Loading...
HomeMy WebLinkAboutCorrespondence - 130 WINDKIST FARM ROAD 6/20/2018 North Andover Health Department Community and Economic Development Division September 15, 2017 Owner: Christopher Cronin Applicant: Steven Knight 78 State Street 334 Maple Street Newburyport, MA Danvers, MA 01923 Re: Subsurface Sewage Disposal sSystein Plan for Lot 9 Windkist Farm Road (Map 109, Lot 54 Dear Owner/Applicant: The proposed wastewater system design plan for the above site dated :lune 30, 2017 with a final revision date of uRtmm2received on August 28, 2017 has been approved, The design has been app ©ved o se in the construction of a new on-site septic system for a five (5) bedroom home with a maximum number of eleven 11) rooms utilizing a gravity leaching field system. This design plan approval is valid until September 15, 2020. During this time, a licensed septic system installer must obtain a permit and complete this work, and a Certificate of Compliance be endorsed by the installer, designer and the"Town of North Andover, This approval is also subject to the following conditions: I. Prior to the issuance of the Disposal Works Construction Permit, the applicant must submit a foundation as-built at the same scale as the approved plan; 2. Prior to the issuance of the Disposal Works Construction Permit, the applicant must submit the floor plans of the proposed dwelling showing no greater than five (5) bedrooms or a total of eleven(11) rooms; Page 1 oft North Andover Health Department Town Hall, 120 Main Street t North Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542 Lot 9 Windkist Farm Road September 15, 2017 3. If site conditions are found in the field to be different from those indicated on the design plan and/or soil evaluation, the originally issued Disposal System Construction Permit is void, installation shall stop, and the applicant shall reapply for a new Disposal Systems Construction Permit (310 CMR 15.020(l)); 4, It is the responsibility of the applicant and/or the applicant's septic system designer, septic system installer or other representative to ensure that all other state and municipal requirements are met. These may include review by the Conservation Commission, Zoning Board,Planning Board, Building Inspector, Plumbing Inspector and/or Electrical Inspector. The issuance of a Disposal System Construction Permit shall not construe and/or imply compliance with any of the aforementioned requirements. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain.a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environinent of North Andover, SincQ��Iy, Ile /V "Brian J. LaGrasse, CENT Director of Public Health Encl. Installers list cc: Christiansen & Sergi, 160 Summer Street, Haverhill, MA 01830 File ................ -----------............... Page 2 of 2 North Andover Health Department Town Hall, 120 Main Street Noith Andover, MA 01845 Phone: 978.688.9540 Fax: 978.688. 9542