Loading...
HomeMy WebLinkAbout2012-06-05 Planning Board Supplemental Materials (39) MERRIMACK ENGINEERING $ERVICES INC.� PROFESSIONAL ENGINEERS • HAND SURVEYORS 66 pARK STREET• ANDOVER,MA 01810•(976)4783856.373-8721 •FAY(978)478.1446•ENERS MAIL IntoQmertlmock �In0.c6m May 30, 2012 Mr Eugene Willis,PE Town of North Andover DPW Osgood Street No Andover,Ma RE:Loweil Five Site Plan 498 Chickering Road No Andover,Ma Dear Mr Willis; Regarding the storm drainage runoff,the existing site has 24,594 square4'eet impervious area (roof and pavement)on it and the proposed site developmentwill wilion h ve 22,805 square feet impervious area on it(roof and pavement). ve 9 square feet of impervious area is a 7%reduction in impervious area. The reduction in impervious area will reduce the runoff from the site when Compared to the predevelopment condition as that impervious area wilt be replaced with landscaping, which has a lower curve number than the impervious.area. ent tion is d in In addition the nt condition 3 5%, and the slight reduction m slope will also oreduce the e post development and delaying the runoff and thus slightly time of concentration(making it longer) y1 g reducing the peak runoff rate at the design point, For this project pn the: redeve opment condition,fall runoff ended up attha the catch basin on Chickerig Road at Franklin Seet as the ultimate design point as location. The system, at that point,will then have a reduction of runoff into it. Please do not hesitate to contact me should you have further questions or comments. Very ly 0 G EKING SERVICES • Step Pr ' r