Loading...
HomeMy WebLinkAboutMiscellaneous - 178 GRANVILLE LANE 6/27/2018 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 178 Granville Lane MAP: 106.C LOT: 76 INSTALLER: Dean Dynan 508-726-9935 DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: 6/27/2018 D-box Repair – 3 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: M. Grant – system has 3 d-boxes, All 3 where compromised. All 3 where replaced.