Loading...
HomeMy WebLinkAbout2013-12-03 Planning Board Supplemental Materials (38) Anaover, mAuisiu December 31, 2013 Ms. Judith M. Tymon, AI Town Planner 1600 Osgood Street, Bldg 20, Suite 2-36 North Andover, MA 01845 Re: Brightview, North Andover Certification of Site Work Completion Dear Mis, Tymon, As Environmental and Construction Monitor I have made weekly site inspections since the project started construction. My duties did not include full time inspection but Miller Engineering and Testing Inc- of Manchester, N14 was on site to monitor the day to construction of the site work as well as the building construction. They filed reports of construction activities concerning compliance with the specifications. I was on their distribution list for these reports and have reviewed them. Furthermore, I have discussed the project with Frank Miller, Vice President at Miller Engineering. From this discussion, my inspections and our joint site walk on November 25, 1 submit the following Certification- f certify that the site work including, slope's and retaining walls have been completed conforming to the approved plans and as documented by the as- built plans. Wetland mitigation plantings were started last year and are well established. Site landscaping was started at the end of this growing season and is well established around the immediate building perimeter.er. In man of these a rea s turf was provided. Where grass and meadow mixes were planted in the more outlying areas the vegetation is still becoming established. I have been on site during the 1.6 inch rain storm on Wednesday November 27, and the runoff from the site was c1car- If you should have any questions please let me know. With-best TegaT4, CLIF FORD EINAR CARLSON Cliffofiko.)Carlson, P. E. Nn.28343 CIVIL