HomeMy WebLinkAboutMiscellaneous - 2211 TURNPIKE STREET 6/20/2018
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 2211 Turnpike Street MAP: LOT:
INSTALLER: James H. Currier II
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
D-Box Repair 6/19/2018 Inspection M. Grant
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
DISTRIBUTION-BOX
Installed on stable stone base
H-20 D-Box
Inlet tee (if pumped or >0.08’/foot)
Hydraulic cement around inlet & outlets
Observed even distribution
Speed levelers provided (not required)
Schedule 40 PVC Pipe