Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract #: 1074 - From: 05-08-2018 To: 05-31-2018 - Heimlich Landscaping and Construction Corp. - Public works
TOWN OF NORTH ANDOVER, CONTRACT CONTRACT#. DATE: This Contract is entered into on, or as of,this date by and between-the-Town of North Andover (the "Town"),.and Contractor: Heimlich Landscaping& Construction Corp., . Address: 65 Burlington Street Woburn, MA 01801 Telephone Number: 781-938-8988 Fax Number:. 781-935-6272 - 1. This is a Contract for the procurement of the following: Improvements to the softball field at McEvoy Field,includingthe installationof ball safety netting systems, in accordance with the Invitation for Bids dated March 28,2018 2. The Contract price to be paid.to the Contractor,by the Town of North Andover is: $23,900.00 ..3. Payment will be made as follows: Upon completion and acceptance of work, and receipt of invoice (net 30): 4. Definitions bs .4.1 Acceptance:. All- Contracts requireproper_ acceptance. of the -described..-goods ;or services by the. Town of.North Andover: - Proper acceptance shall be understood to include inspection of goods and certification of acceptable.,performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the.Contract. (Rev 5-2007)Contract by and between Town of North Andover and Page 1 Heimlich Landscaping&Construction Corp. 4.2 Contract Documents:. All.documents.relative to the Contract including (where used) Instructions,to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications; Other :Specifications included in Project Manual, Drawings, and all. Addenda issued during the bidding period. The Contract documents are complementary, and what is called:for by any one shall be as binding asif called for by aR...The intention of the document is to include all labor and.materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The ".other parry" to any Contract with the Town. This term shall (as the sense and'particular,Contract so require) include Vendor; Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the,goods delivered,.in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods,Supplies or Materials: 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to :a special. design according to the Drawings .or Specifications of this work,but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance This Contract shall be fully performed by the Contractor in accordance with the.provisions of the Contract Documents on or before May 31, 2018, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. . 6. Subject to Appropriation Notwithstanding anything in the Contract documents to the contrary, any and all payments which -the Town is required to make under,this .Contract shall be subject to appropriation or'other availability of funds as certified by the Town Accountant. In the absence of appropriation, this- Contract hisContract shall .be. immediately terminated without liability for. damages, penalties or other charges. - 7. Permits and Approvals Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract.shall be secured and paid for by the Contractor*. (Rev 5-2007)Contract by and between Town of North Andover and Page 2 Heimlich Landscaping&Construction Corp: 8. Termination and Default 8..1 Without Cause. The Town may terminate this-Contract on seven (7) calendar days notice When inthe best interests of the Town by providing notice to the Contractor; which shall.be in writing and shall be deemed delivered and received :when given in person to the ..:Contractor, or when received by fax,_express mail, certifled mail return receipt requested, regular mail postage prepaid or delivered by, any other appropriate method evidencing actual receipt:by the Contractor. Upon termination without cause,.Contractor will be paid for services rendered to the date of termination. -8.2 For. Cause-. If the Contractor is.determined by the Town to,be in default of any term or condition of this Contract, the Town may terminate.this Contract on seven (7) days notice by providing notice to the. Contractor, which shall. be in writing and shall be deemed delivered and received when given m person-to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any.other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any, material misrepresentation.made by the Contractor to the Town; 2) any failure to perform any of its, obligations under.this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance. within the;Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material'to ensure the completion of-this Contract within the specified time.due to a reason or circumstance within the Contractor's, reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly-re-perform within a reasonable time the services that were rejected by the Town as :unsatisfactory, or erroneous, (v) discontinuance of the.services for reasons not.beyond the'Contractor's reasonable control, (vi) failure to:comply with a material term of this Contract, including;but not limited to, the provision of insurance and non-discrimination, .(vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of.:this Contact, and (viii) failure to . comply with any and all requirements of state law and/or regulations,.and Town bylaw and/or-regulations: - 9. The Contractor's Breach and the:Town's Remedies Failure of the Contractor:to_comply with any of the terms or conditions of this Contract shall:be deemed a material breach of this Contract,-and the Town of North Andover -shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or it!.part, the right to maintain any and all. actions.at law or in equity or other proceedings with respect to a breach of this:Contract, including damages and - specific performance, and the right to select among the remedies.available to.it by all:of the . above. From any sums due to the Contractor for services,- the Town-may keep-the whole or any part of the amount for. expenses, losses and damages incurred by the Town as a consequence of (Rev 5-2007)Contract by and between Town of North Andover and Page 3 Heimlich Landscaping&Construction Corp: procuring services as a result of any failure, omission or mistake of the.Contractor in providing services as provided in this Contract. 10. Statutory Compliance 10.1. This Contract will be construed and governed by the provisions of applicable, federal, state and local laws and regulations; and wherever.any provision 'of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local lawor regulation, then the provisions.:of law and regulation shall control. Where applicable to .the Contract, the provisions of the General Laws are incorporated by reference into this Contract,including,but not limited to,the following: General Laws Chapter 30B-Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: Public Works Contracts. General.Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts.. 10.2 Wherever applicable law mandates the inclusion of any term and provision into:a municipal contract, this Section shall be understood_to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law: or regulation limiting the power or liability of cities and towns, such law or regulation.shall control. 1.0.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation,the Contractor shall.bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of.all orders and decrees of any bodies or-tribunals having jurisdiction in any manner affecting -those engaged or employed in the. work, of the:materials used in the work or in any way affecting the conduct of the work. If any-discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this:work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report,the same in writing to the.Town. It shall, at.all times, itself observe and comply with all such existing and {future laws, by-laws, regulations, orders and decrees;;and shall protect and indemnify the Town of.North Andover; and its duly appointed agents against any-claim or liability arising from or - based oil any violation whether by him or its agents, employees or subcontractors of any such law,by-law, regulation or decree: 11. . Conflict of Interest Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest. Law (General Laws Chapter 268A),:and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and .by executing the Contract documents the Contractor certifies to'-the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. (Rev 5-2007)Contract by and between Town of North Andover and Page 4 Heimlich Landscaping&Construction Corp. 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor; as required,by General Laws Chapter 62C,_ Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or.Real Estate Space to the Commonwealth or Subdivision). . 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all.'of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against Discrimination) and any executive. orders, rules, regulations, and requirements of the Commonwealth of Massachusetts-as they may from time to:time be amended. 14. -Assigriment Assignment of this Contract is prohibited, unless and only. to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town This Contract is only binding upon, and enforceable against, the Town if: (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town. Accountant as to appropriation or availability- of funds; and(3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor -If the Contractor is a corporation, it shall endorse upon this,Contract (or attach hereto) its Clerk's. Certificate certifying the corporate capacity and authorityof:the signing this Contract for party. ��g the corporation. Such certificate shall be accompanied by a letter or other instrument.stating that such authority continues in full force .and effect as of the date the Contract is executed by the Contractor.. This Contract shall not be enforceable-against_the Town of North_ Andover unless and until the Contractor complies with this section. The.Contractor, if a.foreign corporation, shall comply with the provisions of the General,Laws, . . Chapter 181, Sections 3.and 5-- and any-Acts and Amendments thereof, and in addition thereto; relating to the appointment:of the Commissioner of Corporations.as its attorney, shall file with the Commissioner of-Corporatioris a Power of Attorney and duly authenticated copies of-its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws.of the Commonwealth. 17. Liability of Public Officials To the full extent permitted by law; no official,employee, agent or representative of the Town of North°Andover shall be individually or personally liable on any obligation of the Town under this- Contract. (Rev 5-2007)Contract by-and between Town of North Andover and Page 5 Heimlich Landscaping&Construction Corp: 18: . Indemnification The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, :claims, demands, losses, costs, expenses, recoveries. and judgments of every, nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, .its employees, agents, subcontractors, material men, and anyone directly or indirectly employed.by any of them or anyone for whose acts any .:of them may be liable, regardless of.whether; or not it is caused in part_ by any party .indemnified hereunder. The Contractor further agrees to' reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly- or indirectly employed by any of them or anyone for whose acts any, of them. may be. liable,, including damages caused by his, its or their use of faulty, defective, or unsuitable material. or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The.existence of insurance shall.in no way limit the scope of the Contractor's.'indemnification under this contract. .19. Workers Compensation Insurance The Contractor.shall provide by insurance for the payment of compensation.and the furnishing.of ..other-.benefits under Chapter 152 of the General Laws of Massachusetts (The. Worker's Compensation Act) Wall employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract; shall operate as an,immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to.the execution of this Contract before the same shall be binding on the parties thereto, except if specifically.waived by the Town. 20. Documents,Materials, Etc. Any materials;- reports,- information, data, etc: given to or prepared-or assembled by the - Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town,-except as otherwise required by law. The Contractor shall comply with_the provisions Chapter 66A of the General Laws of Massachusetts-as it relates-to public documents, and-all .other.state and federal laws and_. _ regulations:relating to confidentiality, security,privacy and use of confidential.data. Any materials produced in whole or in part under this Contract shall not be subject'to copyright, except by the Town, in the United States or:any other country. The Town shall.have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature,' (Rev 5-2007)Contract by and between Town of North Andover and Page 6 Heimlich Landscaping&Construction Corp. publicly disclose, reproduce, distribute and.otherwise use, and authorize others to use, in whole or in part,any reports, data or other materials prepared under this Contract. All data, reports, programs, software,.,equipment, furnishings,.and any other documentation or product .paid for by the Town shall gest in the Town at the termination of this Contract.. The Contractor shall at all times, during or after termination of this Contract, obtain the prior.written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium: 21. Audit,Inspection and Recordkeeping. At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions..of employment and other data relating to all matters covered by this Agreement. 22. Payment The Town agrees to make all reasonable efforts to pay to the Contractor the.sum set forth in.the Contractor's bid or-proposal.within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation .contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement,prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, - - - _ -- - nor in any manner.limit the legal or equitable remedies. available to that party. No waiver by either party of any default or breach shall constitute a waiver.of any.subsequent default or breach of a similar or different matter. 24. Forum and Choice-of Law This Contract and any performance herein shall be governed by.and be construed in accordance with the laws of the Commonwealth. _Any.and all.proceedings or actions relating to subject matter herein.shall be brought and maintained in the courts of the Commonwealth or the federal .. district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. (Rev 5-2007)Contract by and between Town of North Andover and Page 7 Heimlich Landscaping&Construction Corp: 25. Notices. Any notice permitted or required-under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto,shall be in writing and signed in the name or on the-behalf of the party giving or serving:the same. Notice shall be:deemed to have been received at the time. of actual service or.three (3) business,days after.the date.of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed.sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager; Town Hall, 120 Main Street,North Andover, Massachusetts 01845. 26. Binding on Successors This Contract,shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest(and where not corporate, the heirs and estate of the Contractor). . 27. Complete Contract This instrument, together with its endorsed .supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. 28. Supplemental Conditions The foregoing provisions apply to all contracts to which the Town of North;Andover:shall be a party. One of the following "Supplements" must be "checked". as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires: The Supplement contains additional terms governing the Contract: [ ] -GOODS SUPPLEMENT"G" - Applicable to Contracts for the procurement of Goods (governed by the provisions.of General Laws Chapter 3013) [ ] SERVICES SUPPLEMENT"S" - Applicable to Contracts for the procurement of Services (governed by the provisions of.General Laws Chapter 30B) [X] CONSTRUCTION SUPPLEMENT"C" - Applicable to Contracts for Construction- (Rev 5-2007)Contract by and between Town of North Andover and Page 8 Heimlich Landscaping&Construction Corp: IN WITNESS WHEREOF the parties have hereto and to two other.identical-instruments set forth their hands the day and year first above written. THE TOWN THE CONTRACTOR L", lit Lftn&MD( . Div sio epartent Head Company Name Town Manager . Date Signa e Date Prin Name&Title Federal Identification No.: Q�•�6?®L f APPROVED AS TO FORM: own Counsel' Date CERTIFICATION AS TO AVAILABILITY.OF FUNDS:., L r Town Ac:ountant Date (Rev 5-2007)Contract by and between Town of North Andover and Page 9 Heimlich Landscaping&Construction Corp: SUPPLEMENT"C" []: CONSTRUCTION SUPPLEMENT"C"-Applicable to Contracts for the construction of- (1) f(1)Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2)Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3)Public:Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) 1. This form.supplements the Town of North.Andover".Contract and General Conditions"and applies only to contracts for the construction;reconstruction,alteration,remodeling or repair of public works . or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded,such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required)in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. 3. Equal 3.1. In the case of a closed Specification written for a specific item or items to be furnished under the Base Bid,such specifications shall,as applicable,be in compliance with the Massachusetts General Laws,Chapter 30, Section 39M and Chapter 149, Sec.44A et seq. 3.2. Where the name of an item,material or manufacturer is mentioned in the Specifications or on the Drawings,except as above noted,the intent is to establish a standard and in.no way should be construed to exclude any item or manufacturer not mentioned by name,but whose product meets the Specifications as to design,utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by.General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five(25%)per cent,iri compliance with Sec: 13 of Chapter 30B.- 5. The Contractor will carry out the-obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151,Sec. 1,et seq.(Minimum Wage Law)and any executive orders,rules,regulations,and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor.will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149,Sections 26 and 27D(Prevailing Wage),.as shall:. be in force and as amended. 6. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others,including adjacent property,from injury or loss_arising (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page1 and.Heimlich Landscaping&Construction Corp. in connection with the:Contract. The Contractor shall make good_any such.damage,injury or loss, except as:may be directly due to errors in the Contract Documents or caused by agents or employees of the Town,or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall:take all necessary precautions for the safety of employees on the work,and shall comply with all applicable.provisions.of Federal;-State and local laws and codes to prevent accidents .: or injury to persons on,about or adjacent to the premises where the work is being performed. The. Contractor will erect and properly maintain at all times,as required by the conditions and progress of the work,all.necessary safeguards for the protection of workers and the public,shall post danger signs:warntng against the hazards_created by such features of construction such as pits,protruding nails,hosts,well holes,elevator hatchways,:scaffolding,window openings,stairways and falling... materials;and shall designate a responsible:member of its organization on the work,whose duty.shall be the;prevention of accidents. - 8. The Town shall at all times have access to the work-wherever it is in preparation or progress and the Contractor shall provide suitable accommodations forsuch access. 9: The Contractor shall appoint a competent superintendent and foreman and.any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent;foreman,or assistants are unacceptable to the Town,_then upon seven days.notice from the Town,the Contractor shall:replace such person or persons with people acceptable to the Town. 10. The,Contractor shall give efficient supervision:to the work,using its-best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at.once report to the Town.any error,inconsistency or omission which shall be discovered. . Included iii this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly,or fail to perform the.contract or any of its_provisions,the Town,upon three days written notice,may,without prejudice toany other remedy it may have,make good such:deficiencies and may deduct the cost thereof from the payment. then or thereafter_due the Contractor. 12:: -Inspection by the Town's Project Representative - - .12.1. The Town shall have the right to designate a Project Representative who may,make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous ori-site inspections to check the quality or quantity of the work,and will not be responsible for the.Contractor's failure to carry out-the construction work'in accordance with.. the Contract Documents. During such visits and on the basis:of these observationswhile at the-site,the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and-may condemn.structural work as failing to conform to the Contract.Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expresslydelegated by the Town,-which shallbe shown to the Contractor,and shall have. authority to stop the work whenever such_ stoppage may reasonably be necessary to insure . the proper execution of the Contract. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 2 and Heimlich Landscaping,&Construction Corp. . 12.2. in connection with the.work,the Project Representative shall not be responsible for construction methods,means,techniques;sequences or procedures employed by the Contractor or the Contractor's safety programs,requirements,regulations,or precautions. 13. Decisions of the Project Representative 113.1. The Project Representative shall,within a reasonable time,make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress-of the structural work or the interpretation of the Contract Documents. . 13.2. - The Project Representative's decision,in matters relating to the project,shall be final,if within the terms of the Contract Documents: 13.3. If,however,the Project Representative fails to render a decision withinten days after the parties have presented their evidence,either party may then avail itself of the remedies: provided in this contractor available to it by law. If the Project Representative renders a decision'after such remedies have commenced,such decision may be entered as.evidence but:shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties:concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus,the storage of materials and the operations of its workmen to limits indicated by law,by-laws,permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load,or permit anypart of the structure to be loaded with.a weight that will endanger its.safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shallremove all its rubbish from and about the work site and:all its tools, scaffolding and surplus materials and shall leave its work"broom-clean", or its equivalent,-unless more exactly specified. 'In case of dispute.the Town may remove the rubbish and charge the cost to the several contractors, as the Town . shall determine to be;just. 16. Right to Terminate If the Cointractor.should(1)be adjudged;a bankrupt,.(2)make a general assignment for the benefit of creditors,(3).have a receiver appointed on.account of its insolvency, (4)persistently.or: repeatedly_.refuse or fail to supply enough personnel.and:resources to performthe contract,(5)fail:.:.... to make prompt payment to subcontractors or to providers of materials or labor,(6)persistently disregard laws and regulations or lawful directives of the Town, or(7)be guilty of a substantial violation of any provision of the Contract,then the Town may,without prejudice to any-;other right or remedy and after giving the Contractor(or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and.of all materials;tools and appliances thereon and finish the work by whatever method.it deems aPP p ro riate. , (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 3 and Heimlich Landscaping&Construction Corp. In such cases,the Contractor shall not be entitled to:receive any further payment until the work is fmished. If the unpaid amount owed to the Contractor forvork already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to:the Contractor. If such expenses shall exceed such unpaid balances,the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement,the Town reserves the right:at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part.for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Progress PgMents: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing"payments for . materials and labor,payments to Subcontractors.and such other evidence of the; . Contractor's right to payment. 17.2. The Contractor shall,before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract,,divided so as to facilitate payments to Subcontractors,made out in such form as the Town and the Contractor may agree,upon, and, if required, supported by such evidence as to,its correctness. This schedule,when approved by the Town, shall be used as a basis for payment,unless it is found to be in error..If applying for payments,the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence,nullify the whole.or part of any payment to such extent as may-be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of: 18.1.1. Defective work not remedied. 18.1.2. Claims filed or,reasonable evidence indicating probable filing of claims. 18.1.3. Failure of.the Contractor to make payments properly to Subcontractors or for material-or labor: 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 4 and Heimlich Landscaping k Construction Corp. 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall,unless otherwise provided by law,be initiated by a written claim submitted to the Town no later than seven(7)calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein.for.work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or:lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize(1)that the.time for completion.of this Contract is of the essence, (2)that the Town will suffer loss if the work is not.completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and{3)the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town.if the work is not completed in time,itis agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages,not as a penalty,the sum of One Thousand Dollars($1,000)per day for each:calendar day of delay until the work is completed,whether the work is completed bythe Contractor or some other person. The Town's right toimpose liquidated damages shall in no way prohibit or restrict the Town'_s right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor,and if such payment is . insufficient to cover the liquidated damages,then the:Contractor shall pay the'amount due. 2L. The Contractors' Mutual Responsibility: Should the Contractor cause damage to any separate subcontractor on the work,the.Contractor agrees,upon due notice,to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If.such separate contractor sues the Town on account of any damage alleged to'have been sustained,the Town shall notify the Contractor, who shall defend such proceedings at the:Town's expense and,if any judgment against the Town arises therefrom,the Contractor shall payor satisfy it and pay all costs incurred by the Town. 22. Separate Contracts:. 22.1. The Town reserves the right to let other Contracts in connection with this work under similar.General Conditions. The Contractor shah afford other contractors reasonable Opportunity for the introduction and storage of their materials and.the execution of their work,and shall properly connect.and coordinate its work with theirs. 2.2.2. If any part of the Contractor's work depends, for proper execution or results,upon the work of any other contractor,the Contractor.shall inspect and promptly report to the Town any defects in such work that,render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 5 and Heimlich Landscaping&Construction Corp. of the other contractor's work as fit and proper for the.reception of its work except as to defects which may develop in the:other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work,the Contractor shall measure work already in place and shall at once report to.the Town any discrepancy between the executed work and the Drawings. . 23. Subcontracts: 23.1. All Subcontracts shall be awardedin conformity with the requirements of the.General Laws,.Commonwealth of Massachusetts,Chapter 149, Sections 44A to 44L,inclusive. 23.2. The Contractor agrees that it is as fully responsible to-the Town:for the acts-and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions.of persons directly employed by it. 23.3 Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor-Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement,the General Conditions of the Contract,.the Supplementary General Conditions,the Drawings and Specifications,as far as_applicable to its work, including the provisions of the General Laws,Commonwealth of Massachusetts,Chapter 149, Section 44A, et seq. 25. Indemnification: 25.1.. The Contractor shall indemnify,-defend and save harmless the Town,its.officers, agents and employees from and against any and all damages, liabilities,actions, suits, proceedings, claims, demands, losses;recoveries.and judgments of every nature and description(including reasonable attorneys' fees)brought or recovered against them that May arise in whole or in part out of or in connection with the work being performed onto be performed, or out of any act or omission by the Contractor, its employees, agents,: subcontractors;material men-and anyone directly or indirectly employed by any of them.', or anyone for,whose acts any of them may be liable,regardless of whether or not it is caused in part by any party indemnified hereunder-The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents,subcontractors or material men;and anyone directly or indirectly employed by any of them or anyone for whose acts any of.them may be liable,including damages caused by his, its or their use of faulty,defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence°or willful misconduct.The existence of-insurance shall in no way limit the scope of the-Contractor's indemnification under this Contract: 252:: In any and all claims against the Town.or any of their agents or employees by any employee of the Contractor;any Subcontractor, anyone directly or indirectly.employed, by any of them or anyone for whose actsany of them may be liable,the indemnification obligation under.this paragraph shall not be limited in any way by any limitation on the amount or type of damages;compensation or benefits payable by or for the Contractor or (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 6 and:Heimlich Landscaping&Construction Corp. any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under:the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from.exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may-arise out of or result from the Contractor's operations under the Contract,whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker'.s Compensation,disability benefit and other similar _ employee benefit acts; . 26.1.2..:Claims for damages because of bodily injury, occupational sickness or . disease,or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3..-Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2 The insurance.required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements = ' Workers'.Compensation coverage as required by the laws of the Commonwealth of Massachusetts. _ - - 26.2.2.' Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive general:basis including Premises and Operations,=Owners and Contractor's Protective, Products and Completed Operations, and Owned,Non-owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless.otherwise-provided-in the contract documents,or the.following limits,whichever are.greater: (Rev 5-2007)Supplement"C"to Contract between the To wri of North Andover Page:7 and Heimlich Landscaping'&:Construction Corp. f Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000,per person $2,000,000 aggregate Property Damage $1,000,000 per occurrence . $2,000,000 aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence Excess Liability(Umbrella) $2,600,000 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, a's hereinafter specified under Paragraph.enfitled"Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement.of claims. 26.3.2. Certificates of Insurance acceptable to the.Town shall be addressed to and filed with the Town:prior-to commencement of the:work. Renewal certificates shall be Addressed to and filed with the Town at least ten(10)days prior to the expiration: date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty(30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies: 263.4. All Certificates of Insurance shall be on- the"VIIIA"or"ACORD"Certificate of Insurance form, shall contain true_transcripts from the policies, authenticatedby the proper officer of the Insurer, evidencing in particular those insured,the extent -of coverage,the location and operations to which the insurance applies,the expiration date and the above_mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence-basis.-Coverage shall be maintained without interruption.from date of the Contract until date of final payment and termination of any coverage required to be maintained after. - payment. 27. :Protective Liability Insurance: 2.7.1: The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page-8 and Heimlich Landscaping&:Construction Corp. O -27.2. The Contractor shall also purchase and maintain such insurance.as will protect the.Town against Automobile Non-Ownership Liability in connection with the Contractor's operations under the Contract,whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them,or by anyone for whose acts any of them may be liable. 27.3.- The limits of liability for coverage:required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's:General Liability Policy.. 27.4. The Town shall be named as an additional insured on the above referenced liability _ Policies,.and the Contractor's.insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole- - responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor,if required, shall deliver to the Town a complete release of all liens arising out of.the Contract,or receipts in full in lieu thereof and, if required in either case, anaffidavit that as far as it has knowledge or information,the.releases and receipts include all the labor and material for . which a lien could be filed. The Contractor shall comply with all statutory provisions of the. General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended(as a minimum requirement). 29. Guarantees: 29.1. The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken,that the product of such labor will yield only first-class results,that materials and equipment furnished will be.of good quality and new unless otherwise permitted by this Contract .and that the Work will. . be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements maybe considered defective. 29.2-.-- -If at any any part of the work constructed under the terms of this contract shall in the. opinion of the Town Manager require repairing due to defective work or materials furnished bythe Contractor,he may notify the Contractor in writing to mak_e the required repairs. -If the Contractor shall neglect to start such repairs within ten days=of the date of giving it notice thereof and to complete the same to the satisfaction of the Town.Manager_ with reasonable dispatch,then the.latter may Iemploy other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use:any moneys still retained to pay for the same, and if such sum.is insufficient,the Contractor shall be obligated to pay,the balance thereof. .:29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with-a'Subcontractor or Manufacturer_must be delivered to:the Town before final payment,to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to.deliver a required:guarantee or warranty shall be held to constitute a failure of the Subcontractor to. fully complete-his work in accordancewith the Contract Documents.: The Contractor's (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 9 and Heimlich Landscaping&:Construction Corp. obligation to.correct work is in addition to,and not in substitution of, such guarantees or warranties as may be required in the various Sections.of the Specifications.. This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto-- . Dated: - The Contractor by: Authori ed Signature The Town of North Andover by: To Manager D ent/Divr n Head own Counsel Approved.as to Form own ccountant Certi ed as to Appropriation (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 10 and:Heimlich Landscaping&Construction Corp. .. THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates CHARLES D.BAKER As determined by the Director under the provisions of the ROSALIN ACOSTA Governor Massachusetts General Laws,Chapter 149,Sections 26 to 27H secretary- WII.LIAM D MCKINNEY KARYN E.POLITO Director Lt.Govemor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Improvements to the softball field at McEvoy Field including the installation of ball safety netting systems Job Location: Chadwick Street Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number"on all pages of this schedule. • An Awarding Authority must request an updated wage schedule from the Department of Labor Standards("DLS")if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects(bid pursuant to G.L.c.149A),the earlier of. (a)the execution date of the GMP Amendment,or(b)the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, §27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L.c. 149 §27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor,a filed sub-bidder,or any sub-contractor. • All apprentices working on the project are required to be registered with the Massachusetts Department of Labor Standards,Division of Apprentice Standards(DLS/DAS). Apprentice must keep his/her apprentice identification card on his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS regardless of whether or not they are registered with any other federal,state,local,or private agency must be paid the journeyworker's rate for the trade. • The wage rates will remain in effect for the duration of the project,except in the case of multi-year public construction projects. For construction projects lasting longer than one year,awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor.For multi-year CM AT RISK projects,awarding authority must request an annual update no later than two weeks before the anniversary date,determined as the earlier of. (a) the execution date of the GMP Amendment,or(b)the execution date of the first amendment to permit procurement of construction services.Contractors are required to obtain the wage schedules from awarding authorities,and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F"rental of equipment"contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee's name,address,occupational classification,hours worked,and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at(617)626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at(617)727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Construction (2 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 TEAMSTERS JOINT COUNCIL NO.10 ZONE B (3 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 TEAMSTERSJOINT COUNCIL NO.10 ZONE B (4&5 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 TEAMSTERSJOINT COUNCIL NO.10 ZONE B ADS/SUBMERSIBLE PILOT 08/01/2017 $92.97 $9.90 $21.15 $0.00 $124.02 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85 08/01/2019 $102.78 $9.90 $21.15 $0.00 $133.83 For apprentice rates see"Apprentice-PILE DRIVER" AIR TRACK OPERATOR 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88 LABORERS-ZONE 2 06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72 12/01/2018 $35.26 $7.70 $13.60 $0.00 $56.56 06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43 12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29 06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18 12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07 06/01/2021 $39.69 $7.70 $13.60 $0.00 $60.99 12/01/2021 $40.60 $7.70 $13.60 $0.00 $61.90 For apprentice rates see"Apprentice-LABORER" ASBESTOS REMOVER-PIPE/MECH.EQUIPT. 12/01/2017 $35.90 $11.50 $7.10 $0.00 $54.50 HEAT&FROST INSULATORS LOCAL 6(BOSTON) 06/01/2018 $36.90 $11.50 $7.10 $0.00 $55.50 12/01/2018 $37.90 $11.50 $7.10 $0.00 $56.50 06/01/2019 $38.90 $11.50 $7.10 $0.00 $57.50 12/01/2019 $39.90 $11.50 $7.10 $0.00 $58.50 06/01/2020 $40.90 $11.50 $7.10 $0.00 $59.50 12/01/2020 $41.90 $11.50 $7.10 $0.00 $60.50 ASPHALT RAKER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" BACKHOE/FRONT-END LOADER 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 2 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BARCO-TYPE JUMPING TAMPER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" BLOCK PAVER,RAMMER/CURB SETTER 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88 LABORERS-ZONE 2 06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72 12/01/2018 $35.26 $7.70 $13.60 $0.00 $56.56 06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43 12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29 06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18 12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07 06/01/2021 $39.69 $7.70 $13.60 $0.00 $60.99 12/01/2021 $40.60 $7.70 $13.60 $0.00 $61.90 For apprentice rates see"Apprentice-LABORER" BOILER MAKER 01/01/2017 $42.92 $6.97 $16.21 $0.00 $66.10 BOILERMAKERS LOCAL 29 Apprentice- BOILERMAKER-Local 29 Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 65 $27.90 $6.97 $10.54 $0.00 $45.41 2 65 $27.90 $6.97 $10.54 $0.00 $45.41 3 70 $30.04 $6.97 $11.35 $0.00 $48.36 4 75 $32.19 $6.97 $12.16 $0.00 $51.32 5 80 $34.34 $6.97 $12.97 $0.00 $54.28 6 85 $36.48 $6.97 $13.78 $0.00 $57.23 7 90 $38.63 $6.97 $14.59 $0.00 $60.19 8 95 $40.77 $6.97 $15.40 $0.00 $63.14 Notes: k Apprentice to Journeyworker Ratio:1:5 ------------------------------------------------------------------------------------------------------------------------------------ Issue Date: 02/14/2018 Waee Reauest Number: 20180214-032 Paze 3 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BRICK/STONE/ARTIFICIAL MASONRY(INCL.MASONRY 02/01/2018 $52.06 $10.75 $20.03 $0.00 $82.84 WATERPROOFING) 08/01/2018 $53.41 $10.75 $20.16 $0.00 $84.32 BRICKLAYERS LOCAL 3(LYNN) 02/01/2019 $54.05 $10.75 $20.16 $0.00 $84.96 08/01/2019 $55.40 $10.75 $20.30 $0.00 $86.45 02/01/2020 $56.04 $10.75 $20.30 $0.00 $87.09 08/01/2020 $57.39 $10.75 $20.45 $0.00 $88.59 02/01/2021 $58.03 $10.75 $20.45 $0.00 $89.23 08/01/2021 $59.43 $10.75 $20.61 $0.00 $90.79 02/01/2022 $60.02 $10.75 $20.61 $0.00 $91.38 Apprentice- BRICKIPLASTER/CEMENT MASON-Local 3 Lynn Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.03 $10.75 $20.03 $0.00 $56.81 2 60 $31.24 $10.75 $20.03 $0.00 $62.02 3 70 $36.44 $10.75 $20.03 $0.00 $67.22 4 80 $41.65 $10.75 $20.03 $0.00 $72.43 5 90 $46.85 $10.75 $20.03 $0.00 $77.63 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.71 $10.75 $20.16 $0.00 $57.62 2 60 $32.05 $10.75 $20.16 $0.00 $62.96 3 70 $37.39 $10.75 $20.16 $0.00 $68.30 4 80 $42.73 $10.75 $20.16 $0.00 $73.64 5 90 $48.07 $10.75 $20.16 $0.00 $78.98 Notes: Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" CAISSON&UNDERPINNING BOTTOM MAN 12/01/2016 $37.45 $7.60 $14.35 $0.00 $59.40 LABORERS-FOUNDATIONAND MARINE For apprentice rates see"Apprentice-LABORER" CAISSON&UNDERPINNING LABORER 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25 LABORERS-FOUNDATIONAND MARINE For apprentice rates see"Apprentice-LABORER" CAISSON&UNDERPINNING TOP MAN 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25 LABORERS-FOUNDATIONAND MARINE For apprentice rates see"Apprentice-LABORER" ------------------------------- ------------------------------------------------------------------------------------------------ Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 4 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CARBIDE CORE DRILL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" CARPENTER 09/01/2017 $39.28 $9.90 $17.50 $0.00 $66.68 CARPENTERS-ZONE 2(Eastern Massachusetts) 03/01/2018 $40.28 $9.90 $17.50 $0.00 $67.68 09/01/2018 $41.32 $9.90 $17.50 $0.00 $68.72 03/01/2019 $42.35 $9.90 $17.50 $0.00 $69.75 Apprentice- CARPENTER-Zone 2 Eastern MA Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.64 $9.90 $1.73 $0.00 $31.27 2 60 $23.57 $9.90 $1.73 $0.00 $35.20 3 70 $27.50 $9.90 $12.31 $0.00 $49.71 4 75 $29.46 $9.90 $12.31 $0.00 $51.67 5 80 $31.42 $9.90 $14.04 $0.00 $55.36 6 80 $31.42 $9.90 $14.04 $0.00 $55.36 7 90 $35.35 $9.90 $15.77 $0.00 $61.02 i 8 90 $35.35 $9.90 $15.77 $0.00 $61.02 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.14 $9.90 $1.73 $0.00 $31.77 2 60 $24.17 $9.90 $1.73 $0.00 $35.80 3 70 $28.20 $9.90 $12.31 $0.00 $50.41 4 75 $30.21 $9.90 $12.31 $0.00 $52.42 5 80 $32.22 $9.90 $14.04 $0.00 $56.16 6 80 $32.22 $9.90 $14.04 $0.00 $56.16 7 90 $36.25 $9.90 $15.77 $0.00 $61.92 8 90 $36.25 $9.90 $15.77 $0.00 $61.92 Notes: 9 %Indentured After 10/1/17;45/45/55/55/70/70/80/80 1 Step 1&2$29.31/3&4$34.90/5&6$51.44/7&8$57.09 Apprentice to Journeyworker Ratio:l:5 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 WaEe Rea nest Number: 20180214-032 Pase 5 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CEMENT MASONRY/PLASTERING 01/01/2018 $46.02 $12.35 $22.41 $0.30 $81.08 BRICKLAYERS LOCAL 3(LYNN) 07/01/2018 $47.41 $12.35 $22.41 $0.30 $82.47 01/01/2019 $48.15 $12.35 $22.41 $0.30 $83.21 07/01/2019 $49.54 $12.35 $22.41 $0.30 $84.60 01/01/2020 $50.29 $12.35 $22.41 $0.30 $85.35 Apprentice- CEMENT MASONRY/PLASTERING-Eastern Mass(Lynn) Effective Date- 01/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.01 $12.35 $15.41 $0.00 $50.77 2 60 $27.61 $12.35 $17.41 $0.30 $57.67 3 65 $29.91 $12.35 $18.41 $0.30 $60.97 4 70 $32.21 $12.35 $19.41 $0.30 $64.27 5 75 $34.52 $12.35 $20.41 $0.30 $67.58 6 80 $36.82 $12.35 $21.41 $0.30 $70.88 7 90 $41.42 $12.35 $22.41 $0.30 $76.48 Effective Date- 07/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.71 $12.35 $15.41 $0.00 $51.47 2 60 $28.45 $12.35 $17.41 $0.30 $58.51 3 65 $30.82 $12.35 $18.41 $0.30 $61.88 4 70 $33.19 $12.35 $19.41 $0.30 $65.25 5 75 $35.56 $12.35 $20.41 $0.30 $68.62 6 80 $37.93 $12.35 $21.41 $0.30 $71.99 7 90 $42.67 $12.35 $22.41 $0.30 $77.73 (Notes: Steps 3,4 are 500 hrs.All other steps are 1,000 hrs. Apprentice to Journeyworker Ratio:l:3 CHAIN SAW OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" CLAM SHELLS/SLURRY BUCKETSMEADING MACHINES 12/01/2017 $47.63 $10.50 $15.50 $0.00 $73.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 6 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DELEADER(BRIDGE) 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 PAINTERSLOCAL 35-ZONE 2 Apprentice- PAINTER Local 35 -BRIDGES/TANKS Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.71 $7.85 $0.00 $0.00 $33.56 2 55 $28.28 $7.85 $3.66 $0.00 $39.79 3 60 $30.85 $7.85 $3.99 $0.00 $42.69 4 65 $33.42 $7.85 $4.32 $0.00 $45.59 5 70 $35.99 $7.85 $14.11 $0.00 $57.95 6 75 $38.56 $7.85 $14.44 $0.00 $60.85 7 80 $41.13 $7.85 $14.77 $0.00 $63.75 8 90 $46.27 $7.85 $15.44 $0.00 $69.56 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 DEMO:ADZEMAN 12/01/2017 $37.65 $7.70 $14.75 $0.00 $60.10 LABORERS-ZONE 2 06/01/2018 $38.60 $7.70 $14.75 $0.00 $61.05 12/01/2018 $39.55 $7.70 $14.75 $0.00 $62.00 06/01/2019 $40.55 $7.70 $14.75 $0.00 $63.00 12/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 For apprentice rates see"Apprentice-LABORER" DEMO:BACKHOE/LOADER/HAMNMR OPERATOR 12/01/2017 $38.65 $7.70 $14.75 $0.00 $61.10 LABORERS-ZONE2 06/01/2018 $39.60 $7.70 $14.75 $0.00 $62.05 12/01/2018 $40.55 $7.70 $14.75 $0.00 $63.00 06/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 12/01/2019 $42.55 $7.70 $14.75 $0.00 $65.00 For apprentice rates see"Apprentice-LABORER" DEMO:BURNERS 12/01/2017 $38.40 $7.70 $14.75 $0.00 $60.85 LABORERS-ZONE 2 06/01/2018 $39.35 $7.70 $14.75 $0.00 $61.80 12/01/2018 $40.30 $7.70 $14.75 $0.00 $62.75 06/01/2019 $41.30 $7.70 $14.75 $0.00 $63.75 12/01/2019 $42.30 $7.70 $14.75 $0.00 $64.75 For apprentice rates see"Apprentice-LABORER" DEMO:CONCRETE CUTTER/SAWYER 12/01/2017 $38.65 $7.70 $14.75 $0.00 $61.10 LABORERS-ZONE 2 06/01/2018 $39.60 $7.70 $14.75 $0.00 $62.05 12/01/2018 $40.55 $7.70 $14.75 $0.00 $63.00 06/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 12/01/2019 $42.55 $7.70 $14.75 $0.00 $65.00 For apprentice rates see"Apprentice-LABORER" --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 7 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO:JACKHAMNIER OPERATOR 12/01/2017 $38.40 $7.70 $14.75 $0.00 $60.85 LABORERS-ZONE2 06/01/2018 $39.35 $7.70 $14.75 $0.00 $61.80 12/01/2018 $40.30 $7.70 $14.75 $0.00 $62.75 06/01/2019 $41.30 $7.70 $14.75 $0.00 $63.75 12/01/2019 $42.30 $7.70 $14.75 $0.00 $64.75 For apprentice rates see"Apprentice-LABORER" DEMO:WRECKING LABORER 12/01/2017 $37.65 $7.70 $14.75 $0.00 $60.10 LABORERS-ZONE2 06/01/2018 $38.60 $7.70 $14.75 $0.00 $61.05 12/01/2018 $39.55 $7.70 $14.75 $0.00 $62.00 06/01/2019 $40.55 $7.70 $14.75 $0.00 $63.00 12/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 For apprentice rates see"Apprentice-LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" DIVER 08/01/2017 $61.98 $9.90 $21.15 $0.00 $93.03 PILEDRIVER LOCAL 56(ZONE 1) 08/01/2018 $65.20 $9.90 $21.15 $0.00 $96.25 08/01/2019 $68.52 $9.90 $21.15 $0.00 $99.57 For apprentice rates see"Apprentice-PILE DRIVER" DIVER TENDER 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32 PILEDRIVER LOCAL 56(ZONE 1) 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 For apprentice rates see"Apprentice-PILE DRIVER" DIVER TENDER(EFFLUENT) 08/01/2017 $66.41 $9.90 $21.15 $0.00 $97.46 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $69.86 $9.90 $21.15 $0.00 $100.91 08/01/2019 $73.41 $9.90 $21.15 $0.00 $104.46 For apprentice rates see"Apprentice-PILE DRIVER" DIVER/SLURRY(EFFLUENT) 08/01/2017 $92.97 $9.90 $21.15 $0.00 $124.02 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85 08/01/2019 $102.78 $9.90 $21.15 $0.00 $133.83 For apprentice rates see"Apprentice-PILE DRIVER" DRAWBRIDGE OPERATOR(Construction) 09/01/2017 $49.28 $13.00 $17.48 $0.00 $79.76 ELECTRICIANS LOCAL 103 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN" ELECTRICIAN 09/01/2017 $49.28 $13.00 $17.48 $0.00 $79.76 ELECTRICIANS LOCAL 103 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 8 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELECTRICL4N-Local 103 Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $19.71 $13.00 $0.59 $0.00 $33.30 2 40 $19.71 $13.00 $0.59 $0.00 $33.30 3 45 $22.18 $13.00 $13.39 $0.00 $48.57 4 45 $22.18 $13.00 $13.39 $0.00 $48.57 5 50 $24.64 $13.00 $13.76 $0.00 $51.40 6 55 $27.10 $13.00 $14.12 $0.00 $54.22 7 60 $29.57 $13.00 $14.50 $0.00 $57.07 8 65 $32.03 $13.00 $14.87 $0.00 $59.90 9 70 $34.50 $13.00 $15.25 $0.00 $62.75 10 75 $36.96 $13.00 $15.62 $0.00 $65.58 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $20.06 $13.00 $0.60 $0.00 $33.66 2 40 $20.06 $13.00 $0.60 $0.00 $33.66 3 45 $22.57 $13.00 $13.61 $0.00 $49.18 4 45 $22.57 $13.00 $13.61 $0.00 $49.18 5 50 $25.08 $13.00 $13.99 $0.00 $52.07 6 55 $27.58 $13.00 $14.38 $0.00 $54.96 7 60 $30.09 $13.00 $14.76 $0.00 $57.85 8 65 $32.60 $13.00 $15.15 $0.00 $60.75 9 70 $35.11 $13.00 $15.53 $0.00 $63.64 10 75 $37.61 $13.00 $15.93 $0.00 $66.54 Notes: : App Prior 1/1/03;30/35/40/45/50/55/65/70/75/80 Apprentice to Journeyworker Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2017 $55.86 $15.28 $15.71 $0.00 $86.85 ELEVATOR CONSTRUCTORS LOCAL 4 --------------------------------------------------------------------------------------------------------------------------------------------- Tssne Date: 07/14/701 R Waue Rennest Number: 20180214-032 Paae 9 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- ELEVATOR CONSTRUCTOR-Local 4 Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $27.93 $15.28 $0.00 $0.00 $43.21 2 55 $30.72 $15.28 $15.71 $0.00 $61.71 3 65 $36.31 $15.28 $15.71 $0.00 $67.30 4 70 $39.10 $15.28 $15.71 $0.00 $70.09 5 80 $44.69 $15.28 $15.71 $0.00 $75.68 Notes: ! Steps 1-2 are 6 mos.;Steps 3-5 are 1 year I Apprentice to Journeyworker Ratio:1:1 ELEVATOR CONSTRUCTOR HELPER 01/01/2017 $39.10 $15.28 $15.71 $0.00 $70.09 ELEVATOR CONSTR UCTORS L OCAL 4 For apprentice rates see"Apprentice-ELEVATOR CONSTRUCTOR" FENCE&GUARD RAIL ERECTOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2017 $42.88 $10.00 $15.25 $0.00 $68.13 OPERATING ENGINEERS LOCAL 4 05/01/2018 $43.59 $10.00 $15.25 $0.00 $68.84 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2017 $44.34 $10.00 $15.25 $0.00 $69.59 OPERATING ENGINEERSLOCAL 4 05/01/2018 $45.06 $10.00 $15.25 $0.00 $70.31 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2017 $22.83 $10.00 $15.25 $0.00 $48.08 OPERATING ENGINEERS LOCAL 4 05/01/2018 $23.26 $10.00 $15.25 $0.00 $48.51 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIRE ALARM INSTALLER 09/01/2017 $49.28 $13.00 $17.48 $0.00 $79.76 ELECTRICIANS LOCAL 103 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN' - FIRE ALARM REPAIR/MAINTENANCE 09/01/2017 $36.96 $13.00 $15.62 $0.00 $65.58 l LOCAL 103 COMMISSIONINGELECTIucrANs 03/01/2018 $37.61 $13.00 $15.93 $0.00 $66.54 09/01/2018 $38.51 $13.00 $15.96 $0.00 $67.47 03/01/2019 $39.40 $13.00 $15.98 $0.00 $68.38 For apprentice rates see"Apprentice-TELECOMMUNICATIONS TECHNICIAN' --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 10 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment FIREMAN(ASST.ENGINEER) 12/01/2017 $38.57 $10.50 $15.50 $0.00 $64.57 OPERATING ENGINEERSLOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FLAGGER&SIGNALER 12/01/2017 $21.50 $7.70 $13.60 $0.00 $42.80 LABORERS-ZONE 2 06/01/2018 $21.50 $7.70 $13.60 $0.00 $42.80 12/01/2018 $22.50 $7.70 $13.60 $0.00 $43.80 06/01/2019 $22.50 $7.70 $13.60 $0.00 $43.80 12/01/2019 $23.50 $7.70 $13.60 $0.00 $44.80 06/01/2020 $23.50 $7.70 $13.60 $0.00 $44.80 12/01/2020 $24.50 $7.70 $13.60 $0.00 $45.80 06/01/2021 $24.50 $7.70 $13.60 $0.00 $45.80 12/01/2021 $24.50 $7.70 $13.60 $0.00 $45.80 For apprentice rates see"Apprentice-LABORER' FLOORCOVERER 03/01/2016 $42.13 $9.80 $17.62 $0.00 $69.55 FLOORCOVERERSLOCAL 2168 ZONE] Apprentice- FLOORCOVERER-Local 2168 Zone I Effective Date- 03/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.07 $9.80 $1.79 $0.00 $32.66 2 55 $23.17 $9.80 $1.79 $0.00 $34.76 3 60 $25.28 $9.80 $12.25 $0.00 $47.33 4 65 $27.38 $9.80 $12.25 $0.00 $49.43 5 70 $29.49 $9.80 $14.04 $0.00 $53.33 6 75 $31.60 $9.80 $14.04 $0.00 $55.44 7 80 $33.70 $9.80 $15.83 $0.00 $59.33 8 85 $35.81 $9.80 $15.83 $0.00 $61.44 Notes:Steps are 750 hrs. %After 09/1/17;45/45/55/55/70/70/80/80(1500hr Steps) Step 1&2$30.55/3&4$36.49/5&6$53.33/7&8$59.33 Apprentice to Journeywo&J Ratio.i.I FORK LIFT/CHERRY PICKER 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" GENERATOR/LIGHTING PLANTMEATERS 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" GLAZIER(GLASS PLANK/AIR BARRIERANTERIOR 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 SYSTEMS) GLAZIERS LOCAL 35(ZONE 2) --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 11 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- GLAZIER-Local 35 Zone 2 Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.46 $7.85 $0.00 $0.00 $28.31 2 55 $22.50 $7.85 $3.66 $0.00 $34.01 3 60 $24.55 $7.85 $3.99 $0.00 $36.39 4 65 $26.59 $7.85 $4.32 $0.00 $38.76 5 70 $28.64 $7.85 $14.11 $0.00 $50.60 6 75 $30.68 $7.85 $14.44 $0.00 $52.97 7 80 $32.73 $7.85 $14.77 $0.00 $55.35 8 90 $36.82 $7.85 $15.44 $0.00 $60.11 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:I:I HOISTINGENGINEER/CRANES/GRADALLS 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 Apprentice- OPERATING ENGINEERS-Local 4 Effective Date- 12/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $25.65 $10.50 $0.00 $0.00 $36.15 2 60 $27.98 $10.50 $15.50 $0.00 $53.98 3 65 $30.31 $10.50 $15.50 $0.00 $56.31 4 70 $32.64 $10.50 $15.50 $0.00 $58.64 5 75 $34.97 $10.50 $15.50 $0.00 $60.97 6 80 $37.30 $10.50 $15.50 $0.00 $63.30 7 85 $39.64 $10.50 $15.50 $0.00 $65.64 8 90 $41.97 $10.50 $15.50 $0.00 $67.97 Notes: Apprentice to Journeyworker Ratio:1:6 HVAC(DUCTWORK) 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84 SHEETMETAL WORKERS LOCAL 17-A For apprentice rates see"Apprentice-SHEET METAL WORKER" HVAC(ELECTRICAL CONTROLS) 09/01/2017 $49.28 $13.00 $17.48 $0.00 $79.76 ELECTRICIANSLOCAL 103 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN' HVAC(TESTING AND BALANCING-AIR) 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84 SHEETMETAL WORKERS LOCAL 17-A --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 12 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment For apprentice rates see"Apprentice-SHEET METAL WORKER" HVAC(TESTING AND BALANCING-WATER) 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEFITTERS LOCAL 537(Local 138) For apprentice rates see"Apprentice-PIPEFITTER"or"PLUMBER/PIPEFITTER" HVAC MECHANIC 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEFITTERS LOCAL 537(Local 138) For apprentice rates see"Apprentice-PIPEFITTER"or"PLUMBER/PIPEFITTER" HYDRAULIC DRILLS 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88 LABORERS-ZONE 2 06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72 12/01/2018 $35.26 $7.70 $13.60 $0.00 $56.56 06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43 12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29 06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18 12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07 06/01/2021 $39.69 $7.70 $13.60 $0.00 $60.99 12/01/2021 $40.60 $7.70 $13.60 $0.00 $61.90 For apprentice rates see"Apprentice-LABORER" INSULATOR(PIPES&TANKS) 09/01/2017 $47.09 $11.75 $14.20 $0.00 $73.04 HEAT&FROSTINSULATORSLOCAL 6(BOSTON) 09/01/2018 $4934 $11.75 $14.20 $0.00 $75.29 09/01/2019 $51.84 $11.75 $14.20 $0.00 $77.79 Apprentice- ASBESTOS INSULATOR(Pipes&Tanks)-Local 6 Boston Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.55 $11.75 $10.45 $0.00 $45.75 2 60 $28.25 $11.75 $11.20 $0.00 $51.20 3 70 $32.96 $11.75 $11.95 $0.00 $56.66 4 80 $37.67 $11.75 $12.70 $0.00 $62.12 Effective Date- 09/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.67 $11.75 $10.45 $0.00 $46.87 2 60 $29.60 $11.75 $11.20 $0.00 $52.55 3 70 $34.54 $11.75 $11.95 $0.00 $58.24 4 80 $39.47 $11.75 $12.70 $0.00 $63.92 Notes: Steps are 1 year Apprentice to Journeyworker Ratio:1:4 IRONWORKER/WELDER 03/16/2017 $40.24 $7.80 $20.85 $0.00 $68.89 IRONWORKERSLOCAL 7(LAWRENCEAREA) --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 13 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- IRONWORKER-Local 7 Lawrence Effective Date- 03/16/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.14 $7.80 $20.85 $0.00 $52.79 2 70 $28.17 $7.80 $20.85 $0.00 $56.82 3 75 $30.18 $7.80 $20.85 $0.00 $58.83 4 80 $32.19 $7.80 $20.85 $0.00 $60.84 5 85 $34.20 $7.80 $20.85 $0.00 $62.85 6 90 $36.22 $7.80 $20.85 $0.00 $64.87 Notes: Structural 1:6;Ornamental 1:4 Apprentice to Journeyworker Ratio: JACKHAMMER&PAVING BREAKER OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" LABORER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 ------------------------------------------ -------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 14 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- LABORER-Zone 2 Effective Date- 12/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.70 $7.70 $13.60 $0.00 $41.00 2 70 $22.98 $7.70 $13.60 $0.00 $44.28 3 80 $26.26 $7.70 $13.60 $0.00 $47.56 4 90 $29.55 $7.70 $13.60 $0.00 $50.85 Effective Date- 06/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.20 $7.70 $13.60 $0.00 $41.50 2 70 $23.57 $7.70 $13.60 $0.00 $44.87 3 80 $26.94 $7.70 $13.60 $0.00 $48.24 4 90 $30.30 $7.70 $13.60 $0.00 $51.60 Notes: Apprentice to Journeyworker Ratio:1:5 LABORER:CARPENTER TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For apprentice rates see"Apprentice-LABORER" LABORER:CEMENT FINISHER TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 313.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For apprentice rates see"Apprentice-LABORER" LABORER:HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2017 $33.03 $7.70 $13.55 $0.00 $54.28 LABORERS-ZONE 2 06/01/2018 $33.87 $7.70 $13.55 $0.00 $55.12 12/01/2018 $34.71 $7.70 $13.55 $0.00 $55.96 06/01/2019 $35.58 $7.70 $13.55 $0.00 $56.83 12/01/2019 $36.44 $7.70 $13.55 $0.00 $57.69 For apprentice rates see"Apprentice-LABORER" --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Reauest Number: 20180214-032 Page 15 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER:MASON TENDER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 •$60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER' LABORER:MULTI-TRADE TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For apprentice rates see"Apprentice-LABORER" LABORER:TREE REMOVER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 This classification applies to all tree work associated with the removal of standing trees,and trimming and removal of branches and limbs when the work is not done for a utility company for the purpose of operation,maintenance or repair of utility company equipment.For apprentice rates see"Apprentice-LABORER" LASER BEAM OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 16 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MARBLE&TILE FINISHERS 02/01/2018 $39.82 $10.75 $18.34 $0.00 $68.91 BRICKLAYERS LOCAL 3-MARBLE&TILE 08/01/2018 $40.90 $10.75 $18.47 $0.00 $70.12 02/01/2019 $41.41 $10.75 $18.47 $0.00 $70.63 08/01/2019 $42.49 $10.75 $18.61 $0.00 $71.85 02/01/2020 $43.00 $1.0.75 $18.61 $0.00 $72.36 08/01/2020 $44.08 $10.75 $18.76 $0.00 $73.59 02/01/2021 $44.59 $10.75 $18.76 $0.00 $74.10 08/01/2021 $45.71 $10.75 $18.92 $0.00 $75.38 02/01/2022 $46.18 $10.75 $18.92 $0.00 $75.85 Apprentice- MARBLE&TILE FINISHER.-Local 3 Marble&Tile Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.91 $10.75 $18.34 $0.00 $49.00 2 60 $23.89 $10.75 $18.34 $0.00 $52.98 3 70 $27.87 $10.75 $18.34 $0.00 $56.96 4 80 $31.86 $10.75 $18.34 $0.00 $60.95 5 90 $35.84 $10.75 $18.34 $0.00 $64.93 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.45 $10.75 $18.47 $0.00 $49.67 2 60 $24.54 $10.75 $18.47 $0.00 $53.76 3 70 $28.63 $10.75 $18.47 $0.00 $57.85 4 80 $32.72 $10.75 $18.47 $0.00 $61.94 5 90 $36.81 $10.75 $18.47 $0.00 $66.03 €Notes: 9 Apprentice to Journeyworker Ratio:1:3 MARBLE MASONS,TILELAYERS&TERRAZZO MECH 02/01/2018 $52.10 $10.75 $20.03 $0.00 $82.88 BRICKLAYERS LOCAL 3-MARBLE&TILE 08/01/2018 $53.45 $10.75 $20.16 $0.00 $84.36 02/01/2019 $54.07 $10.75 $20.16 $0.00 $84.98 08/01/2019 $55.42 $10.75 $20.30 $0.00 $86.47 02/01/2020 $56.05 $10.75 $20.30 $0.00 $87.10 08/01/2020 $57.40 $10.75 $20.45 $0.00 $88.60 02/01/2021 $58.04 $10.75 $20.45 $0.00 $89.24 08/01/2021 $59.44 $10.75 $20.61 $0.00 $90.80 02/01/2022 $60.01 $10.75 $20.61 $0.00 $91.37 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 17 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- MARBLE-TILE-TERRAZZO MECHANIC-Local 3 Marble&Tile Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.05 $10.75 $20.03 $0.00 $56.83 2 60 $31.26 $10.75 $20.03 $0.00 $62.04 3 70 $36.47 $10.75 $20.03 $0.00 $67.25 4 80 $41.68 $10.75 $20.03 $0.00 $72.46 5 90 $46.89 $10.75 $20.03 $0.00 $77.67 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.73 $10.75 $20.16 $0.00 $57.64 2 60 $32.07 $10.75 $20.16 $0.00 $62.98 3 70 $37.42 $10.75 $20.16 $0.00 $68.33 4 80 $42.76 $10.75 $20.16 $0.00 $73.67 5 90 $48.11 $10.75 $20.16 $0.00 $79.02 Notes: Apprentice to Journeyworker Ratio:1:5 MECH.SWEEPER OPERATOR(ON CONST.SITES) 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" MECHANICS MAINTENANCE 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" MILLWRIGHT(Zone 2) 10/01/2017 $36.32 $9.90 $18.50 $0.00 $64.72 MILLWRIGHTS LOCAL 1121-Zone 2 04/01/2018 $37.17 $9.90 $18.50 $0.00 $65.57 10/01/2018 $38.02 $9.90 $18.50 $0.00 . $66.42 04/01/2019 $38.87 $9.90 $18.50 $0.00 $67.27 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 18 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- MILLWRIGHT-Local 1121 Zone 2 Effective Date- 10/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $19.98 $9.90 $5.31 $0.00 $35.19 2 65 $23.61 $9.90 $15.13 $0.00 $48.64 3 75 $27.24 $9.90 $16.10 $0.00 $53.24 4 85 $30.87 $9.90 $17.06 $0.00 $57.83 Effective Date- 04/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $20.44 $9.90 $5.31 $0.00 $35.65 2 65 $24.16 $9.90 $15.13 $0.00 $49.19 3 75 $27.88 $9.90 $16.10 $0.00 $53.88 4 85 $31.59 $9.90 $17.06 $0.00 $58.55 Notes: Steps are 2,000 hours Apprentice to Journeyworker Ratio:1:5 MORTARMIXER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER' OILER(OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2017 $23.24 $10.50 $15.50 $0.00 $49.24 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" OILER(TRUCK CRANES,GRADALLS) 12/01/2017 $27.40 $10.50 $15.50 $0.00 $53.40 OPERATING ENGINEERSLOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT-CLASS H 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PAINTER(BRIDGES/TANKS) 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 PAINTERS LOCAL 35-ZONE 2 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Reauest Number: 20180214-032 Page 19 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 -BRIDGES/TANKS Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.71 $7.85 $0.00 $0.00 $33.56 2 55 $28.28 $7.85 $3.66 $0.00 $39.79 3 60 $30.85 $7.85 $3.99 $0.00 $42.69 4 65 $33.42 $7.85 $4.32 $0.00 $45.59 5 70 $35.99 $7.85 $14.11 $0.00 $57.95 6 75 $38.56 $7.85 $14.44 $0.00 $60.85 7 80 $41.13 $7.85 $14.77 $0.00 $63.75 8 90 $46.27 $7.85 $15.44 $0.00 $69.56 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:l:l PAINTER(SPRAY OR SANDBLAST,NEW)* 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 *If 30%or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERSLOCAL 35-ZONE 2 Apprentice- PAINTER Local 35 Zone 2-Spray/Sandblast-New Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate - 1 50 $21.16 $7.85 $0.00 $0.00 $29.01 2 55 $23.27 $7.85 $3.66 $0.00 $34.78 3 60 $25.39 $7.85 $3.99 $0.00 $37.23 4 65 $27.50 $7.85 $4.32 $0.00 $39.67 5 70 $29.62 $7.85 $14.11 $0.00 $51.58 6 75 $31.73 $7.85 $14.44 $0.00 $54.02 7 80 $33.85 $7.85 $14.77 $0.00 $56.47 8 90 $38.08 $7.85 $15.44 $0.00 $61.37 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PAINTER(SPRAY OR SANDBLAST,REPAINT) 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 PAINTERS LOCAL 35-ZONE 2 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 20 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- PAINTER Local 35 Zone 2-Spray/Sandblast-Repaint Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.19 $7.85 $0.00 $0.00 $28.04 2 55 $22.20 $7.85 $3.66 $0.00 $33.71 3 60 $24.22 $7.85 $3.99 $0.00 $36.06 4 65 $26.24 $7.85 $4.32 $0.00 $38.41 5 70 $28.26 $7.85 $14.11 $0.00 $50.22 6 75 $30.28 $7.85 $14.44 $0.00 $52.57 7 80 $32.30 $7.85 $14.77 $0.00 $54.92 8 90 $36.33 $7.85 $15.44 $0.00 $59.62 Notes: 3 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PAINTER(TRAFFIC MARKINGS) 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For Apprentice rates see"Apprentice-LABORER" PAINTER/TAPER(BRUSH,NEW)* 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 *If 30%or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERS LOCAL 35-ZONE 2 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 21 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- PAINTER-Local 35 Zone 2-BRUSHNEW Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.46 $7.85 $0.00 $0.00 $28.31 2 55 $22.50 $7.85 $3.66 $0.00 $34.01 3 60 $24.55 $7.85 $3.99 $0.00 $36.39 4 65 $26.59 $7.85 $4.32 $0.00 $38.76 5 70 $28.64 $7.85 $14.11 $0.00 $50.60 6 75 $30.68 $7.85 $14.44 $0.00 $52.97 7 80 $32.73 $7.85 $14.77 $0.00 $55.35 8 90 $36.82 $7.85 $15.44 $0.00 $60.11 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:IJ PAINTER/TAPER(BRUSH,REPAINT) 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 PAINTERS LOCAL 35-ZONE 2 Apprentice- PAINTER Local 35 Zone 2-BRUSH REPAINT Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.49 $7.85 $0.00 $0.00 $27.34 2 55 $21.43 $7.85 $3.66 $0.00 $32.94 3 60 $23.38 $7.85 $3.99 $0.00 $35.22 4 65 $25.33 $7.85 $4.32 $0.00 $37.50 5 70 $27.28 $7.85 $14.11 $0.00 $49.24 6 75 $29.23 $7.85 $14.44 $0.00 $51.52 7 80 $31.18 $7.85 $14.77 $0.00 $53.80 8 90 $35.07 $7.85 $15.44 $0.00 $58.36 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:lJ PANEL&PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMSTERSJOINT COUNCIL NO.10 ZONE B PIER AND DOCK CONSTRUCTOR(UNDERPINNING AND 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32 DECK) 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 PILEDRIVER LOCAL 56(ZONE 1) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 For apprentice rates see"Apprentice-PILE DRIVER" PILE DRIVER 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 22 of 33 Classification Effective Date Base Wage Health Pension SupplementalTotal Rate Unemployment Apprentice- PILEDRIVER-Local 56 Zone 1 Effective Date- 08/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.14 $9.90 $21.15 $0.00 $53.19 2 60 $26.56 $9.90 $21.15 $0.00 $57.61 3 70 $30.99 $9.90 $21.15 $0.00 $62.04 4 75 $33.20 $9.90 $21.15 $0.00 $64.25 5 80 $35.42 $9.90 $21.15 $0.00 $66.47 6 80 $35.42 $9.90 $21.15 $0.00 $66.47 7 90 $39.84 $9.90 $21.15 $0.00 $70.89 8 90 $39.84 $9.90 $21.15 $0.00 $70.89 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.29 $9.90 $21.15 $0.00 $54.34 2 60 $27.94 $9.90 $21.15 $0.00 $58.99 3 70 $32.60 $9.90 $21.15 $0.00 $63.65 4 75 $34.93 $9.90 $21.15 $0.00 $65.98 5 80 $37.26 $9.90 $21.15 $0.00 $68.31 6 80 $37.26 $9.90 $21.15 $0.00 $68.31 7 90 $41.91 $9.90 $21.15 $0.00 $72.96 8 90 $41.91 $9.90 $21.15 $0.00 $72.96 Notes: Apprentice to Journeyworker Ratio:1:5 PIPEFITTER&STEAMFITTER 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEFITTERS LOCAL 537(Local 138) Apprentice- PIPEFITTER Local 537(Local 138) Effective Date- 03/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $19.54 $9.70 $5.50 $0.00 $34.74 2 45 $21.99 $9.70 $16.14 $0.00 $47.83 3 60 $29.32 $9.70 $16.14 $0.00 $55.16 4 70 $34.20 $9.70 $16.14 $0.00 $60.04 5 80 $39.09 $9.70 $16.14 $0.00 $64.93 Notes: ** 1:3;3:15; 1:10 thereafter/Steps are 1 yr. Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) Apprentice to Journeyworker Ratio:** --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 23 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PIPELAYER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" PLUMBER 09/01/2017 $49.86 $11.57 $15.26 $0.00 $76.69 PLUMBERS&GASFI7TERSL0CAL 12(Local 13 8) 03/01/2018 $5136 $11.57 $15.26 $0.00 $78.19 09/01/2018 $52.86 $11.57 $15.26 $0.00 $79.69 03/01/2019 $54.36 $11.57 $15.26 $0.00 $81.19 09/01/2019 $55.86 $11.57 $15.26 $0.00 $82.69 03/01/2020 $57.36 $11.57 $15.26 $0.00 $84.19 09/01/2020 $58.86 $11.57 $15.26 $0.00 $85.69 03/01/2021 $60.36 $11.57 $15.26 $0.00 $87.19 Apprentice- PL UMBERIGASFITTER-Local 12(Local 138) Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.45 $11.57 $5.54 $0.00 $34.56 2 40 $19.94 $11.57 $6.29 $0.00 $37.80 3 55 $27.42 $11.57 $8.53 $0.00 $47.52 4 65 $32.41 $11.57 $10.03 $0.00 $54.01 5 75 $37.40 $11.57 $11.52 $0.00 $60.49 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.98 $11.57 $5.54 $0.00 $35.09 2 40 $20.54 $11.57 $6.29 $0.00 $38.40 3 55 $28.25 $11.57 $8.53 $0.00 $48.35 4 65 $33.38 $11.57 $10.03 $0.00 $54.98 5 75 $38.52 $11.57 $11.52 $0.00 $61.61 Notes: Steps are 1 yr 9 Step 4 with lic$55.65 Step5 with lic$61.89 1 Apprentice to Journeyworker Ratio:1:5 PNEUMATIC CONTROLS(TEMP.) 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEFITTERSLOCAL 537(Local 138) For apprentice rates see"Apprentice-PIPEFITTER"or"PLUMBER/PIPEFITTER' --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 24 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PNEUMATIC DRILL/TOOL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" POWDERMAN&BLASTER 12/01/2017 $33.83 $7.70 $13.60 $0.00 $55.13 LABORERS-ZONE 2 06/01/2018 $34.67 $7.70 $13.60 $0.00 $55.97 12/01/2018 $35.51 $7.70 $13.60 $0.00 $56.81 06/01/2019 $36.38 $7.70 $13.60 $0.00 $57.68 12/01/2019 $37.24 $7.70 $13.60 $0.00 $58.54 06/01/2020 $38.13 $7.70 $13.60 $0.00 $59.43 12/01/2020 $39.02 $7.70 $13.60 $0.00 $60.32 06/01/2021 $39.94 $7.70 $13.60 $0.00 $61.24 12/01/2021 $40.85 $7.70 $13.60 $0.00 $62.15 For apprentice rates see"Apprentice-LABORER" POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PUMP OPERATOR(CONCRETE) 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PUMP OPERATOR(DEWATERING,OTHER) 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" READY-MIX CONCRETE DRIVER 05/01/2017 $24.21 $8.49 $11.54 $0.00 $44.24 TEAMSTERS LOCAL 42 04/30/2018 $24.21 $8.49 $11.96 $0.00 $44.66 05/01/2018 $24.24 $8.49 $12.46 $0.00 $45.19 04/30/2019 $24.24 $8.49 $12.92 $0.00 $45.65 RECLAIMERS 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME(All Other Work) 06/01/2016 $25.32 $9.80 $16.82 $0.00 $51.94 CARPENTERS-ZONE 2(Residential Wood) RESIDENTIAL WOOD FRAME CARPENTER** 10/01/2017 $26.25 $7.07 $7.86 $0.00 $41.18 **The Residential Wood Frame Carpenter classification applies 04/01/2018 $26.67 $7.07 $7.86 $0.00 $41.60 only to the construction of new,wood frame residences that do not exceed four stories including the basement.CARPENTERS-zoNE 10/01/2018 $27.09 $7.07 $7.86 $0.00 $42.02 2(Residential Wood) 04/01/2019 $27.52 $7.07 $7.86 $0.00 $42.45 10/01/2019 $27.95 $7.07 $7.86 $0.00 $42.88 As of 9/1/09 Carpentry work on wood-frame residential WEATHERIZATION projects sball be paid the RESIDENTIAL WOOD FRAME CARPENTER rate. --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 25 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- CARPENTER(Residential Wood Frame)-Zone 2 Effective Date- 10/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $15.75 $7.07 $0.00 $0.00 $22.82 2 60 $15.75 $7.07 $0.00 $0.00 $22.82 3 65 $17.06 $7.07 $7.86 $0.00 $31.99 4 70 $18.38 $7.07 $7.86 $0.00 $33.31 5 75 $19.69 $7.07 $7.86 $0.00 $34.62 6 80 $21.00 $7.07 $7.86 $0.00 $35.93 7 85 $22.31 $7.07 $7.86 $0.00 $37.24 8 90 $23.63 $7.07 $7.86 $0.00 $38.56 Effective Date- 04/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $16.00 $7.07 $0.00 $0.00 $23.07 2 60 $16.00 $7.07 $0.00 $0.00 $23.07 3 65 $17.34 $7.07 $7.86 $0.00 $32.27 4 70 $18.67 $7.07 $7.86 $0.00 $33.60 5 75 $20.00 $7.07 $7.86 $0.00 $34.93 6 80 $21.34 $7.07 $7.86 $0.00 $36.27 7 85 $22.67 $7.07 $7.86 $0.00 $37.60 8 90 $24.00 $7.07 $7.86 $0.00 $38.93 Notes: %Indentured After 10/1/17;45/45/55/55/70/70/80/80 Step 1&2$18.88/3&4$26.26/5&6$33.31/7&8$35.93 Apprentice to Journeyworker Ratio:l:5 RIDE-ON MOTORIZED BUGGY OPERATOR 12/01/2017 $33.08 - $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" ROOFER(Ine.Roofer Waterproofng&Roofer Damproofg) 02/01/2018 $42.36 $11.35 $14.80 $0.00 $68.51 ROOFERSLOCAL 33 08/01/2018 $43.46 $11.35 $14.80 $0.00 $69.61 02/01/2019 $44.61 $11.35 $14.80 $0.00 $70.76 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 26 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- ROOFER-Local 33 Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.18 $11.35 $3.44 $0.00 $35.97 2 60 $25.42 $11.35 $14.80 $0.00 $51.57 3 65 $27.53 $11.35 $14.80 $0.00 $53.68 4 75 $31.77 $11.35 $14.80 $0.00 $57.92 5 85 $36.01 $11.35 $14.80 $0.00 $62.16 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.73 $11.35 $3.44 $0.00 $36.52 2 60 $26.08 $11.35 $14.80 $0.00 $52.23 3 65 $28.25 $11.35 $14.80 $0.00 $54.40 4 75 $32.60 $11.35 $14.80 $0.00 $58.75 5 85 $36.94 $11.35 $14.80 $0.00 $63.09 Notes:** 1:5,2:6-10,the 1:10;Reroofing:-1:4,then 1:1 Step 1 is 2000 hrs.;Steps 2-5 are 1000 hrs. (Hot Pitch Mechanics'receive$1.00 hr.above ROOFER) Apprentice to Journeyworker Ratio:** ROOFER SLATE/TILE/PRECAST CONCRETE 02/01/2018 $42.61 $11.35 $14.80 $0.00 $68.76 ROOFERS LOCAL 33 08/01/2018 $43.71 $11.35 $14.80 $0.00 $69.86 02/01/2019 $44.86 $11.35 $14.80 $0.00 $71.01 For apprentice rates see"Apprentice-ROOFER" SHEETMETAL WORKER 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84 SHEETMETAL WORKERS LOCAL 17-A --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 27 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- SHEET METAL WORKER-Local 17,4 Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.64 $12.20 $5.61 $0.00 $35.45 2 40 $17.64 $12.20 $5.61 $0.00 $35.45 3 45 $19.85 $12.20 $10.85 $1.29 $44.19 4 45 $19.85 $12.20 $10.85 $1.29 $44.19 5 50 $22.06 $12.20 $11.80 $1.38 $47.44 6 50 $22.06 $12.20 $12.05 $1.39 $47.70 7 60 $26.47 $12.20 $13.70 $1.57 $53.94 8 65 $28.67 $12.20 $14.65 $1.67 $57.19 9 75 $33.08 $12.20 $16.56 $1.86 $63.70 10 85 $37.49 $12.20 $17.96 $2.03 $69.68 Notes: Steps are 6 mos. Apprentice to Journeyworker Ratio:1:4 SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 PAINTERS LOCAL 35-ZONE 2 Apprentice- SIGNERECTOR-Local 35 Zone 2 Effective Date- 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 ` ` 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 Notes: Steps are 4 mos. Apprentice to Journeyworker Ratio:1:1 SPECIALIZED EARTH MOVING EQUIP<35 TONS 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 TEAMSTERS JOINT COUNCIL NO.10 ZONE B SPECIALIZED EARTH MOVING EQUIP>35 TONS 12/01/2016 $32.73 $10.91 $10.89 $0.00 $54.53 TEAMSTERS JOINT COUNCIL NO.10 ZONE B --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 28 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment SPRINKLER FITTER 01/01/2018 $51.33 $9.12 $17.40 $0.00 $77.85 SPRINKLER FITTERS LOCAL 550-(Section B)Zone 2 03/01/2018 $52.68 $9.12 $17.40 $0.00 $79.20 10/01/2018 $54.03 $9.12 $17.40 $0.00 $80.55 01/01/2019 $54.03 $9.47 $17.60 $0.00 $81.10 03/01/2019 $55.38 $9.47 $17.60 $0.00 $82.45 10/01/2019 $56.73 $9.47 $17.60 $0.00 $83.80 03/01/2020 $58.08 $9.47 $17.60 $0.00 $85.15 10/01/2020 $59.43 $9.47 $17.60 $0.00 $86.50 03/01/2021 $60.78 $9.47 $17.60 $0.00 $87.85 Apprentice- SPRINKLER FITTER-Local 550(Section B)Zone 2 Effective Date- 01/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.97 $9.12 $8.90 $0.00 $35.99 2 40 $20.53 $9.12 $8.90 $0.00 $38.55 3 45 $23.10 $9.12 $8.90 $0.00 $41.12 4 50 $25.67 $9.12 $8.90 $0.00 $43.69 5 55 $28.23 $9.12 $8.90 $0.00 $46.25 6 60. $30.80 $9.12 $10.40 $0.00 $50.32 7 65 $33.36 $9.12 $10.40 $0.00 $52.88 8 70 $35.93 $9.12 $10.40 $0.00 $55.45 9 75 $38.50 $9.12 $10.40 $0.00 $58.02 10 80 $41.06 $9.12 $10.40 $0.00 $60.58 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $18.44 $9.12 $8.90 $0.00 $36.46 2 40 $21.07 $9.12 $8.90 $0.00 $39.09 3 45 $23.71 $9.12 $8.90 $0.00 $41.73 4 50 $26.34 $9.12 $8.90 $0.00 $44.36 5 55 $28.97 $9.12 $8.90 $0.00 $46.99 6 60 $31.61 $9.12 $10.40 $0.00 $51.13 7 65 $34.24 $9.12 $10.40 $0.00 $53.76 8 70 $36.88 $9.12 $10.40 $0.00 $56.40 9 75 $39.51 $9.12 $10.40 $0.00 $59.03 10 80 $42.14 $9.12 $10.40 $0.00 $61.66 Notes:Apprentice entered prior 9/30/10: 40/45/50/55/60/65/70/75/80/85 Steps are 850 hours Apprentice to Journeyworker Ratio:1:3 STEAM BOILER OPERATOR 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" TAMPERS,SELF-PROPELLED OR TRACTOR DRAWN 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 29 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment For apprentice rates see"Apprentice-OPERATING ENGINEERS" TELECOMMUNICATION TECHNICIAN 09/01/2017 $36.96 $13.00 $15.62 $0.00 $65.58 ELECTRICIANS LOCAL 103 03/01/2018 $37.61 $13.00 $15.93 $0.00 $66.54 09/01/2018 $38.51 $13.00 $15.96 $0.00 $67.47 03/01/2019 $39.40 $13.00 $15.98 $0.00 $68.38 Apprentice- TELECOMMUNICATION TECHNICIAN-Local 103 Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $14.78 $13.00 $0.44 $0.00 $28.22 2 40 $14.78 $13.00 $0.44 $0.00 $28.22 3 45 $16.63 $13.00 $12.55 $0.00 $42.18 4 45 $16.63 $13.00 $12.55 $0.00 $42.18 5 50 $18.48 $13.00 $12.82 $0.00 $44.30 6 55 $20.33 $13.00 $13.10 $0.00 $46.43 7 60 $22.18 $13.00 $13.39 $0.00 $48.57 8 65 $24.02 $13.00 $13.66 $0.00 $50.68 9 70 $25.87 $13.00 $13.95 $0.00 $52.82 10 75 $27.72 $13.00 $14.22 $0.00 $54.94 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.04 $13.00 $0.45 $0.00 $28.49 2 40 $15.04 $13.00 $0.45 $0.00 $28.49 3 45 $16.92 $13.00 $12.74 $0.00 $42.66 4 45 $16.92 $13.00 $12.74 $0.00 $42.66 5 50 $18.81 $13.00 $13.03 $0.00 $44.84 6 55 $20.69 $13.00 $13.32 $0.00 $47.01 7 60 $22.57 $13.00 $13.61 $0.00 $49.18 8 65 $24.45 $13.00 $13.90 $0.00 $51.35 9 70 $26.33 $13.00 $14.19 $0.00 $53.52 10 75 $28.21 $13.00 $14.48 $0.00 $55.69 Notes: Apprentice to Journeyworker Ratio:1:1 TERRAZZO FINISHERS 02/01/2018 $51.00 $10.75 $20.03 $0.00 $81.78 BRICKLAYERS LOCAL 3-MARBLE&TILE 08/01/2018 $52.35 $10.75 $20.16 $0.00 $83.26 02/01/2019 $52.99 $10.75 $20.16 $0.00 $83.90 08/01/2019 $54.34 $10.75 $20.30 $0.00 $85.39 02/01/2020 $54.98 $10.75 $20.30 $0.00 $86.03 08/01/2020 $56.33 $10.75 $20.45 $0.00 $87.53 02/01/2021 $56.97 $10.75 $20.45 $0.00 $88.17 08/01/2021 $58.37 $10.75 $20.61 $0.00 $89.73 02/01/2022 $58.96 $10.75 $20.61 $0.00 $90.32 --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 30 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- TERRAZZO FIMSHER-Local 3 Marble&Tile Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.50 $10.75 $20.03 $0.00 $56.28 2 60 $30.60 $10.75 $20.03 $0.00 $61.38 3 70 $35.70 $10.75 $20.03 $0.00 $66.48 4 80 $40.80 $10.75 $20.03 $0.00 $71.58 5 90 $45.90 $10.75 $20.03 $0.00 $76.68 Notes: Apprentice to Journeyworker Ratio:1:3 TEST BORING DRILLER 12/01/2016 $37.70 $7.60 $14.35 $0.00 $59.65 LABORERS-FOUNDATIONAND MARINE For apprentice rates see"Apprentice-LABORER" TEST BORING DRILLER HELPER 12/01/2016 $36.42 $7.60 $14.35 $0.00 $58.37 LABORERS-FOUNDATIONAND MARINE For apprentice rates see"Apprentice-LABORER" TEST BORING LABORER 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25 LABORERS-FOUNDATIONAND MARINE For apprentice rates see"Apprentice-LABORER" TRACTORS/PORTABLE STEAM GENERATORS 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.82 TEAMSTERS JOINT COUNCIL NO.10 ZONE B TUNNEL WORK-COMPRESSED AIR 12/01/2016 $48.58 $7.60 $14.75 $0.00 $70.93 LABORERS(COMPRESSED AIR) For apprentice rates see"Apprentice-LABORER' TUNNEL WORK-COMPRESSED AIR(HAZ.WASTE) 12/01/2016 $50.58 $7.60 $14.75 $0.00 $72.93 LABORERS(COMPRESSED AIR) For apprentice rates see"Apprentice-LABORER' TUNNEL WORK-FREE AIR 12/01/2016 $40.65 $7.60 $14.75 $0.00 $63.00 LABORERS(FREEAIR TUNNEL) For apprentice rates see"Apprentice-LABORER" TUNNEL WORK-FREE AIR(HAZ.WASTE) 12/01/2016 $42.65 $7.60 $14.75 $0.00 $65.00 LABORERS(FREE AIR TUNNEL) For apprentice rates see"Apprentice-LABORER" ... VAC-HAUL 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 TEAMSTERSJOINT COUNCIL NO.10 ZONES --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 31 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment WAGON DRILL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER' WASTE WATER PUMP OPERATOR 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" WATER METER INSTALLER 09/01/2017 $49.86 $11.57 $15.26 $0.00 $76.69 PLUMBERS&GASPTITERSLOCAL 12(Local 138) 03/01/2018 $51.36 $11.57 $15.26 $0.00 $78.19 09/01/2018 $52.86 $11.57 $15.26 $0.00 $79.69 03/01/2019 $54.36 $11.57 $15.26 $0.00 $81.19 09/01/2019 $55.86 $11.57 $15.26 $0.00 $82.69 03/01/2020 $57.36 $11.57 $15.26 $0.00 $84.19 09/01/2020 $58.86 $11.57 $15.26 $0.00 $85.69 03/01/2021 $60.36 $11.57 $15.26 $0.00 $87.19 For apprentice rates see"Apprentice-PLUMBER/PIPEFITTER'or"PLUMBER/GASFITI'ER" Outside Electrical-East CABLE TECHNICIAN(Power Zone) 09/03/2017 $27.14 $7.75 $1.81 $0.00 $36.70 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" CABLEMAN(Underground Ducts&Cables) 09/03/2017 $38.45 $7.75 $9.53 $0.00 $55.73 OUTSIDE ELECTRICAL WORKERS-EASTLOCAL 104 For apprentice rates see"Apprentice-LINEMAN" DRIVER/GROUNDMAN CDL 09/03/2017 $31.66 $7.75 $9.44 $0.00 $48.85 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" DRIVER/GROUNDMAN-Inexperienced(<2000 Hrs) 09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.38 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" EQUIPMENT OPERATOR(Class A CDL) 09/03/2017 $38.45 $7.75 $13.61 $0.00 $59.81 OUTSIDE ELECTRICAL WORKERS-EASTLOCAL 104 For apprentice rates see"Apprentice-LINEMAN" EQUIPMENT OPERATOR(Class B CDL) 09/03/2017 $33.92 $7.75 $10.21 $0.00 $51.88 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" GROUNDMAN 09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.38 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" GROUNDMAN-Inexperienced(<2000 Hrs.) 09/03/2017 $20.35 $7.75 $1.61 $0.00 $29.71 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" JOURNEYMAN LINEMAN 09/03/2017 $45.23 $7.75 $16.61 $0.00 $69.59 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 -----------------------------------------------------------------------------------------=--------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 32 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- LINEMAN(Outside Electrical)-East Local 104 Effective Date- 09/03/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $27.14 $7.75 $3.31 $0.00 $38.20 2 65 $29.40 $7.75 $3.38 $0.00 $40.53 3 70 $31.66 $7.75 $3.45 $0.00 $42.86 4 75 $33.92 $7.75 $5.02 $0.00 $46.69 5 80 $36.18 $7.75 $5.09 $0.00 $49.02 6 85 $38.45 $7.75 $5.15 $0.00 $51.35 7 90 $40.71 $7.75 $7.22 $0.00 $55.68 Notes: Apprentice to Journeyworker Ratio:1:2 TELEDATA CABLE SPLICER 01/01/2016 $28.98 $4.25 $3.12 $0.00 $36.35 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 TELEDATA LINEMAN/EQUIPMENT OPERATOR 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 TELEDATA WIREMAN/INSTALLER/TECEMCIAN 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 TREE TRIMMER 01/31/2016 $18.51 $3.55 $0.00 $0.00 $22.06 OUTSIDE ELECTRICAL WORKERS-EASTLOCAL 104 This classification applies only to tree work done:(a)for a utility company,R.E.A.cooperative,or railroad or coal mining company,and(b)for the purpose of operating,maintaining,or repairing the utility company's equipment,and(c)by a person who is using hand or mechanical cutting methods and is not on the ground. This classification does not apply to wholesale tree removal. TREE TRIMMER GROUNDMAN 01/31/2016 $16.32 $3.55 $0.00 $0.00 $19.87 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 This classification applies only to tree work done:(a)for a utility company,R.E.A.cooperative,or railroad or coal mining company,and(b)for the purpose of operating,maintaining,or repairing the utility company's equipment,and(c)by a person who is using hand or mechanical cutting methods and is on the ground. This classification does not apply to wholesale tree removal. Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre-determined hourly wage rate established by the Commissioner under the provisions of the M.G.L.c.149,ss.26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c.23,ss.11E-I IL. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L.c.23,ss.I IE-11L. All steps are six months(1000 hours.) Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof,unless otherwise specified. ** Multiple ratios are listed in the comment field. *** APP to JM;1:1,2:2,2:3,3:4,4:4,4:5,4:6,5:7,6:7,6:8,6:9,7:10,8:10,8:11,8:12,9:13,10:13,10:14,etc. **** APP to JM;1:1,1:2,2:3,2:4,3:5,4:6,4:7,5:8,6:9,6:10,7:11,8:12,8:13,9:14,10:15,10:16,etc. --------------------------------------------------------------------------------------------------------------------------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-032 Page 33 of 33 CERTIFICATIONS CERTIFICATE OF NON-COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee,union, club or other organization, entity, or group of individuals. Signature j Date 7 &/i r, jAA o l lot, Sic�dtt _i�h.l i�h �r_ .r�G� it i-tcon,5f Pritif Name & Title Company Name C(�� CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I a�3-fi`'UiCf-t•��v�26 A�WMD2jOjO& ,l1 , authorized signatory for] ki q kr&1yY4Sf i t10 Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes,permit or other fees,reporting of employees and contractors, and withholding and remitting child support. g1/ 7 1 l T �w Signature Date =' ``_J------- Town - ---Town of North Andover IFB Page 54 of 69 McEvoy Field Improvements CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The,undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA- approved construction safety and health course lasting at least ten (10)hours. Signature Date e"Igfcr—tib- Pridl4ame, &Title Company Name C .1 . Town of North Andover IFB Page 55 of 69 McEvoy Field Improvements CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of , shall be valid and binding upon I hereby certify that I am the clerk of the above named and that is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover IFB Page 56 of 69 McEvoy Field Improvements CERTIFICATE OF VOTE I, Raymond W. Heimlich,hereby certify that I am the duly qualified and acting Secretary of Heimlich Landscaping and Construction Corporation and I further certify that a meeting of the Directors of said company, duly called and held on June 2, 2017, at which all Directors were present and voting, the following vote was unanimously passed: VOTED: To authorize and empower Raymond W. Heimlich, President Anyone acting singly, to execute Forms of General Bid, Contracts or Bonds on behalf of the Corporation. I further certify that the above vote is still in effect and has not been changed or modified in any respect. BY: ,�., - ae?gi� Raymond W. Heimlich (Clerk) �-, HEIML-1 OP ID: EST ACORO" DATE(MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 04/27/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER CONTACT Eastern States Insurance NAME: Agency,Inc. a/CONN E:t:781-642-9000 ac No: 781-647-3670 Prospect Street E'MAIL Waltham,MA 02453 SS:certificaterequest@esia.com W INSURER(S)AFFORDING COVERAGE NAIL# INSURER A:U.S. Fire Insurance Company 21113 INSURED Heimlich Landscaping INSURER B:The North River Insurance Co. 21105 &Construction Corporation wsu 65 Burlington Street Rear RERc:Travelers Property Casualty Co 25674 Woburn, MA 01801 INSURERD:Travelo--casualty Insurance 19046 www.sakenvironmental.com Ipecialty Ins Co. 25445 978-688-7804 COVERAGES CERTIE REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OI INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDINGANY REQUI ITHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PER / c CRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POL LAIMS. AiDDLI TR TYPE OF INSURANCE DI v - fYYYY LIMITS A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00 DAMAGE TO RENTED CLAIMS-MADE a OCCUR X 2019 PREMISES Ea occurrence $ 50,00 MED EXP(Any one person) $ 5,00 PERSONAL&ADV INJURY $ 1,000,00 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,00 JECT LOC I v. PRODUCTS-COMP/OP AGG $ 2,000,00 POLICY a OTHER: F �� U $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,00( Ea accident D ANY AUTO X 19 BODILY INJURY(Per person) $ ALL OWNEDSCHEDULED AUTOS X AUTOS BODILY INJURY(Per accident) $ NON-OWNED ®®� EnvYonmentaf ParraccltleMDAMAGE $ HIRED AUTOS AUTOS ACV $ Ded$1,00 X UMBRELLA LIAR X OCCUR EACH OCCURRENCE $ 5,000,00 B I EXCESS LIAB CLAIMS-MADE X 5811100029 01/01/2018 01/01/2019 AGGREGATE $ 5,000,00 DED X RETENTION$ None $ WORKERS COMPENSATION X AND EMPLOYERS'LIABILITY AND ER YIN A ANY PROPRIETOR/PARTNER/EXECUTIVE 408-7331532 01/01/2018 01/01/2019 E.L.EACH ACCIDENT $ 500,00 OFFICER/MEMBER EXCLUDED? NIA (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 500,00 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.-DISEASE-POLICY LIMIT $ 500,00 C Equipment Floater QT 660 6B276737 TIL 18 01/01/2018 01/01/2019 Rented 250,00 E Pollution UBEB0659998117 01/01/2018 01/01/2019 Occ/Agg $1M/$2 DESCRIPTION OF OPERATIONS r LOCATIONS r VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) RE: McEvoy Field Improvements ball safety nettingg systems Town of Andover is included as additional insure on a primary non- contributory basis on polcies as indicated above when required by written contract or agreement. CERTIFICATE HOLDER CANCELLATION ANDAND2 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of Andover ACCORDANCE WITH THE POLICY PROVISIONS. 36 Bartlet Street Andover, MA 01810 AUTHORIZED REPRESENTATIVE ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD Form W=9 Request for Taxpayer Give Form to the (Rev.November 2017) Identification Number and Certification requester.Do not Department of the Treasury send to the IRS. Internal Revenue Service ►Go to www.irs.gov/FormW9 for instructions and the latest information. 1 Name(as shown on your income tax return).Name is required on this line;do not leave this line blank. Heimlich Landscaping&Construction Corp. 2 Business name/disregarded entity name,if different from above M 3 Check appropriate box for federal tax classification of the person whose name Is entered on line 1.Check only one of the 4 Exemptions(codes apply only to rofollowing seven boxes. certain entitles,not individuals;see CL Instructions on page 3): p ❑ Individual/sole proprietor or ❑ C Corporation ❑✓ S Corporation ❑ Partnership ❑Trust/estate single-member LLC Exempt payee code(d any) CL 2 ❑ Limited liability company.Enter the tax classification(C=C corporation,S=S corporation,P=Partnership)► `p .�_. Note:Check the appropriate box in the line above for the tax classification of the single-member owner. Do not check Exemption from FATCA reporting SLLC if the LLC is classified as a single-member LLC that is disregarded from the owner unless the owner of the LLC is code( y) E c ci another LLC that is not disregarded from the owner for U.S.federal tax purposes.Otherwise,a single-member LLC that if an Is disregarded from the owner should check the appropriate box for the tax classification of its owner. y ❑ Other(see instructions)► (Applies to accounts maintained outside the U.S.) N 5 Address(number,street,and apt.or suite no.)See instructions. Requester's name and address(optional) 65 Burlington Street Town of North Andover 6 City,state,and ZIP code 120 Main Street Woburn,MA 01801 North Andover MA 01845 7 List account number(s)here(optional) EMU Taxpayer Identification Number(TIN) Enter your TIN in the appropriate box.The TIN provided must match the name given on line 1 to avoid social security number backup withholding.For individuals,this is generally your social security number(SSN).However,for a -El - resident alien,sole proprietor,or disregarded entity,see the instructions for Part I,later.For other entities,it is your employer identification number(EIN).If you do not have a number,see How to get a TIN,later. or Note:If the account is in more than one name,see the instructions for line 1.Also see What Name and Employer identification number Number To Give the Requester for guidelines on whose number to enter. . -1 L MO4 - 2 1 8 1 7 1 0 1 4 1 5 Certification Under penalties of perjury,I certify that: 1.The number shown on this form is my correct taxpayer identification number(or I am waiting for a number to be issued to me);and 2.1 am not subject to•backup withholding because:(a)I am exempt from backup withholding,or(b)I have not been notified by the Internal Revenue Service(IRS)that I am subject to backup withholding as a result of a failure to report all interest or dividends,or(c)the IRS has notified me that I am no longer subject to backup withholding;and 3.1 am a U.S.citizen or other U.S.person(defined below);and 4.The FATCA code(s)entered on this form(if any)indicating that I am exempt from FATCA reporting is correct. Certification instructions.You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return.For real estate transactions,item 2 does not apply.For mortgage interest paid, acquisition or abandonment of secured property,cancellation of debt,contributions to an individual retirement arrangement(IRA),and generally,payments other than interest and dividends,you are not required to sign the certification,but you must provide your correct TIN.See the instructions for Part 11,later. Sin 9 Signature of , Here U.S.person► r / � Date 0, / f f General Instructions •Form 1099-DIV(dividends,including those from stocks or mutual funds) Section references are to the Internal Revenue Code unless otherwise .Form 1099-MISC(various types of income,prizes,awards,or gross noted, proceeds) Future developments.For the latest information about developments e Form 1099-B(stock or mutual fund sales and certain other related to Form W-9 and its instructions,such as legislation enacted transactions by brokers) after they were published,go to www.irs.gov/F6rmW9. •Form 1099-S(proceeds from real estate transactions) Purpose of Form •Form 1099-K(merchant card and third party network transactions) An individual or entity(Form W-9 requester)who is required to file an •Form 1098(home mortgage interest),1098-E(student loan interest), information return with the IRS must obtain your correct taxpayer 1098-T(tuition) identification number(TIN)which may be your social security number •Form 1099-C(canceled debt) (SSN),individual taxpayer identification number(ITIN),adoption •Form 1099-A(acquisition or abandonment of secured property) taxpayer identification number(ATIN),or employer identification number Use Form W-9 only if you are a U.S.person(including a resident (EIN),to report on an information return the amount paid to you,or other alien),to provide your correct TIN. amount reportable on an information return.Examples of information returns include,but are not limited to,the following. If you do not return Form W-9 to the requester with a TIN,you might •Form 1099-INT(interest earned or paid) be subject to backup withholding.See What is backup withholding, later. Cat.No.10231X Form W-9(Rev.11-2017)