HomeMy WebLinkAboutMiscellaneous - 93 ROCKY BROOK ROAD 5/29/2018
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 93 Rocky Brook Road MAP: 90.A LOT: 51
INSTALLER: Todd Bateson – Bateson Enterprises
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
D-Box and Inlet Tee – Inspection May 29, 2018 M. Grant
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
DISTRIBUTION-BOX
Installed on stable stone base
H-20 D-Box
Inlet tee (if pumped or >0.08’/foot)
Hydraulic cement around inlet & outlets
Observed even distribution
Speed levelers provided (not required)
Schedule 40 PVC Pipe
Comments:
Tee in the tank added – per M. Grant