Loading...
HomeMy WebLinkAbout2012-09-18 Planning Board Supplemental Materials (32) !_5r 5" ,4R , E ENGINEERING, ZNG. May 24,2012 Mr.Richard Keller Keller Construction 8 Fosters Pond Road Andover,MA 01810 RE: Foundation Inspection Site Address: 40 Red Gate Road North Andover,MA Mr.Keller, Martel Engineering,Inc. is pleased to provide you this letter following our site visit and investigation into the boulder retaining wall at the above reference site. The wall was constructed prior to the engineer site visit, but photos of its construction were made available for review. The engineer was also able to talk to the operator that installed the Wali to gather more information about its construction. A geotechnical engineer was contacted as an expert in the construction of this type of wall in this material to assist in the review of the stability of the wall. The wall was constructed with varying sizes of boulders that were 4 feet.deep or larger at the base and decreased in size as the wall went up. The maximum height of the wall is 6 feet at its mid-point and has a 2 to 1 slope from the top of the wall back. The boulders at the top of the wall had a minimum depth of 3 feet. A drainage swate was installed at the top of the slope to divert water away from the wall. A filter fabric was also installed against the existing material and backfilled with inch and a half stone between the boulders and fabric. The construction of this wall is adequate to support the soil behind the wall. The wall must be maintained to allow water to flow out from behind the boulders to relieve the water pressure behind the wall. The one foot backfill at the base of the wall must also maintain in place. Should you have any questions regarding this subject,please feel free to contact our office. Sincerely, neeng44 ,v e'�y\ J,tH OF/,4q,Ss9�vv MARTEL EN IN INS, IN 1 HAEL E.. e <`> _ OM TRUC7U d No. 41674 ti e Michael E. Martel, P.E. _ — exp k'FcIsre0� w�Q� e President o,,p�/O1NA 44 Partridge Road e Windham,NH o (978)204-3753