Loading...
HomeMy WebLinkAboutPermits - 178 GRANVILLE LANE 6/27/2018irduiiiiilo Commonwealth of Massachusetts BOARD OF HEALTH North Andover Map -Block -Lot 106.00076 Permit No BHP -2018-0213 FEE DISPOSAL WORKS CONSTRUCTION PERMIT Permission is hereby granted Dean Dynan to (Construct) an Individual Sewage Disposal System. at No 1 78 GRANVILLE LANE as shown on the application for Disposal Works Construction Permit No. BHP -2018-02 Issued On: Jun -27-2018 $175.00 OA OF HEAL Commonwealth of Massachusetts BOARD OF HEALTH North Andover P.I. F.I. DISPOSAL WORKS CONSTRUCTION PERMIT Map -Block -Lot 106.00076 Pcrmit No BHP -2018-0213 FEE $175.00 Permission is hereby granted Dean Dynan to (Construct) an Individual Sewage Disposal System. at No 178 GRANVII.,LE LANE as shown on the application for Disposal Works Construction Permit No. BI1P-2018-02 , ated J Issued On: n-27-2018 BOAID OF [-IEALTtl CHECK #: Town of North Andover HEALTH DEPARTMENT DATE: LOCATION: LI (c, H/O NAME: HU CONTRACTOR NAME: h\ I( ) Type of Permit or License,: (Check box) LJ Animal O Body Art Establishment O Body Art Practitioner O Dumpster O Food Service - Type: O Funeral Directors O Massage Establishment O Massage Practice O Offal (Septic) Hauler O Recreational Camp O Sun tanning O Swimming Pool O Tobacco O Trash/Solid Waste Hauler O Well Construction f2.5- $ SEPTIC System: O Septic - Soil Testing El Septic - Design Approval Septic Disposal Works Construction (DWC) O Septic Disposal Works Installers (DWI) O Title 5 Inspector O Title 5 Report O Other: (Indicate) $ i! 1 Health Agentlnitials White - Applicant Yellow - Health Pink - Treasurer Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Application for Septic Disposal System Construction Permit — TOWN OF NORTH ANDOVER, MA 01845 Application is hereby made for a permit to: 0 Construct a new on-site sewage disposal system* 0 Repair or replace an existing on-site sewage disposal system*_) ,)repair or replace an existing system component — What? j7 A. FaciNcrrmation / / 6-' // Address or Lot # City/Town 2.- .*TYPE OF SEPTIC SYSTEM*: 1111 Pump 1111 Gravity (choose one) **If pump system, attach copy of electrical permit to application*** • 11 Conventional System (pipe and stone system) Ei Infiltrator or Biodiffuser (Gravel -Less) (Attach a copy of your certification to install this type of systein.) >, ID Pressure Distribution S.A.S. (No D -Box) -El-Pressure-Dosed (1:1Box-Piresent) ) LJ Does the system require an effluent filter? Yes No Ifyes, does plan specify make and model of filter? YES = (no further info. needed) NO = (installer must specify brand of filter before DWC issuance) /64) DAY'S DALE $350.00 - Full Repair $175.00 - Component 2 ?fL, 'TOWNOFNe.)P.".fill, 6,11rocyvE:p EL? rMtJfl What's the Make? 2. Owner Information Name Address (if different from above) Cityr lown Email address 3. Installer Inforogation $ .Lkv-f.-ea Address ulty/Toz 4. Designer Information Name What is the ModeL? Stat Telephone Number Name of Cornpany Zip Code Fo ? Cei/c9).r. State Telephone umber (Cell Phone # if p ssiblo please) -7d6 7,31 - Name of Company Address City/Town State Zip Code Telephone Number (Best # to Reach) Application for Disposal System Construction Permit • Page 1 of 2 pinplication for Septic Disposal System Construction Permit—TOWN OF NORTH ANDOVER, MA 01845 PAGE 2 OF 2 A. Facility Information continued.... TODAY'S DATE $350.00 - Full Repair $175.00 - Component 5. Type of Building: DResidential Dwelling or OComnnercial B. Agreement The undersigned agrees to ensure the construction and maintenance of the on-site sewage disposal system in accordance with the provisions of Title 5 Environmental Code, as well as the Local Subsurface Disposal Regulations North ver. 1 understa at until a final Certificate of Compliance has thi oar gf He he ed system is not approved. Da ,/y Application Approved Jity: (Board of Health Representative),„ Name ApplicatiOn Disapproved for the following reasons: Date For Office Use Only: 1. Fee Attached? Yes 1, No afore -described of the for the Town of been issued by 2. Project Manager Obligation F01711 Attached? Yes No 3. Pump System? If so, Attach copy ofElectrical Permit Yes_ No4_ Applicant received copy of "Electrical Inspection Notes far Septic Systems" Yes NoJ Handout? 4. Reviewed approval letter, a 1 I paperwaticreceived? Yes Missing: 5. Foundation As-Bullt? (new construction only): (Same scale as approved plan) 6. Float Plans? (new construction only): Yes_ No Nbl Application for Disposal System Construction Permit • Page 2 of 2 SEPTIC SYSTEM INSTALLER PROJECT MANAGEMENT OBLIGATIONS As the North Andover licensed installer for the construction for the septic system for the property at: / 6 (-6 ,e -N (Jij. /g_ (Address f septic system) Relative to the application of Dated (Installer's nam 7o4ays-afe) For plans by 71(' And dated (Unginal date) With revisions dated (Last revised date) I understand the following obligations for management of this project: t)l)teV ,94-11 I. As the installer, I am obligated to obtain all permits and Board of Health approved plans prior to performing any work on a site. I must have the approved plans and the permit on site: when any work is beingslone. 2. As the installer, I must call for any and all inspections. If homeowner, contractor, project manager, or any other person not associated with my company schedules an inspection and -the system is not ready, then item three shall be applicable. 3. As the installer, I am required to have the necessary work completed pnor to the applicable inspections as indicated below. I understand that requesting- an inspection. without completion of the items in accordance with Title 5 and the Board of Health Regulations may result in a $50.00 fine being levied against me and/or my company. a. Bottom of Bed - Generally, this is the first (1') inspection unless there is a retaining wall, which should be done first. The installer must request the inspection but does not have to be present. b. Finatconstruction Inspection - Engineer must first do their inspection for elevations, ties, etc. As -built of verbal OK (or e-mail to: healthdept@northandoverma.gov) from the engineer must be submitted to the Board of Health, after which installer calls for an inspection time. Installer must be present for this inspection. With a pump system, all electrical work must be ready and able to cause pump to work and alarm to function. c. Final Grade - Installer must request inspection when all grading is complete. Installer does not have to be on-site. 4. As the installer, I understand that only I may perform the work (other than simple excavation) and I am required to complete the installation of the system identified in the attached application for installation. I further understand that work done by others unlicensed to install septic systems in North Andover can constitute reasons for denial of the system and/or revocation or suspension. of my license to operate in the Town of North Andover, significant: fines to all persons involved are also possible. 5. As the installer, I understand that I must be on-site during the performance of the following construction steps: a. Determination that the proper elevation of the excavation has been reached. b. Inspection of the sand and stone to be used. c. Final inspection by Board of Health staff or consultant. Installation of tank; D -Box, pipes, stone, vent, pump chamber, retaining wall and other componefltS. 6. As the installer, I tinders -Land that I am solely responsible for the installation of the system as per the approved plans. No instructions by the hotneowner. general contTactor, or any other persons shall absolve me of this obligation. Undersigned Licensed Septic Installer: -4-‘ ap.r1c[-- e - Print) -- Signed)