Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2012-07-17 Planning Board Supplemental Materials (46)
RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED7/3/2012) PHASE 3 AUTUMN CHASE: MOLLY TOWN ROAD, Lots 12 - 16 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 7/3/2012 CLEARING & GRUBBING L.F.$5.00 $0 $0 ROADWAY EXCAVATION C.Y.$0 $0 ROCK EXCAVATION C.Y.$90.00 $0 $0 SANITARY SEWERS 8" P.V.C. < 10' DEPTH L.F.$0 $0 10" P.V.C. < 10' DEPTH L.F.$0 $0 12" P.V.C. < 10' DEPTH L.F.$0 $0 8" P.V.C. > 10' DEPTH L.F.$0 $0 10" P.V.C. > 10' DEPTH L.F.$0 $0 12" P.V.C. > 10' DEPTH L.F.$0 $0 MANHOLES V.F.$200.00 $0 $0 SERVICES L.F.$20.00 $0 $0 6" FORCE MAIN L.F.$25.00 $0 $0 TESTING L.S.$0 $0 MAINTENANCE L.S.$1,500.00 1 $1,500 $1,500 TOTAL, PAGE 1 $1,500 $0 $0 $0 $0 $1,500 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED7/3/2012) PHASE 3 AUTUMN CHASE: MOLLY TOWN ROAD, Lots 12 - 16 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 7/3/2012 WATER MAIN 12" C.L.D.I.L.F.$38.00 $0 $0 8" C.L.D.I.L.F.$34.00 $0 $0 6" C.L.D.I L.F.$25.00 $0 $0 12" G.V.EA.$700.00 $0 $0 8" G.V.EA.$400.00 $0 $0 12" x 12" T.S. & G.EA.$3,000.00 $0 $0 12" x 8" T.S. & G.EA.$2,000.00 $0 $0 8" x 8" T.S. & G.EA.$1,200.00 $0 $0 HYDRANTS EA.$1,200.00 $0 $0 SERVICES L.F.$10.00 $0 $0 TESTING L.S.$300.00 $0 $0 MAINTENANCE L.S.$1,500.00 1 $1,500 $1,500 STORM DRAINS 12" R.C.P.L.F.$27.00 $0 $0 15" R.C.P.L.F.$30.00 $0 $0 18" R.C.P. L.F.$33.00 $0 $0 MANHOLES V.F.$200.00 $0 $0 CATCH BASINS EA.$1,000.00 $0 $0 CLEAN C.B.'s EA.$100.00 6 $600 $600 MAINTENANCE L.S.$1,000.00 1 $1,000 $1,000 TOTAL, PAGE 2 $3,100 $0 $0 $0 $0 $3,100 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED7/3/2012) PHASE 3 AUTUMN CHASE: MOLLY TOWN ROAD, Lots 12 - 16 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 7/3/2012 HEADWALL EA.$3,000.00 $0 $0 GRAVEL C.Y.$7.00 $0 $0 PAVEMENT BINDER S.Y.$12.00 $0 $0 TOPPING S.Y.$7.00 1830 $12,800 $12,800 SIDEWALK L.F.$10.00 0 $0 $0 BOUNDS EA.$400.00 10 $4,000 $4,000 STREET TREES EA.$400.00 12 $4,800 $4,800 CURB GRANITE L.F.$30.00 205 $6,150 $6,150 BITUMINOUS L.F.$2.50 $0 $0 GRADE, LOAM & SEED S.Y.$8.00 100 $800 $800 DETENTION AREA EA.$2,000.00 1 $2,000 $2,000 EROSION CONTROL L.S.$1,000.00 0 $0 $0 TOTAL, PAGE 3 $30,550 $0 $0 $0 $0 $30,550 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED7/3/2012) PHASE 3 AUTUMN CHASE: MOLLY TOWN ROAD, Lots 12 - 16 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 7/3/2012 STREETS SIGNS EA.$300.00 $0 $0 CONVEYANCE PROCEDURE L.S.$2,500.00 1 $2,500 $2,500 FINAL AS-BUILT DRAWING L.S.$5,000.00 1 $5,000 $5,000 MISCELLANEOUS $0 $0 $0 $0 $0 TOTAL, PAGE 4 $7,500 $0 $0 $0 $0 $7,500 PAGE 1 $1,500 $0 $0 $0 $0 $1,500 PAGE 2 $3,100 $0 $0 $0 $0 $3,100 PAGE 3 $30,550 $0 $0 $0 $0 $30,550 PAGE 4 $7,500 $0 $0 $0 $0 $7,500 GRAND TOTALS $42,650 $0 $0 $0 $0 $42,650