February 12, 2012
Mr. Greg Knight
MetroPCS
285 Billerica Road
Chelmsford, MA 01824
RE: Structural Assessment Letter
Site Number: BOS0380C
Site Name:Trinitarian Congregational Church
70 Elm St.
North Andover, MA
Dear Mr. Knight,
Hudson Design Group LLC (HDG) has been authorized by MetroPCS to provide a structural
Assessment of the existing site located at Trinitarian Congregational Church, 70 Elm St., North
Andover, MA.
Based on our evaluation,we have determined that the existing site is capable of supporting the
MetroPCS antennas and equipment.
This determination was based on the following information provided:
1. Structural analysis provided by Hudson Design Group, LLC, dated 10-07-08.
If you have any questions about this project, please contact our office.
Respectfully Submitted,
HUDS DESI N GROUP, LLC � jµof4(4�c
9
o� DANIEL P. yG
HAMM
tL N
Daniel P H m P No.a0720
Preside t 9ForST��Ga
Hudson Design Group, LLC. fWVAL
1600 Osgood Street
Building 20 North Suite 2-101
p:978.557.5553 f:978.336.5586 a: 1600 Osgood Street, Building 20 North,Suite 2-101, N.Andover,MA 01845
p:413.588.8139 f:413.517.0590 a:116 Pleasant Street,Ste 302, Easthampton,MA 01027
STRUCTURAL ANALYSIS REPORT
For
BOS0380C
70 Elm Street North Andover
70 Elm Street
North Andover, Massachusetts
Antennas in the Steeple and Equipment on the Ground
Floor
Prepared for:
MetroPCS WIRELESS
285 Billerica Road, Third Floor
Chelmsford, MA 01824
ca F- A
C ^^r��"�4�'�"�.SF
Dated: :�'�.3.�t#
October 7, 2008 �,Fo
4n Iw�! S4'
Prepared by:
HUDSON DESIGN GROUP, LLC.
1600 Osgood Street Building 20 North, Suite 2-101
North Andover, MA 01845
Phone: (978) 557-5553
Hudson ,
Design Groupuc
SCOPE OF WORK:
Hudson Design Group LLC (HDG)has been authorized by MetroPCS to conduct a structural
evaluation of the existing roof structure supporting the proposed MetroPCS equipment located in
the areas depicted in the Hudson Design Group Lease Exhibit dated 10-02-2008.
This report represents this office's findings, conclusions and recommendations pertaining to the
support of MetroPCS's proposed BTS,Battery and PPC cabinets.
This office conducted an on-site visual survey of the above areas on September 26, 2008.
Attendees included Michael Cabral (HDG-Project Engineer),Andrew Powers(HDG-Associate).
CONCLUSION SUMMARY:
No design documents were available for our use. A limited visual survey of the structure was
complete in or near the areas of the Proposed Work. Based on our evaluation, we have
determined that, in general, structural designs to support the proposed MetroPCS Equipment
within or near the Proposed Lease Area can be completed and components installed with NO
STRUCTURAL UPGRADES REQUIRED to the existing structure. The proposed antennas
are to be secured to pipe masts attached at the top and bottom with lag screws to the existing
wood structure directly behind the existing louvers. The louvers are recommended to be replaced
with an FRP material.
A summary of the proposed support types and attachment locations are as follows:
Proposed BTS (wt=734 lbs) ...Located at inside an existing closet supported at the ground
level.
Proposed Battery Cabinet(wt=2210 lbs)....Located at inside an existing closet supported at
the ground level.
Proposed Galaxy Power Cabinet(wt=2720 lbs)....Located at inside an existing closet
supported at the ground level.
Proposed PPC (wt=200+/-lbs)....Located at inside and existing closet secured to the wall.
Proposed (8)Antennas............Mounted directly behind the existing louvers supported on pipe
masts directly below the clock tower.
,
Hudson
Design Groupuc r
Calculations and referenced documents are attached.
DESIGN CRITERIA:
1. Massachusetts State Building code, latest edition.
Wind Analysis: (N/A due to Antennas being enclosed with the steeple)
Reference Wind Speed, q(z): 110 mph [780CMR 1604.10]
Exposure: C
Category: II [ASCE 7-05 T1.1]
Gust-effect Factor, G: .85 [ASCE Sect 6.5.8.1]
Force Coefficient, C(f): varies [ASCE Fig 6-21]
F= q(z) x G x C(f)x A(f) [ASCE 7-05 Eq 6-281
Snow Loading:
Basic Ground Snow Load: 55 psf [780CMR 1604.10]
2. EIA/TIA -222-F Structural Standards for Steel Antenna Towers and Antenna
Supporting Structures
County: Essex
Wind Load: 90 mph
3. Approximate height above grade to antennas: 80'-0"
Hudson
Design GrOUPLLC
EQUIPMENT SUPPORT RECOMMENDATIONS:
HDG recommends that the proposed equipment be located inside the existing closet below the
stairs supported by the existing concrete slab.
ANTENNA SUPPORT RECOMMENDATIONS:
HDG recommends the antennas be located directly behind the existing louvers(See photos
attached). The antennas will be supported by new pipe masts secured at the top and bottom with
standard lag screws attachments to the existing wood structure. The existing louvers are
recommended to be replaced with an FRP material painted to match the look of the existing
louvers. Lag screws will be designed and furnished in the construction drawings
I
H udsan
Design Group
��c
LOCATION OF PROPOSED EQUIPMENT:
Iowa
r
3931
■1 Ong
1�
Photo 1: Sample photo of the existing closet located at the ground level below the stairs where
the equipment is proposed to be located.
Hudson
Design GroupLLc
f
F E
4
l�
E'
Photo 2: Sample photo of the existing closet below other stairwell on opposite end of proposed
equipment location. Be advised of the concrete floor shown above similar to what is supporting
the proposed equipment.
Hudson 00
Design GroupLLc
LOCATION OF PROPOSED ANTENNAS WITHIN THE CHURCH STEEPLE.
T
r'
Ir-41
rr
rr
j
1
Photo 3: Sample photo of where new MetroPCS antennas are proposed to be located behind the
existing louvers shown above. These louvers are recommended to be replaced with an FRP
material.
e
Hudson
Design Groupuc
PROPOSED PRELIMARY SKETCHES
TOP OF EXISTING SPIR E
ELN. 1567-6"± (AGL)
PROPOSED ANTENNA (TYP. OF 8)
BEHIND FIBERGLASS LOUVERS
TO MATCH EXISTING
PROPOSED ANTENNAS (TOTAL 8) EXISTING BELL
_4
TOWER----TEE� 6;± (AGL)
PROPOSED COAX
RUN FROM
EQUIPMENT TO
ANTENNAS
EXISTING CHURCH
FLOOR LEVEL
ELEV. = 37'-0" (AGL)
PROPOSED
12'-10"X7'-0" LEASE
PROPOSED AREA UNDER STAIRS
POWER/TELCO
(APPRX. 120 SQ* Fl)
GROUND CONDUITS
\
INSIDE CHURCH
GROUND LEVEL
0'
EAST ELEVATION ELEV. = -0" (ACL)
REV 2: 10/02/08
REV 1: 09/29/08
SITE NO: BOS0380C Metrop �S SITE TYPE: CHURCH DATE..
SITE NAME: TRINITARIAN CONGREGATIONAL C& . 09/25/08
CHURCH UnUmR Youmeff.
ADDRESS: 70 ELM STREET 285 BILLERICA ROAD-THIRD FLOOR
NORTH ANDOVER, MA 01845 CHELMSFORD, MA 01824 DRAWN BY: PG SCALE: NTS
PROPOSED INDOOR
BATTERY CABINET
PROPOSED
INDOOR
POWER
CABINET
3'-0"
r
PROPOSED INDOOR MODCELLJ .�
CABINET o
i
LOW CEILING
EL.=6'-8"
EXPAND INTO SLOPE UP
DEAD AREA IF + +
AVAILABLE
EXISTING WALL EXISTING
TO BE REMOVED PIPE
HIGH CEILING
EL=10'-5'
_ 30"
EQUIPMENT PLAN
CLOSET UNDERNEATH STAIRS
@ GRADE LEVEL REV 2: 10/02/08
REV 1: 09/29/08
SITE NAME: TRINITARIAN CONGREGATIONAL metroPC��). SITE TYPE: CHURCH DATE:
CHURCH Unokm Ymme�f, 09/30/08
ADDRESS: N ELM STREET 285 CHELMSF ROAD—THIRD
D MA 01824L00R DRAWN BY: PG SCALE: NTS
NORTH ANDOVER, MA 01845