HomeMy WebLinkAbout2013-07-16 Planning Board Supplemental Materials (38)
July 15, 2013
Ms. Judy Tymon, Planner
North Andover Planning Board
1600 Osgood Street – Bldg. 20 Suite 2-36
North Andover, MA 01845
Subject: Peer Review Summary
1077 Osgood Street
Application for Site Plan Special Permit
Dear Ms. Tymon:
This letter is in response to Lynnfield Engineering, Inc.'s June 26, 2013 letter addressing
Hancock Associate's April 1, 2013 peer review summary. Also included is a review of
the following:
1. Proposed Site Plans, "Pentucket Bank at Butcher Boy Marketplace", prepared by
Lynnfield Engineering, Inc., dated March 15, 2013 and revised June 26, 2013,
containing sixteen (16) sheets.
The following was used to assist in our review:
1. Zoning Bylaw of Town of North Andover last amended June 12, 2012
2. General Bylaws of the Town of North Andover, (adopted April 23 1979 as
amended).
Project Description
The project entails development of a portion of the Butcher Boy Market Place site current
occupied by a stormwater detention basin and access drive from Osgood Street with the
construction of a 3,672 square foot bank with a three lane drive-through window
featuring two teller lanes and one automated teller machine (ATM). A twenty-one-space
parking lot and connection to on site utilities is also proposed. Access to the site will be
provided via the existing one-way entrance and exit driveways that serve the current
marketplace from Osgood Street.
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
Comments
1. The Special Permit - Watershed Permit Application is incomplete and should
include the proposed building height, setbacks Lot Coverage.
Lynnfield Engineering, Inc. Response:
Proposed Retail Bank Building
Building Height: 35’
Front Yard Setback: 85’
Side Yard Setback: 56’/>450’
Rear Setback: >250’
Lot Coverage: 1.1%
Existing Butcher Boy Marketplace
Building Height: 20’ +/-
Front Yard Setback: 122’
Side Yard Setback: 89’/99’
Rear Setback: 54’
Lot Coverage: 9.3%
Proposed Butcher Boy Marketplace and Retail Bank Buildings
Building Height: 35’/20’
Front Yard Setback: 85’/122’
Side Yard Setback: 56’/89’
Rear Setback: >250’/54’
Lot Coverage: 10.4%
Hancock Associates Response:
No further comments.
2. The Special Permit - Site Plan review Application is incomplete and should
include the proposed building height, setbacks and Lot Coverage.
Lynnfield Engineering, Inc. Response:
Refer to Response No. 1.
Hancock Associates Response:
No further comments.
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
3. As the proposal is an expansion of the existing retail center, the Applicant must
present zoning compliance information for the entire site as well as impact on
prior approvals and conditions of approvals for the site.
Lynnfield Engineering, Inc. Response:
No response provided.
Hancock Associates Response:
Zoning compliance information for the entire site is included in the response to
comment 1. Applicant should provide impact on prior approvals and conditions
of approvals for the site.
4. The proposed sign must be in conformance with Zoning Section 6.
Lynnfield Engineering, Inc. Response:
Comment noted.
Hancock Associates Response:
No further comments.
5. The applicant must demonstrate that adequate parking in compliance with Zoning,
Section 8, exists on the site for the current use. (Zoning Section 8.1)
Lynnfield Engineering, Inc. Response:
Refer to Table No. 1.
Hancock Associates Response:
Parking summary chart is now included on Site Layout Plan, C-5 of the proposed
site plans. The overall project appears to be in compliance with zoning section
8.1. No further comments.
6. The Landscape Plan must be prepared and stamped by a Landscape Architect not
a Sanitary Engineer. The landscape plan refers to relocation of trees and shrubs
without itemizing quantities. It appears more trees are proposed than available for
relocation. The Applicant should provide a plant list containing new and relocated
species and sizes should relocation prove unsuitable. The Applicant must
demonstrate compliance with Zoning By-law Section 8.4.
Lynnfield Engineering, Inc. Response:
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
Refer to revised Drawing L-1, Landscape Plan.
Hancock Associates Response:
The note 3 on the Landscape Plan, L-1 should be revised to indicate that plants
that are deemed unsuitable before, during, or after relocation will be replaced with
the same size and species.
7. The landscape island modified by the reconfigured entrance is only three (3) feet
wide. This is far too narrow for effective landscaping. The Applicant should
comment on the impact to the overall Butcher Boy Market Place compliance with
Zoning By-law Section 8.4 given the proposed modifications.
Lynnfield Engineering, Inc. Response:
Refer to revised Drawing L-1, Landscape Plan.
Hancock Associates Response:
The width of the landscaped aisle has been revised so that it is 5 feet wide in most
areas and 4' wide at the narrowest location. The aisle should be 6' wide or greater
to comply with Zoning By-Law Section 8.4. Since the aisle is located on the
perimeter of the parking lot, at least one tree shall be planted for every thirty
linear feet. The trees shall be planted to be in compliance with Zoning By-Law
Section 8.4. The applicant must revise the existing plan.
8. The Existing Conditions plan must be prepared and stamped by a Registered
Professional Land Surveyor, not a Sanitary Engineer. A Registered Architect
must stamp the Architectural Plans, they are unstamped. (Zoning Section 8.3.5.b)
Lynnfield Engineering, Inc. Response:
Comment noted. Drawing C-2, Existing Conditions Plan, is stamped by a
Registered Professional Land Surveyor. Drawings A210 and A211 are stamped
by a Registered Architect.
Hancock Associates Response:
No further comments.
9. The modification to the access road and layout of the entrances to the bank
parking lot and tellers is unconventional potentially causing conflicts with the
existing marketplace traffic. This office will defer to the traffic engineering
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
review being provided by Vanasse Associates, Inc. (VAI) under separate cover
for additional comments regarding the layout.
Lynnfield Engineering, Inc. Response:
Comment noted.
Hancock Associates Response:
The access and circulation patterns have been revised. Hancock defers to VAI for
further input.
10. The location of the proposed stabilized construction entrance should be added to
sheet C-3.
Lynnfield Engineering, Inc. Response:
The stabilized construction entrance has been added to Drawing C-3, Erosion
and Sedimentation Control Plan.
Hancock Associates Response:
The construction entrance should be oriented so that the edge perpendicular to the
direction of travel connects directly with existing pavement.
11. The plans should clarify if the proposed entrance is one or two-way and provide
appropriate signage on sheet C-4.
Lynnfield Engineering, Inc. Response:
The site entrance is one way. Proposed signage is presented on Drawing C-5, Site
Layout Plan.
Hancock Associates Response:
Signage and flow arrows are shown on the Site Layout Plan, C-5. The plans
should indicate if the entrance is one lane or two. The entrance is shown as
tapering from 25' wide to 16' wide. For a two lane driveway, a 20' minimum
aisle is required per Zoning Section 8.1(5). If the driveway is one lane, the 16'
width is acceptable.
12. The plans received by this office are very difficult to read, with the greyscaled
background almost unreadable, please provide more readable copies for future
reviews.
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
Lynnfield Engineering, Inc. Response:
As requested, the grey scale used has been adjusted to allow the Existing
Conditions Plan to be more easily read.
Hancock Associates Response:
No further comments.
13. Provide top and bottom of retaining wall elevations on sheet C-5. It appears the
wall will be as much as seven (7) feet high along Pond Road. The applicant must
provide design plans for the wall stamped by a structural engineer.
Lynnfield Engineering, Inc. Response:
The top and bottom of wall elevations have been added to the plans. The plans are
for permitting purposes only. The wall will be designed by a structural engineer
prior to application for a building permit.
Hancock Associates Response:
The applicant should provide existing and proposed top and bottom of retaining
wall elevations at the location where the new wall will meet the existing wall.
Although preliminary, the applicant should verify that geogrid required for the
proposed wall will not be in conflict with Proposed Extended Dry Detention
System B.
14. The proposed retaining wall is directly over the existing sewer main that feeds the
adjacent pump station. The applicant should provide details on how this wall will
be constructed without damaging the existing main, and comment on the ability to
repair or replace the sewer main once the wall is constructed on top of it.
Lynnfield Engineering, Inc. Response:
The proposed Versa Lok retaining wall will extend approximately 12” - 16”
below the existing grade, approximately 5 to 6 feet above the existing pipe. The
Contractor shall video inspect the sewer line prior to and after construction to
document the condition of the sewer line.
Hancock Associates Response:
The plans should include a note indicating that the contractor is responsible for
repairing any damages to the existing sewer main.
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
15. Hancock defers to Eggleston Environmental for a detailed stormwater review,
however we would like to offer several observations.
Lynnfield Engineering, Inc. Response:
Comment noted.
Hancock Associates Response:
No further response.
16. Proposed catch basin PCB10 appears to connect directly into the drainage system
without treatment and does not meet the 80% TSS removal requirement.
Lynnfield Engineering, Inc. Response:
Refer to the revised site layout and storm drain system.
Hancock Associates Response:
The Site Grading, Drainage and Utility Plan, C-6, has been revised so that catch
basin PCB10 now drains to drain manhole PDMH1 which drains to water quality
inlet PWQI#1 before entering Extended Dry Detention System A. Stormwater
flow from PCB10 now appears to receive adequate treatment. The existing site
drainage system now appears to connect directly into the drainage system via
drain manholes PDMH7 and PDMH6 and does not meet the 80% TSS removal
requirement.
17. The applicant should provide a detail of the catch basin frame and grates, with
dimensions demonstrating that they can be constructed with only 1.5± feet of
cover over the pipe as they are designed.
Lynnfield Engineering, Inc. Response:
In order to construct the catch basin structures and install the pipe the minimum
cover over the HDPE is 1.7 feet. This would include a frame and cover 8 inches
deep and a flat top catch basin which is 12 inches thick.
Hancock Associates Response:
The applicant's response does not account for the thickness of the HDPE pipe
which for 12" pipe is typically 2.5" or the fact that the structure cannot be cored
within 6" of the cover seal. The applicant should provide a detail of the catch
basin frame and grates and adjust the elevations of the drainage system as
necessary so that the structures and pipes can be installed as shown on the plans.
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
18. The applicant has not provided infiltration as required by the MADEP SWM
Regulations.
Lynnfield Engineering, Inc. Response:
A substantial portion of the property is located in a Zone A Area. The design
provides infiltration of the roof area of the proposed bank. The infiltration system
will treat the one inch rainfall event. The overflow from the infiltration system will
then discharge to extended dry detention systems.
Hancock Associates Response:
The Massachusetts stormwater handbook states that "Unless essential to operation
of a public water system, stormwater BMP's are prohibited within the Zone A."
and "Stormwater Discharges to a Zone I or Zone A are prohibited unless essential
to operation of the public water supply." The applicant should provide a figure
showing the delineation of Zone A area on the project site and a Hydrocad report
of the storage within the proposed infiltration and detention systems which should
not be located within the Zone A. If the infiltration and detention systems are
allowed in the Zone A area by the DEP and the North Andover Planning Board
and Conservation Commission, they should be designed to meet all of the
Massachusetts Stormwater Standards and the applicant should provide
documentation of their compliance with the standards.
19. The applicant has considered the underground detention area an "extended dry
detention basin" with a TSS removal rate of 50%, they should provide the
appropriate data and calculations including volumes and detention times between
the low flow orifice elevation and the first primary outlet to document this
assumption or change the design to a "dry detention basin" which has no TSS
removal. We note that volumes between the bottom of the stone and the low flow
orifice appear to be included in the calculations despite having no way to drain
this volume between storms.
Lynnfield Engineering, Inc. Response:
Refer to the revised extended dry detention basins design.
Hancock Associates Response:
The Underground Extended Dry Detention System details indicated CMP pipe. If
this pipe is intended to be perforated this should be indicated on the details. We
also suggest that these systems be wrapped with non-woven filter fabric to
prevent clogging of the systems. The applicant should indicate estimated seasonal
high groundwater (ESHGW) elevations on the "Underground Extended Dry
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
Detention System" and "Roof Drywell" details. A minimum of 2' separation
should be provided between the ESHGW and the bottom of the infiltration and
detention systems. If the applicant chooses to use infiltration as a discharge outlet
for these systems, the separation needs to be 4'. The extended dry detention
basins should be designed to meet the criteria described in the Massachusetts
Stormwater Handbook in order to provide the TSS removal rate of 50%.
20. The "Checklist for Stormwater Report" must be stamped by a registered
Professional Engineer.
Lynnfield Engineering, Inc. Response:
Comment noted.
Hancock Associates Response:
Hancock Associates defers to Eggleston Environmental for their review of the
Checklist for Stormwater Report.
21. The "Checklist for Stormwater Report" indicates the site is a mix of new
development and redevelopment, as such the project "must improve existing
conditions" per the MADEP SWM Regulations. "New stormwater controls
(retrofitted or expanded) must be incorporated into the design and result in a
reduction in annual stormwater pollutant loads from the site. Proponents of
redevelopment projects shall make full use of all opportunities for controlling the
sources of pollution and to incorporate environmentally sensitive site design and
low impact development techniques."
Lynnfield Engineering, Inc. Response:
Comment noted.
Hancock Associates Response:
In order for a project to qualify as a "redevelopment" the project must not result in
a net increase in impervious area from the previous developed condition. The
portions of this project that do not meet the redevelopment requirements must
fully meet all of the Massachusetts Stormwater Standards. Hancock Associates
does not believe this project is considered a redevelopment under the
Massachusetts Stormwater Handbook.
22. The applicant should provide the "Redevelopment Checklist" from MADEP
SWM Vol. 2 Chapter 3 to document compliance with all the requirements of
Standard 7.
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
Lynnfield Engineering, Inc. Response:
The checklist standards are addressed within the Stormwater Report.
Hancock Associates Response:
Hancock Associates defers to Eggleston Environmental for their review of the
Redevelopment Checklist.
23. The "Checklist for Stormwater Report" indicates that certain standards are not
met, the applicant should clearly indicate what standards are not met and why
with Stormwater Report.
Lynnfield Engineering, Inc. Response:
The Stormwater Report indicates what standards have not been met.
Hancock Associates Response:
As discussed above, Hancock Associates feels the project must meet all of the
Massachusetts Stormwater Standards.
24. The traffic report indicates an average weekday daily traffic for the bank of 544
trips. The applicant needs to provide the number of trips for the entire site, and if
the total is over 1,000 trips per day the site is considered a Land Use with Higher
Pollutant Loads and the drainage design must be updated accordingly.
Lynnfield Engineering, Inc. Response:
The original Butcher Boy Marketplace was constructed in the early 1990’s, more
than 20 years ago. This project is not considered to be a phased project; therefore
the entire site should not be reviewed as a whole. In addition the majority of the
existing site is located outside of the wetland buffer zone and the stormwater
system discharges to the Merrimack River. The bank traffic is estimated to be
approximately 544 vehicle trips per day which does not classify as a LUHPPL.
However, the Applicant is providing improvements to the existing stormwater
system. A hydrodynamic separator is proposed, prior to the existing storm drain
system exiting the site. The hydrodynamic separator will provide TSS removal for
the entire site in an effort to improve the overall stormwater quality exiting the
property.
Hancock Associates Response:
The applicant should provide the number of trips for the entire site to demonstrate
the daily traffic on the entrance driveway portion of the project which will be used
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com
by the entire site. If the total is over 1,000 trips per day, the entrance driveway
portion of the project is considered a Land Use with Higher Pollutant Loads, and
stormwater runoff from this area must be designed to accordingly. Particular
consideration should be taken if this area is within the Zone A since Land Uses
with Higher Pollutant Loads are not permitted in Zone A areas.
Additional Comments
25. The proposed water, sanitary sewer, and gas services for the proposed building
are no longer shown on the Site Grading, Drainage and Utility Plan, C-6. These
services, including size and materials of the services should be included on the
plans. The applicant should also include electric and communications services for
the proposed building.
26. The applicant should demonstrate how the existing "electric hand hole" and
associated conduits and/or duct banks will be relocated so as not to be in conflict
with the proposed building and other site utilities.
27. The applicant should demonstrate how traffic will enter the existing Butcher Boy
development during construction.
We believe the Applicant should address the issues raised prior tot the Board finalizes
their deliberation of the matter. Should you have any questions or comments, please do
not hesitate to contact our office.
Sincerely,
Hancock Associates
Joseph D. Peznola, PE
Principal
Marlborough, MA Danvers, MA
315 Elm Street 185 Centre Street
www.hancockassociates.com