HomeMy WebLinkAboutContract #: 015473 - From: To: - Exception - North Andover School DepartmentA
m
LL
00
r-
�14
M
0)
r -q
V-4
%-I
�L
CL
c
3
N
c
z
w
4)
Cl)
4)
0
C
CO
`
N
N
N
N
m
0
V
C
f0
•Q
N
N
N
N
N
CJ
K
C
0
•N
3
>
a
U
T
a
a
G
O
z
aV
0
N
N
N
0
t
0i
U
C
N
?
T
A
A
O
OC
C
'O
Q
C
0
>
to
C
N
�
L
0.
cvO
°
a
ai
c
j
0
U
Q
U
b
W
J
f6
W
C
W
to
ADDENDA #1— May 9, 2012
INVITATION FOR BIDS
KITTREDGE ELEMENTARY SCHOOL
DRAINAGE IMPROVEMENT
NORTH ANDOVER SCHOOL DEPARTMENT
Northerly existing catch basin:
• Sawcut paving & remove existing soil, paving & base materials to 4 foot minimum
beyond exterior face of catch basin structure
• Soil removal to extend to bottom of catch basin structure elevation
• Backfill with processed gravel compacted to 90 %
• Finish paving to be blended to match existing grades at or beyond the 4 ft. minimum limit
• Provide emulsion at new/existing paving patch intersection
Excess soil disposal:
• Contractor to provide for disposal of any excess soil materials, paving, demolition debris,
etc.
• The public works yard areas are not available as a disposal site
• There is no disposal site mileage limitation
Santilli, Ray
From:
Mealey, James
Sent:
Monday, May 07, 2012 10:40 AM
To:
Santilli, Ray
Cc:
Foster, Stephen E.
Subject:
FW: kittredge school
Contacts: James Mealey
Ray,
Here is the addendum for the Kittredge Drainage Project.
Jim
From: Foster, Stephen E.
Sent: Monday, May 07, 2012 8:53 AM
To: Mealey, James
Subject: kittredge school
Addenda # 01:
Northerly existing catch basin:
• Sawcut paving & remove existing soil, paving & base materials to 4 foot minimum beyond exterior face of catch
basin structure
• Soil removal to extend to bottom of catch basin structure elevation
• backfill with processed gravel compacted to 90
• finish paving to be blended to match existing grades at or beyond the 4 ft. minimum limit
• provide emulsion at new/existing paving patch intersection
Excess soil disposal:
• contractor to provide for disposal of any excess soil materials, paving, demolition debris, etc.
• the dpw yard areas are not available as a disposal site
• there is no disposal site mileage limitation
Stephen E. Foster
Facilities Director
Town of North Andover
1600 Osgood Street Suite 3-59
North Andover, MA 01845
Phone 978.794.1503 x-41306
1
Santilli, Ray
From: Mealey, James
Sent: Wednesday, May 02, 2012 3:12 PM
To: Foster, Stephen E.; Santilli, Ray
Subject: Kittredge Pre -Bid Meeting
Following is a list of those who attended the Pre -Bid Meeting at Kittredge this morning...
Name
Company
Ryan Greenwich
K&R Construction
Frank Fodera
East Coast Developments, Inc.
Joe Cristaldi
ARCO
Rick LaMarre
Rene LaMarre
Mark Moroso
Eagle Point Builders, Inc.
Rob Celiberti
CRL
Bob Bushnell
Sunshine Paving
There were two questions asked that I indicated we would address through an addendum we would make available on
line...
1. Do we need them to do anything to the pavement just past the furthest catch basin, since it is currently higher
than the catch basin?
2. Is there any Town entity that could use the extra fill?
Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more
information please refer to: hftp://www.sec.state.ma.us/pre/preidx.htm.
Please consider the environment before printing this email.
NORTH ANDOVER SCHOOL DEPARTMENT
INVITATION FOR BIDS
KITTREDGE ELEMENTARY SCHOOL
DRAINAGE IMPROVEMENTS
April 25, 2012
Contact Jim Mealey
School Business Manager
Address 1600 Osgood Street
North Andover, MA 01845
Telephone Number: 978-794-1503
Fax Number: 978-794-0231
Email mealeyj@northandover.kl2.ma.us
Table of Contents
1. Introduction........................................................... 3
2. Submission Deadline and Instructions ............................. 3
3. Questions, Addendum or Proposed Modifications ............... 4
4. Mandatory On -Site Inspection ...................................... 5
5. Minimum Requirements ............................................. 5
6. General Requirements ................................................ 5
7. Scope of Work ........................................................ 6
8. Prevailing Wage Rates .............................................. 7
9. Payment Bond ......................................................... 7
10. Criminal Offender Records Check ................................ 7
11. Evaluation of Bids .................................................. 7
12. Term of Contract .................................................... 8
Appendix A — Price Proposal .......................................... 9
Standard North Andover School Department Contract
With Supplement«C".............................................. 10
Certifications............................................................ 30
PaymentBond........................................................... 33
LayoutDrawings........................................................ 34
Prevailing Wage Rates
North Andover School Department IFB Page 2 of 34
Kittredge School Drainage Improvements
1. Introduction
In accordance with M.G.L. c30, §39M, the North Andover School Department (`School') is
soliciting bids from qualified contractors to improve drainage in a specified area in the rear of the
Kittredge Elementary School located at 601 Main Street, North Andover. Qualified contractors
are requested to submit bids to the School Business Manager at North Andover School
Department, 1600 Osgood Street, North Andover, MA, in accordance with the instructions
contained within this Invitation for Bids.
Notice of this IFB is published in the Central Register (which is a weekly publication of the
Office of the Secretary of the Commonwealth), the Eagle -Tribune (a newspaper of general
circulation) and posted on the Town website (www.townof iorthandover.com) under "Available
Bids, Quotes and Proposals".
The School will accept proposals delivered in person or by mail. All proposals must be received
by 2:00 p.m. on Thursday, May 17, 2012 to be considered. Proposals submitted by fax or by
electronic mail will not be considered. All proposals must be submitted to:
Mr. James Mealey, School Business Manager
North Andover School Department
1600 Osgood Street
North Andover, MA 01845
The North Andover School Department may cancel this IFB or reject in whole or in part
any and all proposals, if they determine that cancellation or rejection serves the best
interest of the North Andover School Department.
2. Submission Deadline and Instructions
Qualified contractors are requested to submit a comprehensive pricing proposal in a sealed
envelope marked "Kittredge Elementary School, Drainage Improvements" with the applicant's
name and address on the front. Applicants should provide one (1) signed original proposal. Fax
or electronic submissions will not be accepted. Applicants must also execute and include in the
sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax
Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The
North Andover School Department, through the School Superintendent, is the awarding authority
and reserves the right to reject any and all proposals or parts of proposals; to waive any defects,
information, and minor irregularities; to accept exceptions to these specifications; and to award
contracts or to cancel this Invitation for Bids if it is in the North Andover School Department's
best interest to do so.
Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if
the bidder is a partnership, by the name of the partnership, followed by the signature of each
general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature
must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed.
North Andover School Department IFB Page 3 of 34
Kittredge School Drainage Improvements
All sealed proposals must be received and registered by the School Business Manager's office by
Thursday, May 17, 2012 at 2:00 p.m. All outer envelopes must be labeled "Kittredge
Elementary School, Drainage Improvements" and mailed or hand delivered to the following
address:
Mr. James Mealey, School Business Manager
North Andover School Department
1600 Osgood Street
North Andover, MA 01845
No proposals will be accepted after the time and date noted. Late delivery of materials due to
any type of delivery system shall be cause for rejection. If on the date and time of the submittal
deadline the North Andover School Department is closed due to an uncontrolled event such as
fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00
p.m. on the next normal business day.
3. Questions, Addendum or Proposal Modification
Questions concerning this IFB must be submitted in writing to: Mr. James Mealey, School
Business Manager, 1600 Osgood Street North Andover, MA 01845, or they may be emailed to
Mr. Mealey at mealeyj@northandover.k12.ma.us. All questions/inquiries must be received by
close of business on Tuesday, May 8, 2012 to be considered. Questions/inquiries may be
delivered, mailed, emailed or faxed. Written responses will be posted on the Town's website
(www.townof iorthandover.com) in "Available Bids, Quotes and Proposals" by Thursday, May
10, 2012 at 2:00 p.m.
If any changes are made to this IFB, an addendum will be posted on the Town's website in
"Available Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the
existence of any addenda and/or modifications issued by the School. As this IFB has been
published on the Town's website (www.townofnorthandover.com) all bidders are responsible for
checking the website for any addenda and /or modifications that are subsequently made to this
IFB.
The School accepts no liability for and will provide no accommodations to bidders who fail to
check for amendments and/or modifications to this IFB and subsequently submit inadequate or
incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any
IFB component files. Modifications to the body of the IFB, Scope of Work, terms and
conditions, or which change the intent of this IFB are prohibited and may disqualify a response.
All proposals submitted in response to this IFB shall remain firm for sixty (60) days following
the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days
after the submittal deadline.
Bidders are not to communicate directly with any employee of the North Andover School
Department, except as specified in this IFB, and no other individual employee or representative
North Andover School Department IFB Page 4 of 34
Kittredge School Drainage Improvements
is authorized to provide any information or respond to any question or inquiry concerning this
IFB.
Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the
bidder is having trouble obtaining any part of the IFB electronically through the Town website
(www.townofnorthandover.com), including, and without limitation the form and attachments.
Bidder with disabilities or hardships that seek reasonable accommodations, which may include
the receipt of IFB information and/or addenda and/or modifications in an alternative format,
must communicate such requests in writing to the contact person, and reasonable
accommodation will be made by agreement with the contact person on behalf of the North
Andover School Department.
4. Mandatory Site Inspection
A mandatory site inspection of the rear area of the Kittredge Elementary School will be held on
Wednesday, May 2, 2012 at 10:00 a.m. All interested contractors are required to attend so that
they can accurately submit pricing for the work being bid. All parties will meet at the front
entrance to the Kittredge Elementary School at 601 Main Street, North Andover.
5. Minimum Requirements
Each bidder must demonstrate that it meets the following minimum requirements:
A. Contractor must demonstrate a minimum of five (5) years experience providing the
services required in the Scope of Services.
B. Contractor shall submit a complete list of all similar contracts performed in the past two
(2) years with contact names and telephone numbers.
C. The contractor shall furnish all labor, equipment, and vehicles as required for work in
accordance with the scope of services.
D. The contractor shall conform to all requirements of federal, state and local laws, including
compliance with the prevailing wage laws.
E. Submission of required statements and forms.
6. General Requirements
The work will consist of improving the Kittredge Elementary School drainage at the base of the
slope in the area on the left side of the road passing behind the school and providing all
equipment, services and materials. This work includes installing pvc drainage piping to
discharge into existing catch basin; re -working slope to match existing slope; hauling away
excess soil materials; providing loam and reseeding; re -working the swale to provide positive
drainage and providing loam and reseeding; catch basin repair that includes saw -cutting and
North Andover School Department IFB Page 5 of 34
Kittredge School Drainage Improvements
removing affected paving; removing unsuitable soils below affected paving; replacing unsuitable
soil with compacted processed gravel; and patching paving to match existing paving.
The contractor must be approved as an authorized applicator of binder pavement. The contractor
shall provide all materials so as to provide a completely paved addition to the existing paved area
that is fully tacked against the existing paving. Materials not available from the primary
materials manufacturer shall be approved by said manufacturer for use with his system materials.
The contractor shall submit within ten (10) days of award of contract:
A. Manufacturer's certification approving the contractor as an authorized applicator.
B. A complete list of materials proposed for use and manufacture's specifications and
application instructions. Edit specifications and instructions for the project.
C. Manufacture's certification or other data substantiating that the paving materials
proposed for installation conform to the specified requirements and are suitable for use
on the project.
No materials shall be purchased until approval of the above submittals is received from the
School's representative.
The Contractor shall furnish all labor, materials, and equipment required to furnish and
install Class I Type 1-I bituminous concrete pavement including binder &/or top courses at
depths designated. All work shall conform to the MassDOT Standard Specifications for
Highways and Bridges, latest edition, unless otherwise specified herein.
MDPW 420 Class I bituminous concrete base course Type I -I
MDPW 460 Class I bituminous concrete pavement
Paving and associated work may only proceed when existing and forecast weather conditions
permit work to be performed in accordance with manufacturer's recommendations, the
established procedures, and only when the work can be guaranteed as required without additional
reservations, or restrictions.
7. Scope of Work
The base bid is for the improvement of drainage and re -grading of slope as detailed in attached
drawings (2) dated 11-15-11 in the back of the Kittredge Elementary School.
A. Base Bid
1) Toe of Slope Drain
a. 6" diameter pvc
b. 1001f length
c. 3/4" crushed stone
North Andover School Department IFB Page 6 of 34
Kittredge School Drainage Improvements
d. Filter fabric
e. Discharge into existing catch basin
f. Pipe opening into catch basin per NA DPW specifications
2) Grading
a. Slope
i. Re -work slope to match "existing slope"
ii. See plan for locations of "existing slope" and "proposed slope"
iii. Haul away excess soil material (Assumed disposal location < 5 miles)
iv. Provide 4" loam, and reseed
b. Swale
i. Re -work to provide positive drainage
ii. Provide 4" loam, and reseed
3) Catch Basin at northwest corner
a. Saw cut and remove affected pavement
b. Remove unsuitable soils below affected pavement to depth of suitable bearing soil
c. Replace unsuitable soil with compacted processed gravel
d. Patch pavement to match existing pavement
8. Prevailing Waize Rates
The successful bidder will at all times comply with the prevailing wage rates as determined by
the Commissioner of the Division of Occupational Safety, under the provisions of Massachusetts
General Laws as shall be in force and as amended. The prevailing wage rates are attached.
9. Payment Bond
In accordance with M.G.L. c30, §39M upon award of any contract greater than $25,000, the
successful bidder shall provide a payment bond in the amount of 50% of the total cost of the
contract. The payment bond must be on the School's form that is attached.
10. Criminal Offender Records Check
In accordance with Massachusetts General Laws, c71, §38R, the North Andover School
Department requires criminal offender records checks be performed on all personnel of
contractors authorized to do work on school grounds that may have direct and unmonitored
contact with children.
The successful contractor will be required to submit a `CORI Request Form' for any person who
may be assigned to work on school department property. The forms will be submitted directly to
the designated contact person at the North Andover School Department.
The `CORI Request Form' may be viewed at
http://www.northandoverpublicschools. com/ems files/resources/coriFormEmployee.pdf
North Andover School Department IFB Page 7 of 34
Kittredge School Drainage Improvements
11. Evaluation of Bids
Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility
of the bidder will then be ascertained. Finally, the aggregate price offered by each responsive and
responsible bidder will be evaluated. The School is required to award the contract to the lowest
responsive and responsible bidder.
■ Responsiveness
Bidders must completely fill out and submit the bid form and all other required forms. All
services that are the subject of the bid must meet the minimum standards and Scope of Work
set forth including the standards by which the procurement officer will determine
acceptability as to quality, workmanship, results of inspections and tests, and suitability for a
particular purpose.
■ Responsibility
Bidders must demonstrate that they meet the measures of responsibility. The School will
not award a contract to any bidder who cannot furnish satisfactory evidence of his ability
and experience in this type of work and that he has sufficient plant and capital to enable
him to prosecute and complete the work as outlined in the Scope of Services. The School
may make such investigations as it deems necessary to determine the above and a bidder
shall furnish any information requested in this regard.
All costs not listed on the bid price sheet will not be considered part of the contract and therefore
will not be paid. The North Andover School Department will not be charged fuel surcharges or
administrative fees as part of any contract entered into as a result of this IFB. Additionally the
North Andover School Department will not be charged late fees unless payment is not made
within sixty (60) days of the receipt of invoice.
The North Andover School Department is a tax exempt entity so no sales tax will be assessed to
any purchases made under this proposed contract.
12. Term of Contract
The successful bidder will be required to execute the standard North Andover School
Department Contract and any relevant supplement (as attached).
North Andover School Department IFB Page 8 of 34
Kittredge School Drainage Improvements
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible, responsive bidder offering the lowest price for
the work to be performed. The School is required to award the contract to the lowest responsive
and responsible bidder. All prices are to remain firm for the duration of the Contract.
* All bidders are required to attend the mandatory site inspection of the Kittredge
Elementary School to be held on Wednesday, May 2, 2012 at 10:00 a.m. *
Total Lump Sum Price to furnish all labor, materials and equipment required for drainage
improvements at the Kittredge Elementary School as specified:
Addenda
Business Name
Business Address
Business Phone
E.1
are acknowledged:
Signature
Fax
Name of Person Authorized to sign Price Proposal
Title of Person Authorized to sign Price Proposal
Signature of Above Person
North Andover School Department IFB Page 9 of 34
Kittredge School Drainage Improvements
NORTH ANDOVER SCHOOL DEPARTMENT
CONTRACT
CONTRACT#
DATE:
This Contract is entered into on, or as of, this date by and between the North Andover
School Department (the "School"), and
Contractor:
Address:
Telephone Number: _
Fax Number:
1. This is a Contract for the procurement of the following:
2. The Contract price to be paid to the Contractor by the North Andover School Department
is:
3. Payment will be made as follows:
4. Definitions:
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the North Andover School Department. Proper acceptance shall be
understood to include inspection of goods and certification of acceptable
North Andover School Department IFB Page 10 of 34
Kittredge School Drainage Improvements
performance for services by authorized representatives of the School to insure that
the goods or services are complete and are as specified in the Contract.
4.2 Contract Documents: All documents relative to the Contract including (where
used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary
General Conditions, General Specifications, Other Specifications included in
Project Manual, Drawings, and all Addenda issued during the bidding period. The
Contract documents are complementary, and what is called for by any one shall be
as binding as if called for by all. The intention of the document is to include all
labor and materials, equipment and transportation necessary for the proper
performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the School. This term
shall (as the sense and particular Contract so require) include Vendor, Contractor,
Engineer, or other label used to identify the other party in the particular Contract.
Use of the term "Contractor" shall be understood to refer to any other such label
used.
4.4 Date of Substantial Performance: The date when the work is sufficiently complete,
the services are performed, or the goods delivered, in accordance with Contract
documents, as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term
includes one who furnished material worked to a special design according to the
Drawings or Specifications of this work, but does not include one who merely
furnishes material not so worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance:
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before , unless extended pursuant to a
provision for extension contained in the Contract documents at the sole discretion of the School,
and not subject to assent by the Contractor, and subject to the availability and appropriation of
funds as certified by the Town Accountant. The time limits stated in the Contract documents are
of the essence of the Contract.
6. Subject to Appropriation:
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the School is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this
North Andover School Department IFB Page 11 of 34
Kittredge School Drainage Improvements
Contract shall be immediately terminated without liability for damages, penalties or other
charges.
7. Permits and Approvals:
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its
performance of the Contract shall be secured and paid for by the Contractor.
8. Termination and Default:
8.1 Without Cause. The School may terminate this Contract on seven (7) calendar days
notice when in the best interests of the School by providing notice to the Contractor,
which shall be in writing and shall be deemed delivered and received when given in
person to the Contractor, or when received by fax, express mail, certified mail return
receipt requested, regular mail postage prepaid or delivered by any other appropriate
method evidencing actual receipt by the Contractor. Upon termination without cause,
Contractor will be paid for services rendered to the date of termination.
8.2 For Cause. If the Contractor is determined by the School to be in default of any term
or condition of this Contract, the School may terminate this Contract on seven (7)
days notice by providing notice to the Contractor, which shall be in writing and shall
be deemed delivered and received when given in person to the Contractor, or when
received by fax, express mail, certified mail return receipt requested, regular mail
postage prepaid or delivered by any other appropriate method evidencing actual
receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract:
1) any material misrepresentation made by the Contractor to the School; 2) any
failure to perform any of its obligations under this Contract including, but not
limited to the following: (i) failure to commence performance of this Contract at
the time specified in this Contract due to a reason or circumstance within the
Contractor's reasonable control, (ii) failure to perform this Contract with
sufficient personnel and equipment or with sufficient material to ensure the
completion of this Contract within the specified time due to a reason or
circumstance within the Contractor's reasonable control, (iii) failure to perform
this Contract in a manner reasonably satisfactory to the School, (iv) failure to
promptly re -perform within a reasonable time the services that were rejected by
the School as unsatisfactory, or erroneous, (v) discontinuance of the services for
reasons not beyond the Contractor's reasonable control, (vi) failure to comply
with a material term of this Contract, including, but not limited to, the provision
of insurance and non-discrimination, (vii) any other acts specifically and
expressly stated in this Contract as constituting a basis for termination of this
Contact, and (viii) failure to comply with any and all requirements of state law
and/or regulations, and Town bylaw and/or regulations.
North Andover School Department IFB Page 12 of 34
Kittredge School Drainage Improvements
9. The Contractor's Breach and the School's Remedies:
Failure of the Contractor to comply with any of the terms or conditions of this Contract
shall be deemed a material breach of this Contract, and the North Andover School
Department shall have all the rights and remedies provided in the Contract documents, the
right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain
any and all actions at law or in equity or other proceedings with respect to a breach of this
Contract, including damages and specific performance, and the right to select among the
remedies available to it by all of the above.
From any sums due to the Contractor for services, the School may keep the whole or any
part of the amount for expenses, losses and damages incurred by the School as a
consequence of procuring services as a result of any failure, omission or mistake of the
Contractor in providing services as provided in this Contract.
10. Statutory Compliance:
10.1 This Contract will be construed and governed by the provisions of applicable
federal, state and local laws and regulations; and wherever any provision of the
Contract or Contract documents shall conflict with any provision or requirement
of federal, state or local law or regulation, then the provisions of law and
regulation shall control. Where applicable to the Contract, the provisions of the
General Laws are incorporated by reference into this Contract, including, but not
limited to, the following:
General Laws Chapter 30B — Procurement of Goods and Services.
General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts.
General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts.
10.2 Wherever applicable law mandates the inclusion of any term and provision into a
municipal contract, this Section shall be understood to import such term or
provision into this Contract. To whatever extent any provision of this Contract
shall be inconsistent with any law or regulation limiting the power or liability of
cities and towns, such law or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations
bearing on the performance of the Contract. If the Contractor performs the
Contract in violation of any applicable law or regulation, the Contractor shall bear
all costs arising therefrom.
10.4 The Contractor shall keep itself fully informed of all existing and future State and
National Laws and Municipal By-laws and Regulations and of all orders and
decrees of any bodies or tribunals having jurisdiction in any manner affecting
those engaged or employed in the work, of the materials used in the work or in any
way affecting the conduct of the work. If any discrepancy or inconsistency is
North Andover School Department IFB Page 13 of 34
Kittredge School Drainage Improvements
discovered in the Drawings, Specifications or Contract for this work in violation of
any such law, by-law, regulation, order or decree, it shall forthwith report the same
in writing to the School. It shall, at all times, itself observe and comply with all
such existing and future laws, by-laws, regulations, orders and decrees; and shall
protect and indemnify the North Andover School Department, the Town of North
Andover, and its duly appointed agents against any claim or liability arising from
or based on any violation whether by him or its agents, employees or
subcontractors of any such law, by-law, regulation or decree.
11. Conflict of Interest:
Both the School and the Contractor acknowledge the provisions of the State Conflict of
Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any
activity which shall constitute a violation of that law. The Contractor shall be deemed to
have investigated the application of M.G.L. c. 268A to the performance of this Contract;
and by executing the Contract documents the Contractor certifies to the School that
neither it nor its agents, employees, or subcontractors are thereby in violation of General
Laws Chapter 268A.
12. Certification of Tax Compliance
This Contract must include a certification of tax compliance by the Contractor, as
required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance
by All Contractors Providing Goods, Services, or Real Estate Space to the
Commonwealth or Subdivision).
13. Discrimination
The Contractor will carry out the obligations of this Contract in full compliance with all
of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended.
14. Assi n�men_t:
Assignment of this Contract is prohibited, unless and only to the extent that assignment is
provided for expressly in the Contract documents.
15. Condition of Enforceability gainst the School:
This Contract is only binding upon, and enforceable against, the School if. (1) the
Contract is signed by the School Superintendent or its designee; and (2) endorsed with
approval by the Town Accountant as to appropriation or availability of funds; and (3)
endorsed with approval by the Town Counsel as to form.
North Andover School Department IFB Page 14 of 34
Kittredge School Drainage Improvements
16. Corporate Contractor:
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its
Clerk's Certificate certifying the corporate capacity and authority of the party signing this
Contract for the corporation. Such certificate shall be accompanied by a letter or other
instrument stating that such authority continues in full force and effect as of the date the
Contract is executed by the Contractor. This Contract shall not be enforceable against the
North Andover School Department unless and until the Contractor complies with this
section.
The Contractor, if a foreign corporation, shall comply with the provisions of the General
Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in
addition thereto, relating to the appointment of the Commissioner of Corporations as its
attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly
authenticated copies of its Charter or Certificate of Incorporation; and said Contractor
shall comply with all the laws of the Commonwealth.
17. Liability of Public Officials:
To the full extent permitted by law, no official, employee, agent or representative of the
Town of North Andover shall be individually or personally liable on any obligation of the
Town under this Contract.
18. Indemnification:
The Contractor shall indemnify, defend and save harmless the School, the Town of North
Andover„ the Town's officers, agents and employees, from and against any and all
damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses,
recoveries and judgments of every nature and description (including reasonable
attorneys' fees) that may arise in whole or in part out of or in connection with the work
being performed or to be performed, or out of any act or omission by the Contractor, its
employees, agents, subcontractors, material men, and anyone directly or indirectly
employed by any of them or anyone for whose acts any of them may be liable, regardless
of whether or not it is caused in part by any party indemnified hereunder. The Contractor
further agrees to reimburse the School for damage to its property caused by the
Contractor, its employees, agents, subcontractors or material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
including damages caused by his, its or their use of faulty, defective, or unsuitable
material or equipment, unless the damage is caused by the School's gross negligence or
willful misconduct. The existence of insurance shall in no way limit the scope of the
Contractor's indemnification under this contract.
19. Workers Compensation Insurance:
The Contractor shall provide by insurance for the payment of compensation and the
furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts
North Andover School Department IFB Page 15 of 34
Kittredge School Drainage Improvements
(The Worker's Compensation Act) to all employees of the Contractor who are subject to
the provisions of Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract
shall be deemed a material breach of this Contract, shall operate as an immediate
termination thereof, and Contractor shall indemnify the School for all losses, claims, and
actions resulting from the failure to provide the insurance required by this Article.
The Contractor shall furnish to the School evidence of such insurance prior to the
execution of this Contract before the same shall be binding on the parties thereto, except
if specifically waived by the School.
20. Documents, Materials, Etc.
Any materials, reports, information, data, etc. given to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available
to any individual or organization by the Contractor (except agents, servants, or employees
of the Contractor) without the prior written approval of the School, except as otherwise
required by law. The Contractor shall comply with the provisions Chapter 66A of the
General Laws of Massachusetts as it relates to public documents, and all other state and
federal laws and regulations relating to confidentiality, security, privacy and use of
confidential data.
Any materials produced in whole or in part under this Contract shall not be subject to
copyright, except by the School, in the United States or any other country. The School
shall have unrestricted authority to, without payment of any royalty, commission, or
additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise
use, and authorize others to use, in whole or in part, any reports, data or other materials
prepared under this Contract.
All data, reports, programs, software, equipment, furnishings, and any other
documentation or product paid for by the School shall vest in the School at the
termination of this Contract. The Contractor shall at all times, during or after termination
of this Contract, obtain the prior written approval of the School before making any
statement bearing on the work performed or data collected under this Contract to the
press or issues any material for publication through any medium.
21. Audit, Inspection and Recordkeeping
At any time during normal business hours, and as often as the School may deem it
reasonably necessary, there shall be available in the office of the Contractor for the
purpose of audit, examination, and/or to make excerpts or transcript all records, contracts,
invoices, materials, payrolls, records of personnel, conditions of employment and other
data relating to all matters covered by this Agreement.
North Andover School Department IFB Page 16 of 34
Kittredge School Drainage Improvements
22. Payment
The School agrees to make all reasonable efforts to pay to the Contractor the sum set
forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice
detailing the work completed and acceptance from the School of the work completed.
23. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all
signatories to the original Agreement, prior to the effective date of the amendment.
To the extent allowed by law, any conditions, duties, and obligations contained in this
Contract may be waived only by written Agreement by both parties.
Forbearance or indulgence in any form or manner by a party shall not be construed as a
waiver, nor in any manner limit the legal or equitable remedies available to that party.
No waiver by either party of any default or breach shall constitute a waiver of any
subsequent default or breach of a similar or different matter.
24. Forum and Choice of Law
This Contract and any performance herein shall be governed by and be construed in
accordance with the laws of the Commonwealth. Any and all proceedings or actions
relating to subject matter herein shall be brought and maintained in the courts of the
Commonwealth or the federal district court sitting in the Commonwealth, which shall
have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any
other legal rights of the parties.
25. Notices
Any notice permitted or required under the provisions of this Contract to be given or
served by either of the parties hereto upon the other party hereto shall be in writing and
signed in the name or on the behalf of the party giving or serving the same. Notice shall
be deemed to have been received at the time of actual service or three (3) business days
after the date of a certified or registered mailing properly addressed. Notice to the
Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to
the North Andover School by being sent to the School Superintendent, 1600 Osgood,
North Andover, Massachusetts 01845.
26. Bindiniz on Successors:
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or
successors in interest (and where not corporate, the heirs and estate of the Contractor).
North Andover School Department IFB Page 17 of 34
Kittredge School Drainage Improvements
27. Complete Contract:
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no
agreements other than those incorporated herein.
28. Supplemental Conditions:
The foregoing provisions apply to all contracts to which the North Andover School
Department shall be a party. One of the following "Supplements "
SSu plements" must be "checked" as
applicable to this Contract, shall be attached hereto, and shall in any event apply as the
nature of the Contract requires. The Supplement contains additional terms governing the
Contract:
[ ] GOODS
[ ] SERVICES
SUPPLEMENT "G" - Applicable to Contracts for the procurement of
Goods (governed by the provisions of General Laws
Chapter 30B)
SUPPLEMENT "S" - Applicable to Contracts for the procurement of
Services (governed by the provisions of General
Laws Chapter 30B)
[ X ] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for Construction
North Andover School Department IFB Page 18 of 34
Kittredge School Drainage Improvements
IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set
forth their hands the day and year first above written.
THE SCHOOL
Division/Department Head
Contract Manager
School Superintendent Date
APPROVED AS TO FORM:
Town Counsel
Date
THE CONTRACTOR
Company Name
Signature
Print Name & Title
CERTIFICATION AS TO AVAILABILITY OF FUNDS:
Town Accountant
North Andover School Department IFB
Kittredge School Drainage Improvements
Date
Date
Page 19 of 34
SUPPLEMENT "C"
[] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for the construction of:
(1) Public Buildings and Public Works
(governed by the provisions of General Laws Chapter 30B);
(2) Public Buildings
(governed by the provisions of General Laws Chapter 149,§ 44A,
et seq.); and
(3) Public Works
(governed by the provisions of General Laws Chapter 30, §39M, et seq)
1. This form supplements the North Andover School Department "Contract and General Conditions"
and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of
public works or public buildings.
2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
(where required) in the form required by the School and provide an original thereof to the School
prior to the commencement of performance.
Equality:
3.1. In the case of a closed Specification written for a specific item or items to be furnished under
the Base Bid, such specifications shall, as applicable, be in compliance with the
Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq.
3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or
on the Drawings, except as above noted, the intent is to establish a standard and in no way
should be construed to exclude any item or manufacturer not mentioned by name, but whose
product meets the Specifications as to design, utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of
goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of
Chapter 30B.
5. The Contractor will carry out the obligations of this contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage
Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of
Massachusetts as they may from time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall
be in force and as amended.
6. The Contractor shall continuously maintain adequate protection of all work from damage and shall
protect the property of the School and others, including adjacent property, from injury or loss arising
North Andover School Department IFB Page 20 of 34
Kittredge School Drainage Improvements
in connection with the Contract. The Contractor shall make good any such damage, injury or loss,
except as may be directly due to errors in the Contract Documents or caused by agents or employees
of the School, or due to causes beyond the Contractor's control and not the Contractor's fault or
negligence.
7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall
comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents
or injury to persons on, about or adjacent to the premises where the work is being performed. The
Contractor will erect and properly maintain at all times, as required by the conditions and progress of
the work, all necessary safeguards for the protection of workers and the public, shall post danger
signs warning against the hazards created by such features of construction such as pits, protruding
nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling
materials; and shall designate a responsible member of its organization on the work, whose duty shall
be the prevention of accidents.
8. The School shall at all times have access to the work wherever it is in preparation or progress and the
Contractor shall provide suitable accommodations for such access.
9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the School. If the School in its sole discretion determines that the
construction superintendent, foreman, or assistants are unacceptable to the School, then upon seven
days notice from the School, the Contractor shall replace such person or persons with people
acceptable to the School.
10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The
Contractor shall carefully study and compare the drawings, specifications and other instructions and
shall at once report to the School any error, inconsistency or omission which shall be discovered.
Included in this responsibility shall be supervision of all work performed by subcontractors on the
work.
11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any
of its provisions, the School, upon three days written notice, may, without prejudice to any other
remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection by the School's Project Representative
12.1. The School shall have the right to designate a Project Representative who may make
periodic visits to the site to familiarize the School generally with the progress and quality of
the work, and to determine in general if the work is proceeding in accordance with the
Contract Documents. The Project Representative will not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the work, and will not be
responsible for the Contractor's failure to carry out the construction work in accordance with
the Contract Documents. During such visits and on the basis of these observations while at
the site, the Project Representative will keep the School informed on the progress of the
work, will endeavor to guard the School against defects and deficiencies in the work of
contractors, and may condemn structural work as failing to conform to the Contract
Documents. The Project Representative shall have authority to act on behalf of the School
only to the extent expressly delegated by the School, which shall be shown to the Contractor,
and shall have authority to stop the work whenever such stoppage may reasonably be
necessary to insure the proper execution of the Contract.
North Andover School Department IFB Page 21 of 34
Kittredge School Drainage Improvements
12.2. In connection with the work, the Project Representative shall not be responsible for
construction methods, means, techniques, sequences or procedures employed by the
Contractor or the Contractor's safety programs, requirements, regulations, or precautions.
13. Decisions of the Project Representative
13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of
the School or the Contractor and on all other matters relating to the execution and progress
of the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision, in matters relating to the project, shall be final, if
within the terms of the Contract Documents.
13.3. If, however, the Project Representative fails to render a decision within ten days after the
parties have presented their evidence, either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Project Representative renders a
decision after such remedies have commenced, such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the parties concerned.
14.1 Use of Premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by law, by-laws, permits or directions of the School and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or permit any part of the structure to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute,
the School may remove the rubbish and charge the cost to the several contractors, as the School
shall determine to be just.
16. Right to Terminate
If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit
of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail
to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently
disregard laws and regulations or lawful directives of the School, or (7) be guilty of a substantial
violation of any provision of the Contract, then the School may, without prejudice to any other
right or remedy and after giving the Contractor (or any surety) seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of all materials, tools and appliances thereon and finish the work by whatever method it
deems appropriate.
North Andover School Department IFB Page 22 of 34
Kittredge School Drainage Improvements
In such cases, the Contractor shall not be entitled to receive any further payment until the work is
finished. If the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of finishing the work, including compensation for additional architectural,
managerial, legal and administrative services, such excess shall be paid to the Contractor. If such
expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the School.
The Contractor shall not be relieved of liability to the School by virtue of any termination of this
contract, and any claim for damages against the Contractor relating to the Contractor's
performance under this contract shall survive any termination hereunder.
Notwithstanding any other provision of this Agreement, the School reserves the right at any time
in its absolute discretion to suspend or terminate this Agreement in whole or in part for its
convenience upon seven days written notice to the Contractor. The School shall incur no liability
by reason of such termination except for the obligation to pay compensation for all work
performed by the Contractor and accepted by the School to the termination date.
17. Progress ss Payments:
17.1. The Contractor shall submit to the School an itemized Application for Payment,
supported to the extent required by the School by invoices or other vouchers, showing
payments for materials and labor, payments to Subcontractors and such other evidence of
the Contractor's right to payment.
17.2. The Contractor shall, before the first application, submit to the School a schedule of
values of the various parts of the work, including quantities aggregating the total sum of
the Contract, divided so as to facilitate payments to Subcontractors, made out in such
form as the School and the Contractor may agree upon, and, if required, supported by
such evidence as to its correctness. This schedule, when approved by the School, shall be
used as a basis for payment, unless it is found to be in error. If applying for payments,
the Contractor shall submit a statement based upon this schedule.
18. Withholdinjz of Payments
18.1. The School may withhold or, on account of subsequently discovered evidence, nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the North Andover School Department from loss on account of:
18.1.1. Defective work not remedied.
18.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor.
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5. Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
North Andover School Department IFB Page 23 of 34
Kittredge School Drainage Improvements
18.2. Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims by Contractor and Liability of School
All claims by the Contractor against the School shall, unless otherwise provided by law, be
initiated by a written claim submitted to the School no later than seven (7) calendar days after the
event or the first appearance of the circumstances causing the claim. The claim shall set forth in
detail all known facts and circumstances supporting the claim. The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims.
The limit of liability of the School under this Agreement is limited to the compensation provided
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special or consequential damages or lost profits or for damages or loss from causes
beyond the School's reasonable control.
20. Liquidated Damages:
Because both parties recognize (1) that the time for completion of this Contract is of the essence,
(2) that the School will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the
delays, expense and difficulties involved in a legal proceeding to determine the actual loss
suffered by the School if the work is not completed in time, it is agreed that the Contractor will
pay the School as liquidated damages representing an estimate of delay damages, not as a penalty,
the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work
is completed, whether the work is completed by the Contractor or some other person. The
School's right to impose liquidated damages shall in no way prohibit or restrict the School's right
to bring a legal action for damages in lieu of or in addition to its option to impose liquidated
damages. The School may deduct any liquidated damages from money due the Contractor, and if
such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the
amount due.
21. The Contractors' Mutual Responsibility:
Should the Contractor cause damage to any separate subcontractor on the work, the Contractor
agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies
provided by law or by the provisions of the contract. If such separate contractor sues the School
on account of any damage alleged to have been sustained, the School shall notify the Contractor,
who shall defend such proceedings at the School's expense and, if any judgment against the
School arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the
School.
22. Separate Contracts:
22.1. The School reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results, upon the
work of any other contractor, the Contractor shall inspect and promptly report to the
North Andover School Department IFB Page 24 of 34
Kittredge School Drainage Improvements
School any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
of the other contractor's work as fit and proper for the reception of its work except as to
defects which may develop in the other contractor's work after the execution of its work.
22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work
already in place and shall at once report to the School any discrepancy between the
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
23.2. The Contractor agrees that it is as fully responsible to the School for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by
them, as it is for the acts and omissions of persons directly employed by it.
23.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the School.
24. Contractor -Subcontractor Relations:
The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound
by the terms of the Agreement, the General Conditions of the Contract, the Supplementary
General Conditions, the Drawings and Specifications, as far as applicable to its work, including
the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
25. Indemnification:
25.1. The Contractor shall indemnify, defend and save harmless the School, its officers, agents
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) brought or recovered against them that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or omission by the Contractor, its employees, agents,
subcontractors, material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable, regardless of whether or not it is
caused in part by any party indemnified hereunder. The Contractor further agrees to
reimburse the School for damage to its property caused by Contractor, its employees,
agents, subcontractors or material men, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the School's gross negligence or willful misconduct. The
existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this Contract.
25.2. In any and all claims against the School or any of their agents or employees by any
employee of the Contractor, any Subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable, the indemnification
North Andover School Department IFB Page 25 of 34
Kittredge School Drainage Improvements
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
employee benefit acts.
25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. However, it shall be the
Contractor's responsibility to purchase and maintain insurance of such character and in
such amounts as will adequately protect it and the School from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
26. The Contractor's Insurance:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone
for whose acts any of them may be liable.
26.1.1. Claims under Worker's Compensation, disability benefit and other similar
employee benefit acts;
26.1.2. Claims for damages because of bodily injury, occupational sickness or
disease, or death of its employees, and claims insured by usual personal
injury liability coverage;
26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees, and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
26.2.1. Worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability Insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and Operations, Owners and Contractor's Protective, Products
and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such
insurance shall be written for not less than any limits of liability required by law, unless otherwise
provided in the contract documents, or the following limits, whichever are greater:
North Andover School Department IPB Page 26 of 34
Kittredge School Drainage Improvements
Comprehensive General Liability Insurance (Broad Form)
Bodily Injury $1,000,000 per person
$3,000,000 per occurrence
Property Damage $1,000,000 per occurrence
$3,000,000 annual aggregate
Automobile Liability Insurance $500,000 per person
$1,000,000 per occurrence
26.3. The above insurance policies shall also be subject to the following requirements:
26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under Paragraph entitled "Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the School shall be addressed to and filed
with the School prior to commencement of the work. Renewal certificates shall
be addressed to and filed with the School at least ten (10) days prior to the
expiration date of required policies.
26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30)
days prior written notice forwarded by registered or certified mail to the School.
The School shall also be notified of the attachment of any restrictive amendments
to the policies.
26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of
Insurance form, shall contain true transcripts from the policies, authenticated by
the proper officer of the Insurer, evidencing in particular those insured, the extent
of coverage, the location and operations to which the insurance applies, the
expiration date and the above-mentioned notice clauses.
26.3.5. All premium costs shall be included in the Contractor's bid.
26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
27. Protective Liability Insurance:
27.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the School from claims which may arise from operations under
the Contract, including operations performed for the named insureds by independent
contractors and general inspection thereof by the named insureds.
North Andover School Department IFB Page 27 of 34
Kittredge School Drainage Improvements
27.2. The Contractor shall also purchase and maintain such insurance as will protect the School
against Automobile Non -Ownership Liability in connection with the Contractor's
operations under the Contract, whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable.
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing the Contractor's General Liability
Policy.
27.4. The Town of North Andover and the North Andover School Department shall be named
as an additional insured on the above referenced liability Policies, and the Contractor's
insurance shall be the primary coverage. The cost of such insurance, including required
endorsements and amendments, shall be the sole responsibility of the Contractor.
28. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the School a complete release of all liens arising out of the
Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as
it has knowledge or information, the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149
as amended (as a minimum requirement).
29. Guarantees:
29.1 The Contractor guarantees and warrants to the School that all labor furnished
under this Contract will be competent to perform the tasks undertaken, that the product of
such labor will yield only first-class results, that materials and equipment furnished will
be of good quality and new unless otherwise permitted by this Contract, and that the
Work will be of good quality, free from faults and defects and in strict conformance with
this Contract. All Work not conforming to these requirements may be considered
defective.
29.2. If at any time any part of the work constructed under the terms of this contract shall in the
opinion of the School Superintendent require repairing due to defective work or materials
furnished by the Contractor, he may notify the Contractor in writing to make the required
repairs. If the Contractor shall neglect to start such repairs within ten days of the date of
giving it notice thereof and to complete the same to the satisfaction of the School
Superintendent with reasonable dispatch, then the latter may employ other persons to
make such repairs. The School shall charge the expense thereof to the Contractor and
may use any moneys still retained to pay for the same, and if such sum is insufficient, the
Contractor shall be obligated to pay the balance thereof.
29.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the School before
final payment to the Contractor may be made for the amount of that subtrade or for the
phase of work to which the guarantee or warranty relates. The failure to deliver a
North Andover School Department IFB Page 28 of 34
Kittredge School Drainage Improvements
required guarantee or warranty shall be held to constitute a failure of the Subcontractor to
fully complete his work in accordance with the Contract Documents. The Contractor's
obligation to correct work is in addition to, and not in substitution of, such guarantees or
warranties as may be required in the various Sections of the Specifications.
This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals
hereto:
Dated:
The North Andover School Department by:
The Contractor by:
North Andover School Department IFB
Kittredge School Drainage Improvements
School Superintendent
Department/Division Head
Town Accountant
Certified as to Appropriation
Town Counsel
Approved as to Form
Authorized Signature
Page 29 of 34
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the
held on it was
VOTED, THAT
(Name)
(Officer)
of be and hereby is authorized to execute contracts and bonds in
the name and on behalf of said , and affix its corporate seal hereto;
and such execution of any contract or obligation in the name of on
its behalf by such officer under seal of , shall be valid and binding
upon
that
I hereby certify that I am the clerk of the above named
and
is the duly elected officer as above of said
and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
(Date)
(Clerk)
North Andover School Department IFB Page 30 of 34
Kittredge School Drainage Improvements
CERTIFICATIONS
CERTIFICATE OF NON -COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature.
Date
Print Name & Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I
authorized signatory for
Name of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes, permit or other fees, reporting of employees and contractors, and withholding and
remitting child support.
Signature
Date
North Andover School Department IFB Page 31 of 34
Kittredge School Drainage Improvements
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an
OSHA -approved construction safety and health course lasting at least ten (10) hours.
Signature
Print Name & Title
Date
Company Name
North Andover School Department IFB Page 32 of 34
Kittredge School Drainage Improvements
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS, that we
with a place of business at
as Principal (the "Principal"), and , a
corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at
as Surety
(the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee
(the "Obligee"), in the sum of lawful money of
the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we
bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of
for the construction of
NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications, alterations, extensions of time, changes or
additions to said contract that may hereafter be made, notice to the Surety of such modifications,
alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but
not be limited to, any other purposes or items set out in, and to be subject to, the provisions of
Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then
this obligation shall become null and void; otherwise, it shall remain in full force and virtue.
IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this
day of
PRINCIPAL
[Name and Seal]
[Title]
Attest:
SURETY
[Attorney-in-fact] [Seal]
[Address]
[Phone]
Attest:
North Andover School Department IFB Page 33 of 34
Kittredge School Drainage Improvements
Layout Drawings
North Andover School Department IFB Page 34 of 34
Kittredge School Drainage Improvements
r,
Z.op
v
o
W
O
J
�
IS
00
IS
m
In
J
J-7 (OT",
o
W
O
J
�
O
W
U
�
4.
/aJ
O
00
IL
�
IS
00
IS
m
In
J
J-7 (OT",
o
J
�
O
ao
/aJ
W
IL
J+
�1
X
uj
9
J 0o
O
4J
I
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN
Gov-Scactary
TIMOTTIY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Direclor
Awarding Authority: Town of North Andover
Contract Number:
City/Town: NORTH
ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing
pvc piping,
re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
Construction
(2 AXLE) DRIVER - EQUIPMENT
12/01/2011
$29.85
$8.56
$7.27
0.00
$45.68
TEAMSTERSJOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.15
$8.56
$7.27
0.00
$45.98
08/01/2012
$30.15
$8.91
$7.27
0.00
$46.33
12/01/2012
$30.45
$8.91
$8.00
0.00
$47.36
(3 AXLE) DRIVER - EQUIPMENT
12/01/2011
$29.92
$8.56
$7.27
0.00
$45.75
TEAMSTERSJOINT COUNCIL NO. ]OZONE B
06/01/2012
$30.22
$8.56
$7.27
0.00
$46.05
08/01/2012
$30.22
$8.91
$7.27
0.00
$46.40
12/01/2012
$30.52
$8.91
$8.00
0.00
$47.43
(4 & 5 AXLE) DRIVER - EQUIPMENT
12/01/2011
$30.04
$8.56
$7.27
0.00
$45.87
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.34
$8.56
$7.27
0.00
$46.17
08/01/2012
$30.34
$8.91
$7.27
0.00
$46.52
12/01/2012
$30.64
$9.07
$8.00
0.00
$47.71
ADS/SUBMERSIBLE PILOT
08/01/2011
$80.43
$9.80
$17.12
0.00
$107.35
PILE DRIVER LOCAL 56 (ZONE 1)
AIR TRACK OPERATOR
12/01/2011
$30.10
$7.10
$11.55
0.00
$48.75
LABORERS -7.ONE2
ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
12/01/2011
$28.40
$9.90
$5.95
0.00
$44.25
ASBESTOS WORKERS LOCAL 6 (BOSTON)
ASPHALT RAKER
12/01/2011
$29.60
$7.10
$11.55
0.00
$48.25
LABORERS - ZONE 2
ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE
12/01/2011
$39.52
$10.00
$12.40
0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
0.00
$64.67
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page l of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
00 DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN
GovemorSccmmry
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Gmemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Health
Pension
Supplemental
Unemployment
Total Rate
$24.51
$6.97
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$42.66
$26.39
$6.97
11.18
$0.00
Unemployment
$28.28
BACKHOE/FRONT-END LOADER
12/01/2011
$39.52
$10.00
$12.40
0.00
$61.92
OPERATING ENGINEERS LOCAL 4
$48.31
$32.05
$6.97
11.18
$0.00
$50.20
$33.93
06/01/2012
$40.09
$10.00
$12.40
0.00
$62.49
11.18
12/01/2012
$40.71
$10.00
$1.2.40
0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
0.00
$64.67
BARCO-TYPE JUMPING TAMPER 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25
LABORERS - ZONE 2
BLOCK PAVER, RAMMER / CURB SETTER 12/01/2011 $30.10 $7.10 $11.55 0.00 $48.75
LABOItE.RS - ZONE 2
BOILER MAKER
BOILERMAKERS LOCAL 29
Apprentice- BOILERMAKER -Local 29
Effective Date - 01/01/2010
Step percent
1 65
2 65
3 70
4 75
5 80
6 85
7 90
8 95
01/01/2010 $37.70 $6.97 $11.18 0.00 $55.85
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
$24.51
$6.97
11.18
$0.00
$42.66
$24.51
$6.97
11.18
$0.00
$42.66
$26.39
$6.97
11.18
$0.00
$44.54
$28.28
$6.97
11.18
$0.00
$46.43
$30.16
$6.97
11.18
$0.00
$48.31
$32.05
$6.97
11.18
$0.00
$50.20
$33.93
$6.97
11.18
$0.00
$52.08
$35.82
$6.97
11.18
$0.00
$53.97
-----------------------------
Notes:
I
r- - - - - - - - - - - - - - - - - - - -
Apprentice to Journeyworker Ratio:1:5
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 2 of 54
THE COMMONWEALTH OF MASSACHUSETTS
fth EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
UTL
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOrLDSTEIN
Govemor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RowE
LL Gocemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 03/01/2012 $46.56 $10.18 $17.25 0.00 $73.99
WATERPROOFING)
BRICKLAYERS LOCAL 3 (LYNN)
Apprentice- BRICKIPLASTERICEMENT MASON -Local 3 Lynn
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$23.28
$10.18
17.25
$0.00
$50.71
2 60
$27.94
$10.18
17.25
$0.00
$55.37
3 70
$32.59
$10.18
17.25
$0.00
$60.02
4 80
$37.25
$10.18
17.25
$0.00
$64.68
5 90
$41.90
$10.18
17.25
$0.00
$69.33
(--------------------------
Notes:
--t
L ----------------------------
Apprentice to Journeyworker Ratio: 1:5
BULLDOZER/GRADER/SCRAPER
12/01/2011
$39.16
$10.00
$12.40
0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
0.00
$62.12
12/01/201.2
$40.34
$10.00
$12.40
0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
0.00
$64.29
CAISSON & UNDERPINNING BOTTOM MAN
12/01/2011
$32.80
$7.10
$12.60
0.00
$52.50
LABORERS - FOUNDATION AND MARINE
CAISSON & UNDERPINNING LABORER
12/01/2011
$31.65
$7.10
$12.60
0.00
$51.35
LABORERS - FO UNDATIONAND MARINE
CAISSON & UNDERPINNING TOP MAN
12/01/201.1
$31.65
$7.10
$12.60
0.00
$51.35
LABORERS - FOUNDATION AND MARINE
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 3 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE s F. OLDSTEiN
Governor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Goverrmr Dimclor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
CARBIDE CORE DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25
LABORF,RS-ZONF,2
CARPENTER
CARPENTERS -7.ONE 2 (Eastern Massachusetts)
Apprentice - CARPENTER - Zone 2 Eastern MA
Effective Date - 03/01/2012
03/01/2012 $33.03 $9.80 $15.61
Step
percent
Apprentice Base Wage
Health
Pension
1
50
$16.52
$9.80
1.57
2
60
$19.82
$9.80
1.57
3
70
$23.12
$9.80
10.90
4
75
$24.77
$9.80
10.90
5
80
$26.42
$9.80
12.47
6
80
$26.42
$9.80
12.47
7
90
$29.73
$9.80
14.04
8
90
$29.73
$9.80
14.04
Supplemental
Unemployment
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.00
Total Rate
$27.89
$31.19
$43.82
$45.47
$48.69
$48.69
$53.57
$53.57
- - - - - - - - - - - - - - - - - - - - - - - - - - - - --
Notes:
- - - - - - - - - - - - - - - - - - -
Apprentice to Journeyworker Ratio.i-5
$58.44
CEMENT MASONRY/PLASTERING 02/01/2012 $45.10 $9.93 $16.51 0.00 $71.54
BRICKLAYERS LOCAL 3 (LYNN)
CHAIN SAW OPERATOR
LABORERS - 7ONI3 2
12/01/2011 $29.60 $7.10 $11.55 0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
$48.25
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 4 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gover-r
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS
LL Gov- HEATHER
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$45.01
$7.80
$14.60
0.00
$67.41
Unemployment
$46.01
CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES
12/01/2011
$40.52
$10.00
$12.40
0.00
$62.92
OPERATING ENGINEERS LOCAL 4
06/01/201.2
$41.09
$10.00
$12.40
0.00
$63.49
12/01/2012
$41.71
$10.00
$12.40
0.00
$64.11
06/01/2013
$42.49
$10.00
$12.40
0.00
$64.89
12/01/2013
$43.27
$10.00
$12.40
0.00
$65.67
COMPRESSOR OPERATOR
12/01/2011
$27.95
$10.00
$12.40
0.00
$50.35
OPERATING ENGINEERS LOCAL 4
06/01/2012
$28.34
$10.00
$12.40
0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
0.00
$51.74
12/01/2013
$29.89
$10.00
$12.40
0.00
$52.29
DELEADER (BRIDGE)
PAINTERS LOCAL 35 - ZONE 2
01/01/2012
$44.01
$7.80
$14.60
0.00
$66.41
07/01/2012
$45.01
$7.80
$14.60
0.00
$67.41
01/01/2013
$46.01
$7.80
$14.60
0.00
$68.41
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 5 of 54
DEVAL L. PATRICK
Governor
TIMOTHY P. MURRAY
Lt. Govemor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE s F. GOLDSTEIN
9
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGES/TANKS
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$22.01
$7.80
0.00
$0.00
$29.81
2 55
$24.21
$7.80
3.25
$0.00
$35.26
3 60
$26.41
$7.80
3.54
$0.00
$37.75
4 65
$28.61
$7.80
3.84
$0.00
$40.25
5 70
$30.81
$7.80
12.83
$0.00
$51.44
6 75
$33.01
$7.80
13.13
$0.00
$53.94
7 80
$35.21
$7.80
13.42
$0.00
$56.43
8 90
$39.61
$7.80
14.01
$0.00
$61.42
Effective Date - 07/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$22.51
$7.80
0.00
$0.00
$30.31
2 55
$24.76
$7.80
3.25
$0.00
$35.81
3 60
$27.01
$7.80
3.54
$0.00
$38.35
4 65
$29.26
$7.80
3.84
$0.00
$40.90
5 70
$31.51
$7.80
12.83
$0.00
$52.14
6 75
$33.76
$7.80
13.13
$0.00
$54.69
7 80
$36.01
$7.80
13.42
$0.00
$57.23
8 90
$40.51
$7.80
14.01
$0.00
$62.32
----------------------------
Notes:
` Steps are 750 his.
I
Apprentice to Journeyworker R. Ti. a
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 6 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 0.00 $51.35
LABORERS - ZONE 2
Apprentice - LABORER Demo (Group 1)
Effective Date - 12/01/2011
Step percent
1 60
2 70
3 80
4 90
Apprentice Base Wage
THE COMMONWEALTH OF MASSACHUSETTS
Pension
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Total Rate
DEPARTMENT OF LABOR STANDARDS
$7.10
Prevailing Wage Rates
DEVALL. PATRICK
Govemor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
TIMOTHY P. MURRAY
Secretary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LL Governor
HEATHER E. ROWS
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 0.00 $51.35
LABORERS - ZONE 2
Apprentice - LABORER Demo (Group 1)
Effective Date - 12/01/2011
Step percent
1 60
2 70
3 80
4 90
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
$19.08
$7.10
12.45
$0.00
$38.63
$22.26
$7.10
12.45
$0.00
$41.81
$25.44
$7.10
12.45
$0.00
$44.99
$28.62
$7.10
12.45
$0.00
$48.17
(--------------------------
Notes:
t -----------------------
Apprentice to Journeyworker Ratio: 1:5
DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 0.00
LABORERS - ZONE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
$52.35
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 7 of 54
DEVAL L. PATRICK
Govem,
TIMOTHY P. MURRAY
Lt. Governor
Awarding Authority:
Contract Number:
Description of Work:
Job Location
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE P. GOLDSTEIN
Sec=,
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Direclor
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - LABORER Demo (Group 3)
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.68
$7.10
12.45
$0.00
$39.23
2 70
$22.96
$7.10
12.45
$0.00
$42.51
3 80
$26.24
$7.10
12.45
$0.00
$45.79
4 90
$29.52
$7.10
12.45
$0.00
$49.07
-------------------------------
Notes:
'--- -------------------
Apprentice to Journeyworker Ratio:l:5
DEMO: BURNERS
LABORERS - 70NE 2
12/01/2011 $32.55 $7.10 $12.45
Apprentice - LABORER Demo (Group 2)
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment
0.00 $52.10
Total Rate
1 60
$19.53
$7.10
12.45
$0.00
$39.08
2 70
$22.79
$7.10
12.45
$0.00
$42.34
3 80
$26.04
$7.10
12.45
$0.00
$45.59
4 90
$29.30
$7.10
12.45
$0.00
$48.85
Notes:
Apprentice to Journeyworker Ratio:l:5
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 8 of 54
THE COMMONWEALTH OF MASSACHUSETTS
s> EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
WL
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gov -
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HE E. RowE
LL Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 0.00 $52.35
LABORERS-7.ONE2
Apprentice - LABORER Demo (Group 3)
Effective Date - 12/01/2011
Step percent
1 60
2 70
3 80
4 90
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
$19.68
$7.10
12.45
$0.00
$39.23
$22.96
$7.10
12.45
$0.00
$42.51
$26.24
$7.10
1.2.45
$0.00
$45.79
$29.52
$7.10
12.45
$0.00
$49.07
(--------------------------
Notes:--+
I
�-- - -------------------
Apprentice to Journeyworker Ratio: 1:5
DEMO: JACKHAMMER OPERATOR
LABORERS - ZONE 2
12/01/2011 $32.55 $7.10 $12.45 0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
$52.1.0
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 9 of 54
THE COMMONWEALTH OF MASSACHUSETTS
s} EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
WL
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
Governor Y P
Secretan
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Gov- Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice - LABORER Demo (Group 2)
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.53
$7.10
12.45
$0.00
$39.08
2 70
$22.79
$7.10
12.45
$0.00
$42.34
3 80
$26.04
$7.10
12.45
$0.00
$45.59
4 90
$29.30
$7.10
12.45
$0.00
$48.85
- - - - - - - - - - -
(Notes:
- - - - -
- - -
-- - - -
- - -
- - -t
L -----------------------------
Apprentice to Journeyworker Ratio: 1:5
I
DEMO: WRECKING LABORER
LABORERS - ZONE 2
12/01/2011 $31.80 $7.10 $12.45
Apprentice - LABORER Demo (Group 1)
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment
0.00 $51.35
Total Rate
1 60
$19.08
$7.10
12.45
$0.00
$38.63
2 70
$22.26
$7.10
12.45
$0.00
$41.81
3 80
$25.44
$7.10
12.45
$0.00
$44.99
4 90
$28.62
$7.10
12.45
$0.00
$48.17
Notes:
Apprentice to Journeyworker Ratio: 1:5
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 10 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
THE COMMONWEALTH OF MASSACHUSETTS
$53.62
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
W
DEPARTMENT OF LABOR STANDARDS
$80.54
Prevailing Wage Rates
DEVAL L. PATRICK
Govertar
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Health
Pension
Supplemental
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P MURRAY
Lt. Govcroor
HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
08/01/2011
$53.62
$9.80
$17.12
0.00
$80.54
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
DIVER TENDER
08/01/2011
$38.30
$9.80
$17.12
Unemployment
$65.22
DIRECTIONAL DRILL MACHINE OPERATOR
12/01/2011
$39.16
$10.00
$12.40
0.00
$61.56
OPERATING ENGINEERS LOCAL 4
08/01/2011
$57.45
$9.80
$17.12
0.00
$84.37
PILE DRIVER LOCAL 56 (ZONE 1)
06/01/2012
$39.72
$10.00
$12.40
0.00
$62.12
DIVER/SLURRY (EFFLUENT)
12/01/2012
$40.34
$10.00
$12.40
0.00
$62.74
PILE DRIVER LOCAL 56 (ZONE 1)
06/01/2013
$41.11
$10.00
$12.40
0.00
$63.51
ELECTRICIAN
12/01/2013
$41.89
$1.0.00
$12.40
0.00
$64.29
DIVER
08/01/2011
$53.62
$9.80
$17.12
0.00
$80.54
PILE DRIVER LOCAL 56 (ZONE 1)
DIVER TENDER
08/01/2011
$38.30
$9.80
$17.12
0.00
$65.22
PILE DRIVER LOCAL 56 (ZONE 1)
DIVER TENDER (EFFLUENT)
08/01/2011
$57.45
$9.80
$17.12
0.00
$84.37
PILE DRIVER LOCAL 56 (ZONE 1)
DIVER/SLURRY (EFFLUENT)
08/01/2011
$80.43
$9.80
$17.12
0.00
$107.35
PILE DRIVER LOCAL 56 (ZONE 1)
ELECTRICIAN
03/01/2012
$42.37
$13.00
$13.87
0.00
$69.24
ELECTRICIANS LOCAL 103
09/01/2012
$43.05
$13.00
$13.89
0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
0.00
$75.52
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 11 of 54
THE COMMONWEALTH OF MASSACHUSETTS
# EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gov-
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATT>ERE. ROWE
Lt. G-r Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Apprentice - ELECTRICIAN - Local 103
Effective Date - 03/01/2012
Step percent
Effective Date Base Wage
Apprentice Base Wage Health
Health
Pension
Pension Supplemental Total Rate
Unemployment
Supplemental
Unemployment Total Rate
1
40
$16.95
$13.00
7.81
$0.00
$37.76
2
40
$16.95
$13.00
7.81
$0.00
$37.76
3
45
$19.07
$13.00
10.26
$0.00
$42.33
4
45
$19.07
$13.00
10.26
$0.00
$42.33
5
50
$21.19
$13.00
10.59
$0.00
$44.78
6
55
$23.30
$13.00
10.92
$0.00
$47.22
7
60
$25.42
$13.00
11.24
$0.00
$49.66
8
65
$27.54
$13.00
11.58
$0.00
$52.12
9
70
$29.66
$13.00
11.90
$0.00
$54.56
10
75
$31.78
$13.00
12.23
$0.00
$57.01
Effective Date - 09/01/2012
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$17.22
$13.00
7.82
$0.00
$38.04
2
40
$17.22
$13.00
7.82
$0.00
$38.04
3
45
$19.37
$13.00
10.27
$0.00
$42.64
4
45
$19.37
$13.00
10.27
$0.00
$42.64
5
50
$21.53
$13.00
10.60
$0.00
$45.13
6
55
$23.68
$13.00
10.93
$0.00
$47.61
7
60
$25.83
$13.00
11.25
$0.00
$50.08
8
65
$27.98
$13.00
11.59
$0.00
$52.57
9
70
$30.14
$13.00
11.91
$0.00
$55.05
10
75
$32.29
$13.00
12.25
$0.00
$57.54
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 12 of 54
WL
DEVAL L. PATRICK
Govcmor
TIMOTHY P. MURRAY
LI. Govcmor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
smarm,
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Dimclor
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
------------------------------
Notes: :
----------------------------rNotes::
App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80
'-
----------------------------
Apprentice to Journeyworker Ratio:2:3***
ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 4
Apprentice- ELEVATOR CONSTRUCTOR - Local 4
Effective Date - 01/01/2012
01/01/2012 $52.45 $8.78 $6.96
Step
percent
Apprentice Base Wage
Health
1
50
$26.23
$8.78
2
55
$28.85
$8.78
3
65
$34.09
$8.78
4
70
$36.72
$8.78
5
80
$41.96
$8.78
Pension
0.00
6.96
6.96
6.96
6.96
Supplemental
Unemployment
$0.00
$0.00
$0.00
$0.00
$0.00
0.00
Total Rate
$35.01.
$44.59
$49.83
$52.46
$57.70
$68.19
(Notes: ---------------------------+
Steps 1-2 are 6 mos.; Steps 3-5 are 1 year
-- ------------------
Apprentice to Journeyworker Ratioaa
ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 0.00 $54.33
ELEVATOR CONSTRUCTORS LOCAL 4
FENCE & GUARD RAIL ERECTOR
LABORERS - 70NE 2
12/01/2011 $29.60 $7.10 $11.55 0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
$48.25
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 13 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date
THE COMMONWEALTH OF MASSACHUSETTS
Health
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Supplemental
DEPARTMENT OF LABOR STANDARDS
$61.08
$61.69
$62.31
$62.93
$63.70
$64.47
Prevailing Wage Rates
DEVAL L. PATRICK
Govemor
As determined by the Director under the provisions of the JOANNE s F. GOLDSTEIN
TIMOTHY P. MURRAY
Lt. Govc-,
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$61.08
$61.69
$62.31
$62.93
$63.70
$64.47
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
11/01/2011
$20.91
Unemployment
$12.20
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2011
$37.49
$10.00
$12.20
0.00
$59.69
OPERATING ENGINEERS LOCAL 4
05/01/2012
$21.07
05/01/2012
$37.90
$10.00
$12.40
0.00
$60.30
11/01/2012
$38.51
$10.00
$12.40
0.00
$60.91.
05/01/2013
$39.12
$10.00
$12.40
0.00
$61.52
11/01/2013
$39.88
$10.00
$12.40
0.00
$62.28
05/01/2014
$40.65
$10.00
$12.40
0.00
$63.05
FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
11/01/2011
05/01/2012
11/01/2012
05/01/2013
11/01/2013
05/01/2014
$38.88
$39.29
$39.91
$40.53
$41.30
$42.07
$10.00
$10.00
$10.00
$10.00
$10.00
$10.00
$12.20
$12.40
$12.40
$12.40
$12.40
$12.40
0.00
0.00
0.00
0.00
0.00
0.00
$61.08
$61.69
$62.31
$62.93
$63.70
$64.47
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
11/01/2011
$20.91
$10.00
$12.20
0.00
$43.11
OPERATING ENGINEERS LOCAL 4
05/01/2012
$21.07
$10.00
$12.40
0.00
$43.47
11/01/2012
$21.43
$10.00
$12.40
0.00
$43.83
05/01/2013
$21.79
$10.00
$12.40
0.00
$44.19
11/01/2013
$22.25
$10.00
$12.40
0.00
$44.65
05/01/2014
$22.70
$10.00
$12.40
0.00
$45.10
FIRE ALARM INSTALLER
03/01/2012
$42.37
$13.00
$13.87
0.00
$69.24
ELECTRICIANS LOCAL 103
09/01/2012
$43.05
$13.00
$13.89
0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
0.00
$75.52
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 14 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Governor Secretary
TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H xEATxERE�RowE
Lt. Goremor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
FIRE ALARM REPAIR / MAINTENANCE
03/01/2012
$31.78
$13.00
$12.23
0.00
$57.01
I COMMISSIONINGELEcTRIcIANs
LOCAL 103
09/01/2012
$32.29
$13.00
$12.25
0.00
$57.54
03/01/2013
$32.83
$13.00
$12.26
0.00
$58.09
09/01/2013
$33.34
$13.00
$12.28
0.00
$58.62
03/01/2014
$33.88
$13.00
$12.30
0.00
$59.18
09/01/2014
$34.38
$13.00
$12.31
0.00
$59.69
03/01/2015
$34.91
$13.00
$12.33
0.00
$60.24
09/01/2015
$35.63
$13.00
$12.35
0.00
$60.98
03/01/2016
$36.35
$13.00
$12.37
0.00
$61.72
FIREMAN (ASST. ENGINEER)
12/01/2011
$33.23
$10.00
$12.40
0.00
$55.63
OPERATING ENGINEERS LOCAL 4
06/01/2012
$33.70
$10.00
$12.40
0.00
$56.10
12/01/2012
$34.23
$10.00
$12.40
0.00
$56.63
06/01/2013
$34.88
$10.00
$12.40
0.00
$57.28
12/01/2013
$35.54
$10.00
$12.40
0.00
$57.94
FLAGGER & SIGNALER
12/01/2011
$20.50
$7.10
$11.55
0.00
$39.15
LABORERS - ZONE 2
FLOORCOVERER 03/01/2012 $37.20 $9.80 $16.61 0.00 $63.61
FLOORCOVERERS LOCAL 2168 ZONE I
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 15 of 54
DEVAL L. PATRICK
Govemor
TIMOTHY P. MURRAY
Lt. Governor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE S c� DSTEIN
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- FLOORCOVERER -Local 2168 Zone I
Effective Date - 03/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$18.60
$9.80
1.79
$0.00
$30.19
2 55
$20.46
$9.80
1.79
$0.00
$32.05
3 60
$22.32
$9.80
11.24
$0.00
$43.36
4 65
$24.18
$9.80
11.24
$0.00
$45.22
5 70
$26.04
$9.80
13.03
$0.00
$48.87
6 75
$27.90
$9.80
13.03
$0.00
$50.73
7 80
$29.76
$9.80
14.82
$0.00
$54.38
8 85
$31.62
$9.80
14.82
$0.00
$56.24
-----------------------------
--------------------------_.--_,Notes:
Notes:
Steps are 750 hrs.
'--------------------
Apprentice to Journeyworker Ratio:l:l
FORK LIFT/CHERRY PICKER
12/01/2011
$39.52
$10.00
$12.40
0.00
$61.92
OPF_R9TING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
0.00
$64.67
GENERATOR/LIGHTING PLANTMEATERS
12/01/2011
$27.95
$10.00
$12.40
0.00
$50.35
OPERATING ENGINEERS LOCAL 4
06/01/2012
$28.34
$10.00
$12.40
0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
0.00
$51.74
12/01/2013
$29.89
$10.00
$12.40
0.00
$52.29
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 16 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gov—
relary
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re-working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
GLAZIER (GLASS PLANK/AIR BARRIERANTERIOR 01/01/2012 $33.51 $7.80 $14.60 0.00 $55.91
SYSTEMS)
GLA7.IERS LOCAL 35 (ZONE 2) 07/01/2012 $34.51 $7.80 $14.60 0.00 $56.91
01/01/2013 $35.51 $7.80 $14.60 0.00 $57.91
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 17 of 54
S
k
WL
DEVAL L. PATRICK
Governor
TIMOTHY P. MURRAY
LL Governor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNES GOLDSTEIN
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - GLAZIER - Local 35 Zone 2
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$16.76
$7.80
0.00
$0.00
$24.56
2 55
$18.43
$7.80
3.25
$0.00
$29.48
3 60
$20.11
$7.80
3.54
$0.00
$31.45
4 65
$21.78
$7.80
3.84
$0.00
$33.42
5 70
$23.46
$7.80
12.83
$0.00
$44.09
6 75
$25.13
$7.80
13.13
$0.00
$46.06
7 80
$26.81
$7.80
13.42
$0.00
$48.03
8 90
$30.16
$7.80
14.01
$0.00
$51.97
Effective Date - 07/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.26
$7.80
0.00
$0.00
$25.06
2 55
$18.98
$7.80
3.25
$0.00
$30.03
3 60
$20.71
$7.80
3.54
$0.00
$32.05
4 65
$22.43
$7.80
3.84
$0.00
$34.07
5 70
$24.16
$7.80
12.83
$0.00
$44.79
6 75
$25.88
$7.80
13.13
$0.00
$46.81
7 80
$27.61
$7.80
13.42
$0.00
$48.83
8 90
$31.06
$7.80
14.01
$0.00
$52.87
- - - - - - - - - - - - - - - - - - - - - - - - - - - -
(Notes:
Steps are 750 hrs.
�- - _._.-----_...-..__..------------
Apprentice to Journeyworker Ratio:l:l
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 18 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
WJ
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK
GovemorScemary
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
TTMOTEY P. MURRAY
Lt. Govemor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEAT.HEe E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
HOISTING ENGINEER/CRANES/GRADALLS
12/01/2011
$39.52
$10.00
$12.40
0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
0.00
$64.67
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 19 of 54
DEVALL. PATRICK
Govemor
TIMOTHY P. MURRAY
Li. Govcmor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNES GO DSTEIN
mtary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- HOIST/PORT. ENG.- Local 4
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 55
$21.74
$10.00
0.00
$0.00
$31.74
2 60
$23.71
$10.00
12.40
$0.00
$46.11
3 65
$25.69
$10.00
12.40
$0.00
$48.09
4 70
$27.66
$10.00
1.2.40
$0.00
$50.06
5 75
$29.64
$10.00
12.40
$0.00
$52.04
6 80
$31.62
$10.00
12.40
$0.00
$54.02
7 85
$33.59
$10.00
1.2.40
$0.00
$55.99
8 90
$35.57
$10.00
12.40
$0.00
$57.97
Effective Date - 06/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 55
$22.05
$10.00
0.00
$0.00
$32.05
2 60
$24.05
$10.00
12.40
$0.00
$46.45
3 65
$26.06
$10.00
12.40
$0.00
$48.46
4 70
$28.06
$10.00
12.40
$0.00
$50.46
5 75
$30.07
$10.00
12.40
$0.00
$52.47
6 80
$32.07
$10.00
12.40
$0.00
$54.47
7 85
$34.08
$10.00
12.40
$0.00
$56.48
8 90
$36.08
$10.00
.12.40
$0.00
$58.48
- - - - - - - - - - - - - - - - - - - - - - - - - - - -
(Notes: I
'-- - --------.___.----------__...-
Apprentice to Journeyworker Ratio:l:6
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 20 of 54
THE COMMONWEALTH OF MASSACHUSETTS
# 1k EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Go -mor
Socretary
TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
LL Gov- Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
HVAC (DUCTWORK)
02/01/2012
$40.79
$9.82
$17.34
2.04
$69.99
SHEETMETAL WORKERS LOCAL 17 -A
08/01/2012
$42.04
$9.82
$17.34
2.08
$71.28
02/01/2013
$43.29
$9.82
$17.34
2.11
$72.56
HVAC (ELECTRICAL CONTROLS)
03/01/2012
$42.37
$13.00
$13.87
0.00
$69.24
ELECTRICIANS LOCAL 103
09/01/2012
$43.05
$13.00
$13.89
0.00
$69.94
03/01/2013
$43.77
$13.00
$13.91
0.00
$70.68
09/01/2013
$44.45
$13.00
$13.93
0.00
$71.38
03/01/2014
$45.17
$13.00
$13.95
0.00
$72.12
09/01/2014
$45.84
$13.00
$13.97
0.00
$72.81
03/01/2015
$46.55
$13.00
$14.00
0.00
$73.55
09/01/2015
$47.51
$13.00
$14.03
0.00
$74.54
03/01/2016
$48.47
$13.00
$14.05
0.00
$75.52
HVAC (TESTING AND BALANCING - AIR)
02/01/2012
$40.79
$9.82
$17.34
2.04
$69.99
SHEETME7AL WORKERS LOCAL 17 - A
08/01/2012
$42.04
$9.82
$17.34
2.08
$71.28
02/01/2013
$43.29
$9.82
$17.34
2.11
$72.56
HVAC (TESTING AND BALANCING -WATER)
03/01/2012
$44.51
$8.75
$12.39
0.00
$65.65
PIPEF17TERS LOCAL 537 (Local 138)
09/01/2012
$45.76
$8.75
$12.39
0.00
$66.90
03/01/2013
$47.01
$8.75
$12.39
0.00
$68.15
HVAC MECHANIC
03/01/2012
$44.51
$8.75
$12.39
0.00
$65.65
PIPEFI7TERS LOCAL 537 (Local 138)
09/01/2012
$45.76
$8.75
$12.39
0.00
$66.90
03/01/2013
$47.01
$8.75
$12.39
0.00
$68.15
HYDRAULIC DRILLS
12/01/2011
$30.10
$7.10
$11.55
0.00
$48.75
LABORERS -70NE2
INSULATOR (PIPES & TANKS)
09/01/2011
$40.66
$10.40
$11.20
0.00
$62.26
ASBESTOS WORKERS LOCAL 6 (BOSTON)
09/01/2012
$42.06
$10.40
$11.20
0.00
$63.66
09/01/2013
$43.66
$10.40
$11.20
0.00
$65.26
09/01/2014
$45.66
$10.40
$11.20
0.00
$67.26
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 21 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
km
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. � LDSTEIN
Governor
TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
LL Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
$33.58
$7.70
$18.35
0.00
$59.63
Classification
Effective Date
Base Wage
Health
Pension Supplemental
Total Rate
03/16/2013
$35.83
$7.70
$18.35
Unemployment
$61.88
Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston
Effective Date - 09/01/2011
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$20.33
$10.40
8.30
$0.00
$39.03
2 60
$24.40
$10.40
8.88
$0.00
$43.68
3 70
$28.46
$10.40
9.46
$0.00
$48.32
4 80
$32.53
$10.40
10.04
$0.00
$52.97
Effective Date - 09/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$21.03
$10.40
8.30
$0.00
$39.73
2 60
$25.24
$10.40
8.88
$0.00
$44.52
3 70
$29.44
$10.40
9.46
$0.00
$49.30
4 80
$33.65
$10.40
10.04
$0.00
$54.09
-----------------------------
Notes:
---------------.-----------Notes:
Steps are 1 year
Apprentice to Journeyworker Ratio: f 4
IRONWORKER/WELDER
IRONWORKERS LOCAL 7 (LAWRENCE AREA)
04/02/2012
$33.58
$7.70
$18.35
0.00
$59.63
09/16/2012
$34.58
$7.70
$18.35
0.00
$60.63
03/16/2013
$35.83
$7.70
$18.35
0.00
$61.88
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 22 of 54
it
DEVALL. PATRICK
Gov -
TIMOTHY P. MURRAY
Lt. Govemor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE S GOLDSTEIN
ry
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- IRONWORKER -Local 7 Lawrence
Effective Date - 04/02/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$20.15
$7.70
18.35
$0.00
$46.20
2 70
$23.51
$7.70
18.35
$0.00
$49.56
3 75
$25.19
$7.70
18.35
$0.00
$51.24
4 80
$26.86
$7.70
18.35
$0.00
$52.91
5 85
$28.54
$7.70
18.35
$0.00
$54.59
6 90
$30.22
$7.70
18.35
$0.00
$56.27
Effective Date - 09/16/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$20.75
$7.70
18.35
$0.00
$46.80
2 70
$24.21
$7.70
18.35
$0.00
$50.26
3 75
$25.94
$7.70
18.35
$0.00
$51.99
4 80
$27.66
$7.70
18.35
$0.00
$53.71
5 85
$29.39
$7.70
18.35
$0.00
$55.44
6 90
$31.12
$7.70
18.35
$0.00
$57.17
- - - - - - - - - - -
Notes:
- - - - -
- - - -
- -
- - - -
- - -.
Structural 1:6; Ornamental 1:4
I
'- -- - -
Apprentice to Journeyworker Ratio:
- - - - - -
- - -
- -
- - - -
- - -
JACKHAMMER & PAVING BREAKER OPERATOR
12/01/2011
$29.60
$7.10
$11.55
0.00 $48.25
L4BORERS-7.0NE2
LABORER
LABORERS-7.0NF2
12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 1.49, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 23 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Govemor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Govemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice - LABORER - Zone 2
Effective Date - 12/01/2011
Step percent
1 60
2 70
3 80
4 90
Apprentice Base Wage Health
$17.61
$7.10
$20.55
$7.10
$23.48
$7.10
$26.42
$7.10
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -,
(Notes:
1- ----------------------------
Apprentice to Journeyworker Ratio: 1:5
LABORER: CARPENTER TENDER 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00
LABORERS - ZONE 2
LABORER: CEMENT FINISHER TENDER
Supplemental
$29.35
Pension
Unemployment
Total Rate
11.55
$0.00
$36.26
11.55
$0.00
$39.20
11.55
$0.00
$42.13
11.55
$0.00
$45.07
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -,
(Notes:
1- ----------------------------
Apprentice to Journeyworker Ratio: 1:5
LABORER: CARPENTER TENDER 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00
LABORERS - ZONE 2
LABORER: CEMENT FINISHER TENDER
12/01/2011
$29.35
$7.10
$11.55
0.00
$48.00
LABORERS - ZONE 2
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
12/01/2011
$29.35
$7.10
$11.55
0.00
$48.00
LABORERS -7.ONF.2
LABORER: MASON TENDER
12/01/2011
$29.60
$7.10
$11.55
0.00
$48.25
LABORERS - ZONE 2
LABORER: MULTI -TRADE TENDER
12/01/2011
$29.35
$7.10
$11.55
0.00
$48.00
LABORERS - ZONE 2
LABORER: TREE REMOVER
12/01/2011
$29.35
$7.10
$11.55
0.00
$48.00
LABORERS - ZONE 2
This classification applies to the wholesale removal
of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not
on or around utility lines.
LASER BEAM OPERATOR
12/01/2011
$29.60
$7.10
$11.55
0.00
$48.25
LABORERS - ZONE 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 24 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
MARBLE & TILE FINISHERS 03/01/2012 $35.52 $10.18 $16.04 0.00 $61.74
BRICKLAYERS LOCAL 3 -MARBLE & TILE
Apprentice- MARBLE & TILE FINISHER -Local
Effective Date - 03/01/2012
Step percent
THE COMMONWEALTH OF MASSACHUSETTS
#
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Supplemental
Unemployment
DEPARTMENT OF LABOR STANDARDS
1 50
Prevailing Wage Rates
DEVAL L. PATRICK
Govemor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Secretary
TIMOTHY P. MURRAY
Lt. Govcmor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Dimclor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
MARBLE & TILE FINISHERS 03/01/2012 $35.52 $10.18 $16.04 0.00 $61.74
BRICKLAYERS LOCAL 3 -MARBLE & TILE
Apprentice- MARBLE & TILE FINISHER -Local
Effective Date - 03/01/2012
Step percent
3 Marble & Tile
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 50
$17.76
$10.18
16.04
$0.00
$43.98
2 60
$21.31
$10.18
16.04
$0.00
$47.53
3 70
$24.86
$10.18
16.04
$0.00
$51.08
4 80
$28.42
$10.18
16.04
$0.00
$54.64
5 90
$31.97
$10.18
16.04
$0.00
$58.19
(--------------------------
Notes:
-+
Steps are 800 hrs.
'--- ------------------
Apprentice to Journeyworker Ratio:l:3
MARBLE MASONS,TILELAYERS & TERRAZZO MECH 03/01/2012 $46.60 $10.18 $17.25 0.00
BRICKLAYERS LOCAL 3 - MARBLE & TILE
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
$74.03
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 25 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Co ew,
TJMOTHYP MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
LL Govemr Dimclor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
Unemployment
Apprentice- MARBLE -TILE -TERRAZZO
MECHANIC -Local 3 Marble & Tile
Effective Date - 03/01/2012
Supplemental
Step percent
Apprentice Base Wage Health
Pension
Unemployment
Total Rate
1 50
$23.30 $10.18
17.25
$0.00
$50.73
2 60
$27.96 $10.18
17.25
$0.00
$55.39
3 70
$32.62 $10.18
17.25
$0.00
$60.05
4 80
$37.28 $10.18
17.25
$0.00
$64.71
5 90
$41.94 $10.18
17.25
$0.00
$69.37
- - - - - - - - - -
Notes:
- - - - - - - - -
- - -
- - - -
- - -+
- -
Apprentice to Journeyworker Ratio:1:3
- - - - - - - - - -
- -
- - - -
- --
MECH. SWEEPER OPERATOR (ON CONST. SITES)
12/01/2011 $39.16
$10.00
$12.40
0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012 $39.72
$10.00
$12.40
0.00
$62.12
12/01/2012 $40.34
$10.00
$12.40
0.00
$62.74
06/01/2013 $41.11
$10.00
$12.40
0.00
$63.51
12/01/2013 $41.89
$10.00
$12.40
0.00
$64.29
MECHANICS MAINTENANCE
12/01/2011 $39.16
$10.00
$12.40
0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012 $39.72
$10.00
$1.2.40
0.00
$62.12
12/01/2012 $40.34
$10.00
$12.40
0.00
$62.74
06/01/2013 $41.11
$10.00
$12.40
0.00
$63.51
12/01/2013 $41.89
$10.00
$12.40
0.00
$64.29
MILLWRIGHT (Zone 2)
04/01/2011 $31.71
$8.67
$15.61
0.00
$55.99
MILLWRIGHTS LOCAL 1121 - Zone 2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 26 of 54
THE COMMONWEALTH OF MASSACHUSETTS
# EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
WL
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
mo
Gover
TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location:
601 Main Street
$10.00
$12.40
0.00
$43.68
Classification
Effective Date
Base Wage
Health
Pension Supplemental Total Rate
06/01/2012
$21.56
$10.00
$12.40
0.00
Unemployment
Apprentice-
MILLWRIGHT- Local
1121 Zone 2
$12.40
0.00
$44.30
Effective Date - 04/01/2011
$22.32
$10.00
$12.40
0.00
$44.72
12/01/2013
$22.74
$10.00
$12.40
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
unemployment Total Rate
1
50
$15.86
$8.67
11.64
$0.00 $36.17
2
55
$17.44
$8.67
11.64
$0.00 $37.75
3
60
$19.03
$8.67
13.23
$0.00 $40.93
4
65
$20.61
$8.67
13.23
$0.00 $42.51
5
70
$22.20
$8.67
14.02
$0.00 $44.89
6
75
$23.78
$8.67
14.02
$0.00 $46.47
7
80
$25.37
$8.67
14.82
$0.00 $48.86
8
85
$26.95
$8.67
14.82
$0.00 $50.44
----------------------------
Notes:
-----------------------------Notes:
-------------------------- _ _ _ _
Tice
I
Apprento Journeyworker Ratio: 1:5
MORTARMIXER 12/01/201.1 $29.60 $7.1.0 $11.55 0.00 $48.25
LABORERS - ZONE 2
OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2011
$21.28
$10.00
$12.40
0.00
$43.68
OPERATING ENGINEERS LOCAL 4
06/01/2012
$21.56
$10.00
$12.40
0.00
$43.96
12/01/2012
$21.90
$10.00
$12.40
0.00
$44.30
06/01/2013
$22.32
$10.00
$12.40
0.00
$44.72
12/01/2013
$22.74
$10.00
$12.40
0.00
$45.14
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 27 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
THE COMMONWEALTH OF MASSACHUSETTS
tr
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Pension
DEPARTMENT OF LABOR STANDARDS
Total Rate
Prevailing Wage Rates
DEVALL. PATRICK
As determined by the Director under the provisions of the JOANNE s F. GOLDSTEIN
Govcmor
$67.41
Unemployment
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. MURRAY
Lt. Govcmor
HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$45.01
$7.80
$14.60
0.00
$67.41
Unemployment
$46.01
OILER (TRUCK CRANES, GRADALLS)
12/01/2011
$24.51
$10.00
$12.40
0.00
$46.91
OPERATING ENGINEIiRS LOCAL 4
06/01/2012
$24.85
$10.00
$12.40
0.00
$47.25
12/01/2012
$25.24
$10.00
$12.40
0.00
$47.64
06/01/2013
$25.72
$10.00
$12.40
0.00
$48.12
12/01/2013
$26.21
$10.00
$12.40
0.00
$48.61
OTHER POWER DRIVEN EQUIPMENT - CLASS II
12/01/2011
$39.16
$10.00
$12.40
0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
0.00
$64.29
PAINTER (BRIDGES/TANKS)
PAINTERS LOCAL 35 - 70NE 2
01/01/2012
$44.01
$7.80
$14.60
0.00
$66.41
07/01/2012
$45.01
$7.80
$14.60
0.00
$67.41
01/01/2013
$46.01
$7.80
$14.60
0.00
$68.41
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 28 of 54
DEVAL L. PATRICK
Gov -
TIMOTHY P. MURRAY
LI. Governor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE F.
7
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - PAINTER Local 35 - BRIDGESITANKS
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
50
$22.01
$7.80
0.00
$0.00
$29.81.
2
55
$24.21
$7.80
3.25
$0.00
$35.26
3
60
$26.41
$7.80
3.54
$0.00
$37.75
4
65
$28.61
$7.80
3.84
$0.00
$40.25
5
70
$30.81
$7.80
12.83
$0.00
$51.44
6
75
$33.01
$7.80
13.13
$0.00
$53.94
7
80
$35.21
$7.80
13.42
$0.00
$56.43
8
90
$39.61
$7.80
14.01
$0.00
$61.42
Effective Date - 07/01/2012
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
50
$22.51
$7.80
0.00
$0.00
$30.31
2
55
$24.76
$7.80
3.25
$0.00
$35.81
3
60
$27.01
$7.80
3.54
$0.00
$38.35
4
65
$29.26
$7.80
3.84
$0.00
$40.90
5
70
$31.51
$7.80
12.83
$0.00
$52.14
6
75
$33.76
$7.80
13.13
$0.00
$54.69
7
80
$36.01
$7.80
13.42
$0.00
$57.23
8
90
$40.51
$7.80
14.01
$0.00
$62.32
- -
(Notes:
- - - - - - - -
- - - - - -
- - -
- - -
- - - -
- - -r
ISteps
are 750 hrs.
I
'- - --
Apprentice to Journeyworker Rational
- - - - -
- - -
- - -
- - - -
- - -
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 29 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
WL
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN
Govemor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Gocet-r Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re-working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2012 $34.91 $7.80 $14.60 0.00 $57.31
* If 30% or more of surfaces to be painted are new construction, 07/01/2012 $35.91 $7.80 $14.60 0.00 $58.31
NEW paint rate shall be used.PANTERS LOCAL 35 - ZONE 2
01/01/2013 $36.91 $7.80 $14.60 0.00 $59.31
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 30 of 54
it
DEVAL L. PATRICK
Governor
TIMOTHY P. MURRAY
Lt. Governor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN
Secretary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
UnemploVment
Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.46
$7.80
0.00
$0.00
$25.26
2 55
$19.20
$7.80
3.25
$0.00
$30.25
3 60
$20.95
$7.80
3.54
$0.00
$32.29
4 65
$22.69
$7.80
3.84
$0.00
$34.33
5 70
$24.44
$7.80
12.83
$0.00
$45.07
6 75
$26.18
$7.80
13.13
$0.00
$47.11
7 80
$27.93
$7.80
13.42
$0.00
$49.15
8 90
$31.42
$7.80
14.01
$0.00
$53.23
Effective Date - 07/01/2012
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1
50
$17.96
$7.80
0.00
$0.00
$25.76
2
55
$19.75
$7.80
3.25
$0.00
$30.80
3
60
$21.55
$7.80
3.54
$0.00
$32.89
4
65
$23.34
$7.80
3.84
$0.00
$34.98
5
70
$25.14
$7.80
12.83
$0.00
$45.77
6
75
$26.93
$7.80
13.13
$0.00
$47.86
7
80
$28.73
$7.80
13.42
$0.00
$49.95
8
90
$32.32
$7.80
14.01
$0.00
$54.13
(Notes:
Apprentice to Journeyworker Ratioa:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 31 of 54
THE COMMONWEALTH OF MASSACHUSETTS
# EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gov—
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. HURRAY HEATHER E. ROWS
Lt. Govemor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re-working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2012 $32.97 $7.80 $14.60 0.00 $55.37
PAINTERS LOCAL 35 - ZONE 2
07/01/2012 $33.97 $7.80 $14.60 0.00 $56.37
01/01/2013 $34.97 $7.80 $14.60 0.00 $57.37
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 32 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
THE COMMONWEALTH OF MASSACHUSETTS
st
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Classification
Prevailing Wage Rates
DEVAL L. PATRICK
Govemor
TIMOTHY P. MURRAY
LI. Governor
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Secretary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. xowE
HEATHER
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER Local 35 Zone 2
- Spray/Sandblast -Repaint
Effective Date - 01/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$16.49
$7.80
0.00
$0.00
$24.29
2 55
$18.13
$7.80
3.25
$0.00
$29.18
3 60
$19.78
$7.80
3.54
$0.00
$31.12
4 65
$21.43
$7.80
3.84.
$0.00
$33.07
5 70
$23.08
$7.80
12.83
$0.00
$43.71
6 75
$24.73
$7.80
13.13
$0.00
$45.66
7 80
$26.38
$7.80
13.42
$0.00
$47.60
8 90
$29.67
$7.80
14.01
$0.00
$51.48
Effective Date - 07/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$16.99
$7.80
0.00
$0.00
$24.79
2 55
$18.68
$7.80
3.25
$0.00
$29.73
3 60
$20.38
$7.80
3.54
$0.00
$31.72
4 65
$22.08
$7.80
3.84
$0.00
$33.72
5 70
$23.78
$7.80
12.83
$0.00
$44.41
6 75
$25.48
$7.80
13.13
$0.00
$46.41
7 80
$27.18
$7.80
13.42
$0.00
$48.40
8 90
$30.57
$7.80
14.01
$0.00
$52.38
Notes:
Apprentice to Journeyworker Ratio:l:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 33 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
THE COMMONWEALTH OF MASSACHUSETTS
Base Wage
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
W)
DEPARTMENT OF LABOR STANDARDS
Total Rate
Prevailing Wage Rates
DEVAL L. PATRICK
Gover
mo
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
TIMOTHY P. MURRAY
Lt. Govcmor
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
PAINTER (TRAFFIC MARKINGS)
12/01/2011
$29.35
$7.10
$11.55
0.00
$48.00
LABORERS -ZONE2
PAINTER / TAPER (BRUSH, NEW) *
01/01/2012
$33.51
$7.80
$14.60
0.00
$55.91
* If 30% or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2
07/01/2012
$34.51
$7.80
$14.60
0.00
$56.91
01/01/2013
$35.51
$7.80
$14.60
0.00
$57.91
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 34 of 54
THE COMMONWEALTH OF MASSACHUSETTS
# EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
Goverrar Y P
Secretary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. HURRAY HEATHER E. ROWE
Lt. Govertmr Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Healtb
Pension Supplemental Total Rate
Unemployment
Apprentice- PAINTER -Local 35 Zone 2
- BRUSHNEW
Effective Date - 01/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$16.76
$7.80
0.00
$0.00
$24.56
2 55
$18.43
$7.80
3.25
$0.00
$29.48
3 60
$20.11
$7.80
3.54
$0.00
$31.45
4 65
$21.78
$7.80
3.84
$0.00
$33.42
5 70
$23.46
$7.80
12.83
$0.00
$44.09
6 75
$25.13
$7.80
13.13
$0.00
$46.06
7 80
$26.81
$7.80
13.42
$0.00
$48.03
8 90
$30.16
$7.80
1.4.01
$0.00
$51.97
Effective Date - 07/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$17.26
$7.80
0.00
$0.00
$25.06
2 55
$18.98
$7.80
3.25
$0.00
$30.03
3 60
$20.71
$7.80
3.54
$0.00
$32.05
4 65
$22.43
$7.80
3.84
$0.00
$34.07
5 70
$24.16
$7.80
12.83
$0.00
$44.79
6 75
$25.88
$7.80
13.13
$0.00
$46.81
7 80
$27.61
$7.80
13.42
$0.00
$48.83
8 90
$31.06
$7.80
14.01
$0.00
$52.87
(Notes:--------------------------�
ISteps are 750 hrs.
`--- -------------------
Apprentice to Journeyworker Ratio:l:l
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/1.1/2012 Wage Request Number: 20120411-063 Page 35 of 54
THE COMMONWEALTH OF MASSACHUSETTS
v
Ilk EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PAnucx As determined by the Director under the provisions of the JOAN F. GOL DSTEaa
Govemor
TTMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
LL Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re-working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
PAINTER / TAPER (BRUSH, REPAINT) 01/01/2012 $31.57 $7.80 $14.60 0.00 $53.97
PAINTERS LOCAL 35 - ZONE 2
07/01/2012 $32.57 $7.80 $14.60 0.00 $54.97
01/01/2013 $33.57 $7.80 $14.60 0.00 $55.97
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 36 of 54
ft t.
WL
DEVAL L. PATRICK
Governor
TIMOTHY P. MURRAY
Lt. Governor
Awarding Authority:
Contract Number:
Description of Work:
Job Location
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE P. GOLDSTEIN
Secretary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemplovment
Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT
Effective Date - 01/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$15.79
$7.80
0.00
$0.00
$23.59
2 55
$17.36
$7.80
3.25
$0.00
$28.41.
3 60
$18.94
$7.80
3.54
$0.00
$30.28
4 65
$20.52
$7.80
3.84
$0.00
$32.16
5 70
$22.10
$7.80
12.83
$0.00
$42.73
6 75
$23.68
$7.80
13.13
$0.00
$44.61
7 80
$25.26
$7.80
13.42
$0.00
$46.48
8 90
$28.41
$7.80
14.01
$0.00
$50.22
Effective Date - 07/01/2012
Step percent
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 50
$16.29
$7.80
0.00
$0.00
$24.09
2 55
$17.91
$7.80
3.25
$0.00
$28.96
3 60
$19.54
$7.80
3.54
$0.00
$30.88
4 65
$21.17
$7.80
3.84
$0.00
$32.81
5 70
$22.80
$7.80
12.83
$0.00
$43.43
6 75
$24.43
$7.80
13.13
$0.00
$45.36
7 80
$26.06
$7.80
13.42
$0.00
$47.28
8 90
$29.31
$7.80
14.01
$0.00
$51.12
-------- --------------------
(Notes:
I
Steps are 750 hrs.
�- --------------------------
Apprentice to Journeyworker Ratio: 1:1
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 37 of 54
THE COMMONWEALTH OF MASSACHUSETTS
tt EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Govemor smm,o,,.
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS
LL Governor Di.aor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
percent
Apprentice Base Wage
Health
1
60
$22.98
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
$26.81
$8.08
4
75
$28.73
Unemployment
5
PANEL & PICKUP TRUCKS DRIVER
12/01/2011
$29.68
$8.56
$7.27
0.00
$45.51
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
90
$34.47
$8.08
8
95
$36.39
$8.08
06/01/2012
$29.98
$8.56
$7.27
0.00
$45.81
08/01/2012
$29.68
$8.91
$7.27
0.00
$45.86
12/01/2012
$30.28
$9.07
$8.00
0.00
$47.35
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND
08/01/2011
$38.30
$9.80
$17.12
0.00
$65.22
DECK)
PILE DRIVER LOCAL 56 (ZONE 1)
PILE DRIVER
PILE DR1VIiR LOCAL 56 (ZONE 1)
Apprentice- PILE DRI VER -Local 56 Zone 1
Effective Date - 08/01/2011
08/01/2011 $38.30 $9.80 $17.12 0.00 $65.22
Step
percent
Apprentice Base Wage
Health
1
60
$22.98
$8.08
2
65
$24.90
$8.08
3
70
$26.81
$8.08
4
75
$28.73
$8.08
5
80
$30.64
$8.08
6
85
$32.56
$8.08
7
90
$34.47
$8.08
8
95
$36.39
$8.08
Pension
Supplemental
Unemployment
Total Rate
17.12
$0.00
$48.18
17.12
$0.00
$50.10
17.12
$0.00
$52.01
17.12
$0.00
$53.93
17.12
$0.00
$55.84
17.12
$0.00
$57.76
17.12
$0.00
$59.67
17.12
$0.00
$61.59
- - - - - - - - - - - - - - - - - - - -- - - - - - - - -
(Notes: I
I
----------------------
Apprentice to Journeyworker Ratio:l:3
PIPEFITTER & STEAMFITTER 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65
PIPEP-17713RSLOCAL 537(Local 138) 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90
03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 38 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
WL
177 DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
oEvnt L. PATRICK As determined by the Director under the provisions of the lonxxe F. mart ostx
Gove nor
Secretary
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H ttr,nx E. xowE
LL Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
40
$18.30
$8.75
4.50
Classification
Effective Date
Base Wage
Health
Pension Supplemental Total Rate
$8.75
12.39
$0.00
$41.73
Unemployment
Apprentice- PIPEFITTER Local 537 (Local 138)
$27.46
$8.75
12.39
Effective Date - 03/01/2012
$48.60
4
70
$32.03
$8.75
12.39
$0.00
$53.17
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment Total Rate
1 40
$17.80
$8.75
4.50
$0.00 $31.05
2 45
$20.03
$8.75
12.39
$0.00 $41.17
3 60
$26.71
$8.75
12.39
$0.00 $47.85
4 70
$31.16
$8.75
12.39
$0.00 $52.30
5 80
$35.61
$8.75
12.39
$0.00 $56.75
Effective Date - 09/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
40
$18.30
$8.75
4.50
$0.00
$31.55
2
45
$20.59
$8.75
12.39
$0.00
$41.73
3
60
$27.46
$8.75
12.39
$0.00
$48.60
4
70
$32.03
$8.75
12.39
$0.00
$53.17
5
80
$36.61
$8.75
12.39
$0.00
$57.75
Notes:
--------------------------
$45.23
$9.32
$13.29
0.00
-t
I
I
** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr.
Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max)
Apprentice to Journeyworker Ratio:**
-
PIPELAYER
12/01/2011
$29.60
$7.10
$11.55
0.00
$48.25
LABORERS -7.ON&2
PLUMBER
03/01/2012
$42.73
$9.32
$13.29
0.00
$65.34
PLUMBERS & GASFITTERS LOCAL 12 (Local 138)
09/01/2012
$43.98
$9.32
$13.29
0.00
$66.59
03/01/2013
$45.23
$9.32
$13.29
0.00
$67.84
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 39 of 54
THE COMMONWEALTH OF MASSACHUSETTS
sY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
Governor �' p
Secrcup
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. G -mor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
$15.39
$9.32
4.97
$0.00
$29.68
Classification
Effective Date Base Wage
Health
Pension Supplemental Total Rate
$0.00
$32.52
3 55
$24.19
Unemplovment
Apprentice- PLUMBERIGASFITTER
-Local 12 (Local 138)
$41.04
4 65
$28.59
$9.32
Effective Date - 03/01/2012
$0.00
$46.72
5 75
Supplemental
$9.32
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 35
$14.96
$9.32
4.97
$0.00
$29.25
2 40
$17.09
$9.32
5.61
$0.00
$32.02
3 55
$23.50
$9.32
7.53
$0.00
$40.35
4 65
$27.77
$9.32
8.81
$0.00
$45.90
5 75
$32.05
$9.32
10.09
$0.00
$51.46
Effective Date - 09/01/2012
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 35
$15.39
$9.32
4.97
$0.00
$29.68
2 40
$17.59
$9.32
5.61
$0.00
$32.52
3 55
$24.19
$9.32
7.53
$0.00
$41.04
4 65
$28.59
$9.32
8.81
$0.00
$46.72
5 75
$32.99
$9.32
10.09
$0.00
$52.40
-----------------------------
Notes:
Step 4 with lic$48.68 Steps with lic$54.22
'-- - --------.-----------
Apprentice to Journeyworker Ratio -f 5
PNEUMATIC CONTROLS (TEMP.) 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65
P1PEF17TERSLOCAL 537(Local 138) 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90
03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15
PNEUMATIC DRILL/TOOL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25
1 ABORERS-70NE2
POWDERMAN & BLASTER 12/01/2011 $30.35 $7.10 $11.55 0.00
LABORERS-7.ONE2
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
$49.00
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 40 of 54
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
THE COMMONWEALTH OF MASSACHUSETTS
s�
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
Pension
DEPARTMENT OF LABOR STANDARDS
Total Rate
Prevailing Wage Rates
DEVAL L. PATRICK
Gow
As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
mr
Sccmary
Unemployment
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
TIMOTHY P. muRRAY
Lt Govemor
HEATHER E. ROWE
Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
06/01/2012 $39.72 $1.0.00 $12.40
0.00 $62.12
12/01/2012 $40.34 $10.00 $12.40
0.00 $62.74
Unemployment
0.00 $63.51
POWER SHOVEL/DERRICK/TRENCHING MACHINE
12/01/2011
$39.52
$10.00
$12.40
0.00
$61.92
OPERATING ENGINEERS LOCAL 4
** The Residential Wood Frame Carpenter classification applies
only to the construction of new, wood frame residences that do
not exceed four stories including the basement. CARPENTERS -ZONE
2 (Residential Wood)
06/01/2012
$40.09
$10.00
$12.40
0.00
$62.49
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
12/01/2012
$40.71
$10.00
$12.40
0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
0.00
$64.67
PUMP OPERATOR (CONCRETE)
12/01/2011
$39.52
$10.00
$12.40
0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
0.00
$64.67
PUMP OPERATOR (DEWATERING, OTHER)
12/01/2011
$27.95
$10.00
$12.40
0.00
$50.35
OPERATING ENGINEERS LOCAL 4
06/01/2012
$28.34
$10.00
$12.40
0.00
$50.74
12/01/2012
$28.79
$10.00
$12.40
0.00
$51.19
06/01/2013
$29.34
$10.00
$12.40
0.00
$51.74
12/01/2013
$29.89
$10.00
$12.40
0.00
$52.29
READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34
0.00 $37.10
TEAMSTERS LOCAL 42
RECLAIMERS 12/01/2011 $39.16 $10.00 $12.40
0.00 $61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012 $39.72 $1.0.00 $12.40
0.00 $62.12
12/01/2012 $40.34 $10.00 $12.40
0.00 $62.74
06/01/2013 $41.11 $10.00 $12.40
0.00 $63.51
12/01/2013 $41.89 $10.00 $12.40
0.00 $64.29
RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51
0.00 $48.42
CARPENTERS -ZONE 2 (Residential Wood)
RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23
0.00 $36.81
** The Residential Wood Frame Carpenter classification applies
only to the construction of new, wood frame residences that do
not exceed four stories including the basement. CARPENTERS -ZONE
2 (Residential Wood)
As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate.
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 41 of 54
WL
DEVAL L. PATRICK
Governor
TIMOTHY P. MURRAY
LL Govemor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE s F. GOLDSTEIN
cntwy
Massachusetts General Laws, Chapter 149, Sections 26 to 27H
HEATHER E. ROWS
Direelor
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 .Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- CARPENTER (Residential Wood Frame) -Zone 2
Effective Date - 05/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$14.54
$6.34
0.00
$0.00
$20.88
2 60
$14.54
- $6.34
6.23
$0.00
$27.11
3 65
$15.76
$6.34
6.23
$0.00
$28.33
4 70
$16.97
$6.34
6.23
$0.00
$29.54
5 75
$18.18
$6.34
6.23
$0.00
$30.75
6 80
$19.39
$6.34
6.23
$0.00
$31.96
7 85
$20.60
$6.34
6.23
$0.00
$33.17
8 90
$21.82
$6.34
6.23
$0.00
$34.39
-f - - - - - - - - - - - - - - - - - - - - - - - - - - - -+
(Notes:
�--- ------------._._.._-----
Apprentice to Journeyworker Ratio:1:5
RIDE -ON MOTORIZED BUGGY OPERATOR 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25
LABORERS - ZONE 2
ROLLER/SPREADER/MULCHING MACHINE
12/01/2011
$39.16
$10.00
$12.40
0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
0.00
$64.29
ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg)
02/01/2012
$35.56
$10.50
$10.70
0.00
$56.76
ROOFERS LOCAL 33
08/01/2012
$36.56
$10.50
$10.70
0.00
$57.76
02/01/2013
$37.56
$10.50
$10.70
0.00
$58.76
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 42 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Govemor secretary
TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H-rEA,rxEx E�RowE
Lt. Govertror Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
Apprentice - ROOFER - Local 33
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$17.78
$10.50
3.38
$0.00
$31.66
2 60
$21.34
$10.50
10.70
$0.00
$42.54
3 65
$23.11
$10.50
10.70
$0.00
$44.31
4 75
$26.67
$10.50
10.70
$0.00
$47.87
5 S5
$30.23
$10.50
10.70
$0.00
$51.43
Effective Date - 08/01/2012
Supplemental
Step percent Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 50
$18.28
$10.50
3.38
$0.00
$32.16
2 60
$21.94
$10.50
10.70
$0.00
$43.14
3 65
$23.76
$10.50
10.70
$0.00
$44.96
4 75
$27.42
$10.50
10.70
$0.00
$48.62
5 85
$31.08
$10.50
10.70
$0.00
$52.28
-----------------------------
(Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1
I
Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs.
�_._- ---..._......__.._------------
Apprentice to Journeyworker Ratio:**
ROOFER SLATE / TILE / PRECAST CONCRETE
02/01/2012
$35.81
$10.50
$10.70
0.00
$57.01
ROOFERS LOCAL 33
08/01/2012
$36.81
$10.50
$10.70
0.00
$58.01
02/01/2013
$37.81
$10.50
$10.70
0.00
$59.01
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 43 of 54
DEVAL L. PATRICK
Govemor
TIMOTHY P. MURRAY
Lt. Goem,
Awarding Authority:
Contract Number:
Description of Work:
Job Location
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE E. GOLDSTEIN
Secretary
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - ROOFER (Slate/Tile/Precast Concrete) - Local 33
Effective Date - 02/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$17.91
$10.50
3.38
$0.00
$31.79
2 60
$21.49
$10.50
10.70
$0.00
$42.69
3 65
$23.28
$10.50
10.70
$0.00
$44.48
4 75
$26.86
$10.50
10.70
$0.00
$48.06
5 85
$30.44
$10.50
10.70
$0.00
$51.64
Effective Date - 08/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$18.41
$10.50
3.38
$0.00
$32.29
2 60
$22.09
$10.50
10.70
$0.00
$43.29
3 65
$23.93
$10.50
10.70
$0.00
$45.13
4 75
$27.61
$10.50
10.70
$0.00
$48.81
5 85
$31.29
$10.50
10.70
$0.00
$52.49
-------------_.-----------------
(Notes:
`- - --
To Apprentice Journeyworker Ratio:**
- - - - -
- - -
- - - -
- - -
I
- - -
SHEETMETAL WORKER
SHEETME'TAL WORKERS LOCAL 17 -A
02/01/2012
$40.79
$9.82
$17.34
2.04
$69.99
08/01/2012
$42.04
$9.82
$17.34
2.08
$71.28
02/01/2013
$43.29
$9.82
$17.34
2.11
$72.56
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 44 of 54
THE COMMONWEALTH OF MASSACHUSETTS
it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNES . GOLDSTEIN
Govemor
TIMOTHY P. muRRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS
LL Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - SHEET METAL WORKER
Effective Date - 02/01/2012
Step percent
- Local 17-A
Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 40
$16.32
$9.82
3.74
$0.00
$29.88
2 45
$18.36
$9.82
7.45
$1.07
$36.70
3 50
$20.40
$9.82
8.42
$1.16
$39.80
4 60
$24.47
$9.82
9.60
$1.32
$45.21
5 65
$26.51
$9.82
10.32
$1.40
$48.05
6 75
$30.59
$9.82
11.76
$1.57
$53.74
7 85
$34.67
$9.82
12.69
$1.72
$58.90
Effective Date - 08/01/2012
-- - -
Apprentice to Journeyworker Ratio:1:4
- - - -
- - -
- - - -
Supplemental
- -
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 40
$16.82
$9.82
3.74
$0.00
$30.38
2 45
$18.92
$9.82
7.45
$1.09
$37.28
3 50
$21.02
$9.82
8.42
$1.18
$40.44
4 60
$25.22
$9.82
9.60
$1.34
$45.98
5 65
$27.33
$9.82
10.32
$1.42
$48.89
6 75
$31.53
$9.82
11.76
$1.59
$54.70
7 85
$35.73
$9.82
12.69
$1.75
$59.99
(Notes: ---------------------------+
Steps 1-3 are 1 year; Steps 4-7 are 6 mos.
-- - -
Apprentice to Journeyworker Ratio:1:4
- - - -
- - -
- - - -
- - -
- -
SIGN ERECTOR
PAINTERS LOCAL 35 - 7.ONE 2
06/01/2009 $24.81 $7.07 $5.90 0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
$37.78
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 45 of 54
DEVAL L. PATRICK
Govcmor
TIMOTHY P. MURRAY
LL G-emor
Awarding Authority:
Contract Number:
Description of Work:
Job Location:
Classification
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
As determined by the Director under the provisions of the JOANNE s F. G LDST�EIN
Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Director
Town of North Andover
City/Town: NORTH ANDOVER
Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
601 Main Street
Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice - SIGN ERECTOR - Local 35 Zone 2
Effective Date - 06/01/2009
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50
$12.41
$7.07
0.00
$0.00
$19.48
2 55
$13.65
$7.07
2.40
$0.00
$23.12
3 60
$14.89
$7.07
2.40
$0.00
$24.36
4 65
$16.13
$7.07
2.40
$0.00
$25.60
5 70
$17.37
$7.07
5.90
$0.00
$30.34
6 75
$18.61
$7.07
5.90
$0.00
$31.58
7 80
$19.85
$7.07
5.90
$0.00
$32.82
8 85
$21.09
$7.07
5.90
$0.00
$34.06
9 90
$22.33
$7.07
5.90
$0.00
$35.30
--------------.--.-------------�
(Notes:
I
Steps are 4 mos.
----------------------------
Apprentice to Journeyworker Ratio:1:1
SPECIALIZED EARTH MOVING EQUIP < 35 TONS
12/01/2011
$30.14
$8.56
$7.27
0.00
$45.97
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
06/01/2012
$30.44
$8.56
$7.27
0.00
$46.27
08/01/2012
$30.44
$8.91
$7.27
0.00
$46.62
12/01/2012
$30.74
$8.91
$8.00
0.00
$47.65
SPECIALIZED EARTH MOVING EQUIP > 35 TONS
12/01/2011
$30.43
$8.56
$7.27
0.00
$46.26
TEAMSTERS JOINT COUNCIL NO. 10 7.ONE B
06/01/2012
$30.73
$8.56
$7.27
0.00
$46.56
08/01/2012
$30.73
$8.91
$7.27
0.00
$46.91
12/01/2012
$31.03
$8.91
$8.00
0.00
$47.94
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 46 of 54
THE COMMONWEALTH OF MASSACHUSETTS
>t EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATIucK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Govcmr Secrdan
TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RowE
LI. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
SPRINKLER FITTER 03/01/2012 $47.13 $8.42 $11.60 0.00 $67.15
SPRINKLER FI7TLRS LOCAL 550 - (Section B)
09/01/2012 $48.13 $8.42 $11.60 0.00 $68.15
03/01/2013 $49.13 $8.42 $11.60 0.00 $69.15
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 47 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Govemor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Govcmor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
Job Location:
601 Main Street
$16.85
$8.42
7.85
$0.00
$33.12
Classification
40
Effective Date
Base Wage
Health
Pension Supplemental Total Rate
$35.52
3
45
$21.66
$8.42
Unemvlovment
$0.00
Apprentice
- SPRINKLER FITTER -
Local 550 (Section B)
$24.07
$8.42
7.85
$0.00
Effective Date - 03/01/2012
5
55
$26.47
Supplemental
7.85
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
35
$16.50
$8.42
7.85
$0.00
$32.77
2
40
$18.85
$8.42
7.85
$0.00
$35.12
3
45
$21.21
$8.42
7.85
$0.00
$37.48
4
50
$23.57
$8.42
7.85
$0.00
$39.84
5
55
$25.92
$8.42
7.85
$0.00
$42.19
6
60
$28.28
$8.42
7.85
$0.00
$44.55
7
65
$30.63
$8.42
7.85
$0.00
$46.90
8
70
$32.99
$8.42
7.85
$0.00
$49.26
9
75
$35.35
$8.42
7.85
$0.00
$51.62
10
80
$37.70
$8.42
7.85
$0.00
$53.97
Effective Date - 09/01/2012
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1
35
$16.85
$8.42
7.85
$0.00
$33.12
2
40
$19.25
$8.42
7.85
$0.00
$35.52
3
45
$21.66
$8.42
7.85
$0.00
$37.93
4
50
$24.07
$8.42
7.85
$0.00
$40.34
5
55
$26.47
$8.42
7.85
$0.00
$42.74
6
60
$28.88
$8.42
7.85
$0.00
$45.15
7
65
$31.28
$8.42
7.85
$0.00
$47.55
8
70
$33.69
$8.42
7.85
$0.00
$49.96
9
75
$36.10
$8.42
7.85
$0.00
$52.37
10
80
$38.50
$8.42
7.85
$0.00
$54.77
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 48 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN
GovemorSecrmry
TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rowe.
Lt. Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental
Unemplovment
- - - - - - - - - - - - - - - - - - - - - - - - - - --- -�
(Notes:
'- - - - - - - - - - - - - - - - - - - - --
Apprentice to Journeyworker Ratio:1:1
STEAM BOILER OPERATOR 12/01/2011 $39.16 $10.00 $12.40 0.00
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
0.00
12/01/2012
$40.34
$10.00
$12.40
0.00
06/01/2013
$41.11
$10.00
$12.40
0.00
12/01/2013
$41.89
$10.00
$12.40
0.00
Total Rate
$61.56
$62.12
$62.74
$63.51
$64.29
TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 12/01/2011
$39.16
$10.00
$12.40
0.00
$61.56
OPERATING ENGINEERS LOCAL 4
$32.29
$13.00
$12.25
0.00
$57.54
06/01/2012
$39.72
$10.00
$12.40
0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
0.00
$64.29
TELECOMMUNICATION TECHNICIAN
ELECTRICIANS LOCAL 103
03/01/2012
$31.78
$13.00
$12.23
0.00
$57.01
09/01/201.2
$32.29
$13.00
$12.25
0.00
$57.54
03/01/2013
$32.83
$13.00
$12.26
0.00
$58.09
09/01/2013
$33.34
$13.00
$12.28
0.00
$58.62
03/01/2014
$33.88
$13.00
$12.30
0.00
$59.18
09/01/2014
$34.38
$13.00
$12.31
0.00
$59.69
03/01/2015
$34.91
$13.00
$12.33
0.00
$60.24
09/01/2015
$35.63
$13.00
$12.35
0.00
$60.98
03/01/2016
$36.35
$13.00
$12.37
0.00
$61.72
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 49 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Govemor
0
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H REATI4ER E. ROWE
Lt. Govemor Dite w
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage
Apprentice- TELECOMMUNICATION TECHNICIAN -Local 103
Effective Date - 03/01/2012
Step percent Apprentice Base Wage Health
Health
Pension
Pension Supplemental Total Rate
Unemployment
Supplemental
Unemployment Total Rate
1
40
$12.71
$13.00
9.27
$0.00
$34.98
2
40
$12.71
$13.00
9.27
$0.00
$34.98
3
45
$14.30
$13.00
9.51
$0.00
$36.81
4
45
$14.30
$13.00
9.51
$0.00
$36.81
5
50
$15.89
$13.00
9.76
$0.00
$38.65
6
55
$17.48
$13.00
10.01
$0.00
$40.49
7
60
$19.07
$13.00
10.26
$0.00
$42.33
8
65
$20.66
$13.00
10.50
$0.00
$44.16
9
70
$22.25
$13.00
10.75
$0.00
$46.00
10
75
$23.84
$13.00
11.00
$0.00
$47.84
Effective Date - 09/01/2012
Supplemental
Step
percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1
40
$12.92
$13.00
9.28
$0.00
$35.20
2
40
$12.92
$13.00
9.28
$0.00
$35.20
3
45
$14.53
$13.00
9.53
$0.00
$37.06
4
45
$14.53
$13.00
9.53
$0.00
$37.06
5
50
$16.15
$13.00
9.77
$0.00
$38.92
6
55
$17.76
$13.00
10.02
$0.00
$40.78
7
60
$19.37
$13.00
10.27
$0.00
$42.64
8
65
$20.99
$13.00
10.52
$0.00
$44.51
9
70
$22.60
$13.00
10.77
$0.00
$46.37
10
75
$24.22
$13.00
11.02
$0.00
$48.24
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 50 of 54
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
OPL
ITY DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN
Govertar Y P satetary
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. Govertor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental
Unemployment
(Notes:
I I
- - - - - - - - - - - - - - - - - - -
Apprentice to Journeyworker Ratio:l:1
TERRAZZO FINISHERS 03/01/2012 $45.50 $10.18 $17.25 0.00
BRICKLAYERS LOCAL 3 - MARBLE & TILE
Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile
Effective Date - 03/01/2012
Step percent Apprentice Base Wage
Health
Pension
Supplemental
Unemployment
Total Rate
1 50
$22.75
$10.18
17.25
$0.00
$50.18
2 60
$27.30
$10.18
17.25
$0.00
$54.73
3 70
$31.85
$10.18
17.25
$0.00
$59.28
4 80
$36.40
$10.18
17.25
$0.00
$63.83
5 90
$40.95
$10.18
17.25
$0.00
$68.38
- - - - - - - - - -
(Notes:
- - - - - -
- - -
- - -
- - - -
- - -�
I
Steps are 800 hrs.
I
---------------------------
Apprentice to Journeyworker Ratio: 1:3
- -
TEST BORING DRILLER
LABORERS - FOUNDATIONAND MARINE
12/01/2011 $33.05 $7.10 $12.60 0.00
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Total Rate
$72.93
$52.75
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 51 of 54
THE COMMONWEALTH OF MASSACHUSETTS
it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S cGOLDSTEIN
Govemor
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE
Lt. (3 -mor Dimoor
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine)
Effective Date - 12/01/2011
Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60
$19.83
$7.10
12.60
$0.00
$39.53
2 70
$23.14
$7.10
12.60
$0.00
$42.84
3 80
$26.44
$7.10
12.60
$0.00
$46.14
4 90
$29.75
$7.10
12.60
$0.00
$49.45
- - - - - - - - - - -
(Notes:
- - - - -
- - -
- - - -
- - -
- - -
--
Apprentice to 3ourneyworker Ratio:l:3
--- --
--------
----
TEST BORING DRILLER HELPER 12/01/2011 $31.77 $7.10 $12.60 0.00 $51.47
I ABORIi
c
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Gov- Secretary
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHERE�ROWE
LL Governor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and Swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date Base Wage
Health
Pension Supplemental
Total Rate
Unemployment
Apprentice- TEST BORING LABORER (Laborers Foundation & Marine)
Effective Date - 12/01/2011
Supplemental
Step percent
Apprentice Base Wage
Health
Pension
Unemployment
Total Rate
1 60
$18.99
$7.10
12.60
$0.00
$38.69
2 70
$22.16
$7.10
12.60
$0.00
$41.86
3 80
$25.32
$7.10
12.60
$0.00
$45.02
4 90
$28.49
$7.10
12.60
$0.00
$48.1.9
(---------------------------
Notes:,
�- --
Apprentice to Journeyworker Ratio:1:3
- - - - - -
- - - -
- -
- - - -
- -
TRACTORS/PORTABLE STEAM GENERATORS
12/01/2011
$39.16
$10.00
$12.40
0.00
$61.56
OPERATING ENGINEERS LOCAL 4
06/01/2012
$39.72
$10.00
$12.40
0.00
$62.12
12/01/2012
$40.34
$10.00
$12.40
0.00
$62.74
06/01/2013
$41.11
$10.00
$12.40
0.00
$63.51
12/01/2013
$41.89
$10.00
$12.40
0.00
$64.29
TRAILERS FOR EARTH MOVING EQUIPMENT
12/01/2011
$30.72
$8.56
$7.27
0.00
$46.55
TEAMS7T RS JOINT COUNCIL NO. I OZONE, B
06/01/2012
$31.02
$8.56
$7.27
0.00
$46.85
08/01/2012
$31.02
$8.91
$7.27
0.00
$47.20
12/01/2012
$31.32
$8.91
$8.00
0.00
$48.23
TUNNEL WORK - COMPRESSED AIR
12/01/2011
$44.08
$7.10
$13.00
0.00
$64.18
LABORERS (COMPRESSED AIR)
TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE)
12/01/2011
$46.08
$7.10
$13.00
0.00
$66.18
LABORERS (COMPRESSED AIR)
TUNNEL WORK - FREE AIR
12/01/2011
$36.15
$7.10
$13.00
0.00
$56.25
LABORERS (FREE AIR TUNNEL)
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 53 of 54
THE COMMONWEALTH OF MASSACHUSETTS
* EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN
Go, error
Secretary
TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RowE
LL Govcmor Director
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Drainage improvements in rear of Kittredge Elementary School to include installing pvc piping, re -working slope
and swale, catch basin repair, and patching pavement
Job Location: 601 Main Street
Classification
Effective Date
Base Wage
Health
Pension
Supplemental
Total Rate
Unemployment
TUNNEL WORK - FREE AIR (HAZ. WASTE)
12/01/2011
$38.15
$7.10
$13.00
0.00
$58.25
LABORERS (TREE AIR TUNNEL)
VAC -HAUL
12/01/2011
$30.14
$8.56
$7.27
0.00
$45.97
TEAMSTERSJOINT COUNCIL NO. ]OZONE B
06/01/2012
$30.44
$8.56
$7.27
0.00
$46.27
08/01/2012
$30.44
$8.91
$7.27
0.00
$46.62
12/01/2012
$30.74
$8.91
$8.00
0.00
$47.65
WAGON DRILL OPERATOR
12/01/2011
$29.60
$7.10
$11.55
0.00
$48.25
LABORERS -ZONE2
WASTE WATER PUMP OPERATOR
12/01/2011
$39.52
$10.00
$12.40
0.00
$61.92
OPERATING ENGINEERS LOCAL 4
06/01/2012
$40.09
$10.00
$12.40
0.00
$62.49
12/01/2012
$40.71
$10.00
$12.40
0.00
$63.11
06/01/2013
$41.49
$10.00
$12.40
0.00
$63.89
12/01/2013
$42.27
$10.00
$12.40
0.00
$64.67
WATER METER INSTALLER
03/01/2012
$42.73
$9.32
$13.29
0.00
$65.34
PLUMBERS& GAST177ERSLOCAL 12 (Local 138)
09/01/2012
$43.98
$9.32
$13.29
0.00
$66.59
03/01/2013
$45.23
$9.32
$13.29
0.00
$67.84
Additional Apprentice Information:
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the
Commissioner under the provisions of the M.G.L. c. 149, as. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L
c. 23, ss. 11 E -1 1L.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 1IE-1 IL.
All steps are six months (1000 hours) unless otherwise specified.
* Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof.
** Multiple ratios are listed in the comment field.
*** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc.
**** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc.
This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the
employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch.
1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the
violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel:
Issue Date: 04/11/2012 Wage Request Number: 20120411-063 Page 54 of 54
SPR Central Register General Contract Submit Confirmation
state Publications and Regulations
William Francis Galvin, Secretary of the Commonwealth
Page 1 of 2
Home I Search I index I Feedback I Contact
The following General Contract submission was successfully
received.
Planned date of publish is 4/25/2012
Awarding Agency
Agency Name
and Address:
North Andover School Department 1600 Osgood
Street North Andover, MA 01845
Project Number:
Estimated Cost:
Contractor
Qualification:
Required for DCAM contracts over $100,000, Massachusetts Highway contracts over $50,000.
Contact Information
Name: —�
James Meale_y, School Business Manager
1978-794-1503 =1 Fax 978-794-0231
mealeyinnorthandover.kl2.ma,us
Notify email address listed when final publish date assigned
Phone:
Email Address:
Contract Information
Project: In accordance with M.G.L. c30, §39M, the North Andover School
Department is soliciting bids from qualified contractors to
improve drainage in a specified area in the rear of the Kittredge
Elementary School located at 601 Main Street, North Andover.
Plans/Specifications
Available:
Place, date and time
General Bid
Deadline*:
Sub Bid
Deadline:
Sub Bid
Categories:
The complete Invitation for Bids document will be available on
Wednesday, April 25, 2012 at 11:00 a.m. at
www.townofnorthandover.com by clicking on 'Available Bids,
Quotes and Proposals'
05/17/2012 Time 2:00 p.m.
Time
Additional
Information
A mandatory site inspection of the rear area of the Kittredge
Elementary School will be held on Wednesday, May 2, 2012 at
10.00 a.m.
http://www.sec.state.ma.us/sprpublicforms/GCSubmitConfinnation.aspx?ID=72910 4/11/2012
Request Official Wage Schedule
Confirmation
Page 1 of 2
Your request for an Official Prevailing Wage
Schedule has been successfully received and
is being processed by DOS. The schedule will
be emailed to the email address provided in
your request.
Please note the wage request number
20120411-063 for future inquires.
Request another official Wage Schedule
http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSup... 4/11/2012
TOWN OF NORTH ANDOVER
INVITATION FOR BIDS
KITTREDGE SCHOOL DRAINAGE IMPROVEMENT
February 16, 2012
Contact Jim Mealey
School Business Manager
Address 1600 Osgood Street
North Andover, MA 01845
Telephone Number: 978-794-1503
Fax Number: 978-794-0231
Email mealeyi(&northand over.kl2.ma.us
Table of Contents
1. Introduction............................................................. 3
2. Submission Deadline and Instructions .............................. 3
3. Questions, Addendum or Proposal Modifications .................. 4
4. On -Site Inspection..................................................... 5
5. General Requirements.................................................. 5
6. Quality Assurance..................................................... 5
7. Scope of Work ......................................................... 6
8. Prevailing Wage Rates ................................................ 7
9. Evaluation of Bids ..................................................... 7
Appendix A — Price Proposal.............................................8
Standard Town of North Andover Contract
With Supplement«C".............................................9
Certifications.............................................................29
Prevailing Wage Rates ................................................. 31
Town of North Andover IFB Page 2 of 30
Kittredge School Drainage Improvement
1. Introduction
The Town of North Andover (`Town') is soliciting bids from qualified excavating contractors to
improve drainage in a specified area in the rear of the Kittredge Elementary School. This work
includes installing pvc drainage piping to discharge into existing catch basin, re -working slope to
match existing slope; hauling away excess soil materials; providing loam and reseeding; re-
working the swale to provide positive drainage and providing loam and reseeding; as well as
catch basin repair that includes saw -cutting and removing affected paving; removing unsuitable
soils below affected paving; replacing unsuitable soil with compacted processed gravel; and
patching paving to match existing paving. Qualified companies are requested to submit bids to
the School Business Manager at North Andover School Department, 1600 Osgood Street, North
Andover, MA, in accordance with the instructions contained within this invitation for bid.
Notice of this IFB is published in the Central Register, which is a weekly publication of the
Office of the Secretary of State. Additionally this IFB is also posted on the Town website
(www.townofnorthandover.com) under `Available Bids, Quotes and Proposals'.
The Town will accept proposals delivered in person or by mail. All proposals must be received
by 2:00 p.m. on Wednesday, March 21, 2012 to be considered. Proposals submitted by fax or by
electronic mail will not be considered. All proposals must be submitted to:
Mr. Jim Mealey, School Business Manager
North Andover School Department
1600 Osgood Street
North Andover, MA 01845
The Town of North Andover may cancel this IFB or reject in whole or in part any and all
proposals, if they determine that cancellation or rejection serves the best interest of the
Town of North Andover.
2. Submission Deadline and Instructions
Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed
envelope marked "Kittredge School Drainage Improvement" with the applicant's name and
address on the front. Applicants should provide one (1) signed original proposal. Fax or
electronic submissions will not be accepted. Applicants must also execute and include in the
sealed submission the Certificate of Vote, Certificate of Non -Collusion, and the Certificate of
Tax Compliance. The North Andover School Building Committee is the awarding authority and
reserves the right to reject any and all proposals or parts of proposals; to waive any defects,
information, and minor irregularities; to accept exceptions to these specifications; and to award
contracts or to cancel this Invitation for Bids if it is in the Town of North Andover's best interest
to do so.
Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if
the bidder is a partnership, by the name of the partnership, followed by the signature of each
Town of North Andover IFB Page 3 of 30
Kittredge School Drainage Improvement
general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature
must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed.
All sealed proposals must be received and registered by the School Business Manager's office by
Wednesday, March 21, 2012 at 2:00 p.m. All outer envelopes must be labeled "Kittredge School
Drainage Improvement" and mailed or hand delivered to the following address:
Mr. Jim Mealey, School Business Manager
North Andover School Department
1600 Osgood Street
North Andover, MA 01845
No proposals will be accepted after the time and date noted. Late delivery of materials due to
any type of delivery system shall be cause for rejection. If on the date and time of the submittal
deadline the North Andover School Department is closed due to an uncontrolled event such as
fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00
p.m. on the next normal business day.
3. Questions, Addendum or Proposal Modification
Questions concerning this IFB must be submitted in writing to: Mr. Jim Mealey, School Business
Manager, 1600 Osgood Street North Andover, MA 01845, or they may be emailed to Mr.
Mealey at mealeyj@northandover.kl2.ma.us. All questions/inquiries must be received by 4:30
p.m. on Thursday, March 3, 2011 to be considered. Questions/inquiries may be delivered,
mailed, emailed or faxed. Written responses will be posted on the Town's website
(www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" by Monday,
February 7, 2011 at 2:00 p.m.
If any changes are made to this IFB, an addendum will be posted on the Town's website in
"Available Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the
existence of any addenda and/or modifications issued by the Town. As this IFB has been
published on the Town's website (www.townofnorthandover.com) all bidders are responsible for
checking the website for any addenda and /or modifications that are subsequently made to this
IFB.
The Town accepts no liability for and will provide no accommodations to bidders who fail to
check for amendments and/or modifications to this IFB and subsequently submit inadequate or
incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any
IFB component files. Modifications to the body of the IFB, Scope of Work, terms and
conditions, or which change the intent of this IFB are prohibited and may disqualify a response.
All proposals submitted in response to this IFB shall remain firm for sixty (60) days following
the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days
after the submittal deadline.
Town of North Andover IFB Page 4 of 30
Kittredge School Drainage Improvement
Bidders are not to communicate directly with any employee of the Town of North Andover,
except as specified in this IFB, and no other individual employee or representative is authorized
to provide any information or respond to any question or inquiry concerning this IFB.
Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the
bidder is having trouble obtaining any part of the IFB electronically through the Town website
(www.townofnorthandover.com), including, and without limitation the form and attachments.
Bidder with disabilities or hardships that seek reasonable accommodations, which may include
the receipt of IFB information and/or addenda and/or modifications in an alternative format,
must communicate such requests in writing to the contact person, and reasonable
accommodation will be made by agreement with the contact person on behalf of the Town of
North Andover.
4. On -Site Inspection
An on-site inspection of the Kittredge School Drainage area will be held on Monday, March 5,
2012 at 2:00 p.m. All interested bidders must attend so that they can accurately submit pricing
for work being quoted. All parties will meet at the front entrance to the Kittredge School at 601
Main Street.
5. General Requirements
The work will consist of improving the Kittredge School drainage at the base of the slope in the
area on the left side of the road passing behind the school and providing all services and
materials, as included in the Scope of Work described below. The contract shall comply with the
quality assurance provisions listed below. The contractor shall guarantee in writing all work
under this project for one (1) year. The guarantee shall cover both labor and materials necessary
to affect structural integrity of the drainage system, without limit as to the amount required to
effect repairs. Upon notification of any such defects within said guarantee period the contractor
shall make all necessary repairs and replacements at no cost to the Town.
6. Quality Assurance
A. The contractor must be approved as an authorized applicator of binder pavement.
B. The contractor shall provide all materials,so as to provide a completely paved addition to
the existing paved area that is fully tacked against the existing paving.
C. Materials not available from the primary materials manufacturer shall be approved by said
manufacturer for use with his system materials.
D. The contractor shall submit within ten (10) days of award of contract:
1. Manufacture's certification approving the contractor as an authorized applicator.
Town of North Andover IFB Page 5 of 30
Kittredge School Drainage Improvement
2. A complete list of materials proposed for use and manufacture's specifications and
application instructions. Edit specifications and instructions for the project.
3. Manufacture's certification or other data substantiating that the paving materials
proposed for installation conform to the specified requirements and are suitable for use
on the project.
E. No materials shall be purchased until approval of the above submittals is received from the
Town's representative.
F. The paving material manufacturer shall provide a full time job site inspector during the
course of the work. The inspector shall submit daily job reports.
G. Paving and associated work may only proceed when existing and forecast weather
conditions permit work to be performed in accordance with manufacture's
recommendations, the established procedures, and only when the work can be guaranteed
as required without additional reservations, or restrictions.
7. Scope of Work
The base bid is for the improvement of drainage and re -grading of slope as detailed in attached
sk drawings (2) dated 11.15.11 in the back of the Kittredge Elementary School.
A. Base Bid
1) Toe of Slope Drain
a. 6" diameter pvc
b. 3/4" crushed stone
c. Filter fabric
d. Discharge into existing catch basin
2) Grading
a. Slope
i. Re -work slope to match existing slope
ii. Haul away excess soil material (Assumed disposal location < 5 miles)
iii. Provide 4" loam, and reseed
b. Swale
i. Re -work to provide positive drainage
ii. Provide 4" loam, and reseed
3) Catch Basin at northwest corner
a. Sawcut and remove affected pavement
b. Remove unsuitable soils below affected pavement
c. Replace unsuitable soil with compacted processed gravel
d. Patch pavement to match existing pavement
Town of North Andover IFI3 Page 6 of 30
Kittredge School Drainage Improvement
8. Prevailing Wage Rates
The successful bidder will at all times comply with the prevailing wage rates as determined by
the Commissioner of the Division of Occupational Safety, under the provisions of Massachusetts
General Laws as shall be in force and as amended. The prevailing wage rates are attached.
9. Evaluation of Bids
Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility
of the bidder will then be ascertained. Finally, the contract will be awarded to the responsible and
responsive bidder offering the lowest aggregate price for the base bid. The Town is required to
award the contract to the lowest responsive responsible bidder.
■ Responsiveness
Bidders must completely fill out and submit the bid form and all other required forms. All
supplies and services that are the subject of the bid must meet the minimum standards and
Specifications set forth in the purchase description including the standards by which the
procurement officer will determine acceptability as to quality, workmanship, results of
inspections and tests, and suitability for a particular purpose.
■ Responsibility
Bidders must demonstrate that they meet the following measures of responsibility. The
Town will not award a contract to any bidder who cannot furnish satisfactory evidence of
his ability and experience in this type of work and that he has sufficient plant and capital
to enable him to prosecute and complete the work as outlined in the Scope of Services.
The Town may make such investigations as it deems necessary to determine the above
and a bidder shall furnish any information requested in this regard.
All costs not listed on the bid price sheet will not be considered part of the contract and therefore
will not be paid. The Town of North Andover will not be charged fuel surcharges or
administrative fees as part of any contract entered into as a result of this IFB. Additionally the
Town of North Andover will not be charged late fees unless payment is not made within sixty
(60) days of the receipt of invoice.
The Town of North Andover is a tax exempt entity so no sales tax will be assessed to any
purchases made under this proposed contract.
Town of North Andover IFB Page 7 of 30
Kittredge School Drainage Improvement
APPENDIX A - PRICE PROPOSAL
The Contract will be awarded to the responsible, responsive bidder offering the lowest aggregate
price for the base bid. In the event any of the alternates are deemed necessary, then the contract will
be awarded to the responsible, responsive bidder offering the lowest aggregate price for the base bid
plus the chosen alternates. All prices are to remain firm for the duration of the Contract.
A. Base Bid
Total Lump Sum Price Base Bid for Drainage Improvements $
Business Name
Business Address
Business Phone
Fax
Name of Person Authorized to sign Price Proposal
Title of Person Authorized to sign Price Proposal
Signature of Above Person
Town of North Andover IFB Page 8 of 30
Kittredge School Drainage Improvement