Loading...
HomeMy WebLinkAboutContract #: 015763 - From: To: - Exception - North Andover School DepartmentCP 0 9) NORTH ANDOVER SCHOOL DEPARTMENT INVITATION FOR BIDS SCHOOL ATHLETIC FIELDS MAINTENANCE Contact Address Telephone Number: Fax Number: Email September 19, 2012 Jim Mealey Chief Operations Officer North Andover School Department 1600 Osgood Street, #3059 North Andover, MA 01845 978-794-1503 978-794-0231 mealeyj @northandover.kl2.ma.us Table of Contents 1. Introduction........................................................... 3 2. Submission Deadline and Instructions ............................. 3 3. Questions, Addendum or Proposed Modifications ............... 4 4. Minimum Requirements ............................................. 5 5. Scope of Services .................................................... 5 6. Prevailing Wages .................................................... 6 7. Bid Deposit/Bond.................................................... 6 8. Payment Bond ......................................................... 6 9. Criminal Offender Records Check ................................. 6 10. Evaluation of Bids .................................................. 7 11. Term of Contract .................................................... 8 Appendix A — Price Proposal .......................................... 9 Standard North Andover School Department Contract With Supplement«C................................................ 10 Certifications............................................................ 31 Payment Bond Form ................................................... 34 Prevailing Wage Rates ................................................ 35 North Andover School Department IFB Page 2 of 35 School Athletic Fields Maintenance 1. Introduction In accordance with M.G.L. c149, the North Andover School Department (`School') is soliciting bids from qualified companies to perform maintenance on school athletic fields in various locations. Qualified companies are requested to submit bids to the Chief Operations Officer at North Andover School Department, 1600 Osgood Street #3059, North Andover, MA, in accordance with the instructions contained within this Invitation for Bids. The North Andover School Department is seeking to award a one-year contract for the period of October 15, 2012 through October 14, 2013 with two (2) additional one-year renewals, solely at the discretion of the School. The School will provide written confirmation of renewal at least sixty (60) days prior to the end of the contract period. Notice of this IFB is published in the Central Register (which is a weekly publication of the Office of the Secretary of the Commonwealth), the Eagle -Tribune (a newspaper of general circulation) and posted on the Town website (www.townofnorthandover.com) under "Bids, Quotes and Proposals". The School will accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on Tuesday, October 9, 2012 to be considered. Proposals submitted by fax or by electronic mail will not be considered. All proposals must be submitted to: Mr. James Mealey, Chief Operations Officer North Andover School Department 1600 Osgood Street, #2059 North Andover, MA 01845 The North Andover School Department may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the North Andover School Department. 2. Submission Deadline and Instructions Qualified companies are requested to submit a comprehensive pricing proposal in a sealed envelope marked "Athletic Fields Maintenance" with the applicant's name and address on the front. Applicants should provide one (1) signed original proposal. Fax or electronic submissions will not be accepted. Applicants must also execute and include in the sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The North Andover School Department, through the School Superintendent, is the awarding authority and reserves the right to reject any and all proposals or parts of proposals; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; and to award contracts or to cancel this Invitation for Bids if it is in the North Andover School Department's best interest to do so. North Andover School Department IFB Page 3 of 35 School Athletic Fields Maintenance Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if the bidder is a partnership, by the name of the partnership, followed by the signature of each general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed. All sealed proposals must be received and registered by the Chief Operations Officer's office by Tuesday, October 9 at 2:00 p.m. All outer envelopes must be labeled "Athletic Fields Maintenance" and mailed or hand delivered to the following address: Mr. James Mealey, Chief Operations Officer North Andover School Department 1600 Osgood Street, #3059 North Andover, MA 01845 No proposals will be accepted after the time and date noted. Late delivery of materials due to any type of delivery system shall be cause for rejection. If on the date and time of the submittal deadline the North Andover School Department is closed due to an uncontrolled event such as fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the next normal business day. 3. Questions, Addendum or Proposal Modification Questions concerning this IFB must be submitted in writing to: Mr. James Mealey, Chief Operations Officer, 1600 Osgood Street #3059, North Andover, MA 01845, or they may be emailed to Mr. Mealey at mealeyj@northandover.kl2.ma.us. All questions/inquiries must be received by close of business on Friday, September 28, 2012 to be considered. Questions/inquiries may be delivered, mailed, emailed or faxed. Written responses will be posted on the Town's website (www.townofnorthandover.com) in "Bids, Quotes and Proposals" by Tuesday, October 2, 2012 at 2:00 p.m. If any changes are made to this IFB, an addendum will be posted on the Town's website in "Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence of any addenda and/or modifications issued by the School. As this IFB has been published on the Town's website (www.townofnorthandover.com), all bidders are responsible for checking the website for any addenda and /or modifications that are subsequently made to this IFB. The School accepts no liability for and will provide no accommodations to bidders who fail to check for amendments and/or modifications to this IFB and subsequently submit inadequate or incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any IFB component files. Modifications to the body of the IFB, Scope of Work, terms and conditions, or which change the intent of this IFB are prohibited and may disqualify a response. All proposals submitted in response to this IFB shall remain firm for sixty (60) days following the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days after the submittal deadline. North Andover School Department IFB Page 4 of 35 School Athletic Fields Maintenance Bidders are not to communicate directly with any employee of the North Andover School Department, except as specified in this IFB, and no other individual employee or representative is authorized to provide any information or respond to any question or inquiry concerning this IFB. Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the bidder is having trouble obtaining any part of the IFB electronically through the Town website (www.townofnorthandover.com), including, and without limitation the form and attachments. Bidder with disabilities or hardships that seek reasonable accommodations, which may include the receipt of IFB information and/or addenda and/or modifications in an alternative format, must communicate such requests in writing to the contact person, and reasonable accommodation will be made by agreement with the contact person on behalf of the North Andover School Department. 4. Minimum Requirements Each bidder must demonstrate that it meets the following minimum requirements: A. Contractor must demonstrate a minimum of five (5) years experience providing the services required in the Scope of Services. B. Contractor shall submit a complete list of all similar contracts performed in the past two (2) years with contact names and telephone numbers. . C. The contractor shall furnish all labor, equipment, and vehicles as required for work in accordance with the Scope of Services. D. The contractor shall conform to all requirements of federal, state and local laws, including compliance with the prevailing wage laws. E. Quoted prices shall remain firm for entire duration of the contract. F. Submission of required statements and forms. 5. Scope of Services All listed services shall be provided on an annual basis. The schedule of services shall be coordinated with the designated School Department representative. A. Middle School Baseball and Softball Fields 1) Till skinned infield areas and power rake, prepare for play 2) Supply, spread and grade 10 cubic yards of infield mix 3) Three applications of slow release fertilizer to all turf areas for both fields 4) Baseball Field Only: Reshape/rebuild the pitching mound, re -sod mound perimeter 4' wide. North Andover School Department IFB Page 5 of 35 School Athletic Fields Maintenance B. Hayes Stadium (football field) 1) Aerate and slice seed all worn areas 2) Apply three applications of slow release fertilizer to entire field. C. High School Baseball Diamond 1) Till skinned infield areas and power rake, prepare for play 2) Supply, spread and grade 20 cubic yards of infield mix 3) Apply 3 applications of slow release fertilizer to the entire field. D. Drummond Softball Field 1) Trim edges as needed and roto -till as needed 2) Supply, spread and grade 10 cubic yards of infield mix 3) Power rake and prepare for play. E. High School Softball Field 1) Remove and dispose of existing clay infield mix to 5" depth 2) Furnish and spread 5" depth of loam and seed. 6. Prevailing Wage Rates The successful bidder will at all times comply with the prevailing wage rates as determined by the Commissioner of the Division of Occupational Safety, under the provisions of Massachusetts General Laws as shall be in force and as amended. The prevailing wage rates are attached. 7. Bid Deposit/Bond In accordance with M.G.L c30 §39M, all bidders are required to submit a 5% bid deposit/bond of the value bid for the contract. 8. Payment Bond Upon award of the contract, the successful bidder shall provide a payment bond in the amount of 50% of the total projected cost of the contract, if the cost of the first year of the contract is more than $25,000.00. The payment bond must be on the Town of North Andover's form that is attached. 9. Criminal Offender Records Check In accordance with Massachusetts General Laws, c71, §38R, the North Andover School Department requires criminal offender records checks be performed on all personnel of North Andover School Department IFB Page 6 of 35 School Athletic Fields Maintenance contractors authorized to do work on school grounds that may have direct and unmonitored contact with children. The successful contractor will be required to submit a `CORI Request Form' for any person who may be assigned to work on school department property. The forms will be submitted directly to the designated contact person at the North Andover School Department. The `CORI Request Form' may be viewed at http://www.northandoverpublicschools. com/cros_files/resources/coriFormEmployee.pdf 10. Evaluation of Bids Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility of the bidder will then be ascertained. Finally, the aggregate price offered by each responsive and responsible bidder will be calculated for the first year solely of the proposed contract. The School is required to award the contract to the lowest responsive and responsible bidder. ■ Responsiveness Bidders must completely fill out and submit the bid form and all other required forms. All services that are the subject of the bid must meet the minimum standards and Scope of Services set forth including the standards by which the procurement officer will determine acceptability as to quality, workmanship, results of inspections and tests, and suitability for a particular purpose. ■ Responsibility Bidders must demonstrate that they meet the measures of responsibility. The School will not award a contract to any bidder who cannot furnish satisfactory evidence of his ability and experience in this type of work and that he has sufficient plant and capital to enable him to prosecute and complete the work as outlined in the Scope of Services. The School may make such investigations as it deems necessary to determine the above and a bidder shall furnish any information requested in this regard. All costs not listed on the bid price sheet will not be considered part of the contract and therefore will not be paid. The North Andover School Department will not be charged fuel surcharges or administrative fees as part of any contract entered into as a result of this IFB. Additionally the North Andover School Department will not be charged late fees unless payment is not made within sixty (60) days of the receipt of invoice. The North Andover School Department is a tax exempt entity so no sales tax will be assessed to any purchases made under this proposed contract. North Andover School Department IFB Page 7 of 35 School Athletic Fields Maintenance 11. Term of Contract The North Andover School Department is seeking to award a one-year contract with two (2) additional one-year renewals, solely at the discretion of the School. The School will provide written confirmation of renewal at least sixty (60) days prior to the end of the contract period. The successful bidder will be required to execute the standard North Andover School Department Contract and any relevant supplement (as attached). North Andover School Department IFB Page 8 of 35 School Athletic Fields Maintenance APPENDIX A - PRICE PROPOSAL The Contract will be awarded to the responsible and responsive bidder offering the lowest aggregate price for the first year of the proposed contract. All prices are to remain firm for the duration of the Contract. Total lump sum price to furnish all labor, materials and equipment required for School Athletic Fields Maintenance as specified: October 15. 2012 through October 14. 2013 Middle School Baseball and Softball Fields $ Hayes Stadium (football field) $ High School Baseball Diamond $ Drummond Softball Field $ High School Softball Field $ TOTAL $ October 15, 2013 through October 14, 2014 Middle School Baseball and Softball Fields $ Hayes Stadium (football field) $ High School Baseball Diamond $ Drummond Softball Field $ High School Softball Field $ TOTAL $ North Andover School Department IFB Page 9 of 35 School Athletic Fields Maintenance October 15, 2014 through October 14, 2015 Middle School Baseball and Softball Fields $ Hayes Stadium (football field) $ High School Baseball Diamond ra Drummond Softball Field $ High School Softball Field $ Addenda Business Name Business Address Business Phone TOTAL $ are acknowledged: Signature Fax Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person North Andover School Department IFB Page 10 of 35 School Athletic Fields Maintenance NORTH ANDOVER SCHOOL DEPARTMENT CONTRACT CONTRACT# DATE: This Contract is entered into on, or as of, this date by and between the North Andover School Department (the "School"), and Contractor: Address: Telephone Number: _ Fax Number: 1. This is a Contract for the procurement of the following: 2. The Contract price to be paid to the Contractor by the North Andover School Department is: 3. Payment will be made as follows: 4. Definitions: 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the North Andover School Department. Proper acceptance shall be understood to include inspection of goods and certification of acceptable North Andover School Department IFB Page 11 of 35 School Athletic Fields Maintenance performance for services by authorized representatives of the School to insure that the goods or services are complete and are as specified in the Contract. 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the School. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance: This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before , unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation: Notwithstanding anything in the Contract documents to the contrary, any and all payments which the School is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this North Andover School Department IFB Page 12 of 35 School Athletic Fields Maintenance Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals: Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default: 8.1 Without Cause. The School may terminate this Contract on seven (7) calendar days notice when in the best interests of the School by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the School to be in default of any term or condition of this Contract, the School may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the School; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the School, (iv) failure to promptly re -perform within a reasonable time the services that were rejected by the School as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. North Andover School Department IFB Page 13 of 35 School Athletic Fields Maintenance 9. The Contractor's Breach and the School's Remedies: Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the North Andover School Department shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the School may keep the whole or any part of the amount for expenses, losses and damages incurred by the School as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance: 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B — Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is North Andover School Department IFB Page 14 of 35 School Athletic Fields Maintenance discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the School. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the North Andover School Department, the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest: Both the School and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the School that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment: Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability gainst the School: This Contract is only binding upon, and enforceable against, the School if. (1) the Contract is signed by the School Superintendent or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. North Andover School Department IFB Page 15 of 35 School Athletic Fields Maintenance 16. Corporate Contractor: If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the North Andover School Department unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials: To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification: The Contractor shall indemnify, defend and save harmless the School, the Town of North Andover, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the School for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the School's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance: The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts North Andover School Department IFB Page 16 of 35 School Athletic Fields Maintenance (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the School for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the School evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the School. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the School, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the School, in the United States or any other country. The School shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the School shall vest in the School at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the School before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkegping At any time during normal business hours, and as often as the School may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. North Andover School Department IFB Page 17 of 35 School Athletic Fields Maintenance 22. Payment The School agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the School of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the North Andover School by being sent to the School Superintendent, 1600 Osgood Street #3059, North Andover, Massachusetts 01845. 26. Binding on Successors: This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). North Andover School Department IFB Page 18 of 35 School Athletic Fields Maintenance 27. Complete Contract: This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. 28. Supplemental Conditions: The foregoing provisions apply to all contracts to which the North Andover School Department shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: [ ] GOODS [ ] SERVICES SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) SUPPLEMENT "S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) [ X ] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for Construction North Andover School Department IFB Page 19 of 35 School Athletic Fields Maintenance IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth their hands the day and year first above written. THE SCHOOL Division/Department Head Contract Manager School Superintendent Date APPROVED AS TO FORM: Town Counsel Date THE CONTRACTOR Company Name Signature Print Name & Title CERTIFICATION AS TO AVAILABILITY OF FUNDS: Town Accountant North Andover School Department IFB School Athletic Fields Maintenance Date Date Page 20 of 35 SUPPLEMENT "C" [] CONSTRUCTION SUPPLEMENT "C" - Applicable to Contracts for the construction of. (1) Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2) Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3) Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) This form supplements the North Andover School Department "Contract and General Conditions" and applies only to contracts for the construction, reconstruction, alteration, remodeling or repair of public works or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded, such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required) in the form required by the School and provide an original thereof to the School prior to the commencement of performance. ualit : 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid, such specifications shall, as applicable, be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec. 44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings, except as above noted, the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name, but whose product meets the Specifications as to design, utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five (25%) per cent, in compliance with Sec. 13 of Chapter 30B. 5. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1, et seq. (Minimum Wage Law) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D (Prevailing Wage), as shall be in force and as amended. 6. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the School and others, including adjacent property, from injury or loss arising North Andover School Department IFB Page 21 of 35 School Athletic Fields Maintenance in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the School, or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on, about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times, as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails, hosts, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and shall designate a responsible member of its organization on the work, whose duty shall be the prevention of accidents. 8. The School shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the School. If the School in its sole discretion determines that the construction superintendent, foreman, or assistants are unacceptable to the School, then upon seven days notice from the School, the Contractor shall replace such person or persons with people acceptable to the School. 10. The Contractor shall give efficient supervision to the work, using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the School any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions, the School, upon three days written notice, may, without prejudice to any other remedy it may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the School's Project Representative 12.1. The School shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the School generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at the site, the Project Representative will keep the School informed on the progress of the work, will endeavor to guard the School against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the School only to the extent expressly delegated by the School, which shall be shown to the Contractor, and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. North Andover School Department IFB Page 22 of 35 School Athletic Fields Maintenance 12.2. In connection with the work, the Project Representative shall not be responsible for construction methods, means, techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs, requirements, regulations, or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall, within a reasonable time, make decisions on all claims of the School or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project, shall be final, if within the terms of the Contract Documents. 13.3. If, however, the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced, such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of its workmen to limits indicated by law, by-laws, permits or directions of the School and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work "broom -clean", or its equivalent, unless more exactly specified. In case of dispute, the School may remove the rubbish and charge the cost to the several contractors, as the School shall determine to be just. 16. Right to Terminate If the Contractor should (1) be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3) have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5) fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the School, or (7) be guilty of a substantial violation of any provision of the Contract, then the School may, without prejudice to any other right or remedy and after giving the Contractor (or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials, tools and appliances thereon and finish the work by whatever method it deems appropriate. North Andover School Department IFB Page 23 of 35 School Athletic Fields Maintenance In such cases, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances, the Contractor shall pay the difference to the School. The Contractor shall not be relieved of liability to the School by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement, the School reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The School shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the School to the termination date. 17. Progress ss Payments: 17.1. The Contractor shall submit to the School an itemized Application for Payment, supported to the extent required by the School by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall, before the first application, submit to the School a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract, divided so as to facilitate payments to Subcontractors, made out in such form as the School and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the School, shall be used as a basis for payment, unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The School may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the North Andover School Department from loss on account of - 18.1.1. £ 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. North Andover School Department IFB Page 24 of 35 School Athletic Fields Maintenance 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of School All claims by the Contractor against the School shall, unless otherwise provided by law, be initiated by a written claim submitted to the School no later than seven (7) calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the School under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the School's reasonable control. 20. Liquidated Damages: Because both parties recognize (1) that the time for completion of this Contract is of the essence, (2) that the School will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and (3) the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the School if the work is not completed in time, it is agreed that the Contractor will pay the School as liquidated damages representing an estimate of delay damages, not as a penalty, the sum of One Thousand Dollars ($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The School's right to impose liquidated damages shall in no way prohibit or restrict the School's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The School may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages, then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work, the Contractor agrees, upon due notice, to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the School on account of any damage alleged to have been sustained, the School shall notify the Contractor, who shall defend such proceedings at the School's expense and, if any judgment against the School arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the School. 22. Separate Contracts: 22.1. The School reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the North Andover School Department IFB Page 25 of 35 School Athletic Fields Maintenance School any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance of the other contractor's work as ft and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work, the Contractor shall measure work already in place and shall at once report to the School any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the School for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the School. 24. Contractor -Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement, the General Conditions of the Contract, the Supplementary General Conditions, the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the School, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the School for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the School's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the School or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification North Andover School Department IFB Page 26 of 35 School Athletic Fields Maintenance obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the School from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned, Non -owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever are greater: North Andover School Department IFB Page 27 of 35 School Athletic Fields Maintenance Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $3,000,000 per occurrence Property Damage $1,000,000 per occurrence $3,000,000 annual aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the School shall be addressed to and filed with the School prior to commencement of the work. Renewal certificates shall be addressed to and filed with the School at least ten (10) days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the School. The School shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the "MIIA" or "ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer, evidencing in particular those insured, the extent of coverage, the location and operations to which the insurance applies, the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the School from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. North Andover School Department IFB Page 28 of 35 School Athletic Fields Maintenance 27.2. The Contractor shall also purchase and maintain such insurance as will protect the School against Automobile Non -Ownership Liability in connection with the Contractor's operations under the Contract, whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town of North Andover and the North Andover School Department shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the School a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1 The Contractor guarantees and warrants to the School that all labor furnished under this Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results, that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the School Superintendent require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the School Superintendent with reasonable dispatch, then the latter may employ other persons to make such repairs. The School shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient, the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the School before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a North Andover School Department IFB Page 29 of 35 School Athletic Fields Maintenance required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's obligation to correct work is in addition to, and not in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: The North Andover School Department by: The Contractor by: North Andover School Department IFB School Athletic Fields Maintenance School Superintendent Department/Division Head Town Accountant Certified as to Appropriation Town Counsel Approved as to Form Authorized Signature Page 30 of 35 CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon that I hereby certify that I am the clerk of the above named and is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) North Andover School Department IFB Page 31 of 35 School Athletic Fields Maintenance CERTIFICATIONS CERTIFICATE OF NON -COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signature Date Print Name & Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I authorized signatory for Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support. Signature Date North Andover School Department IFB Page 32 of 35 School Athletic Fields Maintenance CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA -approved construction safety and health course lasting at least ten (10) hours. Signature. Print Name & Title North Andover School Department IFB School Athletic Fields Maintenance Date Company Name Page 33 of 35 PAYMENT BOND I.6roe M KNOW ALL MEN BY THESE PRESENTS, that we with a place of business at as Principal (the "Principal"), and a corporation qualified to do business in the Commonwealth of Massachusetts, with a place of business at as Surety (the "Surety"), are held and firmly bound unto the Town of North Andover, Massachusetts as Obligee (the "Obligee"), in the sum of lawful money of the United States of America, to be paid to the Obligee, for which payment, well and truly to be made, we bind ourselves, our respective heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has assumed and made a contract with the Obligee, bearing the date of for the construction of NOW, THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications, alterations, extensions of time, changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations, extensions of time, changes or additions being hereby waived, the foregoing to include, but not be limited to, any other purposes or items set out in, and to be subject to, the provisions of Massachusetts General Laws, Chapter 30, Section 39M, and Chapter 149, Section 29, as amended then this obligation shall become null and void; otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE, the Principal and Surety have hereto set their hands and seals this day of PRINCIPAL SURETY [Name and Seal] [Attorney-in-fact] [Seal] [Title] [Address] Attest: [Phone] Attest: North Andover School Department IFB Page 34 of 35 School Athletic Fields Maintenance Prevailing Wage Rates North Andover School Department IFB Page 35 of 35 School Athletic Fields Maintenance THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN m GerrorSemary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Gm-r Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Construction (2 AXLE) DRIVER - EQUIPMENT 08/01/2012 $30.15 $8.91 $7.27 0.00 $46.33 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 12/01/2012 $30.45 $8.91 $8.00 0.00 $47.36 (3 AXLE) DRIVER - EQUIPMENT 08/01/2012 $30.22 $8.91 $7.27 0.00 $46.40 TEAMSTERS JOINT COUNCIL NO. 10 70N B 12/01/2012 $30.52 $8.91 $8.00 0.00 $47.43 (4 & 5 AXLE) DRIVER - EQUIPMENT 08/01/2012 $30.34 $8.91 $7.27 0.00 $46.52 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 12/01/2012 $30.64 $9.07 $8.00 0.00 $47.71 ADS/SUBMERSIBLE PILOT 08/01/2012 $82.32 $9.80 $17.67 0.00 $109.79 TILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $85.47 $9.80 $17.67 0.00 $112.94 08/01/2014 $88.62 $9.80 $17.67 0.00 $116.09 08/01/2015 $91.77 $9.80 $17.67 0.00 $119.24 AIR TRACK OPERATOR 06/01/2012 $30.10 $7.10 $11.55 0.00 $48.75 I.ABORERS-ZONE 2 12/01/2012 $30.35 $7.10 $11.55 0.00 $49.00 06/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 0.00 $53.25 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-69.52. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 1 of 66 04. THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Y P seeteuq, TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE U. Governor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate $48.25 LABORERS - ZONE 2 Unemployment ASBESTOS REMOVER - PIPE / MECH. EQUIPT. 06/01/2012 $28.48 $10.40 $5.95 0.00 $44.83 ASBESTOS WORKERS LOCAL 6 (BOSTON) 0.00 $48.50 06/01/2013 $30.35 12/01/2012 $29.08 $10.40 $5.95 0.00 $45.43 06/01/2013 $29.88 $10.40 $5.95 0.00 $46.23 12/01/2013 $30.68 $10.40 $5.95 0.00 $47.03 06/01/2014 $31.58 $10.40 $5.95 0.00 $47.93 12/01/2014 $32.48 $10.40 $5.95 0.00 $48.83 06/01/2015 $33.43 $10.40 $5.95 0.00 $49.78 12/01/2015 $34.38 $10.40 $5.95 0.00 $50.73 ASPHALT RAKER 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 ASPHALT/CONCRETE/CRUSHER PLANT -ON SITE 06/01/2012 $39.84 $10.00 $12.65 0.00 $62.49 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.46 $10.00 $12.65 0.00 $63.11 06/01/2013 $41.24 $10.00 $12.65 0.00 $63.89 12/01/2013 $42.02 $10.00 $12.65 0.00 $64.67 BACKHOE/FRONT-END LOADER 06/01/2012 $39.84 $10.00 $12.65 0.00 $62.49 OPERA77NG ENGINEERS LOCAL 4 12/01/2012 $40.46 $10.00 $12.65 0.00 $63.11 06/01/2013 $41.24 $10.00 $12.65 0.00 $63.89 12/01/2013 $42.02 $10.00 $12.65 0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 2 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE LDSTEIN Govcmor Massachusetts General Laws, Chapter 149, Sections 26 to 27H retm TIMOTHY P. HURRAY HEATHER E. ROWS LL Govcmor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate $48.75 LABORERS -ZONE2 Unemployment BARCO-TYPE JUMPING TAMPER 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 0.00 $49.00 06/01/2013 $30.85 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 BLOCK PAVER, RAMMER / CURB SETTER 06/01/2012 $30.10 $7.10 $11.55 0.00 $48.75 LABORERS -ZONE2 12/01/2012 $30.35 $7.10 $11.55 0.00 $49.00 06/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 0.00 $53.25 BOILER MAKER 01/01/2010 $37.70 $6.97 $11.18 0.00 $55.85 BOILERMAKERS LOCAL 29 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 3 of 66 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmor Y p Sccrelary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Dimclor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Apprentice- BOILERMAKER -Local 29 Effective Date - 01/01/2010 Step percent Effective Date Base Wage Apprentice Base Wage Health Health Pension Pension Supplemental Unemployment Supplemental Unemployment Total Rate Total Rate 1 65 $24.51 $6.97 11.18 $0.00 $42.66 2 65 $24.51 $6.97 11.18 $0.00 $42.66 3 70 $26.39 $6.97 11.18 $0.00 $44.54 4 75 $28.28 $6.97 11.18 $0.00 $46.43 5 80 $30.16 $6.97 11.18 $0.00 $48.31 6 85 $32.05 $6.97 11.18 $0.00 $50.20 7 90 $33.93 $6.97 11.18 $0.00 $52.08 8 95 $35.82 $6.97 11.18 $0.00 $53.97 Notes: Apprentice to Journeyworker Ratio: 1:5 BR1CK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY 08/01/2012 $47.41 $10.18 $17.25 0.00 $74.84 WATERPROOFING) RRICKLAYF_RS LOCAL, 3 (LYNN) 02/01/2013 $47.99 $10.18 $17.25 0.00 $75.42 08/01/2013 $48.89 $10.18 $17.32 0.00 $76.39 02/01/2014 $49.45 $10.18 $17.32 0.00 $76.95 08/01/2014 $50.35 $10.18 $17.39 0.00 $77.92 02/01/2015 $50.91 $10.18 $17.39 0.00 $78.48 08/01/2015 $51.81 $10.18 $17.46 0.00 $79.45 02/01/2016 $52.38 $10.18 $17.46 0.00 $80.02 08/01/2016 $53.28 $10.18 $17.54 0.00 $81.00 02/01/2017 $53.85 $10.18 $17.54 0.00 $81.57 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 4 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE s F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RowE LI. Governor Dimaor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $10.18 17.25 $0.00 $51.43 2 60 Classification $10.18 Effective Date Base Wage Health Pension Supplemental Total Rate 3 70 $33.59 $10.18 17.25 $0.00 Unemplovment Apprentice- BRJCK/PLASTER/CEMENT MASON -Local 3 Lynn $38.39 $10.18 17.25 $0.00 Effective Date - 08/01/2012 $43.19 $10.18 17.25 $0.00 $70.62 $40.09 $10.00 $1.2.65 0.00 $62.74 Supplemental 06/01/2013 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.71 $10.18 17.25 $0.00 $51.14 2 60 $28.45 $10.18 17.25 $0.00 $55.88 3 70 $33.19 $10.18 17.25 $0.00 $60.62 4 80 $37.93 $10.18 17.25 $0.00 $65.36 5 90 $42.67 $10.18 17.25 $0.00 $70.10 Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.00 $10.18 17.25 $0.00 $51.43 2 60 $28.79 $10.18 17.25 $0.00 $56.22 3 70 $33.59 $10.18 17.25 $0.00 $61.02 4 80 $38.39 $10.18 17.25 $0.00 $65.82 5 90 $43.19 $10.18 17.25 $0.00 $70.62 (Notes: Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPERA77NG ENGINEERS LOCAL 4 12/01/2012 $40.09 $10.00 $1.2.65 0.00 $62.74 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 CAISSON & UNDERPINNING BOTTOM MAN 12/01/2011 $32.80 $7.10 $12.60 0.00 $52.50 LABORERS - FOUNDA7ION AND MARINE This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 5 of 66 THE COMMONWEALTH OF MASSACHUSETTS sc EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE s F. GOLDSTEIN mo Gover TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Dirodor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CAISSON & UNDERPINNING LABORER 12/01/2011 $31.65 $7.10 $12.60 0.00 $51.35 LABORERS - FOUNDATIONAND MARINE CAISSON & UNDERPINNING TOP MAN 12/01/2011 $31.65 $7.10 $12.60 0.00 $51.35 LABORERS - FOUNDA7IONAND MARINE CARBIDE CORE DRILL OPERATOR 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 CARPENTER 03/01/2012 $33.03 $9.80 $15.61 0.00 $58.44 CARPENTERS -ZONE 2 (Eastern Massachusetls) This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 6 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALI I. PATRICK As determined by the Director under the provisions of the JOANNE E. GOLDSTEIN Govcmor Secretam nmoTTTY P. muRRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govcmor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension supplemental Total Rate Unemployment Apprentice - CARPENTER - Zone 2 Eastern MA Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.52 $9.80 1.57 $0.00 $27.89 2 60 $19.82 $9.80 1.57 $0.00 $31.19 3 70 $23.12 $9.80 10.90 $0.00 $43.82 4 75 $24.77 $9.80 10.90 $0.00 $45.47 5 80 $26.42 $9.80 12.47 $0.00 $48.69 6 80 $26.42 $9.80 12.47 $0.00 $48.69 7 90 $29.73 $9.80 14.04 $0.00 $53.57 8 90 $29.73 $9.80 14.04 $0.00 $53.57 (Notes: I Apprentice to Journeyworker Ratio:1:5 CEMENT MASONRY/PLASTERING 08/01/2012 $42.42 $10.50 $18.61 1.30 $72.83 BRICKLAYERS LOCAL 3 (LYNN) 02/01/2013 $42.87 $10.50 $18.61 1.30 $73.28 08/01/2013 $43.62 $10.50 $18.61 1.30 $74.03 02/01/2014 $44.05 $10.50 $18.61 1.30 $74.46 08/01/2014 $44.80 $10.50 $18.61 1.30 $75.21 02/01/2015 $45.23 $10.50 $18.61 1.30 $75.64 08/01/2015 $45.98 $10.50 $18.61 1.30 $76.39 02/01/2016 $46.43 $10.50 $18.61 1.30 $76.84 08/01/2016 $47.18 $10.50 $18.61 1.30 $77.59 02/01/2017 $47.63 $10.50 $18.61 1.30 $78.04 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 7 of 66 W DEVALL. PATRICK Govemm TIMOTHY P. MURRAY Lt. Govemor Awarding Authority: Contract Number: Description of Work: THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GO DSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover -School Dept City/Town: NORTH ANDOVER Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools 06/01/2012 $40.84 $10.00 $12.65 0.00 $63.49 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 12/01/2012 $41.46 $10.00 $12.65 Unemployment $64.11 CHAIN SAW OPERATOR 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS- ZONE 2 12/01/2013 $43.02 $10.00 $12.65 0.00 $65.67 COMPRESSOR OPERATOR 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 OPERATING ENGINEERS LOCAL 4 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 DELEADER (BRIDGE) 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 PAINTERS LOCAL 35 - ZONE 2 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 06/01/2012 $40.84 $10.00 $12.65 0.00 $63.49 OPERATING ENGINEERS LOCAL 4 12/01/2012 $41.46 $10.00 $12.65 0.00 $64.11 06/01/2013 $42.24 $10.00 $12.65 0.00 $64.89 12/01/2013 $43.02 $10.00 $12.65 0.00 $65.67 COMPRESSOR OPERATOR 06/01/2012 $28.09 $10.00 $12.65 0.00 $50.74 OPERATING ENGINEERS LOCAL 4 12/01/2012 $28.54 $10.00 $12.65 0.00 $51.19 06/01/2013 $29.09 $10.00 $12.65 0.00 $51.74 12/01/2013 $29.64 $10.00 $12.65 0.00 $52.29 DELEADER (BRIDGE) 07/01/2012 $44.51 $7.80 $15.10 0.00 $67.41 PAINTERS LOCAL 35 - ZONE 2 01/01/2013 $45.01 $7.80 $15.60 0.00 $68.41 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 8 of 66 THE COMMONWEALTH OF MASSACHUSETTS sY EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE GOLDSTEIN rrm Gover TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rowe Lt. Governor DirMor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 07/01/2012 Step percent Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 50 $22.26 $7.80 0.00 $0.00 $30.06 2 55 $24.48 $7.80 3.38 $0.00 $35.66 3 60 $26.71 $7.80 3.69 $0.00 $38.20 4 65 $28.93 $7.80 4.00 $0.00 $40.73 5 70 $31.16 $7.80 13.26 $0.00 $52.22 6 75 $33.38 $7.80 13.56 $0.00 $54.74 7 80 $35.61 $7.80 13.87 $0.00 $57.28 8 90 $40.06 $7.80 14.49 $0.00 $62.35 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.51 $7.80 0.00 $0.00 $30.31 2 55 $24.76 $7.80 3.52 $0.00 $36.08 3 60 $27.01 $7.80 3.84 $0.00 $38.65 4 65 $29.26 $7.80 4.16 $0.00 $41.22 5 70 $31.51 $7.80 13.68 $0.00 $52.99 6 75 $33.76 $7.80 14.00 $0.00 $55.56 7 80 $36.01 $7.80 14.32 $0.00 $58.13 8 90 $40.51 $7.80 14.96 $0.00 $63.27 (Notes: 3 Steps are 750 hrs. I _ Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 61.7-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 9 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOry DSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H. HEATHER E. ROWE LL Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO: ADZEMAN 12/01/2011 $31.80 $7.10 $12.45 0.00 $51.35 LABORERS -7,ONF.2 DEMO: BACKHOE/LOADER/HAMMER OPERATOR 12/01/2011 $32.80 $7.10 $12.45 0.00 $52.35 LABORERS -70NE2 DEMO: BURNERS 12/01/2011 $32.55 $7.10 $12.45 0.00 $52.10 LABORERS - ZONE 1 DEMO: CONCRETE CUTTER/SAWYER 12/01/2011 $32.80 $7.10 $12.45 0.00 $52.35 LABORERS - ZONE 2 DEMO: JACKHAMMER OPERATOR 12/01/2011 $32.55 $7.10 $12.45 0.00 $52.10 LABORERS -ZONE2 DEMO: WRECKING LABORER 12/01/2011 $31.80 $7.10 $12.45 0.00 $51.35 LABOREYS - ZONE 2 DIRECTIONAL DRILL MACHINE OPERATOR 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPITRAl7NG ENGINEERS LOCAL 4 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 DIVER 08/01/2012 $54.88 $9.80 $17.67 0.00 $82.35 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $56.98 $9.80 $17.67 0.00 $84.45 08/01/2014 $59.08 $9.80 $17.67 0.00 $86.55 08/01/2015 $61.18 $9.80 $17.67 0.00 $88.65 DIVER TENDER 08/01/2012 $54.88 $9.80 $17.67 0.00 $82.35 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $56.98 $9.80 $17.67 0.00 $84.45 08/01/2014 $59.08 $9.80 $17.67 0.00 $86.55 08/01/2015 $61.18 $9.80 $17.67 0.00 $88.65 DIVER TENDER (EFFLUENT) 08/01/2012 $58.80 $9.80 $17.67 0.00 $86.27 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $61.05 $9.80 $17.67 0.00 $88.52 08/01/2014 $63.30 $9.80 $17.67 0.00 $90.77 08/01/2015 $65.55 $9.80 $17.67 0.00 $93.02 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 10 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN GovcmorSecretary TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. Rowe Lt. Governor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DIVER/SLURRY (EFFLUENT) 08/01/2012 $82.32 $9.80 $1.7.67 0.00 $109.79 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $85.47 $9.80 $17.67 0.00 $112.94 08/01/2014 $88.62 $9.80 $17.67 0.00 $116.09 08/01/2015 $91.77 $9.80 $17.67 0.00 $119.24 ELECTRICIAN 03/01/2012 $42.37 $13.00 $13.87 0.00 $69.24 F,LEMICIANS LOCAL 103 09/01/2012 $43.05 $13.00 $13.89 0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 0.00 $75.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 11 of 66 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor sm N TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Apprentice - ELECTRICIAN - Local 103 Effective Date - 03/01/2012 Step percent Effective Date Base Wage Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 40 $16.95 $13.00 7.81 $0.00 $37.76 2 40 $16.95 $13.00 7.81 $0.00 $37.76 3 45 $19.07 $13.00 10.26 $0.00 $42.33 4 45 $19.07 $13.00 10.26 $0.00 $42.33 5 50 $21.19 $13.00 10.59 $0.00 $44.78 6 55 $23.30 $13.00 10.92 $0.00 $47.22 7 60 $25.42 $13.00 11.24 $0.00 $49.66 8 65 $27.54 $13.00 11.58 $0.00 $52.12 9 70 $29.66 $13.00 11.90 $0.00 $54.56 10 75 $31.78 $13.00 12.23 $0.00 $57.01 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.22 $13.00 7.82 $0.00 $38.04 2 40 $17.22 $13.00 7.82 $0.00 $38.04 3 45 $19.37 $13.00 10.27 $0.00 $42.64 4 45 $19.37 $13.00 10.27 $0.00 $42.64 5 50 $21.53 $13.00 10.60 $0.00 $45.13 6 55 $23.68 $13.00 10.93 $0.00 $47.61 7 60 $25.83 $13.00 11.25 $0.00 $50.08 8 65 $27.98 $13.00 11.59 $0.00 $52.57 9 70 $30.14 $13.00 11.91 $0.00 $55.05 10 75 $32.29 $13.00 12.25 $0.00 $57.54 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 12 of 66 kA DEVAL L. PATRICK Govemor TIMOTHY P. MURRAY Li Govemor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNES GOLDSTEIN mury Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover -School Dept City/Town: NORTH ANDOVER Athletic Fields Site Work - Quotes for the Athletic Fields site work North Andover Public Schools Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Notes:: App Prior 1/1/03; 30/35/40/45/50/55/65/70/75/80 Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR ELEVATOR CONSTRUCTORS LOCAL 4 Apprentice- ELEVATOR CONSTRUCTOR -Local 4 Effective Date - 01/01/2012 01/01/2012 $52.45 $8.78 $6.96 Step percent Apprentice Base Wage Health 1 50 $26.23 $8.78 2 55 $28.85 $8.78 3 65 $34.09 $8.78 4 70 $36.72 $8.78 5 80 $41.96 $8.78 Pension 0.00 6.96 6.96 6.96 6.96 Supplemental Unemployment $0.00 $0.00 $0.00 $0.00 $0.00 0.00 Total Rate $35.01 $44.59 $49.83 $52.46 $57.70 --- ------ __-------------.-- -__------__-_-----_ - - - - - (Notes: I Steps 1-2 are 6 mos.; Steps 3-5 are 1 year Apprentice to Journeyworker Ratio: 1:1 ELEVATOR CONSTRUCTOR HELPER ELEVATOR CONSTRUCTORS LOCAL 4 01/01/2012 $38.59 $8.78 $6.96 0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $68.19 $54.33 Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 13 of 66 THE COMMONWEALTH OF MASSACHUSETTS Sr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK JOANNE F. GOLDSTEIN Govemr As determined by the Director under the provisions of the s«mtar. TIMOTW P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Dimctor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate $60.30 OPERATING ENGINEERS LOCAL 4 $10.00 $12.40 Unemployment $43.83 FENCE & GUARD RAIL ERECTOR 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 I.ABORERS - 70NE 2 0.00 $60.91 $12.40 05/01/2013 $39.12 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 05/01/2012 $37.90 $10.00 $12.40 0.00 $60.30 OPERATING ENGINEERS LOCAL 4 $10.00 $12.40 0.00 $43.83 05/01/2013 $21.79 $10.00 11/01/2012 $38.51 $10.00 $12.40 0.00 $60.91 $12.40 05/01/2013 $39.12 $10.00 $12.40 0.00 $61.52 0.00 11/01/2013 $39.88 $10.00 $12.40 0.00 $62.28 05/01/2014 $40.65 $10.00 $12.40 0.00 $63.05 FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 05/01/2012 $39.29 $10.00 $12.40 0.00 $61.69 OPERA77NG ENGINEERS LOCAL 4 11/01/2012 $39.91 $10.00 $12.40 0.00 $62.31 05/01/2013 $40.53 $10.00 $12.40 0.00 $62.93 11/01/2013 $41.30 $10.00 $12.40 0.00 $63.70 05/01/2014 $42.07 $10.00 $12.40 0.00 $64.47 FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY OPERATING ENGINEERS LOCAL 4 05/01/2012 $21.07 $10.00 $12.40 0.00 $43.47 11/01/2012 $21.43 $10.00 $12.40 0.00 $43.83 05/01/2013 $21.79 $10.00 $12.40 0.00 $44.19 11/01/2013 $22.25 $10.00 $12.40 0.00 $44.65 05/01/2014 $22.70 $10.00 $12.40 0.00 $45.10 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 14 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT WL DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E'RowE Lt. Governor Dimgor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment $33.98 FIRE ALARM INSTALLER 03/01/2012 $42.37 $13.00 $13.87 0.00 $69.24 ELECTRICIANS LOCAL 103 0.00 $57.28 12/01/2013 $35.29 $10.00 $12.65 0.00 09/01/2012 $43.05 $13.00 $13.89 0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 0.00 $75.52 FIRE ALARM REPAIR / MAINTENANCE 03/01/2012 $31.78 $13.00 $12.23 0.00 $57.01 / COMMISSIONINGELECTR/CIANS LOCAL, 103 09/01/2012 $32.29 $13.00 $12.25 0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 0.00 $61.72 FIREMAN (ASST. ENGINEER) 06/01/2012 $33.45 $10.00 $12.65 0.00 $56.10 OPERATING ENGINEERS LOCAL 4 12/01/2012 $33.98 $10.00 $12.65 0.00 $56.63 06/01/2013 $34.63 $10.00 $12.65 0.00 $57.28 12/01/2013 $35.29 $10.00 $12.65 0.00 $57.94 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 15 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. Gory DSTEIN Govemr TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unem loyment FLAGGER & SIGNALER 06/01/2012 $20.50 $7.10 $11.55 0.00 $39.15 LABORERS - ZONE 2 12/01/2012 $20.50 $7.10 $11.55 0.00 $39.15 06/01/2013 $20.50 $7.10 $11.55 0.00 $39.15 12/01/2013 $20.50 $7.10 $11.55 0.00 $39.15 06/01/2014 $20.50 $7.10 $11.55 0.00 $39.15 12/01/2014 $20.50 $7.10 $11.55 0.00 $39.15 06/01/2015 $20.50 $7.10 $11.55 0.00 $39.15 12/01/2015 $20.50 $7.10 $11.55 0.00 $39.15 06/01/2016 $20.50 $7.10 $11.55 0.00 $39.15 12/01/2016 $20.50 $7.10 $11.55 0.00 $39.15 FLOORCOVERER 03/01/2012 $37.20 $9.80 $16.61 0.00 $63.61 FLOORCOVERERS LOCAL 2168 ZONE I This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 16 of 66 THE COMMONWEALTH OF MASSACHUSETTS sr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S F. G LDSTEIN mo Gover TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LI. Govcmor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Apprentice to Journeyworker Ratio: 1:1 Unemployment Apprentice - FLOORCOVERER - Local 2168 Zone I $39.84 $10.00 $12.65 0.00 Effective Date - 03/01/2012 OPERATING ENGINEERS LOCAL 4 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.60 $9.80 1.79 $0.00 $30.19 2 55 $20.46 $9.80 1.79 $0.00 $32.05 3 60 $22.32 $9.80 11.24 $0.00 $43.36 4 65 $24.18 $9.80 11.24 $0.00 $45.22 5 70 $26.04 $9.80 13.03 $0.00 $48.87 6 75 $27.90 $9.80 13.03 $0.00 $50.73 7 80 $29.76 $9.80 14.82 $0.00 $54.38 8 85 $31.62 $9.80 14.82 $0.00 $56.24 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 FORK LIFT/CHERRY PICKER 06/01/2012 $39.84 $10.00 $12.65 0.00 $62.49 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.46 $10.00 $12.65 0.00 $63.11 06/01/2013 $41.24 $10.00 $12.65 0.00 $63.89 12/01/2013 $42.02 $10.00 $12.65 0.00 $64.67 GENERATOR/LIGHTING PLANT/HEATERS 06/01/2012 $28.09 $10.00 $12.65 0.00 $50.74 OPERATING ENGINEERS LOCAL 4 12/01/2012 $28.54 $10.00 $12.65 0.00 $51.19 06/01/2013 $29.09 $10.00 $12.65 0.00 $51.74 12/01/2013 $29.64 $10.00 $12.65 0.00 $52.29 GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR 07/01/2012 $34.51 $7.80 $14.60 0.00 SYSTEMS) G/.A7.BRS LOCAL 35 (ZONE 2) 01/01/2013 $35.51 $7.80 $14.60 0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $56.91 $57.91 Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 17 of 66 THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL, PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmr S' p Secrctary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmr Dirccbr Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $17.76 $7.80 0.00 $0.00 $25.56 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $30.58 3 60 $21.31 $7.80 Unemployment $0.00 Apprentice - GLAZIER - Local 35 Zone 2 4 65 $23.08 $7.80 3.84 $0.00 Effective Date - 07/01/2012 5 70 $24.86 $7.80 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 0.00 $0.00 $25.06 2 55 $18.98 $7.80 3.25 $0.00 $30.03 3 60 $20.71 $7.80 3.54 $0.00 $32.05 4 65 $22.43 $7.80 3.84 $0.00 $34.07 5 70 $24.16 $7.80 12.83 $0.00 $44.79 6 75 $25.88 $7.80 13.13 $0.00 $46.81 7 80 $27.61 $7.80 13.42 $0.00 $48.83 8 90 $31.06 $7.80 14.01 $0.00 $52.87 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.76 $7.80 0.00 $0.00 $25.56 2 55 $19.53 $7.80 3.25 $0.00 $30.58 3 60 $21.31 $7.80 3.54 $0.00 $32.65 4 65 $23.08 $7.80 3.84 $0.00 $34.72 5 70 $24.86 $7.80 12.83 $0.00 $45.49 6 75 $26.63 $7.80 13.13 $0.00 $47.56 7 80 $28.41 $7.80 13.42 $0.00 $49.63 8 90 $31.96 $7.80 14.01 $0.00 $53.77 (Notes: ISteps are 750 hrs. Apprentice to Journeyworker Ratioa:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 18 of 66 THE COMMONWEALTH OF MASSACHUSETTS >r EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Sccretan TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWS Lt. Governor Direaor Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment HOISTING ENGINEER/CRANES/GRADALLS 06/01/2012 $39.84 $10.00 $12.65 0.00 $62.49 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.46 $10.00 $12.65 0.00 $63.11 06/01/2013 $41.24 $10.00 $12.65 0.00 $63.89 a 12/01/2013 $42.02 $10.00 $12.65 0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 19 of 66 THE COMMONWEALTH OF MASSACHUSETTS tr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Y P Swmry TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $22.25 $10.00 0.00 $0.00 $32.25 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 65 $26.30 $10.00 12.65 Unemployment $48.95 Apprentice- HOIST/PORT. ENG.- Local 4 $28.32 $10.00 12.65 $0.00 $50.97 Effective Date - 06/01/2012 $30.35 $10.00 12.65 Supplemental $53.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $21.91 $10.00 0.00 $0.00 $31.91 2 60 $23.90 $10.00 12.65 $0.00 $46.55 3 65 $25.90 $10.00 12.65 $0.00 $48.55 4 70 $27.89 $10.00 12.65 $0.00 $50.54 5 75 $29.88 $10.00 12.65 $0.00 $52.53 6 80 $31.87 $10.00 12.65 $0.00 $54.52 7 85 $33.86 $10.00 12.65 $0.00 $56.51 8 90 $35.86 $10.00 12.65 $0.00 $58.51 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $22.25 $10.00 0.00 $0.00 $32.25 2 60 $24.28 $10.00 12.65 $0.00 $46.93 3 65 $26.30 $10.00 12.65 $0.00 $48.95 4 70 $28.32 $10.00 12.65 $0.00 $50.97 5 75 $30.35 $10.00 12.65 $0.00 $53.00 6 80 $32.37 $10.00 12.65 $0.00 $55.02 7 85 $34.39 $10.00 12.65 $0.00 $57.04 8 90 $36.41 $10.00 12.65 $0.00 $59.06 Notes: I Apprentice to Journeyworker Ratio:1:6 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 20 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALi. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmor Y P Secreiary TIMOTHY P MURRAY Massachusetts General Laws, Chapter 1.49, Sections 26 to 27H HEATHER E. ROWE LL Govcmor Dimaor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension supplemental Total Rate Unemployment HVAC (DUCTWORK) 08/01/2012 $41.10 $9.82 $18.24 2.08 $71.24 SHEETMETAL WORKERS LOCAL 17 - A 02/01/2013 $42.35 $9.82 $18.24 2.11 $72.52 HVAC (ELECTRICAL CONTROLS) 03/01/2012 $42.37 $13.00 $13.87 0.00 $69.24 ELECTRICIANS LOCAL 103 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 09/01/2012 $43.05 $13.00 $13.89 0.00 $69.94 03/01/2013 $43.77 $13.00 $13.91 0.00 $70.68 09/01/2013 $44.45 $13.00 $13.93 0.00 $71.38 03/01/2014 $45.17 $13.00 $13.95 0.00 $72.12 09/01/2014 $45.84 $13.00 $13.97 0.00 $72.81 03/01/2015 $46.55 $13.00 $14.00 0.00 $73.55 09/01/2015 $47.51 $13.00 $14.03 0.00 $74.54 03/01/2016 $48.47 $13.00 $14.05 0.00 $75.52 14VAC (TESTING AND BALANCING - AIR) 08/01/2012 $41.10 $9.82 $18.24 2.08 $71.24 SHEETWETAL WORKERS LOCAL 17 - A 02/01/2013 $42.35 $9.82 $18.24 2.11 $72.52 HVAC (TESTING AND BALANCING -WATER) 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65 PIPEFITTERS LOCAL 537 (Local 138) 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15 HVAC MECHANIC IIIPEF17TERSLOCAL 537 (Local 138) 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 21 of 66 THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN Governorsecretary TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemot Direaor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment HYDRAULIC DRILLS 06/01/2012 $30.10 $7.10 $11.55 0.00 $48.75 LABORERS - ZONE 2 12/01/2012 $30.35 $7.10 $11.55 0.00 $49.00 06/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 12/01/2013 $31.35 $7.10 $11.55 0.00 $50.00 06/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 12/01/2014 $32.35 $7.10 $11.55 0.00 $51.00 06/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 12/01/2015 $33.35 $7.10 $11.55 0.00 $52.00 06/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 12/01/2016 $34.60 $7.10 $11.55 0.00 $53.25 INSULATOR (PIPES & TANKS) 09/01/2011 $40.66 $10.40 $11.20 0.00 $62.26 ASBESTOS WORKERS LOCAL 6 (BOSTON) 09/01/2012 $42.06 $10.40 $11.20 0.00 $63.66 09/01/2013 $43.66 $10.40 $11.20 0.00 $65.26 09/01/2014 $45.66 $10.40 $11.20 0.00 $67.26 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 22 of 66 it DEVALL. PATRICK Govemor TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNES GOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Director Town of North Andover -School Dept City/Town: NORTH ANDOVER Athletic Fields Site Work - Quotes for the Athletic Fields site work North Andover Public Schools Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ASBESTOS INSULATOR (Pipes & Tanks) -Local 6 Boston Effective Date - 09/01/2011 Step percent Apprentice Base Wage Health 1 50 $20.33 $10.40 2 60 $24.40 $10.40 3 70 $28.46 $10.40 4 80 $32.53 $10.40 Supplemental Pension Unemployment 8.30 $0.00 8.88 $0.00 9.46 $0.00 10.04 $0.00 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment 1 50 $21.03 $10.40 8.30 2 60 $25.24 $10.40 8.88 3 70 $29.44 $10.40 9.46 4 80 $33.65 $10.40 10.04 Notes: $61.88 Steps are 1 year '-- ---.-- _ --.-.- Apprentice to Journeyworker Ratio:1:4 -_.__.--. ._-- _._.- IRON WORKER/WELDER IRONWORKERS LOCAL 7 (LAWRENCE AREA) Total Rate $39.03 $43.68 $48.32 $52.97 Total Rate $0.00 $39.73 $0.00 $44.52 $0.00 $49.30 $0.00 $54.09 04/02/2012 $33.58 $7.70 $18.35 0.00 $59.63 09/16/2012 $34.58 $7.70 $18.35 0.00 $60.63 03/16/2013 $35.83 $7.70 $18.35 0.00 $61.88 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 23 of 66 Awarding Authority: Town of North Andover -School Dept Contract Number: THE COMMONWEALTH OF MASSACHUSETTS fr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT NORTH ANDOVER DEPARTMENT OF LABOR STANDARDS Description of Work: Athletic Fields Site Work - Quotes Prevailing Wage Rates DEVAL L. PATRICK Gov Gov- ror As determined by the Director under the provisions of the JOANNE F. GOrLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P. MURRAY Lt. Govem, HEATHER E. ROWE Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER -Local 7 Lawrence Effective Date - 04/02/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.15 $7.70 18.35 $0.00 $46.20 2 70 $23.51 $7.70 18.35 $0.00 $49.56 3 75 $25.19 $7.70 18.35 $0.00 $51.24 4 80 $26.86 $7.70 18.35 $0.00 $52.91 5 85 $28.54 $7.70 18.35 $0.00 $54.59 6 90 $30.22 $7.70 18.35 $0.00 $56.27 Effective Date - 09/16/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.75 $7.70 18.35 $0.00 $46.80 2 70 $24.21 $7.70 18.35 $0.00 $50.26 3 75 $25.94 $7.70 18.35 $0.00 $51.99 4 80 $27.66 $7.70 18.35 $0.00 $53.71 5 85 $29.39 $7.70 18.35 $0.00 $55.44 6 90 $31.12 $7.70 18.35 $0.00 $57.17 Notes: IStructural 1:6; Ornamental 1:4 Apprentice to Journeyworker Ratio: This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 24 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmor y p Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment JACKHAMMER & PAVING BREAKER OPERATOR 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 LABORER 06/01/2012 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS -70NE2 12/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 25 of 66 THE COMMONWEALTH OF MASSACHUSETTS ith EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE LDSTEIN Govemor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - LABORER - Zone 2 Effective Date - 06/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.61 $7.10 11.55 $0.00 $36.26 2 70 $20.55 $7.10 11.55 $0.00 $39.20 3 80 $23.48 $7.10 11.55 $0.00 $42.13 4 90 $26.42 $7.10 11.55 $0.00 $45.07 Effective Date - 12/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $17.76 $7.10 11.55 $0.00 $36.41 2 70 $20.72 $7.10 11.55 $0.00 $39.37 3 80 $23.68 $7.10 11.55 $0.00 $42.33 4 90 $26.64 $7.10 11.55 $0.00 $45.29 'Notes: Apprentice to Journeyworker Ratio: 1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 26 of 66 THE COMMONWEALTH OF MASSACHUSETTS Sth EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE LDSTEIN Govemor O TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate $48.00 LABORERS - ZONE 2 Unemployment LABORER: CARPENTER TENDER 06/01/2012 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS - ZONE 2 0.00 $48.25 06/01/2013 $30.10 12/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 LABORER: CEMENT FINISHER TENDER 06/01/2012 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS - ZONE 2 12/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 0.00 $50.25 06/01/2015 $32.10 $7.10 $1.1.55 0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2011 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS -ZONE:2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 27 of 66 THE COMMONWEALTH OF MASSACHUSETTS Sr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOry DSTEIN mo Govcr TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Dimctor Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER: MASON TENDER 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS -ZONE.2 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 LABORER: MULTI -TRADE TENDER 06/01/2012 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS - ZONE 2 12/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 28 of 66 THE COMMONWEALTH OF MASSACHUSETTS * EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE LDSTEIN Governor 7 TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER: TREE REMOVER 06/01/2012 $29.35 $7.10 $11.55 0.00 $48.00 L4BORERS-ZONE2 12/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 This classification applies to the wholesale removal of standing trees including all associated trimming of branches and limbs, and applies to the removal of branches at locations not on or around utility lines. LASER BEAM OPERATOR 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONF 2 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 29 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN GOrcmor Y P Smrmr • TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Gme mr Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MARBLE & TILE FINISHERS 08/01/2012 $36.20 $10.18 $16.04 0.00 $62.42 BRICKLAYERS LOCAL 3 -MARBLE, & TILE 02/01/2013 $36.67 $10.18 $16.04 0.00 $62.89 08/01/2013 $37.38 $10.18 $16.11 0.00 $63.67 02/01/2014 $37.83 $10.18 $16.11 0.00 $64.12 08/01/2014 $38.54 $10.18 $16.18 0.00 $64.90 02/01/2015 $38.99 $10.18 $16.18 0.00 $65.35 08/01/2015 $39.70 $10.18 $16.25 0.00 $66.13 02/01/2016 $40.15 $10.18 $16.25 0.00 $66.58 08/01/2016 $40.85 $10.18 $16.33 0.00 $67.36 02/01/2017 $41.31 $10.18 $16.33 0.00 $67.82 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 30 of 66 THE COMMONWEALTH OF MASSACHUSETTS ft EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN GovemorSeemary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- MARBLE & TILE FINISHER -Local 3 Marble & Tile Effective Date - 08/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.10 $10.18 16.04 $0.00 $44.32 2 60 $21.72 $10.18 16.04 $0.00 $47.94 3 70 $25.34 $10.18 16.04 $0.00 $51.56 4 80 $28.96 $10.18 16.04 $0.00 $55.18 5 90 $32.58 $10.18 16.04 $0.00 $58.80 Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $18.34 $10.18 16.04 $0.00 $44.56 2 60 $22.00 $10.18 16.04 $0.00 $48.22 3 70 $25.67 $10.18 16.04 $0.00 $51.89 4 80 $29.34 $10.18 16.04 $0.00 $55.56 5 90 $33.00 $10.18 16.04 $0.00 $59.22 (Notes: - - _ . _ - -_ _.....,.._ ...,_ - - -- - - - . _ - ._-..-. _ .. - - ---- --- ..._...,._... -- -1 Steps are 800 hrs. Apprentice to Journeyworker Ratio:l:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 31 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT kv DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN GovcmorSecretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcm, Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MARBLE MASONS,TILELAYERS & TERRAZZO MECH 08/01/2012 $47.45 $10.18 $17.25 0.00 $74.88 BXICKLAYERSLOCAL 3 -MARBLE& TILE 02/01/2013 $48.03 $10.18 $17.25 0.00 $75.46 08/01/2013 $48.93 $10.18 $17.32 0.00 $76.43 02/01/2014 $49.49 $10.18 $17.32 0.00 $76.99 08/01/2014 $50.39 $10.18 $17.39 0.00 $77.96 02/01/2015 $50.95 $10.18 $17.39 0.00 $78.52 08/01/2015 $51.85 $10.18 $17.46 0.00 $79.49 02/01/2016 $52.42 $10.18 $17.46 0.00 $80.06 08/01/2016 $53.32 $10.18 $17.54 0.00 $81.04 02/01/2017 $53.89 $10.18 $17.54 0.00 $81.61 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 32 of 66 THE COMMONWEALTH OF MASSACHUSETTS �r EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmr Y P SecrMan TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Dior Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE -TILE -TERRAZZO MECHANIC -Local 3 Marble & Tile Effective Date - 08/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.73 $10.18 1.7.25 $0.00 $51.16 2 60 $28.47 $10.18 17.25 $0.00 $55.90 3 70 $33.22 $10.18 17.25 $0.00 $60.65 4 80 $37.96 $10.18 17.25 $0.00 $65.39 5 90 $42.71 $10.18 17.25 $0.00 $70.14 Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.02 $10.18 17.25 $0.00 $51.45 2 60 $28.82 $10.18 17.25 $0.00 $56.25 3 70 $33.62 $10.18 17.25 $0.00 $61.05 4 80 $38.42 $10.18 17.25 $0.00 $65.85 5 90 $43.23 $10.18 17.25 $0.00 $70.66 (Notes: Apprentice to Journeyworker Ratio:1:3 y MECH. SWEEPER OPERATOR (ON CONST. SITES) 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 33 of 66 Its, THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTErN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $15.86 $8.67 11.64 $0.00 $36.17 2 55 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $8.67 13.23 $0.00 $40.93 4 65 Unemployment $8.67 MECHANICS MAINTENANCE 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPF,RATING ENGINEERS LOCAL 4 $44.89 6 75 $23.78 $8.67 14.02 $0.00 $46.47 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 8 85 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 MILLWRIGHT (Zone 2) 04/01/2011 $31.71 $8.67 $15.61 0.00 $55.99 MILLWRIGHTS LOCAL 1121 - Zone 2 Apprentice- MILLWRIGHT- Local 1121 Zone 2 Effective Date - 04/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $15.86 $8.67 11.64 $0.00 $36.17 2 55 $17.44 $8.67 11.64 $0.00 $37.75 3 60 $19.03 $8.67 13.23 $0.00 $40.93 4 65 $20.61 $8.67 13.23 $0.00 $42.51 5 70 $22.20 $8.67 14.02 $0.00 $44.89 6 75 $23.78 $8.67 14.02 $0.00 $46.47 7 80 $25.37 $8.67 14.82 $0.00 $48.86 8 85 $26.95 $8.67 14.82 $0.00 $50.44 Notes: Apprentice to Journeyworker Ratio:1:5 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 34 of 66 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEFN GovcmorScmary TJMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate $43.96 OPERATING ENGINEERS LOCAL 4 Unemployment MORTARMIXER 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 0.00 $44.30 $12.65 06/01/2013 $22.07 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 OILER (OTHER THAN TRUCK CRANES,GRADALLS) 06/01/2012 $21.31 $10.00 $12.65 0.00 $43.96 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.09 $10.00 12/01/2012 $21.65 $10.00 $12.65 0.00 $44.30 $12.65 06/01/2013 $22.07 $10.00 $12.65 0.00 $44.72 0.00 12/01/2013 $22.49 $1.0.00 $12.65 0.00 $45.14 OILER (TRUCK CRANES, GRADALLS) 06/01/2012 $24.60 $10.00 $12.65 0.00 $47.25 OPERATING ENGINEERS LOCAL 4 12/01/2012 $24.99 $10.00 $12.65 0.00 $47.64 06/01/2013 $25.47 $10.00 $12.65 0.00 $48.12 12/01/2013 $25.96 $10.00 $12.65 0.00 $48.61 OTHER POWER DRIVEN EQUIPMENT - CLASS II 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPERATING ENGINEERS LOCAL. 4 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 PAINTER (BRIDGES/TANKS) PAINTERS LOCAL 35 - ZONE. 2 07/01/2012 $44.51 $7.80 $15.10 0.00 01/01/2013 $45.01 $7.80 $15.60 0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: $67.41 $68.41 Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 35 of 66 it DEVAL L. PATRICK Gove-, TIMOTHY P. MURRAY Lt. Governor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. G LDSTEIN Scc=ry Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dimaor Town of North Andover -School Dept City/Town: NORTH ANDOVER Athletic Fields Site Work - Quotes for the Athletic Fields site work North Andover Public Schools Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 - BRIDGESITANKS Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.26 $7.80 0.00 $0.00 $30.06 2 55 $24.48 $7.80 3.38 $0.00 $35.66 3 60 $26.71 $7.80 3.69 $0.00 $38.20 4 65 $28.93 $7.80 4.00 $0.00 $40.73 5 70 $31.16 $7.80 13.26 $0.00 $52.22 6 75 $33.38 $7.80 13.56 $0.00 $54.74 7 80 $35.61 $7.80 13.87 $0.00 $57.28 8 90 $40.06 $7.80 14.49 $0.00 $62.35 Effective Date - 01/01/201.3 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $22.51 $7.80 0.00 $0.00 $30.31 2 55 $24.76 $7.80 3.52 $0.00 $36.08 3 60 $27.01 $7.80 3.84 $0.00 $38.65 4 65 $29.26 $7.80 4.16 $0.00 $41.22 5 70 $31.51 $7.80 13.68 $0.00 $52.99 6 75 $33.76 $7.80 14.00 $0.00 $55.56 7 80 $36.01 $7.80 14.32 $0.00 $58.13 8 90 $40.51 $7.80 14.96 $0.00 $63.27 (Notes: I Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 36 of 66 THE COMMONWEALTH OF MASSACHUSETTS tr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor E. TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHERE ROWE Lt. Govemor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, NEW) * 07/01/2012 $35.41 $7.80 $15.10 0.00 $58.31 * if 300/. or more of cnrfaces to he. naimerl are new cnnetrnctinn NEW paint rate shall be used.PAINTERS LOCAL 35 - ZONE 2 01/01/2013 $35.91 $7.80 $15.60 0.00 $59.31 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 37 of 66 Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools THE COMMONWEALTH OF MASSACHUSETTS :Y EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $0.00 DEPARTMENT OF LABOR STANDARDS Classification Prevailing Wage Rates DEVAL L. PATRICK Govemor As determined by the Director under the provisions of the JOANNE F. G LDSTEIN Pension Supplemental 7 TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $17.96 $7.80 0.00 $0.00 $25.76 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 3 60 $21.55 $7.80 3.84 Unemplovment $33.19 Apprentice- PAINTER Local 35 Zone 2 - Spray/Sandblast -New $23.34 $7.80 4.16 $0.00 Effective Date - 07/01/2012 5 70 $25.14 $7.80 Supplemental $0.00 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.71 $7.80 0.00 $0.00 $25.51 2 55 $19.48 $7.80 3.38 $0.00 $30.66 3 60 $21.25 $7.80 3.69 $0.00 $32.74 4 65 $23.02 $7.80 4.00 $0.00 $34.82 5 70 $24.79 $7.80 13.26 $0.00 $45.85 6 75 $26.56 $7.80 13.56 $0.00 $47.92 7 80 $28.33 $7.80 13.87 $0.00 $50.00 8 90 $31.87 $7.80 14.49 $0.00 $54.16 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.96 $7.80 0.00 $0.00 $25.76 2 55 $19.75 $7.80 3.52 $0.00 $31.07 3 60 $21.55 $7.80 3.84 $0.00 $33.19 4 65 $23.34 $7.80 4.16 $0.00 $35.30 5 70 $25.14 $7.80 13.68 $0.00 $46.62 6 75 $26.93 $7.80 14.00 $0.00 $48.73 7 80 $28.73 $7.80 14.32 $0.00 $50.85 8 90 $32.32 $7.80 14.96 $0.00 $55.08 - _ -_ - - ---. - _--. -, -_ - - _ - (Notes: ~-• . - -.- - --- -_ - - -- -_ _-- « -_ .-. ..`- .-- . -1 Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 38 of 66 THE COMMONWEALTH OF MASSACHUSETTS �r EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gov— secreup TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RowE LL Governor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (SPRAY OR SANDBLAST, REPAINT) 07/01/2012 $33.47 $7.80 $15.10 0.00 $56.37 PAINTERS LOCAL. 35 - ZONE 2 01/01/2013 $33.97 $7.80 $15.60 0.00 $57.37 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 39 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN GovcmorSecroary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice - PAINTER Local 35 Zone 2 - Spray/Sandblast - Repaint Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.74 $7.80 0.00 $0.00 $24.54 2 55 $18.41 $7.80 3.38 $0.00 $29.59 3 60 $20.08 $7.80 3.69 $0.00 $31.57 4 65 $21.76 $7.80 4.00 $0.00 $33.56 5 70 $23.43 $7.80 13.26 $0.00 $44.49 6 75 $25.10 $7.80 13.56 $0.00 $46.46 7 80 $26.78 $7.80 13.87 $0.00 $48.45 8 90 $30.12 $7.80 14.49 $0.00 $52.41 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.99 $7.80 0.00 $0.00 $24.79 2 55 $18.68 $7.80 3.52 $0.00 $30.00 3 60 $20.38 $7.80 3.84 $0.00 $32.02 4 65 $22.08 $7.80 4.16 $0.00 $34.04 5 70 $23.78 $7.80 13.68 $0.00 $45.26 6 75 $25.48 $7.80 14.00 $0.00 $47.28 7 80 $27.18 $7.80 14.32 $0.00 $49.30 8 90 $30.57 $7.80 14.96 $0.00 $53.33 Notes: Apprentice to Journeyworker Ratio:I :l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 40 of 66 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE S . GOLDSTEIN Gmemor TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Gocevmr Direaor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER (TRAFFIC MARKINGS) 06/01/2012 $29.35 $7.10 $11.55 0.00 $48.00 LABORERS - ZONE 2 12/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 06/01/2013 $30.10 $7.10 $11.55 0.00 $48.75 12/01/2013 $30.60 $7.10 $11.55 0.00 $49.25 06/01/2014 $31.10 $7.10 $11.55 0.00 $49.75 12/01/2014 $31.60 $7.10 $11.55 0.00 $50.25 06/01/2015 $32.10 $7.10 $11.55 0.00 $50.75 12/01/2015 $32.60 $7.10 $11.55 0.00 $51.25 06/01/2016 $33.10 $7.10 $11.55 0.00 $51.75 12/01/2016 $33.85 $7.10 $11.55 0.00 $52.50 PAINTER / TAPER (BRUSH, NEW) * 07/01/2012 $34.01 $7.80 $15.10 0.00 $56.91 * If 30% or more of surfaces to be painted are new construction, 01/01/2013 $34.51 $7.80 $15.60 0.00 $57.91 NEW paint rate shall be used.PA/NTERS LOCAL 35 - ZONE 2 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 41 of 66 THE COMMONWEALTH OF MASSACHUSETTS st EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Gov- y p Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcrnor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $17.26 $7.80 0.00 $0.00 $25.06 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $30.30 3 60 $20.71 $7.80 Unemployment Apprentice- PAINTER -Local 35 Zone 2 - BRUSHNEW 4 65 $22.43 $7.80 4.16 Effective Date - 07/01/2012 $34.39 5 70 $24.16 Supplemental 13.68 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.01 $7.80 0.00 $0.00 $24.81 2 55 $18.71 $7.80 3.38 $0.00 $29.89 3 60 $20.41 $7.80 3.69 $0.00 $31.90 4 65 $22.11 $7.80 4.00 $0.00 $33.91 5 70 $23.81 $7.80 13.26 $0.00 $44.87 6 75 $25.51 $7.80 13.56 $0.00 $46.87 7 80 $27.21 $7.80 13.87 $0.00 $48.88 8 90 $30.61 $7.80 14.49 $0.00 $52.90 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $17.26 $7.80 0.00 $0.00 $25.06 2 55 $18.98 $7.80 3.52 $0.00 $30.30 3 60 $20.71 $7.80 3.84 $0.00 $32.35 4 65 $22.43 $7.80 4.16 $0.00 $34.39 5 70 $24.16 $7.80 13.68 $0.00 $45.64 6 75 $25.88 $7.80 14.00 $0.00 $47.68 7 80 $27.61 $7.80 14.32 $0.00 $49.73 8 90 $31.06 $7.80 14.96 $0.00 $53.82 . � .�. �. �..._...-- --- - - .� Notes: r _ �. . _ � - ._.- --- __._ .__ -� � .._ ....- - - • -; 1 Steps are 750 hrs. Apprentice to Journeyworker Ratio: 1:1 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 42 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemr Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PAINTER / TAPER (BRUSH, REPAINT) 07/01/2012 $32.07 $7.80 $15.10 0.00 $54.97 PAINTERS LOCAL 35 - ZONF. 2 01/01/2013 $32.57 $7.80 $15.60 0.00 $55.97 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 43 of 66 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govertar 7 TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Goverttor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2 -BRUSH REPAINT Effective Date - 07/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.04 $7.80 0.00 $0.00 $23.84 2 55 $17.64 $7.80 3.38 $0.00 $28.82 3 60 $19.24 $7.80 3.69 $0.00 $30.73 4 65 $20.85 $7.80 4.00 $0.00 $32.65 5 70 $22.45 $7.80 13.26 $0.00 $43.51 6 75 $24.05 $7.80 13.56 $0.00 $45.41 7 80 $25.66 $7.80 13.87 $0.00 $47.33 8 90 $28.86 $7.80 14.49 $0.00 $51.15 Effective Date - 01/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $16.29 $7.80 0.00 $0.00 $24.09 2 55 $17.91 $7.80 3.52 $0.00 $29.23 3 60 $19.54 $7.80 3.84 $0.00 $31.18 4 65 $21.17 $7.80 4.16 $0.00 $33.13 5 70 $22.80 $7.80 13.68 $0.00 $44.28 6 75 $24.43 $7.80 14.00 $0.00 $46.23 7 80 $26.06 $7.80 14.32 $0.00 $48.18 8 90 $29.31 $7.80 14.96 $0.00 $52.07 (Notes: _ Steps are 750 hrs. tApprentice to 3ourneyworker Ratio:l:l This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 44 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PACK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment $40.70 PANEL & PICKUP TRUCKS DRIVER 08/01/2012 $29.68 $8.91 $7.27 0.00 $45.86 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 0.00 $69.67 08/01/2015 $43.70 $9.80 $17.67 0.00 12/01/2012 $30.28 $9.07 $8.00 0.00 $47.35 PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND 08/01/2012 $39.20 $9.80 $17.67 0.00 $66.67 DECK) PILE DRIVER LOCAL 56 (ZONE IJ 08/01/2013 $40.70 $9.80 $17.67 0.00 $68.17 08/01/2014 $42.20 $9.80 $17.67 0.00 $69.67 08/01/2015 $43.70 $9.80 $17.67 0.00 $71.17 PILE DRIVER 08/01/2012 $39.20 $9.80 $17.67 0.00 $66.67 PILE DRIVER LOCAL 56 (ZONE 1) 08/01/2013 $40.70 $9.80 $17.67 0.00 $68.17 08/01/2014 $42.20 $9.80 $17.67 0.00 $69.67 08/01/2015 $43.70 $9.80 $17.67 0.00 $71.17 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 45 of 66 THE COMMONWEALTH OF MASSACHUSETTS Sr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN GovernorSecretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lr. Govcmor Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Apprentice- PILEDRIVER -Local 56 Zone 1 Effective Date - 08/01/2012 Step percent Apprentice Base Wage Health Health Pension Pension Supplemental Total Rate Unemplovment Supplemental Unemployment Total Rate 1 50 $19.60 $9.80 17.67 $0.00 $47.07 2 60 $23.52 $9.80 17.67 $0.00 $50.99 3 70 $27.44 $9.80 17.67 $0.00 $54.91 4 75 $29.40 $9.80 17.67 $0.00 $56.87 5 80 $31.36 $9.80 17.67 $0.00 $58.83 6 80 $31.36 $9.80 17.67 $0.00 $58.83 7 90 $35.28 $9.80 17.67 $0.00 $62.75 8 90 $35.28 $9.80 17.67 $0.00 $62.75 Effective Date - 08/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.35 $9.80 17.67 $0.00 $47.82 2 60 $24.42 $9.80 17.67 $0.00 $51.89 3 70 $28.49 $9.80 17.67 $0.00 $55.96 4 75 $30.53 $9.80 17.67 $0.00 $58.00 5 80 $32.56 $9.80 17.67 $0.00 $60.03 6 80 $32.56 $9.80 17.67 $0.00 $60.03 7 90 $36.63 $9.80 17.67 $0.00 $64.10 8 90 $36.63 $9.80 17.67 $0.00 $64.10 ((Notes: I Apprentice to Journeyworker Ratio:1:3 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 46 of 66 ILI THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Gov- TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. RowE Lt. Governor Di.aw Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $17.80 $8.75 4.50 $0.00 $31.05 2 45 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $8.75 12.39 $0.00 $47.85 4 70 Unemployment $8.75 PIPEFITTER & STEAMFITTER 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65 11PEFI7TERS LOCAL 537 (local 138) $56.75 $36.61 $8.75 12.39 $0.00 $57.75 Notes: 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15 Apprentice- PIPEFI7TER Local 537 (Local 138) Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.80 $8.75 4.50 $0.00 $31.05 2 45 $20.03 $8.75 12.39 $0.00 $41.17 3 60 $26.71 $8.75 12.39 $0.00 $47.85 4 70 $31.16 $8.75 12.39 $0.00 $52.30 5 80 $35.61 $8.75 12.39 $0.00 $56.75 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $18.30 $8.75 4.50 $0.00 $31.55 2 45 $20.59 $8.75 12.39 $0.00 $41.73 3 60 $27.46 $8.75 12.39 $0.00 $48.60 4 70 $32.03 $8.75 12.39 $0.00 $53.17 5 80 $36.61 $8.75 12.39 $0.00 $57.75 Notes: ** 1:3; 3:15; 1:10 thereafter / Steps are 1 yr. Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) _ - _ - - -_. - - Apprentice to Journeyworker Ratio:** A _ - - ._.. _ _ _. _ ­ � This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 1.49, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 47 of 66 THE COMMONWEALTH OF MASSACHUSETTS �r EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN GovcmorSeactam TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Direclor Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PIPELAYER 06/01/2012 $29.60 $7.10 $1.1.55 0.00 $48.25 LABORERS -7_ONE2 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 PLUMBER 03/01/2012 $42.73 $9.32 $13.29 0.00 $65.34 PLUMBERS& GASFI=RSLOCAL 12 (Local 138) 09/01./2012 $43.98 $9.32 $13.29 0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 0.00 $67.84 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 48 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Secreury TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E.ROWE LL Governor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools 35 $15.39 2 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 4 65 $28.59 5 Unemployment Apprentice- PLUMBERIGASFIITER -Local 12 (Local 138) $9.32 10.09 $0.00 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $14.96 $9.32 4.97 $0.00 $29.25 2 40 $17.09 $9.32 5.61 $0.00 $32.02 3 55 $23.50 $9.32 7.53 $0.00 $40.35 4 65 $27.77 $9.32 8.81 $0.00 $45.90 5 75 $32.05 $9.32 10.09 $0.00 $51.46 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $15.39 2 40 $17.59 3 55 $24.19 4 65 $28.59 5 75 $32.99 'Notes: Steps are 1 yr Step 4 with lic$48.68 Step5 with lic$54.22 Apprentice to Journeyworker Ratio: 1:5 PNEUMATIC CONTROLS (TEMP.) P11IEF177ERS LOCAL 537 (Local 138) $9.32 4.97 $0.00 $29.68 $9.32 5.61 $0.00 $32.52 $9.32 7.53 $0.00 $41.04 $9.32 8.81 $0.00 $46.72 $9.32 10.09 $0.00 $52.40 03/01/2012 $44.51 $8.75 $12.39 0.00 $65.65 09/01/2012 $45.76 $8.75 $12.39 0.00 $66.90 03/01/2013 $47.01 $8.75 $12.39 0.00 $68.15 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 49 of 66 THE COMMONWEALTH OF MASSACHUSETTS W EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemcr Secretary. TIMOTM P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATTTER E. ROWE LL Govcmor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate OPERATING F.NGINEF.RS LOCAL 4 Unemployment PNEUMATIC DRILL/TOOL OPERATOR 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS -ZONF.2 06/01/2013 $41.24 $10.00 $12.65 0.00 $63.89 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 PUMP OPERATOR (CONCRETE) 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 OPERATING ENGINEERS LOCAL 4 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 POWDERMAN & BLASTER 06/01/2012 $30.35 $7.10 $11.55 0.00 $49.00 LABORERS -7.ONE2 12/01/2012 $30.60 $7.10 $11.55 0.00 $49.25 06/01/2013 $31.10 $7.10 $11.55 0.00 $49.75 12/01/2013 $31.60 $7.10 $11.55 0.00 $50.25 06/01/2014 $32.10 $7.10 $11.55 0.00 $50.75 12/01/2014 $32.60 $7.10 $11.55 0.00 $51.25 06/01/2015 $33.10 $7.10 $11.55 0.00 $51.75 12/01/2015 $33.60 $7.10 $11.55 0.00 $52.25 06/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 12/01/2016 $34.85 $7.10 $11.55 0.00 $53.50 POWER SHOVEL/DERRICK/TRENCHING MACHINE 06/01/2012 $39.84 $10.00 $12.65 0.00 $62.49 OPERATING F.NGINEF.RS LOCAL 4 12/01/2012 $40.46 $10.00 $12.65 0.00 $63.11 06/01/2013 $41.24 $10.00 $12.65 0.00 $63.89 12/01/2013 $42.02 $10.00 $12.65 0.00 $64.67 PUMP OPERATOR (CONCRETE) 06/01/2012 $39.84 $10.00 $12.65 0.00 $62.49 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.46 $10.00 $12.65 0.00 $63.11 06/01/2013 $41.24 $10.00 $12.65 0.00 $63.89 12/01/2013 $42.02 $10.00 $12.65 0.00 $64.67 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 50 of 66 THE COMMONWEALTH OF MASSACHUSETTS si EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE s F. OLDSTEIN Govemor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H LEATHER E. ROWE LL 6o1emo1 Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $39.47 $10.00 $12.65 0.00 $62.12 OPERATING ENGINEERS LOCAL 4 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $10.00 $12.65 0.00 $62.74 06/01/2013 Unemployment $10.00 PUMP OPERATOR (DEWATERING, OTHER) 06/01/2012 $28.09 $10.00 $12.65 0.00 $50.74 OPERATING ENGINEERS LOCAL 4 $64.29 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 12/01/2012 $28.54 $10.00 $12.65 0.00 $51.19 12/01/2015 06/01/2013 $29.09 $10.00 $12.65 0.00 $51.74 $33.35 12/01/2013 $29.64 $10.00 $12.65 0.00 $52.29 READY -MIX CONCRETE DRIVER 04/30/2009 $25.80 $5.96 $5.34 0.00 $37.10 TEAMSTERS LOCAL 42 RECLAIMERS 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPERATING ENGINEERS LOCAL 4 $29.85 $7.10 $11.55 0.00 $48.50 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $1.2.65 0.00 $64.29 RESIDENTIAL WOOD FRAME (All Other Work) 04/01/2011 $24.24 $8.67 $15.51 0.00 $48.42 CARPENTERS -ZONE 2 (Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER ** 05/01/2011 $24.24 $6.34 $6.23 0.00 $36.81 * * The Residential Wood Frame Carpenter classification applies only to the construction of new, wood frame residences that do not exceed four stories including the basement. CARPENTERS -ZONE 2 (Residential Wood) As of 9/1/09 Carpentry work on wood -frame residential WEATHERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. RIDE -ON MOTORIZED BUGGY OPERATOR LABORERS - ZONE 2 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 51 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Governor Y P Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $36.41 $10.50 $10.70 0.00 $57.61 02/01/2013 $37.41 Classification Effective Date Base Wage Health Pension Supplemental Total Rate 60 Apprentice Base Wage Health Pension Unemployment Unemployment $18.21 ROLLER/SPREADER/MULCHINGMACHINE 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPERATING ENGINEERS LOCAL 4 $43.05 $23.67 $10.50 10.70 $0.00 $44.87 $27.31 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 10.70 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 ROOFER (Inc.Roofer Waterproofng &Roofer Damproofg) ROOFERS LOCAL 33 Apprentice - ROOFER - Local 33 Effective Date- 08/01/2012 Step percent 1 50 2 60 3 65 4 75 5 85 08/01/2012 $36.41 $10.50 $10.70 0.00 $57.61 02/01/2013 $37.41 $10.50 $10.70 0.00 $58.61 3.38 $0.00 $32.59 Supplemental 60 Apprentice Base Wage Health Pension Unemployment Total Rate $18.21 $10.50 3.38 $0.00 $32.09 $21.85 $10.50 10.70 $0.00 $43.05 $23.67 $10.50 10.70 $0.00 $44.87 $27.31 $10.50 10.70 $0.00 $48.51 $30.95 $10.50 10.70 $0.00 $52.15 Effective Date - 02/01/2013 Step percent Apprentice Base Wage Health Pension Supplemental Unemployment Total Rate 1 50 $18.71 $10.50 3.38 $0.00 $32.59 2 60 $22.45 $10.50 10.70 $0.00 $43.65 3 65 $24.32 $10.50 10.70 $0.00 $45.52 4 75 $28.06 $10.50 10.70 $0.00 $49.26 5 85 $31.80 $10.50 10.70 $0.00 $53.00 Notes: ** 1:5, 2:6-10, the 1:10; Reroofmg: 1:4, then 1:1 Step 1 is 2000 hrs.; Steps 2-5 are 1000 hrs. Apprentice to Journeyworker Ratio:** This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 52 of 66 THE COMMONWEALTH OF MASSACHUSETTS sY f EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT WL DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN Gover wr TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Gove Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate UnemploVment ROOFER SLATE / TILE / PRECAST CONCRETE 08/01/2012 $36.66 $10.50 $10.70 0.00 $57.86 ROOFERS LOCAL 33 02/01/2013 $37.66 $10.50 $10.70 0.00 $58.86 SHEETMETAL WORKER 08/01/2012 $41.10 $9.82 $18.24 2.08 $71.24 SHEETMETAL WORKERS LOCAL 17 - A 02/01/2013 $42.35 $9.82 $18.24 2.11 $72.52 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 53 of 66 Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 08/01/2012 Step percent Apprentice Base Wage Health Pension THE COMMONWEALTH OF MASSACHUSETTS fr EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT $16.44 DEPARTMENT OF LABOR STANDARDS 4.00 Prevailing Wage Rates DEVAL L. PADUcx Govemor As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN �' P Secretary 40 Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY P MURRAY Lt. Goaernor HEATHER E. ROWE Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Apprentice- SHEET METALWORKER -Local 17-A Effective Date - 08/01/2012 Step percent Apprentice Base Wage Health Pension NORTH ANDOVER Pension supplemental Total Rate Unemployment Supplemental Unemployment Total Rate 1 40 $16.44 $9.82 4.00 $0.00 $30.26 2 40 $16.44 $9.82 4.00 $0.00 $30.26 3 45 $18.50 $9.82 8.00 $1.09 $37.41 4 45 $18.50 $9.82 8.00 $1.09 $37.41 5 50 $20.55 $9.82 8.75 $1.17 $40.29 6 50 $20.55 $9.82 9.00 $1.18 $40.55 7 60 $24.66 $9.82 10.24 $1.34 $46.06 8 65 $26.72 $9.82 10.99 $1.43 $48.96 9 75 $30.83 $9.82 12.49 $1.59 $54.73 10 85 $34.94 $9.82 13.49 $1.75 $60.00 Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $16.94 $9.82 4.00 $0.00 $30.76 2 40 $16.94 $9.82 4.00 $0.00 $30.76 3 45 $19.06 $9.82 8.00 $1.11 $37.99 4 45 $19.06 $9.82 8.00 $1.11 $37.99 5 50 $21.18 $9.82 8.75 $1.19 $40.94 6 50 $21.18 $9.82 9.00 $1.20 $41.20 7 60 $25.41 $9.82 10.24 $1.36 $46.83 8 65 $27.53 $9.82 10.99 $1.45 $49.79 9 75 $31.76 $9.82 12.49 $1.62 $55.69 10 85 $36.00 $9.82 13.49 $1.78 $61.09 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 54 of 66 DEVAL L. PATRICK Governor TIMOTHY P. MURRAY Lt. Gmentor Awarding Authority: Contract Number: Description of Work: Job Location: Classification THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Dircom Town of North Andover -School Dept City/Town: NORTH ANDOVER Athletic Fields Site Work - Quotes for the Athletic Fields site work North Andover Public Schools Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Notes: Steps are 6 mos. Apprentice to Journeyworker Ratio: 1:4 SIGN ERECTOR PAINTERS LOCAL 35 - ZONE 2 Apprentice- SIGN ERECTOR -Local 35 Zone 2 Effective Date - 06/01/2009 06/01/2009 $24.81 $7.07 $5.90 0.00 $37.78 Step percent Apprentice Base Wage Health 1 50 $12.41 $7.07 2 55 $13.65 $7.07 3 60 $14.89 $7.07 4 65 $16.13 $7.07 5 70 $17.37 $7.07 6 75 $18.61 $7.07 7 80 $19.85 $7.07 8 85 $21.09 $7.07 9 90 $22.33 $7.07 (Notes: $0.00 Steps are 4 mos. Apprentice to Journeyworker Ratio:1:1 SPECIALIZED EARTH MOVING EQUIP < 35 TONS 08/01/2012 $30.44 $8.91 $7.27 0.00 $46.62 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 12/01/2012 $30.74 $8.91 $8.00 0.00 $47.65 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 08/01/2012 $30.73 $8.91 $7.27 0.00 $46.91 TEAMSTERSJOINT COUNCIL NO. 10 ZONF. B 12/01/2012 $31.03 $8.91 $8.00 0.00 $47.94 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 55 of 66 Supplemental Pension Unemployment Total Rate 0.00 $0.00 $19.48 2.40 $0.00 $23.12 2.40 $0.00 $24.36 2.40 $0.00 $25.60 5.90 $0.00 $30.34 5.90 $0.00 $31.58 5.90 $0.00 $32.82 5.90 $0.00 $34.06 5.90 $0.00 $35.30 I SPECIALIZED EARTH MOVING EQUIP < 35 TONS 08/01/2012 $30.44 $8.91 $7.27 0.00 $46.62 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 12/01/2012 $30.74 $8.91 $8.00 0.00 $47.65 SPECIALIZED EARTH MOVING EQUIP > 35 TONS 08/01/2012 $30.73 $8.91 $7.27 0.00 $46.91 TEAMSTERSJOINT COUNCIL NO. 10 ZONF. B 12/01/2012 $31.03 $8.91 $8.00 0.00 $47.94 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 55 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT kv DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. G LDSTEIN Governor TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATTERE. ROWE LI. Govemor Dircaor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SPRINKLER FITTER 03/01/2012 $47.13 $8.42 $11.60 0.00 $67.15 SPRINKI PR FITTERS LOCAL 550 - (Section B) 09/01/2012 $48.13 $8.42 $11.60 0.00 $68.15 03/01/2013 $49.13 $8.42 $11.60 0.00 $69.15 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 56 of 66 THE COMMONWEALTH OF MASSACHUSETTS it EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmor y p Sccmtary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL GOVCMI Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension SupplementalTotal Rate Unemplovment Apprentice - SPRINKLER FITTER - Local 550 (Section B) Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.50 $8.42 7.85 $0.00 $32.77 2 40 $18.85 $8.42 7.85 $0.00 $35.12 3 45 $21.21 $8.42 7.85 $0.00 $37.48 4 50 $23.57 $8.42 7.85 $0.00 $39.84 5 55 $25.92 $8.42 7.85 $0.00 $42.19 6 60 $28.28 $8.42 7.85 $0.00 $44.55 7 65 $30.63 $8.42 7.85 $0.00 $46.90 8 70 $32.99 $8.42 7.85 $0.00 $49.26 9 75 $35.35 $8.42 7.85 $0.00 $51.62 10 80 $37.70 $8.42 7.85 $0.00 $53.97 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $16.85 $8.42 7.85 $0.00 $33.12 2 40 $19.25 $8.42 7.85 $0.00 $35.52 3 45 $21.66 $8.42 7.85 $0.00 $37.93 4 50 $24.07 $8.42 7.85 $0.00 $40.34 5 55 $26.47 $8.42 7.85 $0.00 $42.74 6 60 $28.88 $8.42 7.85 $0.00 $45.15 7 65 $31.28 $8.42 7.85 $0.00 $47.55 8 70 $33.69 $8.42 7.85 $0.00 $49.96 9 75 $36.10 $8.42 7.85 $0.00 $52.37 10 80 $38.50 $8.42 7.85 $0.00 $54.77 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 57 of 66 THE COMMONWEALTH OF MASSACHUSETTS # 16 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEM Govemor y p Secmary Massachusetts General Laws, Chapter 149, Sections 26 to 27H TTMOTTiY P. HURRAY HEATHER Di% o ROWS LL rno Gover Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment }Notes: I Steps are 850 hours Apprentice to Journeyworker Ratio: 1:1 STEAM BOILER OPERATOR 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 TAMPERS, SELF-PROPELLED OR TRACTOR DRAWN 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 TELECOMMUNICATION TECHNICIAN 03/01/2012 $31.78 $13.00 $12.23 0.00 $57.01 ELECTRICIANS LOCAL 103 09/01/2012 $32.29 $13.00 $12.25 0.00 $57.54 03/01/2013 $32.83 $13.00 $12.26 0.00 $58.09 09/01/2013 $33.34 $13.00 $12.28 0.00 $58.62 03/01/2014 $33.88 $13.00 $12.30 0.00 $59.18 09/01/2014 $34.38 $13.00 $12.31 0.00 $59.69 03/01/2015 $34.91 $13.00 $12.33 0.00 $60.24 09/01/2015 $35.63 $13.00 $12.35 0.00 $60.98 03/01/2016 $36.35 $13.00 $12.37 0.00 $61.72 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 58 of 66 THE COMMONWEALTH OF MASSACHUSETTS s7 EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Gov- Y P Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TELECOMMUNICATION TECHNICIAN- Local 103 Effective Date - 03/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.71 $13.00 9.27 $0.00 $34.98 2 40 $12.71 $13.00 9.27 $0.00 $34.98 3 45 $14.30 $13.00 9.51 $0.00 $36.81 4 45 $14.30 $13.00 9.51 $0.00 $36.81 5 50 $15.89 $13.00 9.76 $0.00 $38.65 6 55 $17.48 $13.00 10.01 $0.00 $40.49 7 60 $19.07 $13.00 10.26 $0.00 $42.33 8 65 $20.66 $13.00 10.50 $0.00 $44.16 9 70 $22.25 $13.00 10.75 $0.00 $46.00 10 75 $23.84 $13.00 11.00 $0.00 $47.84 Effective Date - 09/01/2012 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $12.92 $13.00 9.28 $0.00 $35.20 2 40 $12.92 $13.00 9.28 $0.00 $35.20 3 45 $14.53 $13.00 9.53 $0.00 $37.06 4 45 $14.53 $13.00 9.53 $0.00 $37.06 5 50 $16.15 $13.00 9.77 $0.00 $38.92 6 55 $17.76 $13.00 10.02 $0.00 $40.78 7 60 $19.37 $13.00 10.27 $0.00 $42.64 8 65 $20.99 $13.00 10.52 $0.00 $44.51 9 70 $22.60 $13.00 10.77 $0.00 $46.37 10 75 $24.22 $13.00 11.02 $0.00 $48.24 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 59 of 66 THE COMMONWEALTH OF MASSACHUSETTS �r EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GO DSTEIN GovernorSecretary Massachusetts General Laws, Chapter 149, Sections 26 to 27H TIMOTHY MURRAY HEATHER E. ROWS Lt. Govcrrar Director Awarding Authority: Town of North Andover-School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Unemployment Notes: Apprentice to Journeyworker Ratio: 1:1 TERRAZZO FINISHERS 08/01/2012 $46.35 $10.18 $17.25 0.00 BRICKLAYERS LOCAL 3 - MARBLE B 77LE 02/01/2013 $46.93 $10.18 $17.25 0.00 08/01/2013 $47.83 $10.18 $17.32 0.00 02/01/2014 $48.39 $10.18 $17.32 0.00 08/01/2014 $49.29 $10.18 $17.39 0.00 02/01/2015 $49.85 $10.18 $17.39 0.00 08/01/2015 $50.75 $10.18 $17.46 0.00 02/01/2016 $51.32 $10.18 $17.46 0.00 08/01/2016 $52.22 $10.18 $17.54 0.00 02/01/2017 $52.79 $10.18 $17.54 0.00 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Total Rate $73.78 $74.36 $75.33 $75.89 $76.86 $77.42 $78.39 $78.96 $79.94 $80.51 Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 60 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govcmor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools 50 $23.47 $10.18 17.25 $0.00 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $10.18 17.25 $0.00 $55.59 Unemployment 70 Apprentice- TERRAZZO FINISHER -Local 3 Marble & Tile $10.18 17.25 $0.00 $60.28 Effective Date - 08/01/2012 80 $37.54 $10.18 17.25 $0.00 $64.97 5 90 $42.24 Supplemental 17.25 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.18 $10.18 17.25 $0.00 $50.61 2 60 $27.81 $10.18 17.25 $0.00 $55.24 3 70 $32.45 $10.18 17.25 $0.00 $59.88 4 80 $37.08 $10.18 17.25 $0.00 $64.51 5 90 $41.72 $10.18 17.25 $0.00 $69.15 Effective Date - 02/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.47 $10.18 17.25 $0.00 $50.90 2 60 $28.16 $10.18 17.25 $0.00 $55.59 3 70 $32.85 $10.18 17.25 $0.00 $60.28 4 80 $37.54 $10.18 17.25 $0.00 $64.97 5 90 $42.24 $10.18 17.25 $0.00 $69.67 Notes: Steps are 800 hrs. Apprentice to Journeyworker Ratio: 1:3 TEST BORING DRILLER 12/01/2011 $33.05 $7.10 $12.60 0.00 $52.75 LABORERS - FOUNDATION AND MARINE This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 61 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVAL L. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govcmm Y p Secretin TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemm Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING DRILLER (Laborers Foundation & Marine) Effective Date - 12/01/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.83 $7.10 12.60 $0.00 $39.53 2 70 $23.14 $7.10 12.60 $0.00 $42.84 3 80 $26.44 $7.10 12.60 $0.00 $46.14 4 90 $29.75 $7.10 12.60 $0.00 $49.45 Notes: Apprentice to Journeyworker Ratio:l:3 TEST BORING DRILLER HELPER 12/01/2011 $31.77 $7.10 $12.60 0.00 $51.47 LABORERS - FO UNDA TION A NJ) MARINE TEST BORING LABORER LABORERS - FOUNDA'I'IONAND MARINE 12/01/2011 $31.65 $7.10 $12.60 0.00 $51.35 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 62 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor y p Secretary TIMOTHY P. MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROwE Lt. Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TEST BORING LABORER (Laborers Foundation & Marine) 0.00 $62.12 OPERATING ENGINEERS LOCAL 4 Effective Date - 12/01/2011 12/01/2012 $40.09 $10.00 $12.65 0.00 Supplemental 06/01/2013 $40.86 $10.00 $12.65 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $18.99 $7.10 12.60 $0.00 $38.69 2 70 $22.16 $7.10 12.60 $0.00 $41.86 3 80 $25.32 $7.10 12.60 $0.00 $45.02 4 90 $28.49 $7.10 12.60 $0.00 $48.19 Notes: TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2011 $38.15 $7.10 $13.00 0.00 $58.25 LABORERS (FREE AIR TUNNEL) Apprentice to 3ourneyworker Ratio: 1:3 VAC -HAUL 08/01/2012 $30.44 $8.91 $7.27 0.00 $46.62 I EAMS7ERS JOINT COUNCIL. NO. 10 70NE B TRACTORS/PORTABLE STEAM GENERATORS 06/01/2012 $39.47 $10.00 $12.65 0.00 $62.12 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.09 $10.00 $12.65 0.00 $62.74 06/01/2013 $40.86 $10.00 $12.65 0.00 $63.51 12/01/2013 $41.64 $10.00 $12.65 0.00 $64.29 TRAILERS FOR EARTH MOVING EQUIPMENT 08/01/2012 $31.02 $8.91 $7.27 0.00 $47.20 TEAMSTERS JOINT COUNCIL NO. 10 ZONE B 12/01/2012 $31.32 $8.91 $8.00 0.00 $48.23 TUNNEL WORK - COMPRESSED AIR 12/01/2011 $44.08 $7.10 $13.00 0.00 $64.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - COMPRESSED AIR (HAZ. WASTE) 12/01/2011 $46.08 $7.10 $13.00 0.00 $66.18 LABORERS (COMPRESSED AIR) TUNNEL WORK - FREE AIR 12/01/2011 $36.15 $7.10 $13.00 0.00 $56.25 LABORERS (FREEAIR TUNNEL) TUNNEL WORK - FREE AIR (HAZ. WASTE) 12/01/2011 $38.15 $7.10 $13.00 0.00 $58.25 LABORERS (FREE AIR TUNNEL) VAC -HAUL 08/01/2012 $30.44 $8.91 $7.27 0.00 $46.62 I EAMS7ERS JOINT COUNCIL. NO. 10 70NE B 12/01/2012 $30.74 $8.91 $8.00 0.00 $47.65 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 63 of 66 THE COMMONWEALTH OF MASSACHUSETTS A EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Govemor y 1� Secreury. TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE LL Govemor Dimclor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools $42.73 $9.32 $13.29 0.00 $65.34 09/01/2012 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $9.32 $13.29 0.00 $67.84 $1.00 Unemployment $46.11 WAGON DRILL OPERATOR 06/01/2012 $29.60 $7.10 $11.55 0.00 $48.25 LABORERS - ZONE 2 08/29/2011 $31.63 $6.70 $2.50 0.00 $40.83 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 12/01/2012 $29.85 $7.10 $11.55 0.00 $48.50 DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs) 06/01/2013 $30.35 $7.10 $11.55 0.00 $49.00 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 12/01/2013 $30.85 $7.10 $11.55 0.00 $49.50 06/01/2014 $31.35 $7.10 $11.55 0.00 $50.00 12/01/2014 $31.85 $7.10 $11.55 0.00 $50.50 06/01/2015 $32.35 $7.10 $11.55 0.00 $51.00 12/01/2015 $32.85 $7.10 $11.55 0.00 $51.50 06/01/2016 $33.35 $7.10 $11.55 0.00 $52.00 12/01/2016 $34.10 $7.10 $11.55 0.00 $52.75 WASTE WATER PUMP OPERATOR 06/01/2012 $39.84 $10.00 $12.65 0.00 $62.49 OPERATING ENGINEERS LOCAL 4 12/01/2012 $40.46 $10.00 $1.2.65 0.00 $63.11 06/01/2013 $41.24 $10.00 $12.65. 0.00 $63.89 12/01/2013 $42.02 $10.00 $12.65 0.00 $64.67 WATER METER INSTALLER PLUMBERS & GASEITTERS LOCAL 12 (Local 138) Outside Electrical - East 03/01/2012 $42.73 $9.32 $13.29 0.00 $65.34 09/01/2012 $43.98 $9.32 $13.29 0.00 $66.59 03/01/2013 $45.23 $9.32 $13.29 0.00 $67.84 CABLE TECHNICIAN (Power Zone) 08/29/2011 $27.11 $6.70 $1.50 0.00 $35.31 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 CABLEMAN (Underground Ducts & Cables) 08/29/2011 $38.41 $6.70 $1.00 0.00 $46.11 OUTSIDE EL13C7RICAL WORKERS - EAST LOCAL 104 DRIVER / GROUNDMAN CDL 08/29/2011 $31.63 $6.70 $2.50 0.00 $40.83 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 DRIVER / GROUNDMAN -Inexperienced (<2000 Hrs) 08/29/2011 $24.85 $6.70 $1.50 0.00 $33.05 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 EQUIPMENT OPERATOR (Class A CDL) 08/29/2011 $38.41 $6.70 $5.00 0.00 $50.11 OUTSIDE ELECTRICAL, WORKERS - EAST LOCAL 104 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 64 of 66 THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined by the Director under the provisions of the JOANNE F. GOLDSTEIN GovemorSccmmry TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Governor Dimaor Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools 08/29/2011 Classification Effective Date Base Wage Health Pension Supplemental Total Rate $0.75 Unemployment EQUIPMENT OPERATOR (Class B CDL) 08/29/2011 $33.89 $6.70 $2.75 0.00 $43.34 OUTSIDE ELECTRICAL WORKERS - EASTLOCAL 104 GROUNDMAN 08/29/2011 $24.85 $6.70 $1.00 0.00 $32.55 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 GROUNDMAN -Inexperienced (<2000 Hrs) 08/29/2011 $20.34 $6.70 $0.75 0.00 $27.79 O UTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 JOURNEYMAN LINEMAN 08/29/2011 $45.19 $6.70 $7.86 0.00 $59.75 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 Apprentice - LINEMAN (Outside Electrical) - East Local 104 Effective Date - 08/29/2011 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $27.11 $6.70 2.11 $0.00 $35.92 2 65 $29.37 $6.70 2.36 $0.00 $38.43 3 70 $31.63 $6.70 2.86 $0.00 $41.19 4 75 $33.89 $6.70 3.36 $0.00 $43.95 5 80 $36.15 $6.70 3.86 $0.00 $46.71 6 85 $38.41 $6.70 4.36 $0.00 $49.47 7 90 $40.67 $6.70 5.36 $0.00 $52.73 Notes: Apprentice to Journeyworker Ratio: 1:2 TELEDATA CABLE SPLICER 07/16/2012 $26.33 $4.18 $2.79 0.00 $33.30 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 TELEDATA LINEMAN/EQUIPMENT OPERATOR 07/16/2012 $24.78 $4.18 $2.74 0.00 $31.70 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 65 of 66 THE COMMONWEALTH OF MASSACHUSETTS s� EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates DEVALL. PATRICK As determined b the Director under the provisions of the JOANNE F. GOLDSTEIN Governor y it Secretary TIMOTHY P MURRAY Massachusetts General Laws, Chapter 149, Sections 26 to 27H HEATHER E. ROWE Lt. Govemor Director Awarding Authority: Town of North Andover -School Dept Contract Number: City/Town: NORTH ANDOVER Description of Work: Athletic Fields Site Work - Quotes for the Athletic Fields site work Job Location: North Andover Public Schools Classification Effective Date Base Wage Health Pension supplemental Total Rate Unemployment TELEDATA WIREMAN/INSTALLER/TECHNICIAN 07/16/2012 $24.78 $4.18 $2.74 0.00 $31.70 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 TREE TRIMMER 02/01/2009 $16.59 $2.42 $0.00 0.00 $19.01 OUTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. TREE TRIMMER GROUNDMAN 02/01/2009 $14.64 $2.42 $0.00 0.00 $17.06 O UTSIDE ELECTRICAL WORKERS - EAST LOCAL 104 This classification applies only to the trimming of branches on and around utility lines. Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre -determined hourly wage rate established by the Commissioner under the provisions of the M.G.L. c. 149, ss. 26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L c. 23, ss. I IE -11L. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L. c. 23, ss. 11 E-1 IL. All steps are six months (1000 hours) unless otherwise specified. • Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof. Multiple ratios are listed in the comment field. ••' APP to JM; 1:1, 2:2, 2:3, 3:4, 4:4, 4:5, 4:6, 5:7, 6:7, 6:8, 6:9, 7:10, 8:10, 8:11, 8:12, 9:13, 10:13, 10:14, etc. APP to JM; 1:1, 1:2, 2:3, 2:4, 3:5, 4:6, 4:7, 5:8, 6:9, 6:10, 7:11, 8:12, 8:13, 9:14, 10:15, 10:16, etc. This wage schedule must be posted by the contractor at the work site in accordance with M.G.L. ch. 149, sec. 27. Failure of the employer to pay "prevailing wage rates," which are the "total rates" listed above, on public works projects is a violation of M.G.L. ch. 149, sec. 27. Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at www.mass.gov/dols or at 617-626-6952. Employees not receiving such rates should report the violation to the Fair Labor Division of the Office of the Attorney General, 100 Cambridge Street, Boston, MA 02108; Tel: Issue Date: 08/13/2012 Wage Request Number: 20120813-001 Page 66 of 66 SPR Central Register General Contract Submit Confirmation State POW ications and Regulations W*1111arn Francis GaMn, Secretary of the Commonwealth Page 1 of 2 Feedback The following General Contract submission was successfully received. Planned date of publish is 9/19/2012 Awarding Agency Agency Name and Address: North Andover School Department 1600 Osgood Street, 93059 North Andover, MA 01845 Project Number: Estimated Cost: Contractor Qualification: Required for DCAM contracts over $100,000, Massachusetts Highway contracts over $50,000. Contact Information Name: James Mealey, Chief Operations Officer Phone: 978794-1503 Fax 978-794-0231 Email Address: mealeyj(&northandover.k12.ma.us Notify email address listed when final publish date assigned. Contract Information Project: School Department is seeking_gualified contractor to perform maintenance on school athletic fields Plans/Specifications Available: Place, date and time General Bid Deadline*: The complete Invitation for Bids document will be available on Wednesday, September 19, 2012 at 11:00 a.m. at www.townofnorthandover.com by clicking on 'Bids, Quotes and Proposals'. 10/09/2012 Time 2:00 p.m. Sub Bid Deadline: Time Sub Bid Categories: Additional Information This page can be printed for your records. http://www.sec.state.ma.us/sprpublicforms/GCSubmitConfirtnation.aspx?ID=75536 9/10/2012 NORTH ANDOVER SCHOOL DEPARTMENT INVITATION FOR BIDS ATHLETIC FIELDS September 7, 2012 Contact James Mealey Chief Operations Officer Address North Andover Public Schools 1600 Osgood Street, #3059 North Andover, MA 01845 Telephone Number: 978-794-1503 Fax Number: 978-794-0231 Email Mealeyj *north andover.kl2.ma.us Table of Contents 1. Introduction.......................................................... 3 2. Submission Deadline and Instructions ............................ 3 3. Questions, Addendum or Proposed Modifications .............. 4 4. Minimum Requirements ............................................. 5 5. Scope of Services...................................................... 5 6. Estimated Quantities ................................................ 6 7. Prevailing Wage Rates ............................................... 6 8. Payment Bond ....................................................... 6 9. Bid Deposit/Bond..................................................... 7 10. Evaluation of Bids .................................................. 7 11. Term of Contract ................................................... 7 Appendix A — Price Proposal ........................................ 8 Standard North Andover School Department Contract With Supplement "C" ............................................. 10 Certifications........................................................... 30 PaymentBond........................................................... 33 Prevailing Wage Rates ................................................. 34 North Andover School Department IFB Page 2 of 33 Athletic Fields Maintenance 1. Introduction In accordance with M.G.L. c30 §39M, the North Andover School Department is soliciting bids from qualified contractors to perform maintenance on the Athletic Fields. Qualified contractors are requested to submit bids to the Chief Operations Officer at North Andover School Department Hall, 1600 Osgood St, 43059 North Andover, MA, in accordance with the instructions contained within this Invitation for Bids. The North Andover School Department is seeking to award a one-year contract for the period of October 1, 2012 through September 31, 2013. Notice of this IFB is published in the Central Register, which is a weekly publication of the Office of the Secretary of the Commonwealth, the Eagle -Tribune (a newspaper of general circulation) and posted on the Town of North Andover website, (www.townofnorthandover.com) under "Available Bids, Quotes and Proposals". The School Department will accept proposals delivered in person or by mail. All proposals must be received by 2:00 p.m. on Thursday, September 13, 2012 to be considered. Proposals submitted by fax or by electronic mail will not be considered. All proposals must be submitted to: Mr. James Mealey, Chief Operations Officer North Andover School Department 1600 Osgood St, 43059 North Andover, MA 01845 The North Andover School Department may cancel this IFB or reject in whole or in part any and all proposals, if they determine that cancellation or rejection serves the best interest of the North Andover School Department. 2. Submission Deadline and Instructions Qualified companies are requested to submit the pricing proposal sheet (Appendix A) in a sealed envelope marked "Athletic Fields Maintenance" with the applicant's name and address on the front. Applicants should provide one (1) signed original proposal. Fax or electronic submissions will not be accepted. Applicants must also execute and include in the sealed submission the Certificate of Vote, Certificate of Non -Collusion, the Certificate of Tax Compliance and the Certification of Labor Harmony and OSHA Training Requirements. The North Andover School Department, through the Chief Operations Officer, is the awarding authority and reserves the right to reject any and all proposals or parts of proposals; to waive any defects, information, and minor irregularities; to accept exceptions to these specifications; and to award contracts or to cancel this Invitation for Bids if it is in the North Andover School Department's best interest to do so. Proposals must be signed as follows: a) if the bidder is an individual, by her/him personally; b) if the bidder is a partnership, by the name of the partnership, followed by the signature of each North Andover School Department IFB Page 3 of 33 Athletic Fields Maintenance general partner; and c) if the bidder is a corporation, by the authorized officer, whose signature must be attested to by the Clerk/Secretary of the corporation and the corporate seal affixed. All sealed proposals must be received and registered by the Assistant School department Manager's office by Thursday, September 13, 2012 at 2:00 p.m. All outer envelopes must be labeled "Asphalt Concrete Excavation" and mailed or hand delivered to the following address: Mr. James Mealey, Chief Operations Officer North Andover School Department 1600 Osgood St, #3059 North Andover, MA 01845 No proposals will be accepted after the time and date noted. Late delivery of materials due to any type of delivery system shall be cause for rejection. If on the date and time of the submittal deadline the North Andover School Department is closed due to an uncontrolled event such as fire, snow, ice, wind or building evacuation, the submittal deadline will be postponed until 2:00 p.m. on the next normal business day. 3. Questions, Addendum or Proposal Modification Questions concerning this IFB must be submitted in writing to: Mr. James Mealey, Chief Operations Officer, 1600 Osgood St, 43059, North Andover, MA 01845, or they may be emailed to Mr. Mealey at Mealeyj@northandover.kl2.ma.us. All questions/inquiries must be received by 4:30 p.m. on Wednesday 12, 2012 to be considered. Questions/inquiries may be delivered, mailed, emailed or faxed. Written responses will be posted on the Town of North Andover's website (www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" by Friday September 14, 2012 at 2:00 p.m. If any changes are made to this IFB, an addendum will be posted on the Town of North Andover's website in "Available Bids, Quotes and Proposals". It is the sole responsibility of the bidder to ascertain the existence of any addenda and/or modifications issued by the School department. As this IFB has been published on on the Town of North Andover's website (www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" all bidders are responsible for checking the website for any addenda and /or modifications that are subsequently made to this IFB. The School Department accepts no liability for and will provide no accommodations to bidders who fail to check for amendments and/or modifications to this IFB and subsequently submit inadequate or incorrect responses. Bidders may not alter (manually or electronically) the IFB language or any IFB component files. Modifications to the body of the IFB, Scope of Work, terms and conditions, or which change the intent of this IFB are prohibited and may disqualify a response. All proposals submitted in response to this IFB shall remain firm for sixty (60) days following the submittal deadline. It is anticipated that the contract will be awarded within thirty (30) days after the submittal deadline. North Andover School Department IFB Page 4 of 33 Athletic Fields Maintenance Bidders are not to communicate directly with any employee of the North Andover School Department, except as specified in this IFB, and no other individual employee or representative is authorized to provide any information or respond to any question or inquiry concerning this IFB. Bidders may contact the Contact Person for this IFB in the event this IFB is incomplete or the bidder is having trouble obtaining any part of the IFB electronically through the Town of North Andover's website (www.townofnorthandover.com) in "Available Bids, Quotes and Proposals" including, and without limitation the form and attachments. Bidder with disabilities or hardships that seek reasonable accommodations, which may include the receipt of IFB information and/or addenda and/or modifications in an alternative format, must communicate such requests in writing to the contact person, and reasonable accommodation will be made by agreement with the contact person on behalf of the North Andover School Department. 4. Minimum Requirements Each bidder must demonstrate that it meets the following minimum requirements: A. Contractor must demonstrate a minimum of five (5) years experience providing the services required in the Scope of Services. B. Contractor shall submit a complete list of all similar contracts performed in the past two (2) years with contact names and telephone numbers. C. The contractor shall furnish all labor, equipment, and vehicles as required for work in accordance with the scope of services. D. Unit price quoted shall include milling, loading, disposal, sweeping and final clean-up. E. The contractor shall conform to all requirements of federal, state and local laws, including compliance with the prevailing wage laws. F. Unit prices shall remain firm for the initial one-year period of the contract. G. Submission of required statements and forms. 5. Scope of Services 1. Middle School Baseball and Softball Fields Till skinned infield areas and power rake, prepare for play. Supply, spread and grade 10 cubic yards of infield mix. Three applications of slow release fertilizer to all turf areas for both fields. Baseball Field Only: Reshape/rebuild the pitching mound, re -sod mound perimeter 4' wide. North Andover School Department IFB Page 5 of 33 Athletic Fields Maintenance 2. Hayes Stadium (football field) Aerate and slice seed all worn areas. fertilizer to entire field. Apply three applications of slow release 3. High School Baseball Diamond Till skinned infield areas and power rake, prepare for play. Supply, spread and grade 20 cubic yards of infield mix. Apply 3 applications of slow release fertilizer to the entire field. 4. Drummond Softball Field Trim edges as needed and roto -till as needed. Supply, spread and grade 10 cubic yards of infield mix. Power rake and prepare for play. 5. High School Softball Field Remove and dispose of existing clay infield mix to 5" depth, furnish and spread 5" depth of loam and seed. 6. Prevailing Wage Rates The successful bidder will at all times comply with the prevailing wage rates as determined by the Department of Labor Standards under the provisions of Massachusetts General Laws as shall be in force and as amended. The prevailing wage rates are attached. 7. Payment Bond Upon award of the contract, the successful bidder shall provide a payment bond in the amount of 50% of the total projected cost of the contract if the cost is more than $25,000.00. The payment bond must be on the Town of North Andover's form that is attached. 9. Bid Deposit/Bond In accordance with M.G.L c30 §39M, all bidders are required to submit a 5% bid deposit/bond of the value bid for the contract. 10. Evaluation of Bids Bids will first be examined for their responsiveness to what is requested in this IFB. Responsibility of the bidder will then be ascertained. Finally, the aggregate price for the services delivered in the base bid only by each responsive and responsible bidder will be calculated for the first year solely of the proposed contract. The School Department is required to award the contract to the lowest responsive and responsible bidder. North Andover School Department IFB Page 6 of 33 Athletic Fields Maintenance ■ Responsiveness Bidders must completely fill out and submit the bid form and all other required forms. All supplies and services that are the subject of the bid must meet the minimum standards and scope of services set forth in the purchase description including the standards by which the procurement officer will determine acceptability as to quality, workmanship, results of inspections and tests, and suitability for a particular purpose. ■ Responsibility Bidders must demonstrate that they meet measures of responsibility. The School department will not award a contract to any bidder who cannot furnish satisfactory evidence of his ability and experience in this type of work and that he has sufficient plant and capital to enable him to prosecute and complete the work as outlined in the Scope of Services. The School department may make such investigations as it deems necessary to determine the above and a bidder shall furnish any information requested in this regard. All costs not listed on the bid price sheet will not be considered part of the contract and therefore will not be paid. The North Andover School Department will not be charged fuel surcharges or administrative fees as part of any contract entered into as a result of this IFB. Additionally the North Andover School Department will not be charged late fees unless payment is not made within sixty (60) days of the receipt of invoice. The North Andover School Department is a tax exempt entity so no sales tax will be assessed to any purchases made under this proposed contract. 11. Term of Contract The North Andover School Department is seeking to award a one-year contract. North Andover School Department IFB Page 7 of 33 Athletic Fields Maintenance APPENDIX A - PRICE PROPOSAL The contract(s) will be awarded to the responsible, responsive bidder offering the lowest price for each item of work to be performed. The school is required to award the contract(s) to the lowest responsible, responsive bidder. All prices to remain in firm for the duration of the contract. Total lump sum price to furnish all labor, materials and equipment required for Athletic Fields Maintenance as specified: Middle School Baseball and Softball Fields Hayes Stadium (football field) $ High School Baseball Diamond $ Drummond Softball Field High School Softball Field Addenda Business Name: Business Address: Business Phone: Business Contact: are acknowledged: Name of Person Authorized to sign Price Proposal Title of Person Authorized to sign Price Proposal Signature of Above Person Signature North Andover School Department IFB Page 8 of 33 Athletic Fields Maintenance - - 19781682-9725 " Ethan Allen Georgian Court armoire, cherry $750. Computer Desk with bookase $400. Ethan Allen formal desk with leather chair 8 ottoman, cherry $1000. Leather couch with coffee table, $500 Call 978-470-1387 FULL SIZE BED WITH PLUSH POSTURPEDIC MATTFIESS $225 (6031362-5291 FURNITURE - Sectional couch $400, chair $75, high top table with 2 chairs $150, lamps $50. All in mint condition. Make offers! Call 978 304-9622 HOT -Brand new 6 person, waterfall, LED • ts, cover 8 warranty. Must sell $3800. r Call 603-235-5218. The Town of North Andover ' The Town of North Andover iE soliciting bids from qualified cc soliciting bids from qualified compa. nies to conduct annual testin d nies to conduct annual testing anc on -tali service and maintena of on-call service and maintenance of fire sprinkler systems in all munici- fire alarm systems in all municipal pal and school buildings. Qualified and. school buildings. Qualified companies are requested to submit companies are requested to submii bids to the Assistant Town Manager bids to the Assistant Town Manager at North Andover Town Hall, 120 at North Andover Town Hall, 120 Main Street, North Andover, MA, in Main Street, North Andover, MA, in accordance with the instructions accordance with the instructions contained within the Invitation 'for contained within the Invitation for Bids (IFB). Bids (IFB). The complete IFB is available The complete IFB is available on the Town website (www.townof- on the Town website (www.townof- northandovet:com) under "Bids, northandovencom) under "Bids, Quotes and Proposals". The Town Quotes and Proposals". The Town will only accept proposals delivered will only accept proposals delivered in person or by mail. All proposals in person or by mail. All proposals must be received by 2:00 p.m. on must be received by 2:00 p.m. on October 11, 2012 to be considered. October 11, 2012 to be considered. The Town of North Andover may The Town of North Andover may cancel this IFB or reject in whole or cancel this IFB or reject in whole or in part any and all proposals,if they in part any and all proposals, if they determine that cancellation or rejec- determine that cancellation or rejec- tion serves the best interest of the tion serves the best interest of the Town of North Andover. Town of North Andover. ET,,,V/19/12 ET - 9/19/12 NAME YOUR PRICE - Most Countries, Rev War through Vietnam. Call Peter (781)631-1718 ru►1givlarlll- , I Il47a>e ANTIQUE FIRE HYDRANT, 1956,.Ludlow/Troy New York, "list 90 model 1046", $175 or be. reasonable offer 978.766-8409 ATTENTION! j Beware of anyone replying to your ad offering to send you a check for shipping and you send- ing them back the difference. Also beware when responding to classified ads that ask you to send shipping cost. r' Possible scam! Full ' Cockatiel cage with rolling stand, 0 or best offer. Call 978-685-2060 INVITATION TO BID Stevens Estate Masonry Repairs Kang Associates, Inc. North Andover, MA September 19, 2012 The Town of North Andover, the Awarding Authority, invites sealed bids from general contractors for the construction of the Stevens Estate Ma- sonry Repairs in North Andover, Massachusetts, in accordance with the documents prepared by Kang Associates, Inc. The Project consists of exterior repairs to the existing brick and stone walls and brick patios of a town -owned historical building. The work is estimated to cost $150,000. General bidders must be certified by the Division of Capital Asset Man- agement in the following category of work: Masonry or Historical Ma- sonry. Bids are subject to M.G.L. c. 149 §44A -J and to minimum wage rates as required by M.G.L. c. 149 026 to 27H inclusive. General, Bids will be received until 2:OOPM on October 3, 2012 at the North Andover Town Hall, 120 Main Street, Office of the Town Manager, North Andover, MA and publicly opened, forthwith. There are no Filed Sub -Bids. Mailed Bids should be sent to the North Andover Town Hall, 120.Maln Street, Office of the Town Manager, North Andover, MA 01845 and re- ceived no later than the date and time specified above. General bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (considering alternates) and made payable to the Town of North Andover. Bid Forms and Contract Documents will be available for pick-up at Nashoba Blue, 433 Main Street, Hudson, MA or electronically at Bid- DocsOnline.com starting September 19, 2012. A deposit is required in the amount of $50.00 per set, payable to BidDocsOr ine, in the form of a certified or cashier's check or a money order. This deposit will be refunded for up to two sets for general bidders upon return of the sets in good con- dition within thirty days of receipt of general bids. Otherwise the deposit shall be the property of the Awarding Authority. Additional sets maybe purchased for $50.00. Bidders requesting Contract Documents to be mailed to them shall in- clude a separate check for $40.00 per set for regular mail and $65.00 per set for next day delivery, payable to the BidDocsOnline, to cover mail han- dling costs. A pre-bid conference will be held at the Stevens Estate, 723 Osgood Street, North Andover, MA, on Sept. 26, 2012 at 2:0013M. Bidders will be held responsible for thoroughly familiarizing themselves with all existing conditions. Town of North Andover ET - 9/19/12 MORTGAGEE'S NOTICE OF SALE OF REAL ESTATE By virtue and in execution of the Power of Sale contained in a certain Mortgage given by Charles R. Regan to Mortgage Electronic Registration Systems, Inc. as nominee for, Mortgage Network, Inc., its successors and assigns, dated September 8, 2005 and recorded with the Essex County (Northern District) Registry. of_ Deeds at Book 9757, Page 4 of which the Casio Digital Keyboard, Stand, Adapter 8 In- structions included never used $150 firm The North Andover School DE partment is soliciting bids from qua ified companies to -perform mair tenance on school athletic fields i various locations. Qualified compo nies are requested to submit bids t the Chief Operations Officer at th North Andover School Departmen 1600 Osgood Street #3059, Nortl Andover, MA, in accordance with th instructions contained within the In vitation for Bids (IFB). The complete IFB is availabl on the Town website (www.townof- northandovencom) under "Bids Quotes and Proposals". The Scho Department will only accept propos als delivered in. person or by mail All proposals must be received b 2:00 p.m. on October 9, 2012 to b considered. The North Andover School De- partment partment may cancel this IFB o reject in whole or in part any an all proposals, if they determine this or rejection serves the best interest of the North Andove School Department. ET - 9/19/12 COMMONWEALTH OF MASSACHUSETTS THE TRIAL COURT PROBATE AND FAMILY COURT Essex Probate and Family Court 36 Federal Street Salem, MA 01970 Docket No. ES12D1473DR DIVORCE SUMMONS BY PUBLICATION AND RULING Lydia -E Rodriguez Vs: Chadi Fakhoury To the Defendant: The Plaintiff has filed a Complaint for Divorce requesting that the Court grant a divorce for VA IRRETRIEVABLE BREAKDOWN The Complaint is on file at the Court. An Automatic Restraining Or- der has been entered in this matter preventing you from taking any ac- tion which would negatively impact the current financial status of either party. SEE Supplemental Probate Court Rule 411. You are hereby summoned and required to serve upon: Lydia E Rodriguez .21 Boylston Street Methuen, MA 01844 your answer, if any, on or before' Di/02/2013. If you fail to do so, the Dourt will proceed to the hearing and adjudication of this action. You are also required to file a copy of your answer, if any, in the office How of the 4egister of this Court. WITNESS, HoMary Anne Sa- tagian, First Justice of this CourL Date: August 27, 2012 PamelCasey O'Brien 7-9/19/12 Register of Probate COMMONWEALTH OF MASSACHUSETTS County of Essex The Superior Court f CIVIL DOCKET# ESCV2012-01679 E:. Wells Fargo Bank NA as Trustee for Merrill Lynch Mortgage v Gourley et al ORDER OF NOTICE BY PUBLICATION To: Allan T Gourley, Patricia A Gourley, Haverhill, in the County of Essex; all in said Common- weakh -. AND TO_ALL- PERSONS EN, les' uunoing, 41 Pleasant Street, Methuen, MA 01844, on the follow- ing Petitions: Michael & Leena Antypas 110 Pleasant Street Methuen Mass. A variance to sub -divide a parcel of land into two lots. Leaving lot B without the required frontage under section VI -D in R.D. Zoning District @ 110 Pleasant. Street Methuen Mass. Matthew J. D'Agostino, Chairman Methuen Zoning Board of Appeals ET - 9/12. 9/19/12 les Building, 41 PI Methuen, MA.01844, ing petitions: . Louise Samperi, St., Methuen, ma 01. Variance requeste tion (s) VI -D of the C Zoning Ordinance 't Single Family Dwellir, trict Map 412 - Blk. ie' Matthew J. D'Agost Methuen 20 ET - 9/12, 9/19/12 MORTGAGEE'S NOTICE OF SALE OF REAL ES' e By virtue and in execution of the Power of Sale contain[ Mortgage given by Lionel Beauvoir and Jeannette Nievei , Electronic Registration Systems, Inc. as nominee for, The of gage Company, LLC, its successors and assigns, dated A and recorded with the Essex County (Northern District) Reg at Book 9680, Page 82 of which the Mortgage the undersign y ant holder by assignment for breach of the conditions of e and for the purpose of foreclosing same will be -sold at Pul 09:00 AM on September 26, 2012 at 46 Hoffman Avenue ak e Avenue, Lawrence, MA, all and singular the premises des r Mortgage, to wit: d The land with the buildings thereon situated in Lawrence, t Massachusetts, on the northerly side of Hoffman Avenue bE Lot Nop21 and 22 on a plan entitled: "Plan of Ewald and Hi r by WE. Hudson, C.E.," recorded with the North Essex Di oWliseds as Plan No. 69. Said lots are contiguous and.whel 401 nded and described as follows: Northerly: 100 feet by land now or formerly of Emil Karkus; Easterly: 74.2 feet by Lot No. 23 as shown on said plan; Southerly: 100 feet by Hoffman Avenue as shown on said I Westerly: 78.93 feet by No. 20 as shown on said plan. Said Lots together contain 7,650 square feet, more of less said plan. Subject to any and all easements, restrictions, reservatior, tions of record,nf any, hereunder as the same may be in foi cable. i For Grantors Title see deed recorded herewith at Book The premises are to be sold subject to and with the bene' ments, restrictions, building and zoning laws, unpaid taxes, k bills, municipal liens and assessments, rights of tenants and F session. TERMS OF SALE: A deposit of FIVE THOUSAND DOLLARS AND 00 CENTS j the form of a cera fled check or bank treasurer's check will b be delivered at or before the time the bid is offered. The suct will be required to execute a Foreclosure Sale Agreement imm the close of the bidding. The balance of the purchase price l within thirty (30) days from the sale date in the form of a cJ bank treasurer's check or other check satisfactory to Mortgag The Mortgagee reserves the right to bid at the sale, to rejec bids, to continue the sale and to amend the terms of the sale; oral announcement made before or during the foreclosure sal is set aside for any reason, the Purchaser at the sale shall be e a return of the deposit paid. The purchaser shall have no furl against the Mortgagor, the Mortgagee or the Mortgagee's description of the premises contained in said mortgage shall i event of an error in this publication. TIME WILL BE OF THE I Other terms If any, to be announced at the sale. Deutsche Bank National Trust Company! Trustee Under The Indenture Relating to IMH / Collateralized Asset -Backed Bonds, 5 Present Holder of sa Byl Orlansj P.O! Boston ET - 9/5, 9112, 9/19/12 Phone: (61 MORTGAGEE'S NOTICE OF SALE OF REAL ESTA By virtue and in execution of the Power of Sale contained Mortgage given by Vahid Nickpour to Mortgage Electronic I Systems, Inc., dated August 15, 2006 and recorded with the Ei (Northern District) Registry of Deeds at Book 10344, Page 1661 Mortgage the undersigned is the present holder by assignmer of the conditions of said Mortgage and for the purpose of forst will be sold at Public Auction at 02:00 PM on September 26, 20' Street, Unit #1, Andover, MA, all and singular the premises said Mortgage, to will: The Unit known as and numbered Unit Number 1, in the 5 Street Condominium ("Condominium"), 55 Elm Street, And County, Massachusetts, a condominium established pursuan chusetts General Laws, Chapter 183A and by Master Deed 1 21,1996, recorded with the Essex North District Registry of Di ment 16087, Book 4531, Page 209, ("Master Deed"). I The Unit is conveyed with an undivided interest of Fifty (50% the common areas and facilities of the Condominium as descri the Master Deed and the 55 & 57 Elm Street Condominium I June 21, 1996 and recorded with said Registry of Deeds as 16088, Book 4531, Page 231 ("Condominium Trust"), with an ai square feet all as shown on the floor plans for the Condominii "Plans Elm Street Condominium in Andover, Mass.", as draw Schofield, 1510 North Shore Road, Revere, Mass. 02151, Scal June 1, 1996, Merrimack Engineering Services, Inc., 66 Park icvAL-Massachusettc-A]814..consisfim.of waSbeets„arLd„f_ec