Loading...
HomeMy WebLinkAboutNACC #166, 1055 Salem Street CONSERVATICyN DEPARTMENT Community Development Division December: 21, 20115 Tyson&Rebecca Moore 1055 Salem Street North Andover,MA 01845 1055 Salem Street, North Andover Installation of a Natural Gas Line Conservation Conditions of Approval,NACC #166 Pursuant to section 4.4.2 (L) of the North.Andover Wetlands protection Regulations,Tyson and Rebecca Moore (owners/applicants) and Columbia Gas of MA (co-applicant), filed for a small project for work proposed at 1055 Salem Street,North Andover. The proposed work includes the installation of a gas line to connect the home to natural gas from the existing line in Salem Street. The closest point of the proposed work is approximately 85 feet from the edge of bordering Vegetated Wetland (13 as shown on the herein referenced plan. During the December 16,20115 public meeting, the NACC voted unanimously to approve thus project. All work shall conform to the following: RECORD DOCUMENTS: Small Project Filing Including: Application Checklist; Plan: A copy of the as-built for 1055 Salem Street with proposed gas line location drawn in by hand Received: 12/3/15 Filing received: December 3, 2015 i ' The following conditions are hereby mandated: f CONDITIONS: 1 1. Prior to the start of construction the site contractor shall review the small project permit and be aware of the wetland resource area and tlae limits of the proposed work. 1600 Osgood Street,Buzilding,20,Suite 2-36,North Andover,Nbssachuscus 01845 Phone 978.688.9530 Fax 978.688.9542 Web www.http://svNvNv.toNvnoftiortliajidoti7er.com/conservcl.htni I 2. Prior to the start of construction a silt sock (or other erosion controls as approved by the Conservation Department) shall be placed between the work area and the wetlands and the Conservation Department shall be contacted for a pre-construction site inspection. 3. Excess construction material shall be properly disposed of offsite and accepted engineering and construction standards and procedures shall be followed in the completion of die project. 4. Upon completion of the approved project and site stabilization, please contact the Conservation Department for a final inspection. 5. This .permit shall exPire six months from the date of issuance. Should you have any question or comments regarding the contents of this letter, please do not J hesitate to contact the undersigned at 978.688.95311 at your earliest convenience.Thanking you in advance for your anticipated cooperation with this matter. I I Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT f= a ' Heidi Gaffney Conservation Field Inspector i i 1600 Osgood Street,Building 20,Stite -ata„North Andover,Massachusetts 01 84-5, Phone 978.(M.9530 Fax 978.688.9542 Wleb w%r%7.http./Y'www-tcnvnofnordundoveLcom/coiiservel.htin C E APPLICATION CHECKLIST- Small Project NORTH ANDOVER CONSEE3'WA°fION COMMISSION Project hcrcatxoaa: Applicant.1'k- Address: I(Y; Phone: ecs General Re drentents--Wetland Protection Re ylatlons: VS coon 4.4 --The applicant has read and understands the applicable regulations The applicant maintains that the project falls within the small project category below: ❑ A. Open slotted decks,without roofs,equal to or less than 300 square feet surface area,inclusive of stairs and ramps,which are to be attached to an existing home,where soil disruption during construction is limited to less than 50 square feet, and where no permanent soil alterations are planned under the footprint of the deck B. In kind replacement of existing decks,regardless of size. ❑ C. Sheds or other outbuildings of less than 7.00 square feet,which are to be placed oil footings, not permanent foundations. ❑ D. Sewer system connections as required by the Town of North Andover. E. Unpaved pedestrian walkways (less than four(4)feet wide) for private use or:for public access on conservation property. ❑ F. Patios less than 300 square feet,not requiring excavation or grading. El G. Pruning of existing vegetation,planting of new native vegetation and gardening. ❑ H.Fences and stone walls which do not alter the flow of surface waters nor alter wildlife habitat or movement(does not include retaining walls). ❑ 1. Conversion of non-permeable surfaces to permeable vegetated surfaces. ❑ . In-kind replacement of existing basement bulkheads. 1 p g for compliance with accessibility requirements. ❑ K. Installation of a ramp p � q L. Other similar projects of minimal impact,as determined by the North Andover Conservation /' Commission. D The local Wetland Bylaw filing fee of$25 has been included with this application. L A written narrative description/scope of work of the proposed project and potential impacts to all wetland resource areas has been included. D/ The applicant has identified and clearly marked all wetland resource area boundaries in the field.. 1."g Two (2) copies of a 1" = 20' scale(or other as deemed appropriate by the Conservation Commission or agent thereof) drawing showing existing and proposed conditions and the delineated wetland resource areas (see plan requirements below for additional detail). Effective 0312/2014 1 ❑ A pre-construction/pre-approval meeting was held on site between the applicant and a representative of the Conservation Commission. Date of Meeting: ❑ The delineated resource area boundaries have been confirmed by the Conservation Department as accurate. Platz.Requirements(Section 4.4.3 B)_ Certified and/or professionally prepared plans are not required. However,the North Andover Conservation Commission or its designated agent shall have the final authority to determine whether the submitted plans/drawings are adequate and include all pertinent information for review. At a minimum,all plans submitted shall clearly and accurately show the present conditions and proposed work and depict the location of all wetlax-Ld resource areas within 100' of the proposed work. All plans must be signed and dated by the person who prepared there. The Commission may also require the following information on the proposed plans in addition to the aforementioned criteria where applicable: ❑ Location of any subsurface sewage disposal systems. j ❑ Locations of any drainage structures. El Locations of any easements,including but not limited to, drainage and utility easements. El Locations of any open space boundaries if(e.g. if the lot is affected by the 50' open space boundary as required in a Planned Residential Development(PRD)). ❑ Location and nature of all proposed alterations to the Buffer Zone Resource Area. a ( - Signature of Applicant or Applicant's Representative � "�" Date: - -------------------------------- -------------(TOWN USE ONLY) WCOMPLETE APPLICATION,The application meets the submittal requirements. Therefore,the Conservation Department has prepared a written list of conditions necessaay to protect any adjacent wetlands for approval by the Conservation Commission. This condition list shall be filed with the North Andover Conservation Department as NACC#V" ❑ INCOMPLETE APPLICATION-The following sections of the Wetland Protection Bylaw &/or Regulations have not been complied with and as a result this Department is rejecting this incomplete application w/in two (2)business days from the date of receipt (Section 178.4 North Andover Wetland Protection Bylaw). You may pick up this application and supporting plans at the Conservation Office and re-file with the required supporting documents and information. F1 NOTA SMALL PROJECT-The North Andover Conservation Commission has determined that the proposed project as submitted does not meet the small project criteria and hereby denies the application. As such,a Request for Determination of Applicability(RDA) or a Notice of Intent(NOl)must be filed. Reason(s) Signature of Agent: Date: 2 Effective 031212014 December 3, 2015 ti 3 201-5 10 Tyson & Rebecca Moore/Columbia Gas of MA NORTH ANDOVER CONSERVATION COMMISSION 1055 Salem St. North Andover, MA 01845 We would like to connect our house to the natural gas line that is already on Salem Street. We are currently using propane for heat/cooking. Enclosed is the plot of our property with the proposed gas line drawn. We have contacted Columbia Gas about this project, and they have indicated the need to be named in this proposal for authorization to complete the work. Thank you for considering this proposal. Rebecca L. Moore CC]�1'S�NATION C152.0 ts INS51C14 t 2.29 1516.73 X 151,24 152.37 X.152.07 7 B �C s X 1 a08 •`• j 1 7 5 ` X 157,10 4 J' 157.34 152, e � / X 157.43 r� X VENT rrsg`�f 99 157.37 fir'y x 16-7.' 6 t52,4ax �U X 157.84' 157.45 1r a r raFa s„ 100 6�J1 1at2 /Olt 151.91 � s 158. 7 Alt 15.07 :5 18 5 tr^. F 1 77 I' ..a+•74at 6 z QS, Ji x IJ�Q:1i 153.61 .mom.1 air a, .. 153�2 157 a r,ta 7,,97 1113 r I 1 155.72 '� 1 1• 4 T 'F1r, 1156.99 157.05 r PT P a 152 6 156.9 15fi.9 ySSM aM1 t '} 1 1�� c�fi01 t 52.58 ' -0% tx 152.13 712 5-2,05- - N 159,Er ..M Y . (� LOfi1E 1 .4.. .. ,. A E11 Kt111.S? W151.6 ; 7415179 LOT 69. spy S k 151.21 X y 1.6! tlt"a ';S i'i,�ta ma rte" .;: X 153.20 � � 15 6 r�� WIL , d !r i X 00 t45b.9 r ry 15179 X .9 15h6 150.96 Cyt 19 A