HomeMy WebLinkAbout2013-05-07 Planning Board Supplemental Materials (19)
PLANNING DEPARTMENT
Community Development Division
1600 Osgood Street
North Andover, Massachusetts, 01845
SITE PLAN REVIEW DECISION
Any appeal shall be filed
within (20) days after the
date of filing this notice in
the office of the Town Clerk.
Date:
May 7, 2013
Date of Hearing:
April 2, 2013, April 16,
2013, May 7, 2013
Date of Decision:
May 7, 2013
Petition of: Flight Landata, Inc.
250 Clark Street
North Andover, MA 01845
Premises Affected: 250 Clark Street
Assessors Map 75 Lot F
Referring to the above petition for a Site Plan Special Permit, from the requirements of the North Andover
Zoning Bylaw, Sections 8.3, 10.3, and 10.31, and M.G.L. c.40A, Sec. 9.
So as to allow the expansion of an existing building from 9,525 sq. ft. to a total of 19,005 sq. ft., to provide
additional office and R&D space as well as hanger space, with expanded parking from 14 to 38 spaces,
associated landscaping, installation of a larger septic system, stormwater management and installation of
utilities in the Industrial 2 (I-2) Zoning District.
nd
APPROVE
After a public hearing given on the above date, and upon a motion by X and 2 by X to the Site
X – 0 in favor
Plan Special Permit as amended and based upon the following conditions. The vote was of the
application.
__________
On behalf of the North Andover Planning Board
John Simons, Chairman
Richard Rowen
Lora McSherry
Michael Colantoni
Dave Kellogg
Lynne Rudnicki
1
250 Clark Road.
Map 75, Parcel F
Site Plan Special Permit – Expansion of Existing Industrial Building
The Planning Board herein APPROVES a Site Plan Review Special Permit for the expansion of an existing
building from 9,525 sq. ft. to a total of 19,005 sq. ft., to provide additional office and R&D space as well as
hanger space, with expanded parking from 14 to 38 spaces, associated landscaping, installation of a larger
septic system, stormwater management and installation of utilities in the Industrial 2 (I-2) Zoning District.
The project is located at 250 Clark Street, North Andover, Massachusetts 01845, Assessors Map 75, Parcel F
within the Industrial 2 (I-2) Zoning District. The parcel totals approximately 74,122 sq. ft. of leasehold area
Flight Landata Inc., 250 Clark Street,
with frontage on Clark Street. This Special Permit was requested by
North Andover, MA 01845.
The application was filed with the Planning Board on or about February 15,
2013. The public hearing on the above referenced application was opened on April 2, 2013, with additional
hearings on April 16, 2013, and closed by the North Andover Planning Board on May 7, 2013. The applicant
submitted a complete application, which was noticed and reviewed in accordance with Section 8.3, 10.3 and
10.31 of the Town of North Andover Zoning Bylaw and MGL C.40A, Sec. 9.
The Planning Board makes the following findings as required by the North Andover Zoning Bylaws
Section 8.3 and 10.3:
FINDINGS OF FACT:
1) The specific site is an appropriate location for the project as it is the expansion of an existing
structure, expansion of parking, improvements to the stormwater system that will improve the
drainage on the lot, as well as an expansion of the septic system.
2) Based on input received from both the Planning Board, the Planning Board’s consultants, the
applicant has provided sufficient stormwater management facilities to mitigate flow of stormwater by
providing two (2) Bio-filters with stone spillways to treat stormwater runoff from the parking area
and the addition. Roof runoff will be captured by deep stone-filled trench located at the southern
edge of the addition. This design will mitigate the flow of stormwater from the new parking areas and
the addition, thus complying with the Planning Board’s Site Plan Review standards.
3) The project is in compliance with all Board of Health Department Regulations. Having received
approval of the Septic Design Plan dated April 18, 2013
4) The site has sufficient space for parking and traffic circulation. The proposed warehouse and office
use requires 27 spaces, according to the Town’s Zoning Bylaw section 8.1 Off-Site Parking and the
proposal includes 38 spaces. Because of its location at the Lawrence Airport, there will be no parking
or traffic circulation impacts on surrounding neighborhoods.
5) Finally the Planning Board finds that this project generally complies with the Town of North Andover
Zoning Bylaw requirements as listed in Section 8.3.5, but requires conditions in order to be fully in
compliance. The Planning Board hereby grants an approval to the applicant providedthe following
conditions are met:
SPECIAL CONDITIONS:
1) Permit Definitions:
A) The “Locus” or “Site” refers to the 74,122 sq. ft. parcel with land fronting on Clark Street as
shown on Assessors Map 75, Parcel F, and also known as 250 Clark Street, North Andover,
Massachusetts.
2
250 Clark Road.
Map 75, Parcel F
Site Plan Special Permit – Expansion of Existing Industrial Building
B) The “Plans” refer to the plans prepared by Williams & Sparages, 191 South Main Street, Suite
103, Middleton, MA 01949 entitled “Layout Plan in North Andover, Mass.”, dated February 7,
2013, as most recently revised on April 16, 2013 consisting of Sheets 1 through 4.
The “Project” refers to the expansion of an existing building from 9,525 sq. ft. to a total
C)
of 19,005 sq. ft., to provide additional office and R&D space as well as hanger space,
with expanded parking from 14 to 38 spaces, associated landscaping, installation of a
larger septic system, stormwater management and installation of utilities in the Industrial
2 (I-2) Zoning District.
D) The “Applicant” refers to Flight Landata, Inc., 250 Clark Street, North Andover, MA 01845, the
applicant for the Special Permit, its successors and assigns.
E) The “Project Owner” refers to the person or entity holding the fee interest to the title to the Locus
from time to time, which can include but is not limited to the applicant, developer, and owner.
2) Waivers: The Applicant has requested waivers from the following provisions of the Town of North
including
Andover Zoning Bylaw, Section 8.3.5.e (xix) – Traffic Study, (xxii) – Fiscal Impact, and
(xxiii) – Community Impact. As part of this decision, the Planning Board has granted the above
waivers, in that it has found that the Applicant has provided sufficient information as part of its
application to address all traffic, fiscal, community, and other impacts.
PRIORTO ENDORSEMENT OF PLANS
3)
A) The developer shall provide the Planning Board with copies of permits, plans and decisions
received from all North Andover land use Boards.
PRIOR TO THE START OF SITE WORK OR CONSTRUCTION
4)
A) Three (3) copies of the signed, recorded decision and the recorded plans must be delivered to the
Planning Department.
B) The applicant shall designate an independent Construction Monitor who shall be chosen in
consultation with the Planning Department staff. The Construction Monitor shall submit weekly
reports during the entire duration of the project and must be available upon four (4) hours notice
to inspect the site with the Planning Board staff.
C) A detailed construction schedule shall be submitted to the Planning Staff for the purpose of
tracking the construction and informing the public of anticipated activities on the site.
$5,000.00)
D) A bond in the amount of five thousand dollars ( shall be posted for the purpose of
insuring that the site is constructed in accordance with the approved plan and that a final as-built
plan is provided, showing the location of all on-site structures. This bond shall be in the form of
a check made out to the Town of North Andover. This check will then be deposited into an
interest bearing bond account.
E) All stormwater management best practices shall be maintained as specified in the Stormwater
Operations and Maintenance Plan that was submitted with the on February 7, 2013, revised
March 26, 2013 and April 9, 2013, titled “Operations and Maintenance Plan 250 Clark Street”.
F) All applicable erosion control measures must be in place and reviewed and approved by the Planning
all existing and proposed
Department. These measures must include erosion control to protect
catch basins and oil traps on the site or on the streets adjacent to the project.
3
250 Clark Road.
Map 75, Parcel F
Site Plan Special Permit – Expansion of Existing Industrial Building
G) Yellow “Caution” tape must be placed along the limit of clearing and grading as shown on the plan.
The Planning Department must be contacted prior to any cutting and or clearing on site. All existing
trees that will remain in the landscaped area are to be marked prior to the pre-construction meeting.
H) A pre-construction meeting must be held with the developer, their construction employees, Planning
Department and other applicable departments, to discuss scheduling of inspections to be conducted
on the project and the construction schedule.
5) DURING CONSTRUCTION
A) Dust mitigation must be performed weekly, or more frequently as directed by the Town Planner,
throughout the construction process.
B) Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan and
reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times
and fenced off to minimize any dust problems that may occur with adjacent properties.
C) It shall be the responsibility of the developer to assure that no erosion from the construction site shall
occur which will cause deposition of soil or sediment upon adjacent properties or public ways,
except as normally ancillary to off-site construction. Off-site erosion will be a basis for the Planning
Board making a finding that the project is not in compliance with the plan; provided, however, that
the Planning Board shall give the developer written notice of any such finding and ten days to cure
said condition.
6) PRIOR TO A CERTIFICATE OF OCCUPANCY
A) The applicant must submit a letter from the architect and engineer of the project stating that the
building, landscaping, lighting and site layout substantially comply with the plans referenced at the
end of this decision as endorsed by the Planning Board.
B) All stormwater structures shall be cleaned, in accordance with the approved Operation &
Maintenance Plan.
7) PRIOR TO THE FINAL RELEASE OF ALL SECURITY AND ESCROWED FUNDS
A) The Planning Staff shall review the site. Any screening as may be reasonably required by the
Planning Staff will be added at the Project Owner’s expense.
B) A final as-built plan showing final topography, the location of all on- site utilities, structures, curb
cuts, parking spaces and drainage facilities, including invert elevations of all stormwater
structures, must be submitted to the Planning Department. The as-built must be provided in paper
form as well as in SDF (Standard Digital File) format. The as-built shall also provide a
calculation showing the increase in impervious area. The applicant must also submit a letter from
the architect and engineer of the project stating that the building, landscaping, lighting and site layout
substantially comply with the plans referenced at the end of this decision as endorsed by the Planning
Board.
4
250 Clark Road.
Map 75, Parcel F
Site Plan Special Permit – Expansion of Existing Industrial Building
C) The Planning Board must by a majority vote make a finding that the site is in conformance with the
approved plan.
8) GENERAL CONDITIONS
A) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
B) Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the
respective utility companies.
C) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through
Friday and between 8:00 a.m. and 5:00 p.m. on Saturday.
D) No open burning shall be done except as is permitted during burning season under the Fire
Department regulations.
E) If a dumpster is required once the building is occupied, the owner shall apply to the Board of
Health for the appropriate permit. The location of the dumpster must be approved by the
Planning Office.
F) The provisions of this conditional approval shall apply to and be binding upon the applicant, its
employees and all successors and assigns in interest or control.
G) Any action by a Town Board, Commission, or Department, which requires changes in the plan or
design of the building, as presented to the Planning Board, may be subject to modification by the
Planning Board.
H) Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed
substantial, the developer must submit revised plans to the Planning Board for approval.
after May 7, 2015
I) This Special Permit approval shall be deemed to have lapsed (two years from
the date permit granted), exclusive of the time required to pursue or await determination of any
appeals, unless substantial use or construction has commenced within said two-year period or for
good cause. For purposes of this development, the developer shall be deemed to have undertaken
substantial use or construction if the developer has begun any site grading or tree clearing.
J) The following information shall be deemed part of the decision:
Plan titled
: Layout Plan in North Andover, Ma
Prepared for
: Flight Landata, Inc.
250 Clark Street
North Andover, MA 01845
Prepared by
: Williams & Sparages
Suite 103
191 South Main Street
Middleton, Ma 01949
Scale
: 1” = 20’
Date
: February 7, 2013, last revised on XXX.
Sheets
: 1 through 4
5
250 Clark Road.
Map 75, Parcel F
Site Plan Special Permit – Expansion of Existing Industrial Building
Architectural Plans
:
Prepared by
: David Barsky-Architect
477 Concord Ave
Cambridge, Ma 02138
Date
: November 2012
Sheets
: A.01-A.07
Stormwater Report
: 250 Clark Street
Dated: February 7, 2013, last revised March 26, 2013
Operations and Maintenance Plan “250 Clark Road”
Dated: February 7, 2013, March 26, 2013 and April 9, 2013
cc: Town Departments
Applicant
Engineer
Abutters
Assessor
6