified below. Membranes referred to as reinforced membrane, reinforced roofing membrane, roofing membrane, or single ply membrane shall all mean the same roofing material specified in this section. B. Furnish and install all cover board, protection board, expansion joints and other roofing accessories as well as air and vapor barriers. 1.3 RELATED WORK SPECIFIED IN OTHER SECTIONS A. Section 04 20 00 — UNIT MASONRY B. Section 05 41 00 — EXTERIOR METAL STUD FRAMING C. Section 06 10 00 — ROUGH CARPENTRY D. Section 07 26 00 —VAPOR RETARDERS/AIR BARRIERS E. Section 07 42 13 — METAL PARAPET PANELS F. Section 07 62 06 — SHEET METAL FLASHING and TRIM G. Section 08 90 00 —ARCHITECTURAL LOUVERS and VENTS H. Divisions 21-27 — ROOF DRAINS, VENTS and MECHANICAL ITEMS. 1.4 SUBMITTALS A. Issue submittals in accordance with Section 01 33 00, Submittals. Submittals under this Section shall include: 1. Manufacturers' specifications and installation instructions on all specified products. 2. Samples of roofing membrane, mechanical fasteners, and insulation. Addendum No. 1 PVC MEMBRANE ROOFING 09/09/2014 07 54 23 -1 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 B. Shop drawings of entire roof system. Show layout, details, dimensions, locations And installation methods of all sheet roofing, insulation, metal flashings, flashing and specialty items as indicated on the Drawings. Do not commence fabrication of any work or begin installation until approval has been obtained from the Architect and the roofing manufacturer. C. Form of roofing manufacturer's warranty. 1.5 QUALITY ASSURANCE A. Refer to General Conditions and Division 1 general requirements for general provisions covering material delivery, storage, and installation, and product substitutions. B. Provide materials tested by UL or other nationally -recognized laboratory, for Class A fire - resistance rating. C. Materials and installation shall comply with applicable provisions of Factory Mutual Data Sheet series 1-28, 1-29, 1-30, and 1-47, 1-90 Windstorm Resistance Classification. D. If requested, assist Owner in preparation and submittal of roof installation acceptance certification, such as FM Form 800, required by Owner's insurance company. E. Unless shown otherwise on drawings, construction details shall conform to manufacturer's recommendations and to National Roofing Contractors Association " NRCA Construction Details" Guide. F. All flexible sheet membrane roofing and flashing material furnished and installed under this Section shall be the product of a single manufacturer, or shall be specifically approved for use with his materials by the manufacturer whose roofing specification is used. Materials shall be high grade, first quality of domestic USA manufacturer with an application history of ten (10) years in the United States. Furnish a written affidavit stating that these requirements have been complied with. G. Roofing and flashing shall be applied by a roofing applicator licensed, franchised or approved by the roofing materials manufacturer, using experienced skilled roofers. Furnish a written affidavit stating that the roof applicator is licensed. H. All roofing and flashing work shall be applied in strict accordance with the roofing manufacturer's written requirements and specifications applicable to roof conditions. There shall be no deviations made from this specification of the approved shop drawings without prior written approval by the manufacturer. I. Where additional work or materials, or greater quantities of materials than required by roofing manufacturer are specified herein, these Project Specifications shall govern. J. The completed roofing system shall exceed EPA Energy Star requirements K. Roof must be approved for ballasted P.V. installation loads. (approx. 15 lbs/SF) 1.6 DELIVERY, STORAGE AND HANDLING A. Do not install bent or otherwise damaged materials. 1.7 SEQUENCING AND SCHEDULING A. Coordinate the installation of flashings and sheet metal work with the various trades PVC MEMBRANE ROOFING Addendum No. 1 07 54 23 -2 09/09/2014 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 responsible for installing interfacing materials, and install the work at appropriate times so as not to delay the progress of related work. A. Provide executed copy of membrane roofing manufacturer's standard "no dollar limit" warranty, for entire roofing system, including flashing endorsement, directly from manufacturer to Owner, signed by authorized representative of manufacturer. Length of warranty period after Substantial Completion: 15 years. Also provide Manufacturer's 20 year membrane warranty. B. The Applicator shall supply the Owner with a separate five (5) year workmanship warranty. In the event that any work related to roofing, flashing or metal is found to be, within the Applicator warranty term, defective or otherwise not in accordance with the Contract Documents, the Applicator shall repair that defect at no cost to the owner. The Applicator's warranty obligation shall run directly to the Owner and a copy shall be sent to the roofing manufacturer. 1.9 EXTRA MATERIALS A. Provide sufficient quantity of each color finish coat material, for field touch-up work after erection, and pack the additional coating materials with the components to be furnished hereunder. B. Clearly label and package extra materials securely to prevent damage. PART 2 — PRODUCTS 2.1 ROOFING MATERIALS AND ACCESSORIES A. Assembly shall consist of a PVC (Polyvinyl Chloride) sheet membrane adhesive -bonded to cover board adhered to mechanically -fastened insulation and protection board. Acceptable products include: 1. SikaPlan 60 Adhered 2. Durolast 3. Flex 4. or Equal B. PVC (Polyvinyl Chloride) membrane: Per ASTM D 4434 (latest version). "Standard for Polyvinyl Chloride Sheet Roofing". Classification" Type Il, Grade I Thickness: 60 -mil (nominal) reinforced. Color: White C. Accessories: as supplied or recommended by roofing manufacturer, including sheet seaming system, tapered edge strips, sealants, tapes in seam sealant, membrane and roof drain flashing, protective mat or board, slip sheet, and expansion joint cover. D. Flashing at roof penetrations: I. Flash roof penetrations, interruptions, and intersections with sloped or vertical surfaces, using manufacturer's standard flashing in longest pieces possible. 2. Pre -fabricated conical pipe penetration accessory may also be used, including all required accessories including sealant, sealing mastic, fasteners, and clamping ring. 3. Where standard flashing cannot be used, such as at multiple pipe and conduit Addendum No. 1 PVC MEMBRANE ROOFING 09/09/2014 07 54 23 -3 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 penetrations, provide pre -fabricated pipe seals. Generally, seals shall consist of a flanged base, and stainless steel clamping ring, exact materials and configurations as required for type of roof and penetrations. Pitch pans specified in Division 7 metal roof flashing Section may be used only with Architect's permission Refer to architectural, plumbing, mechanical and electrical drawings for quantities and locations of roof penetrations. 2.2 INSULATION A. Material: Rigid polyisocyanurate board, faced on both sides with fiberglass -reinforced roofing felts. Minimum compressive strength of 20 psi. Acceptable manufacturers: as approved by membrane manufacturer for 15 year total system warranty. Provide a complete plan of insulation installation showing slopes and tapered insulation. Average insulation value over all slopes shall be R equal to 30 min. B. Where shown on drawings or otherwise required, provide tapered insulation boards, pre- formed crickets, and eave strips, of material matching or compatible with top layer of roof insulation. Where pitch to drainage outlet is not attained by sloping roof structure, provide minimum pitch of 1/8 in. per ft., with crickets pitching 1/4 in. per ft. C. Insulation fasteners: FMRC (Factory Mutual Research -Approved) shank or toggle -type to achieve secure attachment to or through substrate, galvanized steel, designed so as not to damage membrane. Provide matching washers, interlocked with fasteners, of large enough diameter to resist pull-through. Provide minimum'/ in. penetration at steel deck, I in. at other types of substrate. D. Insulation and mechanical fasteners shall be supplied or approved by roof membrane manufacturer. 2.3 VAPOR RETARDER/AIR BARRIER A. Membrane vapor barrier: Flexible self-sealing, self -healing, fully adhering composite flexible membrane consisting of .8 mm (32 mils) of self-adhesive rubberized asphalt integrally bonded to .2 mm (8 mils) of cross -laminated, high-density polyethylene film to provide a min. 1 mm (40 mil) thick membrane. Membrane shall be interleaved with silicone - coated release paper until installed. Provide membrane vapor barrier approved by manufacturer for warranty purposes and with manufacturer recommended surface conditioners and termination mastics. Air permeability: 0.004 CFM/ft2 1.57 PSF. Water vapor permeance: <0.05 perms (tested per ASTM E96 Method B). Chemical resistance: Alkalis and salt. Acceptable Products include: Sarnavap SA by Sika, Perm -A -Barrier Wall Flashing by Grace Construction Products, CCW -705 Carlisle Waterproofing, Air -Shield Thru-Wall Flashing W.R. Meadows. B. Air Barrier: self-adhesive water -resistive and vapor permeable air barrier sheet by Sika, Delta, WR Meadows, Carlisle, or approved equal. Air Barrier to be approved by manufacturer for warranty purposes. Air Barrier product to meet or exceed Massachusetts Commercial Energy Code for Building Envelope Systems. C. Seam Tape: High Density Polyethylene Tape or HDPE Tape as recommended by vapor barrier manufacturer, with pressure sensitive adhesive. Minimum width 4 inches. D. Pipe Boots: Construct pipe boots from vapor barrier material and pressure sensitive tape per manufacturer's instructions. PVC MEMBRANE ROOFING Addendum No. 1 07 54 23 -4 09/09/2014 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 E. Sealants: Provide sealants that comply with ASTM C920, elastomeric polymer sealant to maintain watertight conditions. F. Prime substrate when required by air barrier manufacturer or membrane manufacturer. The type of primer and the installation of the primer shall follow the requirements of the manufacturer for the surface conditions 2.4 RELATED MATERIALS A. Protective Mat: PVC protection layer or high density nonwoven polypropylene fabric. B. Walkway Pads: PVC molded Walkway Pads or walkway rolls as provided by the roofing membrane manufacturer... Molded Walkway material to have slip resistant surface Walkway material shall be approved by the membrane manufacturer and must be heat weldable to the membrane without voiding the membrane warranty. C. Rubber Pavers: Provide rubber pavers where shown on building roof. Provide the membrane manufacturer's roof pavers compatible with the specified membrane. Install 24" x 24" x 2" interlocking rubber roof pavers over the membrane. Provide Carlisle Sure -Seal Rubber Pavers or equal. Install the pavers over UV resistant, polypropylene fabric for use as an underlayment, unless recommended otherwise by the manufacturer. D. Cover Board: board to be high density polyi socyanu rate cover board, with a minimum 100 psi compressive strength by Carlisle, or approved equal. Board to be referred to as Cover Board on Drawings, and is shown between insulation and membrane roofing. Thickness to be'/" thickness. E. Protection/Recovery Board: ASTM C 1177/C 1177M, glass -mat, water resistant gypsum substrate. 1/2 inch (13 mm) thick. Basis -of -Design Product: Subject to compliance with requirements: provide Georgia- Pacific Gypsum LLC; DensDeck or comparable product by one of the following: CertainTeed Corporation, CertainTeed Corporation, Temple- Inland, Inc., USG Corporation. F. Adhesives: 1. Provide insulation adhesive for adhering cover board to rigid insulation. Use Sarnacol 2163, Olybond 500 by OMG, Millenium Weather-Tite , or approved equal. 2. Provide membrane adhesive for attachment of PVC to cover board. Use solvent based adhesive recommended by specific PVC membrane manufacturer. PART 3 — EXECUTION 3.1 JOB CONDITIONS A. Store materials on raised platforms or pallets, in temporary sheds or under light-colored opaque tarpaulins, well -secured from wind. Each day, verify that stored materials are clean and dry. Protect sheet materials from abrasion and puncturing. B. Store adhesives and sealants at 60 -to -80 degree F temperatures. Should these materials be exposed to lower temperatures, store at 60 -to -80 degrees for a minimum of 24 hours before use. C. Do not install any portion of roof assembly over wet substrate, in inclement weather, or when precipitation is forecast. Addendum No. 1 PVC MEMBRANE ROOFING 09/09/2014 07 54 23 -5 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 D. Protect substrate and installed materials from damage during roofing installation and subsequent operations such as installation of roof -top mechanical equipment, by proper selection and operation of materials -handling equipment, provision of plywood panels for temporary walkways, etc. 3.2 PREPARATION A. Before beginning installation, inspect existing conditions for unevenness, excessive corrosion, deteriorated decking, or other conditions which would prevent satisfactory installation of roofing system. B. Verify that structural roof openings have been provided as detailed, and that wood nailers, blocking, curbs, etc. have been properly installed and are suitable for installation of roofing system. C. Remove water, ice, dirt, debris, oil deposits etc., using appropriate cleaning methods. Install no roofing or insulation over wet or dirty substrates. Sweep off loose material immediately before beginning work. 3.3 ROOFING AND ROOF INSULATION INSTALLATION A. Install insulation with long joints continuous and end joints staggered. Limit joints between adjacent units to 1/4 in. maximum. Neatly cut and fit insulation around roof penetrations. B. Secure insulation to protection/recovery board to structural deck, in accordance with manufacturer's instructions and FM 1-28, including fastener placement diagrams for different types and sizes of insulation board. Provide a minimum of one fastener for every 2 sq. ft. of surface area. C. At completion of each day's work, provide temporary protection consisting of strip of roofing membrane, extending 6 in. onto deck and 6 in. over ends of exposed insulation, secured with adhesive. D. Membrane: 1. Over the properly installed and prepared substrate surface, solvent based adhesive shall be applied using solvent resistant W nap paint rollers. The adhesive shall be applied to the substrate at a rate according to the membrane manufacturer's requirements. The adhesive shall be applied in a smooth, even coating with no gaps, globs, puddles or similar inconsistencies. Only an area which can be completely covered in the same day's operations shall be coated with adhesive. The first layer of adhesive shall be allowed to dry completely prior to installing the membrane. 2. When the adhesive on the substrate is dry, the PVC roof membrane is unrolled. Adjacent sheets shall be overlapped three inches. Once in place, one half of the sheet's length shall be turned back and the underside shall be coated with solvent based adhesive at a rate of'/ gallon per 100 ft2. When the membrane adhesive has dried slightly to produce strings when touched with a dry finger, the coated material shall be rolled onto the previously coated substrate being careful to avoid wrinkles. Do not allow adhesive on the underside of the PVC membrane to dry completely. The amount of membrane that can be coated with adhesive before rolling into substrate will be determined by ambient temperature, humidity and crew. The bonded sheet shall be pressed firmly into place with water filled, foam covered lawn roller by frequent rolling in two directions. The remaining unbounded half of the sheet shall be folded back and the procedure repeated. Notes: a) The applicator shall count the amount of pails of adhesive used per area per PVC MEMBRANE ROOFING Addendum No. 1 07 54 23 -6 09/09/2014 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 day to verify conformance to the specified adhesive usage rate. b) No adhesive shall be applied in seam areas. All membrane shall be applied in the same manner 4. Hot air weld the PVC membrane sheets using the Automatic Hot Air Welding Machine. Use Hot Air Hand Welders for detail areas in accordance with the manufacturer's hot air welding procedures. E. Install roof penetration flashing as detailed on drawings and in accordance with manufacturer's recommendations. Extend base flashing up vertical surfaces 8 in. minimum and horizontally 4 in. minimum. Adhere to vertical surfaces with manufacturer's recommended adhesive and properly terminate. F. Splice flashing to main roof sheet before bonding to vertical surface. Seal splice at least 3 in. beyond fasteners attaching horizontal membrane. Take care that flashing does not bridge at transitions from horizontal to vertical. G. After joints have set up, test all spliced joints for continuity by running a screwdriver along joint. Re -splice as required. H. Temporarily seal loose edges of membrane at night or when inclement weather is threatening, to prevent water from flowing under completed portion of roof. Pull sheet free from sealing compound before continuing work. I. Do not use oil -base or plastic roofing cement in conjunction with elastomeric roofing material. J. Prime metal flashing as recommended by roofing manufacturer, and secure elastomeric sheet material to metal flashing and curbs with manufacturer's recommended adhesive. Overlap elastomeric over metal 4 in. minimum. K. Protective Mat: Install in accordance with Manufacturer's recommended specifications. L. Walkway Pads: Adhere to membrane with solvent based membrane adhesive in center of pad, or equal. Hot air weld edges. M. Immediately after completion, manufacturer's representative shall inspect and approve installed roof membrane. Manufacturer's representative shall issue written report and approval to Architect before substantial Completion. M. At job completion, clean adhesives from walls, ground surfaces, flashing, and accessories. Remove debris from roof surfaces. Provide three copies of manufacturer's maintenance and repair recommendations for elastomeric roofing. Deliver warranty specified under GENERAL. END OF SECTION Addendum No. 1 PVC MEMBRANE ROOFING 09/09/2014 07 54 23 -7 �FF y - W O SE6 s -';e € 3 �<u - Z-- tl9..�8tia K o„46ky`o oe8 � .o Z lz O 4aHbio i t Q6 p •1 Q 4 � x Q Po@ It. w 53 pe .27 p¢; Z w u~ Q 6`e Q Q za j ., eI Q O Q C�32° `�Y''.� 6"a5 .'4°S +xtwtnaeut»t �z 13381SllO)S321d € ° ' 3 :° rxtrux .ax a t mntxn xvxxtwers o c '�� :8 L19 h c: e i ° z ------_ - N a €q o y Y 8 %qa Q 820 71 1,' 5 g tC I `yl " Yo oz 03 F 0009 vas Goa; w�a'.ca�aa.wmx°+www N'dld 3115 SES60 34V SIV 0061 Ci9 G19 "a S9Z x�9 aa'LOtmd IIIZO VW uoim8 d e PN 4^40 aF'1 RaHb anuanV �afl 89 E MJfI :+agwnu t»I°+e 0 f J S .1. 3 3 .1, 1 H O ZI V Sb8L0 VW 'aanopuy 43JoN z o € d auaams a8 uauquoQ u011els aai� 1eaIuaD aanopuy y�oN �FF y - W O SE6 s -';e € 3 �<u - Z-- tl9..�8tia K o„46ky`o oe8 � .o Z lz O 4aHbio i t Q6 p •1 Q 4 � x Q Po@ It. w 53 pe .27 p¢; Z w u~ Q 6`e Q Q za j ., eI Q O Q C�32° `�Y''.� 6"a5 .'4°S +xtwtnaeut»t �z 13381SllO)S321d € ° ' 3 :° rxtrux .ax a t mntxn xvxxtwers o c '�� :8 L19 h c: e i ° z ------_ - N a €q o y Y 8 %qa Q 820 71 1,' 5 g tC I `yl " Yo oz 03 F 0009 vas Goa; w�a'.ca�aa.wmx°+www N'dld 3115 SES60 34V SIV 0061 Ci9 G19 "a S9Z x�9 aa'LOtmd IIIZO VW uoim8 d e PN 4^40 aF'1 RaHb anuanV �afl 89 E MJfI :+agwnu t»I°+e 0 f J S .1. 3 3 .1, 1 H O ZI V Sb8L0 VW 'aanopuy 43JoN z o € d auaams a8 uauquoQ u011els aai� 1eaIuaD 0009 9es Loz ww,(auo Wx q,�V SIItJ'134 21012131X3 SCS60 HIC MV 0061 CZb L19 S9Z ao .Ujot ' [11W VIV uolso9 889 T,dq-qJa UP M6 an V ---H 89 wc[ :i:gw���vp�a 9 p S I L 1 H Sb810 VW 'Janoputl 41JON a T /q y / 2A22MS 78 LLW72gUOQ UOIJEJS aal j JeJlUa:) J@AOpUy TPON & ggs i s § Q 58fY o3t'. :33��i144 ems:.. e = ` 0009 gas ioz w -x -"F ... W°r Sllb'13a a01a31X3 �� a ",to 34V x"11' .ti £Zt 419 . x°0 °IDOtN IIILO VIV �°l I a - dab M \ l Pll4�^4J'P1F°Ht OMDAV U—H 89 t9E1 �+M�nu lvryE ' � f �7 SI D H ,I. I H Q �V Sb8i0 VW 'aanopuV 41JON m0 s a Q 2U22MS 78 UILiIUOQ uoije;S aaij lea}uaD aanopuV PON 58fY o3t'. :33��i144 ems:.. e = ` I a - C W 0 uoijejS ajiA lejlu@D JaAOPUV PON 01A < 33ms W W?aquo(l LD Ns illuv o lu ®r, a F a Y .,q 5'i ig Z Vg4 0 4i 0 Q'pC K So "Sy yE 3 S `5 6 ljl U' �g.c4'b�gia S KC YF "`y H 0 soesa7e'ggW U ¢3 xb 8�3 3es"": G m.t3w3o� �€ she q $8� q Y a a �Y �`az s jyl a s Iy1=a+8w °gl ao 3 ;gig 9 g e p Li.. ` 8 I N i i + , i U ; di, Z F ,u�ood.0 E > 1.:! i o w w I I F Ff l ec $ 0 4ee$�g5'E5 o F E LLp Si`i "oaG `y`G9 SS Ye z > vagggA G'k. x �a g ����� � sod . j� . _ .°_. Et `aicE E x€.riga gz- EWR H i I 3 a - Q �0 5 s z „ o m w Egy22` 15 z @r — _ a Ege�39�Y3� op9 x i 04 Bax -�w t; - e < a " 0009 gas coz u,wca�,rM�xwor $ll`d134 doo2i sasro H/C Niv oorl szr tI9 qs S 9 i •MI -9IO tmd I I Ii0 tlIC uut,o0 94 4yo�0 'PUP aH p anua�tl uosymH 89 � V/ DOft �+agwnu x'µ0 9 E 0 S 1, DJ .I. 1 H D X d $b8T0 dW 'lanopuy 41JoN 2u22Ms 7� LLILL[UOQ u011e1$ aa{J JeaIuaD aanopuy y1 aoN s - a F a Y .,q 5'i ig Z Vg4 0 4i 0 Q'pC K So "Sy yE 3 S `5 6 ljl U' �g.c4'b�gia S KC YF "`y H 0 soesa7e'ggW U ¢3 xb 8�3 3es"": G m.t3w3o� �€ she q $8� q Y a a �Y �`az s jyl a s Iy1=a+8w °gl ao 3 ;gig 9 g e p Li.. ` 8 I N i i + , i U ; di, Z F ,u�ood.0 E > 1.:! i o w w I I F Ff l ec $ 0 4ee$�g5'E5 o F E LLp Si`i "oaG `y`G9 SS Ye z > vagggA G'k. x �a g ����� � sod . j� . _ .°_. Et `aicE E x€.riga gz- EWR H i I 3 a - Q �0 5 s z „ o m w Egy22` 15 z @r — _ a Ege�39�Y3� op9 x i 04 Bax -�w t; - e < a " 0009 gas coz u,wca�,rM�xwor $ll`d134 doo2i sasro H/C Niv oorl szr tI9 qs S 9 i •MI -9IO tmd I I Ii0 tlIC uut,o0 94 4yo�0 'PUP aH p anua�tl uosymH 89 � V/ DOft �+agwnu x'µ0 9 E 0 S 1, DJ .I. 1 H D X d $b8T0 dW 'lanopuy 41JoN 2u22Ms 7� LLILL[UOQ u011e1$ aa{J JeaIuaD aanopuy y1 0009 9es tot u,�Ra"a.mwuw,wwor scsbo aw Mtl oorl ae n9 SINE(] 18 31f1a3HDS 9NIN3d0'8 2!00499Z as 1111111'1''1'11■1111111111111111■■111■ xog wap Isod I I IZA tl1Y uolsog 1111111111111111'i E 1� 999999999999999■99999■9999199994■99991 0 P8 w'^4�aI'!I. r^aHb .—v uosweH 89 S St D H.I. IH D� V oN 9969199999999999', v0El :ngwnu uvp,a Sb8i0 VW 'Janopuy PON "f z 111101111111111■9091111111111111■■119■ 910000000010010■1111111111111111■■111■ uoije;S P aaid lea}ua� aanopuy yRig. 1111111111111119 1111010010100001... 2LI22MS 1y LUE[�AOQ ® erg a�� 1100091090999999 H Yo§ � o .� ■ u t 999919999999999�9999999919999999■■999® Hffi P "J. oo"� ^ R W uj ® 9999999999999999 "�g�' "� g8OH W C) gaudy ";ag ■ (93GE 111111111111111®IIIIIIIIIIIIIIII■■III® z 0 tS$s mg �G�£_ IIIIIIIIIIIIIIII o�8au5 O 't3aa am;�8w §a RHO P O Z > O w A 0 O i Q4 O +rtto.v ae 6660600006909909 �� O €€2 Y 0 a O Q a 0 Z Z ® - DD DO s = W y o b ❑ DD o ° a © LL 9999999999999999 e u DEJ lw c ..n u.. rc �` 110608880000006®1110009111@10111®®901® �� 0 o 9900000000060600 ® 919999999999999�9999999999999999��999� IIIIIIIIIIIIIIla1911111111111111■■111■ d� 999999999991999 111111111111111 ® W J a�.ae O z �3 Z� Z 0- 0 0 �8 8�e i2 saesa 1111111'1''1'11■1111111111111111■■111■ 1111111111111111'i 1� 999999999999999■99999■9999199994■99991 oN 9969199999999999', 1111111'1''1'11■1111111111111111■■111■ 1111111111111111'i 1� 999999999999999■99999■9999199994■99991 9969199999999999', 111101111111111■9091111111111111■■119■ 910000000010010■1111111111111111■■111■ 1111111111111119 1111010010100001... ® 1199119999199991991119111111111■■999 1100091090999999 ■ 999919999999999�9999999919999999■■999® 9999999999999999 ■ 111111111111111®IIIIIIIIIIIIIIII■■III® IIIIIIIIIIIIIIII 110090990968860®8880008111111118■■996® 6660600006909909 ® 1199999999999901119119111111111■■910 9999999999999999 ® 110608880000006®1110009111@10111®®901® 9900000000060600 ® 919999999999999�9999999999999999��999� IIIIIIIIIIIIIIla1911111111111111■■111■ 999999999991999 111111111111111 ® 1 §� g .....__.----..__....._._ . gg gin IF d0 g Z �$ B�� @ 5 - II d �� g ill e Y� a rz 6 1161 gdggggggggiggi 4a3 gyg 0009 985 Qoz m%�a�o, o-: i swea9dia IoalNoD - DenH 115.311 vltl 0061 LZb L19 S 9 Z x°e myOlsvd 0 vvSs umsog w O N4yv4J aP!1 PoHb avwntl 71 89 � ,• f ppE{ :�agwiw nabn S .1, I H D 'd V 548L0 eW 'JanoPuV PON� k L(1 auaams VuzeuuoQ �; u011e1s aaiJ lealuaD J anopuy y�oN mar auaamspuewequop. OOb l £ Z b L 19 u.,71od.,.w„ m 0101-684L19 q0£T ❑agwnu hafad IIIN vw uolsog ou£Zn vw vRI+o,u.<Id mz. M -R 11"Its o-Ilw M c� E anuany uosweH 8 9 S.j. ,j, I }; �J+7T�Fi�t'.�ja�c�a7h�,oJT SgBTO tlW '�anoPW 4LoN uoijejS aii j �ealu@D aanopuy HIJON bT'80'60 :panssi J�Jd :Aqume�p i (� O c Y N v XBII22MS�UIPI[UOQ J1C1V lOQ • ,OZ ..T :aleos Ln V a v�G / ..•� /a5 JPg. ,,,. ��EOG� JG�� �,w S`�',�`5';`•- _.doe "% .r.4'l / Gyf i �0� '" s t GG \ Q (7Dx ' -� co Q �G % rho � � • � d U � • `//��� k 28.3. U�' O� Nud r 5fi 126 c� 35, y'. .6 �\ fV p °t" '` 16.5' C, \ 1 OCO \N �d 2 2 Jl �ri: tl O r—. A � t U e a� °sem W\ y .- I_ 717 T 4tN120 5U:3' -r o 3W � odM3 �� "V IMM -I v+ � N•O j iD c c °` W m N U 2! LL y Z O 00 '""' O • v+ V V WIN b-', r- i{ ' I o6 N ,0 Ln 0 z W � c6 N v I 0 N a s r------� W 00 '+� + Q o O Q a N ,. z Lc c j U „U a u 0 < v 0 t/) Z o Z z Q O F O z 02 to •• C 6 cu (1) 08 W m �omN H N v3 �3 ,x Q N a W � C !/1 'C (/� a a SKA-2 scale: -0„ North Andover Central Fire Station Donham & Sweeney drawn by:y: DI DI ARCHITECTS A8.1 issued: 09.09.14 North Andover, MA 01845 68 Harrison Avenue Boston MA 02111 Addendum 1 project number: 1304 donhamandsweeney com SECOND FLOOR RCP - 1/A8.2 1/8" = 1'-0" &Sweeney North Andover Central scale: iI10 drawn by:s DI SKA-3 ARCHITECTS ARC 68 Harrison Avenue Station issued: 09.09.14 A8.2 111 Boston MA 02Fire 6 1 7 423 1 4 0 0 donhamandsweeney.com North Andover, MA 01845 project number: 1304 Addendum 1 woo' auaaMsPUL'WU llOp bOET :jaqw nu �oafad 0041 £z4 L19 11lzo VI^ uolsog It E anuany uosu�eH 89 i S .I. 0 11 I H D X d 54810 tlW'Janopuy PON U01jejS aJl j JeJjU@D JaAOpUV PON 4T'60'60 :panssi laz/TTU.aeas Q N V) ¢ a auoomS7�TALquo(l „0-,i o�c I w m ¢ 3c3w zG`LL' N �" 2�LL zto 00 LL V N Q = \NN 1- EO I w V - z z a aa V V w� wm z z .12 z y _j guu a moo z azo "Ga �LLxm z � ¢ z z z N m 1p U z w �o . LL r0 �z w z a N V 00 z z ��z Q zLL� Vv�f z LU U F- Y K w z z V c VFy�w O>az- Z isFw-j15 � Z u N =VOZ wwZ� H "'� tj LU N T. V• V J iazm5 m »JW U �"I v aZZ 3 ^ wWQ w V - z z a aa V V w� wm z z .12 z y _j guu a moo z azo "Ga �LLxm z � ¢ z z z N m 1p U z w �o . LL r0 �z w z a N V 00 z z ��z Q zLL� Vv�f z LU U F- Y K w z z V Luoxfouam,spumuquop b0£T :jagwnu pafojd _________—____ 0 0 b I £ Z b L 19 I IIIZO vw uolsog ri anuany uosuaeH 89 Q S .I. D I .I. I H D 2I d Sb8T0'.' "opuy yUoN uOIJeJS @Ai IeaIua� Janopuy 41JON bT' [a : :panssiumeip Q N Q a 2LI2aMSTUMLIUOQ „0-,T „b/I:a s r -I Q M ►- O N rH I O N LU -D:0 ai Q N _________—____ H I 0 O t I ►- O N rH I O N LU -D:0 ai Q N O ti H I 0 O / 0 O z om z Q O ti 7 Harrison Avenue Boston MA 02111 T.O. UPPER PARAPET 0 194' - 4" .m. REBAR, TYP. , . : A !1: PRECAST DOWEL PIN ANCHOR,SETIN GROUT 11/2" .. - DRIP EDGE MTL. FLASHING TERMINATION BAR PRECAST COPING CAP'' WD. BLOCKING MASONRYANCHOR, ATTACH TO MTL. ___-------.'.: ,- �.. ., URETHANE SPRAY INSULATION FRAMING, SPACED @ 16"V x 24"H MAX, - --'. - r.- 1/2" SHEATHING BOARD TYP.- SEE SPECIFICATIONS - - _ I . WD. CANT STRIP MEMBRANE ROOFING - I COVER BOARD RIGID INSULATION BRICK VENEER MINERALWOOL INSULATION AIR CAVITY AIR &VAPOR BARRIER - _ AIR BARRIER, WRAPAROUND PROVIDE 5/8" HORIL JOINT IN ; �' - - ;. INSULATION & CONTINUE FOR 2' EXT. SHEATHING TO ALLOW - t. FOR EXPANSION. INSTALL --{ BACKER ROD, & LAP AIR & VAPOR BARRIER OVER.(TYP.)_... ..... ..... __ --------------- _ROOF U.O.D. V 3 5/85 �1. - 0 5/8" TYP. SECTION DETAIL @ P ECAST COPING CAP - 5 A5.2 3" =1'-0" SKA-6 scale: 3'�-'`°" drawn North Andover Central Fire Station Donham&Sweeney by: TM ARCHITECTS Q5.2 issued: 09.09.14 North Andover, MA 01845 68 Harrison Avenue Boston MA 02111 Addendum 1 project number: 1304 617 423 1400 donhamandsweeney.corn HORIZONTAL FCB SIDING MINERAL WOOL INSULATION LAP AVB OVER FLEXIBLE HEAD FLASHING STARTER STRIP THROUGH WALL FLASHING FCB TRIM 3/4" COX PLYWOOD BACKER ROD & SEALANT, TYP, FCB TRIM BEYOND AWNING WINDOW UNIT -1/A5.5 3" =1'-0" VNERCHANNEL CKING VCHOR , TYP. %SHNG TO LAP AD FLASHING NOTE: SEE 1/A5.1 FOR ADDITIONAL TYP. FOUNDATION DETAILS/ NOTES ALUM. STOREFRONT SYSTEM scadrawn le: by: : TMD" North Andover Central Fire Station DOTlI11113&sweeney BACKER ROD & SEALANT TM WD. SHIM EXTERIOR SYNTHETIC issued: 09.09.14 North Andover, MA 01845 FINISH FLOOR MATERIAL, SEE PLAN', RUBBER SEALANT UNDERSLAB AIR & VAPOR BARRIER, AVB, WRAP DOWN WALL & OVER LAP ONTO TOP OF FOUNDATION FOUND. WATERPROOFING - TERMINATE project number: 1304 WALL & BASE LAYER OF LIQUID @ VERT. SURFACE, BY MASON. APPLIED WATERPROOFING RIGID INSULATION CONCRETE SLAB, SEE STRUCT. BASE LAYER & SECOND LAYER OF CONC. FOUNDATION WALL, LIQUID APPLIED WATERPROOFING SEE STRUCr. FIRST FLOOR .. -165' e ... - 0" 6• 1 ,a " n ra 8 p". a . I-III—III III -III -III II -III -III III r _ I . _ 'I SILL DETAIL @ STOREFRONT- 10/A5.5 3" = 1'-0" SKA-7 scadrawn le: by: : TMD" North Andover Central Fire Station DOTlI11113&sweeney TM ARCHITECTS A5.5 issued: 09.09.14 North Andover, MA 01845 68 Harrison Avenue Boston MA 02111 Addendum 1 project number: 1304 617 423 1400 donhamandsweeney.com CONT. 2 X WD. BLOCKING, BY GC SIDESPLASH @ WALL RETURNS, TYP. SEALANT 1/4" COVE COUNTERTOP SUPPORT, (1) LAYER 3/4" PLYWOOD 3/4" MELAMINE ADJ. SHELF ON MTL. STANDARDS, PROVIDE (1) PER CABINET DOOR HINGE W/ SOFT CLOSE FFEATURE, 110 DEG. SWING MELAMINE INTERIOR 3" CEILING, SEE RCP 3/4" P.LAM. DOOR W/ SQ. EDGE PAN ELS 3/4" P. LAM. ADJ. SHELF ON MTL. STANDARDS, PROVIDE (2) PER CABINET WIRE DOOR HANDLE SOLID SURFACE COUNTERTOP & BACKSPLASH W/ SQUARE EDGE INTERNAL CABINET FRAME DRAWER BOX W/ FULL EXTENSION SLIDES & SOFT CLOSE FEATURE. NO DRAWER @ CABINET UNDER SINK WIRE DRAWER HANDLE 3/4" P.LAM. DOOR W/ SQ. EDGE PANELS FINISHED EDGES @ ALL EXPOSED PANELS, TYP. BASE AS SCHEDULED TYP. KITCHEN COUNTER - UPPER/LOWER CABINETS - 1/A9.4 3/4" =1'-0" Dunham&SweeneyNorth Andover Central scale: 3/4" ARCHITECTS TMV-0"SKA-8 drawn by::TM 68 Harrison Avenue Fire Station issued: 09.09.14 A9.4 Boston MA 02111 6 1 7 423 1 4 0 0 donhamandsweeney.com North Andover, MA 01845 project number: 1304 Addendum 1 N Ic - op du /0 •o° r I cc 00 N '^ Q W O N a O .0 �* \ U m z 4-1 O , W W- . m U O r %�� � o 0 r p m / y Q 'W Al Q , PIT 8 -W ..tp £ ,9- W m 3 LL I a N _ U / /Alla I LU um Q JU I Z Q /1J^ .�•�• m N K Oco O O J O LL IN 'DLL WZz $ O O Icr d mQ > U j .1 J - Ln In]>- Lu ami m Q LL O 0000 IQV u0 .E .-� ' II < m .L -,M 00 \ = 2, I• I� L c ' O I I• l0 ' co n V '�- �-- 'n y o 0 z / u ' z n W LL 1 w ' /� w I 1.10- ,6 U. t Q v o Zo rn .. o c v v 3 v u N N 'O E QC / Q Q CLW � N M U c Cd o o M Q d' I LU J m 0 Lf) a--+ W 4-J co LJ m O LL J ro +-' z o a� U L o > � 0 0 m a J LL Z O o Q N �boco J O O Q w o m z0 �LL Q v w LU 4 J O E p a 0 N L c c D a LLI YO O u � m a C ii ` Z a Q M a Q n of m a v 3 v m � MN V J Q Q WALL SYSTEM (SEE ARCH) — CONT H.D. GALV L4x4x3/8 T/STL EL 1784" (VERIFY W/ARC STL ROOF DECK (SEE PLAN) i PL's 1/4x31/2x0 -8" SHOP WELDED TO THEIR RESPECTIVE STL ANGLES W/ (2)-3/4"0 A325 BOLTS FOR ADJUSTMENT SPACE A T 4'-0" 0. C., MAX. W BEAM (SEE PLAN) 9 1-05/8" 8" BACK OF R.A. 3" F. 0. L8x4 0 N 1/4 � / —<I CONT L8x4x7/16 LLV W/L3x3x1/4 FOR ROOF DECK SUPPORT WELDED ASSEMBLY CONC SLAB ON STEEL DECK (SEE PLAN) T/SLAB EL 777 L (SEE PLAN) SECTION 5 3/4"=1=0" S1.2 1/41 12-8 Donham &SweeneyNorth Andover C e n t ra I scale: 3/4" = -0" drawn by: SKS-1 ARCHITECTS MSK 68 Harrison Avenue Fire Station issued: 09.09.14 S3.2 Boston MA 02111 6 17 423 1 4 0 0 donhamandsweeney.com North Andover MA 01845 project number: 3287 Addendum 1 GARCIA-GALUSKA• DESOUSA CONSULTING ENGINEERS INC. 370 Faunce Corner Road, Dartmouth, MA 02747-1271 508-998-5700 • FAX508-998-0883 • E-MA1Lmfo@g-g-d.com Donham &SweeneyNorth A n d ove r Ce nt ra I scale: 1/8" = 1�-0-- drawn by: S K M -1 ARCHITECTS TRB 68 Harrison Avenue North Andover, Ma 01845 Fire Station issued: 09.09.14 M2.01 Boston MA 02111 6 1 7 423 1 4 0 0 donhamandsweeney.com project number: 1304 Addendum 1 8 A \ � I RL & RS LINES UP & --_- DN. SIZED PER —i MANUFACTURER'S -RECOMMENDATIONS.-- { i T..I rl—l_I Ir - GARCIA-GALUSKA•DESOUSA CONSULTING ENGINEERS INC. 370 Faunce Corner Road, Dartmouth, MA 02747-1271 "k 508-998-5700 • FAX508-998-0883 • E-MAILinfo(a)q-q-d.00m Donham &SweeneyNorth Andover Central scale: 1/8" = 1,-0-' drawn by: S K M- 2 ARCHITECTS TRB 6 8 Harrison Avenue North Andover, Ma 01845 Fire Station issued: 09.09.14 M2.02 Boston MA 02111 6 1 7 423 1 4 0 0 donhamandsweeney.com project number: 1304 Addendum 1 a GARCIA•GALUSKA•DESOUSA CONSULTING ENGINEERS INC. .„ 370 Faunce Corner Road, Dartmouth, MA 02747-1271 508-998-5700 • FAX508-998-0883 • E-MAILinfo@g-g-d.com &Sweeney North Andover Central scale: =1�o drawn by: SKM-3 ARC ARCHITECTS y: TRB 68 Harrison Avenue North Andover, Ma 01845 Fire Station issued: 09.09.14 M1.03 Boston MA 02111 6 1 7 423 1 4 0 0 donhamandsweene com Project number: 1304 Addendum 1 T 9 ELEVATOR PENTHOUSE BY G.C. REFER TO ELEVATOR SHAT DETAIL ON DW M3.02� 1 9 A.5 GARCIA•GALUSKA•DESOUSA CONSULTING ENGINEERS INC. .. 370 Faunce Corner Road, Dartmouth, MA 02747-1271 "K 508-998-5700 • FAX508-998-0883 • E-MAILinfo@g-g-d.com &Sweeney North AdCentral nover scale: =1�o drawn by: SKM-4 ARCHITECTS ARC TRB 6 8 Harrison Avenue North Andover, Ma 01845 Fire Station issued: 09.09.14 M1.03 Boston MA 02111 6 1 7 423 1 4 0 0 donhamandsweeney.com Project number: 1304 Addendum 1 o}/m�e_ R! s, menuw OnUD/ vw ® ¥ 9e 9 Sl3HIIHD#Y _,m' _ _. u OI EJS a� ] |e]!u QD ]AAO P uV H O N x , _»:E m G _� . q r a mST ui yo ©� .ONu;� 6 d no � Sn d � \\ / k §LU( ` �(B *fib LU co �\§m °2 LU 8 ui U. B�§§§ IL �k§w i� >s§kk ~�)» n kk�0§- LU l CO tz LU 0 a. 2 :, a. Q� ��2 0 (1) a 2IL Lu !]% 2;k;g kk§ �( m /m)§§ § §2 § Z`a§§ ■ O d#P, 2>s��k 2 §_ O § §\ 2 U L) U) z72, 0m oz(/) LU )°p� U LUZ§ .� �a�W§a. D o Sa. URu§§§ § 0 IL u0 ( 9y$a uE®o§ )§\� b 2§�0 ' au }� 2mkO §§! rG�; K K)-iL k �,V)LL PROTECTIVE; BOLLARDS BY GENERAL CONTRACTOR (TYPICAL) SEE 8 I, E0.4 /IAPB#1 LP -1 SL1/4L \ I 5 \ ....... E0.4 I I \ ! T C _� I I I — I ' E 4 D IC C / E0.4 D I /V 3 A / A / E0.4 I / 1 I / E0.4 � GENERATOR I� 1I=1.1 EMH SEE 1 E( SEE NOTE #7 _.._...... ---------- PAD ---- PAD MOUNTED TRANSFOF REFER TO 3 EMERGENCY STANDBY GENERATOR DETAIL E0.5 K 4 SEE E0.5 & E0.5 GARCIA•GALUSKA•DESOUSA 17 CONSULTING ENGINEERS INC. ._—. 370 Faunce Corner Road, Dartmouth, MA 02747-1271 ` 508-998-5700 • FAX508-998-0883 • E-MAILinfo@g-g-d.com &Sweeney over North AndCentral scale: = drawn by: SKE-1 ARC ARCHITECTS MB : MB 6 8 Hamson Avenue North Andover, MA 01845 Fire Station issued: 09.09.2014 E0.3 Boston MA 02111 6 1 7 423 1 4 0 0 project number: 1304donhamandsweeney.com Addendum 1 IIS EF CU F77� SKE-2 ROOF LEVEL - POWER PLAN SCALE: 1/8" = V-0" ....... ..... 2 SKE-2 FIRST FLOOR PLAN - POWER ��E-2 SCALE: 1/8" = V-0" GARCIA-GALUSKA-DESOUSA CONSULTING ENGINEERS INC. 370 Faunce Corner Road, Dartmouth, MA 02747-1271 508-998-5700 - FAX508-998-0883 - E-MAII-info@g-g-d.com Donham & SweeneyNort h Andover Central scale: 1/8" = -0" V drawn by: SKE-2 ARCHITECTS MB 68 Harrison Avenue North Andover, MA 01845 Fire Station issued: 09.09.2014 E2.1 & E2.3 Boston MA 02111 617 423 1400 donhamandsweeney.com project number: 1304 Addendum 1 SCHEDULE OF UNIT NO. DESCRIPTION LOAD CHARACTERISTICS VOLT PH PANEL CIRCUIT CIRCUIT BREAKER F 0D WP OO DCUc-1 SPLIT SYS. AC COND. - 208 1 MP1-74,76 30A/2P 3#1C DCUe-1 SPLIT SYS. AC EVAP. - 208 1 MP1-78,80 30A/2P 3#1C project number: 1304 Addendum 1 OF MECHANICAL EQUIPMENT FEEDER EQUIPMENT AND CONNCECTIONS TS SS ® M Ell E� — 0D WP OO J Q'SWP NEMA 3R MF DI 617 423 1400 donhamandsweeney.com project number: 1304 Addendum 1 3#10 & 1#10G - 3/4"C - - - - XI X - - X - - - 3#10 & 1#10G - 3/4"C - - - - X X - - X - - - C NEMA 3R VFD REMARKS MECHANICAL SCHEDULE NOTES: 13 PROVIDE 3/4" CONDUIT w/ PULL WIRE BETWEEN INDOOR EVAPORATOR UNIT & EXTERIOR CONDENSER UNIT FOR CONTROLS. �.,)GARCIA•GALUSKA•DESOUSA CONSULTING ENGINEERS INC. 370 Faunce Corner Road, Dartmouth, MA 02747-1271 508-998-5700 • FAX508-998-0883 • E-MA1L1nfo@g-g-d.com DSweeney North Andover Central scale: drawn by: SKE-3 ARCHIRCHI TECTS MB 68 Harrison Avenue North Andover, MA 01845 Fire Station issued: 09.09.2014 E3.3 Boston MA 02111 617 423 1400 donhamandsweeney.com project number: 1304 Addendum 1