HomeMy WebLinkAboutContract #: 012190 - From: To: - Exception - ExceptionNORTH ANDOVER CENTRAL FIRE STATION
North Andover, Massachusetts 01845
Project No. 1304.00
ADDENDUM No. 7
20 October, 2014
PART 1 — GENERAL
1.1 DESCRIPTION
A. This addendum shall supplement, amend and become part of the bid documents. Bid
Documents are the Contract Documents, Drawings and Specifications, for the North
Andover Central Fire Station dated August 28, 2014. All bids and the construction contract
shall be based on these modifications.
1.2 PROCEDURES
A. The attention of bidders submitting proposals for the above subject project is called to the
following addendum to the specifications and drawings. The items set forth herein, whether
of omission, addition, substitution, or clarifications are all to be included in and form a part
of the proposal submitted.
B. THE NUMBER OF THIS ADDENDUM (7) MUST BE ENTERED IN THE APPROPRIATE
SPACE "B" OF THE "FORM FOR SUB -BID."
1.3 RELATED WORK
A. All work shall comply with requirements specified for similar work unless otherwise described.
1.4 THIS ADDENDUM CONTAINS
A. Revisions to the:
1. Answers to Contractor's Questions
PART 2 — ANSWERS TO CONTRACTORS' QUESTIONS
2.1 DESCRIPTION
A. Bidder Question: Does the HVAC Filed Sub bid have to list any Sub Sub bidders under
paragraph E?
For example:
1 Sheet Metal
2 Insulation
3 Vehicle Exhaust System
4 Automatic Temperature Controls
5 Test and Balancing
Response: Refer to Addendum No. 1, 3. 1, A, 30.
B. Bidder Question: Who is responsible for the furnishing and installation of the Air
Compressor and Air lines needed for the Vehicle Exhaust System?
Response: Furnishing and installation of the Air Compressor and Air Lines for the Vehicle
Exhaust System is owned under Specification Section 22 00 00 (Plumbing). Refer to P1.3.
B. Bidder Question: Do we use the Original HVAC sub bid form to submit our bid
electronically?
10/20/2014
ADDENDUM No.7
Page -1
NORTH ANDOVER CENTRAL FIRE STATION
North Andover, Massachusetts 01845
Project No. 1304.00
Response: The bid form is completed electronically so while it is similar to the original bid
form, bidders will complete a new document which will be submitted for the re -bid. Bidders
will go to the web -site (www. biddocsonline. com) and open the project to submit an "ebid"
The required bid form will appear.
END OF ADDENDUM NO. 7
ADDENDUM No. 7 10/20/2014
Page -2