HomeMy WebLinkAbout2012-03-20 Planning Board Supplemental Materials (128)DJK
Dermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning
280 Main Street, Suite 204
North Reading, MA 01864-1300
978-664-2205
MEMORANDUM
TO: Mr. George Hughes FROM:Dermot J. Kelly, PE
JEFFCO, INC. DJK Associates, Inc.
P. O. Box 802 280 Main St., Ste. 204
Andover, MA 01810 North Reading, MA 01864
SUBJECT: 26 Main Street
North Andover, MA
Traffic Impact Analysis
REF:824
DATE:February 6, 2011
Proposal
DJK Associates, Inc. has conducted a Traffic Impact Analysis for the proposed construction of 8
Condominiums to be located at 26 Main Street east of the existing buildings located at 22-24
and 28-30 Main Street in North Andover, MA. A single standard 22-foot wide access driveway
is proposed to connect to the 22-24 and 28-30 Main Street parcels in the center of the project
parcel. The existing curb cut serving 22-24 and 28-30 Main Street parcels will be used a
Common Driveway to provide access/egress for the proposed of 8 Condominiums to be located
at 26 Main Street. As part of the proposed project two existing structures located on the lot will
demolished. The existing on site conditions and the proposed project are graphically shown on
the Existing Conditions Plan and the Site Plan prepared by Andover Consultants Inc. dated
January 19, 2012.
Vehicle-Trip Generation Study
Traffic volumes generated by residential developments normally follow well-established patterns
with respect to magnitude and temporal distribution. Measurements of numerous such
developments published by the Institute of Transportation Engineers (ITE) have established trip
generation rates, which have been standardized for analysis purposes. The rates at which
residential projects generate vehicle-trips depend on the type of residential project; i.e., single-
family units versus residential condominiums. Accordingly, the ITE Trip Generation Manual was
researched with the appropriate vehicle-trip generation characteristics applied to the proposed
project.
Based on the Institute of Transportation Engineers (ITE) trip generation rates, it is anticipated
that an 8-unit residential condominium development project would generate approximately 46
vehicle-trips per day (vpd). This daily volume would be split evenly with 23 vehicle-trips entering
and 23 vehicle-trips exiting the site over the course of the entire 24-hour day.
DJK
Dermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning
Mr. Jeff Hughes
February 6, 2012
Page 2
824-Mem2.docx; 2/6/12
More importantly, during the weekday morning peak hour, 8 residential condominium units
would generate a total of 4 vehicle-trips per hour with 1 vehicle-trip entering and 3 vehicle-trips
exiting the project site. Similarly, during the evening peak hour, it is anticipated that 4 vehicle-
trips would be generated. The 4 vehicle-trips would consist of 3 vehicle-trips entering and 1
vehicle-trip exiting the development during the peak 60-minute period. The remaining vehicle-
trips would occur over the course of the day.
Table 1 summarizes the peak-hour and daily project-generated traffic volumes for the proposed
8-unit residential condominium development project as well as the total projected traffic volumes
to be generated onto Main Street at the Common Driveway from both the existing structures
and the proposed project.
A total of 112 vpd would be generated by the existing structures and the proposed 8
Condominiums at the intersection of the Common Driveway with Main Street. During each of
the morning and evening peak hours, a total of 13 vph would be generated at the intersection of
the Common Driveway with Main Street.
DJK
Dermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning
Mr. Jeff Hughes
February 6, 2012
Page 3
824-Mem2.docx; 2/6/12
TABLE 1
VEHICLE-TRIP GENERATION SUMMARY
Time Period/
Direction of Travel
6,076 SF of
Office/Specialty
Retail Space a
8 Condominium
Units b
6,076 SF of
Office/Specialty
Retail Space Plus
8 Condominium
Weekday Morning
Peak Hour
Entering (vph) c 8 1 9
Exiting (vph) 1 3 4
Total (vph) 9 4 13
Weekday Evening
Peak Hour
Entering (vph) 2 3 5
Exiting (vph) 7 1 8
Total (vph) 9 4 13
Daily Traffic
Entering (vpd) d 33 23 56
Exiting (vpd) 33 23 56
Total (vpd) 66 46 112
a Based on the Institute of Transportation Engineers (ITE) Trip Generation, 8th Edition, 2008 Land Use Code #710 General Office
Building
b Based on the Institute of Transportation Engineers (ITE) Trip Generation, 8th Edition, 2008 Land Use Code #230 Residential
Condominium/Townhouse.
c vph = vehicle-trips per hour.
d vpd = vehicle-trips per day.
DJK
Dermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning
Mr. Jeff Hughes
February 6, 2012
Page 4
824-Mem2.docx; 2/6/12
Mitigation Measures
The final phase of the analysis process is to identify the mitigation measures necessary to
minimize the traffic-related impacts of the project on the adjacent transportation system. The
proponent has committed to implement all mitigation measures listed below, assuming all
permits and approvals are obtained to construct the proposed project as well as all necessary
permits and approvals to implement such mitigation and the project proponent proceeding to
construction of the project:
o Installation of a Stop sign at the intersection of the Existing/Proposed Common Driveway
and Main is suggested to be considered.
o To enhance the overall sight distance at the intersection of the Existing/Proposed Common
Driveway with Main Street it is recommended that no roadside vegetation be planted within
five of the adjacent sidewalk.
824-Mem2.docx; 2/6/12
PLAN REFERENCES
o Existing Conditions Plan prepared by Andover Consultants Inc. dated January
19, 2012.
o Site Plan prepared by Andover Consultants Inc. dated January 19, 2012.