Loading...
HomeMy WebLinkAbout2013-10-01 Planning Board Supplemental Materials (20) Enright, Jean From: Lisa Eggleston <lisa @egglestonenvironmental.com> Sent: Tuesday, September 17, 2013 5:53 PM To: Tymon, Judy Subject: Kittredge School Judy, Per your request, I have conducted a brief review of the 7/3/13 plans for the new gymnasium at Kittredge School with respect to stormwater management. I also had a phone conversation to discuss the drainage design yesterday with Paul Avery and Sean Malone of Oak Consulting Group. My comments are as follows: 1. If possible, connection from proposed catchbasin#1 should be to a new manhole structure,and the existing catchbasin at the edge of pavement moved offline. 2. Proposed catchbasin#2 should also be installed as an offline structure and the extension of the existing 12-inch drain under the building tied in at a downgradient manhole. 3. Outlet hoods should be specified on the two new catchbasins. 4. I recommend domed landscape grates on the catchbasins to prevent blockage. 5. I recommend straw wattles in lieu of or in addition to the silt fence sedimentation barrier. 6. The stabilized construction entrance should have a minimum 2" stone to prevent tracking. Let me know if you have any questions. Lisa D. Eggleston, P.E. Eggleston Environmental 32 Old Framingham Rd, Unit#29 Sudbury, MA 01776 Tel 508.259.1137 Fax 866.820.7840 Icaac inu�c dho IVlauuac:h°iuuc��s Scc;icJary of SJaJ c ufficc has dc�cnrnhncd dha�rnosu ornallc�u and from ir7uinlc;ilcal ufficccu and officials arc public rccui Ju I::::or inorc nfurrnaJlon Icicacc rcfcr Coc http://www.sec.state.ma.us/pre/preidx.htm, Icacc cuinuldcr dho cinvinuinrncinE lucfure,IurlinElnq dhic crnall, 1