Loading...
HomeMy WebLinkAbout2012-03-20 Planning Board Supplemental Materials (102) NORTH pFI ,,So 6q/1/O O { d f oma° V C l.. OCTI t) ��ADRATEDC14 S Ill PLANNING DEPARTMENT Community Development Division 1600 Osgood Street North Andover,Massachusetts,01845 Decision—Definitive Subdivision Plan Any appeal shall be filed within (20) clays after the date of filing this notice in the office of the Town Clerk. Date: October 18, 2011 Date of Hearing: September 6, 2011; October 4,2011; October 18,2011 Date of Decision: October 18,2011 Petition of: George A.Haseltine,Trustee of the 2009 Salem St.Revocable Trust 66 Gilcreast Road Londonderry,NH 03053 Premises Affected: 2009 Salem St,,North Andover,MA,Assessors Map 108A,Parcel 2. Referring to the above petition for Approval of a Definitive Subdivision Plan according to the requirements of the North Andover Subdivision Rules and Regulations Section 5.6 Decision: So as to construct a three-lot subdivision, including a roadway, the installations of storrnwater management infrastructure, the installation of underground utilities, the installation of underground water and septic systems and grading in the R-2 Zoning District. After a public hearing given on the above dates, and upon a motion by R. Rowen and 2"`r by T. Seibert to APPROVE, the Application for a Definitive Subdivision Pl� s amended and based upon the following conditions.A vote of 5 -0 was made in favor of the applicatio °1 behalf of the North Andover Planning Board John Simons, Chair ✓ Richard Rowen Michael Colantoni Timothy Seibert Rickey Glover 1 2009 Salem Street 2009 Salem Sheet,"Salem Woods"Definitive Subdivision Plan Decision Map 108A, Parcel The Planning Board herein APPROVES the Application for a Definitive Subdivision to create three lots, including lot 1 with 129,181 sq. ft., Lot 2 with 220,496 sq. ft., and Lot 3 with 54,923 sq. ft. The project is located at 2009 Salem St.,North Andover, Massachusetts, 01845, Map 108A, Parcel 2 in the Residential 2 (R-2) Zoning District. The application was filed with the Planning Board on August 4, 2011. The public hearing on the above referenced application was opened on September 6, 2011, and closed by the North Andover Planning Board on October 18, 2011. The applicant submitted a complete application, which was noticed and reviewed in accordance with Section IV of the Town of North Rules and Regulations Governing the Subdivision of Land. The Planning Board makes the following findings as required by section 5.6 of the North Andover Rules and Regulations Governing the Subdivision of Land: FINDINGS OF FACT: In accordance with Section 5.6 of the North Andover Zoning Rules and Regulations Governing the Subdivision of Land,the Planning Board makes the following findings: A) The Definitive Plan,which dated July 13, 2011,revised September 14, 2011,and October 14, 2011 is substantially complete and technically adequate,except as amended herein. B) The Definitive Plan shows a Property Line Plan (Sheet 2 of 6) that depicts the creation of three lots with the following area and frontage on a 50 ft. Right-of-Way shown on the plan titled "Salem Woods": Lot 1 with 129,181 sq. ft. and 150.76 ft. of frontage, Lot 2 with 220,496 sq. ft. and 334.36 ft. of frontage, and Lot 3 with 54,923 sq. ft and 388.40 ft. of frontage. The Plan thus conforms to all applicable zoning requirements. C) The Planning Board finds that the layout and design of the proposed roadway/common driveway, hereinafter defined as the"Private Roadway," (Sheet 2 of 6, Properly Line Plan) is less intrusive than that of a conventional subdivision road and that the design is more in keeping with the character of the neighborhood. The proposed plan shows all area of approximately 6.3653 acres that will remain as "Conservation Land", containing isolated wetlands and endangered species. D) The Private Roadway layout provides for use of an existing driveway, thus providing for minimal disturbance in creating the new Roadway. E) The Private Roadway layout provides adequate access to all of the lots in the subdivision that will be safe and convenient for travel. F) The Private Roadway layout and stornmvater management systems as depicted in Sheet 4 of 6 (Drainage, Grading and Utilities Plan) has been found to provide a design that is compatible with the surrounding neighborhood, that provides for adequate stormwater drainage, while at the same time, providing for recharge of the existing isolated wetlands in the "Conservation Area". G) The Definitive Plan has been prepared to lessen congestion in such ways and in the adjacent public ways. A) The Private Roadway depicted on the Definitive Plan reduces danger to life and limb in the operation of motor vehicles. At the intersection of the new Private Roadway and Salem St., there are adequate sites lines, in both directions,of over 400 ft. 1) The Definitive Plan secures safety in the case of fire, flood, panic and other emergencies. The new Private Roadway will provide adequate access for emergency situations. J) The Definitive Plan secures adequate provisions for water, sewerage, drainage, underground utility services, fire, police and other similar municipal equipment, and other requirements where necessary in a subdivision. 2 2009 Salem Street 2009 Salem Street,"Salem Woods"Definitive Subdivision Plan Decision Map 108A,Parcel 2 K) The Health Department has observed deep hole and percolation tests for all three lots and has found sufficient soils to sustain a subsurface disposal system. L) The Definitive Plan has been reviewed by the Fire Department and has been found to be acceptable. M) The Definitive Plan conforms with the design and construction standards described in these Rules and Regulations,with the exceptions of waivers granted in Condition 2. Upon reaching the above findings, the Planning Board approves this Definitive Plan based upon the following SPECIAL CONDITIONS: 1) Permit Definitions: A) The"Locus"refers to the 10 acre parcel of land with land fronting on Salem Street as shown on a portion of Assessors Map 108A as Parcel 2, and also known as 2009 Salem Street, North Andover,Massachusetts. B) The "Plans" refer to the plans prepared by Merrimack Engineering Services, 66 Park Street, Andover, MA 01810, dated July 13, 2011, revised to September 14, 2011, October 6, 2011 and October 14, 2011, consisting of Sheets 1 - 6, titled "Salem Woods A Single Family Subdivision, located in North Andover, Massachusetts, record owner and applicant George A. Haseltine, as Trustee of the 2009 Salem Street Revocable Trust,66 Gilcreast Road,Londonderry,NH 03053. C) The "Project' or "2009 Salem Street" refers to the construction of a three-lot subdivision, including a roadway, the installations of stormwater management infrastructure, the installation of underground utilities, connections to existing water and sewer service and substantial grading in the R-2 Zoning District D) The "Applicant' refers to George A. Haseltine, Trustee of the 2009 Salem St. Revocable Trust, the applicant for the Definitive Subdivision Plan Approval. E) The"Project Owner"refers to the person or entity holding the fee interest to the title to the Locus from time to time,which can include but is not limited to the applicant,developer, and owner. F) The "Private Roadway" refers to that section of the roadway as depicted on Sheet 4 of 6 of the "Plans",Drainage,Grading and Utilities Plan Sheet,revised to October 6,2011 and firrther revised to October 14,2011,starting at Station 100+26.13 up to and including Station 105+47.02. 2) The Private Roadway is designed to be less intrusive than a standard subdivision road, in that it provides for significant open space containing natural vernal pools and endangered species habitat and is more compatible with the natural surroundings; 3) The roadway, utilities and stormwater management systems will be constructed according to the Plans, with the following waivers granted by the Town of North Andover Planning Board, according to the provisions of the Town of North Andover Rules and Regulations Governing the Subdivision of Land. The following waivers are hereby granted in consideration of the fact that subdivision only contains 3 lots and that the design of the roadway follows the path of the existing driveway; A) Section 5.2.5.4 Street Plan and Profile: Waiver from the requirement that a street plan and profile be provided. 3 2009 Salem Street 2009 Salem Street,"Salem Woods"Definitive Subdivision Plan Decision Map 108A,Parcel 2 B) Section 6.4 Construction Specifications: Waiver from specifications for roadway construction referenced in Appendices I through IV,to the extent that they are not applicable to the subdivision as designed C) Section 6.5 General Construction Procedures: Waiver from the procedures applicable to roadway construction. D) Section 6.8 Design Standards: Waiver from design standards applicable to roadway construction. E) Section 6.9.No curbing is proposed. F) Section 6.11.No sidewalks are proposed. G) Section 6.15.2.No fire hydrants are proposed. The two new homes will be equipped with a home sprinkler system that will be installed according to current building code standards. H) Section 6.15.5 Municipal Water Supply Not Available: Waiver from the requirement that an alternative water supply be proposed for fire protection, The two new homes will be sprinkled. I) Section 6.18 Street Trees. Waiver from the requirement that street trees be required. J) Section 6.20 No street signs are proposed. K) Section 6.21.No street lighting is proposed. L) Appendix V: Rules &Regulations Governing Stormwater Management. Waiver from those requirements not satisfied the by drainage analysis submitted to and accepted by the Planning Board. The Board deems that each of the foregoing waivers is in the public interest and consistent with the intent and purpose of the Subdivision Control Law and the Rules and Regulations and such waivers are hereby granted. Upon reaching the above findings, the Plamring Board approves this Definitive Plan based upon the following SPECIAL CONDITIONS: 1) The Private Roadway will remain private, to be maintained by a homeowner's association, with the terms of ownership and maintenance to be documented in the respective deeds for each lot in the subdivision. The homeowner's association will also be responsible for the maintenance, in perpetuity, of the drainage Swale along the roadway and for the infiltration basins located on lots 1 and 2. 2) The Town Planner shall approve any changes made to these plans. Any changes deemed substantial by the Town Planner would require a public hearing and modification by the Planning Board. 3) In consideration of the approval of the Plan, there is to be no further division or subdivision of a part or portion of the parcel. This restriction is to be documented in the respective deeds for each lot in the subdivision. PRIOR TO ENDORSEMENT OF THE PLAN Prior to endorsement of the plans by the Planning Board the applicant shall adhere to the following: A) A covenant (FORM 1) securing all lots within the subdivision for the construction of ways and municipal services must be submitted to the Planning Board. Said lots may be released firom the covenant upon posting of security as required in Condition 2 under "PRIOR TO LOTS BEING RELEASED FROM THE STAUTORY COVENANTS". B) A Site Opening Bond in the amount of five thousand ($5,000) dollars to be held by the Town of North Andover. The Site Opening Bard shall be in the form of a check made out to the Town of North Andover that will be placed into an interest hearing escrow account. 4 2009 Salem Sheet 2009 Salem Street,"Salem Woods"Definitive Subdivision Plan Decision Map 108A,Parcel l C) A notation must be placed on the plan noting that the roadway is considered a private roadway, not a public road. D) Deed restrictions must be placed on Lots 1, 2 and 3 regarding the fact that the private roadway will never be maintained by the Town and that it will never be accepted as a public road. E) Deed restrictions must be placed on all lots regarding the father subdivision of the lots, as noted in Special Condition#3. F) Draft easement documents and a draft homeowner's association agreement, containing the specifications for maintenance of the private roadway and storrmvater drainage structures must be submitted and reviewed and approved by Town Counsel as to form. G) The applicant must submit to the Town Planner a FORM M for all utilities and easements placed on the subdivision. H) All drainage, water and sewage facilities designs shall be approved by the North Andover Division of Public Works. 1) An updated Stonuwater Pollution Prevention Plan (SWPPP)must be submitted, that addresses the sequence of construction, to minimize exposed slopes and to protect areas proposed for infiltration. It should also include detail regarding a stabilized construction entrance at the intersection of the Private Roadway and Salem St. J) The applicant must meet with the Town Planner in order to ensure that the plans conform to the Board's decision. These plans must be submitted within ninety (90) clays of filing the decision with the Town Clerk. K) The Subdivision Decision for this project must appear on the mylars. L) A Construction Schedule must be submitted for signature by the Town Planner. M) All documents shall be prepared at the expense of the applicant, as required by the Planning Board Rules and Regulations Governing the Subdivision of Land. N) The applicant will provide copies of all Decisions, Notification and Orders of Conditions from the North Andover Conservation Commission. O) The applicant will also provide a draft copy of the Declaration of Restriction as required by NHESP (Natural Heritage Endangered Species Protection). P) A Construction Monitor must be chosen in consultation with the Planning Department. The monitor must be a registered Professional Civil Engineer.During the installation and construction of the Private Roadway and the infiltration structures(roof leader dry wells and infiltration swale),the Monitor shall conduct periodic inspections as necessary to certify that base materials, installation depth, invert elevations, amount of cover, asphalt layers and all other details proposed for installation of those structures are consistent with design plans and specifications.The certification shall be in the form of a stamped as-built plan as required prior to release of all security and escrowed funds. The Monitor will also monitor the site for compliance with the SWPPP (Storm Water Pollution Prevention Plan)for those areas of the site that are not within the jurisdiction of the Conservation Commission. The Monitor will file a report after each inspection with the Planning Department. PRIOR TO THE START OF CONSTRUCTION OR SITE WORK A) The record plans and deed restrictions must be endorsed by the Planning Board and recorded by the applicant at the Registry of Deeds. B) Three(3)copies of the signed,recorded plans and two copies of the following documents must be delivered to the Planning Department: a recorded Subdivision Approval Form M, draft Easement documents, draft homeowners' agreement and maintenance documents referred to in Condition #1 under"Prior to Endorsement of Plans". C) Yellow"Caution"tape must be placed along the limit of clearing and grading as shown on the plan. The Planning Staff must be contacted prior to any cutting and or clearing on site. 5 2009 Salem Street 2009 Salem Street,"Salem Woods"Definitive Subdivision Plan Decision Map 108A,Parcel D) All applicable erosion control measures must be in place and reviewed and approved by the Planning Department. E) A pre-construction meeting must be held with the developer,their construction employees,Planning Department and Building Department (and other applicable departments) to discuss scheduling of inspections to be conducted on the project and the construction schedule. F) In lieu of constructing sidewalks, the applicant has agreed to make a contribution to the sidewalk fund. The DPW and the Town Planner will determine the amount of the contribution and will provide evidence of determination of that amount to the applicant. PRIOR TO THE ISSUANCE Or A BUILDING PERMIT A) The private driveway for the lot,for which the Building Permit applies,must be constructed to binder paving with stabilized shoulders and the drainage swale in place. B) A Septic System Plan approved by the Board of Health must be provided for the lot. C) A Plot Plan for the lot in question must be submitted to include the following: a. Location of the structure b. Location of the driveway c. Location of all water and sewer lines d. Any graded called for on the lot e. Location of drainage,utility and other easements. D) All appropriate erosion control measures for the lot shall be in place. E) All catch basins shall be protected and maintained with hay bales to prevent siltation into the drain line during construction. E) The lot in question shall be staked in the field. The location of any major departures from the plan must be shown. G) Lot numbers,visible from the Private Roadway must be posted on all lots. DURING CONSTRUCTION A) Any stockpiling of materials (dirt, wood, construction material, etc.)must be shown on a plan and reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times and fenced off to minimize any dust problems that may occur with adjacent properties. B) It shall be the responsibility of the developer to assure that no erosion from the site of construction shall occur which will cause deposition of soil or sediment upon adjacent properties or public ways, except as normally ancillary to off-site sewer or other off-site construction. Off-site erosion will be a basis for the Plarming Board making a finding that the project is not in compliance with the plan; provided, however, that the Planning Board shall give the developer written notice of any such finding and ten days to cure said condition. C) In an effort to reduce noise levels, the developer shall keep in optimum working order, through 6 2009 Salem Street 2009 Salem Street,"Salem Woods"Definitive Subdivision Plan Decision Map 108A,Parcel 2 regular maintenance,any and all equipment that shall emanate sounds from the structures or site. D) Hours of construction are limited from 7 a.m, to 5 p.m., Monday through Friday and 8 a.m.—5 p.m. on Saturdays,excepting interior construction. PRIOR TO ANY LOTS BEING RELEASED FROM THE STATUTORY COVENANTS A) All easement documents, a Homeowner's Association Agreement and the Declaration of Restriction required by NHESP must be recorded and a copy of the recorded documents must be provided to the Planning Office. B) The applicant must submit a lot release(FORM J)to the Planning Board for signature. C) A Performance Guarantee in an amount to be approved by the Planning Board and DPW shall be posted to ensure completion of the work in accordance with the Plans approved as part of this conditional approval. The bond must be in the form acceptable to the North Andover Planning Board. Items covered by the Bond may include,but shall not be limited to: a. as-built drawings; b. sewers and utilities; c. roadway construction and maintenance; d. lot and site erosion control; e. site screening and street trees; f. drainage facilities; g. site restoration; h. final site cleanup. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY A) A granite post with the three "Salem Sheet"house numbers must be installed at the entrance to the driveway. The location and size of granite post must be approved by the North Andover Fire Department. B) All slopes shall be stabilized, as determined by the Planning Board, with regard to erosion and safety. C) The lot must be raked, loamed and seeded, sodded or mulched, and if the weather does not permit seeding or sodding,the site must be stabilized using appropriate erosion control measures. D) It shall be the developer's responsibility to assure the proper placement of the driveways regardless of whether individual lots are sold. Tire Planning Board requires any driveway to be moved at the owner's expense if such driveway is at a catch basin or stone bound position. B) The Planning Board reserves the right to review the site after construction is complete and require additional site screening as it deems necessary and reasonable. F) The applicant must submit a letter from the architect and engineer of the project stating that the building and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. G) The homes built on lots 1 and 2 must be equipped with a home sprinkler system that will be installed according to current building code standards. The sprinkler systems must be inspected and approved by the North Andover Fire Department. 7 2009 Salem Street 2009 Salem Sheet,"Salem Woods"Definitive Subdivision Plan Decision Map 108A,Parcel PRIOR TO THE FINAL RELEASE OF ALL SECURITY AND ESCROWED FUNDS A) A final as-built plan showing final topography, the location of all on- site utilities, structures and drainage facilities must be submitted to the Planning Department. B) The Planning Board must by a majority vote make a finding that the site is in conformance with the approved plan. C) The Town Planner shalll ensure that all Planning, Conservation, Board of Health and Division of Public Works requirements are satisfied and that construction was in strict compliance with all approved plans and conditions. D) The private driveway and all stormwater management systems must be constructed according to the plans approved by the Planning Board GENERAL CONDITIONS A) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. B) Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the respective utility companies. C) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through Friday and between 8:00 a.m. and 5:00 p.m. on Saturday, excepting interior construction. D) The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control. E) Any action by a Town Board, Commission, or Department, which requires changes in the plan or design of the building, as presented to the Planning Board, may be subject to modification by the Planning Board. F) Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed substantial,the developer must submit revised plans to the Planning Board for approval. G) The following information shall be deemed part of the decision: Plan titled: Salem Woods,A Single Family Subdivision,North Andover,Massachusetts Prepared for: 2009 Salem Street Realty Trust 66 Gilgreast Road Londonderry,NH 03053 Prepared by: Merrimack Engineering Services 66 Park Street Andover,MA 01810 North Andover,MA 01845 Scale: 1"=40' Date: July 13,2011,revisions September 14,2011,October 14,2011. Sheets: 1-6 Drainage Analysis Dated: August 1.2011,revised to September 15,2011 8 2009 Salem Street 2009 Salem Street,"Salem Woods"Definitive Subdivision Plan Decision Map I08A,Parcel 2 Plan titled: Pre-Development Subcatclunent Areas Sheets: 1 Application for Definitive Subdivision Plan Received: August 5,2011 cc: Town Departments Applicant Engineer Abutters Assessor School Dept. 9