Loading...
HomeMy WebLinkAbout2011-07-05 Planning Board Supplemental Materials (35) PROPOSED AREA TO BE ADDED LINE OF APPROVED FOUNDATION / / PROPOSED AREA — — TO BE ADDED LINE OF BUILDING \ — \ LINE OF APPROVED ABOVE \ \ FOUNDATION / APPROVED PATIO APPROVED ° V PORTE GOGHERE 0 _PROPOSED PROPOSED PORTE PATIO ° GOGHERE APPROVEDI PROPOSED PATIO I PATIO I I _ J----�—APPROVED PORTE GOGHERE 1 FIRST FLOOR PLAN SCALE: N.T.S. PRO CON4 EF. REF.NORTH ANDOVER SENIOR HOUSING PROJECT 3°1112 SHEET A1.1 INCORPORATED NORTH ANDOVER,MASSACHUSETTS SCALE: N.T.S. Design and Construction Management ARCHITECTURE PROPOSED FIRST FLOOR PLAN o6/z9/I1 A Stebbins Company, P.O.Box 4430,Manchester,NH 03108