HomeMy WebLinkAbout2013-10-01 Planning Board Supplemental Materials (38) INTEROFFICE MEMORANDUM DATE: August 27, 2013 TO: James Mealey FROM: Gene Willis CC: Steve Foster RE: Kittredge School Gym Project review Per your email dated August 27, 2013, I have downloaded plans labeled “bid set” from the link to petermanarchitects.com. I have reviewed the Grading, Drainage, and Utilities Plan - sheet C-300 Bid Set. I offer the following comments: The drainage as designed should be revised; existing and proposed contours will allow for this revision. 1. The proposed drain from the existing catch basin on the southern side of the building to the proposed catch basin #2 flows under the floor slab. It should be re-routed to the west and around the building. This should be fairly easy to accomplish without change in price. I suggest relocating proposed C.B. #1 and #2 off the southwestern and northwestern corners of the building. The 150 L.F. of specified service weight iron pipe proposed for under the slab can be changed to the equivalent length of HDPE pipe that needs to be added. 2. A clean out should be added at the intersection of the existing 12”HDPE pipe on the north side of the existing building and the new PD on the east side of the proposed building that flows to DMH #1. Making this change does three things: 1. It stops the introduction of storm water runoff to a drain pipe running under the floor slab. Possible future complications with this line cannot be repaired and might cause moisture problems with the gym floor. 2. The relocation of the catch basins allows for surface water runoff to be more effectively collected from the swale on the western side of the proposed building. 3. Relocation allows for connection of the western gutter downspouts to the drain rather than surface runoff from a splash plate.