Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2012-07-17 Planning Board Supplemental Materials (47)
RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED 7/3/2012) PHASE 1 AUTUMN CHASE: ABBY LANE, LOTS 1 - 5 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 6/12/2007 REQUESTED CLEARING & GRUBBING L.F.$3.00 $0 $0 ROADWAY EXCAVATION C.Y.$0 $0 ROCK EXCAVATION C.Y.$25.00 $0 $0 SANITARY SEWERS 8" P.V.C. < 10' DEPTH L.F.$0 $0 10" P.V.C. < 10' DEPTH L.F.$0 $0 12" P.V.C. < 10' DEPTH L.F.$0 $0 8" P.V.C. > 10' DEPTH L.F.$40.00 500 $0 $0 10" P.V.C. > 10' DEPTH L.F.$0 $0 12" P.V.C. > 10' DEPTH L.F.$0 $0 MANHOLES V.F.$200.00 $0 $0 SERVICES L.F.$20.00 $0 $0 6" FORCE MAIN L.F.$25.00 $0 $0 TESTING L.S.$0 $0 MAINTENANCE L.S.$2,000.00 1 $2,000 $2,000 TOTAL, PAGE 1 $2,000 $0 $0 $0 $0 $2,000 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED 7/3/2012) PHASE 1 AUTUMN CHASE: ABBY LANE, LOTS 1 - 5 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 6/12/2007 REQUESTED WATER MAIN 12" C.L.D.I.L.F.$38.00 $0 $0 8" C.L.D.I.L.F.$34.00 $0 $0 6" C.L.D.I L.F.$25.00 $0 $0 12" G.V.EA.$700.00 $0 $0 8" G.V.EA.$400.00 $0 $0 12" x 12" T.S. & G.EA.$3,000.00 $0 $0 12" x 8" T.S. & G.EA.$2,000.00 $0 $0 8" x 8" T.S. & G.EA.$1,200.00 $0 $0 HYDRANTS EA.$1,200.00 $0 $0 SERVICES L.F.$10.00 $0 $0 TESTING L.S.$300.00 1 $0 $0 MAINTENANCE L.S.$2,000.00 1 $2,000 $2,000 STORM DRAINS 12" R.C.P.L.F.$27.00 $0 $0 15" R.C.P.L.F.$30.00 $0 $0 18" R.C.P. L.F.$33.00 $0 $0 MANHOLES V.F.$200.00 $0 $0 CATCH BASINS EA.$1,000.00 $0 $0 CLEAN C.B.'s EA.$100.00 5 $500 $500 MAINTENANCE L.S.$2,000.00 1 $2,000 $2,000 TOTAL, PAGE 2 $4,500 $0 $0 $0 $0 $4,500 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED 7/3/2012) PHASE 1 AUTUMN CHASE: ABBY LANE, LOTS 1 - 5 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 6/12/2007 REQUESTED HEADWALL EA.$3,000.00 $0 $0 GRAVEL C.Y.$7.00 $0 $0 PAVEMENT BINDER S.Y.$5.00 $0 $0 TOPPING S.Y.$4.00 1590 $6,360 $4,840 $11,200 SIDEWALK L.F.$10.00 550 $5,500 ($5,500)$0 BOUNDS EA.$300.00 12 $3,600 $3,600 STREET TREES EA.$350.00 28 $9,800 $9,800 CURB GRANITE L.F.$15.00 1000 $15,000 ($15,000)$0 BITUMINOUS L.F.$2.50 $0 $0 GRADE, LOAM & SEED S.Y.$7.00 1450 $0 $0 DETENTION AREA EA.$2,000.00 1 $0 $0 EROSION CONTROL L.S.$2,000.00 1 $0 $0 TOTAL, PAGE 3 $40,260 $0 ($15,660)$0 $0 $24,600 RECOMMENDATIONS BY CHRISTIANSEN & SERGI, INC. TO THE TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS UNIT PRICES (REVISED 7/3/2012) PHASE 1 AUTUMN CHASE: ABBY LANE, LOTS 1 - 5 ITEM UNIT PRICE QUANT.TOTAL RELEASE RELEASE RELEASE RELEASE BALANCE 6/12/2007 REQUESTED STREETS SIGNS EA.$300.00 $0 $0 CONVEYANCE PROCEDURE L.S.$3,000.00 $0 $0 FINAL AS-BUILT DRAWING L.S.$10,000.00 $0 $0 MISCELLANEOUS FENCE L.F.$4.00 1000 $0 $0 TURNAROUND L.S.$5,000.00 1 $0 $0 Excess held in account from 2007 $3,450.00 $3,450 ($3,450) TOTAL, PAGE 4 $3,450 $0 ($3,450)$0 $0 $0 PAGE 1 $2,000 $0 $0 $0 $0 $2,000 PAGE 2 $4,500 $0 $0 $0 $0 $4,500 PAGE 3 $40,260 $0 ($15,660)$0 $0 $24,600 PAGE 4 $3,450 $0 ($3,450)$0 $0 $0 GRAND TOTALS $50,210 $0 ($19,110)$0 $0 $31,100