Loading...
HomeMy WebLinkAbout2012-07-17 Planning Board Supplemental Materials (43)RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED 7/3/2012) PHASE 2 AUTUMN CHASE: MOLLY TOWN ROAD, LOTS 6 - 11 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 10/10/2006 REQUESTED CLEARING & GRUBBING L.F.$5.00 $0 $0 ROADWAY EXCAVATION C.Y.$0 $0 ROCK EXCAVATION C.Y.$90.00 $0 $0 SANITARY SEWERS 8" P.V.C. < 10' DEPTH L.F.$0 $0 10" P.V.C. < 10' DEPTH L.F.$0 $0 12" P.V.C. < 10' DEPTH L.F.$0 $0 8" P.V.C. > 10' DEPTH L.F.$0 $0 10" P.V.C. > 10' DEPTH L.F.$0 $0 12" P.V.C. > 10' DEPTH L.F.$0 $0 MANHOLES V.F.$200.00 $0 $0 SERVICES L.F.$20.00 $0 $0 6" FORCE MAIN L.F.$25.00 $0 $0 TESTING L.S.$0 $0 MAINTENANCE L.S.$1,500.00 1 $1,500 $1,500 TOTAL, PAGE 1 $1,500 $0 $0 $0 $0 $1,500 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED 7/3/2012) PHASE 2 AUTUMN CHASE: MOLLY TOWN ROAD, LOTS 6 - 11 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 10/10/2006 REQUESTED WATER MAIN 12" C.L.D.I.L.F.$38.00 $0 $0 8" C.L.D.I.L.F.$34.00 $0 $0 6" C.L.D.I L.F.$25.00 $0 $0 12" G.V.EA.$700.00 $0 $0 8" G.V.EA.$400.00 $0 $0 12" x 12" T.S. & G.EA.$3,000.00 $0 $0 12" x 8" T.S. & G.EA.$2,000.00 $0 $0 8" x 8" T.S. & G.EA.$1,200.00 $0 $0 HYDRANTS EA.$1,200.00 $0 $0 SERVICES L.F.$10.00 $0 $0 TESTING L.S.$300.00 $0 $0 MAINTENANCE L.S.$1,500.00 1 $1,500 $1,500 STORM DRAINS 12" R.C.P.L.F.$27.00 $0 $0 15" R.C.P.L.F.$30.00 $0 $0 18" R.C.P. L.F.$33.00 $0 $0 MANHOLES V.F.$200.00 $0 $0 CATCH BASINS EA.$1,000.00 $0 $0 CLEAN C.B.'s EA.$100.00 5 $500 $500 MAINTENANCE L.S.$1,000.00 1 $1,000 $1,000 TOTAL, PAGE 2 $3,000 $0 $0 $0 $0 $3,000 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED 7/3/2012) PHASE 2 AUTUMN CHASE: MOLLY TOWN ROAD, LOTS 6 - 11 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 10/10/2006 REQUESTED HEADWALL EA.$3,000.00 $0 $0 GRAVEL C.Y.$7.00 $0 $0 PAVEMENT BINDER S.Y.$12.00 $0 $0 TOPPING S.Y.$6.00 1800 $10,800 $1,300 $12,100 SIDEWALK L.F.$10.00 620 $6,200 ($6,200)$0 BOUNDS EA.$400.00 15 $6,000 $6,000 STREET TREES EA.$400.00 15 $6,000 $6,000 CURB GRANITE L.F.$20.00 1350 $27,000 ($25,300)$1,700 BITUMINOUS L.F.$2.50 $0 $0 GRADE, LOAM & SEED S.Y.$8.00 2500 $20,000 ($19,680)$320 DETENTION AREA EA.$2,000.00 1 $2,000 $2,000 EROSION CONTROL L.S.$1,000.00 1 $1,000 $1,000 TOTAL, PAGE 3 $79,000 $0 ($49,880)$0 $0 $29,120 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED 7/3/2012) PHASE 2 AUTUMN CHASE: MOLLY TOWN ROAD, LOTS 6 - 11 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 10/10/2006 REQUESTED STREETS SIGNS EA.$300.00 $0 $0 CONVEYANCE PROCEDURE L.S.$2,500.00 1 $2,500 $2,500 FINAL AS-BUILT DRAWING L.S.$5,000.00 1 $5,000 $5,000 MISCELLANEOUS $0 $0 $0 $0 $0 TOTAL, PAGE 4 $7,500 $0 $0 $0 $0 $7,500 PAGE 1 $1,500 $0 $0 $0 $0 $1,500 PAGE 2 $3,000 $0 $0 $0 $0 $3,000 PAGE 3 $79,000 $0 ($49,880)$0 $0 $29,120 PAGE 4 $7,500 $0 $0 $0 $0 $7,500 GRAND TOTALS $91,000 $0 ($49,880)$0 $0 $41,120