HomeMy WebLinkAboutMiscellaneous - 178 GRANVILLE LANE 6/27/2018
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 178 Granville Lane MAP: 106.C LOT: 76
INSTALLER: Dean Dynan 508-726-9935
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
6/27/2018
D-box Repair – 3
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
DISTRIBUTION-BOX
Installed on stable stone base
H-20 D-Box
Inlet tee (if pumped or >0.08’/foot)
Hydraulic cement around inlet & outlets
Observed even distribution
Speed levelers provided (not required)
Schedule 40 PVC Pipe
Comments:
M. Grant – system has 3 d-boxes, All 3 where compromised. All 3 where
replaced.