Loading...
HomeMy WebLinkAbout2012-11-20 Planning Board Supplemental Materials (23) INTEROFFICE MEMORANDUM DATE: November 14, 2012 TO: Judy Tymon FROM: Gene Willis CC: RE: 72 Great Pond Rd. house lot The construction of a single family home is proposed on the lot at #72 Great Pond Road and a roadway construction waiver has been requested. The DPW does not oppose the waiver of the roadway construction provided that the resulting construction will not impose additional responsibilities upon the department. No lot lines are changing; no easements are being created; and no property is being exchanged. The maintenance of access for public safety vehicles and other requirements will be the responsibility of the homeowner. Trash and recycle pick up will be curbside on Great Pond Rd. The DPW responsibilities will end at the property’s Great Pond Rd. front lot line/right of way.