HomeMy WebLinkAboutContract #: 015579 - From: To: - Exception - North Andover School DepartmentMar 01 12 10:06a HTITG 555-5555 R.ty MEMORANDUM l TO: THOMAS DONALDSON, MASSACHUSETTS INTERLOCAL INSURANCE AGENCY FROM: PATRICK MARKEY DATE: AUGUST 9, 2011 RE: APPLICABILITY OF MASSACHUSETTS COMPETITIVE BIDDING REQUIREMENTS TO MITA You have asked me for a legal opinion regarding the applicability of Massachusetts Public Bidding Statute to MIIA. MIIA insures many municipalities throughout the Commonwealth of Massachusetts. When an insurable event occurs on property for which a MIIA insurance policy provides coverage, it has been MIIA's practice to make insurance payments directly to contractors which it alone selects and hires to undertake repair and/or restoration work. As I understand it, MIIA does not pay anything to the municipalities and the municipalities play no role in selecting, hiring, or paying the contractors. My review of the applicable Massachusetts statute indicates that such an arrangement is entirely legal. Section 44A of Massachusetts General Laws, Chapter 149 provides, in pertinent part: Every contract for the construction, reconstruction, installation, demolition, maintenance or repair of any building by a public agency estimated to cost more than $25,000 except for a pumping station to be constructed as an integral part of a sewer construction or water construction project bid under the provisions of Section 39M of Chapter 30, shall be awarded to the Iowest responsible and eligible general bidder on the basis of competitive bids in accordance with the procedure set forth in the provisions of Section 44A to 44H, inclusive. M.G.L.c. 149, §44A. (emphasis added). As defined in this statute, a "public agency" is "a department, agency, board, commission, authority, or other instrumentality of the commonwealth or political subdivision of the commonwealth..." M.G.L.c. 149, §44A(1). Under this definition, MIIA is not a public agency. As such, the public bidding requirements of M.G.L. c. 149, §44A do not apply to it. As long as municipalities do not participate in the selection , hiring or paying of contractors and as Iong it is MIIA and MIIA alone that selects, hires, and pays the contractors, M.G.L. c. 149, §44A does not apply. p.1 Santilli, Ra From: Hunter, Lisa Sent: Monday, March 05, 2012 3:20 PM To: 'estimator@kenvofloor.com'; 'charlie@monumentflooring.com; 'miked@aasportsgroup.com'; 'info@americansportfloors.com; 'jamesosullivan@verizon.net' Cc: Santilli, Ray; Mealey, James; Foster, Stephen E. Subject: Addendum # 1 for Field House Floor at North Andover High School Attachments: addenda #1 - field house floor.docx Good afternoon, Attached, please find addendum # 1 for the North Andover High School field house floor project. Please pay particular attention to the requirement changes. Thank you, Lisa Hunter Business Secretary 978 794-1503 X41281 Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: hftp:/Avww.sec.state.ma.us/pre/preidx.htm. Please consider the environment before printing this email. ADDENDA #1— March 5, 2012 INVITATION FOR BIDS FIELD HOUSE FLOOR NORTH ANDOVER HIGH SCHOOL NORTH ANDOVER SCHOOL DEPARTMENT The Massachusetts Interlocal Insurance Association (MIIA) is the Town of North Andover's property/liability insurance carrier. As such: o The selection and hiring of the qualified company to furnish and install approximately 4,900 square feet of new maple wood sports floor at the North Andover High School Field House will be made strictly by MIIA. o Upon the satisfactory completion of the work as designated in the Invitation for Bids (IFB) issued on February 22, 2012, the selected company will be paid directly by MIIA. Due to the change in the selection and hiring process, the following modifications are made to the IFB requirements: o Section 7 — Prevailing Wage Rates: as the selected company will be hired and paid directly by MIIA, prevailing wage rates no longer apply to this project. o Section 8 — Bid Deposit: as the selected company will be hired and paid directly by MIIA, a bid deposit is no longer required as part of the submission. o Section 9 — Payment Bond: as the selected company will be hired and paid directly by MIIA, a payment bond is no longer required on this project. o Section 10 — Performance Bond: as the selected company will be hired and paid directly by MIIA, a performance bond is no required on this project. o Section 13 — Term of Contract: as the selected company will be hired and paid directly by MIIA, the standard North Andover School Department contract and relevant supplements will no longer be required to be executed upon award. The Scope of Services and all other provisions/requirements of the IFB remain in effect. D CL J CL rD crc � Lo 0 � 2 k > 0 § z � � § / � � I c G o / 2 / m � � ] � 2 O R 5 / o E 2 § ƒ'0/ o d => k] q > (D F 7 Ln o n §\ n CU ƒ 0 > o 3 m (D � 7 A ƒ 0 ° D / CL LA § _ 7 \ c < o 7 + o / g ƒ n / ° < \ ( ■ o c E k / Ln $ 00 \ � k / Ln ? E k � / ? t 0 § E a 7 0 03 § F ] ¢ n k F < \ / 2 < rD 2 k k (AE 2 \ e 00 q (A ° ® 0 B § ] o / 7 � r 0 o ° k m § > 0. § § ] / w NJ i \ 00 Q � 6 � � & @ / � / -4 % $ ƒ / \ m k Q k - t E D CL J CL rD crc � Lo 0 � 2 k > 0 § z � � § / � � I c G o / 2 / m � � ] � 2 NORTH ANDOVER SCHOOL DEPARTMENT INVITATION FOR BIDS FIELD HOUSE FLOOR NORTH ANDOVER HIGH SCHOOL Contact Address Telephone Number: Fax Number: Email February 22, 2012 Jim Mealey School Business Manager 1600 Osgood Street North Andover, MA 01845 978-794-1503 978-794-0231 mealeyj@northandover.kl2.ma.us Table of Contents 1. Introduction........................................................... 3 2. Submission Deadline and Instructions ............................. 3 3. Questions, Addendum or Proposed Modifications ............... 4 4. Contractor Prequalification.......................................... 5 5. Mandatory On -Site Inspection ...................................... 5 6. Scope of Services .................................................... 5 7. Prevailing Wages .................................................... 6 8. Bid Deposit........................................................... 6 9. Payment Bond ......................................................... 6 10. Performance Bond ................................................... 6 11. Criminal Offender Records Check ................................ 6 11. Evaluation of Bids .................................................. 7 12. Term of Contract .................................................... 7 Appendix A — Price Proposal .......................................... 8 Standard North Andover School Department Contract With Supplement«C................................................ 9 Certifications............................................................ 29 PaymentBond........................................................... 32 Performance Bond ...................................................... 33 Prevailing Wage Rates ................................................ 35 North Andover School Department IFB Page 2 of 35 Field House Floor 1. Introduction In accordance with M.G.L. 049, the North Andover School Department (`School') is soliciting bids from qualified companies to furnish and install approximately 4,900 square feet of new maple wood sports flooring due to water damage at the North Andover High School Field House located at 430 Osgood Street, North Andover. Qualified companies are requested to submit bids to the School Business Manager at North Andover School Department, 1600 Osgood Street, North Andover, MA, in accordance with the instructions contained within this Invitation for Bids. Notice of this IFB is published in the Central Register (which is a weekly publication of the Office of the Secretary of the Commonwealth), the Eagle -Tribune (a newspaper of general circulation) and posted on the Town website (www.townofnorthandover.com) under "Available Bids, Quotes and Proposals". The School will accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on Thursday, March 8, 2012 to be considered. Proposals submitted by fax or by electronic mail will not be considered. All proposals must be submitted to: Mr. James Mealey, School Business Manager North Andover School Department 1600 Osgood Street North Andover, MA 01845 The North Andover School Department may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the North Andover School Department. 2. Submission Deadline and Instructions Qualified companies are requested to submit a comprehensive pricing proposal in a sealed envelope marked "Field House Floor" with the applicant's name and address on the front. Applicants should provide one (1) signed original proposal. Fax or electronic submissions will not be accepted. Applicants must also execute and include in the sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The North Andover School Department, through the School Superintendent, is the awarding authority and reserves the right to reject any and all proposals or parts of proposals; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; and to award contracts or to cancel this Invitation for Bids if it is in the North Andover School Department's best interest to do so. Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if the bidder is a partnership, by the name of the partnership, followed by the signature of each general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed. North Andover School Department IFB Page 3 of 35 Field House Floor All sealed proposals must be received and registered by the School Business Manager's office by Thursday, March 8 at 2:00 p.m. All outer envelopes must be labeled "Field House Floor" and mailed or hand delivered to the following address: Mr. James Mealey, School Business Manager North Andover School Department 1600 Osgood Street North Andover, MA 01845 No proposals will be accepted after the time and date noted. Late delivery of materials due to any type of delivery system shall be cause for rejection. If on the date and time of the submittal deadline the North Andover School Department is closed due to an uncontrolled event such as fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the next normal business day. 3. Questions, Addendum or Proposal Modification Questions concerning this IFB must be submitted in writing to: Mr. James Mealey, School Business Manager, 1600 Osgood Street North Andover, MA 01845, or they may be emailed to Mr. Mealey at mealeyj@northandover.k12.ma.us. All questions/inquiries must be received by close of business on Wednesday, February 29, 2012 to be considered. Questions/inquiries may be delivered, mailed, emailed or faxed. Written responses will be posted on the Town's website (www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" by Thursday, March 1, 2012 at 2:00 p.m. If any changes are made to this IFB, an addendum will be posted on the Town's website in "Available Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence of any addenda and/or modifications issued by the School. As this IFB has been published on the Town's website (www.townof iorthandover.com) all bidders are responsible for checking the website for any addenda and /or modifications that are subsequently made to this IFB. The School accepts no liability for and will provide no accommodations to bidders who fail to check for amendments and/or modifications to this IFB and subsequently submit inadequate or incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any IFB component files. Modifications to the body of the IFB, Scope of Work, terms and conditions, or which change the intent of this IFB are prohibited and may disqualify a response. All proposals submitted in response to this IFB shall remain firm for sixty (60) days following the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days after the submittal deadline. Bidders are not to communicate directly with any employee of the North Andover School Department, except as specified in this IFB, and no other individual employee or representative is authorized to provide any information or respond to any question or inquiry concerning this IFB. North Andover School Department IFB Page 4 of 35 Field House Floor Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the bidder is having trouble obtaining any part of the IFB electronically through the Town website (www.townofnorthandover.com), including, and without limitation the form and attachments. Bidder with disabilities or hardships that seek reasonable accommodations, which may include the receipt of IFB information and/or addenda and/or modifications in an alternative format, must communicate such requests in writing to the contact person, and reasonable accommodation will be made by agreement with the contact person on behalf of the North Andover School Department. 4. Contractor Prequalification Contractor must be certified by the Division of Capital Asset Management (DCAM) of the Commonwealth of Massachusetts. Bids must be accompanied by (1) a Certificate of Eligibility issued by DCAM showing that the contractor has been approved to bid on projects the size and nature of this project, and (2) a Contractor Update Statement. It is the bidder's responsibility to obtain the necessary forms from DCAM and make application to DCAM in sufficient time for DCAM to evaluate the application and issue a Certificate of Eligibility. 5. Mandatory Site Inspection A mandatory site inspection of the North Andover High School Field House will be held on Wednesday, February 29, 2012 at 10:00 a.m. All parties will meet in the main office on the first floor of the North Andover High School at 430 Osgood Street, North Andover. 6. Scope of Services The successful contractor will be required to furnish and install approximately 4,900 sf of new maple wood sports flooring system. The contractor shall furnish all labor, materials, equipment, and vehicles as required for work in accordance with this scope of services. The new flooring system must match (to the extent possible) the existing flooring system. The contractor will be responsible for field verifying all quantities, dimensions, existing conditions and details. The contractor shall conform to all requirements of state and local laws, including compliance with the prevailing wage laws. The contractor shall apply for all necessary permits and require inspection of the work by the local inspector when required. Permit fees may be waived by approval of the Board of Selectmen. A. Demolition — Remove minor portions of existing flooring at perimeter B. Plywood Subfloor — It is the intent to re -use the existing plywood subfloor. Inspect existing plywood subfloor system. Determine if any irregularities or deformities exist which may affect finish floor performance. Nail as needed. C. Maple Flooring — Furnish and install new maple sports flooring system by AacerFlex to match existing flooring. Nailing system and methods to match existing. Align new North Andover School Department IFB Page 5 of 35 Field House Floor flooring to existing. Installation to allow for new wood expansion/contraction to avoid buckling and gaps. D. Finishing — Sand new and existing wood floor surfaces. Apply new finish floor coatings per manufacturer specifications. Install new line striping and center court logo to match existing. E. Submittals — Successful contractor to provide submittals and samples of all items to be installed as part of above scope of services. F. Material/Debris Removal — Contractor will be responsible for providing a dumpster to dispose of all material/debris. All material and debris shall be cleaned up immediately and removed from the building, leaving the premises in a clean condition. 7. Prevailing Wage Rates The successful bidder will at all times comply with the prevailing wage rates as determined by the Commissioner of the Division of Occupational Safety, under the provisions of Massachusetts General Laws as shall be in force and as amended. The prevailing wage rates are attached. 8. Bid Deposit In accordance with M.G.L. c149, all bidders are required to submit a bid deposit in the amount of 5% of the value of the total bid. 9. Payment Bond In accordance with M.G.L. c149, upon award of the contract the successful bidder shall provide a payment bond in the amount of 100% of the total cost of the contract. The payment bond must be on the School's form that is attached. 10. Performance Bond In accordance with M.G.L. c149, upon award of the contract the successful bidder shall provide a performance bond in the amount of 100% of the total cost of the contract. The performance bond must be on the School's form that is attached. 11. Criminal Offender Records Check In accordance with Massachusetts General Laws, c71, §38R, the North Andover School Department requires criminal offender records checks be performed on all personnel of contractors authorized to do work on school grounds that may have direct and unmonitored contact with children. The successful contractor will be required to submit a `CORI Request Form' for any person who may be assigned to work on school department property. The forms will be submitted directly to the designated contact person at the North Andover School Department. North Andover School Department IFB Page 6 of 35 Field House Floor The `CORI Request Form' may be viewed at http://www.northandoverpublicschools. com/cm s_files/resources/coriFormEmployee.pdf 12. Evaluation of Bids Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility of the bidder will then be ascertained. Finally, the aggregate price offered by each responsive and responsible bidder will be evaluated. The School is required to award the contract to the lowest responsive and responsible bidder. ■ Responsiveness Bidders must completely fill out and submit the bid form and all other required forms. All services that are the subject of the bid must meet the minimum standards and Scope of Services set forth including the standards by which the procurement officer will determine acceptability as to quality, workmanship, results of inspections and tests, and suitability for a particular purpose. ■ Responsibility Bidders must demonstrate that they meet the measures of responsibility. The School will not award a contract to any bidder who cannot furnish satisfactory evidence of his ability and experience in this type of work and that he has sufficient plant and capital to enable him to prosecute and complete the work as outlined in the Scope of Services. The School may make such investigations as it deems necessary to determine the above and a bidder shall furnish any information requested in this regard. All costs not listed on the bid price sheet will not be considered part of the contract and therefore will not be paid. The North Andover School Department will not be charged fuel surcharges or administrative fees as part of any contract entered into as a result of this IFB. Additionally the North Andover School Department will not be charged late fees unless payment is not made within sixty (60) days of the receipt of invoice. The North Andover School Department is a tax exempt entity so no sales tax will be assessed to any purchases made under this proposed contract. 13. Term of Contract The successful bidder will be required to execute the standard North Andover School Department Contract and any relevant supplement (as attached). North Andover School Department IFB Page 7 of 35 Field House Floor APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible, responsive bidder offering the lowest price for the work to be performed. The School is required to award the contract to the lowest responsive and responsible bidder. All prices are to remain firm for the duration of the Contract. * All bidders are required to attend the mandatory site inspection of the North Andover High School Field House to be held on Wednesday, February 29, 2012 at 10:00 a.m. * Total Lump Sum Price to furnish all labor, materials and equipment required to supply and install new maple sports flooring system at the North Andover High School Field House as specified: Addenda Business Name Business Address are acknowledged: Signature Business Phone Fax Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person North Andover School Department IFB Page 8 of 35 Field House Floor NORTH ANDOVER SCHOOL DEPARTMENT CONTRACT DATE: This Contract is entered into on, or as of, this date by and between the North Andover School Department (the "School"), and Contractor: Address: Telephone Number: _ Fax Number: 1. This is a Contract for the procurement of the following: 2. The Contract price to be paid to the Contractor by the North Andover School Department is: 3. Payment will be made as follows: 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the North Andover School Department. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the School to insure that the goods or services are complete and are as specified in the Contract. North Andover School Department IFB Page 9 of 35 Field House Floor 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the School. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before , unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the School, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the School is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. North Andover School Department IFB Page 10 of 35 Field House Floor 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default: 8.1 Without Cause. The School may terminate this Contract on seven (7) calendar days notice when in the best interests of the School by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the School to be in default of any term or condition of this Contract, the School may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the School; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the School, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the School as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. 9. The Contractor's Breach and the School's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the North Andover School North Andover School Department IFB Page 11 of 35 Field House Floor Department shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the School may keep the whole or any part of the amount for expenses, losses and damages incurred by the School as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the School. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall North Andover School Department IFB Page 12 of 35 Field House Floor protect and indemnify the North Andover School Department, the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest: Both the School and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the School that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assi mg hent: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the School: This Contract is only binding upon, and enforceable against, the School if. (1) the Contract is signed by the School Superintendent or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other North Andover School Department IFB Page 13 of 35 Field House Floor instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the North Andover School Department unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the School, the Town of North Andover„ the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the School for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the School's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate North Andover School Department IFB Page 14 of 35 Field House Floor termination thereof, and Contractor shall indemnify the School for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the School evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the School. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the School, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the School, in the United States or any other country. The School shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the School shall vest in the School at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the School before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkegping At any time during normal business hours, and as often as the School may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Payment The School agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the School of the work completed. North Andover School Department IFB Page 15 of 35 Field House Floor 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the North Andover School by being sent to the School Superintendent, 1600 Osgood, North Andover, Massachusetts 01845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. North Andover School Department IFB Page 16 of 35 Field House Floor 28. Supplemental Conditions: The foregoing provisions apply to all contracts to which the North Andover School Department shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS [ ] SERVICES SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X ] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction North Andover School Department IFB Page 17 of 35 Field House Floor IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE SCHOOL Division/Department Head Contract Manager School Superintendent APPROVED AS TO FORM: Town Counsel Date Date THE CONTRACTOR Company Name Signature Print Name & Title CERTIFICATION AS TO AVAILABILITY OF FUNDS: Town Accountant North Andover School Department IFB Field House Floor Date Date Page 18 of 35 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of: (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) This form supplements the North Andover School Department "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the School and provide an original thereof to the School prior to the commencement of performance. 3. Equalit : 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the School and others, including adjacent property, from injury or loss arising North Andover School Department IFB Page 19 of 35 Field House Floor in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the School, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. The School shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the School. If the School in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the School, then upon seven days notice from the School, the Contractor shall replace such person or persons with people acceptable to the School. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the School any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the School, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the School's Project Representative 12.1. The School shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the School generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the School informed on the progress of the work, will endeavor to guard the School against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the School only to the extent expressly delegated by the School, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. North Andover School Department IFB Page 20 of 35 Field House Floor 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the School or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the School and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the School may remove the rubbish and charge the cost to the several contractors, as the School shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the School, or (7) be guilty of a substantial violation of any provision of the Contract, then the School may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. North Andover School Department IFB Page 21 of 35 Field House Floor In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the School. The Contractor shall not be relieved of liability to the School by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the School reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The School shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the School to the termination date. 17. Progress Payments: 17.1. The Contractor shall submit to the School an itemized Application for Payment, supported to the extent required by the School by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the School a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the School and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the School, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The School may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the North Andover School Department from loss on account of: 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. North Andover School Department IFB Page 22 of 35 Field House Floor 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of School All claims by the Contractor against the School shall, unless otherwise provided by law, be initiated by a written claim submitted to the School no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the School under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the School's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the School will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the School if the work is not completed in time, it is agreed that the Contractor will pay the School as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The School's right to impose liquidated damages shall in no way prohibit or restrict the School's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The School may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the School on account of any damage alleged to have been sustained, the School shall notify the Contractor, who shall defend such proceedings at the School's expense and, if any judgment against the School arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the School. 22. Separate Contracts: 22.1. The School reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the North Andover School Department IFB Page 23 of 35 Field House Floor School any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance of the other contractor's work as ft and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the School any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the School for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the School. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the School, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the School for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the School's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the School or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification North Andover School Department IFB Page 24 of 35 Field House Floor obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the School from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: North Andover School Department IFB Page 25 of 35 Field House Floor Comprehensive General Liability Insurance (Broad Form) Bodily Injury Property Damage Automobile Liability Insurance Excess Liability (Umbrella) $1,000,000 per person $3,000,000 per occurrence $1,000,000 per occurrence $3,000,000 annual aggregate $500,000 per person $1,000,000 per occurrence $10,000,000 Excess Liability (Umbrella) Insurance (Subcontractors) $1,000,000 or 1.5 times the value of the subcontract, whichever is higher 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the School shall be addressed to and filed with the School prior to commencement of the work. Renewal certificates shall be addressed to and filed with the School at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the School. The School shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. North Andover School Department IFB Page 26 of 35 Field House Floor 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the School from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. 27.2. The Contractor shall also purchase and maintain such insurance as will protect the School against Automobile Non -Ownership Liability in connection with the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town of North Andover and the North Andover School Department shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the School a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the School that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the School Superintendent require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the School Superintendent with reasonable dispatch, then the latter may employ other persons to North Andover School Department IFB Page 27 of 35 Field House Floor make such repairs. The School shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the School before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: The North Andover School Department by: School Superintendent Department/Division Head Town Accountant Certified as to Appropriation Town Counsel Approved as to Form The Contractor by: Authorized Signature North Andover School Department IFB Field House Floor Page 28 of 35 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon I hereby certify that I am the clerk of the above named and that is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) North Andover School Department IFB Page 29 of 35 Field House Floor CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I authorized signatory for Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature Date North Andover School Department IFB Page 30 of 35 Field House Floor CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature Print Name & Title North Andover School Department IFB Field House Floor Date Company Name Page 31 of 35 PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS, that we with a place of business at , as Principal (the "Principal"), and a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of for the construction of NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL SURETY [Name and Seal] [Attorney-in-fact] [Seal] [Title] [Address] Attest: [Phone] Attest: North Andover School Department IFB Page 32 of 35 Field House Floor PERFORMANCE BOND F-TWO1 mill KNOW ALL MEN BY THESE PRESENTS, that we with a place of business at as Principal (the "Principal"), and , a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a Contract with the Obligee, bearing the date of , for the construction of NOW THE CONDITIONS of this obligation are such that if the Principal (and all Subcontractors under said contract) shall well and truly keep and perform all the undertakings, covenants, agreement, terms and conditions of said contract on its part to be kept and performed during the original term of said contract and any extensions thereof that may be granted by the Obligee, with or without notice to the Surety, and during the life and any guarantee required under the contract, and shall also well and truly keep and perform all the undertakings, covenants, agreements, terms and conditions of any and all duly authorized modifications, alterations, changes or additions with notice to the Surety being hereby waived, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN THE EVENT the Contract is abandoned by the Principal, or is terminated by the Town of North Andover, Massachusetts under the applicable provisions of the Contract, the Surety hereby further agrees that the Surety shall, if requested in writing by the Town of North Andover, Massachusetts promptly take such action as is necessary to complete said Contract in accordance with its terms and conditions. North Andover School Department IFB Page 33 of 35 Field House Floor IN WITNESS WHEREOF, the Principal and Surety have hereto set their hands and seals this of PRINCIPAL SURETY [Name and Seal] [Attorney-in-fact] [Seal] [Title] [Address] Attest: [Phone] Attest: END OF PERFORMANCE BOND day North Andover School Department IFB Page 34 of 35 Field House Floor Prevailing Wage Rates North Andover School Department IFB Page 35 of 35 Field House Floor THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.85 $8.56 $7.27 0.00 $45.68 TEAMSTERS JOINT COUNCIL NO. 107.ONEB 06/01/2012 $30.15 $8.56 $7.27 0.00 $45.98 08/01/2012 $30.15 $8.91 $7.27 0.00 $46.33 12/01/2012 $30.45 $8.91 $8.00 0.00 $47.36 (3 AXLE) DRIVER - EQUIPMENT 12/01/2011 $29.92 $8.56 $7.27 0.00 $45.75 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.22 $8.56 $7.27 0.00 $46.05 08/01/2012 $30.22 $8.91 $7.27 0.00 $46.40 12/01/2012 $30.52 $8.91 $8.00 0.00 $47.43 (4 & 5 AXLE) DRIVER - EQUIPMENT 12/01/2011 $30.04 $8.56 $7.27 0.00 $45.87 TEAMSTERS JOINT COUNCIL NO. 10 70NE B 06/01/2012 $30.34 $8.56 $7.27 0.00 $46.17 08/01/2012 $30.34 $8.91 $7.27 0.00 $46.52 12/01/2012 $30.64 $9.07 $8.00 0.00 $47.71 ADS/SUBMERSIBLE PILOT 08/01/2011 $82.60 $8.08 $17.12 0.00 $107.80 PILE DRIVER LOCAL 56 (ZONE 1) AIR TRACK OPERATOR 12/01/2011 $30.10 $7.10 $11.55 0.00 $48.75 LABORERS - ZONE 2 ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 12/01/2011 $28.40 $9.90 $5.95 0.00 $44.25 ASBESTOS WORKERS LOCAL 6 (BOSTON) ASPHALT RAKER 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 12/01/2011 $39.52 $10.00 $12.40 0.00 $61.92 OPERATING ENGINEERS LOCAL, a 06/01/2012 $40.09 $10.00 $12.40 0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page l of 56 THE COMMONWEALTH OF MASSACHUSETTS st �I EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BACKHOE/FRONT-END LOADER 12/01/2011 $39.52 $10.00 $12.40 0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 0.00 $64.67 BARCO-TYPE JUMPING TAMPER 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 BLOCK PAVER, RAMMER / CURB SETTER 12/01/2011 $30.10 $7.10 $11.55 0.00 $48.75 LABORLRS-ZONE 2 BOILERMAKER 01/01/2010 $37.70 $6.97 $11.18 0.00 $55.85 BOILERMAKERS LOCAL 29 Apprentice - BOILERMAKER - Local 29 Effective Date - 01/01/2010 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $24.51 $6.97 11.18 $0.00 $42.66 2 65 $24.51 $6.97 11.18 $0.00 $42.66 3 70 $26.39 $6.97 11.18 $0.00 $44.54 4 75 $28.28 $6.97 11.18 $0.00 $46.43 5 80 $30.16 $6.97 11.18 $0.00 $48.31 6 85 $32.05 $6.97 11.18 $0.00 $50.20 7 90 $33.93 $6.97 11.18 $0.00 $52.08 8 95 $35.82 $6.97 11.18 $0.00 $53.97 ---------------------------- .-.---------------------------------Notes: Notes: 1 Apprentice to Journeyworker Ratio:.1:5 � This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 2 of 56 THE COMMONWEALTH OF MASSACHUSETTS u 1 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H }LEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 02/01/2012 $47.55 $9.93 $16.51 0.00 $73.99 WATERPROOFING) BWCKLAMRS LOCAL 3 (LYNN) 03/01/2012 $46.56 $10.18 $17.25 0.00 $73.99 Apprentice- BRICK/PLASTERICEMENT MASON - Local 3 Lynn Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.78 $9.93 16.51 $0.00 $50.22 2 60 $28.53 $9.93 16.51 $0.00 $54.97 3 70 $33.29 $9.93 16.51 $0.00 $59.73 4 80 $38.04 $9.93 16.51 $0.00 $64.48 5 90 $42.80 $9.93 16.51 $0.00 $69.24 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.28 $10.18 17.25 $0.00 $50.71 2 60 $27.94 $10.18 17.25 $0.00 $55.37 3 70 $32.59 $10.18 17.25 $0.00 $60.02 4 80 $37.25 $10.18 17.25 $0.00 $64.68 5 90 $41.90 $10.18 17.25 $0.00 $69.33 Notes: 1 -- Apprentice to Journeyworker Ratio:1:5 - - - ` .-.._._ - - - _..- .-- - - - ----- - This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 3 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS v Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the Governor JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H. HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BULLDOZER/GRADER/SCRAPER 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 CAISSON & UNDERPINNING BOTTOM MAN 12/01/2011 $32.80 $7.10 $12.60 0.00 $52.50 LABORERS - FOUNDATIONAND MARINE CAISSON & UNDERPINNING LABORER 12/01/2011 $31.65 $7.10 $12.60 0.00 $51.35 LABORERS - FOUNDATIONAND MARINE CAISSON & UNDERPINNING TOP MAN 12/01/2011 $31.65 $7.10 $12.60 0.00 $51.35 LABORERS - FOUNDATIONAND MARINE CARBIDE CORE DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS-ZONE 2 CARPENTER 09/01/2011 $32.05 $9.80 $15.51 0.00 $57.36 CARPEN7ERS -ZONE 2 (Eastern Massachusetts) 03/01/2012 $33.17 $9.80 $15.51 0.00 $58.48 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 4 of 56 DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govcmor Awarding Authority: Contract Number: Description of Work: Job Location Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE. GOLDSTEIN ret - Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E'ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern MA Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.03 $9.80 1.57 $0.00 $27.40 2 60 $19.23 $9.80 1.57 $0.00 $30.60 3 70 $22.44 $9.80 10.80 $0.00 $43.04 4 75 $24.04 $9.80 10.80 $0.00 $44.64 5 80 $25.64 $9.80 12.37 $0.00 $47.81 6 80 $25.64 $9.80 12.37 $0.00 $47.81 7 90 $28.85 $9.80 13.94 $0.00 $52.59 8 90 $28.85 $9.80 13.94 $0.00 $52.59 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.59 $9.80 2 60 $19.90 $9.80 3 70 $23.22 $9.80 4 75 $24.88 $9.80 5 %0 $26.54 $9.80 6 80 $26.54 $9.80 7 90 $29.85 $9.80 8 90 $29.85 $9.80 (Notes: i Apprentice to Journeyworker Ratio:1:5 1.57 $0.00 $27.96 1.57 $0.00 $31.27 10.80 $0.00 $43.82 10.80 $0.00 $45.48 12.37 $0.00 $48.71 12.37 $0.00 $48.71 13.94 $0.00 $53.59 13.94 $0.00 $53.59 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 5 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification THE COMMONWEALTH OF MASSACHUSETTS 1 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT CEMENT MASONRY/PLASTERING DEPARTMENT OF LABOR STANDARDS BRICKLAYERSLOCAL 3 (LYNN) Prevailing Wage Rates DEVAL L. PATRICK Govemor As determined by the Director under the provisions of the JOANNE S F. G`OOLDSTEIN TIMOTHY P. MURRAY LI. Govemor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dimetor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate $10.00 Unemployment CEMENT MASONRY/PLASTERING 02/01/2012 $45.10 $9.93 $16.51 0.00 $71.54 BRICKLAYERSLOCAL 3 (LYNN) $45.01 CHAIN SAW OPERATOR 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 $67.41 CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2011 $40.52 $10.00 $12.40 0.00 $62.92 OPERATING ENGINEERS LOCAL 4 $45.01 $7.80 $14.60 0.00 $67.41 06/01/2012 $41.09 $10.00 $12.40 0.00 $63.49 12/01/2012 $41.71 $10.00 $12.40 0.00 $64.11 06/01/2013 $42.49 $10.00 $12.40 0.00 $64.89 12/01/2013 $43.27 $10.00 $12.40 0.00 $65.67 COMPRESSOR OPERATOR 12/01/2011 $27.95 $10.00 $12.40 0.00 $50.35 OPERATING ENGINEERS LOCAL 4 $45.01 $7.80 $14.60 0.00 $67.41 06/01/2012 $28.34 $10.00 $12.40 0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 0.00 $52.29 DELEADER (BRIDGE) PAINTERS LOCAL 35 - ZONE 2 01/01/2012 $44.01 $7.80 $14.60 0.00 $66.41 07/01/2012 $45.01 $7.80 $14.60 0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 6 of 56 it ! DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 0.00 $0.00 $29.81 2 55 $24.21 $7.80 3.25 $0.00 $35.26 3 60 $26.41 $7.80 3.54 $0.00 $37.75 4 65 $28.61 $7.80 3.84 $0.00 $40.25 5 70 $30.81 $7.80 12.83 $0.00 $51.44 6 75 $33.01 $7.80 13.13 $0.00 $53.94 7 80 $35.21 $7.80 13.42 $0.00 $56.43 8 90 $39.61 $7.80 14.01 $0.00 $61.42 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 0.00 $0.00 $30.31 2 55 $24.76 $7.80 3.25 $0.00 $35.81 3 60 $27.01 $7.80 3.54 $0.00 $38.35 4 65 $29.26 $7.80 3.84 $0.00 $40.90 5 70 $31.51 $7.80 12.83 $0.00 $52.14 6 75 $33.76 $7.80 13.13 $0.00 $54.69 7 80 $36.01 $7.80 13.42 $0.00 $57.23 8 90 $40.51 $7.80 14.01 $0.00 $62.32 Notes: ----------------_..__---_- _----t Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 7 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 0.00 $51.35 LABORERS-ZONF.2 DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 LABORERS - ZONE 2 Apprentice - LABORER Demo Backhoe/Loader/Hammer Operator Effective Date - 12/01/2011 Step percent Apprentice Base Wage Health 1 60 $19.68 $7.10 2 70 $22.96 $7.10 3 80 $26.24 $7.10 4 90 $29.52 $7.10 Pension 12.45 12.45 12.45 12.45 Supplemental Unemployment $0.00 $0.00 $0.00 $0.00 0.00 $52.35 Total Rate $39.23 $42.51 $45.79 $49.07 1Notes: - - - Apprentice to Journeyworker Ratio:l:5 DEMO: BURNERS LABORERS - ZONE 2 12/01/2011 $32.55 $7.10 $12.45 0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $52.10 Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 8 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Govemor As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 0.00 $51.35 LABORERS-ZONF.2 DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 LABORERS - ZONE 2 Apprentice - LABORER Demo Backhoe/Loader/Hammer Operator Effective Date - 12/01/2011 Step percent Apprentice Base Wage Health 1 60 $19.68 $7.10 2 70 $22.96 $7.10 3 80 $26.24 $7.10 4 90 $29.52 $7.10 Pension 12.45 12.45 12.45 12.45 Supplemental Unemployment $0.00 $0.00 $0.00 $0.00 0.00 $52.35 Total Rate $39.23 $42.51 $45.79 $49.07 1Notes: - - - Apprentice to Journeyworker Ratio:l:5 DEMO: BURNERS LABORERS - ZONE 2 12/01/2011 $32.55 $7.10 $12.45 0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $52.10 Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 8 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P.MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E.ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER Demo Burners Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment 1 60 $19.53 $7.10 2 70 $22.79 $7.10 3 80 $26.04 $7.10 4 90 $29.30 $7.10 _. - (----- ____-------_ Notes: Apprentice to Journeyworker Ratio:1:5 Total Rate 12.45 $0.00 $39.08 12.45 $0.00 $42.34 12.45 $0.00 $45.59 12.45 ---------- ---------i $0.00 $48.85 I DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 0.00 $52.35 LABORERS - ZONE 2 DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 0.00 $52.10 LABORERS -ZONE 2 DEMO: WRECKING LABORER LABORERS - 70NE 2 12/01/2011 $31.80 $7.10 $12.45 0.00 $51.35 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 9 of 56 DEVAL L. PATRICK Govcmor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. LDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER Demo Wrecking Laborer Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.08 $7.10 12.45 $0.00 $38.63 2 70 $22.26 $7.10 12.45 $0.00 $41.81 3 80 $25.44 $7.10 12.45 $0.00 $44.99 4 90 $28.62 $7.10 12.45 $0.00 $48.17 (Notes: ---------------__ _----------._.. _ Apprentice to Journeyworker Ratio: 1:5 I DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPERA77NG ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 DIVER 08/01/2011 $55.07 $8.08 $17.12 0.00 $80.27 PILE DRM-, R LOCAL 56 (ZONE. 1) DIVER TENDER 08/01/2011 $40.12 $8.08 $17.12 0.00 $65.32 PILE DRIVER LOCAL 56 (ZONE 1) DIVER TENDER (EFFLUENT) 08/01/2011 $60.18 $8.08 $17.12 0.00 $85.38 PILE DRI VER LOCAL 56 (ZONE. 1) DIVER/SLURRY (EFFLUENT) 08/01/2011 $82.60 $8.08 $17.12 0.00 $107.80 PILEDRIVER LOCAL 56 (ZONE 1) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 10 of 56 DEVAL L. PATRICK Go -or TIMOTHY P. MURRAY Lt. G -c - Awarding Authority: Contract Number: Description of Work: Job Location Classification ELECTRICIAN ELEC7RICIANS LOCAL 103 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN sec.t� , Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health 09/01/2011 $41.89 $13.00 03/01/2012 $42.37 $13.00 09/01/2012 $43.05 $13.00 03/01/2013 $43.77 $13.00 09/01/2013 $44.45 $13.00 03/01/2014 $45.17 $13.00 09/01/2014 $45.84 $13.00 03/01/2015 $46.55 $13.00 09/01/2015 $47.51 $13.00 03/01/2016 $48.47 $13.00 Pension Supplemental Unemployment Total Rate $13.86 0.00 $68.75 $13.87 0.00 $69.24 $13.89 0.00 $69.94 $13.91 0.00 $70.68 $13.93 0.00 $71.38 $13.95 0.00 $72.12 $13.97 0.00 $72.81 $14.00 0.00 $73.55 $14.03 0.00 $74.54 $14.05 0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 11 of 56 THE COMMONWEALTH OF MASSACHUSETTS u EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAs determined by the Director under the provisions of the JOANNE F. GOLDSTEIN GovemorSeactary TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Dimctor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ELECTRICIAN - Local 103 Effective Date - 09/01/2011 Step percent 1 40 2 40 3 45 4 45 5 50 6 55 7 60 8 65 9 70 10 75 Effective Date - 03/01/2012 Step percent Apprentice Base Wage Health $16.76 $16.76 $18.85 $18.85 $20.95 $23.04 $25.13 $27.23 $29.32 $31.42 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 Apprentice Base Wage Health Pension 7.80 7.80 10.26 10.26 10.58 10.91 11.23 11.57 11.89 12.22 Pension Supplemental Unemployment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Supplemental Unemployment Total Rate $37.56 $37.56 $42.11 $42.11 $44.53 $46.95 $49.36 $51.80 $54.21 $56.64 Total Rate 1 40 $16.95 $13.00 7.81 $0.00 $37.76 2 40 $16.95 $13.00 7.81 $0.00 $37.76 3 45 $19.07 $13.00 10.26 $0.00 $42.33 4 45 $19.07 $13.00 10.26 $0.00 $42.33 5 50 $21.19 $13.00 10.59 $0.00 $44.78 6 55 $23.30 $13.00 10.92 $0.00 $47.22 7 60 $25.42 $13.00 11.24 $0.00 $49.66 8 65 $27.54 $13.00 11.58 $0.00 $52.12 9 70 $29.66 $13.00 11.90 $0.00 $54.56 10 75 $31.78 $13.00 12.23 $0.00 $57.01 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 12 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT kv DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE s cr OLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage (Notes::- --------•------ -- - ----- App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 - ___. ____ ..-. - - - - --. Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2012 $52.45 ELEVATOR CONSTRUCTORSLOCAL 4 Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 Step percent Apprentice Base Wage Health Health Pension Supplemental Total Rate Unemployment $8.78 $6.96 0.00 Supplemental Pension Unemployment Total Rate 1 50 $26.23 $8.78 0.00 $0.00 $35.01 2 55 $28.85 $8.78 6.96 $0.00 $44.59 3 65 $34.09 $8.78 6.96 $0.00 $49.83 4 70 $36.72 $8.78 6.96 $0.00 $52.46 5 80 $41.96 $8.78 6.96 $0.00 $57.70 $68.19 ---.-.---...._--- _------------------- Notes: Steps 1-2 are 6 mos.; Steps 3-5 are 1 year `._.. - .- __.-- ___.- - - - - - - .-..-------- - I Apprentice to Journeyworker Ratio: 1:1 ELEVATOR CONSTRUCTOR HELPER 01/01/2012 $38.59 $8.78 $6.96 0.00 $54.33 ELEVATOR CONSTRUCTORSLOCAL 4 FENCE & GUARD RAIL ERECTOR LABORERS - ZONE 2 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 13 of 56 DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY LL G. -- Awarding Authority: Contract Number: Description of Work: Job Location: THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate OPERATING ENGINEERS LOCAL 4 $42.37 $13.00 $13.87 Unemployment $69.24 FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $37.49 $10.00 $12.20 0.00 $59.69 OPERATING ENGINEERS LOCAL 4 $40.11 $10.00 $12.20 0.00 $62.31 05/01/2012 $38.10 $10.00 $12.20 0.00 $60.30 11/01/2012 $38.71 $10.00 $12.20 0.00 $60.91 05/01/2013 $39.32 $10.00 $12.20 0.00 $61.52 11/01/2013 $40.08 $10.00 $12.20 0.00 $62.28 05/01/2014 $40.85 $10.00 $12.20 0.00 $63.05 FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2011 $38.88 $10.00 $12.20 0.00 $61.08 OPERATING ENGINEERS LOCAL 4 $42.37 $13.00 $13.87 0.00 $69.24 05/01/2012 $39.49 $10.00 $12.20 0.00 $61.69 11/01/2012 $40.11 $10.00 $12.20 0.00 $62.31 05/01/2013 $40.73 $10.00 $12.20 0.00 $62.93 11/01/2013 $41.50 $10.00 $12.20 0.00 $63.70 05/01/2014 $42.27 $10.00 $12.20 0.00 $64.47 FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2011 $20.91 $10.00 $12.20 0.00 $43.11 OPERATING ENGINEERS LOCAL 4 $42.37 $13.00 $13.87 0.00 $69.24 05/01/2012 $21.27 $10.00 $12.20 0.00 $43.47 11/01/2012 $21.63 $10.00 $12.20 0.00 $43.83 05/01/2013 $21.99 $10.00 $12.20 0.00 $44.1.9 11/01/2013 $22.45 $10.00 $12.20 0.00 $44.65 05/01/2014 $22.90 $10.00 $12.20 0.00 $45.10 FIRE ALARM INSTALLER ELECTRICIANS LOCAL 103 09/01/2011 $41.89 $13.00 $13.86 0.00 $68.75 03/01/2012 $42.37 $13.00 $13.87 0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 14 of 56 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN GovemorScactary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FIRE ALARM REPAIR / MAINTENANCE 09/01/2011 $31.42 $13.00 $12.22 0.00 $56.64 l COMMISSIONINGELEcTRICiANs LOCAL 103 03/01/2012 $31.78 $13.00 $12.23 0.00 $57.01 09/01/2012 $32.29 $13.00 $12.25 0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 0.00 $61.72 FIREMAN (ASST. ENGINEER) 12/01/2011 $33.23 $10.00 $12.40 0.00 $55.63 OPERATING ENGINEERS LOCAL 4 06/01/2012 $33.70 $10.00 $12.40 0.00 $56.10 12/01/2012 $34.23 $10.00 $12.40 0.00 $56.63 06/01/2013 $34.88 $10.00 $12.40 0.00 $57.28 12/01/2013 $35.54 $10.00 $12.40 0.00 $57.94 FLAGGER & SIGNALER 12/01/2011 $20.50 $7.10 $11.55 0.00 $39.15 L4BORERS-7.ONE2 FLOORCOVERER 09/01/2011 $35.95 $9.80 $16.61 0.00 $62.36 FLOORCOVERERS LOCAL 2168 ZONE I 03/01/2012 $37.20 $9.80 $16.61 0.00 $63.61 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 15 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT I DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAs determined by the Director under the provisions of the JOANNE F. GOLDSTEIN G -mor Secrctan• Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. HURRAY HEATHER E. ROWS Lt. Go,emor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring: sand new and existing floor: install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Apprentice- FLOORCOVERER -Local 2168 Zone I Effective Date - 09/01/2011 Step percent Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 50 $17.98 $9.80 1.79 $0.00 $29.57 2 55 $19.77 $9.80 1.79 $0.00 $31.36 3 60 $21.57 $9.80 11.24 $0.00 $42.61 4 65 $23.37 $9.80 11.24 $0.00 $44.41 5 70 $25.17 $9.80 13.03 $0.00 $48.00 6 75 $26.96 $9.80 13.03 $0.00 $49.79 7 80 $28.76 $9.80 14.82 $0.00 $53.38 8 85 $30.56 $9.80 14.82 $0.00 $55.18 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.60 $9.80 1.79 $0.00 $30.19 2 55 $20.46 $9.80 1.79 $0.00 $32.05 3 60 $22.32 $9.80 11.24 $0.00 $43.36 4 65 $24.18 $9.80 11.24 $0.00 $45.22 5 70 $26.04 $9.80 13.03 $0.00 $48.87 6 75 $27.90 $9.80 13.03 $0.00 $50.73 7 80 $29.76 $9.80 14.82 $0.00 $54.38 8 85 $31.62 $9.80 14.82 $0.00 $56.24 ,Notes: -------------------- -------_- --------, Steps are 750 hrs. Apprentice to Journeyworker Ratioaa This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 16 of 56 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAS determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHERE. ROWE LL Govemor Di -tor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor, install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FORK LIFT/CHERRY PICKER 12/01/2011 $39.52 $10.00 $12.40 0.00 $61.92 OPERATING ENGINE ERSLOCAL 4 06/01/2012 $40.09 $10.00 $12.40 0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 0.00 $64.67 GENERATOR/LIGHTING PLANTMEATERS 12/01/2011 $27.95 $10.00 $12.40 0.00 $50.35 OPERATING ENGINEERS LOCAL a 06/01/2012 $28.34 $10.00 $12.40 0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 0.00 $51.19 06/01/201.3 $29.34 $10.00 $12.40 0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 0.00 $52.29 GLAZIER (GLASS PLANK/AIR BARRIERANTERIOR 01/01/2012 $33.51 $7.80 $14.60 0.00 $55.91 SYSTEMS) GLAZIERS LOCAL 35 (ZONE 2) 07/01/2012 $34.51 $7.80 $14.60 0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 17 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. GtOOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Direaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Apprentice - GLAZIER - Local 35 Zone 2 Effective Date - 01/01/2012 Step percent Effective Date Base Wage , Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 50 $16.76 $7.80 0.00 $0.00 $24.56 2 55 $18.43 $7.80 3.25 $0.00 $29.48 3 60 $20.11 $7.80 3.54 $0.00 $31.45 4 65 $21.78 $7.80 3.84 $0.00 $33.42 5 70 $23.46 $7.80 12.83 $0.00 $44.09 6 75 $25.13 $7.80 13.13 $0.00 $46.06 7 80 $26.81 $7.80 13.42 $0.00 $48.03 8 90 $30.16 $7.80 14.01 $0.00 $51.97 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 0.00 $0.00 $25.06 2 55 $18.98 $7.80 3.25 $0.00 $30.03 3 60 $20.71 $7.80 3.54 $0.00 $32.05 4 65 $22.43 $7.80 3.84 $0.00 $34.07 5 70 $24.16 $7.80 12.83 $0.00 $44.79 6 75 $25.88 $7.80 13.13 $0.00 $46.81 7 80 $27.61 $7.80 13.42 $0.00 $48.83 8 90 $31.06 $7.80 14.01 $0.00 $52.87 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 18 of 56 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Secrelory TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment HOISTING ENGINEER/CRANES/GRADALLS 12/01/2011 $39.52 $10.00 $12.40 0.00 $61.92 OPERA77NG ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 19 of 56 DEVAL L. PATRICK Govcmor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- HOIST/PORT. EAIG.- Local 4 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $21.74 $10.00 0.00 $0.00 $31.74 2 60 $23.71 $10.00 12.40 $0.00 $46.11 3 65 $25.69 $10.00 12.40 $0.00 $48.09 4 70 $27.66 $10.00 12.40 $0.00 $50.06 5 75 $29.64 $10.00 12.40 $0.00 $52.04 6 80 $31.62 $10.00 12.40 $0.00 $54.02 7 85 $33.59 $10.00 12.40 $0.00 $55.99 8 90 $35.57 $10.00 12.40 $0.00 $57.97 Effective Date - 06/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.05 2 60 $24.05 3 65 $26.06 4 70 $28.06 5 75 $30.07 6 80 $32.07 7 85 $34.08 8 90 $36.08 (Notes: Apprentice to Journeyworker Ratio:1:6 $10.00 0.00 $0.00 $32.05 $10.00 12.40 $0.00 $46.45 $10.00 12.40 $0.00 $48.46 $10.00 12.40 $0.00 $50.46 $10.00 12.40 $0.00 $52.47 $10.00 12.40 $0.00 $54.47 $10.00 12.40 $0.00 $56.48 $10.00 12.40 $0.00 $58.48 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 20 of 56 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DBVAL L. PATRICK Asdetermined by the Director under the provisions of the JOANNE F. is . GOLDSTEIN Govemor O TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Dimaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor: install new line striping and center court logo Job Location: 430 Osgoo Street 09/01/2011 $41.89 $13.00 $13.86 0.00 $68.75 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 03/01/2012 $42.37 $13.00 $13.87 Unemployment $69.24 HVAC (DUCTWORK) 02/01/2012 $40.79 $9.82 $17.34 2.04 $69.99 SHEETME7AL WORKERS LOCAL 17 -A 03/01/2013 $43.77 $13.00 $13.91 0.00 $70.68 08/01/2012 $42.04 $9.82 $17.34 2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 2.11 $72.56 HVAC (ELECTRICAL CONTROLS) 09/01/2011 $41.89 $13.00 $13.86 0.00 $68.75 ELECTRICIANS LOCAL 103 03/01/2012 $42.37 $13.00 $13.87 0.00 $69.24 09/01/2012 $43.05 $13.00 $13.89 0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 0.00 $75.52 HVAC (TESTING AND BALANCING - AIR) 02/01/2012 $40.79 $9.82 $17.34 2.04 $69.99 SHEETMETAL WORKERS LOCAL 17 -A 08/01/2012 $42.04 $9.82 $17.34 2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 2.11 $72.56 HVAC (TESTING AND BALANCING -WATER) 09/01/2011 $43.76 $8.75 $12.39 0.00 $64.90 PIPF1717TERS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15 HVAC MECHANIC 09/01/2011 $43.76 $8.75 $12.39 0.00 $64.90 PIPEFI77F.RS LOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15 HYDRAULIC DRILLS 12/01/2011 $30.10 $7.10 $11.55 0.00 $48.75 LABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 21 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4.900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street THE COMMONWEALTH OF MASSACHUSETTS s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS 2 60 Prevailing Wage Rates DEVAL L. PATRICKAS Governor determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Health Secrcta TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H }LEATHER E. ROWE Lt. Govemor Dimctor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4.900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street $20.33 $10.40 8.30 $0.00 $39.03 2 60 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $10.40 9.46 $0.00 $48.32 4 80 Unemployment $10.40 INSULATOR (PIPES & TANKS) 09/01/2011 $40.66 $10.40 $11.20 0.00 $62.26 ASBESTOS WORKERS LOCAL 6 (BOSTON) Supplemental 09/01/2012 $42.06 $10.40 $11.20 0.00 $63.66 09/01/2013 $43.66 $10.40 $11.20 0.00 $65.26 09/01/2014 $45.66 $10.40 $11.20 0.00 $67.26 Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.33 $10.40 8.30 $0.00 $39.03 2 60 $24.40 $10.40 8.88 $0.00 $43.68 3 70 $28.46 $10.40 9.46 $0.00 $48.32 4 80 $32.53 $10.40 10.04 $0.00 $52.97 Effective Date - 09/01/2012 $17.95 0.00 $58.52 IRONWORKERS LOCAL 7 (LA WRFNCE AREA) Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.03 $10.40 8.30 $0.00 $39.73 2 60 $25.24 $10.40 8.88 $0.00 $44.52 3 70 $29.44 $10.40 9.46 $0.00 $49.30 4 80 $33.65 $10.40 10.04 $0.00 $54.09 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 22 of 56 Steps are 1 year Apprentice to Journeyworker Ratio: 1:4 IRONWORKER/WELDER 09/16/2011 $32.87 $7.70 $17.95 0.00 $58.52 IRONWORKERS LOCAL 7 (LA WRFNCE AREA) 03/16/2012 $33.87 $7.70 $17.95 0.00 $59.52 09/16/2012 $34.87 $7.70 $17.95 0.00 $60.52 03/16/2013 $36.12 $7.70 $17.95 0.00 $61.77 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 22 of 56 st } DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNEs F. GOLDSTEIN Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor, install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 09/16/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.72 $7.70 17.95 $0.00 $45.37 2 70 $23.01 $7.70 17.95 $0.00 $48.66 3 75 $24.65 $7.70 17.95 $0.00 $50.30 4 80 $26.30 $7.70 17.95 $0.00 $51.95 5 85 $27.94 $7.70 17.95 $0.00 $53.59 6 90 $29.58 $7.70 17.95 $0.00 $55.23 Effective Date - 03/16/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.32 2 70 $23.71 3 75 $25.40 4 80 $27.10 5 85 $28.79 6 90 $30.48 $7.70 17.95 $0.00 $45.97 $7.70 17.95 $0.00 $49.36 $7.70 17.95 $0.00 $51.05 $7.70 17.95 $0.00 $52.75 $7.70 17.95 $0.00 $54.44 $7.70 17.95 $0.00 $56.13 (Notes: Structural 1:6; Ornamental 1:4 Apprentice to Journeyworker Ratio: JACKHAMMER & PAVING BREAKER OPERATOR 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - 7ONF 2 LABORER LABORERS -ZONF2 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 23 of 56 THE COMMONWEALTH OF MASSACHUSETTS >t EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICKAs determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Secretan TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H FATHER E. ROWE Lt. Govemor Dimclor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4;900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.61 $7.10 11.55 $0.00 $36.26 2 70 $20.55 $7.10 11.55 $0.00 $39.20 3 80 $23.48 $7.10 11.55 $0.00 $42.13 4 90 $26.42 $7.10 11.55 $0.00 $45.07 (Notes: ` I Apprentice to Journeyworker Ratio: 1:5 LABORER: CARPENTER TENDER 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS - ZONE 2 LABORER: CEMENT FINISHER TENDER 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS - ZONE 2 LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00 I,ABORFRS - ZONE 2 LABORER: MASON TENDER 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABORF.RS - 7.0NE 2 LABORER: MULTI -TRADE TENDER 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS-ZONE 2 LABORER: TREE REMOVER 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS - ZONE 2 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. LASER BEAM OPERATOR 12/0.1/2011 $29.60 $7.10 $11.55 0.00 $48.25 I ABORERS - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 24 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAS determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MARBLE & TILE FINISHERS 02/01/2012 $36.31 $9.93 $15.50 0.00 $61.74 BRICKLAYERS LOCAL 3 - MARBLE & TILE 03/01/2012 $35.52 $10.18 $16.04 0.00 $61.74 Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.16 $9.93 15.50 $0.00 $43.59 2 60 $21.79 $9.93 15.50 $0.00 $47.22 3 70 $25.42 $9.93 15.50 $0.00 $50.85 4 80 $29.05 $9.93 15.50 $0.00 $54.48 5 90 $32.68 $9.93 15.50 $0.00 $58.11 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.76 $10.18 16.04 $0.00 $43.98 2 60 $21.31 $10.18 16.04 $0.00 $47.53 3 70 $24.86 $10.18 16.04 $0.00 $51.08 4 80 $28.42 $10.18 16.04 $0.00 $54.64 5 90 $31.97 $10.18 16.04 $0.00 $58.19 (Notes: Steps are 800 hrs. Apprentice to Journeyworker Ratio: 1:3 MARBLE MASONS,TILELAYERS & TERRAZZO MECH 02/01/2012 $46.60 $9.93 $16.51 0.00 BRICKLAYERS LOCAL 3 - MARBLE & TII E 03/01/2012 $46.60 $10.18 $17.25 0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $73.04 $74.03 Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 25 of 56 DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dimctor Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor: install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.30 $9.93 16.51 $0.00 $49.74 2 60 $27.96 $9.93 16.51 $0.00 $54.40 3 70 $32.62 $9.93 16.51 $0.00 $59.06 4 80 $37.28 $9.93 16.51 $0.00 $63.72 5 90 $41.94 $9.93 16.51 $0.00 $68.38 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.30 $10.18 2 60 $27.96 $10.18 3 70 $32.62 $10.18 4 80 $37.28 $10.18 5 -------------------- 90 $41.94 $10.18 (Notes: Apprento Journeyworker Ratio:l:3 Tice MECH. SWEEPER OPERATOR (NON -CONSTRUCTION) SWEEPER LOCAL 25 (NON -CONSTRUCTION) 17.25 $0.00 $50.73 17.25 $0.00 $55.39 17.25 $0.00 $60.05 17.25 $0.00 $64.71 17.25 $0.00 $69.37 07/01/2011 $24.80 $5.49 $0.00 0.00 $30.29 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 26 of 56 THE COMMONWEALTH OF MASSACHUSETTS >7 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAS determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor TIMOTHY P.MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Go-mor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate $61.56 OPT,RA77NG ENGINEERS LOCAL 4 Unemployment MECH. SWEEPER OPERATOR (ON CONST. SITES) 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPF_RATING ENGINEERS LOCAL 4 0.00 $62.12 12/01/2012 $40.34 06/01/2012 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 MECHANICS MAINTENANCE 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPT,RA77NG ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 MILLWRIGHT (Zone 2) 04/01/2011 $31.71 $8.67 $15.61 0.00 $55.99 MILLWRIGHTS LOCAL 1121 -Zone 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 27 of 56 DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Gowmor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE S F. GtOOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dimotor Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension supplemental Total Rate Unemployment Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 11.64 $0.00 $36.17 2 55 $17.44 $8.67 11.64 $0.00 $37.75 3 60 $19.03 $8.67 13.23 $0.00 $40.93 4 65 $20.61 $8.67 13.23 $0.00 $42.51 5 70 $22.20 $8.67 14.02 $0.00 $44.89 6 75 $23.78 $8.67 14.02 $0.00 $46.47 7 80 $25.37 $8.67 14.82 $0.00 $48.86 8 85 $26.95 $8.67 14.82 $0.00 $50.44 r.._._. -------------------------- (Notes: f _ -.__.--------.---- ----- Apprentice to Journeyworker Ratio:1:5 MORTAR MIXER 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABOP ERS -ZONE2 OILER (OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2011 $21.28 $10.00 $12.40 0.00 $43.68 OPERATING ENGINEERS LOCAL a 06/01/2012 $21.56 $10.00 $12.40 0.00 $43.96 12/01/2012 $21.90 $10.00 $12.40 0.00 $44.30 06/01/2013 $22.32 $10.00 $12.40 0.00 $44.72 12/01/2013 $22.74 $10.00 $12.40 0.00 $45.14 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 28 of 56 THE COMMONWEALTH OF MASSACHUSETTS x ! EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAs determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEAT14ER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate OPERA77NG ENGINEERS LOCAL 4 $45.01 $7.80 $14.60 Unemployment $67.41 OILER (TRUCK CRANES, GRADALLS) 12/01/2011 $24.51 $10.00 $12.40 0.00 $46.91 OPERA77NG ENGINF,ERSLOCAL 4 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2012 $24.85 $10.00 $12.40 0.00 $47.25 12/01/2012 $25.24 $10.00 $12.40 0.00 $47.64 06/01/2013 $25.72 $10.00 $12.40 0.00 $48.12 12/01/2013 $26.21 $10.00 $12.40 0.00 $48.61 OTHER POWER DRIVEN EQUIPMENT - CLASS II 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPERA77NG ENGINEERS LOCAL 4 $45.01 $7.80 $14.60 0.00 $67.41 06/01/2012 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 PAINTER (BRIDGES/TANKS) PAIN7ERSLOCAL 35 - ZONE 2 01/01/2012 $44.01 $7.80 $14.60 0.00 $66.41 07/01/2012 $45.01 $7.80 $14.60 0.00 $67.41 01/01/2013 $46.01 $7.80 $14.60 0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with D.LS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 29 of 56 .Cill THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAs determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemorsecmatv TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGES/TANKS Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.01 $7.80 0.00 $0.00 $29.81 2 55 $24.21 $7.80 3.25 $0.00 $35.26 3 60 $26.41 $7.80 3.54 $0.00 $37.75 4 65 $28.61 $7.80 3.84 $0.00 $40.25 5 70 $30.81 $7.80 12.83 $0.00 $51.44 6 75 $33.01 $7.80 13.13 $0.00 $53.94 7 80 $35.21 $7.80 13.42 $0.00 $56.43 8 90 $39.61 $7.80 14.01 $0.00 $61.42 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 2 55 $24.76 3 60 $27.01 4 65 $29.26 5 70 $31.51 6 75 $33.76 7 80 $36.01 8 90 $40.51 +Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 $7.80 0.00 $0.00 $30.31 $7.80 3.25 $0.00 $35.81 $7.80 3.54 $0.00 $38.35 $7.80 3.84 $0.00 $40.90 $7.80 12.83 $0.00 $52.14 $7.80 13.13 $0.00 $54.69 $7.80 13.42 $0.00 $57.23 $7.80 14.01 $0.00 $62.32 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 30 of 56 THE COMMONWEALTH OF MASSACHUSETTS s EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAs determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, NEW) * 01/01/2012 $34.91 $7.80 $14.60 0.00 $57.31 * If 30% or more of surfaces to be painted are new construction, 07/01/2012 NEW paint rate shall be used.PA1NTERSLOCAL 35 - ZONE 2 $35.91 $7.80 $14.60 0.00 $58.31 01/01/2013 $36.91 $7.80 $14.60 0.00 $59.31 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 31 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAS determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4.900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - New Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.46 $7.80 0.00 $0.00 $25.26 2 55 $19.20 $7.80 3.25 $0.00 $30.25 3 60 $20.95 $7.80 3.54 $0.00 $32.29 4 65 $22.69 $7.80 3.84 $0.00 $34.33 5 70 $24.44 $7.80 12.83 $0.00 $45.07 6 75 $26.18 $7.80 13.13 $0.00 $47.11 7 80 $27.93 $7.80 13.42 $0.00 $49.15 8 90 $31.42 $7.80 14.01 $0.00 $53.23 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.96 $7.80 0.00 $0.00 $25.76 2 55 $19.75 $7.80 3.25 $0.00 $30.80 3 60 $21.55 $7.80 3.54 $0.00 $32.89 4 65 $23.34 $7.80 3.84 $0.00 $34.98 5 70 $25.14 $7.80 12.83 $0.00 $45.77 6 75 $26.93 $7.80 13.13 $0.00 $47.86 7 80 $28.73 $7.80 13.42 $0.00 $49.95 8 90 $32.32 $7.80 14.01 $0.00 $54.13 (Notes: Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 32 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, REPAINT) 01/01/2012 $32.97 $7.80 $14.60 0.00 $55.37 PAINTERS LOCAL 35 - ZONE 2 07/01/2012 $33.97 $7.80 $14.60 0.00 $56.37 01/01/2013 $34.97 $7.80 $14.60 0.00 $57.37 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 33 of 56 THE COMMONWEALTH OF MASSACHUSETTS 1 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Dmoor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.49 $7.80 0.00 $0.00 $24.29 2 55 $18.13 $7.80 3.25 $0.00 $29.18 3 60 $19.78 $7.80 3.54 $0.00 $31.12 4 65 $21.43 $7.80 3.84 $0.00 $33.07 5 70 $23.08 $7.80 12.83 $0.00 $43.71 6 75 $24.73 $7.80 13.13 $0.00 $45.66 7 80 $26.38 $7.80 13.42 $0.00 $47.60 8 90 $29.67 $7.80 14.01 $0.00 $51.48 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.99 $7.80 0.00 $0.00 $24.79 2 55 $18.68 $7.80 3.25 $0.00 $29.73 3 60 $20.38 $7.80 3.54 $0.00 $31.72 4 65 $22.08 $7.80 3.84 $0.00 $33.72 5 70 $23.78 $7.80 12.83 $0.00 $44.41 6 75 $25.48 $7.80 13.13 $0.00 $46.41 7 80 $27.18 $7.80 13.42 $0.00 $48.40 8 90 $30.57 $7.80 14.01 $0.00 $52.38 - - - - - --- - -- - -- - � -' -- ` - - - - - ` - -- - - `- -- - - - `1 (Notes: Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 34 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT I DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICKAs determined by the Director under the provisions of the JOANNE F. GO`LDSTEIN Gav — TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Unemployment Total Rate PAINTER (TRAFFIC MARKINGS) 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00 L4BORERS-ZONE2 PAINTER / TAPER (BRUSH, NEW) * 01/01/2012 $33.51 $7.80 $14.60 0.00 $55.91 * If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.PA1NTERSLOC4L 35 - zoNr: 2 07/01/2012 $34.51 $7.80 $14.60 0.00 $56.91 01/01/2013 $35.51 $7.80 $14.60 0.00 $57.91 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 35 of 56 THE COMMONWEALTH OF MASSACHUSETTS tr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. eGOLDSTEIN Goveroor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Apprentice- PAINTER -Local 35 Zone 2 Effective Date - 01/01/2012 Step percent Effective Date Base Wage - BRUSHNEW Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 50 $16.76 $7.80 0.00 $0.00 $24.56 2 55 $18.43 $7.80 3.25 $0.00 $29.48 3 60 $20.11 $7.80 3.54 $0.00 $31.45 4 65 $21.78 $7.80 3.84 $0.00 $33.42 5 70 $23.46 $7.80 12.83 $0.00 $44.09 6 75 $25.13 $7.80 13.13 $0.00 $46.06 7 80 $26.81 $7.80 13.42 $0.00 $48.03 8 90 $30.16 $7.80 14.01 $0.00 $51.97 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 0.00 $0.00 $25.06 2 55 $18.98 $7.80 3.25 $0.00 $30.03 3 60 $20.71 $7.80 3.54 $0.00 $32.05 4 65 $22.43 $7.80 3.84 $0.00 $34.07 5 70 $24.16 $7.80 12.83 $0.00 $44.79 6 75 $25.88 $7.80 13.13 $0.00 $46.81 7 80 $27.61 $7.80 13.42 $0.00 $48.83 8 90 $31.06 $7.80 14.01 $0.00 $52.87 (Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 36 of 56 THE COMMONWEALTH OF MASSACHUSETTS �t �J EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PAMCxAs determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Secretary T[MOTtirP.MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER / TAPER (BRUSH, REPAINT) 01/01/2012 $31.57 $7.80 $14.60 0.00 $53.97 PAINT ERS LOCAL 35 - ZONE 1 07/01/2012 $32.57 $7.80 $14.60 0.00 $54.97 01/01/2013 $33.57 $7.80 $14.60 0.00 $55.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 37 of 56 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN GovernorSecmtary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH Effective Date - 01/01/2012 Step percent REPAINT Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $15.79 $7.80 0.00 $0.00 $23.59 2 55 $17.36 $7.80 3.25 $0.00 $28.41 3 60 $18.94 $7.80 3.54 $0.00 $30.28 4 65 $20.52 $7.80 3.84 $0.00 $32.16 5 70 $22.10 $7.80 12.83 $0.00 $42.73 6 75 $23.68 $7.80 13.13 $0.00 $44.61 7 80 $25.26 $7.80 13.42 $0.00 $46.48 8 90 $28.41 $7.80 14.01 $0.00 $50.22 Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.29 $7.80 0.00 $0.00 $24.09 2 55 $17.91 $7.80 3.25 $0.00 $28.96 3 60 $19.54 $7.80 3.54 $0.00 $30.88 4 65 $21.17 $7.80 3.84 $0.00 $32.81 5 70 $22.80 $7.80 12.83 $0.00 $43.43 6 75 $24.43 $7.80 13.13 $0.00 $45.36 7 80 $26.06 $7.80 13.42 $0.00 $47.28 8 90 $29.31 $7.80 14.01 $0.00 $51.12 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 38 of 56 Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street THE COMMONWEALTH OF MASSACHUSETTS >x 1 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $17.12 DEPARTMENT OF LABOR STANDARDS PILE DRIVER Prevailing Wage Rates OEVALL. PATRICK Governor As determined by the Director under the provisions of the JOANNE s F. GOrLDSTEIN TIMOTHY P. MURRAY Lt. Governor Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street 08/01/2011 $40.12 $8.08 $17.12 0.00 $65.32 PILE DRIVER Classification Effective Date Base Wage Health Pension Supplemental Total Rate Apprentice - PILE DRIVER - Local 56 Zone I Unemployment PANEL & PICKUP TRUCKS DRIVER 12/01/2011 $29.68 $8.56 $7.27 0.00 $45.51 TFAMST FRS JOINT COUNCIL NO. IO ZONE B Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 06/01/2012 $29.98 $8.56 $7.27 0.00 $45.81 $26.08 08/01/2012 $29.68 $8.91 $7.27 0.00 $45.86 $8.08 12/01/2012 $30.28 $9.07 $8.00 0.00 $47.35 PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND DECK) PILE DRIVER LOCAL 56 (70NE 1) 08/01/2011 $40.12 $8.08 $17.12 0.00 $65.32 PILE DRIVER 08/01/2011 $40.12 $8.08 $17.12 0.00 $65.32 PILE DRIVER LOCAL 56 (ZONI; 1) Apprentice - PILE DRIVER - Local 56 Zone I Effective Date - 08/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.07 $8.08 17.12 $0.00 $49.27 2 65 $26.08 $8.08 17.12 $0.00 $51.28 3 70 $28.08 $8.08 17.12 $0.00 $53.28 4 75 $30.09 $8.08 17.12 $0.00 $55.29 5 80 $32.10 $8.08 17.12 $0.00 $57.30 6 85 $34.10 $8.08 17.12 $0.00 $59.30 7 90 $36.11 $8.08 17.12 $0.00 $61.31 8 95 $38.11 $8.08 17.12 $0.00 $63.31 Notes: Apprentice to Journeyworker Ratio:1:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 39 of 56 THE COMMONWEALTH OF MASSACHUSETTS # ) EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Dimctor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street $17.50 $8.75 4.50 $0.00 $30.75 2 45 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $8.75 12.39 $0.00 $47.40 4 70 Unemployment $8.75 PIPEFITTER & STEAMFITTER 09/01/2011 $43.76 $8.75 $12.39 0.00 $64.90 P1PF.F17T1-,'RSLOCAL 53 7 (Local 138) $56.15 12.39 $0.00 $52.30 5 80 $35.61 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15 Apprentice- PIPEFITTER Local 537 (Local 138) Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.50 $8.75 4.50 $0.00 $30.75 2 45 $19.69 $8.75 12.39 $0.00 $40.83 3 60 $26.26 $8.75 12.39 $0.00 $47.40 4 70 $30.63 $8.75 12.39 $0.00 $51.77 5 80 $35.01 $8.75 12.39 $0.00 $56.15 Effective Date - 03/01/2012 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 40 $17.80 $8.75 4.50 $0.00 $31.05 2 45 $20.03 $8.75 12.39 $0.00 $41.17 3 60 $26.71 $8.75 12.39 $0.00 $47.85 4 70 $31.16 $8.75 12.39 $0.00 $52.30 5 80 $35.61 $8.75 12.39 $0.00 $56.75 Notes: ** 1:3; 3:15; 1:10 thereafter/ Steps are 1 yr. - Refrig/AC Mechanic**1:1;1:2;2:4;3:6,4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) - --------------------- Apprentice to Journeyworker Ratio:** ------ PIPELAYER LABORERS-70NE2 12/01/2011 $29.60 $7.10 $11.55 0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $48.25 Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 40 of 56 THE COMMONWEALTH OF MASSACHUSETTS si EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE P. GOLDSTEIN Gocemor Sccretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Gocemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Local 12 (Local 138) Effective Date - 09/01/2011 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Supplemental Step percent Unemployment Health PLUMBER 09/01/2011 $41.93 $9.32 $13.29 0.00 $64.54 PLUMBERS& GASNT7'1;RSLOCAL 12 (Local 138) $28.97 2 40 $16.77 $9.32 5.61 $0.00 $31.70 03/01/2012 $42.73 $9.32 $13.29 0.00 $65.34 4 65 09/01/2012 $43.98 $9.32 $13.29 0.00 $66.59 $31.45 03/01/2013 $45.23 $9.32 $13.29 0.00 $67.84 Apprentice - PLUMBERIGASFITTER - Local 12 (Local 138) Effective Date - 09/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.68 $9.32 4.97 $0.00 $28.97 2 40 $16.77 $9.32 5.61 $0.00 $31.70 3 55 $23.06 $9.32 7.53 $0.00 $39.91 4 65 $27.25 $9.32 8.81 $0.00 $45.38 5 75 $31.45 $9.32 10.09 $0.00 $50.86 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.96 $9.32 4.97 $0.00 $29.25 2 40 $17.09 $9.32 5.61 $0.00 $32.02 3 55 $23.50 $9.32 7.53 $0.00 $40.35 4 65 $27.77 $9.32 8.81 $0.00 $45.90 5 75 $32.05 $9.32 10.09 $0.00 $51.46 Notes: Step 4 with lic$48.12 Steps with lic$53.58 Apprentice to Journeyworker Ratio: 1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 41 of 56 THE COMMONWEALTH OF MASSACHUSETTS s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Dimctor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PNEUMATIC CONTROLS (TEMP.) 09/01/2011 $43.76 $8.75 $12.39 0.00 $64.90 PIPEFI7TERS LOCAL 537 (Loca1138) 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15 PNEUMATIC DRILL/TOOL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 POWDERMAN & BLASTER 12/01/2011 $30.35 $7.10 $11.55 0.00 $49.00 LABORERS -ZONE2 POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2011 $39.52 $10.00 $12.40 0.00 $61.92 OPERATING ENGINFERS LOCAL 4 06/01/2012 $40.09 $10.00. $12.40 0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 0.00 $64.67 PUMP OPERATOR (CONCRETE) 12/01/2011 $39.52 $10.00 $12.40 0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 0.00 $64.67 PUMP OPERATOR (DEWATERING, OTHER) 12/01/2011 $27.95 $10.00 $12.40 0.00 $50.35 OPE RA77NG ENGINEERS LOCAL 4 06/01/2012 $28.34 $10.00 $12.40 0.00 $50.74 12/01/2012 $28.79 $10.00 $12.40 0.00 $51.19 06/01/2013 $29.34 $10.00 $12.40 0.00 $51.74 12/01/2013 $29.89 $10.00 $12.40 0.00 $52.29 READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 0.00 $37.10 TEAMSTERS LOCAL 42 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 42 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Asdetermined by the Director under the provisions of the JOANNE F. GOLDSTEIN Go-or TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H: HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment RECLAIMERS 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPERATING ENGINEERS LOCAL a 06/01/2012 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 0.00 $36.81 ** The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPEWTE.RS-ZONE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 43 of 56 DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE S F. GOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- CARPENTER (Residential Wood Frame) -Zone 2 Effective Date - 05/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $14.54 $6.34 0.00 $0.00 $20.88 2 60 $14.54 $6.34 6.23 $0.00 $27.11 3 65 $15.76 $6.34 6.23 $0.00 $28.33 4 70 $16.97 $6.34 6.23 $0.00 $29.54 5 75 $18.18 $6.34 6.23 $0.00 $30.75 6 80 $19.39 $6.34 6.23 $0.00 $31.96 7 85 $20.60 $6.34 6.23 $0.00 $33.17 8 90 $21.82 $6.34 6.23 $0.00 $34.39 (Notes: ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 02/01/2012 $35.56 $10.50 $10.70 - ----___..--- Apprentice to Journeyworker Ratio:1:5 $56.76 _---------_...----- RIDE -ON MOTORIZED BUGGY OPERATOR LABORERS - ZONE 2 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 ROLLER/SPREADER/MULCHING MACHINE 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPER-4 77NG ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) 02/01/2012 $35.56 $10.50 $10.70 0.00 $56.76 ROOFERS LOCAL 33 08/01/2012 $36.56 $10.50 $10.70 0.00 $57.76 02/01/2013 $37.56 $10.50 $10.70 0.00 $58.76 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 44 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE . GO\LDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Dimaor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - ROOFER - Local 33 Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $1.7.78 $10.50 3.38 $0.00 $31.66 2 60 $21.34 $10.50 10.70 $0.00 $42.54 3 65 $23.11 $10.50 10.70 $0.00 $44.31 4 75 $26.67 $10.50 10.70 $0.00 $47.87 5 85 $30.23 $10.50 10.70 $0.00 $51.43 Effective Date - 08/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.28 $10.50 3.38 $0.00 $32.16 2 60 $21.94 $10.50 10.70 $0.00 $43.14 3 65 $23.76 $10.50 10.70 $0.00 $44.96 4 75 $27.42 $10.50 10.70 $0.00 $48.62 5 85 $31.08 $10.50 10.70 $0.00 $52.28 -------------------..._.._._ --.-------__, (Notes: ** 1:5, 2:6-10, the 1:10; Reroofing: 1:4, then 1:1 Step 1 is 2000 hrs.; Steps 2-5 are 1000 firs. _----._.._. __--------_. - Apprentice to Journeyworker Ratio:** ROOFER SLATE / TILE / PRECAST CONCRETE 02/01/2012 $35.81 $10.50 $10.70 0.00 $57.01 ROOFERS LOCAL 33 08/01/2012 $36.81 $10.50 $10.70 0.00 $58.01 02/01/2013 $37.81 $10.50 $10.70 0.00 $59.01 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 45 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street $18.41 $10.50 3.38 $0.00 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.00 $43.29 3 65 $23.93 Unemployment Apprentice - ROOFER (Slate/Tile/Precast Concrete) - Local 33 $0.00 $45.13 4 75 Effective Date - 02/01/2012 $10.50 10.70 $0.00 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.91 $10.50 3.38 $0.00 $31.79 2 60 $21.49 $10.50 10.70 $0.00 $42.69 3 65 $23.28 $10.50 10.70 $0.00 $44.48 4 75 $26.86 $10.50 10.70 $0.00 $48.06 5 85 $30.44 $10.50 10.70 $0.00 $51.64 Effective Date - 08/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.41 $10.50 3.38 $0.00 $32.29 2 60 $22.09 $10.50 10.70 $0.00 $43.29 3 65 $23.93 $10.50 10.70 $0.00 $45.13 4 75 $27.61 $10.50 10.70 $0.00 $48.81 5 85 $31.29 $10.50 10.70 $0.00 $52.49 (Notes: Apprentice to Journeyworker Ratio:** SHEETMETAL WORKER SHEETMETAL WORKERS LOCAL I7 -A 02/01/2012 $40.79 $9.82 $17.34 2.04 $69.99 08/01/2012 $42.04 $9.82 $17.34 2.08 $71.28 02/01/2013 $43.29 $9.82 $17.34 2.11 $72.56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 46 of 56 fc DEVAL L. PATRICK Gocemor TIMOTHY P. MURRAY Lt. Govcmor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secrctay Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dimctor Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor: install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 02/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.32 $9.82 3.74 $0.00 $29.88 2 45 $18.36 $9.82 7.45 $1.07 $36.70 3 50 $20.40 $9.82 8.42 $1.16 $39.80 4 60 $24.47 $9.82 9.60 $1.32 $45.21 5 65 $26.51 $9.82 10.32 $1.40 $48.05 6 75 $30.59 $9.82 11.76 $1.57 $53.74 7 85 $34.67 $9.82 12.69 $1.72 $58.90 Effective Date - 08/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.82 $9.82 3.74 $0.00 $30.38 2 45 $18.92 $9.82 7.45 $1.09 $37.28 3 50 $21.02 $9.82 8.42 $1.18 $40.44 4 60 $25.22 $9.82 9.60 $1.34 $45.98 5 65 $27.33 $9.82 10.32 $1.42 $48.89 6 75 $31.53 $9.82 11.76 $1.59 $54.70 7 85 $35.73 $9.82 12.69 $1.75 $59.99 Steps 1-3 are 1 year; Steps 4-7 are 6 mos. Apprentice to Journeyworker Ratio:l:4 SIGN ERECTOR FAINTPRS LOCAL 35 - ZONE 2 06/01/2009 $24.81 $7.07 $5.90 0.00 $37.78 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 47 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govomor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27HATt-max E.xowE Lt. G- mor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring-, sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- SIGN ERECTOR -Local 35 Zone 2 Effective Date - 06/01/2009 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.41 $7.07 0.00 $0.00 $19.48 2 55 $13.65 $7.07 2.40 $0.00 $23.12 3 60 $14.89 $7.07 2.40 $0.00 $24.36 4 65 $16.13 $7.07 2.40 $0.00 $25.60 5 70 $17.37 $7.07 5.90 $0.00 $30.34 6 75 $18.61 $7.07 5.90 $0.00 $31.58 7 80 $19.85 $7.07 5.90 $0.00 $32.82 8 85 $21.09 $7.07 5.90 $0.00 $34.06 9 90 $22.33 $7.07 5.90 $0.00 $35.30 (Notes: `---------------.-----.-..------- Steps are 4 mos. Apprentice to Journeyworker Ratio: 1:1 SPECIALIZED EARTH MOVING EQUIP < 35 TONS 12/01/2011 $30.14 $8.56 $7.27 0.00 $45.97 T FAMSTEIZSJOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.44 $8.56 $7.27 0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 0.00 $46.62 12/01/2012 $30.74 $8.91 $8.00 0.00 $47.65 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 12/01/2011 $30.43 $8.56 $7.27 0.00 $46.26 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $30.73 $8.56 $7.27 0.00 $46.56 08/01/2012 $30.73 $8.91 $7.27 0.00 $46.91 12/01/2012 $31.03 $8.91 $8.00 0.00 $47.94 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 48 of 56 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 49 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT W DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK Go—or As determined by the Director under the provisions of the JOANNE F. Gr�OOLDSTEIN TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SPRINKLER FITTER 01/01/2012 $46.38 $8.42 $11.60 0.00 $66.40 SPRINKLER FITTERS LOCAL 550 - (Section B) 03/01/2012 $47.13 $8.42 $11.60 0.00 $67.15 09/01/2012 $48.13 $8.42 $11.60 0.00 $68.15 03/01/2013 $49.13 $8.42 $11.60 0.00 $69.15 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 49 of 56 DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretan• Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice - SPRINKLER FITTER - Local 550 (Section B) Effective Date - 01/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.23 $8.42 7.85 $0.00 $32.50 2 40 $18.55 $8.42 7.85 $0.00 $34.82 3 45 $20.87 $8.42 7.85 $0.00 $37.14 4 50 $23.19 $8.42 7.85 $0.00 $39.46 5 55 $25.51 $8.42 7.85 $0.00 $41.78 6 60 $27.83 $8.42 7.85 $0.00 $44.10 7 65 $30.15 $8.42 7.85 $0.00 $46.42 8 70 $32.47 $8.42 7.85 $0.00 $48.74 9 75 $34.79 $8.42 7.85 $0.00 $51.06 10 80 $37.10 $8.42 7.85 $0.60 $53.37 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.50 $8.42 7.85 $0.00 $32.77 2 40 $18.85 $8.42 7.85 $0.00 $35.12 3 45 $21.21 $8.42 7.85 $0.00 $37.48 4 50 $23.57 $8.42 7.85 $0.00 $39.84 5 55 $25.92 $8.42 7.85 $0.00 $42.19 6 60 $28.28 $8.42 7.85 $0.00 $44.55 7 65 $30.63 $8.42 7.85 $0.00 $46.90 8 70 $32.99 $8.42 7.85 $0.00 $49.26 9 75 $35.35 $8.42 7.85 $0.00 $51.62 10 80 $37.70 $8.42 7.85 $0.00 $53.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 50 of 56 UTL DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Secretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4.900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Notes: Apprentice to Journeyworker Ratio: 1:1 Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment STEAM BOILER OPERATOR OPERATING ENGINEERS LOCAL 4 12/01/2011 06/01/2012 12/01/2012 06/01/2013 12/01/2013 $39.16 $39.72 $40.34 $41.11 $41.89 $10.00 $10.00 $10.00 $10.00 $10.00 $12.40 $12.40 $12.40 $12.40 $12.40 0.00 0.00 0.00 0.00 0.00 $61.56 $62.12 $62.74 $63.51 $64.29 TAMPERS. SELF-PROPELLED OR TRACTOR DRAWN 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPERATING ENGINEERS LOCAL 4 06/01/2012 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 TELECOMMUNICATION TECHNICIAN 09/01/2011 $31.42 $13.00 $12.22 0.00 $56.64 ELECTRICIANS LOCAL 103 03/01/2012 $31.78 $13.00 $12.23 0.00 $57.01 09/01/2012 $32.29 $13.00 $12.25 0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 0.00 $61.72 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 51 of 56 sY � DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNEs . GOLDSTEIN mtam Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dimctor Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Apprentice- TELECOMMUNICATION TECHNICIAN -Local 103 Effective Date - 09/01/2011 Step percent Apprentice Base Wage Health 1 40 $12.57 2 40 $12.57 3 45 $14.14 4 45 $14.14 5 50 $15.71 6 55 $17.28 7 60 $18.85 8 65 $20.42 9 70 $21.99 10 75 $23.57 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 $13.00 Effective Date - 03/01/2012 Step percent Apprentice Base Wage Health Pension 9.27 9.27 9.51 9.51 9.76 10.01 10.26 10.50 10.75 11.00 Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Supplemental Unemployment Total Rate $34.84 $34.84 $36.65 $36.65 $38.47 $40.29 $42.11 $43.92 $45.74 $47.57 Total Rate 1 40 $12.71 $13.00 9.27 $0.00 $34.98 2 40 $12.71 $13.00 9.27 $0.00 $34.98 3 45 $14.30 $13.00 9.51 $0.00 $36.81 4 45 $14.30 $13.00 9.51 $0.00 $36.81 5 50 $15.89 $13.00 9.76 $0.00 $38.65 6 55 $17.48 $13.00 10.01 $0.00 $40.49 7 60 $19.07 $13.00 10.26 $0.00 $42.33 8 65 $20.66 $13.00 10.50 $0.00 $44.1.6 9 70 $22.25 $13.00 10.75 $0.00 $46.00 10 75 $23.84 $13.00 11.00 $0.00 $47.84 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 52 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK JOANNE F. GOLDSTEIN Govemor As determined by the Director under the provisions of the seercton. TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H. HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification (Notes: __ L- -- Apprentice to Journeyworker Ratio: 1:1 TERRAZZO FINISHERS BRICKLAYERS LOCAL 3 - MARBLE & TILE Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment i 02/01/2012 $46.49 03/01/201.2 $45.50 Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile Effective Date - 02/01/2012 Step percent Apprentice Base Wage Health $9.93 $16.51 0.00 $72.93 $10.18 $17.25 0.00 $72.93 Supplemental Pension Unemployment Total Rate 1 50 $23.25 $9.93 16.51 $0.00 $49.69 2 60 $27.89 $9.93 16.51 $0.00 $54.33 3 70 $32.54 $9.93 16.51 $0.00 $58.98 4 80 $37.19 $9.93 16.51 $0.00 $63.63 5 90 $41.84 $9.93 16.51 $0.00 $68.28 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.75 $10.18 17.25 $0.00 $50.18 2 60 $27.30 $10.18 17.25 $0.00 $54.73 3 70 $31.85 $10.18 17.25 $0.00 $59.28 4 80 $36.40 $10.18 17.25 $0.00 $63.83 5 90 $40.95 $10.18 17.25 $0.00 $68.38 Notes: Steps are 800 hrs. Apprentice to Journeyworker Ratio: 1:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 53 of 56 THE COMMONWEALTH OF MASSACHUSETTS # EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor seaete TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 0.00 $52.75 LABORERS - FOUNDA7IONAND MARINE Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.83 $7.10 12.60 $0.00 $39.53 2 70 $23.14 $7.10 12.60 $0.00 $42.84 3 80 $26.44 $7.10 12.60 $0.00 $46.14 4 90 $29.75 $7.10 12.60 $0.00 $49.45 --------------------------- Notes: I Apprentice to Journeyworker Ratio:l:3 I TEST BORING DRILLER HELPER 12/01/2011 $31.77 $7.10 $12.60 0.00 $51.47 LABORERS - FO UNDA TION AND MARINE TEST BORING LABORER 12/01/2011 $31.65 $7.10 $12.60 0.00 $51.35 I.ABORERS - FOUNDATION AND MARINE This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 54 of 56 DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover City/Town: NORTH ANDOVER High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo 430 Osgoo Street Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING LABORER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.99 $7.10 12.60 $0.00 $38.69 2 70 $22.16 $7.10 12.60 $0.00 $41.86 3 80 $25.32 $7.10 12.60 $0.00 $45.02 4 90 $28.49 $7.10 12.60 $0.00 $48.19 ------ --- -._------------------ Notes: $12.40 0.00 ---------� 06/01/2013 Apprentice to Journeyworker Ratio:1:3 $10.00 $12.40 0.00 $63.51 TRACTORS/PORTABLE STEAM GENERATORS 12/01/2011 $39.16 $10.00 $12.40 0.00 $61.56 OPERATING &NGINF.F.RS LOCAL 4 06/01/201.2 $39.72 $10.00 $12.40 0.00 $62.12 12/01/2012 $40.34 $10.00 $12.40 0.00 $62.74 06/01/2013 $41.11 $10.00 $12.40 0.00 $63.51 12/01/2013 $41.89 $10.00 $12.40 0.00 $64.29 TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2011 $30.72 $8.56 $7.27 0.00 $46.55 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 06/01/2012 $31.02 $8.56 $7.27 0.00 $46.85 08/01/2012 $31.02 $8.91 $7.27 0.00 $47.20 12/01/2012 $31.32 $8.91 $8.00 0.00 $48.23 TUNNEL WORK - COMPRESSED AIR 12/01/2011 $44.08 $7.10 $13.00 0.00 $64.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2011 $46.08 $7.10 $13.00 0.00 $66.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - FREE AIR 12/01/2011 $36.15 $7.10 $13.00 0.00 $56.25 I.ABORF.RS (FREE AIR TUNNEL) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 55 of 56 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT kv DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: High School Field House Flooring Works - Install app 4,900 sf of hardwood basketball flooring; sand new and existing floor; install new line striping and center court logo Job Location: 430 Osgoo Street Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2011 $38.15 $7.10 $13.00 0.00 $58.25 LABORERS (FREE AIX TUNNEL) VAC -HAUL 12/01/2011 $30.14 $8.56 $7.27 0.00 $45.97 TEAMSTERSJOINT COUNCII NO. ]OZONE B 06/01/2012 $30.44 $8.56 $7.27 0.00 $46.27 08/01/2012 $30.44 $8.91 $7.27 0.00 $46.62 12/01/2012 $30.74 $8.91 $8.00 0.00 $47.65 WAGON DRILL OPERATOR 12/01/2011 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 WASTE WATER PUMP OPERATOR 12/01/2011 $39.52 $10.00 $12.40 0.00 $61.92 OPERATING ENGINEERS LOCAL 4 06/01/2012 $40.09 $10.00 $12.40 0.00 $62.49 12/01/2012 $40.71 $10.00 $12.40 0.00 $63.11 06/01/2013 $41.49 $10.00 $12.40 0.00 $63.89 12/01/2013 $42.27 $10.00 $12.40 0.00 $64.67 WATER METER INSTALLER 09/01/2011 $41.93 $9.32 $13.29 0.00 $64.54 PLUMBERS & GASFITTERS LOCAL 12 (Local ]38) 03/01/2012 $42.73 $9.32 $13.29 0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 0.00 $67.84 Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L c. 23, ss. 11E-1IL. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. I I E-11 L. All steps are six months (1000 hours) unless otherwise specified. * Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. **** APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 02/21/2012 Wage Request Number: 20120221-014 Page 56 of 56 Request Official Wage Schedule Confirmation Page 1 of 2 Your request for an Official Prevailing Wage Schedule has been successfully received and is being processed by DOS. The schedule will be emailed to the email address provided in your request. Please note the wage request number 20120221-014 for future inquires. Request another official Wage Schedule Return to P http://prevailingwage.detma.org/WageRequest.aspx?wr=121 &AspxAutoDetectCookieSup... 2/21/2012 Legal Ad for Eagle -Tribune In accordance with M.G.L. c149, the North Andover School Department (`School') is soliciting bids from qualified companies to furnish and install approximately 4,900 square feet of hardwood basketball court and rubberized flooring due to water damage at the North Andover High School Field House located at 430 Osgood Street, North Andover. Qualified contractors are requested to submit bids to the School Business Manager at 1600 Osgood Street, North Andover, MA, in accordance with the instructions contained within the Invitation for Bids. The complete IFB is available on the Town website (www.townofnorthandover.com) under "Available Bids, Quotes and Proposals". The School will only accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on March 8, 2012 to be considered. The North Andover School Department may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the North Andover School Department. SPR Central Register General Contract Submit Confirmation Mate Publications and Regulations William Francis Galvin, Secretary of the Commonwealth Page 1 of 2 Home I Search I Index I Feedback I Contact The following General Contract submission was successfully received. Planned date of publish is 2/22/2012 Awarding Agency Agency Name and Address: North Andover School Department 1600 Osgood Street North Andover, MA 01845 Project Number: Estimated Cost: Contractor Qualification: Required for DCAM contracts over $100,000, Massachusetts Highway contracts over $50,000. Contact. Information Name: James Meala, Business Manager Phone: 978-688-1503 Fax Email Address: mealeyi(a)northandover.k12.ma.us Notify email address listed when final publish date assigned Contract Information Project: Plans/Specifications Available: Place, date and time Repair/replace 2,000-4,000 sq. ft. of hardwood basketball court and rubberized flooring due to water damage at North Andover High School gymnasium The complete Invitation for Bids document will be available at www.townofnorthandover.com by clicking on 'Available Bids, Quotes and Proposals' General Bid Deadline*: Sub Bid Deadline: Sub Bid Categories: 03/08/2012 Time 2:00 p.m. Time -IF 11 Additional Information There will be a mandatory site visit at the North Andover High School gymnasium for all interested contractors on Wednesday, February 29, 2012 at 10.00 a.m. http://www.sec.state.ma.us/sprpublicforms/GCSubmitConfirmation.aspx?ID=71772 2/14/2012 North andover high school 430 Osgood street North Andover, MA 01845 Fieldhouse wood flooring repairs Scope of work: General: It is the intent of the new wood flooring system to match the existing flooring system furnish & install approximately 4,900 s.f. of new maple wood sports flooring system field verify all quantities, dimensions, existing conditions and details obtain necessary installation permit(s) — permit fee is waived daily cleanup to contractor furnished dumpster CORI check on all employees Demolition: remove minor portions of existing flooring at perimeter Plywood subfloor: inspect existing plywood subfloor system advise if any irregularities or deformities which may affect the finish floor performance provide minor 're -nailing' only of plywood base as needed it is the intent to re -use the existing plywood subfloor system Maple flooring: Furnish and install new maple sport flooring system by "Acer" Nailing system & methods to match existing Align new flooring system to existing Installation to allow for new wood expansion/contraction to avoid buckling & gaps Finishing: sand new & existing wood floor surfaces (approx. 9,744 s.f.) apply new finish floor coating(s) per specifications install new line striping and center court logo to match existing Reference documents: Floor plan sk drawing 2/21/2012 wood floor specification approved wood floor submittals for existing flooring system center court "logo" all installations per maple wood manufacturers association standards and recommendations Submittals: provide submittals and samples for all items to be installed as part of above scope of work AacerFlex A precision - engineered pad integrates load blaaring ability with enhanced athletic performance. ance. FA AacerFlex is a performance sports floor system which meets the ergonomic needs of today's athlete through sufficient force r reduction and increased energy return as well By -- WN T. CA as outstanding ball rebound characteristics. 8 (RSTSTREE: P 0.80X391 8,91 G&VATER, MA 0'. �,o (508) 691.93N AacerFlex's unique pad minimizes, potential APPROVE610RStl deadspots by increasing pad.s:urfq;ce contact ct:q MEUSE& RiSVOM,11 Di RE]WO area without compromising the, load be. a r 9 Q'RES6ill PER QNIRAC; ability of the system. si aver ex A, Shock Absorbing Performance System. o • Precision -engineered pad integrates load bearing ability with enhanced athletic performance • Reduces injuries • AacerFlex stays flexible and out performs synthetic EPDM rubber and urethane pads. • Three-point contact pad disperses the load and provides uniform response Part l - GENERAL` A. A floating sports performance floor system consisting of vapor barrier, two layers of underlayment, resilient AacerFlex Performance Pads and Aacer maple flooring. 1. The concrete slab depression for 25/32" thick maple flooring with AacerFlex system shall be 2-112". B. See general specifications on page 4. Palrt 11`-- PRODUCTS 2.1 — Materials A. Vapor barrier shall be 6 -mil polyethylene. B. Resilient Subfloor Pads Aacer 3/4" Performance Pad. C. Subfloor 1. Underlayment — 2 layers of 15/32" x 4' x 8' APA rated underlayment with an exposure rating of 1. 2. Underlayment Attachment 1" coated staples D. Flooring — Aacer Maple 25/32" x 2-1/4" 2nd & Better Grade Northern Hard Maple flooring tongued, grooved and end -matched as manufactured by Aacer Flooring, LLC. Flooring will be graded, marked and stamped in accordance with the standards established by the Maple Flooring Manufacturers Association (MFMA). Options: Sizes — 25/32" x 1-1 /2 "' 33/32" x 1-1/2", and 33/32"x2-1/4" Grades -- First Grade and Third Grade Treating — treat with WOODLIFE FIV E. Flooring fasteners shall be 2" barbed cleats or coated staples. F. Wall base shall be 3" x 4" molded vent cove base. 'Part IIt EXECUTION 3. T — Are -installation Inspection A. Floor installer shall verify slab tolerance of concrete and report any corrections to General Contractor and Architect in - writing. Room shall be broom cleaned and free of any foreign material. Floor installer shall document site and working conditions prior to and during installation. This documentation shall become a part of any warranty and may or may not affect fulfillment of any warranty. 3.2 — Installation A. Cover entire slab with 6 -mil polyethylene, sealing and lapping joints a minimum of 6". B. Subfloor 1. AacerFlex Performance Pads shall be attached to first underlayment layer 12" O.C. (32 per sheet) and 6" from underlayment edges on all sides. Install first layer of underlayment with pads facing down perpendicular to the orientation of the long dimension of the maple flooring and breaking rows by 4'. Allow 1/4" spacing between sheets. 2. The second layer of subfloor material shall be laid diagonally at 45° angles over the first layer with 1/4" spacing on all edges, breaking rows at 4'. Second layer shall be attached using 1" coated staples, or equivalent, at a minimum of 12" O.C. Option: Both layers of underlayment may be laid at 450 angles (cuss cross fashion) to finish flooring. C. Aacer Maple Flooring 1. Install Aacer maple flooring parallel with the long dimension of room. Flooring shall be power nailed or stapled every 10" to 12" O.C. with all end joints properly driven tight. 2. Expansion joints may be required between flooring strips intermittently throughout the floor. Requirements will be determined by site and geographical conditions. 3. Provide a minimum 1-1/2" expansion void at all walls and permanent obstructions. 3.3 — Floor Sanding A. Machine sand entire floor with coarse, medium and fine paper to a smooth and uniform surface, free from edger marks and drum drops. B, Remove all sanding dust and lint from entire surface by vacuum and/or tack. 3.4 — Finishittg and Gamelines A. Inspect entire floor to be sure surface is ready to accept seal/finish. Floor should be free from dust and debris, B. Apply seal and finish per manufacturer's label instructions. C. Floor shall be buffed, cleaned and tacked between coats. With water- based finish the floor does not need to be buffed between coats if the next coat of finish is applied within 6 hours of the previous coat. D. Gamelines — apply game lines and logos as indicated by drawings. Paint shall be compatible with finish. 3.5 — Base Installation Install vent cove base with cove base adhesive and/or mechanical attachment to walls. Use pre -molded outside corners and mitered inside corners. 3.6 — Documentation Provide job condition documentation to owner with any warranties. Wall Based Detail Threshold Detail -- 3"x4" VENTED RUBBER BASE --- 1/4" ALUMINUM THRESHOLD (WIDTH MAY VARY) 1 1!2"MIN. EXPANSION SPACE 1112* MIN. EXPANSION SPACE — AACER 314" PERFORMANCE PAD 1 SOLID BLOCKING AT DOORWAY AND HEAVY LOAD AREAS 2 LAYERS 15132" NOM, APA SHEATHING i : 1 f— 2 LAYERS 15/32' NOM. APA SHEATHING 25/32" x 21/4" AACER MAPLE (MFMA) 1 ! i' f 25/32'x 2 114"AACER MAPLE (MFMA) VAPOR BARRIER 1i t i i— AACER 314" PERFORMANCE PAD VAPOR BARRIER 21/2' b tj .2112" 4 4 0 A CONCRETE SLAB For complete details see Aacer shop drawings at www. aacerflooring, com ar — General pe i ica .� o§, 'hese specifications provide strict guidelines hat must be adhered to for proper installation ind performance of the materials supplied by Aacer Flooring, LLC, 1.1- Description 4. Related Work 1. Concrete Substrate - Section 03300 a. The concrete contractor shall furnish and install the concrete substrate depressing the slab in relation to surrounding areas in order to accommodate the floor system: The slab shall be smooth troweled and finished to a tolerance of 1 /8" in a 10' radius. High spots shall be ground and low spots shall be filled with an approved leveling compound by the concrete contractors to meet the full approval of the floor installer. 2. Waterproofing Membrane - Section 07100 a. Concrete subfloor at or below grade shall be adequately vapor -proofed and/or waterproofed beneath the slab and at the perimeter of below grade walls by the general contractor using a suitable type membrane. Thresholds - Section 08700 a. Thresholds or transitional entryways shall be designed and installed to adequately accommodate the expansion and contraction of the wood floor system. Thresholds and transitionways shall be installed by the flooring contractor. 4. Game Standard Inserts -- Section 11500 1.2 - References A. MFMA Maple Flooring Manufacturers Association 1.3 - Quality Assurance A. Manufacturer - Manufacturer of athletic flooring shall be Aacer Flooring, LLC B. Flooring Contractor/Installer - The installation of the floor system described in these specifications shall be completed by a firm familiar with the requirements of the system specified and fully experienced in procedures required for installing athletic flooring manufactured by Aacer Flooring, LLC. Member 0jt~ I ': 1.4 - Submittals A. Submit Aacer Flooring, LLC specification sheets and shop drawings as required. B. Samples - submit the required number of samples of the specified System as requested by the owner/architect. C. Maintenance Guidelines - upon completion of floor send the Aacer Floor Maintenance Guide to the owner. This guide will explain the Proper HVAC and building maintenance requirements as well as floor cleaning and servicing guidelines to assure proper floor performance and longevity. 1.5 -- Working Conditions A. The wood flooring and its components specified herein shall not be delivered or installed until all wet trades and overhead work is completed. This includes all masonry, painting, plaster, tile, marble and terrazzo, as well as all overhead mechanical trades. The building shall be fully enclosed and weather tight and all permanent windows and doorways shall be installed. Permanent heating and air conditioning shall be installed and working in accordance with building occupation requirements. B. The concrete substrate shall be determined fully cured by industry standards. It shall be free of all foreign materials and broom clean when turned over to the floor installer. Permanent HVAC units for the building shall have been operating a minimum of one week prior to floor installation start up. C. During and after installation, building HVAC and lighting systems shall maintain a temperature and humidity range compatible with the expected high and low moisture content range of the flooring. The floor installer, based on the building's HVAC control and geographical situation, shall determine this range. D. Flooring must be stored on site in a dry, well - ventilated area while acclimating to site conditions. Moisture content of wood shall be consistent with the ambient conditions of the building as it will be maintained when occupied. 1.6 - Warranty and Disclaimer A. Aacer Flooring, LLC, Peshtigo, WI, hereby warrants the materials, it has supplied to be free from manufacturing defects for a period of one year. THIS WARRANTY IS IN LIEU OF AND EXCLUDES ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. B. This warranty is limited to the materials manufactured by and supplied by Aacer Flooring, LLC. THIS WARRANTY EXCLUDES ANY CONSEQUENTIAL OR INCIDENTAL DAMAGES and, in the event of breach, Aacer Flooring, LLC's sole liability and your exclusive remedies will be limited to repair or replacement of material and components supplied by Aacer Flooring, LLC and proven to be defective by the manufacturing process. C. During the warranty period, the floor shall not be recoated without the approval of the flooring contractor. D. The jobsite documentation forms by the flooring contractor shall become a part of the warranty and both the owner and flooring contractor shall retain record of said forms as a permanent reference for any abrogation. E. Flooring contractor warrants the installation of the floor systems to be free from defects in materials and workmanship for a period of one year. 'ORT FLOORING, LLO P.O. Box 151 • 970 Ogden Rd. • Peshtigo, WI 54157 Toll -Free 877-582-1181 6 Fax: 715-582-1182 • www.aacerflooring.com ssu� t1SSL. Performance Tested �ra.A�0 11/06/2002 TUB 12:27 PAZ "`-"-`�� S5011tlp131p3dS _pNN1Np983dii'fti9OS3d O MORN 0. .;i96AS3U 7 3SIA38 r,_ _t }�11�nansep3p3�o��d 6u£6't61405 tZ£tdi Yff'S31 Splay ' 133S1S 1w OE �tll •S';pS E A7htil:Op' l hhpi "Ike 't® ,}fid ME bVIS0dd to 39dd A3113A 30l 8S9LS9ELOZ GZ:hT ZOOZISO/TT J cr C tf a rw� 8o uw NZ,waz Na`d x t�1 Q Q IL Q•QLU<i� b.� O Zdbh•bbb-DT6,��99iTT� 1\6 a Z00Z���'� ^h r , �e ��DDO oVx r �tCg r, 10 '7 G ro G • 0 C QIs 0 p 8S�..5 A -v0 to 39dd A3113A 30l 8S9LS9ELOZ GZ:hT ZOOZISO/TT J cr C tf a rw� 8o uw NZ,waz Na`d x t�1 Q Q IL Q•QLU<i� b.� O Zdbh•bbb-DT6,��99iTT� Z00Z���'� to 39dd A3113A 30l 8S9LS9ELOZ GZ:hT ZOOZISO/TT I Electrical contractor seeks Electrician and/or Apprentice for commercial/industrial work. Min. 3 yrs. experience Resumes to Electrical, P.O. Box 166, Fremont, NH 03044 Call and leave Qualifications 8 number @ 978-241-9883 "i W*# MA9 MANUFACTURING AND MAINTENANCE REPAIR FULL-TIME North Shore manufacturing company seeks an experienced maintenance 8 repair person. We are looking for someone who can maintain 8 repair our pneumatic production equipment, do routine preventative maintenance 8 work effectively between departments. We require some one who can work independently with minimal supervision. Qualified candidates email resume with salary requirements to: hrdeptl2@gmail.com North Shore HVAC Contractor looking for an EXPERIENCED HVAC TECHNICIAN Must have 5 years experience in commercial and residential heating and cooling repairs. You must have exceptional work habits and be highly motivated. We offer a generous wage with a comprehen- sive benefit package.. Fax resume to (978) 774-2995 or email to kcosta@breenandsullivan.com 1' . 11, , 11#1#11 ANTIQUES 26th Annual Winter SALE. PickeringWhatfAntiquesGallery.com for more info, 978-741-3113. 11-5 every day. Sale ends 2/29/12. COMMONWEALTH OF MASSACHUSETTS LAND COURT DEPARTMENT OF THE TRIAL COURT (SEAL) 2012-MISC. 458424 ORDER OF NOTICE To: Ep'rfania Gabin Santos; Carlos Gabin and to all persons entitled to the benefit of the Servicemembers Civil Relief Act, 50 U.S.C. App. § 501 at seq.: Flagstar Bank, FSB claiming to have an interest in a Mortgage covering real property in 2-4 Sara- toga Ter, Lawrence given by Epifania Gabin Santos and Carlos Gabin to Mortgage Electronic Registration Systems, Inc., dated February 29, 2008, and registered with the Essex County (Northern District) Registry District of the Land Court as Docu- ment No.95766 and noted on Certifi- cate of Title No. 15814 and now held by the plaintiff by assignment has/ have filed with this coup a complaint for determination of Defendant's/De- fendants' Servicemembers status. If you now are, or recently have been, in the active military service of the United States of America, then you may be entitled to the benefits of the Servicemembers Civil ReliefAct. If you object to a foreclosure of the above-mentioned property on that basis, then you or your attorney must file a written appearance and answer in this court at Three Pem- berton Square, Boston, MA 02108 on or before Mar 26 2012 or you will be forever barred from claiming that you are entitled to the benefits of said Act. Witness, KARYN F. SCHEIER Chief Justice of this Court on Feb 13, 2012 Attest: Deborah J. Patterson Recorder 201112 -1693 -RED Vintage Clydesdale Budweiser sign enclose in bubble, that lights up 6' long mounts on wall Over 40 years old, good condition $1,000 Call (978) 587-2115 (Peabody) 4$ 44W VINTAGE SET 1947 solid mahogany credenza and china cabinet excellent condition, $500 or best, Diane @ 508-838-9781 12ml,"' ill VENDERS NEEDED Craft Fair -Sat .,Mar .24, Gaythorne Hall, Rt.28, Methuen. Barbara Zraket amedeb@comcast.net or 978-683-6271 ATTENTION! Beware of anyone replying to your ad offering to send you a check for shipping and you sending them back the difference. Also be- ware when responding to classified ads that ask you to send shipping cost. Possible scam! IPOD TOUCH New 32 gig, 4th generation. $175. Call at Paul (603) 479-2010 ADS in this category must show prices by cubic feet. Half a cord is 64 cu. ft. and a cord is 128 cu. ft. SEASONED FIREWOOD 2 cords $250 a cord It 28 cu. ft.). Cut 6 split. Will deliver. Call 978-729-0895. "WOODBOY" - FIREWOOD Seasoned, + green cordwood. Grapple loads, full + AIN truck. 603-642-3864 FILL 8 CLEAN BEDDING SAND FREE PICK-UP ONLY. 978-687-7361 COMMONWEALTH OF MASSACHUSETTS LAND COURT DEPARTMENT OF THE TRIAL COURT (SEAL) 2012 MISC. 458485 ORDER OF NOTICE TO: Oswaldo P. Almelda and to all persons entitled to the benefit of the ,Servicemembers Civil Relief Act, 50 U.S.C. App. § 501 at seq.: Wells Fargo Bank, NA claiming to have an interest in a Mortgage covering real property in 92-94 Phillips Street, Methuen given by Oswaldo P. Almelda to Mortgage Electronic Registra- tion Systems, Inc., dated June 15, 2001, and recorded with the Essex County (Northern District) Reg- Istry of Deeds at Book 6200, Page 337 has/have filed with this court a complaint for determination of De- fendant's/Defendants' Servicemem- bers status. If you now are, or recently have been, in the active military service of the United States of America, then you may be entitled to the benefits of the Servicemembers Civil ReliefAct. If you object to a foreclosure of the above-mentioned property on that basis, then you or your attorney must file a written appearance and answer in this court at Three Pem- berton Square, Boston, MA 02108 on or before Mar 26 2012 or you will be forever barred from claiming that you are entitled to the benefits of said Act. Witness, KARYN F. IrSCHEIER Chief Justice of this Court on Feb 13, 2012 Attest: Deborah J. Patterson Recorder 201106-0722 YEL ET — 2/23/12 I ET - 02/23/12 NOTIFICATION OF TRADE CERTIFICATION The U.S. Department of Labor has determined that Schneider Electric USA, Inc., a subsidiary of Schneider Electric Industries SAS, System Con- sistency Division, Finance Department, in North Andover, MA has been ad- versely impacted by increased imports. The subject firm has been certified for (TAA) Trade Adjustment Assistance benefits as of 01/06/2012. As a result, affected workers totally or partially separated from employ- ment on or after 02/13/2010 and before 01/06/2014 may be eligible to re- ceive weekly cash benefits; financial assistance for remedial or vocational training programs; travel allowances to and from training; job search expens- es; relocation allowances; Reemployment Trade Adjustment Assistance (RTAA); a Health Coverage Tax Credit and other reemployment services such as resume preparation, employment counseling and job referrals. For information about these benefits, all workers should inquire and ap- ply at ValleyWorks - Career Center of Lawrence, 439 South Union Street, Lawrence, MA 01843 or their nearest One -Stop Career Center. Information about Career Center services is available at www.tnass.gov/eolwdfdcs or by calling (617) 626-6007. ET - 2/16,2/23/12 NOTICE OF MORTGAGEEI'S SALE OF REAL ESTATE By virtue of and in execution of the Power of Sale contained in a certain mortgage given by Intercity, LLC to Louis M. Saab, now held by Center Harbor Funding, LLC, said mortgage dated April 21, 2010 and recorded with the Essex County Northern District Registry of Deeds in Book 12013, Page 20, of which mortgage the undersigned is the present holder, for breach of the conditions of said mortgage and for the purpose of foreclos- ing the same will be sold at Public Auction at 12:00 PM Noon on the 5th day of March, 2012 on the mortgaged premises located at 8 River Place, Methuen, Essex County, Massachusetts, all and singular the premises de- scribed in said mortgage, To wit: Two certain tracts of land with the buildings thereon situated in said Methuen, Essex County, Commonwealth of Massachusetts, and being lot number 36 and the Southwesterly portion of lot number 57 on a plan of land of Robert Wilson made by Joseph S. Howe in 1870 and recorded with North Essex Registry of Deeds at Book 11, Page 600, said lots being contiguous and bounded together as follows: WESTERLY one hundred twenty-three feet on a proposed street as shown on said Plan; NORTHERLY . by Lot No. 26 as shown on said plan one hundred five feet; NORTHEASTERLY by the remaining portion of Lot No. 57 on said Plan; SOUTHEASTERLY & EASTERLY by a proposed street; and SOUTHERLY by Lot No. 37 on said plan, one hundred five feet, more or less. Said premises are conveyed subject to rights, restrictions, easements, and taking as appear of record so far as the same are now in force and applicable. For reference to title see deed in Intercity, LLC recorded with the Essex County Northern District Registry of Deeds in Book 12013, Page 14. Premises will be sold and conveyed subject to and/or with the benefit of all rights, rights of way, restrictions, easements, covenants, tenancies, and/or rights of parties in possession, liens or claims in the nature of liens, improvements, public assessments, any and all unpaid taxes, tax titles, tax liens, water and sewer liens and any other municipal assessments or liens or existing encumbrances of record which are in force and are applicable, having priority over said mortgage, whether or not reference to such re- strictions, easements, improvements, liens or encumbrances is made in the deed. Terms of sale: A deposit of ten thousand dollars ($10,000) by certified or bank check will be required to be paid by the purchaser at the time and place of sale. The balance is to be paid by certified or bank check at the law office of Rollins, Rollins and Fox, 60 William Street, Suite 220, Wellesley, MA 02481 within thirty (30) days from the date of sale. Foreclosure Deed will be provided to purchaser for recording upon receipt in full of the pur- chase price, immediately available in good funds. In the event of an error in this publication, the description of the premises contained in said mortgage shall control. Other terms, if any, to be announced at the sale. , The Mortgagee reserves the right to postpone the sale to a later date by public proclamation at the time and date appointed for the sale and to further postpone at any adjourned sale -date by public proclamation at the time and date appointed for the adjourned sale date. In the event that the successful bidder at the foreclosure sale shall de- fault in purchasing the within described property according to the terms of this Notice of Sale and/or the terms of the Memorandum of Sale executed at the time of foreclosure, the Mortgagee reserves the right, but shall not have the obligation, to sell the property by foreclosure deed to the second highest bidder, providing that said second highest bidder shall deposit with the Mortgagee's attorneys, Rollins, Rollins and Fox, 60 William Street, Suite 220, Wellesley, MA 02481, the amount of the required deposit as set forth herein within three (3) business days after written notice of the default of the previous highest bidder and title shall be conveyed to the said second highest bidder within twenty (20) days of said written notice. If the second highest bidder declines to purchase the within described property, the Mortgagee reserves the right to purchase the within described property at the amount bid by the second highest bidder. Center Harbor Funding, LLC Present holder of said mortgage I By its attorneys, Joshua M. Fox Rollins, Rollins & Fox 60 William Street, Suite 220 Wellesley, MA 02481 ET - 2/9, 2/16, 2/23/12 781-489-1030 CLASSIFIED MARKETPLACE FREE WOOD Trees on ground must be cut up Call (978) 470-1343 UPLIFT CHAIR - Leather. Good condition. Oversized, overstuffed recliner, beige. (978) 556-0336 ABSOLUTE OIL Call for current price. 100 gal. minimum. 24 hr. burner service. 978-535-2839 --- 978-744-640 5 yyyyyy ATTENTION FUEL CONSUMERS: All ads in this classification run in our 10 paper "Classified Connection" that covers the North Shore, Merrimack Valley and Southern New Hampshire. Ads appearing in this section may or may not deliver to this entire market. Prices may reflect a "Local" delivery area only and may be higher for an extended delivery area. TTTTTT LOWEST Call 24 hrs. yes weekends. PAYLESS OIL - Price subject to change 978-921-0702 781-631-8193 Bedroom Set Full, Captains Table w/4 chairs, Futon, Whirlpool washer 8 dryer hardly used $1500 or best offer (978) 682-1066 COMMONWEALTH OF MASSACHUSETTS LAND COURT DEPARTMENT OF'THE TRIAL COURT (SEAL) 2012 MISC: 458285 ORDER OF NOTICE To: Marjorie Sanchez and to all persons entitled to the benefit of the Servicemembers Civil Relief Act, 50 U.S.C. App. § 501 et seq.: OneWest Bank FSB claiming to have an interest in a Mortgage covering real property in 19 Logan Street, Lawrence given by Marjorie Sanchez to Mortgage Electronic Registration Systems, Inc., dated February 12, 2007, and recorded with the Essex County (Northern District) Registry of Deeds at Book 10629, Page 141 and now held by the plaintiff by assignment has/have filed with this court a complaint for determination of Defendant's/Defen- dants' Servicemembers status. If you now are, or recently have been, in the active military service of the UnitedStates of America, then you may be entitled to the benefits of the Servicemembers Civil ReliefAct. If you object to a foreclosure of the above-mentioned property on that basis, then you or your attorney must file a written appearance and answer in this court at Three Pem- berton Square, Boston, MA 02108 on or before Mar 26 2012 or you will be forever barred from claiming that you are entitled to the benefits of said Act. Witness, KARYN F. SCHEIER Chief Justice of this Court on Feb 10, 2012 Attest: Deborah J. Patterson Recorder 201103-1293-GRY ET — 2/23/12 BEDROOM SET, Stanley, converts to full/queen, light natural wood, bureau, dresser.6 mirror, desk/hutch, chair, chest (blankets/toys)-$1200 kelly.e.roberge@gmail.com or 978-470-3759. BEDS - NEW!! Twins $150, Fulls $175 Queens $199, Kings $325 - 5 -pc Bedroom set - New in Boxes $599, Bunk Beds, $199 603-566-3840 www.nhfurnituredirect.com DINETTE SET with 4 chairs. 48" round glass top, wood base, light finish. Good condition. $275. Call (978) 975-7321 BEVERLY, MA: ESTATE SALE 299 Dodge St Sat. February 25th, 8-1 pm Antiques, collectibles, furniture, household items, and much more... GLOUCESTER, MA: INDOOR ESTATE SALE 70 Concord St. Fri. 2/24, Sat. 2/25 8 Sun. 2/26 10-3pm.Furniture/retro, dishes,antiques, Lenox china, stengelware pottery, paintings, Old Pho- tography equipment, Christmas decoc.etc THE EAGLE -TRIBUNE .HAVERHILL, MA: 11 North Avenue, corner of Macon Ave., Saturday, Feb. 25, 9am-12 noon, MOVING: farmer's white oak table with 8 chairs, 2 Windsor chairs, Queen Anne wing chairs, antique double drop leaf mahogany an- tique table, mahogany end tables with brass pull drawers, mahogany 4 poster queen bed, 2 drawer mahogany file cabinet, antique 1928 Singer electric sewing machine in Queen Anne style, English country hunt scene 30x40 in 3" gold frame frame triple matted, 20" flatscreen TV with DVD, lamps, 8 MORE! COMMONWEALTH OF MASSACHUSETTS LAND COURT DEPARTMENT OF THE TRIAL COURT (SEAL) 2012 MISC. 458208 ORDER OF NOTICE TO: Jennifer J. Jop and to all persons entitled td the benefit of the Servicemembers Civil Relief Act, 50 U.S.C. App. § 501 et seq.: . CitiMortgage, Inc. claiming to have an interest in a Mortgage covering real property in 44 LYNDALE AVENUE, METHUEN given by Jennifer J. Jop to Mort- gage Electronic Registration Sys- tems, Inc., dated May 10, 2006, and recorded with the Essex Coun- ty (Northern District) Registry of Deeds at Book 10180, Page 162 as affected by a modification agree- ment dated February 15, 2009 and recorded with said records at Book 11590, Page 279 and now held by the plaintiff by assignment has/have filed with this court a complaint for determination of Defendant's/Defen- dants' Servicemembers status. If you now are, or recently have been, in the active military service of the United States of America, then you may be entitled to the benefits of the Servicemembers Civil Relief - Act. If you object to a foreclosure of the above-mentioned property on that basis, then you or your attorney must file a written appearance and answer in this court at Three Pem- berton Square, Boston, MA 02108 on or before March 26, 2012 or you will be forever barred from claiming that you are entitled to the benefits of said Act. Witness, KARYN F. SCHEIER Chief Justice of this Court on Febru- ary 9, 2012 Attest: Deborah J. Patterson Recorder 201112 -1669 -BLU ET - 2/23/12 A, L & M REALTY D/B/A HAMPSHIRE ROAD SELF STORAGE 9 HAMPSHIRE ROAD SALEM, NH 03079 LEGAL ADVERTISING Advertisement of Sale of Contents of Individual Storage Space at the above-named Self Storage Facilities pursuant to the provision of Chapter 319, Acts and Resolves of the Commonwealth of Massachusetts, Massachusetts General Laws, Chapter 105A. This is notice of Default and Enforcement by Sale, of Self Storage Lien by the above-named operators of Self Storage Facilities against occupants to pay storage fee and/or late fee for storage of goods as set forth in rental agreement between the above-named facilities and occupants and notice that the above-named facilities shall enforce its lien by public auction against each occupant as follows: Time, Day, Date, and Place of Sale of Contents by Public Auction: 2:00 PM, Friday, on March 9, 2012 at 9 Hampshire Road, Salem, NH 03079. Occupant(s), Leased Space(s), Last Known Address, by Certified Mail Dated: February 1, 2012.. 1. Baggett,Michael, H -A-025, 17 Jennings St., Lawrence, MA 01841 2. LaRoche, Brian, H -A -036-B, 12 Old Rockingham Rd, Salem, NH 03079 3. Ayala, Julian H -A -057-D, 64 Myrtle St, Lawrence, MA 01841 4. Boutin, Cindy Rose, H -A-060, 385 Holly Ave, Manchester, NH 03103 ' 5. Thomas, Denise, H -A -076-D, 47 Sevoian Dr, ILL, Methuen, MA 01844 6. Castillo, Jhonata, H -A -086-D, 10 Danbury Drive, #6, Methuen, MA 01844 7. Biasiucci, Elizabeth, H -A-164, 49 Milk Street, Methuen, MA 01844 8. Gomez, Carlos R., H -A-174, 525 Essex Street, PMB 232, Lawrence, MA 01840 9. Diaz, Daniel, H -A-200, 15 Bedford Street, 1 fl, Lawrence, MA 01841 10. Gmyrek, Steven, H -B-46, 103 Cluff Crossing Rd, L-12, Salem NH 03079 11. Bruett, Gregg, H -B-73, PO Box 134,Swampscott, MA 01907 12. Beaulieu, Daniel, H -C-04, 34 Brookwood Rd, Salem, NH 03079 13. Caminero, Marcus, H -D-008, 575 Common Street, #212, Lawrence, MA 01841 14. Legette, Judy, H -D -074-D, 634 Haverhill Street, #3, Lawrence, MA 01841 15. Graceffo, Eugene, H -D -144-D, 284 North Braodway, Salem NH 03079 16. Alliette, Karen, H -E-37, 43 Cedar ST, #44, Haverhill, MA01832 17. Almonte, Arnulfo, H -E-38, 61 East Pleasant St, 11fl, Lawrence, MA 01841 18. Gomez, Carlos J., H -E -40-B, 5 Community Ave, Lawrence, MA 01841 19. Parchuke, Kim, H -H -40-C, 7323 Haven Way, Wilmington, NC 28411 20. McGrath, Michael, H-1-03, 29 Center St, Methuen, MA 01844 DECRIPTION OF CONTENTS: Believed to contain mostly household goods including clothing, furniture, appliances, tools, etc.; office supplies and equipment; automobiles; and automotive parts. ET - 2/16, 2/23/12 MORTGAGEE'S SALE OF REAL ESTATE By virtue of and in execution of the Power of Sale contained in a certain mortgage given by Albert J. Stebbins Jr. and Ruth L. Stebbins to World Sav- ings Bank, FSB, dated July 19, 2006 and recorded in Essex County (North- ern District) Registry of Deeds in Book 10300, Page 291, of which mortgage Wells Fargo Bank, N.A. f/k/a Wachovia Mortgage, FSB f/k/a World Savings Bank, FSB, is the present holder, for breach of conditions of said mortgage and for the purpose of foreclosing the same, the mortgaged premises lo- cated at 48 Dunstable Street, Lawrence, Massachusetts will be sold at a Public Auction at 2:00 p.m. on March 15, 2012, at the mortgaged premises, more particularly described below, all and singular the premises described in said mortgage, to wit: A certain parcel of land with the buildings thereon situated on the easterly side of Dunstable Street in Lawrence, Essex County, Commonwealth of Massachusetts, and more particularly bounded and described as follows: Northerly 100 feet by land now or formerly of Grammont; Easterly 100 feet by land now or formerly of Essex Company; Southerly 100 feet by the northerly line of Groton Street; and Westerly 100 feet by the easterly line of Dunstable Street. All of said premises being more particularly shown on a plan duly re- corded in the North Essex District Registry of Deeds as Plan No. 1363. The mortgagor(s) expressly reserve my/our rights of Homestead and do not wish to terminate my/our Homestead by granting the within convey- ance notwithstanding my/our waiver of such Homestead in paragraph 24 of the within mortgage. Being the same premises conveyed Dated May 23, 2002 and recorded with the Essex North Registry of Deeds on May 29, 2003 at Book 7848 Page 272. The above premises will be sold subject to all taxes, assessments, and other encumbrances which may constitute a prior lien thereon, and will be conveyed subject to any easements, restrictions of record, tenancies, and rights of redemption for unpaid federal taxes, if any, as shall, notwithstand- ing this provision, constitute valid liens or encumbrances thereon after said sale. Terms of the Sale: Cash, cashier's check, or certified check in the sum of Five Thousand Dollars ($5,000.00) as a deposit must be shown at the time and place of the sale in order to qualify as a bidder and will be required to be paid as a deposit by the successful bidder; successful bidder to sign written Memorandum of Sale upon acceptance of bid; balance of purchase price payable in cash or current funds in thirty (30) days from the date of, the sale at the offices of mortgagee's attorney, Partridge Snow & Hahn LLP, 2364 Post Road, Suite 100, Warwick, RI 02886, or such other time as may be designated by mortgagee. The description for the premises contained in said mortgage shall control in the event of a typographical. error in this publication. Other terms to be announced at the sale. Wells Fargo Bank, N.A. f/k/a Wachovia Mortgage, FSB f/k/a World Savings. Bank, FSB By Its Attorneys, PARTRIDGE SNOW & HAHN LLP 2364 Post Road, Suite 100 Warwick, Rhode Island 02886 ' ET - 2/16, 2/23, 3/1/12 (401) 681-1900 SALEM, NH, 7 Castleridge Road Estate Sale: Sat 2/25 and 2/26 from 9am to 2pm. Living room, bedroom, dining room, kitchen. *. AMAZING! * New Queen Mattress Set European Pillowtop. Still in plastic. Cost $1099 Sell $249 Can deliver 603-305-9763 BED orthopedic 10" thick, pillowtop mattress 8 box. New in plastic Cost $1199; Queen $299; Full $280 King $450 can deliver 603-235-1695 COMMONWEALTH OF MASSACHUSETTS THE TRIAL COURT PROBATE AND FAMILY COURT Essex Probate and Family Court 36 Federal Street Salem, MA 01970 (978) 744-1020 Docket No. ES12PO213EA NOTICE OF PETITION FOR PROBATE OF WILL In the Estate of: Albert O Martin Sr. aka Albert O Martin aka Albert Martin aka Albert Orel Martin Sr. Late of: Methuen MA Date of Death: 11/06/2011 " to all persons interested in e above captioned estate,' a ion has been presented requesti that a document purporting to be the last will of said decedent be proved and allowed and that Albert 0 Martin Jr. of Raymond NH, Robert Martin of Barrington, NH be appointed ex- ecutor/trix, named in the will to serve Without Surety IF YOU DESIRE TO OBJECT THERETO, YOU OR YOUR ATTOR- NEY MUST FILE A WRITTEN AP- PEARANCE IN SAID COURT AT: Salem ON OR BEFORE TEN O'CLOCK IN THE MORNING (10:00 AM) ON: 03/26/2012 In addition, you must file a written affidavit of objections to the petition, stating specific facts and grounds upon which the objection is based, within (30) days after the return day (or such other time as the court, on motion with notice to the petitioner, may allow) in accordance with Pro- bate Rule 16. WITNESS, Hon. Mary Anne Sa- haglan, First Justice of this Court. Date: February 9, 2012 Pamela Casey O'Brien Register of Probate ET - 2/23/12 23, 2012 19 BEDROOM Set, solid cherrywood sleigh, dresser, mirror, chest 6 nightstand. New/in boxes. Cost $2300 sell $895 603-235-1695 Brass Fireplace basket $5. Fancy Brass Fireplace fan $15. Andirons $10. Fire Tool $5. Wing chair $25. Bookcase desk $25. Bookcase $15. An- tique cradle $45/Highchair $55 603 793-6179 Ethan Allen chair $65. Large Kitchen table/leaf $35. Entertainment center $65. Pulpit $35 Stu- dent desk $15 Bistro Set. $65 9 x 12 oriental rug $25 603-793-6179 METHUEN CO-OPERATIVE _ BANK LEGAL NOTICE ANNUAL MEETING NOTICE The annual meeting of the share- holders of this bank will be held at Methuen Co-operative Bank, 243 Broadway, Methuen, MASS. On Thursday, March 1, 2012, at 10:15 A.M. for the election of Directors for the ensuing three years and for Chairman of the Board of Directors and Clerk of the Corporation for the ensuing year, and for the transaction of such business as may be legally come betote them. David J. Minicucci s' , Clerk of the Corporation Y 11�_r — 91014r9rn 7 In accordance with M.G.L. c149, the North Andover School Depart- ment ('School') is soliciting bids from qualified companies to furnish and install approximately 4,900 square feet of hardwood basketball court and rubberized flooring due to water . damage at the North Andover High School Field House, located at 430 Osgood Street, North Andover. Qual- ified contractors are requested to submit bids to the School Business Manager at 1600 Osgood Street, North Andover, MA, in accordance with the instructions contained within the Invitation for Bids. The complete IFB is available on the Town website (www.townof- northandover.com) under "Avail- able Bids, Quotes and Proposals". The School will only accept propos- als delivered in person or by mail. All proposals must be received by 2:00 p.m. on March 8, 2012 to be consid- ered. The North Andover School De- partment may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the North Andover School Department. a ET - 2/23/12 r NOTICE OF MORTGAGEES SALE OF REAL ESTATE By virtue and in execution of the Power of Sale contained in a c in mortgage given by Sherley Carre and Edenswear Carre to Mortga lec- tronic Registration Systems, Inc., dated March 14, 2007 and recorded with the Essex County .(Northern District) Registry of Deeds at Book 10674, Page 44, of which mortgage Bank of America, N.A., as successor by merger to BAC Home Loans Servicing, LP is the present holder, for breach of the conditions of said mortgage and for the purpose of foreclosing, the same will be sold at Public Auction at 4:00 p.m. on March 9, 2012, on the mortgaged premises located at 75 Tower Hill Street, Lawrence, Essex County, Massa-, chusetts, all and singular the premises described in said mortgage, TO WIT: A certain tract or parcel of land, with the buildings thereon, situate in Law- rence, County of Essex, Massachusetts, being the westerly part of Lot Nno. 37 on plan of lands in said Lawrence known as Emery Terrace, recorded With the Essex North District Registry of deeds in Book 237, Page 600. Be- ing the same premises conveyed to the herein named grantor(s) by deed recorded with the Essex Registry of Deeds in Book 6980, Page 70. For mortgagor's(s') title see deed recorded with Essex County (Northern District) Registry of Deeds in Book 6980, Page 70. These premises will be sold and conveyed subject to and with the ben- efit of all rights, rights of way, restrictions, easements, covenants, liens or claims in the nature of liens, improvements, public assessments, any and all unpaid taxes, tax titles, tax liens, water and sewer liens and any other municipal assessments or liens or existing encumbrances of record which are in force and are applicable, having priority over said mortgage, whether or not reference to such restrictions, easements, improvements, liens or encumbrances is made in the deed. TERMS OF SALE: A deposit of Five Thousand ($5,000.00) Dollars by certified or bank check will be required to be paid by the purchaser at the time and place of sale. The balance is to be paid by certified or bank check at Harmon Law Of- fices, P.C., 150 California Street, Newton, Massachusetts 02458, or by mail to P.O. Box 610389, Newton Highlands, Massachusetts 02461-0389, within thirty (30) days from the date of sale. Deed will be provided to purchaser for recording upon receipt in full of the purchase price. The description of the premises contained in said mortgage shall control in the event of an error in ' this publication. ' Other terms, if any, to be announced at the sale. BANK OF AMERICA, N.A., AS SUCCESSOR BY MERGER TO BAC HOME LOANS SERVICING, LP Present holder of said mortgage By its Attorneys, HARMON LAW OFFICES, P.C. 150 California Street Newton, MA 02458 (617) 558-0500 201011-1387 - BLU ET - 2/16, 2/23, 3/11/112 NOTICE OF MORTGAGEEI'S'SALE OF REAL ESTATE By virtue and in execution of the Power of Sale contained in a certain mortgage given by Cory Bishop to Argent Mortgage Company, LLC, dat- ed July 11, 2005 and recorded with the Essex County (Southern District) Registry of Deeds in Book 24552, Page 438 of which mortgage Deutsche Bank National Trust Company, as Trustee for, Argent Securities Inc., Asset - Backed Pass -Through Certificates, Series 2005-W2 Under the Pooling and Servicing Agreement dated September 1, 2005 is the present holder, by assignment for breach of the conditions of said mortgage and for the pur- pose of foreclosing, the same will be sold at Public Auction at 12:00 PM on March 1, 2012, on the mortgaged premises located at 31-33 Ashland Street, Unit 2, Haverhill, MA 01830, all and singular the premises described in said mortgage, TO WIT The Condominium Unit known as Condominium Unit Number 2, (hereinafter called the ("Subject Unit"), in the Condominium known as Ashland Place Condominium a Condominium (hereinafter called the "Con- dominium") established by Master Deed (hereinafter called the "Master Deed"), dated May 19, 2005, filed with the Essex County South Registry in Book 24356 Page 456. The post office address of the Condominium is 31 Ashland Street, Haverhill, Essex County, 'Massachusetts. This Deed, and the Subject Unit, and the Condominium are'subject to the provisions of Chapter 183A. The Subject Unit is shown on the Master Plans of the Con- dominium filed in the Essex County South Registry District with the Master deed as set forth above, and on the Unit Plan of the. Subject Unit, which is attached hereto as Exhibit A, and the verified statement of a registered architect in the form required by Chapter 183A, Sections 8 and 9, is affixed to said Master Plans and Unit Plan. The Subject Unit is hereby conveyed together with: 1. An undivided 18% percent interest in the common areas and facilities of the Condominium described in the Master Deed appertaining to the Subject Unit; and 2. An easement, as an appurtenance to the Subject Unit, for the exclusive use of Parking Spaces or Garage as shown on the plan recorded with the Master Deed; and The Subject Unit is hereby conveyed subject to: 1. The provisions of the Master Deed and Master Plans of the Condominium recorded simultane- ously with and as part of the Master Deed, and the provisions of By -Laws and Rules and Regulations of the Condominium Association thereto, as the same may be further amended from time to time by instruments recorded with said Deeds, which provisions, together with any amendments thereto, shall constitute covenants running with the land and shall bind any person having at any time any interest or estate in the Subject Unit; and 2. Ease- ments, rights, obligations, provisions, agreements, restrictions, zoning reg- ulations, public utility and telephone easements, easements in favor of the Declarant of the Master Deed, and all other matters set forth or referred to in the Master Deed; and 3. Provisions of the Master Deed, and the By -Laws creating or reserving certain easements and rights in favor of the Grantor; and 4. The provisions of Chapter 183A. The Subject Unit is intended to be used solely for residential purposes subject to the restrictions and provisions of the Master Deed. The Subject Unit shall not be used or maintained in a manner incon- sistent with the provisions of the Master Deed, or of the Unit Deed, or the By -Laws and rules and regulations thereto, as the same may from time to time be amended. For mortgagors' title see deed recorded with the Essex County (Southern District) Registry of Deeds in Book 24552, Page 433. These premises will be sold and conveyed subject to and with the benefit of all rights, rights of way, restrictions, easements, right of ways, covenants, liens or claims in the nature of liens, improvements,'public assessments, any and all unpaid taxes, tax titles, tax liens, water and sewer liens and any other municipal assessments or liens or existing encumbrances of record which are in force and are applicable, having priority over said mortgage, whether or not reference to such restrictions, easements, improvements, liens or encumbrances is made in the deed. TERMS OF SALE: A deposit of TEN THOUSAND ($10,000.00) DOLLARS by certified or bank check will be required to be paid by the purchaser at the time and place of sale. The balance is to be paid by certified or bank check at ABLITT I SCOFIELD, P.C., 304 Cambridge Road, Woburn, MA 01801, other terms and conditions will be provided at the place of sale. The description of the premises contained in said mortgage shall control in the event of an error in this publication. OTHER TERMS, IF ANY, TO BE ANNOUNCED AT THE SALE. Present holder of said mortgage Deutsche Bank National Trust Company, as Trustee for, Argent Securities Inc., Asset Backed Pass -Through Certificates, Series 2005-W2 Under the Pooling and Servicing Agreement dated September 1, 2005 By its Attorneys, /s/ ABLITTI SCOFIELD, P.C. 304 Cambridge Road Woburn, MA 01801 Telephone: 781-246-8995 Fax: 781-246-8994 Date: January 23, 2012 ET - 2/9, 2/16, 2/23/12 C96.1645 -F- Bishop(2/9/2012 2/16/2012 2/23/2012) r 20 Thursday, February 23,202 THE EAGLE -TRIBUNE CLASSIFIED MARKETPLACE COFFEE CARAFES ( two) 2.2 LITERS, $25 EACH, GLASS SALAD PLATES 8' , 10 dozen, availa- ble, $15/dozen..(978) 373-4224. GAS (PROPANE) HOT WATER TANK GE 40 gal. used 2 mo. changed to electric. Very clean have all paper work. Bought at Home Depot $419 asking $275 (603) 382-8991 KITCHEN CABINETS - Hardwood, brand new never installed need to be finished. $4000. Call (978) 682-5269 KITCHEN CABINETS, solid maple, cherrywood, antique white 8 shaker styie. Never installed. Cost $6500; sell $1595 603-235-1695. 1IISi` Avian LEATHER SECTIONAL Teal colored 5 piece leather sectional with 2 manual recliners, good condition. $600/best offer. 978-474-0977 WASHER 8 ELECTRIC DRYER, Heavy duty, large capacity $375/set, ELECTRIC STOVE,(coil) 30" W self cleaning $200 Cash only. Plaistow, NH, 603-498-4192 or 603-247.4383. ANTIQUES Furniture, glass, china, silver, jewelry, clocks. WILLIAM GRAHAM, 420 Water St., Haverhill 978 374-8031, cell 178-835-2042 CASH FOR ANTIQUES/ ESTATE CONTENTS, Needed for auction. www.ouctionwally.com Lic#2621 . Call 978-395-7077 CASH FOR TOOLS - Hand a power! Carpenters, machinists, mechanics, plumbers, rollaways. 1-800-745-8665 Cash Paid, 978-241-7388 DIABETIC TEST STRIPS -W-1 pay up to $'I 0/box HAND TOOLS WANTED Planes -Chisels -Adzes -Calipers Useful tools - All trades. Estate lots.' -888-405-2007 HIGHEST PRICES PAID for platinum, diamonds, gold, silver, paintings, estates. Linda's Jewelers, 781-596-1886.2 Markot St., Lynn, MA WANTED OLD TUBE RADICS AND HI-FI: amplifi- ers, tuners, turntables, sfeakers, parts, mics, manuals, magazines, any o d electronics! Jack 978-430-9754 orjs326is@gmail.com ATTENTION! Beware of anyone replying to your ad offering to send you a check for shipping and you send- ing them back the difference. Also beware when responding to classified ads that ask you to send shipping cost. Possible scum! BUFFERS, 20"Pullman $200, 20" Pullman High Speed 1725, for spray buffing $450. Carpet Shampoo 16" Von Schrader $250. Call AI (978) 927-4474 CUSTOM DECALS, LOWEST PRICES IN N.E. Custom designed decals for home, marine, automotive, motorcycle, snowmobile, busi- ness. My prices are 50% 'ower than any other provider and I guarantee your satisfaction. Whether you want a custom decal for your mailbox or a giant pink flamingo on the side of your *t, I can help. How about some laptop graphics for your employees or a cool custom decal for the back of your smartphone. t Don't waste anotherQay leaving your advertising space blan 1 pride myself on excellent customer service, so shoot me an email and let's.get die ball rolling: decals4everything((-Pgma il. co m 2010 Hyundai Elands 51 $12,985 (866) 602-4390 2010 Chryslet Sebring $13,5 5 (866) 602-4390 2010 Dodge Avenger in $13,785 (866)602-4390 2010 Chrysler Sebring $13,885 (866)602-4390 2007 Buick Lucerne 15. $16,985 (866) 602-4390 f t DELL 17" Laptop Windows 7, 4 gmb, 5.8 Gig hard drive $425. 24" Tube TV color $30. 978-208-0268. DR.'S Medical record shelving approx. 6' H x 36" W. Heavy Duty open shelving with dividers 5 trays. $95 each section.(5 sections) Pictures available in Haverhill, MA. (603) 382-8991 EXERCISE BIKES - Stand-up Orbatrec and sit-down Proform. $50 for each. Small dog crate, Icrate, has water bottle. paid $150; ask- ing $50. Call (508) 451-0515 Go sox! Individual game tickets available for Red Sox Games. Call Dick Jr. 978-815-5925 4P kllllo MOVING, MUST SELL Stove, kitchen table, washer, dryer, girls bedroom set, excellent conditions B/O on each, Diane 508-838-9781 PIANO WITH BENCH excellent condition, Schu- man upright, brown wood grain, new $2000; asking $900. 10" Craftsman table saw, clean, used only once, new $450, asking $200. Treadmill, Nordic Track XT2000 asking $200; Upright freezer GE 14 cuA., white, clean, ask- ing $200. Call 978-806-5709 (Andover) POWER WHEELCHAIR Padded nylon seat 8 back. seat 18" wide. Swing away adjustable footrests. Puncture proof tires. Padded desk arms. Chair is collaps- ible. Good condition $275. (978) 475-6235 TREADMILL Tunturi, $125; Man's Gortex snow- mobile suit large, hardly worn $50; Harley Da- vidson 26" bicycle never used, $85. Woman's snow �obile suit medium, $50.978-373-1691 Women's black wool coat Marc NY Size 14 $25. Georgous long Marvin Richards black Iambs wool coat, large black fur lapel size 10 $100 Call (978) 208-1927 Go soxI 5 GALLON BUCKETS WITH LID Clean, food grade. Great for planting, storage, gardening, etc. $1 each. (978) 682-6939. PIANO: GULBRANSEN UPRIGHT PIANO/ ANDOVER. Beautiful upright Gulbransen piano - asking $700. Needs to be tuned. You pay moving costs. Call (508) 574-1238. AAA DOG TRAINING WITH A HEART Only $35. ,private - Problem dogs a specialty 603-642-5084 AMERICAN PIT BULL TERRIER PUPS males 8 females. Black 8 white, tan/white. 13 weeks, shots. Ready to go. $600-$700 ea. Call (508) 369-2279 AMERICAN PIT BULL TERRIER PUPS ADBA Reg- istered, good lines 8 temperaments. Family dogs. $400-$600. Call 978-360-2984 ATTENTION! ATTENTION! Beware of anyone replying to your ad offering to send you a check for shipping and you sending them back the difference. Also beware when responding to classified ads that ask you to send shipping cost. Possible scam! BEAGLE PUPS AKC PUREBRED, male black/tri $550; female, rare blue/tri $650. Call 978-766-7145 BEAUTIFUL BENGAL/ MAINE COON Cats 8 Kittens. $200 - $950. SALE 20% OFF. 603-818-8136 attractivecats@mac.com Beautiful PIT BULL Puppies 9 weeks old, Mother is blue nose AKC certified. Pups are well be- haved, looking for good and respectable home to call their own. Call (978) 210-3075 for more information. BISHON / SHI-TZU Mix - Beautiful companion or family dog, neutered male, all shots, trained. 6 yrs old. Moving $200. (603) 898-9688 BUGG PUPS (BostonX Pug) red, ready 2/21, vet checked, parents on premises, 2 females, $650.978-335-4580 or sunyside@yahoo.com CHIHUAHUA PUPPY 1 white female, 8 weeks old, ready to go, good health, parents on site, $800. Call (978) 609-1429. CHIHUAHUA PUPS 2 black $700 each, 1 unu- sual coloring white with black spots $800, Come see 8 pick out one out. (978) 943-5785 Cockapoos, Hava-tzu, Schnoodle, Jug, Wesbes„ Chiweenie, Rat, Pekapoo, Bichon-poo, Morkie, Hippo, Coton, Porn, etc. $495+ 603-942-9970 COCKATOO, female, 3 years old, all accessories included. Name is Cucka. Talks a lot. Beautiful bird. Asking $600. Call (978) 390-7728 COCKER SPANIELS - AKC champion sired, tri -color, l st vxs, health clearances, males 8 fe- males. Call 978-317-6603. DASCHUND PUPPIES - 3 males, 2 females. Par- ents on premises. No shots yet. Very reasona- bly price $250 each or $400 for a pair. Call 978-465-8641 after 7pm FREE Shihtzu-poodle MIX 5 month old male, sweet but timid to adult home only. needs shots,not fixed. 978-712-0411 FRENCH BULLDOG PUPPIES I have 2 male pup- pies. They were bom on 1/14/2012. They will be ready to go to their new home in the mid- dle of march. They come with Ltd. AKC pa- pers, 1 st round of shots. Taking non refunda- ble deposits of $500. Price of puppies is $2500. (978) 378-4645 Email me Luvmykogs@ymail.com GOLDEN/PAPILLON MIX PUPPIES - THEY LOOK LIKE MINIATURE GOLDEN RETRIEVERS, EX- CEPT THE COLORING WHICH IS BLACK. THEY HAVE GREAT DISPOSITIONS. THEY LOVE TO PLAY 6 THEY LOVE WATER (BATHS). $300. READY NOW. 1-603-382-7777 GOLDEN RETRIEVER PUPPIES- (AKC/OFA) UPPIES- (AKC/OFA) 8 weeks old - Ready March 4. Health Guarantee, Eyes, Hips, Elbows. Great Pedigree. Vaccinated, Wormed, Socialized, Good Recall, No Jumping, No Biting, 24 Years Experience. $500 to $1500. Call Heidi 978-417-9249. www.justbehaving.com GERMAN SHEPHERD FEMALE age 1.6, AKC reg- istered. Shots, spade,working bloodlines. No small children. Best offer. Info (978) 556-1595 IRISH JACK RUSSELL PUPS Family raised, crate trained, exc. disposition. They come with 1st shots, health/temperament guarantee. $850 8 up. Call (978) 273 0893 IRISH JACK RUSSELLS 1st shots, great disposi- tions, short 8 stalky, 1 female, 2 males. Call 978-317-6603. LABRADOODLES PUPS multi -generational, intel- ligent, sociable, great w/kids, allergy friendly - no shed, vet certificate, shots, 1 yr guarantee, $850Male-$95OFemale 603-303-8784. MALTESE PUPS pure white very friendly. Vet checked, wormed, shots, micro chipped, ready now. $600 8 up. Call 603 435-9344. PAPILLON PUPPIES - AKC, Health Guarantee 1st shots, raised with children. Ready to go! $900 -$1000 ea. 603-818-8446 PUG PUPPIES, adorable. Fawn $800. Blacks $1000 Up to date on shots, dewormed. 978-604-9152 or zadacares@yahoo.com PUPPY WANTED Small dog, up to 20lbs, house trained, affectionate. Female preferable, but Will accept male. Should be spade or neutered 781-274-1201, or cell 781-698-5072 PURE BRED MINI DACHSHUND PUPPIES - and adorable Cockapoo puppies. Ready to go, home raised. Shots 8 heath certificates.,$350 females, $300 males. Call 603-651-9016 RENAISSANCE OLDE ENGLISH BULL DOG 1 yr old, male, tri -colored. Call 781-350-0714 Salem Animal Rescue League, Rte 28 Salem, NH (behind Barron's TV) Cats/kittens/dogs-ready for adoption - open Wed thru Sun. www.sad-nh.org 603-890-2166 SHITZU PUPS Beautiful, Loving, Sweet 8 Smart. $600 + $700. Ready Feb. 20+27.603-785-6280 SHORTYBULL PUPPIES - Short, muscular 8 bully. Will max out at 35 lbs. $1500. Call 781-350-0714 TEACUP 8 TOY SIZE YORKIES GreaCtemperaments. Beautiful fur. Good for the whole family. (978)648-0811 YORKIE PUPPY Male, 4 months old, black 8 tan, AKC' parents. Health certificate. Shots. Par- ents on premises. $950.603-942-8025. Yorkshire Terrier AKC Adorable Male Pups! All shots 8 health certifi- cates. Bom 6/30/11. $500 or best offer. Call 603-819-8886 YORKSHIRE TERRIER PUPPY Baby doll face. Tiny, cuddly ball of love. Registered, shots, health guaranteed, home raised, parents on premises. $850.00 cash. Call 978-055-2896 YORKSHIRE Terrier pups, very friendly, no shed, vet checked, shots, wormed and microchip - ped. $600. and up. Call (603) 435-9344. 2 Lilac Point Siamese Cats both are male, have all shots, neutered, $200 each (978)914-6352 Haverhill, MA r RESTAURANT CHINA, dinner, bread 8 salad plates, bowls, water goblets, pitchers, napkin dispensers, carts, all new. 978- 373-4224 "J.100 ANN WALK-IN COOLER 6X6, 12' Stainless Steel hood with vent system. Stainless Steel Sink, 3 bay. Grease Trap. 6 restaurant booths. Best offer. 617-320-8572 SNOWBLOWER 8 HP Electric start. Only $250 or best offer. .(603) 890-4095. POOL TABLE 4' X8', 1" thick real slate, 4 heavy duty legs removed. nor rips or tears good bumpers Ready to go Can be moved with pick up truck Haverhill $325 best (603) 382-8991 CARPENTER'S POWER TOOLS: $1700. Nail guns, compressors, miter saw, saws all, jig saw, lots more. Call 978-587-3242 for details. TABLE SAW 10" Craftsman with 2 cast table ex- tensions, front 8 rear rails, rip fence 8 blade guard assembly. LIKE NEW. Asking $300. 603-642-5922 TABLE SAW , Rockwell 3/4 HR belt drive, single phase, cast iron table, Dole adjustable blade, $149. (978) 373-4224. TOOLS Radial Arm Saw;10 inch. DeWalt. $100. Miscellaneous hand tools. Some power. 978-922-2632 I !I I I CARGO LINER by Weathertech, tan, custom made for Lexus RX 350. New $119.95. Sell $50. Salisbury Beach (978) 358-7667. TIRES (2) 30X9.5R15LT-LRC $50. Call (978) 283-8530 $250 8 UP JUNK CARS WANTED WEBER AUTO 8 TRUCK 1-800-594-2084 - 603-432-2084 "rSl`%llll ACURAINTEGRA LS 1998 4 door sedan, needs body work $1300 best offer Call 978-857-2127 �:.. NORTH TKE FAW TRIAONE GLOUCESTER ' DERRY �R DAILY TNES BOSTON TiA 1ETAr1MER TOWNSMAN THE DAILY NEWS GARRIARE TOWN1 s OF NEWBURYKaT HA1CMILL GAIETFE NEWS - LEAD SYSTEMS TECHNICIAN - North of Boston Media Group, North Andover, MA (The Eagle -Tribune, The Salem News, The Gloucester Dadly Tunes, The Daily News of Newburyport) Provide operational system support. Install, maintain PC and Macintosh desktop hardware. Support network and security infrastructure. Develop and maintain server environment. Manage SQL databases. Support communication infrastructure including VPN, data and voice. Provide helpdesk support and after hours support required. Hours 8:30 to 5:30. Full Time. 5 - 7 years experience required. Please -e-mail resume and cover letter with salary requirements to hr@northofboston.com DISTRICT SALES MANAGER - The Salem Newt' Beverly, AM Full-time. Develop newspaper circulation sales programs while working with adult and youth news -carriers to provide quality service to subscribers. Ability to work well with the public required. Must have strong organizational skills and be familiar with Microsoft Word and Excel. High School Diploma required. Sales experience preferred. Please e-mail resume and cover letter with salary requirements to hr@salemnews.com ADVERTISING SALES PROFESSIONALS - Gloucester Daily Times, Gloucester, AM Full-time. This position offers an outstanding career opportunity for a results -oriented, high-energy, experienced sales professional to build on an existing territory and grow new business. One to three years sales experience required. Prior newspaper experience preferred. Candidates should have excellent communication, organizational and customer service skills. Please e-mail resume and cover letter with salary requirements to hr@gloucestertimes.cwm MATERIAL HANDLERS - The Eagle -Tribune, North Andover, MA Come work in our state-of-the-art packaging center to load fliers into machines for distribution in the newspaper. Entry level positions. Some moderate lifting is involved. Training is provided. All applicants must be at least 18 years of age. Part-time shift - Monday and Tuesday 10:00 a.m. to 6:30 p.m. and Wednesday, 8:00 a.m. to 4:30 p.m. Please stop by our North Andover office to complete an application. Comprehensive benefits package offered to all full-time (30+ hours) employees. For consideration, please e-mail resume and cover letter with salary requirements to hr@northofboston.com. Resumes received without salary requirements will not be considered. Applications may also be obtained in the lobby of any of our publications Monday through Friday 8 a.m. to 5 p.m. An Equal Opportunity Employer www.eaaletribune.com ACURA, MDX2001. 109k miles. 7 passen- PONTIAC Grand Prix 1994 SE Coupe. Sport gerfully loaded,leather heated seats,well model with many factory extras, automatic, maintained, black on black, very good condi- r.•rr DIRECTORY tion. $8500 (978) 922-6129 GO PATSI ATTENTION! JUNK REMOVAL ALL THE RIHT MOVES automatic, A/C, traction control, runs great, to send you a check for shipping and you Interior/ExteriorPainting, Wallpapering sending them back the difference. Also be- Anything Goes. Free Estimate, 978-609-5589 Ceramic Tile. Bill, 978-585-3228, 603-898-1035 r r ,• APPLIED PAINTING 0978-539-8658 BMW 528i 2009 XDrive. midnight blue 41K, 1 TOYOTA Camry 94 LE V-6, gas saver! All power, Int./Ext. Fully Insured sunroof,silver, Low miles.State inspected. FRAME TO FINISH www.appliedpainting.net BMW 750i 2006 - fully loaded, immaculate, Repairs, Skim 8 New Work - Textured Ceilings 8 Metal Studs - Norman @ 603-890-3113 gALDASSARI - Painting I nterior/Exterior. Wallpapering 8 removal. Free estimates. ANDOVER,MA: Paralized woman needs reliable, new timing belt $1395 best (603) 490-1897 experienced PCA/HHA, 4-10pm. Mon. Thurs. 9 978-688-0161; 781-953-6890 2 rior. All power options. Great condition. GAURON PAINTING. Interior 8 Exterior, Fri.,and/or every other weekend $12.48/hr. + QUALITY, SERVICE 8 PRICE E Not private pay. 978-725-8145 after 1:30pm That Won't Shock You! Insured. MA#31525E 1H#128311A. ItCall Mike 978423-8510 Ceilings, Repairs. Insured. References. Call Mike, 978-769-5381 or 603-382-1734 CARETAKER Available: I AM LOOKING FOR Vitale Electric Rates Excellent condition $6,500. WORK. Mature certified woman EXPERIENCED Please call 603.234.0535 with elderly 8 Alzheimers 8 Dimentia patients. .,,Low Flex hours. I will travel. Excellent References. All Electric Needs. #A20829.978-979-0858 ABBOTT PLASTERING New/Old Plastering Work Call 978-255-2111 Ceilings - All Types of Finishes, condition, no accidents, navy blue, automatic, CNA with experience needed for Sun. mornings Plus Dry Wall, Sand 6 Prime. (978) 835-2563 D.M. BROPHY PLASTERING 6 Sun. overnights. Methuen MA woman, must Jim's Pickup Service Removal of have references 8 own transportation, call be- trash, junk, furniture appliances etc. Full skim coat plastering, board 8 patchwork. tween 9am-12pm, 978-688-3193 dependable 8 reasonable (603) 642-8996 Commercial 8 residential.Custom ceilings. EXPERIENCED, LOVING live-in Care Provider Quality service. Free estimates. 978-852-0504 , , . needed for elderly woman in Beverly Farms condo. Must be able to lift her (I 10 lbs.), VILLAGE FLOORING CO. • Install 4l Sand MATTHEW'S PLASTERING *Reliable, Quality work * Additions, kitchens, transfer to wheel chair, shower, providd 0 Refinish • Repairs • Staining baths, basements. 978-314-0816 meals, housekeeping. Pr vote bedroom 8 bath. 30 Yrs Experience. Insured.. 976-689-3385 4,900 miles, many custom accessories, looks / , , * MV PLASTERING 8 DRYWALL # best prices, old ceilings and walls new again. Board 8 salary. Call 978-704-9222. NEWBURYPORT, MA PCA wanted for disa- ARMAND FLOORING Free estimates. 978-686-5012 bled man, week nights 8pm-9pm. Good pay. Carpet, Linoleum, Tile Sales, Installation 8 He - "�yy� 131 Affir Call after noon. (978) 465-0173. pairs 978-479-7434 ---603-458-5125 BILL BROGAN Master Plumber. PCA, CNA, HHA needed for Danvers area equipped, needs nothing $1400/best. Excel- disabled woman, Sam to f pm 8 2 pm to 6 pm. lent condition. 978-376-5735: 781-605-8170 Remodeling --- Repairs - Replacements - Car, nonsmoker. Call 978-774-1584 ADDITIONS, RENOVATIONS, WINDOWS, Basements, Decks. Frame to Finish! Emergencies. Providing quality service for over 25 years! MA Lic. #9565.978-475-4237 PCA -Dependable person needed Mon., Wed., 2004 ARCTIC CAT Sabercat LX, 600 cc, electric start, reverse, hot grips, mirrors, excellent condi- 8 Fri. mornings for handicap male from Licensed / Insured. Call 877-302-5491 9am-1 pm. in Salem, Ma. Must have own car. HAGGAR CONSTRUCTION BRITE SIDE Call Joseph, (978) 594-5276 All your Home Improvement Needs- Commercial 8 Residential. (978) 685-0461 ,t PRESSURE WASHING We work well under pressure! 978-685-9545 RESPONSIBLE Certified Care Attendant, part- 83k miles. Asking $3600. Tom, 978-239-6258 time needed for fill-in for a 90 Ib. young disa- ble woman in Lynnfield, MA for moming/afte- SAAB Convertible 2008, 9 -3 -OT silver, black moon shift. Must have good HOUSE DOCTORS deck restoration, gutter/house cleanings. Dan 978-749-9808 eommuerences skills, be able qu lift 8 drive. Recent References absolutely required. Call 781-598-5585, or Handyman Professionals - MA Lic.158222 www, ust Iain aintin com 1 p p 9 cellent condition, $22,500.978-745-8713. email: ladynel89@aol.com. Home Improvements/ Repairs. Insured -Bonded. housedoctors.com 978-474-0788 HANDYMAN SERVICES COUTURE HOME IMPROVEMENT O GOT MOLDO for Straight forward price $3517-. Any home repair FINISHED BASEMENTS and Interior Finish ' Testings, Insurance Estimate, , Removal, Certi- Call Don 978-417-9175 work 15 yrs Fully insured. TJ, 978-902-7644 111101n, BEST CHOICE CONSTRUCTION ' Roofing, siding, gutters. Quality work, reason; fied, Licensed Contractor A.R.S. 978-688-1111 John's Handyman Service We repair faucet leaks to broken windows and everything in between. Free estimates 978-977-3713 INDEPENDENT Carpenter Interior/exterior. Windows, doors, decks, kitchen, bath, tile, ble costs. 25 yrs. exp. Fully ins. 978-973-5410 Patriot Home Improvements Custom Carpentry8 Quality Craftsmanship Honest-Reliable-Affomble, Larry 603-717-5945 978-265-6843 FOR THE CHEAPEST ROOFING 8 SIDING in the state! Licensed/lnsured. flooring. Big/Small. Uc.070390.978-446-1407CALL MICHAEL N. ROGERS -Finish Carpentry, custom woodworking, kitchens, remodeling. Insured. SMALL JOB? Repairs 8 Maintenance $100 ROOF REPAIRS -Gutter Repairs - 978-994-2751 Fax 978-914-6857 Augi Traynor 603-300-6386 Siding Repairs- Interior Painting. Free roofing estimates. Derek 978-914-7718 3-H HANDYMAN Reasonably priced, basements, carpentry/ TOM'S HOME IMPROVEMENT IS BACK!No job too small. All types of work considered. remodeling, tiles, painting 978-686-0424 Sheetrock repair, light framing, home mainte- nance. Call (603) 553-0174 SELF -STORAGE: Salem, NH; Methuen, MA. Automobiles, boats, motorcycles, - - , , , ALL CHILDCARE PROVIDERS IN household goods, business stock, etc. Prices from $20 to $190/mo. Home & Office MASSACHUSETTS ARE REQUIRED TO BE LICENSED. Only NH Childcare Providers May Be Call 603-894-0631 ` Licensed Or Non-Ucensed J 8 L Cleaning,week/bi-wkly/month, move in/out reasonable rate,insured,bonded 978-373-8390 www.hampshireroad selfstorage.net 11111111111111111M I ' CUSTOM ,MADE SLIP COVERS pin fitted to your set. Your own fabric. ABSOLUTELY THE BEST: S&V Cleaning r BALDASSARI - Painting Interior/Exterior. Affordable, dependable, reliable and thorough iaweekly. Call 978-685-2229 housecleaning. Weekly and Wallpapering 8 removal. Free estimates. Experienced and very trustworthy person. 978-688-0161; 781-953-6890 CPA 8 IRS Registered. Why pay a firm? Call978-884-5698 PROFESSIONAL CLEANING Home, Office, Condo Individual Tax Return Preparation. Daily, Weekly or Biweekly, SEE COUPONS AT BATH LINERS; WALL SURROUNDS Most returns completed for $100 or less. roses-professional-cleaning-service.com Bath Tub Reglazing IIC. taxprep7@gmail.com or 978-257-0623 978-532-3994 Insured Free Estimates Mr. Tub 800-453-6171 mrtub.com DO YOU OWNACOMPUTER? TILE Installation. Bathrooms. Kitchens. BATH REMODELING I do hardware or software consulting, 8 Tile Installed. Complete redesign or update of Free estimates. Jim 978-774-4067. installation, troubleshooting or training in the fixtures 8 Handicap showers/toilets/grab bars. ' comfort of your own home. Reasonable rates. Free estimate, 978-375-1900 bath-designs.net Microsoft Certified. 978-502-5119. DONOVAN'S TREE REMOVAL, LLC . , I Winter 8 Spring Specials. Emergency Calls, PERENNIAL Landscaping Lawn installations 8, Free Est. /Fully Insured 603-842-0487 Al' BARGAIN designs. Brick walkways, patios, retaining walls, ED'S STUMP GRINDING - Stum s round out. p 9 Call AJ'S Clean-up Service - Attics, Cellars, drainage, planting. Bobcat 8 Backhoe service. Garages Cleaned for a reasonable price. Prompt, Basement french drains installed. Tree stumps 8 shrubs Good work, reliable service. CaIIJim at 978-685-1302 Mike Winslow 781- 334-3764 perennialland.com quick service, fully insured. 603-893-6902 ALL DAY JUNK REMOVAL - FREE ESTIMATES LIVINGSTON Tree 8 Stump Removal Fast/Quality Service, Free est. (978) 361-5216 978-689-8373 livingstonfamilytree.com ' BRICK- CEMENT- STUCCO 8 STONE, All Masonry: Steps, walks, walls, chimney, BACK ALL YOUR SPACE BACKS Money does grow Junk Removal 8 Cl Dumpster rentals. Insured 603-571-4187 ' foundations. Call 978-688-5331 ON TREES! LOOKING TO BUY SOFT 8 HARD - WOOD TREES. CALL (978) 273-3315 ANYTHING 8 EVERYTHING Estate Clean -outs, BRICK WORK Cement work. Stairs, walks, walls. All size jobs. Free estimates. Excellent Demolitions, Basement, Garage, Yard Debris Dump runs. Call 978-521-0445 Andover references. Tony at 978-681-7701 JIM NASSIOS MASONRY Specializing in: brick, QUALITY TREE SERVICE Tree 8 Hazardous removal, trimming. Firewood. BEST RATES block, stone, stucco, chimneys, steps, walks, Low prices. Fully insured, free estimates We removeTanything from A -Z walls 8 repairs 978-453-8460 / 978-332-2395 Call 603-365-7364 Call Michael @ 978-973-2009 , , . , STEPHEN J. REPOZA CO. Mosier Tree Cheap Trash Removal & Climber -Quality tree care, hazardoustakedownsi- r I HAVE THE TRUCK If you need help clean- , and fine -trimming. Insured. 978-470-8114 " Clean -outs. Call Dempsey @ 978.707.9572 ing up yards, garages, cellars, attics, etc. FREE estimates, great rates. Mike, 978-657-4240 " ' CLEANOUTS AND JUNK REMOVAL NO JOB TOO SMALL apartments, attics, rooms, whole house YARD CLEAN - UP - Leaves, Pine Needles, DBS can HELP! Father/daughter own/operated Available 7 days. Licensed and Insured Acorns, BrushitTrees - Junk Removal 978-335-4710 Discount Prices 978-682-0399 (6031505-2715 orjoe@atortriplej.com classif ed mar etp Be included in this section by cciling 800.927.9200 fax: 478.685.1500 ACURA, MDX2001. 109k miles. 7 passen- PONTIAC Grand Prix 1994 SE Coupe. Sport gerfully loaded,leather heated seats,well model with many factory extras, automatic, maintained, black on black, very good condi- runs great. $1650, Call Ed, 978-948-2103. tion. $8500 (978) 922-6129 GO PATSI ATTENTION! SATURN SL2 1997 sedan, blue, gray interior, Beware of anyone replying to your ad offering . automatic, A/C, traction control, runs great, to send you a check for shipping and you needs nothing, 82KO, $3,450.978-432-1711. sending them back the difference. Also be- TOYOTA CAMRY 1995, sunroof, CD, only 157k ware when responding to classified ads that miles, $1500. FORD RANGER 2001, good con - ask you to send shipping cost! Possible scam! dition. $1500. (978) 601-4071 BMW 528i 2009 XDrive. midnight blue 41K, 1 TOYOTA Camry 94 LE V-6, gas saver! All power, owner warranty garaged excellent condition sunroof,silver, Low miles.State inspected. winter package $31,000 best (978) 475-1434 $1600/best 603-275-0091781-605-8170 TOYOTA CELICA GT 1990 1 owner, well main - BMW 750i 2006 - fully loaded, immaculate, 44,000 miles, silver metallic with gray interior. tained, runs 6 drives great. 5 speed, 175K $29,900. Call (603) 231-5009 new timing belt $1395 best (603) 490-1897 BUICK CENTURY 2003, Sedan V6, tan / tan inte- VOLVO S80 2006 4 door sedan, 110,000 miles rior. All power options. Great condition. (all highway miles), 1 owner, no accidents, 64k miles. $6450. Call 781-640-9858 very good condition. $8995. (978( 749-2780 CADILLAC STS 2011 RWD - Navigation, 23,000 2007 DUCATI MONSTER1000. miles moonroof, heated seats, like new. Only 250 miles. Black w white stripe. $26,500 617-797-9996 Billy Excellent condition $6,500. Please call 603.234.0535 CHEVY IMPALA 04 LS V6 tan / tan. All power options. Alloy wheels, rear spoiler, showroom condition! 69k miles. $7950 781-640-9858 FORD FUSION 2006, 65,000 miles, excellent condition, no accidents, navy blue, automatic, FWD, 4 door, all power, after market stereo, $7,950. Cash only. For details, 978-836-8309. 16 Ft AMESBURY SKIFF by Stur-dee Boat Company. 2005. Johnson 25 HP Four Stroke motor. New electric pump, new battery, new FORD, Taunts 1999.81000 miles. 4 door sedan, alarm, runs good, no rust, needs transmission, gas tank. Center console with electric.starter. $1500.00 or BO. Salem MA (978)745-0780. Serviced and ready to put in the water! $5900. Cal( Nick at 508-577-7988. FORD TAURUS 2007, 48,000 miles, automatic, remote start, 4 door, silver, 1 owner, CD, good 1967 Sedan Cruiser Wood Hull excellent work- ing order Twin Diesels well maintained must must sell $5000 or Best reasonable offer call LINCOLN LS, 01 V8, grey / tan leather. Trac- tion control, moonroof, mint condition. 98k mi- 978-927-6111 ask for Paul call 1 Oam-6pm only les. $6,850. Call 781-640-9858 HARLEY DAVIDSON 2006 Soft Tail Delux, black, LINCOLN MKZ 2009, RWD, loaded, 21 K, sun- roof, heated/AC seats, navigation, candy apple 4,900 miles, many custom accessories, looks / red, excellent condition -$24,000.978-973-9445 runs great, must see, $10,700.603-778-6251. MAZDA PROTEGE SE 2001 - 4 door, 4 cylinder, HARLEY DAVIDSON, FX standard 2004.26344 automatic, FM, CD, sunroof. Great shape, miles. blue with detachable windshield, some Runs perfect. $2900. (978) 452-5238 extras also. $7100. Call 603-818-7845 or 603-458-2019 "�yy� 131 Affir HARLEY Davidson FXWG 1999; wide glide, 8k PLYMOUTH 2000 Breeze 1 owner, 5 speed fully miles, blue/silver, chrome, garaged, excellent equipped, needs nothing $1400/best. Excel- condition, twin cam. $7,800 603-560-0686. lent condition. 978-376-5735: 781-605-8170 MOTOR SCOOTER, 2008 Paid $1800. Has 700 miles. Runs excellent. 90 mpg. Will sell for PLYMOUTH NEON 98 Sedan, green/gray' auto, a/c, tilt, needs nothing - runs great! 90k miles. $1200. Call (978) 462-8337 $3850. Call 781-640-9858 2004 ARCTIC CAT Sabercat LX, 600 cc, electric start, reverse, hot grips, mirrors, excellent condi- 00 Parse tion, 4.5K, fully serviced -$3,995.978-372-29202920 PONTIAC SUNBIRD 1999 - 4 cyilnder auto- matic, excellent on gas, 29-30mpg Clean great shape better than cars several years newer., FORD ESCAPE Limited 2011 4x4, 6 cylinder, 83k miles. Asking $3600. Tom, 978-239-6258 43K, all power, heated seats. Excellent condi- tion. $18,800. Call 617-797-9996 Billy SAAB Convertible 2008, 9 -3 -OT silver, black HONDA, Pilot 2007. 67,000 miles. Automatic, leather interior, 6 speed manual/ automatic, low miles 9,904, 1 owner, garaged, never used V6, 4wheel drive, leather seats, running in winter, XM satellite radio, On -Star ready, ex- boards, roof rack, sun roof, seats 8 with front cellent condition, $22,500.978-745-8713. 1 heated seats. $17,200.(603) 339-1995 JEEP Wrangler X 2008, 6 cylinder, automatic, soft top, custom wheels/rims, 14K FLA miles, excellent condition. $15,900.978-281-6841. SNOWMOBILE TRAILER fully enclosed Triton Elite, 2 place. New tires and rims, little use. Nice condition. $1150. (978) 372-2920 FORD 1998 E450 14' box truck. with 7.3 power stroke turbo diesel, 190k, new transmission in 2004 great contractor work truck $5200 best offer (978) 687-2247 GMC 1996 6.5 Turbo Diesel 3/4 ton 145,900 miles extra cab pick up loaded, with 8' MM plow. To many new parts to list $5200/best offer 978-382-1566 GMC SONOMA 2002 SLS pick-up. 83,260 miles. V6, automatic, 4.3 liter, 2 wheel drive, ABS, cruise control, CD. 1 owner. Good condition. Tonneau top $5500. Call 617-416-3925 Tom. GO PATs1 DODGE CARAVAN 2005 white with gray inte- rior, all power options, runs 8 looks new, 68K, $7,950. Call (978) 432-1711. GO PATS/ DODGE Grand Caravan 2005 Special Edition, silver, tan leather, navigation, all captain seats, DVO/TV,moonroof, 78K-$9,950.978-432-1711 r Absolutely ALL CARS 6 TRUCKS wanted! Paying up to $500. Call Murray's Auto Recycling 603-425-2562 A CALL AWAY will haul away your vehicle. Top dollars paid. Scrap metal wanted 978-683-1273 JUNK CARS 8 TRUCKS WANTED Picked up with 24 his. Up to $800 CASH PAID, CALL (603) 303-2866 JUNK Cars Wanted- r Highest prices paid - Call for price! 1-800-292-1149 Brandy Brow Auto Parts ' PAYING $350 8 up delivered Call for pick up price, 800-894-4361 ROWLEY AUTO SALVAGE - TOP $$ For late model vehicles. Quick service. 978-948-7410. www.rowleyautosalvage.com WE PAY THE MOST FOR Junk Cars 978 -595 -CARS + CASH TODAY! E www.sal isburysalvage.com $250 to $500 Cash paid for cars 8 trucks Dave's Towing/Auto Recycle 978-664-6710