HomeMy WebLinkAboutContract #: 012128 - From: To: - Exception - ExceptionNORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 ADDENDUM No. 3 25 September, 2014 PART 1 —GENERAL 1.1 DESCRIPTION A. This addendum shall supplement, amend and become part of the bid documents. Bid Documents are the Contract Documents, Drawings and Specifications, for the North Andover Central Fire Station dated August 28, 2014. All bids and the construction contract shall be based on these modifications. 1.2 PROCEDURES A. The attention of bidders submitting proposals for the above subject project is called to the following addendum to the specifications and drawings. The items set forth herein, whether of omission, addition, substitution, or clarifications are all to be included in and form a part of the proposal submitted. B. THE NUMBER OF THIS ADDENDUM (3) MUST BE ENTERED IN THE APPROPRIATE SPACE "B" PROVIDED AFTER THE WORD "NUMBERS" OF THE CONTRACT FORM ENTITLED "FORM FOR GENERAL BID," AND IN SPACE "B" OF THE "FORM FOR SUB - BID." 1.3 RELATED WORK A. All work shall comply with requirements specified for similar work unless otherwise described. 1.4 THIS ADDENDUM CONTAINS A. Direction to General Contractors submitting a bid. B. Filed Sub -Bid - BID TABULATIONS PART 2 — DIRECTION TO GENERAL CONTRACTORS 2.1 DIVISION 14 — CONVEYING SYSTEMS A. Division 14, Section 14 22 00 COMPACT TRACTION ELEVATOR, shall become part of the General Contractor's scope of work. 2.2. DIVISION 23 A. Division 23 00 00, HEATING VENTILATING AND AIR CONDITIONING, will be re -bid. Each General Contractor submitting a bid shall carry $565,000.00 in their bid for Division 23 00 00. The general contract amount shall be adjusted via change order after the Re -Bid results have been submitted subsequent to awarding the General Contractor the bid for construction. 1. Division 23 00 00, HEATING VENTILATING AND AIR CONDITIONING, Re -Bid documents will be available via BidDocs ONLINE after eight o'clock AM 8 October 2014 at www.BIDDocsonline.com (may be viewed electronically and hardcopy requested) or from Nashoba Blue, Inc. 2. Division 23 00 00, HEATING VENTILATING AND AIR CONDITIONING, will be received until two o'clock PM on 22 October 2014 electronically submitted on-line and publicly opened on-line, forthwith. 09/25/2014 ADDENDUM No.3 Page -1 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 PART 3 — FILED SUB -BID TABULATION RESULTS 3.1 DESCRIPTION A. The following sheets contain the Bid Tabulation for the Field Sub -Bidders: END OF ADDENDUM NO. 3 ADDENDUM No. 3 09/25/2014 Page -2 SUB -BID RESULTS Town of North Andover Central Fire Station [BDO #1772] Estimated cost: $5,900,000.00 04 20 00 Masonry Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Fabrications Official Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: G.V.W., Inc. $176,000.00 1: $0.00 G.V.W., Inc 1200 Bennington Street i East Boston, MA 02128 i Northern Contracting Corp. $230,000.00 1: $0.00 Northern Contracting 68 Jackson Street Corp. j Canton, MA 02021 I Marmelo Bros. Construction $261,000.00 1: $0.00 Co., Inc. 13 Ventura Drive i North Dartmouth, MA 02747 Cenedella Masonry Inc. $274,441.00 1: $0.00 TLT i 19 East Walnut Street Milford, MA 01757 L.A.L. Masonry, Inc. $294,000.00 1: $0.00 390 Lincoln Avenue Saugus, MA 01906 i Lighthouse Masonry, Inc. $294,000.00 1: $0.00 150 John Vertente Blvd New Bedford, MA 02745 Fernandes Masonry, Inc. $304,000.00 1: $0.00 1031 Phillips Rd. New Bedford , MA 02745 _ Costa Brothers Masonry ........ I $317,000.00 - - — 1: $0.00 ..._........ - - ---...... _...... ............. 2 Lambeth Park Drive Fairhaven, MA 02719 Dependable Masonry $320,000.00 1: $0.00 73 Concord Street j North Reading, MA 01864 05 50 00 Metal Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Fabrications Official Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: V&G Ironworks,lnc. $118,367.00 1: $0.00 1500 shawsheen street i tewksbury, MA 01876 j United Steel, Inc. $158,000.00 1: $0.00 164 School St. East Hartford, CT 06108 I Quinn Brothers of Essex, $163,000.00 1: $0.00 Waterproofing and Seaver Construction, Inc. Sealants Inc. 239 Western Avenue Alternates Bid Restricted to: Bidders Excluded from Essex, MA 01929 using this bid: G.V.W., Inc. Larkin Iron Works Inc. $178,400.00 1: $0.00 PJ Gear and Sons 9 B St. East Boston, MA 02128 Hyde Park, MA 02136 Folan Waterproofing & EDM Construction $192,500.00 1: $0.00 Construction Co., Inc. 125 East Main Street 795 Washington Street Merrimac, MA 01860 South Easton, MA 02375 SMJ Metal Company $194,000.00 1: $0.00 P.J. Spillane Co., Inc. 36 Smith Street 1: $0.00 TILT Construction 97 Tileston Street Northampton, MA 01060 Everett, MA 02149 Village Forge, Inc. $222,000.00 1: $0.00 DeBrino Caulking 51 Industrial Drive 1: $3,965.00 Associates, Inc. Readville, MA 02137 1304 Route 9 07 00 01 Dampproofing, Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Waterproofing and Official Sealants Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: G.V.W., Inc. $36,000.00 1: $0.00 G.V.W., Inc. 1200 Bennington Street East Boston, MA 02128 Folan Waterproofing & $46,800.00 1: $4,860.00 Construction Co., Inc. 795 Washington Street South Easton, MA 02375 P.J. Spillane Co., Inc. $47,690.00 1: $0.00 TILT Construction 97 Tileston Street Everett, MA 02149 DeBrino Caulking $49,925.00 1: $3,965.00 Associates, Inc. 1304 Route 9 Castleton, NY 12173 - - ACME WATERPROOFING -...._. ............. $52,710.00 . _..._......... _......... .. 1: $0.00 CO. INC 21 NIGHTINGALE AVENUE QUINCY , MA 02169 Chapman Waterproofing $79,100.00 1: $1,140.00 TLT and G & R 395 Columbia Rd. Construction Boston, MA 02125 Northern Contracting Corp. $80,000.00 1: $0.00 Northern Contracting 68 Jackson Street Corp. Canton, MA 02021 07 00 02 Roofing and Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Flashing Official Bidder j Base Bid Alternates Bid Restricted to: Bidders Excluded from Alternates Bid Restricted to: Bidders Excluded from using this bid: Capeway Roofing Systems, $134,600.00 1: $0.00 _.......... . ....... _......_.. 1: $0.00 G.V.W., Inc. Inc. 1200 Bennington Street i 664 Sanford Road 1 j I i Westport, MA 02790 42 Eastman Street Stanley Roofing Company, $157,300.00 1: $0.00 Seaver Construction I Inc. Kapiloffs Glass Inc. $36,628.00 1: $0.00 j 42 Mitchell Road Adams, MA 01220 1 _ __.. ...... — Ipswich, MA 01938 ----.......... _ .. _ _ .:.:. - - - ------------ ------- j Rockwell Roofing, Inc. $170,800.00 1: $0.00 44 Pond Street i Leominster, MA 01453 ......... ... _...... _ -.. ........ Belcour Corp $213,600.00 ...... 1: $0.00 _.._. _... ... ... _. Builders Systems 1 99 Front Street Woonsocket, RI 02895 Silktown Roofing, Inc. $233,600.00 1: $0.00 27 Pleasant St. Manchester, CT 06040 08 4413 Alum. Storefront, Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Doors and Windows ; Official Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from — .......... using this bid: - _. G.V.W., Inc. $25,000.00 _.......... . ....... _......_.. 1: $0.00 G.V.W., Inc. 1200 Bennington Street i East Boston, MA 02128 j Modern Glass & Aluminum $33,948.00 1: $0.00 42 Eastman Street Easton, MA 02375 Kapiloffs Glass Inc. $36,628.00 1: $0.00 5 Hoosac Street Adams, MA 01220 1 _ __.. ...... — - ----.......... _ .. _ _ .:.:. - - - ------------ ------- 08 80 00 Glass and Glazing Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Official Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: G.V Inc. $10,000.00 1: $0.00 G.V.W., Inc. ' 1200 Bennington Street East Boston, MA 02128 j Kapiloffs Glass Inc. i $14,300.00 1: $0.00 5 Hoosac Street Adams, MA 01220 Modern Glass & Aluminum $15,848.00 1: $0.00 42 Eastman Street Easton, MA 02375 _1.......... -- ----- .. ... ----- - - .......... -- - 09 00 06 Resilient Flooring Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: i Official Bidder i Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: G.V.W., Inc. $20,000.00 1: $0.00 G.V.W., Inc. 1200 Bennington Street East Boston, MA 02128 West Floor Covering, Inc $28,896.00 1: $0.00 42 Winter Street, Suite 11 $66,329.00 1: $0.00 Pembroke, MA 02359 Capital Carpet & Flooring $32,612.00 1: $0.00 TLT Construction, Specialists, Inc $69,690.00 1: $0.00 CJM Services, 12 Walnut Hill Park Callahan Inc., Woburn, MA 01801 Lambrian bouchard painting inc $71,200.00 1: $0.00 Construction, GVW one corporate park drive #5 Inc, Endicott 03038, NH 03038 Constructors, i Northeast Interiors, G.V.W., Inc. $72,500.00 1: $0.00 G.V.W., Inc. MCM, USA, LLC., – --.._._-- ... _._-- _ ---------------- --- ._... PDS Engineering CJM Services, Inc. i $33,300.00 1: $0.00 GVW, Inc. box 424, 50 Kerry Place $73,480.00 1: $0.00 Norwood, MA 02062 j 09 00 09 Painting Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: i Official i Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: JM's Painting Corp $63,600.00 1: $0.00 22 Washington Street Dedham, MA 02026 ....... ..... ........ ..--- _ — ............. -- ... ...... ...... __. Homer Contracting Inc. $66,329.00 1: $0.00 195 Broadway Arlington, MA 02474 King Painting Inc $69,690.00 1: $0.00 85 Flagship Dr North Andover, MA 01845 bouchard painting inc $71,200.00 1: $0.00 one corporate park drive #5 03038, NH 03038 G.V.W., Inc. $72,500.00 1: $0.00 G.V.W., Inc. 1200 Bennington Street East Boston, MA 02128 j Dandis Contracting $73,480.00 1: $0.00 1020 Turnpike St Unit 12 Canton, MA 02021 Alpha Contracting $76,000.00 1: $0.00 Associates, Inc. 20 Mulberry Lane I Dedham, MA 02026 .......... _ -....- .. ............. _ ............- Sub Bid Date: Tuesday, September 23, 2014 02:00 PM ----- SUB BID STATUS: and Porcelain Sub Bid Date: Tuesday, September 23, 2014 02:00 PM I Keltic Painting $79,700.00 1: $0.00 Alternates Bid Restricted to: 189 Hill Road Alternates Bid Restricted to: Bidders Excluded from Thompson, CT 06277 CJM Services, Inc. $20,604.00 1: $0.00 K&K Acoustical Ceilings, Inc. Bello Painting Co Inc $81,900.00 1: $0.00 TILT Construction 1881 Main St #7 585 East St i Norwood, MA 02062 j Tewksbury, MA 01876 Weymouth, MA, MA 02189 I G.V.W., Inc. 0 Byrne Painting and $82,400.00 1: $2,000.00 1: $0.00 G.V.W., Inc. Contracting Inc. 1200 Bennington Street 21 Old Farm Road i East Boston, MA 02128 Wayland, MA 01778 _ .. -..--- -.... $42,698.00 1: $0.00 Drizos Contracting, LLC $92,666.00 1: $0.00 101 Middlesex Turnpike Ste 12 Walnut Hill Park 6 #353 3 Woburn, MA 01801 Burlington, MA 01803 _..- - Fox Painting Co., Inc. .............. _-- _.. $195,000.00 ................. - - _ 1: $0.00 PO Box 630 Arlington, MA 02476 _....... -- ..... ------ ---...... ----..-..-...... ---- ......... -- . -- ...... ...... --- ..-... - ----_. _ 09 30 00 Tiling, Ceramic i .......... _ -....- .. ............. _ ............- Sub Bid Date: Tuesday, September 23, 2014 02:00 PM ----- SUB BID STATUS: and Porcelain Sub Bid Date: Tuesday, September 23, 2014 02:00 PM Official Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from Alternates Bid Restricted to: Bidders Excluded from using this bid: CJM Services, Inc. $20,604.00 1: $0.00 K&K Acoustical Ceilings, Inc. GVW, Inc. box 424, 50 Kerry Place TILT Construction 1881 Main St #7 i Norwood, MA 02062 j Tewksbury, MA 01876 I G.V.W., Inc. $23,000.00 G.V.W., Inc. $36,000.00 1: $0.00 G.V.W., Inc. 1200 Bennington Street i East Boston, MA 02128 Capital Carpet & Flooring $42,698.00 1: $0.00 TILT Constr, CJM Specialists, Inc Services, Callahan, 12 Walnut Hill Park Inc., Lambrian 3 Woburn, MA 01801 Constr., GVW Inc., Endicott Constructors, Northeast Interiors, MCM, USA, LLC, PDS _....... -- ..... ------ ---...... ----..-..-...... ---- ......... -- . -- ...... ...... --- ..-... - ----_. Engineering West Floor Covering, Inc $48,577.00 1: $0.00 i 42 Winter Street, Suite 11 Pembroke, MA 02359 - --- .... _........ ---- 09 5100 Acoustical Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Ceilings Official Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: K&K Acoustical Ceilings, Inc. $21,879.00 1: $0.00 TILT Construction 1881 Main St #7 j Tewksbury, MA 01876 I G.V.W., Inc. $23,000.00 1: $0.00 G.V.W., Inc. 1200 Bennington Street Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: �- ....--........._ East Boston, MA 02128 Bidder I Base Bid Alternates Bid Restricted to: Acoustek, Inc $27,150.00 1: $0.00 20 Ventura DRIVE Rustic Fire Protection $79,250.00 1: $0.00 i Dartmouth, MA 02747 320 West Main Street The Cheviot Corporation $27,640.00 1: $0.00 55 Fourth Ave Carlysle Engineering, Inc. $81,800.00 1: $0.00 Needham, MA 02494 ; j $341,650.00 1: $0.00 Central Ceilings, Inc. i $28,900.00 1: $0.00 G&R Construction, 36 Norfolk Avenue Cogswell Sprinkler Co., Inc. i $84,321.00 1: $0.00 Inc. South Easton, MA 02375 22 Canterbury Street i 14 22 00 Compact Traction Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Elevator Canceled - See Addendum 21 00 00 Fire Protection i Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: �- ....--........._ Official Bidder I Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: Rustic Fire Protection $79,250.00 1: $0.00 320 West Main Street Norton, MA 02766 Carlysle Engineering, Inc. $81,800.00 1: $0.00 132 Brookside Ave. $341,650.00 1: $0.00 i Jamaica Plain, MA 02130 Cogswell Sprinkler Co., Inc. i $84,321.00 1: $0.00 22 Canterbury Street i Worcester, MA 01610 $368,000.00 1: $0.00 Xcel Fire Protection, Inc. $104,479.00 1: $0.00 11A Industrial Way Salem, NH 03079 22 00 00 Plumbing Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: �- ....--........._ Official - Bidder ............ ......._ Base Bid __._ Alternates ......... Bid Restricted to: Bidders Excluded from using this bid: Kneeland Plumbing & $340,400.00 1: $0.00 Heating, Inc. 63 Hammond Street Rowley, MA 01969 Araujo Bros. Plumbing,lnc. $341,650.00 1: $0.00 PO Box 50225 New Bedford, MA 02743 Robert W. Irvine & Sons, $368,000.00 1: $0.00 Inc. 147 Blossom Street Lynn, MA 01902 26 00 00 Electrical Sub Bid Date: Tuesday, September 23, 2014 02:00 PM SUB BID STATUS: Official Bidder Base Bid Alternates Bid Restricted to: Bidders Excluded from using this bid: Jupiter Electric, Inc. $516,900.00 1: $0.00 Suffolk Construction 142 B Lafayette Road Salisbury, MA 01952 Brothers Electrical $545,900.00 1: $0.00 Corporation 18 Graf Road Unit 31 Newburyport, MA 01950 Annese Electrical Services, $546,600.00 1: $0.00 I Inc. 280 Libbey Industrial Parkway Weymouth, MA 02189 Wayne J. Griffin Electric, Inc. $589,050.00 ............. .. 1: $0.00 -_ _ ......— -- -� 116 Hopping Brook Road Holliston, MA 01746 Systems Contracting Inc. $596,750.00 1: $0.00 7 Scobee Circle Plymouth, MA 02360 1 Richard T. Losordo Electrical $613,960.00 1: $0.00 Svc Inc 244 Liberty St -Unit 8A Brockton, MA 02301 Mercier Electric & $677,342.00 1: $0.00 i Communications, Inc. 1929 Lakeview Avenue Dracut, MA 01826 —------.------- -- Dagle Electrical Construction ................ . _ - _ $884,884.00 _ ..... 1: $0.00 — -- ................ .- Dagle Electrical Corp Construction Corp 285 Salem Street Woburn, MA 01801 y NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 ADDENDUM No. 4 26 September, 2014 PART 1 —GENERAL 1.1 DESCRIPTION A. This addendum shall supplement, amend and become part of the bid documents. Bid Documents are the Contract Documents, Drawings and Specifications, for the North Andover Central Fire Station dated August 28, 2014. All bids and the construction contract shall be based on these modifications. 1.2 PROCEDURES A. The attention of bidders submitting proposals for the above subject project is called to the following addendum to the specifications and drawings. The items set forth herein, whether of omission, addition, substitution, or clarifications are all to be included in and form a part of the proposal submitted. B. THE NUMBER OF THIS ADDENDUM (4) MUST BE ENTERED IN THE APPROPRIATE SPACE "B" PROVIDED AFTER THE WORD "NUMBERS" OF THE CONTRACT FORM ENTITLED "FORM FOR GENERAL BID," AND IN SPACE "B" OF THE "FORM FOR SUB - BID." 1.3 RELATED WORK A. All work shall comply with requirements specified for similar work unless otherwise described. 1.4 THIS ADDENDUM CONTAINS A. Revisions to the: 1. Answers to Contractor's Questions 2. Project Manual, dated 08/28/2014 (Specifications) 3. Bid Set Documents, dated 08/28/2014 (Construction Drawings) 4. Addenda No.1, 2 & 3 Documents B. Publications listed below form a part of the Specifications and Construction Documents to the extent referenced. 1. Revised Specification Sections None issued as part of Addendum No. 4 2. Revised Drawing Sheet (attached) a. Sheet SPLA 3. Sketches (attached) a. SKC-4 b. SKS-3 PART 2 — ANSWERS TO CONTRACTORS' QUESTIONS 2.1 DESCRIPTION 09/26/2014 ADDENDUM No.4 Page -1 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 A. Bidder Question: Are the drain manhole structures (DMH) water quality structures (indicated on legend on sheet C5.0) or standard drain manholes as detailed on sheet C6.0? There is a significant price difference. Response: The DMH structures shown on C5.0 are the standard manhole structures detailed on Sheet 6.0. B. Bidder Question: Please confirm that video-taping all sewer/water/drain systems is a requirement for this project. Response: Water lines shall be pressure tested per Specification Sections 33 11 16. Sewer and Drain lines shall be low pressure air tested and vacuum tested per Specification Section 33 05 00. C. Bidder Question: Drawing C7.0 has a detail for "Grass Ring Pavers". The plan view doesn't indicate any requirement for this work. Please confirm there is no requirement for grass ring pavers. Response: The Grass Ring Pavers detail on Sheet C7.0 was deleted in Addendum No. 2, Item 4.1, 3. D. Bidder Question: The bottom of Infiltration Area No. 3 is at elev. 159.25. The system requires approx. 6.5ft in height (8" peastone, 18" crushed stone, 4'-2" h Diffusers and 3" peastone on top) plus 16" of pavement and gravel. Based on these requirements and the proposed finish grade of 164, the bottom of the infiltration system must be at elev. 156.17. Please confirm if this is correct. Response: Elevation 159.25 is the B.O.G., or Bottom of Galleys, which is a minimum of 4.75 feet below the proposed ground surface. The elevations listed on Sheet C5.0 are correct. E. Bidder Question: Drawing C5.0 and E0.3 indicate 2 concrete light pole bases located within Infiltration system #3. Based on detail 6/E0.4, the concrete bases require an in ground depth of 6ft and will penetrate the diffusers. Please review and advise. Response: The light poles have been relocated to outside of the Infiltration structure #3. Refer to revised SPI. 1, issued as part of this Addendum, which references revisions to C2.0, C4.0, C5.0 and E0.3. F. Bidder Question: Please provide a detail(s) for the site concrete pads (Dumpster and hydrant) showing reinforcing and thickness of concrete. Response. Refer to revised SPI. 1, issued as part of this Addendum, details on Sheet C7.0 and revision to Specification Section 35 05 00, Item 6 in this Addendum. G. Bidder Question: Drawing C3.0 requires the removal of unsuitable soils below the footprint of the building, under pavement and other structures and refers to spec section 0310 00 - Earthwork. There is only 4 boring and 3 test pits provided which is insufficient information to accurately determine the volume of unsuitable soils to be removed and replaced. Furthermore, spec section 31 10 00-1.3 para C.2 implies that the Engineer will determine the depth of soil to be removed and para C.3 refers to a unit rate. Given that there is no unit rate schedule and the quantity is unknown, our suggestion is to provide a quantity of ADDENDUM No. 4 09/26/2014 Page -2 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 unsuitable soils that must be carried in the base bid with a unit cost for adjustments. Please consider this method. Response: All bidders shall carry in their base bid the removal of 2,935 cubic yards, removal to an approximate depth of 2.13' below existing grade, of unsuitable soils in the area designated on Sheet C3.0. H. Bidder Question: The bottom of Infiltration Area No. 2 is at elev. 158.35, The system requires approx. 6.5ft in height (8" peastone, 18" crushed stone, 4'-2" h Diffusers and 3" peastone on top) plus 16" of pavement and gravel. This puts the finish grade at approx. elev. 164.85. There are finish grades in this area below elev. 164. Please review and advise. Response: Elevation 158.35 is the B. 0. G., or Bottom of Galleys, which is a minimum of 5.25 feet below the proposed ground surface. The elevations listed on Sheet C5.0 are correct. I. Bidder Question: Drawing C3.0 indicates removal of the existing pavement to the southerly property line. Drawing C5.0 indicates a 12ft wide path from the property line to the apparatus apron. Does this require new asphalt pavement and subbase? Response: Yes. Refer to SKC-4 for clarification for removal scope, bituminous and base, as well as new base and new bituminous pavement scope. J. Drawing SP1.1 indicates CCB on each side of the apparatus apron and drawing C2.0 indicates VGC. Are we to assume drawing C2.0 is correct since there is an alternate for a concrete apron and VGC is more applicable if the alternate is accepted? Response: Curbing on south and north edges of Apparatus apron shall be VGC. Refer to revised SPI. 1, included as part of this Addendum. K. Bidder Question: The quantity and size of steel bollards at the transformer and generator concrete pads vary from the civil and electrical sheets. Response: Refer to revised SPI. 1, issued as part of this Addendum, for layout of galvanized concrete filled bollards at equipment and dumpster concrete pads. SPI. 1 bollard layout at pads shall supersede bollard layout on civil and electrical sheets. L. Bidder Question: The size per detail on sheet C8.0 is 8" dia x 8'-0" h and on sheet E0.4 the size is 6" dia x 9'-0". Please review and advise which quantity and sizes are required for this project. Response: Bollards shall be 6 inch diameter and 8 feet high. (Reference revisions to sheet C2., Part 4, 4. 1, 1, A.) M. Bidder Question: Is Cl 56 DI water pipe required in North Andover? Response: Yes, class 56 ductile iron water pipe to be used per Sheet C4.0. N. Bidder Question: Drawing C7.0 details grass pavers but we cannot find it on the plans. Please clarify. 09/26/2014 ADDENDUM No.4 Page -3 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 Response: The Grass Ring Pavers detail on Sheet C7.0 was deleted in Addendum No. 2, Item 4.1, 3. 0. Bidder Question: Drawing C5.0 calls out drain pipe as SDR 17. Is that correct or should it be SDR 35 or HDPE? Response: SDR -17 is thick walled HDPE Pipe and is required by the Town of North Andover for drain pipes. P. Bidder Question: Drawing C3.0 states "remove existing unsuitable.... new building." To what elevation is existing material to be removed? To what distance from the foundation is this removal to occur? Response: All bidders shall carry in their base bid the removal of 2,935 cubic yards, removal to an approximate depth of 2.13' below existing grade, of unsuitable soils in the area designated on Sheet C3.0. The building foundation is within the designated area shown on Sheet C3.0. Q. Is the concrete encasement for electrical ductbanks required below the slab on grade within the building footprint or does it stop at the foundation wall? Response: Concrete encasement of ductbanks is not required below the building slab. (Within the building footprint) R. Wood spec. Par 2.1 E calls for grilles (louvers?) in doors 209 & 220 and then in Par 3.1 mentions "aluminum grilles". Door manufacturers provide either matching wood louvers or metal louvers (not aluminum). Should we exclude the louvers as by others? Responses: Section 08 14 16, 2. 1, H, 4 states louvers for non -label doors shall be same species as face finish. Louvers to be clear finish maple. Refer to revisions to Sections 08 14 16 & 08 90 00 below. (Part 3, 3. 1, A, 4 & 5 below) S. Wood spec Par 2.1 H1 specifies all doors to be painted but then mentions to match Section 06200 for natural wood finish which is maple. Door schedule indicates "clear" finish. Are we to exclude the reference to painted doors? Response: Wood veneer doors to receive "clear" finish as noted in Door Schedule on Sheet A7.1. T. Many doors are shown in openings with either fire -rated partition types or are shown with the "dotted lines" per the Ration Partition Legend but are not indicated on the door schedule to be rated (ex, 128, 118A, 107, 127, etc). Should we qualify that we are rating doors per the door schedule only? Response: Door 128 has a 45 min. rating. Refer to revision to Sheet A7.1, Door Schedule. (Part 4, 4.1, 8) U. What supports the interior masonry wall on line 6 (which stays on line 6) at the area the stud wall recesses back to door 127. The wall is approx. 8ft AFF. See section 3 on sheet A4.1. This is an approx. 12'-6" span. Response: Provide a L6x4x5/8 painted galvanized loose lintel to support 4" CMU veneer over recess in wall. Provide 4'x8" bearing area each end of angle. " Refer to SKS-3. V. The door head and jamb details on the door schedule sheet A7.1 seem to be mislabeled. Please review and revise these numbers to match the wall condition. Response: Refer to revision to Sheet 7. 1, DOOR SCHEDULE, below. ADDENDUM No. 4 09/26/2014 Page -4 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 (Reference Part 4, 4.1A, 8) W. The quantity and size of steel bollards at the transformer and generator concrete pads vary from the civil and electrical sheets. On sheet SP1.1 there are a total of 4 bollards and on sheet E0.4 there are 21. The size per detail on sheet C8.0 is 8" dia x 8'-0" h and on sheet E0.4 the size is 6" dia x 9'-0". Please review and advise which quantity and sizes are required for this project. Response: Refer to revised Sheet SPI. 1, included in this Addendum, for location and quantity of bollards at the transformer and generator concrete pads. The diameter of the galvanized steel bollard pipe, Sheet C8.0 Detail, has been revised to 6 inches per this Addendum. (Reference Part 4, 4. 1, A, 1) X. Spec Section 23 00 00 -HVAC para 1.2413 indicates that there is an alternate #2 "Radiant heating in the Apparatus bay concrete Floor. Spec Section 0123 13 — Pricing Alternates only mentions Alternate #1 — Concrete Apparatus Apron. Please review and confirm there is only 1 alternate required. Response: Please refer to Addendum #1, Part 2, 2. 1, F. Y. Sheet A7.1 shows an Ext Alum Louver L1. There are no L1 Louvers shown on the exterior elevations. Are any louvers required? Also, please confirm that the penthouse louvers and dampers are provided by the HVAC contractor as indicated on sheet A5.6. Response: Reference revised Sheet A 7.1 in Addendum No. 1. Refer to revisions to Sheets A3.1, A5.6, and A6.4 below. (Part 4, 4. 1, A, 5, 6 & 7), Penthouse Elevator Vent is owned per Specification Section 08 90 00. Refer to Sheet M3.02 for HVAC components. Z. Addendum #2 revised sheet A7.1 interior opening schedule to include window type Al the schedule notes hollow metal but the details on sheet A7.3 calls for the frame to be aluminum, and sheet A7.1 type Al also notes it to be aluminum interior window elevation. Response: Interior Windows, Type A1, are Aluminum. Refer to revisions to Sheet 7. 1, Interior Opening Schedule. (Part 4, 4. 1, A, 8 below) AA. Addendum #2 states you can use poly VB on the exterior wall construction. This poly will get perforated at every masonry tie and wood stud attachment location. Is that your intent? Response: Addendum No. 2 does not state that. The exterior wall assembly requires an Air & Vapor Barrier. A 6 mill poly sheet is not an A&V Barrier and therefore it cannot be used. BB. Are steel bollards (Civil dwgs) or metal corner guards (Arch dwgs, 2,3/A4.3) required at the overhead door openings? Response: Yes. Both are required at all overhead door openings as per Section 05 50 00 1, 1, C, items 6 & 7. Reference Sheets A3.1 & A5.3 details for painted galvanized angles at Overhead Door Jambs. Refer to revisions to Sheet C2.0 for bollards. (Reference Part 4, 4. 1, A, 1 below) CC. Is 2" rigid insulation required beneath exterior concrete slabs (incl alternate #1) as shown on sections 2 & 4/A4.2 and 2 & 3/A4.3? Response: No. The underslab insulation shown in these sections is below the interior slab only, and not the exterior slab. DD. Who is responsible for installing the owner furnished items? Response: Reference Specification Section 0164 00, 3. 1, A -C. 09/26/2014 ADDENDUM No.4 Page -5 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 replacement, except as otherwise noted, shall match as closely as possible those employed in existing work." e. PART 1: Insert the following: "I. 7ADA AND MAAB COMPLIANCE A. Special attention is to be given to compliance with Americans with Disabilities Act (ADA) and the requirements of the Massachusetts Architectural Access Board (MAAB). 1. Slopes: All walkways as defined by the section 22.1 of 521 CMR shall be graded to a maximum 4.5%. The cross pitch (perpendicular to travel) for all walkways and paths shall be constructed at 1.5%. The slope of all ramps and side slopes on handicap curb cuts as defined by section 2 1. 1 of 521 CMR shall be constructed at 7% maximum. Ramps as defined in section 24.1 of 521 CMR shall be constructed to a maximum slope of 7%. 2. The Contractor is to assume that all sidewalk grades shall be verified/checked with a 2 -foot long electronic "Smart Level". 3. A 5'-0" minimum level (1.5% pitch) area shall be provided at all entrances to buildings. Puddling or water at the entrances will not be allowed. 4. The above requirements shall supercede the grades shown on the plans. If these requirements cannot be met with the grades shown on the plans, the Architect shall be notified immediately for direction." f. 2.1: Insert the following: `D. Steel Reinforcement: 1. Welded wire fabric reinforcement shall conform to the applicable requirements of ASTM A 185. Fabric reinforcement shall be furnished in flat sheets. Fabric reinforcement in rolls will not be permitted. E. Portland Cement Concrete 1. Portland cement concrete for pavements and slabs shall be air - entrained type with a maximum water -cement ratio of 5.0 conforming to ACI 316R. Minimum compressive strengths at 28 days shall be as follows: Flexural strength with third point loading - 650 psi; compressive strength - 4000 psi. a. Concrete shall be air -entrained type, conforming to ASTM C 94. Air content by volume shall be 6% ± I%, and shall be tested in accordance with ASTM C 231. b. Concrete slump shall be no less than 2 in. nor greater than 4 in., determined in accordance with ASTM C 143. c. Cement shall be Portland cement, conforming to ASTM C 150, Type I or 11. Only one color of cement, all of the same manufacturer, shall be used for the work. Type 111 cement shall be used only with the prior approval of the Architect. d. Fine and coarse aggregates shall conform to ASTM C 33. e. Concrete shall contain a water reducing agent to minimize cement and water content of the concrete mix at the specified slump. Water reducing agent shall conform to ASTM C 494. f. No calcium chloride or admixtures containing calcium chloride shall be added to the concrete. No admixtures other than those specified shall be used in the concrete without the specific written permission ADDENDUM No. 4 09/26/2014 Page -8 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 of the Architect in each case. F. Curing Materials 1. Curing shall be by moist curing or by use of curing compound. 2. Curing paper shall be nonstaining, fiber reinforced laminated kraft bituminous product conforming to ASTM C 171. Four mil polyethylene sheeting may be substituted for curing paper. 3. Curing compound shall be a resin -base, white pigmented compound conforming to ASTM C 309, Type 2. G. Expansion Joints 1. Unless otherwise indicated on the Drawings, expansion joints shall be located 30 ft. o.c., maximum. 2. Expansion joint filler shall be preformed, nonbituminous type joint filler conforming to ASTM D 1752, Type 11, similar to Sealtight Cork Expansion Joint Filler, manufactured by W.R. Meadows, Inc., Elgin, IL 60120, or approved equal. a. Premolded filler shall be one piece for the full depth and width of the joint leaving a sealant recess as indicated. b. Use of multiple pieces of lesser dimensions to make up required depth and width of joint will not be permitted. c. Except as otherwise noted on the Drawings, joint filler shall be 1/2 in. thick. 3. Expansion joint shall receive joint backer rod and shall be sealed with joint sealant under the work of Section 07160, Dampproofing. H. Control Joints 1. Control joints indicated to be tooled shall be made by scoring concrete slab after finishing of slab, with scoring tool which will cut into slab at least 1 in., but in no case less than 25% of slab depth. I. Construction Joints 1. Transverse construction joints shall be placed whenever placing of concrete is suspended for more than 30 minutes. a. Butt joint with dowels or thickened edge joint shall be used if construction joints occurs at location of control joint. b. Keyed joints with tie bars shall be used if the joint occurs at any other location. J. Grout 1. Grout shall be mixed in the proportions of one part Portland cement to two parts sand, by volume. Only sufficient water shall be used to enable grout to barely hold its shape when squeezed into a ball in the hand. Sand for grout shall be "Fine Aggregate", conforming to ASTM C 33. 2. Nonshrink grout shall be pre -mixed non -shrinking, high strength grout. Compressive strength in 28 days shall be 5, 000 psi minimum, but in no case less than the specified strength of the adjacent concrete. Manufacturer shall provide evidence that the material meets the requirements of the COE CRDC 621 (558). Grout permanently exposed to view shall be nonoxidizing; metallic grout may be used in other locations. 09/26/2014 ADDENDUM No.4 Page -9 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 a. Nonshrink grout shall be one of the following, or approved equal: Manufacturer Product Gifford -Hill Co. Supreme Master Builders Co. Embeco U.S. Grout Corporation Five Star Grout K. Bond Breaker 1. Bond breaker shall be asphalt felt conforming to ASTM D 226, Type 1 or 6 mil polyethylene sheeting. g. 3.2, F, 2: Add the following after "Cement concrete".- . entry oncrete". "entry pads, equipment and dumpster pads, and sidewalks. h. 3.2, F, 2, b: Delete and insert the following: In the first line, delete "and concrete driveways shall be 6 inches thick" In the second line, delete "4,000"and insert "6,000" i. 3.2, F, 2: Add the following: "g. Paving mix, equipment, methods of mixing and placing, and precautions to be observed as to weather, condition of base etc., shall meet the requirements of ACI 316R. Pavement shall be constructed in accordance with the Drawings. h. The Architect shall be notified of concrete placement sufficiently in advance of start of operation to allow his representative to complete preliminary inspection of the work, including subgrade, forms, and reinforcing steel, if used. i. Normal concrete placement procedures shall be followed. Concrete shall arrive at the jobsite so that no additional water will be required to produce the desired slump. When conditions develop that required addition of water to produce the desired slump, permission of the Architect must be obtained. The concrete shall be transported from the mixer to its place of deposit by a method that will prevent segregation or loss of material. j. Work shall not be performed during rainy weather or when temperature is less than 40 F. (4.4 C). k. Adjacent work, etc., shall be protected from stain and damage during entire operation. Damaged and stained areas shall be replaced or repaired to equal their original conditions. 1. Existing concrete, earth, and other water -permeable material against which new concrete is to be placed shall thoroughly damp when concrete is placed. There shall be no free water on surface. m. Concrete which has set or partially set before placing shall not be employed. Re -tempering of concrete will not be permitted. n. Concrete shall be thoroughly spaded and tamped to secure a solid and homogeneous mass, thoroughly worked around reinforcement and into corners of forms. o. When joining fresh concrete to concrete which has attained full set, latter shall be cleaned of foreign matter, and mortar scum and laitance shall be removed by chipping and washing. Clean, roughened base surface shall be saturated with water, but shall have no free water on surface. A coat of 1:1 cement -sand grout, approx. 1/8 in. thick, shall be well scrubbed into thoroughly dampened concrete base. New concrete ADDENDUM No. 4 09/26/2014 Page -10 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 shall be placed immediately, before grout has dried or set." j. 3.2, F: Insert the following: "5. Concrete Finishing: a. Concrete flatwork surfaces shall be screeded off and finished true to line and grade, and free of hollows and bumps. Surface shall be dense, smooth, and at exact level and slope required. b. Finished concrete surface for subbases shall be woodfloated to a slightly rough surface. Surface shall not deviate more than 1/4 in. in 10 ft. c. Finished concrete surface for concrete walks and pads shall be wood - floated and steel troweled to a smooth surface. Surface shall not deviate more than 1/8 in. in 10 ft. d. Unless otherwise indicated, horizontal surfaces of concrete surfaces which will be exposed shall be given a light broomed finish, with direction of grooves in concrete surface perpendicular to length of concrete band, slab, or pad. After concrete has set sufficiently to prevent coarse aggregate from being torn from surface, but before it has completely set, brooms shall be drawn across it to produce a pattern of small parallel grooves. Broomed surface shall be uniform, with no smooth, unduly rough or porous spots, or other irregularities. Coarse aggregate shall not be dislodged by brooming operation. e. Immediately following finishing operations, arises at edges and both sides of expansion joints shall be rounded to a 1/4 in. radius. Control joints to be tooled shall be scored into slab surface with scoring tool. Adjacent edges of control joint shall at same time be finished to a 1/4 in. radius. f. Where finishing is performed before end of curing period, concrete shall not be permitted to dry out, and shall be kept continuously moist from time of placing until end of curing period, or until curing membrane is applied. 6. Concrete Curing: a. It is essential that concrete be kept continuously damp from time of placement until end of specified curing period. It is equally essential that water not be added to surface during floating and troweling operations, and not earlier than 24 hours after concrete placement. Between finishing operations surface shall be protected from rapid drying by a covering of waterproofing paper. Surface shall be damp when the covering is placed over it, and shall be kept damp by means of a fog spray of water, applied as often as necessary to prevent drying, but not sooner than 24 hours after placing concrete. None of the water so applied shall be troweled or floated into surface. b. Concrete surfaces shall be cured by completely covering with curing paper or application of a curing compound. c. Concrete cured using waterproof paper shall be completely covered with paper with seams lapped and sealed with tape. Concrete surface shall not be allowed to become moistened between 24 and 36 hours after placing concrete. During curing period surface shall be checked frequently, and sprayed with water as often as necessary to prevent drying, but not earlier than 24 hours after placing concrete. d. If concrete is cured with a curing compound, compound shall be applied at a rate of 200 sq. ft. per gallon, in two applications perpendicular to each other. e. Curing period shall be seven days minimum. 09/26/2014 ADDENDUM No.4 Page -11 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 7. Concrete Expansion Joints: a. Expansion joints shall be 1/2 in. wide. Expansion joint shall be formed in the concrete to required width with preformed joint filler in place. Joint filler shall extend the full depth of the slab. Joint filler shall extend the full length of the expansion joint. b. For conc. pavements and pads, depth of joint filler shall be as required to form a 1-1/4 in. deep sealant and backer rod recess below finished concrete surface. 8. Control Joints: a. Unless otherwise indicated, control joints to be tooled shall be scored into the concrete slab every 10 ft. o.c. maximum. Joint shall be made after concrete is finished and when the surface is stiff enough to support the weight of workmen without damage to the slab, but before slab has achieved its final set. 9. Cold Weather Concreting: a. Materials for concrete shall be heated when concrete is mixed, placed, or cured when the mean daily temperature is below 40 F. or is excepted to fall to below 40 F. within 72 hours, and the concrete after placing shall be protected by covering, heat, or both. b. Details of handling and protecting of concrete during freezing weather shall be subject to the approval and direction of the Architect. Procedures shall be in accordance with provisions of ACI 306R. 10. Hot Weather Concreting: a. Concrete just placed shall be protected from the direct rays of the sun and the forms and reinforcement just prior to placing shall be sprinkled with cold water. Every effort shall be made to minimize delays which will result in excessive mixing of the concrete after arrival on the job. b. During periods of excessively hot weather (95 F, or above), ingredients in the concrete shall be cooled insofar as possible and cold mxing water shall be used to maintain the temperature of the concrete at permissible levels all in accordance with the provisions of ACI 305. Any concrete with a temperature above 95 F, when ready for placement will not be acceptable, and will be rejected. c. Temperature records shall be maintained throughout the period of hot weather giving air temperature, general weather conditions (calm, windy, clear, cloudy, etc.) and relative humidity. Records shall include checks on temperature of concrete as delivered and after placing in forms. Data should be correlated with the progress of the work so that conditions surrounding the construction of any part of the structure can be ascertained. k. 3.3, A: Insert the following: "2. Concrete surfaces shall be protected from traffic or damage until surfaces have hardened sufficiently. If necessary 1/2 in. thick plywood sheets shall be used to protect the exposed surface." PART 4 — BID SET DOCUMENTS 4.1 DESCRIPTION A. The following Drawings are revised as follows: ADDENDUM No. 4 09/26/2014 Page -12 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 1. Sheet C2.0: Revise as follows: Incorporate revisions per SKC-4 & SP1.1 Add the following Note: Note: Provide concrete filled galvanized steel bollards at exterior equipment and dumpster pads and at each side of all Apparatus Room overhead doors. 2. Sheet C3.0: Revise as follows: Incorporate revisions per SKC-4 3. Sheet C5.0: Revise as follows: Incorporate revisions per SKC-4 & SP1.1 4. Sheet SP1.1: Revise as follows: Add the following to General Notes: Note 6: Provide concrete filled galvanized steel bollards at exterior equipment and dumpster pads and at each side of all Apparatus Room overhead doors. 5. Sheet A3.1: Insert the following notes to Elevations 1 & 5 at Elevator Vent: Elevator Vent to be labeled 11, Penthouse Elevator Vent" Reference Sheet A5.6 Details 7 & 8, Sheet A6.4 Section 5, Elevator Shaft Vent on M3.02, Specification Section 08 90 00, 1.1, 2 and 2.3 A & 8 6. Sheet A5.6: Details 7 & 8 (Revised Sheet A5.6 issued in Addendum No. 1) Delete Specification reference "23 00 00". Change note to read "Penthouse Elevator Vent, See Specification Section 08 90 00" 7. Sheet A6.4: Revise as follows: Section 5: Delete Specification reference "23 00 00". Change note to read "Penthouse Elevator Vent, See Specification Section 08 90 00" 8. Sheet A7.1: Revise as follows: DOOR SCHEDULE: Door #107, Comments: changed "insulated door w/vision panel" to "Vision Panel in door" DOOR SCHEDULE: Door #128, Label: Insert "45" min. DOOR SCHEDULE: Revise the FRAME head and jamb details as follows: Door #104 Head Details changes from Detail #23 to Detail #22 Door #104 Jamb Detail changes from Detail #22 to Detail #18 Doors #126 & #127 Head Detail changes from Detail #18 to Detail #20 Doors #103, #105, #107, #122, S1 -1A Head changes from Detail #3 to Detail #12 Door S1 -1A Jamb Detail changes from Detail #21 to Detail #11 Doors #109, #110, #111, #112, #113, #114, #115, #116, #118A, #119, #120, #121, #128, SI -IB, S2-18, #204, #205, #206, #208, #209, #211, #212, #213, #214, #215, #216, #217, #218, #219, #220, S2 -2A Jamb Detail changes from Detail #21 to Detail #19 INTERIOR OPENING SCHEDULE: Revise as follows: 09/26/2014 ADDENDUM No.4 Page -13 NORTH ANDOVER CENTRAL FIRE STATION North Andover, Massachusetts 01845 Project No. 1304.00 Windows 102 & 109 - change material from "HM" to `ALUM' 9. Sheet S1.0: Revise as follows: LINTELS. Delete "CMU Lintel Schedule" 10. Sheet E0.3 -Electrical Site Plan: Incorporate revisions per SKC-4 & SPI. 1 END OF ADDENDUM NO. 4 ADDENDUM No. 4 09/26/2014 Page -14 I 1 F �2 e S w rt �gsc� Z 5e= =eti4 Q LGy�p� F� 0009 gas w». w�rv> n—I Nbld 3115 YswI L1,e9 9[94U �0z 3{\ IV OOCia d3SE6 t� nyl= ami S 9 L xup »'LO 110d HIM IM VII uo!sog 8 'GNW^ WLLIF-IH I, an V uow-H 89 o0ff:+agwn°+»ym g SID 9 1 1 H D N d Sb8i0 VW 'aanopUV 41JON u I nq21 uoljejS aalj 1eaIua:) aanopuV 4IJoN 1� aua;)MS w ua>;quo(l F �2 e S w rt �gsc� Z 5e= =eti4 Q LGy�p� F� Fg3 I J 13HELLO)Shda 4` ° 1E.W—M F a s" g 3 g s = `e i 'ig8ds b • n—I n=ni �i—n Y - n—I nil nyl= ami iii 'I n ICNf, u I nq21 1� �I�Iljj6°,, 4 ►^ g2ls� n=I u0� is Fg3 I J 13HELLO)Shda 4` ° 1E.W—M F a s" g 3 g s = `e i 'ig8ds b w0:)aLaaMspueweyuop o s,eifld M, W�otmve4[t9 b0£t jagwnu;oafad 0041 £Z4 Ll9 l l lZ0 yvqu0;s08 tOZ azo S haai35 eW tE anuany uosweH 89 SbStO bW'tanopuy 41JON i t t t -9Z 60 panssi SID 311 H a tf 447uj uoLIeIS aJl j �eaIua) aanopuy WON �9d .(9umep ! � .(auaaMs �gweyuoa ,OZ=„t Ln 0 U i / 5 \ 4 PROVIDE L6x4x5/8 LLV LOOSE LINTEL AT WALL RECESS BELOW. PROVIDE 8" LONGx4" WIDE BEARING SURFACE, MIN. , / r of , ry / B/ , Q r C14 co b 3 _k* E i i 1'L�8x3s Donham &SweeneyNorth A n d over CentraI scale: 1/8" = 1'-0"SKS-3 drawn by: MSK issued: 09.26.14 S1.2 A R C H ITE C T S 68 Harrison Avenue Station 111 Boston MA 02Fire 6 17 423 1 4 0 0 donhamandsweeney.com North Andover, MA 01845 project number: 3287 Addendum 4