Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2012-07-17 Planning Board Supplemental Materials (23)
ttnnxxTToowweerr Job MA2010 Page 10 of 10 TowerCo 5000 Valleystone Drive Project ENG-15910 (123%) Date 15:13:30 06/11/12 Cary, NC 27519 Phone: (919) 469-5539 FAX: (919) 469-5530 Client TowerCo Designed by Kingsley Section No. Elevation ft Ratio Pu Pn Ratio Mux Mnx Ratio Muy Mny Ratio Vu Vn Ratio Tu Tn Comb. Stress Ratio Allow. Stress Ratio Criteria L4 79.5 - 79 (4) 0.002 0.940 0.000 0.010 0.000 0.943 1.000 4.8.2 L5 79 - 69.5 (5) 0.005 1.220 0.000 0.010 0.000 1.225 1.000 4.8.2 L6 69.5 - 69 (6) 0.005 1.218 0.000 0.002 0.000 1.223 1.000 4.8.2 L7 69 - 23.25 (7) 0.008 0.768 0.000 0.015 0.000 0.776 1.000 4.8.2 L8 23.25 - 0 (8) 0.010 0.970 0.000 0.016 0.000 0.980 1.000 4.8.2 Section Capacity Table Section No. Elevation ft Component Type Size Critical Element P K øPallow K % Capacity Pass Fail L1 99 - 89.5 Pole TP4x4x2 1 -4.25 565.49 69.4 Pass L2 89.5 - 89 Pole TP5x4x2 2 0.07 565.49 69.3 Pass L3 89 - 79.5 Pole TP5x5x2.5 3 -1.85 883.57 94.3 Pass L4 79.5 - 79 Pole TP5.5x5x2.5 4 -1.93 883.57 94.3 Pass L5 79 - 69.5 Pole TP5.5x5.5x2.75 5 -4.89 1069.12 122.5 Fail L6 69.5 - 69 Pole TP19.25x5.5x2.75 6 -5.05 1069.12 122.3 Fail L7 69 - 23.25 Pole TP25.9057x19.25x0.1875 7 -8.04 1005.64 77.6 Pass L8 23.25 - 0 Pole TP28.75x24.9852x0.1875 8 -10.62 1083.81 98.0 Pass Summary Pole (L5) 122.5 Fail RATING = 122.5 Fail Program Version 6.0.0.8 - 9/7/2011 File:L:/2012/1203_Steven's Estate_MA/Task 1/Models/TNX/ERP/MA2010-ERP.eri